TELE

Weltweit größte Digital TV Fachzeitschrift
seit 1981

B 9318 E

Satellit
OTT
Smart TV
IP/WebTV
Streaming

audiovision

I N T E R N AT I O N A L
Firmenbericht

GLOBALINVACOM

Ivan Horrocks verkündet stolz
Zwei Millionen Haushalte erhalten ihr
Satelliten-TV von Fibre Optic LNBs

Test Report

AMIKO Mini HD

11-12 2013
Test Report

WORK Microwaves
Handheld Satcom
Test Source
Ideale Lösung für präzise
und zertifierte Meesungen

Jozsef Zsiman packt jedes
Feature in einen sehr
kleinen Receiver

Firmenbericht

Forum BSD

Marcos Benni führt erfolgreich
seit 10 Jahren das größte
brasilianische Digital TV Forum

Test Report

ICECRPYT

Chris Ward stellt einen
ausgeklügelten Easy-to-UseReceiver vor

1
1-12/2013

Test Report

AB IPBox Prismcube Ruby

PERFEKT

für den Multi-Satelliten
Empfang UND für jeden Internet TV Kanal der Welt

www.TELE-audiovision.com
TELE-audiovision
International
t
The World’s Larges
zine
ital TV Trade Maga
Dig
since 1981

Alexander Wiese
Publisher

alex@tavmag.com
y
HQ in Munich, German

Liebe Leser,
lange Zeit war das Betriebszeit Linux das beliebteste

sowieso - ist sehr kurz in einer Zeit, in der ständig

Betriebssystem für Digital TV Receiver. Seit 2-3 Jahren

neue Techniken auf dem Markt erscheinen. Flexible

hören wir in der TELE-audiovision Redaktion immer

Softwarelösungen sind in so einem Fall die beste Lösung,

öfters vom Android System für Digital Receiver - nur:

aber auch das gilt mittlerweile für alle Betriebssysteme.

entsprechend ausgerüstete Receiver konnten wir bislang
nur selten in einem Testbericht vorstellen.

Nach welchen Kriterien sollen sich also die Hersteller und
anschließend die Endkunden entscheiden? Die Antwort

Und mittlerweile fragen wir uns, ob Digital Receiver

auf diese Frage erscheint unmöglich, es hängt vor allem

mit

überhaupt einen

davon ab, was der Hersteller dem Endkunden anbieten

nennenswerten Marktanteil erreichen werden. Denn seit

dem

Android

Betriebssystem

will und was sich dieser wünscht. Dies vorherzusagen

kurzem taucht ein neues Betriebssystem immer öfters

wird immer aussichtsloser, aber eine Antwort ist sicher:

auf, das auf XBox basiert. In dieser TELE-audiovision

der Endbenutzer möchte eine möglichst intuitive und

Ausgabe stellen wir ein derartiges Gerät vor, dass uns

ergonomisch sinnvolle Bedienung bzw Menüführung.

so überzeugt hat, dass wir sogar einen TELE-audiovision
Innovations Award vergeben konnten.

Hier können die Programmierer noch viel verbessern und
die Menüführung kundenfreundlicher gestalten. Weches

Schon bei Android war klar, wohin die Entwicklung geht:

Betriebssystem letztlich im Receiver steckt, spielt dann

die komplette Integration aller verfügbaren Medien in

keine Rolle mehr.

einem einzigen Receiver. Uns scheint, dass das XBox
System für diese Aufgabe besonders gut geeignet ist,
aber diese Aussage kann man sofort einschränken: es
sieht im Moment so aus. Das kann sich schnell wieder
ändern.
Ihr Alexander Wiese
Der Lebenszyklus von Software - und der Hardware

Chefredakteur TELE-audiovision International

Address TELE-audiovision International, PO Box 1234, 85766 Munich-Ufg, GERMANY/EUROPE
Editor-in-Chief Alexander Wiese, alex@tavmag.com
Letter to The Editor www.TELE-audiovision.com/letter/
Published by TELE-audiovision Magazine GmbH, Aschheimer Weg 19, 85774 Munich-Ufg, GERMANY/EUROPE
Design Németi Barna Attila
Advertising www.TELE-audiovision.com/ads/ or email to alex@tavmag.com
Hard Copy Subscription www.TELE-audiovision.com/subscription/
Hard Copy Subscription by Courier Service Send Order to subscription@tavmag.com
Printer Printmedia Com Kft, Fehérvári út 120-124, 1116 Budapest, HUNGARY/EUROPE
Copyright © 2013 by TELE-audiovision ISSN 2195-5433

TELE-satellite was established in 1981 and today is the oldest, largest and most-read digital tv trade magazine in the world. TELE-satellite is
seen by more than 350,000 digital tv professionals around the world and is available both in printed form and online.

www.TELE-audiovision.com

Redaktion TELE-audiovision, Postfach 1234, D-85766 München-Ufg
Chefredakteur Alexander Wiese (verantwortlich) Anschrift wie Verlag
Verlag TELE-audiovision Magazine GmbH, Aschheimer Weg 19, D-85774 Unterföhring
Inhaber: Alexander Wiese, Verleger, Unterföhring Anzeigen Alexander Wiese (verantwortlich), Anschrift wie Verlag
Abonnementverwaltung IPS Presseservice, Postfach 1211, D-53334 Meckenheim
CONTENT

AB IPBox Prismcube Ruby
HDTV PVR Satellite Receiver
with Media Center...................... 18

BSD..................178

Deviser S7000
Multi Norm
Professional Digital
TV Signal Analyzer
Part 2............... 34
AMIKO MINI HD
Miniature DVB-S2
HDTV Receiver............................ 56

GLOBALINVACOM....... 188

SPAUN SUS 5581 NFA, SUS 5581/33
NFA LEGACY, SUS 4441 F, SUS 4481 F,
SUS 5541 F & SUS 5541 NFA
Cascadable SCR
Multiswitches................... 70

Icecrypt S3700CHD
Triple Tuner PVR
HDTV Satellite Receiver................ 80

ELNET...............204

WORK
Microwave’s
Handheld
Satcom Test
Source
RF Signal Generator............................ 96
Global Readership of
TELE-audiovision Magazine............... 12
AWARD Winning:
Digital Receivers of 21st Century......... 116
AWARD Winning:
Signal Analyzers of 21st Century......... 126
AWARD Winning:
IPTV/WebTV Receivers
of 21st Century.............................. 134
AWARD Winning:
The Best Headend Equipment
of 21st Century.............................. 140
Feature:
Self-made IPTV - Part 4...................... 146
Feature:
Extensions to DVB-S2........................ 158
Digital Technology:
New Developments............................ 162
8

Vitor’s Workshop Overview:
How to get the most
out of technology.............................. 168
Product Report:
High-Frequency Filters
Made by MFC.................................... 170
Company Report:
Digital TV Internet Forum
BSD, Brazil....................................... 178
Company Report:
Fibre Optic Manufacturer
GlobalInvacom, UK............................ 188
Company Report:
Digital TV Wholesaler and Retailer
ELNET, Iceland.................................. 204
Global Company Directory:
The Decision Makers in
Worldwide Digital TV Industry.......... 212

DXer Report:
Siddharth Gautam in India.................. 224
Uplink Overview:
Best Satellite Uplink Earth Stations...... 230
TELE-audiovision History:
TELE-audiovision in 1983................. 240
TELE-audiovision History:
TELE-audiovision in 1993................. 242
TELE-audiovision History:
TELE-audiovision in 2003................. 244
News: Ultra High Definition HDTV.... 248
WebTV Providers
Around the World........................... 250
DTT of the World............................ 252
Satellites of the World................. 254

TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
ADVERTISER‘S INDEX
ABCOM.................................... Slovakia..................... 43

JIUZHOU................................. China........................260

ALUOSAT................................. China........................125

JEZETEK.................................. China........................260

AMIKOSTB............................... Hungary...................... 5

JONSA..................................... Taiwan....................... 51

ASIATVRO............................... China........................221

LIANXING............................... China......................... 91

AUDOLICI............................... Portugal....................115

MFC......................................... USA............................ 83

AZBOX..................................... Portugal....................259

MICO....................................... China........................... 2

AZURESHINE........................... Taiwan....................... 73

MKTECH.................................. China......................... 75

B-MAGA................................... Japan........................195

NABSHOW2014....................... USA...........................155

BSD......................................... Brazil........................215

OESF....................................... Japan....................... 223

BT........................................... UK.............................235

PANODIC................................. China........................... 2

CABSAT2014........................... Dubai........................185

PERFECTVISION..................... USA............................ 41

CCBN2014............................... China....................... 181

ROGETECH.............................. China......................... 87

CES2014.................................. USA...........................149

SATBEAMS............................... Belgium................... 229

CHANGHONG........................... China.......................... 9

SATELLITEGUYS...................... USA...........................221

CHINABROADCASTING........... China....................... 229

SAT-LINK................................ China......................... 59

CONVERGENCEINDIA2014...... India.........................177

SCATINDIA2013...................... India.........................151

COSMOSAT.............................. Argentina..................113

SES.......................................... Luxembourg.............201

DEVISER................................. China.................. 79, 217

SICHUANJIUZHOU.................. China........................260

DEKTEC................................... Netherlands..............109

SKYWORTH............................. China......................... 11

DEXIN..................................... China........................101

SOWELL.................................. China.......................... 4

DIGITALTELEMEDIA................ China........................260

SPAUN....................................... Germany...... 215, 219, 223

DISHPOINTER......................... UK.............................219

SPAUN ELECTRONIC..................Germany...................... 63

DISHTUNING........................... India.........................227

TEKNIKSAT............................. Turkey...................... 209

DVBCN.................................... China....................... 209

TENOW.................................... China........................217

FTATV...................................... Argentina..................227

TIANDITONG........................... China........................ 25

GLOBALINVACOM.................... UK.............................. 67

TOPSIGNAL............................. China......................... 37

GOOSAT.................................. China......................... 75

TSINGHWA.............................. China........................103

HORIZON................................ UK....................... 29, 139

TURBOSAT............................... UK.............................. 55

HTCE....................................... Hongkong.................259

VIETNAM2013......................... Vietnam....................173

ICECRYPT................................ UK.............................. 55

WORK MICROWAVE....................Germany.......................69

10

TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
> 350 000 W
Professional Readers

本杂志全球有35万多读者
America

Europe

North America
>28000 Readers
USA
Canada
Mexico

West Europe
>107000 Readers
Germany
Italy
UK
France
NL
Portugal
Belgium
Spain
CH
Austria
Sweden
Norway
Ireland
Denmark

South America
>42000 Readers
Brasil
Argentina
Chile
Venezuela
Colombia
Peru

East Europe
>60000 Readers
Turkey
Romania
Russia
Hungary
Poland
Bulgaria
Czech
Greece

MENA
>46000 Readers
Iran
Algeria
Morocco
Egypt
KSA
Tunesia

The Only
Global Digital TV Trade Magazine
Published in
20 Languages

Arabic
‫العربية‬

Bahasa Bulgarian
Indonesia
български

Czech

German

český

deutsch

English

Spanish

Farsi

French

Hebrew

Croatian

Italian

Hungarian

español

‫فارسی‬

française

‫עברית‬

hrvatski

italiano

magyar

Chin

中国
Top 25 to 105

Top 25

Worldwide

COUNTRY	

Readers #

Brazil	31,706
Germany	27,403
USA	22,574
Italy	14,261
China	12,808

Asia

UK	12,585
Iran	12,359
France	11,663
Indonesia	10,190
Turkey	10,000
Netherlands	9,530
Algeria	9,471
Romania	8,243
Portugal	6,666
Russia	6,155
Belgium	5,956
Morocco	5,753
Spain	5,589

Asia
>38000 Readers

Hungary	5,477

China
Indonesia
India
Pakistan
Malaysia

Poland	5,411
India	4,821
Egypt	4,751
Bulgaria	4,563
Czech 	

4,200

Greece	4,194
Canada	4,036
Ukraine	3,757
Saudi Arabia	

3,661

Slovakia	3,260

Readers'
Breakdown

nese

Dutch

Polish

Portuguese

国

nederlands

polski

português

Romanian Russian
român

русский

Turkish
türk

Top 106 to 180

COUNTRY	

COUNTRY	

Countries
> 130 - 3200 Readers

Countries
> 3200 Readers

Manufacturers	4%
Distributors	9%
Wholesaler	18%
Dealers	27%
Installers	12%
Satellite Provider	 2%
Cable Provider	
8%
IPTV Provider	
5%
Program Provider	 6%
Governmental	2%
Institutional	2%
Private Enthusiasts	 5%

Readers #

Argentina	3,120
Switzerland	3,100
Chile	2,943
Tunisia	2,904
Pakistan	2,774
Austria	2,766
Croatia	2,713
Iraq	2,355
Malaysia	2,347
Sweden	2,344
Australia	2,107
Israel	2,069
Venezuela	2,052
Norway	2,043
Serbia	1,945
UAE	1,580
Ireland	1,561
Colombia	1,531
South Africa	
1,510
Mexico	1,476
Denmark	1,390
Thailand	1,298
Finland	1,137
Philippines	1,058
Libya	977
Sri Lanka	
975
Slovenia	934
Jordan	900
Peru	864
Yemen	842
Nigeria	831
Lithuania	829
Lebanon	814
South Korea	
759
Bosnia and Herzegovina	
749
Syria	740
Macedonia	726
Ecuador	698
Sudan	685
Japan	644
Uruguay	622
Kenya	587
Bolivia	571
Kuwait	565
Puerto Rico	
562
Panama	558
Albania	548
Cyprus	536
Qatar	511
Taiwan	494
Paraguay	476
Latvia	467
Hong Kong	
463
Luxembourg	454
Moldova	446
Oman	412
Senegal	410
New Zealand	
403
Belarus	356
Georgia	351
Mauritius	324
Vietnam	313
Côte d’Ivoire	
298
Estonia	298
Kazakhstan	292
Bahrain	287
Ghana	284
Singapore	272
Dominican Republic	
240
Iceland	212
Uganda	210
Palestine	199
Aruba	193
Ethiopia	191
Bangladesh	190
Malta	181
Cameroon	175
Costa Rica	
158
Barbados	155
Azerbaijan	145
Montenegro	142
Afghanistan	141
Zimbabwe	141
Myanmar	134

Countries
< 130 Readers

Readers #

Suriname	133
Mali	131
Trinidad and Tobago	
129
Tanzania	128
Uzbekistan	128
Netherlands Antilles	
117
Maldives	112
Brunei	109
Malawi	106
Armenia	101
Mauritania	98
Botswana	94
New Caledonia	
90
Madagascar	88
Niger	88
Namibia	84
Zambia	77
Angola	69
Rwanda	69
Guatemala	68
Martinique	66
Haiti	65
French Polynesia	
65
Guyana	63
Kyrgyzstan	61
Mozambique	61
Burkina Faso	
60
Congo	56
Réunion	55
Benin	54
Djibouti	53
Honduras	53
Cape Verde	
49
Gambia	49
Jamaica	49
Macau	49
French Guiana	
47
Guadeloupe	46
Togo	43
Cambodia	42
Seychelles	42
Cuba	40
Tajikistan	40
Nepal	39
Gabon	36
Comoros	36
Turkmenistan	35
Nicaragua	34
Greenland	33
El Salvador	
33
Monaco	30
Dominica	27
Bermuda	25
Palau	25
Mongolia	23
Fiji	19
Bahamas	17
Laos	17
Burundi	16
Timor-Leste	15
Somalia	14
Congo Republic	
13
Belize	12
Guinea	12
Saint Vincent and Grenadines	 11
Anguilla	10
Guernsey	10
Papua New Guinea	
10
British Virgin Islands	
10
Isle of Man	
9
Jersey	9
Andorra	8
Turks and Caicos Islands	
8
Central African Republic	
7
Curaçao	7
Eritrea	7
Swaziland	7

Source:
Google Analytics
as of 05-06/2013
1
1-12/2013

AB IPBox Prismcube Ruby
Perfectly equipped receiver for multi satellite
reception as well as for Internet TV reception
from around the world

www.TELE-audiovision.com/13/11/abipbox

08-09/2009
Global Invacom Optical LNB
The first worldwide optical satellite
reception and transmission system

www.TELE-audiovision.com/09/09/globalinvacom

02-03/2012
AZBox ME
Today‘s absolute
best Linux Receiver

www.TELE-audiovision.com/12/03/azbox-me
16 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
MAGAZINE

07-08/2013

TBS Streaming Box MOI
Offers a double-shot of innovation for the
future of TV with its channel streaming and
separation of hardware and software

www.TELE-audiovision.com/13/07/tenow

1
1-12/2012
JIUZHOU DTP2100
Cutting-edge receiver thanks
to Android operating system

www.TELE-audiovision.com/12/11/jiuzhou
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

17
TEST REPORT

HDTV PVR Satelliten Receiver mit Internet Mediazentrum

AB IPBox
Prismcube
Ruby

18 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
•	optimiert für die Benutzung aller Audio und Video Medien
•	ausgerüstet für alle Internet TV Standards
•	zwei Sat-ZF Eingänge für beliebige PVR Aufzeichnungen
•	alle DiSEqC-Protokolle integriert, dadurch bestens
geeignet für den Einsatz an Drehanlagen
•	Riesenauswahl an Menü-Sprachen, damit einsatzbar in
allen Ländern
•	kann perfekt auf das verwendete TV-Gerät angepaßt
werden

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

19
TEST REPORT

HDTV PVR Satelliten Receiver mit Internet Mediazentrum

Ein Receiver voll toller Features
Wer hätte das gedacht:
Im Jahr 2002 begannen
zwei findige Hobbyprogrammierer ein alternatives Betriebssystem,
aufbauend
auf der Spielekonsole Xbox
aus dem Hause Microsoft,
zu entwickeln und heute,
11 Jahre und viel Entwicklungsarbeit später, landet

bei uns im TELE-audiovisions Testcenter der erste
Receiver Firma AB-COM, die
genau auf dieser Software
aufbaut. Natürlich hat sich
in diesen 11 Jahren viel getan und das Xbox Mediacenter von damals hat nur mehr
sehr rudimentär mit dem zu
tun, was wir heute erleben.

11-12/2013
AB IPBox Prismcube Ruby
Perfectly equipped receiver for multi satellite
reception plus for all the worldwide Internet TV

www.TELE-audiovision.com/13/11/abipbox

Schließlich kam es nicht nur
zu einem massiven Wandel
bei der verwendeten Hardware, sondern es hatten
dank GPL (General Public Licence) auch unzählige Programmierer die Möglichkeit,
ihr Können unter Beweis zu
stellen und das System stetig zu verbessern und zu erweitern.
Tatsächlich hatten wir von
der TELE-audiovision uns
schon länger gefragt, wann
denn der erste Hersteller
den Schritt zu einem Receiver mit dem Xbox Mediacenter als Betriebssystem
wagen würde. So hat es
uns besonders gefreut, den
neuen AB-COM Receiver zu
testen. Schon beim Auspacken war klar, dass AB-COM
mit der AB IPBox Prismcube Ruby nicht nur in Puncto
Software völlig neue Wege

0.60

20 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

gehen wollte, auch das Design ist modern und äußerst
elegant. Das perfekt lesbare VFD Display sticht in
einer Art Aufsatz aus dem
in dezentem Grau gehaltenen Receiver hervor und
verleiht ihm zusammen mit
dem hintergrundbeleuchteten Standby Button ein regelrecht futuristisches Design. Hinter einer Klappe an
der Frontseite hat AB-COM
einen CI Slot zur Aufnahme
aller gängigen Module sowie
einen integrierten Kartenleser untergebracht.
Perfekt ausgestattet präsentiert sich die Rückseite,
diese wartet mit zwei Sat-ZF
Eingängen, 3 RCA Buchsen
für Stereo Audio und CVBS
Video, einem optischen Digitalausgang, einer HDMI
sowie RJ45 Buchse, einem
USB Anschluss und natürlich
einer Buchse für das externe Netzteil auf. Richtig gut
gefallen hat uns eine Klappe an der Unterseite des
Receivers, die sich durch
das Lösen einer Schraube
öffnen lässt. Mit dem im
Lieferumfang enthaltenen
Einbaurahmen kann der Anwender hier eine 2.5“ SATA
Festplatte in den Receiver
integrieren. Apropos Lieferumfang: der beinhaltet das
externe Netzteil mit Stromkabel, den Festplatteneinbaurahmen, ein HDMI Kabel
sowie eine gut gemachte
Erstinstallationsanleitung.
Selbstverständlich
darf
natürlich auch eine Fernbedienung nicht fehlen und
die hat es in sich: An der
Oberseite hat der Hersteller
nur die wichtigsten Tasten
untergebracht und diese
sogar teilweise doppelt belegt (z.B. die Zifferntasten).
Das fördert die einfache Bedienung des Receivers und
hat sich im Alltagseinsatz
als praktisch erwiesen. An

der Rückseite der Fernbedienung findet der Besitzer dafür zum Ausgleich
eine vollwertige Tastatur
im Miniformat, die im Test
ebenfalls überzeugen konnte. Generell liegt die Fernbedienung sehr gut in der
Hand und wider Erwarten
haben wir im Test kein einziges Mal versehentlich eine
Taste der anderen Fernbedienungsseite betätigt.
Zusammenfassend waren
wir von der Verarbeitungsqualität und dem Design der
neuen AB IPBox Prismcube
Ruby begeistert und falls
jemand mit Graphitgrau
keine Freude haben sollte,
so hat der Hersteller bereits
angekündigt, dass es die
Box auch in weiteren Gehäusefarben geben wird.
Wie heute bei nahezu allen Receivern üblich geleitet auch bei der AB IPBox Prismcube Ruby ein
Er stinst allationsassistent
den Besitzer durch die Anpassung des Receivers an

seine persönlichen Bedürfnisse. Besonders ins Auge
gestochen ist uns dabei die
OSD Sprachwahl, die mit
51 Einträgen für nahezu jeden Anwender die passende
OSD Anzeige bieten sollte.
Gefreut hat uns auch, dass
der neue AB-COM Receiver
FULL HD tauglich ist und
somit eine Videosignalauflösung
von
1920x1080P
unterstützt.
Kennen auch Sie das lästige Problem, dass so mancher Receiver das Videosignal etwas zu groß oder zu
klein für den heimischen
Fernseher oder Beamer anzeigt? Wenn ja, dann wird
es Sie freuen zu hören,
dass die neue AB IPBox im
Rahmen der Erstinstallation
eine Overscan Anpassung
bietet und Sie somit die
Bildausgabe individuell an
ihren Fernseher angleichen
können. Für unseren Test
war das auf jeden Fall schon
mal ein dicker Pluspunkt!
Im nächsten Schritt geht
es gleich weiter mit der Adaption des Receivers an die
verwendete Satellitenempfangsanlage, hierfür stehen
sämtliche DiSEqC Protokolle
(also 1.0, 1.1, 1.2 und 1.3)

zur Auswahl bereit ebenso
wie SCR Einkabellösungen
unterstützt werden. Insgesamt 108 europäische, asiatische und amerikanische
Satelliten hat der neue ABCOM Receiver vorprogrammiert und das zu unserer
großen Freude mit relativ
aktuellen
Transponderdaten.
Jeder Satellit, der vom
Receiver empfangen werden soll, muss einzeln aktiviert und konfiguriert werden. Kommt eine Multifeed
Anlage mit drei oder vier
empfangbaren
Satelliten
zum Einsatz so macht das
richtig Sinn und ist auch
sehr praktisch; im Fall einer
DiSEqC Drehanlage mit z.B.
40 empfangbaren Satelliten
wird es hingegen mühsam.
Auf jeden Fall aber hat es
uns gefreut zu sehen, dass
alle Einträge wirklich vollständig und individuell (z.B.
durch die manuelle LOF Eingabe) angepasst werden
können. Abschließend sei zu
den Satelliteneinstellungen
noch erwähnt, dass die AB
IPBox Prismcube Ruby auch
die Wiederholung von DiSEqC Kommandos unterstützt,
ein Feature, das gerade

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

21
1

2

3

4

5

dann besonders praktisch
ist, wenn mehrere Multischalter nacheinander angesteuert werden müssen.
Im nächsten Schritt der
Erstinstallation folgt der automatische Suchlauf, der erfreulicherweise für alle oder
einzeln wählbare Satelliten
in den Modi FTA und CAS,
nur-FTA oder nur-CAS sowie
mit und ohne Netzwerksuche durchgeführt werden
kann. In etwas mehr als vier
Minuten förderte die AB IPBox Prismcube Ruby so insgesamt 1452 TV- und 250
Radioprogramme auf dem
HOTBIRD 13° Ost zu Tage.
Zum Abschluss der Erstinstallation
muss
sich
der Besitzer noch mit dem
Thema Zeiteinstellung befassen. Hier bietet der neue
AB-COM Receiver ein ganz
besonderes Feature, näm-

22 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

1. Erstinstallation - Sprachwahl
2. Mit 51 Einträgen ist die
Liste der unterstützten OSD
Sprachen sehr vielfältig
3. Erstinstallation - Videoausga
ngssignaleinstellungen
4. Overscan Anpassung
5. Auch die Position der
Untertitelanzeige lässt sich
individuell festlegen
6. Pixelverhältnisanpassung
7. Erstinstallation - Videoausga
ngssignaleinstellungen
8. Antenneneinstellungen –
sämtliche DiSEqC Protokolle
werden unterstützt
9. Die Eingabe kann entweder
mittels OSD Tastatur oder einer
der beiden Fernbedienungen
erfolgen
10. DiSEqC 1.3 Einstellungen
11. Die vorprogrammierte
Satellitenliste enthält 108
Einträge
12. Jeder zum Empfang
gewünschte Satellit muss
manuell hinzugefügt werden
13. Satelliteneinstellungen
14. Kanalsuchlaufeinstellungen
15. Kanalsuchlauf auf dem
HOTBIRD 13° Ost
6

11

7

12

8

13

9

14

10

15

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

23
16
6
16. Zeiteinstellungen
17. Am Ende der Erstinstallation zeigt die AB IPBox eine Übersicht
der gewählten Einstellungen an
18. Kanalliste
19. Die Kanalliste kann auf einzelne Satelliten, Favoritenlisten oder
Verschlüsselungssysteme beschränkt werden
20. Anzeige der belegten Tasten und deren Funktion innerhalb der
Kanalliste
21. Bearbeiten der Kanalliste
22. Hauptmenü der AB IPBox Prismcube Ruby
23. Manueller Kanalsuchlauf
24. Spracheinstellungen

17

21

18

22

19

23

20

24

24 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
25

27

26

28

lich die manuelle Auswahl
jenes Senders, von dem der
Receiver das Zeitsignal zukünftig erfassen soll. Jene
unserer Leser, die häufig Signale außerhalb der großen
DTH Positionen bzw. Feeds
empfangen, kennen das
Problem sicher: Ehe man es
sich versieht ist die Zeiteinstellung falsch und eine geplante Timeraufnahme kann
nicht mehr richtig durchgeführt werden. Das alles ist
aber kein Problem für die
AB IPBox Prismcube Ruby,
Sie wählen einfach einen
Sender von dem Sie genau

det er sich auf den ersten
Blick erstmal überhaupt
nicht von jedem anderen,
gewöhnlichen Receiver. Wie
üblich öffnet ein Druck auf
die OK Taste die Kanalliste,
die mit nur einem weiteren
Tastendruck auf einzelne
Satelliten,
Favoritenlisten
oder
Verschlüsselungssysteme beschränkt werden kann. Ebenso einfach
lässt sich die alphabeti25. Jugendschutzeinstellungen
26. Aufnahmeeinstellungen
27. Netzwerkeinstellungen
28. Suche nach verfügbaren
WiFi Netzen

29

29. Festplatteneinstellungen
30. Diverse Einstellungen – hier
lässt sich der Deep Standby
aktivieren bzw. deaktivieren
31. Infoleiste mit dem Titel der

wissen, dass dessen Zeitsignal korrekt ist und fortan
wird es die Box nur noch
über diesen einen Sender
aktualisieren.
Auch wenn der neue ABCOM Receiver mit dem Xbox
Mediacenter als Betriebssystem läuft so unterschei26 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

aktuellen Sendung
32. Erweiterte EPG
Informationen
33. Auswahl von Videoformat
und Tonspur
34. EPG
35. Aus dem EPG kann mit nur
einem Tastendruck direkt ein
Timereintrag erstellt werden
36. EPG Suche
37. EPG – Bei populären
Sendern zeigt der Receiver
automatisch auch das
Senderlogo an
38. Favoritengruppen
39. On Screen Hilfe
30

35

31

36

32

37

33

38

34

39

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

27
44

40. On Screen Hilfe
41. Infoleiste – derzeit sind zwei Aufnahmen aktiv
42. Beenden von Aufnahmen
43. Übersicht der bereits aufgezeichneten Sendungen
44. Hauptmenüpunkt „Media“
45. Wettervorhersage mit Satellitenbild
46. Diverse Add-ons wie z.B. ein IRC Chat stehen zum
Download bereit
47. WhatTheMovie Add-on
48. Xbox Mediacenter Einstellungen

40

45

41

46

42

47

43

48

28 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
49
6

51

menhang auch, dass die Box
auf Wunsch eine Funktionsbeschreibung der einzelnen
Tasten einblendet, so dass
der Anwender jederzeit über
alle verfügbaren Funktionen
im Bilde ist.
Was wäre ein moderner
PVR Receiver ohne EPG?
Klar, dass AB-COM natürlich auch daran gedacht und
eine vorbildlich gestaltete,
elektronische
Programmzeitschrift integriert hat.
Von 8 Sendern gleichzeitig stellt diese das aktuelle
und folgende Programm der
nächsten 7 Tage dar, sofern
der Programmanbieter diese
Informationen auch übermittelt. Ein nettes Detail am
Rande: Bei besonders populären Sendern blendet die

49. Dateimanager

50

sche Sortierung aktivieren,
auf Wunsch wandern sogar
die HD Sender rasch an die
vorderste Stelle. Gerade
beim Einsatz einer drehbaren Satellitenantenne ist die
Kanalliste nach dem Suchlauf sicherlich mit hunderten, wenn nicht tausenden
Sendern vollgestopft – Zeit
also, hier rasch für etwas
Ordnung zu sorgen. Dank
der cleveren Menüführung
der AB IPBox Prismcube
Ruby genügt hierfür ein
Druck auf die i-Taste und
schon stehen sämtliche Bea r b e i t u n g s m ö g l i c h ke i t e n
wie löschen, verschieben,
umbenennen oder mit einem PIN Code sperren zur
Auswahl bereit. Gut gefallen
hat uns in diesem Zusam-

56. Bildbetrachter
57. Der integrierte Musikplayer
unterstützt alle gängigen
Audioformate
58. Der Zugriff auf Medien
kann nicht nur lokal, sondern
auch via Netzwerk (z.B. UPnP)
erfolgen
59. Anzeige der im Netzwerk
verfügbaren UPnP Server
60. Wiedergabe von
Mediadateien via Netzwerk
61. Zugriff auf die Mediathek
von Greenpeace
62. Auch auf den Musikdienst
Soundcloud bietet die AB IPBox
Prismcube Ruby Zugriff

50. Die Prismcube.com
Add-ons enthalten eine
Sammlung unterschiedlichster
Add-ons aus den Bereichen
Musik, Video, Programme,
Dienstprogramme, Untertitel
und Bilder
51. Flickr Add-on
52. Untertitel Add-on
53. Apple iTunes Podcast
Add-on
54. Auch die Mediatheken
verschiedener TV-Sender
stehen zum Aufruf bereit
55. Vimeo Add-on

52

54

53

55

30 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
58
Box im EPG und in der Infoleiste sogar das Senderlogo ein! Dank der automatischen EPG Grabber Funktion
stehen dem Anwender auch
die EPG Daten jener Sender
jederzeit zur Verfügung, die
er gerade nicht empfängt.
Zu einer frei definierbaren Zeit aktiviert sich der
Receiver automatisch und
der EPG Grabber ruft einen Sender nach dem anderen (welche genau lässt
sich individuell festlegen)
auf und sichert dessen EPG
Daten im internen Speicher.
Dadurch steht dem Anwender auch eine Suchfunktion innerhalb des EPG zur
Verfügung, mit der er nach
seinen Lieblingssendungen
oder
Lieblingsschauspielern Ausschau halten kann.
Dass direkt aus dem EPG
Timereinträge erstellt werden können ist ohnehin eine
Selbstverständlichkeit und
sei nur am Rande erwähnt.
Die nach jedem Kanalwechsel eingeblendete Infoleiste enthält neben dem
Senderlogo und dem Kanalnamen auch stets den Titel
des aktuellen Programms.
Mittels mehrerer Symbole
kann der Anwender direkt
aus ihr die Untertitel- und

Sprachwahl sowie den integrierten OSD Teletext Decoder aufrufen. Auch das
Starten und Stoppen von
Aufnahmen ist entweder
mittels eigener Symbole in
der Infoleiste möglich, oder
der Besitzer greift auf die
entsprechenden Funktionstasten der Fernbedienung
zurück. Dank des in seiner Größe frei wählbaren
Timeshift
Zwischenspeichers bringt Sie zukünftig auch ein unerwarteter
Besuch oder Telefonanruf
nicht mehr aus der Ruhe,
das aktuelle Programm wird
einfach angehalten und zu
einem beliebigen Zeitpunkt
wieder fortgesetzt. Die PVR
Funktion erlaubt übrigens
maximal zwei Aufnahmen
gleichzeitig während ein
drittes Programm im Timeshift Zwischenspeicher landet – prima!
An der Bild- und Tonqualität der AB IPBox Prismcube Ruby gab es im Test
absolut nichts auszusetzen,
auch die Kanalumschaltgeschwindigkeit ist mit etwa
einer Sekunde ausreichend
schnell. Der von AB-COM
verbaute Tuner erwies sich
in unserem Praxistest als
eingangsempfindlich
und

59

60

56

61

57

62

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

31
hatte weder mit schwachen
noch besonders schmalbandigen SCPC Signalen ein
Problem. Konkret griffen wir
dazu auf Signale des BADR
26° Ost und TURKSAT 42°
Ost zurück. Die verwendete
PNX8496-1250DMIPS CPU
mit 4 GB NAND Flash sowie
4GB DRAM ist ausreichend
dimensioniert, so dass der
Receiver jederzeit zügig auf
Fernbedienungsbefehle reagieren konnte und selbstverständlich auch bei der
Wiedergabe hochauflösender Inhalte keine Probleme
hatte. Das auf Linux basierte Xbox Mediacenter wurde
von AB-COM perfekt auf
die verwendete Hardware
abgestimmt, so dass der
neue Receiver einen richtig
runden und damit positiven
Eindruck bei uns hinterließ.
Über das Hauptmenü der
AB IPBox werden im Bereich
Einstellungen im wesentlichen nur jene Auswahlmöglichkeiten nochmals einzeln
zugänglich gemacht, die der
Anwender bereits im Rahmen der Erstinstallation
durchlaufen hat. Hinzu kommen hier lediglich noch der
manuelle Kanalsuchlauf, die

Möglichkeit, Satelliten- und
Transpondereinträge zu bearbeiten sowie die Netzwerkeinstellungen. Hier hat uns
besonders gut gefallen, dass
der Receiver bereits einen
WiFi Empfänger an Board
hat und dadurch ganz ohne
lästiges Anstecken irgendwelcher WiFi Dongles sofort
eine drahtlose Verbindung
mit dem heimischen Router
aufbauen kann. Nicht minder praktisch ist die automatische und frei wählbare
Vor- und Nachlaufzeit von
Aufnahmen, so fehlt garantiert nichts mehr von Ihrer
Lieblingssendung, falls der
Programmanbieter sich mal
wieder nicht an die vorgegebenen Sendezeiten hält.
Wer
Energie
sparen
möchte, der kann die Deep
Standby Funktion aktivieren. In dieser verbraucht
der Receiver fast keine
Energie, dafür dauert es
aber auch rund 80 Sekunden, bis er wieder einsatzbereit ist.
Was wäre das Xbox Mediacenter ohne die vielfältigen
Multimediafeatures,
die diese Software dem
Anwender zur Verfügung

stellt? Problemlos konnten
wir im Test nicht nur Musik
in den Formaten MIDI, AIFF,
WAV/WAVE, MP2, MP3, AAC,
AACplus, AC3, DTS, ALAC,
AMR sowie WMA wiedergeben, sondern es steht
auch im Videobereich mit
AVI, MPEG, WMV, ASF, FLV,
QuickTime, MP4, VOB, DivX,
WEBM und RealMedia eine
nicht minder repräsentative
Auswahl an unterstützten
Formaten bereit.
Auch der Bildbetrachter
glänzt mit Unterstützung
von BMP, JPEG, GIF, PNG
und TIFF. Egal ob Sie also
Ihre AB IPBox Prismcube
Ruby als Jukebox einsetzen
möchten oder lieber Internetvideos sehen bzw. Ihren
Freunden und Bekannten
die letzten Urlaubsfotos zeigen möchten, Sie sind mit
dem neuen AB-COM Receiver stets auf der sicheren
Seite. Und das übrigens
nicht nur mit lokal verfügbaren Medien, denn schließlich unterstützt das Xbox
Mediacenter auch folgende
Netzwerkprotokolle: UPnP,
NFS,
SMB/SAMBA/CIFS,
HTTP, HTTPS, FTP, RTSP
sowie TCP, UDP, SFTP und

32 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

RTP. Somit bietet es auf nahezu alles Zugriff, was sich
irgendwie durch ein Netzwerkkabel quetschen lässt.
In unserem Praxistest gab
es weder mit der Wiedergabe lokaler Medien noch
beim Netzwerkzugriff via
UPnP oder SMB irgendwelche Probleme, die AB IPBox
hat alle verfügbaren Server
automatisch erkannt und
deren Inhalte problemlos
wiedergegeben.
Abgerundet wird der bisher schon enorme Funktionsumfang der AB IPBox
Prismcube Ruby noch durch
die Möglichkeit, zusätzliche
Add-ons aus dem Internet
laden zu können. Diese kleinen Programme erweitern
den Receiver in den Bereichen Audio, Video und Tools
um z.B. YouTube oder Vimeo
Empfang, den Zugriff auf die
Mediatheken verschiedener
TV-Sender, der Möglichkeit
Soundcloud und andere Audiodienste zu verwenden,
oder ganz einfach nur einen
RSS Reader oder einen IRC
Client starten zu können.
Die Auswahl an verfügbaren Add-ons ist auf jeden
Fall riesig und dank direk-
63

tem Download via Internet
lassen sich diese auch ganz
einfach installieren.
Apropos Internet Download: Da natürlich ständig
an der Verbesserung der
Software gearbeitet wird,
lässt sich diese – ebenso
wie die Add-ons – mit nur
einem Tastendruck direkt
via Internet aktualisieren
und auf den neuesten Stand
bringen. Einfacher und bequemer
geht’s
wirklich
nicht mehr.
Für den Fall, dass Sie
gerade in der Anfangszeit
noch die eine oder andere
Frage zur Bedienung des
neuen AB-COM Receivers
haben hat der Hersteller mit
einer praktischen Hilfefunk-

64

tion, die direkt über das
Hauptmenü zu erreichen
ist, vorgesorgt. Hier finden
sich nicht nur Erklärungen
zur Fernbedienung und zu
den einzelnen Anschlüssen,
sondern es sind auch die
wichtigsten Funktionen des
Receivers übersichtlich und
ansprechend bebildert dargestellt.
Überhaupt
empfanden
wird das 3D GUI (Graphical User Interface) der AB
IPBox Prismcube Ruby als
nahezu selbsterklärend und
wirklich hervorragend gestaltet. Auf Wunsch kann
der Anwender dessen Aussehen sogar individuell mit
aus dem Internet nachladbaren Skins anpassen.

63. Soundcloud Zugriff
64. SCPC Empfang über den TURKSAT 42° Ost

expert
OPINION

AB IPBox Prismcube Ruby
PVR Satellite Receiver with
Internet Media Center

RECOMMENDED
PRODUCT BY

Thomas Haring
Test Center
Austria

+ ● Perfekte Umsetzung des Xbox Mediacenter als Betriebssystem für einen eigenständigen Receiver
● Dank der vielfältigen Multimediafeatures vereint dieser Receiver die Funktionen eines klassischen PVR mit denen eines Mediaplayers.
● Innovatives und modernes Design
● Unkomplizierter Einbau für 2.5“ SATA Festplatten
● Moderne und übersichtlich gestaltete Software, für jedermann leicht und verständlich zu bedienen.
● Idealer Receiver für die ganze Familie.

– Es ist kein HW Tuner-Loopausgang vorhanden.

ENERGY
DIAGRAM

Apparent Power

Active Power

Mode
Active
StandBy
Deep StandBy

Apparent Active Factor
32.5 W
19.5 W 0.6
30 W
18 W
0.6
5W
0.5 W
0.1

Die ersten 15 Minuten aktiver Betrieb, die zweiten 15 Minuten Fake
Standby, die dritten 15 Minuten Deep Standby.
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

33
TEST REPORT

Multi Norm Digital TV Signal Analyzer

34 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
Deviser TV
Analyser
S7000
•	gleichwertig mit hochpreisigen
kommerziellen Messgeräten
•	Spektrumanalyse in Echtzeit zum extrem
schnellen Finden von Transpondern
•	mit integrierter RemoteBedienungsfunktion für PC oder Handy
•	dank integrierten Wasserfall-Diagramms
ideal geeignet für die Justage von
Drehanlagen
•	Echo-Messungen sind möglich

Teil 2:
Praxis
Test
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

35
Multi Norm Digital TV Signal Analyzer

TEST REPORT

Professionelles
Kombi Messgerät für
alle Digital TV Normen
■ TELE-audiovision's
Technical Editor
Vitor Martins
Augusto using the
Deviser S7000

TEST REPORT

Multi Norm Digital TV Signal Analyzer

Deviser TV
Analyser
S7000

Part 1: Analyzer
Functions

• Very large, high resolution display
• Suitable for MPEG2 and MPEG4
• Real-time spectrum for quickly
identifying active transponders
• Can be remotely controlled via PC
or mobile phone
• Very ergonomical and practical
operation

14

TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 09-10/2013 — www.TELE-audiovision.com

www.TELE-audiovision.com — 09-10/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

15

■ Teil 1 dieses Testberichts erschien in TELE-audiovision

09-10/2013. Der Testbericht kann online hier gelesen werden:
www.TELE-audiovision.com/TELE-audiovision-1309/eng/deviser1.pdf

36 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
Nachdem wir in der
letzten Ausgabe der TELE-audiovision die Funktionen des neuen Deviser
S7000 vorgestellt haben
beschreiben wir in diesem zweiten Teil die Ergebnisse unserer Praxistests und die Ergebnisse
unseres Vergleichs mit
unseren
verschiedenen
Referenzgeräten.

Bei einem professionellen
Messgerät erwartet man in
erster Linie eine hohe Messgenauigkeit; man muss einfach auf die angezeigten
Messwerte vertrauen können. Deshalb haben wir verschiedene Signalquellen mit
5 verschiedenen ReferenzMessgeräten gemessen und
die Messwerte mit denen
des Deviser S7000 verglichen. Bei diesen 5 ReferenzGeräten handelt es sich um
Messgeräte des obersten
Profi-Segmentes.
Wie man in der folgenden
Tabelle sehen kann sind die
Messwerte des S7000 auf
gleichem Niveau wie die
Referenzgeräte. Dass Deviser es mit der Messgenauigkeit ernst meint beweist
das
Konfigurationsmenü
des S7000 gleich zweimal:
es kann hier das Datum der
letzten Kalibration abgelesen werden und außerdem
gibt es die Möglichkeit, die
Messwerte des S7000 selber
abzugleichen. Der Anwender
kann das Messgerät eichen,
um zum Beispiel zu gewährleisten, dass alle Messgeräte des Betriebes exakt den
gleichen Pegel anzeigen.

Der Deviser S7000 ist ein
erstaunliches
Messgerät,
das praktisch alle TV Signale demodulieren, messen
und analysieren kann. Es
stehen dem Techniker alle
bekannten und auch eher
seltenen Messungen zur
Verfügung. Der integrierte
Transportstream
Analysator macht dieses Gerät auch
für den Einsatz in Kopfstationen interessant, denn es
können zum Beispiel Fehler
in neu gemuxten Transportstreams ermittelt werden.
Um diese Funktionsvielfalt
ausgiebig zu testen stellten
wir in unserem Testcenter verschiedene Szenarien
nach und konstruierten Aufgaben, die den S7000 auf
Probe stellen.

Tabelle 1 zeigt die Ergebnisse unseres Vergleichs. Wir
sind vom Deviser S7000 sehr
beeindruckt, denn selbst mit
unseren viel teureren Referenz-Messgeräten konnten
wir keine besseren Resultate
erzielen. Hervorragend auch
die
Empfangseigenschaften des Tuners: der S7000
konnte selbst dann noch ein
Bild darstellen, wenn andere
Messgeräte am zu schlechten Signal scheiterten. Man
merkt dem Deviser an, dass
er die modernste Technik ingegriert hat.

Aufgabe:
Feinjustierung
einer motorisierten
110 cm
Offset-Antenne

Mit dem S7000 ist die
Justierung einer Antenne
extrem leicht, denn dieses
Messgerät bestimmt seine
Position durch die mitgelieferte GPS-Antenne selbstständig und zeigt automatisch Elevation, Azimut und
LNB Skew für den gewählten
Satelliten an.
Der Aufbau der neuen

76.9 dBµV

75.6 dBµV

77.0 dBµV

73.0 dBµV

76.0 dBµV

75.0 dBµV

MER

14.9 dB

-

12.5 dB

12.0 dB

17.1 dB

14.9 dB

CBER

<1.0E-6

-

3.6E-6

1.7E-6

2.0E-4

<1.0E-6

<1.0E-8

<1.0E-8

<1.0E-8

-

<1.0E-7

<1.0E-9

Power
DVB-S2

Deviser
S7000

VBER

DVB-S

Measurement
Power

Modulation

76.3 dBµV

-

76.0 dBµV

-

76.1 dBµV

74.6 dBµV

MER

13.3 dB

-

16.8 dB

-

17.1 dB

14.8 dB

CBER

4.4E-0

-

7.0E-4

-

2.0E-4

4.4E-4

Reference 1 Reference 2 Reference 3 Reference 4 Reference 5

LBER

-

<1.0E-7

<1.0E-7

-

56.5 dBµV

55.0 dBµV

56.5 dBµV

MER

>30 dB

-

-

30.3 dB

34.3 dB

30.7 dB

CBER

2.1E-02

-

-

6.1E-5

3.0E-5

<1.0E-6

1.9E-03

-

-

-

<1.0E-8

<1.0E-9

52.9 dBµV

49.0 dBµV

-

51.0 dBµV

51.1 dBµV

51.3 dBµV

MER

35.1 dB

29.5 dB

-

23.4 dB

>36 dB

29.5 dB

PRE-BER

<1.0E-9

<1.0E-8

-

1.3E-3

<1.0E-9

<1.0E-7

POST-BER
Analog

<1.0E-8

-

Power
DVB-C

-

56.5 dBµV

VBER

DVB-T

<1.0E-8

Power

<1.0E-9

-

-

-

<1.0E-9

<1.0E-9

Video

57.5 dBµV

59.9 dBµV

-

58.0 dBµV

58.1 dBµV

57.7 dBµV

Audio

42.3 dBµV

-

-

41.5 dBµV

41.5 dBµV

39.7 dBµV

■ Tabelle 1: Vergleich der Messwerte des Deviser S7000 mit fünf professionellen Referenzgeräten
des TELE-audiovision Messlabors.

38 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

Antenne war daher unspektakulär und die stärksten
Satelliten
konnten
auch
gleich empfangen werden,
weshalb nur noch eine Feinjustierung notwendig war.
Und hier konnte der Deviser S7000 sich so richtig
bewähren, denn die Darstellung des Wasserfall-Diagramms machte diese sonst
eher lästige Aufgabe zum
Kinderspiel. Einfach die Antenne von Limit zu Limit fahren und dann das resultierende Wasserfall-Diagramm
anschauen: sofort erkennt
man, wie viele Satelliten mit
welcher Leistung empfangen werden können. Für die
Nordhalbkugel der Erde gilt:
sind die Satelliten eher im
Osten empfangsstark und
im Westen empfangsarm,
dann muss die Antenne samt
Motor nach links gedreht
werden, im umgekehrten
Fall nach rechts. Sind eher
die äußeren Satelliten empfangsstark und die zentralen Satelliten empfangsarm
(von Süden aus gesehen),
dann muss die Neigung des
Motors gesenkt werden und
die Neigung der Antenne erhöht werden. Ist eher der
Empfang der zentralen Satelliten gut und der äußeren
schwach, muss umgekehrt
vorgegangen werden. Diese
Prozedur wurde schon in der
TELE-audiovision Ausgabe
02-03/2012 beschrieben siehe Tabelle 2.
Das besondere am Wasserfall-Diagramm ist, dass
man auf einen Blick den
Empfang des gesamten Horizonts ablesen kann. Mit etwas Übung und Gefühl ist es
sogar möglich, anhand des
Wasserfall-Diagramms einzelne Satelliten zu ermitteln
und nach einiger Zeit weiß
man sogar, um wie viel Grad
die Antenne gedreht werden
muss, damit der Empfang
gelingt.
Keine Frage: wenn es um
die Einrichtung von Satelliten-Antennen geht, egal ob
motorisiert oder nicht, ist
ein Echtzeit-Spektrum meiner Meinung nach immer
noch die beste Hilfe, die
4

Waterfall
1. The waterfall diagram shows
the spectrum encoded with
colours over a period of time.
If the antenna is rotated, it
is possible to clearly see the
individual satellites and their
transponders. Also, this gives
a clear indication on the signal
level of each satellite: in the
picture you can see that some
satellites have a very low
signal.
2. Deviser implemented an
additional visualization in the
S7000: a combined view of the
spectrum and the respective
waterfall diagram.
3. This is ideal to adjust the
antenna. The picture shows the
variation of the reception – this
allows to fine tune the antenna
for maximum gain.
4. This picture shots that
satellites located east show
a much better signal than
satellites in the west. This
means the inclination of the
motor is wrong.

5. After correcting the motor
inclination, all satellites are
received with a similar signal
level.
6. The motor handling is
extremely well implemented
on the Devisor S7000. You
can choose between a fully
dedicated menu featuring all
required DiSEqC-commands
(1.0, 1.1 and 1.2), as well as
theSaTCR (Sat Cable Routing)
mode, used to provide the
satellite signal to multiple
users with a single cable.
7. Alternatively you can stay
in the spectrum modus and
rotate the dish using the DRIVE
option. When it is active, the
left and right keys are used
to rotate the dish, while the
up and down keys are used to
switch between a continuous
move and a stepped move. The
pictures shows the results of
the fine tuning – no doubts
it has never been as easy to
obtain the perfect alignment.
8. As a reward it is possible
to enjoy a bit of live radio
fromEutelsat W3A

5

1

6

2

7

3

8

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

39
■ Checking a

Multiswitch
with the Deviser
S7000

ein Messgerät bieten kann.
Wird das Spektrum obendrein noch als WasserfallDiagramm dargestellt, ist
man praktisch im Himmel.
Ich kann Deviser nur danken, diese so wertvolle Darstellungsform
umgesetzt
zu haben und will sie nicht
mehr missen.

Aufgabe:
Fehlersuche
– Störungen in der
CATV Verteilung
im Haus

In unserem portugiesischen Testcenter steht CATV
und SAT-TV über eine gemeinsame Kabelverteilung
zur Verfügung. Dazu wird
das Koax-Kabel des CATVProvider zuerst über einen
Splitter geteilt, eine Leitung
geht direkt zum DOCSISModem und stellt so den
Breitband-Internetanschluss
bereit, die andere Leitung

■ Tabelle 2: Korrekte Ausrichtung des Motors und der Antenne:
alle Satelliten befinden sich auf dem angefahrenen Bogen:

Fehlerhafte Ausrichtung des Motors und der Antenne

geht in einen Multischalter,
der das CATV-Signal von
50-850 MHz mit dem Satelliten-Signal von Astra 19.2E,
Hotbird 13.0E und Hispasat
30.0W von 950-2100 MHz
mischt. Plötzlich konnte an
den Dosen aber nur noch
analoges CATV mit starken
Bildstörungen
empfangen
werden, das Satelliten-Sig-

Zu groß

Zu klein

Neigung der
Motorachse

Außenstehende Satelliten werden nicht empfangen
(Antenne zu weit nach oben)

Außenstehende Satelliten werden nicht empfangen
(Antenne zu weit nach unten)

Neigung der
Antenne

Satelliten werden nicht empfangen
(Antenne zu weit nach oben)

Satelliten werden nicht empfangen
(Antenne zu weit nach unten)

Ausrichtung
des Motors

Linke Satelliten werden nicht empfangen weil
Antenne zu niedrig, rechte Satelliten werden nicht
empfangen, weil Antenne zu hoch

Linke Satelliten werden nicht empfangen weil
Antenne zu hoch, rechte Satelliten werden nicht
empfangen, weil Antenne zu niedrig

40 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

nal war nicht mehr zu empfangen.
Gleich kam der S7000 zum
Einsatz. An der ersten Dose
waren digitale CATV Signale
gar nicht zu empfangen, Satelliten-Signale auch nicht.
Anhand
eines
analogen
Transponder sah ich auch
schon den Grund: die Dose
war nicht korrekt mit dem
Koax-Kabel verbunden.
Trotzdem machten sich
intermittierende Störungen
bemerkbar. Ein Barscan der
CATV-Kanäle belegte zusätzlich eine signifikante Verringerung der Signal-Pegel/
Leistung (je nachdem ob
es sich um einen analogen
oder digitalen Transponder
handelt) und das Konstellations-Diagramm zeigte weit
verstreute Wolken, anstatt
der üblichen konzentrierten
Bildpunkte für jeden Quadranten.
Diese Situation war auch
an einer anderen Antennendose messbar, so dass davon
ausgegangen werden konnte, dass das Problem nicht
am Kabel oder der Dose zu
suchen war. Deshalb ging
ich zum Verteilerkasten und
9

12

10

13

11

14

schloss das Messgerät direkt
an einem der Ausgänge des
Multischalters an. Wieder
das gleiche fehlerhafte Ergebnis.
Da die angeschlossenen
Satelliten-Antennen und besonderes die LNBs schon
seit längerem nicht mehr gewartet wurden lag der Verdacht nahe, dass die Stecker
oxidiert sind oder einer der
LNBs defekt sein könnte.
Ich schloss daher die Kabel
von den LNB-Ausgängen
einzeln an den S7000, doch
hier konnte jede Ebene der 3
Quadro-LNBs perfekt empfangen werden.
Konnte vielleicht der Multischalter defekt sein? Als
ich das CATV-Kabel direkt
vom Splitter an das Messgerät angeschlossen habe
kam langsam etwas Licht in
die Sache: auch hier waren
Störungen vorhanden, ob-

CATV
9. An analogue picture like this
is normally an indication that
something is definitely wrong
with the cable. And yes: even
today it is still important to be
able to measure analogue CATV
channels and to show a live picture.
10. The video and audio signal
level is far too low.
11. Same problem with the channel to noise ratio.
12. After opening the aerial
socket and reconnecting the
coaxial cable properly, reception
was apparently back to normal.
13. Still I was getting intermittent
picture interferences. There was
another additional problem.
14. The constellation diagram
shows a less defined and concentrated cloud – a clear indication that the signal modulation
was not OK.
15. The culprit was a defect
signal splitter. After exchanging it, the constellation diagram
showed perfectly concentrated
clouds.
16. The signal quality was back
to normal and without any interferences.

15

16

42 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
17
wohl der Multischalter nicht
genutzt wurde. Der Fehler
konnte also nur noch am
vom Provider bereitgestelltem Signal liegen oder vielleicht am Splitter?
Als ich das Koax-Kabel
vom Provider direkt an den
S7000 anschloss, konnte ich
wieder normal CATV in analog und digital empfangen.
Das Problem lag definitiv
am Splitter (und somit auf
meiner Seite – der Provider war nicht Schuld). Zum
Glück habe ich immer einige Ersatzteile auf Lager und
so konnte ich diesen schnell
durch einen neuen ersetzen
und dann funktionierte alles
wieder wie normal.
In dieser Fehlerbeseitigung zeigte sich, wie wertvoll ein Messgerät wie der
S7000 sein kann. Problemlos kann es DVB-C Signale
in allen Modulationen aber
auch analoge Signale und
DVB-S/S2 Signale analysieren. Die Spektrum-Anzeige
in Echtzeit ermöglicht es,
intermittierende Störsignale
sichtbar zu machen und natürlich habe ich weitgehend
die kombinierte WasserfallDarstellung bevorzugt, da so
gleichzeitig zum Spektrum
dieses auch über einen Zeitraum festgehalten wird. So
können unter anderem auch
Tendenzen dargestellt werden, was besonders dann
wichtig ist, wenn das Signal
nur langsam steigt oder abfällt.
Durch die tadellose DiSEqC-Implementierung konnte der Multischalter bedient
werden und anhand des Konstellations-Diagramms
die
Qualität der Modulation geprüft werden. Bei dem Test
wurden Kabel an- und abgesteckt, ohne dass der S7000
Schaden genommen hätte.
Insgesamt bewies sich das
Gerät als sehr robust.
Mit dem S7000 ist ein
Techniker bestens ausgestattet, um bei Kunden auf
Fehlersuche zu gehen. Alle
notwendigen
Funktionen
sind ausnahmslos implementiert und funktionieren
auch in der Praxis wie erwartet.

Aufgabe:
Entwicklung einer
DIY DVB-T
Antenne

In vielen Regionen wird
DVB-T als SFN (Single Frequency Network) implementiert. Alle Sender strahlen
den oder die Transponder
landesweit auf den gleichen
Frequenzen. Dies hat den
großen Vorteil, dass das Frequenzspektrum für andere
Anwendungen freibleibt und
für den Anwender, dass er
den Empfänger innerhalb der
Region bewegen kann (zum
Beispiel im Auto), ohne die
Frequenz neu einstellen zu
müssen, wenn der Empfang
plötzlich über einen anderen
Sender erfolgt.
In diesem Test wollte ich
herausfinden, ob die mit den
USB-Empfängern mitgelieferten „Stummel-Antennen“,
es handelt sich hier um TDipol Antennen, an die länderspezifische DVB-T Frequenz angepasst sind, oder
nicht. Deshalb habe ich mir
mit einem Draht eineT-Dipol
Antenne selber gebastelt.Die
Länge des Drahtes wurde
exakt für die portugiesische
DVB-T Frequenz von 754
MHz berechnet. (formel 1)
Für eine DVB-T Frequenz
von 754 MHz ergibt sich so
eine Länge des Außenleiters
von 94mm und eine Länge
des Innenleiters von 96mm.
Der Außenleiter wird durch
ein Zurückstülpen des Metallgeflechts erreicht, der
Innenleiter wird einfach von
seiner Isolation befreit, fertig ist die DIY („Do ItYourself“) DVB-T Antenne für den
SFN Empfang. Im Internet
finden sich übrigens diverse Bauvorschläge für diese
T-Dipol Antennen und sogar
von Doppelquad-Antennen,
die eine noch bessere Empfangsleistung versprechen.
Es stellt sich nun die Frage: ist unsere DIY-Antenne
wirklich besser als die mitgelieferte Stummelantenne?
Die Antwort findet sich Tabelle 3.
Tatsächlich lohnt es sich,

18

19

eine speziell für die Empfangsfrequenz optimierte TDipol Antenne zu benutzen.
Allerdings stellte sich bei unseren Experimenten heraus,
dass man das Metallgeflecht
getrost abschneiden kann.

Lässt man nur den Innenleiter in korrekter Länge, sind
die
Empfangsergebnisse
sogar noch besser und die
Herstellung und Optimierung
der Antenne gestaltet sich
einfacher. Der Deviser S7000

■ Formel 1: Die Formel für die DIY T-Dipol Antenne
754 MHz

Televés TDT Roof
Antenna

Original Antenna

Optimized DIY
T-Dipol Antenna

Leistung

61.0dBµV

41.7dBµV

46.2dBµV

MER

>30 dB

23.8 dB

23.8 dB

CBER

<1.0E-5

2.2E-3

3.4E-3

VBER

<1.0E-7

<1.0E-7

<1.0E-7

■ Tabelle 3: Vergleich der DVB-T Messungen mit dem
Deviser S7000

44 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
20

21

DIY DVB-T Antenna
17. DVB-T Signal of our external
antenna. Reception is quite
good.
18. A good indicator for
DVB-T reception quality is the
constellation diagram. As long
as all dots are closely within
the centre of each square,
everything is fine.
19. The Deviser S7000 allows to
set the resolution bandwidth in
spectrum mode. This is unique
among the meters I have tested
so far. A smaller bandwidth will
feature higher resolution, while
a bigger bandwidth will result
in a slower spectrum refresh
rate. Because we are looking at
the specific DVB-T transponder
at 754 MHz, a span of 16 MHz
is sufficient and thus even the
lowest resolution bandwidth
setting will produce a real time
refresh rate. The resolution
is so good, that you can
practically see the carriers.

22

23

24

25

20. The same signal, but in
combined spectrum and
waterfall diagram view. This
allows to monitor the spectrum
over a period of time, while
simultaneously monitoring the
spectrum in high detail.
21. A generic rod antenna
provided with a USB DVB-T
receiver: this antenna was not
designed specifically for a
certain frequency; its length
does not match the SDN
frequency of 754 MHz as used
in Portugal.

26

22. As a result, the signal
power is only 41.7 dbµV and the
CBER is rather low, though still
correctable since the VBER is
under 1.0E-7.
23. Looking at the constellation
diagram using the generic
rod antenna, it is obvious that
the signal quality is far from
perfect.
24. First step of the DIY
antenna: strip the rubber off
the cable, maintaining the
length calculated for the SFN
frequency.

27

25. Flip the mesh back and
leave the inner wire with the
correct length: you just got
yourself the “poor-man’s”
DVB-T antenna.
26. Amazingly, the signal power
is on average 5 dBµV higher
than with the generic antenna.
27. Again, using the waterfall
diagram it is easy to adjust
the antenna so that reception
is maximized. It is strange
to think on how it has been
possible in the past to fine tune
the alignment of the antenna
without this functionality. One
thing is for sure: the waterfall
diagram is an outstanding aid
for installers.
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

45
28
löste unsere Fragestellung
hervorragend. Durch seine
hohe Messgenauigkeit und
Schnelligkeit erzielten wir
schnell Aufschluss über die
Empfangsleistung der Antennen.

Echo-Messung

Der Deviser S7000 erlaubt
die für DVB-T/H wichtige
Echo-Messung. Dies ermöglicht es, eine optimale Antenne aufzubauen, die den
störenden Empfang von einem zweiten, weiter entfernten Sender, auslöscht. Wenn
dieser Sender außerhalb des
so genannten Guard Intervalls liegt, werden störende
Laufzeitverzögerungen des
Signals erzeugt, die der Demodulator nicht mehr kompensieren kann. Es kommt
zu Aussetzern bzw. der
Empfang ist nicht möglich.
Diese Situation kann ein mit
dem S7000 ausgerüsteter
Techniker lösen, indem er
zum Beispiel zwei Antennen
benutzt, deren Abstand so
gewählt wird, dass sich die
an beiden Antennen eingehenden störenden Wellen gegenseitig auslöschen.
Das Prinzip besteht darin,
dass beide Antennen auf
den nahe gelegenen Sender
ausgerichtet sind und die
störende Strahlung, die von
einem entfernten Sender
stammt,die Antennen mit
einer Drehung erreichen.
Wählt man den Abstand beider Antennen geschickt, addieren sich die Wellen der
naheliegenden
Antennen,
während sich die Wellen des
entfernten Senders gegenseitig auslöschen. Mangels
störender Echos in meiner

Mux TS Analyser
28. In order to use the Transport
Stream Analyser of the S7000
with the ASI input, you have to
first enable this interface.
29. By pressing the TV key on the
meter, you enter the Transport
Stream Analyser, which is now
receiving the TS stream on its
ASI input connector. In this case
I setup a TS containing channels
from two different German FTA
transponders.
30. The Deviser S7000 gives
access to all parameters of the

Region musste ich mich leider nicht um diese Art von
Störungen kümmern, doch
mit dem S7000 wäre es
leicht, eine solche „DoppelAntenne“ einzurichten.
Interessant ist die Möglichkeit, anhand der mitgelieferten GPS-Antenne die
aktuelle Position bestimmen
zu können. So kann man den
Deviser S7000 auch zur Erstellung von regionalen Empfangskarten nutzen. Schade,
dass es nicht möglich ist, die
erfassten Messwerte automatisch auch mit der Lokalisation zu speichern um sie
dann am Computer im Google-Maps Format zu exportieren bzw. hochzuladen. Deviser wird vielleicht so eine
Funktion mit einer zukünftigen Firmware-Aktualisierung nachreichen. In diesem
Fall könnte man nämlich im
Auto die gewünschte Region
abfahren und hätte am Ende
ein automatisch generierte
Karte der Feldstärke.

Aufgabe:
MUX-Analyse
eines selbst
erstellten
Transport Stream

Um den Deviser S7000 als
TV Analyser zu testen habe
ich ein Szenario in einer
Kopfstation
nachgestellt.
Ein professioneller IRD mit
integriertem
Multiplexer
empfängt einen Transponder über den eingebauten
DVB-S2 Tuner und einen
weiteren Transponder von
einem zweiten IRD über die
ASI-IN Schnittstelle. Die beiden Transponder werden im
TS stream. 31, 32. Interestingly,
the equipment used to generate
this mux filtered all NIT information, which is correct. Don’t
you hate receiving a CATV transponder containing a satellite
NIT?
33. One important application
for the S7000: determining the
TS rate. Notice on this picture
that the specified bandwidth of
the TS is 75 MB/s, but 32.45%
are not being used. This clearly
represents a waste of allocated
bandwidth.
34. I reduced the bandwidth on
the multiplexer to 35 MB/s but

29

30

31

this time the S7000 indicates
that there is 0% empty capacity
in the stream. This means that
there is no reserve for sporadic
increases in bandwidth.
35. Again, the multiplexer was
setup, this time to use a bandwidth of 40 MB/s. And this time
around 15% of the bandwidth is
empty, leaving some reserve.
This adjustment took a couple of
minutes and resulted in saving a
bandwidth of 35 MB/s.
36. To compare our TS with one
of the originally broadcasted
streams, we connected the ASI
output of one of the IRDs.

46 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

37. While there is no disturbance
in the PCR interval measurement
in our TS…
38. …some can be detected from
the satellite signal, which is
normal after travelling back and
forth into space. However, if the
TS from our multiplexer would
show a PCR like this, then something would clearly be wrong.
39. Analysis of one of the original satellite Transport Streams.
40. The PIDs carry different numbers…
41. …and the NIT contains additional data.
32

37

33

38

34

39

35

40

36

41

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

47
Gerät zu einem neuen Transponder gemuxt und an dem
ASI-Ausgang bereitgestellt.
Hier wurde nun der S7000
angeschlossen und Ziel war
es, den empfangenen Transportstream zu analysieren,
um zum Beispiel die verwendeten PIDs zu prüfen und um
eventuelle Timing-Fehler zu
messen. Diese Arbeit verrichtete der S7000 glanzvoll. Es muss lediglich der
ASI-Eingang aktiviert werden und schon kann die TV
Analyser Funktion mit dem
TS-Stream des ASI-Eingangs
genutzt werden. Sämtliche
Funktionen stehen nun genau so zur Verfügung, wie in
den normalen Tuner-Modi.
Ich konnte schnell prüfen,
ob der Stream tatsächlich
die gewünschten Kanäle und
zusammenhängende Services enthielt. Interessant war
übrigens die Tatsache, dass
der IRD die PIDs neu vergeben hat, so dass diese nicht
mehr den PIDs der originalen
Transponder entsprach - der
S7000 zeigte mir dies sofort
an.
Schließlich macht es sich
bezahlt, auch die PCR-Messung durchzuführen: gab
es im originalen SatellitenSignal kleine Abweichungen
(im grünen Bereich), war der
vom IRD erzeugte Stream

perfekt synchron mit dem
Taktgeber des S7000. Wären
hier schon kleinste Fehler
vorhanden könnten sie sich
durch die weitere Signalverteilung tragisch auswirken.
Der Deviser S7000 ist ideal für diese Aufgabe gewachsen.

PC Software
des S7000

Welche Software ist auf

der mitgelieferten CD? Diese S7000 Toolbox genannte
Software erlaubt es, sämtliche Transponder- und Satelliten-Listen komfortabel zu
editieren und zu verwalten.
Weiterhin können im S7000
gespeicherte Messungen am
PC dargestellt werden. Anders als sonst üblich erlaubt
der S7000 das Abspeichern
der Messungen auf zwei verschiedenen Weisen. Zum einen kann man einfach den

aktuellen
Bildschirminhalt
als Bild abspeichern. Zum
anderen können aber auch
die Messwerte selbst gespeichert werden. Diese Messwerte können dann in der
PC-Software dargestellt werden, wobei natürlich mehr
Einfluss auf die Darstellung
gegeben ist. Dies ermöglicht
die Erstellung von professionellen
Abnahme-Reports
am Computer. Der Techniker kann so gegebenfalls

42

43

48 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
44

45

46

Toolbox Software
42. Thanks to the S7000’s Ethernet port
it is possible to access the data captured
through an FTP client.
43. Naturally, the same can be done using
the Deviser Toolbox software, which
allows to edit the channel lists and satellite
transponder as well.
44. Editing the satellite transponder lists

is really easy, but Deviser did a good job
maintaining them updated, so there really
was nothing to edit: the S7000 features all
worldwide satellite transponder lists.
45. Editing the terrestrial channels is no
challenge either, and again all channel
plans worldwide are predefined.
46. Amazingly, the Toolbox software is
not only capable of downloading and
displaying the screenshots taken during
measurements. If you instead store the

actual data, the measurements can be
rendered with the toolbox software instead.
This provides additional functionality,
since markers can be moved, etc. Also, the
technician taking the measurements does
not have to worry about specific readings
for the report – they can be generated with
the stored data and you don’t even need
the meter to do that: just transfer the data
using the network or a USB memory and
the meter is ready to be used for the next
call!

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

49
47

48

49

die Messwerte am Deviser
S7000 auf einen USB-speicher kopieren und im Büro
dem Kollegen übergeben,
der den Report anfertigt,
ohne selber am S7000 arbeiten zu müssen, so dass dieser für den nächsten Einsatz
frei ist.
Die Daten (Settings und
Messungen) können direkt
als Datei von einem Datenträger gelesen werden oder
über die integrierte ActiveSync genannte Funktion über das Netzwerk vom
Messgerät ausgelesen werden. Natürlich kann man die
Dateien auf diesem Wege
auch vom PC zurück zum
Messgerät kopieren.
Das zugrunde liegende
Protokoll ist übrigens das
bewährte FTP-Protokoll und
dank des Netzwerk-Analyse Tool Wireshark habe ich
dann auch schnell die Zugangsdaten ermittelt: wer
möchte, kann die Dateien
auch normal über FTP hin
und her kopieren, in dem

einfach nur die IP-Adresse
des Messgerätes mit dem
Username „ftpadmin“ und
dem Passwort „Instrument“
angegeben werden. Wichtig
ist es, die FTP-Verbindung
im „Active“-Modus zu betreiben. So kann man schneller
Dateien hin und her kopieren. Schaden kann man dem
Gerät so übrigens nicht zufügen, denn über FTP stehen
nur die Anwender-Verzeichnisse Plan, SaveBmp, SaveData und Temp zur Verfügung.
Der Höhepunkt der S7000
Toolbox Software ist aber
die Fernbedienung des gesamten Gerätes! Über den
unscheinbaren Knopf „Remote Control“ öffnet sich
ein neues Fenster, das die
Vorderseite des Messgerätes
samt Bildschirm nachbildet.
Mit der Maus lassen sich alle
virtuellen Tasten des Messgerätes genau wie die echten Tasten bedienen und der
Bildschirm reagiert genauso
schnell wie das echte Gerät.

50

51

Toolbox Software
47. Incredibly, Deviser implemented
a remote access to the meter. All
you need is a network connection
to the meter to be able to fully
operate the S7000 remotely.
48. Everything shown on the
physical screen is rendered in real
time on the remote software.
49, 50. Even the TS analyser
function can be used this way –
only the live picture is obviously
not shown, due to bandwidth
limitations of the network.
51. If you have a smartphone, you
can do a VNC connection to the
PC running the Deviser Toolbox
software. This means that you can
climb to the roof with just your
phone and still use all functions
of the S7000. This is simply
incredible.

50 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
Man kann daher wirklich auf
alle Funktionen auch über
das Netzwerk zugreifen und
braucht keinen Zugang zum
physischen Gerät. Einzig die
demodulierte Audio/VideoAusgabe wird nicht weitergereicht, was anhand der
notwendigen Bandbreite ja
auch zu erwarten ist.
Mir kam natürlich sofort
folgende Idee auf: warum
nicht den S7000 im Haus lassen und nur mit dem Smartphone auf das Dach steigen?
Über VNC verbindet man das
Smartphone mit dem Computer und kann diesen dann
fernbedienen. Wurde zuvor
schon die Toolbox Software
gestartet, kann man so bequem den Deviser S7000 am
Smartphone
fernbedienen
mit dem Vorteil, dass man
dank Touchscreen direkt
dessen virtuelle Tasten bedienen kann.
Plötzlich hat man ein 100 g
schweres Smartphone in der
Hand und kann stundenlang
auf dem Dach die Antennen
justieren… einfach genial!
Vielleicht bietet Deviser
ja bald eine App für Android
und/oder iPhone an, mit dem
man den S7000 direkt ohne
Umweg über den PC fernsteuern kann.

Was gibt es
am Gerät
auszusetzen?

Ein Test, in welchem es
am Gerät nichts auszusetzen gibt, kann es nicht geben und wäre ein Anzeichen,
dass man sich nicht ausreichend mit diesem auseinandergesetzt hat. Trotzdem
gibt es praktisch nichts am
S7000 zu bemängeln und
daher musste ich mich wirklich anstrengen, um doch
wenigstens folgende Punkte
aufzulisten:
- Bei analogen CATV Signalen kann der S7000 keinen
Videotext anzeigen. Dies
ist nicht unbedingt wichtig,
denn das analoge Videosignal kann anhand des Oszillator-Modus analysiert werden.
- Im Spektrum-Modus ist

es nicht möglich, das Bild
eines vorher gespeicherten
Spektrums dem aktuellen
als Referenz zu hinterlegen.
Dies dient normalerweise
dazu, verschiedene Antennen exakt identisch auszurichten und um das aktuelle Spektrum nach einem
größeren Zeitraum mit dem
gespeicherten Spektrum zu
vergleichen, um Aufschluss
darüber zu bekommen, ob
es sich verschlechtert hat.
Diese Funktion kann Deviser
sicherlich leicht mittels einem Firmware-Update nachreichen.
- Ich fand es etwas störend, dass der S7000 die
Spanne des Spektrums automatisch auf die Bandbreite des eingerastetenSignals
reduziert, wenn man in den
Mess-Modus
umschaltet.
Sobald man das Spektrum
erneut aufruft, muss man
daher die Spanne manuell
wieder ändern, um wieder
das gesamte Spektrum zu
sehen. Dies ist nur eine Kleinigkeit und sicherlich werden genauso viele Anwender eben diese Eigenschaft
schätzen – ein typischer Fall
von: man kann es nie allen
recht machen.
Aber das sind Kleinigkeiten. Tatsächlich handelt es
bei dem Deviser S7000 um
ein professionelles Messgerät für praktisch alle TVNormen, mit dem man für
wirklich jede Aufgabenstellung bestens gerüstet ist.
Alle denkbaren Messungen
sind vorhanden, das Gerät
lässt sich sehr leicht bedienen, ist robust und bietet
obendrein noch einen kompletten TV Analysator. Die
Messwerte sind allen Zweifeln überlegen und bieten
die gleiche Genauigkeit, wie
andere Messgeräte der ProfiOberliga.
Was kann man sich eigentlich noch wünschen? Mit dem
S7000 zur Hand eigentlich
nur, dass es hoffentlich viele
komplexe Fehler zu diagnostizieren und beseitigen gibt,
denn es macht einfach Spaß
mit diesem tollen Messgerät
zu arbeiten!

52

Battery and Inside Peek
52. The battery pack of the S7000 is easily accessible on the back
side of the meter. Two big screws need to be loosened up.
53. The cover plate can be removed, revealing the battery pack.
54. The battery back can be pulled by the two cords. It is a composed of a 10x AA battery pack.
55. We could not resist removing the cover of the meter to have a
peek inside. What we saw: a highly integrated and extremely well
built electronic equipment. Naturally we did not dare to further
disassemble the device, so this is the best insight we can provide.

53

54

52 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
56

55

57

Ka-Band Satellite Scan
56. This waterfall diagram shows the horizon from about 30.0E to
30.0W using the Inverto Ka LNB. Only 9.0E is broadcasting transponders in the 19.7 GHz – 20.2 GHz range.
57. This picture shows 9.0E over a period of time (about 30 seconds).
The second half (lower part – representing about 15 seconds) of the
waterfall diagram was recorded during a sporadic rain shower. Curiously the rain did not produce any signal loss.

How to interpret BER
measurements
What
does
1.2E-03
mean? BER stands for Bit
Error Ratio: the measuring instrument will basically count the erroneous
bits within all received
bits and calculate this
simple formula:

Because the amount
of erroneous bits is normally very small, let’s
say 1 wrong bit in every
1.000.000 bits, it would
look odd to see a value of 0.000001 on the
meter’s screen. A much
more convenient format
would be 1x10-6. Calculators will frequently

show this number as 1E6, instead, to save some
screen space. So this is
what a reading of CBER =
1.2E-03 means: you will
get one wrong bit in every 1200 bits received.

CBER means that no error correction has been
applied to the signal, so
let’s now see what LBER
< 1.0E-8 means:

Let’s do the math:

It means that after applying the error correction, we only will receive
one bad bit every hundred million received bits.
We will have a great picture without any noticeable artifacts. However,

because our initial CBER
value is low, there is no
bad weather reserve.
If the signals gets only
slightly worse, the error correction will not be
able to correct the incoming stream and picture
artifacts will be produced.
The thumb rule is: the
smaller the BER value
before error correction,
the better. Notice that
smaller means a bigger
number after the “E”, because there is a “-“ sign:
-5 is smaller than -3! The
smaller the number, the
more bad weather reserve you will get. The BER
value after the error correction will give you an
idea, if artifacts will be
noticeable on the screen
with the current signal.

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

53
4

DVB-S, DVB-S2, DVB-C, DVB-T,
DVB-T2, DVB-H, ATSC – der
Deviser S7000 kann alles!
Was kann man sich eigentlich noch wünschen? Mit dem
S7000 zur Hand eigentlich nur, dass es hoffentlich viele komplexe Fehler zu diagnostizieren und beseitigen gibt,
denn es macht einfach Spaß mit diesem tollen Messgerät zu
arbeiten!
1, 2. Der S7000 kann neben DVB-T auch DVB-T2 Signale analysieren und zeigt auch das entsprechende Konstellations-Diagramm
souverän an. Interessant an DVB-T2 ist die Option, die Modulation
mit einer TILT genannten Neigung zu versehen, mit welcher das
Signal stabiler gegen Störungen wird.
3, 4. Oftmals geht man einfach davon aus, dass DVB-H von jedem
DVB-T fähigem Messgerät auch analysiert werden kann. Wir wollten uns sicher gehen und haben es probiert. Tatsächlich kann der
S7000 DVB-H ohne Probleme messen.
5, 6. Weiter geht es mit ATSC. Und hier zeigt der S7000 was Sache
ist: während man bei Konkurrenzprodukten fast immer ATSC nur
als extra Option erhält, liefert Deviser diese Norm gleich als Standardfunktion mit. Auch das Konstellationsdiagramm für 8VSB wird
korrekt angezeigt.
7, 8. Selbstverständlich macht der S7000 auch bei 16VSB Modulation nicht halt. Phantastisch wie gut man mit diesem Messgerät für
alle Fälle ausgerüstet ist.

5

1

6

2

7

3

8

54 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
TEST REPORT

Miniature DVB-S2 HDTV Receiver

56 TELE-audiovision International — The World‘s Largest TV Box Magazine — 1
1-12/2013 — www.TELE-audiovision.com
•	Besonderheit: kann versteckt angebracht werden, da
der IR-Empfänger für die Fernbedienung flexible montiert
werden kann
•	dank USB-Anschluß vollwertiger PVR
•	integriertes Internet, z.B. für YouTube und Google Maps
•	automatische DiSEqC-Erkennung, automatische
Erkennung der Videoauflösung des Programms und
TV-Monitors
•	LNB Spannung kann erhöht werden, um Verluste durch
lange Kabel auszugleichen

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

57
TEST REPORT

Miniature DVB-S2 HDTV Receiver

Ein HDTV Receiver für
Satellit mit allen Features
Mit dem Mini HD bringt

des Receivers untergebracht

hat den Mini HD bewusst so

ten Seite sorgt zudem für die

Amiko einen DVB-S2 taugli-

wurden. Konkret handelt es

gebaut, dass er entweder di-

Möglichkeit, rasch ein USB

chen HDTV PVR Receiver im

sich dabei um einen LNB Ein-

rekt an der Wand montiert

Speichermedium

Kleinstformat auf den Markt.

gang, eine Ethernet Buchse,

oder an der Rückseite des

ßen zu können.

Der kann es allerdings in

einen USB 2.0 Port sowie

Fernsehers unauffällig un-

Puncto Features problemlos

eine Buchse für das externe

tergebracht werden kann.

mit seinen größeren Brüdern

12V Netzteil.

anschlie-

Angetrieben wird der Amiko Mini HD von einem 400

Für die perfekte Ausgabe

MHz Prozessor, dem 64 MB

aufnehmen. Lediglich 15 x

Mit Hilfe von drei Klinken-

des Videosignals sorgt eine

Flashspeicher sowie 1 GB

11 x 3.5 cm misst die in ele-

buchsen hat Amiko zudem

HDMI Buchse, kristallklarer

DDR SDRAM zur Verfügung

gantem Schwarz gehaltene

Anschlussmöglichkeiten

für

Dolby Digital 5.1 Ton wird

stehen. Im späteren Praxis-

Gehäusebox und dank ihres

ein

Verbindungskabel

leider nur via HDMI, nicht

test wird diese Kombination

geringen Gewichts von et-

(CVBS und Stereo Audio)

aber über einen S/PDIF Aus-

für eine problemlose Dar-

was mehr als 250 Gramm ist

sowie eine RS232 Buchse

gang an die heimische Ste-

stellung von HDTV sowie ein

sie zudem federleicht.

geschaffen, die dafür not-

reoanlage weitergereicht.

zügig auf Fernbedienungs-

A/V

An der Frontseite offen-

wendigen Adapterkabel lie-

Besonders gut gefallen hat

baren zwei Status LEDs den

gen dem Receiver bei. Die

uns, dass Amiko beim Mini

OSD sorgen. Die vom Her-

aktuellen

dritte

kommandos

reagierendes

dient

HD wirklich jeden Zentimeter

steller

während alle wichtigen An-

zum Anschluss des externen

genutzt hat, so wurde vom

bedienung liegt gut in der

schlüsse an der Rückseite

IR-Empfängers, denn Amiko

Hersteller z.B. an der Re-

Hand, ist ergonomisch ge-

ceiverunterseite ein an der

formt und weist eine über-

Front zugänglicher Karten-

sichtliche Beschriftung auf.

Betriebszustand

Klinkenbuchse

leser für Conax Smartcards

mitgelieferte

Einen

Fern-

Installationsassis-

untergebracht, eine zweite

tenten sucht man beim Mini

USB 2.0 Buchse an der rech-

HD vergebens, der Anwen-

11-12/2013
AMIKO MINI HD
Perfekt gelungener Receiver
in Kleinstformat

www.TELE-audiovision.com/13/11/amiko

58 TELE-audiovision International — The World‘s Largest TV Box Magazine — 1
1-12/2013 — www.TELE-audiovision.com

0.53
1
der

muss

die

wichtigsten

Grundeinstellungen

aber auf europäische Einträ-

seines

ge und sollte etwas umfang-

Receivers selbst vornehmen.

reicher sein. Gut gefallen hat

Das Videosignal via HDMI

uns die Möglichkeit, die LNB

kann der neue Amiko Recei-

Versorgungsspannung

ver in den Auflösungen 480i,

0.5 Volt erhöhen zu können,

480p, 576i, 576p, 720p 50

falls

Hz, 720p 60 Hz, 1080i 50

zum Einsatz kommen.

längere

um

Koaxialkabel

Hz, 1080i 60 Hz, 1080p 50

sierte Anwender kann die

geben, da bleiben also keine

Auto DiSEqC Funktion zur

Wünsche offen, zumal Ami-

Rettung in der Not werden,

ko auch noch einen Auto-

dank ihrer Hilfe erkennt der

matik Modus (der Receiver

Receiver automatisch, wel-

passt sich an die Auflösung

cher Satellit über welchen

des

2

Gerade für nicht so ver-

Hz sowie 1080p 60 Hz aus-

DiSEqC Port mit dem Re-

derzeit

Programms

empfangenen
ei-

ceiver verbunden ist. Hier

nen Native by TV Modus

macht sich jedoch die leider

(der Receiver passt sich an

etwas karge Satellitenliste

die maximale Auflösung des

bemerkbar, denn nur dar-

verwendeten Fernsehers an)

3

an)

sowie

in enthaltene Einträge kön-

integriert hat.

nen auch erkannt werden.

Der Mini HD beherrscht die

Im Test mit den in Europa

DiSEqC Protokolle 1.0, 1.1,

sehr häufig genutzten AST-

1.2 und 1.3 und kann somit

RA und EUTELSAT Satelliten

sowohl mit einer Multifeed,

funktionierte die Erkennung

Multifokus oder drehbaren

problemlos, weniger populä-

Antenne umgehen. Die mit

re Satelliten wurden jedoch

28 Einträgen gefüllte, vor-

nicht erkannt.

programmierte Satellitenliste ist aktuell, beschränkt sich

4

5

1. Hauptmenü des Amiko Mini
HD
2. Zum Bearbeiten der
Kanalliste stehen alle
notwendigen Möglichkeiten
bereit
3. Einzelne Sender können
leicht umbenannt werden
4. Installationsmenü
5. Satelliteneinstellungen
6. Auf Wunsch kann der
Anwender die PID Werte
einzelner Sender manuell
eingeben
7. Mittels FastScan werden
alle Transponder eines
der 9 vorprogrammierten
Pay-TV Anbieter automatisch
eingelesen
8. Auto DiSEqC Funktion
9. Berechnung der zum
Justieren der Antenne
notwendigen Winkel
10. Benutzereinstellungen
11. Zeiteinstellungen
12. Insgesamt 8 Timerslots
stehen zur Auswahl bereit
13. Das Videosignal kann in
einer Auflösung von maximal
1080p via HDMI ausgegeben
werden
14. Das OSD kann der Benutzer
individuell anpassen
15. Drei integrierte Videospiele
sorgen für Unterhaltung in
Werbepausen

60 TELE-audiovision International — The World‘s Largest TV Box Magazine — 1
1-12/2013 — www.TELE-audiovision.com

Suchlaufseitig

stehen

dem Anwender ein Satelliten-,

Transponder-

oder

Blindscansuchlauf zur Verfügung. Hier hat es uns natürlich gerade der Blindscan
besonders angetan, dieser
förderte auf dem HOTBIRD
13° Ost in 6 Minuten 1597
TV- und 373 Radioprogramme zu Tage. Damit kann man
absolut zufrieden sein. Auch
auf nicht so häufig genutzten
Satelliten wie z.B. dem SES4
22° West lieferte der Blindscan bei Transpondern mit
verschiedensten

Symbolra-

ten gute Ergebnisse.
Ein herausragendes Feature des Amiko Mini HD ist
die

FastScan

Option,

mit

deren Hilfe die Transponder
von

insgesamt

9

vorpro-

grammierten, europäischen
Pay-TV

Providern

mühelos

eingelesen werden können.
Im Test hat das mit dem
holländischen
problemlos

CanalDigitaal
geklappt.

Im
6

11

7

12

8

13

9

14

10

15

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

61
16
6
16. Netzwerkfeatures des Amiko Mini HD
17. IP Einstellungen, das DHCP Protokoll wird selbstverständlich
unterstützt
18. Die Software des Receivers kann automatisch via Internet
aktualisiert werden
19. Wettervorhersage
20. RSS Feeds werden übersichtlich angezeigt
21. Die Videodienste YouTube und YouPorn stehen direkt am
Receiver zur Verfügung
22. YouTube
23. Der Receiver unterstützt neben der Aufnahme von Sendungen
natürlich auch die Timeshift Funktion
24. Google Maps am Amiko Mini HD

17

21

18

22

19

23

20

24

62 TELE-audiovision International — The World‘s Largest TV Box Magazine — 1
1-12/2013 — www.TELE-audiovision.com
Highlights
BluBox SOTx
•	 Bis

zu 16 SAT - ZF Ebenen und
Terrestrik auf einer LWL - Faser!

•	 19"

Grundeinheit mit
redundantem Schaltnetzteil

•	 Verteilung

auf bis zu 32 optische
Knotenpunkte möglich

•	 Konfiguration	und	Überwachung		

	 via	LAN	/	IP

WhiteBox
•	 Modulare	Kopfstelle	für

	 vielfältige	Umsetzungen
•	 19"

Grundeinheit mit
redundantem Schaltnetzteil

•	 Konfiguration	und	Überwachung		

	 via	LAN	/	IP

SPAROS 711 Touch Serie
•	 Intuitive	Bedienung	durch	

	 Touch	Screen	10"
•	 DVB	-	S	/	S2,	DVB	-	T/	T2,	DVB	-	C,	

	 HDTV	Bildwiedergabe
•	 Kompaktes	und	robustes		

	 Druckgussgehäuse	aus	Aluminium	
	
•	 Lieferung	im	stabilen	Transportkoffer!

SPAUN electronic GmbH & Co. KG
Byk - Gulden - Str. 22 · 78224 Singen · Germany
Phone: + 49 (0)7731 - 8673 - 0 · Fax: + 49 (0)7731 - 8673 - 17
Email: contact@spaun.com · www.spaun.com
25
6

26

Handumdrehen

erscheinen

so ganz ohne mühsames Ab-

Tastendruck sofort zur Verfügung.

suchen mehrerer Transpon-

Nachdem der Receiver an

der alle Sender eines Pay-TV

die eigenen Bedürfnisse an-

Anbieters in der Kanalliste.

gepasst wurde genügt ein

Nachdem

die

Kanalliste

Druck auf die Exit Taste der

des Receivers erstmal mit

Fernbedienung

tausenden Einträgen gefüllt

wird das Einstellungsmenü

wurde drängt sich die Frage

verlassen und der Mini HD

der

Kanallistenbearbeitung

nimmt seine Arbeit auf. Er

nahezu auf. Hier gibt sich der

verfügt dabei über clever

Mini HD jedoch keine Blöße

angeordnete OSD Einblen-

und bietet alle nur erdenkli-

dungen, die dem Anwender

chen Optionen wie z.B. das

eine logisch durchdachte Be-

Löschen, Verschieben, Um-

dieneroberfläche zur Verfü-

benennen, Gruppieren oder

gung stellen. Besonders gut

mit einem PIN Code verse-

hat uns dabei der EPG ge-

hen der einzelnen Einträge

fallen, dessen Inhalte in drei

an.

verschiedenen Modi darge-

Dank

32

und

schon

Favoritenlisten

stellt werden können. Dank

wandern die Lieblingssender

weiterer Funktionstasten an

rasch in eine dieser Samm-

der

lungen

27

Fernbedienung

lassen

dem

sich Optionen wie Untertitel,

Anwender dann mit einem

Teletext oder Sprachwahl di-

25. Auch die Satellitenansicht
von Google Maps steht zur
Auswahl bereit
26. Via OSD Tastatur kann
auf Google Maps nach Orten
gesucht werden
27. Kanalsuchlauf
28. Info Leiste mit EPG Daten
der aktuellen und folgenden
Sendung
29. EPG Ansicht 1
30. EPG Ansicht 2
31. EPG Ansicht 3
32. Kanalliste
33. Die Kanalliste kann auf
einzelne Satelliten beschränkt
werden
34. Die Kanalliste kann auf
einzelne Anbieter beschränkt
werden
35. Sprachwahl
36. Satellitenauswahl
37. OSD Teletext
38. Problemlos kann der Amiko
Mini HD zuvor aufgezeichnete
Sendungen wiedergeben
39. MP3 Wiedergabe

28

rekt ohne Umweg über das

und

stehen

Hauptmenü

aufrufen,

das

spart Zeit und freut den Anwender.
Da es sich beim Amiko Mini
HD um einen vollwertigen
PVR Receiver handelt schlossen wir natürlich sofort ein
USB

Speichermedium

an

einen der beiden USB Ports

29

an, daraufhin waren wir in
der Lage, bis zu zwei Sendungen gleichzeitig in HD
Qualität aufzunehmen, während ein drittes Programm
live

gesehen

zeitgesteuerten

wurde.

Zur

Aufnahme

von Sendungen stehen insgesamt nur 8 Timerslots zur
Verfügung, das ist heutzutage nicht mehr zeitgemäß.

64 TELE-audiovision International — The World‘s Largest TV Box Magazine — 1
1-12/2013 — www.TELE-audiovision.com
30

35

31

36

32

37

33

38

34

39

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

65
Neben

PVR

Aufnahmen

kann der USB Port auch zur

Adapter einsetzen, der den

werden können.
Test-

Mini HD kabellos ins Inter-

Wiedergabe von Videos in

bericht aufmerksam gele-

net bringt, dieser ist jedoch

den Formaten AVI, MPEG,

sen haben dann haben Sie

nicht

MP4, TS, Flash und VOB ver-

sicherlich

fangs.

wendet werden, ebenso wie

Amiko dem Mini HD eine

zum Abspielen von Musik im

Netzwerkbuchse

MP3 Format. Den einen oder

und ihm somit die Welt des

anderen Anwender wird es

Internet geöffnet hat. Wer

auch freuen zu hören, dass

WiFi in den eigenen vier

JPEG Bilder via Amiko Mini

Wänden

HD am Fernseher angezeigt

kann auch einen USB WiFi

Wenn

Sie

diesen

bemerkt,

dass

spendiert

verwendet,

Teil

des

Lieferum-

42

der

40. Der integrierte Bildbetrachter funktionierte im Test tadellos
41. Videowiedergabe verschiedenster Formate
42. DivX Wiedergabe
43. Full HD Videowiedergabe
44. Auch Flash Videos werden problemlos abgespielt

40
6

43

41

44

66 TELE-audiovision International — The World‘s Largest TV Box Magazine — 1
1-12/2013 — www.TELE-audiovision.com
Neben der Möglichkeit, die

uns im Test allesamt rich-

Software des Receivers via

tig Spaß machten, sowie die

Internet zu aktualisieren, er-

Möglichkeit, sämtliche Ein-

hält der Anwender zusätzlich

stellungen und die Kanalliste

Zugriff auf aktuelle Wetter-

für den Notfall auf ein USB

/
PVR Receiver with
Function	Miniature
	
external IR remote control

daten, RSS Feeds sowie die

Speichermedium zu sichern.

Dienste

Generell

Input frequency	

950 - 2150 MHz

Input symbol rate	

2 - 45 Ms/s

Modulations	

QPSK, 8PSK

YouTube,

YouPorn

begeisterte

uns

TECHNICAL
DATA

Model	

Mini HD

und Google Maps. Die Idee,

während des gesamten Tests

Google Maps auf einem Sa-

die logische und übersichtli-

tellitenreceiver verfügbar zu

che OSD Struktur ebenso

EPG	yes

machen erscheint auf den

wie deren gelungene grafi-

ersten Blick innovativ, in der

sche Umsetzung. Dank des

Video resolution	
	

480i, 480p, 576i, 576p, 720p 50 Hz, 720p 60 Hz,
1080i 50 Hz, 1080i 60 Hz, 1080p 50 Hz, 1080p 60 Hz

Praxis ist es aber gar nicht

niedrigen

DiSEqC	

1.0, 1.1, 1.2, 1.3

so einfach, den Dienst nur

von nur maximal 3 Watt im

SCR	no

mit Fernbedienung und OSD

Standby schont der Amiko

RS232	yes

Tastatur auch wirklich sinn-

Mini HD den Geldbeutel und

Ethernet	yes

voll zu nutzen.

das platzsparend und gut

USB 2.0	yes

Abgerundet wird der Funk-

Stromverbrauchs

versteckt irgendwo in den

tionsumfang noch durch drei

Tiefen

integrierte Videospiele, die

Ihrer

Fernsehland-

schaft.

Card Reader	

yes (Conax)

HDTV	yes
MPEG4/H.264	yes

expert
OPINION

AMIKO Mini HD
DVB-S2 HDTV Receiver

CI Slot	no

RECOMMENDED
PRODUCT BY

OSD languages	
	
	
	

English, German, Greek, Italian, Russian, Spanish,
Ukrainian, 	 Rumanian, Hungarian, Croatian,
Bulgarian, Czech, Slovenian, Slovakian, Serbian,
Hebrew, Portuguese, Dutch, Polish

Power Supply	

100 - 240V AC, 50/60 Hz AC / 12V DC

Dimensions	

15 x 11 x 3.5 cm

Weight	

250 g

ENERGY
DIAGRAM

Thomas Haring
Test Center
Austria
Apparent Power

+ Sehr kompakte und platzsparende Bauweise, geringer Strom-

Active Power

verbrauch, übersichtliches OSD, durchdachte Bedienung und alle
Features die man von einem PVR Receiver erwartet sind deutliche
Pluspunkte des Amiko Mini HD, denen keine Negativpunkte gegenüber stehen. Ein insgesamt perfekt gelungener Receiver

– Die Auto DiSEqC Funktion ist aufgrund der nur mit wenigen Einträgen gefüllten Satellitenliste in einigen Fällen nicht in der Lage,
überzeugende Ergebnisse zu liefern. 8 Timerslots sind für einen
PVR Receiver zu wenig.

Die ersten 15 Minuten aktiver Betrieb,
die zweiten 15 Minuten Standby

68 TELE-audiovision International — The World‘s Largest TV Box Magazine — 1
1-12/2013 — www.TELE-audiovision.com

Mode
Apparent Active Factor
Active
15 W
8W
0.53
StandBy
2W
1W
0.5
TEST REPORT

SCR Multischalter

K

70 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
Kaskadierbare SCR
Multischalter von
SPAUN
•	Verfügbar in unterschiedlichen Varianten für verschiedene
Einsatzgebiete
•	Extrem gute Leistung, sogar besser als im technischen
Datenblatt vom Hersteller angegeben
•	Der gleichzeitige Einsatz von SCR Receivern und regulären
Receivern ist möglich
•	Dank sehr schneller Umschaltgeschwindigkeit macht das Zappen
richtig Spaß
•	Die LEGACY Modelle können auch mit regulären, nicht SCR
fähigen Receivern verwendet werden

Teil 2
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

71
TEST REPORT

SCR Multischalter

In Teil 1 dieser Artikelserie
(siehe TELE-audiovision 0910/2013) haben wir Ihnen
zwei Einkabel-Multischalter
aus dem Hause SPAUN vorgestellt: Den SUS 5581/33
NF LEGACY und den SUS
5581 F.
Nun möchten wir auf einige weitere Modelle der
umfangreichen SPAUN Produktpalette näher eingehen,
die sich sowohl in der Anzahl
ihrer Ein- und Ausgänge als
auch in der maximal möglichen Anzahl der zu versorgenden Receiver unterscheiden. Konkret handelt es sich
dabei um die Modelle: SUS
5581 NFA, SUS 5581/33 NFA
LEGACY, SUS 4441 F, SUS
4481 F, SUS 5541 F und SUS
5541 NFA.
Lassen Sie uns aber zuerst rasch erklären, wofür
die Ziffern und Buchstaben
der Produktbezeichnungen
genau stehen: Die ersten
beiden Ziffern geben die
Anzahl der Eingänge und
Stammausgänge an. So bedeutet z.B. „44“, dass der
Multischalter über 4 Satelliteneingänge (von einem
Quattro LNB) und 4 Stammausgänge für vertikales lowund high-Band sowie horizontales low- und high-Band
verfügt.
Enthält die Bezeichnung
statt der 4 eine 5, so bedeutet dies, dass ein zusätzlicher Eingang und Stammausgang für terrestrische
Signale vorhanden ist, der in
den meisten Fällen mit einer
terrestrischen Außenantenne verbunden wird.
Die zweite Ziffernfolge in
der Modellbezeichnung gibt
die Anzahl an SCR Ausgängen sowie die maximale Anzahl an Receivern an, die
darüber verbunden werden
können. Die Ziffernfolge
„41“ bedeutet also, dass eine

Ausgangsleitung vorhanden
ist, an die bis zu 4 Receiver angeschlossen werden
können. Dementsprechend
würde „81“ auf eine Ausgangsleitung mit bis zu 8
möglichen Receivern hinweisen etc. Hinzu kommt
noch die Kombination von
zwei Ziffernfolgen, so steht
z.B. „81/33“ für einen Multischalter, der entweder über
eine Signalleitung bis zu 8
Receiver oder über 3 Signalleitungen bis zu jeweils
3 Receiver versorgen kann.
Der gewünschte Modus lässt
sich dabei jeweils über einen
Drehknopf an der Oberseite
des Multischalters einstellen.
Die Bezeichnung „NFA“
steht für integrierte Verstärker an jedem Satellitensignaleingang, aber Achtung:
Wenn Sie ein modernes
Quattro LNB mit relativ kurzer Verkabelung an so einen
Multischalter
anschließen
könnten Sie leicht die maximal erlaubten 80 dBµV Eingangspegel überschreiten.
Besonders problematisch
wird das auf manchen ohnehin schon starken Transpondern der in Europa häufig empfangenen ASTRA
und HOTBIRD Satelliten. In
diesem Fall würde die Signalqualität an allen Ausgängen signifikant abnehmen,
wodurch deutlich wird, dass
NFA Modelle als dritter oder
vierter Multischalter in einer
ganzen Kaskade von Multischaltern, von denen jeder
das Signal schon deutlich
gedämpft hat, gedacht sind.
Den
Begriff
„LEGACY“
verwendet SPAUN für jene
Multischalter, die über drei
Ausgänge und zwei verschiedene
Betriebsmodi
verfügen: 8x1 oder 3x3. Sie
verhalten sich zudem im 8x1
Modus auf den beiden nicht

11-12/2013
SUS 5581 NFA, SUS 5581/33 NFA LEGACY,
SUS 4441 F, SUS 4481 F, SUS 5541 F
and SUS 5541 NFA
Best products for creating a reliable SCR
distribution system

www.TELE-audiovision.com/13/11/spaun

72 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
für SCR genutzten Ausgängen wie
klassische Multischalter und können so
zwei ganz reguläre Receiver mit Signalen, entsprechend denen eines Universal LNB, versorgen.
Die Verarbeitungsqualität aller getesteten Multischalter ließ, wie von SPAUN
gewohnt, absolut keine Wünsche offen.
Alles war perfekt verarbeitet und dank
der Beschriftungen direkt an den Multischaltern waren auch die Funktionen
der einzelnen Ein- und Ausgänge sofort
ersichtlich.
Da auch die Trägerfrequenzen direkt
am Multischalter abgedruckt sind war
es nicht einmal notwendig, einen Blick
in die Installationsanleitung zu werfen, die mit jedem Produkt ausgeliefert
wird. Wer es, und das empfehlen wir
natürlich, trotzdem tut, der erhält Informationen zu den technischen Parametern und Spezifikationen sowie verschiedene Anwendungsbeispiele.
Da einige der getesteten Modelle eine
externe Spannungsversorgung benötigen liegt diesen ein Steckernetzteil bei.
Es verfügt über verschiedene Steckeraufsätze und kommt mit unterschiedlichen Eingangsspannungen zurecht. Damit ist es praktisch überall auf der Welt
sofort einsatzbereit.
Zusätzlich lagen einigen Modellen
75 Ohm Endstücke bei, die mit den
Stammausgängen verbunden werden,
falls an diesen kein weiterer Multischalter angeschlossen wird. Gerade wenn

■ In der Ausgabe 09-10/2013 der TELE-audiovision stellten wir die

SPAUN SCR Multischalter SUS 5581/33 NF LEGACY und SUS 5581 F vor
www.tele-audiovision.com/TELE-audiovision-1309/eng/spaun.pdf

man die maximal mögliche Signalqualität erreichen möchte sollte man den
Einsatz dieser Endstücke nicht vergessen!
Unsere Testumgebung für die neuen
SPAUN Multischalter beinhaltete diesmal eine 85cm Offset Antenne, die auf

die HOTBIRD Satelliten (13° Ost) ausgerichtet war und an der wir ein Quattro LNB angebracht hatten.
Für den Test der NFA Modelle haben
wir zusätzlich einen 10 dB Signaldämpfer verwendet, damit das Eingangssignal unterhalb der maximal erlaubten 80

74 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
dBµV blieb.
Schon auf den ersten Blick
fiel uns auf, dass das Signalspektrum aller Multischalter
ausgesprochen sauber war.
So gab es fast keine unerwünschten Signale zwischen
den einzelnen SCR Trägern
und das C/R Verhältnis lag
bei über 35 dB! Über solch
optimale Bedingungen verfügt man beim Umgang mit
regulären Satellitensignalen
in der Regel nicht.
Als nächstes haben wir den
Signalpegel bei allen getesteten Produkten gemessen,
dieser lag dabei stets genau
in dem Bereich, den SPAUN
vorsieht.
Unsere Schlussfolgerung

daraus: Egal welche Frequenz Sie mit Ihrem Receiver empfangen möchten,
die SPAUN Multischalter versorgen ihn stets mit einem
gleichmäßig starken Signal.
Abhängig vom jeweiligen
Modell geben die Stammausgänge das Eingangssignal
einfach mit leichter Dämpfung weiter oder verstärken
es oder verstärken und regeln es auf einen bestimmten Pegel.
Die Diagramme 1, 2 und 3
stellen das genauer dar, wobei es sich dabei natürlich lediglich um eine Auswahl der
von uns erstellten Diagramme handelt, da deren Anzahl
sonst den Rahmen des Test-

berichts bei weitem sprengen würde. Glauben Sie uns
bitte einfach, dass auch die
in diesem Test nicht extra angeführten Modelle mit
nahezu identischer Leistung
überzeugten.
Wie sieht es nun aber mit
der Qualität der Ausgangssignale aus? Hat diese deutlich
oder lediglich geringfügig
abgenommen? Die Diagramme 4, 5 und 6 zeigen unsere
Messergebnisse in Form der
MER des Eingangs- und Ausgangssignals im Vergleich.
Wie Sie erkennen können,
hat sich die MER nur ganz
geringfügig verschlechtert,
wobei uns im Zuge des Tests
aufgefallen ist, dass dies nur

■ Graph 1.

■ Graph 2.

■ Graph 3.
76 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

für Ausgangssignale im oberen Frequenzbereich zutrifft.
Die Differenz ist allerdings
dermaßen gering, dass sie
auf den Empfang keinen Einfluß hat.
Selbstverständlich haben
wir auch wo immer möglich
den terrestrischen Eingang
unter die Lupe genommen
und können bestätigen, dass
der Signalverlust, so wie von
SPAUN angegeben, bei unter
4 dB liegt.
Schlussendlich haben wir
noch den Test unter Alltagsbedingungen mit einem richtigen Receiver gemacht und
dabei festgestellt, dass das
Zappen in einem SPAUN SCR
System richtig schnell funk-
tioniert. Das ist besonders
deshalb
interessant
und
wichtig zu wissen, da in einem SCR Netz nicht der Tuner Ihres Receivers auf eine
neue Frequenz umschalten
muss, sondern der SCR Multischalter! Umso mehr freut

■ Graph 4.

■ Graph 5.

■ Graph 6.
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

77
es uns daher, dass Sie keine Angst haben müssen, die
SPAUN Multischalter könnten
das Zappen verzögern. Ganz
im Gegenteil: Sie sind extrem schnell!
Zusammenfassend
können wir bestätigen, dass die
Leistung der SPAUN Multischalter den technischen
Spezifikationen entspricht.
Das Ausgangssignal ist
sehr sauber und kräftig, zudem ist seine MER nur geringfügig schlechter als jene
des Eingangssignals – in
unserem Fall eines Quattro
LNB.
Das SPAUN Produktportfolio enthält eine Vielzahl an
Modellen mit und ohne Ver-

stärkung, passend für vier,
acht, neun (3x3) oder sogar
zehn (8x1 + 2xLEGACY) Receiver, so dass eine Lösung
für nahezu jeden Einsatzbereich zur Verfügung steht.
Möchten Sie mehr Receiver einsetzen als Anschlüsse
zur Verfügung stehen so bieten sich die Stammausgänge
an, die das LNB Signal an einen zusätzlichen SCR Multischalter weiterleiten.
Zudem kann so auch ganz
einfach eine Kombination
aus SCR und klassischen
Multischaltern
verwendet
werden, falls einzelne Receiver in Ihrer Verteilung nicht
mit SCR Signalen umgehen
können.

expert
OPINION

SPAUN SUS 5581 NFA, SUS 5581/33
NFA LEGACY, SUS 4441 F, SUS 4481 F,
SUS 5541 F & SUS 5541 NFA

Jacek Pawlowski
Test Center
Poland

+ Die verschiedenen Modelle machen es einfach Ihre Signalver

teilung zu optimieren
Hervorragende Leistung, die den technischen Spezifikationen
entspricht
Sehr gutes Rauschverhalten
Tadellose Verarbeitung

TECHNICAL
DATA

Manufacturer	

SPAUN electronic GmbH & Co. KG, Germany

Web	www.spaun.com

RECOMMENDED
PRODUCT BY

– keine

E-mail	contact@spaun.com
Phone / Fax	

+49-7731-8673-0 / +49-7731-8673-17

Model	

SUS 5581/33 NFA LEGACY	

Inputs SAT/TERR	
Through loss 5...862 MHz	

SUS 5581 NFA	

4/1/	

SUS 4441 F	

SUS 4481 F	

SUS 5541 F	

SUS 5541 NFA

4/1	 4	 4	 4/1	4/1

< 4 dB	

< 4 dB	

-	

-	

< 4 dB	

Through loss 950...2200 MHz	

12 … 14 dB	

-	

-1 ... 2 dB	

-1 ... 2 dB	

-1 ... 2 dB	

-

Through gain 950...2200 MHz	

-	

12 … 14 dB	

-	

-	

-	

12 … 14 dB

Tap Loss 5...862 MHz	
SAT Input Level	
SAT Output Level (Legacy Mode)	
Output Level 950...2200 MHz	
	
SCR carriers [MHz]	
	
	
	
	
	
	
	
	
Power consumption	

< 4 dB

13 … 15 dB	

4 … 6 dB	

-	

-	

4 … 6 dB	

4 … 6 dB

50 … 80 dBμV	

50 … 80 dBμV	

65 … 95 dBμV	

65 … 95 dBμV	

65 … 95 dBμV	

65 … 95 dBμV

73 dBμV	

N/A	

N/A	

N/A	

N/A	

N/A

1x8: 95 dBμV	
3x3: 82 dBμV	

95 dBμV	

95 dBμV	

95 dBμV	

95 dBμV	

95 dBμV

974	
1076	
1178	
1280	
1382	
1484	
1586	
1688	
1790 (only in 3x3 setup)	
< 7 W	

974	1210	
974	974	974
1076	 1420	1076	1076	1076
1178	1680	1178	1178	1178
1280	 2040	1280	1280	1280
1382		1382
1484		1484
1586		1586
1688		1688
< 7W	

-	

-	

78 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

-	

< 7W
TEST REPORT

Triple Tuner PVR HDTV Receiver

Icecrypt
S3700CHD

80 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
•	sehr rasche Reaktionsgeschwindigkeit
dank neuester CPU
•	sehr schneller Blindscan
•	eigener App-Store erweitert die
Mediamöglichkeiten des Receivers
•	PVR-Funktion für zwei Aufnahmen,
während eine dritte live gesehen wird
•	Motorparameter können auf alle
Satelliten übertragen werden

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

81
TEST REPORT

Triple Tuner PVR HDTV Receiver

Triple Tuner PVR
Die sehr elegante Frontpartie des neuen Icecrypt
S3700CHD
mit
seinem
perfekt lesbarem VFD Display offenbart hinter einer
Klappe versteckt zwei Conax Smartcardleser, des
weiteren insgesamt sieben
Tasten zur Steuerung ohne
Fernbedienung sowie einen
USB Port. An der Rückseite
des Triple Tuner Receivers
stechen sofort die drei Tunereingänge samt Loop-

Ausgängen (2x DVB-S2,
1x DVB-T/C) ins Auge. Daneben findet man noch einen USB , HDMI und RJ-45
Netzwerkanschluss, 3 RCA
Buchsen für Stereo Audio
und Composite Video, eine
Scart Buchse, einen optischen und koaxialen Audiodigitalausgang, einen UHF
Modulator sowie eine RS232
Buchse und einen mechanischen Netzschalter.
Die vom Hersteller mitge-

lieferte Fernbedienung liegt
angenehm in der Hand, ist
übersichtlich
beschriftet
und weist vor allem zwischen ihren Tasten ausreichend Platz auf, so dass
sie auch von nicht ganz so
zarten Fingern problemlos
verwendet werden kann.
Das in Deutsch und Englisch verfügbare Handbuch
stellte uns ebenfalls voll
und ganz zufrieden.
Gleich zu Beginn des Erstinstallationsassistenten
werden Grundeinstellungen
wie die gewünschte OSD
Sprache, die Zeiteinstellung
sowie die Netzwerkpara-

0.59

meter abgefragt, ebenso
die Auswahl der gewünschten
Videosignalauflösung.
Hier hat uns besonders
gefreut, dass der Receiver
1080p unterstützt und somit dank Full-HD Kompatibilität
zukunftstauglich
ist. Abgeschlossen wird die
Ersteinrichtung noch durch
das Festlegen eines persönlichen PIN Codes sowie
die Möglichkeit, die automatische Benachrichtigung
über Softwareupdates oder
wichtige Informationen des
Hersteller
zu
aktivieren
bzw. zu deaktivieren.
Nach Abschluss der Erstinstallation läßt sich über
das Hauptmenü rasch ein
Sendersuchlauf durchführen, wobei der Hersteller
insgesamt 50 Satelliteneinträge in der internen Daten-

11-12/2013
Icecrypt S3700CHD
Hervorragende Hardware in Verbindung
mit ausgereifter und einfach zu
bedienender Software

www.TELE-audiovision.com/13/11/icecrypt

82 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
1

2

3

4

5

bank vorprogrammiert hat.
Leider fehlen ein paar Einträge, was sich durch den
Vergleich der Ergebnisse eines Blindscansuchlaufs und
eines regulären Suchlaufs
auf dem HOTBIRD 13° Ost
rasch herausstellte. Gefreut
hat uns, dass softwareseitig
alle DiSEqC Protokolle (1.0,
1.1, 1.2 und 1.3) sowie frei
definierbare LOF Werte und
auch SCR Einkabellösungen unterstützt werden. Ein
pfiffiges Detail ist die Möglichkeit, die gewählten Motorparameter (DiSEqC 1.3)
eines einzelnen Satelliteneintrags auf alle Satelliteneinträge in der Datenbank
zu übertragen. Wie viele
Receiver hatten wir schon
im Test, bei denen wir diese
Einstellung für jeden einzelnen Eintrag mühsam manuell vornehmen mussten.
Wer übrigens nicht genau
weiß, an welchem Port seines DiSEqC Multischalters
der gerade gewünschte Satellit angeschlossen ist, der
kann sich durch die Auto
DiSEqC Funktion einen Hinweis geben lassen; ein äußerst praktisches Feature
der Icecrypt Software.
Suchlaufseitig
stehen
der automatische Suchlauf
über einen oder mehrere
Satelliten sowie über einen
oder mehrere Transponder
zur Auswahl bereit, aber
auch an die Blindscansuche wurde gedacht. Während der reguläre Suchlauf
in 5 Minuten 1518 TV- und
361 Radioprogramme am
HOTBIRD 13° Ost ans Tageslicht brachte erkannte
die Blindscansuche in 8 Minuten 1707 TV- und 414 Radioprogramme. Wir meinen,
dass diese drei zusätzlichen
Minuten in Anbetracht des
hervorragenden Suchlaufergebnisses gut investierte
Zeit sind.
Im
terrestrischen
Bereich muss man sich vor
dem
Suchlauf
zwischen
DVB-T und DVB-C entscheiden. Leider unterstützt der
neue
Icecrypt
Receiver
kein DVB-T2; gerade HDSender verwenden dieses
neue Übertragungsformat.

84 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

Für einen automatischen
Suchlauf über das gesamte Frequenzband benötigte
der S3700CHD etwas mehr
als drei Minuten. Dank einer
vom Anwender aktivierbaren +5V Versorgungsspannung über den Innenleiter
des Koaxialkabels können
auch DVB-T Antennen mit
integriertem
Verstärker
verwendet werden.
Erfreulicherweise
kennt
die Icecrypt Software keine Beschränkung der maximalen Anzahl an Kanälen
innerhalb der Kanalliste;
trotzdem empfiehlt es sich,
nach dem Suchlauf aus
Gründen der Übersichtlichkeit erstmal für Ordnung
zu sorgen. Dazu können
einzelne Sender verschoben, umbenannt, mit einem
PIN Code gesperrt oder
gelöscht werden, ebenso
wie die Kanalliste anhand
der Kategorien Satelliten,
A-Z, Provider, CAS, HD,
Broadcaster oder Favoriten sortiert werden kann.
Apropos Favoriten: Insgesamt 32 frei benennbare
Favoritenlisten stehen zur
Auswahl bereit und erlauben dem Anwender, rasch
auf seine Lieblingssender
1: Installationsassistent des
Icecrypt S3700CHD
2: Zeiteinstellung
3: Netzwerkeinstellungen
4: Videoausgangssignaleinste
llungen
5: Im Rahmen der
Erstinstallation muss der
Anwender auch einen PIN Code
definieren
6: Über neue Software bzw.
wichtige Hinweise kann der
Anwender direkt am Receiver
informiert werden
7: Das Hauptmenü des Icecrypt
S3700CHD
8: Installationsmenü
9: Softwareupgrade via USB
10. Tunereinstellungen
11. DiSEqC 1.3 Einstellungen
12. Die DiSEqC 1.3
Einstellungen können
auf Wunsch für alle
Satelliteneinträge übernommen
werden
13. Die Auto-DiSEqC Funktion
erkennt automatisch an
welchem Port der gewünschte
Satellit angeschlossen ist
14. Blindscan Suchlauf
15. Die Blindscan Suche
hat 1707 TV- und 414
Radioprogramme auf dem
HOTBIRD 13° Ost entdeckt
6

11

7

12

8

13

9

14

10

15

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

85
16
6
16. Einzelne Transpondereinträge können gelöscht, hinzugefügt
oder bearbeitet werden
17. Beim dritten Tuner muss sich der Anwender zwischen DVB-T
und DVB-C entscheiden
18. Tunereinstellungen im terrestrischen Bereich
19. Terrestrischer Suchlauf. DVB-T2 wird nicht unterstützt, deshalb
kann der Receiver auch nur 13 TV- und 1 Radiosender einlesen
20. Die 32 Favoritenlisten können individuell benannt werden
21. Bearbeiten einer Favoritenliste
22. Bearbeiten der Kanalliste
23. Diverse Grundeinstellungen
24. A/V Einstellungen

17

21

18

22

19

23

20

24

86 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
25
6

26

zugreifen zu können. Dank
des besonders übersichtlich
gestalteten
Einstellungsmenüs kann der Benutzer
eines S3700CHD sehr einfach auf die verschiedenen
Parameter seines Receivers
Einfluss nehmen und hier
lässt dieser wirklich keine
Wünsche offen: Sei es nun
eine automatische Aufnahmeverlängerung, die Größe
des Timeshift Zwischenspeichers, der drahtlose
Internet bzw. Netzwerkzugang via externem WiFi
bzw. 3G Dongle, die Sicherung der Kanalliste und aller
Einstellungen auf ein externes Speichermedium oder
die Aktualisierung der Software – alle Funktionen können problemlos konfiguriert
und verwendet werden.
Wie bei nahezu allen Receivern üblich öffnet ein
Druck auf die OK Taste die
Kanalliste des S3700CHD,
die sich in drei Spalten gliedert. Ganz links wählt der
Anwender die gewünschte
Gruppe an Sendern (Alle,
Favoriten, Satelliten, A-Z,
Provider, CAS, HD, Top und
Broadcaster), während in
der zweiten Spalte eine weitere Unterauswahl getroffen
wird (welches Verschlüsselungssystem, welche Favoritenliste, welcher Provider
etc.). In der dritten, äußerst
rechten Spalte werden dann
die so gefilterten Kanäle

angezeigt und stehen dem
Anwender zur Auswahl zur
Verfügung. Besonders gut
gefallen hat uns, dass die
Software auch die elektronische Programmzeitschrift
(EPG) in die Kanalliste integriert, denn drückt man in
der dritten Spalte nochmals
die Pfeiltaste rechts an der
Fernbedienung so blendet
der Receiver die EPG Daten
der aktuellen Sendung aller
in der Kanalliste gerade angezeigten Programme ein.
Ein nochmaliger Tastendruck offenbart dann den
25. Die Icons der TV-Wall
Funktion können aus dem
Internet geladen werden
26. Aufnahmeeinstellungen
27. 3G
Verbindungseinstellungen
28. Web Server Einstellungen
29. Die gesamte Kanalliste
kann auf einem externen
Speichermedium gesichert
werden
30. Wichtige Nachrichten
des Herstellers würde der
Receiver an dieser Stelle
auflisten
31. Wettervorhersage
32. FAQ und
Bedienungsanleitung sind
direkt in der Software
verfügbar
33. Die integrierten
Multimediafeatures des
Icecrypt S3700CHD
34. YouTube
35. Shoutcast
36. Picasa
37. Opera Webbrowser
38. IPTV Player
39. WebTV Player

27

28

29

88 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
30

35

31

36

32

37

33

38

34

39

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

89
44
40. Ebay App
41. Sender können direkt in der Kanalliste bearbeitet werden
42. Das Programm der nächsten Stunden eines Senders
43. Erweiterte Sendungsbeschreibung
44. Die Infoleiste mit dem Titel der aktuellen und folgenden
Sendung
45. Kanalsuche mit vollständiger OSD Tastatur
46. Kanalsuche mit OSD Tastatur im SMS Stil
47. Sprachwahl
48. Teletext, Untertitel und die gewünschte Audiosprache können
ganz einfach gewählt werden

40

45

41

46

42

47

43

48

90 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
49
6

50

51

Inhalt der folgenden Stunden des derzeit gewählten
Senders in voller Übersicht.
Wir meinen, dass man einfacher und praktischer wohl
kaum auf den EPG zugreifen
kann.
Dank einer eigenen Taste an der Fernbedienung
steht dem Benutzer eines
S3700CHD auch die gezielte
Suche nach einzelnen Senders über deren Namen zur
Verfügung, die dazu eingeblendete OSD Tastatur lässt
sich in zwei verschiedenen
Modi (entweder als vollständige Tastatur oder wie vom
Telefon gewohnt mit mehrfacher Zusatzbelegung der
Zifferntasten) anzeigen.
Im alltäglichen Betrieb
hat uns der neue Icecrypt
Receiver mit seiner raschen
Reaktion auf Fernbedienungsbefehle
begeistern
49. EPG Anzeige
50. Die verschiedenen
Sortiermöglichkeiten der
Kanalliste
51. Satellitenauswahl
52. MP3 Wiedergabe
53. Bildbetrachter
54. Wiedergabe eines AVI
Testvideo
55. Wiedergabe eines DivX
Testvideo

52

54

53

55

92 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

können. Kein Wunder, stehen doch neben einer 450
MHz CPU auch 2 MB NOR
Flash, 512 MB NAND Flash
sowie 2x 128MD DDR2 Arbeitsspeicher zur Verfügung. Auch an der Bild- und
Tonqualität des S3700CHD
gab es im Praxistest nichts
auszusetzen und dank der
zügigen Kanalumschaltgeschwindigkeit von unter 1
Sekunde macht auch das
Zappen Spaß. Mit Hilfe der
HbbTV Funktion hat der
Anwender bei HbbTV kompatiblen Sendern Zugriff
auf erweiterte Inhalte wie
Mediatheken, eigenen EPG
und vieles mehr. Als PVR
Receiver unterstützt der
S3700CHD zwei Aufnahmen
gleichzeitig, während eine
dritte Sendung live gesehen
wird. Hier hätten wir uns
allerdings gewünscht, dass
drei oder vielleicht sogar
vier Aufnahmen zur selben
Zeit durchgeführt werden
können.
Neben den Grundfunktionen glänzt der neue Icecrypt Receiver erfreulicherweise durch jede Menge
Zusatzfeatures, die dem
Anwender
kostenlos
zur
Verfügung stehen. Beson-
ders erwähnenswert ist in
diesem Zusammenhang sicherlich die in die Icecrypt
Software integrierte Nachrichtenfunktion, dank deren
Hilfe der Hersteller seine
Kunde via OSD Einblendung
mit wichtigen Informationen (z.B. neue Software
etc.)
informieren
kann.
Auch das Softwareupgrade
geht ganz einfach vonstatten, besonders hat uns dabei gefreut zu sehen, dass
dem Endverbraucher auch
eine Änderungshistory mit
detaillierten Informationen
angeboten wird. Insgesamt
legt die Software ganz besonderen Wert auf einfache
Bedienung, da war es dann
auch nur folgerichtig, dass
man das Handbuch kurzerhand digitalisiert hat und
zusammen mit einer FAQ
Übersicht direkt im Menü
des Receivers zur Anzeige
anbietet. Vorbei sind also die
Zeiten, in denen der Anwender das Handbuch erst suchen und aus den Tiefen ir-

gendwelcher Schränke und
Schubkästen kramen muss.
Ein Tastendruck genügt und
schon steht es top aktuell
am Fernseher bereit. An
Multimediafeatures enthält
die Icecrypt Software neben der fast schon obligatorischen Wettervorhersage
auch Clients für die Dienste
YouTube, Shoutcast (Internetradio), Picasa (Bilder)
und den russischen Pay-TV
Anbieter Kartina TV. Hinzu
kommen ein Web Browser
(Opera), ein FTP Client sowie ein RSS Feedreader.
Die Punkte IPTV und WebTV ergänzen das Angebot,

leider sind hier aber weder
IPTV noch WebTV Sender
vorprogrammiert, so dass
der Anwender die von ihm
gewünschten Angebote manuell hinzufügen muss. Uns
hat im Praxistest auf jeden
Fall sehr gefreut, dass alle
integrierten Dienste problemlos funktioniert haben,
egal ob es sich dabei um die
Wiedergabe eines YouTube Videos, eines Shoutcast
Streams oder die Anzeige
von RSS Feeds bzw. einer
Website gehandelt hat.

56

58

57

Natürlich darf auch eine
Abspielmöglichkeit für eigene Musiktitel und Videos
nicht fehlen; dafür unterstützt der S3700CHD die
Formate AVI, MKV, MPG,
TS, WMA, WMV, M2TS, FLV,
DAT, ASF sowie MP3, und
natürlich ließ uns auch der
Bildbetrachter mit den letzten Urlaubsfotos im JPEG
Format nicht im Stich.
Abgerundet wird der Funk-

59

56. Die Sexview App lässt sich einfach über den App Store auf den
Icecrypt Receiver laden
57. Über die Sexview Website muss der Anwender den am Receiver
angezeigten Authorisierungscode bei der Registrierung eingeben
58. Hauptmenü der Sexview App
59. Dank PIN Abfrage ist der Jugendschutz jederzeit gewährleistet
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

93
60

63

61

64

62

65

94 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
60. Wiedergabe eines Flash
Testvideo
61. Wiedergabe eines MOV
Testvideo
62. Wiedergabe eines MP4
Testvideo
63. Wiedergabe eines TS
Teststream
64. HbbTV wird unterstützt
65. Die TV-Wall Funktion der
Icecrypt Software

tionsumfang noch durch einen hauseigenen App Store
mit dutzenden kostenlos
verfügbaren Erweiterungen
für den S3700CHD. Egal ob
Ebay Client, Mediatheken,
Sportnachrichten,
Spiele
oder sogar Essensbestel-

lungen beim Lieferservice
um die Ecke: Es stehen für
nahezu alle Einsatzbereiche die passenden Apps zur
Verfügung.
Ein
Exklusivangebot
ist der Erwachsenensender Sexview, der nur mit
den
Icecrypt
Receivern
T2300HD und S3700CHD
zur Verfügung steht. Nach
einer kurzen Registrierung
über die Website des Anbieters wird dem persönlichen Account die MAC
Adresse des eigenen Receivers
zugeordnet,
so
dass das Gerät eindeutig
adressierbar wird. Im Test

ENERGY

hat der Service problemlos
funktioniert, auch bei der
Bildqualität gab es nichts
auszusetzen.
Vorbildlich
fanden wir zudem, dass
diese App mittels PIN Code
vor neugierigen Blicken geschützt ist.
Abschließend
möchten
wir noch auf ein besonders
schön gestaltetes Feature
des neuen Icecrypt Receivers hinweisen, die TV-Wall
Funktion. Diese kann an-

stelle der regulären Kanalliste eingeblendet werden
und zeigt die Namen und
Logos von jeweils 20 Sendern inkl. deren EPG Daten
und einem live Vorschaubild übersichtlich an. Besonders gefreut hat uns im
Test, dass die Senderlogos
direkt aus dem Internet geladen werden können und
es sogar möglich ist, diese
individuell am PC zu bearbeiten.

expert
OPINION

Icecrypt S3700CHD
Triple Tuner PVR

RECOMMENDED
PRODUCT BY

DIAGRAM

Apparent Power

Thomas Haring
Test Center
Austria

Active Power

Mode
Apparent Active Factor
Active
21 W
12.5 W 0.59
Active StandBy 19 W
11.5 W 0.60
Sleep StandBy
8W
3 W 0.75

+ Der S3700CHD ist ein grundsolider und bestens ausgestatte-

Die ersten 15 Minuten aktiver Betrieb, die zweiten 15 Minuten
Standby ohne Energiesparfunktion (der Receiver ist sofort
wieder einsatzbereit), die dritten 15 Minuten Standby mit
Energiesparfunktion (der Receiver benötigt einige Zeit bis er
wieder einsatzbereit ist).

ter Triple Tuner PVR. Er verfügt über eine hervorragende Softwareplattform, die dem Anwender unzählige praktische Features
und Funktionen zur Verfügung stellt. Dank Full-HD Unterstützung
und konstanter Weiterentwicklung der Software ist der neue Icecrypt Receiver zukunftstauglich.

– Der terrestrische Tuner unterstützt leider kein DVB-T2, es sind
nur zwei Aufnahmen gleichzeitig möglich.

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

95
TEST REPORT

Testsignal-Generator

WORK
Microwave
Handheld
Satcom
Test Source

96 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
•	Haupt-Einsatzgebiet in Satelliten Uplink-Stationen
•	ermöglicht die Messung von Intermodulationen und
Kompressionspunkten
•	auch ideal geeignet, um Messgeräte zu kalibrieren
und zertifizierte Messungen damit zu protokollieren
•	eingebauter Sweep-Generator ermöglicht die
Messung und Protokollierung von Kabelinstallationen
•	eingebaute Batterien machen das Gerät universell
einsetzbar

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

97
TEST REPORT

Testsignal-Generator

Die Referenz
bestimmt die Qualität
Um komplexe Anlagen
einzumessen,
Messgeräte
zu kalibrieren oder Hochfrequenzkonverter zu testen
benötigt man einen Testsignal-Generator. Dieser erzeugt ein Signal auf einer
definierten Frequenz und
mit einem spezifischen Leistungspegel, wobei die Genauigkeit extrem wichtig ist,
da dieses Signal als Referenz
genutzt wird.
WORK Microwave hat genau einen solchen professionellen Testsignal Generator
im Angebot, der Signale von
50-180 MHz und von 9502150MHz erzeugen kann.

Ausgeliefert wird die Handheld Satcom Test Source in
einer gut geschützten Verpackung. In dieser befinden
sich ein roter AluminiumKoffer, zwei USB-Kabel (A-B)
und ein Netzkabel.
Öffnet man den roten Aluminium-Koffer findet sich
darin gut gepolstert der Signal-Generator, das Netzteil,
ein USB-Speicher, die Bedienungsanleitung und ein Zertifikat. Mit diesem Konformitäts-Zertigikat
bescheinigt
WORK Microwave, dass die
ausgelieferte Handheld Satcom Test Source die gelisteten Parameter einhält; es

wird sogar darauf hingewiesen, dass auf Anfrage sämtliche Dokumentation, die
zur Herstellung des SignalGenerators erzeugt wurde,
angefordert werden kann.
Durch eine solche Dokumentation ergibt sich eine
Rückverfolgbarkeit:
alle
Messwerte können bis zu
zum Hersteller WORK Microwave zurückverfolgt werden,
wodurch sich Diskussionen
über Messergebnisse ausschließen. Die mitgelieferte
Bedienungsanleitung
erklärt auf 15 Seiten sämtliche
Funktionen in ausführlicher
aber leicht verständlicher
Form. Die Installation des
Gerätes ist denkbar ein-

fach. Es muss lediglich die
ausführbare Datei vom USB
Speicher ausgeführt werden.
Eine Installation ist nicht
notwendig. Natürlich kann
das Programm auch auf die
Festplatte kopiert werden.
Auf dem USB Speicher ist
außerdem eine Kopie des
Handbuchs als PDF Datei
vorhanden – vorbildlich. Eine
Treiberinstallation ist nicht
notwendig, da Windows XP,
Windows Vista und Windows
7 das Instrument als HID
(„Human Interface Device“)
erkennt und automatisch in
das Betriebssystem einbindet.
Das Gehäuse der Handheld Satcom Test Source
hat ein längliches Format
und besteht aus Aluminium.
Keine Zweifel, es handelt
sich um ein robustes Gerät,
dass zusätzlich vorne und
hinten durch hartes Plastik
geschützt ist. Auf der Vorderseite befinden sich der
Spannungseingang
(12V

11-12/2013
WORK Microwave
Handheld Satcom Test Source
Ermöglicht präzise und zertifizierte
HF-Messungen

www.TELE-audiovision.com/13/11/work-microwave

■ TELE-audiovision Editor Vitor
in action. It's not nearly as
difficult as it looks.

98 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

99
1
- 24V), zwei USB Eingänge (Typ B) und drei StatusLEDs. Die erste LED zeigt
den Zustand des Gerätes an
(OK oder Fehler), die zweite
LED dient zur Anzeige des
Ladestatus des Akkus und
die dritte LED dient zur Anzeige des System-Status.
Die beiden USB-Eingänge haben unterschiedliche
Funktionen. USB1 dient zur
zusätzlichen Spannungsversorgung und für die Datenkommunikation mit dem PC.
USB2 dient ausschließlich
zur Stromversorgung, wenn
der Anwender das externe Netzteil nicht benutzen
kann.
Die Handheld Satcom Test
Source verfügt über einen
internen Akku, mit welchem
das Gerät auch unabhängig
von einer Stromleitung betrieben werden kann. Genial
und doch eigentlich selbstverständlich für einen tragbaren Signal-Generator. Interessanter ist die Tatsache,
dass das Gerät auch von einem PC bzw. Laptop mittels
USB geladen und betrieben
werden kann. Da eine USBSchnittstelle aber zu wenig
Strom liefert ist es möglich,
die Handheld Satcom Test
Source an zwei USB-Ports
anzuschließen. Clever!
Auf der Rückseite befindet sich der Ein/Aus-Schalter. Weiterhin sind hier eine
BNC-Buchse vorhanden, die
ein Referenzsignal (10 MHz)
ausgibt, sowie eine SMABuchse, an welcher das vom
Signal-Generator erzeugte
Signal anliegt.
Das Gerät ist in der Lage,
an
dieser
Buchse
eine
Gleichspannung
auszugeben, was durch eine zusätzliche LED angezeigt wird.
Die Steuerung des Gerätes
erfolgt über eine WindowsSoftware, die auch eine
Sweep-Funktion beherrscht.

Messung von
Hochfrequenzkonvertern

Das
Haupteinsatzgebiet
der Handheld Satcom Test
Source ist die Messung ver-

schiedener Parameter von
Hoc hfr equenzkonver ter n.
Diese
HF-Konverter,
die
WORK Microwave ebenfalls
anbietet, wandeln das zu
sendende Signal von der Eingangsfrequenz auf eine höhere Ausgangsfrequenz um.
Da sich diese hochfrequenten Signale innerhalb
einer Satelliten-Uplink-Station aber zwischen den verschiedenen Geräten (Modulatoren, Multiplexer, usw.)
nicht über Kabel verlustfrei
leiten lassen sondern nur
über Hohlleiter oder sehr
teure Koaxkabel, geht man
einen anderen Weg und bearbeitet das Signal solange
in den Frequenzbereichen
von 50 MHz bis 180 MHz
oder von 950 MHz bis 2150
MHz, bis es fertig aufbereitet in die Uplinkeinheit eingespeist wird. Erst jetzt wird
es im letzten Schritt durch
den Hochfrequenzkonverter
in den Satelliten-Uplink-Frequenzbereich gewandelt.
Es ist selbstverständlich,
dass der Hochfrequenzkonverter dabei keine Fehler
produzieren darf, da dies
zum Beispiel benachbarte
Transponder oder gar den
regulären Satellitenbetrieb
stören kann.
Ein solcher Störeffekt wird
Intermodulation
genannt.
Dabei beeinflussen sich zwei
Signale, die auf naheliegenden Frequenzen moduliert
sind so, dass weitere Signalpegel seitlich zu den beiden
Frequenzen entstehen.
Bei diesem Effekt handelt
es sich nicht um die bekannten Oberschwingungen, die
an ganzzahligen Vielfachen
der modulierten Frequenz
auftreten, denn die Intermodulation macht sich direkt links und rechts neben
den beiden interferierenden
Signalen bemerkbar (siehe
Bild 1).
Um zu prüfen, in wie weit
ein Hochfrequenzkonverter
den Effekt dieser Intermodulation minimieren kann,
benötigt man zwei HF-Testquellen, um zwei benachbarte Signalpegel mit bekannten
Parametern zu modulieren.
Diese beiden Signalpegel

2

1: Intermodulationen treten unmittelbar neben dem Nutzsignal auf
- siehe rot gekennzeichnete Signale
2: Der Kompressionspunkt ist bei genau 1 dB definiert, ab dem die
Signalqualität von der Ideal-Kennlinie abweicht

werden dann in den Hochfrequenzkonvertern
eingespeist und anhand eines
Spektrum-Analysators kann
man sich dann ein Bild der
Intermodulation machen.
Genau aus diesem Grund
hat WORK Microwave der
Handheld Satcom Test Source zwei unabhängige Synthesizer spendiert, so dass
man nun mit einer einzigen
HF-Testquelle diese Messung
durchführen kann.
Dies reduziert natürlich erheblich die Kosten in der Anschaffung der HF-Testquelle,
denn man braucht nur eines
dieser Instrumente, statt
wie üblich zwei. Doch gleichfalls wichtig ist der Umstand,
dass der Testaufbau stark
vereinfacht ist, denn es
muss nur ein einziges Kabel
an den Up-Converter angeschlossen werden.
Ein weiterer Parameter,
der bei Hochfrequenzkonvertern
gemessen
wird,

100 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

ist der sogenannte 1 dB
Kompressions-Punkt.
Diese Messung dient dazu, das
nicht lineare Verhalten des
Hochfrequenzkonverters zu
messen. Dazu wird die Amplitude des Eingangssignals
langsam erhöht, bis die Signalverzerrung durch Nichtlinearität am Ausgang genau
1 dB von der idealen Kennlinie abweicht (siehe Bild 2).
Die rote Linie zeigt die
ideale Ausgangsleistung. Ab
einer bestimmten Eingangsleistung, beginnt der Hochfrequenzkonverter
jedoch
das Signal zu verzerren und
stellt eine geringere Leistung am Ausgang bereit –
daher auch der Name „Kompression“: es wird weniger
Leistung ausgegeben, der
Signalpegel ist komprimiert.
Um verschiedene Geräte
vergleichen zu können misst
man die Eingangsleistung,
die zu einer Kompression
von genau 1 dB am Ausgang
führt. Hier bewährt sich die
WORK Microwave Handheld
Satcom Test Source mit der
Möglichkeit, das Testsignal
auf einer beliebigen Frequenz von 50 MHz bis 180
MHz und 950 MHz bis 2150
MHz mit einer Leistung von
-45 dBm bis -5 dBm in 0.5 dB
Schritten zu erzeugen.
Schließlich gilt es, bei

H o c h f r e q u e n z ko nve r t e r n
auch deren Konversionsgewinn zu messen. Genau wie
bei der Messung des 1 dB
Kompressionspunktes wird
hier ein Signal mit bekannter Leistung eingespeist und
mittels Spektrum Analysator
die Signalleistung am Ausgang gemessen.
Natürlich könnte man auch

ein echtes Nutzsignal einspeisen und dieses messen.
In diesem Fall würde die
Messung aber durch verschiedene Faktoren recht
ungenau ausfallen, weshalb
es einfach notwendig ist,
eine kalibrierte HF-Testquelle zu benutzen.
In all diesen Einsatzgebieten zeigt sich, das WORK

1
6

4

2

Microwave ein ausgereiftes
und gut durchdachtes Instrument entwickelt hat: zwei
unabhängige
Synthesizer
können simultan zwei Signale einspeisen, um Intermodulationen zu messen.
Die frei wählbare Ausgangsleistung der Handheld
Satcom Test Source ermöglicht die Messung des 1 dB

5

3

1. The application that controls the Handheld Satcom
Test Source is an easy to use tool which basically
consists of this main window. Thumbs up for the nice
graphical scheme, that perfectly explains what each
parameter and button is used for.
2. First you need to connect the software with the
Test Source. This takes exactly 5 seconds and both
Windows XP and Windows 7 did install the instrument
automatically without the need to provide any drivers.
3. Once the instrument is connected, the status in the
upper part of the window is updated. In this case, the
power is provided through two USB cables.
4. The sweep generator opens in a separate window
and allows to specify rage frequency range, the up
and down increment and speed, as well as the pause
between sweeps.
5. It is of course possible to use the Handheld Satcom
Test Source without a connected laptop. You just
need to set up the desired parameters and store them
in the instrument. When you then turn it on, it will use
these parameters automatically. Great if you need to
measure several devices with the same input signal.

102 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
Kompressionspunktes
und
ebenso kann man auch den
Konversionsgewinn messen.
Die Handhabung der WORK

1

Microwave Handheld Satcom
Test Source wird durch weitere Details vereinfacht: ein
Akku erlaubt den stunden-

langen Betrieb ohne Netzanschluss und weil man die
Funktionsparameter
auch
im Gerät speichern kann ist

auch ein Betrieb ohne Verbindung zu einem Laptop
möglich, zum Beispiel wenn
man den Konversionsgewinn

4

2
■ The setup to test and evaluate the

WORK Microwave Handheld Satcom
Test Source. Notice the 50 Ohm to 75
Ohm impedance matching adapter from
HP. Tests confirmed the theory: in our
case the error was insignificant, so I
dispensed the use of the adapter.

3

104 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
an mehreren Geräten misst.
Ein weiterer Pluspunkt ist der
BNC-Ausgang, an dem ein
kalibriertes 10 MHz Signal

5

anliegt, mit dem verschiedene Geräte der HF-Technik
angesteuert werden können:
somit entfällt ein weiteres

separates Gerät.

Kalibrieren
von Messgeräten

In der letzten TELE-audiovision Ausgabe haben wir
den Deviser S7000 TV Analyzer getestet und waren von
diesem Gerät schwer beeindruckt, bietet es doch alle
denkbaren Funktionen, die
ein TV Messgerät und Analysator haben kann. Auch die
Messgenauigkeit konnte sich
im Vergleich zu unseren Referenz-Messgeräten zeigen
lassen.
Mit der WORK Microwave
Handheld Satcom Test Sour-

1. The Handheld Satcom
Test Source is configured
to generate a signal at 1000
MHz with -15 dBm and the
Deviser S7000 correctly shows
the signal at this frequency.
However, the units are shown
in dBµV as I forgot to configure
them properly.
2. Fortunately, the
Deviser S7000 allows the
measurements to be shown in
dBµV, dBmV or dBm. The latter
one is what I need.
3. And now the Deviser S7000
is showing the measurement
value of -16.5dBm. The
deviation of -1.5 dBm is not a
measurement error but rather
the effect of having too much
signal level on the cable I am
using.
4. Reducing the signal
output to -35 dBm on the test
source produces a readout of
-35.9 dBm. Excellent result,
considering these two devices
are manufactured at opposite
sides of the world.
5. The Handheld Satcom
Testscoure can actually
output two different signals
simultaneously. Here I
configured one -35 dBm signal
at 1000 MHz and the other at
1100 MHz with -15 dBm.
Again, this signal level is
correctly identified and
confirmed by the Deviser
S7000. Simply brilliant.

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

105
6

8

7

ce wollte ich es aber genau
wissen: wie genau misst der
Deviser S7000 wirklich?
Der Signal-Ausgang der

6. Now for something
9
completely different. At 75
MHz a signal of -35 dBm is
generated and measured
with a deviation less
than 1 dBm. Absolutely
amazing.
7. Since the Deviser S7000
supports two markers
in CATV mode which is
used to measure the tilt
between two channels, I
generated one signal at 80
MHz with -35 dBm and a
second signal at 100 MHz
with -45 dBm. Incredibly,
the deviation was -0.1
dBm and -0.2 dBm,
respectively. The tilt was
measured with 9.9 dB.
8. To test the end of scale
I generated a signal at 2000 MHz with -15 dBm. Again the Deviser
S7000 measured this signal with an amazing precision.
9. To test the sweep generator several slop step intervals had to be
tested in order to allow the spectrum analyser function to sample
enough data to correctly measure the signal.
10. With a slop step interval of 500 ms the Deviser S7000 produced
good results so I started the test run.
11. First I measured the whole spectrum with the MAX function
active. This way we can see the whole range at the end of the test.
The result is excellent with the spectrum oscillating about 3 dB
around -35 dBm, which is the output level setup on the Handheld
Satcom Test Source. This oscillation is an acceptable error and
due to the fact that I was giving the spectrum analyser just about
the time to render the spectrum.
12. This picture shows the same output signal, but this time the
signal had to pass a multi switch and about 20 meter of cable, an
aerial socket and then another cable before reaching the spectrum
analyser. Notice that only the upper curve is of interest. The result
is clear to see: there is an over attenuation of about 10 dB to 15 dB.
Also, it is clear to see that the attenuation is not uniform.

Handheld Satcom Test Source ist auf 50 Ohm spezifiziert, der Eingang des Deviser S7000 allerdings auf

75 Ohm, wie es eben für TV
Anwendungen üblich ist. Ich
habe deshalb einen Impedanz-Wandler von Hewlett

106 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

Packard genommen (Modell
08590-60090), der für den
Frequenzbereich von 1 MHz
bis 1.8 GHz spezifiziert ist.
10

11

12

Dieser
Impedanz-Wandler
erzeugt eine Dämpfung von
-15dBm.
Die
WORK
Microwave
Handheld Satcom Test Source zeigte hier, dass das Profi-Messgerät mit einer Abweichung von unter 1 dBm
misst. Dies ist extrem wenig
und ein Resultat der exakten
Anwendung internationaler
Normen in der Entwicklung
und Produktion.
Die Bilder belegen die
Messwerte im Bereich von
50 MHz bis 180 MHz sowie
von 950 bis 2150 MHz. Dies
ist absolut innerhalb der
Messgenauigkeit des Gerätes und der im Zertifikat der
WORK Microwave Handheld
Satcom Test Source angegebenen Abweichung.
Eine weitere hervorragende Anwendung der Handheld Satcom Test Source ist
damit gezeigt: sie kann zur
extrem exakten Kalibrierung
von Messgeräten eingesetzt
werden.

Prüfen einer CATV
Verkabelung

Noch ein Einsatzgebiet der
Handheld Satcom Test Source ist die Überprüfung der
Kabelinstallation eines Kabel
TV Netzes. Zum Test benutzte ich unser eigenes kleines
Verteilnetz im TELE-audiovisions Test Center.
Zur Distribution wird hier
ein Multiswitch mit 16 Eingängen für Sat-Ebenen (950

MHz – 2150 MHz) und einem
Eingang für terrestrisches
TV oder CATV (50 MHz – 850
MHz) genutzt. Das Signal
wird dann an 8 Ausgängen
bereitgestellt und innerhalb
des Hauses an den Antennendosen zur Verfügung gestellt, die separate Ausgänge
für SAT und CATV bieten.
Es galt nun, die Dämpfung
des Signals im SAT-Bereich
zu messen und außerdem
wollte ich wissen, ob durch
den Multiswitch, den Antennendosen und dem verlegten
Kabel bestimmte Frequenzbereich stärker beeinflusst
werden als andere.
Dazu benutzt man normalerweise einen Rauschgenerator, doch diese bieten nicht
die Messgenauigkeit, die die
Handheld Satcom Test Source ermöglicht.
Wer jetzt denkt, dass das
eine Riesenarbeit ist, da man
ja praktisch alle Frequenzen einzeln durchprobieren
muss, irrt. Denn WORK Microwave hat in der Handheld
Satcom Test Source einen
Sweep Generator mit eingebaut, der das Ausgangssignal innerhalb eines vom
Anwender
spezifizierten
Frequenzbereichs (50 MHz
bis 180 MHz und 950 MHz
bis 2150 MHz) laufen lassen
kann. Dazu kann natürlich
die Schrittweite (mindestens
0.5 MHz) eingeben werden
sowie die gewünschte Geschwindigkeit (ab 10 ms pro
Schritt).

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

107
Der Pegel kann von -5 bis
-45 dBm gewählt werden.
Weiterhin ist es möglich,
den Sweep bidirektional laufen zu lassen: kommt das
Signal am oberen Grenzwert
an läuft es wieder zurück,
wobei hier eine separate
Schrittweite (MHz) und Geschwindigkeit (ms) eingestellt werden kann.
Ein weiterer Parameter ermöglicht die Konfiguration
einer Pause zwischen den
Sweeps.
Mein Vorhaben war es, die
Handheld Satcom Test Source am Eingang des Multiswitches
anzuschließen
und
ihn dann mit der FrequenzSweep Funktion zu betreiben. Am Messgerät habe ich
den
Spektrum-Analysator
Modus aktiviert und diesen
mit der Spitzenwert-Haltefunktion benutzt, um so
das Ergebnis des FrequenzSweeps über den gesamten
Frequenzraum abzulesen.
Der erste Versuch scheiterte, weil ich nicht bedacht
hatte, dass der SpektrumAnalysator eine gewisse
Sampling-Periode braucht,
um aus dem Signal das
Spektrum zu generieren. Erzeugt der Signal-Generator
einen zu schnellen Sweep,
dann bleibt dem Messgerät
keine Zeit, das Signal korrekt zu messen.
Daher musste ich zuerst
diesen Versuchsaufbau mit
einer direkten Verbindung
zwischen dem Messgerät
und dem Signal-Generator

■ Setup to measure the

attenuation and other
problems in our SAT and
CATV distribution system.
Luckily, the Handheld Satcom
Test Source works on battery.

108 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
1

2

3

4

betreiben, um geeignete Parameter für den FrequenzSweep zu ermitteln.
Nun wurde mir auch klar,
warum WORK Microwave
dieser Funktion in der Hand-

held Satcom Test Source so
viel Parameter spendiert hat:
sie sind tatsächlich notwendig und sinnvoll. Schließlich
konnte ich die gewünschte
Messung mit folgenden Pa-

rametern durchführen:
- Startfrequenz: 950 MHz
- Endfrequenz: 2150 MHz
- Frequenzschritt: 1 MHz
- Zeitintervall pro Schritt:
500 ms

110 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

- Leistungspegel: -35 dBm
Mit diesen Werten konnte
der gesamte SAT-Frequenzraum analysiert werden und
die Schwankungen bei direkt
angeschlossenem Messgerät
5

1. Testing the DVB-T USB dongle with SDR# at 50
MHz. The signal is clean and correctly tuned on the
supposed frequency.
2. Same test, but now on 120 MHz. This frequency
band is used for air control communications and it is
good to see that the DVB-T USB dongle behaves very
well here.
3. At 180 MHz the reception is acceptable, albeit
the gain is lower. The indicated dB value is just a
reference as the RTL2832U chip and the FC0012 tuner
have automatic gain control activated.
4. Unfortunately my DVB-T USB dongle has the FC0012
tuner instead of the much better E4000 one. The result
is a total deafness at 950 MHz.
5. As expected, no signal at 1200 MHz, either.
6. At 118 MHz frequent radio communications between
pilot and tower can be heard as the test centre is
located near the local airport. Using the Handheld
Satcom Test Source I can be sure that my DVB-T USB
dongle is capable of tuning and demodulating this
frequency.
7. I did not have to wait long to get to hear a pilot
reporting to the tower. Notice the small red line
at 118.000 MHz in the waterfall graph. It suddenly
appears with the communication and lasts only a few
seconds. This kind of air traffic communication is
naturally modulated in AM and it is incredible that a
DVB-T USB receiver for less than 20 Euro can actually
be used as a SDR radio scanner to receive such
communications.

betrug zirka +/- 3dBm.
Weil die WORK Microwave
Handheld Satcom Test Source als portables Gerät mit
eingebautem Akku entworfen wurde war es ein leichtes, es zum Schaltkasten zu
transportieren und zu betreiben. Ich habe ihn dazu
einfach an ein Netbook angeschlossen und ohne Netzstrom-Anschluss benutzt.
Durch den im Signal-Generator eingebautem Akku
kann man auch mit einem
Laptop ohne Stromanschluss
für längere Zeit arbeiten,
denn der Signal-Generator
saugt den Laptop-Akku nicht
leer, wenn man nicht beide USB-Buchsen der Handheld Satcom Test Source
anschließt (die zweite USBBuchse dient exklusiv zum
Laden des Akkus).
Die Messung des kompletten Spektrums dauert bei
diesen Parametern ungefähr

6

7

fünf Minuten.
Dabei
kann
man getrost seine Aufmerksamkeit auch etwas
anderem
widmen, denn wenn
der Test länger läuft wird die
Messung einfach fortgehend
wiederholt.
Das Resultat dieser Messung zeigt, dass die Dämpfung durch die Signalverteilung zwischen 10 dB und
15 dB beträgt. Dies ist ein
durchaus guter Wert wenn
man bedenkt, dass zwischen
der Handheld Satcom Test
Source und dem Deviser
S7000 über 20 m Kabel, ein
Multswitch, eine Antennendose und ein weiteres Kabel
liegen.
Etwas ärgerlicher ist jedoch die Tatsache, dass
diese Messung es sichtbar
macht, dass die Dämpfung
nicht konstant über den ge-

samten
Frequenzbereich
ist, sondern einige Bereiche
stärker dämpft als andere.
Keine Frage, die WORK Microwave Handheld Satcom
Tetsource ermöglicht einem
Installateur die Abnahme einer Installation bevor die Signale anliegen, beziehungsweise es kann anhand eines
zertifizierten
Referenzsignals zweifelsfrei die Qualität
der Anlage nachgewiesen
werden.
Die Betonung hier liegt auf
Zertifiziert und Referenz:
mit der Handheld Satcom
Test Source gibt es keine
Diskussionen mehr über
Fehlertoleranzen.

Prüfen eines
SDR Empfängers

Eine ungewöhnliche Anwendung für die Handheld
Satcom Test Source ergab
sich zufällig: der in vielen
USB DVB-T Empfängern eingebaute DVB-T COFDM Demodulator, der RTL2832U
von Realtek, kann auch zum
Radio-Empfang genutzt werden kann, weil dieser Chip
die rohen I/Q Samples bereitstellt.
Dies ist eigentlich dazu
gedacht, DAB, DAB+ und
FM zu demodulieren, doch
mit dem passenden Treiber
kann man einen solchen
USB DVB-T Empfänger auch

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

111
als Software Defined Radio
benutzen; mit speziell angepasster SDR-Software wie
dem SDR# erhält man einen
echten Radio-Scanner, mit
welchem man zum Beispiel

Flugfunk empfangen kann.
Das Problem ist jedoch der
im USB DVB-T Empfänger
verbaute Tuner. Hier kommen verschiedene Chips
zum Einsatz, zum Beispiel

die FC0012 und FC0013 Modelle. Ein USB-Empfänger im
Test Center hat den FC0012
Tuner.
Leider sind diese Tuner auf
den Frequenzbereich von
50 MHz bis 950 MHz eingeschränkt, aber mich interessierte ganz besonders die
Frequenzspanne von 117
MHz bis 137 MHz, in welcher
der Flugfunk erfolgt. Das
Test Center ist dazu mit einer passenden Empfangsantenne ausgestattet und mit
einem Icom R3 Handempfänger kann der Flugfunk
auch abgehört werden.
Da nun aber nicht ständig
auf diesen Frequenzen gefunkt wird und weil ich die
Sensibilität und Empfangseigenschaften des USB Empfängers genauer analysieren
wollte, kam die WORK Microwave Handheld Satcom Test
Source zum Einsatz.
Der Testaufbau war extrem einfach: der USB DVBT Empfänger wurde am PC
angeschlossen und mit dem
speziellen SDR Treiber, der
unter dem Namen „Zadig“ im

112 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

Internet zu finden ist, installiert. Die freie und kostenlose SDR# Software erkennt
die USB Empfänger mit RTL2832U Chips automatisch
und schon kann das Signal
am PC als Spektrum dargestellt werden. Die Demodulation erfolgt in den für Radioscannern
gewöhnlichen
Modulationen: AM, FM, CW,
usw., wobei die Bandbreite
individuell eingestellt werden kann.
An der WORK Microwave
Handheld Satcom Test Source habe ich nun verschiedene Frequenzen zwischen
50 MHz und 180 MHz ausprobiert, mit besonderem
Augenmerk auf Frequenzen
von 117 MHz bis 137 MHz.
Das Ergebnis ist in den
Bildern zu sehen und variiert von spektakulär bis
ernüchternd. Toll ist zum
Beispiel, mit welcher Auflösung das von der Handheld
Satcom Test Source erzeugte Signal dargestellt wird.
Im Frequenzbereich, der für
den Flugfunk genutzt wird,
scheint der USB DVB-T Empfänger ein brauchbares Resultat zu ergeben, so dass
ich ihn anschließend erfolgreich an die Außenantenne
angeschlossen habe. Tatsächlich konnte ich nach ein
paar Minuten einen Piloten
im Anflug hören.
Die Ernüchterung entstand
deshalb, weil der USB DVB-T
Empfänger eben keineswegs
expert
OPINION

WORK Microwave
Test Signal Generator

RECOMMENDED
PRODUCT BY

Vitor Martins
Augusto
Test Center
Portugal

+ Compact and portable Test Source
Two synthesizers for simultaneous generation of two signals
Configurable sweep generator
Extremely high accuracy
Provided with compliance certificate, containing detailed information about the instruments precision
Easy to use software, no installation required
No driver installation required, device recognized by Windows
as Human Input Device
Internal battery

– Parameters have to be confirmed with ENTER key
Sweep Modus does not show current Frequency

TECHNICAL
DATA

Manufacturer	

WORK Microwave, Germany

Tel.	

+ 49-8024-6408-27

Internet	www.work-microwave.de

den oft zitierten Frequenzbereich korrekt empfängt. So
wird das von der Handheld
Satcom Test Source erzeugte Signal auch an verkehrten
Frequenzen empfangen; das
zeigt deutlich einen Fehler
des DVB-T Tuners. Oberhalb
von 950 MHz war der FC0012
Tuner tatsächlich nicht in der
Lage, irgendein brauchbares
Signal zu empfangen, obwohl sich diese Frequenzen
sehr wohl eingeben lassen.

Fazit

Obwohl vom Hersteller nur
der Test von Hochfrequenzkonvertern als Einsatzgebiet
angegeben wird, ist diese
Testquelle für HF-Signale
auch für viele andere Zwecke zu benutzen. Wenn es
darum geht, Messgeräte zu
kalibrieren, Fehler durch
Störsignale oder Dämpfung
zu klären, macht sich eine
solche Testquelle unbezahlbar, denn man kann direkt

messen, was mit dem bekannten Signal passiert.
Ganz besonders beeindruckt waren wir von der
unglaublichen Präzision der
Handheld Satcom Test Source. Zusammen mit dem Zertifikat wird es so auch für
kleine Betriebe möglich, die
Genauigkeit der Messgeräte
zu überprüfen, diese zu kalibrieren und zertifizierte Protokolle zu erstellen, die jeder
Überprüfung standhalten.
WORK Microwave ist mit
der Handheld Satcom Test
Source ein aussergewöhnliches Instrument gelungen,
das gezielt für den Einsatz
von Technikern entwickelt
wurde. Statt eines großen
und schweren, an eine Netzsteckdose gebundenes Instrument, hat man hier ein
kompaktes, tragbares Gerät
mit eigenem Akku in den
Händen. Ein Gerät, das sich
in vielen Betrieben schnell
amortisiert.

Model	

RF Signal Generator

Frequency range	

50 MHz to 180 MHz and 950 MHz to 2150 MHz

Frequency resolution	

0.5 MHz

Output level	

-45 dBm to -5 dBm

Output level resolution	

0.5 dB

Level tolerance	

± 1 dB

Output impedance	

50 Ohm

Output mute	

< -60 dBc

Reference Output	

10 MHz, -10 dBm to +10 dBm, 0.5 dB steps

Temperature range	

0°C to +50°C

Interface	

USB 2.0

Power supply	

ext. 24 V DC, USB, internal Battery

Power consumption	

max. 12 W

Connectors	
	
	

RF out: 50 Ohm SMA female
REF out: 50 Ohm BNC-female
USB 2.0: USB Standard type B

Weight	

1.5 kg

Dimensions (L x W x H)	

250 x 125 x 74 mm

114 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
DIGITAL
receivers of

这些是获得最高奖的产品

116 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
AB IPBox

Manufacturer
Website

www.abipbox.com

Function

HDTV PVR Satellite Receiver
with Internet Media Center

/LAN

—/●

PVR

●

DiSEqC

1.0 / 1.1 / 1.2 / 1.3

S-Video/HDMI

—/●

Scart/Digital Audio

—/●

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/11/abipbox

Read TELE-audiovision Test Report
1-1
1 2/2013

by
ismcube Ru
AB IPBox Pr d receiver for multi
pe
e
Perfectly equipplus for all the worldwid
tion
satellite recep Internet TV

0.60

Manufacturer

Amiko

Website

www.amikostb.com

Function

Miniature
/
PVR
Receiver with external IR
remote control

/LAN

●/●

DiSEqC

1.0 / 1.1 / 1.2 / 1.3

S-Video/HDMI

—/●

Scart/Digital Audio

—/●

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/11/amiko

11 12/2013

Read TELE-audiovision Test Report

HD
AMIKO MINI
sful receiver
Perfect succes mat
for
in small

0.53

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

117
Digital Receivers of 21st Century

AWARD WINNING

Manufacturer

Icecrypt

Website

www.icecrypt.com

Function

2x
&
/
PVR HDTV Receiver

/LAN
DiSEqC
PVR

●/●
1.0 / 1.1 / 1.2 / 1.3
●

S-Video/HDMI

—/●

Scart/Digital Audio

●/●

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/11/icecrypt

11 12/2013

Read TELE-audiovision Test Report

0CHD
Icecr ypt S370 tandem with
are in
Excellent hardw sy-to-use software.
t ea
bu
sophisticated

0.59

Manufacturer
Website
Function

/LAN
DiSEqC
PVR

Gotech
www.gotechcn.com

&
Combo
Receiver
●/●
1.0 / 1.1 / 1.2 / 1.3
●

S-Video/HDMI

—/●

Scart/Digital Audio

●/●

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/09/mktech

09-10/2013

Read TELE-audiovision Test Report

HD
MK Tech IS1-19and local TV in
for Satellite
Well equipped uth America
So

0.59

118 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
这些是获得最高奖的产品
Manufacturer
Website

TBS Tenow

TELE-audiovision
International
Magazine

www.tbsdtv.com

Function

compatible Twin Tuner Streamingbox

DiSEqC

1.0 / 1.1

/LAN

Expert
Opinion

●/●

PVR

●

S-Video/HDMI

—/—

Scart/Digital Audio

—/—

www.TELE-audiovision.com/13/07/tenow

Read TELE-audiovision Test Report
07-08/2013

ing Box MOI ion
TBS Stream
ng and isolat
offers streami
double
Program
d software, a
of hardware an t for the future of TV
concep
innovative

0.54

Manufacturer
Website
Function

Gotech
www.gotechcn.com

Satellite Receiver

/LAN

●/●

Channel Memory

unlimited

DiSEqC

1.0 / 1.1 / 1.2 / 1.3

S-Video/HDMI

—/●

Scart/Digital Audio

●/●

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/07/mktech

07-08/2013

Read TELE-audiovision Test Report

MK TechHD
ceiver
Mini Scart Re
Fully featured
HDMI
with HDTV via

0.61

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

119
Digital Receivers of 21st Century

AWARD WINNING

Manufacturer

Fortis

Website

www.tiviar.com

Function

/
/
Triple PVR Receiver

/LAN

●/●

Channel Memory

10000

DiSEqC

1.0 / 1.1 / 1.2 / 1.3

S-Video/HDMI

—/●

Scart/Digital Audio

●/●

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/07/tiviar

Read TELE-audiovision Test Report
07-08/2013
Plus
Tiviar Alpha ration
d integ
Best dissolve all digital
tion of
for recep
TV signals

0.60

Manufacturer

Changhong

Website

www.changhong.com

Function

Receiver,
Mediaplayer, Android Apps

/LAN

PVR

—/●
●

S-Video/HDMI

—/●

Scart/Digital Audio

—/●

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/05/changhong
05-06/2013

Read TELE-audiovision Test Report

Smar tcenter
Changhong essful
Very succ
for digital TV
hybrid receiver

0.55

120 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
这些是获得最高奖的产品
Manufacturer
Website

Panodic

www.panodic.com

Function
/LAN

PVR

/

Receiver

●/—
●

S-Video/HDMI

—/●

Scart/Digital Audio

●/—

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/03/panodic

03-04/2013

Read TELE-audiovision Test Report

75C
Panodic HDT-2 HDTV era
for the new
Great receiver
trial TV
in digital terres
f DVB-T2
in future-proo

0.53

Manufacturer

Tsinghwa

Function

Receiver

LAN

—

PVR

●

S-Video/HDMI

—/●

Scart/Digital Audio

—/●

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/03/tsinghwa
03-04/2013

Read TELE-audiovision Test Report

-278
Tsinghwa GT
llent
eiver with exce
Rock-solid rec
e
eed reaction tim
sp

0.53

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

121
Digital Receivers of 21st Century

AWARD WINNING

Manufacturer

Skyworth

Website

www.skyworthdigital.com

Function

/
HDTV Receiver

/LAN

●/—

PVR

●

S-Video/HDMI

—/●

Scart/Digital Audio

—/—

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/01/skyworth
01-02/2013

Read TELE-audiovision Test Report

A6
Sk ywor th HT HDTV
eiver for
A rock-solid rec trial antenna
over the terres

0.45

Manufacturer
Website

Jiuzhou
www.jiuzhou.com.cn

Function

& Android STB

/LAN
PVR

—/●
●

S-Video/HDMI

—/●

Scart/Digital Audio

—/●

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/12/11/jiuzhou

Read TELE-audiovision Test Report
1-1
1 2/2012
100
Jiuzhou DTP2 thanks
receiver
Cutting-edge
g system
eratin
to Android op

0.55

122 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
这些是获得最高奖的产品
Manufacturer
Website

Panodic

www.panodic.com

Function

/

/LAN

DiSEqC

Receiver

●/—
1.0 / 1.1 / 1.2 / 1.3

S-Video/HDMI

—/●

Scart/Digital Audio

●/—

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/12/11/panodic

11 12/2012

Read TELE-audiovision Test Report

75
Panodic HDS2 eiver
mini-rec
Best designed
reception
for the best HD

0.58

Manufacturer

AZBox

Website

www.azbox.com

Function

HDTV
/
Miniature
HDTV Linux Receiver with
Multimedia Features

/LAN

●/●

Channel Memory

unlimited

DiSEqC

1.0 / 1.1 / 1.2 / 1.3 / USALS

S-Video/HDMI

—/●

Scart/Digital Audio

—/●

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/12/09/azbox-mini-me

Read TELE-audiovision Test Report

09-10/2012
ME
AZBox mini with Network
receiver
Excellent mini- for a home network
features - ideal

0.57

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

123
AWARD WINNING

Digital Receivers of 21st Century
Manufacturer

Panodic

Website

www.panodic.com
Small

Function
/LAN

HD PVR
Receiver

—/—

DiSEqC

—

S-Video/HDMI

—/●

Scart/Digital Audio

●/—

这些是获得最高奖的产品

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/12/07/panodic

2
1
06-07-08/20

Read TELE-audiovision Test Report

27A DVB-T
Panodic HDT-1 DVB-T
Well-equipped r
ceive
Mini-Re

0.63

Manufacturer

Panodic

Website

www.panodic.com
Mini Receiver with
HDMI and PVR

Function
/LAN

—/—

DiSEqC

—

S-Video/HDMI

—/●

Scart/Digital Audio

—/—

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/12/05/panodic

04-05/2012

Read TELE-audiovision Test Report

1E DVB-T
Panodic M360 eiver with
all rec
Extremely sm
y HDTV tuner
high-sensitivit

0.55

124 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
signal
analyzers of

这些是获得最高奖的产品

126 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
TELE-audiovision
International
Magazine

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/09/horizon

Read TELE-audiovision Test Report
Manufacturer

Horizon Global Electronics

Website

www.horizonhge.com

Function

Digital Meter

Frequency Range

Signals

51 ~ 858 MHz

Video Output

—

Built-in Monitor

LCD display

Expert
Opinion

www.TELE-audiovision.com/13/09/deviser

Read TELE-audiovision Test Report
Manufacturer

Tianjin Deviser Electronics Instrument

Website

www.devisertek.com

Function

Professional TV Signal Anaylzer

Frequency Range
Video Output
Built-in Monitor

5 - 1050 MHz (TV); 950-2150 MHz (Satellite)
HDMI
7” TFT LCD, 800×480 pixels

09-10/2013
DEVISER S7000
Best professional instrument
for measurement and analysis
of all globally used TV systems

09-10/2013
HORIZON HD-CM+ for DVB-C
Extremely easy to operate,
for professional installers

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

127
AWARD WINNING

Signal Analyzers of 21st Century

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/05/deviser

Read TELE-audiovision Test Report
Manufacturer

Tianjin Deviser Electronics Instrument

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/03/horizon

Read TELE-audiovision Test Report
Manufacturer

Website

www.devisertek.com

Function

Satellite Antenna Meter

Function

Horizon Global Electronics

Website

Frequency Range

950~2150 MHz

Video Output

—

Built-in Monitor

LCD display

www.horizonhge.com
Digital Satellite Meter for

Frequency Range

and

950 ~ 2150 MHz

Video Output

—

Built-in Monitor

LCD display

05-06/2013
DEVISER S30
Highly accurate handheld meter optimized
for the satellite dish installer

03-04/2013
HORIZON Nano-S2
Very easy to use instrument
for quick installation of satellite
for HDTV reception

128 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

Signals
这些是获得最高奖的产品

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/12/11/satlink

Read TELE-audiovision Test Report
Manufacturer

Fujian Baotong

Website

Digital Meter & Receiver for

Frequency Range

and

47 ~ 862 MHz & 950 ~ 2150 MHz

Video Output

yes

Built-in Monitor

1
1-12/2012

www.TELE-audiovision.com/12/11/horizon

Read TELE-audiovision Test Report
Horizon Global Electronics

Website
Signals

Function

www.horizonhge.com
Digital Meter for Analogue,

Frequency Range

and

Signals

48 ~ 862 MHz

Video Output

4.3 inch display

Satlink WS-6936
Very easy to use signal meter
which also serves as receiver.

Expert
Opinion

Manufacturer

www.sat-link.com.cn

Function

TELE-audiovision
International
Magazine

—

Built-in Monitor

LCD display

1
1-12/2012
HORIZON HD-T2
One of the world’s first DVB-T2 signal
analyzers with exceptional data

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

129
Signal Analyzers of 21st Century

AWARD WINNING

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/12/11/deviser

Read TELE-audiovision Test Report
Manufacturer

Tianjin Deviser Electronics Instrument

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/12/09/deviser

Read TELE-audiovision Test Report
Manufacturer

Website

www.devisertek.com

Function

Optical Power Meter

Function

Frequency Range

-43 dBm ~ +25 dBm

Tianjin Deviser Electronics Instrument

Website

Frequency Range

Video Output

—

Built-in Monitor

LCD display

1
1-12/2012
DEVISER AE 120
Optical Power Meter
Extremely simle to use but
at same time very accurate

www.devisertek.com
Professional Meter for

,

and CATV (analog TV)

5 ~ 1000 MHz

Video Output

—

Built-in Monitor

320 × 240 TFT display

09-10/2012
DEVISER DS2400T
This is by far the best handheld measuring
instrument for DVB-T, DVB-C and
CATV I have come across. Deviser has
done an excellent job!

130 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
这些是获得最高奖的产品

TELE-audiovision
International
Magazine

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/12/05/spaun

Read TELE-audiovision Test Report
Manufacturer

SPAUN Electronic

Website
/

Frequency Range

and DSS Signal Analyzer

950-2150 MHz

Video Output

Read TELE-audiovision Test Report
Manufacturer

Horizon Global Electronics
www.horizonhge.com

Function

Satellite and terrestrial antenna meter

Frequency Range

—

Built-in Monitor

www.TELE-audiovision.com/12/01/horizon

Website

www.spaun.com

Function

Expert
Opinion

45~861 MHz (terrestrial) and 950~2150 MHz (satellite)

Video Output

4.3” TFT LCD display (16:9)

—

Built-in Monitor

LCD display

04-05/2012
SPAROS SAT HD
Very useful meter for setting up critical
satellite systems

12-01/2012
Horizon HD-STM
Perfect choice for an installer who values
a practical instrument.

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

131
IPTV/WebTV
receivers of

这些是获得最高奖的产品

134 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
AB IPBox

Manufacturer
Website

www.abipbox.com

Function

HDTV PVR Satellite Receiver
with Internet Media Center

/LAN

—/●

PVR

●

DiSEqC

1.0 / 1.1 / 1.2 / 1.3

S-Video/HDMI

—/●

Scart/Digital Audio

—/●

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/11/abipbox

Read TELE-audiovision Test Report
1-1
1 2/2013

by
ismcube Ru
AB IPBox Pr d receiver for multi
pe
e
Perfectly equipplus for all the worldwid
tion
satellite recep Internet TV

0.60

Manufacturer
Website

TBS Tenow
www.tbsdtv.com

Function

compatible Twin Tuner Streamingbox

DiSEqC

1.0 / 1.1

/LAN

●/●

PVR

●

S-Video/HDMI

—/—

Scart/Digital Audio

—/—

TELE-audiovision
International
Magazine

Business
Voucher

www.TELE-audiovision.com/13/07/tenow

Read TELE-audiovision Test Report
07-08/2013

ing Box MOI ion
TBS Stream
isolat
streaming and
Program offers d software, a double
of hardware an t for the future of TV
ep
innovative conc

0.54

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

135
AWARD WINNING

IPTV/WebTV Receivers of 21st Century
Manufacturer

D-Link

Website

www.dlink.com

Function

Internet Streaming Box

WIFI /LAN

●/●

Internal Storage
HDTV

no
yes (up to 1080p)

CVBS/HDMI

—/●

USB/SD Card

●/●

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/07/boxee

Read TELE-audiovision Test Report

0.52

Manufacturer

Netgear

Website

www.netgear.com

Function

Streaming Player

WIFI /LAN

●/●

Internal Storage
HDTV

no
yes (up to 1080p)

CVBS/HDMI

—/●

USB/SD Card

—/—

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/05/netgear

Read TELE-audiovision Test Report

136 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
这些是获得最高奖的产品

Manufacturer

Roku

Website

www.roku.com

Function

Streaming Player

WIFI /LAN

●/—

Internal Storage
HDTV

no
yes (up to 1080p)

CVBS/HDMI

●/●

USB/SD Card

—/●

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/03/roku

Read TELE-audiovision Test Report

Manufacturer

LookeeTV

Website

www.lookeetv.com

Function

Multimedia Player for local
media and Internet

WIFI /LAN

●/●

Internal Storage
HDTV

yes, 1.14 GB
yes (up to 720p)

CVBS/HDMI

●/●

USB/SD Card

●/●

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/12/11/lookee

Read TELE-audiovision Test Report

0.54

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

137
AWARD WINNING

IPTV/WebTV Receivers of 21st Century
Manufacturer

AZBox

Website

www.azbox.com

Function

HDTV
/
Miniature
HDTV Linux Receiver with
Multimedia Features

/LAN

●/●

Channel Memory

unlimited

DiSEqC

1.0 / 1.1 / 1.2 / 1.3 / USALS

S-Video/HDMI

—/●

Scart/Digital Audio

—/●

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/12/09/azbox-mini-me

Read TELE-audiovision Test Report

09-10/2012
ME
AZBox mini with Network
receiver
Excellent mini- for a home network
features - ideal

0.57

Manufacturer

Logitech

Website

www.logitech.com

Function

IPTV Receiver

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/12/03/googletv

Read TELE-audiovision Test Report

138 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
这些是获得最高奖的产品

Manufacturer

Jiuzhou

Website

www.jiuzhou.com.cn

Function

IPTV Set-Top-Box

Stream Protocol

UDP

Menu Standards

HTML4, Javascript 1.5, Java
Virtual Machine

WLAN

● (via USB stick)

1
12-01/201
P830 0
Jiuzhou DT uipped
r Eq
IPTV Receive
Technology
with Top- Notch

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/11/01/jiuzhou

Read TELE-audiovision Test Report

0.57

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

139
The Best
Headend
Equipment of

这些是获得最高奖的产品

140 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
Manufacturer
Website

WORK Microwave

TELE-audiovision
International
Magazine

www.work-microwave.de

Model

RF Signal Generator

Function

Test Signal Generator

Frequency range
Frequency resolution
Output level
Output level resolution

Output impedance

Output mute
Reference Output

Expert
Opinion

50 MHz to 180 MHz and 950 MHz to 2150 MHz
0.5 MHz
-45 dBm to -5 dBm
0.5 dB
50 Ohm
< -60 dBc
10 MHz, -10 dBm to +10 dBm, 0.5 dB steps

www.TELE-audiovision.com/13/11/work-microwave

Read TELE-audiovision Test Report

1
1-12/2013
WORK Microwave
Handheld Satcom Test Source
Allows for precise and certified
high-frequency measurements

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/03/antiference

Read TELE-audiovision Test Report

Manufacturer

Antiference

Website

www.antiference.co.uk

Model

KLA-110 Launch Amplifier &
KCC-110 Channel Convertor/Processor

Function

Filtering, amplifying and converting DTT
channels to new frequencies

Input / Output frequency range

44 – 862 MHz / 44 – 862 MHz

Input level range

65 – 95 dBµV

Output level adjustment (KCC-110)

60 – 80 dBµV

Gain adjustment (KLA-110)

14 – 45 dB

03-04/2013
KLA-110 Launch Amplifier &
KCC-110 Channel Convertor/Processor
Professional handling
of DTT signals

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

141
AWARD WINNING

The Best Headend Equipment of 21st Century

Manufacturer

Dexin Digital Technology

Website

www.dsdvb.com/english

Model

NDS3975 DVB-S2 HD IRD

Function

Professional Integrated Receiver Decorder

Tuner Input

QPSK,QPSK

(

/

/

optional)

ASI Input

Maximum transmitting rate 90Mbps

ASI Input

Maximum transmitting rate 90Mbps

/LAN

●/●

SDI/YPbPr/CVBS/HDMI

●/●/●/●

Scart/Digital Audio

Manufacturer

Read TELE-audiovision Test Report

0.61

Dexing NDS3975
Most powerful and versatile IRD ever
- its built-in monitor is a unique plus.

Sat & Sound

Website

www.satson.eu

Model

HD-MOD-001T

Function

HDTV-compatible

Modulator

Output Frequency

50 - 860 MHz

Video Input Format

Component Video, YPbPr RCA, HDMI

Video Encoding Format

MPEG-2 Video (ISO/IEC 13818-2)

HDMI/LAN

●/●

Modulator Standard

DVB-T (ETSI EN 300 744)

Bandwidth

6, 7, 8 MHz

Constellation

Expert
Opinion

www.TELE-audiovision.com/13/01/dexin

—/●

01-02/2013

TELE-audiovision
International
Magazine

QPSK, QAM16, QAM64

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/13/01/satson-modulator

Read TELE-audiovision Test Report

01-02/2013
Satson HD-MOD-001T
Smart solution for distributing HD signals
via an existing coax cable network

0.84

142 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
这些是获得最高奖的产品

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/12/11/dektec

Read TELE-audiovision Test Report
Manufacturer

DekTec

Website

www.dektec.com

Model

DTE-3137

Function

Networked

Frequency range
Transmission Standards
Modulations

Receiver

DVB, DVB-RSC, ATSC
QPSK, 8-PSK, 16-APSK and 32-APSK

/LAN

0.56

/

950 - 2150 MHz)

●/●

1
1-12/2012
DekTec DTE-3137
Perfectly equipped professional satellite
receiver for use in networks and for
processing in cable networks.

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/12/09/spaun-vam

Read TELE-audiovision Test Report

Manufacturer
Website
Model
Function
Frequency range

TV standard

Spaun
www.spaun.com
VAM 420 NG PAL
VSB Twin Modulator
110 … 862 MHz
B/G/D/K/I/L

Output level max

90 dBµV

Output level adjustment

0...-10 dB

Spurious level
C/N ratio
Input level

<-60 dB
≥ 50 dB
1 ± 0.1 V p-p

09-10/2012
SPAUN VAM 420 NG PAL
Easy way to create
analogue tv channels

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

143
AWARD WINNING

The Best Headend Equipment of 21st Century

Manufacturer

Global Invacom

Website

TELE-audiovision
International
Magazine

www.gloablinvacom.com

Model

FibreIRS DTT Processor

Function

Filtering and amplifying

Frequency range

signal

Expert
Opinion

470-862 MHz

Number of channels

6 (expandable to 9)

Broadcast standard

8 MHz

Gain

20 dB

Channel flatness

< 2.5 dB

DAB Frequency range

217-230 MHz

Insertion loss

< 2 dB

www.TELE-audiovision.com/12/07/globalinvacom

Read TELE-audiovision Test Report

06-07-08/201
2
FibreIRS DTT Processor
Delivery perfectly clean
DTT signals for any
distribution system

TELE-audiovision
International
Magazine

06-07-08/201
2

Expert
Opinion

SPAUN BluBox 16
Great leap forward in
headend technology

www.TELE-audiovision.com/12/07/spaun

Read TELE-audiovision Test Report
Manufacturer

Spaun

Website

www.spaun.com

Model
Function

/LAN
Number of inputs
Input frequency range

BluBox 16

/

to

Head End

●/●
4 (cascadable)
950 ... 2150 MHz

Allowable input signal power

64 ... 94 dBµV

Number of outputs

2 (cascadable)

Output frequency range
QAM standard

144 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

47 ... 862 MHz
/ ITU-T J.83 Annex A (fixed)
这些是获得最高奖的产品

TELE-audiovision
International
Magazine

Expert
Opinion

www.TELE-audiovision.com/12/01/netup

Read TELE-audiovision Test Report
Manufacturer

NetUP

Website

www.netup.tv

Model

Dual DVB-T/C-CI
and

Function

PCI-e adapter for professional
applications under Linux

12-01/2012
DVB-T/C-CI
Impressive professional card for IPTV
servers and multimedia centers that is
loaded with the latest technologies
for long-term use

Manufacturer

NetUP

Website

www.netup.tv

Model

Function

IPTV Combine 4x

IPTV Gateway for DVB Signals, Middleware,Billing,
VoD, nVoD, DHCP-, Time- & DNS-Server

Tuners

4

Max. simultaneous
Transponders

4

Max. bandwidth

240 MB/s

DISEqC

1.0

Ethernet ports

6 x Gigabit Ethernet 10/100/1000 MB/s

CI Slots

02-03/201
1

Expert
Opinion

www.TELE-audiovision.com/11/03/netup

Read TELE-audiovision Test Report

4

NetUP DVB-IP Gateway 4x
Perfect ease of use, combined with
reliable technology – ideal for
IPTV providers.

TELE-audiovision
International
Magazine

0.98

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

145
FEATURE

Selfmade IPTV

Fernsehen
aus dem
Netzwerk
Teil 4

146 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
■ This is how our test

centre looked like for
this report.

•	ideal für Bastler, um Audio und Video zuhause zu
streamen
•	eine kleine Platine dient als Basis für das eigene
Heim IPTV Netzwerk
•	MPEG2 und VC Lizenzen müssen getrennt gekauft
werden
•	zum Streaming wird TSReader Pro eingesetzt
•	kann auch mit VLC eingesetzt werden

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

147
FEATURE

Selfmade IPTV

Vitor Martins Augusto
Nachdem wir uns in den ersten
drei Teilen zum Thema IPTV eher
der Theorie gewidmet haben möchten wir nun im vierten Teil eine konkrete IPTV-Lösung implementieren.
Benötigt wird gar nicht mal so viel:
als Server dient ein PC mit einem
Empfänger für digitales Fernsehen
(DVB, ATSC oder ISDB) und TSReader Pro. Als IPTV-Receiver benutzen wir den Raspberry Pi.
Das häufigste Problem bei der Implementierung von IPTV im Heim ist die
Frage, wie man denn das IPTV am Fernseher empfangen und darstellen soll.
Natürlich könnte man an jedem Fernseher einfach einen kompletten PC hinstellen, doch dies würde nicht unbedingt gut
aussehen und außerdem kostet auch ein
günstiger PC doch einiges an Geld, von
den Stromkosten mal abgesehen. Wir
haben uns deshalb umgesehen, welches
Gerät wir denn als IPTV Receiver benutzen könnten. Unsere Kriterien: günstig,
klein, verfügbar und vielseitig sollte das
Gerät sein. Nachdem wir verschiedene Kandidaten geprüft haben (von der
Spielekonsole bis zum modifizierten AppleTV war alles dabei), entschieden wir
uns für den Raspberry Pi.
Der Raspberry Pi ist ein winziger Computer, dessen Platine die Fläche einer
Kreditkarte belegt (85.6mm x 56mm x
21mm). Trotz der kleinen Größe handelt

2
es sich um einen vollwertigen Computer
mit einem ARM-Prozessor. Die Eckdaten
sind:
SoC („System on Chip“): Broadcom
BCM2835 mit einem ARM1176JZFS
Kern, der mit 700MHz getaktet wird und
eine Videocore 4 GPU Grafikeinheit enthält, die in der Lage ist, H.264 mit bis zu
40MBits/s in Hardware zu dekodieren.
Weiterhin werden OpenGL ES2.0 und
OpenVG Bibliotheken unterstützt.
Model B verfügt über 512MB RAM, aktuell werden die Platinen sogar zum gleichen Preis mit 1GB RAM ausgeliefert.
Anschlüsse:
- SD-Karte: von dieser wird das Betriebssystem geladen

1. The Raspberry Pi is a small computer
with the footprint of a credit card. Still, it
features all conceivable connections:
- HDMI
- Composite Video
- Analog Stereo Audio
- 2x USB
- 1x Micro-USB for power supply
- RJ-45 Network
- SD card reader
On the PCB there are furthermore
connectors for digital and analog inputs/
outputs
2. The Raspberry Pi will convert any TV or
monitor into a full blown media center when
using XBMC. Because the Raspberry Pi is
so small, it will snug away behind the TV.
If you then use a wireless keyboard with
integrated trackball or touch pad, you won’t
even see any loose cables.

1

148 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
3

7

4

3. The webpage “openelec.thestateofme.com” features all
published versions of OpenELEC for Raspberry Pi, including
Windows-friendly *.img version, which can be easily flashed using
Image Writer, whose Windows version is called Win32 Disk Imager.
4. Just download the latest rXXXXX.img.zip File and extract it with
your favourite compressing tool.
5. Use Win32 Disk Imager to write the image file onto the SD card.
We recommend the use of 8GB SD cards with 6x speed or better.
The card is written with 10MB/s which is not that bad. Flashing
should take less than a minute.
6. When the flashing is finished, a message box appears. Don’t
remove the card yet, because we need to write the license keys for
the MPEG2 decoder.
7. On the root of the freshly written SD card you will find a file
called “config.txt”. Open it with a text editor (we prefer to use the
free Notepad++) and scroll down to the license keys section. Copy
& paste the license file you
from
6 received After the Raspberry
Pi store.
completing the
purchase our keys arrived
about 2 hours later, but the site
mentions that it could take up to
72 hours.

5

- 2x USB: zum Anschluss
von Tastatur, Maus, USBSpeicher, usw.
- LAN: RJ-45 mit
100MBit/s
- Audio: analoger StereoAusgang
- RCA Video: analoger
Composite Video-Ausgang
- HDMI: für digitale Audio
und Video Ausgabe
- Micro-USB: für Stromversorgung
Das interessante an diesem Gerät ist sein Preis: offiziell kostet der Raspberry
Pi Model B lediglich US$ 35,
zu welchen sich Steuern und
Versandkosten addieren. In
Europa kann man den Raspberry Pi für ungefähr 35
Euro kaufen. Dieser niedrige
Preis ist deshalb möglich, weil

dieser
Miniatur-Computer
von der Raspberry Pi Stiftung
entwickelt wurde, die es sich
zum Ziel gesetzt hat, einen
absolut günstigen Computer
für alle Kinder zur Verfügung
zu stellen, um das Programmieren auch im Kindesalter
zu motivieren, wie es früher bei den 8-Bit Computern
wie dem Spektrum und dem
Commodore 64 der Fall war.
Für alle anderen ist es aber
toll, dass diese Platine uneingeschränkt zu erwerben
ist und somit Applikationen
möglich sind, die vorher aus
Kostengründen eigentlich unvorstellbar wären.
Der Raspberry Pi wird in
Zusammenarbeit von Farnell und RS Electronics hergestellt und ist bei diesen

weltweit zu beziehen. Damit
man die Platine benutzen
kann benötigt man weiterhin
ein Micro-USB Netzteil, das
auch bei modernen Smartphones üblich ist. Außerdem
braucht man eine SD-Karte,
wir empfehlen eine mit 8GB.
Ein passendes Gehäuse kann
seit kurzem ebenfalls für ca.
6 Euro bestellt werden und
macht auf jeden Fall Sinn,
um die Platine vor einem
Kurzschluss oder statischer
Entladung zu schützen. Wir
haben die Platine allerdings
wochenlang ohne Gehäuse
benutzt und diese auch angefasst, ohne dass etwas passiert wäre.
Weil die Platine so klein
ist, lässt sie sich prima hinter dem Fernseher platzieren

150 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

und als Tastatur und Maus
eignet sich am besten eine
kabellose Version, die beide
Funktionen auf kleiner Fläche
integriert. Im Handel finden
sich viele oft als „Multimedia“
oder „TV“ Tastatur bezeichnete Modelle, deren Maus als
Trackball oder Touchpad implementiert ist.
Ganz wichtig: um den Preis
von Raspberry Pi klein zu
halten, fehlen dem Gerät die
Lizenzen, um MPEG2 abzuspielen, obwohl die Hardware
dazu durchaus in der Lage
ist. Dies ist aber für die Darstellung von IPTV notwendig,
da die meisten Kanäle, die in
SD ausgestrahlt werden, in
MPEG2 kodiert sind. Im Webshop der Raspberry Pi Stiftung kann man für 3,00 Euro
die MPEG2 Lizenz kaufen.
Man erhält per e-Mail einen
Schlüssel, der diese Funktion aktiviert. Dieser Schüssel
8

muss auf der SD-Karte in der
„config.txt“-Datei an entsprechender Stelle eingetragen werden. Fortan werden
auch MPEG2 kodierte Inhalte
mittels hardware-gestützter
Dekodierung dargestellt. Auf
gleiche Weise kann auch eine
VC-1 Lizenz für 1.50 Euro gekauft werden, um entsprechende Inhalte darstellen zu
können.
Raspberry Pi funktioniert
hauptsächlich mit einer angepassten Linux-Distribution,
doch mittlerweile bekommt
man auch schon fertige
Firmware-Dateien („Image“
genannt) mit XBMC. Der seltsame Name dieser Multimedia-Software entstand aus
der Abkürzung für „Xbox Media Center“: diese Software
wurde ursprünglich für die
erste Version der Xbox entwickelt. Mittlerweile wurde
diese Software auf alle denkbaren Systemen portiert, darunter auch Windows, Linux,
MacOS sowie Android und
iOS. Keine Frage: bei XBMC
handelt es sich um eines der
besten Multimedia-Programme. Es werden praktisch alle
Formate abgespielt (Audio,
Video und Bilder), es gibt unzählige Plugins und die Bedienung ist kinderleicht. Wer
XBMC noch nicht kennt sollte
dieses Programm unbedingt
auf Windows, MacOS oder Linux ausprobieren.
Wie im Linux-Umfeld üblich, gibt es gleich mehrere
verschiedene Distributionen
von XBMC für den Raspberry Pi: OpenELEC, Raspbmc,
XBian, usw. Wir haben mit
OpenELEC die besten Resultate erzielt.
Um den Raspberry Pi mit
XBMC zu benutzen, müssen
folgende Schritte durchgeführt werden:
1) Die Datei mit dem
XBMC-Image muss von der
OpenELEC Webseite geladen
werden (siehe Linktabelle).
2) Entpacken Sie das Archiv
zum Beispiel mit WinRAR.
3) Die *.img Datei wird
anschließend mit Win32DiskImager auf die SD-Karte
geflasht. Stellen Sie sicher,
dass Win32DiskImager auch
wirklich das korrekte Lauf-

9

10

werk für die SD-Karte entdeckt hat, damit Sie nicht
aus Versehen das falsche
Laufwerk formatieren.
4) Nun muss die „config.
txt“ Datei editiert werden:
an der entsprechenden Stelle
muss der Lizenz-Schlüssel für
MPEG2 eingegeben werden.
Nun kann man den Raspberry Pi starten und nach
wenigen Sekunden erscheint
die XBMC Oberfläche, die
hervorragend
selbsterklärend ist. Wichtiger Hinweis:
es ist normal, dass beim

152 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

11
12

ersten Start, nachdem die
SD-Karte beschrieben wurde, das Betriebssystem automatisch neu startet. Erst
beim zweiten Start wird dann
XBMC geladen. Der erste
Durchlauf dient zur Konfiguration des Betriebssystems.
Warten Sie daher etwa, anstatt es wie wir zu machen:
wir dachten am Anfang, etwas sei fehlgelaufen und haben prompt die SD-Karte neu
programmiert…
Mit TSReader Pro ist es
möglich, den empfangenen
Transport Stream direkt über
UDP in das Netzwerk einzuspeisen. Entweder kann der
Transport Stream komplett
1:1 in das Netzwerk geleitet
werden oder man benutzt die
integrierte Demuxer-Funktion. Mit dieser kann jeder einzelne im Transport Stream
enthaltene Kanal separat
in das Netzwerk gestreamt
werden.
Da
gewöhnliche
Multimedia-Geräte normalerweise über keinen Demuxer
verfügen, können Sie einen
Transport Stream nicht darstellen oder es wird nur ein
Kanal des Transport Streams
angezeigt ohne Möglichkeit,
einen anderen Kanal auszuwählen. Genau dies passiert
auch mit XBMC, wenn man
versucht, den kompletten
Transport Stream zu empfangen: es wird einfach nur ein
Kanal dargestellt, ohne dass
man die Möglichkeit hat, auf
einen anderen umzuschalten.
Deshalb benutzen wir die
Demuxer-Funktion von TSReader Pro und streamen die
gewünschten Kanäle per Multicast in das Netzwerk, wobei
wir aber für jeden Kanal eine
individuelle
Port-Nummer
verwenden.
Damit XBMC diese Streams
auf
verschiedenen
Ports
empfangen kann, müssen wir
eine Playliste im *.m3u Format erstellen. Dies ist praktisch, denn so erscheint in
XBMC eine Liste mit den vollständigen Kanalnamen und
das Zappen gestaltet sich
äußerst komfortabel.
Der Clou ist aber, dass
man mehrere Instanzen von
TSReader Pro starten kann,
jeweils mit einem andern Tu-

13

15

14

8. Start TSReader Pro and tune
to the desired transponder as
usual.
9. Open the “Forward” menu
and select “Forward to UDP…”.
On the list in the upper part
of the window select each
channel you want to stream
and configure the respective IP
address and port number. You
can use the same IP address for
all channels, but then you need
to use individual port numbers.
Remember that the multicast
addresses start at 224.1.1.1 and
go up to 239.255.255.255.

10. Using a text editor like
Notepad++, you need to
configure the play list for XBMC,
introducing each streamed
channel with the respective IP
and port.
11. In our first experiment, we
streamed four channels and
configured the IPTV.m3u file
accordingly. Naturally you can
name the file as you desire,
as long as you keep the *.m3u
extension.
12. Not too soon, we wanted
to try to increase our IPTV
bouquet and added a second

TSReader session, this time
using a DVB-T tuner.	
13. With this TSReader
session we were receiving the
Portuguese digital terrestrial
television, which contains only
4 channels.
14. Each channel was assigned
an IP address and an individual
port number.	
15. Streaming has started.
TSReader tracks on how much
data has been sent and how
many errors occurred.

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

153
16
6

16. Boot screen of the OpenELEC
distribution of XBMC for the
Raspberry Pi
17. Main menu of XBMC. You can
access all functions from here,
using the keyboard, the mouse
or any other device you connect,
including a wide range of remote
controllers.
18. The video menu. You can add
new folders containing video using
the “Add Videos…” entry. These
can be folders on the Raspberry
Pi or shared folders within the
network.
19. Playing a TV channel received
over the network – IPTV at its best
20. XBMC includes a wide range of
configurations for audio and video,

17

21

18

22

19

23

20

24

154 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

including the display of subtitles
21. Zapping can be done using the
|<< and >>| buttons or by going
back to the playlist.
22. Playing a streamed channel
from HOTBIRD 13.0E.
23. This is a different playlist,
showing the channels we are
streaming from our DVB-S/S2 card.
You can have as many playlists as
you wish.
24. Zapping between the different
channels within the playlist is easy,
but naturally you have to expect 2-3
seconds to see the next picture.
The reason is the buffering that
is required, to ensure that sudden
delays within the network traffic
don’t stop the reproduction.
25
6

26

27

ner (egal ob auf einem oder
mehreren PCs – schließlich
benutzen wir ja Multicast), so
dass man sich ein ansehnliches Bouquet erstellen kann.
Wir haben zum Beispiel einige
Kanäle eines Transponders
von HOTBIRD (13.0E) mit
dem portugiesischen digitalen terrestrischen Fernsehen
kombiniert. Fortan stehen im
ganzen Haus über das Netzwerk diese 8 Kanäle bereit
und können mit dem Raspberry Pi, aber auch anderen
Geräten (PC, Tablet, Konsole, usw.) empfangen werden,
wenn diese mit UDP-Streams
umgehen können. Besonders
einfach ist es natürlich, wenn
auf dem jeweiligen Gerät
XBMC installiert ist.
Das Format der *.m3u
Playliste ist recht einfach und
sieht so aus:
#EXTM3U
#EXTINF:0,RTP-1
#E X T V L C O P T:n e t w o r kcaching=1000
udp://@224.2.2.2:1001
#EXTINF:0,RTP-2
#E X T V L C O P T:n e t w o r kcaching=1000
udp://@224.2.2.2:1002
#EXTINF:0,SIC
#E X T V L C O P T:n e t w o r kcaching=1000
udp://@224.2.2.2:1003

28

30

29

31

156 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

#EXTINF:0,TVI
#E X T V L C O P T:n e t w o r kcaching=1000
udp://@224.2.2.2:1004
Die erste Zeile identifiziert
die Datei als EXTM3U-Playliste und muss genau so vorhanden sein. Nun folgen für
jeden Kanal 3 Zeilen: #EXTINF bietet „Extended Info“,
also weitere Informationen,
damit XBMC statt dem Dateinamen und der IP-Adresse
den Namen des Kanals anzeigt. Hier kann nach dem
„0,“ ein beliebiger Text, in
unserem Fall eben der Name
des Kanals, eingegeben werden. Die nächste Zeile dient
dazu XBMC anzuweisen, einen Puffer anzulegen, damit das Bild bei kurzzeitigen
Netzwerk-Kollisionen
nicht
stottert. Bei einem großen
Wert dauert das Zappen
deutlich länger. Wir verwendeten Werte zwischen 100
und 1000. Nun folgt eine Zeile, in welcher das Protokoll
(udp://@) und die entsprechende IP-Adresse mit PortNummer angegeben wird.
Diese müssen natürlich zu
den IP-Adressen und PortNummern passen, die in TSReader angegeben wurden.
Diese drei Zeilen wiederholen sich für jeden einzel-
nen Kanal. Um diese Datei
zu erstellen und zu editieren,
kann jeder beliebige Texteditor benutzt werden, denn es
handelt sich im Grunde um
eine normale *.txt-Datei, bei
welcher die Datei-Endung auf
*.m3u geändert wurde. Wir
weisen hier auf Notepad++
hin - ein toller Open Source
Editor mit vielen Funktionen
und Plugins, der auch mit
entsprechendem Plugin als
Hex-Editor dient.
Die fertige *.m3u-Datei kopiert man nun zum Beispiel
auf einen USB-Speicher und
steckt ihn an den Rasperry
Pi. Dies kann bei laufendem
Gerät erfolgen, XBMC erkennt den Speicher automatisch. Geht man nun auf Video, kann man die Playliste
anklicken und den gewünschten Kanal wählen. Außerdem
kann man leicht zum nächsten oder vorherigen Kanal
zappen. Nur ein direktes numerisches Anwählen ist nicht
vorgesehen. Weiterhin kann
man wählen, ob man Kanäle aus verschiedenen Transpondern, die von verschiedenen TSReader-Instanzen
gestreamt werden, in eine
einzige *.m3u-Playliste integrieren möchte, oder ob man
nicht doch lieber verschiede-

32

ne Playlisten anlegt. Die hier
beschriebene Konfiguration
lässt sich übrigens auch mit
VLC als Server verwirklichen,
wodurch man nochmal etwas Geld spart, da es sich
bei VLC um ein Open Source
Projekt handelt. Hier muss
man aber deutlich mehr Zeit
als mit TSReader Pro investieren, da die Konfiguration
des VLC-Servers nicht so
einfach ist. Wir konnten zum
Beispiel problemlos über VLC
einen DVB-T Transponder
streamen, bei DVB-S klappte
es aber nicht, da die aktuelle
Version scheinbar einen Problem mit DVB-S Tunern hat.
Installiert man eine ältere
VLC Version, dann klappt der
DVB-S Empfang zwar, dafür
funktioniert das Streamen
aber nicht mehr.
Unser Fazit: IPTV in der
Praxis ist gar nicht mal so
kompliziert. Wir erzielten absolut brauchbare Resultate
und mit einem 1000MBit/s
Netzwerk braucht man sich
nicht vor einer Überbelastung des Netzwerkes fürchten. Durch das Multicasting
kann man beliebig viele
IPTV-Receiver
anschließen
und mit XBMC kann man
gleichzeitig auch auf ideale
Weise auf Musik und Filme

zugreifen, die entweder lokal
auf dem USB-Speicher oder
im Netzwerk vorhanden sind.
Inzwischen hat die Raspberry Fan-Gemeinde auch
schon diverse USB-Tuner
zum Laufen gebracht und natürlich werden wir demnächst
ebenfalls versuchen, auf Ba-

sis des Rasperry Pi unseren
eigenen „Linux-Receiver“ zu
basteln. Auf jeden Fall ist
der Raspberry Pi ein interessantes Gerät zum Basteln
und wer sich mit Audio und
Video beschäftigt bekommt
so eine brauchbare Plattform
für kleines Geld.

www.raspberrypi.org
Webseite der Raspberry Pi Stiftung. Hier findet man die wichtigsten Betriebssystem-Images zum Download, einen Wiki, ein
Forum und Anleitungen. Außerdem werden hier fast täglich
neue interessante Projekte vorgestellt.
www.raspbmc.com
Eine von vielen XBMC-Distributionen für den Raspberry Pi. Diese ist besonders einsteiger-freundlich.
wiki.openelec.tv/index.php?title=Installing_
OpenELEC_on_Raspberry_Pi
Wiki-Seite der OpenELEC XBMC Distribution für den Raspberry
Pi. Diese scheint uns besonders ausgereift und bietet den größten Funktionsumfang.
sources.openelec.tv/tmp/image
Auf dieser offiziellen Seite kann das OpenELEC XBMC Image
für verschiedene Plattformen, auch dem Raspberry Pi, geladen werden. Allerdings lässt sich dieses Image nur über Linux
installieren.
openelec.thestateofme.com
Auf dieser Seite werden die OpenELEC XBMC Images für Raspberry Pi auch im windows-kompatiblen Format zur Verfügung
gestellt. Diese können mit Image Writer auf die SD-Karte geflasht werden. Wählen Sie am Ende der Liste die neueste ZIPDatei (rXXXXX.img.zip).
https://launchpad.net/win32-image-writer/+download
Webseite des Image Writer für Windows. Dieses Tool schreibt
die Firmware-Images auf die SD-Speicherkarten.
www.tsreader.com/tsreader
Webseite von TSReader. Für die Streaming-Funktion wird die
Professional Version benötigt, die kostenpflichtig ist.
www.videolan.org/vlc
Wer lieber Gratis-Lösungen benutzt, sollte VideoLANs VLC probieren. Mit dieser Software ist es auch möglich, einen Transport-Stream zu demuxen und die enthaltenen Kanäle einzeln
über separate IP-Adressen und/oder Ports zu streamen. Allerdings ist die Konfiguration doch weitaus komplizierter.

33

25. Here you can see both playlists: one for the Portuguese TDT
transponder and one for the HOTBIRD 13.0E satellite transponder
26. If you prefer, you can merge the channels of different playlists
into a single playlist. Here we see all streamed channels in one
single playlist, despite the fact that these channels come originally
from different tuners.
27. Naturally, XBMC has many more capabilities. Why not watch
a movie? Almost all formats are recognized and supported,
including subtitles and multiple audio channels.
28. Time for a break: watching the classic Metropolis. Did you
know that this masterpiece can be downloaded for free, because
the copyright expired long time ago?
29. Here a different movie, encoded and encapsulated differently
(*.mp4): a recreation of the Space Odyssey, but using Lego
actors…
30. XBMC can be adjusted to your preferences and needs. Just go
to the settings menu.
31. Here you can setup every detail, including the weather settings.
32. We specified the location of our test centre.
33. There are many options to setup audio and video. The
Raspberry Pi features a full HDMI connector and is capable of
resolutions up to full HD at 1920x1080
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

157
FEATURE

New DVB Standards

Extensions to
DVB-S2

158 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
•	new enhancements allow for higher data rates
•	more rectangular transponder spectrums provide
more space for additional transponders
•	reducing sidelobs gives more space for more
transponders
•	wide-band transponders add to efficiency
•	new modulation with 6 bits

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

159
FEATURE

New DVB Standards

What‘s coming next
after DVB-S2?
Jacek Pawlowski

The DVB-S2 standard was first published in 2005. While the performance
it offers may still impress us nowadays,
the advances in technology and growing demand for higher and higher data
rates make the satellite industry search
for even more efficient ways to transfer
huge amount of data most notably the
high demands generated by Ultra High
Definition TV (UHDTV) and high speed
IP services over satellite.
Recently in TELE-audiovision 0708/2013 we have published a feature
articles about the new UHDTV standard
and the video compression standard
HEVC, also known as H.265 – a successor of MPEG-4 (H.264). These new
solutions require new hardware and
software. It makes a good moment to
improve also the modulation, coding
and error correction standard as defined by the DVB-S2 standard.
As the proposed improvements have
not yet been blessed by the DVB organization we will call them the proposed extensions to DVB-S2. However,
real hardware devices have been built
and various test have been performed
to prove these new concepts. These
new DVB-S2 extensions are labelled as
DVB-S2EB1, DVB-Sx or even DVB-S3
although such a standard does not yet
officially exist in this moment.
The proposed extensions can give a
20% increase in data rate compared
to DVB-S2 in DTH (Direct-To-Home)
broadcasts. For professional services,
like VSAT communication, the gain can
be as high as 64%.
So, what exactly are these extensions? Here is our list:
- reduction of the roll-off factors and
the side lobes of digitally modulated
carriers
- use of wide bandwidth transponders
- additional modulation: 64 APSK
- more modulation and coding (MODCOM) schemes and forward error correction (FEC) choices and non-linear
MODCOMs
Not all of the extensions are easy to

■ Figure 1. With smaller roll-offs, transponders can be squeezed closer to one another.
comprehend but in this features article
we try to help you to get a general idea
on most of them.
The roll-off factor describes the
shape of the transponder spectrum as
seen on a spectrum analyzer. Its value
tells you how close to an ideal rectangular the spectrum is. The smaller it
is the more steep are the slopes of a
transponder spectrum. DVB-S requires
a roll-off of 35%, DVB-S2 of 20% and
25% while the the proposed S2 extensions aim at 15%, 10% and 5%. It is
easy to understand that with smaller
roll-offs one can position transponders
closer to one another in the frequency
domain and gain a free space for additional ones in the same Ku-Band or
C-Band.
However, not only (relatively) big rolloffs prevent closer location of the DVBS2 transponders. So called side lobes
are normally present on both sides of
the useful signal. These are unwanted
artifacts after modulation. With today’s
technology it is possible to practically
get rid of them thanks to improved
filtering. Once they are removed, the
center frequencies of the neighboring
transponders can be set closer to one
another.
If you take a look at Figure 2, you can
come to the conclusion that even after removing side lobes and improving

roll-offs, there is still some spectrum
wasted between the transponders. And
that’s why wideband transponders are
the next trick in improving efficiency.
Their throughput is increased to 72 Ms/
sec. When compared with the most
popular 27.5 Ms/sec transponders, the
wideband ones are three times wider in
spectral view.
Every new DVB standard introduces a
new modulation schemes. DVB-S2 ended up with 32 APSK. The proposed extensions call for 64 APSK. In this modulation, every symbol is made up of 6
bits. Of course, the higher the order of
modulation, the smaller the differences
in amplitude and phase between similar
symbols. We can send more data in the

160 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
■ Figure 2. Reducing side lobes by more efficient filtering contributes to better bandwidth utilization.
same bandwidth but the signal is more
sensitive to interference and noise. 64
APSK will be used in professional setups with large antennas rather than in
DTH transmissions.
Probably the same goes true for the
last extension mentioned in the beginning of this article: more MODCOM and
FEC values. These parameters generally describe how big overhead is introduced in the data stream to the useful payload. The overhead in bit rate is
needed for error correction. Once we
have more possibilities here, we can
almost smoothly change the proportion between useful and corrective bits
in order to find a minimum overhead
still ensuring faultless processing. Such

thing is possible when we have a pointto-point two-way communication. In
case of a reception problem, the system automatically adjusts MODCOM/
FEC.
Also the wideband transponders
described above require the reception system to be of a higher performance because the carrier-to-noise
ratio degrades proportionally with the
bandwidth increase. The best way to
maintain a good C/R is to use a bigger
dish. Therefore, it is not certain if wideband transponders will be used for DTH
broadcasts. After all, not too many end
users will be eager to replace their 6090 cm dishes with larger ones.
That’s why the experts assume that in

DTH transmissions only about 20% increase in the efficiency is realistic while
in professional links even 64% would be
possible. Anyway, we can not say today
which particular extension proposals
will be included in the eventual settlement of the DVB-S3 standard. Maybe
only some of the above, maybe all of
them. We will not be surprised though
if brand new concepts are worked out
in meantime and included in the new
standard.
One thing is for sure: the improvements will enable higher useful data
rates in the existing satellite communication channels and this will be an
important factor enabling UHDTV and
other wideband services.

Wideband transponder

■ Figure 3. Wideband transponders use frequency spectrum more efficiently.
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

161
DIGITAL TECHNOLOGY

New Developments

Take Advantage

Read TELE-audiovision's Technical
Feature Stories to Know All About
the Digital Developments and New
Technical Breakthroughs
Enjoy Reading TELE-audiovision
FREE on Your
Tablet Computer
www.TELE-audiovision.com
162 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
Self-made IPTV

Self-made IPTV

www.TELE-audiovision.com/TELE-audiovision-1311/eng/feature-satip4.pdf

www.TELE-audiovision.com/TELE-audiovision-1307/eng/feature-satip2.pdf

New DVB Extensions

Ultra High Definition

www.TELE-audiovision.com/TELE-audiovision-1311/eng/feature-dvbs3.pdf

www.TELE-audiovision.com/TELE-audiovision-1307/eng/feature-hevc.pdf

Self-made IPTV

Self-made IPTV

www.TELE-audiovision.com/TELE-audiovision-1309/eng/feature-satip3.pdf

www.TELE-audiovision.com/TELE-audiovision-1305/eng/feature-satip1.pdf

Ultra High Definition TV

Phase Shifts in Digital TV

www.TELE-audiovision.com/TELE-audiovision-1309/eng/feature-uhdtv.pdf

www.TELE-audiovision.com/TELE-audiovision-1303/eng/feature-iqswap.pdf

www.TELE-satellite.com — 06-07/2012 — TELE-satellite International International — 全球发行量最大的数字电视杂志
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision — The World‘s Largest Digital TV Trade Magazine

163
DIGITAL TECHNOLOGY

New Developments

Digital Terrestrial TV - 2nd Level

DVB-S2: Hide the SD inside the HD

www.TELE-audiovision.com/TELE-audiovision-1301/eng/feature-atsc2.pdf

www.TELE-audiovision.com/TELE-satellite-1207/eng/feature-h8psk.pdf

The Secret Special Transmission Modes

How a tuner for VCM operates

www.TELE-audiovision.com/TELE-satellite-1209/eng/feature-transmission.pdf

www.TELE-audiovision.com/TELE-satellite-1205/eng/dvb-S2-vcm.pdf

All About Fiber Optic Connectors

DVB-S2 MIS Reception with VCM/ACM

www.TELE-audiovision.com/TELE-satellite-1209/eng/feature-optical.pdf

www.TELE-audiovision.com/TELE-satellite-1201/eng/tenow-TBS6925.pdf

Basic Knowledge: Polar Mount Antennas

Automatic Creation of 3D

www.TELE-audiovision.com/TELE-satellite-1207/eng/polarmount.pdf

www.TELE-audiovision.com/TELE-satellite-1109/eng/2d3dconversion.pdf

164 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
How a Silicon Tuner Works

How the SFN Modulation Works

www.TELE-audiovision.com/TELE-satellite-1107/eng/silicontuner.pdf

www.TELE-audiovision.com/TELE-satellite-1103/eng/sfn.pdf

Channel Capacity of a Transponder

How HbbTV Works

www.TELE-audiovision.com/TELE-satellite-1107/eng/sdinhd.pdf

www.TELE-audiovision.com/TELE-satellite-1101/eng/hbbtv.pdf

CI+ and HD+Encryption

How DVB-C2 Works

www.TELE-audiovision.com/TELE-satellite-1107/eng/CI+HD+.pdf

www.TELE-audiovision.com/TELE-satellite-1009/eng/dvb-c2.pdf

How MPEG Surround Works

Streaming TV via the Internet

www.TELE-audiovision.com/TELE-satellite-1105/eng/mpeg-surround.pdf

www.TELE-audiovision.com/TELE-satellite-1007/eng/streaming.pdf

www.TELE-satellite.com — 06-07/2012 — TELE-satellite International International — 全球发行量最大的数字电视杂志
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision — The World‘s Largest Digital TV Trade Magazine

165
DIGITAL TECHNOLOGY

New Developments

Testing Horizon to Horizon Actuator

Matching LNB with Dish

www.TELE-audiovision.com/TELE-satellite-1005/eng/h-h-actuator.pdf

www.TELE-audiovision.com/TELE-satellite-0811/eng/lnb+dish.pdf

How SCR Works

How to Calculate the Power Factor

www.TELE-audiovision.com/TELE-satellite-0911/eng/scr.pdf

www.TELE-audiovision.com/TELE-satellite-0809/eng/powerfactor.pdf

How Decoding Works

How to Solve Problems with DiSEqC

www.TELE-audiovision.com/TELE-satellite-0909/eng/decoding.pdf

www.TELE-audiovision.com/TELE-satellite-0807/eng/diseqc.pdf

How ABS-S Works

How the 3D Diffractive Antenna Works

www.TELE-audiovision.com/TELE-satellite-0903/eng/abs-s.pdf

www.TELE-audiovision.com/TELE-satellite-0805/eng/3ddiffractive.pdf

166 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
Relation between Dish Size and EIRP

How MPEG Works

www.TELE-audiovision.com/TELE-satellite-0803/eng/dishsize.pdf

www.TELE-audiovision.com/TELE-satellite-0707/eng/mpeg.pdf

Secrets of the Aspect Ratio

Secrets of Antenne Alignment

www.TELE-audiovision.com/TELE-satellite-0801/eng/aspectratio.pdf

www.TELE-audiovision.com/TELE-satellite-0705/eng/performance.pdf

How the Network Connection Works

The Secrets of HDMI

www.TELE-audiovision.com/TELE-satellite-0711/eng/networkconnections.pdf

www.TELE-audiovision.com/TELE-satellite-0703/eng/hdmi.pdf

How the Ka Band Works

The Relation of Dish Size and EIRP

www.TELE-audiovision.com/TELE-satellite-0709/eng/kaband.pdf

www.TELE-audiovision.com/TELE-satellite-0701/eng/dishsize.pdf

www.TELE-satellite.com — 06-07/2012 — TELE-satellite International International — 全球发行量最大的数字电视杂志
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision — The World‘s Largest Digital TV Trade Magazine

167
OVERVIEW

Vitor’s Workshop

How
to get
the most
out of
technology
AZBox Ultra HD Recovery

Satellite Reception in the Ka-Band

www.TELE-audiovision.com/TELE-audiovision-1307/eng/vitorsworkshop.pdf

www.TELE-audiovision.com/TELE-audiovision-1305/eng/vitorsworkshop.pdf

168 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
Oscilloscope for Basic Use

Chip Flashing

www.TELE-audiovision.com/TELE-audiovision-1303/eng/vitorsworkshop.pdf

www.TELE-audiovision.com/TELE-audiovision-1205/eng/vitorsworkshop.pdf

Two-axis Motor Control

Add-On for SPAUN Signal Analyzers

www.TELE-audiovision.com/TELE-audiovision-1211/eng/vitorsworkshop.pdf

www.TELE-audiovision.com/TELE-audiovision-1203/eng/vitorsworkshop.pdf

Selfmade Dish

Upgrade for 8dtek Satellite Meters

www.TELE-audiovision.com/TELE-audiovision-1209/eng/vitorsworkshop.pdf

www.TELE-audiovision.com/TELE-audiovision-1201/eng/vitorsworkshop.pdf

Digital Picture Frame

Receiver Firmware

www.TELE-audiovision.com/TELE-audiovision-1207/eng/vitorsworkshop.pdf

www.TELE-audiovision.com/TELE-audiovision-1111/eng/vitorsworkshop.pdf

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

169
PRODUCT REPORT

Hochfrequenzfilter

Filter von
MFC
•	bietet HF-Filter für alle Anwendungen an
•	besonders erfolgreich im Bereich C-Band Filter
•	hochspezielle Filter im Angebot, z.B. gegen WiMAX-Störungen
•	Hoch- und Tiefpassfilter lassen sich kombinieren und können
Frequenzweichen ersetzen

170 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

171
PRODUCT REPORT

Hochfrequenzfilter

Die vielen Vorteile von HF-Filtern
Normale
Endanwender, die sich eine einfache Ku-Band Satellitenanlage
aufbauen,
brauchen außer der Antenne, dem LNB, einem
Receiver und dem LNBKabel kein weiteres Zubehör. Möchte man aber
tiefer in den Satellitenempfang
einsteigen
und eine Kabelkopfstation betreiben oder gar
eine Satelliten Uplinkstation, dann braucht
man oftmals ganz besonderes Zubehör wie
Hochfrequenzfilter. Es
gibt weltweit nur sehr
wenige Hersteller, die
solche Spezialprodukte
anbieten.
Einer davon ist ist MFC
(Microwave
Filter
Co.,
Inc.), die sich auf Filter
und Zubehör im Hochfrequenz-Band
spezialisiert hat, genauer gesagt

für den Frequenzbereich
von 5 Hz bis 50 GHz. Die
Produktpalette von MFC
umfasst Wellenleiter, dielektrische Resonatoren,
Frequenzweichen,
Filter,
Lastwiderstände (gewöhnlich als Dummy Loads bezeichnet), Adapter und
weiteres Zubehör. Besonder nachgefragt sind Filter
für das C-Band, denn hier
treten sehr häufig Störungen auf, die man mit einem solchen Filter beseitigen kann.
Filter für HF-Anwendungen dienen hauptsächlich
dazu, ungewünschte Signale zu eliminieren. Diese
Störsignale machen sich
meist nicht nur auf einer
einzigen
Frequenz
bemerkbar, sie beeinflussen
oftmals auch benachbarte
Frequenzen negativ und
können aktive Elemente
im System, zum Beispiel

1

2

3

1. A sample spectrum: the signal level is high over a great
frequency range, no filter is used.
2. Using a high pass filter: only frequencies above the cutoff frequency pass the filter, low frequencies are attenuated
substantially.
3. Using a low pass filter: only frequencies under the cut-off
frequency pass the filter, high frequencies are attenuated
substantially.
4. Band-Pass filter: combining both a high pass filter with a
lower cut-off frequency and a low pass filter with a higher cut-off
frequency. The result is that the centre band will pass the filter with
minimal attenuation.
5. Band-Rejection filter: in this case a low pass filter with a low
cut-off frequency is combined with a high pass filter with a high
cut-off frequency are combined. The result is that the centre band
is attenuated substantially.

4

5

172 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
■ Example with a UHF filter of a pay TV operator: The left picture shows the whole CATV
spectrum without any filter. The right picture shows the result of using a low pass filter
with a cut-off frequency of 296 MHz.

■ The new catalogue by MFC gives an extensive overview of all available filters made by MFC. The
catalogue can also be downloaded diretly off their website: www.microwavefilter.com

174 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

Verstärker, zur Fehlfunktion
verleiten.
Deshalb
filtert man am besten
die nicht benötigten Frequenzbereiche, in denen
sich die störenden Signale
befinden, heraus.
Ein vorhandenes Signal
kann unterschiedlich gefiltert werden. Zum einen
kann man einfach nur Signale unter oder über einer
gegebenen Frequenz filtern. Dazu setzt man Tiefpassfilter und Hochpassfilter ein. Ein Tiefpassfilter
läßt die Frequenzen unter
der Grenzfrequenz durch,
während die Frequenzen
über der Grenzfrequenz
stark gedämpft werden.
Bei Hochpassfilter ist es
entsprechend umgekehrt:
unter der Grenzfrequenz
wird das Signal gedämpft
und darüber kommt das
Signal fast ungedämpft
durch.
Kombiniert man einen
Hochpassfilter mit niedriger Grenzfrequenz mit
einem Tiefpassfilter mit
hoher Grenzfrequenz kann
man sogar ganz gezielt
nur einen Frequenzbereich
durchlassen. In diesem
Fall spricht man von einem
Bandpassfilter.
Benutzt man hingegen
einen Tiefpassfilter mit
einem Hochpassfilter, der
eine
höhere
Grenzfrequenz aufweist, dann wird
der mittige Frequenzraum
gefiltert, das Ergebnis ist
ein so genannter Sperrfilter, auch Rejection-Filter
genannt.
Wofür sind solche Filter
gut? Zum einen können
so verschiedene Receiver mit individuellen Frequenzbändern
versorgt
werden, ohne dass sich
die Receiver ein Frequenzband teilen müssen. Dies
geschieht zum Beispiel in
der SCR-Verteilung (Single
Cable Routing), in welcher
bis zu 8 Receiver in Serie
an einem Kabel individuell
die Satellitenprogramme
wählen können.. Jedem
Receiver wird ein eigenes
Frequenzband zugewiesen
und der Router moduliert
in dieses Frequenzband
den gewünschten Transponder.
Netzwerkbetreiber nutzen Filter auch in analogenCATV Netzwerken, um
Kunden mit „kleinen“ Abos
davon abzuhalten, alle Kanäle zu empfangen. Die
Premium-Kanäle
werden
einfach auf höheren Frequenzen abgelegt und ein
oftmals verplombter Tiefpassfilter am Hauseingang
verhindert den Empfang
dieser Kanäle.
Ein weitaus wichtigerer
Grund Filter einzusetzen
ergibt sich jedoch aus dem
Umstand, dass sich benachbarte Signale oftmals
gegenseitig stören. Leider
drängen sich immer mehr
verschiedene Applikationen in das eingeschränkte Frequenzspektrum und
selbst die strengsten Vorschriften und Frequenztabellen können nichts
gegen diese Störungen
bewirken.
Ein
bekanntes Praxis-Beispiel sind
zum Beispiel Störungen
im DVB-T/T2 Bereich, die
durch das LTE-Signal hervorgerufen werden. Laut
Normen sollten alle Anwendungen im Frequenzspektrum ungestört nebeneinander in den jeweils
zugeteilten
Frequenzen
funktionieren. Die Realität
ist aber zu oft ander.
Allgemein wird Interferenz in der Hochfrequenz
durch verschiedene Phänomen hervorgerufen. In
den Receivern:
- Störungen durch benachbarten Frequenzen
- Störungen im Frequenzbereich der ZF (ZF
= Zwischenfrequenz)
- Störungen im Frequenzbereich der LO-

Frequenz (LO = Lokaler
Oszillator)
Aber auch im Sender
treten Störungen auf:
- Neben der Emissionsfrequenz treten auf
naheliegenden Frequenzen oftmals ungewollte
Ausstrahlungen auf, die
durch den Modulator erzeugt werden
- Oberwellenemissionen
- Störemissionen die
durch Intermodulation
entstehen

Neue Hochfrequenz Filter von MFC
für das C-Band

Model 18253 - C-Band (INSAT) Transmit Reject Filter
• This TRF provides deep rejection of the transmit band with minimal effect on the
receive band.
• Ideal for INSAT and other Region-Specific Receive Applications
• Alternate Flange Configurations are Available Upon Request
Pass band	
4.5 - 4.8 GHz (C-INSAT Downlink)
Insertion Loss	
0.50 dB Max
VSWR	
1.30:1 Max
Reject Band	
6.725 - 7.025 GHz (C-INSAT Uplink)
Rejection	
80 dB Min
Operating Temperature Range	
-10°C to +60°C
Flanges	CPR229G
Dimensions	
3.95” x 3.88” x 2.75” (100mm x 98mm x 70mm)
Finish	
Gloss White Lacquer
Model 18323 - C-Band (INSAT) Receive Reject Filter

Um einen passenden Filter auswählen zu können,
sollte man die vom Hersteller angegebenen Parameter verstehen. Hier
die Erklärung einiger der
wichtigsten Parameter:
- Dämpfung
(Attenuation)
Die Dämpfung gibt in
Dezibel an, um wie viel
das Eingangssignal abgeschwächt wurde. Dazu
wird der Signalpegel am
Eingang und am Ausgang
gemessen, weshalb die
Dämpfung in Dezibel (dB)
angegeben wird.
- Bandbreite
(Bandwidth)
Dieser Parameter gibt
die
Bandbreite
eines
Bandpassfilters an, also
der Frequenzbereich, der
mit einer relativen Durchgangsdämpfung von maximal 3 dB den Filter durchquert.
- Grenzfrequenz
(Cut-Off Frequency)
Hier handelt es sich um
die Frequenz, ab welcher
Hochpassfilter und Tiefpassfilter anspringen.
- Dezibel (Decibel)
Dieser Wert gibt das
Verhältnis zweier Signale
(P1 und P2) anhand der
folgenden Gleichung an:
dB = 10 Log10 (P1/P2)

• Same as before but rejection of the receive (Downlink) band
Passband	
6.725 - 7.025 GHz
Insertion Loss	
0.10 dB Approx.
VSWR	
1.22:1 Max
Reject Band	
4.5 - 4.8 GHz
Rejection	
80 dB Typ
Flanges	CPR137/CPR137G
Dimensions	
5.00“ x 2.69“ x 1.94“ (127mm x 68mm x 49mm)
Finish	
White Lacquer
Model 18506 - Multi-Purpose C-Band Transmit Filter

• This Uplink filter not only rejects the entire receive band (below 4.2 GHz), but
it also rejects transmissions from other potential sources of interference etc., that
RRFs do not.
• Ideal for use in high-density transmit paths, like:
Wireless Services (Point-Multipoint)	
4.55 - 4.9 GHz
Maritime & Aeronautical Radio Navigation	 4.2 - 5.6 GHz
Broadcast Auxiliary Services	
6.95 -7.15 GHz
• Ideal for all “standard band” C-Band Uplink Applications
• Easy bolt-on installation and no power supply required
Passband	
5.925 - 6.425 GHz
Passband Loss	
0.3 dB Max
Passband Return Loss	
17.7 dB Min
Rejection	
50 dB Min @ 5.625 GHz
	
40 dB Min @ 6.725 GHz
Power Rating	
400 Watts
Flanges	CPR137F
Dimensions	
9.50” x 2.69” x 1.94” (241mm x 68mm x 49mm)
Finish	
Gloss White Lacquer

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

175
- Durchgangsdämpung
(Insertion Loss)
Wie bei jedem anderen
aktiven oder passiven Element, das zwischen der
Antenne und dem Receiver/Sender
geschaltet
wird, verursacht auch der
Einsatz eines Filters eine
Dämpfung des gesamten
Signals. Dieser Parameter
gibt diese Dämpfung an,
die möglichst klein (unter
3 dB) sein sollte.
- Phasenverschiebung
(Phase Shift)
Dieser Parameter gibt
die Laufzeitverschiebung
des Signals an, das durch
den
Filter
verursacht
wird. Gewöhnlich macht
sich
diese
Laufzeitverschiebung mit steigender
Frequenz umso mehr bemerkbar und kann besonders in digitalen Signalen
Probleme verursachen.

Probleme
im C-Band

Das C-Band wird besonders durch WiMAX und
Radar-Applikationen, konkret
von
Wetter-Radar
Anwendungen,gestört. Um
den C-Band Empfang ungestört nutzen zu können
empfiehlt es sich deshalb,
Bandpassfilter
einzusetzen, die nur genau den benötigten Frequenzbereich
durchlassen.
Im C-Band wird das
Standard C-Band und das
erweiterte C-Band unterschieden. In einigen Regionen ist der Frequenzbereich
des
C-Bandes
obendrein etwas unterschiedlich, zum Beispiel in
Russland.
Je nach Frequenzband
muss man daher passende Filter benutzen. In den

letzten Jahren hat sich
besondersWiMAX („Worldwide Interoperatibility for
Microwave Access“) zum
Kummerkandidaten entwickelt. Dieser Internet-Zugang über Funk spielt sich
in den Frequenzbändern
von 2300MHz, 2500MHz
und 3500MHz ab und hat
deshalb
das
Potential,
die C-Band Ausstrahlung
nachhaltig zu stören.
Die normale Maßnahme
besteht darin, einen hoch
selektiven Bandpassfilter
einzusetzen, dessen Frequenzbereich dem regionalen Footprint entspricht
(zum Beispiel 3700-4200
MHz,
3400-4200
MHz,
usw.). Seit nicht allzu langer Zeit, wurde WiMAX
aber auch weltweit im Frequenzband von 3400-3800
MHz in Betrieb genommen.
Die daraus resultierenden
Inband-Interferenzen im
C-Band können diesmal
aber nicht einfach mit den
gängigen Bandpassfiltern
eliminiert werden, denn
wenn zum Beispiel ein WiMAXSender auf 3700 MHz
den C-Band Empfang von
3700-4200 MHz stört, wird
ein gewöhnlicher Bandpassfilter alle Frequenzen
von 3700-4200 MHz ungefiltert durchlassen, also
auch das störende WiMAX
Signal. In diesem Fall ist
deshalb ein besonderer
Filter notwendig, der das
Signal zum Beispiel erst
ab 3750 MHz durchlässt.
Filter in diesem HF-Bereich sind jedoch komplex
aufgebaut und entsprechend ist für die Entwicklung viel Erfahrung notwendig. Außerdem bedarf
es spezieller Fertigungsprozesse, denn hier sind
nicht einfach nur elektronische Schaltungen im

C-Band

TX(MHz)

RX (MHz)

Standard

5850–6425

3625–4200

Extended

6425–6725

3400–3625

Neue Hochfrequenz Filter von MFC
für das C-Band

Model 13961W-I - International (Extended)
C-Band Interference Elimination Filter

• No other filter in the industry provides as much rejection of undesired signals in
such a compact size.
• Eliminates WiMAX, RADAR and virtually all other sources of out-of-band interference
• Lightweight - Aluminium Construction
• Ready to install between LNB & feed horn
Pass band	
3.6 - 4.2 GHz
Pass band Loss	
0.5 dB Typ @ centre band
	
0.5 dB Typ roll-off @ band edges
Pass band VSWR	
1.5:1 Typ
Group Delay Variation	
8 ns Max
Rejection	
45 dB Typ @ 3.55 GHz / 4.25 GHz
	
55 dB Typ @ 3.45 GHz / 4.35 GHz
	
70 dB Typ @ 3.40 GHz / 4.40 GHz
Flanges	
CPR229G (Input), CPR229F (Output)
Length	
5.49“ (13.9 cm)
Weight	
1.125 lbs. (0.51 Kg)
Finish	
Gloss White Lacquer

Einsatz – die hochfrequenten Signale verbreiten sich
auch ohne elektrischen
Leiter, weshalb die Filter in
diesem Fall hauptsächlich
aus Hohleitern bestehen.
Überhaupt: schaut man
sich als Laie einen dieser
Filter an fragt man sich zuerst, wie und wo man dieses überhaupt anschließen
muss. Die Antwort ist ganz
einfach: direkt an der Antenne zwischen dem Feed
und dem LNB/LNA.
Der
Fertigungsprozess
von dieser Art von Filtern
besteht daher zum großen Teil aus Fräsen mit
Hilfe einer computergesteuerten Maschine, die
Fräsbahnen werden mit
spezieller CAM Software
berechnet. Für das CBand ist MFC weltweit der
führende Anbieter von Fil-

176 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

tern zur Eliminierung von
Interferenzen. Kein anderes Unternehmen bietet
eine derart große Palette
von Filtern an, sei es um
Radar, WiMAX oder jedes
andere interferierende Signal zu filtern.
Einen Einblick in das umfangreiche Filtersortiment
bietet die Auflistung neuer Filter, die MFC kürzlich
in seine Produktion aufgenommen hat. Die wichtigsten davon stellen wir
den TELE-audiovisions Lesern hier vor.
Es führt kein Weg um
MFC vorbei, wenn im CBand
Filter
eingesetzt
werden müssen. Dieses
Unternehmen hat sich auf
die Entwicklung und Fertigung dieser Filter spezialisiert und bietet mit seinen
Produkten
erstklassige
Charakteristiken an.
Firmen Report

Digital TV Internet Forum BSD, Brasilien

10 Jahre BSD
Internet Forum,
Brasilien
■ Hier in Jundiai hat Marcos

Benni sein neues Office für BSD
eingerichtet

178 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
•	größtes Internet Forum in Brasilien über Digital TV
•	erreicht jeden Monat mehr als 400.000 Leser
•	startet mit einem Video Shop eine neue Form des Online
Shopping für Digital TV Produkte
•	auch im Bereich IPTV und IP Radio aktiv

BSD sagt Danke
10 Jahre BSD waren nur möglich durch die großartige Mitarbeit aller, die
Informationen über Satelliten und terrestrische Sender eingesandt haben.
Ermöglicht wurden 10 Jahre BSD auch durch die Partnerschaften des BSDPortals, welche die Arbeit unterstützt haben. Ein spezieller Dank an die
Hobbyfreunde, Antenneninstallateure, Techniker, Ingenieure und Direktoren der Satelliten- und TV-Sender. Ein besonderer Dank geht an:
Gilson Teles für seine Nachrichten und Reportagen im BSD SatClub Forum, Danilo Rodrigues für die Programmierung der BSD Website und für
alle sonstigen IT Arbeiten, Valdecir Adorno und Francisco Crispim für ihre
unermüdliche Mitarbeit im Bereich der Satellitenkanäle im BSD SatClub
Forum

Marcos Benni
portalbsd.com.br

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

179
Firmen Report

Digital TV Internet Forum BSD, Brasilien

Neues Konzept
bei BSD
Im Oktober 2003 ging das brasilianische Internetforum BSD unter der
Adresse portalbsd.com.br online. Das
Forum, das sich mit allen Themen des
digitalen Empfangs beschäftigt, ist das
Produkt von Marcos Benni, der selbst
ein begeisterter Satelliten DXer ist. In
TELE-audiovision 12-01/2012 hatten
wir über ihn berichtet und seinen rie-

sigen 5m Spiegel gezeigt. Mittlerweile
hat sich einiges getan und der 10. Geburtstag seines Internet Forums war
eine gute Gelegenheit nachzufragen,
wie es heute um BSD steht.
Denn Marcos Benni hat großes Neues
vor: er hat ein brandneues Office bezogen und ist dabei, mit einem neuen
Konzept einen Internet-Handel zu star-

ten. „Meine Idee ist, die Produkte in
kurzen Videos vorzustellen. So wird es
für jeden Interessierten viel einfacher
zu verstehen, wozu die Produkte gut
sind und wofür sie verwendet werden
können.“ Damit dies professionell geschieht hat er in seinem neuen Office
ein echtes TV-Studio eingerichtet. Bei
unserem Besuch befand sich noch alles
im Umbau, mit Erscheinen dieser TELEaudiovision aber soll bsdshop.com.br
bereits voll in Betrieb sein.
„Anbieten werde ich alle Produkte
des Digitalen TV, von Satellitenspiegeln
über normale und fiberoptische LNB
bis zu Kabeln und allen Arten von Receivern und Satfindern,“ listet Marcos
Benni, von jedermann nur Benni ge-

■ Marcos Benni in seinem

Büro. Gerne liest er die TELEaudiovision, die regelmäßig
über Firmen aus Brasilien
berichtet - wie auch über
seine Firma BSD.

180 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
nannt, auf. Aber daneben ist Benni auch
im Bereich IPTV aktiv: „Ich habe hier
einen IPTV Showroom eingerichtet, in
dem interessierte TV Betreiber die notwendige Technik im Live-Einsatz sehen
können und ich die Funktion erläutern
kann.“ Nicht nur das, auch IP-Radio ist
ein Hobby von Benni und er kann die
dafür notwendige Technik jedem Interessierten anbieten. „Ab Oktober 2013
sende ich auch wieder Radio BSD über
das Internet, diesmal über Shoutcast.“
In den 140 Quadratmetern seines
neuen Office hat Benni alles untergebracht, was er für seine neue Aktivitäten plant. „Mit 400.000 Besuchern
jeden Monat, davon 80% aus Brasilien,
gehört mein Forum zu den größten des
Landes.“ verweist Benni auf die beeindruckenden Abrufzahlen von portalbsd.
com.br Jeder, der sich in Brasilien im
Bereich digital TV informieren will tut
dies über sein Forum. „Ich habe hier im
Office mehrere Satellitenspiegel installiert, mit denen ich alle empfangbaren
Programme sehen kann und auch die
Nachrichtensektion meines Forums upto-date halten kann.“ Benni zeigt hier
auf die Spiegelreihe, die von den 3m
C-Band Spiegeln bis hin zu den kleineren Ku-Band Spiegeln reicht. Benni hat
sich in seinem neuen Office den Traum
eines jeden Satelliten DXers verwirklicht. Mit dem neuen Shop auf Basis von
Produktvideos will er den Erfolg seines
Internet Forums nun auch kommerziell anwenden. Viel Erfolg dabei für die
nächsten 10 Jahre!

■ Von der Seitenstraße

aus sieht man die
Spiegelparade auf dem
Dach des BSD Office

■ In TELE-audiovision Ausgabe 12-01/2012 berichteten wir erstmals
über Marcos Benni und sein Internet Forum BSD. Der vollständige
Bericht kann hier nachgelesen werden:
www.TELE-audiovision.com/TELE-satellite-1201/eng/bsd.pdf

182 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
ë

Jundiaí
(São Paulo)

■ Hier landen die

telefonischen
Bestellungen der
BSD-Kunden.

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

183
2
1. In der Rezeption werden Kunden empfangen, die direkt
zur BSD-Zentrale kommen
2. Kleine Auswahl der Digital TV Receiver, die Benni im
BSD Shop anbieten wird

1

184 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
■ Noch ist das TV-Studio nicht fertig eingerichtet, aber erste Testaufnahmen
laufen schon. Hier präsentiert Gilson Teles den fiberoptischen LNB von
GlobalInvacom, den BSD in Brasilien bekannt machen will.

186 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
■ Benni in seinem Element:

im Regieraum seines neuen
TV-Studios hat Benni das
Video Mischpult und seine
PCs aufgebaut.

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

187
COMPANY REPORT

Fibre Optic Manufacturer GlobalInvacom, UK

Two
Million
Connections
with

GlobalInvacom‘s
FibreIRS
188 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
•	Invented the new satellite IF transmission technology via fibre
optics
•	Five million FibreIRS connections are expected by 2015
•	Through continuous technological improvements FibreIRS can
now serve more than 4000 connections from a single LNB; for
professional applications it's several 10,000's
•	14 Multiple R&D Engineers are consistently working to improve
the system
•	Northern Europe, North Africa and Southeast Asia are the
largest FibreIRS markets

■ GlobalInvacom's headquarters in Stevenage north of

London. GlobalInvacom used to occupy only the left hand
side of the building, now they have leased the right side as
well. That's where you'll find their FibreIRS R&D group.

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

189
COMPANY Report

Fibre Optic Manufacturer GlobalInvacom, UK

Congratulations!
Five Years of
Fibre Optic
Systems from
GlobalInvacom
Alexander Wiese

190 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
ë

Stevenage

■ Ivan Horrocks is happy:

GlobalInvacom's FibreIRS
system is celebrating its fifth
birthday with two million
users connected to optical
satellite signals.

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

191
1. Gary Stafford is responsible for
GlobalInvacom's business development.
He came up with the idea in 2007 to
distribute the satellite IF of an LNB via fibre
optic cables. From there came the FibreIRS
products.
2. Matt Presdee looks after their Technical
support for the sales department
and is very familiar with the wiring of
GlobalInvacom's devices. Here we see
him on the balcony of GlobalInvacom's
headquarters in Stevenage north of
London. Using a number of satellite dishes
(equipped, of course, with GlobalInvacom
fibre optic LNBs) he tests their products.
3. Dr. Andrew Collar is especially familiar
with optical technology. Here he is
performing experiments with an optical
polarization controller to determine the
system performance characteristics of an
optical system.
4. Mike Jones is one of the principle
technical designers for the optical system

1

In 2008 the first fibre optic LNB was
introduced by GlobalInvacom. This
made it possible to carry a satellite signal from a fibre optic LNB across miles
of fibre optic cable and then, even more
importantly, split it multiple times without any concern for signal attenuation.
Five years have gone by since then so
we wanted to know how things were
going with fibre optic technology; has it
been successful?
The answer to this question is a resounding YES! This is true even though
this involves a completely new technology; distributing satellite signals
via coaxial cable is still standard today. Coax technology has long been a
proven method and has been in use for
more than 100 years. A fundamentally
new technology would be difficult to
push through - it would have to have
many advantages and these advantages would have to be obvious.
Sure enough, Ivan Horrocks, GlobalInvacom‘s Sales Director, says the
FibreIRS system has been a great success: „In the five years since its introduction, we estimate that this technology has been used to connect in excess
of two million households.“
Over the past several years GlobalInvacom has continued to develop this

fibre optic technology under the name
FibreIRS (Fibre Integrated Reception
System). Especially interesting is the
expansion to terrestrial TV signals such
that today GlobalInvacom‘s system can
be simultaneously used for satellite signals as well as terrestrial TV signals.
Ivan Horrocks explains to us how this
all got started: „Gary Stafford came
up with the original idea.“ He runs the
Business Development section and began working on an LNB system that
distributed signals via fibre optic cable.
„Our first FibreIRS product was still fed
directly from the LNB and distributed
the signal through a 16-way split regime.“ An improved model was introduced in 2009 where the LNB signal
could be distributed so a maximum of
32 users could be connected directly to
the fibre optic satellite signal.
„In 2010 we expanded the system
again by introducing the ODU32 which
allowed terrestrial TV signals to be
added. In 2011/2012 we introduced the
wholband splitter which allowed us to
combine 4 X ODU32’s together catapulting the maximum number of subscribers to 256. But this was still not
enough.”
But it still wasn‘t enough: „Our newest system is the just recently devel-

oped O2E Converter: with this system
we can connect sixty four 64-output
ODU32’s.“ This results in an incredible
64 x 64 = 4096 connections, all fed
from a single LNB that can be installed
on a single satellite antenna installed
in an optimal location since distances
are not a factor when using a fibre optic
signal distribution system.
GlobalInvacom FibreIRS product
sales have been increasing 20% year
after year. „Of course, this is subject to
fluctuations“, we learn from Ivan Horrocks, „Our largest market is northern Europe. There we sell 40 -50% of
all our fibre optic products. Another
important market is MENA (the Middle East and North Africa), 20% of
our fibre optic products are shipped
there.“ He sees the strongest growth
in Southeast Asia: „Sales have greatly
increased there. Right now it encompasses about 30% of our fibre optic
products.“
GlobalInvacom‘s best-selling fibre optic product is the Quattro model. „Multiswitches are connected to these and
are therefore best suited for smaller
communities.“ The highest growth can
be seen with the Quad model: „Four
receivers can be directly connected to
this model and is the best way to go
with individual reception in homes (Direct-to-Home).“ As you can see, more
and more private homes as well as
the installation in single apartments or
houses are opting for GlobalInvacom‘s
fibre optic system.
And there‘s even more news from
GlobalInvacom. Business Development
Manager Gary Stafford tells us more:
„In 2012 we acquired the two produc-

192 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
2
3

4

tion operations in China that produce
our fibre optic products; we have been
trading since then as a Plc on the Singapore stock exchange.“ Because of
this and also because of the steadily
increasing number of employees, the
total number of employees right now
totals 1600. „About 1200 of those are
involved in production“, explains Gary
Stafford, „In Great Britain there are
about 300 employees and in our branch
offices in the USA, Singapore and Ma-

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

193
■ A monitor in the main reception area

shows the FibreIRS system in action with
the pictures then being relayed by the new
wireless link.

laysia there are another 100 workers.“
GlobalInvacom has 60 engineers in
their R&D group and they focus on new
products and the further development
of existing products. „14 engineers in
the R&D group work on the FibreIRS
product line.“ This is quite amazing
considering that at the beginning of FibreIRS development in 2007 there was

only one single developmental engineer.
It comes as no surprise that GlobalInvacom consistently introduces new fibre optic products. „We‘re opening a
completely new segment within the fibre optic system with a converter set
that would take the frequency range
starting at 87 MHz all the way up to
2300 MHz and convert it into the optical range. This product is ideal for the
transmission of a single satellite polarization level simultaneously with ter-

restrial signals.“ In this way GlobalInvacom‘s fibre optic system will also be
compatible with C-band systems where
usually only one polarization level
would be carried.
„Especially interesting is the very low
price of this new system consisting of
the coax-fibre converter and the corresponding fibre-coax converter“, comments Ivan Horrocks. „You don‘t even
need any special knowledge of fibre
optics in order to install this system
and thanks to this system you can span

194 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
■ Another new GlobalInvacom product: the

development of the tvLNK HD system. The
HDMI signal, for example from a satellite
receiver is distributed using a standard
coaxial cable. Using a wideband splitter the
HDMI is split into four receivers; allowing
four TV's to be connected to one HDMI
source. It is noteworthy to mention that
additional services such as Digital TV
and satellite can be combined onto the
same coax cable using the loop through.
Being in the tvLINK family means that
remote control functions are passed back
along the coax to enable changes from
each remote location. The addition of a
USB dongle enables further expansion to
connect a number of streaming devices via
a local router.

196 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
extreme distances that you couldn‘t do
with standard coax cable.“
This new system that can carry a single satellite polarization level is further
enhanced with another new system for
fibre optic cables. „For our professional
systems we offer pre-made cables but
now you can get fibre optic cables from

us that can be fashioned by the installer
on-site easily and with very little effort.
We use cable with the same quality as
G657A2 cable except that it can be
prepared using an easier and less expensive splicing device.“ This would allow the installer to utilize precise cable
lengths by simply cutting them from a
roll of cable. This would be much easier
for the installer.
In upcoming issues of TELE-audiovi-

sion we will be highlighting the many
new GlobalInvacom FibreIRS products
in much more detail in product tests.
GlobalInvacom is even involved in the
area of reconverting the optical signal:
there will soon be new products here
as well.
Five years ago GlobalInvacom began moving in a direction away from
ancient coax cable technology towards
the future of optical signal transmission
with its enormous bandwidth and extremely low attenuation.
The technology of the future is being
offered by GlobalInvacom today.

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

197
5. Using a whiteboard, Matt
Presdee describes the new
O2E FibreIRS with which
up to 4096 fibre optical
connections can be set up.
6. The new O2E system. The
highlight: the original fibre
optic signal from the LNB is
routed to a second optical
converter through the
loop-through output. Using
splitters the signal can be
divided as often as needed.

5
6

198 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
7

8

10

9

11

7. Here we see a Quad GTU connected to a
32-way splitter.
8. The display on the analyzer shows the
result: the signal quality is flawless
9. Prototype of the first coax-fibre and
fibre-coax converters: the satellite IF
signal is combined with the signal from

a terrestrial antenna in a switch. The
combined signal, that could lie in the range
from 87 to 2300 MHz, is converted to an
optical signal that can then be carried over
very long distances.
10. At the other end the optical signal
is then reconverted back to the original

frequency range. The system is available
as a set and is meant for use in inexpensive
installations.
11. Here too: the analyzer shows the
exceptional signal quality after conversion
from the optical range back to the original
frequency range.

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

199
12

13

12. One of the problems that has slowed down the practical
implementation of fibre optic technology and that has
essentially put up a road block is the connecting of two
fibre optic cables. With this new system GlobalInvacom is
incorporating a much easier method that doesn't involve highpriced splicing machines. The picture shows how the core of the
optical cable is cut with this device such that a flat and lossless
edge results. The optical cables need to be connected edge
to edge. In order to actually achieve a true flat edge, the best
method is the effective breaking of the optical cable.
13. The connector plugs are placed in this holder and the ends
of the fibre optic cables can be inserted through the template
easily and securely.
14. A push on the ends locks the flaps. The inner conductor of
the optical cable is then tightly pressed and the two cable ends
touch each other without any loss (nearly).
15. The complete set with the cable cutter (actually, cable
breaker), the connection template and a set of plugs. The small
yellow section of fibre optic cable shows the two types of plugs:
One with a pre fitted connector for customer connection and the
second to splice bare fibres together.

14

15

200 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
1

Five Years FibreIRS
from GlobalInvacom
2

202 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
1. TELE-satellite first reported on GlobalInvacom's new
optical system in the 02-03/2008 issue. Back then the system
was still in the development stage

2. The first test report of the new optical system was
published by TELE-satellite in a worldwide exclusive in the
08-09/2009 issue.

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

203
Firmen Report

Digital-TV Groß- und Einzelhändler ELNET, Island

Von Groß
bis Klein:

•	liefert von DVB Transmittern bis zu DVB Receivern alles
•	paßt sich durch seine große Bandbreite an Produkten den
ständig wechselnden Marktverhältnissen an
•	vertraut auf die Zukunft des DVB-Empfangs sowohl via Satellit
wie terrestrisch
•	erwartet bald Zunahme im Bereich fiberoptische Produkte

204 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
ELNET
führt alles

■ Im Gewerbegebiet von Kopavogur und gut

sichtbar von der Schnellstrasse 41 sind die
vielen Satellitenspiegel an der Fassade des
Digital-TV Groß- und Einzelhändlers ELNET.

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

205
Firmen Report

Digital-TV Groß- und Einzelhändler ELNET, Island

Große
Geschäftsräume,
große und kleine
Produkte
Der Digital-TV Groß- und Einzelhändler ELNET verfügt in Island nicht nur
über großzügige Geschäftsräume mit
600 Quadratmetern Fläche, sondern
auch über ein außergewöhnlich breites
Spektrum an Produkten im Bereich Digital-TV. Das muß auch sein, erklärt uns
Inhaber und General Manager Asmundur Einarsson: „Island hat nur etwas
über 300.000 Einwohner, da kann man
sich nicht spezialisieren sondern muß

ë

alles anbieten.“
Asmundur Einarsson nimmt zwei Koaxialstecker und zeigt eindrucksvoll den
Unterschied: der eine Stecker ist für
dicke 7/8 Kabel der Broadcasttechnik
und der andere Stecker ist ein Miniaturstecker, wie er in Messgeräten verwendet wird (siehe Foto). Damit hat er die
Bandbreite abgesteckt: ELNET vertreibt
einerseits DVB-Messgeräte und andrerseits die kompletten DVB-Sender. „Wir

Reykjavik

vertreteen Rohde & Schwarz hier in Island und waren damit direkt beteiligt am
Aufbau des digitalen TV-Netzwerkes hier
in Island.“ Asmundur Einarsson schätzt,
dass die Hälfte aller digitalen TV-Sender
in Island über sein Unternehmen geliefert wurden.
„Aufgrund der Topografie des Landes
mit seinen vielen Bergen und Tälern und
den weit verstreut liegenden Häusern
sind viele Sender notwendig. Die maxi-

■ Seit 2000 ist Asmundur

Einarsson, Inhaber und
General Manager von ELNET,
treuer Leser der TELEaudiovision.

206 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
2

1

3
1. Magnus Eyjolfsson ist Partner bei ELNET und zuständig für den Verkauf.
2. Im Ladengeschäft von ELNET: ein Kunde läßt sich beraten.
3. Von groß bis klein: in der Mitte ein Großstecker für Sendeanlagen und winzig klein davor
ein Koaxstecker, wie er in Messgeräten eingesetzt wird. Das Bild verdeutlicht die enorme
Bandbreite an Produkten, die ELNET anbietet.

male Sendeleistung beträgt 500W.“ Die
Einwohnerzahl Islands ist winzig, aber
die Fläche des Landes ist riesig. Genau
das liefert Asmundur Einarsson ein gewichtiges Argument für die Zukunft seines Geschäfts: „Kabelgebundene Verbreitungswege wie CATV oder IPTV sind
nur sinnvoll in den Städten. Für die Versorgung der ländlichen Regionen wird
auch weiterhin der Satellitenempfang
gefolgt vom terrestrischen Empfang die

beste Empfangstechnik sein.“
Gegründet wurde ELNET bereits in
1984. Der Gründer Örlygur Jonatansson
verkaufte ELNET an Asmundur Einarsson und unterrichtet seitdem an der
staatlichen Berufsschule. Asmundur
Einarsson selbst war zuvor lange Jahre
bei den beiden damaligen TV-Sendern
des Landes als Techniker beschäftigt.
Beherzt griff er zu, als der Gründer ELNET anbot. „Zwei Angestellte gab es

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

207
■ Asmundur Einarsson mit

den beliebtesten Antennen bei
ELNET: Spiegel mit 1m und 85cm
Durchmesser sowie UHF-Antennen
für den DVB-T Empfang

208 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
1

2

damals und damals boomte das Geschft mit Satellitenempfangsanlagen.“ Die
beste Zeit für ELNET war 2007. Zu dem
Zeitpunkt zog die Firma um in die heutige Lage im Gewerbegebiet von Kopavagur, einem Vorort von Reykjakvik. „Damals betrug unser Umsatz um die 1.5
Mio Euro, heute ist er auf unter 1 Mio
gefallen, aber erfreulicherweise stabil.“
Im Jahr 2000 kam ein Partner hinzu.
Seit dem kümmert sich Magnus Eyjolfsson vor allem um den Verkauf. „200
bis 300 Satellitenspiegel verkaufen wir
pro Jahr,“ erzählt er uns, „vor allem die
85cm und 1m Modelle sind gefragt.“
Aber auch 1.8m Spiegel können ab Lager geliefert werden. Selbst große 3m
Spiegel sehen wir im Lager. Seit 2011
verteibt ELNET auch die fiberoptischen
Systeme von GlobalInvacom. „Preislich
nähern sich die fiberoptischen Systeme
immer mehr den Koaxialsystemen an,“
beobachtet Asmundur Einarsson und
stellt fest: „In 1 oder 2 Jahren wird es
hier zum Umschwung kommen und die
fiberoptischen Systeme stark zunehmen.“
ELNET jedenfalls sit gerüstet für die
Zukunft und verfügt über eine sehr große Auswahl an Produkten, um im bevölkerungsarmen aber großen Island
mit kleinen und großen Produkten auch
weiterhin erfolgreich zu sein.
210 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
1. Noch ist der Umsatz gering, aber
ELNET erwartet bald eine Steigerung: das
fiberoptische System von GlobalInvacom,
das ELNET seit 2011 im Angebot hat.
2. Bei dem Rohrstück handelt es sich
um einen Abschnitt eines 1 5/8" Kabels,
wie es bei den DVB-T Sendern eingesetzt
wird. ELNET liefert diese Kabel. An der
Wand oben Segmente eines 3m Spiegels
und unten weitere kleinere Spiegel.
3. Die Ableitungen der Spiegel an
der Außenfassade landen hier im
Technikraum.
4.Blick in den Technikraum. Hier stapeln
sich Geräte der verschiedensten Art.

3

4
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

211
TELE-audiovision Global Company Directory

The

Decision Makers
in Worldwide Digital TV Industry
according to TELE-audiovision’s Company Reports
BSD, Brazil - Digital TV Internet Forum

	 Manu
Distr
R Whol
R Shop
Serv

www.TELE-audiovision.com/TELE-audiovision-1311/eng/bsd.pdf

GM

Marcos
Benni

• Largest Digital TV Internet forum in Brazil
• Reaches 400,000 readers every month

Elnet, Iceland - Distributor

• Starting a new form of digital TV online shopping with a video shop
• Also active in IPTV and IP Radio
www.TELE-audiovision.com/TELE-audiovision-1311/eng/elnet.pdf

	 Manu
R Distr
R Whol
R Shop
R Serv

GM

Sales

Asmundur
Einarsson

Magnus
Eyjolfsson

• can supply everything from DVB transmitters to DVB receivers
• always adapts its large range of products to meet current market
demands

GlobalInvacom, UK - Fibre Optic Products

R	
Manu
Distr
Whol
Shop
Serv

• believes in terrestrial and satellite DVB reception
• expects fibre-optic products to gain popularity in near future
www.TELE-audiovision.com/TELE-audiovision-1311/eng/globalinvacom.pdf
1
Sales
Technical
Director
Support
1. Visitors are greeted by this very friendly receptionist.
2. Customers purchasing a DEVISER product will
Ivan
Matt
be served by one of the ambitious members of the
Overseas Sales team. Each of them is in charge of a
Horrocks
Presdee
specific region. John Wu (upper row, left) is responsible

Business
Development
Gary
Stafford

• Invented the new satellite IF transmission technology via fibre optics
• Five million FibreIRS connections are expected by 2015
• Through continuous technological improvements FibreIRS can now
serve more than 4000 connections from a single LNB; for professional
applications it’s several 10,000’s

Oreind, Iceland - Distributor
	 Manu
R Distr
R Whol
R Shop
R Serv

www.TELE-audiovision.com/TELE-audiovision-1309/eng/oreind.pdf

Founder

DEVISER with new and
Baldur
modern company
headquarters Sveinsson ë

Founder

Tianjin

Sigurour
Gunnarsson

■ In TELE-audiovision issue 06-07/2011 we introduced DEVISER

shown persistent interest in streaming

systems.”
• successful in the home electronics segment
Together with his staff of eight, six of
which were software engineers at the
• all antenna installation material always in stock

for the first time.
Click on the following link to read the full story:
www.TELE-audiovision.com/TELE-satellite-1107/eng/deviser.pdf

ing export success. Founded almost 25
years ago to supply meters to the Chinese market, DEVISER has long since
become a global player. “By now most
of our products are sold outside China,”
explains Jason Wu and also has some

• focus on IPTV for sustained business development
• sizable repair shop for home electronics equipment

export figures in store for us: “40% go
to the USA, 25% stay in Southeast Asia,
20% are shipped to Europe and 15%
are sold in India.” For the US market

time, Forcetech CEO Mr. Arojoy Wei deDEVISER sells its products under the
brand name of a local cooperation partsigned streaming software for commercial applications during the initial phase
ner, while the company has devised an
of his company. State-run institutions
1
entirely different strategy for Europe:
In July of 2012 DEVISER moved into its
such as schools and universities as well
“We are currently in the process of esnew and spacious company headquartablishing a repair and logistics centre
ters in the industrial zone of Tianjin, a
as industrial enterprises ranked among
in Mechelen, close to Brussels (Belgium)
port city in Eastern China not far from
2
his first customers. Forcetech software
in cooperation with Technetix.” This way
Beijing. DEVISER has been a manufacDEVISER customers will not only receive
and
was implementedCOMPANY REPORT Digital TV Head-end Manufacturer DEXIN, China turer of signala meters since 1990 loyal
on the websites of
new products
has worked up substantial base of
is the
■ Lan Haidongconsiderably faster, they
will also benefit from shorter turnaround
customers. The reason is obvious: DEthose customers for streaming video
Marketingrepairs.
times for Manager at
VISER pays special attention to quality
content. Lan Haidong gives the example
Forcetech.DEVISER expects any increase
Not that The official
and reliability over a long service life for
DEXIN moved into their new producin of the company
all of its products.
namerepair work! Au contraire: “We recentof “lectures at schools and universities”
tion building at the end of 2012. BeDuring the first years of operation only
is Force Innovation
fore that the company was located for
that could be accessed online for viewing
Chinese customers were able to benefit
Technology Co., Ltd.
years in downtown Chengdu. But they
from that strategy, as products manuoutgrew that site and General Manager
at home.
as can be seen in the
factured and sold by DEVISER were only
Sun Yu decided it was time to move to a
background.
available in China at first. Signal meters
At the time, all streaming software was

Deviser, China - Signal Analyzer
R	
Manu
R Distr
Whol
Shop
Serv

2

1. Liu Lian Jun is the Managing Director
of DEVISER and is in charge of the
entire production business.
2. The driveway leading to the main
building of the DEVISER company
headquarters.
3. View from the roof of the DEVISER
company headquarters towards the
production buildings. The houses of
the city of Tianjin can be seen in the
background.

Signal Analyzer Manufacturer DEVISER, China

COMPANY REPORT

for the Indian market, Jason Wu (centre) is the team
leader and can be met at many international fairs and

• 14 Multiple R&D Engineers are consistently working to improve Liu (right)
exhibitions. He is in charge of Europe. Aaron the
looks after Asian customers, Vicky Han (lower row,
system
left) after the Americas and Africa and Simon Liu (right)
serves customers in the CIS region as well as in the
• Northern Europe, North Africa and Southeast Oceania. areChen (centre) makes sure
countries of Asia Sally the largest
deliveries to all corners of the globe run smoothly and
FibreIRS markets
reliably.

President

Zhong
Changgan

MD

Liu Lian
Jun

TV Head-end
Products for
Professional
• new company based on so-called multicast technolheadquarters streamlines production and administraogy, which means every client received
his or
directly from a central
tion at a single site her stream TV Distribution
content server. Things changed in 2008,

completely new building. Sun Yu is not
for cable TV were the major sellers at
only General Manger; he’s also a part
the time, and have stayed right on top
owner of DEXIN. He explains to us: “My
up to this day. “65% of our signal meters
two brothers are also part owners but
are designed for cable TV,” according to
they don’t take part in the company’s
Jason Wu, who heads the International
daily activities. “
Sales team and whom we already met
It wasn’t always like that. “The comtwo years ago during our fist visit to DEpany was founded in 1994 under the
VISER.
name DESAI.” Back then analog moduAt that time DEVISER’s production
lators and transmitters were manufacpremises and offices were spread over a
tured for the local market in China. In
number of different premises in Tianjin,
those days Sun Yu’s parents were part

• expansion of awhen Forcetech launched a P2P (peer- logistics centre in and for Europe
dedicated repair and
DEXIN is a manufacturer of profes-

sional tv software.
types
to-peer) version of its head-ends. TheseWhatof
devices are often specially made acwas different fromcording to on? With P2P all
then customer requirements and
connected streaming clients at the same
time function as active multipliers and
forward the received signal to additional
■ Sun “P2P improves the
clients. Lan Haidong: Yu is DEXIN’s General
Manager. Just like all the
other employees, he also
quality of the received jacket with theabove all.”
wears a signal,
company's logo.
Signals need not be fed from a central
server any longer, but can be received

since each application would have to be
optimally configured DEXIN employes a
large number of engineers in their R&D
department.

www.TELE-audiovision.com/TELE-audiovision-1307/eng/deviser.pdf
Production
Sales
DEVISER
Success
Triggers
Manager
Expansion
Jason
Li Hong
Wu
Xiao

but lasting success called for bundling
all departments under a single roof. The
shiny new and huge headquarters are
ready to tackle continued growth, and
Jason Wu gives us some details about
TV Trade
President of152 TELE-audiovision International — The World‘s Largest Digital forces Magazine — 07-08/2013 — www.TELE-audiovision.com
DEVISER. He established
the driving
behind that goal: “We
the company in 1990.
expect substantial increases in the meter segment for fibre-optic cables as well
as for the telecommunications business.”
The satellite meter line of business can
also look
Chengdu forward to healthy growth,
while DEVISER does not envisage significant potential for cable signal meters
any longer.
One of the reasons for new and large
company headquarters was increas-

• expansion of a dedicated repair and
logistics centre in and for Europe
• strong growth in export markets

• state-of-the-art test benches for EMS and
overvoltage protection

■ The new DEVISER company headquarters
in the Tianjin industrial zone. This is where
both the administrative offices and the
production premises of this manufacturer
of professional meters are located.

148 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com

COMPANY REPORT
该独家报道由高级编辑所作

Forcetech, China - IPTV Solution Provider
1

shown persistent interest in streaming
systems.”
Together with his staff of eight, six of
which were software engineers at the
time, Forcetech CEO Mr. Arojoy Wei designed streaming software for commercial applications during the initial phase
of his company. State-run institutions
182 TELE-audiovision International — The World‘s Largest universities as well
such as schools and TV Box Magazine — 05-06/2013 — www.TELE-audiovision.com
as industrial enterprises ranked among
his first customers. Forcetech software
was implemented on the websites of
those customers for streaming video
content. Lan Haidong gives the example
of “lectures at schools and universities”
that could be accessed online for viewing
at home.
At the time, all streaming software was
based on so-called multicast technology, which means every client received
his or her stream directly from a central
content server. Things changed in 2008,
when Forcetech launched a P2P (peerto-peer) version of its software. What
was different from then on? With P2P all
connected streaming clients at the same
time function as active multipliers and
forward World‘s Largest Digital to additional
TELE-audiovision International — The the received signal TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com
clients. Lan Haidong: “P2P improves the
quality of the received signal, above all.”
Signals need not be fed from a central
server any longer, but can be received

Ren
Nan

153

Digital TV
Head-end
Equipment
Manufacturer
DEXIN

Sun
Yu

left to right) Sales Manager Ren Nan, Sun Wenya, Marketing Manager Lan Haidong, Wang
Qinghua, Dong Peng and Guo Tianwei.
The World‘s Largest Digital TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com

Sales

149

Digital TV Head-end Manufacturer DEXIN, China

www.TELE-audiovision.com — 07-08/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

■ The Forcetech Sales team with TELE-audiovision editor-in-chief Alexander Wiese: (from

150 TELE-audiovision International —

www.TELE-audiovision.com — 07-08/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

■ DEXIN’s new production

facility that the company moved
in to at the end of 2012. It’s
located in the Wuhou high-tech
zone of Chengdu.

ë

• Established in 1994 in Chengdu
• Specializes in professional tv head-end equipment
R	
Manu
R Distr
Whol
Shop
R Serv

• new company headquarters streamlines
production and administration at a single
site

www.TELE-audiovision.com/TELE-audiovision-1307/eng/dexin.pdf

■ Zhong Changgan is founder and

GM

3

Signal Analyzer Manufacturer DEVISER, China

• strong growth in export markets
• state-of-the-art test benches for EMS and overvoltage protection

Dexin, China - Digital TV Head-ends
R	
Manu
Distr
Whol
Shop
Serv

COMPANY REPORT

180 TELE-audiovision International — The World‘s Largest TV Box Magazine — 05-06/2013 — www.TELE-audiovision.com

• Established in 1994 in Chengdu
• Specializes in professional tv
head-end equipment
• 50% of their production is
exported
• Intense quality controls
• Very large R&D team
www.TELE-audiovision.com — 05-06/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

181

• 50% of their production is exported
• Intense quality controls

www.TELE-audiovision.com/TELE-audiovision-1307/eng/forcetech.pdf
Marketing

3

COMPANY REPORT

IPTV Solution Provider Forcetech, China

IPTV Systems
by Forcetech

• offering technically mature and fully-fledged IPTV
solutions
• large Chinese movie provider as showcase customer
and shareholder
• small-scale IPTV systems can be realised on a tight
budget
• excellent video quality thanks to P2P technology

■ Forcetech is based in the

Lan
Haidong

ZhongGuanCun software park in
northwestern Beijing. 40 software
engineers and ten sales experts
work at this site. An additional R&D
office is located in Chengdu, where
the local university offers a topnotch engineering degree program.
Forcetech operates one more office
in Shenzhen, since it sources OEM
hardware such as encorders and settop boxes from there.

148 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com

www.TELE-audiovision.com — 07-08/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

149

• offering technically mature and fully-fledged IPTV solutions
• small-scale IPTV systems can be realised on a tight budget
■ 154 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com
• large Chinese movie provider as showcase customer and shareholder
• excellent video quality thanks to P2P technology
Lan Haidong is the
Marketing Manager at
Forcetech. The official
name of the company
is Force Innovation
Technology Co., Ltd.
as can be seen in the
background.

152
212 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
conquering the
world market

Tianditong, China - Antennas

There was a time when a huge number of hard-working employees manufactured large quantities of all sorts of
products. For most successful companies, this has long become a thing of
the past, and Chinese satellite dish and
antenna manufacturer Tianditong is a
perfect example of that development.
Almost every step of the production is
completed by highly efficient machines,
and even the few components that still
require manual work will be assembled
by automatic equipment in the foreseeable future. All this results in roughly
three million antennas being manufactured by less than 300 employees. Impressive numbers – and reason enough
for us to pay a visit to that company.
Our first port of call is a small office
right in Beijing. As little as 20 employees work at this site, with six members
of staff making up the Sales team for

1

R	
Manu
Distr
Whol
Shop
Serv

GM

Bang Xian
Peng

www.TELE-audiovision.com/TELE-audiovision-1307/eng/tianditong.pdf
Quality
Production
Antennas
for the
Manager
Global
Market
Bang Xing
Peng
COMPANY REPORT

• uses state-of-the-art production
machinery

• fully automatic quality control during the
production process
• volume production of dish sizes from 45
to 180 cm

• ready for production of large quantities at
short notice
• environmentally-friendly production
according to international standards

■ Is this the command centre of a

large satellite dish manufacturer? Yes
indeed, on the 5th floor of the Newton
office building in Beijing’s south we
can find the administration staff and
the Sales team of the dish manufacturer
Tianditong. The production premises,
however, are located in Guan, in the
Chinese province of Hebei. A total of
180 workers are employed at the Guan
premises, with another 100 production
workers based at an additional
production site in the province of
Hunan.

148 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com

• uses state-of-the-art production machinery
Satellite Dish Manufacturer LIANXING, China
COMPANY REPORT
• fully automatic quality control during the production process
• volume production ofCOMPANY REPORT Satellite Dish Manufacturer LIANXING, China
dish sizes from 45 to 180 cm

Satellite dish manufacturer LIANXING has two owners, and both
are fully aware of the fact that only top quality will guarantee last-

COMPANY REPORT

ë

Manager
Jeffersonë
Guilin
Cruz

facility in Aruja, in Brazil’s Sao Paulo
province.

Guilin

Lio Wen Fei and Wen Lang Yuan are the founders of the company,
rect their attention to immaculate workmanship for every antenna
and still have a shareholding of 50% each. What started in 1993 with
they manufacture. A total of ten buildings are located in the beautiful
Xing’an county in Guilin city.
prises a staff of 170. “We started out with producing C band dishes
Lio Wen Fei and Wen Lang Yuan are the founders of the company,

ELDTEC
For
Brazil Only

Android R&D

Will Android become the

2

Sales
Manager
Liao Wen
Fei

COMPANY REPORT

■ The two co-owners

154

• individually checking
each single component
• offering antennas for
the C and Ku bands
• very successful on the
Japanese market

production premises of
LIANXING. The column to
the right of the entrance
displays the full company
name in Chinese: Guangxi
Lianxing Satellite
Equipment Ltd. Company.

DTP2100, one of the first receivers based on the Android operating
system.
www.TELE-audiovision.com/12/11/jiuzhou

2

Product
Manager
Yongjun
Zhang

COMPANY REPORT

•	Installation	of	Apps	on	a	
limited	basis
•	Android	system	
requires	higher	quality	
components	that	results	
in	higher	costs
•	Android	is	well-suited	
for	private	users	but	only	
limited	for	cable	network	
operators

Jiuzhou´s
Android
Department

150 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 05-06/2013 — www.TELE-audiovision.com

COMPANY REPORT

Digital Meter Manufacturer SAT-LINK, Quanzhou, China

SAT-LINK has
• Develops receivers with complex one product
only features
• Installation of Apps on a limited basis
group: digital
• Android system requires higher quality components that results in
signal analyzers
Product Manager. He’s familiar
with all the advantages and
disadvantages of this operating
system.

■ Jiuzhou’s company headquarters in

Shenzhen’s High Tech Park. Here you’ll find
15 receiver developers that are working
exclusively on the Android operating system.

176 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com

If you do only one thing, you can fully
focus on that one thing. This is QingZhang Lin’s philosophy. He is General
Manager of the five-year young company SAT-LINK. “We only produce digital
signal analyzers”, confirms QingZhang
Lin, “and are exclusively involved in the
export market.”
The company was founded only five
years ago in 2008 with 20 R&D employees and 200 production employees.

■ Yongjun Zhang is the Android

Android R&D

•	Develops	receivers	with	
complex	features

of satellite dish
manufacturer
LIANXING:
production manager
Wen Liang Yuan
TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com
(left) and sales
150 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 05-06/2013 — www.TELE-audiovision.com
manager Liao Wen
Fei (right).

Shenzhen

149

www.TELE-audiovision.com/TELE-audiovision-1303/eng/jiuzhou.pdf

1. Project Manager GuiHuang Huang
presents SAT-LINK’s high-end success
model. This analyzer is available in various
versions and will shortly also be available
as a combo unit with DVB-S2 and DVB-T2
as well as a very fast spectrum display.

ë

www.TELE-audiovision.com — 05-06/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

• offering antennas for the C and Ku bands
• very successful on the Japanese market

■ In the 11-12/2012 issue we introduced the new Jiuzhou receiver

■ The two co-owners

R	
Manu
Distr
Whol
Shop
Serv

• using only top-quality
materials

■ Entrance to the vast

Jiuzhou, China - Android Receivers
of satellite dish
manufacturer
LIANXING:
production manager
Wen Liang Yuan
(left) and sales
manager Liao Wen
Fei (right).

167

Satellite Dish Manufacturer LIANXING, China

LIANXING:
Professional
Satellite
Antennas

148 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 05-06/2013 — www.TELE-audiovision.com

• using only top-quality materials
• individually checking each single component
Who better to answer this question
than the Android receiver Product Manager 1 Jiuzhou, Yongjun Zhang, who
at
currently is developing Android prod-

www.TELE-audiovision.com — 05-06/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

www.TELE-audiovision.com/TELE-audiovision-1305/eng/lianxing.pdf

Product
Manager
Wen Liang
Yuan

With an enormous R&D department,
Jiuzhou has become one of the trailblazers of Brothers Bang Xian for
1. large receiver manufacturers Peng (left)
satellite, terrestrial TV and cable recepand Bang Xing Peng (right) are the
tion. Quite a few different operating
founders of satellite dish manufacturer
systems can be found in these receivers
Tianditong.
but there’s one operating system that
everyone has been talking about for the He is the
2. Meet Bang Xing Peng.
past several years: the Android system.
Production Manager, while brother and
Here at TELE-audiovision we also have
co-founder Bang Xian Peng acts as
been expecting that more and more
General appear on the market
receivers wouldManager and is in charge of
overall company strategy, marketing
with this operating system, yet that
and sales.
hasn’t really happened. We introduced
one of the first boxes, a DVB-T receiver
- the DTP2100 from Jiuzhou, back in our
11-12/2012 issue. So, is the expected
Android receiver boom now going to get
off the ground?

• Also offers antennas for 2.4 and 5.8 GHz (WiFi)

• Concentration on just a few product series
• Also offers antennas for 2.4 and 5.8 GHz (WiFi)

operating system of the future?
LIANXING, China - Satellite Dishes

R	
Manu
R Distr
Whol
Shop
Serv

• Large market coverage within Brazil
• OEM production for other brand names
• Concentration on just a few product series

166 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 05-06/2013 — www.TELE-audiovision.com

• Large market coverage within Brazil
• OEM production for other brand names
COMPANY REPORT

Dish, Antenna and Cable Manufacturer ELDTEC, Brazil

■ A look at ELDTEC’s production

150 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com
a workforce of 50 employees has grown continuously and today comand still have a shareholding of 50% each. What started in 1993 with
a workforce of 50 employees has grown continuously and today comprises a staff of 170. “We started out with producing C band dishes

149

www.TELE-audiovision.com/TELE-audiovision-1305/eng/eldtec.pdf

1

1. Jefferson Cruz runs the Sales Team. He would
ing success. Not only do they use top-grade materials, they also dilove to be able to export ELDTEC’s products.
rect their attention to immaculate workmanship for every antenna
2. The Sales Team. Orders■ Thumbs up cablemanufacturer LIANXING has two owners, and both
for dishes, for General Manager
Satellite dish and
they manufacture. A total of ten buildings are located in the beautiful
Bang Xian find their
antennas from Brazil’s wholesalers Peng. He and his brother
are fully aware of the fact that only top quality will guarantee lastBang Xing Peng are the founders of
Xing’an county in Guilin city.
way here.
Tianditong.
ing success. Not only do they use top-grade materials, they also di-

www.TELE-audiovision.com — 07-08/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

• ready for production of large quantities at short notice
• environmentally-friendly production according to international standards

Quality Production of
Satellite Dishes
ELDTEC, Brasil -Quality Antennas of
Dish, Production and Cables
Satellite Dishes Sales
R	
Manu
2
Distr
Whol
Shop
Serv

Antenna Manufacturer Tianditong, China

www.TELE-audiovision.com — 03-04/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

177

higher costs
• Android is well-suited for private users but only limited for cable
network operators

178 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com

174 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 05-06/2013 — www.TELE-audiovision.com

Sat-Link, China - Signal Analyzers

www.TELE-audiovision.com/TELE-audiovision-1303/eng/sat-link.pdf
ë
R	
Manu
GM
Project
Sales
R&D
Signal
Distr
Analyzers
from
Whol
SAT-LINK
Qing
GuiHuang
Han Guang
Shop
Zhang Lin
Huang
Nancy
Rong
R Serv
• Only five years on the market
• Optimizes signal analyzers for every region
• Focusing on the signal analyzer product group
• Brand new: combo analyzers for DVB-S2 and T2 with fast spectrum
• Offers signal analyzers in four function classes and four price classes
display
■ QingZhang Lin is

SAT-LINK’s General
Manager

1

COMPANY

3

2. Nancy is Business Manager and is
always on the telephone taking orders
from customers from all over the world.
When she’s not at SAT-LINK’s headquarters
Quanzhou
talking with customers on the phone, she’s
traveling all over the world visiting them.
1
3. R&D Manager Han Guang Rong
is responsible for the function and
development of
Professional Equipment
REPORTProject the signal analyzers. He
1.
Manager GuiHuang Huang
checks the function of SAT-LINK’s devices
presents SAT-LINK’s high-end success
with oscilloscopes and other professional
model. This analyzer is available in various
test equipment.and will shortly also be available
versions

COMPANY REPORT

Digital Meter Manufacturer SAT-LINK, Quanzhou, China

■ Here in this building in Quanzhou’s High Tech Park you’ll

find SAT-LINK’s headquarters and the signal analyzer’s final
assembly area. The circuit boards and remaining components
are assembled in another location in Quanzhou.

2

2

1. Project Manager GuiHuang Huang
presents SAT-LINK’s high-end success
model. This analyzer is available in various
versions and will shortly also be available
as a combo unit with DVB-S2 and DVB-T2
as well as a very fast spectrum display.

Manufacturer Tecsys, Brazil

as a combo unit with DVB-S2 and DVB-T2
as well as a very fast spectrum display.

With a new SMD line that has been
in operation since June 2012, theFive years later it has grown to 30 R&D
Bra■ Jose Marcos
zilian manufacturer Tecsys can further
engineers and Freire Martins employ250 production
available with ATSC (for Northof the
curity camera.
is one Ameriincrease their quality and improveees.
their
founders of Tecsys
And as if that weren’t enough, SAT- toca) and then in Tec- following is CEO with located
SAT-LINK’s headquarters are
reaction time
incoming orders. the
and year of the
in South American
High Tech Park
ISDB-TB for the Quanzhou’s company mar- in the
LINK also offers a simple Satellite Finder everything themselves.
sys produces
Fujian province in southeastern China
Tecsys was founded in 2000in the process of expanding
by three
with a display that only shows reception ket. “We’re
directly across from Taiwan. The propartners who our all involved for
parameters and therefore can be of- were activities in the Americas”, reveals SMT
duction facilities with the latest
many years in the TV reception indusmachines are in Lin, “and
fered very inexpensively. “This instru- General Manager QingZhangthe Luojiang suburb
try. Today the three founders wear difnortheast of the seven-million-inhabitment is, for example, very ferent hats at Tecsys: CEO is Jose Mar-greater presence at
well-suited we will also have a
ant city of Quanzhou.
for South America”, Business Manager trade shows in that area.”
cos Freire Martins, CCO is Jorge Alberto SAT-LINK only exports their
Since
products, we wanted to know
Ganuza and CTO is Rodolfo Vidal. CEO their first year was where
While SAT-LINK in
Nancy tells us.
they all
And with that, SAT-LINK Jose Marcos Freire Martins explains about General Manager QingZhang
covers the only able to sell to go. 10,000 pieces,
Lin lists for us all the different regions:
us how it all
five “Tecsys began as production is shipped to
those
four most important functions and pric- started: years later“60% of our productionnuma manufacturer of SMATV products. We
ing levels and can therefore offer these bers have nearly quintupled. to the Middle East,
Europe, 20% travels And it’s
had seven employees and produced,

1

that this analyzer series is very popular
in Europe.
The next class of analyzers are those
with smaller displays and non-illuminated keyboards. “These analyzers are especially popular in the Middle East.”
There are also two brand new Satellite Finder product lines: one of these
handy models even has a camera input.
“This is actually in high demand in the
Middle East since many people there
have installed security cameras. They
can use this new signal analyzer to very devices to all the regions of the world.
3
easily check the function of these cam- All of the signal analyzers also come
Professional Equipment DVB-S2 tuners and the terrestrial
COMPANY REPORT
eras.” This new satellite signal analyzer with Manufacturer Tecsys, Brazil
with camera input even comes with a versions and combo models come with
12V output to supply power to the se- not only DVB-T/T2 but will soon also be

•	Optimizes	signal	analyzers	for	every	region

•	Brand	new:	combo	analyzers	for	DVB-S2	and	T2	with	fast	
spectrum	display

especially their10% goesnew combo mod- the rest
brand to North America and
are shipped to the remaining regions.”
el for DVB-S2 and DVB-T2 that promSAT-LINK has expanded its product
those first TV
ises to be quiterange so that for SAT-LINK.
a success four different classes are channels were: “It was
the cable
Since many of covered. The top-endEurope TV channel VCC and its comthe countries in and thus most
expensive signal analyzer comes
petitor CV. It
and Africa are quickly switching over to with was also the state-run

Tecsys, Brazil - Professional Equipment
ë
R	
Manu
CEO
1. Ricardo still has his first analog receiver stored in
his shack: it’s a model from DX Antenna that he used
to receive his first TV channel back in 1985.
2. Ricardo even has a bending machine in his workshop that he uses to bend mounts and attachments
for dishes.
3. Ricardo’s homemade device for the reception of circularly polarized C-band signals.
4. In Cosmosat’s warehouse: Ricardo
is very happy with the AZURESHINE
dishes that he resells and also uses
at his cable operator installations.
5. Also homemade: a Ku-band
feedhorn.

•	Only	five	years	on	the	market

•	Focusing	on	the	signal	analyzer	product	group

•	Offers	signal	analyzers	in	four	function	classes	and	four	
price	classes

152 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com

increase their quality and improve their
reaction time to incoming orders. Tecsys produces everything themselves.
Tecsys was founded in 2000 by three
partners who were all involved for
many years in the TV reception industry. Today the three founders wear different hats at Tecsys: CEO is Jose Marcos Freire Martins, CCO is Jorge Alberto
Ganuza and CTO is Rodolfo Vidal. CEO
Jose Marcos Freire Martins explains to
us how it all started: “Tecsys began as
that this analyzer series is very popular
a manufacturer of SMATV products. We
in Europe.
had seven employees and produced,
The next class of analyzers are those
with smaller displays and non-illuminated keyboards. “These analyzers are especially popular in the Middle East.”
There are also two brand new Satellite Finder product lines: one of these
handy models even has a camera input.
“This is actually in high demand in the
Middle East since many people there
have installed security cameras. They
São José dos new signal analyzer to very
can use this
Campos check the function of these cameasily
eras.” This new satellite signal analyzer
with camera input even comes with a
12V output to supply power to the se-

Distr
Whol
Jose Marcos
Shop
Freire Martins
Serv
• Very good operational organization
ë
• Concentration on professional satellite reception products

COO

• IRD is their success product

systems

2001. In 2011 the company celebrated
its 10-year anniversary and could be
proud of the 125,000 satellite signal
analyzers that they had sold thus far –
see TELE-audiovision issue 10-11/2011.

166 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com

2

www.TELE-audiovision.com — 03-04/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

6

Harlow

COMPANY REPORT

2

Paul Hardcastle, who has been with
Horizon for seven years and is now
their Technical Director, explains to us
more about their product palette. “We

Technical
Director
Paul
Hardcastle

■ Stefaan Cornelis with

one of SATSON’s super
products: a splitter that
distributes HDMI signals to
up to eight Ethernet cables.

3

CEO

1. Paul Hardcastle is Technical
Director and developer of many of
Horizon’s new analyzers. He’s been
the technical heart of Horizon for
seven years now.
2. Trevor Salter is Horizon’s
Service Manager and is primarily
responsible for repairs and quality
issues, as well as assisting
customers with technical
■ Stefaan Cornelis with
■ Didier Debey is happy: he
questions.
one of SATSON’s super
conceived one of SATSON’s
products: a splitter that
success products – the Dual
distributes HDMI signals to
Viewer Technical Manager is Rob Sydee.
3. DSB-0200, a product
up to eight Ethernet cables.
for digital signage.
Long-time readers will recognize
182 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 01-02/2013 — www.TELE-audiovision.com
him: he made it to the front cover
■ Didier Debey is happy: he
of TELE-audiovision back in the
conceived one of SATSON’s
success products – the Dual
12-01/2007 issue. He’s holding here
Viewer DSB-0200, a product
for digital signage.
one of Horizon’s success models
– the yellow color reveals that it’s
a satellite signal analyzer. He says,
“All of our terrestrial DVB-T and
DVB-T2 signal analyzers come in
red housings, combo units come
is green and DVB-C analyzers
come in blue.” The HD-TC8
(for tooway Turbo Internet-viasatelliteservices) is in a grey case.
4. Ivan Valbuena is the Senior
Hardware Engineer. He checks
the mechanical components of
Horizon’s analyzers and does a
lot of the new hardware design,
working with Paul Hardcastle on
new products.

Stefaan
Cornelis

www.TELE-audiovision.com — 03-04/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

4

165

and
His
Company
Cosmosat

•	Learned	everything	about	
satellite	reception	on	his	
own
•	Installs	head	end	stations	
for	cable	operators	as	well	
as	community	systems
•	Planning	his	own	dish	
production
•	Turned	his	hobby	into	his	
career

www.TELE-audiovision.com — 01-02/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

197

www.TELE-audiovision.com/TELE-audiovision-1301/eng/horizon.pdf
Technical
Manager
7
Rob
Horizon on
Sydee
the Way Up
COMPANY REPORT

Digital TV Meter Manufacturer, UK

■ Nine Horizon employees are

currently working in the ‘Allen
House’ in Harlow’s business
district. Production is actually
outsourced to another company
in England.

•	Numerous	new	products	for	
new	DVB	sectors

•	Exports	to	every	country	as	an	
OEM	and	under	their	own	name
•	Focusing	expansion	to	
emerging	countries	such	as	
South	Africa	and	in	South	
America
•	Specializes	in	easy	to	use	
analyzers	for	installers

180 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 01-02/2013 — www.TELE-audiovision.com

203

www.TELE-audiovision.com — 01-02/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

181

South America
• Specializes in easy to use analyzers for installers

3

Technical
Manager
Didier
Debey

• Conquers the new HDMI distribution niche with their specialized
products
• Conceives their own HDMI products

The HDMI
Professionals
The HDMI
from SATSON

of his 3.4-meter double
reflector antenna.

www.TELE-audiovision.com/TELE-audiovision-1301/eng/satson.pdf

HDMI Distributor SATSON, Belgium

1

2

■ El Loco Ricardo in front

• Planning his own dish production
• Turned his hobby into his career

that now cover every other DVB frequency range.

Paul
Pickering

HDMI Distributor SATSON, Belgium

Installer and Dish Manufacturer Cosmosat, Argentina

196 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 01-02/2013 — www.TELE-audiovision.com

Horizon in 2001 and with
enormous foresight has
expanded Horizon’s
market niche: that would
be very reliable and
also easy-to-use signal
analyzers for daily use by
installers.

COMPANY REPORT

1

165

157

El Loco
Ricardo

www.TELE-audiovision.com — 01-02/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志
■ Paul Pickering founded

Satson, Belgium - HDMI

www.TELE-audiovision.com — 03-04/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

•	IRD	is	their	success	product

• Numerous new products for new DVB sectors
• Exports to every country as an OEM and under their own name
• Focusing expansion to emerging countries such as South Africa and in

R	
Manu
R Distr
R Whol
R Shop
R Serv

•	IRD	is	their	success	product

•	In-house	development	department

CEO

202 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 01-02/2013 — www.TELE-audiovision.com

•	Very	good	operational	organization
•	Concentration	on	professional	satellite	
reception	products
•	In-house	development	department

164 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com

COMPANY REPORT

ë

For the end of 2012 he is able to add
another surprising figure: “By then
we’ll have sold 160,000 analyzers in
every DVB sector.” Horizon started as
a manufacturer of satellite signal analyzers but over the past several years
they’ve expanded into other sectors

4

Manager Adilson da Silva
holding a circuit board
produced by their new
SMD machine.

157

•	Concentration	on	professional	satellite	
reception	products

166 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com
164 TELE-audiovision

Horizon, UK - Signal Analyzers

R	
Manu
R Distr
Whol
Shop
R Serv

www.TELE-audiovision.com — 03-04/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

•	Very	good	operational	organization

British Signal
Analyzer
Manufacturer with
Ricardo
Numerous New
• Learned everything about satellite reception on his own
Products
• Installs head end stations for cable operators as well as community
for example, head ends.” The company
grew very quickly. “Today we have 97
employees of which 28 of them are engineers.”
Tecsys produces everything that can
be found in head ends, from IRDs (the
company’s success product) to modulators and decoders. Tecsys ships primarily to the domestic Brazilian market;
many of the larger TV organizations
utilize Tecsys products. Business is so
good that, according to CCO Jorge Alberto Ganuza, Tecsys is planning on
moving into a much larger building.
A highlight at Tecsys is their SMD line.
This work was previously outsourced to
another company but by installing their
own production line, Tecsys is now not
only much more flexible when it comes
to the customer’s requirements, but
they can also react more quickly to
Paul Pickering founded the signal
changes in their own products. The entire production operation at Tecsys is
analyzer manufacturer Horizon back in

■ Tecsys Production

SMD
Line

www.TELE-audiovision.com/TELE-audiovision-1301/eng/cosmosat.pdf

CCO
moving into a much larger building.

Digital TV Meter www.TELE-audiovision.com SMD UK
COMPANY REPORT Largest Digital TV Trade Magazine —A03-04/2013 — Manufacturer,line.
highlight at Tecsys is their
156 TELE-audiovision International — The World‘s

Owner

Professional Equipment Manufacturer Tecsys, Brazil

our activities in the Americas”, reveals
General Manager QingZhang Lin, “and
we will also have a greater presence at

available with ATSC (for North Ameri- one of these for South America”, Business Manager trade shows in that area.”
curity camera.
lite Finder product lines:
the followingeven has a camera input. Nancy tells us. realized that
year broadcaster. He soon
And as if that weren’t enough, SAT- ca) and then in handy models a TVwith
While SAT-LINK in their first year was
And with that,
“This is American marLINK also offers a simple Satellite Finder ISDB-TB for the South actually in high demand technicians and SAT-LINK covers the only able to sell about 10,000 pieces,
his fellow in the
engineers
for example, reception ket. “We’re in the process since many
with a display that only shows head ends.” The company Middle Eastof expandingpeople there four most important functions and pric- five years later those production numwere quite familiar with the theory but
grew very can be “Today activities in the installed security cameras. They ing levels and can therefore offer these bers have nearly quintupled. And it’s
parameters and therefore quickly. of- ourwe have 97 have Americas”, reveals
can use this new signal analyzer toall that much the regions of the world. especially their brand new combo moddidn’t have very devices to all practical exfered very inexpensively. “This instru- of them are en- QingZhang Lin, “and
employees of which 28 General Manager
easily check the function of these cam- All of the signal analyzers also come el for DVB-S2 and DVB-T2 that promment is, for example, very well-suited we will also have a greater presence at with reception. Ricardo on the
perience
gineers.”
eras.” This new satellite signal analyzer with DVB-S2 tuners and the terrestrial ises to be quite a success for SAT-LINK.
for South America”, Business Manager trade showscan with area.” input even comes with a versions and combo models come with Since many of the countries in Europe
Tecsys produces everything that in that camera other hand was always testing dishes
While SAT-LINK in their to supply power
Nancy tells us. be found in head ends, from IRDs (the 12V outputfirst year was to the se- not only DVB-T/T2 but will soon also be and Africa are quickly switching over to
and LNBs and knew exactly what size
And with that, SAT-LINK covers the only able to sell about 10,000 pieces,
company’s success product) to modulathose production numfour most important functions and pric- five years later 156 TELE-audiovision International — Thewhat type of Magazine — 03-04/2013 — www.TELE-audiovision.com
dish and World‘s Largest Digital TV Trade LNB was needed
tors and decoders. Tecsys ships primaring levels and can therefore offer these bers have nearly quintupled. And it’s
to receive a particular satellite.
ily to the domestic Brazilian market;
devices to all the regions of the world. especially their brand new combo modmany of the larger
organizations
After
All of the signal analyzers also comeTV el for DVB-S2 and DVB-T2 that prom- installing satellite systems in
utilize Tecsys products. Business is so
SAT-LINK.
with DVB-S2 tuners and the terrestrial ises to be quite a success forhis free time for years, he finally de■ Jorge Alberto
good models come also to Since Jorge of the countries in Europe
that, according
CCO many AlGanuza is with
versions and combo
one of Tecsys
three
berto will soon theand is and Africa are quickly switching over to
not only DVB-T/T2 but Ganuza, also be is planning on
founders

This work was previously outsourced to
another company but by installing their
own production line, Tecsys is now not
only much more flexible when it comes
to the customer’s requirements, but
they can also react more quickly to
changes in their own products. The entire production operation at Tecsys is

COMPANY REPORT

The New
Tecsys Alberto
Jorge
Adilson da
SMDGanuza
Silva
Line
• In-house development department

Cosmosat, Argentina - Satellite Dishes

R	
Manu
R Distr
R Whol
R Shop
R Serv

www.TELE-audiovision.com/TELE-audiovision-1303/eng/tecsys.pdf
The New
Production
Tecsys
3

to acquire a 3.4-meter antenna. The foland therefore can be
lowing year 1988parameters inexpensively. “Thisfor ofhe began working instrufered very
ment as
a living and started is, foraexample, very well-suited
technician at

ed keyboards. “These analyzers are especially popular in the Middle East.”
There are also two brand new Satel-

153

5
2. Nancy is Business Manager and is
always on the telephone taking orders

from customers from all over the world.
Professional Equipment Manufacturer Tecsys, Brazil
COMPANY REPORT
the largest display and an illuminated
When she’s not at SAT-LINK’s headquarters
Canal 7 and the just-started private TV
keyboard. One of the analyzers in this
talking with customers on the phone, she’s
traveling all over the world visiting them.
series, the combo SAT-LINK model WS- 9.” These four channels
channel Canal
3
www.TELE-audiovision.com — 03-04/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 157
3. R&D Manager Han Guang Rong
Freire Martins
6936 for DVB-S and DVB-T, was already
is responsible for the function and
■ Tecsys Production
were on the INTELSAT V-F13 satellite.
is one of the
2. Nancy is Business Manager and is
Manager Adilson da Silva
development of the signal analyzers. He
introduced by us in the
holding a circuit board
founders of Tecsys
always on the telephone taking orders11-12/2012 ischecks the function of SAT-LINK’s devices
produced by their new
and is CEO of the
with oscilloscopes and other professional
from customers from all over the world.
sue. Business Manager Nancy also
São José dos “I could tells us receive the channels on
SMD machine.
company
test equipment.
When she’s not at SAT-LINK’s headquarters
BRASILSAT A1 and GORIZONT.”
talking Campos on the phone, she’s
with customers
traveling all over the world visiting them.
154 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com
It didn’t take long for him to realize ■ Jorge Alberto
3. R&D Manager Han Guang Rong
Ganuza is
is responsible for the function and
that his 2.5-meter dish was too small one of the also ATSC (for North Ameriavailable with
that this analyzer series is very popular curity camera.
three
development of the signal analyzers. He
ca) and
And
in of SAT-LINK’s devices
checks the function Europe.
for the C-band and inas if that he was able founders and isin the following year mar1987 weren’t enough, SAT- ISDB-TBthen the South American with
with oscilloscopes and other class of analyzers are those LINK also offers a simple Satellite FinderCCO
for
The next professional
test equipment. with smaller displays and non-illuminat- with a display that only shows reception ket. “We’re in the process of expanding

With a new SMD line that has been
in operation since June 2012, the Bra■ Largest Digital
156 TELE-audiovision International — The World‘sJose Marcos TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com
zilian manufacturer Tecsys can further

www.TELE-audiovision.com — 03-04/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

COMPANY REPORT

1. Paul Hardcastle is Technical
Director and developer of many of
Horizon’s new analyzers. He’s been
the technical heart of Horizon for
seven years now.
2. Trevor Salter is Horizon’s
Service Manager and is primarily
responsible for repairs and quality
issues, as well as assisting
customers with technical
questions.
3. Technical Manager is Rob Sydee.
Long-time readers will recognize
him: he made it to the front cover
of TELE-audiovision back in the
12-01/2007 issue. He’s holding here
one of Horizon’s success models
– the yellow color reveals that it’s
a satellite signal analyzer. He says,
“All of our terrestrial DVB-T and
DVB-T2 signal analyzers come in
red housings, combo units come
is green and DVB-C analyzers
come in blue.” The HD-TC8
(for tooway Turbo Internet-viasatelliteservices) is in a grey case.
4. Ivan Valbuena is the Senior
Hardware Engineer. He checks
the mechanical components of
Horizon’s analyzers and does a
lot of the new hardware design,
working with Paul Hardcastle on
new products.

HDMI Distributor SATSON, Belgium

4
■ Stefaan Cornelis with

one of SATSON’s super
products: a splitter that
distributes HDMI signals to
up to eight Ethernet cables.

The HDMI
Professionals
from SATSON
190 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 01-02/2013 — www.TELE-audiovision.com

■ Didier Debey is happy: he

conceived one of SATSON’s
success products – the Dual
Viewer DSB-0200, a product
for digital signage.

•	Conquers	the	new	HDMI	distribution	niche	with	their	
specialized	products
•	Conceives	their	own	HDMI	products
•	Distribution	of	HDTV	signals	in	private	homes	with	HDMI	
Extenders
•	Compatible	with	coaxial	cable	as	well	as	with	Ethernet	
cables
www.TELE-audiovision.com — 01-02/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

191

• Distribution of HDTV signals in private homes with HDMI Extenders
• Compatible with coaxial cable as well as with Ethernet cables

started with DVB-T a few years ago analyzers: “That would be the HD-CM+ signal analyzer for them.“That would be the HD-CM+
started with DVB-T a few years ago analyzers:
•	Conquers	the	new	HDMI	distribution	niche	with	their	 since May primary
and since May 2012 we’ve also been model for which we see the2012 we’ve also been model for which we see the primary
and
specialized	products
“We’re –
developing an extremely
offering signal analyzers for DVB-T2 – markets to be in South America, Can- for DVB-T2 also markets to be in South America, Canoffering signal analyzers
•	Conceives	their	own	HDMI	products
namely the HD-T2 series.” But Horizon ada, India and other the HD-T2 series.” But Horizon device India and other Asian countries.”
namely Asian countries.” easy to use ada, for DVB-C, the Nano
doesn’t only have DVB-S2 and DVB-T2 DVB-C is very popular in the cable net- and DVB-T2 DVB-C is very popular in the cable netdoesn’t only have DVB-S2 Cable, which should become available
•	Distribution	of	HDTV	signals	in	private	homes	with	HDMI	
Extenders
and for the installers in in prepar- works there and for the
products; they are currently prepar- works there products; they are currently the first quarter of 2013.” The Nano installers in
Horizon
ing for the introduction of DVB-C signal those
•	Compatible	with	coaxial	cable	as	well	as	with	Ethernet	 now has the right Cable is Horizon’s solution for those
•	Conquers	the	new	HDMI	distribution	niche	with	their	 regions ing for the introduction of DVB-C signal those regions Horizon now has the right
cables
specialized	products

signal analyzer for them.

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志
“We’re also developing an extremely
easy to use device for DVB-C, the Nano
Cable, which should become available
in the first quarter of 2013.” The Nano
Cable is Horizon’s solution for those

213
Over 70 Years
of TV Antenna Experience
TELE-audiovision Global Company Directory
Digital TV Retailer USATel, Sao Paulo, Brazil

COMPANY REPORT

Everything has a beginning; even TV
reception, that for us today is a part of
life, had a starting point. For England
that was in 1936 when the first regular
TV transmissions began. Broadcasting
took place on VHF channel 1 (50 MHz)
and a system with 405 lines was used.
Today SD uses 720 lines and HD 1080
lines.

■ The company’s Financial Manager is Allam Almughrabi, who, just like the

Antiference, UK
Brazilians Come - Antenna and HDMI
R	
Manu
MD
ë
Here DistrBuy
R to
Their Whol
Digital TV
Trevor
Shop
Paintain
Products Online
Serv

owner of the company, also comes from Syria. “We have sales of about
100,000 US dollars every year”, he reveals to us after taking a look at his
books.
rod manufacturing company was acquired. This company was located in
Lichfield, a half hour train ride north
of Birmingham in England’s Midland. In
1998 the entire company moved to this
location and it can still be found there
today. Antiference’s Managing Director
is Trevor Paintain; he’s been with Antiference for 15 years now. He tells us
who the current owners of Antiference
are: “Since May of 2011 Antiference has
been owned by Mr. and Mrs. Bialecki
from Australia.”

www.TELE-audiovision.com/TELE-satellite-1211/eng/antiference.pdf

Sales

São Paulo

These first TV broadcasts were transmitted from Alexandra Palace in London (The site is still in operation today
and is now used for DVB-T2 and DAB+).
■ Jose Manuel Pereira is USATel’s Manager. The workshop can be sensaAt the time, it was an absolute seen in
the background
tion and raised the curiosity levels of
two electronics technicians: Norman
Best and M. S. Beebe. They recognized
the unbelievable potential of this new
technology and thereby found their
market niche that they never changed
after they founded their company in
Digital TV Retailer USATel, Sao Paulo, Brazil
Y REPORT
1937. They named the company Antiference, and this name was based
on the main problem that existed back
then: the interference that was created

Arnold
Boeijen

• Manufacturing TV antennas since 1937
• Provides all the components needed for TV reception
• Expanding into HDMI distribution, as well as wireless solutions

USATel, Brazil - Distributor

	 Manu
azilians Come
R Distr
ë
is Antiference’s Managing REPORT
■ Trevor
COMPANY
re to Buy R Whol Paintain catalog in his rightSão Paulo
Director. He is seen here holding the current
84-page product
hand
with
TV
eir DigitalR Shop all oneproducts.receptionsuccess
TVfilledholding of theirAntiference’sleftand
TV distribution
In his
hand
he’s
of
stories:
Serv
oducts Online the Tribeam UHF antenna.

Actively Involved in Satellite
Jose Manuel
Business for 33 Years

With a yearly production of five million satellite dishes and even more
LNBs, Topsignal is one of the largest
manufactures of these products. The
company actually started in a completely different product segment: actuators and motors for satellite dishes. It’s an unusual development that
we had a look at in the small city of
Ninghai. Ninghai is located near Ningbo
which itself is a three-hour train ride
south of Shanghai.
Zongbao King founded the company

	 Manu
R Distr
R Whol
R Shop
Serv

ë

City,
A

Chairman

1 Chairman of■theHeinrichs, DMS International’s
Tim Board
CEO,
Acworth,
Zongbao King in his office in of Atlanta. He’s
Georgia, northwest

technical specifications and standards.”
188 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 09-10/2012 — www.TELE-satellite.com
Some of the documents were translat-

Shanghai

Zongbao
King

ed into Chinese by her fellow students.
Anna had managed to find a powerful
market gap; anyone in China who was
involved with receiver production or development of digital receiver software
could view and download all the necessary documents from Anna.

Alexander Wiese

• OEM delivering exclusively to Wholesalers
• Specializes in large production quantities
• Produces millions of satellite dishes and LNBs
It’s not easy to find women in leading positions in the digital TV business
and it’s even rarer for women to actually start a company in this business.
But that’s exactly what Anna Xie did:
she started a website from nothing and
in just 10 years built it up into China’s
largest site for digital TV. It’s an exciting story that we wanted to hear about
directly from her.

194 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2012 — www.TELE-satellite.com

Shanghai’s Minhang District. Anna rented expansive office space on the fifth
floor of a modern office building. 10 employees work there although DVBCN has
an additional 13 employees. But more
on that later. First we wanted to know
how Anna managed to turn her website
into China’s largest site for digital TV.

She explains to us: “I come from
Wenzhou in the Zhejiang Province.” This
province is located south of Shanghai;

Anna studied at the university in Shanghai. “I studied TV and radio journalism.”
That was in 2001. And she was still a
brand new student when she started her website DVBCN in 2002 (www.
dvbcn.com). “At first it was just a forum
to discuss technical information.”
As you can tell by the website’s name,
her forum dealt back then primarily with
the new DVB technology. “We made
available for download all documents,

	 Manu
	 Distr
Whol
Shop
R Serv

GM

even those employees in marketing use
DVBCN for up to date information on
digital TV trade shows and exhibitions.
Today DVBCN has over 200,000 registered users.

1. Chaofeng Ge is General Manager. He
coordinates production and is always on
the phone coordinating production with
customer orders.
2. James You is Sales Manager and counts
on the help of the Lion in front of the
entrance to Topsignal’s building.

Satellite Wholesaler and Meter Manufacturer DMS, USA

•	Always	working	enthusiastically	on	new	products

Tim also worked for the railroad in
Nebraska and when word got around
among his friends and coworkers that
he liked to tinker with radios in his free
time, they began bringing him defective radios, TVs and CBs. At first it was
tedious, but later on it became routine
for him to repair these devices. “Even
the police came to me to repair their
radios.” Tim was becoming more and
more experienced in radio technology.
In 1979 he read an article in a technical magazine about satellite reception.
This new technology was irresistible to
Tim; he simply had to have it. He spent
a lot of money on his first three-meter
dish. “Back then the dish antennas were

•	Enormous	growth	of	the	international	market	outside	
of	North	America

quite heavy; they were made of fiberglass with metal braces and weighed
400 pounds.” Tim still remembers today
what an experience it was to be able to
receive a TV picture with his new dish.
“It was an absolute sensation to be able
to receive a signal from space from so
Americas Busiest
Satellite Enthusiast
far away.”

President of the company.”

•	Innovative	expansion	of	signal	analyzer	models	for	
2012

■ DMS International could be found here
in the Northpoint Business Park with its
two buildings and attached warehouse.

In 1991 another big decision had to
be made: the market in Nebraska was
covered so in order to better expand his
business the decision was made to move
his company to Atlanta, Georgia. DMS
International can still be found there today. “Transportation costs are cheaper
here”, rationalizes Tim regarding this
decision and then grins as he adds,
“Besides, the weather is much better
here.” Sure enough, the company experienced quite a boom in business. Vicky
provides us with a few sales figures: “In
1991 DMS managed sales of roughly
$2.0 million.” The company’s best year
was 2008: “Back then we had sales of
$12 million. Sales have pulled back a little bit since then although in 2009 they
were still at about $9.0 million.”

Tim Heinrichs from DMS

Then came the turning point in Tim
Heinrichs’ evening job: a farmer bought
that dish from him. “That’s when it all
started, next I bought two new dishes.”
That was in 1980 and it was at this point
that Tim Heinrichs recognized that there
was a new business brewing. He sold
and installed these dish antennas at a
faster and faster rate. The breakthrough
came in 1982: “I invested $40,000 and
bought my first truckload of dishes - it
was 500 three-meter antennas.” Tim
Heinrichs young company became a satellite wholesaler.
186 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 09-10/2012 — www.TELE-satellite.com

www.TELE-satellite.com — 09-10/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志

was officially entered into the London Company Register on 28th
January 1938.

189

www.TELE-satellite.com — 1
1-12/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志 197
1. Vicky Heinrichs is the President of DMS
International and runs the administrative
3
side of the company.
1. Chaofeng Ge is General Manager. He
2. Ivy Bliss is the receptionist and takes
www.dvbcn.com
www.51dtv.com
coordinates production and is always on
care of DMS International’s website
the phone coordinating production with
(www.dmsiusa.com). If you call the
customer orders.
outside of China to search for employcompany, Ivy is your first contact.
2. James You is Sales easees and also, vice versa, to make it Manager and counts
3. Tina Ryan handles the accounting
on digital TV the Lion in front of the
ier for Chinesethe help of specialists to
entrance to Topsignal’s building.

find a job with a foreign company.

James
You

4

“At first I worked both jobs; my regular job at the railroad and at nights and
weekends at my own company DMS International.” That only worked for a few
months: he had to make a decision and
naturally he chose his own company.
“My wife Vicky worked along side me
from the beginning; at first she took
care of the books and now she’s the
COMPANY REPORT

Original Equipment Manufacturer Topsignal, China

For many years DMS International
was a small company with very few
employees: It was Vicky and Tim along
with one or two warehouse and administrative employees. “Today we have
10 employees with a warehouse that is
14,000 Sq-ft in size.” Up until recently
DMS International was mainly focused
on the North American market, “that
is, the USA, Canada and Mexico”, explains Tim. As recently as 2009/2010

•		OEM	delivering	exclusively	to	Wholesalers
•	Specializes	in	large	production	quantities

Millions From
Topsignal

•	Produces	millions	of	satellite	dishes	and	LNBs
•	Majority	of	shipments	go	to	South	America

•	Expanding	product	palette	to	include	high-quality	
LNBs	and	VSAT

■ Topsignal’s production plant in Ninghai, China.

The administration building is to the left and two
of the four production buildings are to the right.
Satellite dishes and LNBs are manufactured here in
large quantities.

200 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 09-10/2012 — www.TELE-satellite.com

www.TELE-satellite.com — 09-10/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志

202 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 09-10/2012 — www.TELE-satellite.com

COMPANY REPORT

Digital TV Website DVBCN.com, China

•	Known	by	every	digital	TV	
company	in	China
•	Provides	all	information	regarding	
digital	TV
•	Expanding	in	the	areas	of	
recruitment	and	software	
development
•	Focusing	in	future	technologies	
such	as	OTT	and	IPTV
•	Working	on	international	
expansion

Largest Digital
TV Website
in China:
DVBCN.com

4

210 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com

• Known by every digital TV company in China
• Provides all information regarding digital TV
USA • Expanding in the areas of recruitment and software development

■ In the office building

to the left in Shanghai’s
Minhang district can be
found DVBCN’s leased
offices on the fifth floor.

www.TELE-satellite.com — 06-07-08/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志

3. Some of the R&D engineers. A
total of 10 engineers work here.
www.TELE-satellite.com — 09-10/2012
4. View of the four production
buildings as seen from the
administration building

190 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 09-10/2012 — www.TELE-satellite.com

— TELE-satellite International — 全球发行量最大的数字电视杂志

206 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 09-10/2012 — www.TELE-satellite.com

CEO

Wang
Duo

COMPANY REPORT

ë

Sales TeamOwner

•	Working	on	IPTV	application	programs

•	Planning	on	a	program	for	OCR	recognition	of	
BBC’s	EPG	data

COMPANY REPORT

200 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com

■ Neal is Managing Director for Hypex and personally

takes care of their professional broadcast and cable TV
customers.

satellite magazine. The picture of the
Eiffel Tower in his living room highlights
the fact the he can speak French fluently
and loves the French way of life.

MD

www.TELE-satellite.com — 06-07-08/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志

Rod Hewitt
www.TELE-satellite.com — 06-07-08/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志

193

•	Wrote	one	of	the	most	successful	stream	reader	
programs
•	Developed	a	technical	solution	to	archive	TV	
channels	for	‘Internet	Archive’
•	Working	on	IPTV	application	programs
•	Planning	on	a	program	for	OCR	recognition	of	
BBC’s	EPG	data
200 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com

■ Rod Hewitt enjoys reading TELE-

satellite magazine. The picture of the
Eiffel Tower in his living room highlights
the fact the he can speak French fluently
and loves the French way of life.

www.TELE-satellite.com — 06-07-08/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志

201

• Working on IPTV application programs
• Planning on a program for OCR recognition of BBC’s EPG data
www.TELE-audiovision.com/TELE-satellite-1205/eng/hypex-icecrypt-uk.pdf
COMPANY REPORT

Wholesaler Hypex, UK

Professional
products from
a professional
dealer

201

•	Ships	large	dishes	to	Great	Britain	and	
Europe
•	Offers	successful	product	lines	from	
ICECRYPT	and	GLOBALINVACOM
•	Low	prices	thanks	to	minimal	overhead	
costs
•	Consistent	sales	despite	pricing	pressure

■ An image from the old

days: Hypex resided here
up until recently. Now the
company moved into a 6000
square foot warehouse
only about a mile from here
in Wembley in western
London.

Neal
172 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com

• Ships large dishes to Great Britain and Europe
• Offers successful product lines from ICECRYPT and GLOBALINVACOM

Ricks Satellite, USA - Distributor

	 Manu
R	
Distr
R Whol
R Shop
Serv

Software Programmierer Rod Hewitt, USA

The Man
Behind
TSReader:

Hewitt

■ Rod Hewitt enjoys reading TELE-

185

www.TELE-audiovision.com/TELE-satellite-1207/eng/tsreader-rod-hewitt.pdf
Chengdu,

Rod Hewitt
•	Developed	a	technical	solution	to	archive	TV	
channels	for	‘Internet	Archive’

207

www.TELE-satellite.com — 06-07-08/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志

• Opening a new fully automatic satellite dish production line
• Focusing on top-of-the-line Quality dishes

Wembley

• Wrote one of the most successful stream reader programs
• Developed a technical solution to archive TV channels for ‘Internet
Archive’
•	Wrote	one	of	the	most	successful	stream	reader	
programs

•	Opening	a	new	fully	automatic	satellite	
dish	production	line
•	Focusing	on	top-of-the-line	Quality	
dishes

www.TELE-satellite.com — 09-10/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志

184 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com

ë

•	Large	investment	in	Quality	Assurance
•	Expanding	VSAT	and	Ka-Band	
production

of SVEC’s administration building in
Chengdu in China's Sichuan province.
The manufacturing facilities can be
found directly behind the administration
building.

High Investment
Rod
in Product Quality

Hypex, UK - Distributor

Professional Dish Manufacturer SVEC, China

■ A large dish highlights the location

5

Becky

Software Programmierer Rod Hewitt, USA
Not many digital TV product dealers among other things DX
Sichuan
■SVEC CEO Wang Duo
can boast over 30 years success in the Communications amateur Frieda Kahlo,
1. Kahlo, named herself after the painter
handles the SVEC advertisement in TELE-satellite.
business (in 2012 it will be 33 years). radio 2.receivers. Relatives 15 employees
Becky runs the SVEC sales team with
3. Milton and his team take care of SVEC customers in
his family came later
One of the few wholesalers that fall into from North and South America
4. Betty Lee runs the sales team for India and Africa
this category is the company Hypex in on and Astarted SVEC sales teamfor histhe left
5. look into the working offices. To
is Belinda, responsible for The Far East and to the
right Nina, responsible for The Middle East.
London. We paid a visit to them just company is and so Hypex became
before they moved into their new ware- stronger and stronger over the years.
Just a192 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com
few years ago the company behouse.
SVEC (Sichuan Video Equipment dishes with diameters of 2.4 meters.
Great reported on SVEC back in
came a limited liability corporation and outside ofWe alreadyBritain.” Hypex customCompany) has been manufacturing sa- Lately SVEC is concentrating on expan- TELE-satellite 02-03/2010 issue. Even
ding their professional
antenna be then we already away how
tellite antennas of all sizes under
Hypex was founded in 1979 by Shyv now operates since 1993. the name Hypex,VSATers can back found as farmentionedas MalayProduction quantities are enormous: business. “We also offer Ka-Band di- SVEC was becoming active in VSAT and
sia. Neal explains how it came to
Sood. He is an electrical engineer and Ltd.
SVEC manufactures several million shes for Internet-via satellite”, we learn the Ka-Band. Since then SVEC has in- that:
dishes each month. The most popu- from Becky, Manager of the Internatio- vested enormously to not only guaranour company
recognized back then the need for com- dish types are 60 and 75cm off- nal Sales Team. And, really, “Over those many years also to raise
that’s the tee production quality but
lar
a visit to the quality to well-known and
set
Hypex is a are 1.2 and reason why we does
mercial receivers and other broadcast- antennas. Next in line pure wholesaler andcame to pay has become very new levels; levels that areestab1.5-meter diameter dishes. But SVEC SVEC: professional products require unheard of for a manufacturer that pronot sell to end users. professional Director lished and aside from that month. Asian
ing equipment.
duces millions of dishes every many
also manufactures large segmented Managing production.
Neal tells us more: “We ship to roughly companies have their own branch office
186 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com
As a one-man operation he sold 600 active dealers of which 15% are in Great Britain. For those it’s much sim-

The Man
Behind
TSReader:

3. Some of the R&D engineers. A
total of 10 engineers work here.
4. 4
View of the four production
buildings as seen from the
administration building

206 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 09-10/2012 — www.TELE-satellite.com

TSReader, USA - AnalyzerSVEC
Software

	 Manu
R	
Distr
Whol
Shop
Serv

COMPANY REPORT

SVEC’s
Quality
215
Offensive

www.TELE-satellite.com — 06-07-08/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志

3

1

R	
Manu
	 Distr
Whol
Shop
Serv

www.TELE-satellite.com — 09-10/2012 — TELE-satellite International — 全球发行

Sales

2

Wholesaler Hypex, UK

Success with
• Large investment in Quality Assurance
range of
• Expanding VSAT and Ka-Band production
products

191

www.TELE-audiovision.com/TELE-satellite-1207/eng/svec.pdf
214 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com

COMPANY REPORT

211

• Focusing in future technologies such as OTT and IPTV
• Working on international expansion

Professional Dish Manufacturer SVEC, China

212 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com

R	
Manu
	 Distr
Whol
Shop
Serv

201

www.TELE-audiovision.com/TELE-satellite-1207/eng/dvbcn.com.pdf

Chief
Editor
Victor
Ho

Anna
Xie

SVEC, China - Satellite Dishes

187

• Majority of shipments go to South America
2
3
• Expanding product palette to include high-quality LNBs and VSAT

news and test reports on
DVBCN. He is DVBCN’s Chief
Editor.

COMPANY REPORT

195

•	Special	focus	on	signal	analyzers	for	the	semiprofessional

■ Two electronics technicians founded the company in 1937; it

Chaofeng
Ge

2
■Victor Ho oversees the

the largest website for digital TV in China
(www.dvbcn.com). Recently DVBCN began
cooperating with TELE-satellite. The first
DVBCN ad appeared in the TELE-satellite
issue that Anna is holding in her hand.

COMPANY REPORT

sions in the 27 MHz range would skip
off the ionosphere or troposphere allowing for two-way communications over
extremely long distances. “Back then I
collected QSL cards from my contacts
and managed to collect nearly 1000 of
those cards.”

But that was still not enough for Anna
But Anna was not satisfied with one - in 2011 she founded yet another busiwebsite. “The main site is just a base ness segment in her own company:
website”, she explains, “but two other Digital Technology Ltd. develops digibusiness segments are above all finan- tal TV software. This segment imme“By 2004 we already 1-12/2012 — reg- cially successful.” Since so many profes- diately
www.TELE-satellite.com — 1had 80,000 TELE-satellite International — 全球发行量最大的数字电视杂志 197 caught on; this is the company
istered users”, remembers Anna about sional digital technical users have come with the additional 13 employees we
the quickly growing popularity of her together on DVBCN, it was actually quite had mentioned earlier, although they’re
website. “We also offered the source easy to provide them and digital TV not located in Shanghai. “10 engineers
codes for DVB applications and DVB an- firms a platform where workers could work in an office in Hangzhou plus one
find new jobs and digital TV companies additional engineer each in Shenzhen,
alyzer information.”
could find new employees: In 2005 Anna Chengdu and Beijing.”
A natural development of her down- started her new website www.51dtv.
What are these engineers doing at
load forum website was the start of a com that resembles a recruiting comdiscussion page and not long after that pany; the number 51 is Chinese for “I these locations? “We are primarily working on the DLNAOTT technology, that is,
a news page was started. Today DVBCN need”.
the integration of mobile telephone, lapis the most viewed website in China for
At the moment www.51dtv.com is only top and TV under the term Multi Screen
anyone that in one form or another is
connected with digital TV. Technicians available in Chinese but Anna is in the Interaction.” This means that what you
can find not only valuable information process of creating an English version see on a display screen, for example,
for their work on the DVBCN site, but that would make it easier for companies on a mobile telephone screen, can be

Owner

■Anna Xie is founder and owner of DVBCN,

•	Sells	and	ships	
almost	exclusively	to	
end	users
•	Expanding	into	new	
business	segments	
such	as	WLAN	and	
IPTV

• Sells and ships almost exclusively to end users
• Expanding into new business segments such as WLAN and IPTV
3

DVBCN, China - Internet News and Job Forum
DVBCN’s offices can be found in

•	Optimized	
assortment	for	digital	
TV	needs	in	Brazil

www.TELE-satellite.com — 1
1-12/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志

www.TELE-audiovision.com/TELE-satellite-1209/eng/topsignal.pdf
Success in the
Sales

testing an FS2 signal analyzer beta
model.

Digital TV Website DVBCN.com, China

ë

185

•	Imports	all	of	its	
products	from	China

USATel in
Sao Paulo

company is secretary
and receptionist
Letica Lacender

www.TELE-satellite.com — 1
1-12/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志

2
■Topsignal’s Founder and

How Anna Built up
DVBCN.com
in Just 10 Years

www.TELE-satellite.com — 1
1-12/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志

ica
• Innovative expansion of signal analyzer models for 2012

Many of Antiference’s success
products are on display in their
showroom including HDMI
components, TV amplifiers as well
as cable head ends.

Topsignal, China - Satellite Dishes

e International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2012 — www.TELE-satellite.com

■ The spirit of the

Letica Lacender

The company went through a series
of ups and downs in the demand for
antennas so they began to diversify.
This went so far that even a curtain

188 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2012 — www.TELE-satellite.com

COMPANY REPORT

•	Expanding	distribution	network	to	the	
European	market
•	Offers	their	own	products	as	OEM	and	private	
label

www.TELE-audiovision.com/TELE-satellite-1209/eng/dms-international.pdf
President
1

• Always working enthusiastically on new products
■
• Special focus on signal analyzers for the semi-professional
186
• Enormous growth of the international market outside of North AmerR	
Manu
	 Distr
Whol
Shop
Serv

•	Provides	all	the	components	needed	for	TV	
reception
•	Expanding	into	HDMI	distribution,	as	well	as	
wireless	solutions

Villa can be found online shop USATel’s
headquarters in Sao Paulo, Brazil.
Administration can be found in the right
side of the building; the warehouse can be
seen in the background.

Tim
Vicky
Two other product groups are today’s are almost the same is simply that the
sales giants at Topsignal: “In 2008 we dishes and LNBs are sold in sets. A
Heinrichs
Heinrichs

196 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2012 — www.TELE-satellite.com

•	Manufacturing	TV	antennas	since	1937

■ Behind this unremarkable wall of a small

Allam
Almughrabin

ë

CEO

TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2012 — www.TELE-satellite.com

building in the Fradley
Distribution Park in Lichfield
near Birmingham, UK. There’s
also a logistics center in
Lichfield.

184 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2012 — www.TELE-satellite.com

COMPANY REPORT Digital TV Retailer USATel, Sao Paulo, Brazil

In 1938 their young company became a limited liability company in the
There aren’t too many companies heed and Marietta northwest
Acworth,
London Company Register and the two
that have hung around for decades and of Atlanta, Georgia, USA, we
Atlanta, GA, USA
at the same time are still in the same found Tim Heinrichs and his
young owners hired their first employbusiness segment. DMS International, wife Vicky, the President of
Ninghai
which has been in existence since the the company. We wanted to Back then TV antennas were conees.
very early days of TV reception via know how DMS International
sidered real high-tech products and
(Ningbo)
satellite, belongs to that group. Tim became what it is today.
1
Heinrichs is Founder and CEO of satelthe number of customers they had was
Tim Heinrichs has been a DXer
lite wholesaler DMS International and if
excited about
you’ve been in the same business for so for a long time: he was very small. It all really began to take
long, there’s absolutely no doubt that CB communications when it first startcommunicate wirelessly with each other
off in the 1950’s when TVs became afed and all that
you are a back in the year
in Ninghaireal enthusiast. In the small2003. Back could be done with it. without too much in the form of techtown of Acworth, not too far from Lock- It allowed people for the first timeand nical requirements. for really? In 1968
fordable to the demand Oh antennas
then antenna motors for satellite dishes
Tim erected a tower 25 meters high for
skyrocketed. his CB company,used it to listen in
The antenna. He that up unwere in demand and Zongbao King built
when railroad employees talked to each
til then had its headquarters in central
a production facility for these motors.
other, when construction companies
London, moved toon workoutskirts of the
passed the orders to their builders,
“Unfortunately, today there’s not much
when truck drivers warned others of racity and manufactured TV antennas
dar traps on satellite
when the
demand for these motors anymore”, started manufacturing the highways anddishwith nearly 250 employees. That initial
police would coordinate road blocks with
explains Sales Manager James You to es and in 2011 we started But Tim was espetheir headquarters. producing
boom slowly cially fascinated then in 1964
faded but
us. Order quantities have steadily de- LNBs.” The quantities are with the phenomenon
huge: nearly
of “skip” transmissions: under the
BBC started their second channel incertain
creased, “but we can still handle any a half million satellite dishes are transmisweather conditions CB radio proThe
UHF monthly and evena more LNBs. spirit of the
band. That meant
renewed ■dekind of order since our storeroom is still duced
company is secretary
mand, this time production numbers
fully stocked.”
The reason these for UHF antennas. and receptionist

Lichfield
DMS International, USA - Distributor
(Birmingham)

■ Antiference’s administration

Now the connection is beginning to
make sense. Bitek is one of the largest antenna distributors in Australia
and an antenna manufacturer in China
while Antiference is one of the largest
antenna manufacturers and distributors in Great Britain. For Kaz Bialecki

by those antennas that were not perto the frequency. The
antennas from Antiference were the
solution to that problem; they reduced
interference.

fectly matched
Original Equipment Manufacturer Topsignal, China

l Pereira is USATel’s Manager. The workshop can be seen in
nd

75 Years of
TV Antennas
from
Antiference

CFO

Satellite Wholesaler and Meter Manufacturer DMS, USA

Pereira

Antenna and HDMI Manufacturer, UK

www.TELE-audiovision.com/TELE-satellite-1211/eng/usatel.pdf

European Export Manager and the
first contact for dealers that want to

Europe. He can be directly reached by
owner of the company, also comes from Syria. “We have sales of about
100,000 US dollars every year”, he reveals to us after taking a look at his
e-mail at Arnold@antiference.co.uk
books.

Enormous Numbers
• Imports all of its products from China
for the World Market
• Optimized assortment for digital TV needs in Brazil

ë

How did someone from Australia end
up buying a British company? It turns
out that this was a very logical development. “In the 1990’s Kaz Bialecki started a company in Australia that installed

distribute Antiference’s products in
■ The company’s Financial Manager is Allam Almughrabi, who, just like the

COMPANY REPORT

COMPANY REPORT

• Expanding distribution network to the European market
• Offers their own products as OEM and private label

■ Arnold Boeijen is Antiference’s

MD

antenna systems.” Not long after that
he expanded his activities to include
an antenna installation wholesale business. “Today his company Bitek operates five branch offices all across Australia.” In 2007 Kaz Bialecki started his
own manufacturing: “In Guangzhou,
China, 150 employees produce antennas and accessories, that is, things like
LCD holders, antenna mounts, antenna
outlets and other installation material.”

Owner
Rick
Caylor

TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com

173

• Low prices thanks to minimal overhead costs
• Consistent sales despite pricing pressure

www.TELE-audiovision.com/TELE-satellite-1205/eng/ricks-satellite-azbox.pdf
Owner
10 Years
COMPANY REPORT

Satellite Dealer Ricks Satellite, Kansas City, USA

•	celebrates	its	10th	anniversary	
in	2012

Bobbie & Rick

Rick
Caylor

•	distributes	AZBox's	receivers	in	
North	America
•	is	an	enthusiastic	satellite	
feedhunter

•	sees	a	good	future	for	the	FTA	
market	in	North	America

■ A typical residential home in the USA. Looking from the street there

are no satellite dishes to be seen and there’s also no company sign to
suggest that there’s a successful online satellite shop hidden inside. A
knock on the door reveals Bobbie and Rick along with Ricks Satellite
which can be found in the Internet at www.rickssatelliteusa.com.

156 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com

• celebrates its 10th anniversary in 2012
174
• distributes AZBox’s receivers in North America

www.TELE-satellite.com — 04-05/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

www.TELE-satellite.com — 04-05/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

• is an enthusiastic satellite feedhunter
• sees a good future for the FTA market in North America

214 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

157
行量最大的数字电视杂志

207

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

215
TELE-audiovision Global Company Directory
■Scott Greczkowski with a T-shirt

from SatelliteGuys.us in front of his
two motorized dishes, on the left a
1.5-meter offset antenna and in the
middle a 2.5-meter prime focus dish
both of which are currently pointed
to 85W.

StelliteGuys, USA - Internet Forum
	 Manu
	 Distr
Whol
Shop
R Serv

Headend Manufacturer Wadt, Brazil

COMPANY REPORT

www.TELE-audiovision.com/TELE-satellite-1205/eng/satelliteguys.us.pdf

Owner

COMPANY REPORT

A Family Company Wadt, Brazil
Headend Manufacturer
COMPANY REPORT
Scott
in the Cable Distribution Field
Greczkowski

Scott's
SatelliteGuys

A Family Company
in the Cable Distribution Field

206 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com

• Provides assistance with technical satellite reception questions
• Founded by Scott as a non-profit forum
• All advertising income is reinvested in better technology
The company Wadt has been in existence for three generations. It was
founded by Nelson Wadt back in 1945.
It’s a story of emigration in that Nelson Wadt is originally from Germany.

COMPANY REPORT

cessful for so many years, is all by itself interesting because of its success,
but since they manufacture cable distribution equipment, it’s the perfect
reason for us to pay them a visit.

The company, that has been suc-

The company founder’s grandson,
Joao Alfredo Wadt Miranda, who today
is the company’s Technical Director,

“Wadt’s best times were before
1994”, remembers the company
founder’s Grandson, “Back then we

Sowell, China - IPTV Receivers
ë

R	
Manu
	 Distr
Whol
Shop
Serv

IPTV

Largest
SA

ë

is Future

GM

São Paulo

•	Already	operating	the	first	IPTV	
project
•	3D	planned	for	the	future

•	60%	of	all	Sowell	receivers	are	
already	HD

Neide
Wadt

COMPANY REPORT

www.TELE-satellite.com — 04-05/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

149

Wadt’s finances. Joao, Neide’s son and

clue to what goes on inside this building;
it caught the interest of the TELE-satellite
editorial staff: the company Eletronica
Wadt, which has been involved with
reception technology since 1945, resides
here.

•	Involved	in	HF	for	more	than	60	
years
•	New	allocation	of	cable	
licenses	in	Brazil	opens	up	huge	
opportunities	for	the	company

vinced that exports will also pick up:
“With our new DVB-T2 and DVB-S2
receivers we will increase our market
share and the upcoming football world
cup will increase ISDB-T sales in South
America.”
It’s becoming clear that Panodic is

•	Specialized	products	for	cable	
headends
•	Only	ships	domestically

ë

COMPANY REPORT

Shenzhen

ë

Satellite Information Website BSD, Brasil

■Richard is Vice General

Manager and runs the
Jiuzhou R&D team with 200
engineers.

Even though it appears that this can
all be easily accomplished technically,
two things have to be kept in mind: the
first has to do with a license since there
are many Internet services that have
to be paid for. The second is that even

ë

Bratislava

Founder

though older digital receivers can be
upgraded with OTT, they might not be
good enough to truly take advantage of
OTT. “The chips get faster and faster
every day and if you upgrade a digital
receiver that has an older chipset with
OTT, you might not be able to enjoy
these OTT services interference-free.”
COMPANY REPORT

■ The OTT

Development
Team works on
the sixth floor
of the Jiuzhou
Electric Building
in Nanshan’s
Hightech Park in
Shenzhen, China.

The end result is that it would be far
better to upgrade a new digital receiver
with OTT services; only then would the
menu operation and the speed and capabilities of the built-in chips be optimal
for these OTT services.

www.panodic.com

Engineers in Research & Development | Total Number of Employees

The OTT technology is so important
to Jiuzhou that they have put together
a dedicated development team: “There
are 20 engineers working in the OTT
Team”, we learn from Vice General
Manager Richard who is responsible for
the R&D Team. “Our entire R&D Team
1. engineers”, clarifies
consists of 200Huang Wei is one of the founders
of MICO/Panodic. He
Vice General Manager Richard, “We’re takes care of the
working with strategic orientation of production.
the Android as well as
with the Linux2. Xu Haisystems.”
operating Bin is Panodic’s CEO. He’s

■Receptionist Yan

Jing greets visitors
in the lobby

COMPANY REPORT
该独家报道由高级编辑所作

■Panodic’s Marketing

155

Receiver Manufacturer Panodic, China

R&D teams of OEM/ODM
manufacturer Panodic can
be found in the futuristic
Grentech Building in
Shenzhen’s High Tech Park.

in charge of the company’s daily

Department operations and can reveal to us: “In
Manager Yongjun Zhang
is in charge of the Application Team
2011 we achieved sales of 70 million
consisting of ten engineers. This is
USD and in 2012 we’re expecting an
where the functioning of the software
increase to 100 million USD.”
is tested and optimized so that end users won’t have any trouble accessing
all the different Internet services with
their Jiuzhou receiver later on.

by Luo Shigang

•	Multiple	quality	control	points	before,	
during	and	after	production
•	Concentrating	on	digital	TV	products

•	Cooperating	with	many	license	
providers
•	Continuous	product	palette	
expansion

126 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com

www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

127

• Cooperating with many license providers
• Continuous product palette expansion

GM

www.TELE-audiovision.com/TELE-satellite-1203/sortec.pdf
Sales
Sales
Number in Professional

Pavol
Macko

Alexander
Záhončík

159

COMPANY REPORT

Wholesaler and Installer SORTEC, Slovakia

One

Average Turnover (Previous, This, Next Year Estimates)

Installations

Production Certificates

RoHS, DVB, EMC

Ladislav
Šmárik

Production Categories

OEM

Main Products

Receivers for DVB-T/T2, DVB-S/S2, DVB-C, ISDB-TB, IPTV, DVD
Players, Projectors

www.TELE-satellite.com/TELE-satellite-1201/eng/panodic.pdf

• One of the largest wholesalers in Slovakia
New Receiver from
• Success through distribution of well-known, high-quality brand names

TURBOSAT

Turbosat, UK - Receivers

Pavol
Lukáč

ë

TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com

Sales

ë

Chris
Ward

ë
BSD, Brazil - Internet Forum
of ideas:

TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com

	 Manu
Owner
A successful climb
	 Distr
Whol
Marcus
Shop
128 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com
Bernardini
R Serv

www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

erecting TV antennas”, he remembers,
“This was at the same time when Hungary started their second TV chanBut first we wanted to learn more
nel via UHF.” His first customer was
about Posta’s Company P-SAT. Obvihis parents. And then it happened as
ously, the “P” in P-SAT stands for his
it usually Largest Digital TV Trade Magazine 02-03/2012 —
name Posta. “The company146 TELE-satellite International — The World‘sdoes: friends and— relatives
P-SAT Kft
would call and Tibor Posta ended up
was founded in 2002”, explains Tibor
with more and more work to do. Back
Posta. Before that time he was an anthen he lived in eastern Hungary and
tenna installer. “In 1991 I started out

• Operates Brazil’s largest digital TV website
• Engaged in the further education of digital TV antenna installers

P-Sat, Hungary - Distributor
everything an antenna installer would need, including fiber optic LNBs
from GlobalInvacom, can be found in his shop.

• Has its own customer magazine
• Created supermarket style store
248 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 12-01/2012

•	Active	in	new	technologies	such	as	
fiber	optics	and	IPTV

headquarters in Bratislava,
Slovakia. SORTEC just leases this
space and will move to their own
new building in 2012.

www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

179

133

www.TELE-satellite.com

COMPANY REPORT

„Small and
Valuable“

183

•	own	receiver	line	ICECRYPT
•	50%	of	sales	outside	Great	Britain
•	Focus	on	receivers,	CAM,	SmartCards	and	
LNBs
•	80,000	receivers	a	year
•	produces	Dolly	Buster	TV	programming	
via	HOTBIRD

■ TURBOSAT’s headquarters

in Sittingbourne south east of
London

144 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com

www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

145

• 80,000 receivers a year
• produces Dolly Buster TV programming via HOTBIRD
www.TELE-audiovision.com/TELE-satellite-1201/bsd.pdf

www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

to this problem is P-SAT in Hungary. The founder and operator of
this company, Tibor Posta, gave us
some insight into how he solved the
problem of winning new customers.

■ Tibor Posta is founder and majority owner of P-SAT. Anything and

•	Success	through	distribution	of	wellknown,	high-quality	brand	names
•	Move	to	their	own	building	in	2012

■ Wholesaler SORTEC’s

178 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com

• Move to their own building in 2012
• Active in new technologies such as fiber optics and IPTV

Technical
Director
Ray
Gargiulo

• own receiver line ICECRYPT
• 50% of sales outside Great Britain
• Focus on receivers, CAM, SmartCards and LNBs

Active and full

•	One	of	the	largest	wholesalers	in	
Slovakia

www.TELE-audiovision.com/TELE-satellite-1203/turbosat-icecrypt.pdf

R	
Manu
R	
Distr
R Whol
Shop
R Serv

	 Manu
■ Marcus Bernardini, aka
R	 in his garden. In the
Distr
Benni,
background is his 5.0R meter antenna as well as
Whol
his 1.5-meter dish. Benni
is the operator of the www.
Shop
portalbsd.com.br website
that focuses on satellite
Serv
interests in Brazil.

•	Upgrade	of	older	digital	receivers	
possible	with	a	software	upgrade

www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

■ The administration and

Director is Alan Yu.
He is a loyal reader of
TELE-satellite.

company MICO in Hong Kong. Their
2.Slovakia are Director is Ray
Technical the 80cm and 90cm anGargiulo. One of his main
make up about 50%
tennas; they make up
of
more attractive channels sales the
while found is in motion.”about 90%driver
In addition to the production facility of our can bewith car tasksdish to check production “The 2
first product: a DVD player. Since then
is sales”, says ĽubošThe
our
Bezák.
our CAM’s accountingeast about 20%.
on ASTRA at 23.5 for but there are
samples this the manufacturer
reason for out the
Group also in- of with the
they have gotten larger and larger so in Bao’an, the Panodic SmartCards follow with 15%course is lookingfrom is that for Slovakians the
inmore attractive channels isfront winKorea. “TURBOSAT can be found
also many free-to-air (FTA) channels
1
3
on ASTRA at 23.5 east is
comon ASTRA at “20
that
in consisting 19.2 eastdow they want an ODM Panodic but planning
that today they are one of the top five cludes a branch office rest Beijing. of other satelliteat the traffic. (Original Design there are
Manufacturer)”, he explains,
also many free-to-air (FTA) channels
own
to see”,
Bezák. That’s
ponents such as our ownto make
on
at available in
product 19.2 the receivers;
on our
receiver manufacturers in China with engineers work there primarilycontinues ĽubošLNB series.” this “OurASTRA Manufacturing they want the
Sittingbourne
Engineersterrestrial east that explains
design reception”,
why these of LNBs
dishes be consid1. Pavol Macko is SORTEC’s General Manager
digital
to see”, continues Ľuboš Bezák. That’s
The quantitylarger 132 mayare fitted with
1. Huang Wei is one of the founders
2
4 of MICO/Panodic. He takes care of the
2. Ľuboš Bezák SORTEC‘s E-shop Manager.
2012.larger then
these
The domestic their lowsatellites the receivers based are fitted
more than 1200 production employ- IP receiver’s software. erable but becauseso that both quarter of whyĽuboš Bezák.aredisheson these with
monoblock LNBs of first sales
manufactured
3. It’s always busy in SORTEC’s satellite store
monoblock LNBs so that both satellites
strategic orientation of production.
where end-users shop. Three sales personnel take
But
only make up
care of the customers' needs.
workingretail storesbusiness. “The
found there.”
ees and over 100 R&D engineers. The sales team can also be can they don’t have much“We’re also designs.”theseof SORTEC’sprojectors”,
value be received.
of an imcan be received. on
about 15%
2. Xu Hai Bin is Panodic’s CEO. He’s
4. Two of the four SORTEC Sales Managers:
■ International Sales
largest portion of
comes from
Alexander Záhončík (left) and Pavol Lukáč (right).
on overall sales.
Manager Chris Ward in
in charge of the company’s daily
Sure instalPanodic was founded in 1992 Yu
technology and marketing departments For the Chinese market,pactSORTEC offers said Alan by surprisingly.our salesin ourenough,
SORTEC was business and 1992 by
founded
our wholesale
front of small sampling
operations and can reveal to us: “In
of TURBOSAT’s
Ladislav Šmárik. Back then he was an
lation work”, explains E-shop Manager
products: ICECRYPT
Ladislav
then
2011 we achieved sales of 70 million
of HD there are acmore
and
receivers. in these days antenna installer andour wholesale sucare located in the Shenzhen High Tech primarily DVB-C LNBs. He IPTV highŠmárik. Back sales he was an
Ľuboš Bezák, “From was very
receivers and
The
SmartCard
figures
tivity 90% of installation of instalUSD and in 2012 we’re expecting an
is the contact for new
cessful with thesales comes from profesantenna
was
lations
dealers in Europe and
interested in
Park; the production facility is only a “TV and Internet are constantlyinstaller and and very suc- viewers and the remaining 10% comes TV
increase to 100 million USD.”
comes from merg- TURBOSATmore
another
busisional systems such as those for entire
other areas.
cessful with the installation of profesfrom our cooperation with large store
in larger communities.
ness branch. “We have projectors.
chains.” For
and
projector reallydelivers
half hour car ride away in Fuyong in the ing closer and closer together; we are as the exclusive “A housing blocks these hyper markets makes
sional systems such
those for entire
large electronic chains SORTEC
rights for blocks in larger communities.
This
complete (Master Antenna) include
housing the Dolly Buster adult-oricomments and then
Bao’an District. We paid a visit to both integrating Internet services with our HD beautiful”, he MATVsatellite systems thatinstalladish, LNB and receiver.
ented TV service”, reveals Chris Ward.
are
facilities to see for ourselves how Pan- DVB-C receivers.” International — ThehaveLargest Digital TV Trade Magazineon 02-03/2012 — www.TELE-satellite.com first samples sizes in al182 TELE-satellite
World‘s
— HOTBIRD
www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine 183
“The most requested dish
“WeThis MATV (Master Antenna) installa-“The
five channels promises,
Slovakia are the 80cm and 90cm an■
and we sell our Dolly ready completed tennas; they make up about 90% set to Ladislav Šmárik is
with production of
Panodic started exporting their DVB Buster Smartodic managed to get this far.
Jundiaísays Ľuboš Bezák. “The SORTEC’s Founder and
our dish sales”,
Cards
reason
this is that for Slovakians the
products in 2005. “The first receiver begin in
So, obviously International — The question is Trade Magazine — 02-03/2012 — www.TELE-satellite.com to any country where HOTBIRDthe secondforquarter of 2012.”President
182 TELE-satellite the first World‘s Largest Digital TV
www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine
more attractive channels can be found
can be received.”
on ASTRA at 23.5 east but then. “In
there are
(São Paulo)
this: is the company name MICO or that we manufactured for export was 3D can’t be all that far away channels
also many free-to-air (FTA)
ASTRA at 19.2 east
want
And now we come
the third
we’ll That’s
Panodic? Marketing Director Alan Yu a DVB-T receiver for Great Britain”, re- back to the mot- quarteronof 2012Ľubošthat theyalso be
to see”, continues
Bezák.
why these
dishes
to that also the
introducing receivers larger so that are fitted with
with both satellites
integrated
has the answer for us: “The company members Alan Yu. That waswe highlighted earlier, “Small
monoblock LNBs
and Valuable”. TURBOSAT has placed
can be received.
3D converters.”
time that Panodic
MICO Hongkong REPORT Wholesaler and Shop P-SAT, Hungary expanded into the small products
COMPANY still exists and is the
its entire focus on
SORTEC was founded in 1992 by
Ladislav Šmárik. Back then he was an
Where
prodparent company of the Panodic Group. then new receiver business. “Panod- to ship. “For thiscan you find Panodic’s sucsince they are easier
antenna installer www.TELE-satellite.com
180 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — and was very
reason we don’t deal
cessful with only sold about
installation
ucts? and
MICO has its headquarters in Hong ic’s R&D engineers have accomplished with larger“In 2011 we still thesuch as thoseof professional systems
for entire
heavier products”, explains Paddy.
housing
domestically
Kong and that’s where you’ll also find quite a bit in just a short time: “We’re 10% of our products blocks in larger communities. here
TURBOSAT concentrates on valuable
This MATV (Master Antenna) installain China.
the Panodic Group’s financial manage- introducing a new combination receiverreceivers, small The remaining 90% were ex2
products such as
182
183
for DVB-S2 and DVB-T as well as for ported. In 2012 it will shift to about
ment and logistics.”
Budapest
Linux-based IP 20% Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com
Panodic itself was founded in Shen- DVB-S2 and ISDB-T.” A 150 TELE-satellite International — The World‘s domestic and 80% export.” Alan
Yu is expecting to see an increase in
zhen in 2009 and sold their products box was also completed just now.
“An interesting niche is DVB-T mod- DVB-C as well as ABS, the Chinese digiunder this name to the local market in
China. The company’s products are also ules for reception in a car.” This mod- tal satellite TV standard.
130
But the Marketing Director is conconnected to
exported under every possible brand ule with DVB-T/MPEG4 isTELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com
Anyone, whether it’s a manufacturer
or a dealer, who has something to sell
has the same problem: how do you
win new customers? What good is the
best product if no one knows about it?
What use are all those sensational offers if no one is aware of them? How
do you make your potential customers
notice your products? Every successful manufacturer and every successful dealer managed to find their own
solution. A wholesaler that came up
with an especially interesting solution

•	Dedicated	OTT	development	team
•	Market	for	OTT	in	Europe	and	
North	America

154 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com

The best part is that OTT is only being
such as phase from to the to
in the transition IPTV. Thanks analogappearance
of more and more hybrid receivers, the
1. Pavol Macko is SORTEC’s General Manager
erdigital terrestrial national market in
sales: “For the reception”, explains
www.TELE-satellite.com —
Trade Magazine 157
integration with the 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Ľuboš Bezák SORTEC‘s E-shop Manager.
Internet is moving
4
2.
Ľuboš Bezák.
Great Britain it’s the T5000 for DVB-T
more and more to the forefront.
3. It’s always busy in SORTEC’s satellite store
and it’s brother the T2400 with PVR for
where end-users shop. Three sales personnel take
And that’s how Panodic managed to
But these retail stores only make up
care of the customers' needs.
DVB-T2 as well as the ICECRYPT 3000
work themselves up into the group of
about 15% of SORTEC’s business. “The
4. Two of the four SORTEC Sales Managers:
for the European market.” The latter
top five manufacturers in just a few
largest portion of our sales comes from
Alexander Záhončík (left) and Pavol Lukáč (right).
1
3
receiver we already introduced to instalyears. From the original three-man
our wholesale business and our you
in lation TELE-satellite 08-09/2011 isour work”, explains E-shop Manager
founding team the company has grown
sue withBezák, “From our wholesale acĽuboš a detailed test report. “The
to over 1500 employees and there’s no
1. Pavol Macko is SORTEC’s General Manager
digital terrestrial reception”, explains
2
4
2. Ľuboš Bezák SORTEC‘s E-shop Manager.
158 TELE-satellite International —Bezák. Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com
www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine
Ľuboš The World‘s
T2400 even comes with a 2.0from instaltivity 90% of sales comes terabyte
end in sight. Alan Yu: “We are constant3. It’s always busy in SORTEC’s satellite store
hard drive!” saysremaining Normally,
lations and the ‘Paddy’. 10% comes
where end-users shop. Three sales personnel take
ly working on designing and developing
But these retail stores only make up
care of the customers' needs.
PANODIC
from our cooperation with large store
such high-capacity hard drives can’t Company Details 15% of SORTEC’s business. “The
about
higher quality products. This includes,
4. Two of the four SORTEC Sales Managers:
▼
Alexander Záhončík (left) and Pavol Lukáč (right).
bechains.” For these hyperchip makes 0............................largest portion of our sales comes from
connected. “A special markets and ▼
1000 .............................. 2000
above all, hybrid receivers.” These are
our wholesale business and our instal▼
it large electronic chains SORTEC delivers
possible.”
0................................ 50 ................. 100 Mio US$
lation work”, explains E-shop Manager
receivers that are mostly interesting to
Ľuboš Bezák, “From our wholesale accomplete satellite systems that include
operators.
tivity 90% of sales comes from instaldish, at TURBOSAT are
1
Sales LNB and receiver. divided into
The expansion of their product pallations and the remaining 10% comes
from our cooperation with large store
two regions: “Half of our sales are
ette suggests that Panodic will continue
chains.” For these hyper markets and
“The most requested dish sizes in
to climb higher in the ranks of top class
domestically here in Great Britain;
large electronic chains SORTEC delivers
Slovakia are the
and 90cm anTELE-satellite International —
DVD
video screen in the
name, just not the Panodic name. is to 80cmthe Interna- players 130 the Technical include The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com
“We
companies.
1.complete in
A look satellite systems that
the other half
Europe.”
tennas; they make
about
dish,
Department. receiver.
passengers can
export as an OEM and tional Sales Manager Chris Ward90% ofseatedLNB and Defective units are use
ODM manufac- upcar.” Rear
tells
quickly repaired here..
our dish sales”, says Ľuboš Bezák. “The
Britain
COMPANY REPORTus Wholesaler and ICECRYPT remote control most requested dish sizes in
more: this
a receivers
turer and don’t use our name at “Our isManufacturer TURBOSAT, Great “The to change channels
reason forall.” that for Slovakians the

Founder

•	Developes	Digital	TV	receivers	
optimized	for	OTT

The Jiuzhou development team is
working feverishly on the best possible
solutions for OTT.

cusing on these two markets”, confirms
Jimmy Zhang, “Buying power is the
highest there.”

156 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com

Receiver Manufacturer, China

Digital TV Manufacturer Jiuzhou, China

Over-The-Top by Jiuzhou

• Market for OTT in Europe and North America
• Upgrade of older digital receivers possible with a software upgrade
2

Always Active
You Zhen
When it Has
Yu
• Multiple quality control
to Do withon digitalpoints before, during and after production
• Concentrating
TV products
Digital TV
Sortec, Slovakia - Distributors
	 Manu
R	
Distr
R Whol
Shop
In 1999 three technically enthusiastic young entrepreneurs founded the
Serv

165

www.TELE-audiovision.com/TELE-satellite-1203/panodic.pdf
not a manufacturer that produces only
1
Founderthere are orders; they are continCEO
Marketing
when
One of the
uously active in further development.
Top Five:
“We are cooperating with many indusManager
Panodic
trial partners, such as, NDS,
more shops in the east.” SORTEC will Conax,
SuperNovelTV as covered with
then have Slovakia nicely well as chip manufacHuang storesand Ali. you canalso received
turers
their satellite ST where We’ve find
licenses from Sisvel DivX and
in addition to all the necessary satellite Inview.”
Inview is everything
components, also a provider of terWei reception.Internet-basedforEPG informa- Hai Bin
Xu
Alan Yu
additional data
restrial tion and “Slovakia is currently

SORTEC is not only an inIn 20 years a company went from
starting off as a small installation op- staller and wholesaler; they
becoming exports will also also operate five retail stores
166 TELE-satellite International — The World‘s Largest Digitaleration Magazine — 04-05/2012largest pro- pick up:
TV Trade to vinced that the — www.TELE-satellite.com ansales figures are supported by
“With our Slovakia and at from which end users can buy
■Company founder:
fessional installer in new DVB-T2 and DVB-S2
other important reason: TURBOSAT
You Zhen Yu. He the same time has becomelisted of theevery Zhang is digital TV need for television
and
receivers we will one
increase our anything they
market
receivers are
with ■Jimmy large
two other partners
share andin the country. We device manufacturer Jiuzhou’s
signal
largest wholesalersin the upcoming football worldreception. And if you can’t
Marketing Vice Manager
Great Britain. “Our also responsible for and
receivers
founded MICO inwanted to cupchainincrease ISDB-T salesis in South OTT the in person, you can buy
will
visit their
know more about SORTEC’s marketing from stores
can be found in the superstores of the units.
1999 and Panodic in
America.”
from them online. Ľuboš Bezák, Mansuccess story. Their headquarters and electronics
TESCO, in the MAPLIN
2003.
It’s becoming the that
ager is
main shop are located in clear capitalPanodic of the E-shop, tells us more about
shops, in CPC, Dixons, John Lewis, at
city of Bratislava within sight of a large them: “At the moment four of these
Play.com and many others.”
3
shopping center in which among other stores can be found in western Slovathings can be Sure enough, three receiver mod- the fifth one in the east. But in
found a TESCO hyper- kia with
2012 we
market.
els make up nearly 75% of all receiv- are planning to open up two

2

not a manufacturer that produces only
when there are orders; they are continInternet services and terrestrial/satuously active in further development.
ellite TV are constantly merging closer
“We are cooperating with many industogether. Many current digital receivers
already have partners, connection
trial an Internet such as, NDS, Conax,
but most of the time this connection is
SuperNovelTV as well as chip manufaconly used to load new software into the
turers ST the receiver to a
receiver or to connectand Ali. We’ve also received
local network. The from Sisvel DivX and Inview.”
licenses total integration of
Internet video and audio content with
digital Inview is still in its infancy.of EPG informareceivers is a provider
One of the companies that is inten- additional data
tion and Internet-based
sively working on this new technology
such as IPTV. Thanks to the appearance
is Jiuzhou.
of more and more hybrid receivers, the
Jimmy Zhang is Jiuzhou’s Marketing
integration with the Internet is moving
Vice Manager and tells us what it’s all
about: more and for Over-The-Top.forefront.
“OTT stands more to the
It means that viewers can not only see
And that’s how Panodic managed to
their normal TV channels terrestrially,
work themselves up into the group of
via satellite or cable, they can now use
the same device to enjoy video and autop five manufacturers in just a few
dio content via the Internet.” YouTube
years. From the just
and VUDU, a movie service, are original three-man
a few founding team the company has grown
examples according to Jimmy
Zhang. The end user doesn’t really care
to over 1500 employees and there’s no
how the video and audio makes it to his
end in sight. can use one
TV screen, as long as heAlan Yu: “We are constantremote control to access everything
ly working on designing and developing
that’s available.
higher quality products. This includes,
Unfortunately, all,weak spot receivers.” These are
above a hybrid in the
OTT technology is the bandwidth of the
receivers connection. Video
end user’s Internet that are mostly interesting to
transmissions require a large bandoperators.
width. Therefore, right now these OTT
The expansion of their product palcompatible digital receivers would really only have markets in that Panodic will continue
ette suggests Europe and
North America even though there are
to climb higher in the ranks of top class
many other regions that offer scattered
companies.
high-speed Internet access. “We’re fo-

www.TELE-audiovision.com/TELE-satellite-1203/jiuzhou-ott.pdf

developed in software form”, reveals
Marketing Vice Manager Jimmy Zhang
to us, “This means that end users
merely have to upload a new software
version in order to make their existing
digital receivers OTT compatible.”

Vice
Vice GM
Marketing
Wholesaler and Installer SORTEC, Slovakia
Jimmy
Shenzhen
Richard
Zhang

Growth Through
• Developes Digital TV receivers optimized for OTT
• Dedicated OTT development Quality
team
Panodic, China - Receivers

www.TELE-satellite.com — 04-05/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

• Specialized products for cable headends
• Only ships domestically
1

Director in Sao Paulo, Brazil.

166 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com

Distribution
Technology
from Wadt

■ The dish antennas on the roof provide a

the company Manufacturer
grandson is
Receiverfounder’s Wadt’s TechnicalPanodic, China
headend manufacturer

The Big Expansion
of Panodic

Headend Manufacturer Wadt, Brazil

164 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com

•	3D	planned	for	the	future China
Digital TV Manufacturer Jiuzhou,
•	Integration	of	TV	reception	with	
IPTV

Jiuzhou, China - Receivers

R	
Manu
	 Distr
Whol
Shop
1
Serv

149

www.TELE-audiovision.com/TELE-satellite-1205/wadt-brazil.pdf
Technical
Director
Joao
Wadt

•	60%	of	all	Sowell	receivers	are	
already	HD

COMPANY REPORT

www.TELE-satellite.com — 04-05/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

• Integration of TV reception with IPTV
• 60% of all Sowell receivers are already HD

• Involved in HF for more than 60 years
Jiuzhou’s OTT
• New allocation of cable licenses in Brazil opens up huge opportunities
of the
for the company ■Neide is the daughter Development Team
company’s founder and takes care of

R	
Manu
	 Distr
Whol
Shop
Serv

Eagle Chain in
Sowell’s showroom
with one of the
company’s success
receivers.

•	Integration	of	TV	reception	with	
IPTV

148 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com

Wadt had to specialize and focused

•	Already	operating	the	first	IPTV	
project

COMPANY REPORT

■ General Manager

is Future

over; in 1994 the Brazilian government lifted the high import duties after which HF products came into the
country at low prices.

Owner

company’s founder and takes care of
Wadt’s finances. Joao, Neide’s son and
the company founder’s grandson is
headend manufacturer Wadt’s Technical
Director in Sao Paulo, Brazil.

148 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com

207

Receiver Manufacturer Sowell, China

IPTV

209

■ Neide is the daughter of the

COMPANY REPORT

COMPANY REPORT

“Wadt’s best times were before
Eagle 1994”, remembers the company
founder’s Grandson, “Back then we
Chain had 200 employees.” Those days are

ë

R	
Manu
R	
Distr
R Whol
Shop
Serv

www.TELE-satellite.com — 04-05/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

Wadt had to specialize and focused

• Already operating the first IPTV project
• 3D planned for the future
São Paulo
Wadt, Brazil - Headends

Newington outside of Hartford,
Connecticut in the USA. Scott operates
his satellite forum SatelliteGuys.us
from here. On the street side he has two
motorized dishes installed; four smaller
fixed dishes are mounted on the wall.
To the left is a multifocus dish with five
LNBs for DirecTV, in the middle is a dish
for the DishNetwork eastern arc pointing
to 61.5W, 72.7W and 77W plus another
antenna for the DishNetwork western
arc at 110W and 119W. All the way to the
right is another antenna for 110W. This
dish is used for automatic scanning that
takes place every hour. It can instantly
identify when a new channel appears on
DishNetwork and posts this information
in the forum thread Uplink Report.

•	All	advertising	income	is	
reinvested	in	better	technology
•	New	is	the	use	of	the	forums	
through	Customer	Service	
employees	of	digital	TV	companies

Sowell’s showroom
with one of the
company’s success
receivers.

The company founder’s grandson,
Joao Alfredo Wadt Miranda, who today
is the company’s Technical Director,
thinks back to the products that
www.TELE-satellite.com — 04-05/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine
started it all: “It was car radios for Ford vehicles that my
Grandfather manufactured
first.” It was already obvious back then what
path
the
company

The company, that has been suc-

■ Scott Gerczkowski’s home in

•	Founded	by	Scott	as	a	non-profit	
forum

www.TELE-audiovision.com/TELE-satellite-1205/eng/sowell-iptv.pdf

cessful for so many years, is all by itwould take - namely further in the
The company Wadt has been in exHartford thinks back to the products that had 200 employees.” Those days are
self it all: “It was car radi- its success,
direction of reception. When the first
istence for three generations. It was started interesting because of over; in 1994 the Brazilian governCT, USA
but since they manufacture cable discable TV duties affounded by Nelson Wadt back in 1945. os for Ford vehicles that my ment lifted the high importsystems were being installed,
Grandfather manufactured
ter perfect
tribution equipment, it’s the which HF products was right the the middle of things
Wadt came into in
It’s a story of emigration in that Nelfirst.” It us already obcountry ■ low prices.
reason forwas to pay them a visit. atGeneral Manager
offering the first cable headends.
son Wadt is originally from Germany.
Eagle Chain in
vious back then what
path
the
company

•	Provides	assistance	with	technical	
satellite	reception	questions

• New is the use of the forums through Customer Service employees of
digital TV companies

would take - namely further in the
direction of reception. When the first
cable TV systems were being installed,
Wadt was right in the middle of things
offering the first cable headends.

Receiver Manufacturer Sowell, China

Satellite Forum Operator Scott Greczkowski, USA

COMPANY REPORT

Satellite Information Website BSD, Brasil

Benni‘s
BSD

•	Operates	Brazil’s	largest	digital	TV	website
•	Engaged	in	the	further	education	of	digital	TV	
antenna	installers
•	Planning	his	own	IPTV	channel	all	about	digital	
technology
•	Living	his	dream	with	his	own	worldwide	radio	
station
246 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 12-01/2012 — www.TELE-satellite.com

www.TELE-satellite.com — 12-01/2012 —

TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

247

• Planning his own IPTV channel all about digital technology
• Living his dream with his own worldwide radio station
www.TELE-audiovision.com/TELE-satellite-1201/p-sat.pdf

Owner

COMPANY REPORT

Wholesaler and Shop P-SAT, Hungary

How P-SAT
Wins New
Customers

Tibor
Posta

•	Has	its	own	customer	
magazine
•	Created	supermarket	style	
store
•	Planning	start	of	own	
branded	TV	services
•	Operates	one	of	the	
most	well-known	web	
communities	in	Hungary
■ Since November 2010 wholesaler and retailer P-SAT Kft has been leasing

this 330 square meter building in northern Budapest; the 150 square meter
warehouse in the background also belongs to P-SAT. The company also
operates a very popular Internet digital TV community as well as a web shop
under the name SAT.HU. The company has six employees.

184 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 12-01/2012 — www.TELE-satellite.com

— www.TELE-satellite.com

www.TELE-satellite.com — 12-01/2012 —

TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

185

• Planning start of own branded TV services
• Operates one of the most well-known web communities in Hungary

216 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

217
TELE-audiovision Global Company Directory
Success with Your
COMPANY REPORT

Wholesaler and Manufacturer SatelliteAV, USA

Hobby – Plus a
Little Luck

ë

SatalliteAV, USA - Wholesaler
first DVB-T2 receiver,” he hints at some
interesting plans for the future. The only
question that still begs an answer is in
which countries DVB-T2 will actually be
launched. As a matter of fact, nobody
knows at this stage because every country will decide independently whether
and how to introduce DVB-T2, and these
decisions are not always easy to understand.

	 Manu
R	
Distr
R Whol
Shop
Serv

Sacramento

consumer applications you need not look net networks are gradually disappearing
further than to the brand new AB 3DBox and that almost every household these
receiver line which features HD receiv- days has set up a WiFi network. So why
Receiver Manufacturer
COMPANY REPORT
ers with integrated 3D TV converter. The not add WiFi capability to satellite renewly developed 3D boxes are sched- ceivers? “These boxes are based on the
uled to hit the market in the first quarter Ali 3606 chipset which is particularly
of 2012. In the previous issue of TELE- fast,” Juraj adds.
satellite we presented the stand-alone
■ Brian Gohl is
Thanks to all these Founder and PresidentABachievements
3D converter, whose software will also
of SatelliteAV. The
company distributes
COM Europe has taken only two years to
be used in the AB 3DBox receivers.
the GLORYSTAR system
become a significant and as a wholesaleris acplayer that
manufactures and
distributes the
The recently introduced AB-COM tively tapping into various product segGEOSATpro brand name.
CryptoBox receiver line from AB-COM ments. For Juraj Masaryk, innovation is
has a very special treat in store: As ex- the key to success and a cornerstone
tremely good-value receivers targeted for a successful expansion path. Even
towards the pay TV market, all receivers the company name has turned out to be
from this line include CA and a CI mod- wisely chosen: The acronym AB appears
ule. The truly special feature, however, on all new brand names whenever a new
is a USB interface which can be used to products series is launched. This way
connect a WiFi dongle, Juraj Masaryk ex- AB-COM is able to grow and prosper for
plains. He knows that fully cabled Ether- a long time to come!

www.TELE-audiovision.com/TELE-satellite-1201/satelliteav.pdf
AB-COM, Slovakia

President

ë

Conquering
the marketBrian
with new Gohl
receivers
• Optimized complete product assortment plus service
The LinkBox series features another
range of receivers: “Here we are talking about boxes we produce for Czech
pay TV provider Skylink, which uses the
Irdeto encryption system.” These receivers are particularly inexpensive, Juraj
says and adds “we’d be ready to offer
this box to other content providers using
Irdeto as well.” If you need further proof
for AB-COM’s orientation towards future

AB-COM, Slovakia - Receivers
R	
Manu
R	
Distr
R Whol
R Shop
R Serv

■ Michal Krajcik’s passion

is all about photography. It
COMPANY REPORT
should be, as he is the head
of design and looks after the
website of AB-COM.

Company founder Juraj Masaryk tells
us how AB-COM products are supplied to

1. Meet Marketing Manager Michal Grezo. What’s that on his
screen? It’s the advertisement of the AB 3DBox as it appeared in
TELE-satellite.
2. Pavol Blaho is Sales Manager

■ Michal Krajcik’s passion

GM

is all about photography. It
should be, as he is the head
of design and looks after the
website of AB-COM.

120 TELE-satellite — Global Digital TV Magazine — 10-1
1/201 — www.TELE-satellite.com
1

■ Juraj Masaryk is founder and

Managing Director of AB-COM.
Here he is seen explaining all the
features of the 3D converter that
is built into the AB 3D boxes.

■ Company premises of receiver manufacturer

AB-COM in Topolcany, Slovakia. The company has
cooperation agreements with TV manufacturer LG
and pay TV provider Skylink, which is why their
logos also appear prominently on the roof of the
building. AB-COM generates 30% of its turnover
in the local markets of Slovakia and the Czech
Republic, with the remaining 70% share coming
from other European markets.

Pavol
Blaho

AB-COM:
Innovation
Guaranteed

•	Particularly	successful	in	Central	Europe
•	Products	for	different	applications	such	as	3D	and	
pay	TV
•	Focus	on	cost-efficient	product	range
•	Products	optimised	for	individual	applications
www.TELE-satellite.com — 10-1
1/201 — TELE-satellite — Global Digital TV Magazine
1

113

A motorized C-band dish on the wall
as well as numerous other dishes
on the roof are all used by Applied
Instruments to develop and test their
signal analyzers.

2

www.TELE-audiovision.com/TELE-satellite-1111/appliedinstruments.pdf
25 Years
Engineering
Sales
1

Tom
Haywood

•	The	power	of	this	company	is	its	robust	
signal	analyzers

A small family business has managed
to become one of the most well-known
names in the North American cable and
satellite TV signal analyzer market. It’s
the perfect reason for us to go and pay
Applied Instruments in Indianapolis, Indiana, USA, a visit only to find out that
the company is expanding into the international market with its products
that are Made in USA.

Product
Manager
Patrick
Zaina

Who’s behind Applied Instruments?
It really is a family-owned business.
It was founded exactly 25 years ago
in 1986 by Doyle Haywood, the father
of the current General Manager Tom
Haywood. His son Scott Haywood also
works for the company as a sales manager.

When we look back at when it all started, we find out that there’s even more
history behind the company’s founder
Doyle Haywood: he founded a company back in 1973 that produced signal
1
analyzers for cable TV. In 1979 he sold
that company to a large corporation.
But when he came up with the idea to
develop clean reliable test signal generators for CATV, he quickly founded a
new company: Applied Instruments. His

3

Where is it, the much-proclaimed heart of Germany? How do you de-

fine its actual location? Sven Melzer, founder and General
COMPANY 	 Manu Manufacturer and Wholesaler SAPRO, Czech Republic Manager
REPORT
CEO130

Signal Analyzer Manufacturer, USA

Company Details
Engineers in Research & Development | Total Number of Employees
www.TELE-satellite.com — 10-1
1/201 — TELE-satellite — Global Digital TV Magazine
1

▼
▼
0................................ 25 .................................. 50
127

▼
0................................ 10 ................... 20 Mio U$D
Production Certificates

DVB

121

Production Categories

own brand

Main Products

Cable TV Signal Analyzers, Satellite TV Analyzers, Noise Signal
Generators, Noise Power Ratio Test Instrument

www.TELE-satellite.com/TELE-satellite-1109/eng/applied.pdf

From here the path to satellite signal
analyzers was not a long one. “In 1998
we introduced the first satellite signal
analyzer from the ‘Buddy’ series”, comments Tom Haywood.

The new company originally began
with three employees, one of whom was
David Poelstra, a research engineer
that worked together with Doyle Haywood in the first company. In 1990 they
released their first successful product to the market – a cable TV signal
analyzer that not only was easy to use
but was also affordable. Over the years
other analyzers appeared. “In order to
test long cable lengths, we produced a
Return Path Test Set”, remembers General Manager Tom Haywood, “It consisted of a CW Test Signal Generator that
was attached to one end of the long
cable and a receiver at the other end.
In this way we could check the quality
of the cable.”

The Sat Buddy quickly became known
and loved by North American satellite
installers and over the years was consistently improved and fitted with new
features. Scott Haywood, Tom Haywood’s son and third generation in the
company, is a sales manager at Applied Instruments and tells us about the
newest Buddy version: “It’s the Super
Buddy 29 and in addition to letting you
measure satellite TV signals, it can also
be used to install the Wildblue Internetvia–satellite service. These LNBs require 29 volts that the Super Buddy 29
can supply, hence the ‘29’ in the model
name.”

Marketing
Manager
Othmar
Fuchs

the main lobby.

not all that much different from being
a building designer who must also be
creative and a problem solver.”

USA and Canada, with only the remaining 5% being shipped abroad to countries like Switzerland, Sweden, Great
Britain, Belgium as well as Australia”,
comments Scott Haywood.

to noise testing”, comments Tom Haywood.

www.TELE-audiovision.com/TELE-satellite-1111/huber+suhner.pdf
When his mother, the wife of founder
Doyle Haywood, began to have health
issues, his father decided to leave the
company and sell 50% ownership of the
company to Tom Haywood. The other
50% was sold to Jeff Haas. Both are enthusiastic with the opportunity to further expand Applied Instruments.
But the company doesn’t only manufacture signal analyzers that are used
at the receiving end. An especially interesting highlight is the Noise Power
Ratio testing product that manufacturers of amplifiers, optical transmitters
and receivers, and other active devices
can use to test the operating range of
their products. It consists of a noise
generator that sends its signal to the
receiver to be tested and a corresponding signal analyzer that measures the
output signal from the tested receiver.

General Manager Tom Haywood explains to us their product palette: “80%
of our sales are made up of reception
signal analyzers, 10% are test generators with the remaining 10% made up of
complete systems consisting of signal
generators and signal analyzers.” And
as far as sales figures go, he tells us,
“For the past several years sales have
been stable at about US$ 5.5 million
but for 2012 we are expecting roughly a
10% increase.”
COMPANY REPORT

Fiber Optic Distribution Systems Manufacturer HUBER+SUHNER, Switzerland

该独家报道由高级编辑所作

■ Smack in the middle of the

Swiss Alps: that’s where
HUBER+SUHNER can be found
in Herisau in northeastern
Switzerland

But this is what will change in the
company’s 25th year of operation: “We
are actively looking for competent distributors in Europe, The Middle East
and Asia.” It is critical for Applied Instruments to find technically competent
partners: “Our products are not throwaway products; they are solidly built
and can be repaired if the need were to
ever arise.” Technical customer service
is actually quite important when dealing with products like signal analyzers;
professional installers use signal analyzers on a daily basis and can thereby
document a proper installation. Reliability and help with technical problems
are excellent reasons why an installer
would want to choose a quality product
from a manufacturer that he knows will
support him later on.

Fiber Optics at

•	One	of	the	leading	fiber	optic	companies	in	the	world
•	New	CLIK!	System	for	easy	installation

HUBER+SUHNER

•	New	market	segment	that	will	make	coaxial	cable	
distribution	systems	obsolete
•	Now	available:	economical	alternative	with	
distribution	systems	starting	with	eight	users

Where will this increase come from?
Sales Manager Scott Haywood has a
few answers for us: “We are currently
developing a signal analyzer for DVB-S2
that will become available in the fourth
quarter of 2011. We are also working
on terrestrial signal analyzers for ATSC
and QAM that will appear in the first
quarter of 2012.”
138 TELE-satellite — Global Digital TV Magazine — 10-1
1/201 — www.TELE-satellite.com
1

www.TELE-satellite.com — 10-1
1/201 — TELE-satellite — Global Digital TV Magazine
1

139

obsolete
• Now available: economical alternative with distribution systems starting with eight users

2

In 1994 MMDS (Multichannel Multipoint Distribution Service), also known
as wireless cable, gained widespread
use primarily in rural areas and Applied Instruments was there providing the appropriate signal analyzers.

Tom Haywood, the current General
Manager, is actually a construction engineer but always enjoyed lending a
hand at the company. In 1996 he decided to work exclusively for his father’s
company: “The creation of solutions
and the ergonomic products have always fascinated me”, he reveals, “It’s

“Our NS-3 Broadband Noise Generator is often used by receiver manufacturers and satellite service providers to
simulate rain fade and conduct carrier

Applied Instruments is looking at satellite signal analyzers as their way of
expanding into the export market. “Up
until now, 95% of our products have
been shipped to North America, that is

“We produce everything ourselves”,
comments General Manager Tom Haywood referring to his nine production
employees, “Our R&D team consists of

www.TELE-audiovision.com/TELE-satellite-1109/ipont.pdf

CTO

3DTV

COMPANY REPORT
该独家报道由高级编辑所作

TELE-satellite — Global Digital TV Magazine — 10-1
1/201 — www.TELE-satellite.com
1

of satellite wholesaler and distributor MEGASAT has a rather pragmatic approach to those questions. “We are right in the heart of
Germany,” and by that he simply means the region he’s at home.
The name of the place is Niederlauer, which is a small town
north of Schweinfurt in northern Bavaria. As a matter of fact,
if you look up Niederlauer in Google Maps the marker pops up
right in the centre of Germany.

www.appliedin.com

industrial complex from which digital TV signal
analyzers are produced.

Average Turnover (Previous, This, Next Year Estimates)

3D

www.TELE-satellite.com — 10-1
1/201 — TELE-satellite — Global Digital TV Magazine
1

iPONT and

ë
Andor
ë Zoltan
Receiver
Korcsok
Pasztor
Fabrication in the converts 3D for use with auto-stereoscopic
• iPONT’s softwarevsolution
monitors
Industrial City annoying glasses
• 3D enjoyment without
1

APPLIED INSTRUMENTS
■ Applied Instruments leases two suites in this

• Special test signal generators for receiver manufacturers
• Special attention to ergonomic operation
• Technical customer service an important highlight of the company

son Tom Haywood explains to us where
the name came from: “We apply a solution to every problem and provide the
■ Marketing Manager for that purpose – Apinstruments justOthmar
Fuchs presents us with a
plied Instruments.”here in
“CLIK!’ system brochure

MEGASAT wholesaler and
• One of the leading fiber optic companies in the world
distributorSystem forfrom
• New CLIK! rises easy installation
• heart of Germany
the New market segment that will make coaxial cable distribution systems
iPONT, Hungary - 3DTV

•	Technical	customer	service	an	important	
highlight	of	the	company

126 TELE-satellite — Global Digital TV Magazine — 10-1
1/201 — www.TELE-satellite.com
1

Huber+Suhner, Switzerland - Fibre Optics

1

•	Special	test	signal	generators	for	receiver	
manufacturers
•	Special	attention	to	ergonomic	operation

121

Scott
Haywood

www.TELE-satellite.com — 10-1
1/201 — TELE-satellite — Global Digital TV Magazine
1

128 TELE-satellite — Global Digital TV Magazine — 10-1
1/201 — www.TELE-satellite.com
1

•	Company	plans	worldwide	expansion	with	
its	internationally	compatible	analyzers

Applied
Instruments

Jeff Haas

120 TELE-satellite — Global Digital TV Magazine — 10-1
1/201 — www.TELE-satellite.com
1

Wholesaler and Manufacturer MEGASAT, Germany

Signal Analyzer Manufacturer Applied Instruments, USA

COMPANY REPORT
该独家报道由高级编辑所作

www.TELE-satellite.com — 10-1
1/201 — TELE-satellite — Global Digital TV Magazine
1

114 TELE-satellite — Global Digital TV Magazine — 10-1
1/201 — www.TELE-satellite.com
1

Niederlauer

Receiver Manufacturer AB-COM, Slovakia

COMPANY REPORT
该独家报道由高级编辑所作

■
• Focus on cost-efficient product range
• Products optimised for individual applications

• The power of this company is its robust signal analyzers
• Company plans worldwide expansion with its internationally compatible analyzers

	 Distr
Whol
Shop
R Serv

195

1

Applied Instruments, USA - Signal Analyzers

R	
Manu
	 Distr
Whol
Shop
R Serv

2

112 TELE-satellite — Global Digital TV Magazine — 10-1
1/201 — www.TELE-satellite.com
1

and prefers to work at this shack. He is
co-owner of Applied Instruments.

a selection of products from Applied Instruments. He
owns 50% of the company while his partner Jeff Haas,
Director of Engineering, owns the other 50%.

COMPANY REPORT

TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

www.TELE-audiovision.com/TELE-satellite-1111/abcom.pdf
Sales

Marketing
Manager
Michal
Grezo

■ Jeff Haas is Director of Engineering

■ General Manager Tom Haywood in the showroom with

R	
Manu
R	
Distr
Whol
Shop
R Serv

www.TELE-satellite.com — 12-01/2012 —

• Offers the smallest LNB in the world
• Develops first Android hybrid satellite and IPTV receiver for North
America

alongside and is the official distributor of
all AB-COM Europe products in the company’s home markets of Slovakia and
the Czech Republic.

Masaryk
Robust
Signal Analyzers
• Particularly successful in Central Europeë
Made in USA
• Products for different applications such as 3D and pay TV
Indianapolis

•	Offers	the	smallest	LNB	in	the	world
•	Develops	first	Android	hybrid	satellite	
and	IPTV	receiver	for	North	America

of Roseville’s enormous industrial park near Sacramento, California in the USA.
You can see the tip of a C-band dish mounted on the roof. There are 10 different
C and Ku band antennas installed on the roof ranging in size from 45cm to 3m
covering the entire arc from 58W to 166E.

Juraj

Signal Analyzer Manufacturer Applied Instruments, USA

•	First	provider	of	OTA-SSU	FTA	
receivers	in	the	USA

Topolcany

1. Meet Marketing Manager Michal Grezo. What’s that on his
screen? It’s the advertisement of the AB 3DBox as it appeared in
TELE-satellite.
2. Pavol Blaho is Sales Manager

Founder

•	Optimized	complete	product	
assortment	plus	service
•	Own	receiver	line	for	semiprofessional	applications

■ SatelliteAV along with their partner company PowerON can be found in a section

by Juraj Masaryk in the year 2002. In
the beginning the business acted as a
wholesaler for satellite components and
it was only in the year 2010 that ABCOM Europe was established as an independent receiver manufacturer. AB-COM
1
as a wholesaler continues to prosper

first DVB-T2 receiver,” he hints at some consumer applications you need not look net networks are gradually disappearing
interesting plans for the future. The only further than to the brand new AB 3DBox and that almost every household these
question that still begs an answer is in receiver line which features HD receiv- days has set up a WiFi network. So why
which countries DVB-T2 will actually be ers with integrated 3D TV converter. The not add WiFi capability to satellite relaunched. As a matter of fact, nobody newly developed 3D boxes are sched- ceivers? “These boxes are based on the
196 TELE-satellite International — The World‘s Largest Digital TV Tradeuled to hit — 12-01/2012 the first quarter Ali 3606 chipset which is particularly
Magazine the market in — www.TELE-satellite.com
knows at this stage because every country will decide independently whether of 2012. In the previous issue of TELE- fast,” Juraj adds.
and how to introduce DVB-T2, and these satellite we presented the stand-alone
Thanks to all these achievements ABdecisions are not always easy to under- 3D converter, whose software will also
COM Europe has taken only two years to
be used in the AB 3DBox receivers.
stand.
become a significant player that is acThe recently introduced AB-COM tively tapping into various product segThe LinkBox series features another
range of receivers: “Here we are talk- CryptoBox receiver line from AB-COM ments. For Juraj Masaryk, innovation is
ing about boxes we produce for Czech has a very special treat in store: As ex- the key to success and a cornerstone
pay TV provider Skylink, which uses the tremely good-value receivers targeted for a successful expansion path. Even
Irdeto encryption system.” These receiv- towards the pay TV market, all receivers the company name has turned out to be
ers are particularly inexpensive, Juraj from this line include CA and a CI mod- wisely chosen: The acronym AB appears
says and adds “we’d be ready to offer ule. The truly special feature, however, on all new brand names whenever a new
this box to other content providers using is a USB interface which can be used to products series is launched. This way
Irdeto as well.” If you need further proof connect a WiFi dongle, Juraj Masaryk ex- AB-COM is able to grow and prosper for
for AB-COM’s orientation towards future plains. He knows that fully cabled Ether- a long time to come!

"My Hobby is
My Occupation"

194 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 12-01/2012 — www.TELE-satellite.com

• Own receiver line for semi-professional applications
• First provider of OTA-SSU FTA receivers in the USA
Slovakian receiver manufacturer ABCOM has found its firm place in the
Central European market within an
impressively short time. Based in the
little-known town of Topolcany, some
100 km east of the Slovakian capital
Bratislava, the company was founded

Wholesaler and Manufacturer SatelliteAV, USA

COMPANY REPORT

•	iPONT’s	software	
solution	converts	3D	
for	use	with	autostereoscopic	monitors

131

•	3D	enjoyment	without	
annoying	glasses
•	Potential	for	receiver	
manufacturers	to	
expand	their	STB’s	to	
include	3D
•	Compatible	with	the		
variety	of	manufacturer		
auto-stereoscopic	
monitor	solutions

■To the left is the

“Allee” shopping mall
in Budapest, Hungary
in which iPONT has
already installed their
3D system. To the right
is the “Allee Corner
Office” building in
which the startup
company iPONT can be
found .

Třinec

HUBER+SUHNER

14 TELE-satellite — Global Digital TV Magazine —— 06-07/201 www.TELE-satellite.com
Global Digital TV Magazine 06-07/201 — — www.TELE-satellite.com
1 1

Engineers in Research & Development | Total Number of Employees

2

Average Turnover (Previous, This, Next Year Estimates)

Production Certificates

ISO 9001, ISO 14001, IRIS, RoHS, REACH
Production Categories

own brand CLIK!
Main Products

Connectivity solutions for Radio Frequency, Low Frequency and
Fiber Optic applications. Fibre optic distribution systems for
professional and home use.

www.TELE-satellite.com/TELE-satellite-1111/eng/huber+suhner.pdf

15

www.TELE-satellite.com — 06-07/201 — —TELE-satellite — Global Digital TV Magazine
www.TELE-satellite.com — 06-07/201
1 1
TELE-satellite —

3D
• Compatible with the variety of manufacturer auto-stereoscopic monitor solutions

Company Details

1. Patrick Zaina is Product
▼
▼
seven engineers, the repair team is made up of five en0............................ 2500 ............................. 5000
Manager for fiber optic
▼
connectors. Here we see
gineers and our technical customer service has four en0.............................. 500 ................ 1000 Mio SFr
him in front of a professional
gineers.” On top of that are three employees in admindistribution cabinet
consisting primarily of
istration as well as two sales managers so that a total of
fiber optic splitters. The
“CLIK!” system is a compact
30 employees make up Applied Instruments all of which
version for the distribution
work in an 11,000 Sq-foot office/production facility loof satellite signals in smaller
apartments.
144 TELE-satellite — Global Digital TV Magazine — 10-1
1/201 — www.TELE-satellite.com
1
cated in an industrial zone southeast of Indianapolis.
2. Jürgen Silbereisen is one
Download Report
of the five “CLIK!” system
design engineers. Here
After 25 successful years, Applied Instruments is
1. The two
Andor
tence 170 years Budapestin front of
the
There’s a large industrial zone in the friends and business partners: CTOago Pasztor and city
2
1. Sales Manager Scott Haywood enjoys
we see him programming
CEO Zoltan Korcsok in their headquarters in
Wholesaler and Manufacturer, USA an online calculatorespecially interested in the satellite reading TELE-satellite.
COMPANY REPORT iPONT’sof without glasses” auto-stereoscopicin
one of
“3D
monitors.
“I’m
DXer reports”, CTO Andor Pasztor and ready to plow into the international market. The enreveals
Třinec. This city currently
northeastern portion of the Czech Re- that currently has 40 employees operates two other has
1. The two friends and business partners:
The company
2
that installers Scott, “It shows the enthusiasm they have their headquarters in Budapest in front of
can use
CEO Zoltan Korcsok in for their hobby.” It’s
thusiasm of the engineers and the requirements that
offices in Hungary: the software engineers are in Szeged while the
one of iPONT’s “3D without
to determine exactly
public. There you’ll find large amounts can be found in Bekescsaba.
creative team 40,000 inhabitants and everywhere
an enthusiasm that Scott shares and that can glasses” auto-stereoscopic monitors. customers have for their signal
be employees operates
The company he managedreadily seen in
Pro
came to the conclusion that this would calls home, that currently has 40to become thetwo other was designed especially with the analyzers provides this
what “CLIK!” systems
Ervin Farkas takes care
offices
the company’s signal analyzers.in Hungary: the software engineers are in Szeged while the
of ore that can be turned into 2.iron; customers. of customer service for iPONT’s
professional you look you can see fabrication syscreative one be found in dealer
never components they would
happen to him again: to be in number team cansatellite Bekescsaba.in just a professionals in with anAnd there’s chance to grow in the world
company mind.” excellent still
need for a specific
2. Diana greets visitors at the reception desk. customer service for iPONT’s
2. Ervin Farkas takes care of
there are also quite a few rivers that tems with their superstructures anddistribution system. “The
it
charge of hisBut SAPRO doesn’t interfere with thanks to his extensive mar- more: “Soon we’ll be introducing an ad- with their robust signal
own time he had to start short time customers.
professional
market over the next 25 years
■ MEGASAT founder
online calculatorCamille Edmonds keeps track “Infinances and organizes the
supply water power as well as a large interconnecting pipes.
at all, 3. lets
rather, started as
pipe of 2002”, remembers Robby, justable monoblock LNB with which you
and General Manager
his own company.books.the this heatingketing. goes
He then
analyzers.
installer plan for an optimal
Sven for likes to
expanse of forest Melzerits enormous
perfectly with
“WS International sold roughly 200 sys- can set the offset anywhere between 4°
a dealer for DishNetwork in this company: composystem. After entering and installed
stay up to date with
and 10°. For installers we’re preparing
customer satellitefor satellite receivers have month.”
One of these pipes, an exteriorall the parameters, the After a few tems a been
supply of building materials. Because
TELE-satellite.
nents systems.
software produces a list
months components TELE-satellitehow danhe realized
Magazine —
1/201 — numbers in1
of all this, an enormous steel works heating pipe, passes just a few cen-of though132 along with developed here sinceyears sales www.TELE-satellite.coma toolbox that will contain all the tools
designed and — Global Digital TVOver the 10-1
signal business was: DishNetwork
level calculations at
gerous this
factory, the „Třinecké Železárny timeters away from manufacturer andevery endpoint.” You can
1992. It’s a perfect match creased steadily and one day, not sur- needed to install our products.”
for the inHow is Robby doing all of this? He
only paid the dealers when the custom- prisingly, he decided he no longer wantPacoima,
find the calculator at www.
(Třinec Steelworks)“ came into exis- wholesaler SAPRO’s building.
dustrial atmosphere here. SAPRO’s
clikulator.com
ers paid DishNetwork. All of the risk ed to be dependent on other importers started WS International in Atlanta
Fibre Optic Cables and Distribution, Switzerland www.hubersuhner.com

• Potential for receiver manufacturers to expand their STB’s to include
Address

HUBER+SUHNER AG
Degersheimerstrasse 14
9100 Herisau
SWITZERLAND
Tel +41-71-353-4111

www.TELE-satellite.com/TELE-satellite-1111/eng/huber+suhner.pdf

Megasat, Germany - Receiver and Wholesaler

R	
Manu
R	
Distr
R Whol
Shop
R Serv

First the USA,
then the world

www.TELE-audiovision.com/TELE-satellite-1109/megasat.pdf

GM

ë

California

www.TELE-satellite.info/11/09/megasat
Direct Contact to Sales Manager

Sven
Melzer

was in the hands of the dealers, a risk

and started up his own production line

• 80% of distributed products come from in-house MEGASAT brand
• full range of satellite components

Sapro, Czech - Receiver and Wholesaler

•	80%	of	distributed	products	come	from	
in-house	MEGASAT	brand
850 square meter company
premises that MEGASAT has
been occupying since 2010 in an
industrial area of Niederlauer.
The official company name is
b2c Electronic, even though
MEGASAT is used as brand
name vis-à-vis the outside
world.

Petr
Jana
Zwrtek square feet in size but only has
Proboszczová
5000

satellite reception of English-language under his own label. “This includes
programming in the USA is generally dishes as small as 75cm to as large as
www.TELE-satellite.com
monopolized by DishNetwork and Di- 4.5 meters”, lists Robby, “and in adrecTV, Robby looked around at other dition to cables and receivers, all the
TV programming. As a native from necessary accessories such as DiSEqC
Iran, the is the very young was and President
■ Robby Dosetarehobvious choice founderforeign switches.” He even has satellite signal
of satellite wholesaler and manufacturer the International.
2
language programming for WS ethnic analyzers. “Our model 5100 Pro can auHere we see him in his Pacoima, California office located
north minorities living he opened just There are
of Los Angeles that in the USA. one year ago tomatically recognize the satellite that
several of these groups that want TV a dish is pointing to”, highlights Robby
1
programming in their own language. and then continues,” The model 7100
Robby Dosetareh provides an overview
on these groups: “In my case of course,
the first group would be TV channels in
Farsi, after that it’s programming in Arabic, Vietnamese, Thai, Chinese, Russian, Armenian as well as the Englishlanguage Christian channels.” Most of
these TV channels, many of which are
produced locally in the USA, can be resons together make for ceived for free and thus makein very in- and
Thomson still existed a France
teresting product to offer these ethnic
quite an argument that BYA started off as an assembly line for
3
groups here in the USA.
exporting his dishes is Thomson’s TV sets. Not long after that,
Robby got right to work. From Mari126 TELE-satellite — Global Digital TV Magazine — 08-09/201
1
a good move to make. etta, Georgia, a small city near Atlanta
they began assembling analog satellite
Slimane Ait Yala: “I with 100,000 followed shortly thereafter
receivers inhabitants that he now

Owner

trade show in southern China and found
out that our prices
are competitive.” And
there’s
still
another
2
120 TELE-satellite — Global Digital TV Magazine — 08-09/201 — www.TELE-satellite.com
1
reason: BYA is not a small
company; they produce
quite a few other products
and thus have plenty of experi134 TELE-satellite — Global Digital TV Magazine — 08-09/201 — www.TELE-satellite.com
1
ence as a manufacturer.

l Bia. This city, with 20,000 inhabitnts, is located about 35km east of the
econd largest city in Algeria: Oran with
oughly 1.6 million people. The Port
rzew harbor is right next to Ain El Bia;
his is where Algeria’s national oil comany Sonatrach loads its oil tankers.

BYA was founded in 1993. Back then

TELE-satellite Magazine

Business Voucher
www.TELE-satellite.info/11/09/sapro
Direct Contact to Sales Manager

■ An external heating pipe runs right past SAPRO’s
administration, warehouse and production
buildings. The company is located in the industrial
city of Třinec in the northeastern end of The Czech
Republic, not too far from Ostrava.

reception hobby, he tests all the products himself and is
thereby able to immediately recognize any weak spots.

1. Alina Proboszcz is responsible for SAPRO’s bookkeeping and is
also the founder’s wife.

■ Joseph Bassala

Wholesaler and Manufacturer, USA

COMPANY REPORT
该独家报道由高级编辑所作

SAPRO

Manufacturer and Wholesaler, Czech Republic

www.sapro.cz

Company Details
Engineers in Research & Development | Total Number of Employees

3. Marek Roszka is Marketing Manager. You can see SAPRO’s

WS website on his monitor (www.sapro.cz) that he also maintains.
“I also translate
International,the user manuals”, says Marek who is fluent in
English and German.
USA Jana Proboszczová is Sales Manager for Slovakia and all of the
4.

▼
▼
0................................ 12 .................................. 25

International’s Sales Manager
in Los Angeles. He receives the
Lubomír’s schedule is full. With a
customer orders primarily of new products, he’s expandfrom
variety
those on the west coast of the
ing in the market as well as moving
USA
into the surrounding countries. Be-

Average Turnover (Previous, This, Next Year Estimates)

TELE-satellite Magazine
remaining countries.

GUARANTEE
direct contact

5. Service Technician Milan Martynek tests a satellite signal
analyzer that SAPRO distributes under its own brand name.

•	Successful	Young	Company	with	
Ambition

Production Certificates

DVB

6. Should there ever be any problems with a SAPRO receiver, the
returns land with Customer Service Manager Ester Vrábelová, who
scans the bar code of all incoming problem items.

•	Manufacturer	of	Satellite	
Components

Production Categories

own brands Di-Way, Di-Box, SatElita, Dreamsky, HD-Box
Main Products

Satellite Receivers for economic range, mid range and high
range, Wholesaler for LNBs, dishes, accessories

•	Plan	for	Worldwide	Expansion	with	
Satellite	Signal	Analyzers
•	Inexpensive	Products	Thanks	to	
Efficient	Production	and	Distribution

3

■ In this building in Pacoima, north
of Los Angeles, can be found WS
International’s west coast office/
warehouse

7. Service Technician Petr Schlesinger is at work repairing a
receiver circuit board.

132 TELE-satellite — Global Digital TV Magazine — 08-09/201 — www.TELE-satellite.com
1

www.TELE-satellite.com/TELE-satellite-1109/eng/sapro.pdf

Address in Czech Republic

Business Voucher

www.TELE-satellite.info/11/09/wsinternational
Direct Contact to Sales Manager

▼
0............................... 2.5 .....................5 Mio €uro

cause of his engineering background
and his personal love of his satellite

— www.TELE-satellite.com

2. Petr Zwrtek is Sales Manager for The Czech Republic. He is
showing us on the map where Třinec is located: right at the point
where The Czech Republic, Slovakia and Poland meet.

In this way he can be confident that the production line
only puts out products that meet his requirements. SAPRO
is on the way up.

Address in Slovakia

www.TELE-satellite.com — 08-09/201 — TELE-satellite — Global Digital TV Magazine
1

133

• Plan for Worldwide Expansion with Satellite Signal Analyzers
• Inexpensive Products Thanks to Efficient Production and Distribution
SAPRO s.r.o.
Konská - Podlesí 455
73961 Třinec
CZECH REPUBLIC
Tel +420-591008312

Download Report

SAPRO SK s.r.o.
SUPERSAT
ul. Slovanská cesta 672
www.TELE-satellite.com
PSČ 02 201 Čadca
SLOVAKIA
Tel +421-220-648942

— 08-09/201 — TELE-satellite — Global Digital TV Magazine
1

127

www.TELE-satellite.com/TELE-satellite-1109/eng/sapro.pdf

www.TELE-audiovision.com/TELE-satellite-1107/bya.pdf
7

COMPANY REPORT
该独家报道由高级编辑所作

Dish and Receiver Manufacturer BYA, Algeria

Perforated
Dishes from
Algeria

ë

Ain El Bia
(Oran, Algeria)

Alexander Wiese

ter of 2011 we’ll be coming out with
an Android based receiver under
the Dreamsky brand name; this will
be followed by a DVB-T2 receiver in
2012.” For the HD-Box and Dreamsky
line of receivers, 2012 will bring with
it a number of enhancements related
to the Internet: “The Dreamsky se136 TELE-satellite — Global Digital TV Magazine — 08-09/201 — will see a box with IPTV enhance1
ries www.TELE-satellite.com
ment”, he reveals to us, “For cable
operators we are planning a DVB-C
receiver.”

126 TELE-satellite — Global Digital TV Magazine — 08-09/201 — www.TELE-satellite.com
1

119

6
www.TELE-audiovision.com/TELE-satellite-1109/wsinternational.pdf

Slimane
Ait Yala

Lubomír’s schedule is full. With a
variety of new products, he’s expanding in the market as well as moving
into the surrounding countries. Because of his engineering background
and his personal love of his satellite

reception hobby, he tests all the products himself and is
thereby able to immediately recognize any weak spots.
In this way he can be confident that the production line
only puts out products that meet his requirements. SAPRO
is on the way up.

1. Alina Proboszcz is responsible for SAPRO’s bookkeeping and is
also the founder’s wife.
2. Petr Zwrtek is Sales Manager for The Czech Republic. He is
showing us on the map where Třinec is located: right at the point
where The Czech Republic, Slovakia and Poland meet.

With a new series of satellite dishes

contested satellite dish market? It won’t
be easy for BYA, but there are several

Slimane Ait Yala, founder of BYA, gives us
the reasons for this optimism.

SAPRO

www.sapro.cz

Company Details
▼
▼
0................................ 12 .................................. 25

4. Jana Proboszczová is Sales Manager for Slovakia and all of the
remaining countries.

Average Turnover (Previous, This, Next Year Estimates)

▼
0............................... 2.5 .....................5 Mio €uro

5. Service Technician Milan Martynek tests a satellite signal
analyzer that SAPRO distributes under its own brand name.

Production Certificates

6. Should there ever be any problems with a SAPRO receiver, the
returns land with Customer Service Manager Ester Vrábelová, who
scans the bar code of all incoming problem items.

DVB
Production Categories

own brands Di-Way, Di-Box, SatElita, Dreamsky, HD-Box
Main Products

Satellite Receivers for economic range, mid range and high
range, Wholesaler for LNBs, dishes, accessories

www.TELE-satellite.com/TELE-satellite-1109/eng/sapro.pdf

Address in Czech Republic

SAPRO s.r.o.
Konská - Podlesí 455
73961 Třinec
CZECH REPUBLIC
Tel +420-591008312

Aside from that, the necessary
metal for their dish production is produced domestically. All of these rea-

Address in Slovakia

www.bya-electronic.com

7. Service Technician Petr Schlesinger is at work repairing a
receiver circuit board.

SAPRO SK s.r.o.
SUPERSAT
ul. Slovanská cesta 672
www.TELE-satellite.com
PSČ 02 201 Čadca
SLOVAKIA
Tel +421-220-648942

— 08-09/201 — TELE-satellite — Global Digital TV Magazine
1

127

Thomson still existed in France and
BYA started off as an assembly line for
Thomson’s TV sets. Not long after that,
they began assembling analog satellite
receivers followed shortly thereafter
by digital receivers. “Back then we had
90 employees”, remembers Slimane Ait
Yala, “and we had sales equivalent to
about eight million Euros.” BYA was at

■ Slimane Ait Yala is General Manager (PDG: Président Directeur Général) and

founder of BYA. BYA actually gets its name from the name of the location: Ain El Bia.
Bia was converted to BYA.

Company Details
Engineers in Research & Development | Total Number of Employees

▼
▼
0................................ 75 ................................ 150
Average Turnover (Previous, This, Next Year Estimates)

▼
0.................................. 5 ...................10 Mio €uro
Production Certificates

RoHS, DVB
Production Categories

OEM, ODM
Main Products

www.TELE-satellite.com/TELE-satellite-1103/eng/bya.pdf

Satellite Dishes with Full and Perforated Metal (60, 105 and
120cm), TV-Sets with CRT, LCD (32 and 40 inch) or Plasma (42
and 50 inch), Satellite Receiver for DVB-S/S2

TELE-satellite World

www.TELE-satellite.com/...

Download this report in other languages from the Internet:

Arabic
Indonesian
German
English
Spanish
French
Hebrew
Chinese
Polish
Portuguese
Russian	
Turkish

144 TELE-satellite — Global Digital TV Magazine — 06-07/201 — www.TELE-satellite.com
1

Engineers in Research & Development | Total Number of Employees

sons together make for
quite an argument that
exporting his dishes is
a good move to make.
Slimane Ait Yala: “I
was just at the Canton
trade show in southern China and found
out that our prices
are competitive.” And
there’s
still
another
reason: BYA is not a small
company; they produce
quite a few other products
and thus have plenty of experience as a manufacturer.
BYA was founded in 1993. Back then

And this is the first reason why Slimane Ait Yala is confident that the
dishes he manufactures will be successful in the export market: “Algeria is
an oil-producing country”, he explains,
“and that means that the energy costs
in Algeria are very low.” He follows right
away with the second reason: “Wages
in Algeria are also very low; the official
minimum wage is about 100 Euros.”

BYA

Dish and Receiver Manufacturer, Algeria

manufacturer BYA Electronic wants to
start an export offensive. Are there
reasons to expect success in the strongly

reasons which would make one optimistic.

Manufacturer and Wholesaler, Czech Republic

The 16,000 squaremeter production
plant can be found in the city of Ain
El Bia. This city, with 20,000 inhabitants, is located about 35km east of the
second largest city in Algeria: Oran with
roughly 1.6 million people. The Port
Arzew harbor is right next to Ain El Bia;
this is where Algeria’s national oil company Sonatrach loads its oil tankers.

made out of perforated metal, Algerian

3. Marek Roszka is Marketing Manager. You can see SAPRO’s
website on his monitor (www.sapro.cz) that he also maintains.
“I also translate the user manuals”, says Marek who is fluent in
English and German.

218 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

And this is the first reason why Slimane Ait Yala is confident that the

www.TELE-satellite.com — 08-09/201 — TELE-satellite — Global Digital TV Magazine
1

7

5

GM

•	In-house	design	and	production	
(assembly	line)

•	Produces	100,000	receivers	per	year

118 TELE-satellite — Global Digital TV Magazine — 08-09/201 — www.TELE-satellite.com
1

coming out with
receiver under
the Dreamsky brand name; this will
be followed by a DVB-T2 receiver in
2012.” For the HD-Box and Dreamsky
line of receivers, 2012 will bring with
it a number of enhancements related
to the Internet: “The Dreamsky series will see a box with IPTV enhancement”, he reveals to us, “For cable
operators we are planning a DVB-C
is receiver.”
WS

90 employees”, remembers Slimane Ait
Yala, “and we had sales equivalent to
about eight million Euros.” BYA was at

BYA, Algeria - Dishes and Receiver

R	
Manu
R	
Distr
Whol
Shop
The 16,000 squaremeter production
Serv
lant can be found in the city of Ain

•	Covers	every	price	segment	with	its	
four	brand	names
•	Starting	expansion	to	surrounding	
countries

is
Expanding

• In-house design and production (assembly line)
• Produces 100,000 receivers per year

Joseph
Bassala

Young Company with Ambition
• Manufacturer of Satellite Canton by digital receivers. “Back then we had
Components
was just at the

Manufacturer and Wholesaler SAPRO, Czech Republic

COMPANY REPORT
该独家报道由高级编辑所作

three employees: Sales Manager Joseph Bassala, who Robby can speak to
in Farsi, Shipping Manager Jeff Bynum
and a warehouse employee. “We also
have one more employee in our Guang5
zhou, China office who takes care of
production and overseas transport”,
adds Robby.
ter of 2011 we’ll be
an Android based
How successful is WS International?

Sales

Robby
Dosetareh

103

6

Lubomír
Proboszcz

Ain El Bia
(Oran, Successful
• Algeria)

www.TELE-satellite.com — 08-09/201 — TELE-satellite — Global Digital TV Magazine
1

www.TELE-audiovision.com/TELE-satellite-1109/sapro.pdf
SAPRO
Sales

WSInternational, USA - Receiver and Wholesaler

ë

•	special	focus	on	self-aligning	camping	
antennas
•	distribution	to	the	whole	of	Europe

102 TELE-satellite — Global Digital TV Magazine — 08-09/201 — www.TELE-satellite.com
1

• special focus on self-aligning camping antennas
• distribution to the whole of Europe

Sales

• Covers every price segment with its four brand names
• Starting expansion to surrounding countries

R	
Manu
R	
Distr
R Whol
Shop
Serv

•	full	range	of	satellite	components

■ In front of the entrance to the

(more precisely Marietta). There are six

Owner

104 TELE-satellite — Global Digital TV Magazine — 08-09/201 —
1

“In the Heart of
Germany”

TELE-satellite Magazine

Business Voucher

Robby Dosetareh patiently built up years old, the family had
with the help of an office in Guangzhou employees in the 4600 square foot ofthat was difficult to calculate.
his company WS International one an opportunity to flee the
Robby Dosetareh decided that there in southern China. “Today we produce fice/warehouse: “Two sales managers,
small step at a — 10-1 He’s still young country, first to Pakistan
142 TELE-satellite — Global Digital TV Magazine time.1/201 — www.TELE-satellite.com
1
LNBs as well as 75cm and 90cm satellite a technical support manager, an assisand since he has already brought his and then for a few months was no future in this! Since he had aldishes ourselves”, comments Robby. In tant as well as two employees in the
company quite a long way in the USA, to Austria. The UN acquired ready sold systems and components to
installers in the past, he decided to be- 2009 his1own receiver line that Robby warehouse”, explains Robby. To better
his expansion to the rest of the world all the necessary paperwork as
fishouldn’t
■ SAPRO’s Founder have any obstacles. In July well as the required visas and come a satellite wholesaler. “On April named Lexium was also added to the serve his customers on the west coast,
and Chief Lubomír opened a 2nd distribution nally in April 1992 the family arrived
1, 2001, I founded WS International”, palette. There’s even a website under Robby opened a branch office in Paco2010 he
Proboszcz standing offices in the small town of in their land of their dreams remembers Robby Dosetareh. Robby, offer name: www.lexium-dvb.com. “In ima, California, near Los Angeles. Not
communications, he accepted an this
– USA.
branch &
in front of a Pacoima, California in order to —make They ended up in —Atlanta, Georgia on from had no business experi- began we sold roughly 30,000 DVB-S re- long after that he decided to move out
cabinet
18 TELE-satellite
Global Digital TV Magazine — 06-07/201
1
www.TELE-satellite.com
2010
who actually a DishNetwork dealer and
full of SAPRO cost efficient for customers in the the US east coast.
working there as a very courait
Robby Magazine —
ence or background, was Sales Manager. ceivers”, says Global Digital TVand then explains to Los Angeles himself. “Since then I go4
receivers. In his
18 TELE-satellite —
1
After a few months his
Young Robby came to a newgeous in this decision and had father became a DVB-S2 variant of this06-07/201 — www.TELE-satellite.com
world,
Western part of the USA and Canada.
receiver back to visit the Atlanta office every two
at the that
hand is the flagship
ill and Robby Dosetareh had to help him
That’s where we met up with Robby a place where it’s normal to get a free
product, a box from
same time a little foresight: the WS in will be available by the time this issue months for one week”, says Robby. He
communicate with the doctors; his fathe HD-Box Dosetareh. He explains to us how it all glass of water in a restaurant. The
series.
is proud to say that he has employees
the company name stands for “World of TELE-satellite hits the newsstands.
ther’s English wasn’t good enough. Unteenager quickly acclimated himself to
began.
Since 2010 Robby has built up his in Atlanta that can operate the business
Satellites”.
fortunately, his time off from the DishRobby Dosetareh was born and his new surroundings. After graduatBut the Network dealer company name much
“World” in his was getting too product palette to the point that any without him having to constantly look
raised in Shiraz, Iran. But his father ing from High School, he immediately
component that an installer could pos- over their shoulders.
and towards the end field that
was stands for the businessof 2000 the dealer
was watched and mistreated by the re- joined the work force. Since he also alThe branch office in Los Angeles is
he selected for his company. Robby the sibly need can be obtained from him
had to let him go. Since Dosetareh
gime at that time. When Robby was ten ways interested in electronics and tele-

R	
Manu
R	
Distr
R Whol
Shop
Serv

Wholesaler and Manufacturer MEGASAT, Germany

COMPANY REPORT
该独家报道由高级编辑所作

4

‫العربية‬
Indonesia
Deutsch
English
Español
Français
‫עברית‬
中文
Polski
Português
Русский		
Türkçe

www.TELE-satellite.com/TELE-satellite-1107/ara/bya.pdf
www.TELE-satellite.com/TELE-satellite-1107/bid/bya.pdf
www.TELE-satellite.com/TELE-satellite-1107/deu/bya.pdf
www.TELE-satellite.com/TELE-satellite-1107/eng/bya.pdf
www.TELE-satellite.com/TELE-satellite-1107/esp/bya.pdf
www.TELE-satellite.com/TELE-satellite-1107/fra/bya.pdf
www.TELE-satellite.com/TELE-satellite-1107/heb/bya.pdf
www.TELE-satellite.com/TELE-satellite-1107/man/bya.pdf
www.TELE-satellite.com/TELE-satellite-1107/pol/bya.pdf
www.TELE-satellite.com/TELE-satellite-1107/por/bya.pdf
www.TELE-satellite.com/TELE-satellite-1107/rus/bya.pdf
www.TELE-satellite.com/TELE-satellite-1107/tur/bya.pdf

Available online starting from 3 June 2011

■ BYA’s production facility

in Ain El Bia east of Oran in
Algeria

146 TELE-satellite — Global Digital TV Magazine — 06-07/201 — www.TELE-satellite.com
1
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

219
ity of Ku-band LNBs to a staggering one
million a month.

When we heard him mention Brazil,
our ears perked up. “We’ve been delivering C-band LNBs to Brazil since 2004
but demand has recently taken a strong
jump
upwards”,
revealed
Hoawen
Chiang, “In fact, for 2011 we’re expecting that 35% of our LNB production will
be delivered to Brazil.”

Of course, we want to know where
all these LNBs are going to. “In the
beginning, we delivered our production
to Indonesia and Thailand”, explains

North America, Australia and Europe.”
But in 2011, Jason Chiang sees these
numbers shifting considerably: “The
North African market will pick up quite
a bit; we expect to ship 30% of our total
production there, 45% will go to the
Middle East, 5% to South Africa, 10% to
Brazil with another 10% going to the rest
of the world.”

TELE-audiovision Global Company Directory
Hoawen Chiang’s son
Jason Chiang also
works
for
the
company.
He’s
1
currently passing
through a number
of stations in the
company but above all
he‘s involved in International Sales. He breaks down
for us the product distribution by
groups; the geographical distribution

Boiingsat, China - LNB

R	
Manu
	 Distr
Whol
Shop
Serv

GM

Haowen
Chiang

■ Haowen Chiang

Boiingsat’s founder
and General
Manager

Once again Brazil is mentioned but this
time in connection with Ku-band LNBs.
Jason Chiang revealed a little secret: “I
have good contacts in Brazil.” That along
with the steadily increasing demand in
that South American country makes for
4
a very attractive market.

3
www.TELE-audiovision.com/TELE-satellite-1105/boiingsat.pdf
Sales

Co-Owner

COMPANY REPORT

•	Three	Production	
Locations	in	Zhuhai/
China

•	Large	Sales	Expansion	
in	South	America
•	In	the	Works:	LNB	
with	Two	Feed	Rings

It’s common knowledge how prices for
LNBs have been falling considerably and
when General Manager Hoawen Chiang

LNB Manufacturer Boiingsat operates
multiple production facilities in Zhuhai,
China, a city with 1.5 million inhabitants
located in western Guangdong Province. Zhuhai sits right next to Macao and
slowly but surely is attracting more and
more satellite component manufacturers.

remembers Hoawen Chiang. “Two of the
investors have in the meantime moved
on to other things but investor, Yunnjye
Qin, is still here and is in charge of Production.”

tence since 1997. However it all really
started in Taiwan. Hoawen Chiang, General Manager of the company who was
also born in Taiwan, explains to us how
it all began.

“In 1996 I was a Production Manager
at an LNB manufacturer in Taiwan. But
things didn’t go exactly as I had planned
so in 1997 I along with three investors
founded Boiingsat in Zhuhai, China”,

But one of the first of these manufacturers was Boiingsat; it has been in exis-

tion plant which they used to manufacture 240,000 C-band LNBs
every month.
2004 became rather turbulent: “We sold our first
production facility and
then built a new one for
Ku-band LNBs.” Now
with 500 employees,
production
climbed
to 350,000 C-band
LNBs per month and
150,000 Ku-band LNBs
per month.

The main reason for moving from
Taiwan to China was obviously the costs.
Wages in China are still lower than that
of Taiwan. “But we still have a small R&D
office in Taiwan with three engineers”,
says Hoawen Chiang. Thus far the technical expertise in Taiwan is somewhat
more advanced than in Mainland China
at least as far as high frequency LNBs
are concerned.

Jason
Chiang
www.TELE-satellite.com — 04-05/201 —
1

87

TELE-satellite — Global Digital TV Magazine

• In the Works: LNB with Two Feed Rings
www.TELE-audiovision.com/TELE-satellite-1105/bomare.pdf

R	
Manu
	 Distr
Whol
Shop
Serv

Technical
Manager
Tewfik
Lamrani

COMPANY REPORT

TV-Sets and Receiver Manufacturer Bomare Company, Algeria

Bomare Company:
a new OEM
Manufacturer

ë

enough: one day it dawned on him that
he could assemble these receivers on
his own production line. Together with

The industrial city of Birtouta is very
conveniently located: the airport, harbor
and numerous highways are all within
easy reach. It is an excellent location
especially for a company that wants to
expand its export business.
It all started many years ago with
the distribution of satellite receivers.
The founder, Ali Boumediene imported
receivers from South Korea and sold
them locally. But for him it wasn’t

Birtouta
(Algiers)

a South Korean manufacturer that supported him with not only the components
but also the “know-how” in setting up an
assembly line, Ali Boumediene started
his own production in 2001. Back then 20
employees assembled digital receivers
using the supplied components. Today
Bomare Company has 120 employees.
Right from the start Ali Boumediene
had a great idea: he chose the brand
name “Stream System” for his line of
receiver products. An excellent choice
considering that in today’s IPTV age
everything revolves around streaming.
But lets get back to the beginning:
in 2003 Ali Boumediene took the next
expansion step. He created his own
production line for power supplies and
then in 2006 he took one more step by
investing two million Euros and install-

In 2005 the European Union entered into an
agreement with the Democratic Peoples Republic
of Algeria to support economic cooperation between
the two. This agreement provides an interesting
opportunity for satellite receiver manufacturers
and, in the case of the Algerian Bomare Company, also
for TV manufacturers. Actually, Bomare Company produces both products. For 2011
Bomare Company has decided to take their products and service capabilities to the
European market. We paid a visit to
Bomare Company’s production facility

1. Annie greets visitors at the reception desk

ing an SMT line in a new production
facility complete with automatic component mounting machines and an oven.
Bomare Company also owns a unit of
plastic injection and silkscreen painting
Technical Director Tewfik Lamrani
gives us some insight into their production numbers: “From 2001 to 2007
we produced a total of three million SD
receivers.”
Production numbers dropped every
year because of the ever-increasing competition with imported receivers. But Ali
Boumediene also managed to find a solution to this: he simply started a second
assembly line to produce TVs. “We are

in Birtouta, about 20km from Algiers,
and had a look around.

2. Yunnjye Qin is co-owner of Boiingsat and in charge of production.

BOMARE

TV and Receiver Manufacturer, Algeria

especially proud of our LCD TVs with
integrated DVB-T tuners”, commented
Tewfik Lamrani whose five-member R&D
team developed this TV. “Now we also
manufacture HD TVs”, says Tewfik and
explains why now is the right time to
begin exporting their products: “In the
past several years we learned how to
start a production line.”
The old adage holds true: “You learn
from your mistakes”; Bomare Company
has accepted all of the setbacks and over
time has become a professional manufacturer.
“Now we have the right products and
now we know how to make them”, says
Tewfik Lamrani, “And now the time has
come to start exporting.” Bomare Company is not only going to export their own
products such as HD receivers and LCDTVs in various sizes from 19” to 47”, but
they are now ready to become an OEM or
ODM maker for other manufacturers and
distributors primarily in Europe.
Tewfik Lamrani gives us a few reasons
why Bomare Company with its location
in Algeria would be a good choice: “We
are in the same time zone as Europe, we
speak the same languages (French and
English), we can ship economically to
Europe, we provide a high-quality product and our production follows the RoHS
directive and just recently also the Euro
1 Norm.”
The subject of quality control is especially critical for the export market: “Five
engineers are directly involved with
quality control during production (preproduction) and five additional engineers
www.bomarecompany.com

Company Details
Engineers in Research & Development | Total Number of Employees

▼
▼
0................................ 75 ................................ 150

■ Even in Algiers it rains occasionally

3. Jason Chiang is the son of the company’s founder and designated successor to the Captain’s chair. Here in the showroom he
shows us one of the company’s specialties: a four-way combination with 4 x C-band LNB. This LNB lets four receivers receive
four C-band satellites independently from each other; this setup is
especially in demand in Indonesia.

2

1

and when it does it pours: a look at
Bomare Company’s production facility
in Birtouta not far from the capital
Algiers. Working hours are from
8AM-12PM and 1PM-5PM Sunday to
Thursday (they are closed Friday and
Saturday).

Average Turnover (Previous, This, Next Year Estimates)

▼
0............................. 12.5 ...................25 Mio €uro
Production Certificates

RoHS, DVB
Production Categories

OEM, ODM
Main Products

LCD and Plasma TV-Sets with integrated DVB-Tuner, Satellite
Receiver for DVB-S/S2, DVB-T, Home Theatre Systems
www.TELE-satellite.com/TELE-satellite-1103/eng/bomare.pdf

TELE-satellite World

www.TELE-satellite.com/...

Download this report in other languages from the Internet:

Arabic
‫العربية‬
www.TELE-satellite.com/TELE-satellite-1105/ara/bomare.pdf
Indonesian Indonesia www.TELE-satellite.com/TELE-satellite-1105/bid/bomare.pdf
German
Deutsch
www.TELE-satellite.com/TELE-satellite-1105/deu/bomare.pdf
English
English
www.TELE-satellite.com/TELE-satellite-1105/eng/bomare.pdf
Spanish
Español
www.TELE-satellite.com/TELE-satellite-1105/esp/bomare.pdf
French
Français www.TELE-satellite.com/TELE-satellite-1105/fra/bomare.pdf
Hebrew
‫עברית‬
www.TELE-satellite.com/TELE-satellite-1105/heb/bomare.pdf
中文
www.TELE-satellite.com/TELE-satellite-1105/man/bomare.pdf
Chinese
Polish
Polski
www.TELE-satellite.com/TELE-satellite-1105/pol/bomare.pdf
Portuguese Português www.TELE-satellite.com/TELE-satellite-1105/por/bomare.pdf
Russian	
Русский		 www.TELE-satellite.com/TELE-satellite-1105/rus/bomare.pdf
Turkish
Türkçe
www.TELE-satellite.com/TELE-satellite-1105/tur/bomare.pdf

Available online starting from 1 April 2011

www.TELE-satellite.com — 04-05/201 —
1

102 TELE-satellite — Global Digital TV Magazine — 04-05/201 — www.TELE-satellite.com
1

TELE-satellite — Global Digital TV Magazine

103

2
4. Sales Manager Joseph Liu runs a team of six employees

Prevail, China - Fibre Optics and CATV

www.TELE-audiovision.com/TELE-satellite-1105/prevail.pdf
Production
Manager
such an increase in sales, could it? “Well,
actually, we’re expecting this increase in
Ren
sales also because we’re expanding into
a new business sector; in 2012 we’ll be
Guorui
opening up a new factory for LED lights.

90 TELE-satellite — Global Digital TV Magazine — 04-05/201 — www.TELE-satellite.com
1

R	
Manu
	 Distr
Whol
Shop
Serv

Zhuhai

China; soon it’ll be four factories. The company’s
administration offices can also be found here.

86 TELE-satellite — Global Digital TV Magazine — 04-05/201 — www.TELE-satellite.com
1

Bomare, Algeria - Receiver

ë

The next expansion
step took place in 2008:
“We constructed our third
factory this time for production of die-cast housings.” With

“Back then we started with 30 employees and produced 20,000 C-band LNBs
every month”, he says looking back. In
2002 Boiingsat started a second produc-

■ One of Boiingsat’s three factories in Zhuhai in southern

Yunnjye
Qin

• Three Production Locations in Zhuhai/ China
• Large Sales Expansion in South America

Sales

Sales

COMPANY REPORT

Fiber Optic and CATV Manufacturer Prevail, China

Prevail’s
Perfect
Organization

•	Substantially	Increased	Sales	for	
2011	Thanks	to	Rising	Exports
•	Additional	Factory	Soon	to	be	in	
Operation
•	Increased	Number	of	Employees

•	Four	New	SMT	Machines	in	Operation
•	Very	Active	R&D	Team

ë

A recipe for the continued success of a manufacturer is a wellorganized operation. A perfect example of this would have to be
the Chinese manufacturer Prevail located in Hangzhou, the capital
of the Zhejiang Province which is south of Shanghai. This company
manufactures fiber optic products, CATV components and professional digital TV modulators and accessories for signal distribution.

Hangzhou

The first thing you notice when you visit Prevail is how neat and
clean the entire factory is; nothing is out of place. Another small
detail are the uniforms that the employees wear. It’s not out of the
ordinary to see workers on an assembly line wear uniforms, but
at Prevail the office workers also wear uniforms. For the visitor it

■ Two of the three Prevail
factories in Xiaoshan in
Hangzhou City in, China.
The fourth is under
construction.

COMPANY REPORT

Necy-xu

becomes immediately clear that the work here is very disciplined and organized. And of course the products themselves
would also be associated with this high standard.
To confirm this we paid a visit to the three manufacturing
plants and had a look around; a fourth factory is currently
under construction.
Necy-xu is General Manager Sales & Marketing and provides
us with a little history about the company: “Prevail was founded
in 2001 by Managing Director Xu Quanhai along with ten other
partners.” The company is in private hands and continues to
manufacture the same product groups that it did at the beginning: fiber optic products, CATV components and accessories
as well as distributors and splitters for coaxial cable lines.
Necy-xu remembers the early days: “In our first year 2001
we had sales of roughly 50 million RMB (5 million Euros) with
about 100 employees. 70% were domestic sales and the rest
were exported.”

Helen

Receiver Manufacturer Sowell, China

For 2010, however, this changed considerably. Necy-xu
revealed to us that now only 50% of their products are sold
domestically in China; exports have increased markedly. To
what countries and regions does Prevail export to?
Helen is Prevail’s International Sales Manager and tells us,
“40% of our exports end up in the south Asian region and this
includes India, Pakistan, Indonesia, The Philippines, Thailand
and Vietnam. 30% land in South America, 20% go to Europe
and the rest go to The Middle East, North America and Africa.”

Necy-xu adds that sales in South America have picked up
quite a bit and that Prevail is shipping more and more products
to that region: “The cable TV providers there are expanding

112 TELE-satellite — Global Digital TV Magazine — 04-05/201 — www.TELE-satellite.com
1

• Founded by 5 Partners

Jiuzhou, China - IPTV Boxes

ë

TELE-satellite — Global Digital TV Magazine

113

But back to LNBs. Sales Manager Jason
Chiang tells us that in 2009 70% of all
the LNBs shipped were single models. In
2010 that number dropped to 50% and
it will obviously continue to sink. Single
Jiuzhou greatly expands into
LNBs will cease IPTV Box Production in a few years. ë
to exist
Twin models made up 35% of the total
in 2010; the rest consisted of quad and
octo models.

www.TELE-audiovision.com/TELE-satellite-1103/jiuzhou.pdf
Vice
Marketing
PC Card Manufacturer Tenow, China
PC Card REPORT
COMPANY REPORT COMPANY Manufacturer Tenow, China
PC Card Manufacturer Tenow, China
COMPANY REPORT
3
4
PC Card Manufacturer Tenow, China
COMPANY REPORT
Huang
Jimmy
2
2
The time has come for new models.
1. Necy-xu is General Manager
know-how and that therefore cable operators
on the rise: now about 450 employees work
Wei
Zhang
Jason Chiang gives us some insight:
Sales and Marketing and takes

• ISDB-T and DVB-T2 Receiver in 2011

• Overseas Offices in the Plan
•	IPTV	box	production	
• User Friendliness is Company
may	reach	1	million	
Philosophy
units	in	2011
A team of five R&D engineers are the
company Sowell.
General Manager
of the young company is Eagle Chain.

1

Sales

Shenzhen

COMPANY REPORT

IPTV Box Manufacturer Jiuzhou, China

Shenzhen

•	IPTV	box	production	
may	reach	1	million	
units	in	2011

•	Jiuzhou	starts	HbbTV	
boxes	for	Europe

•	Big	retailers	about	to	
launch	into	IPTV	box	
sales
•	Jiuzhou	to	attend	all	
major	exhibitions	in	
2011,	10	in	all

felt the same way and so in
2004 they founded their own
company Sowell.

•	Jiuzhou	starts	HbbTV	 OEM
founders of the
The
boxes	for	Europe driving force and

1

in Pevail’s entrance lobby.

Prevail achieved sales of 200 million RMB (roughly 20 million Euros) in 2010. The number of employees has also been

• Four New SMT Machines in Operation
• Very Active R&D Team

TELE-satellite — Global Digital TV Magazine — 04-05/201 — www.TELE-satellite.com
1

IPTV Box Production

■Two elephant statues greet visitors

significantly and we have exactly the right products for them.”
Exports to South America look to sharply increase for 2011,
but Eastern Europe is also rapidly on the rise.

www.TELE-satellite.com — 04-05/201 —
1

In 2013 we expect that 30% of our sales
will be from LEDs with the rest coming
from LNB production.” OK, now the picture is getting clearer.

IPTV for
• Substantially Increased Sales Box Manufacturer Jiuzhou, China to Rising Exports
COMPANY REPORT
Sowell,2011Engineering Firm
an Thanks
88
• Additional Factory Soon to be in Operation
that’s an OEM
• Increased Number of Employees
Jiuzhou greatly expands into

R	
Manu
	 Distr
Whol
Shop
Serv

LNB Manufacturer Boiingsat, China

Boiingsat’s Numerous
Production Facilities

deal of thought must go into what features are currently in demand. In talking
with Eagle Chain it’s clear that quite a
bit of observation and analysis is going

■ Sales Director Huang Wei is,

amongst many other tasks, in charge
of the IPTV boxes‘ development,
sales and marketing

The Chinese large manufacturer Jiuzhou is very well known by our readers.
The company originated in Sichuan and
has been in existence since 1958. In
2008 they celebrated their 50th birthday
(see TELE-satellite issue 02-03/2008).
In 2009 the company expanded into
HDTV and in 2010 terrestrial TV was
the theme. In 2011 Jiuzhou is planning
on taking a huge step further into the
IPTV market with enormous production
numbers. Huang Wei is Jiuzhou’s Sales
Director and reveals to us what Jiuzhou
has planned for 2011.

He was, like his
We met up with General Manon. Eagle Chain cites an example: “I’m
•	Big	retailers	about	to	 four colleagues, an R&D
employee with a large receiver manufacager Eagle Chain in Sowell’s office amazed with Apple and their products.
launch	into	IPTV	box	 time didn’t feel so comfort- in Shenzhen who started off by telling
turer but over
They are precisely geared
this the
at Prevail. But for us how itNecy-xu“All we had was the prefer to tackletowardson their own. This is not
2011 all began: is extremely
Sowell’s■
able with that company. All too often he
end-user and thus very successful.” The with
sales
offices
was assigned projects that had nothing
money we had saved while employed
conclusion according to Eagle 70 employees
their
true for accessoriesChain:
although cable operators
excited: “The number of our employees will

First, though, Sales Director Huang
Wei took us on a trip into the past: “The
first IPTV boxes were manufactured by
Jiuzhou in 2007; back then about 20,000
boxes were produced and involved pure
IPTV boxes.” Production numbers only
increased slowly. “In 2010 we produced
60,000 boxes”, comments Huang Wei.
But 2011 looks to be completely different: “We will be manufacturing a
minimum of 200,000 boxes and it could
go as high as one million.” It all depends
on negotiations that are currently in
progress with a variety of retail chains
in North America as well as Europe.
The reason: these retail chains are in

■ Jiuzhou constructed an impressively large
building in Shenzhen’s High-Tech Park. The
engineers are here continuously working
on new products – currently they’re mostly
occupied with IPTV.

care of the company’s exposure,
such as, at trade shows and in the
press.

“In the second quarter of 2011 we’ll be
releasing a Ku-band LNB with a shorter
housing, for the third quarter there’ll be a
Ku-band LNB with only two rings instead
of the previous three rings in the feed.
For the fourth quarter we’re planning on
an SCR LNB.” So, it’s plain to see that
there are several new products coming
Sowell, an Engineering all”, he says,
for 2011. “But that’s not Firm
that’s an OEM
“In 2012 we’ll be startingë with Ka-band
64 TELE-satellite — Global Digital TV Magazine — 02-03/201 — www.TELE-satellite.com
1

www.TELE-satellite.com — 02-03/201 —
1

TELE-satellite — Global Digital TV Magazine

65

•	Jiuzhou	to	attend	all	 climb
• IPTV box production may reach 1tomillion units in a jump are still the largest customers for this product 2. retailers about to launch into IPTV box sales
2011
• Big Helen
over
TELE-satellite World 500 and we also expect
revealed his sales figures, a tendency in is Internationalsurprised us with his prognosis
then he Sales
major	exhibitions	in	
■
as
they need
in
Prevail
is
• Jiuzhou starts HbbTV boxes for sales.”be on theisShanghai Stock Exchange Shenzhen well since Shenzhenwas clearly visible:Managerwithfor constantly“We expect sales to jump to
Europe actually optimistic that group products. direction large numbersJiuzhou to2013:all in
• of contact andcustomers over all major exhibitions in 2011, 10 in all
attend
that
“For
2011,	10	in	all
Shenzhen
these
they can
to do with receivers. His four colleagues

are with on softwith that other company. We pooled
“We have a similar view locatedour the seventh
floor of this office building in
ware development, namely Receiver production
Shenzhen. a customerDownload this report in other languages from the Internet:
friendly operation takes place in Baoan which isn’t
of our products.” It is
Sales Director Huang Wei is,
Arabic
‫العربية‬
www.TELE-satellite.com/TELE-satellite-1103/ara/jiuzhou.pdf
too
exactly for this reason far from here and close to
that Eagle Chain
Indonesian Indonesiaamongst many other tasks, in charge
www.TELE-satellite.com/TELE-satellite-1103/bid/jiuzhou.pdf
Shenzhen’s airport. 200 employees
the IPTV boxes‘ development,
German
Deutsch ofwww.TELE-satellite.com/TELE-satellite-1103/deu/jiuzhou.pdf
is skeptical about how IPTV will develop;
work in the production facility.
English
English sales and marketing
www.TELE-satellite.com/TELE-satellite-1103/eng/jiuzhou.pdf
the world. She can often be found
200,000 receivers a month can
Shenzhen
for TELE-satellite though, it’s per subject be
Spanish in Español
www.TELE-satellite.com/TELE-satellite-1103/esp/jiuzhou.pdf
produced by one
2012. That’s quite an achievement for such is being approached veryshift; if all three
at trade shows at the Prevail
that
ecstatiFrench
Français www.TELE-satellite.com/TELE-satellite-1103/fra/jiuzhou.pdf
shifts are used, receiver
Hebrew
‫עברית‬
www.TELE-satellite.com/TELE-satellite-1103/heb/jiuzhou.pdf
stand.
cally: “The large international climbs to
providers all
The Chinese large manufacturer Jiu- a young company!
As an telecom production company, Prevail can be
中文
www.TELE-satellite.com/TELE-satellite-1103/man/jiuzhou.pdf
Chinese
more selling
delivering own agenda and that ter■ Jimmy Zhang
have their the programming either is than 500,000
zhou is very well known by our readers.
Polish
Polski
www.TELE-satellite.com/TELE-satellite-1103/pol/jiuzhou.pdf
3. This man is very critical for a
boxes a month.
is Marketing Vice
restrially or via satellite. With IPTV they shows. International
found at numerous trade
Portuguese Português www.TELE-satellite.com/TELE-satellite-1103/por/jiuzhou.pdf
their data packages to end-users;
Manager and deals
The company originated in Sichuan and
quality manufacturer like Prevail:
1
comparatively simple technology using
Russian	
Русский		 www.TELE-satellite.com/TELE-satellite-1103/rus/jiuzhou.pdf
with the global
are focused solely on that concept.” He
has been in existence since 1958. In
Turkish
Türkçe
Sales Manager needed.
Who www.TELE-satellite.com/TELE-satellite-1103/tur/jiuzhou.pdf products? Set
actually buys Prevail’s
marketing of “90%
Gateway servers is all that’s Helen gives us an overview:
he is Yu Xinghong and with his
doesn’t see that the user’s point of view
Available online starting from 28 January 2011
Top Boxes
2008 they celebrated their 50th birthday
But even more important, the customer
20 engineers he is responsible
is considered regarding IPTV and wishes
“In 2011 we’ll be exhibiting at CCBN in Beijing,
no
(see TELE-satellite issue 02-03/2008). of our customers are the cable operators longer needs to install an antenna;
for quality assurance during
deal of thought must go into what feathe process of becoming their own proInternet is opening up new possibili- there’d every household has similar to that
almost be an approach an Internet
In 2009 the company expanded currently in demand. In talking
Cabsat in Dubai, CommunicAsia in Singapore,
tures are into themselves”, explains now there are programming pro- of Apple: following a path based strictly
production.
gramming providers!
ties; Necy-xu, “only about
connection.
HDTV and in 2010 terrestrial Eaglewas
viders that can join the bandwagon on the end user without looking back at
with TV Chain it’s clear that quite a
ANGA enterprises
Cable-Tec in New Orleans
10%
distributors.” any obvious Large businessin Cologne,have
4. He manages production: Ren
the theme. In 2011 Jiuzhou is planninga rather are shipped to that really didn’t have Theinterest in
This is
bit of observation and interesting is going
analysis developwhat the provider wants. that
Guorui is Production Manager
on taking a huge step further ment: the reason for this “I’m that at before since it would’ve meant for quite some time been not only sellinto obviously an example: the doing so this point fiber optic
on. Eagle Chain cites transmitting via is
as well as three shows in South America: one
www.TELE-satellite.com
and organizes the entire
IPTV market with enormous production
amazed with Apple and their products.
Sowell’s General Manager Eagle Chain
in Columbia and two in Brazil.” This provides
production process at Prevail.
numbers. Huang Wei is Jiuzhou’s Sales products towards the a great deal of installation
They are precisely geared require
isn’t just thinking about the further
Company Details
Director and reveals to us end-user and thus very successful.” The NETUP and Hardware Producer, Russia
what Jiuzhou
IPTV Software
www.netup.tv
development of IPTV. The general future
Engineers in Research & Development | Total Number of Employees
has planned for 2011.
conclusion according to Eagle Chain:
of the receiver is also on his mind. “Will
▼
▼
0................................ 25 .................................. 50
“We have a similar view with our softthe 1 — www.TELE-satellite.com
114 TELE-satellite — Global Digital TV Magazine — Average Turnover (Previous, This,receiver transform into a multimedia
04-05/201 Next Year Estimates)
ware development, namely a customerFirst, though, Sales Director Huang
receiver in▼
the Mio US$
Eagle Chain,
0.................................. 5 ................... 10future”, asksIt’s not only since
friendly operation of our products.” It is
Wei took us on a trip into the past: “The
“or will the receiver’s functions gradually
the DVB-IP Gateway 4x
Production Certificates
exactly for by
ISO, RoHS, PCI SIG, IEEE, DVB
first IPTV boxes were manufactured this reason that Eagle Chain
shift over to the TV itself?” It’s a ques- readtest report that
Production Categories
COMPANY REPORT 20,000Software and develop;
minds
Jiuzhou in 2007; back thenis skeptical about how IPTV willHardware Producer NetUP, Russia OEM, ODM tion that’s on all of our ers of and for
about IPTV
TELE-satellite
Main Products
which we all don’t yet have an answer.
boxes were produced and for TELE-satellite though, it’s a subject
involved pure
Professional PC Cards for DVB-S/S2, DVB-T/MPEG-4, DVB-C,
might be familiar with
that is being
ASI, IPTV Gateway/Streamer, IPTV Middleware, IPTV Conditional
IPTV boxes.” Production numbers onlyapproached very ecstatiNetUP.
This
device
Access Systems, IPTV Billing Systems, Video on Demand
cally: “The large telecom providers all
But even if there aren’t any answers,
increased slowly. “In 2010 we produced
to the private end user market. They are
hardware was ready for production. An
setting up your
www.TELE-satellite.com/... is allowsoptimistic
have their own agenda and that is selling
everyone at Sowell
still
60,000 boxes”, comments Huang Wei.
used in professional streaming equipment,
additional two software engineers wrote
own IPTV network in
their data packages to end-users; they Download this report in other languages from the Internet:
about the future. Pan Smile revealed to
like NetUP’s DVB to IP gateway 4x and IPTV
the drivers required for the Linux-based
1
next to no time (TELE‫العربية‬
www.TELE-satellite.com/TELE-satellite-1101/ara/netup.pdf
are focused solely on that concept.” He Arabic
us that his current team of 40 engineers
Indonesian
Indonesia
www.TELE-satellite.com/TELE-satellite-1101/bid/netup.pdf
Combine 4x. The latter (IPTV Combine 4x) is
But 2011 looks to be completely difsoftware.” NetUP even played a major role
satellite
10-11/2010).
2
Česky
www.TELE-satellite.com/TELE-satellite-1101/ces/netup.pdf in 2011. “We also
doesn’t see that the user’s point of view Czech
will be expanded to 80
a special product for the hospitality market.
in finding the right manufacturer for card
ferent: “We will be manufacturing a
German
Deutsch
www.TELE-satellite.com/TELE-satellite-1101/deu/netup.pdf
Even before that TELEis considered regarding IPTV and wishes English
English
www.TELE-satellite.com/TELE-satellite-1101/eng/netup.pdf from Europe here
employ five engineers
This is an all-in-one IPTV solution that
production. “A facility some 100km from
minimum of 200,000 boxes and itbe an approach similar to that Spanish
could
satellite reported on a
Español
www.TELE-satellite.com/TELE-satellite-1101/esp/netup.pdf
there’d
in Shenzhen who are
Farsi
‫فارس ي‬
www.TELE-satellite.com/TELE-satellite-1101/far/netup.pdf primarily responAlexander Wiese Apple: following a path based strictly French
includes IPTV Middleware, billing, DVB to IP
Moscow is in charge of manufacturing our
go as high as one million.” of all depends
It
world first launched by
Français
www.TELE-satellite.com/TELE-satellite-1101/fra/netup.pdf
sible for customer support”, comments
his office in front
■ General Manager Eagle Chain working in back at Hebrew of a ‫עברית‬
gateway and VoD server (see test report in
PC cards.”
www.TELE-satellite.com/TELE-satellite-1101/heb/netup.pdf
NetUP: A DVB-S2 card
on negotiations that areon the end user without looking
currently in
Mandarin
中文
www.TELE-satellite.com/TELE-satellite-1101/man/netup.pdf
Pan Smile. Sales Director Amanda is
painting of the Great Wall.
TELE-satellite 10-11/2010). Such IPTV syswith two inputs (TELEprogress with a variety ofwhat the provider wants.
retail chains
Dutch
Nederlands
www.TELE-satellite.com/TELE-satellite-1101/ned/netup.pdf
also optimistic: “Over the past several
Polish
Polski
www.TELE-satellite.com/TELE-satellite-1101/pol/netup.pdf
tems are a favorite in hotels and hospitals,
The cards are used in professional setsatellite 02-03/2010).
in North America as well as ■ Marketing Specialist Zoe Liu finds
Europe.
Actually, it’swww.TELE-satellite.com/TELE-satellite-1101/por/netup.pdf increase our sales
a triple hit: NetUP, a company
Portuguese
Português
years we were able to
Isn’t ‘young’ and ‘know-how’ a contradiction in terms?
Romanian
Română
www.TELE-satellite.com/TELE-satellite-1101/rom/netup.pdf
because each room can be accessed indiups only, which means production numbers
the graphics
founded as recently as 2001, has its adminThe reason: these retail chains are — Global Managerto be so — 02-03/201 — www.TELE-satellite.com
104 Sowell’s General Digital TV Magazine Chain Russian
TELE-satellite in in TELE-satellite Eagle
1
Русский
www.TELE-satellite.com/TELE-satellite-1101/rus/netup.pdf
50% every year. In 2010 our sales were
good thatwe’re them on her wall.
she pins talking about know-how
In many cases it is, but if
vidually but the cable infrastructure can be
are on the lower side when compared to
istrative office in the vicinity of Moscow
Of course we wanted
Türkçe
www.TELE-satellite.com/TELE-satellite-1101/tur/netup.pdf
isn’t just thinking about the further Turkish
around US$ 30 million and for 2011 we
State University. The closest metro Station
Available online starting from 3 December 2010
laid out as a bus system.
mass consumer good. “We only produce
to learn more about
in the making, the two termsIPTV. together very nicely.
development of go The general future
expect that
large
■ Jiuzhou constructed an impressively66 TELE-satellite — Global Digital TV Magazine — 02-03/2011 — www.TELE-satellite.com and the two founders of NetUP to rise to US$ 45 million.”
is ‘University’
some 1,000 cards per annum,” Abylay
that product line, and
of the The
building ‘Young’ in High-Tech case is an asset,on his mind. “Will
in Shenzhen’s such a Park. receiver is also as it means there’s no
General Manager Eagle Chain added
are – naturally! – former students of that
“One of our largest customer groups are
Ospan tells us. This has made us curious
Necy-xu
engineers are here continuously working
Abylayoptimism: “In 2011 we“We develop is General Manager
Ospan has the details.1.are
a brief run-down of the events leading to the
the receiver transform into a multimediawhere
some two
university. Actually, it’s not only themore
1. Necy-xu is General Managerwhich generally favour two-way sysobligation to depend on
on new products – currently they’re mostly past developments. So establishment of NetUP. “When we still were
hotels
and we’re eager to find
everything in-house. Both software and Marketing and takes out what else is in
receiver in the future”, asks Eagle Chain,
Sales and
founders who are Moscow State University open our own offices in Sao
planning to
occupied with we find a perfect example for ‘young’ meets ‘knowIPTV.
can
Sales and now at the end of tems. This means that hotel guest are not
NetUP’s pipeline. “Right Marketing and takes
hardware (circuit board layout) have been
graduates, but on billing soft“or will the receiver’s functions gradually students we were working almost all other employees
care of the company’s exposure,company’s exposure, enjoy TV and Internet access in
only able to
2010 we’re launching a PCIe card for DVB-T
how’? If we’re talking about digital technology Russia Internet well. It’s providers.” to see that NetUP
care of the
as service clear for all
designed by our very own engineers.”
shift over to the TV itself?” It’s a ques- ware for
such as, at trade shows andas the trade shows and in the but that hotel management is
pools together collective digital technoltheir rooms,
and DVB-C.” Just in the
DVB-S2 card this
64 TELE-satellite — Global Digital TV And if we 02-03/201our minds and for
Magazine
all of 1 our assumption
springs to mind.tion that’s—onsupport — www.TELE-satellite.com with
such as, at
1. Sun Guanghua is also a Software Engineer
ogy know-how, while everybody working at
also able to send personal and customised
card, too, has two inputs and tuners. “We’re
press.
Andrew Budkin is the head of Software
He
in his final semester
and
which State University is ranked
the fact that Moscow we all don’t yet have an answer. right was still NetUP is still very young. at uni- a founding partner.
press.
messages to guests in their rooms,” Abylay
also working on a card with two ASI inputs.”
Development and knows precisely the
versity when Abylay Ospan teamed up with
2.
Peng Yi is one of
2. a
among all the top-notch universities in the worldhis colleague Evgeniy Makeev to set up theirSoftware engineer effort put into Sowell’s project. International Sales
when it
Ospan
amount of
such Helen is
But even if there aren’t any answers,
founding partners.
2. Helen is International Sales lays down the reasons behind such
Let’s start with Abylay Ospan, who is one
infrastructure.
PCIe cards from NetUP are not targeted
comes to digital everyone at Sowell is still optimistic own then
technology teaching and research, business, of the company’s founders and acts as Direc- the DVB-S2 card two of our engineersand is constantly in
Manager
“For
which offered exactly that
www.TELE-satellite.com/...

ë

ë

Sowell, China - Receivers

R	
Manu
	 Distr
Whol
Shop
R Serv

Lamrani in front
■ Technical Director TewfikGM

of one of Bomare Company’s flagship products
- a complete home theater system currently
marketed inside Algeria under the Stream
Eagle
System brandname.

ë

Sun
Guanghua

products after pro-

www.TELE-satellite.com/TELE-satellite-1101/eng/netup.pdf

neers, there are ten more engineers in
Founder
Founder
Bomare Company’s R&D Team. They
3
3
are constantly working to improve their
Richard
Bob
on the rise: now on the 450 employees work employees work that therefore cable operators cable operators
about rise: now about 450 know-how and
product line and also incorporating the therefore
know-how and that
prefer to
at Prevail. But for 2011 Necy-xu for extremely
at Prevail. But is 2011 Necy-xu is extremely this on their own.this on their own. This is not
Zhang
latest requirements tackle prefer to tacklefor
(such as MPEG4 This is not Liu
excited: “The number of our employees will employees will
true for accessories although
excited: “The number of our true for accessories although cable operators cable operators
also works
climb to over 500climb we over expect a we Bomare Company customerslargest customers for this product
and to also DVB-T). also are still a jump
are
500 and jump
expect the largest still the for this product
in sales.” Prevailinis sales.” Prevail is actually the Technical University since they need large numbers of
actually optimistic with optimisticwell since they as well and
closely that group as that group need large numbers of

NetUP, Russia - IPTV

R	
Manu
R	
Distr
Whol
Shop
R Serv

Peng
Yi

Co-Founder

Co-Founder

4

4

Eric
Deng

Abylay
Ospan

Evgeniy
Makeev

from that strategy: Network Up – a com-

• ISDB-T and DVB-T2 Receiver in 2011
• Overseas Offices in the Plan

A team of five R&D engineers are the
founders of the OEM company Sowell.
The driving force and General Manager
of the young company is Eagle Chain.
He was, like his four colleagues, an R&D
employee with a large receiver manufacturer but over time didn’t feel so comfortable with that company. All too often he
was assigned projects that had nothing
to do with receivers. His four colleagues

— 04-05/201 —
1

Shenzhen

• User Friendliness is Company
Philosophy

felt the same way and so in
2004 they founded their own
company Sowell.
We met up with General Manager Eagle Chain in Sowell’s office
in Shenzhen who started off by telling
us how it all began: “All we had was the
money we had saved while employed
with that other company. We pooled

Sowell’s■
offices with
their 70 employees
are located on the seventh
floor of this office building in
Shenzhen. Receiver production
takes place in Baoan which isn’t
too far from here and close to
Shenzhen’s airport. 200 employees
work in the production facility.
200,000 receivers per month can be
produced by one shift; if all three
shifts are used, receiver
production climbs to
more than 500,000
boxes a month.

■ General Manager Eagle Chain working in his office in front of a
painting of the Great Wall.

104 TELE-satellite — Global Digital TV Magazine — 02-03/201 — www.TELE-satellite.com
1

www.TELE-satellite.com — 02-03/201 —
1

There is another feature which shows
that PCIe cards from NetUP are designed
for the professional high-end market: “We
are now beginning to ship our cards based
on the ALTERA chipset.” What makes this
so special? Well, the hardware is identical
for each customer and only the software on
the PCIe card defines its scope of application. “In the third quarter of 2011 we will
also base our 2 x DVB-S2 card – which was
presented in TELE-satellite – on the ALTERA
chipset,” NetUP Sales Manager Konstantin
Emelyanov adds.

COMPANY REPORT

TELE-satellite — Global

Who
Shop
Se v

NetUP has added another business segment to its portfolio in the meantime, which
3. What magazine laying there on Designer
Digital TV Magazine — is 04-05/201of Sowell’s fits in smoothly with the original software
1 — www.TELE-satellite.com
Zoe — desk? Yes, she takes Magazine business for ISPs: NetUP is now also develTELE-satellite Lee’sGlobal Digital TVcare
— 04-05/201 — www.TELE-satellite.com
1
ads in TELE-satellite. She also works on the
oping software and hardware for IPTV.
graphical layout of a receiver’s OSD as well as
the packaging, user manual and everything else “IPTV 3
has already gained a 70% share of
at Sowell that involves graphics.
our turnover,” NetUP Director Abylay Ospan
reveals and adds “annual sales are high in
the one-figure million USD this year.” As a
108 TELE-satellite — Global Digital TV Magazine — 02-03/201of — www.TELE-satellite.comdifficult to difmatter 1 fact, it has become
ferentiate between software for ISPs and
IPTV, as many Internet service providers
have become IPTV providers as well. “For
those providers we offer middleware, videoon-demand servers and streaming servers,” Abylay Ospan explains.

ing its customers.
Ma h as
The quality of Bomare Company’s
Lu
products has become so high that they

Sa beams
A Webs e or Pro ess ona s
Satbeams, Belgium - Software

■ Tenow is in the process of

setting up new offices on the
second floor in this new office
complex in Shenzhen’s HighTech Park. These offices will give
Tenow room to expand.

Shenzhen

James
Liu

Speaking of products already introduced in TELE-satellite: The NetUP DVB-IP
Gateway 4x can be ordered with an H.264
encoder/transconder as of Q3 2011. Things
get even more exciting towards the end of
2011 when “we will offer the DVB-IP Gateway 4x with unicast.” This will make the
device – which hitherto is only available as a
multicast model – even more user-friendly
and will also allow laymen to distribute their
TV channels via the Internet.

founded the company in 2005. From
left to right: Richard Zhang, Bob Liu,
Eric Deng and James Liu

Two of the founders, James Liu,
in charge of Marketing, and Bob Liu,
responsible for Software Development,
met each other while studying at Wuhan
University. The two other partners, both
of whom previously worked at a receiver
manufacturer, are Richard Zhang, in
charge of Hardware Development, and

Ku
O esen
W

IBC

Then, as a design house, Tenow developed complete applications for manufacturers. One success story involved
DVB-T USB sticks: Tenow developed the
TELE-satellite — Global Digital TV Magazine

83

Konstantin
Emelyanov

COMPANY REPORT

Head of Software Development, Andrew
Budkin, has another piece of interesting
news in store. “It makes economic sense for
some providers of Internet-via-satellite only
to use the base band which saves valuable
bandwidth.” This is why NetUP has decided
to develop PC cards with precisely that
strategy in mind. “Large utilities might be
extremely interested in that technology,”
adds Abylay Ospan and has the following example: “Gazprom uses this one-way
technology for its local networks.”

IPTV Software and Hardware Producer NetUP, Russia

Young, Yet With Extensive
Know-how: NetUP from Moscow
Alexander Wiese

Isn’t ‘young’ and ‘know-how’ a contradiction in terms?
In many cases it is, but if we’re talking about know-how
in the making, the two terms go togeth

■ NetUP co-founder and Director

Abylay Ospan showing the company’s
latest developments: PCIe cards for 2
x DVB-S2, 2 x DVB-T or C, 2 x ASI. All
cards come with two CI slots.

82 TELE-satellite — Global Digital TV Magazine — 12-01/201 — www.TELE-satellite.com
1

te-1101/ ev pd

www TELE-aud ov s on com/TELE-sate

te-1011/sa beams pd

86 TELE-satellite — Global Digital TV Magazine — 12-01/201 — www.TELE-satellite.com
1

Founde

Cert ficate
Ho der

to become popular and they distributed
DVB-T demodulator chips to local manufacturers in Shenzhen.

www.TELE-satellite.com — 02-03/201 —
1

A exande
De ug n

Spaun, Germany - Power Supplies

R	
Manu
	D s
Who
Shop
Se v

Tenow then operated as a commercial enterprise: DVB-T was just starting

Founde

SmartWi, Denmark - Wireless Card Reader

W

Eric Deng, who is also involved with
Software Devlopment. All four of them
founded the new company in 2005
using a starting capital of 500,000 RMB
(roughly 50,000 Euros).

Bomare Company’s showroom their newest
Stream System receiver model BM-200HD with
slots for a SmartCard and PCMCIA.
2

84 TELE-satellite — Global Digital TV Magazine — 12-01/201 — www.TELE-satellite.com
1

R	
Manu
R	 s
D
R Who
Shop
Se v

Innovative PC Cards
from China

■ Tenow’s four partners: they

82 TELE-satellite — Global Digital TV Magazine — 02-03/201 — www.TELE-satellite.com
1

and holds a PhD in
mathematics.

104 TELE-satellite — Global Digital TV Magazine — 04-05/201 — www.TELE-satellite.com
1

Power Supp y Un s Made by
SPAUN – guaran eed

105

One company that is fully concentrated on the
development of their products is the young firm Tenow
from Shenzhen, China. PC cards are manufactured
although the actual production process is outsourced
allowing Tenow to focus their efforts on Development
and Marketing. Also interesting to note about Tenow:
the company is run by four partners and all four of them
work together as a team to further expand their young
company. Tenow is in the process of setting up a new
office in Shenzhen’s large High-Tech Park. When we paid
them a visit, we went to their old office located directly
next to the Shen Da Metro Station on route 1.

and organizes the entire organizes the entire
and
■ Evgeniy
production process atMakeev is
co-founder Prevail.
of NetUP
production process at Prevail.

82 TELE-satellite — Global Digital TV Magazine — 12-01/201 — www.TELE-satellite.com
1

R	
Manu
R	 s
D
Who
Shop
R Se v

TELE-satellite — Global Digital TV Magazine

PC Card Manufacturer Tenow, China

ë

comply with of installation in Columbia and two
Tevii, Taiwan products require a great dealthe requirements of ISO9001 in Brazil.” This provides
- PC Cards and Receiver18001
www TELE-aud ov s on com/TELE-sate
V2008, ISO14001 V2004, OHSAS
114
R	
Manu Tev Tapp114 n o
ng
V2007, thus becomingFounde
an proactive and
■ Mellat Abdelkrim is Senior Engineer for SD
R	 s New Marke s
D
efficient organisation, aimed at satisfyand HD Receivers and shows us here in
latest developments: PCIe cards for 2
x DVB-S2, 2 x DVB-T or C, 2 x ASI. All
2. Software engineer Peng Yi is one of Sowell’s
cards come with two CI slots. partners.
founding

91

TELE-satellite — Global Digital TV Magazine

www.TELE-audiovision.com/TELE-satellite-1101/netup.pdf
Sales

in
January 2009 Cologne, software solution,
Bomare
ANGAwhich is ideal
10% are shipped 10% are shippedInopen our own offices in Sao ersin particularfor a our Cable-Tecto in NewCable-Tec in4.New Orleans
to distributors.” The distributors.” The obvious like ANGA Company Orleans
He manages production:manages production: Ren
planning to
client base in up
of Cologne,
to obvious
4. He Ren
Manager
50,000.” three
reason for this is reason for this is that at this point fiber optic companywell isas three to
that at this point fiber optica as well as Even the shows in derived America: one
installed
management name South shows in SouthGuorui is Production Guorui is Production Manager
as system
America: one
1.
Guanghua is also
co-founder and Director
products require a ■ NetUPOspan showing theaof installation Engineer pany that takes care of network expansion. This provides
great dealSunfounding partner. a Software in Columbia and two in Brazil.”
and company’s
Abylay

Receiver Manufacturer Sowell, China

• Founded by 5 Partners

www.TELE-audiovision.com/TELE-satellite-1103/tenow.pdf
Founder
Founder

Manager and is constantly in
Russia seems
contact with customers all over customers all over
they can be on the Shanghai Stockactively involved in Standards Comcontact with
they can be on theExchange Stock Exchange
Shanghai these products. these products.
is
the world. She can often be found can often be found
the world. She
there for customers: Sales
in 2012. That’s quite an achievement for such
at trade shows at 1 at trade shows at the Prevail 1. AlwaysKonstantin Emelyanov.
the Prevail
Manager
in 2012. That’s quite an achievement for such
missions primarily respon- an two onwards turnoverthey have turned hobby into
like CETA international increased con- Prevail can be stand.
(ComitéthatElectrotechin Shenzhen
As year
a young company! young company! who are
indication
2. This is where NetUP runs its
stand.
Ascompany, give us
an sprung to
international company, Prevail can be
a
sible for customer support”, comments sistently. It was the timeWe ask ISPs Ospan
business on the ground floor. Two
profession. when Abylay
3.
very critical man
Pan Smile. Sales et
Amanda is up all over the CIS countries,
nique DirectorTélécommunication andAlgérien) trade shows. —This man—iswww.TELE-satellite.com for a is very critical forsatellite dishes on the roof send down
most 108 TELE-satellite — Global Digital TV Magazine
of
found at numerous trade shows. International
3. This
a
02-03/201
1
the signals required for developing
found at soluInternational
quality manufacturer quality manufacturer like Prevail: satellite cards.
like Prevail:
also optimistic: “Over the past several them turned to NetUP for software numerous
innovative
we were
Who actually buys Prevail’s years buysthe increase our sales tions. “More than 2,000 ISPsNormativesoverview: us he is Yu Xinghong and with his
products? “90% products? “90%
and able 2010 our sales were Techniques currently rely Helen gives
Sales Manager
an overview:
Who actually every year. In to Comité onManager Helen 90% of them an
Prevail’s Sales our billing software, with gives us
he is Yu Xinghong and with his
50%
20 engineers he is
82 TELE-satellite in
we’ll
at CCBN — Global Digital TV Magazine — 02-03/201 — www.TELE-satellite.com engineers he is
of our customers are the cable operators for 2011 we operatorsCIS countries,” NetUPMagazine — 02-03/2011 Beijing, CCBN in1Beijing, responsible
around US$
million
TELE-satellite — Global Digital TV Sales
— www.TELE-satellite.com
at — Global Digital TV assurance20
of our customers 30 rise to and 45 “In 2011 located inbe exhibitingwe’ll be exhibitingTELE-satellitefor quality Magazine — 02-03/2011 — www.TELE-satellite.com responsible
are the
during
Nationaux. cable being 82Konstantin “In 2011proudly
82
expect that to
US$
million.” Manager
Emelyanov
for quality assurance during
themselves”, explains Necy-xu, “only aboutChainCabsat TV Magazine —and medium-sized in Dubai, CommunicAsiaproduction.
General Manager Necy-xu, Global Digital in “Small
Eagle
Cabsat providin Singapore,
themselves”, explains 82 TELE-satellite — added states.about 02-03/2011 — www.TELE-satellite.com in Singapore,
“only Dubai, CommunicAsia
production.
3. What magazine is laying there on Designer
worked
to “I’m 30 years old,” he The Lee’s desk? together for half Sowell’s
toabout the future. Pan Smile revealed to billing softwaretor: potential customers. says smilingly. Yes, she takes care ofa year until the
be spot on!
Zoe
His founding partner is Evgeniyads
Makeev who
us that his current team of 40 engineers point in time could not have been better. in TELE-satellite. She also works on the
2
graphical layout of a receiver’s OSD as well as
will be expanded to 80 in 2011. “We also While in their holds year of operation sales only just
first a PhD in mathematics and
the anything
turned 29. Both care deeply about packaging, user manual and everything else
3
employ five engineers from Europe here never exceeded five-digit USD figures, fromSowell that involves graphics.
at
to do with digital technology, which is a clear

some more optimism: “In 2011 we are

COMPANY REPORT

• Overseas Offices in the Plan
• User Friendliness is Company Philosophy

sure they
Young,duction to make TELE-satellite World
Yet With Extensiveperform as
required.”
Know-how: NetUPquality assurance engifrom Moscow
Tenow, China - PC Cards these
Besides

R	
Manu
R	
Distr
Whol
Shop
Serv

USD$ 24 million!” What? Is he serious?
And then he surprised us for a second
time: “I believe that demand for LNBs
will drop off for several years but then it
will turn around and go back up.” But that
alone couldn’t possibly be the reason for

www.TELE-audiovision.com/TELE-satellite-1103/sowell.pdf
Software
Software
Those aren’t very pretty numbers but

Chain

• Founded by 5 Partners
deal with testing
• ISDB-T and DVB-T2 Receiver in 2011

ë

2010 we calculate sales of USD$ 20 million. For 2011 we expect a fallback to
USD$ 18 million and for 2012 we expect
a further fallback to USD$ 16 million.”

www TELE-aud ov s on com/TELE-sate

te-1011/sma w pd

Techn ca
Manage
Jens
G ad
www TELE-aud ov s on com/TELE-sate

MD

Kev n
Spaun

220 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

te-1011/spaun pd
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

221
wholesaler ATLANTA was born.

PORT

Wi’s in the first year they were offered
sion of their SmartWifor a single product.
jeev Jain.
large number business will be
possible!
It didn’t take long and him to realize
for by 2009 that number increased to
that sold 3000
Even more interesting is what Kurt
“In the first year my father coax cable could be a profitable our SmartWito double this as part of
2000. “For 2010
goal is was introduced
business; his first number”, explains Sanjeev Jain.
Olesen told SmartWi units will
analog receivers for US$ 25.00 a piece”, coax cable delivery their business in 2005. A mutual friend generation of us: “We are expecting to
A new
quickly sold out so he had to order more.
brought Rajmal Jain and Kurt Olesen,
receive approval from one of the largest
remembers Sanjeev Jain, the first genbe marketed soon. We here at TELE-satHis local customer in Dubai asked him if
SmartWi’s President, together.
operatores in Middle East, named ART.”
eration of his family born he Dubai. acquire satellite receivers. only represent domesin could also
These numbers
ellite are waiting for the first sample unit
tic sales. “We also export just as many 500 Smart- report that would appear scale expanOne thing led to another and satellite
ATLANTA managed to sell for a test
Once that happens, large in one
wholesaler ATLANTA pieces
Wi’s in the remaining
The age of digital receivers began in was born.to North Africa, the first year they were the upcoming issues.
of offered sion of their SmartWi business will be
and by 2009 that number increased to
possible!
1998 at which time ATLANTA started
Middle Eastern countries and eastern
Digital TV Receiver Manufacturer BOXSAM, China
“In the first year my father sold 3000
2000. “For 2010 our goal is to double this
marketing receivers under its own label.
Europe”, comments Sanjeev Jain. He

TELE-audiovision Global Company Directory

ivers
e by
SAM

analog receivers for US$ 25.00 a piece”,
remembers Sanjeev Jain, the first generation of his family born in Dubai.

number”, explains Sanjeev Jain.

Boxsam, China - Receivers
The age of digital receivers began in

ATLANTA started
R	
Manu1998 at which timeunder its own label.
marketing receivers
	 Distr
Whol
Shop
Serv

GM

Xiaofeng
Huang

being the main investor and General Manager.

No production facilities can be seen
anywhere near the headquarters, so

the question arises where manufacturing actually takes place. Jeffrey Zhao
has the answer: “Our manufacturing
premises are located 6 km away.” In
the beginning both administration and
production where at the same place,
“but demand soon outstripped capacity
and so we built a 17,000 square meter
manufacturing hall some time ago. Currently we are in the process of setting up
a second manufacturing hall with some
40,000 square meters, which should be
finished by the end of 2010. At that time
we will also move our administration and
offices there.”

almost 100 engineers in the city of Xi´an,
which hosts an outstanding technical
university,” Jeffrey Zhao explains.
BOXSAM’s pride and joy are four SMT
lines for assembling circuit boards with
truly breathtaking speed: “We operate
three Samsung surface-mount technology lines and a brand new one from
Panasonic,” Jeffrey Zhao tells on a tour
around the hall. Naturally, all SMT lines
are located in a clean room which can
only be accessed through wind locks in
which all dust particles are sucked from
clothes. Artie Lee is the SMT Manager
and he explains in the clean room that
the four SMT lines have a combined
maximum daily output of 28,000 circuit
boards. “But this would mean running at
top gear – on an average day we finish

Next, a company driver appears to
take us to the production building where
a total of 700 employees are kept busy
on four floors. “In addition, we employ

ë

200 km southwest of Shanghai. The Chinese
characters on the roof mean “Science and
Technology Centre” – an apt description for an
ambitious manufacturer like BOXSAM.

TELE-satellite World

Jinhua Zhejiang

www.TELE-satellite.com/...

Download this report in other languages from the Internet:
Arabic
Indonesian
Bulgarian
Czech
German
English
Spanish
Farsi
French
Hebrew
Greek
Croatian
Italian
Hungarian
Mandarin
Dutch
Polish
Portuguese
Romanian
Russian
Swedish
Turkish

‫العربية‬
Indonesia
Български
Česky
Deutsch
English
Español
‫فارس ي‬
Français
‫עברית‬
Ελληνικά
Hrvatski
Italiano
Magyar

中文

Nederlands
Polski
Português
Română
Русский
Svenska
Türkçe

www.TELE-satellite.com/TELE-satellite-1009/ara/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/bid/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/bul/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/ces/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/deu/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/eng/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/esp/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/far/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/fra/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/heb/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/hel/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/hrv/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/ita/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/mag/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/man/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/ned/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/pol/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/por/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/rom/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/rus/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/sve/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/tur/boxsam.pdf

Available online starting from 30 July 2010

TELE-satellite — Global Digital TV Magazine — 08-09/2010 — www.TELE-satellite.com

www.TELE-audiovision.com/TELE-satellite-1007/atlanta.pdf

Rajmal
Jain

Sanjeev
■
Jain BOXSAM Vice President Jeffrey Zhao in front of a display wall with a selection of

COMPANY REPORT

This report was written
because of SmartWi, the
Card Sharing Module
that lets you watch every
channel in every room in
your house using just one
PayTV card.
SmartWi in Denmark
distributes their products
all over the world and this
includes The Middle East.
SmartWi’s ever increasing
sales figures in this region
are due in large part to
the non-stop efforts of
local distributor ATLANTA
headquartered in Sharjah
in the United Arab
Emirates.

Changhong, China - Receiver

Sales Representatives Vishal
Malviya (left) and Sunil Jain (right).

■ Repairs are occasionally necessary.
Technician Sadanand Shetty takes
care of this work in his little shack.

■ Above the store
is a storeroom
stocked with
smaller amounts
of every product.
Larger quantities
are shipped from
ATLANTA’s main
warehouse in
Sharjah.

■ The ATLANTA store on Naif Street in the satellite Souk in Dubai’s Deira district. The store is

open every day except Friday from 09:30 to 14:00 and then again from 16:30 to 21:30. ATLANTA is
a wholesaler and therefore doesn’t sell to he general public.

106 TELE-satellite — Global Digital TV Magazine — 06-07/2010 — www.TELE-satellite.com

www.TELE-satellite.com — 06-07/2010 — TELE-satellite — Global Digital TV Magazine

107

■ Ivan Horrocks, Global Invacom’s Director of

is taking shape. We will www.TELE-audiovision.com/TELE-satellite-1007/yinhe.pdf
use it also for
into account the fact that BOXSAM is
antenna and LNB production.”
also one of the official manufacturers for
the Chinese DTH system we identified a
This makes us prick our ears. How
great business opportunity and will be
come BOXSAM is planning to break new
offering dishes and LNBs as well.” While
ground with a whole new product linethere is an endless number of dish and
up? “BOXSAM was granted one of the
LNB manufacturers in China, most of
www.TELE-audiovision.com/TELE-satellite-1005/globalinvacom.pdf
very few licences by the Chinese governthem only possess export licences and
Sales
ment for production and domestic sale
are restricted from selling their products
of satellite antennas and LNBs. Taking
domestically in China – at least officially.
Sales and Marketing, is showing us the new
F-IRS LNB (Fibre Integrated Reception System):
the new LNB utilizes a coaxial N output instead
of an optical output. This output supplies the
0.95 to 5.45 GHz frequency range to a 1.5-meter
long coax cable which connects to the F-IRS
ODU32 (Outdoor Unit). Global Invacom opted
to use N-type connectors on this coax cable.
“These connectors are perfect for use with this
high frequency range and above all are excellent watertight connectors”, explains Ivan Horrocks the reason why standard “F” connectors
weren’t used.

COMPANY REPORT

Presents Their Factory

Alexander Wiese

Chinese high volume manufacturer YINHE is one of the top five
producers in China. Although this company is well know within China,
it is only the insiders that recognize the name YINHE outside the
country since abroad it is only an ODM. In other words, the YINHE
designed boxes (Original Design) are marketed
by other companies, primarily dealers and
programming operators, under their own
brand name. YINHE therefore is just
the manufacturer (hence ODM) and
for the time being it will stay that
way. There are no plans for YINHE
to dive into the export market with
Zhangjiagang,
their own brand name. What does
Jiangsu
it look like inside one of these high
volume manufacturing plants?
TELE-satellite wanted to find out.

That was yesterday! Today one single
optical cable is enough to transport both
satellite and terrestrial signals. Global
Invacom has expanded their system to
include DTT signals as well. Ivan Horrocks, Director Sales and Marketing,
explains to us how this works: “We took
the satellite signal carried in the optical cable and combined it with the DTT
signal; now both signal formats can be
carried on one optical cable.”

■ David Fugeman, Sales and Marketing Director, is seen

here showing us the new F-IRS GTU converter box: it
is installed by the end-user who would then connect a
maximum of four satellite receivers as well as one DTT
receiver. “We’ve integrated two new features”, explains
David Fugeman, “one LED indicates if there’s an optical
signal, the second LED shows if power is connected.”
■ Ivan Horrocks, Global Invacom’s Director of
Sales and Marketing, is showing us the new
F-IRS LNB (Fibre Integrated Reception System):
the new LNB utilizes a coaxial N output instead
of an optical output. This output supplies the
0.95 to 5.45 GHz frequency range to a 1.5-meter
long coax cable which connects to the F-IRS
ODU32 (Outdoor Unit). Global Invacom opted
to use N-type connectors on this coax cable.
“These connectors are perfect for use with this
high frequency range and above all are excellent watertight connectors”, explains Ivan Horrocks the reason why standard “F” connectors
weren’t used.

David
Fugeman

High Volume Digital TV Receiver Manufacturer YINHE, China

Organized for the Future

Receiver Manufacturer YINHE



The enormous 280,000 square-meter
production site is located in the city of
Zhangjiagang in the Jiangsu province
roughly 100 Km north of Shanghai in
eastern China. Here, in addition to the
four-story administration building, you’ll
also find multiple fabrication buildings.

sales of US$ 80 million while the remaining product groups produced sales of
US$ 30 million”, says Jianbiao Zhu. He
continues, “In 2010 we are expecting an
increase to US$ 100 million in receiver
sales with the remaining product groups
increasing to US$ 35 million.”

During the tour of the facility, Jianbiao Zhu, Overseas Marketing Department Manager, told us there are a total
of 1500 employees, 1100 in production
and 400 in administration. “Last year
we had 1200 employees but in 2010 we
added 300 additional employees”, he
explained to us. Business seems to be
booming at YINHE!

What are these other product groups?
“We are one of the largest PC housing
manufacturers; we also produce satellite
dishes as well as professional receiver
components for cable headends .”

YINHE was founded in 1975 and at
that time it was a state-run company
that had the goal of producing China’s
first memory chips for use in the large
computer systems of that time. “It all
started with 50 employees”, Jianbiao
says as he looks back at the old days.
In 2000 the ownership structure
changed and it became a privately run
company made up of 40 share-owners.
“But all of that could possibly change“,
reveals Jianbiao Zhu, “We’re planning
to go public this year on the Shenzhen
stock exchange.” The goal is to acquire
additional capital for expansion.

receivers end up in The Middle East,
20% go to Europe including the CIS
countries and Southeast Asia, another
15% go to Australia, 10% to Africa and
5% to South America.”
It should come as no surprise that
YINHE operates offices in critical
regions namely in Dubai since 2003 and
in Australia since 2005. “This year 2010
we plan to open two additional offices
in Sao Paolo and Moscow. We are also
looking to open an office in Chennai in
2011”, confirms Jianbiao.

But TELE-satellite is primarily interested in receivers, so let’s get back to
that. “Satellite receiver development
started in 1997”, remembers Jianbiao
Zhu, “and in 1998 we produced 10,000
receivers.” This number increased at a
tremendous rate: “In 2009 we produced
3.6 million boxes and in 2010 we expect
production of four million boxes”, he
reveals and then adds, “In both years
two million receivers were sold domestically in China; the rest were exported.”

The best export countries are Australia with DVB-T receivers in MPEG-4 and
HD as well as India with DVB-C boxes in
MPEG-2 and SD. “We want to expand our
distribution in Europe including the CIS
countries with DVB-T MPEG-4, DVB-T2
MPEG-4 and DVB-S2 receivers”, comments Jianbiao Zhu. He adds, “60% of
our exports are satellite receivers, 30%
are terrestrial receivers and 10% are
cable receivers.”

We wanted to know more about the
export side of things: where does YINHE
export to? Jianbiao Zhu takes a look at
his laptop and then says, “30% of our

Another interesting note: with a
market segment of about 10%, YINHE
is one of the largest providers of cable
receivers domestically in China.

TELE-satellite World

www.TELE-satellite.com/...

Download this report in other languages from the Internet:
Arabic
Indonesian
Bulgarian
Czech
German
English
Spanish
Farsi
French
Hebrew
Greek
Croatian
Italian
Hungarian
Mandarin
Dutch
Polish
Portuguese
Romanian
Russian
Swedish
Turkish

So, what do YINHE’s sales figures look
like? “For 2009 our receiver products had

‫ﺍﻟﻌﺭﺑﻳﺔ‬
Indonesia
Български
Česky
Deutsch
English
Español
‫ﻓﺎﺭﺳﻲ‬
Français
‫עברית‬
Ελληνικά
Hrvatski
Italiano
Magyar

www.TELE-satellite.com/TELE-satellite-1007/ara/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/bid/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/bul/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/ces/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/deu/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/eng/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/esp/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/far/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/fra/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/heb/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/hel/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/hrv/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/ita/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/mag/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/man/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/ned/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/pol/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/por/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/rom/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/rus/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/sve/yinhe.pdf
www.TELE-satellite.com/TELE-satellite-1007/tur/yinhe.pdf

中文

Nederlands
Polski
Português
Românesc
Русский
Svenska
Türkçe

Available online starting from 28 May 2010

■ YINHE’s Main Entrance. The administration building is to the left behind which are
numerous production facilities. 1500 employees work here.

64

For this purpose, Global Invacom
developed a new system that will be
marketed under the nickname “Wholeband”, or more officially, F-IRS (Fibre Integrated Reception System). But first
we want to take a quick look again at
how Global Invacom’s optical system
works: the optical LNB (universal LNB)
takes the four satellite frequency
ranges, that is, the upper and lower
bands in both horizontal and vertical
polarizations, and “stacks” them on top
of each other so that all four bands are
carried over the optical cable in one frequency range. Each of these four bands
covers 1000 MHz and if you place them
one on top of the other you get a bandwidth of 4000 MHz.

TELE-satellite — Global Digital TV Magazine — 06-07/2010 — www.TELE-satellite.com

COMPANY REPORT

www.TELE-satellite.com — 06-07/2010 — TELE-satellite — Global Digital TV Magazine

65

Fibre Optic Products by Global Invacom

Global Invacom goes
Fibre DTT

■ Ivan Horrocks, Global Invacom’s Director of

Sales and Marketing, is showing us the new
F-IRS LNB (Fibre Integrated Reception System):
the new LNB utilizes a coaxial N output instead
of an optical output. This output supplies the
0.95 to 5.45 GHz frequency range to a 1.5-meter
long coax cable which connects to the F-IRS
ODU32 (Outdoor Unit). Global Invacom opted
to use N-type connectors on this coax cable.
“These connectors are perfect for use with this
high frequency range and above all are excellent watertight connectors”, explains Ivan Horrocks the reason why standard “F” connectors
weren’t used.

Alexander Wiese

today it is
■ Group shot in Dubai (from left to right): Alexander Wiese, TELE-satellite Editor-in-Chief, Kurt Olesen, SmartWi‘s President, Rajmal Jain, ATLANTA’s
we also implemented every single producing of digital set topfounder and Sanjeev Jain, his son and Director of ATLANTA.
boxes in all standards
eginnings of
So
range. How
BOXSAM production hall with a net floor area of 17,000 square metres.much for thethesatelliterange? Very
do you include the DTT
like DVB-S, DVB-C, DVB-T, ISDB, DMB-TH tion guideline right down to the very last
s founded in
simple: Convert
Digital Terrestrial
shot in Dubai (from left to
■ Groupand of course HDTV108 right): Alexander Wiese, TELE-satellite Editor-in-Chief, Kurt Olesen, SmartWi‘s President, Rajmal Jain, ATLANTA’s
Transmissions using another laser at a
detail.” Richard — www.TELE-satellite.com
including value-added TV Magazine many continues to explain that
oducing miliTELE-satellite — Global Digital
different frequency then combine the
founder and Sanjeev Jain, his son and Director of ATLANTA. The— 06-07/2010dishes in front give a clear
two together.
“this is how things go in the first phase of
systems for digital tv.
the company
indication of what is
That was yesterday! Today one single
In order to do that, Global Invacom
e, pluralistic,
optical cable is enough to transport both
had to modify their LNB system: the
satellite and terrestrial signals. Global
optical LNB already has the laser built
Invacom has expanded their system to
108
Their — Global Digital TV Magazine — 06-07/2010 going on inside.
erent indus- TELE-satelliteproduction capacity reaches up to — www.TELE-satellite.com
into it so that the optical cable can
include DTT signals as well. Ivan Horbe connected directly to the LNB. To
rocks, Director Sales and Marketing,
include terrestrial signals, Global Inva12 million, making them the largest STB
om digital tv
explains to us how this works: “We took
com could have added a second conthe satellite signal carried in the optinector on the LNB for the terrestrial
manufacturer in China. The company has
r conditioner
cal cable and combined it with the DTT
antenna along with the necessary elecsignal; now both signal formats can be
tronics. “This would have been theoretiheavily invested in their quality control and
roducts, set
carried on
cally possible”, says Ivan Horrocks, “but
sible for quality and system managethat Kaifa produces, it’s easier to see why one opticalwe could also manufacture satelus if cable.”
Jianbiao Zhu, Overseas
it really doesn’t make any sense since
has built up a digital TV laboratory, a digiy and power
ment with another 30 expatriats who
Kaifa wants to start manufacturing satel- purpose, Global Invacom
For this lite receivers.” This customer was so
the LNB would have become too heavy
www.TELE-satellite.com/...
developed a new system that will be
and bulky. Not to mention it would have
are mostly responsible for Marketing and
lite receivers. Marketing Manager Jackie under the nickname “Wholeimpressed with the overall quality and
Marketing Manager, in
marketed
tal HFC experimental net, EMC laboratory
s of technicreated problems for installers in that
band”, a
Management.
Yan explains it to us in words: “About or more officially,development of Kaifa’s products
further F-IRS (Fibre in other languages from the Internet:
Integrated Reception System). But first
and most importantly a high accuracy SMT
ineering and
■
■
YINHE’s showroom.
year ago one of our largest power we want to take a quick look again at
meter that it only seemed natural that Kaifa
82
www.TELE-satellite.com/TELE-satellite-1009/ara/boxsam.pdf
After this introduction to everything
customers in India came to us and how Global should also produce satellite receivers
asked Invacom’s optical system
www.TELE-satellite.com/TELE-satellite-1009/bid/boxsam.pdf
production line. CHANGHONG’s aim is to
works: the optical LNB (universal LNB)
Samples
www.TELE-satellite.com/TELE-satellite-1009/bul/boxsam.pdffrom the
takes the for this customer and its DTH project in
four satellite frequency
■
become one of the strongest suppliers for
www.TELE-satellite.com/TELE-satellite-1009/ces/boxsam.pdf
ranges, thatIndia. upper and lower
is, the
bands in both horizontal and vertical
production line are
www.TELE-satellite.com/TELE-satellite-1009/deu/boxsam.pdf
digital tv solutions worldwide.
the CHANGpolarizations, and “stacks” them on top
José Clotet founded the company in
the first satellite signal analyzer and in
www.TELE-satellite.com/TELE-satellite-1009/eng/boxsam.pdf
of each other so that all four bands are quite a fast start for a
Naturally this is
■ At Chengdu airport: His role
on display
www.TELE-satellite.com/TELE-satellite-1009/esp/boxsam.pdf here.
carried over the optical cable in one freCHANGHONG
1963. That
1993 the first microprocessor controlled
brand new four bands was only a few years after
quency range. Each of these satellite receiver producer. But
as Overseas Sales Director
www.TELE-satellite.com/TELE-satellite-1009/far/boxsam.pdf
covers 1000 MHz and if you place them
“In 1978 CHANGHONG
o., Ltd. It is
of the first TV station came on the air in
course there’s more going on than just
www.TELE-satellite.com/TELE-satellite-1009/fra/boxsam.pdf started its TV
leads Richard Cheng Li to
universal analyzer that covered everyone on top of the other you get a bandwww.TELE-satellite.com/TELE-satellite-1009/heb/boxsam.pdf
this
width of 4000 MHz. one customer. Jackie Yan explains,
many destinations around
production,” Richard Cheng Li remembers.
the CHANGBarcelona. in negotiations with
thing from VHF/UHF (including FM) to
www.TELE-satellite.com/TELE-satellite-1009/hel/boxsam.pdf
the globe.
“We are currentlySuddenly, you had not only
So much for the satellite range. How
www.TELE-satellite.com/TELE-satellite-1009/hrv/boxsam.pdf a complete pro“At the time we imported
n research &
do you include the DTT large Very
another range? DTH operator who also

Ivan
Horrocks

■ Inside the store can be found

But what to do with it? The cable manufacturer explained to him that this cable

the company’s products.

Zhu

■

Satellite Wholesaler ATLANTA, Dubai

SmartWi Distributor
ATLANTA in Dubai

While having lunch at an Indian restaurant on Sheikh Khalifa Bin Zayed
street across from the glistening Burjuman Shopping Center, Sanjeev Jain
told us the story of ATLANTA. Just like
with most of the other shops in Dubai,
ATLANTA is also run by an Indian family.
“My father Rajmal Jain came to Dubai in
1968”, explains Sanjeev. “He began selling satellite products in 1992. He had
contact with a manufacturer in India that
produced electronic cables. One day he
received a sample of a black cable: it
was a coax cable.”

92 employees work in the SMT departMarketing
ment to supervise insertion machines
Manager
and to make sure a steady supply of
Jianbiao
required components is available.

R	■
Manu
	 Distr
Whol
Shop
Serv

73

www.TELE-satellite.com — 08-09/2010 — TELE-satellite — Global Digital TV Magazine

Director

Finally, Vice President Jeffrey Zhao
GlobalInvacom, UK - Fibre Optics site right
points to the construction
R	
Manu
Sales
opposite the existing premises. “This
	 Distr
is where our new manufacturing hall
development, marketing and manufactur- duction line from Panasonic in Japan and

te World

BOXSAM is headquartered in the city
of Jinhua in the eastern Chinese province
of Zhejiang. With a population of around
one million it is considered a small city
by Chinese standards.
Jeffrey Zhao is Vice President of
BOXSAM and his main area of responsibility is the Operator Market, which covers
sales to content providers and network
operators. He tells us that back in 2004
– the first year of receiver production –
only 100.000 boxes left the premises.
“By 2009 that figure had increased to
three million receivers of all kinds, and
for 2010 the target stands at five million
receivers,” states Jeffrey Zhao.

■ BOXSAM is a private company with Xiaofeng Huang

Founder

being the main investor and General Manager.

Whol
Shop
Serv

Digital TV Receiver Manufacturer BOXSAM, China

BOXSAM can easily be considered an
up-start company as it was founded
only in 2002 with a seed capital of
15 million USD. Starting out with
CATV products BOXSAM expanded its
business to cover satellite receivers
and some other interesting products
as well in 2004. We paid a visit to this
company to learn about their way of
doing business.

Jeffrey
Zhao

approximately
Yinhe, China - Receiver 20,000 boards.” A total of

in Jinhua, some
anghai. The Chinese
ean “Science and
apt description for an
like BOXSAM.

COMPANY REPORT

Receivers
made by
BOXSAM

72

■ BOXSAM is a private company with Xiaofeng Huang

R	
Manu
	 Distr
Whol
Shop
Serv

www.TELE-audiovision.com/TELE-satellite-1009/boxsam.pdf
VP

■ BOXSAM headquarters in Jinhua, some

Atlanta, Dubai - Wholesaler

easily be considered an
any as it was founded
	 Manu
with a seed capital of
	 Distr
D. Starting out with
R Whol
s BOXSAM expanded its
Shop
over satellite receivers
Serv
er interesting products
4. We paid a visit to this
arn about their way of
s.

A new generation of SmartWi units will
be marketed soon. We here at TELE-satellite are waiting for the first sample unit
for a test report that would appear in one
of the upcoming issues.

These numbers only represent domestic sales. “We also export just as many
pieces to North Africa, the remaining
Middle Eastern countries and eastern
Europe”, comments Sanjeev Jain. He

The British company Global Invacom is best known to
TELE-satellite readers as the inventor and manufacturer
of the sensational fibre optic LNB system (see TELE-satellite
issues 04-05/2008 and 08-09/2009). With an optical
system distances are no longer a factor since the
attenuation in a fibre optic cable is next to nothing. It’s an absolutely great
system except for one thing: these days people want not just satellite TV
but digital terrestrial TV channels as well. Up until now, that meant once
again that you needed two separate cables
routed to the TV; one for satellite signals
and the other for terrestrial digital TV
TELE-satellite World www.TELE-satellite.com/...
Download this report in other languages from the Internet:
signals.
Arabic
‫العربية‬
www.TELE-satellite.com/TELE-satellite-1005/ara/globalinvacom.pdf
Indonesian
Bulgarian
Czech
German
English
Spanish
Farsi
French
Hebrew
Greek
Croatian
Italian
Hungarian
Mandarin
Dutch
Polish
Portuguese
Romanian
Russian
Swedish
Turkish

Indonesia
Български
Česky
Deutsch
English
Español
‫فارس ي‬
Français
‫עברית‬
Ελληνικά
Hrvatski
Italiano
Magyar

中文

Nederlands
Polski
Português
Românesc
Русский
Svenska
Türkçe

That was yesterday! Today one single
optical cable is enough to transport both
satellite and terrestrial signals. Global
Invacom has expanded their system to
include DTT signals as well. Ivan Horrocks, Director Sales and Marketing,
explains to us how this works: “We took
the satellite signal carried in the optical cable and combined it with the DTT
signal; now both signal formats can be
carried on one optical cable.”

www.TELE-satellite.com/TELE-satellite-1005/bid/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/bul/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/ces/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/deu/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/eng/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/esp/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/far/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/fra/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/heb/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/hel/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/hrv/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/ita/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/mag/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/man/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/ned/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/pol/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/por/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/rom/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/rus/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/sve/globalinvacom.pdf
www.TELE-satellite.com/TELE-satellite-1005/tur/globalinvacom.pdf

For this purpose, Global Invacom
developed a new system that will be
marketed under the nickname “Wholeband”, or more officially, F-IRS (Fibre Integrated Reception System). But first
we want to take a quick look again at
how Global Invacom’s optical system
works: the optical LNB (universal LNB)
takes the four satellite frequency
ranges, that is, the upper and lower
bands in both horizontal and vertical
polarizations, and “stacks” them on top
of each other so that all four bands are
carried over the optical cable in one frequency range. Each of these four bands
covers 1000 MHz and if you place them
one on top of the other you get a bandwidth of 4000 MHz.

■ David Fugeman, Sales and Marketing Director, is seen

here showing us the new F-IRS GTU converter box: it
is installed by the end-user who would then connect a
maximum of four satellite receivers as well as one DTT
receiver. “We’ve integrated two new features”, explains
David Fugeman, “one LED indicates if there’s an optical
signal, the second LED shows if power is connected.”

Available online starting from 2 April 2010

■ Global Invacom has two locations in London: here we see

So much for the satellite range. How
do you include the DTT range? Very
simple: Convert the Digital Terrestrial
Transmissions using another laser at a
different frequency then combine the
two together.

their head office in Althorne (Essex).

In order to do that, Global Invacom
had to modify their LNB system: the
optical LNB already has the laser built
into it so that the optical cable can
be connected directly to the LNB. To
include terrestrial signals, Global Invacom could have added a second connector on the LNB for the terrestrial
antenna along with the necessary electronics. “This would have been theoretically possible”, says Ivan Horrocks, “but
it really doesn’t make any sense since
the LNB would have become too heavy
and bulky. Not to mention it would have
created problems for installers in that
80 TELE-satellite — Global Digital TV Magazine — 04-05/2010 — www.TELE-satellite.com

82 TELE-satellite — Global Digital TV Magazine — 04-05/2010 — www.TELE-satellite.com

www.TELE-audiovision.com/TELE-satellite-1003/changhong.pdf

Sales

COMPANY REPORT

Receiver and TV Manufacturer CHANGHONG, China

Large-scale Quality
and Innovation Made
by CHANGHONG
CHANGHONG is one of the largest volume manufacturers of receivers with
headquarters in Mianyang in the Sichuan province of south-western China,
some 130 km from the provincial capital of Chengdu. Not only do millions of satellite
and terrestrial receivers leave the production premises every year
but also an equal number of flat-screen TVs, so that the company ranks
among the most important digital corporations in the world.

Looking at their business today it is
hard to imagine the humble beginnings of
the project. CHANGHONG was founded in
1958 and started out with producing military radar systems. But today the company
has evolved into a super-huge, pluralistic,
international group of 13 different industries, producing everything from digital tv
panel displays to IT systems, air conditioner
systems, digital audiovisual products, set
top boxes, eco-friendly battery and power
supplies up to whole systems of technical equipment, electronic engineering and
chemical materials.
One of the 13 industries of the CHANGHONG GROUP is the SICHUAN CHANGHONG
NETWORK TECHNOLOGIES Co., Ltd. It is
an independent subsidiary of the CHANGHONG GROUP and specializes in research &

duction line from Panasonic in Japan and
we also implemented every single production guideline right down to the very last
detail.” Richard continues to explain that
“this is how things go in the first phase of

development, marketing and manufacturing of digital set top boxes in all standards
like DVB-S, DVB-C, DVB-T, ISDB, DMB-TH
and of course HDTV including value-added
systems for digital tv.
Their production capacity reaches up to
12 million, making them the largest STB
manufacturer in China. The company has
heavily invested in their quality control and
has built up a digital TV laboratory, a digital HFC experimental net, EMC laboratory
and most importantly a high accuracy SMT
production line. CHANGHONG’s aim is to
become one of the strongest suppliers for
digital tv solutions worldwide.

■ At Chengdu airport: His role
as Overseas Sales Director
leads Richard Cheng Li to
many destinations around
the globe.

“In 1978 CHANGHONG started its TV
production,” Richard Cheng Li remembers.
“At the time we imported a complete pro-

■ Digital TV manufacturer CHANGHONG is

headquartered in Mianyang, a city of 600.000
inhabitants. The administrative building can
be seen in the centre, with the development
centre to the left and any many satellite
antennas on its roof. In the background
and extending to the left the CHANGHONG
manufacturing plants stretch out over 2
square km.

TELE-satellite — Global Digital TV Magazine — 04-05/2010 — www.TELE-satellite.com

Richard
Cheng Li

David Fugeman, Sales and Marketing Director, is seen
here showing us the new F-IRS GTU converter box: it
is installed by the end-user who would then connect a
maximum of four satellite receivers as well as one DTT
receiver. “We’ve integrated two new features”, explains
David Fugeman, “one LED indicates if there’s an optical
signal, the second LED shows if power is connected.”

Kaifa, China - Receivers

www.TELE-satellite.com/TELE-satellite-1009/ita/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/mag/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/man/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/ned/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/pol/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/por/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/rom/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/rus/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/sve/boxsam.pdf
www.TELE-satellite.com/TELE-satellite-1009/tur/boxsam.pdf

R	
Manu

YINHE also COMPANY REPORT
works very closely
	 Distr
together with the larger CA module
Whol
Available online starting from 30 July 2010
producers such as Irdeto, Conax, NDS,
Shop
Topreal, Sumavision, Novel and CryptoServ
al Digital TV Magazine — 08-09/2010 — www.TELE-satellite.com
works.”

antenna installers but also then-exist-

simple: Convert the Digital Terrestrial
happens to be from the Southeast Asia
Transmissions using another laser at a
different frequency then combine are also waiting to start
region and we the
two together.

Obviously,

much

more

important

TELE-satellite World

www.TELE-satellite.com/...

Download this report in other languages from the Internet:
Arabic
Indonesian
Bulgarian
Czech
German
English
Spanish
Farsi
French
Hebrew
Greek
Croatian
Italian
Hungarian
Mandarin
Dutch
Polish
Portuguese
Romanian
Russian
Swedish
Turkish

economically are their signal analyz50 TELE-satellite — Global Digital TV Magazine — 02-03/2010 — www.TELE-satellite.com

‫ﺍﻟﻌﺮﺑﻴﺔ‬

Indonesia
Български
Česky
Deutsch
English
Español
‫ﻓﺎﺭﺳﻲ‬
Français
‫עברית‬
Ελληνικά
Hrvatski
Italiano
Magyar
中文
Nederlands
Polski
Português
Românesc
Русский
Svenska
Türkçe

www.TELE-satellite.com/TELE-satellite-1003/ara/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/bid/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/bul/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/ces/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/deu/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/eng/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/esp/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/far/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/fra/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/heb/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/hel/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/hrv/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/ita/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/mag/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/man/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/ned/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/pol/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/por/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/rom/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/rus/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/sve/changhong.pdf
www.TELE-satellite.com/TELE-satellite-1003/tur/changhong.pdf

Available online starting from 29 January 2010

www.TELE-satellite.com — 02-03/2010 — TELE-satellite — Global Digital TV Magazine

ers. “Roughly 30% of our sales can be

51

attributed to signal analyzers”, explains

www.TELE-audiovision.com/TELE-satellite-1003/kaifa.pdf
the TV Distribution division was greatly

the satellite range.

ing TV manufacturers who needed signal

José-Maria Clotet. In 2009 the status of

analyzers and above all test pattern
Digital Powerhouse PROMAX, Spain first year PROMAX
with CI. In the Marketing
fourth quarter will followthe
generators. In

Today PROMAX is still owned by José

enhanced when PROMAX took over a

Clotet. In 2005 his son José-Maria Clotet

local manufacturer of distribution prod-

employed four engineers each of which

took over business operations and in

ucts. “This division now also is respon-

COMPANY REPORT

negotiations with a third customer.”

In order to do that, Global Invacom
had to modify their LNB system: the
And what about production capacity
optical LNB already has the laser built
into it so that Kaifa? GuangYun Zhu is their Satellite
at the optical cable can
be connected directly to the LNB. To
Receiver Global Invainclude terrestrial signals, Production Manager. He says to
com could have added a second conus, “Right now we have production facilinector on the LNB for the terrestrial
ties the necessary produce 5 million satellite
antenna along withwhich can electronics. “This would have been theoretireceivers per years.”
cally possible”, says Ivan Horrocks, “but
it really doesn’t make any sense since
the LNB would have become too heavy
While touring the fabrication facility we
and bulky. Not to mention it would have
created problems for installers in that
can clearly see why Kaifa holds such a

Satellite Receiver Manufacturer Kaifa, China

■ Kaifa’s administration building
in Shenzhen, China

Manager
a DVB-S2 twin tuner PVR with Irdetoown unit. Production on 2007 PROMAX was divided into four divi- sible for 30% of our sales”, comments
developed their
Jackie
as well as a DVB-S2 box withthese media designed units started sions: Test & Measurement, Broadcast, José-Maria Clotet. The remaining 30%
a four newly
the following year; in 1964 there were
TV Distribution and Electronic Training.
falls on the Broadcast division.
player and integrated web browser. For
Yan
ten employees.
high position in the EMS category: everyThat’s quite an assortment and we
At first glance, there does not seem
2011 a DVB-S2 receiver with WiFi and and the
thing is exceptionally organized
In are state of the art.
asked José-Maria Clotet about the last
to be too much uniformity here. But as
machines 1968 a second TV station made
CI+ is planned.”
its appearance in the UHF band. Again
one: “From the beginning PROMAX
José-Maria
Sa e e Consu an Ch na
RT
But this is completely understandSkyworth, Chinaprod- Receivers e
www.TELE-audiovision.com/TELE-satellite-1003/skyworth.pdf
PROMAX was right Samsung and began
there
taught installers and engineers how
m
Sa e
an Ch na able:
COMPANY REPORT
What about any upcoming newCOMPANY REPORTConsu sh An ennaworldwide companies like UHF signal NFOSAT our products.” This service only
demand nothing the the best u e
D
Manu ac
delivering but first quality.
analyzto use Tha and
W
And it looks like it was a very good deciR	
Manu
made up about 10% of their sales but it
M
sion for
step into
ucts? The head of the R&D department
That’s quite Vice GM
an impressive ers. Kaifa toTechnical
list, but the satellite
■ Jack Zhang is
receiver market.
has been a goodwill gesture by PROMAX
	 Distr
S
F Chief nu
M
u
USA
S
M nu
u
USA
COMPANY REPORT
COMPANY REPORT
must have known that those questions
there’s Technicalmore. Up until now In 1986 only
we itManager for PROMAX: F that should not be underestimated.
■
Officer,still
he
was another first
Whol In the past TELE-satellite has had many
manages the m
were coming. We weren’t disappointed m m R&D team David
Jack
reports on receivers from this manufac-mentioned satellite receivers; but YINHE
strong
m
m
Shop
of
turer
always under a different brandalso 350 employees
with the answers.butOn the contrary,
has plansKen terrestrial receivers.
for
Zhang m
name. Skyworth happens to be an OEM
Serv
m
YINHE has quite an array of new prod- The“We just released a DVB-T MPEG-4 box
(Original Equipment Manufacturer).
m
m
success of an OEM
measured by
O
m
m
m
ucts in the works. Accordingis to Hong- thewith HD, twin tuner and PVR”, reveals
quality of
m
m
Promax, their products.inSo Signal Analyzers we will shortly be O
Spain of what makesHongchun Gu, “and
-the OEM busi- w H
www.TELE-audiovision.com/TELE-satellite-0909/promax.pdf
chun Gu: “In the third quarter
2010
Skyworth so successfull
w
H
do more
big m
R	 ness? WhyDVB-S2and
Manu
Founder
m
there will be a ■ newFounder and from moreover andcoming out with a twin tuner PVR for GM
receiver the
the
ownerall
of
■
famous
m
m
m
	 Distr n Chcustomers Clotet Skyworth?Freeview system in Great Britain, AustraPROMAX, José
e nwith sa ebuilt-in dmediana can and also
he a
e fie world start to cooperate with
player
m
m
saw
And
customers all ac ve
Whol why are theseo
d mee ng Luo Sh Gang soone Somebody so satis- n hem e e fie d n Ch na can
m
w
m
José
José m a
Ma
S
no
TV
dSh nd
o Gang
S
no on
h TV
d o nd
fied
exactly for these
ge
m
m
Shop with Skyworth? It is mto ou ound on w h m
ecause he s been d s bu dthat TELE d y h payathem u meen ng Luo o unw n d soone o
ng we ha
reasons
a
h decided
nn
bu
d
h nn
o unw n d
■
Clotet
C o e h ou u m w n bu
a
Hi-Tech
in
o many yea sServ a soNanshan’s h e m No u thencity
bu visit inTELE-satellitePark on y because he s beenwdg bu ng TELEgn
because he World www.TELE-satellite.com/... ou s
gn
n
How do
h m
u
n
n
How do ou g
m
■
of Shenzhen in this report inChina. Ch na o many yea s bu a so because he
sa en e n ng gn
Download southern other languages from the Internet:
o eas
M C m nu N u ng
m
do h
n
ng gn
M m w m nu
C
u ng
figu e n many o he sa e de a h ‫ﺍﻟﻌﺮﺑﻴﺔ‬
Arabic
www.TELE-satellite.com/TELE-satellite-1003/ara/changhong.pdf
Indonesian
Indonesia
www.TELE-satellite.com/TELE-satellite-1003/bid/changhong.pdfreceiver
m n h N USA p odu
sa
e nm
many he sa
p
ofound gh p impresfi
b figu One of the largest
n
p on
fi
b
d
Bulgarian
www.TELE-satellite.com/TELE-satellite-1003/bul/changhong.pdf
na s en e ng he DTH age can 2009h in a very ofi e w d manufacturers in thepoodu UH e e a eas
Skyworth
Infosat, on n beБългарски building. 86Dishesh n USA world DTH age n 2009 oo fi
www TELE-aud ov s on com/TELE-sate te-0907/ n osa pd
CzechThailand Česky
www.TELE-satellite.com/TELE-satellite-1003/ces/changhong.pdf
w
UH n
o fiwe www.TELE-satellite.com/TELE-satellite-1003/deu/changhong.pdf n he
h ncem n na is s h
uSkyworth. Skyworth
h
mn m u h n
German
Deutsch
as
S This is
Ch
en e ng
sive-looking futuristic
me o v s ng Luo Sh Gang n hEnglish
s
www.TELE-satellite.com/TELE-satellite-1003/eng/changhong.pdf
Co. Ltd. is one
R	 where English met now General Manager Groupvmanufacturersofofthe Sh Gang n h ■
Manu Spanish
■
we
Vice
Español
www.TELE-satellite.com/TELE-satellite-1003/esp/changhong.pdf
Founde
TV
s a good me leading s ng Luo
o
s
Farsi
‫ﻓﺎﺭﺳﻲ‬
www.TELE-satellite.com/TELE-satellite-1003/far/changhong.pdf
en
homepage
French
Français
www.TELE-satellite.com/TELE-satellite-1003/fra/changhong.pdf
	 D s David Ken. On the company’sShenzhen sets in China. The company
Hebrew
‫עברית‬
www.TELE-satellite.com/TELE-satellite-1003/heb/changhong.pdf
o fice n
started into the satellite
we saw that Skyworth manufactures TV’s
Greek
Ελληνικά
www.TELE-satellite.com/TELE-satellite-1003/hel/changhong.pdf
The Birth of a New
Receiver Manufacturer
Kaifa in China Starts Production

COMPANY REPORT

www.TELE-satellite.com — 02-03/2010 — TELE-satellite — Global Digital TV Magazine

81

Receiver Manufacturer Skyworth, China

Quality Control at Skyworth

■ The futuristic Skyworth
building in Nanshan/
Shenzhen in southern
China

sat
Aluo-sat
Microwave Filter Company
Filter Company
Innovation
s Everybody!Quality Specialized Filters Microwave Specialized Filters
Knows Everybody! Quality
High
High
Jackie Yan, Marketing Manager, is seen here
showing us Kaifa’s first satellite receiver model. It
is being manufactured for a DTH provider in India.
Jackie Yan is standing in front of a wall on which
are calligraphies of the former President of China
Zemin Jiang.

Out of
Made in USA

The futuristic Skyworth
building in Nanshan/
Shenzhen in southern
China

■ David Ken is Vice General
Manager and explains
Skyworth’s background

TELE-satellite World

One of the largest receiver
manufacturers in the world
is Skyworth. Skyworth
Group Co. Ltd. is one of the
leading manufacturers of TV
sets in China. The company
started into the satellite
receiver research as early
as 1997 and in 2002 a
subsidiary was established
under the name of
Shenzhen Skyworth Digital
Technology Co. Ltd. Those
13 years of experience in
satellite technology made
the company more and
more professional and by
now Skyworth claims to be
the leading STB (set top
box) manufacturer in China.

www.TELE-satellite.com/...

Download this report in other languages from the Internet:
Arabic
Indonesian
Bulgarian
Czech
German
English
Spanish
Farsi
French
Hebrew
Greek
Croatian
Italian
Hungarian
Mandarin
Dutch
Polish
Portuguese
Romanian
Russian
Swedish
Turkish

‫ﺍﻟﻌﺮﺑﻴﺔ‬

Indonesia
Български
Česky
Deutsch
English
Español
‫ﻓﺎﺭﺳﻲ‬
Français
‫עברית‬
Ελληνικά
Hrvatski
Italiano
Magyar
中文
Nederlands
Polski
Português
Românesc
Русский
Svenska
Türkçe

www.TELE-satellite.com/TELE-satellite-1003/ara/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/bid/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/bul/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/ces/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/deu/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/eng/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/esp/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/far/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/fra/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/heb/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/hel/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/hrv/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/ita/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/mag/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/man/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/ned/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/pol/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/por/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/rom/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/rus/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/sve/skyworth.pdf
www.TELE-satellite.com/TELE-satellite-1003/tur/skyworth.pdf

Available online starting from 29 January 2010

84 TELE-satellite — Global Digital TV Magazine — 02-03/2010 — www.TELE-satellite.com

www.TELE-satellite.com — 02-03/2010 — TELE-satellite — Global Digital TV Magazine

85

ThailandMade in USA

David Ken is Vice General
Manager and explains
Skyworth’s background

A portion of the products that Kaifa
manufactures: to the left are power meters, in
the middle are components for hard drives and
to the far right are head stack assemblies for
hard drives.

TELE-satellite — Global Digital TV Magazine — 02-03/2010 — www.TELE-satellite.com

receiver research
Croatian
Hrvatski
Who other products besideswww.TELE-satellite.com/TELE-satellite-1003/hrv/changhong.pdfas early
and Italian
receivers. So
Italiano
www.TELE-satellite.com/TELE-satellite-1003/ita/changhong.pdf a
as 1997 and in 2002
N an
Hungarian first question to David
Magyar
www.TELE-satellite.com/TELE-satellite-1003/mag/changhong.pdf
naturally,
82
was
Shophow Dutch our divided. He explains, “If Ken subsidiary nameestablished
Mandarin
中文
www.TELE-satellite.com/TELE-satellite-1003/man/changhong.pdf
under the
of
Nederlands
www.TELE-satellite.com/TELE-satellite-1003/ned/changhong.pdf
is
is it all
you
Tangp oon ham
Polish
Polski
www.TELE-satellite.com/TELE-satellite-1003/pol/changhong.pdf Digital
Shenzhen Skyworth
Se v atPortuguese a sales figurewww.TELE-satellite.com/TELE-satellite-1003/por/changhong.pdf Those
look
it from
point of view,
Português
Technology Co. Ltd.

TELE-satellite — Global Digital
then 70% of it is Русский 20% is receivers
TV’s, 74
Russian
www.TELE-satellite.com/TELE-satellite-1003/rus/changhong.pdf
13 years of experience in
Swedish
Svenska
www.TELE-satellite.com/TELE-satellite-1003/sve/changhong.pdf made
satellite technology
and the remaining 10% falls on the other
Turkish
Türkçe
www.TELE-satellite.com/TELE-satellite-1003/tur/changhong.pdf
Romanian

Românesc

www.TELE-satellite.com/TELE-satellite-1003/rom/changhong.pdf

TELE-satellite — Broadband & Fiber-Optic — 08-09/2009 — www.TELE-satellite.com

TV Magazine — 08-09/2010 — www.TELE-satellite.com

products.” But as David Ken continues,
Aluosat, China - Wholesaler

the company more
Available online starting from 29 January 2010and

it gets more interesting: “If you look at

more professional and by

now Skyworth
to be
	 Manufrom a profit aspect, then the receiver ■ A look at aSTBclaimstopFounde
the leading portion of the R&D department in which a group Sa es
(set
it
of engineers just finished a meeting
www.TELE-satellite.com — 02-03/2010 — TELE-satellite — Global Digital TV Magazine 51
R	 s section is greater than 20%.” These fig- box) manufacturer in China.
D
ures are all made possible by the 2000
R Who
employees in the receiver section; SkyLuo
C
m Luo N O A
worth
■
R Shop has a total of 20,000 employees.N
C
W
A
Sh gang
Jun
N
Se v Skyworth is a publicly traded company
N O A
www.TELE-satellite.com — 02-03/2010 — TELE-satellite — Global Digital TV Magazine

MPANY REPOR

listed on the Hong Kong exchange. “In w
the yearM
2010 we will also actively plan
USA
to be listed in the China stock exchange
market with our set top box business”,
says David Ken.

S

High

R	
Manu
CEO
Even a ong-stand ng product
R	 s
D
What does this mean in numbers? David
Who jumps right into the millions: “In 2008
Ken
Ca
it
2009
will
Quality Specializedsuch itas a C-band antenna st
Shop was 5 million receivers, inFilters
be
Fah enk
has room or mprovementsug
Se v 8 million and for 2010 we are guessing

total sales of 10 million receivers.” Skyworth manufactures receivers for cable
reception, satellite reception and terrestrial reception. David Ken tells us: “After
m
V
10 years of effort we have obtained an
wm
w
m
outstanding record in the field of national
m
H w
m
digital television. Since mass production
m
M C
m
of STB has started in 2001, Skyworth has
■
USA
m
06-07/2010 — www.TELE-satellite.com
provided products and services in over
m
m 100 cities in all of China m m
owning to our
excellent quality and thoughtful service.
W
In recent years, Skyworth Digital kept its
m
m
first rank in China and provided over 8
million cable m
STBs since 2004, occupying
m
m
m
20% of the domestic STB market.“
m
W
m

www TELE-aud ov s on com/TELE-sate
Ma ke ng
Manage
Sandy
Ne epov z

Sa es
Sco
Pa se

A ew months ago INFOSAT

at
■
Nanoxx, GermanyTha andHardware engineers are seen 1work here
- Wholesaler and 5Receivers
n
ntroduced a

R	
Manu
R	 s
D
R Who
Shop
Se v

Founde

meter s ng e-segment antenna
to the market The resuce was
Ma t
■

Ho baue
mmed ate success! The dr v ng

www TELE-aud ov s on com/TELE-sate
Sa es
Dan e
Sam

TELE-sa e e Wo d

D w

www
m

orce beh nd th s new product s

m

m
m

m

W

N ran Tangp roontham

ounder

m
m
Where do all these receivers go? David
Ken spells it m out for us, “90% of our
all
m
mcable boxes remain within China; the
m
other 10% are exported.” However for ■ Here we see Yuan Quibo, one of the Test
Engineers, checking out a model T29 DVB-T
satellite boxes it’s exactly the opposite:
TELE-audiovision Internationalof the receiver. ThisLargest Digital TV in
World‘s box will ultimately end up Trade
“Only 10% remain in China and — TheSpain
m

and owner o the company

INFOSAT He s not new to the

—
222

pages o TELE-sate te: we
—

te-0905/a uosa pd

B

MFC, USA - Filters

Made in USA

www TELE-aud ov s on com/TELE-sate

85

Microwave Filter Company

—

By the time this issue of TELE-satellite will be published, Kaifa will have
been manufacturing satellites receivers for just a few weeks. When
we paid them a visit, they were just finishing the installation of their
assembly line and an initial test run was soon to follow.
Who exactly is Kaifa and what makes this company think they’re ready
to step into the market as a satellite receiver manufacturer?

80 TELE-satellite — Global Digital TV Magazine — 02-03/2010 — www.TELE-satellite.com

82 TELE-satellite — Global Digital TV Magazine — 04-05/2010 — www.TELE-satellite.com

—

prev ous y reported on N ran and

M

中文

■ This is Terry. He manages the technical

Support team that consists of six engineers.
They help OEM customers with any technical
problems

Magazine — 1
1-12/2013 — www.TELE-audiovision.com

m

te-0903/m c pd

te-0901/nanoxx pd
Power Supply Units Made byof the world-famouscorner of
Germany, home
Black
journey to the south-western

Quality to Measure
Forest
for
SPAUN – guaranteed! cuckoo clocks and a by-word Black
Germany, home of the world-famous

any PT Subur Semesta was founded in 1978 in
The company PT Subur Semesta was founded in 1978 in shows us the testing process on a model 17 test station, the largest of the ten
■ Spaun employee Peter Fuchs
ava, one of the 17,000 islands that make up Indoneby Spaun.
Jakarta TheJava, one of PT 17,000 islands thatwas founded to automaticallyain every function. 50 minutes”, explains Peter Fuchs, “today only
on company the Subur Semesta test stations upneeded in “In the past test
make used Indone1978 complete test required
three minutes is
the 220 million inhabitants can be found on Java of
sia. 60% of theon Java, one inhabitants can be found on Java ofIndoneJakarta 220 million of the 17,000 islands that make up
llion live in the capital city Jakarta – it could even be
which 15 million livethe the capital city Jakarta –can be found on Java of
it
sia. 60% of in 220 million inhabitants office could even be
■ SPAUN administration
n more. To be noticed here you need an extremely
(front) and production premises
a few million 15 million be noticed capitalSingen, southwest an – it could even be
which more. To live in the here inyou need
city Jakarta extremely
(right)
■ The two Smart managing
Germany
and it is for that reason that PT Subur Semesta uses
bright star and it is for that To be noticed here you need an extremely
a few million more. reason that PT Subur Semesta uses
directors Peter Löble (left) and
Venus as their trademark. The wonderful ambiguity
the planet Venus as their trademark. The that PT Subur Semesta uses
bright star and it is for that reason wonderful ambiguity
Christoph Hoefler (right) on the
■ The two Smart managing
od of Love Venus can only make you smile. One of
roof directors Peter Löble (left) and
of the company’s business
with the God of Love Venustheir trademark. you smile. One ambiguity
the planet Venus as can only make The wonderful of
s of the company, Liong Ten Fook, came up with the
premises. Christoph Hoefler on the
the foundersthe the company, Liong Ten Fook, came up with the One of
with of God of Love Venus can only make you smile.
Christoph Hoefler (right)
ngenious idea!
has beenof the company’s business
name – the ingenious of the company, Liong Ten Fook, came up with the
an founders idea!
roof active in the field
of satellite technology since
premises. Christoph Hoefler
name – an ingenious idea! Control
Motor
COMPANY REPORT
1988. Starting active in the field
has been as a radio and
In western Jakarta, not too far
Ten Fook was not
television technician he moved
In western Jakarta, not too far
of satellite technology since
But Liong Ten Fook was not
from the international airport,
under; his partner
on to the purchasing and sales
international airport,
1988. Starting as a radio and
the only But Liong his partner
founder; Ten Fook was not from the In western Jakarta, not too far
can be found PT Subur Semesta,
department of technician he moved
en and still is now
can be found PT Subur Semesta, airport,
television a specialised
from the international
was name then and still is his
the only
brand back Venus. founder; nowpartner
electronics store before and sales
ng An. “We origibrand name Venus.
on to the purchasing
can be found PT Subur Semesta,
The offices are at the front of then and still is now
Thiang was back
Tiong An. “We origistarting as field manager for
The offices are at the front of Venus.
department of a specialised
d as a telephone
brand name
the building with the windows, andTiongtelephone originally started as a
Nokia. In 2005 he finally became
Thiang multiswitch is tested on multiple functions.
An. “We
■ Every
the building with the windows, and front of
electronics store before
The offices are at the
actory. Later on we
towards the back are the factory
The multiswitch is inserted into this
head of sales atfield manager for
accessory factory. singleas onofwe“F”test station and the back are the factory
nally moving a Later all telephone are the building with the windows, and
started lever a the connectors
towards
starting as Wela and
by
rgency lights, that
buildings that house the machines and the test process can be started.
■ Kevin Spaun, managing
inserted
with Nokia. In 2005 he finally became
the foundation of Smart
added emergencyfactory. Later on buildings that house the machines factory
director of SPAUN POWER GmbH
accessory lights, that
we
towards the back are the
to manufacture the dish antennas.
th built in batterElectronic his newat Wela and
to manufacture the dish antennas.
head of sales job was
is, lights of 200
added built in batterbuildings that house the machines
The company employs a totalwith emergency lights, that
■ Even if a Spaun multiswitch passes all of its elec-with the foundation of Smart
managing director there. Peter
used everywhere
The company employs a total of ■ Finished: Spaun with a
200
to manufacture the dish antennas.
ies that are with with built in batterused everywhere
tronic tests perfectly, it still isn’t clear if it is techniFriedrich
is, lights
people of which 60 are involved
Löble, the second managing
cally sound.
completed
multiswitch:
here is a power
people ofThe company involved with of 200
which 60 are employs a total
Electronic his new job was
the manufacture of dishes.that are used everywhere
whenever there is a power
This part is checked here: every multiswitch is
“We have been adding
ies They
director, has been working in Peter
the manufacture of dishes. They numbers to our
placed with its power supply in this high voltage test
members Liong Ten
serial
Every multi-switch and every amplifier comes
managing director there.
people
work from 8AM to 5PM Monday thru
outage”, remembers Liong Ten power from 8AM of which 60 are involved with
chamber. In this way Spaun can guarantee that the
products since 2005”, he
whenever there is a
the satellite field since managing
work
with one, the to 5PM Monday thru has one, qualand manufacture of dishes. They
of course every receiver about their
Löble, the second 1997. He
completed multiswitch is 100% perfect.
explains
Friday and on Fook.
Saturdays to 2PM.
They are so sure that they provide a 5-year guar- worked for an electronics
also director, has been working in
ity assurance.
outage”, remembers Liong Ten awork from 8AM to 5PM2PM.
Fridaypower supply unit which is requiredthru
and on Saturdays to Monday to
too:
antee. “In reality”, explains Friedrich Spaun, “we
Using the serial number
store and joined field since 1997. He
repair products that are older than five years.”
Fook.
connect the device to the Saturdays to 2PM.
It Internet inquiries is
become
the satellite Wela in 2001
Friday and on mains.for hasabout. In this way
It’s very simple, there are so few of them that the
Semesta entered
thought
as product manager.an electronics
such an everyday component of it would be very easy to
virtually any
PT Subur Semesta entered
warranty period could be extended, “but for legal
also worked for Both have
reasons we keep it at five years”, explains Friedrich
e arena in 1989
identify
known each other since 19972001
electronic device that we have stopped plagiarized prodthinking
store and joined Wela in
the satellite Subur Semesta entered
arena in 1989
Spaun.
ucts.
PT
Those are large numbers; we
and consider themselves Both have
began to offer
about how
as product manager. a
Those are it actually works. SPAUN, on the other
large numbers; we
when they satellite to offer 1989
began arena in
the
great team. each other since 1997
hand, has given it a great deal of thought and
llite receivers. In wanted to know how many solid
known
know
solid
analog when they began In wanted arrived at a howlarge conclusion. Kevin
satellite receivers. to offer toThose are manynumbers; we
has
remarkable
rst digital receiver antennas are being manufacand consider themselves a
2000 the first digital receiver antennas isare managing director of SPAUN, one
analog satellite receivers. In wanted being manufacSpaun the to know how many solid
great team.
nd in 2002 it all tured today: “At the moment,
of antennas the being manufacappeared and in first digital receiver the most renowned quality manufactures of
2000 the 2002 it all tured today: “At are moment,
y serious when the our production capacity is at
our multi-switches and other accessories for satellite
production capacity the at
is moment,
turned really serious when2002 it all tured today: “At
appeared and in the
of satellite dishes about 15,000 antennas per
signal distribution. He tells us what it‘s all about.
www.TELE-satellite.com/...
production of really serious when the our production capacity is at
turned satellite dishes about 15,000 antennas per
the meantime the month of which the majority are
about Digital TV Magazine antennas per
began. production of satellite dishes of which 15,000 — 10-11/2010 — www.TELE-satellite.com
In the meantime the month TELE-satellite — Globalthe majority are Download this report in other languages from the Internet:
68
■ After
xpanded its man- sold domestically”, explained the completion of the testing process, the
PC prints a serial number which
www.TELE-satellite.com/...
month of which the majority are
company expanded itsmeantimethen attached
man‫ﺍﻟﻌﺮﺑﻴﺔ‬
www.TELE-satellite.com/TELE-satellite-0901/ara/smart.pdf
began. device. The test results are is sold sodomestically”, explained Arabic
In the
the that
to the
archived
ia Tek Ijoe climbed Thiang Tiong An, “Our company
Indonesian
Indonesia
www.TELE-satellite.com/TELE-satellite-0901/bid/smart.pdf
Spaun can Ijoe climbed
any individual
agement: Tjia Tekexpanded itsfor man- Tiong domestically”, explained
company recall the test results Thiang sold An, “Our company Bulgarian
Download this report in other languages from the Internet:
multiswitch.
Български
www.TELE-satellite.com/TELE-satellite-0901/bul/smart.pdf
partner. Today PT supplies approximately 15% of
supplies approximately “Our company
aboard agement: Tjia Today PTclimbed Thiang Tiong An,15% of Czech
as a partner. Tek Ijoe
Česky
www.TELE-satellite.com/TELE-satellite-0901/ces/smart.pdf
Arabic
‫ﺍﻟﻌﺮﺑﻴﺔ‬
www.TELE-satellite.com/TELE-satellite-0901/ara/smart.pdf
sta is run by these the Indonesian market.” 66 TELE-satellite & Broadband — 10-1
1/2008 — www.TELE-satellite.com
German
Deutsch
www.TELE-satellite.com/TELE-satellite-0901/deu/smart.pdf
Indonesian
Indonesia
www.TELE-satellite.com/TELE-satellite-0901/bid/smart.pdf
Subur Semestaas run by these the Indonesian market.”
aboard is a partner. Today PT supplies approximately 15% of
English
English
Bulgarian
Български www.TELE-satellite.com/TELE-satellite-0901/eng/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/bul/smart.pdf
ers.
three partners.
Subur Semesta is run by these the Indonesian market.” Spanish
Español
www.TELE-satellite.com/TELE-satellite-0901/esp/smart.pdf
Czech
Česky
www.TELE-satellite.com/TELE-satellite-0901/ces/smart.pdf
Of their total production,
A customer has a problem.
‫ ﻓﺎﺭﺳﻲ‬Deutsch 02-03 /200 8
www.TELE-satellite.com/TELE-satellite-0901/far/smart.pdf Steffen Kuck is Technical Support
www.TELE-satellite.com/TELE-satellite-0901/deu/smart.pdf
Of their total production, FarsiGerman
three partners.
Manager and helps Spaun’s
French
Français
www.TELE-satellite.com/TELE-satellite-0901/fra/smart.pdf customers daily from 8AM to 12PM
amount of money 80% is delivered domestically,
English
English
www.TELE-satellite.com/TELE-satellite-0901/eng/smart.pdf
DISHP
Of their total production,
A large amount of money 80% is delivered domestically, Greek
and from 1PM to 5PM. One of
Ελληνικά
Spanish re Solutio OINTER www.TELE-satellite.com/TELE-satellite-0901/hel/smart.pdf his tools is the SatcoDX CD-ROM
Español
www.TELE-satellite.com/TELE-satellite-0901/esp/smart.pdf
Softwa
the rest is exported. According
d in 2004 explains
n
www.TELE-satellite.com/TELE-satellite-0901/hrv/smart.pdfdata.
with its worldwide satellite
the rest is exported. According Croatian
Farsi e MapsHrvatski that, with the help of
‫ﻓﺎﺭﺳﻲ‬
www.TELE-satellite.com/TELE-satellite-0901/far/smart.pdf
was invested in 2004 explains money 80% is delivered domestically,
Googl
A large amount of
and its
e: “We acquired a to Thiang Tiong An, “40% of our
Italian
Italiano real images aswww.TELE-satellite.com/TELE-satellite-0901/fra/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/ita/smart.pdf
French
Français
well
Tjia Tek Ijoe: “We acquired a to Thiang Tiong An, “40% of our Hungarian
was invested in 2004 explains the rest is exported. Accordingas SatcoDX and its up-to- datewww.TELE-satellite.com/TELE-satellite-0901/mag/smart.pdf
channel
Greek provid Magyar
Ελληνικά
www.TELE-satellite.com/TELE-satellite-0901/hel/smart.pdf
data,
ss so that we could dish production goes to Thaies highly accuratewww.TELE-satellite.com/TELE-satellite-0901/man/smart.pdf
satellite
中文Hrvatski
Croatian
www.TELE-satellite.com/TELE-satellite-0901/hrv/smart.pdf
to Thiang Tiong An, “40% Mandarin
machine press so that we could disha production goes to Thai- of our
Tjia Tek Ijoe: “We acquired
reception information.
e the dish segments land and Vietnam, the remainDutch
Nederlands
www.TELE-satellite.com/TELE-satellite-0901/ned/smart.pdf
Italian
Italiano
www.TELE-satellite.com/TELE-satellite-0901/ita/smart.pdf
dish production goes to Thaimanufacture the press so that we couldand Vietnam, the remain- Polish
machine dish segments land
Polski
www.TELE-satellite.com/TELE-satellite-0901/pol/smart.pdf
Hungarian
Magyar
www.TELE-satellite.com/TELE-satellite-0901/mag/smart.pdf
Heavy investment der goes to Brunei with a small
Portuguese
Português
www.TELE-satellite.com/TELE-satellite-0901/por/smart.pdf
ourselves.” Heavy investment der goes to Brunei with a smallremainMandarin
中文
www.TELE-satellite.com/TELE-satellite-0901/man/smart.pdf
manufacture the dish segments land and Vietnam, the
any occurred again percentage going to Australia.”
Românesc
Dutch
Nederlands www.TELE-satellite.com/TELE-satellite-0901/rom/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/ned/smart.pdf
percentage going to Australia.” Romanian
small
in the company occurred again Bergamini
ourselves.” Heavy investment der goes to Brunei with a Russian
The birthday boy himself: Giorgio
Русский
www.TELE-satellite.com/TELE-satellite-0901/rus/smart.pdf
Polish
Polski
www.TELE-satellite.com/TELE-satellite-0901/pol/smart.pdf
ter: “We bought a
is the founder of the USALS program
one year the companyits 10th anniversary inthat is
Swedish
www.TELE-satellite.com/TELE-satellite-0901/sve/smart.pdf
Portuguese Svenska
Português
www.TELE-satellite.com/TELE-satellite-0901/por/smart.pdf
in later: “We bought a again percentage going to Australia.”
occurred 2008.
“Naturally we want to expand celebrating
inting system to
Türkçe
www.TELE-satellite.com/TELE-satellite-0901/tur/smart.pdf
Romanian
Românesc
www.TELE-satellite.com/TELE-satellite-0901/rom/smart.pdf An important communica“Naturally we want to expand Turkish
powder one year later: “We to
painting system bought a
Russian
Русский
www.TELE-satellite.com/TELE-satellite-0901/rus/smart.pdftions medium is of course the
our exports”, explains Tjia Tek
the segments.”
Available online starting from 28 November 2008 Internet. Web designer Patrick
our exports”, explains Tjia Tek expand
“Naturally we want to
spray paint the painting
powder
Swedish
Svenska
www.TELE-satellite.com/TELE-satellite-0901/sve/smart.pdf
70 TELE-satellite & Broadband segments.” system to
Ijoe, “We are investing heavily— 12-01/2009 — www.TELE-satellite.com
Turkish
Türkçe
www.TELE-satellite.com/TELE-satellite-0901/tur/smart.pdf Keil is seen here looking over
Ijoe, “We are investing heavily
our exports”, explains Tjia Tek
spray paint the segments.”
s still not enough. in quality.” PT Subur Semesta
visitors to www.spaun.de.
Available online starting from 28 November 2008
Ijoe, “We are Semesta
But & was still — 12-01/2009 quality.” PT Subur investing heavily
70 TELE-satellite it Broadband not enough. in — www.TELE-satellite.com
“We have about 40,000 visioe revealed to us
Tjia Tek But itrevealed to us
Ijoe was still not enough. in quality.” PT Subur Semesta
tors every month”, explains
yet another large
58 TELE-satellite & Broadband — 08-09/2008 — www.TELE-satellite.com
Patrick Keil. On the monitor
that there’s Tek Ijoe revealed
Tjia yet
PT Subur Semesta’s three another large to us
“We
invested
PT Subur Semesta’s three
he shows us the current webinvestment: left,
“We
invested
partners: From the there’s yet another large
that
partners:Subur the left,
D 600,000 for the
site visitors. Thanks to GeoPT From Semesta’s three
Lionganotherinvestment:
Ten Fook,USD 600,000 “We the
Finance
for
invested
mapping, he knows exactly
Liong Ten partners: From the left,
Fook, Finance
of mesh antennas.
Director, Tjia fabrication of mesh antennas. for the
Tek Ijoe, another USD 600,000
Managing
where these visitors come
Director, Tjia Tek Ijoe, Managing Finance
Liong Ten Fook,
s produce 20,000
Director, come up Tiong An, the
most critical questions that and Thiangfabrication oferec- antennas. Director, and Thiang Tiong An,
before
from and can communicate
This lets us producemesh
20,000
Director, Tjia Tek Ijoe, Managing
Technical
y month.”
with each one of them with a
ellite antenna is how to properly dishes every lets us produce 20,000
position Director
themonth.” so
antenna
Technical Thiang Tiong An,
Director
This
Director, and
pop up window. The surprise:
ired satellite can be received. In whichdishes every month.”
direction should
Technical Director
this program was developed
pointed? To — 04-05/2008 — www.TELE-satellite.com
together by Kevin Spaun and
ite & Broadband the east? To the west? This would be its azi56 the dish Broadband —
Patrick Keil and the best part
hen how far up into the sky should TELE-satellite &look? This 04-05/2008 — www.TELE-satellite.com
– it is freeware and can be
56 TELE-satellite &this
Broadband — 04-05/2008 — www.TELE-satellite.com
elevation. Actually, it’s really not that hard to figure
used by anyone who wants to
out; there are plenty of calculation aides and prepared
get more detailed information
on who is visiting their web
give you all the data you need. But if you do a little extra
site, how long they have been
n did with his Dishpointer software, you’ll discover comthere, what they are looking at
results.
and where they come from, and
all of this live! Here is the link:
www.livezilla.net

precision and the art of craftsmanship.
Forest cuckoo clocks and a by-word for
precision and the art of craftsmanship.

Smart, Germany - Receivers

MD

Peter
Löble

Christoph
Hoefler

▲

Happy
Birthday
IBC

Spaun, Germany - Accessories

directors Peter Löble (left) and
Christoph Hoefler (right) on the
roof of the company’s business
premises. Christoph Hoefler
has been active in the field
of satellite technology since
1988. Starting as a radio and
television technician he moved
on to the purchasing and sales
department of a specialised
electronics store before
starting as field manager for
Nokia. In 2005 he finally became
head of sales at Wela and
with the foundation of Smart
Electronic his new job was
managing director there. Peter
Löble, the second managing
director, has been working in
the satellite field since 1997. He
also worked for an electronics
store and joined Wela in 2001
as product manager. Both have
known each other since 1997
and consider themselves a
great team.

TELE-satellite World

Smart has a clear focus on receiver
production, and this is a segment where
the two managing directors also identify
the core strengths of Smart. Christoph
Hoefler: “We are able to react swiftly to
customer demands, because we manufacture our receivers right here in the Black
Forest region and therefore are not faced
with long and winding delivery channels
for our customers in Europe and Northern
Africa.”
Christoph Hoefele lists some examples:
“Depending on the required language
we package the appropriate instruction
manual or adapt the on-screen menu to the
local language.” After all, Smart lives by its
credo “Connect, watch”. Customers need
to be happy with their Smart receiver right
from the start, which can be guaranteed by

“usability in combination with quality made
in the Black Forest,” according to Christoph
Hoefler, who hits the core of the Smart philosophy with this statement.
Peter Löble visits the sales office in
Morocco almost on a monthly basis and
he adds that “Smart is open for new sales
partners mainly in Europe, but also in nonEuropean countries. We are able to adapt
our receivers to local requirements very
quickly,” he hastens to add.
Even though Smart has only been in
existence for less than a year the company
is already in the process of developing new
products. Some of these will already be
available by the time this issue of TELEsatellite is published. “We’re introducing
a new LNB series with extremely small
dimensions,” reveals Peter Löble. And

www.TELE-satellite.com/...

Download this report in other languages from the Internet:
Arabic
Indonesian
Bulgarian
Czech
German
English
Spanish
Farsi
French
Greek
Croatian
Italian
Hungarian
Mandarin
Dutch
Polish
Portuguese
Romanian
Russian
Swedish
Turkish

‫ﺍﻟﻌﺮﺑﻴﺔ‬

Indonesia
Български
Česky
Deutsch
English
Español
‫ﻓﺎﺭﺳﻲ‬
Français
Ελληνικά
Hrvatski
Italiano
Magyar
中文
Nederlands
Polski
Português
Românesc
Русский
Svenska
Türkçe

www.TELE-satellite.com/TELE-satellite-0901/ara/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/bid/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/bul/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/ces/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/deu/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/eng/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/esp/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/far/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/fra/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/hel/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/hrv/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/ita/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/mag/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/man/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/ned/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/pol/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/por/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/rom/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/rus/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/sve/smart.pdf
www.TELE-satellite.com/TELE-satellite-0901/tur/smart.pdf

Available online starting from 28 November 2008

70 TELE-satellite & Broadband — 12-01/2009 — www.TELE-satellite.com

■ View of the production floor: here, the components sourced as cabinets are equipped with tuners.

Explains Peter Löble: “This way we are able to cover several markets with a single base unit, depending on the individual market demands and with the added advantage of being able to guarantee quality
assurance.” Three product ranges are manufactured here: fully fledged HD receivers with CA, CI, USB
and VFD display, basic models with limited features and – recently added – LINUX-based receivers.

72 TELE-satellite & Broadband — 12-01/2009 — www.TELE-satellite.com

Kevin
Spaun

fall of the Berlin Wall. Up to that point Spaun
only delivered their products to West Gerwww.TELE-audiovision.com/TELE-satellite-0809/stab.pdf
many; there was no real thought of exporting products. The new market in eastern
Happy
Birthday
Germany brought with it so many new
Years
opportunities that Friedrich Spaun finally
decided: “We are now going to distribute
products under our own brand name!”

Founder

■

MD

Finance

Dishpointer, UK - Software

But more on that later. Let’s take a closer look
at Spaun itself: they are a company that can be
found in extreme southwestern Germany. The
founder of the company, that today has nearly
100 employees, is Friedrich Spaun. He explained
to us how it all started: “It all began for me on
my kitchen table in 1969.” Back then FM radio
in Germany was just starting to transmit in
stereo. It quickly became clear that many of
the radios in use were not getting enough of an
antenna signal - an amplifier was needed that
would raise the signal-to-noise ratio. “I constructed an amplifier board that was installed in
the indoor antennas supplied by a large manu-

‫ﺍﻟﻌﺮﺑﻴﺔ‬

Arabic
Indonesian
Bulgarian
Czech
German
English
Spanish
Farsi
French
Greek
Croatian
Italian
Hungarian
Mandarin
Dutch
Polish
Portuguese
Romanian
Russian
Swedish
Turkish

www.TELE-satellite.com/...

www.TELE-satellite.com/TELE-satellite-0811/ara/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/bid/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/bul/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/ces/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/deu/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/eng/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/esp/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/far/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/fra/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/hel/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/hrv/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/ita/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/mag/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/man/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/ned/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/pol/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/por/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/rom/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/rus/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/sve/spaun.pdf
www.TELE-satellite.com/TELE-satellite-0811/tur/spaun.pdf

Indonesia
Български
Česky
Deutsch
English
Español
‫ﻓﺎﺭﺳﻲ‬
Français
Ελληνικά
Hrvatski
Italiano
Magyar
中文
Nederlands
Polski
Português
Românesc
Русский
Svenska
Türkçe

Available online starting from 26 September 2008

facturer”, remembers Friedrich Spaun. It was
the start of his one-man company.

In 1972 his little company was so successful
that he was able to hire his first employees. “In
1974 real production of multi-range amplifiers
and passive distributors was started”, Friedrich Spaun recalls. Of course back then these
were components for terrestrial television and
Spaun was only an OEM manufacturer for other
German firms. In 1980 supply line amplifiers for
cable TV were added to the mix.

■ Kevin Spaun (left), General Manager,

and Friedrich Spaun, Founder, on the
roof of their office building. Both of
them operate Spaun as a team.

Thus far production took place in a rented
house, but that all changed in 1988: “That’s
when we built our production facility in Singen
that we still work out of today and were also at
the same time a pioneer”, comments Friedrich
Spaun as he shows us the outside walls made
of aluminum: “For many years we were a reference point for the manufacturer of these walls.”

■ A look at the office building of company Spaun in Singen

in southwestern Germany. Behind the building to the right
can be found the production facilities for Spaun’s multiswitches.

58 TELE-satellite & Broadband — 10-1
1/2008 — www.TELE-satellite.com

www.TELE-satellite.com — 10-1
1/2008 — TELE-satellite & Broadband

59

Motor Control

COMPANY REPORT

USALS
Celebrates
10 Years

10

Alexander Wiese

Every TELE-satellite reader is familiar with the term USALS. In the Technical
Data table of every receiver test report
there is a line that identifies whether or not
the receiver is USALS compatible. Today,
almost every receiver on the market comes
with USALS. But USALS is not just a group
of letters; there’s actually a human behind
this term!
USALS stands for “Universal Satellite
Automatic Location System” and is software
that was developed exactly ten years ago
by Giorgio Bergamini. But it would be much
better to hear the story from the birthday
boy himself so off to Italy we go near Ferrara located about equidistant from Bologna and Venice. STAB’s headquarters and
production facility can be found there and
Giorgio Bergamini is the founder and owner
of STAB, a company that has been in existence since 1970.

STAB started early on building antenna
motors. In the beginning it was rotors for
VHF/UHF TV antennas and when satellite
reception became popular in the 1990’s,
they expanded to offering an assortment
of satellite antenna motors. “It was 1995”,
remembers Giorgio Bergamini, when a few
of the early satellite receiver manufacturers got together with EUTELSAT and developed the DiSEqC protocol. In 1997 it was
officially introduced and included DiSEqC
1.0 for individual LNBs, DiSEqC 1.1 for two
LNBs and, DiSEqC 1.2 for antenna motors.
But it was quickly discovered that the
1.2 protocol could only be used on a lim-

▲ Sandro Gnani is a STAB technician who checks each sample receiver to make sure that USALS

has been correctly implemented. The manufacturer can only print the USALS logo on the receiver
and its packaging when the receiver has passed every test.

ited basis: it required the storing of satellite positions in the motor and this turned
out to be useless when the motor was used
anywhere in the southern hemisphere.
The dishes there are pointed to the north
and not to the south. As a result, the order
of satellites was no longer correct – it was
now backwards compared to the northern
hemisphere.
“In 1998 I had an idea: the positions
should no longer be stored in the motor
but instead in the receiver”, remembers
Giorgio. This was the birth of USALS. He
wrote a small, but effective software program that with the help of

only the local geographical position on the
Earth and a reference satellite was able to
calculate all the other satellite positions
directly in the receiver, and it didn’t matter
if you were in the northern or southern
hemisphere.
Finally, in January 2000, EUTELSAT officially recognized USALS and introduced
it as DiSEqC 1.3. It is identical to DiSEqC
1.2 but includes an additional line of code:
“Drive Motor to Angular Position”.

The birthday boy himself: Giorgio Bergamini
is the founder of the USALS program that is
celebrating its 10th anniversary in 2008.

In 1993 his first successful product was
a multiswitch for two satellites and one
terrestrial TV input followed soon after by
www.TELE-audiovision.com/TELE-satellite-0805/subursemesta.pdf
four and eight satellite input models. These
products were quickly exported to neighborTechnical
ing countries. Today 50 % of their products
are exported of which 30 % are shipped to
EU countries with 20 % ending up outside of
Thiang
Europe. Total sales for Spaun range between
12 and 15 million Euros each year.

■
Tiong An

58 TELE-satellite & Broadband — 08-09/2008 — www.TELE-satellite.com

COMPANY REPORT

60 TELE-satellite & Broadband — 08-09/2008 — www.TELE-satellite.com

TELE-satellite World

Dish Manufacturer PT Subur Semesta, Indonesia

Arabic
Indonesian
Bulgarian
Czech
German
English
Spanish
Farsi
French
Greek
Croatian
Italian
Hungarian
Mandarin
Dutch
Polish
Portuguese
Romanian
Russian
Swedish
Turkish

The company PT Subur Semesta was founded in 1978 in
Jakarta on Java, one of the 17,000 islands that make up Indonesia. 60% of the 220 million inhabitants can be found on Java of
which 15 million live in the capital city Jakarta – it could even be
a few million more. To be noticed here you need an extremely
bright star and it is for that reason that PT Subur Semesta uses
the planet Venus as their trademark. The wonderful ambiguity
with the God of Love Venus can only make you smile. One of
the founders of the company, Liong Ten Fook, came up with the
name – an ingenious idea!

But Liong Ten Fook was not
the only founder; his partner
was back then and still is now
Thiang Tiong An. “We originally started as a telephone
accessory factory. Later on we
added emergency lights, that
is, lights with built in batteries that are used everywhere
whenever there is a power
outage”, remembers Liong Ten
Fook.

PT Subur Semesta entered
the satellite arena in 1989
when they began to offer
analog satellite receivers. In
2000 the first digital receiver
appeared and in 2002 it all
turned really serious when the
production of satellite dishes
began. In the meantime the
company expanded its management: Tjia Tek Ijoe climbed
aboard as a partner. Today PT
Subur Semesta is run by these
three partners.

A large amount of money
was invested in 2004 explains
Tjia Tek Ijoe: “We acquired a
machine press so that we could
manufacture the dish segments
ourselves.” Heavy investment
in the company occurred again
one year later: “We bought a
powder painting system to
spray paint the segments.”
But it was still not enough.
Tjia Tek Ijoe revealed to us
that there’s yet another large
investment:
“We
invested
another USD 600,000 for the
fabrication of mesh antennas.
This lets us produce 20,000
dishes every month.”

www.TELE-satellite.com/...

Download this report in other languages from the Internet:

Jakarta’s
Venus Star

‫ﺍﻟﻌﺮﺑﻴﺔ‬

Indonesia
Български
Česky
Deutsch
English
Español
‫ﻓﺎﺭﺳﻲ‬
Français
Ελληνικά
Hrvatski
Italiano
Magyar
中文
Nederlands
Polski
Português
Românesc
Русский
Svenska
Türkçe

www.TELE-satellite.com/TELE-satellite-0805/ara/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/bid/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/bul/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/ces/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/deu/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/eng/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/esp/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/far/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/fra/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/hel/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/hrv/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/ita/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/mag/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/man/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/ned/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/pol/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/por/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/rom/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/rus/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/sve/venus.pdf
www.TELE-satellite.com/TELE-satellite-0805/tur/venus.pdf

A devious discovery from Venus:
this small tool makes it very easy to
precisely align a dish.

we use, for example, lead-free

paints from Akzo Nobel and
even the dish is made of the

quality material Galvalume, a

is working on getting ISO certified. “We are expecting the
test results in April 2008”,
reports Tjia Tek Ijoe proudly,
“We applied for ISO 9001 and
14001.” This means that PT
Subur Semesta also follows
the most stringent environmental guidelines. “In order to
have international success, we
have to have quality in every
respect”, confirms Tjia Tek Ijoe,
“For the coating of our dishes

In western Jakarta, not too far
from the international airport,
can be found PT Subur Semesta,
brand name Venus.
The offices are at the front of
the building with the windows, and
towards the back are the factory
buildings that house the machines
to manufacture the dish antennas.
The company employs a total of 200
people of which 60 are involved with
the manufacture of dishes. They
work from 8AM to 5PM Monday thru
Friday and on Saturdays to 2PM.

product of the manufacturer
Bluescope

in

Australia.

The

material consists of 55% alu-

minum and 45% Zinc and is
therefore especially resistant
and durable.”

Finance Manager Liong Ten

Fook is proud of PT Subur
Semesta’s sales figures. “Every

year there’s an increase”, he

comments. “The year before it

was 10% less while in 2008 we

PT Subur Semesta organizes
seminars for installers eight times
a year. Distributors send their
technical people to learn how to
quickly and efficiently set up a
packaged 1.8-meter antenna with
dual-feed LNB. To make these
seminars even more attractive,
time limits are set and winners
are announced. Food and drink is
also taken care of as can be seen
by the accommodation tent in the
background. A large loudspeaker is
also set up there to keep the young
installers happy with loud music.
Each seminar handles 60 installers
where they are taught to install a
dish such that the dual-feed can
successfully receive PALAPA C2 at
113° east and TELKOM at 108° east.

Those are large numbers; we
wanted to know how many solid
antennas are being manufactured today: “At the moment,
our production capacity is at
about 15,000 antennas per
month of which the majority are
sold domestically”, explained
Thiang Tiong An, “Our company
supplies approximately 15% of
the Indonesian market.”
Of their total production,
80% is delivered domestically,
the rest is exported. According
to Thiang Tiong An, “40% of our
dish production goes to Thailand and Vietnam, the remainder goes to Brunei with a small
percentage going to Australia.”

expect 10% more.”

50% of their sales are attrib-

uted to TVRO products such as

dishes and the installation of
satellite receivers as well as
the sale of imported actuators

and LNBs. Then there’s also
the sale of their “homemade”

2in1 and 4in1 products: that

would be Combi-feeds for Cband LNBs with offsets of 5°
with the 2in1 and 5° -2.5° -5°

with the 4in1. Unfortunately,

PT Subur Semesta can’t really

hope for any large business
with this product since it’s so
easy to copy it.

Tjia Tak Ijoe gave us a look

The installers take great care to
remain within the preset time limits.
That would be 45 minutes from the
box to successful reception using
a dual-feed LNB and 75 minutes for
the successful set up of a motorized
system. Since Jakarta is located so
close to the Equator, the declination
angles are very small.

“Naturally we want to expand
our exports”, explains Tjia Tek
Ijoe, “We are investing heavily
in quality.” PT Subur Semesta

PT Subur Semesta’s three
partners: From the left,
Liong Ten Fook, Finance
Director, Tjia Tek Ijoe, Managing
Director, and Thiang Tiong An,
Technical Director

▲

shpointer

Liong
Ten Fook

TELE-satellite World

Download this report in other languages from the Internet:

Alexander Wiese

Almost every TELE-satellite reader will associate the name Spaun with high-quality satellite
distribution components. “Quality made in Germany” is their motto; Spaun’s mission in life is
to make sure that the quality of their products
is always kept at the highest level.

▲

▲

Tjia
Tek Ijoe

High Quality Accessory Manufacturer

Moving into the new decade
with many new products

Well, actually, the title isn’t quite correct; the company Spaun doesn’t celebrate its 40th
anniversary until 2009. But Spaun is so full of energy and is getting ready to introduce
a wide range of new products in their anniversary year that we simply couldn’t wait to
find out about this company’s long history.

▲

Bergamini

COMPANY REPORT

Spaun at 40 years

▲

Friedrich
Spaun

MD

▲

Founder

Subur Semesta, Indonesia - Dishes

at their production: “40% of

our dishes are made of steel,

40% are galvanized and 20%
are made from Galvalume, the
best dish material.”

The Venus Star from Jakarta
is well on the way to establishing itself in the international

Protecting the environment at
PT Subur Semesta: Tjia Tek Ijoe
shows us the waste water treatment
system the company invested
in so that they comply with ISO
environmental standards.

56 TELE-satellite & Broadband — 04-05/2008 — www.TELE-satellite.com

league, and could very well
come out on top of the international market share with their
quality dishes that happen to
be “Made in Indonesia”!

Owner
▲

▲

This is where Kevin Spaun comes into
the picture. He took over company operations from his father Friedrich Spaun in early
www.TELE-audiovision.com/TELE-satellite-0803/dishpointer.pdf
2008. “But we run the company as a team”,
Dishpointer
confirmed both of them at the same time.

▲

Alan

variously sized dots (the larger
the dot, the more visitors) on a
world map. And, wouldn’t you
know it, that is exactly the technology that Alan was looking for
with his idea to display satellite
positions.

ent in aereodynamhis thesis, he’s comme working with PC
g. “I got my first PC
16. It was a C64”,
Alan about his early
ogramming days. “It
been in 2004 when
ss Multimaps; it’s a
geographic maps.”

■ The two Smart managing

Christoph Hoefler und Peter Löble are
the two managing directors of Smart and
they give a brief account of the run-up to
the current business: Smart Electronic
was spun off of the long-running trading
company Wela Electronic at the beginning
of 2008. At the same time Smart also took
over a fully operational manufacturing site
for assembling satellite receivers from
third-party components. Incidentally, satellite receivers make up only one segment
of the complete product range. “We also
supply LNBs, multi-switches and mounting
material, which means we can offer everything a specialised satellite dealer needs,”
explains Peter Löble.
Christoph Hoefler then continues by providing some insight into how the company
performed in the first year of business.
“We had anticipated a first-year turnover
along the lines of 20 million EUR, with a
10% increase for 2009.” All employees
that had been involved in satellite technology were taken over from Wela Electronic. According to Christoph Hoefler “30
employees work in receiver manufacturing, while 15 members of staff take care of
sales and 10 persons work in administration.” The marketing department was set
up from scratch and already has a head
count of four members of staff. Smart is in
expansion mode, that’s for sure!
So what are the actual goals of expansion? Peter Löble summarises the company’s markets as follows. “Some 50%
of sales are generated in Germany, 20%
each go to Western and Eastern Europe
and 10% to North Africa.” For 2009 Peter
Löble expects some shifting of markets in
combination with increased turnover. “We
believe that 45% of our sales will go to
Germany, 15% to Western Europe, 25%
to Eastern Europe and the North African
share will rise to 15% as well.”
He also explains why he is so optimistic
about the development of sales in Northern Africa: “A few months ago we set up
a branch there which means we are now
able to supply our customers in that region
very quickly and with reduced turnaround
times.”

▲

Stab, Italy - Motors

lives in England, has
llite DXer since the
His first antenna was
model with a rotor.
I used an Echostar
sitioner to turn the
ains Alan.

Being ‘SMART’
in Germany’s
Black Forest
When you hold this issue of TELE-satellite in
your hands the company Smart Electronic
will only have been in existence for less
than a year. It doubtlessly is a very young
company, but still it can boast its own
production facilities and dedicated sales
channels. How can a start-up business
develop so fast? That’s exactly what we
wanted to find out when we set out on our
journey to the south-western corner of
Germany, home of the world-famous Black
Forest cuckoo clocks and a by-word for
precision and the art of craftsmanship.

www.TELE-audiovision.com/TELE-satellite-0811/spaun.pdf
He then explained how Spaun ended up with
their company colors: “Those are the colors
Technical
of the building walls, blue and silver, and we
decided to incorporate these colors into our
Manager
corporate identity.”
Steffen
Spaun has only existed as a stand-alone
Kuck
brand name since 1991. That was after the

Years

R	
Manu
	 Distr
Whol
ITE SOFTWARE
Shop Dish Alignment
Serv

R	
Manu
R	
Distr
Whol
Shop
R Serv

Receiver Manufacturer Smart

TELE-satellite World
TELE-satellite World
Giorgio

10

Certificate
Holder

R	
Manu
	 Distr
Whol
Shop
Serv

COMPANY REPORT

▲

R	
Manu
	 Distr
Whol
Shop
Serv

www.TELE-audiovision.com/TELE-satellite-0901/smart.pdf

MD

▲

▲

R	
Manu
R	
Distr
R Whol
Shop
Serv

www.TELE-satellite.com — 04-05/2008 — TELE-satellite & Broadband

SATELLITE SOFTWARE

57

Dish Alignment

02-03/2008
DISHPOINTER
Software Solution that,
with the help of
Google Maps and its
real images
as SatcoDX and its up-to-date as well
channel
data, provides highly
accurate satellite
reception information.

Alan, who lives in England, has
been a satellite DXer since the
year 2000. His first antenna was
a 120 cm model with a rotor.
“Back then I used an Echostar
box with positioner to turn the
motor”, explains Alan.

Kevin Spaun wants to expand the export
business: “At the moment we are in the
process of locking in the North American
market; we are looking for local distributors
and also want to open our own distribution
office in the USA”, reveals Kevin Spaun, “we
also want a stronger presence in the Middle
East.“
As a student in aereodynamics, writing his thesis, he’s completely at home working with PC
programming. “I got my first PC
when I was 16. It was a C64”,
remembers Alan about his early
software programming days. “It
must have been in 2004 when
I came across Multimaps; it’s a
collection of geographic maps.”

He came up with the idea to
incorporate the display of satellite positions on these maps as
a way to help with the set up of
satellite dishes. But how was this
going to work? These were fixed
maps in differing display sizes.
Alan could have programmed
something but it would have
required a lot of time and effort.
So he dropped the idea; it would
have been too much work.
In 2005 he started a web site
(www.uksatellitehelp.co.uk) in
which he provided helpful tips
on how to properly set up a satellite dish.

To get an idea of how successful his website was, he enlisted
the aid of Google Analytics, a
free service that analyzes in
great detail the traffic of a website. TELE-satelli

▲ Alan at home in front of his reception system. He uses the smaller dish

to receive the Sky package and the larger dish for scanning the skies. He
programmed Dishpointer; a tool that combines azimuth and elevation with
Google Maps for positioning on the Earth and SatcoDX with its global satellite databank.

TELE-satellite World

Arabic
Indonesian
Bulgarian
German
English
Spanish
Farsi
French
Greek
Croatian
Italian
Hungarian
Mandarin
Dutch
Polish
Portuguese
Russian
Swedish
Turkish

‫ﺍﻟﻌﺮﺑﻴﺔ‬

Indonesia
Български
Deutsch
English
Español
‫ﻓﺎﺭﺳﻲ‬
Français
Ελληνικά
Hrvatski
Italiano
Magyar
中文
Nederlands
Polski
Português
Русский
Svenska
Türkçe

www.TELE-satellite.com/...

www.TELE-satellite.com/TELE-satellite-0803/ara/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/bid/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/bul/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/deu/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/eng/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/esp/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/far/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/fra/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/hel/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/hrv/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/ita/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/mag/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/man/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/ned/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/pol/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/por/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/rus/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/sve/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/tur/dishpointer.pdf

36 TELE-satellite & Broadband — 02-03/2008 — www.TELE-satellite.com

Spaun offers nearly 200 different products of which the best-selling products are,
and always have been, multiswitches avail-

He extracted his old idea from
the back of his mind and began
with a new sense of purpose
to find a solution – and then
promptly stumbled onto Google
Maps.

up with the idea to
the display of satels on these maps as
p with the set up of
es. But how was this
k? These were fixed
ering display sizes.
have programmed
but it would have
t of time and effort.
ed the idea; it would
oo much work.

e started a web site
ellitehelp.co.uk) in
rovided helpful tips
roperly set up a sat-

dea of how successite was, he enlisted
Google Analytics, a
e that analyzes in
the traffic of a webatellite also uses this

alytics also contains
graphically displays
phical location of a
sitors by displaying

■ Spaun general Manager Kevin Spaun also likes to get his hands
dirty sometimes by testing multiswitches.
The antenna signals from the roof land here and can be connected
to the multiswitches in any arrangement. Customer problems can
also be replicated and then checked out here.

Suddenly, everything clicked:
in August 2007 he programmed
the first version of his Dishpointer. Click on a desired position on the map and the azimuth
and elevation of a selected satellite is displayed. “Now it was only
a question of programming in
order to integrate additional features”, explains Alan about his
work the last several months.
The first step was: why should
a user first have to click on a
map or enter an address when
the IP number alone identifies
the position? There are professional companies that provide
exactly this data. Online stores
use this information to determine if a buyer really lives where
he says he does.
That was the first step. Now
Dishpointer “knows” exactly
where a user is and automatically sets the reception location
to this point. This may not always
be very precise; it depends on
the accuracy of the virtual IP
addresses compared to the real
addresses.
Next, Alan analyzed the
popularity of satellites so that

▲ Alan at home in front of his reception system. He uses the smaller dish

to receive the Sky package and the larger dish for scanning the skies. He
programmed Dishpointer; a tool that combines azimuth and elevation with
Google Maps for positioning on the Earth and SatcoDX with its global satellite databank.

60 TELE-satellite & Broadband — 10-1
1/2008 — www.TELE-satellite.com
www.TELE-satellite.com/...

TELE-satellite World

Download this report in other languages from the Internet:
Arabic
Indonesian
Bulgarian
German
English
Spanish
Farsi
French
Greek
Croatian
Italian
Hungarian
Mandarin
Dutch
Polish
Portuguese
Russian
Swedish
Turkish

‫ﺍﻟﻌﺮﺑﻴﺔ‬

Indonesia
Български
Deutsch
English
Español
‫ﻓﺎﺭﺳﻲ‬
Français
Ελληνικά
Hrvatski
Italiano
Magyar
中文
Nederlands
Polski
Português
Русский
Svenska
Türkçe

www.TELE-satellite.com/TELE-satellite-0803/ara/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/bid/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/bul/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/deu/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/eng/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/esp/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/far/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/fra/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/hel/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/hrv/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/ita/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/mag/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/man/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/ned/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/pol/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/por/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/rus/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/sve/dishpointer.pdf
www.TELE-satellite.com/TELE-satellite-0803/tur/dishpointer.pdf

ite & Broadband — 02-03/2008 — www.TELE-satellite.com

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

223
DXer REPORT

Siddharth Gautam in India

HOTBIRD
in India
■ Bangalore Satellite DXer

Siddharth Gautam in front of his
3.65 m dish. With this equipment
he receives some European
signals, even though he is way out
of their footprints.

•	extreme reception in southern India
•	European satellites – crystal clear
•	Ku band reception with large antenna
•	almost no difference noticeable between offset and PFA LNB

224 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

225
DXer REPORT

Siddharth Gautam in India

Satelliten DXer
Siddharth Gautam
in Bangalore
How far does
HOTBIRD’s footprint
actually go?
India and the European HOTBIRD
position at 13°E are not exactly a perfect match. How’s that? In a word, the
HOTBIRD footprint does not extend as
far as India. But then again, never say
never: Satellite DXer Siddharth Gautam from Bangalore is a regular viewer
of channels broadcast from the HOTBIRD orbital position. If you take a look
at Bangalore on the map it’s obvious
that the capital of the province of Karnataka is definitely out of footprint, so
how is Siddhart able to receive signals
from HOTBIRD?
“I use a 12-foot (3.65 m) antenna,”
Siddhart reveals. “The entire installation set me back some 350 euros.”
But that’s not the full story. If Siddhart
moves the dish he can even receive EUROBIRD 9 and EUTELSAT 36B. “What
I found out is that it hardly makes a
difference whether I use an offset LNB
or a PFA LNB,” although prime focus
antennas (PFA) usually work best with
a PFA LNB. Siddhart has even set up
his own Internet forum by the name of
‘Dish Tuning’ which he uses to publish
his extreme reception experience:
http://dishtuning.com/Thread-Hotbird-In-South-India-13-East
Apart from keeping his Internet forum up to date, Siddhart also runs an
installation business. This provides
an excellent way of showing custom-

■ Siddharth Gautam’s
reception station

226 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

ë

Bangalore
1
1. The HOTBIRD footprint does not reach India,
but satellite DXer Siddharth Gautam is able
to receive a number of European satellites
nonetheless.
2. FunTV – sent from HOTBIRD, received in
Bangalore
3. News channel France 24 – sent from
EUTELSAT 36B, and also received in Bangalore
4. Hungarian HDTV channel Duna World HD
from EUROBIRD 9A in Bangalore

ers what can be achieved with extreme
satellite reception. “Nobody around here
even knows that European satellites can
be received in southern India when you
use a large enough antenna.” Now that
he’s found out how it works Siddhart
even contemplates producing those
large antennas himself. “If demand is
high enough, I’ll definitely grab that

2

3

4

chance,” he states with some optimism.
Pre-orders can be made directly with
Siddhart by contacting him using this email address:
siddharth_pnb@hotmail.com
Siddhart lends prove once again to the
fact that the proof of the pudding is in the
eating. If you try hard enough you may
well achieve something that – in theory –
seems to be out of the question.

228 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
UPLINK OVERVIEW

BEST

TELE-audiovision’s Best Satellite Uplink Earth Stations

SATELLITE

UPLINK

EARTH
STATIONS IN
THE WORLD
BT
Madley
UK ►

ESPN ►
Bristol, USA

CASTOR
Burum
Netherlands ▼

SES ASTRA ►
Luxembourg

CBC
Cologne
◄ Germany

◄ MEDIA BROADCAST
Usingen, Germany

SHENZHEN TV ►
Shenzhen
China

Speedcast ►
São Paulo, Brazil

◄ Nivalod da Silva
São Paulo, Brazil
◄ TV Bandeirantes
Campinas (São Paulo)
Brazil

◄ TELEMEDIA
Johannesburg
South Africa

230 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

PTS
Taipei
◄ Taiwan
Speedcast
Sao Paulo
Brazil
Read Full Report

www.tavmag.com
/13/09/speedcast

ESPN
Bristol
USA
Read Full Report

www.tavmag.com
/12/11/espn

Nivaldo da Silva
São Paulo
Brazil
Read Full Report

www.tavmag.com
/12/09/nivaldodasilva
www.TELE-satellite.com — 06-07/20121-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志
www.TELE-audiovision.com — 1 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

231
UPLINK OVERVIEW

TELE-audiovision’s Best Satellite Uplink Earth Stations

TV Bandeirantes
São Paulo
Brazil
Read Full Report

www.tavmag.com
/12/07/tvbandeirantes

Shenzhen TV
Shenzhen
China
Read Full Report

www.tavmag.com
/12/05/shenzhen-tv

Castor
Burum
Netherlands
Read Full Report

www.tavmag.com
/12/03/castor
232 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
CBC
Cologne
Germany
Read Full Report

www.tavmag.com
/12/01/cbc

BT
Madley
UK
Read Full Report

www.tavmag.com
/11/11/bt

SES ASTRA
Luxembourg
Read Full Report

www.tavmag.com
/11/09/ses
www.TELE-satellite.com — 06-07/20121-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志
www.TELE-audiovision.com — 1 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

233
UPLINK OVERVIEW

TELE-audiovision’s Best Satellite Uplink Earth Stations

Media Broadcast
Usingen
Germany
Read Full Report

www.tavmag.com
/10/09/mediabroadcast

Telemedia
Johannesburg
South Africa
Read Full Report

www.tavmag.com
/07/09/telemedia

PTS
Taipei
Taiwan
Read Full Report

www.tavmag.com
/07/07/pts
234 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
www.TELE-satellite.com — 06-07/20121-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志
www.TELE-audiovision.com — 1 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine

235
TELE-audiovision	M
These Companies Started Their International	

DXANTENNA
1987

ASTRA
1987

MASPRO
1988

SHARP
1989

236 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
Made Them Big!
Success with TELE-audiovision Magazine

TOPFIELD
2001

HUMAX
2001

MTI
2001

ARION
2001

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

237
TELE-audiovision	M
These Companies Started Their International	

NDS
2002

KAON
2003

238 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com

DREAM
2002

SAMSUNG
2003
Made Them Big!

Success with TELE-audiovision Magazine

SVEC
2003

CABSAT
2004

JONSA
2004

JIUZHOU
2004

CHANGHONG
2006

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

239
TELE-audiovision HISTORY

30

TELE-audiovision in 1983

Years Ago
British Company
Sinclari presented its
miniature tv

Cover page of TELE-satellite 06-07/2002

The small tv set with a
5cm flat screen includes
a 6V battery, which will
allow the set to operate
for 15 hours. This set is
especially interesting for
tv enthusaists as it can
detect 525 and 625 line
transmissions and can
decode audio at 4.75,
5.75, 5.5 and 6.0 MHz

240 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

241
TELE-audiovision HISTORY

20

TELE-audiovision in 1993

Years Ago
Round Antenna

Cover page of TELE-satellite 06-07/2002

Teleste from Littoinen
from Finland offers the
Multisat aerial for reception
of an arbitrary number of
satellites. The 90cm sphere
incorporates a special
dielectric tat works much
like a lense, focussing
incoming signals to a point
on its rear side. Equal gain
is achieved for all direftions
with an opneing angle of 2
degrees. The backside rod
can carry up to twenty LNBs.

242 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

243
TELE-audiovision HISTORY

10

TELE-audiovision in 2003

Years Ago
Satellite
Reception
in Frankfurt/
Oder,
Germany
Marko
Sommer's
dishes. Marko’s
favorite
programs can
be found at 5°,
13° and 19°
east.

244 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
Wavefrontier Toroidal-90

Wavefrontier Toroidal-90
the screws are securely tightened, should
the DiSEqC switches be integrated with
the LNB’s.

Antenna
Tuning

You might soon be asking yourself why
the manufacturer doesn’t simply extend
the original LNB rail of the Wavefrontier
antenna.

If the curve of the current rail

were extended left and right, a 100%
reflection of the signal would no longer be
guaranteed.
More than likely, because of TELE-satel-

T

lite reader Chris Mitiul, the engineers at
he ability to receive 16 satellites

Wavefrontier will start working on some

with a fixed antenna is quite the

kind of a solution.

sensation.

The “home made”

After our exclusive

construction discussed above still has a

report of the Wavefrontier Toroidal

lot of room for improvement in terms of

90 antenna in the 10-11/2001 edi-

fine-tuning adjustments.

tion of TELE-satellite magazine, this
true multifeed antenna became an

We tried the idea here ourselves in

overnight success. Yet even the best

the TELE-satellite test department.

product is still for some people not the

assembly and hardware for the additional

perfect one.

Naturally this includes

Assembly of additional LNB’s

The

LNB holders and rails we acquired second-

some hobbyists who, instead of doing

The end result

hand from a normal multifeed antenna.

what everyone else does, rely more

mounting bar was simply extended to the

the far eastern or western end prove to be

The extra costs for the feed holder ended

The vision to be able to receive 20

heavily on their brain and of course

left and right. And if this works for a Triax

difficult, a multifeed holder for three LNB’s

up between €10 (2 LNB’s) and €15 (3

satellites did not come completely true.

their set of tools in order to tell the

then it stands to reason that it should also

could also be used.

LNB’s) per piece. We managed an azimuth

And with the DiSEqC switches we never

manufacturers

work for a Wavefrontier, even though the

range of 56°. This is 40% more than what

managed to get more than 17 satellites

the Wavefrontier can do in its standard

(see diagram).

configuration.

could be selected from a significantly

that

their

products

could still be made better.

reflector design is different.

Before the actual work – the search
for all the desired satellites – starts, the

Mitiul

So the first thing was to fashion two
multifeed holders that could each hold

TELE-satellite

reader

Chris

two LNB’s. Such an aluminum holder was
made out of four feed mount halves, one

and can be turned in various directions.

would not be a problem with a motorized

rail and seven screws.

The rail is 15cm

The screws should only be slightly tight-

antenna but it would be for the neigh-

long and the LNB holders each have a

ened at first. This will help make it easier

bors so some kind of noiseless solution

width of 6cm. Normally the two LNB hold-

to move the assembly while looking for

was necessary.

ers would be fastened to the rail with two

the desired satellites. To prevent possible

screws.

Mounting to the Wavefrontier

errors from occurring with the neces-

antenna only required one screw. Because

sary DiSEqC switches during the satellite

of this an LNB offset of about 25 cm was

search, it is a good idea to initially connect

muth range was nothing new to him. The

achieved.

each LNB directly to the receiver or the

first successful attempts were made with

for any fine adjustments that may have

antenna measurement unit.

a Triax Multifocus antenna.

been needed.

this would be the only viable alternative.

additional LNB holders are quite flexible

West with a fixed antenna. This of course

The bottom line: if the installation of a
motorized antenna is not possible, then

should be aligned as best as possible. The

20 satellites between 24.2° East and 30°

before.

Wavefrontier with its original LNB setup

(www.satlex.de) had a vision: reception of

But these 17 satellites

larger azimuth range than was possible

all the satellites have been found and all

The Toroidal 90 was not

designed for such a wide range.
But for Chris Mitiul expanding an azi-

Extravagant cabling

The feed

This provided plenty of room
If the desired satellites at

Only when

This is how it is all switched

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

245
and Read Old Issues of

TELE-audiovision
M a g a z i n e
established 1981
the world's largest
digital tv magazine
is also the world's
oldest magazine
in the industry

246 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
1982 1986 1986 1987 1987

http://magazine.TELEaudiovision.com/vintage/
TELE-satellite-8211-deu.pdf

http://magazine.TELEaudiovision.com/vintage/
TELE-satellite-8603-deu.pdf

http://magazine.TELEaudiovision.com/vintage/
TELE-satellite-8605-deu.pdf

http://magazine.TELEaudiovision.com/vintage/
TELE-satellite-8705-deu.pdf

http://magazine.TELEaudiovision.com/vintage/
TELE-satellite-8711-deu.pdf

1988 1988 1988 1989 1989

http://magazine.TELEaudiovision.com/vintage/
TELE-satellite-8801-deu.pdf

http://magazine.TELEaudiovision.com/vintage/
TELE-satellite-8805-deu.pdf

http://magazine.TELEaudiovision.com/vintage/
TELE-satellite-8809-deu.pdf

http://magazine.TELEaudiovision.com/vintage/
TELE-satellite-8905-deu.pdf

http://magazine.TELEaudiovision.com/vintage/
TELE-satellite-8911-deu.pdf

1998 1998 1999 1999 1999
SATELLITE SATELLITE SATELLITE SATELLITE
TELE

INTERNATIONAL

TELE

INTERNATIONAL

TELE

INTERNATIONAL

TELE

Exclusive: Global Satellite Frequency Chart

INTERNATIONAL

Exclusive:
Global Satellite Footprints

Exclusive:
Global Satellite
Footprint Maps

New TV Box

MicroniK
http://www.TELE-satellite.com

http://magazine.TELEaudiovision.com/vintage/

TELE-satellite-9810-deu-eng.pdf

B 9318 E

11-12

ISSN 1435-7003

http://magazine.TELEaudiovision.com/vintage/

TELE-satellite-9812-deu-eng.pdf

http://www.TELE-satellite.com

B 9318 E

ISSN 1435-7003

http://magazine.TELEaudiovision.com/vintage/

01-02

TELE-satellite-9902-deu-eng.pdf

http://www.TELE-satellite.com

B 9318 E

ISSN 1435-7003

http://magazine.TELEaudiovision.com/vintage/

03-04

TELE-satellite-9904-deu-eng.pdf

http://www.TELE-satellite.com

B 9318 E

05-06

ISSN 0931-4733

http://magazine.TELEaudiovision.com/vintage/

TELE-satellite-9906-deu-eng.pdf

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

247
NEWS

Ultra High Definition HDTV

Edited by

Branislav Pekic

EUROPE
EBU TESTS HIGHER FRAME
RATES FOR UHDTV

The EBU is conducting a series of tests on the
impact of higher frame-rates for UHDTV services.
The tests are being conducted by the EBU’s
Broadcast Technology Futures group, make up of
the heads of research labs of the BBC, IRT, Rai and
NHK. The tests are designed to address questions
including whether the current UHDTV standard,
which includes only the 120Hz higher frame rate,
needs to be revised to incorporate other rates.

BBC, SKY LAUNCH UK UHD FORUM

The UK industry association for digital TV, the
Digital TV Group, has launched the UK UHD
Forum, which will work closely with Forum for
Advanced Media in Europe (FAME), an initiative led
by the EBU and the Digital Interoperability Forum
and supported by the European Commission. The
group will co-ordinate national requirements to
enable interoperability and examine whether there
is a requirement for an Ultra HD profile for the UK.

HISPASAT PLANS 4K CHANNEL

Spanish satellite operator Hispasat plans to
launch a 4K channel that will allow the industry
to broadcast in the Ultra High Definition standard. It has already launched a trial demonstration of Ultra HD content delivery using the HEVC
compression capabilities of the ViBE VS7000
multi-screen encoding platform powered by
Thomson Video Networks, via the Hispasat 1E
satellite platform. Hispasat has also partnered
with RTVE, Abertis Telecom and Apuntolapospo
for the production of a 50-minute documentary
on the history of the Prado Museum in UHD/4K.

CZECH OPERATOR TO RUN UHDTV TESTS

Czech Radiokomunikace has received approval
from the regulating body to continue DVB-T2 tests
from a transmitter in Prague. The operator will use
the license for testing pay-TV and Ultra HDTV,
with Czech TV being the main content supplier.

BSKYB AIRS 4K FOR FIRST TIME IN UK

BSkyB has conducted the first ultra HD broadcast in the UK, by airing the football match Stoke
City v West Ham on August 31. It has no plans to
launch a commercial service for the moment.

EUTELSAT AND SAMSUNG
AIR ULTRA HD AT IFA

On occasion of the IFA in Berlin, Eutelsat Communications and Samsung Electronics have partnered
to demonstrate a consumer-ready Ultra HD satellite
broadcast on a Samsung UHD TV. A DVB-S2 Ultra
HD signal transmitted by the Eutelsat 10 A satellite
was received on a commercially available UHD TV.

NORTH AMERICA
CEA PUBLISHES 4K ULTRA HD REPORT

The Consumer Electronics Association (CEA) has
released a new report—“Ultra High-Definition:
State of the Industry” that projects shipments of
Ultra HD sets to reach 57,000 units, worth US$ 314
million, by the end of this year. It forecasts Ultra
HD shipments to surpass the one million-unit mark
in 2015. The CEA’s study finds 4K production is

■Learn more about UHDTV in our Feature article:

www.TELE-audiovision.com/TELE-satellite-1309/eng/feature-uhdtv.pdf

increasing, thanks in part to the development of
4K-capable cameras and post-production tools.

SONY SHOOTS ESPN X-GAMES IN 4K

Sony has been shooting ESPN’s Summer X-Games
in 4K, with a goal of creating entertainment content
and drive demand for 4K “Ultra HD” TV sets. A
20-minutes story reel will be available for the Sony
Media Player, created to deliver 4K movies and
other content to owners of Sony’s Ultra HD TVs.

forecast to hit 30,000 units in 2013, with Chimei
products expected to take an 18 per cent share.

WORLD
MIRANDA, SONY COOPERATE ON
4K/UHDTV LIVE SOLUTIONS
Miranda Technologies has teamed up with Sony

LATIN AMERICA

to realize 4K/UHDTV live production solutions,

NET SERVICOS TO SWITCH TO 4K

4K technology solution involving both companies

Brazilian cable TV operator Net Servicos plans
to switch its HD broadcasts from 720p and
1080i directly to 4K, without going through
1080p. This is because transmission in 1080p
would require a new decoder, as the current
one only reads the 720p and 1080i formats.

ASIA
KCTA LAUNCHES 4K PILOT
CHANNEL IN SOUTH KOREA

Korea Cable Television & Telecommunications Association (KCTA) has just launched its
pilot 4K channel in South Korea, six months
ahead of its original schedule. Only limited
households are currently involved in the pilot
run, but the plan is to launch commercial broadcasts as early as next year. Meanwhile, satellite broadcaster KT Skylife announced plans to
offer pilot UHD contents starting next year.

CHUNGWHA TELECOM STARTS
SALES OF 4K TV SETS

Taiwanese operator Chunghwa Telecom began
selling UHD 4K television sets as part of an
effort to drive up local demand for UHD content.
Chunghwa Telecom aims to sell 40,000 50-inch
branded Chimei TVs by the end of this year,
including the 4K model, available on a three-year
subscription to the multimedia-on-demand (MOD)
service. The company aims for a total of 100,000
TV sales by year-end. Taiwan’s 4K TV market is

specifically targeting high profile sports. A seamless
will be used in UK outside broadcast company
Telegenic’s 4K-equipped OB truck expected
to go into service later this year. Miranda and
Sony held demonstrations of the integrated 4K/
UHDTV production scenarios at the NAB 2013.

SONY TO LAUNCH 4K MOVIE DOWNLOADS
Sony will offer 4K movies for download via Video
Unlimited 4K service from the autumn 2013,
featuring movies from Sony Pictures and independent producers. It will allow 4K TV owners to view
native 4K content from Sony’s 4K media server.

SONY LEADS 4K TV SHIPMENTS
Sony emerges as the leader in 4K TV shipments,
with a 37.8% share of the global market in the 1H
2013, according to NPD DisplaySearch. LG is
in second place with 14.2%, followed by Samsung with 4%. NPD DisplaySearch says that the
key reason for Sony’s dominance is its sales of
smaller 55-inch and 65-inch Bravia X9 models.
Powered by these sales, Sony has achieved
revenues of $185 million from its Ultra HD TVs
out of an industry-wide total of $490 million.

248 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

249
TELE-audiovision List

WebTV Provider 

WebTV mostly
www.nederlan
www.kijkdirec

WebTV mostly in English
www.freeinternettvcanada.ca

WebTV mostly in English
www.europa-network.com
www.whatsonthebox.net
www.tvcatchup.com
WebTV mostly in French
www.vpnvision.com
www.hubb-tv.com
www.monvpn.com
www.jcvpn.com

WebTV mostly in English
www.playon.tv
www.ustvnow.com
www.habu.tv
www.watchustvoverseas.com
www.tvandvideoguide.com

WebTV mostly in Span
www.teledirecto.es
www.tutelevisiononlin
WebTV mostly in Portugese
www.tvportugalhd.com
www.tvtuga.com

WebTV Genre Listings:
www.thefirstrow.eu
www.livetv.ru/en/
WebTV mostly in Brasilian
www.canaistv.net
www.radios.com.br
www.assistirtvonlinegratis.tv

WebTV
Provider
around the
WORLD
250 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
网络电视供应商

WebTV mostly in Swedish
www.webbtv.se
webtvpage.com

y in Dutch
nd.tv
ct.nl

WebTV mostly in Polish
www.weeb.tv

WebTV mostly in Russian
www.kartina.tv
www.telemax-tv.com

WebTV mostly in German
www.youfreetv.net
www.zattoo.com
www.tv-stream.to
www.schoener-fernsehen.com
WebTV mostly in Italian
www.guardatv.it

nish

WebTV mostly in Greek
www.megatv.com

ne.com

WebTV mostly in Arabic
www.zaaptv.com
www.arabtvnet.dk
www.tvnetsolutions.com
www.talfazat.com
www.atnnetwork.com
www.mediaboxtv.net
www.atnnetwork.com.au/

WebTV mostly in Chinese
www.kylintv.com
www.pptv.com
www.itv.cn
www.italkbb.com

WebTV mostly in Indian
www.tv-desi.com
www.jadootv.com
www.btviptv.com
www.wherever.tv

WebTV Channel Listings:
www.surfmusic.de/surftv.htm
www.glotzdirekt.de
www.wwitv.com
www.delicast.com
www.onlinetvi.com
www.free-internet-tv.cz
www.lookfortv.com
www.beelinetv.com
www.findinternettv.com
www.tvweb360.tv

www.webactu-webtv.com
www.webtv.pk
www.jumptv.com
www.arabic-media.com
www.broadband-television.com
www.tv4web.net
www.squidtv.net
www.tvnewsradio.com
www.argyletv.com
www.tv-direct.fr

www.playtv.fr
www.tvuzz.com
www.referenceur-tv.com
www.vosflux.tv
www.lookfortv.com
www.teledirecto.es
www.tvgratis.tv
www.miratv.com.ar
www.fulltv.com.ar
www.tv-porinternet.com

www.tvporinternet.tv
www.timstream.com
www.viewmy.tv
www.livestation.com
www.freeetv.com
www.watchfomny.com
www.tv-tube.tv
www.tv4web.net
www.findinternettv.com

www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

251
INTELSAT 10-02 - Europe, Middle East, North India ◄ 359.2 East (000.8 West)
C-Band: INTELSAT 10-02 - Europe, Africa, South East Asia ◄ 359.2 East (000.8 West)
THOR 5, 6 - Europe ◄ 359.2 East (000.8 West)
AMOS 2, 3 - Europe, Middle East ◄ 356.0 East (004.0 West)
EUTELSAT 5 WEST A - Europe ◄ 355.0 East (005.0 West)
C-Band: EUTELSAT 5 WEST A - Europe ◄ 355.0 East (005.0 West)
NILESAT 102, 201, EUTELSAT 7 WEST A - Middle East ◄ 353.0 East (007.0 West)
EUTELSAT 8 WEST A - Europe, America, Middle East ◄ 352.0 East (008.0 West)
EXPRESS AM44 - Middle East ◄ 349.0 East (011.0 West)
C-Band: EXPRESS AM44 - Europe, North Africa, Middle East ◄ 349.0 East (011.0 West)
EUTELSAT 12 WEST A - Europe, Africa ◄ 347.5 East (012.5 West)
TELSTAR 12 - Europe, South Africa, Am. ◄ 345.0 East (015.0 West)
INTELSAT 901 - Europe, Middle East ◄ 342.0 East (018.0 West)
C-Band: INTELSAT 901 - Europe, Africa, Atlantic Ocean Region ◄ 342.0 East (018.0 West)
NSS 7 - Europe, Africa ◄ 340.0 East (020.0 West)
C-Band: NSS 7 - Africa ◄ 340.0 East (020.0 West)
SES 4 - Europe, MIddle East ◄ 338.0 East (022.0 West)
C-Band: SES 4 - America ◄ 338.0 East (022.0 West)
INTELSAT 905 - Europe ◄ 335.5 East (024.5 West)
C-Band: INTELSAT 905 - Europe, Africa, America ◄ 335.5 East (024.5 West)
INTELSAT 907 - Europe ◄ 332.5 East (027.5 West)
C-Band: INTELSAT 907 - Europe, Africa, America ◄ 332.5 East (027.5 West)
HISPASAT 1C, 1D, 1E - Europe, America ◄ 330.0 East (030.0 West)
INTELSAT 25 - Africa ◄ 328.5 East (031.5 West)
C-Band: INTELSAT 25 - Europe, Africa ◄ 328.5 East (031.5 West)
INTELSAT 903 - Europe ◄ 325.5 East (034.5 West)
C-Band: INTELSAT 903 - Europe ◄ 325.5 East (034.5 West)
TELSTAR 11N - Europe, Africa ◄ 322.5 East (037.5 West)
C-Band: NSS 10 - Europe, Africa, America ◄ 322.5 East (037.5 West)
NSS 806 - Europe ◄ 319.5 East (040.5 West)
C-Band: NSS 806 - America, Europe ◄ 319.5 East (040.5 West)
INTELSAT 11 - Brazil ◄ 317.0 East (043.0 West)
C-Band: INTELSAT 11 - Brazil ◄ 315.0 East (043.0 West)
INTELSAT 14 - Europe, North Africa, South America ◄ 315.0 East (045.0 West)
C-Band: INTELSAT 14 - America ◄ 315.0 East (045.0 West)
INTELSAT 1R - America ◄ 315.0 East (050.0 West)
INTELSAT 23 - America ◄ 307.0 East (053.0 West)
C-Band: INTELSAT 23 - America, Africa ◄ 307.0 East (053.0 West)
Galaxy 11 - Brazil ◄ 304.5 East (055.5 West)
C-Band: INTELSAT 805 - America ◄ 304.5 East (055.5 West)
C-Band: INTELSAT 21 - Mexico ◄ 302.0 East (058.0 West)
AMAZONAS 2 - South America ◄ 299.0 East (061.0 West)
C-Band: AMAZONAS 3 - America ◄ 299.0 East (061.0 West)
AMAZONAS 3 - Brazil ◄ 299.0 East (061.0 West)
ECHOSTAR 16 - Conus ◄ 298.5 East (061.5 West)
TELSTAR 14R - Brazil, Mercosul ◄ 297.0 East (063.0 West)
STARONE C1 - Brazil ◄ 295.0 East (065.0 West)
C-Band: STARONE C1 - South America ◄ 295.0 East (065.0 West)
AMC 4 - North America ◄ 295.0 East (065.0 West)
STARONE C2 - Brazil ◄ 290.0 East (070.0 West)
C-Band: STARONE C2 - South America ◄ 290.0 East (070.0 West)
AMC 6 - North America ◄ 288.0 East (072.0 West)
C-Band: AMC 6 - North America ◄ 288.0 East (072.0 West)
NIMIQ 5 - Conus ◄ 287.3 East (072.7 West)
QUETZSAT 1 - Conus ◄ 283.0 East (077.0 West)
ECHOSTAR 1 - America, Mexico ◄ 283.0 East (077.0 West)
SIMON BOLIVAR - South America ◄ 282.0 East (078.0 West)
C-Band: SIMON BOLIVAR - South America ◄ 282.0 East (078.0 West)
NIMIQ 4 - Canada ◄ 278.0 East (082.0 West)
AMC 9 - North America ◄ 277.0 East (083.0 West)
C-Band: BRASILSAT B4 - Brazil ◄ 276.0 East (084.0 West)
AMC 16 - North America ◄ 275.0 East (085.0 West)
SES 2 - North America ◄ 273.0 East (087.0 West)
C-Band: SES 2 - North America ◄ 273.0 East (087.0 West)
GALAXY 28 - America ◄ 271.0 East (089.0 West)
C-Band: GALAXY 28 - America ◄ 271.0 East (089.0 West)
NIMIQ 6 - Canada ◄ 269.0 East (091.0 West)
GALAXY 17 - North America ◄ 269.0 East (091.0 West)
C-Band: GALAXY 17 - North America ◄ 269.0 East (091.0 West)
GALAXY 25 - North America ◄ 266.9 East (093.1 West)
GALAXY 3C - North America ◄ 265.0 East (095.0 West)
C-Band: GALAXY 3C - North America ◄ 265.0 East (095.0 West)
GALAXY 19 - North America ◄ 263.0 East (097.0 West)
C-Band: GALAXY 19 - North America ◄ 263.0 East (097.0 West)
GALAXY 16 - North America ◄ 261.0 East (099.0 West)
C-Band: GALAXY 16 - North America ◄ 261.0 East (099.0 West)
DIRECTV 4S, 8 - America ◄ 259.0 East (101.0 West)
SES 1 - North America ◄ 259.0 East (101.0 West)
C-Band: SES 1 - North America ◄ 259.0 East (101.0 West)
AMC 1 - North America ◄ 257.0 East (103.0 West)
C-Band: AMC 1 - North America ◄ 257.0 East (103.0 West)
AMC 15 - North America ◄ 255.0 East (105.0 West)
C-Band: AMC 18 - North America ◄ 255.0 East (105.0 West)
ANIK F1R - North America ◄ 252.7 East (107.3 West)
C-Band: ANIK F1R - North America ◄ 252.7 East (107.3 West)
C-Band: ANIK F1 - South America ◄ 252.7 East (107.3 West)
ANIK G1 - North America ◄ 252.7 East (107.3 West)
ECHOSTAR 10, 11 - America ◄ 250.0 East (110.0 West)
DIRECTV 5 - America ◄ 250.0 East (110.0 West)
ANIK F2 - North America ◄ 248.9 East (111.1 West)
C-Band: ANIK F2 - North America ◄ 248.9 East (111.1 West)
SATMEX 6 - America ◄ 247.0 East (113.0 West)
C-Band: SATMEX 6 - America ◄ 247.0 East (113.0 West)
SATMEX 8 - America ◄ 243.2 East (116.8 West)
C-Band: SATMEX 8 - America ◄ 247.0 East (113.0 West)
ANIK F3 - Conus ◄ 243.2 East (116.8 West)
C-Band: ANIK F3 - America ◄ 241.0 East (119.0 West)
ECHOSTAR 14 - Conus ◄ 241.0 East (119.0 West)
DIRECTV 7S - Conus ◄ 241.0 East (119.0 West)
ECHOSTAR 9, GALAXY 23 - North America ◄ 239.0 East (121.0 West)
C-Band: ECHOSTAR 9, GALAXY 23 - North America ◄ 239.0 East (121.0 West)
GALAXY 18 - North America ◄ 237.0 East (123.0 West)
C-Band: GALAXY 18 - North America ◄ 237.0 East (123.0 West)
C-Band: GALAXY 14 - North America ◄ 235.0 East (125.0 West)
AMC 21 - North America ◄ 235.0 East (125.0 West)
GALAXY 13, HORIZONS 1 - North America ◄ 233.0 East (127.0 West)
C-Band: GALAXY 13, HORIZONS 1 - North America ◄ 233.0 East (127.0 West)
CIEL 2 - America ◄ 231.0 East (129.0 West)
C-Band: AMC 11 - North America ◄ 229.0 East (131.0 West)
C-Band: GALAXY 15- North America ◄ 227.0 East (133.0 West)
C-Band: AMC 10 - North America ◄ 225.0 East (135.0 West)
C-Band: AMC 7 - North America ◄ 223.0 East (137.0 West)
C-Band: AMC 8 - North America ◄ 221.0 East (139.0 West)

Satellites
of the

World
003.1 East ► C-Band: RASCOM QAF 1R - Africa
003.1 East ► RASCOM QAF 1R - Africa
003.1 East ► EUTELSAT 3D - Europe
003.1 East ► C-Band: EUTELSAT 3A - EUROPE
004.9 East ► ASTRA 4A - Europe
004.9 East ► SES 5 - Europe, AFRICA
007.0 East ► EUTELSAT 7A - Europe, Africa
009.0 East ► EUTELSAT 9A - Europe
010.0 East ► EUTELSAT 10A - Europe
010.0 East ► C-Band: EUTELSAT 10A - Global
013.0 East ► EUTELSAT HOTBIRD 13B,13C,13D - Europe, Middle East
016.0 East ► EUTELSAT 16A - Europe, Africa
017.0 East ► AMOS 5 - North Africa, Middle East
017.0 East ► C-Band: AMOS 5 - Africa, Middle East
019.2 East ► ASTRA 1KR,1L,1M,2C - Europe
020.0 East ► C-Band: ARABSAT 5C - Africa, Middle East
021.5 East ► EUTELSAT 21B - Europe, Asia, West Africa
023.5 East ► ASTRA 3B - Europe
025.5 East ► EUTELSAT 25C - Europe, Asia
026.0 East ► BADR 4,5,6 - North Africa, Middle East
028.2 East ► EUTELSAT 28A, ASTRA 1N,2A,2F - Europe
030.5 East ► ARABSAT 5A - Middle East
030.5 East ► C-Band: ARABSAT 5A - Asia, Middle East
031.5 East ► ASTRA 1G - Europe
033.0 East ► EUTELSAT 33A - Europe
033.0 East ► INELSAT 28 - Africa
034.0 East ► ARABSAT 2B - Middle East
036.0 East ► EUTELSAT 36A,36B - Europe , South Africa, Asia, Russia
038.0 East ► PAKSAT 1R - Pakistan, North India
038.0 East ► C-Band: PAKSAT 1R - Pakistan, India, Middle East, Africa
039.0 East ► HELLAS SAT 2 - Europe, Middle East, Asia
042.0 East ► TURKSAT 2A,3A - Europe, Russia
045.0 East ► INTELSAT 12 - India, South Africa, Middle East, Europe
046.0 East ► AZERSPACE 1,AFRICASAT 1A - Asia, Africa
047.5 East ► INTELSAT 10 - Middle East, Europe
049.0 East ► C-Band: YAMAL 202 - Global
050.0 East ► INTELSAT 26 - Europe
050.5 East ► NSS 5 -Global
050.5 East ► C-Band: NSS 5 - Global
052.5 East ► YAHSAT 1A -Europe, Middle East, Africa
053.0 East ► EXPRESS AM22 -Europe, Middle East, North India
055.0 East ► GSAT-8, YAMAL 402 - Russia
056.0 East ► BONUM 1, DIREC TV 1R - East Russia
057.0 East ► NSS 12 - Europe, Russia, Africa, India
057.0 East ► C-Band: NSS 12 - Europe, Russia, Africa, India, Global
060.0 East ► INTELSAT 904 - Europe
060.0 East ► C-Band: INTELSAT 904 - Europe, Africa, Global
062.0 East ► INTELSAT 902 - Europe, Middle East
062.0 East ► C-Band: INTELSAT 902 - Europe, China, Australia, South Africa, Global
064.2 East ► C-Band: INTELSAT 906 - Europe, Africa, South India, Global
066.0 East ► INTELSAT 17 -Europe,Russia
068.5 East ► INTELSAT 20 - Africa, Europe, Middle East
068.5 East ► C-Band: INTELSAT 20 - Global
070.5 East ► EUTELSAT 70B - Europe,Middle East, India
072.1 East ► INTELSAT 22 - Middle East, Africa
074.0 East ► INSAT 4CR - India
074.0 East ► C-Band: INSAT 3C - India
075.0 East ► ABS-1 - Europe, Asia, Middle East
075.0 East ► C-Band: ABS-1 - Global
076.5 East ► APSTAR 7 - China
076.5 East ► C-Band: APSTAR 7 - Global
078.5 East ► THAICOM 5,6A - Thailand
078.5 East ► C-Band: THAICOM 5,6A - India,China,Thailand, Global
083.0 East ► INSAT 4A - India
083.0 East ► C-Band: INSAT 4A - India, Middle East
085.0 East ► INTELSAT 15 - Middle East
085.0 East ► HORIZONS 2 - Russia
086.5 East ► KAZSAT 2 - Russia
087.5 East ► C-Band: CHINASAT 12 - China, India, Midle East
088.0 East ► ST 2 - India, Malaysia
088.0 East ► C-Band: ST 2 - India, Thailand
090.0 East ► YAMAL 201,300K - Russia, North India
090.0 East ► C-Band: YAMAL 201,300K - Russia, North India
091.5 East ► MEASAT 3 - Malaysia, South Asia
091.5 East ► C-Band: MEASAT 3 -Global, Thailand, Australia, East Asia
091.5 East ► MEASAT 3A - Malaysia, South Asia
091.5 East ► C-Band: MEASAT 3A -Global
092.2 East ► CHINASAT 9 - China
093.5 East ► INSAT 3A,4B - India
093.5 East ► C-Band: INSAT 3A,4B - India, Middle East
095.0 East ► NSS 6 - India, Middle East, South Africa, North East Asia, Australia
096.5 East ► C-Band: EXPRESS AM 33 - Asia, Russia,China
100.5 East ► ASIASAT 5 - East Asia, India, Middle East, Thailand
100.5 East ► C-Band: ASIASAT 5 - Global
103.0 East ► C-Band: EXPRESS A2 - Russia, China
105.5 East ► ASIASAT 3S - East Asia, South Asia, Australia
105.5 East ► C-Band: ASIASAT 3S - Global
108.2 East ► NSS 11 - South Asia, North East Asia, China
108.2 East ► C-Band: TELKOM 1 - Indonesia
108.2 East ► SES 7 - South Asia, Australia
110.0 East ► BSAT 3A,2C,3C N-SAT 110,JCSAT 110R - Japan
110.5 East ► C-Band: CHINASAT 10 - China, Asia Pacific
113.0 East ► KOREASAT 5 - South Korea, North East Asia
113.0 East ► C-Band: PALAPA D - Asia, Australia
115.5 East ► C-Band: CHINASAT 6B - Global
116.0 East ► ABS 7 - South Korea
116.0 East ► KOREASAT 6 - South Korea
118.0 East ► C-Band: TELKOM 2 - Global
119.5 East ► THAICOM 4 - Indonesia, Cambodia
122.0 East ► ASIASAT 4 - East Asia, Australia
122.0 East ► C-Band: ASIASAT 4 - Global
124.0 East ► JCSAT 4B - Japan
125.0 East ► C-Band: CHINASAT 6A - China
128.0 East ► JCSAT 3A - Japan
128.0 East ► C-Band: JCSAT 3A - Asia
132.0 East ► VINASAT 1 - Vietnam
132.0 East ► C-Band:VINASAT 1 - Asia, Australia
132.0 East ► VINASAT 2 - Vietnam
132.0 East ► JCSAT 5A - Japan
134.0 East ► APSTAR 6 - China
134.0 East ► C-Band: APSTAR 6 - Asia, Australia
138.0 East ► TELSTAR 18 - India, China
138.0 East ► C-Band: TELSTAR 18 - Asia, Australia
140.0 East ► EXPRESS AM3 - Russia, China
140.0 East ► C-Band: EXPRESS AM3 - Russia, China
144.0 East ► SUPERBIRD C2 - Japan
152.0 East ► OPTUS D2 - Australia, Newzealand
154.0 East ► JCSAT 2A - Japan
154.0 East ► C-Band: JCSAT 2A - AsiaOceaniaHawaii
156.0 East ► OPTUS C1,D3 - Australia, Newzealand
160.0 East ► OPTUS D1 - Australia, Newzealand
162.0 East ► SUPERBIRD B2 - Japan
164.0 East ► OPTUS B3 - Asia
166.0 East ► INTELSAT 19 - Australia, Newzealand, North East Asia
166.0 East ► C-Band: INTELSAT 19 - Australia
169.0 East ► C-Band: INTELSAT 8 - Pacific
172.0 East ► EUTELSAT 172A - South Pacific, South East Pacific
172.0 East ► C-Band: EUTELSAT 172A - Pacific
180.0 East ► INTELSAT 18 - Australia, Pacific
180.0 East ► C-Band: INTELSAT 18 - Pacific

Copyright 2013 by TELE-audiovision Magazine
www.TELE-audiovision.com
256 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
www.TELE-audiovision.com — 1
1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志

257
TELE-audiovision Deadlines
Issue

TELE-audiovision
11-12/2013

TELE-audiovision
01-02/2014

TELE-audiovision
03-04/2014

TELE-audiovision
05-06/2014

#

1311

1401

1403

1405

27 December 2013 28 February 2014

Editorial Deadline

30 August 2013

1 November 2013

Advertisement Deadline
广告截止日期

6 September

6 November 2013 3 January 2014

7 March 2014

Hardcopies

18 October 2013

20 December 2013 14 February 2014

18 April 2014

Online

1 November 2013

3 January 2014

2 May 2014

28 February 2014

Digital TV Exhibitions

13 - 15 November 2013
InterBEE
International Broadcast Equipment
Exhibition
Makuhari Messe, 2-1 Nakase,
Mihama-ku, Chiba 261-0023, Japan
13 - 14 Nov.: 10:00am - 5:30pm
15 November: 10:00am - 5:00pm
www.inter-bee.com

19 - 22 November 2013
ITU Telecom World
Conversation that Matters
IMPACT, 99 Popular Road, Banmai
Subdistrict, Pakkred District,
Nonthaburi 11120, Thailand
world2013.itu.int

20 - 23 November 2013
Vietnam Electronics 2013
The Best Platform to Capture the
Electronics Market in Vietnam
Saigon Exhibition and Convention
Center, 799 Nguyen Van Linh
Parkway, District 7, Ho Chi Minh
City, Vietnam
www.vietnamelectronics.com
3 - 4 December 2013
Satellite Mobility 2013
London, UK
mobility.vsatevent.com

7 - 10 January 2014
2014 International CES

Manufacturers, developers and
suppliers of consumer technology
hardware, content, technology
delivery systems and related
products and services
Las Vegas Convention Center, Las
Vegas, Nevada, USA
Opening Hours:
7 January: 10:00am - 6:00pm
8 - 9 Jan.: 9:00am - 6:00pm
10 January: 9:00am - 4:00pm
www.cesweb.org
21 - 23 January 2014
Convergence India 2014
New Delhi, India
28 - 30 January 2014
CSTB 2014
Moscow, Russia
25 - 27 February 2014
Andina Link 2014
Cartagena, Colombia
10 - 12 March 2014
DVB World
Prague, Czech

21 - 23 March 2014
CCBN 2014
China Content Broadcasting
Network Exhibition - largest
broadcasting technology and
equipment expo in the Asia-Pacific
region
Beijing International Exhibition
Center, Beijing, China
Opening Hours:
21 - 22 March: 9:00am - 5:00pm
23 March: 9:00am - 4:30pm
www.ccbn.tv
13 - 16 April 2014
HKTDC Spring
Hongkong, China

7 - 10 April 2014
NAB Show 2014
For broader-casting® professionals
Las Vegas Convention Center, Las
Vegas, Nevada, USA
Opening Hours:
7 - 9 April: 9:00am - 6:00pm
10 April: 9:00am - 2:00pm
www.nabshow.com
20 - 21 May 2014
SatCom Africa
Johannesburg, South Africa

11 - 13 March 2014
CABSAT 2014
Premier Broadcast  Satellite
Platform in the ME  North Africa
Dubai International Convention and
Exhibition Centre, Dubai, UAE
Opening Hours:
11 - 12 March: 10:00am - 6:00pm
13 March: 10:00am - 5:00pm
www.cabsat.com
18 - 20 March 2014
TV Connect
London, UK

20 - 22 May 2014
ANGACOM 2014
Cologne, Germany
17 - 20 June 2014
CommunicAsia 2014
Singapore
5 - 7 August 2014
ABTA 2014
São Paulo, Brasil
August 2014
SET Broadcast  Cable 2014
São Paulo, Brasil

258 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1
1-12/2013 — www.TELE-audiovision.com
deu TELE-audiovision-1311
deu TELE-audiovision-1311

deu TELE-audiovision-1311

  • 1.
    TELE Weltweit größte DigitalTV Fachzeitschrift seit 1981 B 9318 E Satellit OTT Smart TV IP/WebTV Streaming audiovision I N T E R N AT I O N A L Firmenbericht GLOBALINVACOM Ivan Horrocks verkündet stolz Zwei Millionen Haushalte erhalten ihr Satelliten-TV von Fibre Optic LNBs Test Report AMIKO Mini HD 11-12 2013 Test Report WORK Microwaves Handheld Satcom Test Source Ideale Lösung für präzise und zertifierte Meesungen Jozsef Zsiman packt jedes Feature in einen sehr kleinen Receiver Firmenbericht Forum BSD Marcos Benni führt erfolgreich seit 10 Jahren das größte brasilianische Digital TV Forum Test Report ICECRPYT Chris Ward stellt einen ausgeklügelten Easy-to-UseReceiver vor 1 1-12/2013 Test Report AB IPBox Prismcube Ruby PERFEKT für den Multi-Satelliten Empfang UND für jeden Internet TV Kanal der Welt www.TELE-audiovision.com
  • 3.
    TELE-audiovision International t The World’s Larges zine italTV Trade Maga Dig since 1981 Alexander Wiese Publisher alex@tavmag.com y HQ in Munich, German Liebe Leser, lange Zeit war das Betriebszeit Linux das beliebteste sowieso - ist sehr kurz in einer Zeit, in der ständig Betriebssystem für Digital TV Receiver. Seit 2-3 Jahren neue Techniken auf dem Markt erscheinen. Flexible hören wir in der TELE-audiovision Redaktion immer Softwarelösungen sind in so einem Fall die beste Lösung, öfters vom Android System für Digital Receiver - nur: aber auch das gilt mittlerweile für alle Betriebssysteme. entsprechend ausgerüstete Receiver konnten wir bislang nur selten in einem Testbericht vorstellen. Nach welchen Kriterien sollen sich also die Hersteller und anschließend die Endkunden entscheiden? Die Antwort Und mittlerweile fragen wir uns, ob Digital Receiver auf diese Frage erscheint unmöglich, es hängt vor allem mit überhaupt einen davon ab, was der Hersteller dem Endkunden anbieten nennenswerten Marktanteil erreichen werden. Denn seit dem Android Betriebssystem will und was sich dieser wünscht. Dies vorherzusagen kurzem taucht ein neues Betriebssystem immer öfters wird immer aussichtsloser, aber eine Antwort ist sicher: auf, das auf XBox basiert. In dieser TELE-audiovision der Endbenutzer möchte eine möglichst intuitive und Ausgabe stellen wir ein derartiges Gerät vor, dass uns ergonomisch sinnvolle Bedienung bzw Menüführung. so überzeugt hat, dass wir sogar einen TELE-audiovision Innovations Award vergeben konnten. Hier können die Programmierer noch viel verbessern und die Menüführung kundenfreundlicher gestalten. Weches Schon bei Android war klar, wohin die Entwicklung geht: Betriebssystem letztlich im Receiver steckt, spielt dann die komplette Integration aller verfügbaren Medien in keine Rolle mehr. einem einzigen Receiver. Uns scheint, dass das XBox System für diese Aufgabe besonders gut geeignet ist, aber diese Aussage kann man sofort einschränken: es sieht im Moment so aus. Das kann sich schnell wieder ändern. Ihr Alexander Wiese Der Lebenszyklus von Software - und der Hardware Chefredakteur TELE-audiovision International Address TELE-audiovision International, PO Box 1234, 85766 Munich-Ufg, GERMANY/EUROPE Editor-in-Chief Alexander Wiese, alex@tavmag.com Letter to The Editor www.TELE-audiovision.com/letter/ Published by TELE-audiovision Magazine GmbH, Aschheimer Weg 19, 85774 Munich-Ufg, GERMANY/EUROPE Design Németi Barna Attila Advertising www.TELE-audiovision.com/ads/ or email to alex@tavmag.com Hard Copy Subscription www.TELE-audiovision.com/subscription/ Hard Copy Subscription by Courier Service Send Order to subscription@tavmag.com Printer Printmedia Com Kft, Fehérvári út 120-124, 1116 Budapest, HUNGARY/EUROPE Copyright © 2013 by TELE-audiovision ISSN 2195-5433 TELE-satellite was established in 1981 and today is the oldest, largest and most-read digital tv trade magazine in the world. TELE-satellite is seen by more than 350,000 digital tv professionals around the world and is available both in printed form and online. www.TELE-audiovision.com Redaktion TELE-audiovision, Postfach 1234, D-85766 München-Ufg Chefredakteur Alexander Wiese (verantwortlich) Anschrift wie Verlag Verlag TELE-audiovision Magazine GmbH, Aschheimer Weg 19, D-85774 Unterföhring Inhaber: Alexander Wiese, Verleger, Unterföhring Anzeigen Alexander Wiese (verantwortlich), Anschrift wie Verlag Abonnementverwaltung IPS Presseservice, Postfach 1211, D-53334 Meckenheim
  • 8.
    CONTENT AB IPBox PrismcubeRuby HDTV PVR Satellite Receiver with Media Center...................... 18 BSD..................178 Deviser S7000 Multi Norm Professional Digital TV Signal Analyzer Part 2............... 34 AMIKO MINI HD Miniature DVB-S2 HDTV Receiver............................ 56 GLOBALINVACOM....... 188 SPAUN SUS 5581 NFA, SUS 5581/33 NFA LEGACY, SUS 4441 F, SUS 4481 F, SUS 5541 F & SUS 5541 NFA Cascadable SCR Multiswitches................... 70 Icecrypt S3700CHD Triple Tuner PVR HDTV Satellite Receiver................ 80 ELNET...............204 WORK Microwave’s Handheld Satcom Test Source RF Signal Generator............................ 96 Global Readership of TELE-audiovision Magazine............... 12 AWARD Winning: Digital Receivers of 21st Century......... 116 AWARD Winning: Signal Analyzers of 21st Century......... 126 AWARD Winning: IPTV/WebTV Receivers of 21st Century.............................. 134 AWARD Winning: The Best Headend Equipment of 21st Century.............................. 140 Feature: Self-made IPTV - Part 4...................... 146 Feature: Extensions to DVB-S2........................ 158 Digital Technology: New Developments............................ 162 8 Vitor’s Workshop Overview: How to get the most out of technology.............................. 168 Product Report: High-Frequency Filters Made by MFC.................................... 170 Company Report: Digital TV Internet Forum BSD, Brazil....................................... 178 Company Report: Fibre Optic Manufacturer GlobalInvacom, UK............................ 188 Company Report: Digital TV Wholesaler and Retailer ELNET, Iceland.................................. 204 Global Company Directory: The Decision Makers in Worldwide Digital TV Industry.......... 212 DXer Report: Siddharth Gautam in India.................. 224 Uplink Overview: Best Satellite Uplink Earth Stations...... 230 TELE-audiovision History: TELE-audiovision in 1983................. 240 TELE-audiovision History: TELE-audiovision in 1993................. 242 TELE-audiovision History: TELE-audiovision in 2003................. 244 News: Ultra High Definition HDTV.... 248 WebTV Providers Around the World........................... 250 DTT of the World............................ 252 Satellites of the World................. 254 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 10.
    ADVERTISER‘S INDEX ABCOM.................................... Slovakia.....................43 JIUZHOU................................. China........................260 ALUOSAT................................. China........................125 JEZETEK.................................. China........................260 AMIKOSTB............................... Hungary...................... 5 JONSA..................................... Taiwan....................... 51 ASIATVRO............................... China........................221 LIANXING............................... China......................... 91 AUDOLICI............................... Portugal....................115 MFC......................................... USA............................ 83 AZBOX..................................... Portugal....................259 MICO....................................... China........................... 2 AZURESHINE........................... Taiwan....................... 73 MKTECH.................................. China......................... 75 B-MAGA................................... Japan........................195 NABSHOW2014....................... USA...........................155 BSD......................................... Brazil........................215 OESF....................................... Japan....................... 223 BT........................................... UK.............................235 PANODIC................................. China........................... 2 CABSAT2014........................... Dubai........................185 PERFECTVISION..................... USA............................ 41 CCBN2014............................... China....................... 181 ROGETECH.............................. China......................... 87 CES2014.................................. USA...........................149 SATBEAMS............................... Belgium................... 229 CHANGHONG........................... China.......................... 9 SATELLITEGUYS...................... USA...........................221 CHINABROADCASTING........... China....................... 229 SAT-LINK................................ China......................... 59 CONVERGENCEINDIA2014...... India.........................177 SCATINDIA2013...................... India.........................151 COSMOSAT.............................. Argentina..................113 SES.......................................... Luxembourg.............201 DEVISER................................. China.................. 79, 217 SICHUANJIUZHOU.................. China........................260 DEKTEC................................... Netherlands..............109 SKYWORTH............................. China......................... 11 DEXIN..................................... China........................101 SOWELL.................................. China.......................... 4 DIGITALTELEMEDIA................ China........................260 SPAUN....................................... Germany...... 215, 219, 223 DISHPOINTER......................... UK.............................219 SPAUN ELECTRONIC..................Germany...................... 63 DISHTUNING........................... India.........................227 TEKNIKSAT............................. Turkey...................... 209 DVBCN.................................... China....................... 209 TENOW.................................... China........................217 FTATV...................................... Argentina..................227 TIANDITONG........................... China........................ 25 GLOBALINVACOM.................... UK.............................. 67 TOPSIGNAL............................. China......................... 37 GOOSAT.................................. China......................... 75 TSINGHWA.............................. China........................103 HORIZON................................ UK....................... 29, 139 TURBOSAT............................... UK.............................. 55 HTCE....................................... Hongkong.................259 VIETNAM2013......................... Vietnam....................173 ICECRYPT................................ UK.............................. 55 WORK MICROWAVE....................Germany.......................69 10 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 12.
    > 350 000W Professional Readers 本杂志全球有35万多读者 America Europe North America >28000 Readers USA Canada Mexico West Europe >107000 Readers Germany Italy UK France NL Portugal Belgium Spain CH Austria Sweden Norway Ireland Denmark South America >42000 Readers Brasil Argentina Chile Venezuela Colombia Peru East Europe >60000 Readers Turkey Romania Russia Hungary Poland Bulgaria Czech Greece MENA >46000 Readers Iran Algeria Morocco Egypt KSA Tunesia The Only Global Digital TV Trade Magazine Published in 20 Languages Arabic ‫العربية‬ Bahasa Bulgarian Indonesia български Czech German český deutsch English Spanish Farsi French Hebrew Croatian Italian Hungarian español ‫فارسی‬ française ‫עברית‬ hrvatski italiano magyar Chin 中国
  • 13.
    Top 25 to105 Top 25 Worldwide COUNTRY Readers # Brazil 31,706 Germany 27,403 USA 22,574 Italy 14,261 China 12,808 Asia UK 12,585 Iran 12,359 France 11,663 Indonesia 10,190 Turkey 10,000 Netherlands 9,530 Algeria 9,471 Romania 8,243 Portugal 6,666 Russia 6,155 Belgium 5,956 Morocco 5,753 Spain 5,589 Asia >38000 Readers Hungary 5,477 China Indonesia India Pakistan Malaysia Poland 5,411 India 4,821 Egypt 4,751 Bulgaria 4,563 Czech 4,200 Greece 4,194 Canada 4,036 Ukraine 3,757 Saudi Arabia 3,661 Slovakia 3,260 Readers' Breakdown nese Dutch Polish Portuguese 国 nederlands polski português Romanian Russian român русский Turkish türk Top 106 to 180 COUNTRY COUNTRY Countries > 130 - 3200 Readers Countries > 3200 Readers Manufacturers 4% Distributors 9% Wholesaler 18% Dealers 27% Installers 12% Satellite Provider 2% Cable Provider 8% IPTV Provider 5% Program Provider 6% Governmental 2% Institutional 2% Private Enthusiasts 5% Readers # Argentina 3,120 Switzerland 3,100 Chile 2,943 Tunisia 2,904 Pakistan 2,774 Austria 2,766 Croatia 2,713 Iraq 2,355 Malaysia 2,347 Sweden 2,344 Australia 2,107 Israel 2,069 Venezuela 2,052 Norway 2,043 Serbia 1,945 UAE 1,580 Ireland 1,561 Colombia 1,531 South Africa 1,510 Mexico 1,476 Denmark 1,390 Thailand 1,298 Finland 1,137 Philippines 1,058 Libya 977 Sri Lanka 975 Slovenia 934 Jordan 900 Peru 864 Yemen 842 Nigeria 831 Lithuania 829 Lebanon 814 South Korea 759 Bosnia and Herzegovina 749 Syria 740 Macedonia 726 Ecuador 698 Sudan 685 Japan 644 Uruguay 622 Kenya 587 Bolivia 571 Kuwait 565 Puerto Rico 562 Panama 558 Albania 548 Cyprus 536 Qatar 511 Taiwan 494 Paraguay 476 Latvia 467 Hong Kong 463 Luxembourg 454 Moldova 446 Oman 412 Senegal 410 New Zealand 403 Belarus 356 Georgia 351 Mauritius 324 Vietnam 313 Côte d’Ivoire 298 Estonia 298 Kazakhstan 292 Bahrain 287 Ghana 284 Singapore 272 Dominican Republic 240 Iceland 212 Uganda 210 Palestine 199 Aruba 193 Ethiopia 191 Bangladesh 190 Malta 181 Cameroon 175 Costa Rica 158 Barbados 155 Azerbaijan 145 Montenegro 142 Afghanistan 141 Zimbabwe 141 Myanmar 134 Countries < 130 Readers Readers # Suriname 133 Mali 131 Trinidad and Tobago 129 Tanzania 128 Uzbekistan 128 Netherlands Antilles 117 Maldives 112 Brunei 109 Malawi 106 Armenia 101 Mauritania 98 Botswana 94 New Caledonia 90 Madagascar 88 Niger 88 Namibia 84 Zambia 77 Angola 69 Rwanda 69 Guatemala 68 Martinique 66 Haiti 65 French Polynesia 65 Guyana 63 Kyrgyzstan 61 Mozambique 61 Burkina Faso 60 Congo 56 Réunion 55 Benin 54 Djibouti 53 Honduras 53 Cape Verde 49 Gambia 49 Jamaica 49 Macau 49 French Guiana 47 Guadeloupe 46 Togo 43 Cambodia 42 Seychelles 42 Cuba 40 Tajikistan 40 Nepal 39 Gabon 36 Comoros 36 Turkmenistan 35 Nicaragua 34 Greenland 33 El Salvador 33 Monaco 30 Dominica 27 Bermuda 25 Palau 25 Mongolia 23 Fiji 19 Bahamas 17 Laos 17 Burundi 16 Timor-Leste 15 Somalia 14 Congo Republic 13 Belize 12 Guinea 12 Saint Vincent and Grenadines 11 Anguilla 10 Guernsey 10 Papua New Guinea 10 British Virgin Islands 10 Isle of Man 9 Jersey 9 Andorra 8 Turks and Caicos Islands 8 Central African Republic 7 Curaçao 7 Eritrea 7 Swaziland 7 Source: Google Analytics as of 05-06/2013
  • 16.
    1 1-12/2013 AB IPBox PrismcubeRuby Perfectly equipped receiver for multi satellite reception as well as for Internet TV reception from around the world www.TELE-audiovision.com/13/11/abipbox 08-09/2009 Global Invacom Optical LNB The first worldwide optical satellite reception and transmission system www.TELE-audiovision.com/09/09/globalinvacom 02-03/2012 AZBox ME Today‘s absolute best Linux Receiver www.TELE-audiovision.com/12/03/azbox-me 16 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 17.
    MAGAZINE 07-08/2013 TBS Streaming BoxMOI Offers a double-shot of innovation for the future of TV with its channel streaming and separation of hardware and software www.TELE-audiovision.com/13/07/tenow 1 1-12/2012 JIUZHOU DTP2100 Cutting-edge receiver thanks to Android operating system www.TELE-audiovision.com/12/11/jiuzhou www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 17
  • 18.
    TEST REPORT HDTV PVRSatelliten Receiver mit Internet Mediazentrum AB IPBox Prismcube Ruby 18 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 19.
    • optimiert für dieBenutzung aller Audio und Video Medien • ausgerüstet für alle Internet TV Standards • zwei Sat-ZF Eingänge für beliebige PVR Aufzeichnungen • alle DiSEqC-Protokolle integriert, dadurch bestens geeignet für den Einsatz an Drehanlagen • Riesenauswahl an Menü-Sprachen, damit einsatzbar in allen Ländern • kann perfekt auf das verwendete TV-Gerät angepaßt werden www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 19
  • 20.
    TEST REPORT HDTV PVRSatelliten Receiver mit Internet Mediazentrum Ein Receiver voll toller Features Wer hätte das gedacht: Im Jahr 2002 begannen zwei findige Hobbyprogrammierer ein alternatives Betriebssystem, aufbauend auf der Spielekonsole Xbox aus dem Hause Microsoft, zu entwickeln und heute, 11 Jahre und viel Entwicklungsarbeit später, landet bei uns im TELE-audiovisions Testcenter der erste Receiver Firma AB-COM, die genau auf dieser Software aufbaut. Natürlich hat sich in diesen 11 Jahren viel getan und das Xbox Mediacenter von damals hat nur mehr sehr rudimentär mit dem zu tun, was wir heute erleben. 11-12/2013 AB IPBox Prismcube Ruby Perfectly equipped receiver for multi satellite reception plus for all the worldwide Internet TV www.TELE-audiovision.com/13/11/abipbox Schließlich kam es nicht nur zu einem massiven Wandel bei der verwendeten Hardware, sondern es hatten dank GPL (General Public Licence) auch unzählige Programmierer die Möglichkeit, ihr Können unter Beweis zu stellen und das System stetig zu verbessern und zu erweitern. Tatsächlich hatten wir von der TELE-audiovision uns schon länger gefragt, wann denn der erste Hersteller den Schritt zu einem Receiver mit dem Xbox Mediacenter als Betriebssystem wagen würde. So hat es uns besonders gefreut, den neuen AB-COM Receiver zu testen. Schon beim Auspacken war klar, dass AB-COM mit der AB IPBox Prismcube Ruby nicht nur in Puncto Software völlig neue Wege 0.60 20 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com gehen wollte, auch das Design ist modern und äußerst elegant. Das perfekt lesbare VFD Display sticht in einer Art Aufsatz aus dem in dezentem Grau gehaltenen Receiver hervor und verleiht ihm zusammen mit dem hintergrundbeleuchteten Standby Button ein regelrecht futuristisches Design. Hinter einer Klappe an der Frontseite hat AB-COM einen CI Slot zur Aufnahme aller gängigen Module sowie einen integrierten Kartenleser untergebracht. Perfekt ausgestattet präsentiert sich die Rückseite, diese wartet mit zwei Sat-ZF Eingängen, 3 RCA Buchsen für Stereo Audio und CVBS Video, einem optischen Digitalausgang, einer HDMI sowie RJ45 Buchse, einem USB Anschluss und natürlich
  • 21.
    einer Buchse fürdas externe Netzteil auf. Richtig gut gefallen hat uns eine Klappe an der Unterseite des Receivers, die sich durch das Lösen einer Schraube öffnen lässt. Mit dem im Lieferumfang enthaltenen Einbaurahmen kann der Anwender hier eine 2.5“ SATA Festplatte in den Receiver integrieren. Apropos Lieferumfang: der beinhaltet das externe Netzteil mit Stromkabel, den Festplatteneinbaurahmen, ein HDMI Kabel sowie eine gut gemachte Erstinstallationsanleitung. Selbstverständlich darf natürlich auch eine Fernbedienung nicht fehlen und die hat es in sich: An der Oberseite hat der Hersteller nur die wichtigsten Tasten untergebracht und diese sogar teilweise doppelt belegt (z.B. die Zifferntasten). Das fördert die einfache Bedienung des Receivers und hat sich im Alltagseinsatz als praktisch erwiesen. An der Rückseite der Fernbedienung findet der Besitzer dafür zum Ausgleich eine vollwertige Tastatur im Miniformat, die im Test ebenfalls überzeugen konnte. Generell liegt die Fernbedienung sehr gut in der Hand und wider Erwarten haben wir im Test kein einziges Mal versehentlich eine Taste der anderen Fernbedienungsseite betätigt. Zusammenfassend waren wir von der Verarbeitungsqualität und dem Design der neuen AB IPBox Prismcube Ruby begeistert und falls jemand mit Graphitgrau keine Freude haben sollte, so hat der Hersteller bereits angekündigt, dass es die Box auch in weiteren Gehäusefarben geben wird. Wie heute bei nahezu allen Receivern üblich geleitet auch bei der AB IPBox Prismcube Ruby ein Er stinst allationsassistent den Besitzer durch die Anpassung des Receivers an seine persönlichen Bedürfnisse. Besonders ins Auge gestochen ist uns dabei die OSD Sprachwahl, die mit 51 Einträgen für nahezu jeden Anwender die passende OSD Anzeige bieten sollte. Gefreut hat uns auch, dass der neue AB-COM Receiver FULL HD tauglich ist und somit eine Videosignalauflösung von 1920x1080P unterstützt. Kennen auch Sie das lästige Problem, dass so mancher Receiver das Videosignal etwas zu groß oder zu klein für den heimischen Fernseher oder Beamer anzeigt? Wenn ja, dann wird es Sie freuen zu hören, dass die neue AB IPBox im Rahmen der Erstinstallation eine Overscan Anpassung bietet und Sie somit die Bildausgabe individuell an ihren Fernseher angleichen können. Für unseren Test war das auf jeden Fall schon mal ein dicker Pluspunkt! Im nächsten Schritt geht es gleich weiter mit der Adaption des Receivers an die verwendete Satellitenempfangsanlage, hierfür stehen sämtliche DiSEqC Protokolle (also 1.0, 1.1, 1.2 und 1.3) zur Auswahl bereit ebenso wie SCR Einkabellösungen unterstützt werden. Insgesamt 108 europäische, asiatische und amerikanische Satelliten hat der neue ABCOM Receiver vorprogrammiert und das zu unserer großen Freude mit relativ aktuellen Transponderdaten. Jeder Satellit, der vom Receiver empfangen werden soll, muss einzeln aktiviert und konfiguriert werden. Kommt eine Multifeed Anlage mit drei oder vier empfangbaren Satelliten zum Einsatz so macht das richtig Sinn und ist auch sehr praktisch; im Fall einer DiSEqC Drehanlage mit z.B. 40 empfangbaren Satelliten wird es hingegen mühsam. Auf jeden Fall aber hat es uns gefreut zu sehen, dass alle Einträge wirklich vollständig und individuell (z.B. durch die manuelle LOF Eingabe) angepasst werden können. Abschließend sei zu den Satelliteneinstellungen noch erwähnt, dass die AB IPBox Prismcube Ruby auch die Wiederholung von DiSEqC Kommandos unterstützt, ein Feature, das gerade www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 21
  • 22.
    1 2 3 4 5 dann besonders praktisch ist,wenn mehrere Multischalter nacheinander angesteuert werden müssen. Im nächsten Schritt der Erstinstallation folgt der automatische Suchlauf, der erfreulicherweise für alle oder einzeln wählbare Satelliten in den Modi FTA und CAS, nur-FTA oder nur-CAS sowie mit und ohne Netzwerksuche durchgeführt werden kann. In etwas mehr als vier Minuten förderte die AB IPBox Prismcube Ruby so insgesamt 1452 TV- und 250 Radioprogramme auf dem HOTBIRD 13° Ost zu Tage. Zum Abschluss der Erstinstallation muss sich der Besitzer noch mit dem Thema Zeiteinstellung befassen. Hier bietet der neue AB-COM Receiver ein ganz besonderes Feature, näm- 22 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com 1. Erstinstallation - Sprachwahl 2. Mit 51 Einträgen ist die Liste der unterstützten OSD Sprachen sehr vielfältig 3. Erstinstallation - Videoausga ngssignaleinstellungen 4. Overscan Anpassung 5. Auch die Position der Untertitelanzeige lässt sich individuell festlegen 6. Pixelverhältnisanpassung 7. Erstinstallation - Videoausga ngssignaleinstellungen 8. Antenneneinstellungen – sämtliche DiSEqC Protokolle werden unterstützt 9. Die Eingabe kann entweder mittels OSD Tastatur oder einer der beiden Fernbedienungen erfolgen 10. DiSEqC 1.3 Einstellungen 11. Die vorprogrammierte Satellitenliste enthält 108 Einträge 12. Jeder zum Empfang gewünschte Satellit muss manuell hinzugefügt werden 13. Satelliteneinstellungen 14. Kanalsuchlaufeinstellungen 15. Kanalsuchlauf auf dem HOTBIRD 13° Ost
  • 23.
    6 11 7 12 8 13 9 14 10 15 www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 23
  • 24.
    16 6 16. Zeiteinstellungen 17. AmEnde der Erstinstallation zeigt die AB IPBox eine Übersicht der gewählten Einstellungen an 18. Kanalliste 19. Die Kanalliste kann auf einzelne Satelliten, Favoritenlisten oder Verschlüsselungssysteme beschränkt werden 20. Anzeige der belegten Tasten und deren Funktion innerhalb der Kanalliste 21. Bearbeiten der Kanalliste 22. Hauptmenü der AB IPBox Prismcube Ruby 23. Manueller Kanalsuchlauf 24. Spracheinstellungen 17 21 18 22 19 23 20 24 24 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 26.
    25 27 26 28 lich die manuelleAuswahl jenes Senders, von dem der Receiver das Zeitsignal zukünftig erfassen soll. Jene unserer Leser, die häufig Signale außerhalb der großen DTH Positionen bzw. Feeds empfangen, kennen das Problem sicher: Ehe man es sich versieht ist die Zeiteinstellung falsch und eine geplante Timeraufnahme kann nicht mehr richtig durchgeführt werden. Das alles ist aber kein Problem für die AB IPBox Prismcube Ruby, Sie wählen einfach einen Sender von dem Sie genau det er sich auf den ersten Blick erstmal überhaupt nicht von jedem anderen, gewöhnlichen Receiver. Wie üblich öffnet ein Druck auf die OK Taste die Kanalliste, die mit nur einem weiteren Tastendruck auf einzelne Satelliten, Favoritenlisten oder Verschlüsselungssysteme beschränkt werden kann. Ebenso einfach lässt sich die alphabeti25. Jugendschutzeinstellungen 26. Aufnahmeeinstellungen 27. Netzwerkeinstellungen 28. Suche nach verfügbaren WiFi Netzen 29 29. Festplatteneinstellungen 30. Diverse Einstellungen – hier lässt sich der Deep Standby aktivieren bzw. deaktivieren 31. Infoleiste mit dem Titel der wissen, dass dessen Zeitsignal korrekt ist und fortan wird es die Box nur noch über diesen einen Sender aktualisieren. Auch wenn der neue ABCOM Receiver mit dem Xbox Mediacenter als Betriebssystem läuft so unterschei26 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com aktuellen Sendung 32. Erweiterte EPG Informationen 33. Auswahl von Videoformat und Tonspur 34. EPG 35. Aus dem EPG kann mit nur einem Tastendruck direkt ein Timereintrag erstellt werden 36. EPG Suche 37. EPG – Bei populären Sendern zeigt der Receiver automatisch auch das Senderlogo an 38. Favoritengruppen 39. On Screen Hilfe
  • 27.
    30 35 31 36 32 37 33 38 34 39 www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 27
  • 28.
    44 40. On ScreenHilfe 41. Infoleiste – derzeit sind zwei Aufnahmen aktiv 42. Beenden von Aufnahmen 43. Übersicht der bereits aufgezeichneten Sendungen 44. Hauptmenüpunkt „Media“ 45. Wettervorhersage mit Satellitenbild 46. Diverse Add-ons wie z.B. ein IRC Chat stehen zum Download bereit 47. WhatTheMovie Add-on 48. Xbox Mediacenter Einstellungen 40 45 41 46 42 47 43 48 28 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 30.
    49 6 51 menhang auch, dassdie Box auf Wunsch eine Funktionsbeschreibung der einzelnen Tasten einblendet, so dass der Anwender jederzeit über alle verfügbaren Funktionen im Bilde ist. Was wäre ein moderner PVR Receiver ohne EPG? Klar, dass AB-COM natürlich auch daran gedacht und eine vorbildlich gestaltete, elektronische Programmzeitschrift integriert hat. Von 8 Sendern gleichzeitig stellt diese das aktuelle und folgende Programm der nächsten 7 Tage dar, sofern der Programmanbieter diese Informationen auch übermittelt. Ein nettes Detail am Rande: Bei besonders populären Sendern blendet die 49. Dateimanager 50 sche Sortierung aktivieren, auf Wunsch wandern sogar die HD Sender rasch an die vorderste Stelle. Gerade beim Einsatz einer drehbaren Satellitenantenne ist die Kanalliste nach dem Suchlauf sicherlich mit hunderten, wenn nicht tausenden Sendern vollgestopft – Zeit also, hier rasch für etwas Ordnung zu sorgen. Dank der cleveren Menüführung der AB IPBox Prismcube Ruby genügt hierfür ein Druck auf die i-Taste und schon stehen sämtliche Bea r b e i t u n g s m ö g l i c h ke i t e n wie löschen, verschieben, umbenennen oder mit einem PIN Code sperren zur Auswahl bereit. Gut gefallen hat uns in diesem Zusam- 56. Bildbetrachter 57. Der integrierte Musikplayer unterstützt alle gängigen Audioformate 58. Der Zugriff auf Medien kann nicht nur lokal, sondern auch via Netzwerk (z.B. UPnP) erfolgen 59. Anzeige der im Netzwerk verfügbaren UPnP Server 60. Wiedergabe von Mediadateien via Netzwerk 61. Zugriff auf die Mediathek von Greenpeace 62. Auch auf den Musikdienst Soundcloud bietet die AB IPBox Prismcube Ruby Zugriff 50. Die Prismcube.com Add-ons enthalten eine Sammlung unterschiedlichster Add-ons aus den Bereichen Musik, Video, Programme, Dienstprogramme, Untertitel und Bilder 51. Flickr Add-on 52. Untertitel Add-on 53. Apple iTunes Podcast Add-on 54. Auch die Mediatheken verschiedener TV-Sender stehen zum Aufruf bereit 55. Vimeo Add-on 52 54 53 55 30 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 31.
    58 Box im EPGund in der Infoleiste sogar das Senderlogo ein! Dank der automatischen EPG Grabber Funktion stehen dem Anwender auch die EPG Daten jener Sender jederzeit zur Verfügung, die er gerade nicht empfängt. Zu einer frei definierbaren Zeit aktiviert sich der Receiver automatisch und der EPG Grabber ruft einen Sender nach dem anderen (welche genau lässt sich individuell festlegen) auf und sichert dessen EPG Daten im internen Speicher. Dadurch steht dem Anwender auch eine Suchfunktion innerhalb des EPG zur Verfügung, mit der er nach seinen Lieblingssendungen oder Lieblingsschauspielern Ausschau halten kann. Dass direkt aus dem EPG Timereinträge erstellt werden können ist ohnehin eine Selbstverständlichkeit und sei nur am Rande erwähnt. Die nach jedem Kanalwechsel eingeblendete Infoleiste enthält neben dem Senderlogo und dem Kanalnamen auch stets den Titel des aktuellen Programms. Mittels mehrerer Symbole kann der Anwender direkt aus ihr die Untertitel- und Sprachwahl sowie den integrierten OSD Teletext Decoder aufrufen. Auch das Starten und Stoppen von Aufnahmen ist entweder mittels eigener Symbole in der Infoleiste möglich, oder der Besitzer greift auf die entsprechenden Funktionstasten der Fernbedienung zurück. Dank des in seiner Größe frei wählbaren Timeshift Zwischenspeichers bringt Sie zukünftig auch ein unerwarteter Besuch oder Telefonanruf nicht mehr aus der Ruhe, das aktuelle Programm wird einfach angehalten und zu einem beliebigen Zeitpunkt wieder fortgesetzt. Die PVR Funktion erlaubt übrigens maximal zwei Aufnahmen gleichzeitig während ein drittes Programm im Timeshift Zwischenspeicher landet – prima! An der Bild- und Tonqualität der AB IPBox Prismcube Ruby gab es im Test absolut nichts auszusetzen, auch die Kanalumschaltgeschwindigkeit ist mit etwa einer Sekunde ausreichend schnell. Der von AB-COM verbaute Tuner erwies sich in unserem Praxistest als eingangsempfindlich und 59 60 56 61 57 62 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 31
  • 32.
    hatte weder mitschwachen noch besonders schmalbandigen SCPC Signalen ein Problem. Konkret griffen wir dazu auf Signale des BADR 26° Ost und TURKSAT 42° Ost zurück. Die verwendete PNX8496-1250DMIPS CPU mit 4 GB NAND Flash sowie 4GB DRAM ist ausreichend dimensioniert, so dass der Receiver jederzeit zügig auf Fernbedienungsbefehle reagieren konnte und selbstverständlich auch bei der Wiedergabe hochauflösender Inhalte keine Probleme hatte. Das auf Linux basierte Xbox Mediacenter wurde von AB-COM perfekt auf die verwendete Hardware abgestimmt, so dass der neue Receiver einen richtig runden und damit positiven Eindruck bei uns hinterließ. Über das Hauptmenü der AB IPBox werden im Bereich Einstellungen im wesentlichen nur jene Auswahlmöglichkeiten nochmals einzeln zugänglich gemacht, die der Anwender bereits im Rahmen der Erstinstallation durchlaufen hat. Hinzu kommen hier lediglich noch der manuelle Kanalsuchlauf, die Möglichkeit, Satelliten- und Transpondereinträge zu bearbeiten sowie die Netzwerkeinstellungen. Hier hat uns besonders gut gefallen, dass der Receiver bereits einen WiFi Empfänger an Board hat und dadurch ganz ohne lästiges Anstecken irgendwelcher WiFi Dongles sofort eine drahtlose Verbindung mit dem heimischen Router aufbauen kann. Nicht minder praktisch ist die automatische und frei wählbare Vor- und Nachlaufzeit von Aufnahmen, so fehlt garantiert nichts mehr von Ihrer Lieblingssendung, falls der Programmanbieter sich mal wieder nicht an die vorgegebenen Sendezeiten hält. Wer Energie sparen möchte, der kann die Deep Standby Funktion aktivieren. In dieser verbraucht der Receiver fast keine Energie, dafür dauert es aber auch rund 80 Sekunden, bis er wieder einsatzbereit ist. Was wäre das Xbox Mediacenter ohne die vielfältigen Multimediafeatures, die diese Software dem Anwender zur Verfügung stellt? Problemlos konnten wir im Test nicht nur Musik in den Formaten MIDI, AIFF, WAV/WAVE, MP2, MP3, AAC, AACplus, AC3, DTS, ALAC, AMR sowie WMA wiedergeben, sondern es steht auch im Videobereich mit AVI, MPEG, WMV, ASF, FLV, QuickTime, MP4, VOB, DivX, WEBM und RealMedia eine nicht minder repräsentative Auswahl an unterstützten Formaten bereit. Auch der Bildbetrachter glänzt mit Unterstützung von BMP, JPEG, GIF, PNG und TIFF. Egal ob Sie also Ihre AB IPBox Prismcube Ruby als Jukebox einsetzen möchten oder lieber Internetvideos sehen bzw. Ihren Freunden und Bekannten die letzten Urlaubsfotos zeigen möchten, Sie sind mit dem neuen AB-COM Receiver stets auf der sicheren Seite. Und das übrigens nicht nur mit lokal verfügbaren Medien, denn schließlich unterstützt das Xbox Mediacenter auch folgende Netzwerkprotokolle: UPnP, NFS, SMB/SAMBA/CIFS, HTTP, HTTPS, FTP, RTSP sowie TCP, UDP, SFTP und 32 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com RTP. Somit bietet es auf nahezu alles Zugriff, was sich irgendwie durch ein Netzwerkkabel quetschen lässt. In unserem Praxistest gab es weder mit der Wiedergabe lokaler Medien noch beim Netzwerkzugriff via UPnP oder SMB irgendwelche Probleme, die AB IPBox hat alle verfügbaren Server automatisch erkannt und deren Inhalte problemlos wiedergegeben. Abgerundet wird der bisher schon enorme Funktionsumfang der AB IPBox Prismcube Ruby noch durch die Möglichkeit, zusätzliche Add-ons aus dem Internet laden zu können. Diese kleinen Programme erweitern den Receiver in den Bereichen Audio, Video und Tools um z.B. YouTube oder Vimeo Empfang, den Zugriff auf die Mediatheken verschiedener TV-Sender, der Möglichkeit Soundcloud und andere Audiodienste zu verwenden, oder ganz einfach nur einen RSS Reader oder einen IRC Client starten zu können. Die Auswahl an verfügbaren Add-ons ist auf jeden Fall riesig und dank direk-
  • 33.
    63 tem Download viaInternet lassen sich diese auch ganz einfach installieren. Apropos Internet Download: Da natürlich ständig an der Verbesserung der Software gearbeitet wird, lässt sich diese – ebenso wie die Add-ons – mit nur einem Tastendruck direkt via Internet aktualisieren und auf den neuesten Stand bringen. Einfacher und bequemer geht’s wirklich nicht mehr. Für den Fall, dass Sie gerade in der Anfangszeit noch die eine oder andere Frage zur Bedienung des neuen AB-COM Receivers haben hat der Hersteller mit einer praktischen Hilfefunk- 64 tion, die direkt über das Hauptmenü zu erreichen ist, vorgesorgt. Hier finden sich nicht nur Erklärungen zur Fernbedienung und zu den einzelnen Anschlüssen, sondern es sind auch die wichtigsten Funktionen des Receivers übersichtlich und ansprechend bebildert dargestellt. Überhaupt empfanden wird das 3D GUI (Graphical User Interface) der AB IPBox Prismcube Ruby als nahezu selbsterklärend und wirklich hervorragend gestaltet. Auf Wunsch kann der Anwender dessen Aussehen sogar individuell mit aus dem Internet nachladbaren Skins anpassen. 63. Soundcloud Zugriff 64. SCPC Empfang über den TURKSAT 42° Ost expert OPINION AB IPBox Prismcube Ruby PVR Satellite Receiver with Internet Media Center RECOMMENDED PRODUCT BY Thomas Haring Test Center Austria + ● Perfekte Umsetzung des Xbox Mediacenter als Betriebssystem für einen eigenständigen Receiver ● Dank der vielfältigen Multimediafeatures vereint dieser Receiver die Funktionen eines klassischen PVR mit denen eines Mediaplayers. ● Innovatives und modernes Design ● Unkomplizierter Einbau für 2.5“ SATA Festplatten ● Moderne und übersichtlich gestaltete Software, für jedermann leicht und verständlich zu bedienen. ● Idealer Receiver für die ganze Familie. – Es ist kein HW Tuner-Loopausgang vorhanden. ENERGY DIAGRAM Apparent Power Active Power Mode Active StandBy Deep StandBy Apparent Active Factor 32.5 W 19.5 W 0.6 30 W 18 W 0.6 5W 0.5 W 0.1 Die ersten 15 Minuten aktiver Betrieb, die zweiten 15 Minuten Fake Standby, die dritten 15 Minuten Deep Standby. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 33
  • 34.
    TEST REPORT Multi NormDigital TV Signal Analyzer 34 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 35.
    Deviser TV Analyser S7000 • gleichwertig mithochpreisigen kommerziellen Messgeräten • Spektrumanalyse in Echtzeit zum extrem schnellen Finden von Transpondern • mit integrierter RemoteBedienungsfunktion für PC oder Handy • dank integrierten Wasserfall-Diagramms ideal geeignet für die Justage von Drehanlagen • Echo-Messungen sind möglich Teil 2: Praxis Test www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 35
  • 36.
    Multi Norm DigitalTV Signal Analyzer TEST REPORT Professionelles Kombi Messgerät für alle Digital TV Normen ■ TELE-audiovision's Technical Editor Vitor Martins Augusto using the Deviser S7000 TEST REPORT Multi Norm Digital TV Signal Analyzer Deviser TV Analyser S7000 Part 1: Analyzer Functions • Very large, high resolution display • Suitable for MPEG2 and MPEG4 • Real-time spectrum for quickly identifying active transponders • Can be remotely controlled via PC or mobile phone • Very ergonomical and practical operation 14 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 09-10/2013 — www.TELE-audiovision.com www.TELE-audiovision.com — 09-10/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 15 ■ Teil 1 dieses Testberichts erschien in TELE-audiovision 09-10/2013. Der Testbericht kann online hier gelesen werden: www.TELE-audiovision.com/TELE-audiovision-1309/eng/deviser1.pdf 36 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 38.
    Nachdem wir inder letzten Ausgabe der TELE-audiovision die Funktionen des neuen Deviser S7000 vorgestellt haben beschreiben wir in diesem zweiten Teil die Ergebnisse unserer Praxistests und die Ergebnisse unseres Vergleichs mit unseren verschiedenen Referenzgeräten. Bei einem professionellen Messgerät erwartet man in erster Linie eine hohe Messgenauigkeit; man muss einfach auf die angezeigten Messwerte vertrauen können. Deshalb haben wir verschiedene Signalquellen mit 5 verschiedenen ReferenzMessgeräten gemessen und die Messwerte mit denen des Deviser S7000 verglichen. Bei diesen 5 ReferenzGeräten handelt es sich um Messgeräte des obersten Profi-Segmentes. Wie man in der folgenden Tabelle sehen kann sind die Messwerte des S7000 auf gleichem Niveau wie die Referenzgeräte. Dass Deviser es mit der Messgenauigkeit ernst meint beweist das Konfigurationsmenü des S7000 gleich zweimal: es kann hier das Datum der letzten Kalibration abgelesen werden und außerdem gibt es die Möglichkeit, die Messwerte des S7000 selber abzugleichen. Der Anwender kann das Messgerät eichen, um zum Beispiel zu gewährleisten, dass alle Messgeräte des Betriebes exakt den gleichen Pegel anzeigen. Der Deviser S7000 ist ein erstaunliches Messgerät, das praktisch alle TV Signale demodulieren, messen und analysieren kann. Es stehen dem Techniker alle bekannten und auch eher seltenen Messungen zur Verfügung. Der integrierte Transportstream Analysator macht dieses Gerät auch für den Einsatz in Kopfstationen interessant, denn es können zum Beispiel Fehler in neu gemuxten Transportstreams ermittelt werden. Um diese Funktionsvielfalt ausgiebig zu testen stellten wir in unserem Testcenter verschiedene Szenarien nach und konstruierten Aufgaben, die den S7000 auf Probe stellen. Tabelle 1 zeigt die Ergebnisse unseres Vergleichs. Wir sind vom Deviser S7000 sehr beeindruckt, denn selbst mit unseren viel teureren Referenz-Messgeräten konnten wir keine besseren Resultate erzielen. Hervorragend auch die Empfangseigenschaften des Tuners: der S7000 konnte selbst dann noch ein Bild darstellen, wenn andere Messgeräte am zu schlechten Signal scheiterten. Man merkt dem Deviser an, dass er die modernste Technik ingegriert hat. Aufgabe: Feinjustierung einer motorisierten 110 cm Offset-Antenne Mit dem S7000 ist die Justierung einer Antenne extrem leicht, denn dieses Messgerät bestimmt seine Position durch die mitgelieferte GPS-Antenne selbstständig und zeigt automatisch Elevation, Azimut und LNB Skew für den gewählten Satelliten an. Der Aufbau der neuen 76.9 dBµV 75.6 dBµV 77.0 dBµV 73.0 dBµV 76.0 dBµV 75.0 dBµV MER 14.9 dB - 12.5 dB 12.0 dB 17.1 dB 14.9 dB CBER <1.0E-6 - 3.6E-6 1.7E-6 2.0E-4 <1.0E-6 <1.0E-8 <1.0E-8 <1.0E-8 - <1.0E-7 <1.0E-9 Power DVB-S2 Deviser S7000 VBER DVB-S Measurement Power Modulation 76.3 dBµV - 76.0 dBµV - 76.1 dBµV 74.6 dBµV MER 13.3 dB - 16.8 dB - 17.1 dB 14.8 dB CBER 4.4E-0 - 7.0E-4 - 2.0E-4 4.4E-4 Reference 1 Reference 2 Reference 3 Reference 4 Reference 5 LBER - <1.0E-7 <1.0E-7 - 56.5 dBµV 55.0 dBµV 56.5 dBµV MER >30 dB - - 30.3 dB 34.3 dB 30.7 dB CBER 2.1E-02 - - 6.1E-5 3.0E-5 <1.0E-6 1.9E-03 - - - <1.0E-8 <1.0E-9 52.9 dBµV 49.0 dBµV - 51.0 dBµV 51.1 dBµV 51.3 dBµV MER 35.1 dB 29.5 dB - 23.4 dB >36 dB 29.5 dB PRE-BER <1.0E-9 <1.0E-8 - 1.3E-3 <1.0E-9 <1.0E-7 POST-BER Analog <1.0E-8 - Power DVB-C - 56.5 dBµV VBER DVB-T <1.0E-8 Power <1.0E-9 - - - <1.0E-9 <1.0E-9 Video 57.5 dBµV 59.9 dBµV - 58.0 dBµV 58.1 dBµV 57.7 dBµV Audio 42.3 dBµV - - 41.5 dBµV 41.5 dBµV 39.7 dBµV ■ Tabelle 1: Vergleich der Messwerte des Deviser S7000 mit fünf professionellen Referenzgeräten des TELE-audiovision Messlabors. 38 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com Antenne war daher unspektakulär und die stärksten Satelliten konnten auch gleich empfangen werden, weshalb nur noch eine Feinjustierung notwendig war. Und hier konnte der Deviser S7000 sich so richtig bewähren, denn die Darstellung des Wasserfall-Diagramms machte diese sonst eher lästige Aufgabe zum Kinderspiel. Einfach die Antenne von Limit zu Limit fahren und dann das resultierende Wasserfall-Diagramm anschauen: sofort erkennt man, wie viele Satelliten mit welcher Leistung empfangen werden können. Für die Nordhalbkugel der Erde gilt: sind die Satelliten eher im Osten empfangsstark und im Westen empfangsarm, dann muss die Antenne samt Motor nach links gedreht werden, im umgekehrten Fall nach rechts. Sind eher die äußeren Satelliten empfangsstark und die zentralen Satelliten empfangsarm (von Süden aus gesehen), dann muss die Neigung des Motors gesenkt werden und die Neigung der Antenne erhöht werden. Ist eher der Empfang der zentralen Satelliten gut und der äußeren schwach, muss umgekehrt vorgegangen werden. Diese Prozedur wurde schon in der TELE-audiovision Ausgabe 02-03/2012 beschrieben siehe Tabelle 2. Das besondere am Wasserfall-Diagramm ist, dass man auf einen Blick den Empfang des gesamten Horizonts ablesen kann. Mit etwas Übung und Gefühl ist es sogar möglich, anhand des Wasserfall-Diagramms einzelne Satelliten zu ermitteln und nach einiger Zeit weiß man sogar, um wie viel Grad die Antenne gedreht werden muss, damit der Empfang gelingt. Keine Frage: wenn es um die Einrichtung von Satelliten-Antennen geht, egal ob motorisiert oder nicht, ist ein Echtzeit-Spektrum meiner Meinung nach immer noch die beste Hilfe, die
  • 39.
    4 Waterfall 1. The waterfalldiagram shows the spectrum encoded with colours over a period of time. If the antenna is rotated, it is possible to clearly see the individual satellites and their transponders. Also, this gives a clear indication on the signal level of each satellite: in the picture you can see that some satellites have a very low signal. 2. Deviser implemented an additional visualization in the S7000: a combined view of the spectrum and the respective waterfall diagram. 3. This is ideal to adjust the antenna. The picture shows the variation of the reception – this allows to fine tune the antenna for maximum gain. 4. This picture shots that satellites located east show a much better signal than satellites in the west. This means the inclination of the motor is wrong. 5. After correcting the motor inclination, all satellites are received with a similar signal level. 6. The motor handling is extremely well implemented on the Devisor S7000. You can choose between a fully dedicated menu featuring all required DiSEqC-commands (1.0, 1.1 and 1.2), as well as theSaTCR (Sat Cable Routing) mode, used to provide the satellite signal to multiple users with a single cable. 7. Alternatively you can stay in the spectrum modus and rotate the dish using the DRIVE option. When it is active, the left and right keys are used to rotate the dish, while the up and down keys are used to switch between a continuous move and a stepped move. The pictures shows the results of the fine tuning – no doubts it has never been as easy to obtain the perfect alignment. 8. As a reward it is possible to enjoy a bit of live radio fromEutelsat W3A 5 1 6 2 7 3 8 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 39
  • 40.
    ■ Checking a Multiswitch withthe Deviser S7000 ein Messgerät bieten kann. Wird das Spektrum obendrein noch als WasserfallDiagramm dargestellt, ist man praktisch im Himmel. Ich kann Deviser nur danken, diese so wertvolle Darstellungsform umgesetzt zu haben und will sie nicht mehr missen. Aufgabe: Fehlersuche – Störungen in der CATV Verteilung im Haus In unserem portugiesischen Testcenter steht CATV und SAT-TV über eine gemeinsame Kabelverteilung zur Verfügung. Dazu wird das Koax-Kabel des CATVProvider zuerst über einen Splitter geteilt, eine Leitung geht direkt zum DOCSISModem und stellt so den Breitband-Internetanschluss bereit, die andere Leitung ■ Tabelle 2: Korrekte Ausrichtung des Motors und der Antenne: alle Satelliten befinden sich auf dem angefahrenen Bogen: Fehlerhafte Ausrichtung des Motors und der Antenne geht in einen Multischalter, der das CATV-Signal von 50-850 MHz mit dem Satelliten-Signal von Astra 19.2E, Hotbird 13.0E und Hispasat 30.0W von 950-2100 MHz mischt. Plötzlich konnte an den Dosen aber nur noch analoges CATV mit starken Bildstörungen empfangen werden, das Satelliten-Sig- Zu groß Zu klein Neigung der Motorachse Außenstehende Satelliten werden nicht empfangen (Antenne zu weit nach oben) Außenstehende Satelliten werden nicht empfangen (Antenne zu weit nach unten) Neigung der Antenne Satelliten werden nicht empfangen (Antenne zu weit nach oben) Satelliten werden nicht empfangen (Antenne zu weit nach unten) Ausrichtung des Motors Linke Satelliten werden nicht empfangen weil Antenne zu niedrig, rechte Satelliten werden nicht empfangen, weil Antenne zu hoch Linke Satelliten werden nicht empfangen weil Antenne zu hoch, rechte Satelliten werden nicht empfangen, weil Antenne zu niedrig 40 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com nal war nicht mehr zu empfangen. Gleich kam der S7000 zum Einsatz. An der ersten Dose waren digitale CATV Signale gar nicht zu empfangen, Satelliten-Signale auch nicht. Anhand eines analogen Transponder sah ich auch schon den Grund: die Dose war nicht korrekt mit dem Koax-Kabel verbunden. Trotzdem machten sich intermittierende Störungen bemerkbar. Ein Barscan der CATV-Kanäle belegte zusätzlich eine signifikante Verringerung der Signal-Pegel/ Leistung (je nachdem ob es sich um einen analogen oder digitalen Transponder handelt) und das Konstellations-Diagramm zeigte weit verstreute Wolken, anstatt der üblichen konzentrierten Bildpunkte für jeden Quadranten. Diese Situation war auch an einer anderen Antennendose messbar, so dass davon ausgegangen werden konnte, dass das Problem nicht am Kabel oder der Dose zu suchen war. Deshalb ging ich zum Verteilerkasten und
  • 42.
    9 12 10 13 11 14 schloss das Messgerätdirekt an einem der Ausgänge des Multischalters an. Wieder das gleiche fehlerhafte Ergebnis. Da die angeschlossenen Satelliten-Antennen und besonderes die LNBs schon seit längerem nicht mehr gewartet wurden lag der Verdacht nahe, dass die Stecker oxidiert sind oder einer der LNBs defekt sein könnte. Ich schloss daher die Kabel von den LNB-Ausgängen einzeln an den S7000, doch hier konnte jede Ebene der 3 Quadro-LNBs perfekt empfangen werden. Konnte vielleicht der Multischalter defekt sein? Als ich das CATV-Kabel direkt vom Splitter an das Messgerät angeschlossen habe kam langsam etwas Licht in die Sache: auch hier waren Störungen vorhanden, ob- CATV 9. An analogue picture like this is normally an indication that something is definitely wrong with the cable. And yes: even today it is still important to be able to measure analogue CATV channels and to show a live picture. 10. The video and audio signal level is far too low. 11. Same problem with the channel to noise ratio. 12. After opening the aerial socket and reconnecting the coaxial cable properly, reception was apparently back to normal. 13. Still I was getting intermittent picture interferences. There was another additional problem. 14. The constellation diagram shows a less defined and concentrated cloud – a clear indication that the signal modulation was not OK. 15. The culprit was a defect signal splitter. After exchanging it, the constellation diagram showed perfectly concentrated clouds. 16. The signal quality was back to normal and without any interferences. 15 16 42 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 44.
    17 wohl der Multischalternicht genutzt wurde. Der Fehler konnte also nur noch am vom Provider bereitgestelltem Signal liegen oder vielleicht am Splitter? Als ich das Koax-Kabel vom Provider direkt an den S7000 anschloss, konnte ich wieder normal CATV in analog und digital empfangen. Das Problem lag definitiv am Splitter (und somit auf meiner Seite – der Provider war nicht Schuld). Zum Glück habe ich immer einige Ersatzteile auf Lager und so konnte ich diesen schnell durch einen neuen ersetzen und dann funktionierte alles wieder wie normal. In dieser Fehlerbeseitigung zeigte sich, wie wertvoll ein Messgerät wie der S7000 sein kann. Problemlos kann es DVB-C Signale in allen Modulationen aber auch analoge Signale und DVB-S/S2 Signale analysieren. Die Spektrum-Anzeige in Echtzeit ermöglicht es, intermittierende Störsignale sichtbar zu machen und natürlich habe ich weitgehend die kombinierte WasserfallDarstellung bevorzugt, da so gleichzeitig zum Spektrum dieses auch über einen Zeitraum festgehalten wird. So können unter anderem auch Tendenzen dargestellt werden, was besonders dann wichtig ist, wenn das Signal nur langsam steigt oder abfällt. Durch die tadellose DiSEqC-Implementierung konnte der Multischalter bedient werden und anhand des Konstellations-Diagramms die Qualität der Modulation geprüft werden. Bei dem Test wurden Kabel an- und abgesteckt, ohne dass der S7000 Schaden genommen hätte. Insgesamt bewies sich das Gerät als sehr robust. Mit dem S7000 ist ein Techniker bestens ausgestattet, um bei Kunden auf Fehlersuche zu gehen. Alle notwendigen Funktionen sind ausnahmslos implementiert und funktionieren auch in der Praxis wie erwartet. Aufgabe: Entwicklung einer DIY DVB-T Antenne In vielen Regionen wird DVB-T als SFN (Single Frequency Network) implementiert. Alle Sender strahlen den oder die Transponder landesweit auf den gleichen Frequenzen. Dies hat den großen Vorteil, dass das Frequenzspektrum für andere Anwendungen freibleibt und für den Anwender, dass er den Empfänger innerhalb der Region bewegen kann (zum Beispiel im Auto), ohne die Frequenz neu einstellen zu müssen, wenn der Empfang plötzlich über einen anderen Sender erfolgt. In diesem Test wollte ich herausfinden, ob die mit den USB-Empfängern mitgelieferten „Stummel-Antennen“, es handelt sich hier um TDipol Antennen, an die länderspezifische DVB-T Frequenz angepasst sind, oder nicht. Deshalb habe ich mir mit einem Draht eineT-Dipol Antenne selber gebastelt.Die Länge des Drahtes wurde exakt für die portugiesische DVB-T Frequenz von 754 MHz berechnet. (formel 1) Für eine DVB-T Frequenz von 754 MHz ergibt sich so eine Länge des Außenleiters von 94mm und eine Länge des Innenleiters von 96mm. Der Außenleiter wird durch ein Zurückstülpen des Metallgeflechts erreicht, der Innenleiter wird einfach von seiner Isolation befreit, fertig ist die DIY („Do ItYourself“) DVB-T Antenne für den SFN Empfang. Im Internet finden sich übrigens diverse Bauvorschläge für diese T-Dipol Antennen und sogar von Doppelquad-Antennen, die eine noch bessere Empfangsleistung versprechen. Es stellt sich nun die Frage: ist unsere DIY-Antenne wirklich besser als die mitgelieferte Stummelantenne? Die Antwort findet sich Tabelle 3. Tatsächlich lohnt es sich, 18 19 eine speziell für die Empfangsfrequenz optimierte TDipol Antenne zu benutzen. Allerdings stellte sich bei unseren Experimenten heraus, dass man das Metallgeflecht getrost abschneiden kann. Lässt man nur den Innenleiter in korrekter Länge, sind die Empfangsergebnisse sogar noch besser und die Herstellung und Optimierung der Antenne gestaltet sich einfacher. Der Deviser S7000 ■ Formel 1: Die Formel für die DIY T-Dipol Antenne 754 MHz Televés TDT Roof Antenna Original Antenna Optimized DIY T-Dipol Antenna Leistung 61.0dBµV 41.7dBµV 46.2dBµV MER >30 dB 23.8 dB 23.8 dB CBER <1.0E-5 2.2E-3 3.4E-3 VBER <1.0E-7 <1.0E-7 <1.0E-7 ■ Tabelle 3: Vergleich der DVB-T Messungen mit dem Deviser S7000 44 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 45.
    20 21 DIY DVB-T Antenna 17.DVB-T Signal of our external antenna. Reception is quite good. 18. A good indicator for DVB-T reception quality is the constellation diagram. As long as all dots are closely within the centre of each square, everything is fine. 19. The Deviser S7000 allows to set the resolution bandwidth in spectrum mode. This is unique among the meters I have tested so far. A smaller bandwidth will feature higher resolution, while a bigger bandwidth will result in a slower spectrum refresh rate. Because we are looking at the specific DVB-T transponder at 754 MHz, a span of 16 MHz is sufficient and thus even the lowest resolution bandwidth setting will produce a real time refresh rate. The resolution is so good, that you can practically see the carriers. 22 23 24 25 20. The same signal, but in combined spectrum and waterfall diagram view. This allows to monitor the spectrum over a period of time, while simultaneously monitoring the spectrum in high detail. 21. A generic rod antenna provided with a USB DVB-T receiver: this antenna was not designed specifically for a certain frequency; its length does not match the SDN frequency of 754 MHz as used in Portugal. 26 22. As a result, the signal power is only 41.7 dbµV and the CBER is rather low, though still correctable since the VBER is under 1.0E-7. 23. Looking at the constellation diagram using the generic rod antenna, it is obvious that the signal quality is far from perfect. 24. First step of the DIY antenna: strip the rubber off the cable, maintaining the length calculated for the SFN frequency. 27 25. Flip the mesh back and leave the inner wire with the correct length: you just got yourself the “poor-man’s” DVB-T antenna. 26. Amazingly, the signal power is on average 5 dBµV higher than with the generic antenna. 27. Again, using the waterfall diagram it is easy to adjust the antenna so that reception is maximized. It is strange to think on how it has been possible in the past to fine tune the alignment of the antenna without this functionality. One thing is for sure: the waterfall diagram is an outstanding aid for installers. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 45
  • 46.
    28 löste unsere Fragestellung hervorragend.Durch seine hohe Messgenauigkeit und Schnelligkeit erzielten wir schnell Aufschluss über die Empfangsleistung der Antennen. Echo-Messung Der Deviser S7000 erlaubt die für DVB-T/H wichtige Echo-Messung. Dies ermöglicht es, eine optimale Antenne aufzubauen, die den störenden Empfang von einem zweiten, weiter entfernten Sender, auslöscht. Wenn dieser Sender außerhalb des so genannten Guard Intervalls liegt, werden störende Laufzeitverzögerungen des Signals erzeugt, die der Demodulator nicht mehr kompensieren kann. Es kommt zu Aussetzern bzw. der Empfang ist nicht möglich. Diese Situation kann ein mit dem S7000 ausgerüsteter Techniker lösen, indem er zum Beispiel zwei Antennen benutzt, deren Abstand so gewählt wird, dass sich die an beiden Antennen eingehenden störenden Wellen gegenseitig auslöschen. Das Prinzip besteht darin, dass beide Antennen auf den nahe gelegenen Sender ausgerichtet sind und die störende Strahlung, die von einem entfernten Sender stammt,die Antennen mit einer Drehung erreichen. Wählt man den Abstand beider Antennen geschickt, addieren sich die Wellen der naheliegenden Antennen, während sich die Wellen des entfernten Senders gegenseitig auslöschen. Mangels störender Echos in meiner Mux TS Analyser 28. In order to use the Transport Stream Analyser of the S7000 with the ASI input, you have to first enable this interface. 29. By pressing the TV key on the meter, you enter the Transport Stream Analyser, which is now receiving the TS stream on its ASI input connector. In this case I setup a TS containing channels from two different German FTA transponders. 30. The Deviser S7000 gives access to all parameters of the Region musste ich mich leider nicht um diese Art von Störungen kümmern, doch mit dem S7000 wäre es leicht, eine solche „DoppelAntenne“ einzurichten. Interessant ist die Möglichkeit, anhand der mitgelieferten GPS-Antenne die aktuelle Position bestimmen zu können. So kann man den Deviser S7000 auch zur Erstellung von regionalen Empfangskarten nutzen. Schade, dass es nicht möglich ist, die erfassten Messwerte automatisch auch mit der Lokalisation zu speichern um sie dann am Computer im Google-Maps Format zu exportieren bzw. hochzuladen. Deviser wird vielleicht so eine Funktion mit einer zukünftigen Firmware-Aktualisierung nachreichen. In diesem Fall könnte man nämlich im Auto die gewünschte Region abfahren und hätte am Ende ein automatisch generierte Karte der Feldstärke. Aufgabe: MUX-Analyse eines selbst erstellten Transport Stream Um den Deviser S7000 als TV Analyser zu testen habe ich ein Szenario in einer Kopfstation nachgestellt. Ein professioneller IRD mit integriertem Multiplexer empfängt einen Transponder über den eingebauten DVB-S2 Tuner und einen weiteren Transponder von einem zweiten IRD über die ASI-IN Schnittstelle. Die beiden Transponder werden im TS stream. 31, 32. Interestingly, the equipment used to generate this mux filtered all NIT information, which is correct. Don’t you hate receiving a CATV transponder containing a satellite NIT? 33. One important application for the S7000: determining the TS rate. Notice on this picture that the specified bandwidth of the TS is 75 MB/s, but 32.45% are not being used. This clearly represents a waste of allocated bandwidth. 34. I reduced the bandwidth on the multiplexer to 35 MB/s but 29 30 31 this time the S7000 indicates that there is 0% empty capacity in the stream. This means that there is no reserve for sporadic increases in bandwidth. 35. Again, the multiplexer was setup, this time to use a bandwidth of 40 MB/s. And this time around 15% of the bandwidth is empty, leaving some reserve. This adjustment took a couple of minutes and resulted in saving a bandwidth of 35 MB/s. 36. To compare our TS with one of the originally broadcasted streams, we connected the ASI output of one of the IRDs. 46 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com 37. While there is no disturbance in the PCR interval measurement in our TS… 38. …some can be detected from the satellite signal, which is normal after travelling back and forth into space. However, if the TS from our multiplexer would show a PCR like this, then something would clearly be wrong. 39. Analysis of one of the original satellite Transport Streams. 40. The PIDs carry different numbers… 41. …and the NIT contains additional data.
  • 47.
    32 37 33 38 34 39 35 40 36 41 www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 47
  • 48.
    Gerät zu einemneuen Transponder gemuxt und an dem ASI-Ausgang bereitgestellt. Hier wurde nun der S7000 angeschlossen und Ziel war es, den empfangenen Transportstream zu analysieren, um zum Beispiel die verwendeten PIDs zu prüfen und um eventuelle Timing-Fehler zu messen. Diese Arbeit verrichtete der S7000 glanzvoll. Es muss lediglich der ASI-Eingang aktiviert werden und schon kann die TV Analyser Funktion mit dem TS-Stream des ASI-Eingangs genutzt werden. Sämtliche Funktionen stehen nun genau so zur Verfügung, wie in den normalen Tuner-Modi. Ich konnte schnell prüfen, ob der Stream tatsächlich die gewünschten Kanäle und zusammenhängende Services enthielt. Interessant war übrigens die Tatsache, dass der IRD die PIDs neu vergeben hat, so dass diese nicht mehr den PIDs der originalen Transponder entsprach - der S7000 zeigte mir dies sofort an. Schließlich macht es sich bezahlt, auch die PCR-Messung durchzuführen: gab es im originalen SatellitenSignal kleine Abweichungen (im grünen Bereich), war der vom IRD erzeugte Stream perfekt synchron mit dem Taktgeber des S7000. Wären hier schon kleinste Fehler vorhanden könnten sie sich durch die weitere Signalverteilung tragisch auswirken. Der Deviser S7000 ist ideal für diese Aufgabe gewachsen. PC Software des S7000 Welche Software ist auf der mitgelieferten CD? Diese S7000 Toolbox genannte Software erlaubt es, sämtliche Transponder- und Satelliten-Listen komfortabel zu editieren und zu verwalten. Weiterhin können im S7000 gespeicherte Messungen am PC dargestellt werden. Anders als sonst üblich erlaubt der S7000 das Abspeichern der Messungen auf zwei verschiedenen Weisen. Zum einen kann man einfach den aktuellen Bildschirminhalt als Bild abspeichern. Zum anderen können aber auch die Messwerte selbst gespeichert werden. Diese Messwerte können dann in der PC-Software dargestellt werden, wobei natürlich mehr Einfluss auf die Darstellung gegeben ist. Dies ermöglicht die Erstellung von professionellen Abnahme-Reports am Computer. Der Techniker kann so gegebenfalls 42 43 48 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 49.
    44 45 46 Toolbox Software 42. Thanksto the S7000’s Ethernet port it is possible to access the data captured through an FTP client. 43. Naturally, the same can be done using the Deviser Toolbox software, which allows to edit the channel lists and satellite transponder as well. 44. Editing the satellite transponder lists is really easy, but Deviser did a good job maintaining them updated, so there really was nothing to edit: the S7000 features all worldwide satellite transponder lists. 45. Editing the terrestrial channels is no challenge either, and again all channel plans worldwide are predefined. 46. Amazingly, the Toolbox software is not only capable of downloading and displaying the screenshots taken during measurements. If you instead store the actual data, the measurements can be rendered with the toolbox software instead. This provides additional functionality, since markers can be moved, etc. Also, the technician taking the measurements does not have to worry about specific readings for the report – they can be generated with the stored data and you don’t even need the meter to do that: just transfer the data using the network or a USB memory and the meter is ready to be used for the next call! www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 49
  • 50.
    47 48 49 die Messwerte amDeviser S7000 auf einen USB-speicher kopieren und im Büro dem Kollegen übergeben, der den Report anfertigt, ohne selber am S7000 arbeiten zu müssen, so dass dieser für den nächsten Einsatz frei ist. Die Daten (Settings und Messungen) können direkt als Datei von einem Datenträger gelesen werden oder über die integrierte ActiveSync genannte Funktion über das Netzwerk vom Messgerät ausgelesen werden. Natürlich kann man die Dateien auf diesem Wege auch vom PC zurück zum Messgerät kopieren. Das zugrunde liegende Protokoll ist übrigens das bewährte FTP-Protokoll und dank des Netzwerk-Analyse Tool Wireshark habe ich dann auch schnell die Zugangsdaten ermittelt: wer möchte, kann die Dateien auch normal über FTP hin und her kopieren, in dem einfach nur die IP-Adresse des Messgerätes mit dem Username „ftpadmin“ und dem Passwort „Instrument“ angegeben werden. Wichtig ist es, die FTP-Verbindung im „Active“-Modus zu betreiben. So kann man schneller Dateien hin und her kopieren. Schaden kann man dem Gerät so übrigens nicht zufügen, denn über FTP stehen nur die Anwender-Verzeichnisse Plan, SaveBmp, SaveData und Temp zur Verfügung. Der Höhepunkt der S7000 Toolbox Software ist aber die Fernbedienung des gesamten Gerätes! Über den unscheinbaren Knopf „Remote Control“ öffnet sich ein neues Fenster, das die Vorderseite des Messgerätes samt Bildschirm nachbildet. Mit der Maus lassen sich alle virtuellen Tasten des Messgerätes genau wie die echten Tasten bedienen und der Bildschirm reagiert genauso schnell wie das echte Gerät. 50 51 Toolbox Software 47. Incredibly, Deviser implemented a remote access to the meter. All you need is a network connection to the meter to be able to fully operate the S7000 remotely. 48. Everything shown on the physical screen is rendered in real time on the remote software. 49, 50. Even the TS analyser function can be used this way – only the live picture is obviously not shown, due to bandwidth limitations of the network. 51. If you have a smartphone, you can do a VNC connection to the PC running the Deviser Toolbox software. This means that you can climb to the roof with just your phone and still use all functions of the S7000. This is simply incredible. 50 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 52.
    Man kann daherwirklich auf alle Funktionen auch über das Netzwerk zugreifen und braucht keinen Zugang zum physischen Gerät. Einzig die demodulierte Audio/VideoAusgabe wird nicht weitergereicht, was anhand der notwendigen Bandbreite ja auch zu erwarten ist. Mir kam natürlich sofort folgende Idee auf: warum nicht den S7000 im Haus lassen und nur mit dem Smartphone auf das Dach steigen? Über VNC verbindet man das Smartphone mit dem Computer und kann diesen dann fernbedienen. Wurde zuvor schon die Toolbox Software gestartet, kann man so bequem den Deviser S7000 am Smartphone fernbedienen mit dem Vorteil, dass man dank Touchscreen direkt dessen virtuelle Tasten bedienen kann. Plötzlich hat man ein 100 g schweres Smartphone in der Hand und kann stundenlang auf dem Dach die Antennen justieren… einfach genial! Vielleicht bietet Deviser ja bald eine App für Android und/oder iPhone an, mit dem man den S7000 direkt ohne Umweg über den PC fernsteuern kann. Was gibt es am Gerät auszusetzen? Ein Test, in welchem es am Gerät nichts auszusetzen gibt, kann es nicht geben und wäre ein Anzeichen, dass man sich nicht ausreichend mit diesem auseinandergesetzt hat. Trotzdem gibt es praktisch nichts am S7000 zu bemängeln und daher musste ich mich wirklich anstrengen, um doch wenigstens folgende Punkte aufzulisten: - Bei analogen CATV Signalen kann der S7000 keinen Videotext anzeigen. Dies ist nicht unbedingt wichtig, denn das analoge Videosignal kann anhand des Oszillator-Modus analysiert werden. - Im Spektrum-Modus ist es nicht möglich, das Bild eines vorher gespeicherten Spektrums dem aktuellen als Referenz zu hinterlegen. Dies dient normalerweise dazu, verschiedene Antennen exakt identisch auszurichten und um das aktuelle Spektrum nach einem größeren Zeitraum mit dem gespeicherten Spektrum zu vergleichen, um Aufschluss darüber zu bekommen, ob es sich verschlechtert hat. Diese Funktion kann Deviser sicherlich leicht mittels einem Firmware-Update nachreichen. - Ich fand es etwas störend, dass der S7000 die Spanne des Spektrums automatisch auf die Bandbreite des eingerastetenSignals reduziert, wenn man in den Mess-Modus umschaltet. Sobald man das Spektrum erneut aufruft, muss man daher die Spanne manuell wieder ändern, um wieder das gesamte Spektrum zu sehen. Dies ist nur eine Kleinigkeit und sicherlich werden genauso viele Anwender eben diese Eigenschaft schätzen – ein typischer Fall von: man kann es nie allen recht machen. Aber das sind Kleinigkeiten. Tatsächlich handelt es bei dem Deviser S7000 um ein professionelles Messgerät für praktisch alle TVNormen, mit dem man für wirklich jede Aufgabenstellung bestens gerüstet ist. Alle denkbaren Messungen sind vorhanden, das Gerät lässt sich sehr leicht bedienen, ist robust und bietet obendrein noch einen kompletten TV Analysator. Die Messwerte sind allen Zweifeln überlegen und bieten die gleiche Genauigkeit, wie andere Messgeräte der ProfiOberliga. Was kann man sich eigentlich noch wünschen? Mit dem S7000 zur Hand eigentlich nur, dass es hoffentlich viele komplexe Fehler zu diagnostizieren und beseitigen gibt, denn es macht einfach Spaß mit diesem tollen Messgerät zu arbeiten! 52 Battery and Inside Peek 52. The battery pack of the S7000 is easily accessible on the back side of the meter. Two big screws need to be loosened up. 53. The cover plate can be removed, revealing the battery pack. 54. The battery back can be pulled by the two cords. It is a composed of a 10x AA battery pack. 55. We could not resist removing the cover of the meter to have a peek inside. What we saw: a highly integrated and extremely well built electronic equipment. Naturally we did not dare to further disassemble the device, so this is the best insight we can provide. 53 54 52 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 53.
    56 55 57 Ka-Band Satellite Scan 56.This waterfall diagram shows the horizon from about 30.0E to 30.0W using the Inverto Ka LNB. Only 9.0E is broadcasting transponders in the 19.7 GHz – 20.2 GHz range. 57. This picture shows 9.0E over a period of time (about 30 seconds). The second half (lower part – representing about 15 seconds) of the waterfall diagram was recorded during a sporadic rain shower. Curiously the rain did not produce any signal loss. How to interpret BER measurements What does 1.2E-03 mean? BER stands for Bit Error Ratio: the measuring instrument will basically count the erroneous bits within all received bits and calculate this simple formula: Because the amount of erroneous bits is normally very small, let’s say 1 wrong bit in every 1.000.000 bits, it would look odd to see a value of 0.000001 on the meter’s screen. A much more convenient format would be 1x10-6. Calculators will frequently show this number as 1E6, instead, to save some screen space. So this is what a reading of CBER = 1.2E-03 means: you will get one wrong bit in every 1200 bits received. CBER means that no error correction has been applied to the signal, so let’s now see what LBER < 1.0E-8 means: Let’s do the math: It means that after applying the error correction, we only will receive one bad bit every hundred million received bits. We will have a great picture without any noticeable artifacts. However, because our initial CBER value is low, there is no bad weather reserve. If the signals gets only slightly worse, the error correction will not be able to correct the incoming stream and picture artifacts will be produced. The thumb rule is: the smaller the BER value before error correction, the better. Notice that smaller means a bigger number after the “E”, because there is a “-“ sign: -5 is smaller than -3! The smaller the number, the more bad weather reserve you will get. The BER value after the error correction will give you an idea, if artifacts will be noticeable on the screen with the current signal. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 53
  • 54.
    4 DVB-S, DVB-S2, DVB-C,DVB-T, DVB-T2, DVB-H, ATSC – der Deviser S7000 kann alles! Was kann man sich eigentlich noch wünschen? Mit dem S7000 zur Hand eigentlich nur, dass es hoffentlich viele komplexe Fehler zu diagnostizieren und beseitigen gibt, denn es macht einfach Spaß mit diesem tollen Messgerät zu arbeiten! 1, 2. Der S7000 kann neben DVB-T auch DVB-T2 Signale analysieren und zeigt auch das entsprechende Konstellations-Diagramm souverän an. Interessant an DVB-T2 ist die Option, die Modulation mit einer TILT genannten Neigung zu versehen, mit welcher das Signal stabiler gegen Störungen wird. 3, 4. Oftmals geht man einfach davon aus, dass DVB-H von jedem DVB-T fähigem Messgerät auch analysiert werden kann. Wir wollten uns sicher gehen und haben es probiert. Tatsächlich kann der S7000 DVB-H ohne Probleme messen. 5, 6. Weiter geht es mit ATSC. Und hier zeigt der S7000 was Sache ist: während man bei Konkurrenzprodukten fast immer ATSC nur als extra Option erhält, liefert Deviser diese Norm gleich als Standardfunktion mit. Auch das Konstellationsdiagramm für 8VSB wird korrekt angezeigt. 7, 8. Selbstverständlich macht der S7000 auch bei 16VSB Modulation nicht halt. Phantastisch wie gut man mit diesem Messgerät für alle Fälle ausgerüstet ist. 5 1 6 2 7 3 8 54 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 56.
    TEST REPORT Miniature DVB-S2HDTV Receiver 56 TELE-audiovision International — The World‘s Largest TV Box Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 57.
    • Besonderheit: kann verstecktangebracht werden, da der IR-Empfänger für die Fernbedienung flexible montiert werden kann • dank USB-Anschluß vollwertiger PVR • integriertes Internet, z.B. für YouTube und Google Maps • automatische DiSEqC-Erkennung, automatische Erkennung der Videoauflösung des Programms und TV-Monitors • LNB Spannung kann erhöht werden, um Verluste durch lange Kabel auszugleichen www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 57
  • 58.
    TEST REPORT Miniature DVB-S2HDTV Receiver Ein HDTV Receiver für Satellit mit allen Features Mit dem Mini HD bringt des Receivers untergebracht hat den Mini HD bewusst so ten Seite sorgt zudem für die Amiko einen DVB-S2 taugli- wurden. Konkret handelt es gebaut, dass er entweder di- Möglichkeit, rasch ein USB chen HDTV PVR Receiver im sich dabei um einen LNB Ein- rekt an der Wand montiert Speichermedium Kleinstformat auf den Markt. gang, eine Ethernet Buchse, oder an der Rückseite des ßen zu können. Der kann es allerdings in einen USB 2.0 Port sowie Fernsehers unauffällig un- Puncto Features problemlos eine Buchse für das externe tergebracht werden kann. mit seinen größeren Brüdern 12V Netzteil. anschlie- Angetrieben wird der Amiko Mini HD von einem 400 Für die perfekte Ausgabe MHz Prozessor, dem 64 MB aufnehmen. Lediglich 15 x Mit Hilfe von drei Klinken- des Videosignals sorgt eine Flashspeicher sowie 1 GB 11 x 3.5 cm misst die in ele- buchsen hat Amiko zudem HDMI Buchse, kristallklarer DDR SDRAM zur Verfügung gantem Schwarz gehaltene Anschlussmöglichkeiten für Dolby Digital 5.1 Ton wird stehen. Im späteren Praxis- Gehäusebox und dank ihres ein Verbindungskabel leider nur via HDMI, nicht test wird diese Kombination geringen Gewichts von et- (CVBS und Stereo Audio) aber über einen S/PDIF Aus- für eine problemlose Dar- was mehr als 250 Gramm ist sowie eine RS232 Buchse gang an die heimische Ste- stellung von HDTV sowie ein sie zudem federleicht. geschaffen, die dafür not- reoanlage weitergereicht. zügig auf Fernbedienungs- A/V An der Frontseite offen- wendigen Adapterkabel lie- Besonders gut gefallen hat baren zwei Status LEDs den gen dem Receiver bei. Die uns, dass Amiko beim Mini OSD sorgen. Die vom Her- aktuellen dritte kommandos reagierendes dient HD wirklich jeden Zentimeter steller während alle wichtigen An- zum Anschluss des externen genutzt hat, so wurde vom bedienung liegt gut in der schlüsse an der Rückseite IR-Empfängers, denn Amiko Hersteller z.B. an der Re- Hand, ist ergonomisch ge- ceiverunterseite ein an der formt und weist eine über- Front zugänglicher Karten- sichtliche Beschriftung auf. Betriebszustand Klinkenbuchse leser für Conax Smartcards mitgelieferte Einen Fern- Installationsassis- untergebracht, eine zweite tenten sucht man beim Mini USB 2.0 Buchse an der rech- HD vergebens, der Anwen- 11-12/2013 AMIKO MINI HD Perfekt gelungener Receiver in Kleinstformat www.TELE-audiovision.com/13/11/amiko 58 TELE-audiovision International — The World‘s Largest TV Box Magazine — 1 1-12/2013 — www.TELE-audiovision.com 0.53
  • 60.
    1 der muss die wichtigsten Grundeinstellungen aber auf europäischeEinträ- seines ge und sollte etwas umfang- Receivers selbst vornehmen. reicher sein. Gut gefallen hat Das Videosignal via HDMI uns die Möglichkeit, die LNB kann der neue Amiko Recei- Versorgungsspannung ver in den Auflösungen 480i, 0.5 Volt erhöhen zu können, 480p, 576i, 576p, 720p 50 falls Hz, 720p 60 Hz, 1080i 50 zum Einsatz kommen. längere um Koaxialkabel Hz, 1080i 60 Hz, 1080p 50 sierte Anwender kann die geben, da bleiben also keine Auto DiSEqC Funktion zur Wünsche offen, zumal Ami- Rettung in der Not werden, ko auch noch einen Auto- dank ihrer Hilfe erkennt der matik Modus (der Receiver Receiver automatisch, wel- passt sich an die Auflösung cher Satellit über welchen des 2 Gerade für nicht so ver- Hz sowie 1080p 60 Hz aus- DiSEqC Port mit dem Re- derzeit Programms empfangenen ei- ceiver verbunden ist. Hier nen Native by TV Modus macht sich jedoch die leider (der Receiver passt sich an etwas karge Satellitenliste die maximale Auflösung des bemerkbar, denn nur dar- verwendeten Fernsehers an) 3 an) sowie in enthaltene Einträge kön- integriert hat. nen auch erkannt werden. Der Mini HD beherrscht die Im Test mit den in Europa DiSEqC Protokolle 1.0, 1.1, sehr häufig genutzten AST- 1.2 und 1.3 und kann somit RA und EUTELSAT Satelliten sowohl mit einer Multifeed, funktionierte die Erkennung Multifokus oder drehbaren problemlos, weniger populä- Antenne umgehen. Die mit re Satelliten wurden jedoch 28 Einträgen gefüllte, vor- nicht erkannt. programmierte Satellitenliste ist aktuell, beschränkt sich 4 5 1. Hauptmenü des Amiko Mini HD 2. Zum Bearbeiten der Kanalliste stehen alle notwendigen Möglichkeiten bereit 3. Einzelne Sender können leicht umbenannt werden 4. Installationsmenü 5. Satelliteneinstellungen 6. Auf Wunsch kann der Anwender die PID Werte einzelner Sender manuell eingeben 7. Mittels FastScan werden alle Transponder eines der 9 vorprogrammierten Pay-TV Anbieter automatisch eingelesen 8. Auto DiSEqC Funktion 9. Berechnung der zum Justieren der Antenne notwendigen Winkel 10. Benutzereinstellungen 11. Zeiteinstellungen 12. Insgesamt 8 Timerslots stehen zur Auswahl bereit 13. Das Videosignal kann in einer Auflösung von maximal 1080p via HDMI ausgegeben werden 14. Das OSD kann der Benutzer individuell anpassen 15. Drei integrierte Videospiele sorgen für Unterhaltung in Werbepausen 60 TELE-audiovision International — The World‘s Largest TV Box Magazine — 1 1-12/2013 — www.TELE-audiovision.com Suchlaufseitig stehen dem Anwender ein Satelliten-, Transponder- oder Blindscansuchlauf zur Verfügung. Hier hat es uns natürlich gerade der Blindscan besonders angetan, dieser förderte auf dem HOTBIRD 13° Ost in 6 Minuten 1597 TV- und 373 Radioprogramme zu Tage. Damit kann man absolut zufrieden sein. Auch auf nicht so häufig genutzten Satelliten wie z.B. dem SES4 22° West lieferte der Blindscan bei Transpondern mit verschiedensten Symbolra- ten gute Ergebnisse. Ein herausragendes Feature des Amiko Mini HD ist die FastScan Option, mit deren Hilfe die Transponder von insgesamt 9 vorpro- grammierten, europäischen Pay-TV Providern mühelos eingelesen werden können. Im Test hat das mit dem holländischen problemlos CanalDigitaal geklappt. Im
  • 61.
    6 11 7 12 8 13 9 14 10 15 www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 61
  • 62.
    16 6 16. Netzwerkfeatures desAmiko Mini HD 17. IP Einstellungen, das DHCP Protokoll wird selbstverständlich unterstützt 18. Die Software des Receivers kann automatisch via Internet aktualisiert werden 19. Wettervorhersage 20. RSS Feeds werden übersichtlich angezeigt 21. Die Videodienste YouTube und YouPorn stehen direkt am Receiver zur Verfügung 22. YouTube 23. Der Receiver unterstützt neben der Aufnahme von Sendungen natürlich auch die Timeshift Funktion 24. Google Maps am Amiko Mini HD 17 21 18 22 19 23 20 24 62 TELE-audiovision International — The World‘s Largest TV Box Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 63.
    Highlights BluBox SOTx • Bis zu16 SAT - ZF Ebenen und Terrestrik auf einer LWL - Faser! • 19" Grundeinheit mit redundantem Schaltnetzteil • Verteilung auf bis zu 32 optische Knotenpunkte möglich • Konfiguration und Überwachung via LAN / IP WhiteBox • Modulare Kopfstelle für vielfältige Umsetzungen • 19" Grundeinheit mit redundantem Schaltnetzteil • Konfiguration und Überwachung via LAN / IP SPAROS 711 Touch Serie • Intuitive Bedienung durch Touch Screen 10" • DVB - S / S2, DVB - T/ T2, DVB - C, HDTV Bildwiedergabe • Kompaktes und robustes Druckgussgehäuse aus Aluminium • Lieferung im stabilen Transportkoffer! SPAUN electronic GmbH & Co. KG Byk - Gulden - Str. 22 · 78224 Singen · Germany Phone: + 49 (0)7731 - 8673 - 0 · Fax: + 49 (0)7731 - 8673 - 17 Email: contact@spaun.com · www.spaun.com
  • 64.
    25 6 26 Handumdrehen erscheinen so ganz ohnemühsames Ab- Tastendruck sofort zur Verfügung. suchen mehrerer Transpon- Nachdem der Receiver an der alle Sender eines Pay-TV die eigenen Bedürfnisse an- Anbieters in der Kanalliste. gepasst wurde genügt ein Nachdem die Kanalliste Druck auf die Exit Taste der des Receivers erstmal mit Fernbedienung tausenden Einträgen gefüllt wird das Einstellungsmenü wurde drängt sich die Frage verlassen und der Mini HD der Kanallistenbearbeitung nimmt seine Arbeit auf. Er nahezu auf. Hier gibt sich der verfügt dabei über clever Mini HD jedoch keine Blöße angeordnete OSD Einblen- und bietet alle nur erdenkli- dungen, die dem Anwender chen Optionen wie z.B. das eine logisch durchdachte Be- Löschen, Verschieben, Um- dieneroberfläche zur Verfü- benennen, Gruppieren oder gung stellen. Besonders gut mit einem PIN Code verse- hat uns dabei der EPG ge- hen der einzelnen Einträge fallen, dessen Inhalte in drei an. verschiedenen Modi darge- Dank 32 und schon Favoritenlisten stellt werden können. Dank wandern die Lieblingssender weiterer Funktionstasten an rasch in eine dieser Samm- der lungen 27 Fernbedienung lassen dem sich Optionen wie Untertitel, Anwender dann mit einem Teletext oder Sprachwahl di- 25. Auch die Satellitenansicht von Google Maps steht zur Auswahl bereit 26. Via OSD Tastatur kann auf Google Maps nach Orten gesucht werden 27. Kanalsuchlauf 28. Info Leiste mit EPG Daten der aktuellen und folgenden Sendung 29. EPG Ansicht 1 30. EPG Ansicht 2 31. EPG Ansicht 3 32. Kanalliste 33. Die Kanalliste kann auf einzelne Satelliten beschränkt werden 34. Die Kanalliste kann auf einzelne Anbieter beschränkt werden 35. Sprachwahl 36. Satellitenauswahl 37. OSD Teletext 38. Problemlos kann der Amiko Mini HD zuvor aufgezeichnete Sendungen wiedergeben 39. MP3 Wiedergabe 28 rekt ohne Umweg über das und stehen Hauptmenü aufrufen, das spart Zeit und freut den Anwender. Da es sich beim Amiko Mini HD um einen vollwertigen PVR Receiver handelt schlossen wir natürlich sofort ein USB Speichermedium an einen der beiden USB Ports 29 an, daraufhin waren wir in der Lage, bis zu zwei Sendungen gleichzeitig in HD Qualität aufzunehmen, während ein drittes Programm live gesehen zeitgesteuerten wurde. Zur Aufnahme von Sendungen stehen insgesamt nur 8 Timerslots zur Verfügung, das ist heutzutage nicht mehr zeitgemäß. 64 TELE-audiovision International — The World‘s Largest TV Box Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 65.
    30 35 31 36 32 37 33 38 34 39 www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 65
  • 66.
    Neben PVR Aufnahmen kann der USBPort auch zur Adapter einsetzen, der den werden können. Test- Mini HD kabellos ins Inter- Wiedergabe von Videos in bericht aufmerksam gele- net bringt, dieser ist jedoch den Formaten AVI, MPEG, sen haben dann haben Sie nicht MP4, TS, Flash und VOB ver- sicherlich fangs. wendet werden, ebenso wie Amiko dem Mini HD eine zum Abspielen von Musik im Netzwerkbuchse MP3 Format. Den einen oder und ihm somit die Welt des anderen Anwender wird es Internet geöffnet hat. Wer auch freuen zu hören, dass WiFi in den eigenen vier JPEG Bilder via Amiko Mini Wänden HD am Fernseher angezeigt kann auch einen USB WiFi Wenn Sie diesen bemerkt, dass spendiert verwendet, Teil des Lieferum- 42 der 40. Der integrierte Bildbetrachter funktionierte im Test tadellos 41. Videowiedergabe verschiedenster Formate 42. DivX Wiedergabe 43. Full HD Videowiedergabe 44. Auch Flash Videos werden problemlos abgespielt 40 6 43 41 44 66 TELE-audiovision International — The World‘s Largest TV Box Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 68.
    Neben der Möglichkeit,die uns im Test allesamt rich- Software des Receivers via tig Spaß machten, sowie die Internet zu aktualisieren, er- Möglichkeit, sämtliche Ein- hält der Anwender zusätzlich stellungen und die Kanalliste Zugriff auf aktuelle Wetter- für den Notfall auf ein USB / PVR Receiver with Function Miniature external IR remote control daten, RSS Feeds sowie die Speichermedium zu sichern. Dienste Generell Input frequency 950 - 2150 MHz Input symbol rate 2 - 45 Ms/s Modulations QPSK, 8PSK YouTube, YouPorn begeisterte uns TECHNICAL DATA Model Mini HD und Google Maps. Die Idee, während des gesamten Tests Google Maps auf einem Sa- die logische und übersichtli- tellitenreceiver verfügbar zu che OSD Struktur ebenso EPG yes machen erscheint auf den wie deren gelungene grafi- ersten Blick innovativ, in der sche Umsetzung. Dank des Video resolution 480i, 480p, 576i, 576p, 720p 50 Hz, 720p 60 Hz, 1080i 50 Hz, 1080i 60 Hz, 1080p 50 Hz, 1080p 60 Hz Praxis ist es aber gar nicht niedrigen DiSEqC 1.0, 1.1, 1.2, 1.3 so einfach, den Dienst nur von nur maximal 3 Watt im SCR no mit Fernbedienung und OSD Standby schont der Amiko RS232 yes Tastatur auch wirklich sinn- Mini HD den Geldbeutel und Ethernet yes voll zu nutzen. das platzsparend und gut USB 2.0 yes Abgerundet wird der Funk- Stromverbrauchs versteckt irgendwo in den tionsumfang noch durch drei Tiefen integrierte Videospiele, die Ihrer Fernsehland- schaft. Card Reader yes (Conax) HDTV yes MPEG4/H.264 yes expert OPINION AMIKO Mini HD DVB-S2 HDTV Receiver CI Slot no RECOMMENDED PRODUCT BY OSD languages English, German, Greek, Italian, Russian, Spanish, Ukrainian, Rumanian, Hungarian, Croatian, Bulgarian, Czech, Slovenian, Slovakian, Serbian, Hebrew, Portuguese, Dutch, Polish Power Supply 100 - 240V AC, 50/60 Hz AC / 12V DC Dimensions 15 x 11 x 3.5 cm Weight 250 g ENERGY DIAGRAM Thomas Haring Test Center Austria Apparent Power + Sehr kompakte und platzsparende Bauweise, geringer Strom- Active Power verbrauch, übersichtliches OSD, durchdachte Bedienung und alle Features die man von einem PVR Receiver erwartet sind deutliche Pluspunkte des Amiko Mini HD, denen keine Negativpunkte gegenüber stehen. Ein insgesamt perfekt gelungener Receiver – Die Auto DiSEqC Funktion ist aufgrund der nur mit wenigen Einträgen gefüllten Satellitenliste in einigen Fällen nicht in der Lage, überzeugende Ergebnisse zu liefern. 8 Timerslots sind für einen PVR Receiver zu wenig. Die ersten 15 Minuten aktiver Betrieb, die zweiten 15 Minuten Standby 68 TELE-audiovision International — The World‘s Largest TV Box Magazine — 1 1-12/2013 — www.TELE-audiovision.com Mode Apparent Active Factor Active 15 W 8W 0.53 StandBy 2W 1W 0.5
  • 70.
    TEST REPORT SCR Multischalter K 70TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 71.
    Kaskadierbare SCR Multischalter von SPAUN • Verfügbarin unterschiedlichen Varianten für verschiedene Einsatzgebiete • Extrem gute Leistung, sogar besser als im technischen Datenblatt vom Hersteller angegeben • Der gleichzeitige Einsatz von SCR Receivern und regulären Receivern ist möglich • Dank sehr schneller Umschaltgeschwindigkeit macht das Zappen richtig Spaß • Die LEGACY Modelle können auch mit regulären, nicht SCR fähigen Receivern verwendet werden Teil 2 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 71
  • 72.
    TEST REPORT SCR Multischalter InTeil 1 dieser Artikelserie (siehe TELE-audiovision 0910/2013) haben wir Ihnen zwei Einkabel-Multischalter aus dem Hause SPAUN vorgestellt: Den SUS 5581/33 NF LEGACY und den SUS 5581 F. Nun möchten wir auf einige weitere Modelle der umfangreichen SPAUN Produktpalette näher eingehen, die sich sowohl in der Anzahl ihrer Ein- und Ausgänge als auch in der maximal möglichen Anzahl der zu versorgenden Receiver unterscheiden. Konkret handelt es sich dabei um die Modelle: SUS 5581 NFA, SUS 5581/33 NFA LEGACY, SUS 4441 F, SUS 4481 F, SUS 5541 F und SUS 5541 NFA. Lassen Sie uns aber zuerst rasch erklären, wofür die Ziffern und Buchstaben der Produktbezeichnungen genau stehen: Die ersten beiden Ziffern geben die Anzahl der Eingänge und Stammausgänge an. So bedeutet z.B. „44“, dass der Multischalter über 4 Satelliteneingänge (von einem Quattro LNB) und 4 Stammausgänge für vertikales lowund high-Band sowie horizontales low- und high-Band verfügt. Enthält die Bezeichnung statt der 4 eine 5, so bedeutet dies, dass ein zusätzlicher Eingang und Stammausgang für terrestrische Signale vorhanden ist, der in den meisten Fällen mit einer terrestrischen Außenantenne verbunden wird. Die zweite Ziffernfolge in der Modellbezeichnung gibt die Anzahl an SCR Ausgängen sowie die maximale Anzahl an Receivern an, die darüber verbunden werden können. Die Ziffernfolge „41“ bedeutet also, dass eine Ausgangsleitung vorhanden ist, an die bis zu 4 Receiver angeschlossen werden können. Dementsprechend würde „81“ auf eine Ausgangsleitung mit bis zu 8 möglichen Receivern hinweisen etc. Hinzu kommt noch die Kombination von zwei Ziffernfolgen, so steht z.B. „81/33“ für einen Multischalter, der entweder über eine Signalleitung bis zu 8 Receiver oder über 3 Signalleitungen bis zu jeweils 3 Receiver versorgen kann. Der gewünschte Modus lässt sich dabei jeweils über einen Drehknopf an der Oberseite des Multischalters einstellen. Die Bezeichnung „NFA“ steht für integrierte Verstärker an jedem Satellitensignaleingang, aber Achtung: Wenn Sie ein modernes Quattro LNB mit relativ kurzer Verkabelung an so einen Multischalter anschließen könnten Sie leicht die maximal erlaubten 80 dBµV Eingangspegel überschreiten. Besonders problematisch wird das auf manchen ohnehin schon starken Transpondern der in Europa häufig empfangenen ASTRA und HOTBIRD Satelliten. In diesem Fall würde die Signalqualität an allen Ausgängen signifikant abnehmen, wodurch deutlich wird, dass NFA Modelle als dritter oder vierter Multischalter in einer ganzen Kaskade von Multischaltern, von denen jeder das Signal schon deutlich gedämpft hat, gedacht sind. Den Begriff „LEGACY“ verwendet SPAUN für jene Multischalter, die über drei Ausgänge und zwei verschiedene Betriebsmodi verfügen: 8x1 oder 3x3. Sie verhalten sich zudem im 8x1 Modus auf den beiden nicht 11-12/2013 SUS 5581 NFA, SUS 5581/33 NFA LEGACY, SUS 4441 F, SUS 4481 F, SUS 5541 F and SUS 5541 NFA Best products for creating a reliable SCR distribution system www.TELE-audiovision.com/13/11/spaun 72 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 74.
    für SCR genutztenAusgängen wie klassische Multischalter und können so zwei ganz reguläre Receiver mit Signalen, entsprechend denen eines Universal LNB, versorgen. Die Verarbeitungsqualität aller getesteten Multischalter ließ, wie von SPAUN gewohnt, absolut keine Wünsche offen. Alles war perfekt verarbeitet und dank der Beschriftungen direkt an den Multischaltern waren auch die Funktionen der einzelnen Ein- und Ausgänge sofort ersichtlich. Da auch die Trägerfrequenzen direkt am Multischalter abgedruckt sind war es nicht einmal notwendig, einen Blick in die Installationsanleitung zu werfen, die mit jedem Produkt ausgeliefert wird. Wer es, und das empfehlen wir natürlich, trotzdem tut, der erhält Informationen zu den technischen Parametern und Spezifikationen sowie verschiedene Anwendungsbeispiele. Da einige der getesteten Modelle eine externe Spannungsversorgung benötigen liegt diesen ein Steckernetzteil bei. Es verfügt über verschiedene Steckeraufsätze und kommt mit unterschiedlichen Eingangsspannungen zurecht. Damit ist es praktisch überall auf der Welt sofort einsatzbereit. Zusätzlich lagen einigen Modellen 75 Ohm Endstücke bei, die mit den Stammausgängen verbunden werden, falls an diesen kein weiterer Multischalter angeschlossen wird. Gerade wenn ■ In der Ausgabe 09-10/2013 der TELE-audiovision stellten wir die SPAUN SCR Multischalter SUS 5581/33 NF LEGACY und SUS 5581 F vor www.tele-audiovision.com/TELE-audiovision-1309/eng/spaun.pdf man die maximal mögliche Signalqualität erreichen möchte sollte man den Einsatz dieser Endstücke nicht vergessen! Unsere Testumgebung für die neuen SPAUN Multischalter beinhaltete diesmal eine 85cm Offset Antenne, die auf die HOTBIRD Satelliten (13° Ost) ausgerichtet war und an der wir ein Quattro LNB angebracht hatten. Für den Test der NFA Modelle haben wir zusätzlich einen 10 dB Signaldämpfer verwendet, damit das Eingangssignal unterhalb der maximal erlaubten 80 74 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 76.
    dBµV blieb. Schon aufden ersten Blick fiel uns auf, dass das Signalspektrum aller Multischalter ausgesprochen sauber war. So gab es fast keine unerwünschten Signale zwischen den einzelnen SCR Trägern und das C/R Verhältnis lag bei über 35 dB! Über solch optimale Bedingungen verfügt man beim Umgang mit regulären Satellitensignalen in der Regel nicht. Als nächstes haben wir den Signalpegel bei allen getesteten Produkten gemessen, dieser lag dabei stets genau in dem Bereich, den SPAUN vorsieht. Unsere Schlussfolgerung daraus: Egal welche Frequenz Sie mit Ihrem Receiver empfangen möchten, die SPAUN Multischalter versorgen ihn stets mit einem gleichmäßig starken Signal. Abhängig vom jeweiligen Modell geben die Stammausgänge das Eingangssignal einfach mit leichter Dämpfung weiter oder verstärken es oder verstärken und regeln es auf einen bestimmten Pegel. Die Diagramme 1, 2 und 3 stellen das genauer dar, wobei es sich dabei natürlich lediglich um eine Auswahl der von uns erstellten Diagramme handelt, da deren Anzahl sonst den Rahmen des Test- berichts bei weitem sprengen würde. Glauben Sie uns bitte einfach, dass auch die in diesem Test nicht extra angeführten Modelle mit nahezu identischer Leistung überzeugten. Wie sieht es nun aber mit der Qualität der Ausgangssignale aus? Hat diese deutlich oder lediglich geringfügig abgenommen? Die Diagramme 4, 5 und 6 zeigen unsere Messergebnisse in Form der MER des Eingangs- und Ausgangssignals im Vergleich. Wie Sie erkennen können, hat sich die MER nur ganz geringfügig verschlechtert, wobei uns im Zuge des Tests aufgefallen ist, dass dies nur ■ Graph 1. ■ Graph 2. ■ Graph 3. 76 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com für Ausgangssignale im oberen Frequenzbereich zutrifft. Die Differenz ist allerdings dermaßen gering, dass sie auf den Empfang keinen Einfluß hat. Selbstverständlich haben wir auch wo immer möglich den terrestrischen Eingang unter die Lupe genommen und können bestätigen, dass der Signalverlust, so wie von SPAUN angegeben, bei unter 4 dB liegt. Schlussendlich haben wir noch den Test unter Alltagsbedingungen mit einem richtigen Receiver gemacht und dabei festgestellt, dass das Zappen in einem SPAUN SCR System richtig schnell funk-
  • 77.
    tioniert. Das istbesonders deshalb interessant und wichtig zu wissen, da in einem SCR Netz nicht der Tuner Ihres Receivers auf eine neue Frequenz umschalten muss, sondern der SCR Multischalter! Umso mehr freut ■ Graph 4. ■ Graph 5. ■ Graph 6. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 77
  • 78.
    es uns daher,dass Sie keine Angst haben müssen, die SPAUN Multischalter könnten das Zappen verzögern. Ganz im Gegenteil: Sie sind extrem schnell! Zusammenfassend können wir bestätigen, dass die Leistung der SPAUN Multischalter den technischen Spezifikationen entspricht. Das Ausgangssignal ist sehr sauber und kräftig, zudem ist seine MER nur geringfügig schlechter als jene des Eingangssignals – in unserem Fall eines Quattro LNB. Das SPAUN Produktportfolio enthält eine Vielzahl an Modellen mit und ohne Ver- stärkung, passend für vier, acht, neun (3x3) oder sogar zehn (8x1 + 2xLEGACY) Receiver, so dass eine Lösung für nahezu jeden Einsatzbereich zur Verfügung steht. Möchten Sie mehr Receiver einsetzen als Anschlüsse zur Verfügung stehen so bieten sich die Stammausgänge an, die das LNB Signal an einen zusätzlichen SCR Multischalter weiterleiten. Zudem kann so auch ganz einfach eine Kombination aus SCR und klassischen Multischaltern verwendet werden, falls einzelne Receiver in Ihrer Verteilung nicht mit SCR Signalen umgehen können. expert OPINION SPAUN SUS 5581 NFA, SUS 5581/33 NFA LEGACY, SUS 4441 F, SUS 4481 F, SUS 5541 F & SUS 5541 NFA Jacek Pawlowski Test Center Poland + Die verschiedenen Modelle machen es einfach Ihre Signalver teilung zu optimieren Hervorragende Leistung, die den technischen Spezifikationen entspricht Sehr gutes Rauschverhalten Tadellose Verarbeitung TECHNICAL DATA Manufacturer SPAUN electronic GmbH & Co. KG, Germany Web www.spaun.com RECOMMENDED PRODUCT BY – keine E-mail contact@spaun.com Phone / Fax +49-7731-8673-0 / +49-7731-8673-17 Model SUS 5581/33 NFA LEGACY Inputs SAT/TERR Through loss 5...862 MHz SUS 5581 NFA 4/1/ SUS 4441 F SUS 4481 F SUS 5541 F SUS 5541 NFA 4/1 4 4 4/1 4/1 < 4 dB < 4 dB - - < 4 dB Through loss 950...2200 MHz 12 … 14 dB - -1 ... 2 dB -1 ... 2 dB -1 ... 2 dB - Through gain 950...2200 MHz - 12 … 14 dB - - - 12 … 14 dB Tap Loss 5...862 MHz SAT Input Level SAT Output Level (Legacy Mode) Output Level 950...2200 MHz SCR carriers [MHz] Power consumption < 4 dB 13 … 15 dB 4 … 6 dB - - 4 … 6 dB 4 … 6 dB 50 … 80 dBμV 50 … 80 dBμV 65 … 95 dBμV 65 … 95 dBμV 65 … 95 dBμV 65 … 95 dBμV 73 dBμV N/A N/A N/A N/A N/A 1x8: 95 dBμV 3x3: 82 dBμV 95 dBμV 95 dBμV 95 dBμV 95 dBμV 95 dBμV 974 1076 1178 1280 1382 1484 1586 1688 1790 (only in 3x3 setup) < 7 W 974 1210 974 974 974 1076 1420 1076 1076 1076 1178 1680 1178 1178 1178 1280 2040 1280 1280 1280 1382 1382 1484 1484 1586 1586 1688 1688 < 7W - - 78 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com - < 7W
  • 80.
    TEST REPORT Triple TunerPVR HDTV Receiver Icecrypt S3700CHD 80 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 81.
    • sehr rasche Reaktionsgeschwindigkeit dankneuester CPU • sehr schneller Blindscan • eigener App-Store erweitert die Mediamöglichkeiten des Receivers • PVR-Funktion für zwei Aufnahmen, während eine dritte live gesehen wird • Motorparameter können auf alle Satelliten übertragen werden www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 81
  • 82.
    TEST REPORT Triple TunerPVR HDTV Receiver Triple Tuner PVR Die sehr elegante Frontpartie des neuen Icecrypt S3700CHD mit seinem perfekt lesbarem VFD Display offenbart hinter einer Klappe versteckt zwei Conax Smartcardleser, des weiteren insgesamt sieben Tasten zur Steuerung ohne Fernbedienung sowie einen USB Port. An der Rückseite des Triple Tuner Receivers stechen sofort die drei Tunereingänge samt Loop- Ausgängen (2x DVB-S2, 1x DVB-T/C) ins Auge. Daneben findet man noch einen USB , HDMI und RJ-45 Netzwerkanschluss, 3 RCA Buchsen für Stereo Audio und Composite Video, eine Scart Buchse, einen optischen und koaxialen Audiodigitalausgang, einen UHF Modulator sowie eine RS232 Buchse und einen mechanischen Netzschalter. Die vom Hersteller mitge- lieferte Fernbedienung liegt angenehm in der Hand, ist übersichtlich beschriftet und weist vor allem zwischen ihren Tasten ausreichend Platz auf, so dass sie auch von nicht ganz so zarten Fingern problemlos verwendet werden kann. Das in Deutsch und Englisch verfügbare Handbuch stellte uns ebenfalls voll und ganz zufrieden. Gleich zu Beginn des Erstinstallationsassistenten werden Grundeinstellungen wie die gewünschte OSD Sprache, die Zeiteinstellung sowie die Netzwerkpara- 0.59 meter abgefragt, ebenso die Auswahl der gewünschten Videosignalauflösung. Hier hat uns besonders gefreut, dass der Receiver 1080p unterstützt und somit dank Full-HD Kompatibilität zukunftstauglich ist. Abgeschlossen wird die Ersteinrichtung noch durch das Festlegen eines persönlichen PIN Codes sowie die Möglichkeit, die automatische Benachrichtigung über Softwareupdates oder wichtige Informationen des Hersteller zu aktivieren bzw. zu deaktivieren. Nach Abschluss der Erstinstallation läßt sich über das Hauptmenü rasch ein Sendersuchlauf durchführen, wobei der Hersteller insgesamt 50 Satelliteneinträge in der internen Daten- 11-12/2013 Icecrypt S3700CHD Hervorragende Hardware in Verbindung mit ausgereifter und einfach zu bedienender Software www.TELE-audiovision.com/13/11/icecrypt 82 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 84.
    1 2 3 4 5 bank vorprogrammiert hat. Leiderfehlen ein paar Einträge, was sich durch den Vergleich der Ergebnisse eines Blindscansuchlaufs und eines regulären Suchlaufs auf dem HOTBIRD 13° Ost rasch herausstellte. Gefreut hat uns, dass softwareseitig alle DiSEqC Protokolle (1.0, 1.1, 1.2 und 1.3) sowie frei definierbare LOF Werte und auch SCR Einkabellösungen unterstützt werden. Ein pfiffiges Detail ist die Möglichkeit, die gewählten Motorparameter (DiSEqC 1.3) eines einzelnen Satelliteneintrags auf alle Satelliteneinträge in der Datenbank zu übertragen. Wie viele Receiver hatten wir schon im Test, bei denen wir diese Einstellung für jeden einzelnen Eintrag mühsam manuell vornehmen mussten. Wer übrigens nicht genau weiß, an welchem Port seines DiSEqC Multischalters der gerade gewünschte Satellit angeschlossen ist, der kann sich durch die Auto DiSEqC Funktion einen Hinweis geben lassen; ein äußerst praktisches Feature der Icecrypt Software. Suchlaufseitig stehen der automatische Suchlauf über einen oder mehrere Satelliten sowie über einen oder mehrere Transponder zur Auswahl bereit, aber auch an die Blindscansuche wurde gedacht. Während der reguläre Suchlauf in 5 Minuten 1518 TV- und 361 Radioprogramme am HOTBIRD 13° Ost ans Tageslicht brachte erkannte die Blindscansuche in 8 Minuten 1707 TV- und 414 Radioprogramme. Wir meinen, dass diese drei zusätzlichen Minuten in Anbetracht des hervorragenden Suchlaufergebnisses gut investierte Zeit sind. Im terrestrischen Bereich muss man sich vor dem Suchlauf zwischen DVB-T und DVB-C entscheiden. Leider unterstützt der neue Icecrypt Receiver kein DVB-T2; gerade HDSender verwenden dieses neue Übertragungsformat. 84 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com Für einen automatischen Suchlauf über das gesamte Frequenzband benötigte der S3700CHD etwas mehr als drei Minuten. Dank einer vom Anwender aktivierbaren +5V Versorgungsspannung über den Innenleiter des Koaxialkabels können auch DVB-T Antennen mit integriertem Verstärker verwendet werden. Erfreulicherweise kennt die Icecrypt Software keine Beschränkung der maximalen Anzahl an Kanälen innerhalb der Kanalliste; trotzdem empfiehlt es sich, nach dem Suchlauf aus Gründen der Übersichtlichkeit erstmal für Ordnung zu sorgen. Dazu können einzelne Sender verschoben, umbenannt, mit einem PIN Code gesperrt oder gelöscht werden, ebenso wie die Kanalliste anhand der Kategorien Satelliten, A-Z, Provider, CAS, HD, Broadcaster oder Favoriten sortiert werden kann. Apropos Favoriten: Insgesamt 32 frei benennbare Favoritenlisten stehen zur Auswahl bereit und erlauben dem Anwender, rasch auf seine Lieblingssender 1: Installationsassistent des Icecrypt S3700CHD 2: Zeiteinstellung 3: Netzwerkeinstellungen 4: Videoausgangssignaleinste llungen 5: Im Rahmen der Erstinstallation muss der Anwender auch einen PIN Code definieren 6: Über neue Software bzw. wichtige Hinweise kann der Anwender direkt am Receiver informiert werden 7: Das Hauptmenü des Icecrypt S3700CHD 8: Installationsmenü 9: Softwareupgrade via USB 10. Tunereinstellungen 11. DiSEqC 1.3 Einstellungen 12. Die DiSEqC 1.3 Einstellungen können auf Wunsch für alle Satelliteneinträge übernommen werden 13. Die Auto-DiSEqC Funktion erkennt automatisch an welchem Port der gewünschte Satellit angeschlossen ist 14. Blindscan Suchlauf 15. Die Blindscan Suche hat 1707 TV- und 414 Radioprogramme auf dem HOTBIRD 13° Ost entdeckt
  • 85.
    6 11 7 12 8 13 9 14 10 15 www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 85
  • 86.
    16 6 16. Einzelne Transpondereinträgekönnen gelöscht, hinzugefügt oder bearbeitet werden 17. Beim dritten Tuner muss sich der Anwender zwischen DVB-T und DVB-C entscheiden 18. Tunereinstellungen im terrestrischen Bereich 19. Terrestrischer Suchlauf. DVB-T2 wird nicht unterstützt, deshalb kann der Receiver auch nur 13 TV- und 1 Radiosender einlesen 20. Die 32 Favoritenlisten können individuell benannt werden 21. Bearbeiten einer Favoritenliste 22. Bearbeiten der Kanalliste 23. Diverse Grundeinstellungen 24. A/V Einstellungen 17 21 18 22 19 23 20 24 86 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 88.
    25 6 26 zugreifen zu können.Dank des besonders übersichtlich gestalteten Einstellungsmenüs kann der Benutzer eines S3700CHD sehr einfach auf die verschiedenen Parameter seines Receivers Einfluss nehmen und hier lässt dieser wirklich keine Wünsche offen: Sei es nun eine automatische Aufnahmeverlängerung, die Größe des Timeshift Zwischenspeichers, der drahtlose Internet bzw. Netzwerkzugang via externem WiFi bzw. 3G Dongle, die Sicherung der Kanalliste und aller Einstellungen auf ein externes Speichermedium oder die Aktualisierung der Software – alle Funktionen können problemlos konfiguriert und verwendet werden. Wie bei nahezu allen Receivern üblich öffnet ein Druck auf die OK Taste die Kanalliste des S3700CHD, die sich in drei Spalten gliedert. Ganz links wählt der Anwender die gewünschte Gruppe an Sendern (Alle, Favoriten, Satelliten, A-Z, Provider, CAS, HD, Top und Broadcaster), während in der zweiten Spalte eine weitere Unterauswahl getroffen wird (welches Verschlüsselungssystem, welche Favoritenliste, welcher Provider etc.). In der dritten, äußerst rechten Spalte werden dann die so gefilterten Kanäle angezeigt und stehen dem Anwender zur Auswahl zur Verfügung. Besonders gut gefallen hat uns, dass die Software auch die elektronische Programmzeitschrift (EPG) in die Kanalliste integriert, denn drückt man in der dritten Spalte nochmals die Pfeiltaste rechts an der Fernbedienung so blendet der Receiver die EPG Daten der aktuellen Sendung aller in der Kanalliste gerade angezeigten Programme ein. Ein nochmaliger Tastendruck offenbart dann den 25. Die Icons der TV-Wall Funktion können aus dem Internet geladen werden 26. Aufnahmeeinstellungen 27. 3G Verbindungseinstellungen 28. Web Server Einstellungen 29. Die gesamte Kanalliste kann auf einem externen Speichermedium gesichert werden 30. Wichtige Nachrichten des Herstellers würde der Receiver an dieser Stelle auflisten 31. Wettervorhersage 32. FAQ und Bedienungsanleitung sind direkt in der Software verfügbar 33. Die integrierten Multimediafeatures des Icecrypt S3700CHD 34. YouTube 35. Shoutcast 36. Picasa 37. Opera Webbrowser 38. IPTV Player 39. WebTV Player 27 28 29 88 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 89.
    30 35 31 36 32 37 33 38 34 39 www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 89
  • 90.
    44 40. Ebay App 41.Sender können direkt in der Kanalliste bearbeitet werden 42. Das Programm der nächsten Stunden eines Senders 43. Erweiterte Sendungsbeschreibung 44. Die Infoleiste mit dem Titel der aktuellen und folgenden Sendung 45. Kanalsuche mit vollständiger OSD Tastatur 46. Kanalsuche mit OSD Tastatur im SMS Stil 47. Sprachwahl 48. Teletext, Untertitel und die gewünschte Audiosprache können ganz einfach gewählt werden 40 45 41 46 42 47 43 48 90 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 92.
    49 6 50 51 Inhalt der folgendenStunden des derzeit gewählten Senders in voller Übersicht. Wir meinen, dass man einfacher und praktischer wohl kaum auf den EPG zugreifen kann. Dank einer eigenen Taste an der Fernbedienung steht dem Benutzer eines S3700CHD auch die gezielte Suche nach einzelnen Senders über deren Namen zur Verfügung, die dazu eingeblendete OSD Tastatur lässt sich in zwei verschiedenen Modi (entweder als vollständige Tastatur oder wie vom Telefon gewohnt mit mehrfacher Zusatzbelegung der Zifferntasten) anzeigen. Im alltäglichen Betrieb hat uns der neue Icecrypt Receiver mit seiner raschen Reaktion auf Fernbedienungsbefehle begeistern 49. EPG Anzeige 50. Die verschiedenen Sortiermöglichkeiten der Kanalliste 51. Satellitenauswahl 52. MP3 Wiedergabe 53. Bildbetrachter 54. Wiedergabe eines AVI Testvideo 55. Wiedergabe eines DivX Testvideo 52 54 53 55 92 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com können. Kein Wunder, stehen doch neben einer 450 MHz CPU auch 2 MB NOR Flash, 512 MB NAND Flash sowie 2x 128MD DDR2 Arbeitsspeicher zur Verfügung. Auch an der Bild- und Tonqualität des S3700CHD gab es im Praxistest nichts auszusetzen und dank der zügigen Kanalumschaltgeschwindigkeit von unter 1 Sekunde macht auch das Zappen Spaß. Mit Hilfe der HbbTV Funktion hat der Anwender bei HbbTV kompatiblen Sendern Zugriff auf erweiterte Inhalte wie Mediatheken, eigenen EPG und vieles mehr. Als PVR Receiver unterstützt der S3700CHD zwei Aufnahmen gleichzeitig, während eine dritte Sendung live gesehen wird. Hier hätten wir uns allerdings gewünscht, dass drei oder vielleicht sogar vier Aufnahmen zur selben Zeit durchgeführt werden können. Neben den Grundfunktionen glänzt der neue Icecrypt Receiver erfreulicherweise durch jede Menge Zusatzfeatures, die dem Anwender kostenlos zur Verfügung stehen. Beson-
  • 93.
    ders erwähnenswert istin diesem Zusammenhang sicherlich die in die Icecrypt Software integrierte Nachrichtenfunktion, dank deren Hilfe der Hersteller seine Kunde via OSD Einblendung mit wichtigen Informationen (z.B. neue Software etc.) informieren kann. Auch das Softwareupgrade geht ganz einfach vonstatten, besonders hat uns dabei gefreut zu sehen, dass dem Endverbraucher auch eine Änderungshistory mit detaillierten Informationen angeboten wird. Insgesamt legt die Software ganz besonderen Wert auf einfache Bedienung, da war es dann auch nur folgerichtig, dass man das Handbuch kurzerhand digitalisiert hat und zusammen mit einer FAQ Übersicht direkt im Menü des Receivers zur Anzeige anbietet. Vorbei sind also die Zeiten, in denen der Anwender das Handbuch erst suchen und aus den Tiefen ir- gendwelcher Schränke und Schubkästen kramen muss. Ein Tastendruck genügt und schon steht es top aktuell am Fernseher bereit. An Multimediafeatures enthält die Icecrypt Software neben der fast schon obligatorischen Wettervorhersage auch Clients für die Dienste YouTube, Shoutcast (Internetradio), Picasa (Bilder) und den russischen Pay-TV Anbieter Kartina TV. Hinzu kommen ein Web Browser (Opera), ein FTP Client sowie ein RSS Feedreader. Die Punkte IPTV und WebTV ergänzen das Angebot, leider sind hier aber weder IPTV noch WebTV Sender vorprogrammiert, so dass der Anwender die von ihm gewünschten Angebote manuell hinzufügen muss. Uns hat im Praxistest auf jeden Fall sehr gefreut, dass alle integrierten Dienste problemlos funktioniert haben, egal ob es sich dabei um die Wiedergabe eines YouTube Videos, eines Shoutcast Streams oder die Anzeige von RSS Feeds bzw. einer Website gehandelt hat. 56 58 57 Natürlich darf auch eine Abspielmöglichkeit für eigene Musiktitel und Videos nicht fehlen; dafür unterstützt der S3700CHD die Formate AVI, MKV, MPG, TS, WMA, WMV, M2TS, FLV, DAT, ASF sowie MP3, und natürlich ließ uns auch der Bildbetrachter mit den letzten Urlaubsfotos im JPEG Format nicht im Stich. Abgerundet wird der Funk- 59 56. Die Sexview App lässt sich einfach über den App Store auf den Icecrypt Receiver laden 57. Über die Sexview Website muss der Anwender den am Receiver angezeigten Authorisierungscode bei der Registrierung eingeben 58. Hauptmenü der Sexview App 59. Dank PIN Abfrage ist der Jugendschutz jederzeit gewährleistet www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 93
  • 94.
    60 63 61 64 62 65 94 TELE-audiovision International— The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 95.
    60. Wiedergabe einesFlash Testvideo 61. Wiedergabe eines MOV Testvideo 62. Wiedergabe eines MP4 Testvideo 63. Wiedergabe eines TS Teststream 64. HbbTV wird unterstützt 65. Die TV-Wall Funktion der Icecrypt Software tionsumfang noch durch einen hauseigenen App Store mit dutzenden kostenlos verfügbaren Erweiterungen für den S3700CHD. Egal ob Ebay Client, Mediatheken, Sportnachrichten, Spiele oder sogar Essensbestel- lungen beim Lieferservice um die Ecke: Es stehen für nahezu alle Einsatzbereiche die passenden Apps zur Verfügung. Ein Exklusivangebot ist der Erwachsenensender Sexview, der nur mit den Icecrypt Receivern T2300HD und S3700CHD zur Verfügung steht. Nach einer kurzen Registrierung über die Website des Anbieters wird dem persönlichen Account die MAC Adresse des eigenen Receivers zugeordnet, so dass das Gerät eindeutig adressierbar wird. Im Test ENERGY hat der Service problemlos funktioniert, auch bei der Bildqualität gab es nichts auszusetzen. Vorbildlich fanden wir zudem, dass diese App mittels PIN Code vor neugierigen Blicken geschützt ist. Abschließend möchten wir noch auf ein besonders schön gestaltetes Feature des neuen Icecrypt Receivers hinweisen, die TV-Wall Funktion. Diese kann an- stelle der regulären Kanalliste eingeblendet werden und zeigt die Namen und Logos von jeweils 20 Sendern inkl. deren EPG Daten und einem live Vorschaubild übersichtlich an. Besonders gefreut hat uns im Test, dass die Senderlogos direkt aus dem Internet geladen werden können und es sogar möglich ist, diese individuell am PC zu bearbeiten. expert OPINION Icecrypt S3700CHD Triple Tuner PVR RECOMMENDED PRODUCT BY DIAGRAM Apparent Power Thomas Haring Test Center Austria Active Power Mode Apparent Active Factor Active 21 W 12.5 W 0.59 Active StandBy 19 W 11.5 W 0.60 Sleep StandBy 8W 3 W 0.75 + Der S3700CHD ist ein grundsolider und bestens ausgestatte- Die ersten 15 Minuten aktiver Betrieb, die zweiten 15 Minuten Standby ohne Energiesparfunktion (der Receiver ist sofort wieder einsatzbereit), die dritten 15 Minuten Standby mit Energiesparfunktion (der Receiver benötigt einige Zeit bis er wieder einsatzbereit ist). ter Triple Tuner PVR. Er verfügt über eine hervorragende Softwareplattform, die dem Anwender unzählige praktische Features und Funktionen zur Verfügung stellt. Dank Full-HD Unterstützung und konstanter Weiterentwicklung der Software ist der neue Icecrypt Receiver zukunftstauglich. – Der terrestrische Tuner unterstützt leider kein DVB-T2, es sind nur zwei Aufnahmen gleichzeitig möglich. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 95
  • 96.
    TEST REPORT Testsignal-Generator WORK Microwave Handheld Satcom Test Source 96TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 97.
    • Haupt-Einsatzgebiet in SatellitenUplink-Stationen • ermöglicht die Messung von Intermodulationen und Kompressionspunkten • auch ideal geeignet, um Messgeräte zu kalibrieren und zertifizierte Messungen damit zu protokollieren • eingebauter Sweep-Generator ermöglicht die Messung und Protokollierung von Kabelinstallationen • eingebaute Batterien machen das Gerät universell einsetzbar www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 97
  • 98.
    TEST REPORT Testsignal-Generator Die Referenz bestimmtdie Qualität Um komplexe Anlagen einzumessen, Messgeräte zu kalibrieren oder Hochfrequenzkonverter zu testen benötigt man einen Testsignal-Generator. Dieser erzeugt ein Signal auf einer definierten Frequenz und mit einem spezifischen Leistungspegel, wobei die Genauigkeit extrem wichtig ist, da dieses Signal als Referenz genutzt wird. WORK Microwave hat genau einen solchen professionellen Testsignal Generator im Angebot, der Signale von 50-180 MHz und von 9502150MHz erzeugen kann. Ausgeliefert wird die Handheld Satcom Test Source in einer gut geschützten Verpackung. In dieser befinden sich ein roter AluminiumKoffer, zwei USB-Kabel (A-B) und ein Netzkabel. Öffnet man den roten Aluminium-Koffer findet sich darin gut gepolstert der Signal-Generator, das Netzteil, ein USB-Speicher, die Bedienungsanleitung und ein Zertifikat. Mit diesem Konformitäts-Zertigikat bescheinigt WORK Microwave, dass die ausgelieferte Handheld Satcom Test Source die gelisteten Parameter einhält; es wird sogar darauf hingewiesen, dass auf Anfrage sämtliche Dokumentation, die zur Herstellung des SignalGenerators erzeugt wurde, angefordert werden kann. Durch eine solche Dokumentation ergibt sich eine Rückverfolgbarkeit: alle Messwerte können bis zu zum Hersteller WORK Microwave zurückverfolgt werden, wodurch sich Diskussionen über Messergebnisse ausschließen. Die mitgelieferte Bedienungsanleitung erklärt auf 15 Seiten sämtliche Funktionen in ausführlicher aber leicht verständlicher Form. Die Installation des Gerätes ist denkbar ein- fach. Es muss lediglich die ausführbare Datei vom USB Speicher ausgeführt werden. Eine Installation ist nicht notwendig. Natürlich kann das Programm auch auf die Festplatte kopiert werden. Auf dem USB Speicher ist außerdem eine Kopie des Handbuchs als PDF Datei vorhanden – vorbildlich. Eine Treiberinstallation ist nicht notwendig, da Windows XP, Windows Vista und Windows 7 das Instrument als HID („Human Interface Device“) erkennt und automatisch in das Betriebssystem einbindet. Das Gehäuse der Handheld Satcom Test Source hat ein längliches Format und besteht aus Aluminium. Keine Zweifel, es handelt sich um ein robustes Gerät, dass zusätzlich vorne und hinten durch hartes Plastik geschützt ist. Auf der Vorderseite befinden sich der Spannungseingang (12V 11-12/2013 WORK Microwave Handheld Satcom Test Source Ermöglicht präzise und zertifizierte HF-Messungen www.TELE-audiovision.com/13/11/work-microwave ■ TELE-audiovision Editor Vitor in action. It's not nearly as difficult as it looks. 98 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 99.
    www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 99
  • 100.
    1 - 24V), zweiUSB Eingänge (Typ B) und drei StatusLEDs. Die erste LED zeigt den Zustand des Gerätes an (OK oder Fehler), die zweite LED dient zur Anzeige des Ladestatus des Akkus und die dritte LED dient zur Anzeige des System-Status. Die beiden USB-Eingänge haben unterschiedliche Funktionen. USB1 dient zur zusätzlichen Spannungsversorgung und für die Datenkommunikation mit dem PC. USB2 dient ausschließlich zur Stromversorgung, wenn der Anwender das externe Netzteil nicht benutzen kann. Die Handheld Satcom Test Source verfügt über einen internen Akku, mit welchem das Gerät auch unabhängig von einer Stromleitung betrieben werden kann. Genial und doch eigentlich selbstverständlich für einen tragbaren Signal-Generator. Interessanter ist die Tatsache, dass das Gerät auch von einem PC bzw. Laptop mittels USB geladen und betrieben werden kann. Da eine USBSchnittstelle aber zu wenig Strom liefert ist es möglich, die Handheld Satcom Test Source an zwei USB-Ports anzuschließen. Clever! Auf der Rückseite befindet sich der Ein/Aus-Schalter. Weiterhin sind hier eine BNC-Buchse vorhanden, die ein Referenzsignal (10 MHz) ausgibt, sowie eine SMABuchse, an welcher das vom Signal-Generator erzeugte Signal anliegt. Das Gerät ist in der Lage, an dieser Buchse eine Gleichspannung auszugeben, was durch eine zusätzliche LED angezeigt wird. Die Steuerung des Gerätes erfolgt über eine WindowsSoftware, die auch eine Sweep-Funktion beherrscht. Messung von Hochfrequenzkonvertern Das Haupteinsatzgebiet der Handheld Satcom Test Source ist die Messung ver- schiedener Parameter von Hoc hfr equenzkonver ter n. Diese HF-Konverter, die WORK Microwave ebenfalls anbietet, wandeln das zu sendende Signal von der Eingangsfrequenz auf eine höhere Ausgangsfrequenz um. Da sich diese hochfrequenten Signale innerhalb einer Satelliten-Uplink-Station aber zwischen den verschiedenen Geräten (Modulatoren, Multiplexer, usw.) nicht über Kabel verlustfrei leiten lassen sondern nur über Hohlleiter oder sehr teure Koaxkabel, geht man einen anderen Weg und bearbeitet das Signal solange in den Frequenzbereichen von 50 MHz bis 180 MHz oder von 950 MHz bis 2150 MHz, bis es fertig aufbereitet in die Uplinkeinheit eingespeist wird. Erst jetzt wird es im letzten Schritt durch den Hochfrequenzkonverter in den Satelliten-Uplink-Frequenzbereich gewandelt. Es ist selbstverständlich, dass der Hochfrequenzkonverter dabei keine Fehler produzieren darf, da dies zum Beispiel benachbarte Transponder oder gar den regulären Satellitenbetrieb stören kann. Ein solcher Störeffekt wird Intermodulation genannt. Dabei beeinflussen sich zwei Signale, die auf naheliegenden Frequenzen moduliert sind so, dass weitere Signalpegel seitlich zu den beiden Frequenzen entstehen. Bei diesem Effekt handelt es sich nicht um die bekannten Oberschwingungen, die an ganzzahligen Vielfachen der modulierten Frequenz auftreten, denn die Intermodulation macht sich direkt links und rechts neben den beiden interferierenden Signalen bemerkbar (siehe Bild 1). Um zu prüfen, in wie weit ein Hochfrequenzkonverter den Effekt dieser Intermodulation minimieren kann, benötigt man zwei HF-Testquellen, um zwei benachbarte Signalpegel mit bekannten Parametern zu modulieren. Diese beiden Signalpegel 2 1: Intermodulationen treten unmittelbar neben dem Nutzsignal auf - siehe rot gekennzeichnete Signale 2: Der Kompressionspunkt ist bei genau 1 dB definiert, ab dem die Signalqualität von der Ideal-Kennlinie abweicht werden dann in den Hochfrequenzkonvertern eingespeist und anhand eines Spektrum-Analysators kann man sich dann ein Bild der Intermodulation machen. Genau aus diesem Grund hat WORK Microwave der Handheld Satcom Test Source zwei unabhängige Synthesizer spendiert, so dass man nun mit einer einzigen HF-Testquelle diese Messung durchführen kann. Dies reduziert natürlich erheblich die Kosten in der Anschaffung der HF-Testquelle, denn man braucht nur eines dieser Instrumente, statt wie üblich zwei. Doch gleichfalls wichtig ist der Umstand, dass der Testaufbau stark vereinfacht ist, denn es muss nur ein einziges Kabel an den Up-Converter angeschlossen werden. Ein weiterer Parameter, der bei Hochfrequenzkonvertern gemessen wird, 100 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com ist der sogenannte 1 dB Kompressions-Punkt. Diese Messung dient dazu, das nicht lineare Verhalten des Hochfrequenzkonverters zu messen. Dazu wird die Amplitude des Eingangssignals langsam erhöht, bis die Signalverzerrung durch Nichtlinearität am Ausgang genau 1 dB von der idealen Kennlinie abweicht (siehe Bild 2). Die rote Linie zeigt die ideale Ausgangsleistung. Ab einer bestimmten Eingangsleistung, beginnt der Hochfrequenzkonverter jedoch das Signal zu verzerren und stellt eine geringere Leistung am Ausgang bereit – daher auch der Name „Kompression“: es wird weniger Leistung ausgegeben, der Signalpegel ist komprimiert. Um verschiedene Geräte vergleichen zu können misst man die Eingangsleistung, die zu einer Kompression von genau 1 dB am Ausgang
  • 102.
    führt. Hier bewährtsich die WORK Microwave Handheld Satcom Test Source mit der Möglichkeit, das Testsignal auf einer beliebigen Frequenz von 50 MHz bis 180 MHz und 950 MHz bis 2150 MHz mit einer Leistung von -45 dBm bis -5 dBm in 0.5 dB Schritten zu erzeugen. Schließlich gilt es, bei H o c h f r e q u e n z ko nve r t e r n auch deren Konversionsgewinn zu messen. Genau wie bei der Messung des 1 dB Kompressionspunktes wird hier ein Signal mit bekannter Leistung eingespeist und mittels Spektrum Analysator die Signalleistung am Ausgang gemessen. Natürlich könnte man auch ein echtes Nutzsignal einspeisen und dieses messen. In diesem Fall würde die Messung aber durch verschiedene Faktoren recht ungenau ausfallen, weshalb es einfach notwendig ist, eine kalibrierte HF-Testquelle zu benutzen. In all diesen Einsatzgebieten zeigt sich, das WORK 1 6 4 2 Microwave ein ausgereiftes und gut durchdachtes Instrument entwickelt hat: zwei unabhängige Synthesizer können simultan zwei Signale einspeisen, um Intermodulationen zu messen. Die frei wählbare Ausgangsleistung der Handheld Satcom Test Source ermöglicht die Messung des 1 dB 5 3 1. The application that controls the Handheld Satcom Test Source is an easy to use tool which basically consists of this main window. Thumbs up for the nice graphical scheme, that perfectly explains what each parameter and button is used for. 2. First you need to connect the software with the Test Source. This takes exactly 5 seconds and both Windows XP and Windows 7 did install the instrument automatically without the need to provide any drivers. 3. Once the instrument is connected, the status in the upper part of the window is updated. In this case, the power is provided through two USB cables. 4. The sweep generator opens in a separate window and allows to specify rage frequency range, the up and down increment and speed, as well as the pause between sweeps. 5. It is of course possible to use the Handheld Satcom Test Source without a connected laptop. You just need to set up the desired parameters and store them in the instrument. When you then turn it on, it will use these parameters automatically. Great if you need to measure several devices with the same input signal. 102 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 104.
    Kompressionspunktes und ebenso kann manauch den Konversionsgewinn messen. Die Handhabung der WORK 1 Microwave Handheld Satcom Test Source wird durch weitere Details vereinfacht: ein Akku erlaubt den stunden- langen Betrieb ohne Netzanschluss und weil man die Funktionsparameter auch im Gerät speichern kann ist auch ein Betrieb ohne Verbindung zu einem Laptop möglich, zum Beispiel wenn man den Konversionsgewinn 4 2 ■ The setup to test and evaluate the WORK Microwave Handheld Satcom Test Source. Notice the 50 Ohm to 75 Ohm impedance matching adapter from HP. Tests confirmed the theory: in our case the error was insignificant, so I dispensed the use of the adapter. 3 104 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 105.
    an mehreren Gerätenmisst. Ein weiterer Pluspunkt ist der BNC-Ausgang, an dem ein kalibriertes 10 MHz Signal 5 anliegt, mit dem verschiedene Geräte der HF-Technik angesteuert werden können: somit entfällt ein weiteres separates Gerät. Kalibrieren von Messgeräten In der letzten TELE-audiovision Ausgabe haben wir den Deviser S7000 TV Analyzer getestet und waren von diesem Gerät schwer beeindruckt, bietet es doch alle denkbaren Funktionen, die ein TV Messgerät und Analysator haben kann. Auch die Messgenauigkeit konnte sich im Vergleich zu unseren Referenz-Messgeräten zeigen lassen. Mit der WORK Microwave Handheld Satcom Test Sour- 1. The Handheld Satcom Test Source is configured to generate a signal at 1000 MHz with -15 dBm and the Deviser S7000 correctly shows the signal at this frequency. However, the units are shown in dBµV as I forgot to configure them properly. 2. Fortunately, the Deviser S7000 allows the measurements to be shown in dBµV, dBmV or dBm. The latter one is what I need. 3. And now the Deviser S7000 is showing the measurement value of -16.5dBm. The deviation of -1.5 dBm is not a measurement error but rather the effect of having too much signal level on the cable I am using. 4. Reducing the signal output to -35 dBm on the test source produces a readout of -35.9 dBm. Excellent result, considering these two devices are manufactured at opposite sides of the world. 5. The Handheld Satcom Testscoure can actually output two different signals simultaneously. Here I configured one -35 dBm signal at 1000 MHz and the other at 1100 MHz with -15 dBm. Again, this signal level is correctly identified and confirmed by the Deviser S7000. Simply brilliant. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 105
  • 106.
    6 8 7 ce wollte iches aber genau wissen: wie genau misst der Deviser S7000 wirklich? Der Signal-Ausgang der 6. Now for something 9 completely different. At 75 MHz a signal of -35 dBm is generated and measured with a deviation less than 1 dBm. Absolutely amazing. 7. Since the Deviser S7000 supports two markers in CATV mode which is used to measure the tilt between two channels, I generated one signal at 80 MHz with -35 dBm and a second signal at 100 MHz with -45 dBm. Incredibly, the deviation was -0.1 dBm and -0.2 dBm, respectively. The tilt was measured with 9.9 dB. 8. To test the end of scale I generated a signal at 2000 MHz with -15 dBm. Again the Deviser S7000 measured this signal with an amazing precision. 9. To test the sweep generator several slop step intervals had to be tested in order to allow the spectrum analyser function to sample enough data to correctly measure the signal. 10. With a slop step interval of 500 ms the Deviser S7000 produced good results so I started the test run. 11. First I measured the whole spectrum with the MAX function active. This way we can see the whole range at the end of the test. The result is excellent with the spectrum oscillating about 3 dB around -35 dBm, which is the output level setup on the Handheld Satcom Test Source. This oscillation is an acceptable error and due to the fact that I was giving the spectrum analyser just about the time to render the spectrum. 12. This picture shows the same output signal, but this time the signal had to pass a multi switch and about 20 meter of cable, an aerial socket and then another cable before reaching the spectrum analyser. Notice that only the upper curve is of interest. The result is clear to see: there is an over attenuation of about 10 dB to 15 dB. Also, it is clear to see that the attenuation is not uniform. Handheld Satcom Test Source ist auf 50 Ohm spezifiziert, der Eingang des Deviser S7000 allerdings auf 75 Ohm, wie es eben für TV Anwendungen üblich ist. Ich habe deshalb einen Impedanz-Wandler von Hewlett 106 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com Packard genommen (Modell 08590-60090), der für den Frequenzbereich von 1 MHz bis 1.8 GHz spezifiziert ist.
  • 107.
    10 11 12 Dieser Impedanz-Wandler erzeugt eine Dämpfungvon -15dBm. Die WORK Microwave Handheld Satcom Test Source zeigte hier, dass das Profi-Messgerät mit einer Abweichung von unter 1 dBm misst. Dies ist extrem wenig und ein Resultat der exakten Anwendung internationaler Normen in der Entwicklung und Produktion. Die Bilder belegen die Messwerte im Bereich von 50 MHz bis 180 MHz sowie von 950 bis 2150 MHz. Dies ist absolut innerhalb der Messgenauigkeit des Gerätes und der im Zertifikat der WORK Microwave Handheld Satcom Test Source angegebenen Abweichung. Eine weitere hervorragende Anwendung der Handheld Satcom Test Source ist damit gezeigt: sie kann zur extrem exakten Kalibrierung von Messgeräten eingesetzt werden. Prüfen einer CATV Verkabelung Noch ein Einsatzgebiet der Handheld Satcom Test Source ist die Überprüfung der Kabelinstallation eines Kabel TV Netzes. Zum Test benutzte ich unser eigenes kleines Verteilnetz im TELE-audiovisions Test Center. Zur Distribution wird hier ein Multiswitch mit 16 Eingängen für Sat-Ebenen (950 MHz – 2150 MHz) und einem Eingang für terrestrisches TV oder CATV (50 MHz – 850 MHz) genutzt. Das Signal wird dann an 8 Ausgängen bereitgestellt und innerhalb des Hauses an den Antennendosen zur Verfügung gestellt, die separate Ausgänge für SAT und CATV bieten. Es galt nun, die Dämpfung des Signals im SAT-Bereich zu messen und außerdem wollte ich wissen, ob durch den Multiswitch, den Antennendosen und dem verlegten Kabel bestimmte Frequenzbereich stärker beeinflusst werden als andere. Dazu benutzt man normalerweise einen Rauschgenerator, doch diese bieten nicht die Messgenauigkeit, die die Handheld Satcom Test Source ermöglicht. Wer jetzt denkt, dass das eine Riesenarbeit ist, da man ja praktisch alle Frequenzen einzeln durchprobieren muss, irrt. Denn WORK Microwave hat in der Handheld Satcom Test Source einen Sweep Generator mit eingebaut, der das Ausgangssignal innerhalb eines vom Anwender spezifizierten Frequenzbereichs (50 MHz bis 180 MHz und 950 MHz bis 2150 MHz) laufen lassen kann. Dazu kann natürlich die Schrittweite (mindestens 0.5 MHz) eingeben werden sowie die gewünschte Geschwindigkeit (ab 10 ms pro Schritt). www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 107
  • 108.
    Der Pegel kannvon -5 bis -45 dBm gewählt werden. Weiterhin ist es möglich, den Sweep bidirektional laufen zu lassen: kommt das Signal am oberen Grenzwert an läuft es wieder zurück, wobei hier eine separate Schrittweite (MHz) und Geschwindigkeit (ms) eingestellt werden kann. Ein weiterer Parameter ermöglicht die Konfiguration einer Pause zwischen den Sweeps. Mein Vorhaben war es, die Handheld Satcom Test Source am Eingang des Multiswitches anzuschließen und ihn dann mit der FrequenzSweep Funktion zu betreiben. Am Messgerät habe ich den Spektrum-Analysator Modus aktiviert und diesen mit der Spitzenwert-Haltefunktion benutzt, um so das Ergebnis des FrequenzSweeps über den gesamten Frequenzraum abzulesen. Der erste Versuch scheiterte, weil ich nicht bedacht hatte, dass der SpektrumAnalysator eine gewisse Sampling-Periode braucht, um aus dem Signal das Spektrum zu generieren. Erzeugt der Signal-Generator einen zu schnellen Sweep, dann bleibt dem Messgerät keine Zeit, das Signal korrekt zu messen. Daher musste ich zuerst diesen Versuchsaufbau mit einer direkten Verbindung zwischen dem Messgerät und dem Signal-Generator ■ Setup to measure the attenuation and other problems in our SAT and CATV distribution system. Luckily, the Handheld Satcom Test Source works on battery. 108 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 110.
    1 2 3 4 betreiben, um geeigneteParameter für den FrequenzSweep zu ermitteln. Nun wurde mir auch klar, warum WORK Microwave dieser Funktion in der Hand- held Satcom Test Source so viel Parameter spendiert hat: sie sind tatsächlich notwendig und sinnvoll. Schließlich konnte ich die gewünschte Messung mit folgenden Pa- rametern durchführen: - Startfrequenz: 950 MHz - Endfrequenz: 2150 MHz - Frequenzschritt: 1 MHz - Zeitintervall pro Schritt: 500 ms 110 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com - Leistungspegel: -35 dBm Mit diesen Werten konnte der gesamte SAT-Frequenzraum analysiert werden und die Schwankungen bei direkt angeschlossenem Messgerät
  • 111.
    5 1. Testing theDVB-T USB dongle with SDR# at 50 MHz. The signal is clean and correctly tuned on the supposed frequency. 2. Same test, but now on 120 MHz. This frequency band is used for air control communications and it is good to see that the DVB-T USB dongle behaves very well here. 3. At 180 MHz the reception is acceptable, albeit the gain is lower. The indicated dB value is just a reference as the RTL2832U chip and the FC0012 tuner have automatic gain control activated. 4. Unfortunately my DVB-T USB dongle has the FC0012 tuner instead of the much better E4000 one. The result is a total deafness at 950 MHz. 5. As expected, no signal at 1200 MHz, either. 6. At 118 MHz frequent radio communications between pilot and tower can be heard as the test centre is located near the local airport. Using the Handheld Satcom Test Source I can be sure that my DVB-T USB dongle is capable of tuning and demodulating this frequency. 7. I did not have to wait long to get to hear a pilot reporting to the tower. Notice the small red line at 118.000 MHz in the waterfall graph. It suddenly appears with the communication and lasts only a few seconds. This kind of air traffic communication is naturally modulated in AM and it is incredible that a DVB-T USB receiver for less than 20 Euro can actually be used as a SDR radio scanner to receive such communications. betrug zirka +/- 3dBm. Weil die WORK Microwave Handheld Satcom Test Source als portables Gerät mit eingebautem Akku entworfen wurde war es ein leichtes, es zum Schaltkasten zu transportieren und zu betreiben. Ich habe ihn dazu einfach an ein Netbook angeschlossen und ohne Netzstrom-Anschluss benutzt. Durch den im Signal-Generator eingebautem Akku kann man auch mit einem Laptop ohne Stromanschluss für längere Zeit arbeiten, denn der Signal-Generator saugt den Laptop-Akku nicht leer, wenn man nicht beide USB-Buchsen der Handheld Satcom Test Source anschließt (die zweite USBBuchse dient exklusiv zum Laden des Akkus). Die Messung des kompletten Spektrums dauert bei diesen Parametern ungefähr 6 7 fünf Minuten. Dabei kann man getrost seine Aufmerksamkeit auch etwas anderem widmen, denn wenn der Test länger läuft wird die Messung einfach fortgehend wiederholt. Das Resultat dieser Messung zeigt, dass die Dämpfung durch die Signalverteilung zwischen 10 dB und 15 dB beträgt. Dies ist ein durchaus guter Wert wenn man bedenkt, dass zwischen der Handheld Satcom Test Source und dem Deviser S7000 über 20 m Kabel, ein Multswitch, eine Antennendose und ein weiteres Kabel liegen. Etwas ärgerlicher ist jedoch die Tatsache, dass diese Messung es sichtbar macht, dass die Dämpfung nicht konstant über den ge- samten Frequenzbereich ist, sondern einige Bereiche stärker dämpft als andere. Keine Frage, die WORK Microwave Handheld Satcom Tetsource ermöglicht einem Installateur die Abnahme einer Installation bevor die Signale anliegen, beziehungsweise es kann anhand eines zertifizierten Referenzsignals zweifelsfrei die Qualität der Anlage nachgewiesen werden. Die Betonung hier liegt auf Zertifiziert und Referenz: mit der Handheld Satcom Test Source gibt es keine Diskussionen mehr über Fehlertoleranzen. Prüfen eines SDR Empfängers Eine ungewöhnliche Anwendung für die Handheld Satcom Test Source ergab sich zufällig: der in vielen USB DVB-T Empfängern eingebaute DVB-T COFDM Demodulator, der RTL2832U von Realtek, kann auch zum Radio-Empfang genutzt werden kann, weil dieser Chip die rohen I/Q Samples bereitstellt. Dies ist eigentlich dazu gedacht, DAB, DAB+ und FM zu demodulieren, doch mit dem passenden Treiber kann man einen solchen USB DVB-T Empfänger auch www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 111
  • 112.
    als Software DefinedRadio benutzen; mit speziell angepasster SDR-Software wie dem SDR# erhält man einen echten Radio-Scanner, mit welchem man zum Beispiel Flugfunk empfangen kann. Das Problem ist jedoch der im USB DVB-T Empfänger verbaute Tuner. Hier kommen verschiedene Chips zum Einsatz, zum Beispiel die FC0012 und FC0013 Modelle. Ein USB-Empfänger im Test Center hat den FC0012 Tuner. Leider sind diese Tuner auf den Frequenzbereich von 50 MHz bis 950 MHz eingeschränkt, aber mich interessierte ganz besonders die Frequenzspanne von 117 MHz bis 137 MHz, in welcher der Flugfunk erfolgt. Das Test Center ist dazu mit einer passenden Empfangsantenne ausgestattet und mit einem Icom R3 Handempfänger kann der Flugfunk auch abgehört werden. Da nun aber nicht ständig auf diesen Frequenzen gefunkt wird und weil ich die Sensibilität und Empfangseigenschaften des USB Empfängers genauer analysieren wollte, kam die WORK Microwave Handheld Satcom Test Source zum Einsatz. Der Testaufbau war extrem einfach: der USB DVBT Empfänger wurde am PC angeschlossen und mit dem speziellen SDR Treiber, der unter dem Namen „Zadig“ im 112 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com Internet zu finden ist, installiert. Die freie und kostenlose SDR# Software erkennt die USB Empfänger mit RTL2832U Chips automatisch und schon kann das Signal am PC als Spektrum dargestellt werden. Die Demodulation erfolgt in den für Radioscannern gewöhnlichen Modulationen: AM, FM, CW, usw., wobei die Bandbreite individuell eingestellt werden kann. An der WORK Microwave Handheld Satcom Test Source habe ich nun verschiedene Frequenzen zwischen 50 MHz und 180 MHz ausprobiert, mit besonderem Augenmerk auf Frequenzen von 117 MHz bis 137 MHz. Das Ergebnis ist in den Bildern zu sehen und variiert von spektakulär bis ernüchternd. Toll ist zum Beispiel, mit welcher Auflösung das von der Handheld Satcom Test Source erzeugte Signal dargestellt wird. Im Frequenzbereich, der für den Flugfunk genutzt wird, scheint der USB DVB-T Empfänger ein brauchbares Resultat zu ergeben, so dass ich ihn anschließend erfolgreich an die Außenantenne angeschlossen habe. Tatsächlich konnte ich nach ein paar Minuten einen Piloten im Anflug hören. Die Ernüchterung entstand deshalb, weil der USB DVB-T Empfänger eben keineswegs
  • 114.
    expert OPINION WORK Microwave Test SignalGenerator RECOMMENDED PRODUCT BY Vitor Martins Augusto Test Center Portugal + Compact and portable Test Source Two synthesizers for simultaneous generation of two signals Configurable sweep generator Extremely high accuracy Provided with compliance certificate, containing detailed information about the instruments precision Easy to use software, no installation required No driver installation required, device recognized by Windows as Human Input Device Internal battery – Parameters have to be confirmed with ENTER key Sweep Modus does not show current Frequency TECHNICAL DATA Manufacturer WORK Microwave, Germany Tel. + 49-8024-6408-27 Internet www.work-microwave.de den oft zitierten Frequenzbereich korrekt empfängt. So wird das von der Handheld Satcom Test Source erzeugte Signal auch an verkehrten Frequenzen empfangen; das zeigt deutlich einen Fehler des DVB-T Tuners. Oberhalb von 950 MHz war der FC0012 Tuner tatsächlich nicht in der Lage, irgendein brauchbares Signal zu empfangen, obwohl sich diese Frequenzen sehr wohl eingeben lassen. Fazit Obwohl vom Hersteller nur der Test von Hochfrequenzkonvertern als Einsatzgebiet angegeben wird, ist diese Testquelle für HF-Signale auch für viele andere Zwecke zu benutzen. Wenn es darum geht, Messgeräte zu kalibrieren, Fehler durch Störsignale oder Dämpfung zu klären, macht sich eine solche Testquelle unbezahlbar, denn man kann direkt messen, was mit dem bekannten Signal passiert. Ganz besonders beeindruckt waren wir von der unglaublichen Präzision der Handheld Satcom Test Source. Zusammen mit dem Zertifikat wird es so auch für kleine Betriebe möglich, die Genauigkeit der Messgeräte zu überprüfen, diese zu kalibrieren und zertifizierte Protokolle zu erstellen, die jeder Überprüfung standhalten. WORK Microwave ist mit der Handheld Satcom Test Source ein aussergewöhnliches Instrument gelungen, das gezielt für den Einsatz von Technikern entwickelt wurde. Statt eines großen und schweren, an eine Netzsteckdose gebundenes Instrument, hat man hier ein kompaktes, tragbares Gerät mit eigenem Akku in den Händen. Ein Gerät, das sich in vielen Betrieben schnell amortisiert. Model RF Signal Generator Frequency range 50 MHz to 180 MHz and 950 MHz to 2150 MHz Frequency resolution 0.5 MHz Output level -45 dBm to -5 dBm Output level resolution 0.5 dB Level tolerance ± 1 dB Output impedance 50 Ohm Output mute < -60 dBc Reference Output 10 MHz, -10 dBm to +10 dBm, 0.5 dB steps Temperature range 0°C to +50°C Interface USB 2.0 Power supply ext. 24 V DC, USB, internal Battery Power consumption max. 12 W Connectors RF out: 50 Ohm SMA female REF out: 50 Ohm BNC-female USB 2.0: USB Standard type B Weight 1.5 kg Dimensions (L x W x H) 250 x 125 x 74 mm 114 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 116.
    DIGITAL receivers of 这些是获得最高奖的产品 116 TELE-audiovisionInternational — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 117.
    AB IPBox Manufacturer Website www.abipbox.com Function HDTV PVRSatellite Receiver with Internet Media Center /LAN —/● PVR ● DiSEqC 1.0 / 1.1 / 1.2 / 1.3 S-Video/HDMI —/● Scart/Digital Audio —/● TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/11/abipbox Read TELE-audiovision Test Report 1-1 1 2/2013 by ismcube Ru AB IPBox Pr d receiver for multi pe e Perfectly equipplus for all the worldwid tion satellite recep Internet TV 0.60 Manufacturer Amiko Website www.amikostb.com Function Miniature / PVR Receiver with external IR remote control /LAN ●/● DiSEqC 1.0 / 1.1 / 1.2 / 1.3 S-Video/HDMI —/● Scart/Digital Audio —/● TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/11/amiko 11 12/2013 Read TELE-audiovision Test Report HD AMIKO MINI sful receiver Perfect succes mat for in small 0.53 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 117
  • 118.
    Digital Receivers of21st Century AWARD WINNING Manufacturer Icecrypt Website www.icecrypt.com Function 2x & / PVR HDTV Receiver /LAN DiSEqC PVR ●/● 1.0 / 1.1 / 1.2 / 1.3 ● S-Video/HDMI —/● Scart/Digital Audio ●/● TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/11/icecrypt 11 12/2013 Read TELE-audiovision Test Report 0CHD Icecr ypt S370 tandem with are in Excellent hardw sy-to-use software. t ea bu sophisticated 0.59 Manufacturer Website Function /LAN DiSEqC PVR Gotech www.gotechcn.com & Combo Receiver ●/● 1.0 / 1.1 / 1.2 / 1.3 ● S-Video/HDMI —/● Scart/Digital Audio ●/● TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/09/mktech 09-10/2013 Read TELE-audiovision Test Report HD MK Tech IS1-19and local TV in for Satellite Well equipped uth America So 0.59 118 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 119.
    这些是获得最高奖的产品 Manufacturer Website TBS Tenow TELE-audiovision International Magazine www.tbsdtv.com Function compatible TwinTuner Streamingbox DiSEqC 1.0 / 1.1 /LAN Expert Opinion ●/● PVR ● S-Video/HDMI —/— Scart/Digital Audio —/— www.TELE-audiovision.com/13/07/tenow Read TELE-audiovision Test Report 07-08/2013 ing Box MOI ion TBS Stream ng and isolat offers streami double Program d software, a of hardware an t for the future of TV concep innovative 0.54 Manufacturer Website Function Gotech www.gotechcn.com Satellite Receiver /LAN ●/● Channel Memory unlimited DiSEqC 1.0 / 1.1 / 1.2 / 1.3 S-Video/HDMI —/● Scart/Digital Audio ●/● TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/07/mktech 07-08/2013 Read TELE-audiovision Test Report MK TechHD ceiver Mini Scart Re Fully featured HDMI with HDTV via 0.61 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 119
  • 120.
    Digital Receivers of21st Century AWARD WINNING Manufacturer Fortis Website www.tiviar.com Function / / Triple PVR Receiver /LAN ●/● Channel Memory 10000 DiSEqC 1.0 / 1.1 / 1.2 / 1.3 S-Video/HDMI —/● Scart/Digital Audio ●/● TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/07/tiviar Read TELE-audiovision Test Report 07-08/2013 Plus Tiviar Alpha ration d integ Best dissolve all digital tion of for recep TV signals 0.60 Manufacturer Changhong Website www.changhong.com Function Receiver, Mediaplayer, Android Apps /LAN PVR —/● ● S-Video/HDMI —/● Scart/Digital Audio —/● TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/05/changhong 05-06/2013 Read TELE-audiovision Test Report Smar tcenter Changhong essful Very succ for digital TV hybrid receiver 0.55 120 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 121.
    这些是获得最高奖的产品 Manufacturer Website Panodic www.panodic.com Function /LAN PVR / Receiver ●/— ● S-Video/HDMI —/● Scart/Digital Audio ●/— TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/03/panodic 03-04/2013 Read TELE-audiovisionTest Report 75C Panodic HDT-2 HDTV era for the new Great receiver trial TV in digital terres f DVB-T2 in future-proo 0.53 Manufacturer Tsinghwa Function Receiver LAN — PVR ● S-Video/HDMI —/● Scart/Digital Audio —/● TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/03/tsinghwa 03-04/2013 Read TELE-audiovision Test Report -278 Tsinghwa GT llent eiver with exce Rock-solid rec e eed reaction tim sp 0.53 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 121
  • 122.
    Digital Receivers of21st Century AWARD WINNING Manufacturer Skyworth Website www.skyworthdigital.com Function / HDTV Receiver /LAN ●/— PVR ● S-Video/HDMI —/● Scart/Digital Audio —/— TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/01/skyworth 01-02/2013 Read TELE-audiovision Test Report A6 Sk ywor th HT HDTV eiver for A rock-solid rec trial antenna over the terres 0.45 Manufacturer Website Jiuzhou www.jiuzhou.com.cn Function & Android STB /LAN PVR —/● ● S-Video/HDMI —/● Scart/Digital Audio —/● TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/12/11/jiuzhou Read TELE-audiovision Test Report 1-1 1 2/2012 100 Jiuzhou DTP2 thanks receiver Cutting-edge g system eratin to Android op 0.55 122 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 123.
    这些是获得最高奖的产品 Manufacturer Website Panodic www.panodic.com Function / /LAN DiSEqC Receiver ●/— 1.0 / 1.1/ 1.2 / 1.3 S-Video/HDMI —/● Scart/Digital Audio ●/— TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/12/11/panodic 11 12/2012 Read TELE-audiovision Test Report 75 Panodic HDS2 eiver mini-rec Best designed reception for the best HD 0.58 Manufacturer AZBox Website www.azbox.com Function HDTV / Miniature HDTV Linux Receiver with Multimedia Features /LAN ●/● Channel Memory unlimited DiSEqC 1.0 / 1.1 / 1.2 / 1.3 / USALS S-Video/HDMI —/● Scart/Digital Audio —/● TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/12/09/azbox-mini-me Read TELE-audiovision Test Report 09-10/2012 ME AZBox mini with Network receiver Excellent mini- for a home network features - ideal 0.57 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 123
  • 124.
    AWARD WINNING Digital Receiversof 21st Century Manufacturer Panodic Website www.panodic.com Small Function /LAN HD PVR Receiver —/— DiSEqC — S-Video/HDMI —/● Scart/Digital Audio ●/— 这些是获得最高奖的产品 TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/12/07/panodic 2 1 06-07-08/20 Read TELE-audiovision Test Report 27A DVB-T Panodic HDT-1 DVB-T Well-equipped r ceive Mini-Re 0.63 Manufacturer Panodic Website www.panodic.com Mini Receiver with HDMI and PVR Function /LAN —/— DiSEqC — S-Video/HDMI —/● Scart/Digital Audio —/— TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/12/05/panodic 04-05/2012 Read TELE-audiovision Test Report 1E DVB-T Panodic M360 eiver with all rec Extremely sm y HDTV tuner high-sensitivit 0.55 124 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 126.
    signal analyzers of 这些是获得最高奖的产品 126 TELE-audiovisionInternational — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 127.
    TELE-audiovision International Magazine TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/09/horizon Read TELE-audiovision TestReport Manufacturer Horizon Global Electronics Website www.horizonhge.com Function Digital Meter Frequency Range Signals 51 ~ 858 MHz Video Output — Built-in Monitor LCD display Expert Opinion www.TELE-audiovision.com/13/09/deviser Read TELE-audiovision Test Report Manufacturer Tianjin Deviser Electronics Instrument Website www.devisertek.com Function Professional TV Signal Anaylzer Frequency Range Video Output Built-in Monitor 5 - 1050 MHz (TV); 950-2150 MHz (Satellite) HDMI 7” TFT LCD, 800×480 pixels 09-10/2013 DEVISER S7000 Best professional instrument for measurement and analysis of all globally used TV systems 09-10/2013 HORIZON HD-CM+ for DVB-C Extremely easy to operate, for professional installers www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 127
  • 128.
    AWARD WINNING Signal Analyzersof 21st Century TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/05/deviser Read TELE-audiovision Test Report Manufacturer Tianjin Deviser Electronics Instrument TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/03/horizon Read TELE-audiovision Test Report Manufacturer Website www.devisertek.com Function Satellite Antenna Meter Function Horizon Global Electronics Website Frequency Range 950~2150 MHz Video Output — Built-in Monitor LCD display www.horizonhge.com Digital Satellite Meter for Frequency Range and 950 ~ 2150 MHz Video Output — Built-in Monitor LCD display 05-06/2013 DEVISER S30 Highly accurate handheld meter optimized for the satellite dish installer 03-04/2013 HORIZON Nano-S2 Very easy to use instrument for quick installation of satellite for HDTV reception 128 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com Signals
  • 129.
    这些是获得最高奖的产品 TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/12/11/satlink Read TELE-audiovision TestReport Manufacturer Fujian Baotong Website Digital Meter & Receiver for Frequency Range and 47 ~ 862 MHz & 950 ~ 2150 MHz Video Output yes Built-in Monitor 1 1-12/2012 www.TELE-audiovision.com/12/11/horizon Read TELE-audiovision Test Report Horizon Global Electronics Website Signals Function www.horizonhge.com Digital Meter for Analogue, Frequency Range and Signals 48 ~ 862 MHz Video Output 4.3 inch display Satlink WS-6936 Very easy to use signal meter which also serves as receiver. Expert Opinion Manufacturer www.sat-link.com.cn Function TELE-audiovision International Magazine — Built-in Monitor LCD display 1 1-12/2012 HORIZON HD-T2 One of the world’s first DVB-T2 signal analyzers with exceptional data www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 129
  • 130.
    Signal Analyzers of21st Century AWARD WINNING TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/12/11/deviser Read TELE-audiovision Test Report Manufacturer Tianjin Deviser Electronics Instrument TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/12/09/deviser Read TELE-audiovision Test Report Manufacturer Website www.devisertek.com Function Optical Power Meter Function Frequency Range -43 dBm ~ +25 dBm Tianjin Deviser Electronics Instrument Website Frequency Range Video Output — Built-in Monitor LCD display 1 1-12/2012 DEVISER AE 120 Optical Power Meter Extremely simle to use but at same time very accurate www.devisertek.com Professional Meter for , and CATV (analog TV) 5 ~ 1000 MHz Video Output — Built-in Monitor 320 × 240 TFT display 09-10/2012 DEVISER DS2400T This is by far the best handheld measuring instrument for DVB-T, DVB-C and CATV I have come across. Deviser has done an excellent job! 130 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 131.
    这些是获得最高奖的产品 TELE-audiovision International Magazine TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/12/05/spaun Read TELE-audiovision TestReport Manufacturer SPAUN Electronic Website / Frequency Range and DSS Signal Analyzer 950-2150 MHz Video Output Read TELE-audiovision Test Report Manufacturer Horizon Global Electronics www.horizonhge.com Function Satellite and terrestrial antenna meter Frequency Range — Built-in Monitor www.TELE-audiovision.com/12/01/horizon Website www.spaun.com Function Expert Opinion 45~861 MHz (terrestrial) and 950~2150 MHz (satellite) Video Output 4.3” TFT LCD display (16:9) — Built-in Monitor LCD display 04-05/2012 SPAROS SAT HD Very useful meter for setting up critical satellite systems 12-01/2012 Horizon HD-STM Perfect choice for an installer who values a practical instrument. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 131
  • 134.
    IPTV/WebTV receivers of 这些是获得最高奖的产品 134 TELE-audiovisionInternational — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 135.
    AB IPBox Manufacturer Website www.abipbox.com Function HDTV PVRSatellite Receiver with Internet Media Center /LAN —/● PVR ● DiSEqC 1.0 / 1.1 / 1.2 / 1.3 S-Video/HDMI —/● Scart/Digital Audio —/● TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/11/abipbox Read TELE-audiovision Test Report 1-1 1 2/2013 by ismcube Ru AB IPBox Pr d receiver for multi pe e Perfectly equipplus for all the worldwid tion satellite recep Internet TV 0.60 Manufacturer Website TBS Tenow www.tbsdtv.com Function compatible Twin Tuner Streamingbox DiSEqC 1.0 / 1.1 /LAN ●/● PVR ● S-Video/HDMI —/— Scart/Digital Audio —/— TELE-audiovision International Magazine Business Voucher www.TELE-audiovision.com/13/07/tenow Read TELE-audiovision Test Report 07-08/2013 ing Box MOI ion TBS Stream isolat streaming and Program offers d software, a double of hardware an t for the future of TV ep innovative conc 0.54 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 135
  • 136.
    AWARD WINNING IPTV/WebTV Receiversof 21st Century Manufacturer D-Link Website www.dlink.com Function Internet Streaming Box WIFI /LAN ●/● Internal Storage HDTV no yes (up to 1080p) CVBS/HDMI —/● USB/SD Card ●/● TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/07/boxee Read TELE-audiovision Test Report 0.52 Manufacturer Netgear Website www.netgear.com Function Streaming Player WIFI /LAN ●/● Internal Storage HDTV no yes (up to 1080p) CVBS/HDMI —/● USB/SD Card —/— TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/05/netgear Read TELE-audiovision Test Report 136 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 137.
    这些是获得最高奖的产品 Manufacturer Roku Website www.roku.com Function Streaming Player WIFI /LAN ●/— InternalStorage HDTV no yes (up to 1080p) CVBS/HDMI ●/● USB/SD Card —/● TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/03/roku Read TELE-audiovision Test Report Manufacturer LookeeTV Website www.lookeetv.com Function Multimedia Player for local media and Internet WIFI /LAN ●/● Internal Storage HDTV yes, 1.14 GB yes (up to 720p) CVBS/HDMI ●/● USB/SD Card ●/● TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/12/11/lookee Read TELE-audiovision Test Report 0.54 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 137
  • 138.
    AWARD WINNING IPTV/WebTV Receiversof 21st Century Manufacturer AZBox Website www.azbox.com Function HDTV / Miniature HDTV Linux Receiver with Multimedia Features /LAN ●/● Channel Memory unlimited DiSEqC 1.0 / 1.1 / 1.2 / 1.3 / USALS S-Video/HDMI —/● Scart/Digital Audio —/● TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/12/09/azbox-mini-me Read TELE-audiovision Test Report 09-10/2012 ME AZBox mini with Network receiver Excellent mini- for a home network features - ideal 0.57 Manufacturer Logitech Website www.logitech.com Function IPTV Receiver TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/12/03/googletv Read TELE-audiovision Test Report 138 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 139.
    这些是获得最高奖的产品 Manufacturer Jiuzhou Website www.jiuzhou.com.cn Function IPTV Set-Top-Box Stream Protocol UDP MenuStandards HTML4, Javascript 1.5, Java Virtual Machine WLAN ● (via USB stick) 1 12-01/201 P830 0 Jiuzhou DT uipped r Eq IPTV Receive Technology with Top- Notch TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/11/01/jiuzhou Read TELE-audiovision Test Report 0.57 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 139
  • 140.
    The Best Headend Equipment of 这些是获得最高奖的产品 140TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 141.
    Manufacturer Website WORK Microwave TELE-audiovision International Magazine www.work-microwave.de Model RF SignalGenerator Function Test Signal Generator Frequency range Frequency resolution Output level Output level resolution Output impedance Output mute Reference Output Expert Opinion 50 MHz to 180 MHz and 950 MHz to 2150 MHz 0.5 MHz -45 dBm to -5 dBm 0.5 dB 50 Ohm < -60 dBc 10 MHz, -10 dBm to +10 dBm, 0.5 dB steps www.TELE-audiovision.com/13/11/work-microwave Read TELE-audiovision Test Report 1 1-12/2013 WORK Microwave Handheld Satcom Test Source Allows for precise and certified high-frequency measurements TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/03/antiference Read TELE-audiovision Test Report Manufacturer Antiference Website www.antiference.co.uk Model KLA-110 Launch Amplifier & KCC-110 Channel Convertor/Processor Function Filtering, amplifying and converting DTT channels to new frequencies Input / Output frequency range 44 – 862 MHz / 44 – 862 MHz Input level range 65 – 95 dBµV Output level adjustment (KCC-110) 60 – 80 dBµV Gain adjustment (KLA-110) 14 – 45 dB 03-04/2013 KLA-110 Launch Amplifier & KCC-110 Channel Convertor/Processor Professional handling of DTT signals www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 141
  • 142.
    AWARD WINNING The BestHeadend Equipment of 21st Century Manufacturer Dexin Digital Technology Website www.dsdvb.com/english Model NDS3975 DVB-S2 HD IRD Function Professional Integrated Receiver Decorder Tuner Input QPSK,QPSK ( / / optional) ASI Input Maximum transmitting rate 90Mbps ASI Input Maximum transmitting rate 90Mbps /LAN ●/● SDI/YPbPr/CVBS/HDMI ●/●/●/● Scart/Digital Audio Manufacturer Read TELE-audiovision Test Report 0.61 Dexing NDS3975 Most powerful and versatile IRD ever - its built-in monitor is a unique plus. Sat & Sound Website www.satson.eu Model HD-MOD-001T Function HDTV-compatible Modulator Output Frequency 50 - 860 MHz Video Input Format Component Video, YPbPr RCA, HDMI Video Encoding Format MPEG-2 Video (ISO/IEC 13818-2) HDMI/LAN ●/● Modulator Standard DVB-T (ETSI EN 300 744) Bandwidth 6, 7, 8 MHz Constellation Expert Opinion www.TELE-audiovision.com/13/01/dexin —/● 01-02/2013 TELE-audiovision International Magazine QPSK, QAM16, QAM64 TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/13/01/satson-modulator Read TELE-audiovision Test Report 01-02/2013 Satson HD-MOD-001T Smart solution for distributing HD signals via an existing coax cable network 0.84 142 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 143.
    这些是获得最高奖的产品 TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/12/11/dektec Read TELE-audiovision TestReport Manufacturer DekTec Website www.dektec.com Model DTE-3137 Function Networked Frequency range Transmission Standards Modulations Receiver DVB, DVB-RSC, ATSC QPSK, 8-PSK, 16-APSK and 32-APSK /LAN 0.56 / 950 - 2150 MHz) ●/● 1 1-12/2012 DekTec DTE-3137 Perfectly equipped professional satellite receiver for use in networks and for processing in cable networks. TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/12/09/spaun-vam Read TELE-audiovision Test Report Manufacturer Website Model Function Frequency range TV standard Spaun www.spaun.com VAM 420 NG PAL VSB Twin Modulator 110 … 862 MHz B/G/D/K/I/L Output level max 90 dBµV Output level adjustment 0...-10 dB Spurious level C/N ratio Input level <-60 dB ≥ 50 dB 1 ± 0.1 V p-p 09-10/2012 SPAUN VAM 420 NG PAL Easy way to create analogue tv channels www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 143
  • 144.
    AWARD WINNING The BestHeadend Equipment of 21st Century Manufacturer Global Invacom Website TELE-audiovision International Magazine www.gloablinvacom.com Model FibreIRS DTT Processor Function Filtering and amplifying Frequency range signal Expert Opinion 470-862 MHz Number of channels 6 (expandable to 9) Broadcast standard 8 MHz Gain 20 dB Channel flatness < 2.5 dB DAB Frequency range 217-230 MHz Insertion loss < 2 dB www.TELE-audiovision.com/12/07/globalinvacom Read TELE-audiovision Test Report 06-07-08/201 2 FibreIRS DTT Processor Delivery perfectly clean DTT signals for any distribution system TELE-audiovision International Magazine 06-07-08/201 2 Expert Opinion SPAUN BluBox 16 Great leap forward in headend technology www.TELE-audiovision.com/12/07/spaun Read TELE-audiovision Test Report Manufacturer Spaun Website www.spaun.com Model Function /LAN Number of inputs Input frequency range BluBox 16 / to Head End ●/● 4 (cascadable) 950 ... 2150 MHz Allowable input signal power 64 ... 94 dBµV Number of outputs 2 (cascadable) Output frequency range QAM standard 144 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com 47 ... 862 MHz / ITU-T J.83 Annex A (fixed)
  • 145.
    这些是获得最高奖的产品 TELE-audiovision International Magazine Expert Opinion www.TELE-audiovision.com/12/01/netup Read TELE-audiovision TestReport Manufacturer NetUP Website www.netup.tv Model Dual DVB-T/C-CI and Function PCI-e adapter for professional applications under Linux 12-01/2012 DVB-T/C-CI Impressive professional card for IPTV servers and multimedia centers that is loaded with the latest technologies for long-term use Manufacturer NetUP Website www.netup.tv Model Function IPTV Combine 4x IPTV Gateway for DVB Signals, Middleware,Billing, VoD, nVoD, DHCP-, Time- & DNS-Server Tuners 4 Max. simultaneous Transponders 4 Max. bandwidth 240 MB/s DISEqC 1.0 Ethernet ports 6 x Gigabit Ethernet 10/100/1000 MB/s CI Slots 02-03/201 1 Expert Opinion www.TELE-audiovision.com/11/03/netup Read TELE-audiovision Test Report 4 NetUP DVB-IP Gateway 4x Perfect ease of use, combined with reliable technology – ideal for IPTV providers. TELE-audiovision International Magazine 0.98 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 145
  • 146.
    FEATURE Selfmade IPTV Fernsehen aus dem Netzwerk Teil4 146 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 147.
    ■ This ishow our test centre looked like for this report. • ideal für Bastler, um Audio und Video zuhause zu streamen • eine kleine Platine dient als Basis für das eigene Heim IPTV Netzwerk • MPEG2 und VC Lizenzen müssen getrennt gekauft werden • zum Streaming wird TSReader Pro eingesetzt • kann auch mit VLC eingesetzt werden www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 147
  • 148.
    FEATURE Selfmade IPTV Vitor MartinsAugusto Nachdem wir uns in den ersten drei Teilen zum Thema IPTV eher der Theorie gewidmet haben möchten wir nun im vierten Teil eine konkrete IPTV-Lösung implementieren. Benötigt wird gar nicht mal so viel: als Server dient ein PC mit einem Empfänger für digitales Fernsehen (DVB, ATSC oder ISDB) und TSReader Pro. Als IPTV-Receiver benutzen wir den Raspberry Pi. Das häufigste Problem bei der Implementierung von IPTV im Heim ist die Frage, wie man denn das IPTV am Fernseher empfangen und darstellen soll. Natürlich könnte man an jedem Fernseher einfach einen kompletten PC hinstellen, doch dies würde nicht unbedingt gut aussehen und außerdem kostet auch ein günstiger PC doch einiges an Geld, von den Stromkosten mal abgesehen. Wir haben uns deshalb umgesehen, welches Gerät wir denn als IPTV Receiver benutzen könnten. Unsere Kriterien: günstig, klein, verfügbar und vielseitig sollte das Gerät sein. Nachdem wir verschiedene Kandidaten geprüft haben (von der Spielekonsole bis zum modifizierten AppleTV war alles dabei), entschieden wir uns für den Raspberry Pi. Der Raspberry Pi ist ein winziger Computer, dessen Platine die Fläche einer Kreditkarte belegt (85.6mm x 56mm x 21mm). Trotz der kleinen Größe handelt 2 es sich um einen vollwertigen Computer mit einem ARM-Prozessor. Die Eckdaten sind: SoC („System on Chip“): Broadcom BCM2835 mit einem ARM1176JZFS Kern, der mit 700MHz getaktet wird und eine Videocore 4 GPU Grafikeinheit enthält, die in der Lage ist, H.264 mit bis zu 40MBits/s in Hardware zu dekodieren. Weiterhin werden OpenGL ES2.0 und OpenVG Bibliotheken unterstützt. Model B verfügt über 512MB RAM, aktuell werden die Platinen sogar zum gleichen Preis mit 1GB RAM ausgeliefert. Anschlüsse: - SD-Karte: von dieser wird das Betriebssystem geladen 1. The Raspberry Pi is a small computer with the footprint of a credit card. Still, it features all conceivable connections: - HDMI - Composite Video - Analog Stereo Audio - 2x USB - 1x Micro-USB for power supply - RJ-45 Network - SD card reader On the PCB there are furthermore connectors for digital and analog inputs/ outputs 2. The Raspberry Pi will convert any TV or monitor into a full blown media center when using XBMC. Because the Raspberry Pi is so small, it will snug away behind the TV. If you then use a wireless keyboard with integrated trackball or touch pad, you won’t even see any loose cables. 1 148 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 150.
    3 7 4 3. The webpage“openelec.thestateofme.com” features all published versions of OpenELEC for Raspberry Pi, including Windows-friendly *.img version, which can be easily flashed using Image Writer, whose Windows version is called Win32 Disk Imager. 4. Just download the latest rXXXXX.img.zip File and extract it with your favourite compressing tool. 5. Use Win32 Disk Imager to write the image file onto the SD card. We recommend the use of 8GB SD cards with 6x speed or better. The card is written with 10MB/s which is not that bad. Flashing should take less than a minute. 6. When the flashing is finished, a message box appears. Don’t remove the card yet, because we need to write the license keys for the MPEG2 decoder. 7. On the root of the freshly written SD card you will find a file called “config.txt”. Open it with a text editor (we prefer to use the free Notepad++) and scroll down to the license keys section. Copy & paste the license file you from 6 received After the Raspberry Pi store. completing the purchase our keys arrived about 2 hours later, but the site mentions that it could take up to 72 hours. 5 - 2x USB: zum Anschluss von Tastatur, Maus, USBSpeicher, usw. - LAN: RJ-45 mit 100MBit/s - Audio: analoger StereoAusgang - RCA Video: analoger Composite Video-Ausgang - HDMI: für digitale Audio und Video Ausgabe - Micro-USB: für Stromversorgung Das interessante an diesem Gerät ist sein Preis: offiziell kostet der Raspberry Pi Model B lediglich US$ 35, zu welchen sich Steuern und Versandkosten addieren. In Europa kann man den Raspberry Pi für ungefähr 35 Euro kaufen. Dieser niedrige Preis ist deshalb möglich, weil dieser Miniatur-Computer von der Raspberry Pi Stiftung entwickelt wurde, die es sich zum Ziel gesetzt hat, einen absolut günstigen Computer für alle Kinder zur Verfügung zu stellen, um das Programmieren auch im Kindesalter zu motivieren, wie es früher bei den 8-Bit Computern wie dem Spektrum und dem Commodore 64 der Fall war. Für alle anderen ist es aber toll, dass diese Platine uneingeschränkt zu erwerben ist und somit Applikationen möglich sind, die vorher aus Kostengründen eigentlich unvorstellbar wären. Der Raspberry Pi wird in Zusammenarbeit von Farnell und RS Electronics hergestellt und ist bei diesen weltweit zu beziehen. Damit man die Platine benutzen kann benötigt man weiterhin ein Micro-USB Netzteil, das auch bei modernen Smartphones üblich ist. Außerdem braucht man eine SD-Karte, wir empfehlen eine mit 8GB. Ein passendes Gehäuse kann seit kurzem ebenfalls für ca. 6 Euro bestellt werden und macht auf jeden Fall Sinn, um die Platine vor einem Kurzschluss oder statischer Entladung zu schützen. Wir haben die Platine allerdings wochenlang ohne Gehäuse benutzt und diese auch angefasst, ohne dass etwas passiert wäre. Weil die Platine so klein ist, lässt sie sich prima hinter dem Fernseher platzieren 150 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com und als Tastatur und Maus eignet sich am besten eine kabellose Version, die beide Funktionen auf kleiner Fläche integriert. Im Handel finden sich viele oft als „Multimedia“ oder „TV“ Tastatur bezeichnete Modelle, deren Maus als Trackball oder Touchpad implementiert ist. Ganz wichtig: um den Preis von Raspberry Pi klein zu halten, fehlen dem Gerät die Lizenzen, um MPEG2 abzuspielen, obwohl die Hardware dazu durchaus in der Lage ist. Dies ist aber für die Darstellung von IPTV notwendig, da die meisten Kanäle, die in SD ausgestrahlt werden, in MPEG2 kodiert sind. Im Webshop der Raspberry Pi Stiftung kann man für 3,00 Euro die MPEG2 Lizenz kaufen. Man erhält per e-Mail einen Schlüssel, der diese Funktion aktiviert. Dieser Schüssel
  • 152.
    8 muss auf derSD-Karte in der „config.txt“-Datei an entsprechender Stelle eingetragen werden. Fortan werden auch MPEG2 kodierte Inhalte mittels hardware-gestützter Dekodierung dargestellt. Auf gleiche Weise kann auch eine VC-1 Lizenz für 1.50 Euro gekauft werden, um entsprechende Inhalte darstellen zu können. Raspberry Pi funktioniert hauptsächlich mit einer angepassten Linux-Distribution, doch mittlerweile bekommt man auch schon fertige Firmware-Dateien („Image“ genannt) mit XBMC. Der seltsame Name dieser Multimedia-Software entstand aus der Abkürzung für „Xbox Media Center“: diese Software wurde ursprünglich für die erste Version der Xbox entwickelt. Mittlerweile wurde diese Software auf alle denkbaren Systemen portiert, darunter auch Windows, Linux, MacOS sowie Android und iOS. Keine Frage: bei XBMC handelt es sich um eines der besten Multimedia-Programme. Es werden praktisch alle Formate abgespielt (Audio, Video und Bilder), es gibt unzählige Plugins und die Bedienung ist kinderleicht. Wer XBMC noch nicht kennt sollte dieses Programm unbedingt auf Windows, MacOS oder Linux ausprobieren. Wie im Linux-Umfeld üblich, gibt es gleich mehrere verschiedene Distributionen von XBMC für den Raspberry Pi: OpenELEC, Raspbmc, XBian, usw. Wir haben mit OpenELEC die besten Resultate erzielt. Um den Raspberry Pi mit XBMC zu benutzen, müssen folgende Schritte durchgeführt werden: 1) Die Datei mit dem XBMC-Image muss von der OpenELEC Webseite geladen werden (siehe Linktabelle). 2) Entpacken Sie das Archiv zum Beispiel mit WinRAR. 3) Die *.img Datei wird anschließend mit Win32DiskImager auf die SD-Karte geflasht. Stellen Sie sicher, dass Win32DiskImager auch wirklich das korrekte Lauf- 9 10 werk für die SD-Karte entdeckt hat, damit Sie nicht aus Versehen das falsche Laufwerk formatieren. 4) Nun muss die „config. txt“ Datei editiert werden: an der entsprechenden Stelle muss der Lizenz-Schlüssel für MPEG2 eingegeben werden. Nun kann man den Raspberry Pi starten und nach wenigen Sekunden erscheint die XBMC Oberfläche, die hervorragend selbsterklärend ist. Wichtiger Hinweis: es ist normal, dass beim 152 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com 11
  • 153.
    12 ersten Start, nachdemdie SD-Karte beschrieben wurde, das Betriebssystem automatisch neu startet. Erst beim zweiten Start wird dann XBMC geladen. Der erste Durchlauf dient zur Konfiguration des Betriebssystems. Warten Sie daher etwa, anstatt es wie wir zu machen: wir dachten am Anfang, etwas sei fehlgelaufen und haben prompt die SD-Karte neu programmiert… Mit TSReader Pro ist es möglich, den empfangenen Transport Stream direkt über UDP in das Netzwerk einzuspeisen. Entweder kann der Transport Stream komplett 1:1 in das Netzwerk geleitet werden oder man benutzt die integrierte Demuxer-Funktion. Mit dieser kann jeder einzelne im Transport Stream enthaltene Kanal separat in das Netzwerk gestreamt werden. Da gewöhnliche Multimedia-Geräte normalerweise über keinen Demuxer verfügen, können Sie einen Transport Stream nicht darstellen oder es wird nur ein Kanal des Transport Streams angezeigt ohne Möglichkeit, einen anderen Kanal auszuwählen. Genau dies passiert auch mit XBMC, wenn man versucht, den kompletten Transport Stream zu empfangen: es wird einfach nur ein Kanal dargestellt, ohne dass man die Möglichkeit hat, auf einen anderen umzuschalten. Deshalb benutzen wir die Demuxer-Funktion von TSReader Pro und streamen die gewünschten Kanäle per Multicast in das Netzwerk, wobei wir aber für jeden Kanal eine individuelle Port-Nummer verwenden. Damit XBMC diese Streams auf verschiedenen Ports empfangen kann, müssen wir eine Playliste im *.m3u Format erstellen. Dies ist praktisch, denn so erscheint in XBMC eine Liste mit den vollständigen Kanalnamen und das Zappen gestaltet sich äußerst komfortabel. Der Clou ist aber, dass man mehrere Instanzen von TSReader Pro starten kann, jeweils mit einem andern Tu- 13 15 14 8. Start TSReader Pro and tune to the desired transponder as usual. 9. Open the “Forward” menu and select “Forward to UDP…”. On the list in the upper part of the window select each channel you want to stream and configure the respective IP address and port number. You can use the same IP address for all channels, but then you need to use individual port numbers. Remember that the multicast addresses start at 224.1.1.1 and go up to 239.255.255.255. 10. Using a text editor like Notepad++, you need to configure the play list for XBMC, introducing each streamed channel with the respective IP and port. 11. In our first experiment, we streamed four channels and configured the IPTV.m3u file accordingly. Naturally you can name the file as you desire, as long as you keep the *.m3u extension. 12. Not too soon, we wanted to try to increase our IPTV bouquet and added a second TSReader session, this time using a DVB-T tuner. 13. With this TSReader session we were receiving the Portuguese digital terrestrial television, which contains only 4 channels. 14. Each channel was assigned an IP address and an individual port number. 15. Streaming has started. TSReader tracks on how much data has been sent and how many errors occurred. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 153
  • 154.
    16 6 16. Boot screenof the OpenELEC distribution of XBMC for the Raspberry Pi 17. Main menu of XBMC. You can access all functions from here, using the keyboard, the mouse or any other device you connect, including a wide range of remote controllers. 18. The video menu. You can add new folders containing video using the “Add Videos…” entry. These can be folders on the Raspberry Pi or shared folders within the network. 19. Playing a TV channel received over the network – IPTV at its best 20. XBMC includes a wide range of configurations for audio and video, 17 21 18 22 19 23 20 24 154 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com including the display of subtitles 21. Zapping can be done using the |<< and >>| buttons or by going back to the playlist. 22. Playing a streamed channel from HOTBIRD 13.0E. 23. This is a different playlist, showing the channels we are streaming from our DVB-S/S2 card. You can have as many playlists as you wish. 24. Zapping between the different channels within the playlist is easy, but naturally you have to expect 2-3 seconds to see the next picture. The reason is the buffering that is required, to ensure that sudden delays within the network traffic don’t stop the reproduction.
  • 156.
    25 6 26 27 ner (egal obauf einem oder mehreren PCs – schließlich benutzen wir ja Multicast), so dass man sich ein ansehnliches Bouquet erstellen kann. Wir haben zum Beispiel einige Kanäle eines Transponders von HOTBIRD (13.0E) mit dem portugiesischen digitalen terrestrischen Fernsehen kombiniert. Fortan stehen im ganzen Haus über das Netzwerk diese 8 Kanäle bereit und können mit dem Raspberry Pi, aber auch anderen Geräten (PC, Tablet, Konsole, usw.) empfangen werden, wenn diese mit UDP-Streams umgehen können. Besonders einfach ist es natürlich, wenn auf dem jeweiligen Gerät XBMC installiert ist. Das Format der *.m3u Playliste ist recht einfach und sieht so aus: #EXTM3U #EXTINF:0,RTP-1 #E X T V L C O P T:n e t w o r kcaching=1000 udp://@224.2.2.2:1001 #EXTINF:0,RTP-2 #E X T V L C O P T:n e t w o r kcaching=1000 udp://@224.2.2.2:1002 #EXTINF:0,SIC #E X T V L C O P T:n e t w o r kcaching=1000 udp://@224.2.2.2:1003 28 30 29 31 156 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com #EXTINF:0,TVI #E X T V L C O P T:n e t w o r kcaching=1000 udp://@224.2.2.2:1004 Die erste Zeile identifiziert die Datei als EXTM3U-Playliste und muss genau so vorhanden sein. Nun folgen für jeden Kanal 3 Zeilen: #EXTINF bietet „Extended Info“, also weitere Informationen, damit XBMC statt dem Dateinamen und der IP-Adresse den Namen des Kanals anzeigt. Hier kann nach dem „0,“ ein beliebiger Text, in unserem Fall eben der Name des Kanals, eingegeben werden. Die nächste Zeile dient dazu XBMC anzuweisen, einen Puffer anzulegen, damit das Bild bei kurzzeitigen Netzwerk-Kollisionen nicht stottert. Bei einem großen Wert dauert das Zappen deutlich länger. Wir verwendeten Werte zwischen 100 und 1000. Nun folgt eine Zeile, in welcher das Protokoll (udp://@) und die entsprechende IP-Adresse mit PortNummer angegeben wird. Diese müssen natürlich zu den IP-Adressen und PortNummern passen, die in TSReader angegeben wurden. Diese drei Zeilen wiederholen sich für jeden einzel-
  • 157.
    nen Kanal. Umdiese Datei zu erstellen und zu editieren, kann jeder beliebige Texteditor benutzt werden, denn es handelt sich im Grunde um eine normale *.txt-Datei, bei welcher die Datei-Endung auf *.m3u geändert wurde. Wir weisen hier auf Notepad++ hin - ein toller Open Source Editor mit vielen Funktionen und Plugins, der auch mit entsprechendem Plugin als Hex-Editor dient. Die fertige *.m3u-Datei kopiert man nun zum Beispiel auf einen USB-Speicher und steckt ihn an den Rasperry Pi. Dies kann bei laufendem Gerät erfolgen, XBMC erkennt den Speicher automatisch. Geht man nun auf Video, kann man die Playliste anklicken und den gewünschten Kanal wählen. Außerdem kann man leicht zum nächsten oder vorherigen Kanal zappen. Nur ein direktes numerisches Anwählen ist nicht vorgesehen. Weiterhin kann man wählen, ob man Kanäle aus verschiedenen Transpondern, die von verschiedenen TSReader-Instanzen gestreamt werden, in eine einzige *.m3u-Playliste integrieren möchte, oder ob man nicht doch lieber verschiede- 32 ne Playlisten anlegt. Die hier beschriebene Konfiguration lässt sich übrigens auch mit VLC als Server verwirklichen, wodurch man nochmal etwas Geld spart, da es sich bei VLC um ein Open Source Projekt handelt. Hier muss man aber deutlich mehr Zeit als mit TSReader Pro investieren, da die Konfiguration des VLC-Servers nicht so einfach ist. Wir konnten zum Beispiel problemlos über VLC einen DVB-T Transponder streamen, bei DVB-S klappte es aber nicht, da die aktuelle Version scheinbar einen Problem mit DVB-S Tunern hat. Installiert man eine ältere VLC Version, dann klappt der DVB-S Empfang zwar, dafür funktioniert das Streamen aber nicht mehr. Unser Fazit: IPTV in der Praxis ist gar nicht mal so kompliziert. Wir erzielten absolut brauchbare Resultate und mit einem 1000MBit/s Netzwerk braucht man sich nicht vor einer Überbelastung des Netzwerkes fürchten. Durch das Multicasting kann man beliebig viele IPTV-Receiver anschließen und mit XBMC kann man gleichzeitig auch auf ideale Weise auf Musik und Filme zugreifen, die entweder lokal auf dem USB-Speicher oder im Netzwerk vorhanden sind. Inzwischen hat die Raspberry Fan-Gemeinde auch schon diverse USB-Tuner zum Laufen gebracht und natürlich werden wir demnächst ebenfalls versuchen, auf Ba- sis des Rasperry Pi unseren eigenen „Linux-Receiver“ zu basteln. Auf jeden Fall ist der Raspberry Pi ein interessantes Gerät zum Basteln und wer sich mit Audio und Video beschäftigt bekommt so eine brauchbare Plattform für kleines Geld. www.raspberrypi.org Webseite der Raspberry Pi Stiftung. Hier findet man die wichtigsten Betriebssystem-Images zum Download, einen Wiki, ein Forum und Anleitungen. Außerdem werden hier fast täglich neue interessante Projekte vorgestellt. www.raspbmc.com Eine von vielen XBMC-Distributionen für den Raspberry Pi. Diese ist besonders einsteiger-freundlich. wiki.openelec.tv/index.php?title=Installing_ OpenELEC_on_Raspberry_Pi Wiki-Seite der OpenELEC XBMC Distribution für den Raspberry Pi. Diese scheint uns besonders ausgereift und bietet den größten Funktionsumfang. sources.openelec.tv/tmp/image Auf dieser offiziellen Seite kann das OpenELEC XBMC Image für verschiedene Plattformen, auch dem Raspberry Pi, geladen werden. Allerdings lässt sich dieses Image nur über Linux installieren. openelec.thestateofme.com Auf dieser Seite werden die OpenELEC XBMC Images für Raspberry Pi auch im windows-kompatiblen Format zur Verfügung gestellt. Diese können mit Image Writer auf die SD-Karte geflasht werden. Wählen Sie am Ende der Liste die neueste ZIPDatei (rXXXXX.img.zip). https://launchpad.net/win32-image-writer/+download Webseite des Image Writer für Windows. Dieses Tool schreibt die Firmware-Images auf die SD-Speicherkarten. www.tsreader.com/tsreader Webseite von TSReader. Für die Streaming-Funktion wird die Professional Version benötigt, die kostenpflichtig ist. www.videolan.org/vlc Wer lieber Gratis-Lösungen benutzt, sollte VideoLANs VLC probieren. Mit dieser Software ist es auch möglich, einen Transport-Stream zu demuxen und die enthaltenen Kanäle einzeln über separate IP-Adressen und/oder Ports zu streamen. Allerdings ist die Konfiguration doch weitaus komplizierter. 33 25. Here you can see both playlists: one for the Portuguese TDT transponder and one for the HOTBIRD 13.0E satellite transponder 26. If you prefer, you can merge the channels of different playlists into a single playlist. Here we see all streamed channels in one single playlist, despite the fact that these channels come originally from different tuners. 27. Naturally, XBMC has many more capabilities. Why not watch a movie? Almost all formats are recognized and supported, including subtitles and multiple audio channels. 28. Time for a break: watching the classic Metropolis. Did you know that this masterpiece can be downloaded for free, because the copyright expired long time ago? 29. Here a different movie, encoded and encapsulated differently (*.mp4): a recreation of the Space Odyssey, but using Lego actors… 30. XBMC can be adjusted to your preferences and needs. Just go to the settings menu. 31. Here you can setup every detail, including the weather settings. 32. We specified the location of our test centre. 33. There are many options to setup audio and video. The Raspberry Pi features a full HDMI connector and is capable of resolutions up to full HD at 1920x1080 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 157
  • 158.
    FEATURE New DVB Standards Extensionsto DVB-S2 158 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 159.
    • new enhancements allowfor higher data rates • more rectangular transponder spectrums provide more space for additional transponders • reducing sidelobs gives more space for more transponders • wide-band transponders add to efficiency • new modulation with 6 bits www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 159
  • 160.
    FEATURE New DVB Standards What‘scoming next after DVB-S2? Jacek Pawlowski The DVB-S2 standard was first published in 2005. While the performance it offers may still impress us nowadays, the advances in technology and growing demand for higher and higher data rates make the satellite industry search for even more efficient ways to transfer huge amount of data most notably the high demands generated by Ultra High Definition TV (UHDTV) and high speed IP services over satellite. Recently in TELE-audiovision 0708/2013 we have published a feature articles about the new UHDTV standard and the video compression standard HEVC, also known as H.265 – a successor of MPEG-4 (H.264). These new solutions require new hardware and software. It makes a good moment to improve also the modulation, coding and error correction standard as defined by the DVB-S2 standard. As the proposed improvements have not yet been blessed by the DVB organization we will call them the proposed extensions to DVB-S2. However, real hardware devices have been built and various test have been performed to prove these new concepts. These new DVB-S2 extensions are labelled as DVB-S2EB1, DVB-Sx or even DVB-S3 although such a standard does not yet officially exist in this moment. The proposed extensions can give a 20% increase in data rate compared to DVB-S2 in DTH (Direct-To-Home) broadcasts. For professional services, like VSAT communication, the gain can be as high as 64%. So, what exactly are these extensions? Here is our list: - reduction of the roll-off factors and the side lobes of digitally modulated carriers - use of wide bandwidth transponders - additional modulation: 64 APSK - more modulation and coding (MODCOM) schemes and forward error correction (FEC) choices and non-linear MODCOMs Not all of the extensions are easy to ■ Figure 1. With smaller roll-offs, transponders can be squeezed closer to one another. comprehend but in this features article we try to help you to get a general idea on most of them. The roll-off factor describes the shape of the transponder spectrum as seen on a spectrum analyzer. Its value tells you how close to an ideal rectangular the spectrum is. The smaller it is the more steep are the slopes of a transponder spectrum. DVB-S requires a roll-off of 35%, DVB-S2 of 20% and 25% while the the proposed S2 extensions aim at 15%, 10% and 5%. It is easy to understand that with smaller roll-offs one can position transponders closer to one another in the frequency domain and gain a free space for additional ones in the same Ku-Band or C-Band. However, not only (relatively) big rolloffs prevent closer location of the DVBS2 transponders. So called side lobes are normally present on both sides of the useful signal. These are unwanted artifacts after modulation. With today’s technology it is possible to practically get rid of them thanks to improved filtering. Once they are removed, the center frequencies of the neighboring transponders can be set closer to one another. If you take a look at Figure 2, you can come to the conclusion that even after removing side lobes and improving roll-offs, there is still some spectrum wasted between the transponders. And that’s why wideband transponders are the next trick in improving efficiency. Their throughput is increased to 72 Ms/ sec. When compared with the most popular 27.5 Ms/sec transponders, the wideband ones are three times wider in spectral view. Every new DVB standard introduces a new modulation schemes. DVB-S2 ended up with 32 APSK. The proposed extensions call for 64 APSK. In this modulation, every symbol is made up of 6 bits. Of course, the higher the order of modulation, the smaller the differences in amplitude and phase between similar symbols. We can send more data in the 160 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 161.
    ■ Figure 2.Reducing side lobes by more efficient filtering contributes to better bandwidth utilization. same bandwidth but the signal is more sensitive to interference and noise. 64 APSK will be used in professional setups with large antennas rather than in DTH transmissions. Probably the same goes true for the last extension mentioned in the beginning of this article: more MODCOM and FEC values. These parameters generally describe how big overhead is introduced in the data stream to the useful payload. The overhead in bit rate is needed for error correction. Once we have more possibilities here, we can almost smoothly change the proportion between useful and corrective bits in order to find a minimum overhead still ensuring faultless processing. Such thing is possible when we have a pointto-point two-way communication. In case of a reception problem, the system automatically adjusts MODCOM/ FEC. Also the wideband transponders described above require the reception system to be of a higher performance because the carrier-to-noise ratio degrades proportionally with the bandwidth increase. The best way to maintain a good C/R is to use a bigger dish. Therefore, it is not certain if wideband transponders will be used for DTH broadcasts. After all, not too many end users will be eager to replace their 6090 cm dishes with larger ones. That’s why the experts assume that in DTH transmissions only about 20% increase in the efficiency is realistic while in professional links even 64% would be possible. Anyway, we can not say today which particular extension proposals will be included in the eventual settlement of the DVB-S3 standard. Maybe only some of the above, maybe all of them. We will not be surprised though if brand new concepts are worked out in meantime and included in the new standard. One thing is for sure: the improvements will enable higher useful data rates in the existing satellite communication channels and this will be an important factor enabling UHDTV and other wideband services. Wideband transponder ■ Figure 3. Wideband transponders use frequency spectrum more efficiently. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 161
  • 162.
    DIGITAL TECHNOLOGY New Developments TakeAdvantage Read TELE-audiovision's Technical Feature Stories to Know All About the Digital Developments and New Technical Breakthroughs Enjoy Reading TELE-audiovision FREE on Your Tablet Computer www.TELE-audiovision.com 162 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 163.
    Self-made IPTV Self-made IPTV www.TELE-audiovision.com/TELE-audiovision-1311/eng/feature-satip4.pdf www.TELE-audiovision.com/TELE-audiovision-1307/eng/feature-satip2.pdf NewDVB Extensions Ultra High Definition www.TELE-audiovision.com/TELE-audiovision-1311/eng/feature-dvbs3.pdf www.TELE-audiovision.com/TELE-audiovision-1307/eng/feature-hevc.pdf Self-made IPTV Self-made IPTV www.TELE-audiovision.com/TELE-audiovision-1309/eng/feature-satip3.pdf www.TELE-audiovision.com/TELE-audiovision-1305/eng/feature-satip1.pdf Ultra High Definition TV Phase Shifts in Digital TV www.TELE-audiovision.com/TELE-audiovision-1309/eng/feature-uhdtv.pdf www.TELE-audiovision.com/TELE-audiovision-1303/eng/feature-iqswap.pdf www.TELE-satellite.com — 06-07/2012 — TELE-satellite International International — 全球发行量最大的数字电视杂志 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision — The World‘s Largest Digital TV Trade Magazine 163
  • 164.
    DIGITAL TECHNOLOGY New Developments DigitalTerrestrial TV - 2nd Level DVB-S2: Hide the SD inside the HD www.TELE-audiovision.com/TELE-audiovision-1301/eng/feature-atsc2.pdf www.TELE-audiovision.com/TELE-satellite-1207/eng/feature-h8psk.pdf The Secret Special Transmission Modes How a tuner for VCM operates www.TELE-audiovision.com/TELE-satellite-1209/eng/feature-transmission.pdf www.TELE-audiovision.com/TELE-satellite-1205/eng/dvb-S2-vcm.pdf All About Fiber Optic Connectors DVB-S2 MIS Reception with VCM/ACM www.TELE-audiovision.com/TELE-satellite-1209/eng/feature-optical.pdf www.TELE-audiovision.com/TELE-satellite-1201/eng/tenow-TBS6925.pdf Basic Knowledge: Polar Mount Antennas Automatic Creation of 3D www.TELE-audiovision.com/TELE-satellite-1207/eng/polarmount.pdf www.TELE-audiovision.com/TELE-satellite-1109/eng/2d3dconversion.pdf 164 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 165.
    How a SiliconTuner Works How the SFN Modulation Works www.TELE-audiovision.com/TELE-satellite-1107/eng/silicontuner.pdf www.TELE-audiovision.com/TELE-satellite-1103/eng/sfn.pdf Channel Capacity of a Transponder How HbbTV Works www.TELE-audiovision.com/TELE-satellite-1107/eng/sdinhd.pdf www.TELE-audiovision.com/TELE-satellite-1101/eng/hbbtv.pdf CI+ and HD+Encryption How DVB-C2 Works www.TELE-audiovision.com/TELE-satellite-1107/eng/CI+HD+.pdf www.TELE-audiovision.com/TELE-satellite-1009/eng/dvb-c2.pdf How MPEG Surround Works Streaming TV via the Internet www.TELE-audiovision.com/TELE-satellite-1105/eng/mpeg-surround.pdf www.TELE-audiovision.com/TELE-satellite-1007/eng/streaming.pdf www.TELE-satellite.com — 06-07/2012 — TELE-satellite International International — 全球发行量最大的数字电视杂志 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision — The World‘s Largest Digital TV Trade Magazine 165
  • 166.
    DIGITAL TECHNOLOGY New Developments TestingHorizon to Horizon Actuator Matching LNB with Dish www.TELE-audiovision.com/TELE-satellite-1005/eng/h-h-actuator.pdf www.TELE-audiovision.com/TELE-satellite-0811/eng/lnb+dish.pdf How SCR Works How to Calculate the Power Factor www.TELE-audiovision.com/TELE-satellite-0911/eng/scr.pdf www.TELE-audiovision.com/TELE-satellite-0809/eng/powerfactor.pdf How Decoding Works How to Solve Problems with DiSEqC www.TELE-audiovision.com/TELE-satellite-0909/eng/decoding.pdf www.TELE-audiovision.com/TELE-satellite-0807/eng/diseqc.pdf How ABS-S Works How the 3D Diffractive Antenna Works www.TELE-audiovision.com/TELE-satellite-0903/eng/abs-s.pdf www.TELE-audiovision.com/TELE-satellite-0805/eng/3ddiffractive.pdf 166 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 167.
    Relation between DishSize and EIRP How MPEG Works www.TELE-audiovision.com/TELE-satellite-0803/eng/dishsize.pdf www.TELE-audiovision.com/TELE-satellite-0707/eng/mpeg.pdf Secrets of the Aspect Ratio Secrets of Antenne Alignment www.TELE-audiovision.com/TELE-satellite-0801/eng/aspectratio.pdf www.TELE-audiovision.com/TELE-satellite-0705/eng/performance.pdf How the Network Connection Works The Secrets of HDMI www.TELE-audiovision.com/TELE-satellite-0711/eng/networkconnections.pdf www.TELE-audiovision.com/TELE-satellite-0703/eng/hdmi.pdf How the Ka Band Works The Relation of Dish Size and EIRP www.TELE-audiovision.com/TELE-satellite-0709/eng/kaband.pdf www.TELE-audiovision.com/TELE-satellite-0701/eng/dishsize.pdf www.TELE-satellite.com — 06-07/2012 — TELE-satellite International International — 全球发行量最大的数字电视杂志 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision — The World‘s Largest Digital TV Trade Magazine 167
  • 168.
    OVERVIEW Vitor’s Workshop How to get themost out of technology AZBox Ultra HD Recovery Satellite Reception in the Ka-Band www.TELE-audiovision.com/TELE-audiovision-1307/eng/vitorsworkshop.pdf www.TELE-audiovision.com/TELE-audiovision-1305/eng/vitorsworkshop.pdf 168 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 169.
    Oscilloscope for BasicUse Chip Flashing www.TELE-audiovision.com/TELE-audiovision-1303/eng/vitorsworkshop.pdf www.TELE-audiovision.com/TELE-audiovision-1205/eng/vitorsworkshop.pdf Two-axis Motor Control Add-On for SPAUN Signal Analyzers www.TELE-audiovision.com/TELE-audiovision-1211/eng/vitorsworkshop.pdf www.TELE-audiovision.com/TELE-audiovision-1203/eng/vitorsworkshop.pdf Selfmade Dish Upgrade for 8dtek Satellite Meters www.TELE-audiovision.com/TELE-audiovision-1209/eng/vitorsworkshop.pdf www.TELE-audiovision.com/TELE-audiovision-1201/eng/vitorsworkshop.pdf Digital Picture Frame Receiver Firmware www.TELE-audiovision.com/TELE-audiovision-1207/eng/vitorsworkshop.pdf www.TELE-audiovision.com/TELE-audiovision-1111/eng/vitorsworkshop.pdf www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 169
  • 170.
    PRODUCT REPORT Hochfrequenzfilter Filter von MFC • bietetHF-Filter für alle Anwendungen an • besonders erfolgreich im Bereich C-Band Filter • hochspezielle Filter im Angebot, z.B. gegen WiMAX-Störungen • Hoch- und Tiefpassfilter lassen sich kombinieren und können Frequenzweichen ersetzen 170 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 171.
    www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 171
  • 172.
    PRODUCT REPORT Hochfrequenzfilter Die vielenVorteile von HF-Filtern Normale Endanwender, die sich eine einfache Ku-Band Satellitenanlage aufbauen, brauchen außer der Antenne, dem LNB, einem Receiver und dem LNBKabel kein weiteres Zubehör. Möchte man aber tiefer in den Satellitenempfang einsteigen und eine Kabelkopfstation betreiben oder gar eine Satelliten Uplinkstation, dann braucht man oftmals ganz besonderes Zubehör wie Hochfrequenzfilter. Es gibt weltweit nur sehr wenige Hersteller, die solche Spezialprodukte anbieten. Einer davon ist ist MFC (Microwave Filter Co., Inc.), die sich auf Filter und Zubehör im Hochfrequenz-Band spezialisiert hat, genauer gesagt für den Frequenzbereich von 5 Hz bis 50 GHz. Die Produktpalette von MFC umfasst Wellenleiter, dielektrische Resonatoren, Frequenzweichen, Filter, Lastwiderstände (gewöhnlich als Dummy Loads bezeichnet), Adapter und weiteres Zubehör. Besonder nachgefragt sind Filter für das C-Band, denn hier treten sehr häufig Störungen auf, die man mit einem solchen Filter beseitigen kann. Filter für HF-Anwendungen dienen hauptsächlich dazu, ungewünschte Signale zu eliminieren. Diese Störsignale machen sich meist nicht nur auf einer einzigen Frequenz bemerkbar, sie beeinflussen oftmals auch benachbarte Frequenzen negativ und können aktive Elemente im System, zum Beispiel 1 2 3 1. A sample spectrum: the signal level is high over a great frequency range, no filter is used. 2. Using a high pass filter: only frequencies above the cutoff frequency pass the filter, low frequencies are attenuated substantially. 3. Using a low pass filter: only frequencies under the cut-off frequency pass the filter, high frequencies are attenuated substantially. 4. Band-Pass filter: combining both a high pass filter with a lower cut-off frequency and a low pass filter with a higher cut-off frequency. The result is that the centre band will pass the filter with minimal attenuation. 5. Band-Rejection filter: in this case a low pass filter with a low cut-off frequency is combined with a high pass filter with a high cut-off frequency are combined. The result is that the centre band is attenuated substantially. 4 5 172 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 174.
    ■ Example witha UHF filter of a pay TV operator: The left picture shows the whole CATV spectrum without any filter. The right picture shows the result of using a low pass filter with a cut-off frequency of 296 MHz. ■ The new catalogue by MFC gives an extensive overview of all available filters made by MFC. The catalogue can also be downloaded diretly off their website: www.microwavefilter.com 174 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com Verstärker, zur Fehlfunktion verleiten. Deshalb filtert man am besten die nicht benötigten Frequenzbereiche, in denen sich die störenden Signale befinden, heraus. Ein vorhandenes Signal kann unterschiedlich gefiltert werden. Zum einen kann man einfach nur Signale unter oder über einer gegebenen Frequenz filtern. Dazu setzt man Tiefpassfilter und Hochpassfilter ein. Ein Tiefpassfilter läßt die Frequenzen unter der Grenzfrequenz durch, während die Frequenzen über der Grenzfrequenz stark gedämpft werden. Bei Hochpassfilter ist es entsprechend umgekehrt: unter der Grenzfrequenz wird das Signal gedämpft und darüber kommt das Signal fast ungedämpft durch. Kombiniert man einen Hochpassfilter mit niedriger Grenzfrequenz mit einem Tiefpassfilter mit hoher Grenzfrequenz kann man sogar ganz gezielt nur einen Frequenzbereich durchlassen. In diesem Fall spricht man von einem Bandpassfilter. Benutzt man hingegen einen Tiefpassfilter mit einem Hochpassfilter, der eine höhere Grenzfrequenz aufweist, dann wird der mittige Frequenzraum gefiltert, das Ergebnis ist ein so genannter Sperrfilter, auch Rejection-Filter genannt. Wofür sind solche Filter gut? Zum einen können so verschiedene Receiver mit individuellen Frequenzbändern versorgt werden, ohne dass sich die Receiver ein Frequenzband teilen müssen. Dies geschieht zum Beispiel in der SCR-Verteilung (Single Cable Routing), in welcher bis zu 8 Receiver in Serie an einem Kabel individuell
  • 175.
    die Satellitenprogramme wählen können..Jedem Receiver wird ein eigenes Frequenzband zugewiesen und der Router moduliert in dieses Frequenzband den gewünschten Transponder. Netzwerkbetreiber nutzen Filter auch in analogenCATV Netzwerken, um Kunden mit „kleinen“ Abos davon abzuhalten, alle Kanäle zu empfangen. Die Premium-Kanäle werden einfach auf höheren Frequenzen abgelegt und ein oftmals verplombter Tiefpassfilter am Hauseingang verhindert den Empfang dieser Kanäle. Ein weitaus wichtigerer Grund Filter einzusetzen ergibt sich jedoch aus dem Umstand, dass sich benachbarte Signale oftmals gegenseitig stören. Leider drängen sich immer mehr verschiedene Applikationen in das eingeschränkte Frequenzspektrum und selbst die strengsten Vorschriften und Frequenztabellen können nichts gegen diese Störungen bewirken. Ein bekanntes Praxis-Beispiel sind zum Beispiel Störungen im DVB-T/T2 Bereich, die durch das LTE-Signal hervorgerufen werden. Laut Normen sollten alle Anwendungen im Frequenzspektrum ungestört nebeneinander in den jeweils zugeteilten Frequenzen funktionieren. Die Realität ist aber zu oft ander. Allgemein wird Interferenz in der Hochfrequenz durch verschiedene Phänomen hervorgerufen. In den Receivern: - Störungen durch benachbarten Frequenzen - Störungen im Frequenzbereich der ZF (ZF = Zwischenfrequenz) - Störungen im Frequenzbereich der LO- Frequenz (LO = Lokaler Oszillator) Aber auch im Sender treten Störungen auf: - Neben der Emissionsfrequenz treten auf naheliegenden Frequenzen oftmals ungewollte Ausstrahlungen auf, die durch den Modulator erzeugt werden - Oberwellenemissionen - Störemissionen die durch Intermodulation entstehen Neue Hochfrequenz Filter von MFC für das C-Band Model 18253 - C-Band (INSAT) Transmit Reject Filter • This TRF provides deep rejection of the transmit band with minimal effect on the receive band. • Ideal for INSAT and other Region-Specific Receive Applications • Alternate Flange Configurations are Available Upon Request Pass band 4.5 - 4.8 GHz (C-INSAT Downlink) Insertion Loss 0.50 dB Max VSWR 1.30:1 Max Reject Band 6.725 - 7.025 GHz (C-INSAT Uplink) Rejection 80 dB Min Operating Temperature Range -10°C to +60°C Flanges CPR229G Dimensions 3.95” x 3.88” x 2.75” (100mm x 98mm x 70mm) Finish Gloss White Lacquer Model 18323 - C-Band (INSAT) Receive Reject Filter Um einen passenden Filter auswählen zu können, sollte man die vom Hersteller angegebenen Parameter verstehen. Hier die Erklärung einiger der wichtigsten Parameter: - Dämpfung (Attenuation) Die Dämpfung gibt in Dezibel an, um wie viel das Eingangssignal abgeschwächt wurde. Dazu wird der Signalpegel am Eingang und am Ausgang gemessen, weshalb die Dämpfung in Dezibel (dB) angegeben wird. - Bandbreite (Bandwidth) Dieser Parameter gibt die Bandbreite eines Bandpassfilters an, also der Frequenzbereich, der mit einer relativen Durchgangsdämpfung von maximal 3 dB den Filter durchquert. - Grenzfrequenz (Cut-Off Frequency) Hier handelt es sich um die Frequenz, ab welcher Hochpassfilter und Tiefpassfilter anspringen. - Dezibel (Decibel) Dieser Wert gibt das Verhältnis zweier Signale (P1 und P2) anhand der folgenden Gleichung an: dB = 10 Log10 (P1/P2) • Same as before but rejection of the receive (Downlink) band Passband 6.725 - 7.025 GHz Insertion Loss 0.10 dB Approx. VSWR 1.22:1 Max Reject Band 4.5 - 4.8 GHz Rejection 80 dB Typ Flanges CPR137/CPR137G Dimensions 5.00“ x 2.69“ x 1.94“ (127mm x 68mm x 49mm) Finish White Lacquer Model 18506 - Multi-Purpose C-Band Transmit Filter • This Uplink filter not only rejects the entire receive band (below 4.2 GHz), but it also rejects transmissions from other potential sources of interference etc., that RRFs do not. • Ideal for use in high-density transmit paths, like: Wireless Services (Point-Multipoint) 4.55 - 4.9 GHz Maritime & Aeronautical Radio Navigation 4.2 - 5.6 GHz Broadcast Auxiliary Services 6.95 -7.15 GHz • Ideal for all “standard band” C-Band Uplink Applications • Easy bolt-on installation and no power supply required Passband 5.925 - 6.425 GHz Passband Loss 0.3 dB Max Passband Return Loss 17.7 dB Min Rejection 50 dB Min @ 5.625 GHz 40 dB Min @ 6.725 GHz Power Rating 400 Watts Flanges CPR137F Dimensions 9.50” x 2.69” x 1.94” (241mm x 68mm x 49mm) Finish Gloss White Lacquer www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 175
  • 176.
    - Durchgangsdämpung (Insertion Loss) Wiebei jedem anderen aktiven oder passiven Element, das zwischen der Antenne und dem Receiver/Sender geschaltet wird, verursacht auch der Einsatz eines Filters eine Dämpfung des gesamten Signals. Dieser Parameter gibt diese Dämpfung an, die möglichst klein (unter 3 dB) sein sollte. - Phasenverschiebung (Phase Shift) Dieser Parameter gibt die Laufzeitverschiebung des Signals an, das durch den Filter verursacht wird. Gewöhnlich macht sich diese Laufzeitverschiebung mit steigender Frequenz umso mehr bemerkbar und kann besonders in digitalen Signalen Probleme verursachen. Probleme im C-Band Das C-Band wird besonders durch WiMAX und Radar-Applikationen, konkret von Wetter-Radar Anwendungen,gestört. Um den C-Band Empfang ungestört nutzen zu können empfiehlt es sich deshalb, Bandpassfilter einzusetzen, die nur genau den benötigten Frequenzbereich durchlassen. Im C-Band wird das Standard C-Band und das erweiterte C-Band unterschieden. In einigen Regionen ist der Frequenzbereich des C-Bandes obendrein etwas unterschiedlich, zum Beispiel in Russland. Je nach Frequenzband muss man daher passende Filter benutzen. In den letzten Jahren hat sich besondersWiMAX („Worldwide Interoperatibility for Microwave Access“) zum Kummerkandidaten entwickelt. Dieser Internet-Zugang über Funk spielt sich in den Frequenzbändern von 2300MHz, 2500MHz und 3500MHz ab und hat deshalb das Potential, die C-Band Ausstrahlung nachhaltig zu stören. Die normale Maßnahme besteht darin, einen hoch selektiven Bandpassfilter einzusetzen, dessen Frequenzbereich dem regionalen Footprint entspricht (zum Beispiel 3700-4200 MHz, 3400-4200 MHz, usw.). Seit nicht allzu langer Zeit, wurde WiMAX aber auch weltweit im Frequenzband von 3400-3800 MHz in Betrieb genommen. Die daraus resultierenden Inband-Interferenzen im C-Band können diesmal aber nicht einfach mit den gängigen Bandpassfiltern eliminiert werden, denn wenn zum Beispiel ein WiMAXSender auf 3700 MHz den C-Band Empfang von 3700-4200 MHz stört, wird ein gewöhnlicher Bandpassfilter alle Frequenzen von 3700-4200 MHz ungefiltert durchlassen, also auch das störende WiMAX Signal. In diesem Fall ist deshalb ein besonderer Filter notwendig, der das Signal zum Beispiel erst ab 3750 MHz durchlässt. Filter in diesem HF-Bereich sind jedoch komplex aufgebaut und entsprechend ist für die Entwicklung viel Erfahrung notwendig. Außerdem bedarf es spezieller Fertigungsprozesse, denn hier sind nicht einfach nur elektronische Schaltungen im C-Band TX(MHz) RX (MHz) Standard 5850–6425 3625–4200 Extended 6425–6725 3400–3625 Neue Hochfrequenz Filter von MFC für das C-Band Model 13961W-I - International (Extended) C-Band Interference Elimination Filter • No other filter in the industry provides as much rejection of undesired signals in such a compact size. • Eliminates WiMAX, RADAR and virtually all other sources of out-of-band interference • Lightweight - Aluminium Construction • Ready to install between LNB & feed horn Pass band 3.6 - 4.2 GHz Pass band Loss 0.5 dB Typ @ centre band 0.5 dB Typ roll-off @ band edges Pass band VSWR 1.5:1 Typ Group Delay Variation 8 ns Max Rejection 45 dB Typ @ 3.55 GHz / 4.25 GHz 55 dB Typ @ 3.45 GHz / 4.35 GHz 70 dB Typ @ 3.40 GHz / 4.40 GHz Flanges CPR229G (Input), CPR229F (Output) Length 5.49“ (13.9 cm) Weight 1.125 lbs. (0.51 Kg) Finish Gloss White Lacquer Einsatz – die hochfrequenten Signale verbreiten sich auch ohne elektrischen Leiter, weshalb die Filter in diesem Fall hauptsächlich aus Hohleitern bestehen. Überhaupt: schaut man sich als Laie einen dieser Filter an fragt man sich zuerst, wie und wo man dieses überhaupt anschließen muss. Die Antwort ist ganz einfach: direkt an der Antenne zwischen dem Feed und dem LNB/LNA. Der Fertigungsprozess von dieser Art von Filtern besteht daher zum großen Teil aus Fräsen mit Hilfe einer computergesteuerten Maschine, die Fräsbahnen werden mit spezieller CAM Software berechnet. Für das CBand ist MFC weltweit der führende Anbieter von Fil- 176 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com tern zur Eliminierung von Interferenzen. Kein anderes Unternehmen bietet eine derart große Palette von Filtern an, sei es um Radar, WiMAX oder jedes andere interferierende Signal zu filtern. Einen Einblick in das umfangreiche Filtersortiment bietet die Auflistung neuer Filter, die MFC kürzlich in seine Produktion aufgenommen hat. Die wichtigsten davon stellen wir den TELE-audiovisions Lesern hier vor. Es führt kein Weg um MFC vorbei, wenn im CBand Filter eingesetzt werden müssen. Dieses Unternehmen hat sich auf die Entwicklung und Fertigung dieser Filter spezialisiert und bietet mit seinen Produkten erstklassige Charakteristiken an.
  • 178.
    Firmen Report Digital TVInternet Forum BSD, Brasilien 10 Jahre BSD Internet Forum, Brasilien ■ Hier in Jundiai hat Marcos Benni sein neues Office für BSD eingerichtet 178 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 179.
    • größtes Internet Forumin Brasilien über Digital TV • erreicht jeden Monat mehr als 400.000 Leser • startet mit einem Video Shop eine neue Form des Online Shopping für Digital TV Produkte • auch im Bereich IPTV und IP Radio aktiv BSD sagt Danke 10 Jahre BSD waren nur möglich durch die großartige Mitarbeit aller, die Informationen über Satelliten und terrestrische Sender eingesandt haben. Ermöglicht wurden 10 Jahre BSD auch durch die Partnerschaften des BSDPortals, welche die Arbeit unterstützt haben. Ein spezieller Dank an die Hobbyfreunde, Antenneninstallateure, Techniker, Ingenieure und Direktoren der Satelliten- und TV-Sender. Ein besonderer Dank geht an: Gilson Teles für seine Nachrichten und Reportagen im BSD SatClub Forum, Danilo Rodrigues für die Programmierung der BSD Website und für alle sonstigen IT Arbeiten, Valdecir Adorno und Francisco Crispim für ihre unermüdliche Mitarbeit im Bereich der Satellitenkanäle im BSD SatClub Forum Marcos Benni portalbsd.com.br www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 179
  • 180.
    Firmen Report Digital TVInternet Forum BSD, Brasilien Neues Konzept bei BSD Im Oktober 2003 ging das brasilianische Internetforum BSD unter der Adresse portalbsd.com.br online. Das Forum, das sich mit allen Themen des digitalen Empfangs beschäftigt, ist das Produkt von Marcos Benni, der selbst ein begeisterter Satelliten DXer ist. In TELE-audiovision 12-01/2012 hatten wir über ihn berichtet und seinen rie- sigen 5m Spiegel gezeigt. Mittlerweile hat sich einiges getan und der 10. Geburtstag seines Internet Forums war eine gute Gelegenheit nachzufragen, wie es heute um BSD steht. Denn Marcos Benni hat großes Neues vor: er hat ein brandneues Office bezogen und ist dabei, mit einem neuen Konzept einen Internet-Handel zu star- ten. „Meine Idee ist, die Produkte in kurzen Videos vorzustellen. So wird es für jeden Interessierten viel einfacher zu verstehen, wozu die Produkte gut sind und wofür sie verwendet werden können.“ Damit dies professionell geschieht hat er in seinem neuen Office ein echtes TV-Studio eingerichtet. Bei unserem Besuch befand sich noch alles im Umbau, mit Erscheinen dieser TELEaudiovision aber soll bsdshop.com.br bereits voll in Betrieb sein. „Anbieten werde ich alle Produkte des Digitalen TV, von Satellitenspiegeln über normale und fiberoptische LNB bis zu Kabeln und allen Arten von Receivern und Satfindern,“ listet Marcos Benni, von jedermann nur Benni ge- ■ Marcos Benni in seinem Büro. Gerne liest er die TELEaudiovision, die regelmäßig über Firmen aus Brasilien berichtet - wie auch über seine Firma BSD. 180 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 182.
    nannt, auf. Aberdaneben ist Benni auch im Bereich IPTV aktiv: „Ich habe hier einen IPTV Showroom eingerichtet, in dem interessierte TV Betreiber die notwendige Technik im Live-Einsatz sehen können und ich die Funktion erläutern kann.“ Nicht nur das, auch IP-Radio ist ein Hobby von Benni und er kann die dafür notwendige Technik jedem Interessierten anbieten. „Ab Oktober 2013 sende ich auch wieder Radio BSD über das Internet, diesmal über Shoutcast.“ In den 140 Quadratmetern seines neuen Office hat Benni alles untergebracht, was er für seine neue Aktivitäten plant. „Mit 400.000 Besuchern jeden Monat, davon 80% aus Brasilien, gehört mein Forum zu den größten des Landes.“ verweist Benni auf die beeindruckenden Abrufzahlen von portalbsd. com.br Jeder, der sich in Brasilien im Bereich digital TV informieren will tut dies über sein Forum. „Ich habe hier im Office mehrere Satellitenspiegel installiert, mit denen ich alle empfangbaren Programme sehen kann und auch die Nachrichtensektion meines Forums upto-date halten kann.“ Benni zeigt hier auf die Spiegelreihe, die von den 3m C-Band Spiegeln bis hin zu den kleineren Ku-Band Spiegeln reicht. Benni hat sich in seinem neuen Office den Traum eines jeden Satelliten DXers verwirklicht. Mit dem neuen Shop auf Basis von Produktvideos will er den Erfolg seines Internet Forums nun auch kommerziell anwenden. Viel Erfolg dabei für die nächsten 10 Jahre! ■ Von der Seitenstraße aus sieht man die Spiegelparade auf dem Dach des BSD Office ■ In TELE-audiovision Ausgabe 12-01/2012 berichteten wir erstmals über Marcos Benni und sein Internet Forum BSD. Der vollständige Bericht kann hier nachgelesen werden: www.TELE-audiovision.com/TELE-satellite-1201/eng/bsd.pdf 182 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 183.
    ë Jundiaí (São Paulo) ■ Hierlanden die telefonischen Bestellungen der BSD-Kunden. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 183
  • 184.
    2 1. In derRezeption werden Kunden empfangen, die direkt zur BSD-Zentrale kommen 2. Kleine Auswahl der Digital TV Receiver, die Benni im BSD Shop anbieten wird 1 184 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 186.
    ■ Noch istdas TV-Studio nicht fertig eingerichtet, aber erste Testaufnahmen laufen schon. Hier präsentiert Gilson Teles den fiberoptischen LNB von GlobalInvacom, den BSD in Brasilien bekannt machen will. 186 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 187.
    ■ Benni inseinem Element: im Regieraum seines neuen TV-Studios hat Benni das Video Mischpult und seine PCs aufgebaut. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 187
  • 188.
    COMPANY REPORT Fibre OpticManufacturer GlobalInvacom, UK Two Million Connections with GlobalInvacom‘s FibreIRS 188 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 189.
    • Invented the newsatellite IF transmission technology via fibre optics • Five million FibreIRS connections are expected by 2015 • Through continuous technological improvements FibreIRS can now serve more than 4000 connections from a single LNB; for professional applications it's several 10,000's • 14 Multiple R&D Engineers are consistently working to improve the system • Northern Europe, North Africa and Southeast Asia are the largest FibreIRS markets ■ GlobalInvacom's headquarters in Stevenage north of London. GlobalInvacom used to occupy only the left hand side of the building, now they have leased the right side as well. That's where you'll find their FibreIRS R&D group. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 189
  • 190.
    COMPANY Report Fibre OpticManufacturer GlobalInvacom, UK Congratulations! Five Years of Fibre Optic Systems from GlobalInvacom Alexander Wiese 190 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 191.
    ë Stevenage ■ Ivan Horrocksis happy: GlobalInvacom's FibreIRS system is celebrating its fifth birthday with two million users connected to optical satellite signals. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 191
  • 192.
    1. Gary Staffordis responsible for GlobalInvacom's business development. He came up with the idea in 2007 to distribute the satellite IF of an LNB via fibre optic cables. From there came the FibreIRS products. 2. Matt Presdee looks after their Technical support for the sales department and is very familiar with the wiring of GlobalInvacom's devices. Here we see him on the balcony of GlobalInvacom's headquarters in Stevenage north of London. Using a number of satellite dishes (equipped, of course, with GlobalInvacom fibre optic LNBs) he tests their products. 3. Dr. Andrew Collar is especially familiar with optical technology. Here he is performing experiments with an optical polarization controller to determine the system performance characteristics of an optical system. 4. Mike Jones is one of the principle technical designers for the optical system 1 In 2008 the first fibre optic LNB was introduced by GlobalInvacom. This made it possible to carry a satellite signal from a fibre optic LNB across miles of fibre optic cable and then, even more importantly, split it multiple times without any concern for signal attenuation. Five years have gone by since then so we wanted to know how things were going with fibre optic technology; has it been successful? The answer to this question is a resounding YES! This is true even though this involves a completely new technology; distributing satellite signals via coaxial cable is still standard today. Coax technology has long been a proven method and has been in use for more than 100 years. A fundamentally new technology would be difficult to push through - it would have to have many advantages and these advantages would have to be obvious. Sure enough, Ivan Horrocks, GlobalInvacom‘s Sales Director, says the FibreIRS system has been a great success: „In the five years since its introduction, we estimate that this technology has been used to connect in excess of two million households.“ Over the past several years GlobalInvacom has continued to develop this fibre optic technology under the name FibreIRS (Fibre Integrated Reception System). Especially interesting is the expansion to terrestrial TV signals such that today GlobalInvacom‘s system can be simultaneously used for satellite signals as well as terrestrial TV signals. Ivan Horrocks explains to us how this all got started: „Gary Stafford came up with the original idea.“ He runs the Business Development section and began working on an LNB system that distributed signals via fibre optic cable. „Our first FibreIRS product was still fed directly from the LNB and distributed the signal through a 16-way split regime.“ An improved model was introduced in 2009 where the LNB signal could be distributed so a maximum of 32 users could be connected directly to the fibre optic satellite signal. „In 2010 we expanded the system again by introducing the ODU32 which allowed terrestrial TV signals to be added. In 2011/2012 we introduced the wholband splitter which allowed us to combine 4 X ODU32’s together catapulting the maximum number of subscribers to 256. But this was still not enough.” But it still wasn‘t enough: „Our newest system is the just recently devel- oped O2E Converter: with this system we can connect sixty four 64-output ODU32’s.“ This results in an incredible 64 x 64 = 4096 connections, all fed from a single LNB that can be installed on a single satellite antenna installed in an optimal location since distances are not a factor when using a fibre optic signal distribution system. GlobalInvacom FibreIRS product sales have been increasing 20% year after year. „Of course, this is subject to fluctuations“, we learn from Ivan Horrocks, „Our largest market is northern Europe. There we sell 40 -50% of all our fibre optic products. Another important market is MENA (the Middle East and North Africa), 20% of our fibre optic products are shipped there.“ He sees the strongest growth in Southeast Asia: „Sales have greatly increased there. Right now it encompasses about 30% of our fibre optic products.“ GlobalInvacom‘s best-selling fibre optic product is the Quattro model. „Multiswitches are connected to these and are therefore best suited for smaller communities.“ The highest growth can be seen with the Quad model: „Four receivers can be directly connected to this model and is the best way to go with individual reception in homes (Direct-to-Home).“ As you can see, more and more private homes as well as the installation in single apartments or houses are opting for GlobalInvacom‘s fibre optic system. And there‘s even more news from GlobalInvacom. Business Development Manager Gary Stafford tells us more: „In 2012 we acquired the two produc- 192 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 193.
    2 3 4 tion operations inChina that produce our fibre optic products; we have been trading since then as a Plc on the Singapore stock exchange.“ Because of this and also because of the steadily increasing number of employees, the total number of employees right now totals 1600. „About 1200 of those are involved in production“, explains Gary Stafford, „In Great Britain there are about 300 employees and in our branch offices in the USA, Singapore and Ma- www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 193
  • 194.
    ■ A monitorin the main reception area shows the FibreIRS system in action with the pictures then being relayed by the new wireless link. laysia there are another 100 workers.“ GlobalInvacom has 60 engineers in their R&D group and they focus on new products and the further development of existing products. „14 engineers in the R&D group work on the FibreIRS product line.“ This is quite amazing considering that at the beginning of FibreIRS development in 2007 there was only one single developmental engineer. It comes as no surprise that GlobalInvacom consistently introduces new fibre optic products. „We‘re opening a completely new segment within the fibre optic system with a converter set that would take the frequency range starting at 87 MHz all the way up to 2300 MHz and convert it into the optical range. This product is ideal for the transmission of a single satellite polarization level simultaneously with ter- restrial signals.“ In this way GlobalInvacom‘s fibre optic system will also be compatible with C-band systems where usually only one polarization level would be carried. „Especially interesting is the very low price of this new system consisting of the coax-fibre converter and the corresponding fibre-coax converter“, comments Ivan Horrocks. „You don‘t even need any special knowledge of fibre optics in order to install this system and thanks to this system you can span 194 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 196.
    ■ Another newGlobalInvacom product: the development of the tvLNK HD system. The HDMI signal, for example from a satellite receiver is distributed using a standard coaxial cable. Using a wideband splitter the HDMI is split into four receivers; allowing four TV's to be connected to one HDMI source. It is noteworthy to mention that additional services such as Digital TV and satellite can be combined onto the same coax cable using the loop through. Being in the tvLINK family means that remote control functions are passed back along the coax to enable changes from each remote location. The addition of a USB dongle enables further expansion to connect a number of streaming devices via a local router. 196 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 197.
    extreme distances thatyou couldn‘t do with standard coax cable.“ This new system that can carry a single satellite polarization level is further enhanced with another new system for fibre optic cables. „For our professional systems we offer pre-made cables but now you can get fibre optic cables from us that can be fashioned by the installer on-site easily and with very little effort. We use cable with the same quality as G657A2 cable except that it can be prepared using an easier and less expensive splicing device.“ This would allow the installer to utilize precise cable lengths by simply cutting them from a roll of cable. This would be much easier for the installer. In upcoming issues of TELE-audiovi- sion we will be highlighting the many new GlobalInvacom FibreIRS products in much more detail in product tests. GlobalInvacom is even involved in the area of reconverting the optical signal: there will soon be new products here as well. Five years ago GlobalInvacom began moving in a direction away from ancient coax cable technology towards the future of optical signal transmission with its enormous bandwidth and extremely low attenuation. The technology of the future is being offered by GlobalInvacom today. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 197
  • 198.
    5. Using awhiteboard, Matt Presdee describes the new O2E FibreIRS with which up to 4096 fibre optical connections can be set up. 6. The new O2E system. The highlight: the original fibre optic signal from the LNB is routed to a second optical converter through the loop-through output. Using splitters the signal can be divided as often as needed. 5 6 198 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 199.
    7 8 10 9 11 7. Here wesee a Quad GTU connected to a 32-way splitter. 8. The display on the analyzer shows the result: the signal quality is flawless 9. Prototype of the first coax-fibre and fibre-coax converters: the satellite IF signal is combined with the signal from a terrestrial antenna in a switch. The combined signal, that could lie in the range from 87 to 2300 MHz, is converted to an optical signal that can then be carried over very long distances. 10. At the other end the optical signal is then reconverted back to the original frequency range. The system is available as a set and is meant for use in inexpensive installations. 11. Here too: the analyzer shows the exceptional signal quality after conversion from the optical range back to the original frequency range. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 199
  • 200.
    12 13 12. One ofthe problems that has slowed down the practical implementation of fibre optic technology and that has essentially put up a road block is the connecting of two fibre optic cables. With this new system GlobalInvacom is incorporating a much easier method that doesn't involve highpriced splicing machines. The picture shows how the core of the optical cable is cut with this device such that a flat and lossless edge results. The optical cables need to be connected edge to edge. In order to actually achieve a true flat edge, the best method is the effective breaking of the optical cable. 13. The connector plugs are placed in this holder and the ends of the fibre optic cables can be inserted through the template easily and securely. 14. A push on the ends locks the flaps. The inner conductor of the optical cable is then tightly pressed and the two cable ends touch each other without any loss (nearly). 15. The complete set with the cable cutter (actually, cable breaker), the connection template and a set of plugs. The small yellow section of fibre optic cable shows the two types of plugs: One with a pre fitted connector for customer connection and the second to splice bare fibres together. 14 15 200 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 202.
    1 Five Years FibreIRS fromGlobalInvacom 2 202 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 203.
    1. TELE-satellite firstreported on GlobalInvacom's new optical system in the 02-03/2008 issue. Back then the system was still in the development stage 2. The first test report of the new optical system was published by TELE-satellite in a worldwide exclusive in the 08-09/2009 issue. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 203
  • 204.
    Firmen Report Digital-TV Groß-und Einzelhändler ELNET, Island Von Groß bis Klein: • liefert von DVB Transmittern bis zu DVB Receivern alles • paßt sich durch seine große Bandbreite an Produkten den ständig wechselnden Marktverhältnissen an • vertraut auf die Zukunft des DVB-Empfangs sowohl via Satellit wie terrestrisch • erwartet bald Zunahme im Bereich fiberoptische Produkte 204 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 205.
    ELNET führt alles ■ ImGewerbegebiet von Kopavogur und gut sichtbar von der Schnellstrasse 41 sind die vielen Satellitenspiegel an der Fassade des Digital-TV Groß- und Einzelhändlers ELNET. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 205
  • 206.
    Firmen Report Digital-TV Groß-und Einzelhändler ELNET, Island Große Geschäftsräume, große und kleine Produkte Der Digital-TV Groß- und Einzelhändler ELNET verfügt in Island nicht nur über großzügige Geschäftsräume mit 600 Quadratmetern Fläche, sondern auch über ein außergewöhnlich breites Spektrum an Produkten im Bereich Digital-TV. Das muß auch sein, erklärt uns Inhaber und General Manager Asmundur Einarsson: „Island hat nur etwas über 300.000 Einwohner, da kann man sich nicht spezialisieren sondern muß ë alles anbieten.“ Asmundur Einarsson nimmt zwei Koaxialstecker und zeigt eindrucksvoll den Unterschied: der eine Stecker ist für dicke 7/8 Kabel der Broadcasttechnik und der andere Stecker ist ein Miniaturstecker, wie er in Messgeräten verwendet wird (siehe Foto). Damit hat er die Bandbreite abgesteckt: ELNET vertreibt einerseits DVB-Messgeräte und andrerseits die kompletten DVB-Sender. „Wir Reykjavik vertreteen Rohde & Schwarz hier in Island und waren damit direkt beteiligt am Aufbau des digitalen TV-Netzwerkes hier in Island.“ Asmundur Einarsson schätzt, dass die Hälfte aller digitalen TV-Sender in Island über sein Unternehmen geliefert wurden. „Aufgrund der Topografie des Landes mit seinen vielen Bergen und Tälern und den weit verstreut liegenden Häusern sind viele Sender notwendig. Die maxi- ■ Seit 2000 ist Asmundur Einarsson, Inhaber und General Manager von ELNET, treuer Leser der TELEaudiovision. 206 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 207.
    2 1 3 1. Magnus Eyjolfssonist Partner bei ELNET und zuständig für den Verkauf. 2. Im Ladengeschäft von ELNET: ein Kunde läßt sich beraten. 3. Von groß bis klein: in der Mitte ein Großstecker für Sendeanlagen und winzig klein davor ein Koaxstecker, wie er in Messgeräten eingesetzt wird. Das Bild verdeutlicht die enorme Bandbreite an Produkten, die ELNET anbietet. male Sendeleistung beträgt 500W.“ Die Einwohnerzahl Islands ist winzig, aber die Fläche des Landes ist riesig. Genau das liefert Asmundur Einarsson ein gewichtiges Argument für die Zukunft seines Geschäfts: „Kabelgebundene Verbreitungswege wie CATV oder IPTV sind nur sinnvoll in den Städten. Für die Versorgung der ländlichen Regionen wird auch weiterhin der Satellitenempfang gefolgt vom terrestrischen Empfang die beste Empfangstechnik sein.“ Gegründet wurde ELNET bereits in 1984. Der Gründer Örlygur Jonatansson verkaufte ELNET an Asmundur Einarsson und unterrichtet seitdem an der staatlichen Berufsschule. Asmundur Einarsson selbst war zuvor lange Jahre bei den beiden damaligen TV-Sendern des Landes als Techniker beschäftigt. Beherzt griff er zu, als der Gründer ELNET anbot. „Zwei Angestellte gab es www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 207
  • 208.
    ■ Asmundur Einarssonmit den beliebtesten Antennen bei ELNET: Spiegel mit 1m und 85cm Durchmesser sowie UHF-Antennen für den DVB-T Empfang 208 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 210.
    1 2 damals und damalsboomte das Geschft mit Satellitenempfangsanlagen.“ Die beste Zeit für ELNET war 2007. Zu dem Zeitpunkt zog die Firma um in die heutige Lage im Gewerbegebiet von Kopavagur, einem Vorort von Reykjakvik. „Damals betrug unser Umsatz um die 1.5 Mio Euro, heute ist er auf unter 1 Mio gefallen, aber erfreulicherweise stabil.“ Im Jahr 2000 kam ein Partner hinzu. Seit dem kümmert sich Magnus Eyjolfsson vor allem um den Verkauf. „200 bis 300 Satellitenspiegel verkaufen wir pro Jahr,“ erzählt er uns, „vor allem die 85cm und 1m Modelle sind gefragt.“ Aber auch 1.8m Spiegel können ab Lager geliefert werden. Selbst große 3m Spiegel sehen wir im Lager. Seit 2011 verteibt ELNET auch die fiberoptischen Systeme von GlobalInvacom. „Preislich nähern sich die fiberoptischen Systeme immer mehr den Koaxialsystemen an,“ beobachtet Asmundur Einarsson und stellt fest: „In 1 oder 2 Jahren wird es hier zum Umschwung kommen und die fiberoptischen Systeme stark zunehmen.“ ELNET jedenfalls sit gerüstet für die Zukunft und verfügt über eine sehr große Auswahl an Produkten, um im bevölkerungsarmen aber großen Island mit kleinen und großen Produkten auch weiterhin erfolgreich zu sein. 210 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 211.
    1. Noch istder Umsatz gering, aber ELNET erwartet bald eine Steigerung: das fiberoptische System von GlobalInvacom, das ELNET seit 2011 im Angebot hat. 2. Bei dem Rohrstück handelt es sich um einen Abschnitt eines 1 5/8" Kabels, wie es bei den DVB-T Sendern eingesetzt wird. ELNET liefert diese Kabel. An der Wand oben Segmente eines 3m Spiegels und unten weitere kleinere Spiegel. 3. Die Ableitungen der Spiegel an der Außenfassade landen hier im Technikraum. 4.Blick in den Technikraum. Hier stapeln sich Geräte der verschiedensten Art. 3 4 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 211
  • 212.
    TELE-audiovision Global CompanyDirectory The Decision Makers in Worldwide Digital TV Industry according to TELE-audiovision’s Company Reports BSD, Brazil - Digital TV Internet Forum Manu Distr R Whol R Shop Serv www.TELE-audiovision.com/TELE-audiovision-1311/eng/bsd.pdf GM Marcos Benni • Largest Digital TV Internet forum in Brazil • Reaches 400,000 readers every month Elnet, Iceland - Distributor • Starting a new form of digital TV online shopping with a video shop • Also active in IPTV and IP Radio www.TELE-audiovision.com/TELE-audiovision-1311/eng/elnet.pdf Manu R Distr R Whol R Shop R Serv GM Sales Asmundur Einarsson Magnus Eyjolfsson • can supply everything from DVB transmitters to DVB receivers • always adapts its large range of products to meet current market demands GlobalInvacom, UK - Fibre Optic Products R Manu Distr Whol Shop Serv • believes in terrestrial and satellite DVB reception • expects fibre-optic products to gain popularity in near future www.TELE-audiovision.com/TELE-audiovision-1311/eng/globalinvacom.pdf 1 Sales Technical Director Support 1. Visitors are greeted by this very friendly receptionist. 2. Customers purchasing a DEVISER product will Ivan Matt be served by one of the ambitious members of the Overseas Sales team. Each of them is in charge of a Horrocks Presdee specific region. John Wu (upper row, left) is responsible Business Development Gary Stafford • Invented the new satellite IF transmission technology via fibre optics • Five million FibreIRS connections are expected by 2015 • Through continuous technological improvements FibreIRS can now serve more than 4000 connections from a single LNB; for professional applications it’s several 10,000’s Oreind, Iceland - Distributor Manu R Distr R Whol R Shop R Serv www.TELE-audiovision.com/TELE-audiovision-1309/eng/oreind.pdf Founder DEVISER with new and Baldur modern company headquarters Sveinsson ë Founder Tianjin Sigurour Gunnarsson ■ In TELE-audiovision issue 06-07/2011 we introduced DEVISER shown persistent interest in streaming systems.” • successful in the home electronics segment Together with his staff of eight, six of which were software engineers at the • all antenna installation material always in stock for the first time. Click on the following link to read the full story: www.TELE-audiovision.com/TELE-satellite-1107/eng/deviser.pdf ing export success. Founded almost 25 years ago to supply meters to the Chinese market, DEVISER has long since become a global player. “By now most of our products are sold outside China,” explains Jason Wu and also has some • focus on IPTV for sustained business development • sizable repair shop for home electronics equipment export figures in store for us: “40% go to the USA, 25% stay in Southeast Asia, 20% are shipped to Europe and 15% are sold in India.” For the US market time, Forcetech CEO Mr. Arojoy Wei deDEVISER sells its products under the brand name of a local cooperation partsigned streaming software for commercial applications during the initial phase ner, while the company has devised an of his company. State-run institutions 1 entirely different strategy for Europe: In July of 2012 DEVISER moved into its such as schools and universities as well “We are currently in the process of esnew and spacious company headquartablishing a repair and logistics centre ters in the industrial zone of Tianjin, a as industrial enterprises ranked among in Mechelen, close to Brussels (Belgium) port city in Eastern China not far from 2 his first customers. Forcetech software in cooperation with Technetix.” This way Beijing. DEVISER has been a manufacDEVISER customers will not only receive and was implementedCOMPANY REPORT Digital TV Head-end Manufacturer DEXIN, China turer of signala meters since 1990 loyal on the websites of new products has worked up substantial base of is the ■ Lan Haidongconsiderably faster, they will also benefit from shorter turnaround customers. The reason is obvious: DEthose customers for streaming video Marketingrepairs. times for Manager at VISER pays special attention to quality content. Lan Haidong gives the example Forcetech.DEVISER expects any increase Not that The official and reliability over a long service life for DEXIN moved into their new producin of the company all of its products. namerepair work! Au contraire: “We recentof “lectures at schools and universities” tion building at the end of 2012. BeDuring the first years of operation only is Force Innovation fore that the company was located for that could be accessed online for viewing Chinese customers were able to benefit Technology Co., Ltd. years in downtown Chengdu. But they from that strategy, as products manuoutgrew that site and General Manager at home. as can be seen in the factured and sold by DEVISER were only Sun Yu decided it was time to move to a background. available in China at first. Signal meters At the time, all streaming software was Deviser, China - Signal Analyzer R Manu R Distr Whol Shop Serv 2 1. Liu Lian Jun is the Managing Director of DEVISER and is in charge of the entire production business. 2. The driveway leading to the main building of the DEVISER company headquarters. 3. View from the roof of the DEVISER company headquarters towards the production buildings. The houses of the city of Tianjin can be seen in the background. Signal Analyzer Manufacturer DEVISER, China COMPANY REPORT for the Indian market, Jason Wu (centre) is the team leader and can be met at many international fairs and • 14 Multiple R&D Engineers are consistently working to improve Liu (right) exhibitions. He is in charge of Europe. Aaron the looks after Asian customers, Vicky Han (lower row, system left) after the Americas and Africa and Simon Liu (right) serves customers in the CIS region as well as in the • Northern Europe, North Africa and Southeast Oceania. areChen (centre) makes sure countries of Asia Sally the largest deliveries to all corners of the globe run smoothly and FibreIRS markets reliably. President Zhong Changgan MD Liu Lian Jun TV Head-end Products for Professional • new company based on so-called multicast technolheadquarters streamlines production and administraogy, which means every client received his or directly from a central tion at a single site her stream TV Distribution content server. Things changed in 2008, completely new building. Sun Yu is not for cable TV were the major sellers at only General Manger; he’s also a part the time, and have stayed right on top owner of DEXIN. He explains to us: “My up to this day. “65% of our signal meters two brothers are also part owners but are designed for cable TV,” according to they don’t take part in the company’s Jason Wu, who heads the International daily activities. “ Sales team and whom we already met It wasn’t always like that. “The comtwo years ago during our fist visit to DEpany was founded in 1994 under the VISER. name DESAI.” Back then analog moduAt that time DEVISER’s production lators and transmitters were manufacpremises and offices were spread over a tured for the local market in China. In number of different premises in Tianjin, those days Sun Yu’s parents were part • expansion of awhen Forcetech launched a P2P (peer- logistics centre in and for Europe dedicated repair and DEXIN is a manufacturer of profes- sional tv software. types to-peer) version of its head-ends. TheseWhatof devices are often specially made acwas different fromcording to on? With P2P all then customer requirements and connected streaming clients at the same time function as active multipliers and forward the received signal to additional ■ Sun “P2P improves the clients. Lan Haidong: Yu is DEXIN’s General Manager. Just like all the other employees, he also quality of the received jacket with theabove all.” wears a signal, company's logo. Signals need not be fed from a central server any longer, but can be received since each application would have to be optimally configured DEXIN employes a large number of engineers in their R&D department. www.TELE-audiovision.com/TELE-audiovision-1307/eng/deviser.pdf Production Sales DEVISER Success Triggers Manager Expansion Jason Li Hong Wu Xiao but lasting success called for bundling all departments under a single roof. The shiny new and huge headquarters are ready to tackle continued growth, and Jason Wu gives us some details about TV Trade President of152 TELE-audiovision International — The World‘s Largest Digital forces Magazine — 07-08/2013 — www.TELE-audiovision.com DEVISER. He established the driving behind that goal: “We the company in 1990. expect substantial increases in the meter segment for fibre-optic cables as well as for the telecommunications business.” The satellite meter line of business can also look Chengdu forward to healthy growth, while DEVISER does not envisage significant potential for cable signal meters any longer. One of the reasons for new and large company headquarters was increas- • expansion of a dedicated repair and logistics centre in and for Europe • strong growth in export markets • state-of-the-art test benches for EMS and overvoltage protection ■ The new DEVISER company headquarters in the Tianjin industrial zone. This is where both the administrative offices and the production premises of this manufacturer of professional meters are located. 148 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com COMPANY REPORT 该独家报道由高级编辑所作 Forcetech, China - IPTV Solution Provider 1 shown persistent interest in streaming systems.” Together with his staff of eight, six of which were software engineers at the time, Forcetech CEO Mr. Arojoy Wei designed streaming software for commercial applications during the initial phase of his company. State-run institutions 182 TELE-audiovision International — The World‘s Largest universities as well such as schools and TV Box Magazine — 05-06/2013 — www.TELE-audiovision.com as industrial enterprises ranked among his first customers. Forcetech software was implemented on the websites of those customers for streaming video content. Lan Haidong gives the example of “lectures at schools and universities” that could be accessed online for viewing at home. At the time, all streaming software was based on so-called multicast technology, which means every client received his or her stream directly from a central content server. Things changed in 2008, when Forcetech launched a P2P (peerto-peer) version of its software. What was different from then on? With P2P all connected streaming clients at the same time function as active multipliers and forward World‘s Largest Digital to additional TELE-audiovision International — The the received signal TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com clients. Lan Haidong: “P2P improves the quality of the received signal, above all.” Signals need not be fed from a central server any longer, but can be received Ren Nan 153 Digital TV Head-end Equipment Manufacturer DEXIN Sun Yu left to right) Sales Manager Ren Nan, Sun Wenya, Marketing Manager Lan Haidong, Wang Qinghua, Dong Peng and Guo Tianwei. The World‘s Largest Digital TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com Sales 149 Digital TV Head-end Manufacturer DEXIN, China www.TELE-audiovision.com — 07-08/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 ■ The Forcetech Sales team with TELE-audiovision editor-in-chief Alexander Wiese: (from 150 TELE-audiovision International — www.TELE-audiovision.com — 07-08/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 ■ DEXIN’s new production facility that the company moved in to at the end of 2012. It’s located in the Wuhou high-tech zone of Chengdu. ë • Established in 1994 in Chengdu • Specializes in professional tv head-end equipment R Manu R Distr Whol Shop R Serv • new company headquarters streamlines production and administration at a single site www.TELE-audiovision.com/TELE-audiovision-1307/eng/dexin.pdf ■ Zhong Changgan is founder and GM 3 Signal Analyzer Manufacturer DEVISER, China • strong growth in export markets • state-of-the-art test benches for EMS and overvoltage protection Dexin, China - Digital TV Head-ends R Manu Distr Whol Shop Serv COMPANY REPORT 180 TELE-audiovision International — The World‘s Largest TV Box Magazine — 05-06/2013 — www.TELE-audiovision.com • Established in 1994 in Chengdu • Specializes in professional tv head-end equipment • 50% of their production is exported • Intense quality controls • Very large R&D team www.TELE-audiovision.com — 05-06/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 181 • 50% of their production is exported • Intense quality controls www.TELE-audiovision.com/TELE-audiovision-1307/eng/forcetech.pdf Marketing 3 COMPANY REPORT IPTV Solution Provider Forcetech, China IPTV Systems by Forcetech • offering technically mature and fully-fledged IPTV solutions • large Chinese movie provider as showcase customer and shareholder • small-scale IPTV systems can be realised on a tight budget • excellent video quality thanks to P2P technology ■ Forcetech is based in the Lan Haidong ZhongGuanCun software park in northwestern Beijing. 40 software engineers and ten sales experts work at this site. An additional R&D office is located in Chengdu, where the local university offers a topnotch engineering degree program. Forcetech operates one more office in Shenzhen, since it sources OEM hardware such as encorders and settop boxes from there. 148 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com www.TELE-audiovision.com — 07-08/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 149 • offering technically mature and fully-fledged IPTV solutions • small-scale IPTV systems can be realised on a tight budget ■ 154 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com • large Chinese movie provider as showcase customer and shareholder • excellent video quality thanks to P2P technology Lan Haidong is the Marketing Manager at Forcetech. The official name of the company is Force Innovation Technology Co., Ltd. as can be seen in the background. 152 212 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 213.
    conquering the world market Tianditong,China - Antennas There was a time when a huge number of hard-working employees manufactured large quantities of all sorts of products. For most successful companies, this has long become a thing of the past, and Chinese satellite dish and antenna manufacturer Tianditong is a perfect example of that development. Almost every step of the production is completed by highly efficient machines, and even the few components that still require manual work will be assembled by automatic equipment in the foreseeable future. All this results in roughly three million antennas being manufactured by less than 300 employees. Impressive numbers – and reason enough for us to pay a visit to that company. Our first port of call is a small office right in Beijing. As little as 20 employees work at this site, with six members of staff making up the Sales team for 1 R Manu Distr Whol Shop Serv GM Bang Xian Peng www.TELE-audiovision.com/TELE-audiovision-1307/eng/tianditong.pdf Quality Production Antennas for the Manager Global Market Bang Xing Peng COMPANY REPORT • uses state-of-the-art production machinery • fully automatic quality control during the production process • volume production of dish sizes from 45 to 180 cm • ready for production of large quantities at short notice • environmentally-friendly production according to international standards ■ Is this the command centre of a large satellite dish manufacturer? Yes indeed, on the 5th floor of the Newton office building in Beijing’s south we can find the administration staff and the Sales team of the dish manufacturer Tianditong. The production premises, however, are located in Guan, in the Chinese province of Hebei. A total of 180 workers are employed at the Guan premises, with another 100 production workers based at an additional production site in the province of Hunan. 148 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com • uses state-of-the-art production machinery Satellite Dish Manufacturer LIANXING, China COMPANY REPORT • fully automatic quality control during the production process • volume production ofCOMPANY REPORT Satellite Dish Manufacturer LIANXING, China dish sizes from 45 to 180 cm Satellite dish manufacturer LIANXING has two owners, and both are fully aware of the fact that only top quality will guarantee last- COMPANY REPORT ë Manager Jeffersonë Guilin Cruz facility in Aruja, in Brazil’s Sao Paulo province. Guilin Lio Wen Fei and Wen Lang Yuan are the founders of the company, rect their attention to immaculate workmanship for every antenna and still have a shareholding of 50% each. What started in 1993 with they manufacture. A total of ten buildings are located in the beautiful Xing’an county in Guilin city. prises a staff of 170. “We started out with producing C band dishes Lio Wen Fei and Wen Lang Yuan are the founders of the company, ELDTEC For Brazil Only Android R&D Will Android become the 2 Sales Manager Liao Wen Fei COMPANY REPORT ■ The two co-owners 154 • individually checking each single component • offering antennas for the C and Ku bands • very successful on the Japanese market production premises of LIANXING. The column to the right of the entrance displays the full company name in Chinese: Guangxi Lianxing Satellite Equipment Ltd. Company. DTP2100, one of the first receivers based on the Android operating system. www.TELE-audiovision.com/12/11/jiuzhou 2 Product Manager Yongjun Zhang COMPANY REPORT • Installation of Apps on a limited basis • Android system requires higher quality components that results in higher costs • Android is well-suited for private users but only limited for cable network operators Jiuzhou´s Android Department 150 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 05-06/2013 — www.TELE-audiovision.com COMPANY REPORT Digital Meter Manufacturer SAT-LINK, Quanzhou, China SAT-LINK has • Develops receivers with complex one product only features • Installation of Apps on a limited basis group: digital • Android system requires higher quality components that results in signal analyzers Product Manager. He’s familiar with all the advantages and disadvantages of this operating system. ■ Jiuzhou’s company headquarters in Shenzhen’s High Tech Park. Here you’ll find 15 receiver developers that are working exclusively on the Android operating system. 176 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com If you do only one thing, you can fully focus on that one thing. This is QingZhang Lin’s philosophy. He is General Manager of the five-year young company SAT-LINK. “We only produce digital signal analyzers”, confirms QingZhang Lin, “and are exclusively involved in the export market.” The company was founded only five years ago in 2008 with 20 R&D employees and 200 production employees. ■ Yongjun Zhang is the Android Android R&D • Develops receivers with complex features of satellite dish manufacturer LIANXING: production manager Wen Liang Yuan TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com (left) and sales 150 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 05-06/2013 — www.TELE-audiovision.com manager Liao Wen Fei (right). Shenzhen 149 www.TELE-audiovision.com/TELE-audiovision-1303/eng/jiuzhou.pdf 1. Project Manager GuiHuang Huang presents SAT-LINK’s high-end success model. This analyzer is available in various versions and will shortly also be available as a combo unit with DVB-S2 and DVB-T2 as well as a very fast spectrum display. ë www.TELE-audiovision.com — 05-06/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 • offering antennas for the C and Ku bands • very successful on the Japanese market ■ In the 11-12/2012 issue we introduced the new Jiuzhou receiver ■ The two co-owners R Manu Distr Whol Shop Serv • using only top-quality materials ■ Entrance to the vast Jiuzhou, China - Android Receivers of satellite dish manufacturer LIANXING: production manager Wen Liang Yuan (left) and sales manager Liao Wen Fei (right). 167 Satellite Dish Manufacturer LIANXING, China LIANXING: Professional Satellite Antennas 148 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 05-06/2013 — www.TELE-audiovision.com • using only top-quality materials • individually checking each single component Who better to answer this question than the Android receiver Product Manager 1 Jiuzhou, Yongjun Zhang, who at currently is developing Android prod- www.TELE-audiovision.com — 05-06/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 www.TELE-audiovision.com/TELE-audiovision-1305/eng/lianxing.pdf Product Manager Wen Liang Yuan With an enormous R&D department, Jiuzhou has become one of the trailblazers of Brothers Bang Xian for 1. large receiver manufacturers Peng (left) satellite, terrestrial TV and cable recepand Bang Xing Peng (right) are the tion. Quite a few different operating founders of satellite dish manufacturer systems can be found in these receivers Tianditong. but there’s one operating system that everyone has been talking about for the He is the 2. Meet Bang Xing Peng. past several years: the Android system. Production Manager, while brother and Here at TELE-audiovision we also have co-founder Bang Xian Peng acts as been expecting that more and more General appear on the market receivers wouldManager and is in charge of overall company strategy, marketing with this operating system, yet that and sales. hasn’t really happened. We introduced one of the first boxes, a DVB-T receiver - the DTP2100 from Jiuzhou, back in our 11-12/2012 issue. So, is the expected Android receiver boom now going to get off the ground? • Also offers antennas for 2.4 and 5.8 GHz (WiFi) • Concentration on just a few product series • Also offers antennas for 2.4 and 5.8 GHz (WiFi) operating system of the future? LIANXING, China - Satellite Dishes R Manu R Distr Whol Shop Serv • Large market coverage within Brazil • OEM production for other brand names • Concentration on just a few product series 166 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 05-06/2013 — www.TELE-audiovision.com • Large market coverage within Brazil • OEM production for other brand names COMPANY REPORT Dish, Antenna and Cable Manufacturer ELDTEC, Brazil ■ A look at ELDTEC’s production 150 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 07-08/2013 — www.TELE-audiovision.com a workforce of 50 employees has grown continuously and today comand still have a shareholding of 50% each. What started in 1993 with a workforce of 50 employees has grown continuously and today comprises a staff of 170. “We started out with producing C band dishes 149 www.TELE-audiovision.com/TELE-audiovision-1305/eng/eldtec.pdf 1 1. Jefferson Cruz runs the Sales Team. He would ing success. Not only do they use top-grade materials, they also dilove to be able to export ELDTEC’s products. rect their attention to immaculate workmanship for every antenna 2. The Sales Team. Orders■ Thumbs up cablemanufacturer LIANXING has two owners, and both for dishes, for General Manager Satellite dish and they manufacture. A total of ten buildings are located in the beautiful Bang Xian find their antennas from Brazil’s wholesalers Peng. He and his brother are fully aware of the fact that only top quality will guarantee lastBang Xing Peng are the founders of Xing’an county in Guilin city. way here. Tianditong. ing success. Not only do they use top-grade materials, they also di- www.TELE-audiovision.com — 07-08/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 • ready for production of large quantities at short notice • environmentally-friendly production according to international standards Quality Production of Satellite Dishes ELDTEC, Brasil -Quality Antennas of Dish, Production and Cables Satellite Dishes Sales R Manu 2 Distr Whol Shop Serv Antenna Manufacturer Tianditong, China www.TELE-audiovision.com — 03-04/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 177 higher costs • Android is well-suited for private users but only limited for cable network operators 178 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com 174 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 05-06/2013 — www.TELE-audiovision.com Sat-Link, China - Signal Analyzers www.TELE-audiovision.com/TELE-audiovision-1303/eng/sat-link.pdf ë R Manu GM Project Sales R&D Signal Distr Analyzers from Whol SAT-LINK Qing GuiHuang Han Guang Shop Zhang Lin Huang Nancy Rong R Serv • Only five years on the market • Optimizes signal analyzers for every region • Focusing on the signal analyzer product group • Brand new: combo analyzers for DVB-S2 and T2 with fast spectrum • Offers signal analyzers in four function classes and four price classes display ■ QingZhang Lin is SAT-LINK’s General Manager 1 COMPANY 3 2. Nancy is Business Manager and is always on the telephone taking orders from customers from all over the world. When she’s not at SAT-LINK’s headquarters Quanzhou talking with customers on the phone, she’s traveling all over the world visiting them. 1 3. R&D Manager Han Guang Rong is responsible for the function and development of Professional Equipment REPORTProject the signal analyzers. He 1. Manager GuiHuang Huang checks the function of SAT-LINK’s devices presents SAT-LINK’s high-end success with oscilloscopes and other professional model. This analyzer is available in various test equipment.and will shortly also be available versions COMPANY REPORT Digital Meter Manufacturer SAT-LINK, Quanzhou, China ■ Here in this building in Quanzhou’s High Tech Park you’ll find SAT-LINK’s headquarters and the signal analyzer’s final assembly area. The circuit boards and remaining components are assembled in another location in Quanzhou. 2 2 1. Project Manager GuiHuang Huang presents SAT-LINK’s high-end success model. This analyzer is available in various versions and will shortly also be available as a combo unit with DVB-S2 and DVB-T2 as well as a very fast spectrum display. Manufacturer Tecsys, Brazil as a combo unit with DVB-S2 and DVB-T2 as well as a very fast spectrum display. With a new SMD line that has been in operation since June 2012, theFive years later it has grown to 30 R&D Bra■ Jose Marcos zilian manufacturer Tecsys can further engineers and Freire Martins employ250 production available with ATSC (for Northof the curity camera. is one Ameriincrease their quality and improveees. their founders of Tecsys And as if that weren’t enough, SAT- toca) and then in Tec- following is CEO with located SAT-LINK’s headquarters are reaction time incoming orders. the and year of the in South American High Tech Park ISDB-TB for the Quanzhou’s company mar- in the LINK also offers a simple Satellite Finder everything themselves. sys produces Fujian province in southeastern China Tecsys was founded in 2000in the process of expanding by three with a display that only shows reception ket. “We’re directly across from Taiwan. The propartners who our all involved for parameters and therefore can be of- were activities in the Americas”, reveals SMT duction facilities with the latest many years in the TV reception indusmachines are in Lin, “and fered very inexpensively. “This instru- General Manager QingZhangthe Luojiang suburb try. Today the three founders wear difnortheast of the seven-million-inhabitment is, for example, very ferent hats at Tecsys: CEO is Jose Mar-greater presence at well-suited we will also have a ant city of Quanzhou. for South America”, Business Manager trade shows in that area.” cos Freire Martins, CCO is Jorge Alberto SAT-LINK only exports their Since products, we wanted to know Ganuza and CTO is Rodolfo Vidal. CEO their first year was where While SAT-LINK in Nancy tells us. they all And with that, SAT-LINK Jose Marcos Freire Martins explains about General Manager QingZhang covers the only able to sell to go. 10,000 pieces, Lin lists for us all the different regions: us how it all five “Tecsys began as production is shipped to those four most important functions and pric- started: years later“60% of our productionnuma manufacturer of SMATV products. We ing levels and can therefore offer these bers have nearly quintupled. to the Middle East, Europe, 20% travels And it’s had seven employees and produced, 1 that this analyzer series is very popular in Europe. The next class of analyzers are those with smaller displays and non-illuminated keyboards. “These analyzers are especially popular in the Middle East.” There are also two brand new Satellite Finder product lines: one of these handy models even has a camera input. “This is actually in high demand in the Middle East since many people there have installed security cameras. They can use this new signal analyzer to very devices to all the regions of the world. 3 easily check the function of these cam- All of the signal analyzers also come Professional Equipment DVB-S2 tuners and the terrestrial COMPANY REPORT eras.” This new satellite signal analyzer with Manufacturer Tecsys, Brazil with camera input even comes with a versions and combo models come with 12V output to supply power to the se- not only DVB-T/T2 but will soon also be • Optimizes signal analyzers for every region • Brand new: combo analyzers for DVB-S2 and T2 with fast spectrum display especially their10% goesnew combo mod- the rest brand to North America and are shipped to the remaining regions.” el for DVB-S2 and DVB-T2 that promSAT-LINK has expanded its product those first TV ises to be quiterange so that for SAT-LINK. a success four different classes are channels were: “It was the cable Since many of covered. The top-endEurope TV channel VCC and its comthe countries in and thus most expensive signal analyzer comes petitor CV. It and Africa are quickly switching over to with was also the state-run Tecsys, Brazil - Professional Equipment ë R Manu CEO 1. Ricardo still has his first analog receiver stored in his shack: it’s a model from DX Antenna that he used to receive his first TV channel back in 1985. 2. Ricardo even has a bending machine in his workshop that he uses to bend mounts and attachments for dishes. 3. Ricardo’s homemade device for the reception of circularly polarized C-band signals. 4. In Cosmosat’s warehouse: Ricardo is very happy with the AZURESHINE dishes that he resells and also uses at his cable operator installations. 5. Also homemade: a Ku-band feedhorn. • Only five years on the market • Focusing on the signal analyzer product group • Offers signal analyzers in four function classes and four price classes 152 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com increase their quality and improve their reaction time to incoming orders. Tecsys produces everything themselves. Tecsys was founded in 2000 by three partners who were all involved for many years in the TV reception industry. Today the three founders wear different hats at Tecsys: CEO is Jose Marcos Freire Martins, CCO is Jorge Alberto Ganuza and CTO is Rodolfo Vidal. CEO Jose Marcos Freire Martins explains to us how it all started: “Tecsys began as that this analyzer series is very popular a manufacturer of SMATV products. We in Europe. had seven employees and produced, The next class of analyzers are those with smaller displays and non-illuminated keyboards. “These analyzers are especially popular in the Middle East.” There are also two brand new Satellite Finder product lines: one of these handy models even has a camera input. “This is actually in high demand in the Middle East since many people there have installed security cameras. They São José dos new signal analyzer to very can use this Campos check the function of these cameasily eras.” This new satellite signal analyzer with camera input even comes with a 12V output to supply power to the se- Distr Whol Jose Marcos Shop Freire Martins Serv • Very good operational organization ë • Concentration on professional satellite reception products COO • IRD is their success product systems 2001. In 2011 the company celebrated its 10-year anniversary and could be proud of the 125,000 satellite signal analyzers that they had sold thus far – see TELE-audiovision issue 10-11/2011. 166 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com 2 www.TELE-audiovision.com — 03-04/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 6 Harlow COMPANY REPORT 2 Paul Hardcastle, who has been with Horizon for seven years and is now their Technical Director, explains to us more about their product palette. “We Technical Director Paul Hardcastle ■ Stefaan Cornelis with one of SATSON’s super products: a splitter that distributes HDMI signals to up to eight Ethernet cables. 3 CEO 1. Paul Hardcastle is Technical Director and developer of many of Horizon’s new analyzers. He’s been the technical heart of Horizon for seven years now. 2. Trevor Salter is Horizon’s Service Manager and is primarily responsible for repairs and quality issues, as well as assisting customers with technical ■ Stefaan Cornelis with ■ Didier Debey is happy: he questions. one of SATSON’s super conceived one of SATSON’s products: a splitter that success products – the Dual distributes HDMI signals to Viewer Technical Manager is Rob Sydee. 3. DSB-0200, a product up to eight Ethernet cables. for digital signage. Long-time readers will recognize 182 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 01-02/2013 — www.TELE-audiovision.com him: he made it to the front cover ■ Didier Debey is happy: he of TELE-audiovision back in the conceived one of SATSON’s success products – the Dual 12-01/2007 issue. He’s holding here Viewer DSB-0200, a product for digital signage. one of Horizon’s success models – the yellow color reveals that it’s a satellite signal analyzer. He says, “All of our terrestrial DVB-T and DVB-T2 signal analyzers come in red housings, combo units come is green and DVB-C analyzers come in blue.” The HD-TC8 (for tooway Turbo Internet-viasatelliteservices) is in a grey case. 4. Ivan Valbuena is the Senior Hardware Engineer. He checks the mechanical components of Horizon’s analyzers and does a lot of the new hardware design, working with Paul Hardcastle on new products. Stefaan Cornelis www.TELE-audiovision.com — 03-04/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 4 165 and His Company Cosmosat • Learned everything about satellite reception on his own • Installs head end stations for cable operators as well as community systems • Planning his own dish production • Turned his hobby into his career www.TELE-audiovision.com — 01-02/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 197 www.TELE-audiovision.com/TELE-audiovision-1301/eng/horizon.pdf Technical Manager 7 Rob Horizon on Sydee the Way Up COMPANY REPORT Digital TV Meter Manufacturer, UK ■ Nine Horizon employees are currently working in the ‘Allen House’ in Harlow’s business district. Production is actually outsourced to another company in England. • Numerous new products for new DVB sectors • Exports to every country as an OEM and under their own name • Focusing expansion to emerging countries such as South Africa and in South America • Specializes in easy to use analyzers for installers 180 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 01-02/2013 — www.TELE-audiovision.com 203 www.TELE-audiovision.com — 01-02/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 181 South America • Specializes in easy to use analyzers for installers 3 Technical Manager Didier Debey • Conquers the new HDMI distribution niche with their specialized products • Conceives their own HDMI products The HDMI Professionals The HDMI from SATSON of his 3.4-meter double reflector antenna. www.TELE-audiovision.com/TELE-audiovision-1301/eng/satson.pdf HDMI Distributor SATSON, Belgium 1 2 ■ El Loco Ricardo in front • Planning his own dish production • Turned his hobby into his career that now cover every other DVB frequency range. Paul Pickering HDMI Distributor SATSON, Belgium Installer and Dish Manufacturer Cosmosat, Argentina 196 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 01-02/2013 — www.TELE-audiovision.com Horizon in 2001 and with enormous foresight has expanded Horizon’s market niche: that would be very reliable and also easy-to-use signal analyzers for daily use by installers. COMPANY REPORT 1 165 157 El Loco Ricardo www.TELE-audiovision.com — 01-02/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 ■ Paul Pickering founded Satson, Belgium - HDMI www.TELE-audiovision.com — 03-04/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 • IRD is their success product • Numerous new products for new DVB sectors • Exports to every country as an OEM and under their own name • Focusing expansion to emerging countries such as South Africa and in R Manu R Distr R Whol R Shop R Serv • IRD is their success product • In-house development department CEO 202 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 01-02/2013 — www.TELE-audiovision.com • Very good operational organization • Concentration on professional satellite reception products • In-house development department 164 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com COMPANY REPORT ë For the end of 2012 he is able to add another surprising figure: “By then we’ll have sold 160,000 analyzers in every DVB sector.” Horizon started as a manufacturer of satellite signal analyzers but over the past several years they’ve expanded into other sectors 4 Manager Adilson da Silva holding a circuit board produced by their new SMD machine. 157 • Concentration on professional satellite reception products 166 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com 164 TELE-audiovision Horizon, UK - Signal Analyzers R Manu R Distr Whol Shop R Serv www.TELE-audiovision.com — 03-04/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 • Very good operational organization British Signal Analyzer Manufacturer with Ricardo Numerous New • Learned everything about satellite reception on his own Products • Installs head end stations for cable operators as well as community for example, head ends.” The company grew very quickly. “Today we have 97 employees of which 28 of them are engineers.” Tecsys produces everything that can be found in head ends, from IRDs (the company’s success product) to modulators and decoders. Tecsys ships primarily to the domestic Brazilian market; many of the larger TV organizations utilize Tecsys products. Business is so good that, according to CCO Jorge Alberto Ganuza, Tecsys is planning on moving into a much larger building. A highlight at Tecsys is their SMD line. This work was previously outsourced to another company but by installing their own production line, Tecsys is now not only much more flexible when it comes to the customer’s requirements, but they can also react more quickly to Paul Pickering founded the signal changes in their own products. The entire production operation at Tecsys is analyzer manufacturer Horizon back in ■ Tecsys Production SMD Line www.TELE-audiovision.com/TELE-audiovision-1301/eng/cosmosat.pdf CCO moving into a much larger building. Digital TV Meter www.TELE-audiovision.com SMD UK COMPANY REPORT Largest Digital TV Trade Magazine —A03-04/2013 — Manufacturer,line. highlight at Tecsys is their 156 TELE-audiovision International — The World‘s Owner Professional Equipment Manufacturer Tecsys, Brazil our activities in the Americas”, reveals General Manager QingZhang Lin, “and we will also have a greater presence at available with ATSC (for North Ameri- one of these for South America”, Business Manager trade shows in that area.” curity camera. lite Finder product lines: the followingeven has a camera input. Nancy tells us. realized that year broadcaster. He soon And as if that weren’t enough, SAT- ca) and then in handy models a TVwith While SAT-LINK in their first year was And with that, “This is American marLINK also offers a simple Satellite Finder ISDB-TB for the South actually in high demand technicians and SAT-LINK covers the only able to sell about 10,000 pieces, his fellow in the engineers for example, reception ket. “We’re in the process since many with a display that only shows head ends.” The company Middle Eastof expandingpeople there four most important functions and pric- five years later those production numwere quite familiar with the theory but grew very can be “Today activities in the installed security cameras. They ing levels and can therefore offer these bers have nearly quintupled. And it’s parameters and therefore quickly. of- ourwe have 97 have Americas”, reveals can use this new signal analyzer toall that much the regions of the world. especially their brand new combo moddidn’t have very devices to all practical exfered very inexpensively. “This instru- of them are en- QingZhang Lin, “and employees of which 28 General Manager easily check the function of these cam- All of the signal analyzers also come el for DVB-S2 and DVB-T2 that promment is, for example, very well-suited we will also have a greater presence at with reception. Ricardo on the perience gineers.” eras.” This new satellite signal analyzer with DVB-S2 tuners and the terrestrial ises to be quite a success for SAT-LINK. for South America”, Business Manager trade showscan with area.” input even comes with a versions and combo models come with Since many of the countries in Europe Tecsys produces everything that in that camera other hand was always testing dishes While SAT-LINK in their to supply power Nancy tells us. be found in head ends, from IRDs (the 12V outputfirst year was to the se- not only DVB-T/T2 but will soon also be and Africa are quickly switching over to and LNBs and knew exactly what size And with that, SAT-LINK covers the only able to sell about 10,000 pieces, company’s success product) to modulathose production numfour most important functions and pric- five years later 156 TELE-audiovision International — Thewhat type of Magazine — 03-04/2013 — www.TELE-audiovision.com dish and World‘s Largest Digital TV Trade LNB was needed tors and decoders. Tecsys ships primaring levels and can therefore offer these bers have nearly quintupled. And it’s to receive a particular satellite. ily to the domestic Brazilian market; devices to all the regions of the world. especially their brand new combo modmany of the larger organizations After All of the signal analyzers also comeTV el for DVB-S2 and DVB-T2 that prom- installing satellite systems in utilize Tecsys products. Business is so SAT-LINK. with DVB-S2 tuners and the terrestrial ises to be quite a success forhis free time for years, he finally de■ Jorge Alberto good models come also to Since Jorge of the countries in Europe that, according CCO many AlGanuza is with versions and combo one of Tecsys three berto will soon theand is and Africa are quickly switching over to not only DVB-T/T2 but Ganuza, also be is planning on founders This work was previously outsourced to another company but by installing their own production line, Tecsys is now not only much more flexible when it comes to the customer’s requirements, but they can also react more quickly to changes in their own products. The entire production operation at Tecsys is COMPANY REPORT The New Tecsys Alberto Jorge Adilson da SMDGanuza Silva Line • In-house development department Cosmosat, Argentina - Satellite Dishes R Manu R Distr R Whol R Shop R Serv www.TELE-audiovision.com/TELE-audiovision-1303/eng/tecsys.pdf The New Production Tecsys 3 to acquire a 3.4-meter antenna. The foland therefore can be lowing year 1988parameters inexpensively. “Thisfor ofhe began working instrufered very ment as a living and started is, foraexample, very well-suited technician at ed keyboards. “These analyzers are especially popular in the Middle East.” There are also two brand new Satel- 153 5 2. Nancy is Business Manager and is always on the telephone taking orders from customers from all over the world. Professional Equipment Manufacturer Tecsys, Brazil COMPANY REPORT the largest display and an illuminated When she’s not at SAT-LINK’s headquarters Canal 7 and the just-started private TV keyboard. One of the analyzers in this talking with customers on the phone, she’s traveling all over the world visiting them. series, the combo SAT-LINK model WS- 9.” These four channels channel Canal 3 www.TELE-audiovision.com — 03-04/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 157 3. R&D Manager Han Guang Rong Freire Martins 6936 for DVB-S and DVB-T, was already is responsible for the function and ■ Tecsys Production were on the INTELSAT V-F13 satellite. is one of the 2. Nancy is Business Manager and is Manager Adilson da Silva development of the signal analyzers. He introduced by us in the holding a circuit board founders of Tecsys always on the telephone taking orders11-12/2012 ischecks the function of SAT-LINK’s devices produced by their new and is CEO of the with oscilloscopes and other professional from customers from all over the world. sue. Business Manager Nancy also São José dos “I could tells us receive the channels on SMD machine. company test equipment. When she’s not at SAT-LINK’s headquarters BRASILSAT A1 and GORIZONT.” talking Campos on the phone, she’s with customers traveling all over the world visiting them. 154 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com It didn’t take long for him to realize ■ Jorge Alberto 3. R&D Manager Han Guang Rong Ganuza is is responsible for the function and that his 2.5-meter dish was too small one of the also ATSC (for North Ameriavailable with that this analyzer series is very popular curity camera. three development of the signal analyzers. He ca) and And in of SAT-LINK’s devices checks the function Europe. for the C-band and inas if that he was able founders and isin the following year mar1987 weren’t enough, SAT- ISDB-TBthen the South American with with oscilloscopes and other class of analyzers are those LINK also offers a simple Satellite FinderCCO for The next professional test equipment. with smaller displays and non-illuminat- with a display that only shows reception ket. “We’re in the process of expanding With a new SMD line that has been in operation since June 2012, the Bra■ Largest Digital 156 TELE-audiovision International — The World‘sJose Marcos TV Trade Magazine — 03-04/2013 — www.TELE-audiovision.com zilian manufacturer Tecsys can further www.TELE-audiovision.com — 03-04/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 COMPANY REPORT 1. Paul Hardcastle is Technical Director and developer of many of Horizon’s new analyzers. He’s been the technical heart of Horizon for seven years now. 2. Trevor Salter is Horizon’s Service Manager and is primarily responsible for repairs and quality issues, as well as assisting customers with technical questions. 3. Technical Manager is Rob Sydee. Long-time readers will recognize him: he made it to the front cover of TELE-audiovision back in the 12-01/2007 issue. He’s holding here one of Horizon’s success models – the yellow color reveals that it’s a satellite signal analyzer. He says, “All of our terrestrial DVB-T and DVB-T2 signal analyzers come in red housings, combo units come is green and DVB-C analyzers come in blue.” The HD-TC8 (for tooway Turbo Internet-viasatelliteservices) is in a grey case. 4. Ivan Valbuena is the Senior Hardware Engineer. He checks the mechanical components of Horizon’s analyzers and does a lot of the new hardware design, working with Paul Hardcastle on new products. HDMI Distributor SATSON, Belgium 4 ■ Stefaan Cornelis with one of SATSON’s super products: a splitter that distributes HDMI signals to up to eight Ethernet cables. The HDMI Professionals from SATSON 190 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 01-02/2013 — www.TELE-audiovision.com ■ Didier Debey is happy: he conceived one of SATSON’s success products – the Dual Viewer DSB-0200, a product for digital signage. • Conquers the new HDMI distribution niche with their specialized products • Conceives their own HDMI products • Distribution of HDTV signals in private homes with HDMI Extenders • Compatible with coaxial cable as well as with Ethernet cables www.TELE-audiovision.com — 01-02/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 191 • Distribution of HDTV signals in private homes with HDMI Extenders • Compatible with coaxial cable as well as with Ethernet cables started with DVB-T a few years ago analyzers: “That would be the HD-CM+ signal analyzer for them.“That would be the HD-CM+ started with DVB-T a few years ago analyzers: • Conquers the new HDMI distribution niche with their since May primary and since May 2012 we’ve also been model for which we see the2012 we’ve also been model for which we see the primary and specialized products “We’re – developing an extremely offering signal analyzers for DVB-T2 – markets to be in South America, Can- for DVB-T2 also markets to be in South America, Canoffering signal analyzers • Conceives their own HDMI products namely the HD-T2 series.” But Horizon ada, India and other the HD-T2 series.” But Horizon device India and other Asian countries.” namely Asian countries.” easy to use ada, for DVB-C, the Nano doesn’t only have DVB-S2 and DVB-T2 DVB-C is very popular in the cable net- and DVB-T2 DVB-C is very popular in the cable netdoesn’t only have DVB-S2 Cable, which should become available • Distribution of HDTV signals in private homes with HDMI Extenders and for the installers in in prepar- works there and for the products; they are currently prepar- works there products; they are currently the first quarter of 2013.” The Nano installers in Horizon ing for the introduction of DVB-C signal those • Compatible with coaxial cable as well as with Ethernet now has the right Cable is Horizon’s solution for those • Conquers the new HDMI distribution niche with their regions ing for the introduction of DVB-C signal those regions Horizon now has the right cables specialized products signal analyzer for them. www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 “We’re also developing an extremely easy to use device for DVB-C, the Nano Cable, which should become available in the first quarter of 2013.” The Nano Cable is Horizon’s solution for those 213
  • 214.
    Over 70 Years ofTV Antenna Experience TELE-audiovision Global Company Directory Digital TV Retailer USATel, Sao Paulo, Brazil COMPANY REPORT Everything has a beginning; even TV reception, that for us today is a part of life, had a starting point. For England that was in 1936 when the first regular TV transmissions began. Broadcasting took place on VHF channel 1 (50 MHz) and a system with 405 lines was used. Today SD uses 720 lines and HD 1080 lines. ■ The company’s Financial Manager is Allam Almughrabi, who, just like the Antiference, UK Brazilians Come - Antenna and HDMI R Manu MD ë Here DistrBuy R to Their Whol Digital TV Trevor Shop Paintain Products Online Serv owner of the company, also comes from Syria. “We have sales of about 100,000 US dollars every year”, he reveals to us after taking a look at his books. rod manufacturing company was acquired. This company was located in Lichfield, a half hour train ride north of Birmingham in England’s Midland. In 1998 the entire company moved to this location and it can still be found there today. Antiference’s Managing Director is Trevor Paintain; he’s been with Antiference for 15 years now. He tells us who the current owners of Antiference are: “Since May of 2011 Antiference has been owned by Mr. and Mrs. Bialecki from Australia.” www.TELE-audiovision.com/TELE-satellite-1211/eng/antiference.pdf Sales São Paulo These first TV broadcasts were transmitted from Alexandra Palace in London (The site is still in operation today and is now used for DVB-T2 and DAB+). ■ Jose Manuel Pereira is USATel’s Manager. The workshop can be sensaAt the time, it was an absolute seen in the background tion and raised the curiosity levels of two electronics technicians: Norman Best and M. S. Beebe. They recognized the unbelievable potential of this new technology and thereby found their market niche that they never changed after they founded their company in Digital TV Retailer USATel, Sao Paulo, Brazil Y REPORT 1937. They named the company Antiference, and this name was based on the main problem that existed back then: the interference that was created Arnold Boeijen • Manufacturing TV antennas since 1937 • Provides all the components needed for TV reception • Expanding into HDMI distribution, as well as wireless solutions USATel, Brazil - Distributor Manu azilians Come R Distr ë is Antiference’s Managing REPORT ■ Trevor COMPANY re to Buy R Whol Paintain catalog in his rightSão Paulo Director. He is seen here holding the current 84-page product hand with TV eir DigitalR Shop all oneproducts.receptionsuccess TVfilledholding of theirAntiference’sleftand TV distribution In his hand he’s of stories: Serv oducts Online the Tribeam UHF antenna. Actively Involved in Satellite Jose Manuel Business for 33 Years With a yearly production of five million satellite dishes and even more LNBs, Topsignal is one of the largest manufactures of these products. The company actually started in a completely different product segment: actuators and motors for satellite dishes. It’s an unusual development that we had a look at in the small city of Ninghai. Ninghai is located near Ningbo which itself is a three-hour train ride south of Shanghai. Zongbao King founded the company Manu R Distr R Whol R Shop Serv ë City, A Chairman 1 Chairman of■theHeinrichs, DMS International’s Tim Board CEO, Acworth, Zongbao King in his office in of Atlanta. He’s Georgia, northwest technical specifications and standards.” 188 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 09-10/2012 — www.TELE-satellite.com Some of the documents were translat- Shanghai Zongbao King ed into Chinese by her fellow students. Anna had managed to find a powerful market gap; anyone in China who was involved with receiver production or development of digital receiver software could view and download all the necessary documents from Anna. Alexander Wiese • OEM delivering exclusively to Wholesalers • Specializes in large production quantities • Produces millions of satellite dishes and LNBs It’s not easy to find women in leading positions in the digital TV business and it’s even rarer for women to actually start a company in this business. But that’s exactly what Anna Xie did: she started a website from nothing and in just 10 years built it up into China’s largest site for digital TV. It’s an exciting story that we wanted to hear about directly from her. 194 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2012 — www.TELE-satellite.com Shanghai’s Minhang District. Anna rented expansive office space on the fifth floor of a modern office building. 10 employees work there although DVBCN has an additional 13 employees. But more on that later. First we wanted to know how Anna managed to turn her website into China’s largest site for digital TV. She explains to us: “I come from Wenzhou in the Zhejiang Province.” This province is located south of Shanghai; Anna studied at the university in Shanghai. “I studied TV and radio journalism.” That was in 2001. And she was still a brand new student when she started her website DVBCN in 2002 (www. dvbcn.com). “At first it was just a forum to discuss technical information.” As you can tell by the website’s name, her forum dealt back then primarily with the new DVB technology. “We made available for download all documents, Manu Distr Whol Shop R Serv GM even those employees in marketing use DVBCN for up to date information on digital TV trade shows and exhibitions. Today DVBCN has over 200,000 registered users. 1. Chaofeng Ge is General Manager. He coordinates production and is always on the phone coordinating production with customer orders. 2. James You is Sales Manager and counts on the help of the Lion in front of the entrance to Topsignal’s building. Satellite Wholesaler and Meter Manufacturer DMS, USA • Always working enthusiastically on new products Tim also worked for the railroad in Nebraska and when word got around among his friends and coworkers that he liked to tinker with radios in his free time, they began bringing him defective radios, TVs and CBs. At first it was tedious, but later on it became routine for him to repair these devices. “Even the police came to me to repair their radios.” Tim was becoming more and more experienced in radio technology. In 1979 he read an article in a technical magazine about satellite reception. This new technology was irresistible to Tim; he simply had to have it. He spent a lot of money on his first three-meter dish. “Back then the dish antennas were • Enormous growth of the international market outside of North America quite heavy; they were made of fiberglass with metal braces and weighed 400 pounds.” Tim still remembers today what an experience it was to be able to receive a TV picture with his new dish. “It was an absolute sensation to be able to receive a signal from space from so Americas Busiest Satellite Enthusiast far away.” President of the company.” • Innovative expansion of signal analyzer models for 2012 ■ DMS International could be found here in the Northpoint Business Park with its two buildings and attached warehouse. In 1991 another big decision had to be made: the market in Nebraska was covered so in order to better expand his business the decision was made to move his company to Atlanta, Georgia. DMS International can still be found there today. “Transportation costs are cheaper here”, rationalizes Tim regarding this decision and then grins as he adds, “Besides, the weather is much better here.” Sure enough, the company experienced quite a boom in business. Vicky provides us with a few sales figures: “In 1991 DMS managed sales of roughly $2.0 million.” The company’s best year was 2008: “Back then we had sales of $12 million. Sales have pulled back a little bit since then although in 2009 they were still at about $9.0 million.” Tim Heinrichs from DMS Then came the turning point in Tim Heinrichs’ evening job: a farmer bought that dish from him. “That’s when it all started, next I bought two new dishes.” That was in 1980 and it was at this point that Tim Heinrichs recognized that there was a new business brewing. He sold and installed these dish antennas at a faster and faster rate. The breakthrough came in 1982: “I invested $40,000 and bought my first truckload of dishes - it was 500 three-meter antennas.” Tim Heinrichs young company became a satellite wholesaler. 186 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 09-10/2012 — www.TELE-satellite.com www.TELE-satellite.com — 09-10/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志 was officially entered into the London Company Register on 28th January 1938. 189 www.TELE-satellite.com — 1 1-12/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志 197 1. Vicky Heinrichs is the President of DMS International and runs the administrative 3 side of the company. 1. Chaofeng Ge is General Manager. He 2. Ivy Bliss is the receptionist and takes www.dvbcn.com www.51dtv.com coordinates production and is always on care of DMS International’s website the phone coordinating production with (www.dmsiusa.com). If you call the customer orders. outside of China to search for employcompany, Ivy is your first contact. 2. James You is Sales easees and also, vice versa, to make it Manager and counts 3. Tina Ryan handles the accounting on digital TV the Lion in front of the ier for Chinesethe help of specialists to entrance to Topsignal’s building. find a job with a foreign company. James You 4 “At first I worked both jobs; my regular job at the railroad and at nights and weekends at my own company DMS International.” That only worked for a few months: he had to make a decision and naturally he chose his own company. “My wife Vicky worked along side me from the beginning; at first she took care of the books and now she’s the COMPANY REPORT Original Equipment Manufacturer Topsignal, China For many years DMS International was a small company with very few employees: It was Vicky and Tim along with one or two warehouse and administrative employees. “Today we have 10 employees with a warehouse that is 14,000 Sq-ft in size.” Up until recently DMS International was mainly focused on the North American market, “that is, the USA, Canada and Mexico”, explains Tim. As recently as 2009/2010 • OEM delivering exclusively to Wholesalers • Specializes in large production quantities Millions From Topsignal • Produces millions of satellite dishes and LNBs • Majority of shipments go to South America • Expanding product palette to include high-quality LNBs and VSAT ■ Topsignal’s production plant in Ninghai, China. The administration building is to the left and two of the four production buildings are to the right. Satellite dishes and LNBs are manufactured here in large quantities. 200 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 09-10/2012 — www.TELE-satellite.com www.TELE-satellite.com — 09-10/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志 202 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 09-10/2012 — www.TELE-satellite.com COMPANY REPORT Digital TV Website DVBCN.com, China • Known by every digital TV company in China • Provides all information regarding digital TV • Expanding in the areas of recruitment and software development • Focusing in future technologies such as OTT and IPTV • Working on international expansion Largest Digital TV Website in China: DVBCN.com 4 210 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com • Known by every digital TV company in China • Provides all information regarding digital TV USA • Expanding in the areas of recruitment and software development ■ In the office building to the left in Shanghai’s Minhang district can be found DVBCN’s leased offices on the fifth floor. www.TELE-satellite.com — 06-07-08/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志 3. Some of the R&D engineers. A total of 10 engineers work here. www.TELE-satellite.com — 09-10/2012 4. View of the four production buildings as seen from the administration building 190 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 09-10/2012 — www.TELE-satellite.com — TELE-satellite International — 全球发行量最大的数字电视杂志 206 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 09-10/2012 — www.TELE-satellite.com CEO Wang Duo COMPANY REPORT ë Sales TeamOwner • Working on IPTV application programs • Planning on a program for OCR recognition of BBC’s EPG data COMPANY REPORT 200 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com ■ Neal is Managing Director for Hypex and personally takes care of their professional broadcast and cable TV customers. satellite magazine. The picture of the Eiffel Tower in his living room highlights the fact the he can speak French fluently and loves the French way of life. MD www.TELE-satellite.com — 06-07-08/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志 Rod Hewitt www.TELE-satellite.com — 06-07-08/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志 193 • Wrote one of the most successful stream reader programs • Developed a technical solution to archive TV channels for ‘Internet Archive’ • Working on IPTV application programs • Planning on a program for OCR recognition of BBC’s EPG data 200 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com ■ Rod Hewitt enjoys reading TELE- satellite magazine. The picture of the Eiffel Tower in his living room highlights the fact the he can speak French fluently and loves the French way of life. www.TELE-satellite.com — 06-07-08/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志 201 • Working on IPTV application programs • Planning on a program for OCR recognition of BBC’s EPG data www.TELE-audiovision.com/TELE-satellite-1205/eng/hypex-icecrypt-uk.pdf COMPANY REPORT Wholesaler Hypex, UK Professional products from a professional dealer 201 • Ships large dishes to Great Britain and Europe • Offers successful product lines from ICECRYPT and GLOBALINVACOM • Low prices thanks to minimal overhead costs • Consistent sales despite pricing pressure ■ An image from the old days: Hypex resided here up until recently. Now the company moved into a 6000 square foot warehouse only about a mile from here in Wembley in western London. Neal 172 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com • Ships large dishes to Great Britain and Europe • Offers successful product lines from ICECRYPT and GLOBALINVACOM Ricks Satellite, USA - Distributor Manu R Distr R Whol R Shop Serv Software Programmierer Rod Hewitt, USA The Man Behind TSReader: Hewitt ■ Rod Hewitt enjoys reading TELE- 185 www.TELE-audiovision.com/TELE-satellite-1207/eng/tsreader-rod-hewitt.pdf Chengdu, Rod Hewitt • Developed a technical solution to archive TV channels for ‘Internet Archive’ 207 www.TELE-satellite.com — 06-07-08/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志 • Opening a new fully automatic satellite dish production line • Focusing on top-of-the-line Quality dishes Wembley • Wrote one of the most successful stream reader programs • Developed a technical solution to archive TV channels for ‘Internet Archive’ • Wrote one of the most successful stream reader programs • Opening a new fully automatic satellite dish production line • Focusing on top-of-the-line Quality dishes www.TELE-satellite.com — 09-10/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志 184 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com ë • Large investment in Quality Assurance • Expanding VSAT and Ka-Band production of SVEC’s administration building in Chengdu in China's Sichuan province. The manufacturing facilities can be found directly behind the administration building. High Investment Rod in Product Quality Hypex, UK - Distributor Professional Dish Manufacturer SVEC, China ■ A large dish highlights the location 5 Becky Software Programmierer Rod Hewitt, USA Not many digital TV product dealers among other things DX Sichuan ■SVEC CEO Wang Duo can boast over 30 years success in the Communications amateur Frieda Kahlo, 1. Kahlo, named herself after the painter handles the SVEC advertisement in TELE-satellite. business (in 2012 it will be 33 years). radio 2.receivers. Relatives 15 employees Becky runs the SVEC sales team with 3. Milton and his team take care of SVEC customers in his family came later One of the few wholesalers that fall into from North and South America 4. Betty Lee runs the sales team for India and Africa this category is the company Hypex in on and Astarted SVEC sales teamfor histhe left 5. look into the working offices. To is Belinda, responsible for The Far East and to the right Nina, responsible for The Middle East. London. We paid a visit to them just company is and so Hypex became before they moved into their new ware- stronger and stronger over the years. Just a192 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com few years ago the company behouse. SVEC (Sichuan Video Equipment dishes with diameters of 2.4 meters. Great reported on SVEC back in came a limited liability corporation and outside ofWe alreadyBritain.” Hypex customCompany) has been manufacturing sa- Lately SVEC is concentrating on expan- TELE-satellite 02-03/2010 issue. Even ding their professional antenna be then we already away how tellite antennas of all sizes under Hypex was founded in 1979 by Shyv now operates since 1993. the name Hypex,VSATers can back found as farmentionedas MalayProduction quantities are enormous: business. “We also offer Ka-Band di- SVEC was becoming active in VSAT and sia. Neal explains how it came to Sood. He is an electrical engineer and Ltd. SVEC manufactures several million shes for Internet-via satellite”, we learn the Ka-Band. Since then SVEC has in- that: dishes each month. The most popu- from Becky, Manager of the Internatio- vested enormously to not only guaranour company recognized back then the need for com- dish types are 60 and 75cm off- nal Sales Team. And, really, “Over those many years also to raise that’s the tee production quality but lar a visit to the quality to well-known and set Hypex is a are 1.2 and reason why we does mercial receivers and other broadcast- antennas. Next in line pure wholesaler andcame to pay has become very new levels; levels that areestab1.5-meter diameter dishes. But SVEC SVEC: professional products require unheard of for a manufacturer that pronot sell to end users. professional Director lished and aside from that month. Asian ing equipment. duces millions of dishes every many also manufactures large segmented Managing production. Neal tells us more: “We ship to roughly companies have their own branch office 186 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com As a one-man operation he sold 600 active dealers of which 15% are in Great Britain. For those it’s much sim- The Man Behind TSReader: 3. Some of the R&D engineers. A total of 10 engineers work here. 4. 4 View of the four production buildings as seen from the administration building 206 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 09-10/2012 — www.TELE-satellite.com TSReader, USA - AnalyzerSVEC Software Manu R Distr Whol Shop Serv COMPANY REPORT SVEC’s Quality 215 Offensive www.TELE-satellite.com — 06-07-08/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志 3 1 R Manu Distr Whol Shop Serv www.TELE-satellite.com — 09-10/2012 — TELE-satellite International — 全球发行 Sales 2 Wholesaler Hypex, UK Success with • Large investment in Quality Assurance range of • Expanding VSAT and Ka-Band production products 191 www.TELE-audiovision.com/TELE-satellite-1207/eng/svec.pdf 214 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com COMPANY REPORT 211 • Focusing in future technologies such as OTT and IPTV • Working on international expansion Professional Dish Manufacturer SVEC, China 212 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 06-07-08/2012 — www.TELE-satellite.com R Manu Distr Whol Shop Serv 201 www.TELE-audiovision.com/TELE-satellite-1207/eng/dvbcn.com.pdf Chief Editor Victor Ho Anna Xie SVEC, China - Satellite Dishes 187 • Majority of shipments go to South America 2 3 • Expanding product palette to include high-quality LNBs and VSAT news and test reports on DVBCN. He is DVBCN’s Chief Editor. COMPANY REPORT 195 • Special focus on signal analyzers for the semiprofessional ■ Two electronics technicians founded the company in 1937; it Chaofeng Ge 2 ■Victor Ho oversees the the largest website for digital TV in China (www.dvbcn.com). Recently DVBCN began cooperating with TELE-satellite. The first DVBCN ad appeared in the TELE-satellite issue that Anna is holding in her hand. COMPANY REPORT sions in the 27 MHz range would skip off the ionosphere or troposphere allowing for two-way communications over extremely long distances. “Back then I collected QSL cards from my contacts and managed to collect nearly 1000 of those cards.” But that was still not enough for Anna But Anna was not satisfied with one - in 2011 she founded yet another busiwebsite. “The main site is just a base ness segment in her own company: website”, she explains, “but two other Digital Technology Ltd. develops digibusiness segments are above all finan- tal TV software. This segment imme“By 2004 we already 1-12/2012 — reg- cially successful.” Since so many profes- diately www.TELE-satellite.com — 1had 80,000 TELE-satellite International — 全球发行量最大的数字电视杂志 197 caught on; this is the company istered users”, remembers Anna about sional digital technical users have come with the additional 13 employees we the quickly growing popularity of her together on DVBCN, it was actually quite had mentioned earlier, although they’re website. “We also offered the source easy to provide them and digital TV not located in Shanghai. “10 engineers codes for DVB applications and DVB an- firms a platform where workers could work in an office in Hangzhou plus one find new jobs and digital TV companies additional engineer each in Shenzhen, alyzer information.” could find new employees: In 2005 Anna Chengdu and Beijing.” A natural development of her down- started her new website www.51dtv. What are these engineers doing at load forum website was the start of a com that resembles a recruiting comdiscussion page and not long after that pany; the number 51 is Chinese for “I these locations? “We are primarily working on the DLNAOTT technology, that is, a news page was started. Today DVBCN need”. the integration of mobile telephone, lapis the most viewed website in China for At the moment www.51dtv.com is only top and TV under the term Multi Screen anyone that in one form or another is connected with digital TV. Technicians available in Chinese but Anna is in the Interaction.” This means that what you can find not only valuable information process of creating an English version see on a display screen, for example, for their work on the DVBCN site, but that would make it easier for companies on a mobile telephone screen, can be Owner ■Anna Xie is founder and owner of DVBCN, • Sells and ships almost exclusively to end users • Expanding into new business segments such as WLAN and IPTV • Sells and ships almost exclusively to end users • Expanding into new business segments such as WLAN and IPTV 3 DVBCN, China - Internet News and Job Forum DVBCN’s offices can be found in • Optimized assortment for digital TV needs in Brazil www.TELE-satellite.com — 1 1-12/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志 www.TELE-audiovision.com/TELE-satellite-1209/eng/topsignal.pdf Success in the Sales testing an FS2 signal analyzer beta model. Digital TV Website DVBCN.com, China ë 185 • Imports all of its products from China USATel in Sao Paulo company is secretary and receptionist Letica Lacender www.TELE-satellite.com — 1 1-12/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志 2 ■Topsignal’s Founder and How Anna Built up DVBCN.com in Just 10 Years www.TELE-satellite.com — 1 1-12/2012 — TELE-satellite International — 全球发行量最大的数字电视杂志 ica • Innovative expansion of signal analyzer models for 2012 Many of Antiference’s success products are on display in their showroom including HDMI components, TV amplifiers as well as cable head ends. Topsignal, China - Satellite Dishes e International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2012 — www.TELE-satellite.com ■ The spirit of the Letica Lacender The company went through a series of ups and downs in the demand for antennas so they began to diversify. This went so far that even a curtain 188 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2012 — www.TELE-satellite.com COMPANY REPORT • Expanding distribution network to the European market • Offers their own products as OEM and private label www.TELE-audiovision.com/TELE-satellite-1209/eng/dms-international.pdf President 1 • Always working enthusiastically on new products ■ • Special focus on signal analyzers for the semi-professional 186 • Enormous growth of the international market outside of North AmerR Manu Distr Whol Shop Serv • Provides all the components needed for TV reception • Expanding into HDMI distribution, as well as wireless solutions Villa can be found online shop USATel’s headquarters in Sao Paulo, Brazil. Administration can be found in the right side of the building; the warehouse can be seen in the background. Tim Vicky Two other product groups are today’s are almost the same is simply that the sales giants at Topsignal: “In 2008 we dishes and LNBs are sold in sets. A Heinrichs Heinrichs 196 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2012 — www.TELE-satellite.com • Manufacturing TV antennas since 1937 ■ Behind this unremarkable wall of a small Allam Almughrabin ë CEO TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2012 — www.TELE-satellite.com building in the Fradley Distribution Park in Lichfield near Birmingham, UK. There’s also a logistics center in Lichfield. 184 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2012 — www.TELE-satellite.com COMPANY REPORT Digital TV Retailer USATel, Sao Paulo, Brazil In 1938 their young company became a limited liability company in the There aren’t too many companies heed and Marietta northwest Acworth, London Company Register and the two that have hung around for decades and of Atlanta, Georgia, USA, we Atlanta, GA, USA at the same time are still in the same found Tim Heinrichs and his young owners hired their first employbusiness segment. DMS International, wife Vicky, the President of Ninghai which has been in existence since the the company. We wanted to Back then TV antennas were conees. very early days of TV reception via know how DMS International sidered real high-tech products and (Ningbo) satellite, belongs to that group. Tim became what it is today. 1 Heinrichs is Founder and CEO of satelthe number of customers they had was Tim Heinrichs has been a DXer lite wholesaler DMS International and if excited about you’ve been in the same business for so for a long time: he was very small. It all really began to take long, there’s absolutely no doubt that CB communications when it first startcommunicate wirelessly with each other off in the 1950’s when TVs became afed and all that you are a back in the year in Ninghaireal enthusiast. In the small2003. Back could be done with it. without too much in the form of techtown of Acworth, not too far from Lock- It allowed people for the first timeand nical requirements. for really? In 1968 fordable to the demand Oh antennas then antenna motors for satellite dishes Tim erected a tower 25 meters high for skyrocketed. his CB company,used it to listen in The antenna. He that up unwere in demand and Zongbao King built when railroad employees talked to each til then had its headquarters in central a production facility for these motors. other, when construction companies London, moved toon workoutskirts of the passed the orders to their builders, “Unfortunately, today there’s not much when truck drivers warned others of racity and manufactured TV antennas dar traps on satellite when the demand for these motors anymore”, started manufacturing the highways anddishwith nearly 250 employees. That initial police would coordinate road blocks with explains Sales Manager James You to es and in 2011 we started But Tim was espetheir headquarters. producing boom slowly cially fascinated then in 1964 faded but us. Order quantities have steadily de- LNBs.” The quantities are with the phenomenon huge: nearly of “skip” transmissions: under the BBC started their second channel incertain creased, “but we can still handle any a half million satellite dishes are transmisweather conditions CB radio proThe UHF monthly and evena more LNBs. spirit of the band. That meant renewed ■dekind of order since our storeroom is still duced company is secretary mand, this time production numbers fully stocked.” The reason these for UHF antennas. and receptionist Lichfield DMS International, USA - Distributor (Birmingham) ■ Antiference’s administration Now the connection is beginning to make sense. Bitek is one of the largest antenna distributors in Australia and an antenna manufacturer in China while Antiference is one of the largest antenna manufacturers and distributors in Great Britain. For Kaz Bialecki by those antennas that were not perto the frequency. The antennas from Antiference were the solution to that problem; they reduced interference. fectly matched Original Equipment Manufacturer Topsignal, China l Pereira is USATel’s Manager. The workshop can be seen in nd 75 Years of TV Antennas from Antiference CFO Satellite Wholesaler and Meter Manufacturer DMS, USA Pereira Antenna and HDMI Manufacturer, UK www.TELE-audiovision.com/TELE-satellite-1211/eng/usatel.pdf European Export Manager and the first contact for dealers that want to Europe. He can be directly reached by owner of the company, also comes from Syria. “We have sales of about 100,000 US dollars every year”, he reveals to us after taking a look at his e-mail at Arnold@antiference.co.uk books. Enormous Numbers • Imports all of its products from China for the World Market • Optimized assortment for digital TV needs in Brazil ë How did someone from Australia end up buying a British company? It turns out that this was a very logical development. “In the 1990’s Kaz Bialecki started a company in Australia that installed distribute Antiference’s products in ■ The company’s Financial Manager is Allam Almughrabi, who, just like the COMPANY REPORT COMPANY REPORT • Expanding distribution network to the European market • Offers their own products as OEM and private label ■ Arnold Boeijen is Antiference’s MD antenna systems.” Not long after that he expanded his activities to include an antenna installation wholesale business. “Today his company Bitek operates five branch offices all across Australia.” In 2007 Kaz Bialecki started his own manufacturing: “In Guangzhou, China, 150 employees produce antennas and accessories, that is, things like LCD holders, antenna mounts, antenna outlets and other installation material.” Owner Rick Caylor TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com 173 • Low prices thanks to minimal overhead costs • Consistent sales despite pricing pressure www.TELE-audiovision.com/TELE-satellite-1205/eng/ricks-satellite-azbox.pdf Owner 10 Years COMPANY REPORT Satellite Dealer Ricks Satellite, Kansas City, USA • celebrates its 10th anniversary in 2012 Bobbie & Rick Rick Caylor • distributes AZBox's receivers in North America • is an enthusiastic satellite feedhunter • sees a good future for the FTA market in North America ■ A typical residential home in the USA. Looking from the street there are no satellite dishes to be seen and there’s also no company sign to suggest that there’s a successful online satellite shop hidden inside. A knock on the door reveals Bobbie and Rick along with Ricks Satellite which can be found in the Internet at www.rickssatelliteusa.com. 156 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com • celebrates its 10th anniversary in 2012 174 • distributes AZBox’s receivers in North America www.TELE-satellite.com — 04-05/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine www.TELE-satellite.com — 04-05/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine • is an enthusiastic satellite feedhunter • sees a good future for the FTA market in North America 214 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com 157
  • 215.
    行量最大的数字电视杂志 207 www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 215
  • 216.
    TELE-audiovision Global CompanyDirectory ■Scott Greczkowski with a T-shirt from SatelliteGuys.us in front of his two motorized dishes, on the left a 1.5-meter offset antenna and in the middle a 2.5-meter prime focus dish both of which are currently pointed to 85W. StelliteGuys, USA - Internet Forum Manu Distr Whol Shop R Serv Headend Manufacturer Wadt, Brazil COMPANY REPORT www.TELE-audiovision.com/TELE-satellite-1205/eng/satelliteguys.us.pdf Owner COMPANY REPORT A Family Company Wadt, Brazil Headend Manufacturer COMPANY REPORT Scott in the Cable Distribution Field Greczkowski Scott's SatelliteGuys A Family Company in the Cable Distribution Field 206 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com • Provides assistance with technical satellite reception questions • Founded by Scott as a non-profit forum • All advertising income is reinvested in better technology The company Wadt has been in existence for three generations. It was founded by Nelson Wadt back in 1945. It’s a story of emigration in that Nelson Wadt is originally from Germany. COMPANY REPORT cessful for so many years, is all by itself interesting because of its success, but since they manufacture cable distribution equipment, it’s the perfect reason for us to pay them a visit. The company, that has been suc- The company founder’s grandson, Joao Alfredo Wadt Miranda, who today is the company’s Technical Director, “Wadt’s best times were before 1994”, remembers the company founder’s Grandson, “Back then we Sowell, China - IPTV Receivers ë R Manu Distr Whol Shop Serv IPTV Largest SA ë is Future GM São Paulo • Already operating the first IPTV project • 3D planned for the future • 60% of all Sowell receivers are already HD Neide Wadt COMPANY REPORT www.TELE-satellite.com — 04-05/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine 149 Wadt’s finances. Joao, Neide’s son and clue to what goes on inside this building; it caught the interest of the TELE-satellite editorial staff: the company Eletronica Wadt, which has been involved with reception technology since 1945, resides here. • Involved in HF for more than 60 years • New allocation of cable licenses in Brazil opens up huge opportunities for the company vinced that exports will also pick up: “With our new DVB-T2 and DVB-S2 receivers we will increase our market share and the upcoming football world cup will increase ISDB-T sales in South America.” It’s becoming clear that Panodic is • Specialized products for cable headends • Only ships domestically ë COMPANY REPORT Shenzhen ë Satellite Information Website BSD, Brasil ■Richard is Vice General Manager and runs the Jiuzhou R&D team with 200 engineers. Even though it appears that this can all be easily accomplished technically, two things have to be kept in mind: the first has to do with a license since there are many Internet services that have to be paid for. The second is that even ë Bratislava Founder though older digital receivers can be upgraded with OTT, they might not be good enough to truly take advantage of OTT. “The chips get faster and faster every day and if you upgrade a digital receiver that has an older chipset with OTT, you might not be able to enjoy these OTT services interference-free.” COMPANY REPORT ■ The OTT Development Team works on the sixth floor of the Jiuzhou Electric Building in Nanshan’s Hightech Park in Shenzhen, China. The end result is that it would be far better to upgrade a new digital receiver with OTT services; only then would the menu operation and the speed and capabilities of the built-in chips be optimal for these OTT services. www.panodic.com Engineers in Research & Development | Total Number of Employees The OTT technology is so important to Jiuzhou that they have put together a dedicated development team: “There are 20 engineers working in the OTT Team”, we learn from Vice General Manager Richard who is responsible for the R&D Team. “Our entire R&D Team 1. engineers”, clarifies consists of 200Huang Wei is one of the founders of MICO/Panodic. He Vice General Manager Richard, “We’re takes care of the working with strategic orientation of production. the Android as well as with the Linux2. Xu Haisystems.” operating Bin is Panodic’s CEO. He’s ■Receptionist Yan Jing greets visitors in the lobby COMPANY REPORT 该独家报道由高级编辑所作 ■Panodic’s Marketing 155 Receiver Manufacturer Panodic, China R&D teams of OEM/ODM manufacturer Panodic can be found in the futuristic Grentech Building in Shenzhen’s High Tech Park. in charge of the company’s daily Department operations and can reveal to us: “In Manager Yongjun Zhang is in charge of the Application Team 2011 we achieved sales of 70 million consisting of ten engineers. This is USD and in 2012 we’re expecting an where the functioning of the software increase to 100 million USD.” is tested and optimized so that end users won’t have any trouble accessing all the different Internet services with their Jiuzhou receiver later on. by Luo Shigang • Multiple quality control points before, during and after production • Concentrating on digital TV products • Cooperating with many license providers • Continuous product palette expansion 126 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine 127 • Cooperating with many license providers • Continuous product palette expansion GM www.TELE-audiovision.com/TELE-satellite-1203/sortec.pdf Sales Sales Number in Professional Pavol Macko Alexander Záhončík 159 COMPANY REPORT Wholesaler and Installer SORTEC, Slovakia One Average Turnover (Previous, This, Next Year Estimates) Installations Production Certificates RoHS, DVB, EMC Ladislav Šmárik Production Categories OEM Main Products Receivers for DVB-T/T2, DVB-S/S2, DVB-C, ISDB-TB, IPTV, DVD Players, Projectors www.TELE-satellite.com/TELE-satellite-1201/eng/panodic.pdf • One of the largest wholesalers in Slovakia New Receiver from • Success through distribution of well-known, high-quality brand names TURBOSAT Turbosat, UK - Receivers Pavol Lukáč ë TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com Sales ë Chris Ward ë BSD, Brazil - Internet Forum of ideas: TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com Manu Owner A successful climb Distr Whol Marcus Shop 128 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com Bernardini R Serv www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine erecting TV antennas”, he remembers, “This was at the same time when Hungary started their second TV chanBut first we wanted to learn more nel via UHF.” His first customer was about Posta’s Company P-SAT. Obvihis parents. And then it happened as ously, the “P” in P-SAT stands for his it usually Largest Digital TV Trade Magazine 02-03/2012 — name Posta. “The company146 TELE-satellite International — The World‘sdoes: friends and— relatives P-SAT Kft would call and Tibor Posta ended up was founded in 2002”, explains Tibor with more and more work to do. Back Posta. Before that time he was an anthen he lived in eastern Hungary and tenna installer. “In 1991 I started out • Operates Brazil’s largest digital TV website • Engaged in the further education of digital TV antenna installers P-Sat, Hungary - Distributor everything an antenna installer would need, including fiber optic LNBs from GlobalInvacom, can be found in his shop. • Has its own customer magazine • Created supermarket style store 248 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 12-01/2012 • Active in new technologies such as fiber optics and IPTV headquarters in Bratislava, Slovakia. SORTEC just leases this space and will move to their own new building in 2012. www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine 179 133 www.TELE-satellite.com COMPANY REPORT „Small and Valuable“ 183 • own receiver line ICECRYPT • 50% of sales outside Great Britain • Focus on receivers, CAM, SmartCards and LNBs • 80,000 receivers a year • produces Dolly Buster TV programming via HOTBIRD ■ TURBOSAT’s headquarters in Sittingbourne south east of London 144 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine 145 • 80,000 receivers a year • produces Dolly Buster TV programming via HOTBIRD www.TELE-audiovision.com/TELE-satellite-1201/bsd.pdf www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine to this problem is P-SAT in Hungary. The founder and operator of this company, Tibor Posta, gave us some insight into how he solved the problem of winning new customers. ■ Tibor Posta is founder and majority owner of P-SAT. Anything and • Success through distribution of wellknown, high-quality brand names • Move to their own building in 2012 ■ Wholesaler SORTEC’s 178 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com • Move to their own building in 2012 • Active in new technologies such as fiber optics and IPTV Technical Director Ray Gargiulo • own receiver line ICECRYPT • 50% of sales outside Great Britain • Focus on receivers, CAM, SmartCards and LNBs Active and full • One of the largest wholesalers in Slovakia www.TELE-audiovision.com/TELE-satellite-1203/turbosat-icecrypt.pdf R Manu R Distr R Whol Shop R Serv Manu ■ Marcus Bernardini, aka R in his garden. In the Distr Benni, background is his 5.0R meter antenna as well as Whol his 1.5-meter dish. Benni is the operator of the www. Shop portalbsd.com.br website that focuses on satellite Serv interests in Brazil. • Upgrade of older digital receivers possible with a software upgrade www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine ■ The administration and Director is Alan Yu. He is a loyal reader of TELE-satellite. company MICO in Hong Kong. Their 2.Slovakia are Director is Ray Technical the 80cm and 90cm anGargiulo. One of his main make up about 50% tennas; they make up of more attractive channels sales the while found is in motion.”about 90%driver In addition to the production facility of our can bewith car tasksdish to check production “The 2 first product: a DVD player. Since then is sales”, says ĽubošThe our Bezák. our CAM’s accountingeast about 20%. on ASTRA at 23.5 for but there are samples this the manufacturer reason for out the Group also in- of with the they have gotten larger and larger so in Bao’an, the Panodic SmartCards follow with 15%course is lookingfrom is that for Slovakians the inmore attractive channels isfront winKorea. “TURBOSAT can be found also many free-to-air (FTA) channels 1 3 on ASTRA at 23.5 east is comon ASTRA at “20 that in consisting 19.2 eastdow they want an ODM Panodic but planning that today they are one of the top five cludes a branch office rest Beijing. of other satelliteat the traffic. (Original Design there are Manufacturer)”, he explains, also many free-to-air (FTA) channels own to see”, Bezák. That’s ponents such as our ownto make on at available in product 19.2 the receivers; on our receiver manufacturers in China with engineers work there primarilycontinues ĽubošLNB series.” this “OurASTRA Manufacturing they want the Sittingbourne Engineersterrestrial east that explains design reception”, why these of LNBs dishes be consid1. Pavol Macko is SORTEC’s General Manager digital to see”, continues Ľuboš Bezák. That’s The quantitylarger 132 mayare fitted with 1. Huang Wei is one of the founders 2 4 of MICO/Panodic. He takes care of the 2. Ľuboš Bezák SORTEC‘s E-shop Manager. 2012.larger then these The domestic their lowsatellites the receivers based are fitted more than 1200 production employ- IP receiver’s software. erable but becauseso that both quarter of whyĽuboš Bezák.aredisheson these with monoblock LNBs of first sales manufactured 3. It’s always busy in SORTEC’s satellite store monoblock LNBs so that both satellites strategic orientation of production. where end-users shop. Three sales personnel take But only make up care of the customers' needs. workingretail storesbusiness. “The found there.” ees and over 100 R&D engineers. The sales team can also be can they don’t have much“We’re also designs.”theseof SORTEC’sprojectors”, value be received. of an imcan be received. on about 15% 2. Xu Hai Bin is Panodic’s CEO. He’s 4. Two of the four SORTEC Sales Managers: ■ International Sales largest portion of comes from Alexander Záhončík (left) and Pavol Lukáč (right). on overall sales. Manager Chris Ward in in charge of the company’s daily Sure instalPanodic was founded in 1992 Yu technology and marketing departments For the Chinese market,pactSORTEC offers said Alan by surprisingly.our salesin ourenough, SORTEC was business and 1992 by founded our wholesale front of small sampling operations and can reveal to us: “In of TURBOSAT’s Ladislav Šmárik. Back then he was an lation work”, explains E-shop Manager products: ICECRYPT Ladislav then 2011 we achieved sales of 70 million of HD there are acmore and receivers. in these days antenna installer andour wholesale sucare located in the Shenzhen High Tech primarily DVB-C LNBs. He IPTV highŠmárik. Back sales he was an Ľuboš Bezák, “From was very receivers and The SmartCard figures tivity 90% of installation of instalUSD and in 2012 we’re expecting an is the contact for new cessful with thesales comes from profesantenna was lations dealers in Europe and interested in Park; the production facility is only a “TV and Internet are constantlyinstaller and and very suc- viewers and the remaining 10% comes TV increase to 100 million USD.” comes from merg- TURBOSATmore another busisional systems such as those for entire other areas. cessful with the installation of profesfrom our cooperation with large store in larger communities. ness branch. “We have projectors. chains.” For and projector reallydelivers half hour car ride away in Fuyong in the ing closer and closer together; we are as the exclusive “A housing blocks these hyper markets makes sional systems such those for entire large electronic chains SORTEC rights for blocks in larger communities. This complete (Master Antenna) include housing the Dolly Buster adult-oricomments and then Bao’an District. We paid a visit to both integrating Internet services with our HD beautiful”, he MATVsatellite systems thatinstalladish, LNB and receiver. ented TV service”, reveals Chris Ward. are facilities to see for ourselves how Pan- DVB-C receivers.” International — ThehaveLargest Digital TV Trade Magazineon 02-03/2012 — www.TELE-satellite.com first samples sizes in al182 TELE-satellite World‘s — HOTBIRD www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine 183 “The most requested dish “WeThis MATV (Master Antenna) installa-“The five channels promises, Slovakia are the 80cm and 90cm an■ and we sell our Dolly ready completed tennas; they make up about 90% set to Ladislav Šmárik is with production of Panodic started exporting their DVB Buster Smartodic managed to get this far. Jundiaísays Ľuboš Bezák. “The SORTEC’s Founder and our dish sales”, Cards reason this is that for Slovakians the products in 2005. “The first receiver begin in So, obviously International — The question is Trade Magazine — 02-03/2012 — www.TELE-satellite.com to any country where HOTBIRDthe secondforquarter of 2012.”President 182 TELE-satellite the first World‘s Largest Digital TV www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine more attractive channels can be found can be received.” on ASTRA at 23.5 east but then. “In there are (São Paulo) this: is the company name MICO or that we manufactured for export was 3D can’t be all that far away channels also many free-to-air (FTA) ASTRA at 19.2 east want And now we come the third we’ll That’s Panodic? Marketing Director Alan Yu a DVB-T receiver for Great Britain”, re- back to the mot- quarteronof 2012Ľubošthat theyalso be to see”, continues Bezák. why these dishes to that also the introducing receivers larger so that are fitted with with both satellites integrated has the answer for us: “The company members Alan Yu. That waswe highlighted earlier, “Small monoblock LNBs and Valuable”. TURBOSAT has placed can be received. 3D converters.” time that Panodic MICO Hongkong REPORT Wholesaler and Shop P-SAT, Hungary expanded into the small products COMPANY still exists and is the its entire focus on SORTEC was founded in 1992 by Ladislav Šmárik. Back then he was an Where prodparent company of the Panodic Group. then new receiver business. “Panod- to ship. “For thiscan you find Panodic’s sucsince they are easier antenna installer www.TELE-satellite.com 180 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — and was very reason we don’t deal cessful with only sold about installation ucts? and MICO has its headquarters in Hong ic’s R&D engineers have accomplished with larger“In 2011 we still thesuch as thoseof professional systems for entire heavier products”, explains Paddy. housing domestically Kong and that’s where you’ll also find quite a bit in just a short time: “We’re 10% of our products blocks in larger communities. here TURBOSAT concentrates on valuable This MATV (Master Antenna) installain China. the Panodic Group’s financial manage- introducing a new combination receiverreceivers, small The remaining 90% were ex2 products such as 182 183 for DVB-S2 and DVB-T as well as for ported. In 2012 it will shift to about ment and logistics.” Budapest Linux-based IP 20% Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com Panodic itself was founded in Shen- DVB-S2 and ISDB-T.” A 150 TELE-satellite International — The World‘s domestic and 80% export.” Alan Yu is expecting to see an increase in zhen in 2009 and sold their products box was also completed just now. “An interesting niche is DVB-T mod- DVB-C as well as ABS, the Chinese digiunder this name to the local market in China. The company’s products are also ules for reception in a car.” This mod- tal satellite TV standard. 130 But the Marketing Director is conconnected to exported under every possible brand ule with DVB-T/MPEG4 isTELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com Anyone, whether it’s a manufacturer or a dealer, who has something to sell has the same problem: how do you win new customers? What good is the best product if no one knows about it? What use are all those sensational offers if no one is aware of them? How do you make your potential customers notice your products? Every successful manufacturer and every successful dealer managed to find their own solution. A wholesaler that came up with an especially interesting solution • Dedicated OTT development team • Market for OTT in Europe and North America 154 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com The best part is that OTT is only being such as phase from to the to in the transition IPTV. Thanks analogappearance of more and more hybrid receivers, the 1. Pavol Macko is SORTEC’s General Manager erdigital terrestrial national market in sales: “For the reception”, explains www.TELE-satellite.com — Trade Magazine 157 integration with the 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Ľuboš Bezák SORTEC‘s E-shop Manager. Internet is moving 4 2. Ľuboš Bezák. Great Britain it’s the T5000 for DVB-T more and more to the forefront. 3. It’s always busy in SORTEC’s satellite store and it’s brother the T2400 with PVR for where end-users shop. Three sales personnel take And that’s how Panodic managed to But these retail stores only make up care of the customers' needs. DVB-T2 as well as the ICECRYPT 3000 work themselves up into the group of about 15% of SORTEC’s business. “The 4. Two of the four SORTEC Sales Managers: for the European market.” The latter top five manufacturers in just a few largest portion of our sales comes from Alexander Záhončík (left) and Pavol Lukáč (right). 1 3 receiver we already introduced to instalyears. From the original three-man our wholesale business and our you in lation TELE-satellite 08-09/2011 isour work”, explains E-shop Manager founding team the company has grown sue withBezák, “From our wholesale acĽuboš a detailed test report. “The to over 1500 employees and there’s no 1. Pavol Macko is SORTEC’s General Manager digital terrestrial reception”, explains 2 4 2. Ľuboš Bezák SORTEC‘s E-shop Manager. 158 TELE-satellite International —Bezák. Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com www.TELE-satellite.com — 02-03/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine Ľuboš The World‘s T2400 even comes with a 2.0from instaltivity 90% of sales comes terabyte end in sight. Alan Yu: “We are constant3. It’s always busy in SORTEC’s satellite store hard drive!” saysremaining Normally, lations and the ‘Paddy’. 10% comes where end-users shop. Three sales personnel take ly working on designing and developing But these retail stores only make up care of the customers' needs. PANODIC from our cooperation with large store such high-capacity hard drives can’t Company Details 15% of SORTEC’s business. “The about higher quality products. This includes, 4. Two of the four SORTEC Sales Managers: ▼ Alexander Záhončík (left) and Pavol Lukáč (right). bechains.” For these hyperchip makes 0............................largest portion of our sales comes from connected. “A special markets and ▼ 1000 .............................. 2000 above all, hybrid receivers.” These are our wholesale business and our instal▼ it large electronic chains SORTEC delivers possible.” 0................................ 50 ................. 100 Mio US$ lation work”, explains E-shop Manager receivers that are mostly interesting to Ľuboš Bezák, “From our wholesale accomplete satellite systems that include operators. tivity 90% of sales comes from instaldish, at TURBOSAT are 1 Sales LNB and receiver. divided into The expansion of their product pallations and the remaining 10% comes from our cooperation with large store two regions: “Half of our sales are ette suggests that Panodic will continue chains.” For these hyper markets and “The most requested dish sizes in to climb higher in the ranks of top class domestically here in Great Britain; large electronic chains SORTEC delivers Slovakia are the and 90cm anTELE-satellite International — DVD video screen in the name, just not the Panodic name. is to 80cmthe Interna- players 130 the Technical include The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com “We companies. 1.complete in A look satellite systems that the other half Europe.” tennas; they make about dish, Department. receiver. passengers can export as an OEM and tional Sales Manager Chris Ward90% ofseatedLNB and Defective units are use ODM manufac- upcar.” Rear tells quickly repaired here.. our dish sales”, says Ľuboš Bezák. “The Britain COMPANY REPORTus Wholesaler and ICECRYPT remote control most requested dish sizes in more: this a receivers turer and don’t use our name at “Our isManufacturer TURBOSAT, Great “The to change channels reason forall.” that for Slovakians the Founder • Developes Digital TV receivers optimized for OTT The Jiuzhou development team is working feverishly on the best possible solutions for OTT. cusing on these two markets”, confirms Jimmy Zhang, “Buying power is the highest there.” 156 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 02-03/2012 — www.TELE-satellite.com Receiver Manufacturer, China Digital TV Manufacturer Jiuzhou, China Over-The-Top by Jiuzhou • Market for OTT in Europe and North America • Upgrade of older digital receivers possible with a software upgrade 2 Always Active You Zhen When it Has Yu • Multiple quality control to Do withon digitalpoints before, during and after production • Concentrating TV products Digital TV Sortec, Slovakia - Distributors Manu R Distr R Whol Shop In 1999 three technically enthusiastic young entrepreneurs founded the Serv 165 www.TELE-audiovision.com/TELE-satellite-1203/panodic.pdf not a manufacturer that produces only 1 Founderthere are orders; they are continCEO Marketing when One of the uously active in further development. Top Five: “We are cooperating with many indusManager Panodic trial partners, such as, NDS, more shops in the east.” SORTEC will Conax, SuperNovelTV as covered with then have Slovakia nicely well as chip manufacHuang storesand Ali. you canalso received turers their satellite ST where We’ve find licenses from Sisvel DivX and in addition to all the necessary satellite Inview.” Inview is everything components, also a provider of terWei reception.Internet-basedforEPG informa- Hai Bin Xu Alan Yu additional data restrial tion and “Slovakia is currently SORTEC is not only an inIn 20 years a company went from starting off as a small installation op- staller and wholesaler; they becoming exports will also also operate five retail stores 166 TELE-satellite International — The World‘s Largest Digitaleration Magazine — 04-05/2012largest pro- pick up: TV Trade to vinced that the — www.TELE-satellite.com ansales figures are supported by “With our Slovakia and at from which end users can buy ■Company founder: fessional installer in new DVB-T2 and DVB-S2 other important reason: TURBOSAT You Zhen Yu. He the same time has becomelisted of theevery Zhang is digital TV need for television and receivers we will one increase our anything they market receivers are with ■Jimmy large two other partners share andin the country. We device manufacturer Jiuzhou’s signal largest wholesalersin the upcoming football worldreception. And if you can’t Marketing Vice Manager Great Britain. “Our also responsible for and receivers founded MICO inwanted to cupchainincrease ISDB-T salesis in South OTT the in person, you can buy will visit their know more about SORTEC’s marketing from stores can be found in the superstores of the units. 1999 and Panodic in America.” from them online. Ľuboš Bezák, Mansuccess story. Their headquarters and electronics TESCO, in the MAPLIN 2003. It’s becoming the that ager is main shop are located in clear capitalPanodic of the E-shop, tells us more about shops, in CPC, Dixons, John Lewis, at city of Bratislava within sight of a large them: “At the moment four of these Play.com and many others.” 3 shopping center in which among other stores can be found in western Slovathings can be Sure enough, three receiver mod- the fifth one in the east. But in found a TESCO hyper- kia with 2012 we market. els make up nearly 75% of all receiv- are planning to open up two 2 not a manufacturer that produces only when there are orders; they are continInternet services and terrestrial/satuously active in further development. ellite TV are constantly merging closer “We are cooperating with many industogether. Many current digital receivers already have partners, connection trial an Internet such as, NDS, Conax, but most of the time this connection is SuperNovelTV as well as chip manufaconly used to load new software into the turers ST the receiver to a receiver or to connectand Ali. We’ve also received local network. The from Sisvel DivX and Inview.” licenses total integration of Internet video and audio content with digital Inview is still in its infancy.of EPG informareceivers is a provider One of the companies that is inten- additional data tion and Internet-based sively working on this new technology such as IPTV. Thanks to the appearance is Jiuzhou. of more and more hybrid receivers, the Jimmy Zhang is Jiuzhou’s Marketing integration with the Internet is moving Vice Manager and tells us what it’s all about: more and for Over-The-Top.forefront. “OTT stands more to the It means that viewers can not only see And that’s how Panodic managed to their normal TV channels terrestrially, work themselves up into the group of via satellite or cable, they can now use the same device to enjoy video and autop five manufacturers in just a few dio content via the Internet.” YouTube years. From the just and VUDU, a movie service, are original three-man a few founding team the company has grown examples according to Jimmy Zhang. The end user doesn’t really care to over 1500 employees and there’s no how the video and audio makes it to his end in sight. can use one TV screen, as long as heAlan Yu: “We are constantremote control to access everything ly working on designing and developing that’s available. higher quality products. This includes, Unfortunately, all,weak spot receivers.” These are above a hybrid in the OTT technology is the bandwidth of the receivers connection. Video end user’s Internet that are mostly interesting to transmissions require a large bandoperators. width. Therefore, right now these OTT The expansion of their product palcompatible digital receivers would really only have markets in that Panodic will continue ette suggests Europe and North America even though there are to climb higher in the ranks of top class many other regions that offer scattered companies. high-speed Internet access. “We’re fo- www.TELE-audiovision.com/TELE-satellite-1203/jiuzhou-ott.pdf developed in software form”, reveals Marketing Vice Manager Jimmy Zhang to us, “This means that end users merely have to upload a new software version in order to make their existing digital receivers OTT compatible.” Vice Vice GM Marketing Wholesaler and Installer SORTEC, Slovakia Jimmy Shenzhen Richard Zhang Growth Through • Developes Digital TV receivers optimized for OTT • Dedicated OTT development Quality team Panodic, China - Receivers www.TELE-satellite.com — 04-05/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine • Specialized products for cable headends • Only ships domestically 1 Director in Sao Paulo, Brazil. 166 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com Distribution Technology from Wadt ■ The dish antennas on the roof provide a the company Manufacturer grandson is Receiverfounder’s Wadt’s TechnicalPanodic, China headend manufacturer The Big Expansion of Panodic Headend Manufacturer Wadt, Brazil 164 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com • 3D planned for the future China Digital TV Manufacturer Jiuzhou, • Integration of TV reception with IPTV Jiuzhou, China - Receivers R Manu Distr Whol Shop 1 Serv 149 www.TELE-audiovision.com/TELE-satellite-1205/wadt-brazil.pdf Technical Director Joao Wadt • 60% of all Sowell receivers are already HD COMPANY REPORT www.TELE-satellite.com — 04-05/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine • Integration of TV reception with IPTV • 60% of all Sowell receivers are already HD • Involved in HF for more than 60 years Jiuzhou’s OTT • New allocation of cable licenses in Brazil opens up huge opportunities of the for the company ■Neide is the daughter Development Team company’s founder and takes care of R Manu Distr Whol Shop Serv Eagle Chain in Sowell’s showroom with one of the company’s success receivers. • Integration of TV reception with IPTV 148 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com Wadt had to specialize and focused • Already operating the first IPTV project COMPANY REPORT ■ General Manager is Future over; in 1994 the Brazilian government lifted the high import duties after which HF products came into the country at low prices. Owner company’s founder and takes care of Wadt’s finances. Joao, Neide’s son and the company founder’s grandson is headend manufacturer Wadt’s Technical Director in Sao Paulo, Brazil. 148 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 04-05/2012 — www.TELE-satellite.com 207 Receiver Manufacturer Sowell, China IPTV 209 ■ Neide is the daughter of the COMPANY REPORT COMPANY REPORT “Wadt’s best times were before Eagle 1994”, remembers the company founder’s Grandson, “Back then we Chain had 200 employees.” Those days are ë R Manu R Distr R Whol Shop Serv www.TELE-satellite.com — 04-05/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine Wadt had to specialize and focused • Already operating the first IPTV project • 3D planned for the future São Paulo Wadt, Brazil - Headends Newington outside of Hartford, Connecticut in the USA. Scott operates his satellite forum SatelliteGuys.us from here. On the street side he has two motorized dishes installed; four smaller fixed dishes are mounted on the wall. To the left is a multifocus dish with five LNBs for DirecTV, in the middle is a dish for the DishNetwork eastern arc pointing to 61.5W, 72.7W and 77W plus another antenna for the DishNetwork western arc at 110W and 119W. All the way to the right is another antenna for 110W. This dish is used for automatic scanning that takes place every hour. It can instantly identify when a new channel appears on DishNetwork and posts this information in the forum thread Uplink Report. • All advertising income is reinvested in better technology • New is the use of the forums through Customer Service employees of digital TV companies Sowell’s showroom with one of the company’s success receivers. The company founder’s grandson, Joao Alfredo Wadt Miranda, who today is the company’s Technical Director, thinks back to the products that www.TELE-satellite.com — 04-05/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine started it all: “It was car radios for Ford vehicles that my Grandfather manufactured first.” It was already obvious back then what path the company The company, that has been suc- ■ Scott Gerczkowski’s home in • Founded by Scott as a non-profit forum www.TELE-audiovision.com/TELE-satellite-1205/eng/sowell-iptv.pdf cessful for so many years, is all by itwould take - namely further in the The company Wadt has been in exHartford thinks back to the products that had 200 employees.” Those days are self it all: “It was car radi- its success, direction of reception. When the first istence for three generations. It was started interesting because of over; in 1994 the Brazilian governCT, USA but since they manufacture cable discable TV duties affounded by Nelson Wadt back in 1945. os for Ford vehicles that my ment lifted the high importsystems were being installed, Grandfather manufactured ter perfect tribution equipment, it’s the which HF products was right the the middle of things Wadt came into in It’s a story of emigration in that Nelfirst.” It us already obcountry ■ low prices. reason forwas to pay them a visit. atGeneral Manager offering the first cable headends. son Wadt is originally from Germany. Eagle Chain in vious back then what path the company • Provides assistance with technical satellite reception questions • New is the use of the forums through Customer Service employees of digital TV companies would take - namely further in the direction of reception. When the first cable TV systems were being installed, Wadt was right in the middle of things offering the first cable headends. Receiver Manufacturer Sowell, China Satellite Forum Operator Scott Greczkowski, USA COMPANY REPORT Satellite Information Website BSD, Brasil Benni‘s BSD • Operates Brazil’s largest digital TV website • Engaged in the further education of digital TV antenna installers • Planning his own IPTV channel all about digital technology • Living his dream with his own worldwide radio station 246 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 12-01/2012 — www.TELE-satellite.com www.TELE-satellite.com — 12-01/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine 247 • Planning his own IPTV channel all about digital technology • Living his dream with his own worldwide radio station www.TELE-audiovision.com/TELE-satellite-1201/p-sat.pdf Owner COMPANY REPORT Wholesaler and Shop P-SAT, Hungary How P-SAT Wins New Customers Tibor Posta • Has its own customer magazine • Created supermarket style store • Planning start of own branded TV services • Operates one of the most well-known web communities in Hungary ■ Since November 2010 wholesaler and retailer P-SAT Kft has been leasing this 330 square meter building in northern Budapest; the 150 square meter warehouse in the background also belongs to P-SAT. The company also operates a very popular Internet digital TV community as well as a web shop under the name SAT.HU. The company has six employees. 184 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 12-01/2012 — www.TELE-satellite.com — www.TELE-satellite.com www.TELE-satellite.com — 12-01/2012 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine 185 • Planning start of own branded TV services • Operates one of the most well-known web communities in Hungary 216 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 217.
    www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 217
  • 218.
    TELE-audiovision Global CompanyDirectory Success with Your COMPANY REPORT Wholesaler and Manufacturer SatelliteAV, USA Hobby – Plus a Little Luck ë SatalliteAV, USA - Wholesaler first DVB-T2 receiver,” he hints at some interesting plans for the future. The only question that still begs an answer is in which countries DVB-T2 will actually be launched. As a matter of fact, nobody knows at this stage because every country will decide independently whether and how to introduce DVB-T2, and these decisions are not always easy to understand. Manu R Distr R Whol Shop Serv Sacramento consumer applications you need not look net networks are gradually disappearing further than to the brand new AB 3DBox and that almost every household these receiver line which features HD receiv- days has set up a WiFi network. So why Receiver Manufacturer COMPANY REPORT ers with integrated 3D TV converter. The not add WiFi capability to satellite renewly developed 3D boxes are sched- ceivers? “These boxes are based on the uled to hit the market in the first quarter Ali 3606 chipset which is particularly of 2012. In the previous issue of TELE- fast,” Juraj adds. satellite we presented the stand-alone ■ Brian Gohl is Thanks to all these Founder and PresidentABachievements 3D converter, whose software will also of SatelliteAV. The company distributes COM Europe has taken only two years to be used in the AB 3DBox receivers. the GLORYSTAR system become a significant and as a wholesaleris acplayer that manufactures and distributes the The recently introduced AB-COM tively tapping into various product segGEOSATpro brand name. CryptoBox receiver line from AB-COM ments. For Juraj Masaryk, innovation is has a very special treat in store: As ex- the key to success and a cornerstone tremely good-value receivers targeted for a successful expansion path. Even towards the pay TV market, all receivers the company name has turned out to be from this line include CA and a CI mod- wisely chosen: The acronym AB appears ule. The truly special feature, however, on all new brand names whenever a new is a USB interface which can be used to products series is launched. This way connect a WiFi dongle, Juraj Masaryk ex- AB-COM is able to grow and prosper for plains. He knows that fully cabled Ether- a long time to come! www.TELE-audiovision.com/TELE-satellite-1201/satelliteav.pdf AB-COM, Slovakia President ë Conquering the marketBrian with new Gohl receivers • Optimized complete product assortment plus service The LinkBox series features another range of receivers: “Here we are talking about boxes we produce for Czech pay TV provider Skylink, which uses the Irdeto encryption system.” These receivers are particularly inexpensive, Juraj says and adds “we’d be ready to offer this box to other content providers using Irdeto as well.” If you need further proof for AB-COM’s orientation towards future AB-COM, Slovakia - Receivers R Manu R Distr R Whol R Shop R Serv ■ Michal Krajcik’s passion is all about photography. It COMPANY REPORT should be, as he is the head of design and looks after the website of AB-COM. Company founder Juraj Masaryk tells us how AB-COM products are supplied to 1. Meet Marketing Manager Michal Grezo. What’s that on his screen? It’s the advertisement of the AB 3DBox as it appeared in TELE-satellite. 2. Pavol Blaho is Sales Manager ■ Michal Krajcik’s passion GM is all about photography. It should be, as he is the head of design and looks after the website of AB-COM. 120 TELE-satellite — Global Digital TV Magazine — 10-1 1/201 — www.TELE-satellite.com 1 ■ Juraj Masaryk is founder and Managing Director of AB-COM. Here he is seen explaining all the features of the 3D converter that is built into the AB 3D boxes. ■ Company premises of receiver manufacturer AB-COM in Topolcany, Slovakia. The company has cooperation agreements with TV manufacturer LG and pay TV provider Skylink, which is why their logos also appear prominently on the roof of the building. AB-COM generates 30% of its turnover in the local markets of Slovakia and the Czech Republic, with the remaining 70% share coming from other European markets. Pavol Blaho AB-COM: Innovation Guaranteed • Particularly successful in Central Europe • Products for different applications such as 3D and pay TV • Focus on cost-efficient product range • Products optimised for individual applications www.TELE-satellite.com — 10-1 1/201 — TELE-satellite — Global Digital TV Magazine 1 113 A motorized C-band dish on the wall as well as numerous other dishes on the roof are all used by Applied Instruments to develop and test their signal analyzers. 2 www.TELE-audiovision.com/TELE-satellite-1111/appliedinstruments.pdf 25 Years Engineering Sales 1 Tom Haywood • The power of this company is its robust signal analyzers A small family business has managed to become one of the most well-known names in the North American cable and satellite TV signal analyzer market. It’s the perfect reason for us to go and pay Applied Instruments in Indianapolis, Indiana, USA, a visit only to find out that the company is expanding into the international market with its products that are Made in USA. Product Manager Patrick Zaina Who’s behind Applied Instruments? It really is a family-owned business. It was founded exactly 25 years ago in 1986 by Doyle Haywood, the father of the current General Manager Tom Haywood. His son Scott Haywood also works for the company as a sales manager. When we look back at when it all started, we find out that there’s even more history behind the company’s founder Doyle Haywood: he founded a company back in 1973 that produced signal 1 analyzers for cable TV. In 1979 he sold that company to a large corporation. But when he came up with the idea to develop clean reliable test signal generators for CATV, he quickly founded a new company: Applied Instruments. His 3 Where is it, the much-proclaimed heart of Germany? How do you de- fine its actual location? Sven Melzer, founder and General COMPANY Manu Manufacturer and Wholesaler SAPRO, Czech Republic Manager REPORT CEO130 Signal Analyzer Manufacturer, USA Company Details Engineers in Research & Development | Total Number of Employees www.TELE-satellite.com — 10-1 1/201 — TELE-satellite — Global Digital TV Magazine 1 ▼ ▼ 0................................ 25 .................................. 50 127 ▼ 0................................ 10 ................... 20 Mio U$D Production Certificates DVB 121 Production Categories own brand Main Products Cable TV Signal Analyzers, Satellite TV Analyzers, Noise Signal Generators, Noise Power Ratio Test Instrument www.TELE-satellite.com/TELE-satellite-1109/eng/applied.pdf From here the path to satellite signal analyzers was not a long one. “In 1998 we introduced the first satellite signal analyzer from the ‘Buddy’ series”, comments Tom Haywood. The new company originally began with three employees, one of whom was David Poelstra, a research engineer that worked together with Doyle Haywood in the first company. In 1990 they released their first successful product to the market – a cable TV signal analyzer that not only was easy to use but was also affordable. Over the years other analyzers appeared. “In order to test long cable lengths, we produced a Return Path Test Set”, remembers General Manager Tom Haywood, “It consisted of a CW Test Signal Generator that was attached to one end of the long cable and a receiver at the other end. In this way we could check the quality of the cable.” The Sat Buddy quickly became known and loved by North American satellite installers and over the years was consistently improved and fitted with new features. Scott Haywood, Tom Haywood’s son and third generation in the company, is a sales manager at Applied Instruments and tells us about the newest Buddy version: “It’s the Super Buddy 29 and in addition to letting you measure satellite TV signals, it can also be used to install the Wildblue Internetvia–satellite service. These LNBs require 29 volts that the Super Buddy 29 can supply, hence the ‘29’ in the model name.” Marketing Manager Othmar Fuchs the main lobby. not all that much different from being a building designer who must also be creative and a problem solver.” USA and Canada, with only the remaining 5% being shipped abroad to countries like Switzerland, Sweden, Great Britain, Belgium as well as Australia”, comments Scott Haywood. to noise testing”, comments Tom Haywood. www.TELE-audiovision.com/TELE-satellite-1111/huber+suhner.pdf When his mother, the wife of founder Doyle Haywood, began to have health issues, his father decided to leave the company and sell 50% ownership of the company to Tom Haywood. The other 50% was sold to Jeff Haas. Both are enthusiastic with the opportunity to further expand Applied Instruments. But the company doesn’t only manufacture signal analyzers that are used at the receiving end. An especially interesting highlight is the Noise Power Ratio testing product that manufacturers of amplifiers, optical transmitters and receivers, and other active devices can use to test the operating range of their products. It consists of a noise generator that sends its signal to the receiver to be tested and a corresponding signal analyzer that measures the output signal from the tested receiver. General Manager Tom Haywood explains to us their product palette: “80% of our sales are made up of reception signal analyzers, 10% are test generators with the remaining 10% made up of complete systems consisting of signal generators and signal analyzers.” And as far as sales figures go, he tells us, “For the past several years sales have been stable at about US$ 5.5 million but for 2012 we are expecting roughly a 10% increase.” COMPANY REPORT Fiber Optic Distribution Systems Manufacturer HUBER+SUHNER, Switzerland 该独家报道由高级编辑所作 ■ Smack in the middle of the Swiss Alps: that’s where HUBER+SUHNER can be found in Herisau in northeastern Switzerland But this is what will change in the company’s 25th year of operation: “We are actively looking for competent distributors in Europe, The Middle East and Asia.” It is critical for Applied Instruments to find technically competent partners: “Our products are not throwaway products; they are solidly built and can be repaired if the need were to ever arise.” Technical customer service is actually quite important when dealing with products like signal analyzers; professional installers use signal analyzers on a daily basis and can thereby document a proper installation. Reliability and help with technical problems are excellent reasons why an installer would want to choose a quality product from a manufacturer that he knows will support him later on. Fiber Optics at • One of the leading fiber optic companies in the world • New CLIK! System for easy installation HUBER+SUHNER • New market segment that will make coaxial cable distribution systems obsolete • Now available: economical alternative with distribution systems starting with eight users Where will this increase come from? Sales Manager Scott Haywood has a few answers for us: “We are currently developing a signal analyzer for DVB-S2 that will become available in the fourth quarter of 2011. We are also working on terrestrial signal analyzers for ATSC and QAM that will appear in the first quarter of 2012.” 138 TELE-satellite — Global Digital TV Magazine — 10-1 1/201 — www.TELE-satellite.com 1 www.TELE-satellite.com — 10-1 1/201 — TELE-satellite — Global Digital TV Magazine 1 139 obsolete • Now available: economical alternative with distribution systems starting with eight users 2 In 1994 MMDS (Multichannel Multipoint Distribution Service), also known as wireless cable, gained widespread use primarily in rural areas and Applied Instruments was there providing the appropriate signal analyzers. Tom Haywood, the current General Manager, is actually a construction engineer but always enjoyed lending a hand at the company. In 1996 he decided to work exclusively for his father’s company: “The creation of solutions and the ergonomic products have always fascinated me”, he reveals, “It’s “Our NS-3 Broadband Noise Generator is often used by receiver manufacturers and satellite service providers to simulate rain fade and conduct carrier Applied Instruments is looking at satellite signal analyzers as their way of expanding into the export market. “Up until now, 95% of our products have been shipped to North America, that is “We produce everything ourselves”, comments General Manager Tom Haywood referring to his nine production employees, “Our R&D team consists of www.TELE-audiovision.com/TELE-satellite-1109/ipont.pdf CTO 3DTV COMPANY REPORT 该独家报道由高级编辑所作 TELE-satellite — Global Digital TV Magazine — 10-1 1/201 — www.TELE-satellite.com 1 of satellite wholesaler and distributor MEGASAT has a rather pragmatic approach to those questions. “We are right in the heart of Germany,” and by that he simply means the region he’s at home. The name of the place is Niederlauer, which is a small town north of Schweinfurt in northern Bavaria. As a matter of fact, if you look up Niederlauer in Google Maps the marker pops up right in the centre of Germany. www.appliedin.com industrial complex from which digital TV signal analyzers are produced. Average Turnover (Previous, This, Next Year Estimates) 3D www.TELE-satellite.com — 10-1 1/201 — TELE-satellite — Global Digital TV Magazine 1 iPONT and ë Andor ë Zoltan Receiver Korcsok Pasztor Fabrication in the converts 3D for use with auto-stereoscopic • iPONT’s softwarevsolution monitors Industrial City annoying glasses • 3D enjoyment without 1 APPLIED INSTRUMENTS ■ Applied Instruments leases two suites in this • Special test signal generators for receiver manufacturers • Special attention to ergonomic operation • Technical customer service an important highlight of the company son Tom Haywood explains to us where the name came from: “We apply a solution to every problem and provide the ■ Marketing Manager for that purpose – Apinstruments justOthmar Fuchs presents us with a plied Instruments.”here in “CLIK!’ system brochure MEGASAT wholesaler and • One of the leading fiber optic companies in the world distributorSystem forfrom • New CLIK! rises easy installation • heart of Germany the New market segment that will make coaxial cable distribution systems iPONT, Hungary - 3DTV • Technical customer service an important highlight of the company 126 TELE-satellite — Global Digital TV Magazine — 10-1 1/201 — www.TELE-satellite.com 1 Huber+Suhner, Switzerland - Fibre Optics 1 • Special test signal generators for receiver manufacturers • Special attention to ergonomic operation 121 Scott Haywood www.TELE-satellite.com — 10-1 1/201 — TELE-satellite — Global Digital TV Magazine 1 128 TELE-satellite — Global Digital TV Magazine — 10-1 1/201 — www.TELE-satellite.com 1 • Company plans worldwide expansion with its internationally compatible analyzers Applied Instruments Jeff Haas 120 TELE-satellite — Global Digital TV Magazine — 10-1 1/201 — www.TELE-satellite.com 1 Wholesaler and Manufacturer MEGASAT, Germany Signal Analyzer Manufacturer Applied Instruments, USA COMPANY REPORT 该独家报道由高级编辑所作 www.TELE-satellite.com — 10-1 1/201 — TELE-satellite — Global Digital TV Magazine 1 114 TELE-satellite — Global Digital TV Magazine — 10-1 1/201 — www.TELE-satellite.com 1 Niederlauer Receiver Manufacturer AB-COM, Slovakia COMPANY REPORT 该独家报道由高级编辑所作 ■ • Focus on cost-efficient product range • Products optimised for individual applications • The power of this company is its robust signal analyzers • Company plans worldwide expansion with its internationally compatible analyzers Distr Whol Shop R Serv 195 1 Applied Instruments, USA - Signal Analyzers R Manu Distr Whol Shop R Serv 2 112 TELE-satellite — Global Digital TV Magazine — 10-1 1/201 — www.TELE-satellite.com 1 and prefers to work at this shack. He is co-owner of Applied Instruments. a selection of products from Applied Instruments. He owns 50% of the company while his partner Jeff Haas, Director of Engineering, owns the other 50%. COMPANY REPORT TELE-satellite International — The World‘s Largest Digital TV Trade Magazine www.TELE-audiovision.com/TELE-satellite-1111/abcom.pdf Sales Marketing Manager Michal Grezo ■ Jeff Haas is Director of Engineering ■ General Manager Tom Haywood in the showroom with R Manu R Distr Whol Shop R Serv www.TELE-satellite.com — 12-01/2012 — • Offers the smallest LNB in the world • Develops first Android hybrid satellite and IPTV receiver for North America alongside and is the official distributor of all AB-COM Europe products in the company’s home markets of Slovakia and the Czech Republic. Masaryk Robust Signal Analyzers • Particularly successful in Central Europeë Made in USA • Products for different applications such as 3D and pay TV Indianapolis • Offers the smallest LNB in the world • Develops first Android hybrid satellite and IPTV receiver for North America of Roseville’s enormous industrial park near Sacramento, California in the USA. You can see the tip of a C-band dish mounted on the roof. There are 10 different C and Ku band antennas installed on the roof ranging in size from 45cm to 3m covering the entire arc from 58W to 166E. Juraj Signal Analyzer Manufacturer Applied Instruments, USA • First provider of OTA-SSU FTA receivers in the USA Topolcany 1. Meet Marketing Manager Michal Grezo. What’s that on his screen? It’s the advertisement of the AB 3DBox as it appeared in TELE-satellite. 2. Pavol Blaho is Sales Manager Founder • Optimized complete product assortment plus service • Own receiver line for semiprofessional applications ■ SatelliteAV along with their partner company PowerON can be found in a section by Juraj Masaryk in the year 2002. In the beginning the business acted as a wholesaler for satellite components and it was only in the year 2010 that ABCOM Europe was established as an independent receiver manufacturer. AB-COM 1 as a wholesaler continues to prosper first DVB-T2 receiver,” he hints at some consumer applications you need not look net networks are gradually disappearing interesting plans for the future. The only further than to the brand new AB 3DBox and that almost every household these question that still begs an answer is in receiver line which features HD receiv- days has set up a WiFi network. So why which countries DVB-T2 will actually be ers with integrated 3D TV converter. The not add WiFi capability to satellite relaunched. As a matter of fact, nobody newly developed 3D boxes are sched- ceivers? “These boxes are based on the 196 TELE-satellite International — The World‘s Largest Digital TV Tradeuled to hit — 12-01/2012 the first quarter Ali 3606 chipset which is particularly Magazine the market in — www.TELE-satellite.com knows at this stage because every country will decide independently whether of 2012. In the previous issue of TELE- fast,” Juraj adds. and how to introduce DVB-T2, and these satellite we presented the stand-alone Thanks to all these achievements ABdecisions are not always easy to under- 3D converter, whose software will also COM Europe has taken only two years to be used in the AB 3DBox receivers. stand. become a significant player that is acThe recently introduced AB-COM tively tapping into various product segThe LinkBox series features another range of receivers: “Here we are talk- CryptoBox receiver line from AB-COM ments. For Juraj Masaryk, innovation is ing about boxes we produce for Czech has a very special treat in store: As ex- the key to success and a cornerstone pay TV provider Skylink, which uses the tremely good-value receivers targeted for a successful expansion path. Even Irdeto encryption system.” These receiv- towards the pay TV market, all receivers the company name has turned out to be ers are particularly inexpensive, Juraj from this line include CA and a CI mod- wisely chosen: The acronym AB appears says and adds “we’d be ready to offer ule. The truly special feature, however, on all new brand names whenever a new this box to other content providers using is a USB interface which can be used to products series is launched. This way Irdeto as well.” If you need further proof connect a WiFi dongle, Juraj Masaryk ex- AB-COM is able to grow and prosper for for AB-COM’s orientation towards future plains. He knows that fully cabled Ether- a long time to come! "My Hobby is My Occupation" 194 TELE-satellite International — The World‘s Largest Digital TV Trade Magazine — 12-01/2012 — www.TELE-satellite.com • Own receiver line for semi-professional applications • First provider of OTA-SSU FTA receivers in the USA Slovakian receiver manufacturer ABCOM has found its firm place in the Central European market within an impressively short time. Based in the little-known town of Topolcany, some 100 km east of the Slovakian capital Bratislava, the company was founded Wholesaler and Manufacturer SatelliteAV, USA COMPANY REPORT • iPONT’s software solution converts 3D for use with autostereoscopic monitors 131 • 3D enjoyment without annoying glasses • Potential for receiver manufacturers to expand their STB’s to include 3D • Compatible with the variety of manufacturer auto-stereoscopic monitor solutions ■To the left is the “Allee” shopping mall in Budapest, Hungary in which iPONT has already installed their 3D system. To the right is the “Allee Corner Office” building in which the startup company iPONT can be found . Třinec HUBER+SUHNER 14 TELE-satellite — Global Digital TV Magazine —— 06-07/201 www.TELE-satellite.com Global Digital TV Magazine 06-07/201 — — www.TELE-satellite.com 1 1 Engineers in Research & Development | Total Number of Employees 2 Average Turnover (Previous, This, Next Year Estimates) Production Certificates ISO 9001, ISO 14001, IRIS, RoHS, REACH Production Categories own brand CLIK! Main Products Connectivity solutions for Radio Frequency, Low Frequency and Fiber Optic applications. Fibre optic distribution systems for professional and home use. www.TELE-satellite.com/TELE-satellite-1111/eng/huber+suhner.pdf 15 www.TELE-satellite.com — 06-07/201 — —TELE-satellite — Global Digital TV Magazine www.TELE-satellite.com — 06-07/201 1 1 TELE-satellite — 3D • Compatible with the variety of manufacturer auto-stereoscopic monitor solutions Company Details 1. Patrick Zaina is Product ▼ ▼ seven engineers, the repair team is made up of five en0............................ 2500 ............................. 5000 Manager for fiber optic ▼ connectors. Here we see gineers and our technical customer service has four en0.............................. 500 ................ 1000 Mio SFr him in front of a professional gineers.” On top of that are three employees in admindistribution cabinet consisting primarily of istration as well as two sales managers so that a total of fiber optic splitters. The “CLIK!” system is a compact 30 employees make up Applied Instruments all of which version for the distribution work in an 11,000 Sq-foot office/production facility loof satellite signals in smaller apartments. 144 TELE-satellite — Global Digital TV Magazine — 10-1 1/201 — www.TELE-satellite.com 1 cated in an industrial zone southeast of Indianapolis. 2. Jürgen Silbereisen is one Download Report of the five “CLIK!” system design engineers. Here After 25 successful years, Applied Instruments is 1. The two Andor tence 170 years Budapestin front of the There’s a large industrial zone in the friends and business partners: CTOago Pasztor and city 2 1. Sales Manager Scott Haywood enjoys we see him programming CEO Zoltan Korcsok in their headquarters in Wholesaler and Manufacturer, USA an online calculatorespecially interested in the satellite reading TELE-satellite. COMPANY REPORT iPONT’sof without glasses” auto-stereoscopicin one of “3D monitors. “I’m DXer reports”, CTO Andor Pasztor and ready to plow into the international market. The enreveals Třinec. This city currently northeastern portion of the Czech Re- that currently has 40 employees operates two other has 1. The two friends and business partners: The company 2 that installers Scott, “It shows the enthusiasm they have their headquarters in Budapest in front of can use CEO Zoltan Korcsok in for their hobby.” It’s thusiasm of the engineers and the requirements that offices in Hungary: the software engineers are in Szeged while the one of iPONT’s “3D without to determine exactly public. There you’ll find large amounts can be found in Bekescsaba. creative team 40,000 inhabitants and everywhere an enthusiasm that Scott shares and that can glasses” auto-stereoscopic monitors. customers have for their signal be employees operates The company he managedreadily seen in Pro came to the conclusion that this would calls home, that currently has 40to become thetwo other was designed especially with the analyzers provides this what “CLIK!” systems Ervin Farkas takes care offices the company’s signal analyzers.in Hungary: the software engineers are in Szeged while the of ore that can be turned into 2.iron; customers. of customer service for iPONT’s professional you look you can see fabrication syscreative one be found in dealer never components they would happen to him again: to be in number team cansatellite Bekescsaba.in just a professionals in with anAnd there’s chance to grow in the world company mind.” excellent still need for a specific 2. Diana greets visitors at the reception desk. customer service for iPONT’s 2. Ervin Farkas takes care of there are also quite a few rivers that tems with their superstructures anddistribution system. “The it charge of hisBut SAPRO doesn’t interfere with thanks to his extensive mar- more: “Soon we’ll be introducing an ad- with their robust signal own time he had to start short time customers. professional market over the next 25 years ■ MEGASAT founder online calculatorCamille Edmonds keeps track “Infinances and organizes the supply water power as well as a large interconnecting pipes. at all, 3. lets rather, started as pipe of 2002”, remembers Robby, justable monoblock LNB with which you and General Manager his own company.books.the this heatingketing. goes He then analyzers. installer plan for an optimal Sven for likes to expanse of forest Melzerits enormous perfectly with “WS International sold roughly 200 sys- can set the offset anywhere between 4° a dealer for DishNetwork in this company: composystem. After entering and installed stay up to date with and 10°. For installers we’re preparing customer satellitefor satellite receivers have month.” One of these pipes, an exteriorall the parameters, the After a few tems a been supply of building materials. Because TELE-satellite. nents systems. software produces a list months components TELE-satellitehow danhe realized Magazine — 1/201 — numbers in1 of all this, an enormous steel works heating pipe, passes just a few cen-of though132 along with developed here sinceyears sales www.TELE-satellite.coma toolbox that will contain all the tools designed and — Global Digital TVOver the 10-1 signal business was: DishNetwork level calculations at gerous this factory, the „Třinecké Železárny timeters away from manufacturer andevery endpoint.” You can 1992. It’s a perfect match creased steadily and one day, not sur- needed to install our products.” for the inHow is Robby doing all of this? He only paid the dealers when the custom- prisingly, he decided he no longer wantPacoima, find the calculator at www. (Třinec Steelworks)“ came into exis- wholesaler SAPRO’s building. dustrial atmosphere here. SAPRO’s clikulator.com ers paid DishNetwork. All of the risk ed to be dependent on other importers started WS International in Atlanta Fibre Optic Cables and Distribution, Switzerland www.hubersuhner.com • Potential for receiver manufacturers to expand their STB’s to include Address HUBER+SUHNER AG Degersheimerstrasse 14 9100 Herisau SWITZERLAND Tel +41-71-353-4111 www.TELE-satellite.com/TELE-satellite-1111/eng/huber+suhner.pdf Megasat, Germany - Receiver and Wholesaler R Manu R Distr R Whol Shop R Serv First the USA, then the world www.TELE-audiovision.com/TELE-satellite-1109/megasat.pdf GM ë California www.TELE-satellite.info/11/09/megasat Direct Contact to Sales Manager Sven Melzer was in the hands of the dealers, a risk and started up his own production line • 80% of distributed products come from in-house MEGASAT brand • full range of satellite components Sapro, Czech - Receiver and Wholesaler • 80% of distributed products come from in-house MEGASAT brand 850 square meter company premises that MEGASAT has been occupying since 2010 in an industrial area of Niederlauer. The official company name is b2c Electronic, even though MEGASAT is used as brand name vis-à-vis the outside world. Petr Jana Zwrtek square feet in size but only has Proboszczová 5000 satellite reception of English-language under his own label. “This includes programming in the USA is generally dishes as small as 75cm to as large as www.TELE-satellite.com monopolized by DishNetwork and Di- 4.5 meters”, lists Robby, “and in adrecTV, Robby looked around at other dition to cables and receivers, all the TV programming. As a native from necessary accessories such as DiSEqC Iran, the is the very young was and President ■ Robby Dosetarehobvious choice founderforeign switches.” He even has satellite signal of satellite wholesaler and manufacturer the International. 2 language programming for WS ethnic analyzers. “Our model 5100 Pro can auHere we see him in his Pacoima, California office located north minorities living he opened just There are of Los Angeles that in the USA. one year ago tomatically recognize the satellite that several of these groups that want TV a dish is pointing to”, highlights Robby 1 programming in their own language. and then continues,” The model 7100 Robby Dosetareh provides an overview on these groups: “In my case of course, the first group would be TV channels in Farsi, after that it’s programming in Arabic, Vietnamese, Thai, Chinese, Russian, Armenian as well as the Englishlanguage Christian channels.” Most of these TV channels, many of which are produced locally in the USA, can be resons together make for ceived for free and thus makein very in- and Thomson still existed a France teresting product to offer these ethnic quite an argument that BYA started off as an assembly line for 3 groups here in the USA. exporting his dishes is Thomson’s TV sets. Not long after that, Robby got right to work. From Mari126 TELE-satellite — Global Digital TV Magazine — 08-09/201 1 a good move to make. etta, Georgia, a small city near Atlanta they began assembling analog satellite Slimane Ait Yala: “I with 100,000 followed shortly thereafter receivers inhabitants that he now Owner trade show in southern China and found out that our prices are competitive.” And there’s still another 2 120 TELE-satellite — Global Digital TV Magazine — 08-09/201 — www.TELE-satellite.com 1 reason: BYA is not a small company; they produce quite a few other products and thus have plenty of experi134 TELE-satellite — Global Digital TV Magazine — 08-09/201 — www.TELE-satellite.com 1 ence as a manufacturer. l Bia. This city, with 20,000 inhabitnts, is located about 35km east of the econd largest city in Algeria: Oran with oughly 1.6 million people. The Port rzew harbor is right next to Ain El Bia; his is where Algeria’s national oil comany Sonatrach loads its oil tankers. BYA was founded in 1993. Back then TELE-satellite Magazine Business Voucher www.TELE-satellite.info/11/09/sapro Direct Contact to Sales Manager ■ An external heating pipe runs right past SAPRO’s administration, warehouse and production buildings. The company is located in the industrial city of Třinec in the northeastern end of The Czech Republic, not too far from Ostrava. reception hobby, he tests all the products himself and is thereby able to immediately recognize any weak spots. 1. Alina Proboszcz is responsible for SAPRO’s bookkeeping and is also the founder’s wife. ■ Joseph Bassala Wholesaler and Manufacturer, USA COMPANY REPORT 该独家报道由高级编辑所作 SAPRO Manufacturer and Wholesaler, Czech Republic www.sapro.cz Company Details Engineers in Research & Development | Total Number of Employees 3. Marek Roszka is Marketing Manager. You can see SAPRO’s WS website on his monitor (www.sapro.cz) that he also maintains. “I also translate International,the user manuals”, says Marek who is fluent in English and German. USA Jana Proboszczová is Sales Manager for Slovakia and all of the 4. ▼ ▼ 0................................ 12 .................................. 25 International’s Sales Manager in Los Angeles. He receives the Lubomír’s schedule is full. With a customer orders primarily of new products, he’s expandfrom variety those on the west coast of the ing in the market as well as moving USA into the surrounding countries. Be- Average Turnover (Previous, This, Next Year Estimates) TELE-satellite Magazine remaining countries. GUARANTEE direct contact 5. Service Technician Milan Martynek tests a satellite signal analyzer that SAPRO distributes under its own brand name. • Successful Young Company with Ambition Production Certificates DVB 6. Should there ever be any problems with a SAPRO receiver, the returns land with Customer Service Manager Ester Vrábelová, who scans the bar code of all incoming problem items. • Manufacturer of Satellite Components Production Categories own brands Di-Way, Di-Box, SatElita, Dreamsky, HD-Box Main Products Satellite Receivers for economic range, mid range and high range, Wholesaler for LNBs, dishes, accessories • Plan for Worldwide Expansion with Satellite Signal Analyzers • Inexpensive Products Thanks to Efficient Production and Distribution 3 ■ In this building in Pacoima, north of Los Angeles, can be found WS International’s west coast office/ warehouse 7. Service Technician Petr Schlesinger is at work repairing a receiver circuit board. 132 TELE-satellite — Global Digital TV Magazine — 08-09/201 — www.TELE-satellite.com 1 www.TELE-satellite.com/TELE-satellite-1109/eng/sapro.pdf Address in Czech Republic Business Voucher www.TELE-satellite.info/11/09/wsinternational Direct Contact to Sales Manager ▼ 0............................... 2.5 .....................5 Mio €uro cause of his engineering background and his personal love of his satellite — www.TELE-satellite.com 2. Petr Zwrtek is Sales Manager for The Czech Republic. He is showing us on the map where Třinec is located: right at the point where The Czech Republic, Slovakia and Poland meet. In this way he can be confident that the production line only puts out products that meet his requirements. SAPRO is on the way up. Address in Slovakia www.TELE-satellite.com — 08-09/201 — TELE-satellite — Global Digital TV Magazine 1 133 • Plan for Worldwide Expansion with Satellite Signal Analyzers • Inexpensive Products Thanks to Efficient Production and Distribution SAPRO s.r.o. Konská - Podlesí 455 73961 Třinec CZECH REPUBLIC Tel +420-591008312 Download Report SAPRO SK s.r.o. SUPERSAT ul. Slovanská cesta 672 www.TELE-satellite.com PSČ 02 201 Čadca SLOVAKIA Tel +421-220-648942 — 08-09/201 — TELE-satellite — Global Digital TV Magazine 1 127 www.TELE-satellite.com/TELE-satellite-1109/eng/sapro.pdf www.TELE-audiovision.com/TELE-satellite-1107/bya.pdf 7 COMPANY REPORT 该独家报道由高级编辑所作 Dish and Receiver Manufacturer BYA, Algeria Perforated Dishes from Algeria ë Ain El Bia (Oran, Algeria) Alexander Wiese ter of 2011 we’ll be coming out with an Android based receiver under the Dreamsky brand name; this will be followed by a DVB-T2 receiver in 2012.” For the HD-Box and Dreamsky line of receivers, 2012 will bring with it a number of enhancements related to the Internet: “The Dreamsky se136 TELE-satellite — Global Digital TV Magazine — 08-09/201 — will see a box with IPTV enhance1 ries www.TELE-satellite.com ment”, he reveals to us, “For cable operators we are planning a DVB-C receiver.” 126 TELE-satellite — Global Digital TV Magazine — 08-09/201 — www.TELE-satellite.com 1 119 6 www.TELE-audiovision.com/TELE-satellite-1109/wsinternational.pdf Slimane Ait Yala Lubomír’s schedule is full. With a variety of new products, he’s expanding in the market as well as moving into the surrounding countries. Because of his engineering background and his personal love of his satellite reception hobby, he tests all the products himself and is thereby able to immediately recognize any weak spots. In this way he can be confident that the production line only puts out products that meet his requirements. SAPRO is on the way up. 1. Alina Proboszcz is responsible for SAPRO’s bookkeeping and is also the founder’s wife. 2. Petr Zwrtek is Sales Manager for The Czech Republic. He is showing us on the map where Třinec is located: right at the point where The Czech Republic, Slovakia and Poland meet. With a new series of satellite dishes contested satellite dish market? It won’t be easy for BYA, but there are several Slimane Ait Yala, founder of BYA, gives us the reasons for this optimism. SAPRO www.sapro.cz Company Details ▼ ▼ 0................................ 12 .................................. 25 4. Jana Proboszczová is Sales Manager for Slovakia and all of the remaining countries. Average Turnover (Previous, This, Next Year Estimates) ▼ 0............................... 2.5 .....................5 Mio €uro 5. Service Technician Milan Martynek tests a satellite signal analyzer that SAPRO distributes under its own brand name. Production Certificates 6. Should there ever be any problems with a SAPRO receiver, the returns land with Customer Service Manager Ester Vrábelová, who scans the bar code of all incoming problem items. DVB Production Categories own brands Di-Way, Di-Box, SatElita, Dreamsky, HD-Box Main Products Satellite Receivers for economic range, mid range and high range, Wholesaler for LNBs, dishes, accessories www.TELE-satellite.com/TELE-satellite-1109/eng/sapro.pdf Address in Czech Republic SAPRO s.r.o. Konská - Podlesí 455 73961 Třinec CZECH REPUBLIC Tel +420-591008312 Aside from that, the necessary metal for their dish production is produced domestically. All of these rea- Address in Slovakia www.bya-electronic.com 7. Service Technician Petr Schlesinger is at work repairing a receiver circuit board. SAPRO SK s.r.o. SUPERSAT ul. Slovanská cesta 672 www.TELE-satellite.com PSČ 02 201 Čadca SLOVAKIA Tel +421-220-648942 — 08-09/201 — TELE-satellite — Global Digital TV Magazine 1 127 Thomson still existed in France and BYA started off as an assembly line for Thomson’s TV sets. Not long after that, they began assembling analog satellite receivers followed shortly thereafter by digital receivers. “Back then we had 90 employees”, remembers Slimane Ait Yala, “and we had sales equivalent to about eight million Euros.” BYA was at ■ Slimane Ait Yala is General Manager (PDG: Président Directeur Général) and founder of BYA. BYA actually gets its name from the name of the location: Ain El Bia. Bia was converted to BYA. Company Details Engineers in Research & Development | Total Number of Employees ▼ ▼ 0................................ 75 ................................ 150 Average Turnover (Previous, This, Next Year Estimates) ▼ 0.................................. 5 ...................10 Mio €uro Production Certificates RoHS, DVB Production Categories OEM, ODM Main Products www.TELE-satellite.com/TELE-satellite-1103/eng/bya.pdf Satellite Dishes with Full and Perforated Metal (60, 105 and 120cm), TV-Sets with CRT, LCD (32 and 40 inch) or Plasma (42 and 50 inch), Satellite Receiver for DVB-S/S2 TELE-satellite World www.TELE-satellite.com/... Download this report in other languages from the Internet: Arabic Indonesian German English Spanish French Hebrew Chinese Polish Portuguese Russian Turkish 144 TELE-satellite — Global Digital TV Magazine — 06-07/201 — www.TELE-satellite.com 1 Engineers in Research & Development | Total Number of Employees sons together make for quite an argument that exporting his dishes is a good move to make. Slimane Ait Yala: “I was just at the Canton trade show in southern China and found out that our prices are competitive.” And there’s still another reason: BYA is not a small company; they produce quite a few other products and thus have plenty of experience as a manufacturer. BYA was founded in 1993. Back then And this is the first reason why Slimane Ait Yala is confident that the dishes he manufactures will be successful in the export market: “Algeria is an oil-producing country”, he explains, “and that means that the energy costs in Algeria are very low.” He follows right away with the second reason: “Wages in Algeria are also very low; the official minimum wage is about 100 Euros.” BYA Dish and Receiver Manufacturer, Algeria manufacturer BYA Electronic wants to start an export offensive. Are there reasons to expect success in the strongly reasons which would make one optimistic. Manufacturer and Wholesaler, Czech Republic The 16,000 squaremeter production plant can be found in the city of Ain El Bia. This city, with 20,000 inhabitants, is located about 35km east of the second largest city in Algeria: Oran with roughly 1.6 million people. The Port Arzew harbor is right next to Ain El Bia; this is where Algeria’s national oil company Sonatrach loads its oil tankers. made out of perforated metal, Algerian 3. Marek Roszka is Marketing Manager. You can see SAPRO’s website on his monitor (www.sapro.cz) that he also maintains. “I also translate the user manuals”, says Marek who is fluent in English and German. 218 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com And this is the first reason why Slimane Ait Yala is confident that the www.TELE-satellite.com — 08-09/201 — TELE-satellite — Global Digital TV Magazine 1 7 5 GM • In-house design and production (assembly line) • Produces 100,000 receivers per year 118 TELE-satellite — Global Digital TV Magazine — 08-09/201 — www.TELE-satellite.com 1 coming out with receiver under the Dreamsky brand name; this will be followed by a DVB-T2 receiver in 2012.” For the HD-Box and Dreamsky line of receivers, 2012 will bring with it a number of enhancements related to the Internet: “The Dreamsky series will see a box with IPTV enhancement”, he reveals to us, “For cable operators we are planning a DVB-C is receiver.” WS 90 employees”, remembers Slimane Ait Yala, “and we had sales equivalent to about eight million Euros.” BYA was at BYA, Algeria - Dishes and Receiver R Manu R Distr Whol Shop The 16,000 squaremeter production Serv lant can be found in the city of Ain • Covers every price segment with its four brand names • Starting expansion to surrounding countries is Expanding • In-house design and production (assembly line) • Produces 100,000 receivers per year Joseph Bassala Young Company with Ambition • Manufacturer of Satellite Canton by digital receivers. “Back then we had Components was just at the Manufacturer and Wholesaler SAPRO, Czech Republic COMPANY REPORT 该独家报道由高级编辑所作 three employees: Sales Manager Joseph Bassala, who Robby can speak to in Farsi, Shipping Manager Jeff Bynum and a warehouse employee. “We also have one more employee in our Guang5 zhou, China office who takes care of production and overseas transport”, adds Robby. ter of 2011 we’ll be an Android based How successful is WS International? Sales Robby Dosetareh 103 6 Lubomír Proboszcz Ain El Bia (Oran, Successful • Algeria) www.TELE-satellite.com — 08-09/201 — TELE-satellite — Global Digital TV Magazine 1 www.TELE-audiovision.com/TELE-satellite-1109/sapro.pdf SAPRO Sales WSInternational, USA - Receiver and Wholesaler ë • special focus on self-aligning camping antennas • distribution to the whole of Europe 102 TELE-satellite — Global Digital TV Magazine — 08-09/201 — www.TELE-satellite.com 1 • special focus on self-aligning camping antennas • distribution to the whole of Europe Sales • Covers every price segment with its four brand names • Starting expansion to surrounding countries R Manu R Distr R Whol Shop Serv • full range of satellite components ■ In front of the entrance to the (more precisely Marietta). There are six Owner 104 TELE-satellite — Global Digital TV Magazine — 08-09/201 — 1 “In the Heart of Germany” TELE-satellite Magazine Business Voucher Robby Dosetareh patiently built up years old, the family had with the help of an office in Guangzhou employees in the 4600 square foot ofthat was difficult to calculate. his company WS International one an opportunity to flee the Robby Dosetareh decided that there in southern China. “Today we produce fice/warehouse: “Two sales managers, small step at a — 10-1 He’s still young country, first to Pakistan 142 TELE-satellite — Global Digital TV Magazine time.1/201 — www.TELE-satellite.com 1 LNBs as well as 75cm and 90cm satellite a technical support manager, an assisand since he has already brought his and then for a few months was no future in this! Since he had aldishes ourselves”, comments Robby. In tant as well as two employees in the company quite a long way in the USA, to Austria. The UN acquired ready sold systems and components to installers in the past, he decided to be- 2009 his1own receiver line that Robby warehouse”, explains Robby. To better his expansion to the rest of the world all the necessary paperwork as fishouldn’t ■ SAPRO’s Founder have any obstacles. In July well as the required visas and come a satellite wholesaler. “On April named Lexium was also added to the serve his customers on the west coast, and Chief Lubomír opened a 2nd distribution nally in April 1992 the family arrived 1, 2001, I founded WS International”, palette. There’s even a website under Robby opened a branch office in Paco2010 he Proboszcz standing offices in the small town of in their land of their dreams remembers Robby Dosetareh. Robby, offer name: www.lexium-dvb.com. “In ima, California, near Los Angeles. Not communications, he accepted an this – USA. branch & in front of a Pacoima, California in order to —make They ended up in —Atlanta, Georgia on from had no business experi- began we sold roughly 30,000 DVB-S re- long after that he decided to move out cabinet 18 TELE-satellite Global Digital TV Magazine — 06-07/201 1 www.TELE-satellite.com 2010 who actually a DishNetwork dealer and full of SAPRO cost efficient for customers in the the US east coast. working there as a very courait Robby Magazine — ence or background, was Sales Manager. ceivers”, says Global Digital TVand then explains to Los Angeles himself. “Since then I go4 receivers. In his 18 TELE-satellite — 1 After a few months his Young Robby came to a newgeous in this decision and had father became a DVB-S2 variant of this06-07/201 — www.TELE-satellite.com world, Western part of the USA and Canada. receiver back to visit the Atlanta office every two at the that hand is the flagship ill and Robby Dosetareh had to help him That’s where we met up with Robby a place where it’s normal to get a free product, a box from same time a little foresight: the WS in will be available by the time this issue months for one week”, says Robby. He communicate with the doctors; his fathe HD-Box Dosetareh. He explains to us how it all glass of water in a restaurant. The series. is proud to say that he has employees the company name stands for “World of TELE-satellite hits the newsstands. ther’s English wasn’t good enough. Unteenager quickly acclimated himself to began. Since 2010 Robby has built up his in Atlanta that can operate the business Satellites”. fortunately, his time off from the DishRobby Dosetareh was born and his new surroundings. After graduatBut the Network dealer company name much “World” in his was getting too product palette to the point that any without him having to constantly look raised in Shiraz, Iran. But his father ing from High School, he immediately component that an installer could pos- over their shoulders. and towards the end field that was stands for the businessof 2000 the dealer was watched and mistreated by the re- joined the work force. Since he also alThe branch office in Los Angeles is he selected for his company. Robby the sibly need can be obtained from him had to let him go. Since Dosetareh gime at that time. When Robby was ten ways interested in electronics and tele- R Manu R Distr R Whol Shop Serv Wholesaler and Manufacturer MEGASAT, Germany COMPANY REPORT 该独家报道由高级编辑所作 4 ‫العربية‬ Indonesia Deutsch English Español Français ‫עברית‬ 中文 Polski Português Русский Türkçe www.TELE-satellite.com/TELE-satellite-1107/ara/bya.pdf www.TELE-satellite.com/TELE-satellite-1107/bid/bya.pdf www.TELE-satellite.com/TELE-satellite-1107/deu/bya.pdf www.TELE-satellite.com/TELE-satellite-1107/eng/bya.pdf www.TELE-satellite.com/TELE-satellite-1107/esp/bya.pdf www.TELE-satellite.com/TELE-satellite-1107/fra/bya.pdf www.TELE-satellite.com/TELE-satellite-1107/heb/bya.pdf www.TELE-satellite.com/TELE-satellite-1107/man/bya.pdf www.TELE-satellite.com/TELE-satellite-1107/pol/bya.pdf www.TELE-satellite.com/TELE-satellite-1107/por/bya.pdf www.TELE-satellite.com/TELE-satellite-1107/rus/bya.pdf www.TELE-satellite.com/TELE-satellite-1107/tur/bya.pdf Available online starting from 3 June 2011 ■ BYA’s production facility in Ain El Bia east of Oran in Algeria 146 TELE-satellite — Global Digital TV Magazine — 06-07/201 — www.TELE-satellite.com 1
  • 219.
    www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 219
  • 220.
    ity of Ku-bandLNBs to a staggering one million a month. When we heard him mention Brazil, our ears perked up. “We’ve been delivering C-band LNBs to Brazil since 2004 but demand has recently taken a strong jump upwards”, revealed Hoawen Chiang, “In fact, for 2011 we’re expecting that 35% of our LNB production will be delivered to Brazil.” Of course, we want to know where all these LNBs are going to. “In the beginning, we delivered our production to Indonesia and Thailand”, explains North America, Australia and Europe.” But in 2011, Jason Chiang sees these numbers shifting considerably: “The North African market will pick up quite a bit; we expect to ship 30% of our total production there, 45% will go to the Middle East, 5% to South Africa, 10% to Brazil with another 10% going to the rest of the world.” TELE-audiovision Global Company Directory Hoawen Chiang’s son Jason Chiang also works for the company. He’s 1 currently passing through a number of stations in the company but above all he‘s involved in International Sales. He breaks down for us the product distribution by groups; the geographical distribution Boiingsat, China - LNB R Manu Distr Whol Shop Serv GM Haowen Chiang ■ Haowen Chiang Boiingsat’s founder and General Manager Once again Brazil is mentioned but this time in connection with Ku-band LNBs. Jason Chiang revealed a little secret: “I have good contacts in Brazil.” That along with the steadily increasing demand in that South American country makes for 4 a very attractive market. 3 www.TELE-audiovision.com/TELE-satellite-1105/boiingsat.pdf Sales Co-Owner COMPANY REPORT • Three Production Locations in Zhuhai/ China • Large Sales Expansion in South America • In the Works: LNB with Two Feed Rings It’s common knowledge how prices for LNBs have been falling considerably and when General Manager Hoawen Chiang LNB Manufacturer Boiingsat operates multiple production facilities in Zhuhai, China, a city with 1.5 million inhabitants located in western Guangdong Province. Zhuhai sits right next to Macao and slowly but surely is attracting more and more satellite component manufacturers. remembers Hoawen Chiang. “Two of the investors have in the meantime moved on to other things but investor, Yunnjye Qin, is still here and is in charge of Production.” tence since 1997. However it all really started in Taiwan. Hoawen Chiang, General Manager of the company who was also born in Taiwan, explains to us how it all began. “In 1996 I was a Production Manager at an LNB manufacturer in Taiwan. But things didn’t go exactly as I had planned so in 1997 I along with three investors founded Boiingsat in Zhuhai, China”, But one of the first of these manufacturers was Boiingsat; it has been in exis- tion plant which they used to manufacture 240,000 C-band LNBs every month. 2004 became rather turbulent: “We sold our first production facility and then built a new one for Ku-band LNBs.” Now with 500 employees, production climbed to 350,000 C-band LNBs per month and 150,000 Ku-band LNBs per month. The main reason for moving from Taiwan to China was obviously the costs. Wages in China are still lower than that of Taiwan. “But we still have a small R&D office in Taiwan with three engineers”, says Hoawen Chiang. Thus far the technical expertise in Taiwan is somewhat more advanced than in Mainland China at least as far as high frequency LNBs are concerned. Jason Chiang www.TELE-satellite.com — 04-05/201 — 1 87 TELE-satellite — Global Digital TV Magazine • In the Works: LNB with Two Feed Rings www.TELE-audiovision.com/TELE-satellite-1105/bomare.pdf R Manu Distr Whol Shop Serv Technical Manager Tewfik Lamrani COMPANY REPORT TV-Sets and Receiver Manufacturer Bomare Company, Algeria Bomare Company: a new OEM Manufacturer ë enough: one day it dawned on him that he could assemble these receivers on his own production line. Together with The industrial city of Birtouta is very conveniently located: the airport, harbor and numerous highways are all within easy reach. It is an excellent location especially for a company that wants to expand its export business. It all started many years ago with the distribution of satellite receivers. The founder, Ali Boumediene imported receivers from South Korea and sold them locally. But for him it wasn’t Birtouta (Algiers) a South Korean manufacturer that supported him with not only the components but also the “know-how” in setting up an assembly line, Ali Boumediene started his own production in 2001. Back then 20 employees assembled digital receivers using the supplied components. Today Bomare Company has 120 employees. Right from the start Ali Boumediene had a great idea: he chose the brand name “Stream System” for his line of receiver products. An excellent choice considering that in today’s IPTV age everything revolves around streaming. But lets get back to the beginning: in 2003 Ali Boumediene took the next expansion step. He created his own production line for power supplies and then in 2006 he took one more step by investing two million Euros and install- In 2005 the European Union entered into an agreement with the Democratic Peoples Republic of Algeria to support economic cooperation between the two. This agreement provides an interesting opportunity for satellite receiver manufacturers and, in the case of the Algerian Bomare Company, also for TV manufacturers. Actually, Bomare Company produces both products. For 2011 Bomare Company has decided to take their products and service capabilities to the European market. We paid a visit to Bomare Company’s production facility 1. Annie greets visitors at the reception desk ing an SMT line in a new production facility complete with automatic component mounting machines and an oven. Bomare Company also owns a unit of plastic injection and silkscreen painting Technical Director Tewfik Lamrani gives us some insight into their production numbers: “From 2001 to 2007 we produced a total of three million SD receivers.” Production numbers dropped every year because of the ever-increasing competition with imported receivers. But Ali Boumediene also managed to find a solution to this: he simply started a second assembly line to produce TVs. “We are in Birtouta, about 20km from Algiers, and had a look around. 2. Yunnjye Qin is co-owner of Boiingsat and in charge of production. BOMARE TV and Receiver Manufacturer, Algeria especially proud of our LCD TVs with integrated DVB-T tuners”, commented Tewfik Lamrani whose five-member R&D team developed this TV. “Now we also manufacture HD TVs”, says Tewfik and explains why now is the right time to begin exporting their products: “In the past several years we learned how to start a production line.” The old adage holds true: “You learn from your mistakes”; Bomare Company has accepted all of the setbacks and over time has become a professional manufacturer. “Now we have the right products and now we know how to make them”, says Tewfik Lamrani, “And now the time has come to start exporting.” Bomare Company is not only going to export their own products such as HD receivers and LCDTVs in various sizes from 19” to 47”, but they are now ready to become an OEM or ODM maker for other manufacturers and distributors primarily in Europe. Tewfik Lamrani gives us a few reasons why Bomare Company with its location in Algeria would be a good choice: “We are in the same time zone as Europe, we speak the same languages (French and English), we can ship economically to Europe, we provide a high-quality product and our production follows the RoHS directive and just recently also the Euro 1 Norm.” The subject of quality control is especially critical for the export market: “Five engineers are directly involved with quality control during production (preproduction) and five additional engineers www.bomarecompany.com Company Details Engineers in Research & Development | Total Number of Employees ▼ ▼ 0................................ 75 ................................ 150 ■ Even in Algiers it rains occasionally 3. Jason Chiang is the son of the company’s founder and designated successor to the Captain’s chair. Here in the showroom he shows us one of the company’s specialties: a four-way combination with 4 x C-band LNB. This LNB lets four receivers receive four C-band satellites independently from each other; this setup is especially in demand in Indonesia. 2 1 and when it does it pours: a look at Bomare Company’s production facility in Birtouta not far from the capital Algiers. Working hours are from 8AM-12PM and 1PM-5PM Sunday to Thursday (they are closed Friday and Saturday). Average Turnover (Previous, This, Next Year Estimates) ▼ 0............................. 12.5 ...................25 Mio €uro Production Certificates RoHS, DVB Production Categories OEM, ODM Main Products LCD and Plasma TV-Sets with integrated DVB-Tuner, Satellite Receiver for DVB-S/S2, DVB-T, Home Theatre Systems www.TELE-satellite.com/TELE-satellite-1103/eng/bomare.pdf TELE-satellite World www.TELE-satellite.com/... Download this report in other languages from the Internet: Arabic ‫العربية‬ www.TELE-satellite.com/TELE-satellite-1105/ara/bomare.pdf Indonesian Indonesia www.TELE-satellite.com/TELE-satellite-1105/bid/bomare.pdf German Deutsch www.TELE-satellite.com/TELE-satellite-1105/deu/bomare.pdf English English www.TELE-satellite.com/TELE-satellite-1105/eng/bomare.pdf Spanish Español www.TELE-satellite.com/TELE-satellite-1105/esp/bomare.pdf French Français www.TELE-satellite.com/TELE-satellite-1105/fra/bomare.pdf Hebrew ‫עברית‬ www.TELE-satellite.com/TELE-satellite-1105/heb/bomare.pdf 中文 www.TELE-satellite.com/TELE-satellite-1105/man/bomare.pdf Chinese Polish Polski www.TELE-satellite.com/TELE-satellite-1105/pol/bomare.pdf Portuguese Português www.TELE-satellite.com/TELE-satellite-1105/por/bomare.pdf Russian Русский www.TELE-satellite.com/TELE-satellite-1105/rus/bomare.pdf Turkish Türkçe www.TELE-satellite.com/TELE-satellite-1105/tur/bomare.pdf Available online starting from 1 April 2011 www.TELE-satellite.com — 04-05/201 — 1 102 TELE-satellite — Global Digital TV Magazine — 04-05/201 — www.TELE-satellite.com 1 TELE-satellite — Global Digital TV Magazine 103 2 4. Sales Manager Joseph Liu runs a team of six employees Prevail, China - Fibre Optics and CATV www.TELE-audiovision.com/TELE-satellite-1105/prevail.pdf Production Manager such an increase in sales, could it? “Well, actually, we’re expecting this increase in Ren sales also because we’re expanding into a new business sector; in 2012 we’ll be Guorui opening up a new factory for LED lights. 90 TELE-satellite — Global Digital TV Magazine — 04-05/201 — www.TELE-satellite.com 1 R Manu Distr Whol Shop Serv Zhuhai China; soon it’ll be four factories. The company’s administration offices can also be found here. 86 TELE-satellite — Global Digital TV Magazine — 04-05/201 — www.TELE-satellite.com 1 Bomare, Algeria - Receiver ë The next expansion step took place in 2008: “We constructed our third factory this time for production of die-cast housings.” With “Back then we started with 30 employees and produced 20,000 C-band LNBs every month”, he says looking back. In 2002 Boiingsat started a second produc- ■ One of Boiingsat’s three factories in Zhuhai in southern Yunnjye Qin • Three Production Locations in Zhuhai/ China • Large Sales Expansion in South America Sales Sales COMPANY REPORT Fiber Optic and CATV Manufacturer Prevail, China Prevail’s Perfect Organization • Substantially Increased Sales for 2011 Thanks to Rising Exports • Additional Factory Soon to be in Operation • Increased Number of Employees • Four New SMT Machines in Operation • Very Active R&D Team ë A recipe for the continued success of a manufacturer is a wellorganized operation. A perfect example of this would have to be the Chinese manufacturer Prevail located in Hangzhou, the capital of the Zhejiang Province which is south of Shanghai. This company manufactures fiber optic products, CATV components and professional digital TV modulators and accessories for signal distribution. Hangzhou The first thing you notice when you visit Prevail is how neat and clean the entire factory is; nothing is out of place. Another small detail are the uniforms that the employees wear. It’s not out of the ordinary to see workers on an assembly line wear uniforms, but at Prevail the office workers also wear uniforms. For the visitor it ■ Two of the three Prevail factories in Xiaoshan in Hangzhou City in, China. The fourth is under construction. COMPANY REPORT Necy-xu becomes immediately clear that the work here is very disciplined and organized. And of course the products themselves would also be associated with this high standard. To confirm this we paid a visit to the three manufacturing plants and had a look around; a fourth factory is currently under construction. Necy-xu is General Manager Sales & Marketing and provides us with a little history about the company: “Prevail was founded in 2001 by Managing Director Xu Quanhai along with ten other partners.” The company is in private hands and continues to manufacture the same product groups that it did at the beginning: fiber optic products, CATV components and accessories as well as distributors and splitters for coaxial cable lines. Necy-xu remembers the early days: “In our first year 2001 we had sales of roughly 50 million RMB (5 million Euros) with about 100 employees. 70% were domestic sales and the rest were exported.” Helen Receiver Manufacturer Sowell, China For 2010, however, this changed considerably. Necy-xu revealed to us that now only 50% of their products are sold domestically in China; exports have increased markedly. To what countries and regions does Prevail export to? Helen is Prevail’s International Sales Manager and tells us, “40% of our exports end up in the south Asian region and this includes India, Pakistan, Indonesia, The Philippines, Thailand and Vietnam. 30% land in South America, 20% go to Europe and the rest go to The Middle East, North America and Africa.” Necy-xu adds that sales in South America have picked up quite a bit and that Prevail is shipping more and more products to that region: “The cable TV providers there are expanding 112 TELE-satellite — Global Digital TV Magazine — 04-05/201 — www.TELE-satellite.com 1 • Founded by 5 Partners Jiuzhou, China - IPTV Boxes ë TELE-satellite — Global Digital TV Magazine 113 But back to LNBs. Sales Manager Jason Chiang tells us that in 2009 70% of all the LNBs shipped were single models. In 2010 that number dropped to 50% and it will obviously continue to sink. Single Jiuzhou greatly expands into LNBs will cease IPTV Box Production in a few years. ë to exist Twin models made up 35% of the total in 2010; the rest consisted of quad and octo models. www.TELE-audiovision.com/TELE-satellite-1103/jiuzhou.pdf Vice Marketing PC Card Manufacturer Tenow, China PC Card REPORT COMPANY REPORT COMPANY Manufacturer Tenow, China PC Card Manufacturer Tenow, China COMPANY REPORT 3 4 PC Card Manufacturer Tenow, China COMPANY REPORT Huang Jimmy 2 2 The time has come for new models. 1. Necy-xu is General Manager know-how and that therefore cable operators on the rise: now about 450 employees work Wei Zhang Jason Chiang gives us some insight: Sales and Marketing and takes • ISDB-T and DVB-T2 Receiver in 2011 • Overseas Offices in the Plan • IPTV box production • User Friendliness is Company may reach 1 million Philosophy units in 2011 A team of five R&D engineers are the company Sowell. General Manager of the young company is Eagle Chain. 1 Sales Shenzhen COMPANY REPORT IPTV Box Manufacturer Jiuzhou, China Shenzhen • IPTV box production may reach 1 million units in 2011 • Jiuzhou starts HbbTV boxes for Europe • Big retailers about to launch into IPTV box sales • Jiuzhou to attend all major exhibitions in 2011, 10 in all felt the same way and so in 2004 they founded their own company Sowell. • Jiuzhou starts HbbTV OEM founders of the The boxes for Europe driving force and 1 in Pevail’s entrance lobby. Prevail achieved sales of 200 million RMB (roughly 20 million Euros) in 2010. The number of employees has also been • Four New SMT Machines in Operation • Very Active R&D Team TELE-satellite — Global Digital TV Magazine — 04-05/201 — www.TELE-satellite.com 1 IPTV Box Production ■Two elephant statues greet visitors significantly and we have exactly the right products for them.” Exports to South America look to sharply increase for 2011, but Eastern Europe is also rapidly on the rise. www.TELE-satellite.com — 04-05/201 — 1 In 2013 we expect that 30% of our sales will be from LEDs with the rest coming from LNB production.” OK, now the picture is getting clearer. IPTV for • Substantially Increased Sales Box Manufacturer Jiuzhou, China to Rising Exports COMPANY REPORT Sowell,2011Engineering Firm an Thanks 88 • Additional Factory Soon to be in Operation that’s an OEM • Increased Number of Employees Jiuzhou greatly expands into R Manu Distr Whol Shop Serv LNB Manufacturer Boiingsat, China Boiingsat’s Numerous Production Facilities deal of thought must go into what features are currently in demand. In talking with Eagle Chain it’s clear that quite a bit of observation and analysis is going ■ Sales Director Huang Wei is, amongst many other tasks, in charge of the IPTV boxes‘ development, sales and marketing The Chinese large manufacturer Jiuzhou is very well known by our readers. The company originated in Sichuan and has been in existence since 1958. In 2008 they celebrated their 50th birthday (see TELE-satellite issue 02-03/2008). In 2009 the company expanded into HDTV and in 2010 terrestrial TV was the theme. In 2011 Jiuzhou is planning on taking a huge step further into the IPTV market with enormous production numbers. Huang Wei is Jiuzhou’s Sales Director and reveals to us what Jiuzhou has planned for 2011. He was, like his We met up with General Manon. Eagle Chain cites an example: “I’m • Big retailers about to four colleagues, an R&D employee with a large receiver manufacager Eagle Chain in Sowell’s office amazed with Apple and their products. launch into IPTV box time didn’t feel so comfort- in Shenzhen who started off by telling turer but over They are precisely geared this the at Prevail. But for us how itNecy-xu“All we had was the prefer to tackletowardson their own. This is not 2011 all began: is extremely Sowell’s■ able with that company. All too often he end-user and thus very successful.” The with sales offices was assigned projects that had nothing money we had saved while employed conclusion according to Eagle 70 employees their true for accessoriesChain: although cable operators excited: “The number of our employees will First, though, Sales Director Huang Wei took us on a trip into the past: “The first IPTV boxes were manufactured by Jiuzhou in 2007; back then about 20,000 boxes were produced and involved pure IPTV boxes.” Production numbers only increased slowly. “In 2010 we produced 60,000 boxes”, comments Huang Wei. But 2011 looks to be completely different: “We will be manufacturing a minimum of 200,000 boxes and it could go as high as one million.” It all depends on negotiations that are currently in progress with a variety of retail chains in North America as well as Europe. The reason: these retail chains are in ■ Jiuzhou constructed an impressively large building in Shenzhen’s High-Tech Park. The engineers are here continuously working on new products – currently they’re mostly occupied with IPTV. care of the company’s exposure, such as, at trade shows and in the press. “In the second quarter of 2011 we’ll be releasing a Ku-band LNB with a shorter housing, for the third quarter there’ll be a Ku-band LNB with only two rings instead of the previous three rings in the feed. For the fourth quarter we’re planning on an SCR LNB.” So, it’s plain to see that there are several new products coming Sowell, an Engineering all”, he says, for 2011. “But that’s not Firm that’s an OEM “In 2012 we’ll be startingë with Ka-band 64 TELE-satellite — Global Digital TV Magazine — 02-03/201 — www.TELE-satellite.com 1 www.TELE-satellite.com — 02-03/201 — 1 TELE-satellite — Global Digital TV Magazine 65 • Jiuzhou to attend all climb • IPTV box production may reach 1tomillion units in a jump are still the largest customers for this product 2. retailers about to launch into IPTV box sales 2011 • Big Helen over TELE-satellite World 500 and we also expect revealed his sales figures, a tendency in is Internationalsurprised us with his prognosis then he Sales major exhibitions in ■ as they need in Prevail is • Jiuzhou starts HbbTV boxes for sales.”be on theisShanghai Stock Exchange Shenzhen well since Shenzhenwas clearly visible:Managerwithfor constantly“We expect sales to jump to Europe actually optimistic that group products. direction large numbersJiuzhou to2013:all in • of contact andcustomers over all major exhibitions in 2011, 10 in all attend that “For 2011, 10 in all Shenzhen these they can to do with receivers. His four colleagues are with on softwith that other company. We pooled “We have a similar view locatedour the seventh floor of this office building in ware development, namely Receiver production Shenzhen. a customerDownload this report in other languages from the Internet: friendly operation takes place in Baoan which isn’t of our products.” It is Sales Director Huang Wei is, Arabic ‫العربية‬ www.TELE-satellite.com/TELE-satellite-1103/ara/jiuzhou.pdf too exactly for this reason far from here and close to that Eagle Chain Indonesian Indonesiaamongst many other tasks, in charge www.TELE-satellite.com/TELE-satellite-1103/bid/jiuzhou.pdf Shenzhen’s airport. 200 employees the IPTV boxes‘ development, German Deutsch ofwww.TELE-satellite.com/TELE-satellite-1103/deu/jiuzhou.pdf is skeptical about how IPTV will develop; work in the production facility. English English sales and marketing www.TELE-satellite.com/TELE-satellite-1103/eng/jiuzhou.pdf the world. She can often be found 200,000 receivers a month can Shenzhen for TELE-satellite though, it’s per subject be Spanish in Español www.TELE-satellite.com/TELE-satellite-1103/esp/jiuzhou.pdf produced by one 2012. That’s quite an achievement for such is being approached veryshift; if all three at trade shows at the Prevail that ecstatiFrench Français www.TELE-satellite.com/TELE-satellite-1103/fra/jiuzhou.pdf shifts are used, receiver Hebrew ‫עברית‬ www.TELE-satellite.com/TELE-satellite-1103/heb/jiuzhou.pdf stand. cally: “The large international climbs to providers all The Chinese large manufacturer Jiu- a young company! As an telecom production company, Prevail can be 中文 www.TELE-satellite.com/TELE-satellite-1103/man/jiuzhou.pdf Chinese more selling delivering own agenda and that ter■ Jimmy Zhang have their the programming either is than 500,000 zhou is very well known by our readers. Polish Polski www.TELE-satellite.com/TELE-satellite-1103/pol/jiuzhou.pdf 3. This man is very critical for a boxes a month. is Marketing Vice restrially or via satellite. With IPTV they shows. International found at numerous trade Portuguese Português www.TELE-satellite.com/TELE-satellite-1103/por/jiuzhou.pdf their data packages to end-users; Manager and deals The company originated in Sichuan and quality manufacturer like Prevail: 1 comparatively simple technology using Russian Русский www.TELE-satellite.com/TELE-satellite-1103/rus/jiuzhou.pdf with the global are focused solely on that concept.” He has been in existence since 1958. In Turkish Türkçe Sales Manager needed. Who www.TELE-satellite.com/TELE-satellite-1103/tur/jiuzhou.pdf products? Set actually buys Prevail’s marketing of “90% Gateway servers is all that’s Helen gives us an overview: he is Yu Xinghong and with his doesn’t see that the user’s point of view Available online starting from 28 January 2011 Top Boxes 2008 they celebrated their 50th birthday But even more important, the customer 20 engineers he is responsible is considered regarding IPTV and wishes “In 2011 we’ll be exhibiting at CCBN in Beijing, no (see TELE-satellite issue 02-03/2008). of our customers are the cable operators longer needs to install an antenna; for quality assurance during deal of thought must go into what feathe process of becoming their own proInternet is opening up new possibili- there’d every household has similar to that almost be an approach an Internet In 2009 the company expanded currently in demand. In talking Cabsat in Dubai, CommunicAsia in Singapore, tures are into themselves”, explains now there are programming pro- of Apple: following a path based strictly production. gramming providers! ties; Necy-xu, “only about connection. HDTV and in 2010 terrestrial Eaglewas viders that can join the bandwagon on the end user without looking back at with TV Chain it’s clear that quite a ANGA enterprises Cable-Tec in New Orleans 10% distributors.” any obvious Large businessin Cologne,have 4. He manages production: Ren the theme. In 2011 Jiuzhou is planninga rather are shipped to that really didn’t have Theinterest in This is bit of observation and interesting is going analysis developwhat the provider wants. that Guorui is Production Manager on taking a huge step further ment: the reason for this “I’m that at before since it would’ve meant for quite some time been not only sellinto obviously an example: the doing so this point fiber optic on. Eagle Chain cites transmitting via is as well as three shows in South America: one www.TELE-satellite.com and organizes the entire IPTV market with enormous production amazed with Apple and their products. Sowell’s General Manager Eagle Chain in Columbia and two in Brazil.” This provides production process at Prevail. numbers. Huang Wei is Jiuzhou’s Sales products towards the a great deal of installation They are precisely geared require isn’t just thinking about the further Company Details Director and reveals to us end-user and thus very successful.” The NETUP and Hardware Producer, Russia what Jiuzhou IPTV Software www.netup.tv development of IPTV. The general future Engineers in Research & Development | Total Number of Employees has planned for 2011. conclusion according to Eagle Chain: of the receiver is also on his mind. “Will ▼ ▼ 0................................ 25 .................................. 50 “We have a similar view with our softthe 1 — www.TELE-satellite.com 114 TELE-satellite — Global Digital TV Magazine — Average Turnover (Previous, This,receiver transform into a multimedia 04-05/201 Next Year Estimates) ware development, namely a customerFirst, though, Sales Director Huang receiver in▼ the Mio US$ Eagle Chain, 0.................................. 5 ................... 10future”, asksIt’s not only since friendly operation of our products.” It is Wei took us on a trip into the past: “The “or will the receiver’s functions gradually the DVB-IP Gateway 4x Production Certificates exactly for by ISO, RoHS, PCI SIG, IEEE, DVB first IPTV boxes were manufactured this reason that Eagle Chain shift over to the TV itself?” It’s a ques- readtest report that Production Categories COMPANY REPORT 20,000Software and develop; minds Jiuzhou in 2007; back thenis skeptical about how IPTV willHardware Producer NetUP, Russia OEM, ODM tion that’s on all of our ers of and for about IPTV TELE-satellite Main Products which we all don’t yet have an answer. boxes were produced and for TELE-satellite though, it’s a subject involved pure Professional PC Cards for DVB-S/S2, DVB-T/MPEG-4, DVB-C, might be familiar with that is being ASI, IPTV Gateway/Streamer, IPTV Middleware, IPTV Conditional IPTV boxes.” Production numbers onlyapproached very ecstatiNetUP. This device Access Systems, IPTV Billing Systems, Video on Demand cally: “The large telecom providers all But even if there aren’t any answers, increased slowly. “In 2010 we produced to the private end user market. They are hardware was ready for production. An setting up your www.TELE-satellite.com/... is allowsoptimistic have their own agenda and that is selling everyone at Sowell still 60,000 boxes”, comments Huang Wei. used in professional streaming equipment, additional two software engineers wrote own IPTV network in their data packages to end-users; they Download this report in other languages from the Internet: about the future. Pan Smile revealed to like NetUP’s DVB to IP gateway 4x and IPTV the drivers required for the Linux-based 1 next to no time (TELE‫العربية‬ www.TELE-satellite.com/TELE-satellite-1101/ara/netup.pdf are focused solely on that concept.” He Arabic us that his current team of 40 engineers Indonesian Indonesia www.TELE-satellite.com/TELE-satellite-1101/bid/netup.pdf Combine 4x. The latter (IPTV Combine 4x) is But 2011 looks to be completely difsoftware.” NetUP even played a major role satellite 10-11/2010). 2 Česky www.TELE-satellite.com/TELE-satellite-1101/ces/netup.pdf in 2011. “We also doesn’t see that the user’s point of view Czech will be expanded to 80 a special product for the hospitality market. in finding the right manufacturer for card ferent: “We will be manufacturing a German Deutsch www.TELE-satellite.com/TELE-satellite-1101/deu/netup.pdf Even before that TELEis considered regarding IPTV and wishes English English www.TELE-satellite.com/TELE-satellite-1101/eng/netup.pdf from Europe here employ five engineers This is an all-in-one IPTV solution that production. “A facility some 100km from minimum of 200,000 boxes and itbe an approach similar to that Spanish could satellite reported on a Español www.TELE-satellite.com/TELE-satellite-1101/esp/netup.pdf there’d in Shenzhen who are Farsi ‫فارس ي‬ www.TELE-satellite.com/TELE-satellite-1101/far/netup.pdf primarily responAlexander Wiese Apple: following a path based strictly French includes IPTV Middleware, billing, DVB to IP Moscow is in charge of manufacturing our go as high as one million.” of all depends It world first launched by Français www.TELE-satellite.com/TELE-satellite-1101/fra/netup.pdf sible for customer support”, comments his office in front ■ General Manager Eagle Chain working in back at Hebrew of a ‫עברית‬ gateway and VoD server (see test report in PC cards.” www.TELE-satellite.com/TELE-satellite-1101/heb/netup.pdf NetUP: A DVB-S2 card on negotiations that areon the end user without looking currently in Mandarin 中文 www.TELE-satellite.com/TELE-satellite-1101/man/netup.pdf Pan Smile. Sales Director Amanda is painting of the Great Wall. TELE-satellite 10-11/2010). Such IPTV syswith two inputs (TELEprogress with a variety ofwhat the provider wants. retail chains Dutch Nederlands www.TELE-satellite.com/TELE-satellite-1101/ned/netup.pdf also optimistic: “Over the past several Polish Polski www.TELE-satellite.com/TELE-satellite-1101/pol/netup.pdf tems are a favorite in hotels and hospitals, The cards are used in professional setsatellite 02-03/2010). in North America as well as ■ Marketing Specialist Zoe Liu finds Europe. Actually, it’swww.TELE-satellite.com/TELE-satellite-1101/por/netup.pdf increase our sales a triple hit: NetUP, a company Portuguese Português years we were able to Isn’t ‘young’ and ‘know-how’ a contradiction in terms? Romanian Română www.TELE-satellite.com/TELE-satellite-1101/rom/netup.pdf because each room can be accessed indiups only, which means production numbers the graphics founded as recently as 2001, has its adminThe reason: these retail chains are — Global Managerto be so — 02-03/201 — www.TELE-satellite.com 104 Sowell’s General Digital TV Magazine Chain Russian TELE-satellite in in TELE-satellite Eagle 1 Русский www.TELE-satellite.com/TELE-satellite-1101/rus/netup.pdf 50% every year. In 2010 our sales were good thatwe’re them on her wall. she pins talking about know-how In many cases it is, but if vidually but the cable infrastructure can be are on the lower side when compared to istrative office in the vicinity of Moscow Of course we wanted Türkçe www.TELE-satellite.com/TELE-satellite-1101/tur/netup.pdf isn’t just thinking about the further Turkish around US$ 30 million and for 2011 we State University. The closest metro Station Available online starting from 3 December 2010 laid out as a bus system. mass consumer good. “We only produce to learn more about in the making, the two termsIPTV. together very nicely. development of go The general future expect that large ■ Jiuzhou constructed an impressively66 TELE-satellite — Global Digital TV Magazine — 02-03/2011 — www.TELE-satellite.com and the two founders of NetUP to rise to US$ 45 million.” is ‘University’ some 1,000 cards per annum,” Abylay that product line, and of the The building ‘Young’ in High-Tech case is an asset,on his mind. “Will in Shenzhen’s such a Park. receiver is also as it means there’s no General Manager Eagle Chain added are – naturally! – former students of that “One of our largest customer groups are Ospan tells us. This has made us curious Necy-xu engineers are here continuously working Abylayoptimism: “In 2011 we“We develop is General Manager Ospan has the details.1.are a brief run-down of the events leading to the the receiver transform into a multimediawhere some two university. Actually, it’s not only themore 1. Necy-xu is General Managerwhich generally favour two-way sysobligation to depend on on new products – currently they’re mostly past developments. So establishment of NetUP. “When we still were hotels and we’re eager to find everything in-house. Both software and Marketing and takes out what else is in receiver in the future”, asks Eagle Chain, Sales and founders who are Moscow State University open our own offices in Sao planning to occupied with we find a perfect example for ‘young’ meets ‘knowIPTV. can Sales and now at the end of tems. This means that hotel guest are not NetUP’s pipeline. “Right Marketing and takes hardware (circuit board layout) have been graduates, but on billing soft“or will the receiver’s functions gradually students we were working almost all other employees care of the company’s exposure,company’s exposure, enjoy TV and Internet access in only able to 2010 we’re launching a PCIe card for DVB-T how’? If we’re talking about digital technology Russia Internet well. It’s providers.” to see that NetUP care of the as service clear for all designed by our very own engineers.” shift over to the TV itself?” It’s a ques- ware for such as, at trade shows andas the trade shows and in the but that hotel management is pools together collective digital technoltheir rooms, and DVB-C.” Just in the DVB-S2 card this 64 TELE-satellite — Global Digital TV And if we 02-03/201our minds and for Magazine all of 1 our assumption springs to mind.tion that’s—onsupport — www.TELE-satellite.com with such as, at 1. Sun Guanghua is also a Software Engineer ogy know-how, while everybody working at also able to send personal and customised card, too, has two inputs and tuners. “We’re press. Andrew Budkin is the head of Software He in his final semester and which State University is ranked the fact that Moscow we all don’t yet have an answer. right was still NetUP is still very young. at uni- a founding partner. press. messages to guests in their rooms,” Abylay also working on a card with two ASI inputs.” Development and knows precisely the versity when Abylay Ospan teamed up with 2. Peng Yi is one of 2. a among all the top-notch universities in the worldhis colleague Evgeniy Makeev to set up theirSoftware engineer effort put into Sowell’s project. International Sales when it Ospan amount of such Helen is But even if there aren’t any answers, founding partners. 2. Helen is International Sales lays down the reasons behind such Let’s start with Abylay Ospan, who is one infrastructure. PCIe cards from NetUP are not targeted comes to digital everyone at Sowell is still optimistic own then technology teaching and research, business, of the company’s founders and acts as Direc- the DVB-S2 card two of our engineersand is constantly in Manager “For which offered exactly that www.TELE-satellite.com/... ë ë Sowell, China - Receivers R Manu Distr Whol Shop R Serv Lamrani in front ■ Technical Director TewfikGM of one of Bomare Company’s flagship products - a complete home theater system currently marketed inside Algeria under the Stream Eagle System brandname. ë Sun Guanghua products after pro- www.TELE-satellite.com/TELE-satellite-1101/eng/netup.pdf neers, there are ten more engineers in Founder Founder Bomare Company’s R&D Team. They 3 3 are constantly working to improve their Richard Bob on the rise: now on the 450 employees work employees work that therefore cable operators cable operators about rise: now about 450 know-how and product line and also incorporating the therefore know-how and that prefer to at Prevail. But for 2011 Necy-xu for extremely at Prevail. But is 2011 Necy-xu is extremely this on their own.this on their own. This is not Zhang latest requirements tackle prefer to tacklefor (such as MPEG4 This is not Liu excited: “The number of our employees will employees will true for accessories although excited: “The number of our true for accessories although cable operators cable operators also works climb to over 500climb we over expect a we Bomare Company customerslargest customers for this product and to also DVB-T). also are still a jump are 500 and jump expect the largest still the for this product in sales.” Prevailinis sales.” Prevail is actually the Technical University since they need large numbers of actually optimistic with optimisticwell since they as well and closely that group as that group need large numbers of NetUP, Russia - IPTV R Manu R Distr Whol Shop R Serv Peng Yi Co-Founder Co-Founder 4 4 Eric Deng Abylay Ospan Evgeniy Makeev from that strategy: Network Up – a com- • ISDB-T and DVB-T2 Receiver in 2011 • Overseas Offices in the Plan A team of five R&D engineers are the founders of the OEM company Sowell. The driving force and General Manager of the young company is Eagle Chain. He was, like his four colleagues, an R&D employee with a large receiver manufacturer but over time didn’t feel so comfortable with that company. All too often he was assigned projects that had nothing to do with receivers. His four colleagues — 04-05/201 — 1 Shenzhen • User Friendliness is Company Philosophy felt the same way and so in 2004 they founded their own company Sowell. We met up with General Manager Eagle Chain in Sowell’s office in Shenzhen who started off by telling us how it all began: “All we had was the money we had saved while employed with that other company. We pooled Sowell’s■ offices with their 70 employees are located on the seventh floor of this office building in Shenzhen. Receiver production takes place in Baoan which isn’t too far from here and close to Shenzhen’s airport. 200 employees work in the production facility. 200,000 receivers per month can be produced by one shift; if all three shifts are used, receiver production climbs to more than 500,000 boxes a month. ■ General Manager Eagle Chain working in his office in front of a painting of the Great Wall. 104 TELE-satellite — Global Digital TV Magazine — 02-03/201 — www.TELE-satellite.com 1 www.TELE-satellite.com — 02-03/201 — 1 There is another feature which shows that PCIe cards from NetUP are designed for the professional high-end market: “We are now beginning to ship our cards based on the ALTERA chipset.” What makes this so special? Well, the hardware is identical for each customer and only the software on the PCIe card defines its scope of application. “In the third quarter of 2011 we will also base our 2 x DVB-S2 card – which was presented in TELE-satellite – on the ALTERA chipset,” NetUP Sales Manager Konstantin Emelyanov adds. COMPANY REPORT TELE-satellite — Global Who Shop Se v NetUP has added another business segment to its portfolio in the meantime, which 3. What magazine laying there on Designer Digital TV Magazine — is 04-05/201of Sowell’s fits in smoothly with the original software 1 — www.TELE-satellite.com Zoe — desk? Yes, she takes Magazine business for ISPs: NetUP is now also develTELE-satellite Lee’sGlobal Digital TVcare — 04-05/201 — www.TELE-satellite.com 1 ads in TELE-satellite. She also works on the oping software and hardware for IPTV. graphical layout of a receiver’s OSD as well as the packaging, user manual and everything else “IPTV 3 has already gained a 70% share of at Sowell that involves graphics. our turnover,” NetUP Director Abylay Ospan reveals and adds “annual sales are high in the one-figure million USD this year.” As a 108 TELE-satellite — Global Digital TV Magazine — 02-03/201of — www.TELE-satellite.comdifficult to difmatter 1 fact, it has become ferentiate between software for ISPs and IPTV, as many Internet service providers have become IPTV providers as well. “For those providers we offer middleware, videoon-demand servers and streaming servers,” Abylay Ospan explains. ing its customers. Ma h as The quality of Bomare Company’s Lu products has become so high that they Sa beams A Webs e or Pro ess ona s Satbeams, Belgium - Software ■ Tenow is in the process of setting up new offices on the second floor in this new office complex in Shenzhen’s HighTech Park. These offices will give Tenow room to expand. Shenzhen James Liu Speaking of products already introduced in TELE-satellite: The NetUP DVB-IP Gateway 4x can be ordered with an H.264 encoder/transconder as of Q3 2011. Things get even more exciting towards the end of 2011 when “we will offer the DVB-IP Gateway 4x with unicast.” This will make the device – which hitherto is only available as a multicast model – even more user-friendly and will also allow laymen to distribute their TV channels via the Internet. founded the company in 2005. From left to right: Richard Zhang, Bob Liu, Eric Deng and James Liu Two of the founders, James Liu, in charge of Marketing, and Bob Liu, responsible for Software Development, met each other while studying at Wuhan University. The two other partners, both of whom previously worked at a receiver manufacturer, are Richard Zhang, in charge of Hardware Development, and Ku O esen W IBC Then, as a design house, Tenow developed complete applications for manufacturers. One success story involved DVB-T USB sticks: Tenow developed the TELE-satellite — Global Digital TV Magazine 83 Konstantin Emelyanov COMPANY REPORT Head of Software Development, Andrew Budkin, has another piece of interesting news in store. “It makes economic sense for some providers of Internet-via-satellite only to use the base band which saves valuable bandwidth.” This is why NetUP has decided to develop PC cards with precisely that strategy in mind. “Large utilities might be extremely interested in that technology,” adds Abylay Ospan and has the following example: “Gazprom uses this one-way technology for its local networks.” IPTV Software and Hardware Producer NetUP, Russia Young, Yet With Extensive Know-how: NetUP from Moscow Alexander Wiese Isn’t ‘young’ and ‘know-how’ a contradiction in terms? In many cases it is, but if we’re talking about know-how in the making, the two terms go togeth ■ NetUP co-founder and Director Abylay Ospan showing the company’s latest developments: PCIe cards for 2 x DVB-S2, 2 x DVB-T or C, 2 x ASI. All cards come with two CI slots. 82 TELE-satellite — Global Digital TV Magazine — 12-01/201 — www.TELE-satellite.com 1 te-1101/ ev pd www TELE-aud ov s on com/TELE-sate te-1011/sa beams pd 86 TELE-satellite — Global Digital TV Magazine — 12-01/201 — www.TELE-satellite.com 1 Founde Cert ficate Ho der to become popular and they distributed DVB-T demodulator chips to local manufacturers in Shenzhen. www.TELE-satellite.com — 02-03/201 — 1 A exande De ug n Spaun, Germany - Power Supplies R Manu D s Who Shop Se v Tenow then operated as a commercial enterprise: DVB-T was just starting Founde SmartWi, Denmark - Wireless Card Reader W Eric Deng, who is also involved with Software Devlopment. All four of them founded the new company in 2005 using a starting capital of 500,000 RMB (roughly 50,000 Euros). Bomare Company’s showroom their newest Stream System receiver model BM-200HD with slots for a SmartCard and PCMCIA. 2 84 TELE-satellite — Global Digital TV Magazine — 12-01/201 — www.TELE-satellite.com 1 R Manu R s D R Who Shop Se v Innovative PC Cards from China ■ Tenow’s four partners: they 82 TELE-satellite — Global Digital TV Magazine — 02-03/201 — www.TELE-satellite.com 1 and holds a PhD in mathematics. 104 TELE-satellite — Global Digital TV Magazine — 04-05/201 — www.TELE-satellite.com 1 Power Supp y Un s Made by SPAUN – guaran eed 105 One company that is fully concentrated on the development of their products is the young firm Tenow from Shenzhen, China. PC cards are manufactured although the actual production process is outsourced allowing Tenow to focus their efforts on Development and Marketing. Also interesting to note about Tenow: the company is run by four partners and all four of them work together as a team to further expand their young company. Tenow is in the process of setting up a new office in Shenzhen’s large High-Tech Park. When we paid them a visit, we went to their old office located directly next to the Shen Da Metro Station on route 1. and organizes the entire organizes the entire and ■ Evgeniy production process atMakeev is co-founder Prevail. of NetUP production process at Prevail. 82 TELE-satellite — Global Digital TV Magazine — 12-01/201 — www.TELE-satellite.com 1 R Manu R s D Who Shop R Se v TELE-satellite — Global Digital TV Magazine PC Card Manufacturer Tenow, China ë comply with of installation in Columbia and two Tevii, Taiwan products require a great dealthe requirements of ISO9001 in Brazil.” This provides - PC Cards and Receiver18001 www TELE-aud ov s on com/TELE-sate V2008, ISO14001 V2004, OHSAS 114 R Manu Tev Tapp114 n o ng V2007, thus becomingFounde an proactive and ■ Mellat Abdelkrim is Senior Engineer for SD R s New Marke s D efficient organisation, aimed at satisfyand HD Receivers and shows us here in latest developments: PCIe cards for 2 x DVB-S2, 2 x DVB-T or C, 2 x ASI. All 2. Software engineer Peng Yi is one of Sowell’s cards come with two CI slots. partners. founding 91 TELE-satellite — Global Digital TV Magazine www.TELE-audiovision.com/TELE-satellite-1101/netup.pdf Sales in January 2009 Cologne, software solution, Bomare ANGAwhich is ideal 10% are shipped 10% are shippedInopen our own offices in Sao ersin particularfor a our Cable-Tecto in NewCable-Tec in4.New Orleans to distributors.” The distributors.” The obvious like ANGA Company Orleans He manages production:manages production: Ren planning to client base in up of Cologne, to obvious 4. He Ren Manager 50,000.” three reason for this is reason for this is that at this point fiber optic companywell isas three to that at this point fiber optica as well as Even the shows in derived America: one installed management name South shows in SouthGuorui is Production Guorui is Production Manager as system America: one 1. Guanghua is also co-founder and Director products require a ■ NetUPOspan showing theaof installation Engineer pany that takes care of network expansion. This provides great dealSunfounding partner. a Software in Columbia and two in Brazil.” and company’s Abylay Receiver Manufacturer Sowell, China • Founded by 5 Partners www.TELE-audiovision.com/TELE-satellite-1103/tenow.pdf Founder Founder Manager and is constantly in Russia seems contact with customers all over customers all over they can be on the Shanghai Stockactively involved in Standards Comcontact with they can be on theExchange Stock Exchange Shanghai these products. these products. is the world. She can often be found can often be found the world. She there for customers: Sales in 2012. That’s quite an achievement for such at trade shows at 1 at trade shows at the Prevail 1. AlwaysKonstantin Emelyanov. the Prevail Manager in 2012. That’s quite an achievement for such missions primarily respon- an two onwards turnoverthey have turned hobby into like CETA international increased con- Prevail can be stand. (ComitéthatElectrotechin Shenzhen As year a young company! young company! who are indication 2. This is where NetUP runs its stand. Ascompany, give us an sprung to international company, Prevail can be a sible for customer support”, comments sistently. It was the timeWe ask ISPs Ospan business on the ground floor. Two profession. when Abylay 3. very critical man Pan Smile. Sales et Amanda is up all over the CIS countries, nique DirectorTélécommunication andAlgérien) trade shows. —This man—iswww.TELE-satellite.com for a is very critical forsatellite dishes on the roof send down most 108 TELE-satellite — Global Digital TV Magazine of found at numerous trade shows. International 3. This a 02-03/201 1 the signals required for developing found at soluInternational quality manufacturer quality manufacturer like Prevail: satellite cards. like Prevail: also optimistic: “Over the past several them turned to NetUP for software numerous innovative we were Who actually buys Prevail’s years buysthe increase our sales tions. “More than 2,000 ISPsNormativesoverview: us he is Yu Xinghong and with his products? “90% products? “90% and able 2010 our sales were Techniques currently rely Helen gives Sales Manager an overview: Who actually every year. In to Comité onManager Helen 90% of them an Prevail’s Sales our billing software, with gives us he is Yu Xinghong and with his 50% 20 engineers he is 82 TELE-satellite in we’ll at CCBN — Global Digital TV Magazine — 02-03/201 — www.TELE-satellite.com engineers he is of our customers are the cable operators for 2011 we operatorsCIS countries,” NetUPMagazine — 02-03/2011 Beijing, CCBN in1Beijing, responsible around US$ million TELE-satellite — Global Digital TV Sales — www.TELE-satellite.com at — Global Digital TV assurance20 of our customers 30 rise to and 45 “In 2011 located inbe exhibitingwe’ll be exhibitingTELE-satellitefor quality Magazine — 02-03/2011 — www.TELE-satellite.com responsible are the during Nationaux. cable being 82Konstantin “In 2011proudly 82 expect that to US$ million.” Manager Emelyanov for quality assurance during themselves”, explains Necy-xu, “only aboutChainCabsat TV Magazine —and medium-sized in Dubai, CommunicAsiaproduction. General Manager Necy-xu, Global Digital in “Small Eagle Cabsat providin Singapore, themselves”, explains 82 TELE-satellite — added states.about 02-03/2011 — www.TELE-satellite.com in Singapore, “only Dubai, CommunicAsia production. 3. What magazine is laying there on Designer worked to “I’m 30 years old,” he The Lee’s desk? together for half Sowell’s toabout the future. Pan Smile revealed to billing softwaretor: potential customers. says smilingly. Yes, she takes care ofa year until the be spot on! Zoe His founding partner is Evgeniyads Makeev who us that his current team of 40 engineers point in time could not have been better. in TELE-satellite. She also works on the 2 graphical layout of a receiver’s OSD as well as will be expanded to 80 in 2011. “We also While in their holds year of operation sales only just first a PhD in mathematics and the anything turned 29. Both care deeply about packaging, user manual and everything else 3 employ five engineers from Europe here never exceeded five-digit USD figures, fromSowell that involves graphics. at to do with digital technology, which is a clear some more optimism: “In 2011 we are COMPANY REPORT • Overseas Offices in the Plan • User Friendliness is Company Philosophy sure they Young,duction to make TELE-satellite World Yet With Extensiveperform as required.” Know-how: NetUPquality assurance engifrom Moscow Tenow, China - PC Cards these Besides R Manu R Distr Whol Shop Serv USD$ 24 million!” What? Is he serious? And then he surprised us for a second time: “I believe that demand for LNBs will drop off for several years but then it will turn around and go back up.” But that alone couldn’t possibly be the reason for www.TELE-audiovision.com/TELE-satellite-1103/sowell.pdf Software Software Those aren’t very pretty numbers but Chain • Founded by 5 Partners deal with testing • ISDB-T and DVB-T2 Receiver in 2011 ë 2010 we calculate sales of USD$ 20 million. For 2011 we expect a fallback to USD$ 18 million and for 2012 we expect a further fallback to USD$ 16 million.” www TELE-aud ov s on com/TELE-sate te-1011/sma w pd Techn ca Manage Jens G ad www TELE-aud ov s on com/TELE-sate MD Kev n Spaun 220 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com te-1011/spaun pd
  • 221.
    www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 221
  • 222.
    wholesaler ATLANTA wasborn. PORT Wi’s in the first year they were offered sion of their SmartWifor a single product. jeev Jain. large number business will be possible! It didn’t take long and him to realize for by 2009 that number increased to that sold 3000 Even more interesting is what Kurt “In the first year my father coax cable could be a profitable our SmartWito double this as part of 2000. “For 2010 goal is was introduced business; his first number”, explains Sanjeev Jain. Olesen told SmartWi units will analog receivers for US$ 25.00 a piece”, coax cable delivery their business in 2005. A mutual friend generation of us: “We are expecting to A new quickly sold out so he had to order more. brought Rajmal Jain and Kurt Olesen, receive approval from one of the largest remembers Sanjeev Jain, the first genbe marketed soon. We here at TELE-satHis local customer in Dubai asked him if SmartWi’s President, together. operatores in Middle East, named ART.” eration of his family born he Dubai. acquire satellite receivers. only represent domesin could also These numbers ellite are waiting for the first sample unit tic sales. “We also export just as many 500 Smart- report that would appear scale expanOne thing led to another and satellite ATLANTA managed to sell for a test Once that happens, large in one wholesaler ATLANTA pieces Wi’s in the remaining The age of digital receivers began in was born.to North Africa, the first year they were the upcoming issues. of offered sion of their SmartWi business will be and by 2009 that number increased to possible! 1998 at which time ATLANTA started Middle Eastern countries and eastern Digital TV Receiver Manufacturer BOXSAM, China “In the first year my father sold 3000 2000. “For 2010 our goal is to double this marketing receivers under its own label. Europe”, comments Sanjeev Jain. He TELE-audiovision Global Company Directory ivers e by SAM analog receivers for US$ 25.00 a piece”, remembers Sanjeev Jain, the first generation of his family born in Dubai. number”, explains Sanjeev Jain. Boxsam, China - Receivers The age of digital receivers began in ATLANTA started R Manu1998 at which timeunder its own label. marketing receivers Distr Whol Shop Serv GM Xiaofeng Huang being the main investor and General Manager. No production facilities can be seen anywhere near the headquarters, so the question arises where manufacturing actually takes place. Jeffrey Zhao has the answer: “Our manufacturing premises are located 6 km away.” In the beginning both administration and production where at the same place, “but demand soon outstripped capacity and so we built a 17,000 square meter manufacturing hall some time ago. Currently we are in the process of setting up a second manufacturing hall with some 40,000 square meters, which should be finished by the end of 2010. At that time we will also move our administration and offices there.” almost 100 engineers in the city of Xi´an, which hosts an outstanding technical university,” Jeffrey Zhao explains. BOXSAM’s pride and joy are four SMT lines for assembling circuit boards with truly breathtaking speed: “We operate three Samsung surface-mount technology lines and a brand new one from Panasonic,” Jeffrey Zhao tells on a tour around the hall. Naturally, all SMT lines are located in a clean room which can only be accessed through wind locks in which all dust particles are sucked from clothes. Artie Lee is the SMT Manager and he explains in the clean room that the four SMT lines have a combined maximum daily output of 28,000 circuit boards. “But this would mean running at top gear – on an average day we finish Next, a company driver appears to take us to the production building where a total of 700 employees are kept busy on four floors. “In addition, we employ ë 200 km southwest of Shanghai. The Chinese characters on the roof mean “Science and Technology Centre” – an apt description for an ambitious manufacturer like BOXSAM. TELE-satellite World Jinhua Zhejiang www.TELE-satellite.com/... Download this report in other languages from the Internet: Arabic Indonesian Bulgarian Czech German English Spanish Farsi French Hebrew Greek Croatian Italian Hungarian Mandarin Dutch Polish Portuguese Romanian Russian Swedish Turkish ‫العربية‬ Indonesia Български Česky Deutsch English Español ‫فارس ي‬ Français ‫עברית‬ Ελληνικά Hrvatski Italiano Magyar 中文 Nederlands Polski Português Română Русский Svenska Türkçe www.TELE-satellite.com/TELE-satellite-1009/ara/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/bid/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/bul/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/ces/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/deu/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/eng/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/esp/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/far/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/fra/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/heb/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/hel/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/hrv/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/ita/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/mag/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/man/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/ned/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/pol/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/por/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/rom/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/rus/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/sve/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/tur/boxsam.pdf Available online starting from 30 July 2010 TELE-satellite — Global Digital TV Magazine — 08-09/2010 — www.TELE-satellite.com www.TELE-audiovision.com/TELE-satellite-1007/atlanta.pdf Rajmal Jain Sanjeev ■ Jain BOXSAM Vice President Jeffrey Zhao in front of a display wall with a selection of COMPANY REPORT This report was written because of SmartWi, the Card Sharing Module that lets you watch every channel in every room in your house using just one PayTV card. SmartWi in Denmark distributes their products all over the world and this includes The Middle East. SmartWi’s ever increasing sales figures in this region are due in large part to the non-stop efforts of local distributor ATLANTA headquartered in Sharjah in the United Arab Emirates. Changhong, China - Receiver Sales Representatives Vishal Malviya (left) and Sunil Jain (right). ■ Repairs are occasionally necessary. Technician Sadanand Shetty takes care of this work in his little shack. ■ Above the store is a storeroom stocked with smaller amounts of every product. Larger quantities are shipped from ATLANTA’s main warehouse in Sharjah. ■ The ATLANTA store on Naif Street in the satellite Souk in Dubai’s Deira district. The store is open every day except Friday from 09:30 to 14:00 and then again from 16:30 to 21:30. ATLANTA is a wholesaler and therefore doesn’t sell to he general public. 106 TELE-satellite — Global Digital TV Magazine — 06-07/2010 — www.TELE-satellite.com www.TELE-satellite.com — 06-07/2010 — TELE-satellite — Global Digital TV Magazine 107 ■ Ivan Horrocks, Global Invacom’s Director of is taking shape. We will www.TELE-audiovision.com/TELE-satellite-1007/yinhe.pdf use it also for into account the fact that BOXSAM is antenna and LNB production.” also one of the official manufacturers for the Chinese DTH system we identified a This makes us prick our ears. How great business opportunity and will be come BOXSAM is planning to break new offering dishes and LNBs as well.” While ground with a whole new product linethere is an endless number of dish and up? “BOXSAM was granted one of the LNB manufacturers in China, most of www.TELE-audiovision.com/TELE-satellite-1005/globalinvacom.pdf very few licences by the Chinese governthem only possess export licences and Sales ment for production and domestic sale are restricted from selling their products of satellite antennas and LNBs. Taking domestically in China – at least officially. Sales and Marketing, is showing us the new F-IRS LNB (Fibre Integrated Reception System): the new LNB utilizes a coaxial N output instead of an optical output. This output supplies the 0.95 to 5.45 GHz frequency range to a 1.5-meter long coax cable which connects to the F-IRS ODU32 (Outdoor Unit). Global Invacom opted to use N-type connectors on this coax cable. “These connectors are perfect for use with this high frequency range and above all are excellent watertight connectors”, explains Ivan Horrocks the reason why standard “F” connectors weren’t used. COMPANY REPORT Presents Their Factory Alexander Wiese Chinese high volume manufacturer YINHE is one of the top five producers in China. Although this company is well know within China, it is only the insiders that recognize the name YINHE outside the country since abroad it is only an ODM. In other words, the YINHE designed boxes (Original Design) are marketed by other companies, primarily dealers and programming operators, under their own brand name. YINHE therefore is just the manufacturer (hence ODM) and for the time being it will stay that way. There are no plans for YINHE to dive into the export market with Zhangjiagang, their own brand name. What does Jiangsu it look like inside one of these high volume manufacturing plants? TELE-satellite wanted to find out. That was yesterday! Today one single optical cable is enough to transport both satellite and terrestrial signals. Global Invacom has expanded their system to include DTT signals as well. Ivan Horrocks, Director Sales and Marketing, explains to us how this works: “We took the satellite signal carried in the optical cable and combined it with the DTT signal; now both signal formats can be carried on one optical cable.” ■ David Fugeman, Sales and Marketing Director, is seen here showing us the new F-IRS GTU converter box: it is installed by the end-user who would then connect a maximum of four satellite receivers as well as one DTT receiver. “We’ve integrated two new features”, explains David Fugeman, “one LED indicates if there’s an optical signal, the second LED shows if power is connected.” ■ Ivan Horrocks, Global Invacom’s Director of Sales and Marketing, is showing us the new F-IRS LNB (Fibre Integrated Reception System): the new LNB utilizes a coaxial N output instead of an optical output. This output supplies the 0.95 to 5.45 GHz frequency range to a 1.5-meter long coax cable which connects to the F-IRS ODU32 (Outdoor Unit). Global Invacom opted to use N-type connectors on this coax cable. “These connectors are perfect for use with this high frequency range and above all are excellent watertight connectors”, explains Ivan Horrocks the reason why standard “F” connectors weren’t used. David Fugeman High Volume Digital TV Receiver Manufacturer YINHE, China Organized for the Future Receiver Manufacturer YINHE  The enormous 280,000 square-meter production site is located in the city of Zhangjiagang in the Jiangsu province roughly 100 Km north of Shanghai in eastern China. Here, in addition to the four-story administration building, you’ll also find multiple fabrication buildings. sales of US$ 80 million while the remaining product groups produced sales of US$ 30 million”, says Jianbiao Zhu. He continues, “In 2010 we are expecting an increase to US$ 100 million in receiver sales with the remaining product groups increasing to US$ 35 million.” During the tour of the facility, Jianbiao Zhu, Overseas Marketing Department Manager, told us there are a total of 1500 employees, 1100 in production and 400 in administration. “Last year we had 1200 employees but in 2010 we added 300 additional employees”, he explained to us. Business seems to be booming at YINHE! What are these other product groups? “We are one of the largest PC housing manufacturers; we also produce satellite dishes as well as professional receiver components for cable headends .” YINHE was founded in 1975 and at that time it was a state-run company that had the goal of producing China’s first memory chips for use in the large computer systems of that time. “It all started with 50 employees”, Jianbiao says as he looks back at the old days. In 2000 the ownership structure changed and it became a privately run company made up of 40 share-owners. “But all of that could possibly change“, reveals Jianbiao Zhu, “We’re planning to go public this year on the Shenzhen stock exchange.” The goal is to acquire additional capital for expansion. receivers end up in The Middle East, 20% go to Europe including the CIS countries and Southeast Asia, another 15% go to Australia, 10% to Africa and 5% to South America.” It should come as no surprise that YINHE operates offices in critical regions namely in Dubai since 2003 and in Australia since 2005. “This year 2010 we plan to open two additional offices in Sao Paolo and Moscow. We are also looking to open an office in Chennai in 2011”, confirms Jianbiao. But TELE-satellite is primarily interested in receivers, so let’s get back to that. “Satellite receiver development started in 1997”, remembers Jianbiao Zhu, “and in 1998 we produced 10,000 receivers.” This number increased at a tremendous rate: “In 2009 we produced 3.6 million boxes and in 2010 we expect production of four million boxes”, he reveals and then adds, “In both years two million receivers were sold domestically in China; the rest were exported.” The best export countries are Australia with DVB-T receivers in MPEG-4 and HD as well as India with DVB-C boxes in MPEG-2 and SD. “We want to expand our distribution in Europe including the CIS countries with DVB-T MPEG-4, DVB-T2 MPEG-4 and DVB-S2 receivers”, comments Jianbiao Zhu. He adds, “60% of our exports are satellite receivers, 30% are terrestrial receivers and 10% are cable receivers.” We wanted to know more about the export side of things: where does YINHE export to? Jianbiao Zhu takes a look at his laptop and then says, “30% of our Another interesting note: with a market segment of about 10%, YINHE is one of the largest providers of cable receivers domestically in China. TELE-satellite World www.TELE-satellite.com/... Download this report in other languages from the Internet: Arabic Indonesian Bulgarian Czech German English Spanish Farsi French Hebrew Greek Croatian Italian Hungarian Mandarin Dutch Polish Portuguese Romanian Russian Swedish Turkish So, what do YINHE’s sales figures look like? “For 2009 our receiver products had ‫ﺍﻟﻌﺭﺑﻳﺔ‬ Indonesia Български Česky Deutsch English Español ‫ﻓﺎﺭﺳﻲ‬ Français ‫עברית‬ Ελληνικά Hrvatski Italiano Magyar www.TELE-satellite.com/TELE-satellite-1007/ara/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/bid/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/bul/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/ces/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/deu/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/eng/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/esp/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/far/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/fra/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/heb/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/hel/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/hrv/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/ita/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/mag/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/man/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/ned/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/pol/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/por/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/rom/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/rus/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/sve/yinhe.pdf www.TELE-satellite.com/TELE-satellite-1007/tur/yinhe.pdf 中文 Nederlands Polski Português Românesc Русский Svenska Türkçe Available online starting from 28 May 2010 ■ YINHE’s Main Entrance. The administration building is to the left behind which are numerous production facilities. 1500 employees work here. 64 For this purpose, Global Invacom developed a new system that will be marketed under the nickname “Wholeband”, or more officially, F-IRS (Fibre Integrated Reception System). But first we want to take a quick look again at how Global Invacom’s optical system works: the optical LNB (universal LNB) takes the four satellite frequency ranges, that is, the upper and lower bands in both horizontal and vertical polarizations, and “stacks” them on top of each other so that all four bands are carried over the optical cable in one frequency range. Each of these four bands covers 1000 MHz and if you place them one on top of the other you get a bandwidth of 4000 MHz. TELE-satellite — Global Digital TV Magazine — 06-07/2010 — www.TELE-satellite.com COMPANY REPORT www.TELE-satellite.com — 06-07/2010 — TELE-satellite — Global Digital TV Magazine 65 Fibre Optic Products by Global Invacom Global Invacom goes Fibre DTT ■ Ivan Horrocks, Global Invacom’s Director of Sales and Marketing, is showing us the new F-IRS LNB (Fibre Integrated Reception System): the new LNB utilizes a coaxial N output instead of an optical output. This output supplies the 0.95 to 5.45 GHz frequency range to a 1.5-meter long coax cable which connects to the F-IRS ODU32 (Outdoor Unit). Global Invacom opted to use N-type connectors on this coax cable. “These connectors are perfect for use with this high frequency range and above all are excellent watertight connectors”, explains Ivan Horrocks the reason why standard “F” connectors weren’t used. Alexander Wiese today it is ■ Group shot in Dubai (from left to right): Alexander Wiese, TELE-satellite Editor-in-Chief, Kurt Olesen, SmartWi‘s President, Rajmal Jain, ATLANTA’s we also implemented every single producing of digital set topfounder and Sanjeev Jain, his son and Director of ATLANTA. boxes in all standards eginnings of So range. How BOXSAM production hall with a net floor area of 17,000 square metres.much for thethesatelliterange? Very do you include the DTT like DVB-S, DVB-C, DVB-T, ISDB, DMB-TH tion guideline right down to the very last s founded in simple: Convert Digital Terrestrial shot in Dubai (from left to ■ Groupand of course HDTV108 right): Alexander Wiese, TELE-satellite Editor-in-Chief, Kurt Olesen, SmartWi‘s President, Rajmal Jain, ATLANTA’s Transmissions using another laser at a detail.” Richard — www.TELE-satellite.com including value-added TV Magazine many continues to explain that oducing miliTELE-satellite — Global Digital different frequency then combine the founder and Sanjeev Jain, his son and Director of ATLANTA. The— 06-07/2010dishes in front give a clear two together. “this is how things go in the first phase of systems for digital tv. the company indication of what is That was yesterday! Today one single In order to do that, Global Invacom e, pluralistic, optical cable is enough to transport both had to modify their LNB system: the satellite and terrestrial signals. Global optical LNB already has the laser built Invacom has expanded their system to 108 Their — Global Digital TV Magazine — 06-07/2010 going on inside. erent indus- TELE-satelliteproduction capacity reaches up to — www.TELE-satellite.com into it so that the optical cable can include DTT signals as well. Ivan Horbe connected directly to the LNB. To rocks, Director Sales and Marketing, include terrestrial signals, Global Inva12 million, making them the largest STB om digital tv explains to us how this works: “We took com could have added a second conthe satellite signal carried in the optinector on the LNB for the terrestrial manufacturer in China. The company has r conditioner cal cable and combined it with the DTT antenna along with the necessary elecsignal; now both signal formats can be tronics. “This would have been theoretiheavily invested in their quality control and roducts, set carried on cally possible”, says Ivan Horrocks, “but sible for quality and system managethat Kaifa produces, it’s easier to see why one opticalwe could also manufacture satelus if cable.” Jianbiao Zhu, Overseas it really doesn’t make any sense since has built up a digital TV laboratory, a digiy and power ment with another 30 expatriats who Kaifa wants to start manufacturing satel- purpose, Global Invacom For this lite receivers.” This customer was so the LNB would have become too heavy www.TELE-satellite.com/... developed a new system that will be and bulky. Not to mention it would have are mostly responsible for Marketing and lite receivers. Marketing Manager Jackie under the nickname “Wholeimpressed with the overall quality and Marketing Manager, in marketed tal HFC experimental net, EMC laboratory s of technicreated problems for installers in that band”, a Management. Yan explains it to us in words: “About or more officially,development of Kaifa’s products further F-IRS (Fibre in other languages from the Internet: Integrated Reception System). But first and most importantly a high accuracy SMT ineering and ■ ■ YINHE’s showroom. year ago one of our largest power we want to take a quick look again at meter that it only seemed natural that Kaifa 82 www.TELE-satellite.com/TELE-satellite-1009/ara/boxsam.pdf After this introduction to everything customers in India came to us and how Global should also produce satellite receivers asked Invacom’s optical system www.TELE-satellite.com/TELE-satellite-1009/bid/boxsam.pdf production line. CHANGHONG’s aim is to works: the optical LNB (universal LNB) Samples www.TELE-satellite.com/TELE-satellite-1009/bul/boxsam.pdffrom the takes the for this customer and its DTH project in four satellite frequency ■ become one of the strongest suppliers for www.TELE-satellite.com/TELE-satellite-1009/ces/boxsam.pdf ranges, thatIndia. upper and lower is, the bands in both horizontal and vertical production line are www.TELE-satellite.com/TELE-satellite-1009/deu/boxsam.pdf digital tv solutions worldwide. the CHANGpolarizations, and “stacks” them on top José Clotet founded the company in the first satellite signal analyzer and in www.TELE-satellite.com/TELE-satellite-1009/eng/boxsam.pdf of each other so that all four bands are quite a fast start for a Naturally this is ■ At Chengdu airport: His role on display www.TELE-satellite.com/TELE-satellite-1009/esp/boxsam.pdf here. carried over the optical cable in one freCHANGHONG 1963. That 1993 the first microprocessor controlled brand new four bands was only a few years after quency range. Each of these satellite receiver producer. But as Overseas Sales Director www.TELE-satellite.com/TELE-satellite-1009/far/boxsam.pdf covers 1000 MHz and if you place them “In 1978 CHANGHONG o., Ltd. It is of the first TV station came on the air in course there’s more going on than just www.TELE-satellite.com/TELE-satellite-1009/fra/boxsam.pdf started its TV leads Richard Cheng Li to universal analyzer that covered everyone on top of the other you get a bandwww.TELE-satellite.com/TELE-satellite-1009/heb/boxsam.pdf this width of 4000 MHz. one customer. Jackie Yan explains, many destinations around production,” Richard Cheng Li remembers. the CHANGBarcelona. in negotiations with thing from VHF/UHF (including FM) to www.TELE-satellite.com/TELE-satellite-1009/hel/boxsam.pdf the globe. “We are currentlySuddenly, you had not only So much for the satellite range. How www.TELE-satellite.com/TELE-satellite-1009/hrv/boxsam.pdf a complete pro“At the time we imported n research & do you include the DTT large Very another range? DTH operator who also Ivan Horrocks ■ Inside the store can be found But what to do with it? The cable manufacturer explained to him that this cable the company’s products. Zhu ■ Satellite Wholesaler ATLANTA, Dubai SmartWi Distributor ATLANTA in Dubai While having lunch at an Indian restaurant on Sheikh Khalifa Bin Zayed street across from the glistening Burjuman Shopping Center, Sanjeev Jain told us the story of ATLANTA. Just like with most of the other shops in Dubai, ATLANTA is also run by an Indian family. “My father Rajmal Jain came to Dubai in 1968”, explains Sanjeev. “He began selling satellite products in 1992. He had contact with a manufacturer in India that produced electronic cables. One day he received a sample of a black cable: it was a coax cable.” 92 employees work in the SMT departMarketing ment to supervise insertion machines Manager and to make sure a steady supply of Jianbiao required components is available. R ■ Manu Distr Whol Shop Serv 73 www.TELE-satellite.com — 08-09/2010 — TELE-satellite — Global Digital TV Magazine Director Finally, Vice President Jeffrey Zhao GlobalInvacom, UK - Fibre Optics site right points to the construction R Manu Sales opposite the existing premises. “This Distr is where our new manufacturing hall development, marketing and manufactur- duction line from Panasonic in Japan and te World BOXSAM is headquartered in the city of Jinhua in the eastern Chinese province of Zhejiang. With a population of around one million it is considered a small city by Chinese standards. Jeffrey Zhao is Vice President of BOXSAM and his main area of responsibility is the Operator Market, which covers sales to content providers and network operators. He tells us that back in 2004 – the first year of receiver production – only 100.000 boxes left the premises. “By 2009 that figure had increased to three million receivers of all kinds, and for 2010 the target stands at five million receivers,” states Jeffrey Zhao. ■ BOXSAM is a private company with Xiaofeng Huang Founder being the main investor and General Manager. Whol Shop Serv Digital TV Receiver Manufacturer BOXSAM, China BOXSAM can easily be considered an up-start company as it was founded only in 2002 with a seed capital of 15 million USD. Starting out with CATV products BOXSAM expanded its business to cover satellite receivers and some other interesting products as well in 2004. We paid a visit to this company to learn about their way of doing business. Jeffrey Zhao approximately Yinhe, China - Receiver 20,000 boards.” A total of in Jinhua, some anghai. The Chinese ean “Science and apt description for an like BOXSAM. COMPANY REPORT Receivers made by BOXSAM 72 ■ BOXSAM is a private company with Xiaofeng Huang R Manu Distr Whol Shop Serv www.TELE-audiovision.com/TELE-satellite-1009/boxsam.pdf VP ■ BOXSAM headquarters in Jinhua, some Atlanta, Dubai - Wholesaler easily be considered an any as it was founded Manu with a seed capital of Distr D. Starting out with R Whol s BOXSAM expanded its Shop over satellite receivers Serv er interesting products 4. We paid a visit to this arn about their way of s. A new generation of SmartWi units will be marketed soon. We here at TELE-satellite are waiting for the first sample unit for a test report that would appear in one of the upcoming issues. These numbers only represent domestic sales. “We also export just as many pieces to North Africa, the remaining Middle Eastern countries and eastern Europe”, comments Sanjeev Jain. He The British company Global Invacom is best known to TELE-satellite readers as the inventor and manufacturer of the sensational fibre optic LNB system (see TELE-satellite issues 04-05/2008 and 08-09/2009). With an optical system distances are no longer a factor since the attenuation in a fibre optic cable is next to nothing. It’s an absolutely great system except for one thing: these days people want not just satellite TV but digital terrestrial TV channels as well. Up until now, that meant once again that you needed two separate cables routed to the TV; one for satellite signals and the other for terrestrial digital TV TELE-satellite World www.TELE-satellite.com/... Download this report in other languages from the Internet: signals. Arabic ‫العربية‬ www.TELE-satellite.com/TELE-satellite-1005/ara/globalinvacom.pdf Indonesian Bulgarian Czech German English Spanish Farsi French Hebrew Greek Croatian Italian Hungarian Mandarin Dutch Polish Portuguese Romanian Russian Swedish Turkish Indonesia Български Česky Deutsch English Español ‫فارس ي‬ Français ‫עברית‬ Ελληνικά Hrvatski Italiano Magyar 中文 Nederlands Polski Português Românesc Русский Svenska Türkçe That was yesterday! Today one single optical cable is enough to transport both satellite and terrestrial signals. Global Invacom has expanded their system to include DTT signals as well. Ivan Horrocks, Director Sales and Marketing, explains to us how this works: “We took the satellite signal carried in the optical cable and combined it with the DTT signal; now both signal formats can be carried on one optical cable.” www.TELE-satellite.com/TELE-satellite-1005/bid/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/bul/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/ces/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/deu/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/eng/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/esp/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/far/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/fra/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/heb/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/hel/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/hrv/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/ita/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/mag/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/man/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/ned/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/pol/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/por/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/rom/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/rus/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/sve/globalinvacom.pdf www.TELE-satellite.com/TELE-satellite-1005/tur/globalinvacom.pdf For this purpose, Global Invacom developed a new system that will be marketed under the nickname “Wholeband”, or more officially, F-IRS (Fibre Integrated Reception System). But first we want to take a quick look again at how Global Invacom’s optical system works: the optical LNB (universal LNB) takes the four satellite frequency ranges, that is, the upper and lower bands in both horizontal and vertical polarizations, and “stacks” them on top of each other so that all four bands are carried over the optical cable in one frequency range. Each of these four bands covers 1000 MHz and if you place them one on top of the other you get a bandwidth of 4000 MHz. ■ David Fugeman, Sales and Marketing Director, is seen here showing us the new F-IRS GTU converter box: it is installed by the end-user who would then connect a maximum of four satellite receivers as well as one DTT receiver. “We’ve integrated two new features”, explains David Fugeman, “one LED indicates if there’s an optical signal, the second LED shows if power is connected.” Available online starting from 2 April 2010 ■ Global Invacom has two locations in London: here we see So much for the satellite range. How do you include the DTT range? Very simple: Convert the Digital Terrestrial Transmissions using another laser at a different frequency then combine the two together. their head office in Althorne (Essex). In order to do that, Global Invacom had to modify their LNB system: the optical LNB already has the laser built into it so that the optical cable can be connected directly to the LNB. To include terrestrial signals, Global Invacom could have added a second connector on the LNB for the terrestrial antenna along with the necessary electronics. “This would have been theoretically possible”, says Ivan Horrocks, “but it really doesn’t make any sense since the LNB would have become too heavy and bulky. Not to mention it would have created problems for installers in that 80 TELE-satellite — Global Digital TV Magazine — 04-05/2010 — www.TELE-satellite.com 82 TELE-satellite — Global Digital TV Magazine — 04-05/2010 — www.TELE-satellite.com www.TELE-audiovision.com/TELE-satellite-1003/changhong.pdf Sales COMPANY REPORT Receiver and TV Manufacturer CHANGHONG, China Large-scale Quality and Innovation Made by CHANGHONG CHANGHONG is one of the largest volume manufacturers of receivers with headquarters in Mianyang in the Sichuan province of south-western China, some 130 km from the provincial capital of Chengdu. Not only do millions of satellite and terrestrial receivers leave the production premises every year but also an equal number of flat-screen TVs, so that the company ranks among the most important digital corporations in the world. Looking at their business today it is hard to imagine the humble beginnings of the project. CHANGHONG was founded in 1958 and started out with producing military radar systems. But today the company has evolved into a super-huge, pluralistic, international group of 13 different industries, producing everything from digital tv panel displays to IT systems, air conditioner systems, digital audiovisual products, set top boxes, eco-friendly battery and power supplies up to whole systems of technical equipment, electronic engineering and chemical materials. One of the 13 industries of the CHANGHONG GROUP is the SICHUAN CHANGHONG NETWORK TECHNOLOGIES Co., Ltd. It is an independent subsidiary of the CHANGHONG GROUP and specializes in research & duction line from Panasonic in Japan and we also implemented every single production guideline right down to the very last detail.” Richard continues to explain that “this is how things go in the first phase of development, marketing and manufacturing of digital set top boxes in all standards like DVB-S, DVB-C, DVB-T, ISDB, DMB-TH and of course HDTV including value-added systems for digital tv. Their production capacity reaches up to 12 million, making them the largest STB manufacturer in China. The company has heavily invested in their quality control and has built up a digital TV laboratory, a digital HFC experimental net, EMC laboratory and most importantly a high accuracy SMT production line. CHANGHONG’s aim is to become one of the strongest suppliers for digital tv solutions worldwide. ■ At Chengdu airport: His role as Overseas Sales Director leads Richard Cheng Li to many destinations around the globe. “In 1978 CHANGHONG started its TV production,” Richard Cheng Li remembers. “At the time we imported a complete pro- ■ Digital TV manufacturer CHANGHONG is headquartered in Mianyang, a city of 600.000 inhabitants. The administrative building can be seen in the centre, with the development centre to the left and any many satellite antennas on its roof. In the background and extending to the left the CHANGHONG manufacturing plants stretch out over 2 square km. TELE-satellite — Global Digital TV Magazine — 04-05/2010 — www.TELE-satellite.com Richard Cheng Li David Fugeman, Sales and Marketing Director, is seen here showing us the new F-IRS GTU converter box: it is installed by the end-user who would then connect a maximum of four satellite receivers as well as one DTT receiver. “We’ve integrated two new features”, explains David Fugeman, “one LED indicates if there’s an optical signal, the second LED shows if power is connected.” Kaifa, China - Receivers www.TELE-satellite.com/TELE-satellite-1009/ita/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/mag/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/man/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/ned/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/pol/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/por/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/rom/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/rus/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/sve/boxsam.pdf www.TELE-satellite.com/TELE-satellite-1009/tur/boxsam.pdf R Manu YINHE also COMPANY REPORT works very closely Distr together with the larger CA module Whol Available online starting from 30 July 2010 producers such as Irdeto, Conax, NDS, Shop Topreal, Sumavision, Novel and CryptoServ al Digital TV Magazine — 08-09/2010 — www.TELE-satellite.com works.” antenna installers but also then-exist- simple: Convert the Digital Terrestrial happens to be from the Southeast Asia Transmissions using another laser at a different frequency then combine are also waiting to start region and we the two together. Obviously, much more important TELE-satellite World www.TELE-satellite.com/... Download this report in other languages from the Internet: Arabic Indonesian Bulgarian Czech German English Spanish Farsi French Hebrew Greek Croatian Italian Hungarian Mandarin Dutch Polish Portuguese Romanian Russian Swedish Turkish economically are their signal analyz50 TELE-satellite — Global Digital TV Magazine — 02-03/2010 — www.TELE-satellite.com ‫ﺍﻟﻌﺮﺑﻴﺔ‬ Indonesia Български Česky Deutsch English Español ‫ﻓﺎﺭﺳﻲ‬ Français ‫עברית‬ Ελληνικά Hrvatski Italiano Magyar 中文 Nederlands Polski Português Românesc Русский Svenska Türkçe www.TELE-satellite.com/TELE-satellite-1003/ara/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/bid/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/bul/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/ces/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/deu/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/eng/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/esp/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/far/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/fra/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/heb/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/hel/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/hrv/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/ita/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/mag/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/man/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/ned/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/pol/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/por/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/rom/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/rus/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/sve/changhong.pdf www.TELE-satellite.com/TELE-satellite-1003/tur/changhong.pdf Available online starting from 29 January 2010 www.TELE-satellite.com — 02-03/2010 — TELE-satellite — Global Digital TV Magazine ers. “Roughly 30% of our sales can be 51 attributed to signal analyzers”, explains www.TELE-audiovision.com/TELE-satellite-1003/kaifa.pdf the TV Distribution division was greatly the satellite range. ing TV manufacturers who needed signal José-Maria Clotet. In 2009 the status of analyzers and above all test pattern Digital Powerhouse PROMAX, Spain first year PROMAX with CI. In the Marketing fourth quarter will followthe generators. In Today PROMAX is still owned by José enhanced when PROMAX took over a Clotet. In 2005 his son José-Maria Clotet local manufacturer of distribution prod- employed four engineers each of which took over business operations and in ucts. “This division now also is respon- COMPANY REPORT negotiations with a third customer.” In order to do that, Global Invacom had to modify their LNB system: the And what about production capacity optical LNB already has the laser built into it so that Kaifa? GuangYun Zhu is their Satellite at the optical cable can be connected directly to the LNB. To Receiver Global Invainclude terrestrial signals, Production Manager. He says to com could have added a second conus, “Right now we have production facilinector on the LNB for the terrestrial ties the necessary produce 5 million satellite antenna along withwhich can electronics. “This would have been theoretireceivers per years.” cally possible”, says Ivan Horrocks, “but it really doesn’t make any sense since the LNB would have become too heavy While touring the fabrication facility we and bulky. Not to mention it would have created problems for installers in that can clearly see why Kaifa holds such a Satellite Receiver Manufacturer Kaifa, China ■ Kaifa’s administration building in Shenzhen, China Manager a DVB-S2 twin tuner PVR with Irdetoown unit. Production on 2007 PROMAX was divided into four divi- sible for 30% of our sales”, comments developed their Jackie as well as a DVB-S2 box withthese media designed units started sions: Test & Measurement, Broadcast, José-Maria Clotet. The remaining 30% a four newly the following year; in 1964 there were TV Distribution and Electronic Training. falls on the Broadcast division. player and integrated web browser. For Yan ten employees. high position in the EMS category: everyThat’s quite an assortment and we At first glance, there does not seem 2011 a DVB-S2 receiver with WiFi and and the thing is exceptionally organized In are state of the art. asked José-Maria Clotet about the last to be too much uniformity here. But as machines 1968 a second TV station made CI+ is planned.” its appearance in the UHF band. Again one: “From the beginning PROMAX José-Maria Sa e e Consu an Ch na RT But this is completely understandSkyworth, Chinaprod- Receivers e www.TELE-audiovision.com/TELE-satellite-1003/skyworth.pdf PROMAX was right Samsung and began there taught installers and engineers how m Sa e an Ch na able: COMPANY REPORT What about any upcoming newCOMPANY REPORTConsu sh An ennaworldwide companies like UHF signal NFOSAT our products.” This service only demand nothing the the best u e D Manu ac delivering but first quality. analyzto use Tha and W And it looks like it was a very good deciR Manu made up about 10% of their sales but it M sion for step into ucts? The head of the R&D department That’s quite Vice GM an impressive ers. Kaifa toTechnical list, but the satellite ■ Jack Zhang is receiver market. has been a goodwill gesture by PROMAX Distr S F Chief nu M u USA S M nu u USA COMPANY REPORT COMPANY REPORT must have known that those questions there’s Technicalmore. Up until now In 1986 only we itManager for PROMAX: F that should not be underestimated. ■ Officer,still he was another first Whol In the past TELE-satellite has had many manages the m were coming. We weren’t disappointed m m R&D team David Jack reports on receivers from this manufac-mentioned satellite receivers; but YINHE strong m m Shop of turer always under a different brandalso 350 employees with the answers.butOn the contrary, has plansKen terrestrial receivers. for Zhang m name. Skyworth happens to be an OEM Serv m YINHE has quite an array of new prod- The“We just released a DVB-T MPEG-4 box (Original Equipment Manufacturer). m m success of an OEM measured by O m m m ucts in the works. Accordingis to Hong- thewith HD, twin tuner and PVR”, reveals quality of m m Promax, their products.inSo Signal Analyzers we will shortly be O Spain of what makesHongchun Gu, “and -the OEM busi- w H www.TELE-audiovision.com/TELE-satellite-0909/promax.pdf chun Gu: “In the third quarter 2010 Skyworth so successfull w H do more big m R ness? WhyDVB-S2and Manu Founder m there will be a ■ newFounder and from moreover andcoming out with a twin tuner PVR for GM receiver the the ownerall of ■ famous m m m Distr n Chcustomers Clotet Skyworth?Freeview system in Great Britain, AustraPROMAX, José e nwith sa ebuilt-in dmediana can and also he a e fie world start to cooperate with player m m saw And customers all ac ve Whol why are theseo d mee ng Luo Sh Gang soone Somebody so satis- n hem e e fie d n Ch na can m w m José José m a Ma S no TV dSh nd o Gang S no on h TV d o nd fied exactly for these ge m m Shop with Skyworth? It is mto ou ound on w h m ecause he s been d s bu dthat TELE d y h payathem u meen ng Luo o unw n d soone o ng we ha reasons a h decided nn bu d h nn o unw n d ■ Clotet C o e h ou u m w n bu a Hi-Tech in o many yea sServ a soNanshan’s h e m No u thencity bu visit inTELE-satellitePark on y because he s beenwdg bu ng TELEgn because he World www.TELE-satellite.com/... ou s gn n How do h m u n n How do ou g m ■ of Shenzhen in this report inChina. Ch na o many yea s bu a so because he sa en e n ng gn Download southern other languages from the Internet: o eas M C m nu N u ng m do h n ng gn M m w m nu C u ng figu e n many o he sa e de a h ‫ﺍﻟﻌﺮﺑﻴﺔ‬ Arabic www.TELE-satellite.com/TELE-satellite-1003/ara/changhong.pdf Indonesian Indonesia www.TELE-satellite.com/TELE-satellite-1003/bid/changhong.pdfreceiver m n h N USA p odu sa e nm many he sa p ofound gh p impresfi b figu One of the largest n p on fi b d Bulgarian www.TELE-satellite.com/TELE-satellite-1003/bul/changhong.pdf na s en e ng he DTH age can 2009h in a very ofi e w d manufacturers in thepoodu UH e e a eas Skyworth Infosat, on n beБългарски building. 86Dishesh n USA world DTH age n 2009 oo fi www TELE-aud ov s on com/TELE-sate te-0907/ n osa pd CzechThailand Česky www.TELE-satellite.com/TELE-satellite-1003/ces/changhong.pdf w UH n o fiwe www.TELE-satellite.com/TELE-satellite-1003/deu/changhong.pdf n he h ncem n na is s h uSkyworth. Skyworth h mn m u h n German Deutsch as S This is Ch en e ng sive-looking futuristic me o v s ng Luo Sh Gang n hEnglish s www.TELE-satellite.com/TELE-satellite-1003/eng/changhong.pdf Co. Ltd. is one R where English met now General Manager Groupvmanufacturersofofthe Sh Gang n h ■ Manu Spanish ■ we Vice Español www.TELE-satellite.com/TELE-satellite-1003/esp/changhong.pdf Founde TV s a good me leading s ng Luo o s Farsi ‫ﻓﺎﺭﺳﻲ‬ www.TELE-satellite.com/TELE-satellite-1003/far/changhong.pdf en homepage French Français www.TELE-satellite.com/TELE-satellite-1003/fra/changhong.pdf D s David Ken. On the company’sShenzhen sets in China. The company Hebrew ‫עברית‬ www.TELE-satellite.com/TELE-satellite-1003/heb/changhong.pdf o fice n started into the satellite we saw that Skyworth manufactures TV’s Greek Ελληνικά www.TELE-satellite.com/TELE-satellite-1003/hel/changhong.pdf The Birth of a New Receiver Manufacturer Kaifa in China Starts Production COMPANY REPORT www.TELE-satellite.com — 02-03/2010 — TELE-satellite — Global Digital TV Magazine 81 Receiver Manufacturer Skyworth, China Quality Control at Skyworth ■ The futuristic Skyworth building in Nanshan/ Shenzhen in southern China sat Aluo-sat Microwave Filter Company Filter Company Innovation s Everybody!Quality Specialized Filters Microwave Specialized Filters Knows Everybody! Quality High High Jackie Yan, Marketing Manager, is seen here showing us Kaifa’s first satellite receiver model. It is being manufactured for a DTH provider in India. Jackie Yan is standing in front of a wall on which are calligraphies of the former President of China Zemin Jiang. Out of Made in USA The futuristic Skyworth building in Nanshan/ Shenzhen in southern China ■ David Ken is Vice General Manager and explains Skyworth’s background TELE-satellite World One of the largest receiver manufacturers in the world is Skyworth. Skyworth Group Co. Ltd. is one of the leading manufacturers of TV sets in China. The company started into the satellite receiver research as early as 1997 and in 2002 a subsidiary was established under the name of Shenzhen Skyworth Digital Technology Co. Ltd. Those 13 years of experience in satellite technology made the company more and more professional and by now Skyworth claims to be the leading STB (set top box) manufacturer in China. www.TELE-satellite.com/... Download this report in other languages from the Internet: Arabic Indonesian Bulgarian Czech German English Spanish Farsi French Hebrew Greek Croatian Italian Hungarian Mandarin Dutch Polish Portuguese Romanian Russian Swedish Turkish ‫ﺍﻟﻌﺮﺑﻴﺔ‬ Indonesia Български Česky Deutsch English Español ‫ﻓﺎﺭﺳﻲ‬ Français ‫עברית‬ Ελληνικά Hrvatski Italiano Magyar 中文 Nederlands Polski Português Românesc Русский Svenska Türkçe www.TELE-satellite.com/TELE-satellite-1003/ara/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/bid/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/bul/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/ces/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/deu/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/eng/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/esp/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/far/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/fra/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/heb/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/hel/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/hrv/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/ita/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/mag/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/man/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/ned/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/pol/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/por/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/rom/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/rus/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/sve/skyworth.pdf www.TELE-satellite.com/TELE-satellite-1003/tur/skyworth.pdf Available online starting from 29 January 2010 84 TELE-satellite — Global Digital TV Magazine — 02-03/2010 — www.TELE-satellite.com www.TELE-satellite.com — 02-03/2010 — TELE-satellite — Global Digital TV Magazine 85 ThailandMade in USA David Ken is Vice General Manager and explains Skyworth’s background A portion of the products that Kaifa manufactures: to the left are power meters, in the middle are components for hard drives and to the far right are head stack assemblies for hard drives. TELE-satellite — Global Digital TV Magazine — 02-03/2010 — www.TELE-satellite.com receiver research Croatian Hrvatski Who other products besideswww.TELE-satellite.com/TELE-satellite-1003/hrv/changhong.pdfas early and Italian receivers. So Italiano www.TELE-satellite.com/TELE-satellite-1003/ita/changhong.pdf a as 1997 and in 2002 N an Hungarian first question to David Magyar www.TELE-satellite.com/TELE-satellite-1003/mag/changhong.pdf naturally, 82 was Shophow Dutch our divided. He explains, “If Ken subsidiary nameestablished Mandarin 中文 www.TELE-satellite.com/TELE-satellite-1003/man/changhong.pdf under the of Nederlands www.TELE-satellite.com/TELE-satellite-1003/ned/changhong.pdf is is it all you Tangp oon ham Polish Polski www.TELE-satellite.com/TELE-satellite-1003/pol/changhong.pdf Digital Shenzhen Skyworth Se v atPortuguese a sales figurewww.TELE-satellite.com/TELE-satellite-1003/por/changhong.pdf Those look it from point of view, Português Technology Co. Ltd. TELE-satellite — Global Digital then 70% of it is Русский 20% is receivers TV’s, 74 Russian www.TELE-satellite.com/TELE-satellite-1003/rus/changhong.pdf 13 years of experience in Swedish Svenska www.TELE-satellite.com/TELE-satellite-1003/sve/changhong.pdf made satellite technology and the remaining 10% falls on the other Turkish Türkçe www.TELE-satellite.com/TELE-satellite-1003/tur/changhong.pdf Romanian Românesc www.TELE-satellite.com/TELE-satellite-1003/rom/changhong.pdf TELE-satellite — Broadband & Fiber-Optic — 08-09/2009 — www.TELE-satellite.com TV Magazine — 08-09/2010 — www.TELE-satellite.com products.” But as David Ken continues, Aluosat, China - Wholesaler the company more Available online starting from 29 January 2010and it gets more interesting: “If you look at more professional and by now Skyworth to be Manufrom a profit aspect, then the receiver ■ A look at aSTBclaimstopFounde the leading portion of the R&D department in which a group Sa es (set it of engineers just finished a meeting www.TELE-satellite.com — 02-03/2010 — TELE-satellite — Global Digital TV Magazine 51 R s section is greater than 20%.” These fig- box) manufacturer in China. D ures are all made possible by the 2000 R Who employees in the receiver section; SkyLuo C m Luo N O A worth ■ R Shop has a total of 20,000 employees.N C W A Sh gang Jun N Se v Skyworth is a publicly traded company N O A www.TELE-satellite.com — 02-03/2010 — TELE-satellite — Global Digital TV Magazine MPANY REPOR listed on the Hong Kong exchange. “In w the yearM 2010 we will also actively plan USA to be listed in the China stock exchange market with our set top box business”, says David Ken. S High R Manu CEO Even a ong-stand ng product R s D What does this mean in numbers? David Who jumps right into the millions: “In 2008 Ken Ca it 2009 will Quality Specializedsuch itas a C-band antenna st Shop was 5 million receivers, inFilters be Fah enk has room or mprovementsug Se v 8 million and for 2010 we are guessing total sales of 10 million receivers.” Skyworth manufactures receivers for cable reception, satellite reception and terrestrial reception. David Ken tells us: “After m V 10 years of effort we have obtained an wm w m outstanding record in the field of national m H w m digital television. Since mass production m M C m of STB has started in 2001, Skyworth has ■ USA m 06-07/2010 — www.TELE-satellite.com provided products and services in over m m 100 cities in all of China m m owning to our excellent quality and thoughtful service. W In recent years, Skyworth Digital kept its m m first rank in China and provided over 8 million cable m STBs since 2004, occupying m m m 20% of the domestic STB market.“ m W m www TELE-aud ov s on com/TELE-sate Ma ke ng Manage Sandy Ne epov z Sa es Sco Pa se A ew months ago INFOSAT at ■ Nanoxx, GermanyTha andHardware engineers are seen 1work here - Wholesaler and 5Receivers n ntroduced a R Manu R s D R Who Shop Se v Founde meter s ng e-segment antenna to the market The resuce was Ma t ■ Ho baue mmed ate success! The dr v ng www TELE-aud ov s on com/TELE-sate Sa es Dan e Sam TELE-sa e e Wo d D w www m orce beh nd th s new product s m m m m W N ran Tangp roontham ounder m m Where do all these receivers go? David Ken spells it m out for us, “90% of our all m mcable boxes remain within China; the m other 10% are exported.” However for ■ Here we see Yuan Quibo, one of the Test Engineers, checking out a model T29 DVB-T satellite boxes it’s exactly the opposite: TELE-audiovision Internationalof the receiver. ThisLargest Digital TV in World‘s box will ultimately end up Trade “Only 10% remain in China and — TheSpain m and owner o the company INFOSAT He s not new to the — 222 pages o TELE-sate te: we — te-0905/a uosa pd B MFC, USA - Filters Made in USA www TELE-aud ov s on com/TELE-sate 85 Microwave Filter Company — By the time this issue of TELE-satellite will be published, Kaifa will have been manufacturing satellites receivers for just a few weeks. When we paid them a visit, they were just finishing the installation of their assembly line and an initial test run was soon to follow. Who exactly is Kaifa and what makes this company think they’re ready to step into the market as a satellite receiver manufacturer? 80 TELE-satellite — Global Digital TV Magazine — 02-03/2010 — www.TELE-satellite.com 82 TELE-satellite — Global Digital TV Magazine — 04-05/2010 — www.TELE-satellite.com — prev ous y reported on N ran and M 中文 ■ This is Terry. He manages the technical Support team that consists of six engineers. They help OEM customers with any technical problems Magazine — 1 1-12/2013 — www.TELE-audiovision.com m te-0903/m c pd te-0901/nanoxx pd
  • 223.
    Power Supply UnitsMade byof the world-famouscorner of Germany, home Black journey to the south-western Quality to Measure Forest for SPAUN – guaranteed! cuckoo clocks and a by-word Black Germany, home of the world-famous any PT Subur Semesta was founded in 1978 in The company PT Subur Semesta was founded in 1978 in shows us the testing process on a model 17 test station, the largest of the ten ■ Spaun employee Peter Fuchs ava, one of the 17,000 islands that make up Indoneby Spaun. Jakarta TheJava, one of PT 17,000 islands thatwas founded to automaticallyain every function. 50 minutes”, explains Peter Fuchs, “today only on company the Subur Semesta test stations upneeded in “In the past test make used Indone1978 complete test required three minutes is the 220 million inhabitants can be found on Java of sia. 60% of theon Java, one inhabitants can be found on Java ofIndoneJakarta 220 million of the 17,000 islands that make up llion live in the capital city Jakarta – it could even be which 15 million livethe the capital city Jakarta –can be found on Java of it sia. 60% of in 220 million inhabitants office could even be ■ SPAUN administration n more. To be noticed here you need an extremely (front) and production premises a few million 15 million be noticed capitalSingen, southwest an – it could even be which more. To live in the here inyou need city Jakarta extremely (right) ■ The two Smart managing Germany and it is for that reason that PT Subur Semesta uses bright star and it is for that To be noticed here you need an extremely a few million more. reason that PT Subur Semesta uses directors Peter Löble (left) and Venus as their trademark. The wonderful ambiguity the planet Venus as their trademark. The that PT Subur Semesta uses bright star and it is for that reason wonderful ambiguity Christoph Hoefler (right) on the ■ The two Smart managing od of Love Venus can only make you smile. One of roof directors Peter Löble (left) and of the company’s business with the God of Love Venustheir trademark. you smile. One ambiguity the planet Venus as can only make The wonderful of s of the company, Liong Ten Fook, came up with the premises. Christoph Hoefler on the the foundersthe the company, Liong Ten Fook, came up with the One of with of God of Love Venus can only make you smile. Christoph Hoefler (right) ngenious idea! has beenof the company’s business name – the ingenious of the company, Liong Ten Fook, came up with the an founders idea! roof active in the field of satellite technology since premises. Christoph Hoefler name – an ingenious idea! Control Motor COMPANY REPORT 1988. Starting active in the field has been as a radio and In western Jakarta, not too far Ten Fook was not television technician he moved In western Jakarta, not too far of satellite technology since But Liong Ten Fook was not from the international airport, under; his partner on to the purchasing and sales international airport, 1988. Starting as a radio and the only But Liong his partner founder; Ten Fook was not from the In western Jakarta, not too far can be found PT Subur Semesta, department of technician he moved en and still is now can be found PT Subur Semesta, airport, television a specialised from the international was name then and still is his the only brand back Venus. founder; nowpartner electronics store before and sales ng An. “We origibrand name Venus. on to the purchasing can be found PT Subur Semesta, The offices are at the front of then and still is now Thiang was back Tiong An. “We origistarting as field manager for The offices are at the front of Venus. department of a specialised d as a telephone brand name the building with the windows, andTiongtelephone originally started as a Nokia. In 2005 he finally became Thiang multiswitch is tested on multiple functions. An. “We ■ Every the building with the windows, and front of electronics store before The offices are at the actory. Later on we towards the back are the factory The multiswitch is inserted into this head of sales atfield manager for accessory factory. singleas onofwe“F”test station and the back are the factory nally moving a Later all telephone are the building with the windows, and started lever a the connectors towards starting as Wela and by rgency lights, that buildings that house the machines and the test process can be started. ■ Kevin Spaun, managing inserted with Nokia. In 2005 he finally became the foundation of Smart added emergencyfactory. Later on buildings that house the machines factory director of SPAUN POWER GmbH accessory lights, that we towards the back are the to manufacture the dish antennas. th built in batterElectronic his newat Wela and to manufacture the dish antennas. head of sales job was is, lights of 200 added built in batterbuildings that house the machines The company employs a totalwith emergency lights, that ■ Even if a Spaun multiswitch passes all of its elec-with the foundation of Smart managing director there. Peter used everywhere The company employs a total of ■ Finished: Spaun with a 200 to manufacture the dish antennas. ies that are with with built in batterused everywhere tronic tests perfectly, it still isn’t clear if it is techniFriedrich is, lights people of which 60 are involved Löble, the second managing cally sound. completed multiswitch: here is a power people ofThe company involved with of 200 which 60 are employs a total Electronic his new job was the manufacture of dishes.that are used everywhere whenever there is a power This part is checked here: every multiswitch is “We have been adding ies They director, has been working in Peter the manufacture of dishes. They numbers to our placed with its power supply in this high voltage test members Liong Ten serial Every multi-switch and every amplifier comes managing director there. people work from 8AM to 5PM Monday thru outage”, remembers Liong Ten power from 8AM of which 60 are involved with chamber. In this way Spaun can guarantee that the products since 2005”, he whenever there is a the satellite field since managing work with one, the to 5PM Monday thru has one, qualand manufacture of dishes. They of course every receiver about their Löble, the second 1997. He completed multiswitch is 100% perfect. explains Friday and on Fook. Saturdays to 2PM. They are so sure that they provide a 5-year guar- worked for an electronics also director, has been working in ity assurance. outage”, remembers Liong Ten awork from 8AM to 5PM2PM. Fridaypower supply unit which is requiredthru and on Saturdays to Monday to too: antee. “In reality”, explains Friedrich Spaun, “we Using the serial number store and joined field since 1997. He repair products that are older than five years.” Fook. connect the device to the Saturdays to 2PM. It Internet inquiries is become the satellite Wela in 2001 Friday and on mains.for hasabout. In this way It’s very simple, there are so few of them that the Semesta entered thought as product manager.an electronics such an everyday component of it would be very easy to virtually any PT Subur Semesta entered warranty period could be extended, “but for legal also worked for Both have reasons we keep it at five years”, explains Friedrich e arena in 1989 identify known each other since 19972001 electronic device that we have stopped plagiarized prodthinking store and joined Wela in the satellite Subur Semesta entered arena in 1989 Spaun. ucts. PT Those are large numbers; we and consider themselves Both have began to offer about how as product manager. a Those are it actually works. SPAUN, on the other large numbers; we when they satellite to offer 1989 began arena in the great team. each other since 1997 hand, has given it a great deal of thought and llite receivers. In wanted to know how many solid known know solid analog when they began In wanted arrived at a howlarge conclusion. Kevin satellite receivers. to offer toThose are manynumbers; we has remarkable rst digital receiver antennas are being manufacand consider themselves a 2000 the first digital receiver antennas isare managing director of SPAUN, one analog satellite receivers. In wanted being manufacSpaun the to know how many solid great team. nd in 2002 it all tured today: “At the moment, of antennas the being manufacappeared and in first digital receiver the most renowned quality manufactures of 2000 the 2002 it all tured today: “At are moment, y serious when the our production capacity is at our multi-switches and other accessories for satellite production capacity the at is moment, turned really serious when2002 it all tured today: “At appeared and in the of satellite dishes about 15,000 antennas per signal distribution. He tells us what it‘s all about. www.TELE-satellite.com/... production of really serious when the our production capacity is at turned satellite dishes about 15,000 antennas per the meantime the month of which the majority are about Digital TV Magazine antennas per began. production of satellite dishes of which 15,000 — 10-11/2010 — www.TELE-satellite.com In the meantime the month TELE-satellite — Globalthe majority are Download this report in other languages from the Internet: 68 ■ After xpanded its man- sold domestically”, explained the completion of the testing process, the PC prints a serial number which www.TELE-satellite.com/... month of which the majority are company expanded itsmeantimethen attached man‫ﺍﻟﻌﺮﺑﻴﺔ‬ www.TELE-satellite.com/TELE-satellite-0901/ara/smart.pdf began. device. The test results are is sold sodomestically”, explained Arabic In the the that to the archived ia Tek Ijoe climbed Thiang Tiong An, “Our company Indonesian Indonesia www.TELE-satellite.com/TELE-satellite-0901/bid/smart.pdf Spaun can Ijoe climbed any individual agement: Tjia Tekexpanded itsfor man- Tiong domestically”, explained company recall the test results Thiang sold An, “Our company Bulgarian Download this report in other languages from the Internet: multiswitch. Български www.TELE-satellite.com/TELE-satellite-0901/bul/smart.pdf partner. Today PT supplies approximately 15% of supplies approximately “Our company aboard agement: Tjia Today PTclimbed Thiang Tiong An,15% of Czech as a partner. Tek Ijoe Česky www.TELE-satellite.com/TELE-satellite-0901/ces/smart.pdf Arabic ‫ﺍﻟﻌﺮﺑﻴﺔ‬ www.TELE-satellite.com/TELE-satellite-0901/ara/smart.pdf sta is run by these the Indonesian market.” 66 TELE-satellite & Broadband — 10-1 1/2008 — www.TELE-satellite.com German Deutsch www.TELE-satellite.com/TELE-satellite-0901/deu/smart.pdf Indonesian Indonesia www.TELE-satellite.com/TELE-satellite-0901/bid/smart.pdf Subur Semestaas run by these the Indonesian market.” aboard is a partner. Today PT supplies approximately 15% of English English Bulgarian Български www.TELE-satellite.com/TELE-satellite-0901/eng/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/bul/smart.pdf ers. three partners. Subur Semesta is run by these the Indonesian market.” Spanish Español www.TELE-satellite.com/TELE-satellite-0901/esp/smart.pdf Czech Česky www.TELE-satellite.com/TELE-satellite-0901/ces/smart.pdf Of their total production, A customer has a problem. ‫ ﻓﺎﺭﺳﻲ‬Deutsch 02-03 /200 8 www.TELE-satellite.com/TELE-satellite-0901/far/smart.pdf Steffen Kuck is Technical Support www.TELE-satellite.com/TELE-satellite-0901/deu/smart.pdf Of their total production, FarsiGerman three partners. Manager and helps Spaun’s French Français www.TELE-satellite.com/TELE-satellite-0901/fra/smart.pdf customers daily from 8AM to 12PM amount of money 80% is delivered domestically, English English www.TELE-satellite.com/TELE-satellite-0901/eng/smart.pdf DISHP Of their total production, A large amount of money 80% is delivered domestically, Greek and from 1PM to 5PM. One of Ελληνικά Spanish re Solutio OINTER www.TELE-satellite.com/TELE-satellite-0901/hel/smart.pdf his tools is the SatcoDX CD-ROM Español www.TELE-satellite.com/TELE-satellite-0901/esp/smart.pdf Softwa the rest is exported. According d in 2004 explains n www.TELE-satellite.com/TELE-satellite-0901/hrv/smart.pdfdata. with its worldwide satellite the rest is exported. According Croatian Farsi e MapsHrvatski that, with the help of ‫ﻓﺎﺭﺳﻲ‬ www.TELE-satellite.com/TELE-satellite-0901/far/smart.pdf was invested in 2004 explains money 80% is delivered domestically, Googl A large amount of and its e: “We acquired a to Thiang Tiong An, “40% of our Italian Italiano real images aswww.TELE-satellite.com/TELE-satellite-0901/fra/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/ita/smart.pdf French Français well Tjia Tek Ijoe: “We acquired a to Thiang Tiong An, “40% of our Hungarian was invested in 2004 explains the rest is exported. Accordingas SatcoDX and its up-to- datewww.TELE-satellite.com/TELE-satellite-0901/mag/smart.pdf channel Greek provid Magyar Ελληνικά www.TELE-satellite.com/TELE-satellite-0901/hel/smart.pdf data, ss so that we could dish production goes to Thaies highly accuratewww.TELE-satellite.com/TELE-satellite-0901/man/smart.pdf satellite 中文Hrvatski Croatian www.TELE-satellite.com/TELE-satellite-0901/hrv/smart.pdf to Thiang Tiong An, “40% Mandarin machine press so that we could disha production goes to Thai- of our Tjia Tek Ijoe: “We acquired reception information. e the dish segments land and Vietnam, the remainDutch Nederlands www.TELE-satellite.com/TELE-satellite-0901/ned/smart.pdf Italian Italiano www.TELE-satellite.com/TELE-satellite-0901/ita/smart.pdf dish production goes to Thaimanufacture the press so that we couldand Vietnam, the remain- Polish machine dish segments land Polski www.TELE-satellite.com/TELE-satellite-0901/pol/smart.pdf Hungarian Magyar www.TELE-satellite.com/TELE-satellite-0901/mag/smart.pdf Heavy investment der goes to Brunei with a small Portuguese Português www.TELE-satellite.com/TELE-satellite-0901/por/smart.pdf ourselves.” Heavy investment der goes to Brunei with a smallremainMandarin 中文 www.TELE-satellite.com/TELE-satellite-0901/man/smart.pdf manufacture the dish segments land and Vietnam, the any occurred again percentage going to Australia.” Românesc Dutch Nederlands www.TELE-satellite.com/TELE-satellite-0901/rom/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/ned/smart.pdf percentage going to Australia.” Romanian small in the company occurred again Bergamini ourselves.” Heavy investment der goes to Brunei with a Russian The birthday boy himself: Giorgio Русский www.TELE-satellite.com/TELE-satellite-0901/rus/smart.pdf Polish Polski www.TELE-satellite.com/TELE-satellite-0901/pol/smart.pdf ter: “We bought a is the founder of the USALS program one year the companyits 10th anniversary inthat is Swedish www.TELE-satellite.com/TELE-satellite-0901/sve/smart.pdf Portuguese Svenska Português www.TELE-satellite.com/TELE-satellite-0901/por/smart.pdf in later: “We bought a again percentage going to Australia.” occurred 2008. “Naturally we want to expand celebrating inting system to Türkçe www.TELE-satellite.com/TELE-satellite-0901/tur/smart.pdf Romanian Românesc www.TELE-satellite.com/TELE-satellite-0901/rom/smart.pdf An important communica“Naturally we want to expand Turkish powder one year later: “We to painting system bought a Russian Русский www.TELE-satellite.com/TELE-satellite-0901/rus/smart.pdftions medium is of course the our exports”, explains Tjia Tek the segments.” Available online starting from 28 November 2008 Internet. Web designer Patrick our exports”, explains Tjia Tek expand “Naturally we want to spray paint the painting powder Swedish Svenska www.TELE-satellite.com/TELE-satellite-0901/sve/smart.pdf 70 TELE-satellite & Broadband segments.” system to Ijoe, “We are investing heavily— 12-01/2009 — www.TELE-satellite.com Turkish Türkçe www.TELE-satellite.com/TELE-satellite-0901/tur/smart.pdf Keil is seen here looking over Ijoe, “We are investing heavily our exports”, explains Tjia Tek spray paint the segments.” s still not enough. in quality.” PT Subur Semesta visitors to www.spaun.de. Available online starting from 28 November 2008 Ijoe, “We are Semesta But & was still — 12-01/2009 quality.” PT Subur investing heavily 70 TELE-satellite it Broadband not enough. in — www.TELE-satellite.com “We have about 40,000 visioe revealed to us Tjia Tek But itrevealed to us Ijoe was still not enough. in quality.” PT Subur Semesta tors every month”, explains yet another large 58 TELE-satellite & Broadband — 08-09/2008 — www.TELE-satellite.com Patrick Keil. On the monitor that there’s Tek Ijoe revealed Tjia yet PT Subur Semesta’s three another large to us “We invested PT Subur Semesta’s three he shows us the current webinvestment: left, “We invested partners: From the there’s yet another large that partners:Subur the left, D 600,000 for the site visitors. Thanks to GeoPT From Semesta’s three Lionganotherinvestment: Ten Fook,USD 600,000 “We the Finance for invested mapping, he knows exactly Liong Ten partners: From the left, Fook, Finance of mesh antennas. Director, Tjia fabrication of mesh antennas. for the Tek Ijoe, another USD 600,000 Managing where these visitors come Director, Tjia Tek Ijoe, Managing Finance Liong Ten Fook, s produce 20,000 Director, come up Tiong An, the most critical questions that and Thiangfabrication oferec- antennas. Director, and Thiang Tiong An, before from and can communicate This lets us producemesh 20,000 Director, Tjia Tek Ijoe, Managing Technical y month.” with each one of them with a ellite antenna is how to properly dishes every lets us produce 20,000 position Director themonth.” so antenna Technical Thiang Tiong An, Director This Director, and pop up window. The surprise: ired satellite can be received. In whichdishes every month.” direction should Technical Director this program was developed pointed? To — 04-05/2008 — www.TELE-satellite.com together by Kevin Spaun and ite & Broadband the east? To the west? This would be its azi56 the dish Broadband — Patrick Keil and the best part hen how far up into the sky should TELE-satellite &look? This 04-05/2008 — www.TELE-satellite.com – it is freeware and can be 56 TELE-satellite &this Broadband — 04-05/2008 — www.TELE-satellite.com elevation. Actually, it’s really not that hard to figure used by anyone who wants to out; there are plenty of calculation aides and prepared get more detailed information on who is visiting their web give you all the data you need. But if you do a little extra site, how long they have been n did with his Dishpointer software, you’ll discover comthere, what they are looking at results. and where they come from, and all of this live! Here is the link: www.livezilla.net precision and the art of craftsmanship. Forest cuckoo clocks and a by-word for precision and the art of craftsmanship. Smart, Germany - Receivers MD Peter Löble Christoph Hoefler ▲ Happy Birthday IBC Spaun, Germany - Accessories directors Peter Löble (left) and Christoph Hoefler (right) on the roof of the company’s business premises. Christoph Hoefler has been active in the field of satellite technology since 1988. Starting as a radio and television technician he moved on to the purchasing and sales department of a specialised electronics store before starting as field manager for Nokia. In 2005 he finally became head of sales at Wela and with the foundation of Smart Electronic his new job was managing director there. Peter Löble, the second managing director, has been working in the satellite field since 1997. He also worked for an electronics store and joined Wela in 2001 as product manager. Both have known each other since 1997 and consider themselves a great team. TELE-satellite World Smart has a clear focus on receiver production, and this is a segment where the two managing directors also identify the core strengths of Smart. Christoph Hoefler: “We are able to react swiftly to customer demands, because we manufacture our receivers right here in the Black Forest region and therefore are not faced with long and winding delivery channels for our customers in Europe and Northern Africa.” Christoph Hoefele lists some examples: “Depending on the required language we package the appropriate instruction manual or adapt the on-screen menu to the local language.” After all, Smart lives by its credo “Connect, watch”. Customers need to be happy with their Smart receiver right from the start, which can be guaranteed by “usability in combination with quality made in the Black Forest,” according to Christoph Hoefler, who hits the core of the Smart philosophy with this statement. Peter Löble visits the sales office in Morocco almost on a monthly basis and he adds that “Smart is open for new sales partners mainly in Europe, but also in nonEuropean countries. We are able to adapt our receivers to local requirements very quickly,” he hastens to add. Even though Smart has only been in existence for less than a year the company is already in the process of developing new products. Some of these will already be available by the time this issue of TELEsatellite is published. “We’re introducing a new LNB series with extremely small dimensions,” reveals Peter Löble. And www.TELE-satellite.com/... Download this report in other languages from the Internet: Arabic Indonesian Bulgarian Czech German English Spanish Farsi French Greek Croatian Italian Hungarian Mandarin Dutch Polish Portuguese Romanian Russian Swedish Turkish ‫ﺍﻟﻌﺮﺑﻴﺔ‬ Indonesia Български Česky Deutsch English Español ‫ﻓﺎﺭﺳﻲ‬ Français Ελληνικά Hrvatski Italiano Magyar 中文 Nederlands Polski Português Românesc Русский Svenska Türkçe www.TELE-satellite.com/TELE-satellite-0901/ara/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/bid/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/bul/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/ces/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/deu/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/eng/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/esp/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/far/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/fra/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/hel/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/hrv/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/ita/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/mag/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/man/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/ned/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/pol/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/por/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/rom/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/rus/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/sve/smart.pdf www.TELE-satellite.com/TELE-satellite-0901/tur/smart.pdf Available online starting from 28 November 2008 70 TELE-satellite & Broadband — 12-01/2009 — www.TELE-satellite.com ■ View of the production floor: here, the components sourced as cabinets are equipped with tuners. Explains Peter Löble: “This way we are able to cover several markets with a single base unit, depending on the individual market demands and with the added advantage of being able to guarantee quality assurance.” Three product ranges are manufactured here: fully fledged HD receivers with CA, CI, USB and VFD display, basic models with limited features and – recently added – LINUX-based receivers. 72 TELE-satellite & Broadband — 12-01/2009 — www.TELE-satellite.com Kevin Spaun fall of the Berlin Wall. Up to that point Spaun only delivered their products to West Gerwww.TELE-audiovision.com/TELE-satellite-0809/stab.pdf many; there was no real thought of exporting products. The new market in eastern Happy Birthday Germany brought with it so many new Years opportunities that Friedrich Spaun finally decided: “We are now going to distribute products under our own brand name!” Founder ■ MD Finance Dishpointer, UK - Software But more on that later. Let’s take a closer look at Spaun itself: they are a company that can be found in extreme southwestern Germany. The founder of the company, that today has nearly 100 employees, is Friedrich Spaun. He explained to us how it all started: “It all began for me on my kitchen table in 1969.” Back then FM radio in Germany was just starting to transmit in stereo. It quickly became clear that many of the radios in use were not getting enough of an antenna signal - an amplifier was needed that would raise the signal-to-noise ratio. “I constructed an amplifier board that was installed in the indoor antennas supplied by a large manu- ‫ﺍﻟﻌﺮﺑﻴﺔ‬ Arabic Indonesian Bulgarian Czech German English Spanish Farsi French Greek Croatian Italian Hungarian Mandarin Dutch Polish Portuguese Romanian Russian Swedish Turkish www.TELE-satellite.com/... www.TELE-satellite.com/TELE-satellite-0811/ara/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/bid/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/bul/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/ces/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/deu/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/eng/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/esp/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/far/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/fra/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/hel/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/hrv/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/ita/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/mag/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/man/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/ned/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/pol/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/por/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/rom/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/rus/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/sve/spaun.pdf www.TELE-satellite.com/TELE-satellite-0811/tur/spaun.pdf Indonesia Български Česky Deutsch English Español ‫ﻓﺎﺭﺳﻲ‬ Français Ελληνικά Hrvatski Italiano Magyar 中文 Nederlands Polski Português Românesc Русский Svenska Türkçe Available online starting from 26 September 2008 facturer”, remembers Friedrich Spaun. It was the start of his one-man company. In 1972 his little company was so successful that he was able to hire his first employees. “In 1974 real production of multi-range amplifiers and passive distributors was started”, Friedrich Spaun recalls. Of course back then these were components for terrestrial television and Spaun was only an OEM manufacturer for other German firms. In 1980 supply line amplifiers for cable TV were added to the mix. ■ Kevin Spaun (left), General Manager, and Friedrich Spaun, Founder, on the roof of their office building. Both of them operate Spaun as a team. Thus far production took place in a rented house, but that all changed in 1988: “That’s when we built our production facility in Singen that we still work out of today and were also at the same time a pioneer”, comments Friedrich Spaun as he shows us the outside walls made of aluminum: “For many years we were a reference point for the manufacturer of these walls.” ■ A look at the office building of company Spaun in Singen in southwestern Germany. Behind the building to the right can be found the production facilities for Spaun’s multiswitches. 58 TELE-satellite & Broadband — 10-1 1/2008 — www.TELE-satellite.com www.TELE-satellite.com — 10-1 1/2008 — TELE-satellite & Broadband 59 Motor Control COMPANY REPORT USALS Celebrates 10 Years 10 Alexander Wiese Every TELE-satellite reader is familiar with the term USALS. In the Technical Data table of every receiver test report there is a line that identifies whether or not the receiver is USALS compatible. Today, almost every receiver on the market comes with USALS. But USALS is not just a group of letters; there’s actually a human behind this term! USALS stands for “Universal Satellite Automatic Location System” and is software that was developed exactly ten years ago by Giorgio Bergamini. But it would be much better to hear the story from the birthday boy himself so off to Italy we go near Ferrara located about equidistant from Bologna and Venice. STAB’s headquarters and production facility can be found there and Giorgio Bergamini is the founder and owner of STAB, a company that has been in existence since 1970. STAB started early on building antenna motors. In the beginning it was rotors for VHF/UHF TV antennas and when satellite reception became popular in the 1990’s, they expanded to offering an assortment of satellite antenna motors. “It was 1995”, remembers Giorgio Bergamini, when a few of the early satellite receiver manufacturers got together with EUTELSAT and developed the DiSEqC protocol. In 1997 it was officially introduced and included DiSEqC 1.0 for individual LNBs, DiSEqC 1.1 for two LNBs and, DiSEqC 1.2 for antenna motors. But it was quickly discovered that the 1.2 protocol could only be used on a lim- ▲ Sandro Gnani is a STAB technician who checks each sample receiver to make sure that USALS has been correctly implemented. The manufacturer can only print the USALS logo on the receiver and its packaging when the receiver has passed every test. ited basis: it required the storing of satellite positions in the motor and this turned out to be useless when the motor was used anywhere in the southern hemisphere. The dishes there are pointed to the north and not to the south. As a result, the order of satellites was no longer correct – it was now backwards compared to the northern hemisphere. “In 1998 I had an idea: the positions should no longer be stored in the motor but instead in the receiver”, remembers Giorgio. This was the birth of USALS. He wrote a small, but effective software program that with the help of only the local geographical position on the Earth and a reference satellite was able to calculate all the other satellite positions directly in the receiver, and it didn’t matter if you were in the northern or southern hemisphere. Finally, in January 2000, EUTELSAT officially recognized USALS and introduced it as DiSEqC 1.3. It is identical to DiSEqC 1.2 but includes an additional line of code: “Drive Motor to Angular Position”. The birthday boy himself: Giorgio Bergamini is the founder of the USALS program that is celebrating its 10th anniversary in 2008. In 1993 his first successful product was a multiswitch for two satellites and one terrestrial TV input followed soon after by www.TELE-audiovision.com/TELE-satellite-0805/subursemesta.pdf four and eight satellite input models. These products were quickly exported to neighborTechnical ing countries. Today 50 % of their products are exported of which 30 % are shipped to EU countries with 20 % ending up outside of Thiang Europe. Total sales for Spaun range between 12 and 15 million Euros each year. ■ Tiong An 58 TELE-satellite & Broadband — 08-09/2008 — www.TELE-satellite.com COMPANY REPORT 60 TELE-satellite & Broadband — 08-09/2008 — www.TELE-satellite.com TELE-satellite World Dish Manufacturer PT Subur Semesta, Indonesia Arabic Indonesian Bulgarian Czech German English Spanish Farsi French Greek Croatian Italian Hungarian Mandarin Dutch Polish Portuguese Romanian Russian Swedish Turkish The company PT Subur Semesta was founded in 1978 in Jakarta on Java, one of the 17,000 islands that make up Indonesia. 60% of the 220 million inhabitants can be found on Java of which 15 million live in the capital city Jakarta – it could even be a few million more. To be noticed here you need an extremely bright star and it is for that reason that PT Subur Semesta uses the planet Venus as their trademark. The wonderful ambiguity with the God of Love Venus can only make you smile. One of the founders of the company, Liong Ten Fook, came up with the name – an ingenious idea! But Liong Ten Fook was not the only founder; his partner was back then and still is now Thiang Tiong An. “We originally started as a telephone accessory factory. Later on we added emergency lights, that is, lights with built in batteries that are used everywhere whenever there is a power outage”, remembers Liong Ten Fook. PT Subur Semesta entered the satellite arena in 1989 when they began to offer analog satellite receivers. In 2000 the first digital receiver appeared and in 2002 it all turned really serious when the production of satellite dishes began. In the meantime the company expanded its management: Tjia Tek Ijoe climbed aboard as a partner. Today PT Subur Semesta is run by these three partners. A large amount of money was invested in 2004 explains Tjia Tek Ijoe: “We acquired a machine press so that we could manufacture the dish segments ourselves.” Heavy investment in the company occurred again one year later: “We bought a powder painting system to spray paint the segments.” But it was still not enough. Tjia Tek Ijoe revealed to us that there’s yet another large investment: “We invested another USD 600,000 for the fabrication of mesh antennas. This lets us produce 20,000 dishes every month.” www.TELE-satellite.com/... Download this report in other languages from the Internet: Jakarta’s Venus Star ‫ﺍﻟﻌﺮﺑﻴﺔ‬ Indonesia Български Česky Deutsch English Español ‫ﻓﺎﺭﺳﻲ‬ Français Ελληνικά Hrvatski Italiano Magyar 中文 Nederlands Polski Português Românesc Русский Svenska Türkçe www.TELE-satellite.com/TELE-satellite-0805/ara/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/bid/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/bul/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/ces/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/deu/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/eng/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/esp/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/far/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/fra/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/hel/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/hrv/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/ita/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/mag/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/man/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/ned/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/pol/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/por/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/rom/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/rus/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/sve/venus.pdf www.TELE-satellite.com/TELE-satellite-0805/tur/venus.pdf A devious discovery from Venus: this small tool makes it very easy to precisely align a dish. we use, for example, lead-free paints from Akzo Nobel and even the dish is made of the quality material Galvalume, a is working on getting ISO certified. “We are expecting the test results in April 2008”, reports Tjia Tek Ijoe proudly, “We applied for ISO 9001 and 14001.” This means that PT Subur Semesta also follows the most stringent environmental guidelines. “In order to have international success, we have to have quality in every respect”, confirms Tjia Tek Ijoe, “For the coating of our dishes In western Jakarta, not too far from the international airport, can be found PT Subur Semesta, brand name Venus. The offices are at the front of the building with the windows, and towards the back are the factory buildings that house the machines to manufacture the dish antennas. The company employs a total of 200 people of which 60 are involved with the manufacture of dishes. They work from 8AM to 5PM Monday thru Friday and on Saturdays to 2PM. product of the manufacturer Bluescope in Australia. The material consists of 55% alu- minum and 45% Zinc and is therefore especially resistant and durable.” Finance Manager Liong Ten Fook is proud of PT Subur Semesta’s sales figures. “Every year there’s an increase”, he comments. “The year before it was 10% less while in 2008 we PT Subur Semesta organizes seminars for installers eight times a year. Distributors send their technical people to learn how to quickly and efficiently set up a packaged 1.8-meter antenna with dual-feed LNB. To make these seminars even more attractive, time limits are set and winners are announced. Food and drink is also taken care of as can be seen by the accommodation tent in the background. A large loudspeaker is also set up there to keep the young installers happy with loud music. Each seminar handles 60 installers where they are taught to install a dish such that the dual-feed can successfully receive PALAPA C2 at 113° east and TELKOM at 108° east. Those are large numbers; we wanted to know how many solid antennas are being manufactured today: “At the moment, our production capacity is at about 15,000 antennas per month of which the majority are sold domestically”, explained Thiang Tiong An, “Our company supplies approximately 15% of the Indonesian market.” Of their total production, 80% is delivered domestically, the rest is exported. According to Thiang Tiong An, “40% of our dish production goes to Thailand and Vietnam, the remainder goes to Brunei with a small percentage going to Australia.” expect 10% more.” 50% of their sales are attrib- uted to TVRO products such as dishes and the installation of satellite receivers as well as the sale of imported actuators and LNBs. Then there’s also the sale of their “homemade” 2in1 and 4in1 products: that would be Combi-feeds for Cband LNBs with offsets of 5° with the 2in1 and 5° -2.5° -5° with the 4in1. Unfortunately, PT Subur Semesta can’t really hope for any large business with this product since it’s so easy to copy it. Tjia Tak Ijoe gave us a look The installers take great care to remain within the preset time limits. That would be 45 minutes from the box to successful reception using a dual-feed LNB and 75 minutes for the successful set up of a motorized system. Since Jakarta is located so close to the Equator, the declination angles are very small. “Naturally we want to expand our exports”, explains Tjia Tek Ijoe, “We are investing heavily in quality.” PT Subur Semesta PT Subur Semesta’s three partners: From the left, Liong Ten Fook, Finance Director, Tjia Tek Ijoe, Managing Director, and Thiang Tiong An, Technical Director ▲ shpointer Liong Ten Fook TELE-satellite World Download this report in other languages from the Internet: Alexander Wiese Almost every TELE-satellite reader will associate the name Spaun with high-quality satellite distribution components. “Quality made in Germany” is their motto; Spaun’s mission in life is to make sure that the quality of their products is always kept at the highest level. ▲ ▲ Tjia Tek Ijoe High Quality Accessory Manufacturer Moving into the new decade with many new products Well, actually, the title isn’t quite correct; the company Spaun doesn’t celebrate its 40th anniversary until 2009. But Spaun is so full of energy and is getting ready to introduce a wide range of new products in their anniversary year that we simply couldn’t wait to find out about this company’s long history. ▲ Bergamini COMPANY REPORT Spaun at 40 years ▲ Friedrich Spaun MD ▲ Founder Subur Semesta, Indonesia - Dishes at their production: “40% of our dishes are made of steel, 40% are galvanized and 20% are made from Galvalume, the best dish material.” The Venus Star from Jakarta is well on the way to establishing itself in the international Protecting the environment at PT Subur Semesta: Tjia Tek Ijoe shows us the waste water treatment system the company invested in so that they comply with ISO environmental standards. 56 TELE-satellite & Broadband — 04-05/2008 — www.TELE-satellite.com league, and could very well come out on top of the international market share with their quality dishes that happen to be “Made in Indonesia”! Owner ▲ ▲ This is where Kevin Spaun comes into the picture. He took over company operations from his father Friedrich Spaun in early www.TELE-audiovision.com/TELE-satellite-0803/dishpointer.pdf 2008. “But we run the company as a team”, Dishpointer confirmed both of them at the same time. ▲ Alan variously sized dots (the larger the dot, the more visitors) on a world map. And, wouldn’t you know it, that is exactly the technology that Alan was looking for with his idea to display satellite positions. ent in aereodynamhis thesis, he’s comme working with PC g. “I got my first PC 16. It was a C64”, Alan about his early ogramming days. “It been in 2004 when ss Multimaps; it’s a geographic maps.” ■ The two Smart managing Christoph Hoefler und Peter Löble are the two managing directors of Smart and they give a brief account of the run-up to the current business: Smart Electronic was spun off of the long-running trading company Wela Electronic at the beginning of 2008. At the same time Smart also took over a fully operational manufacturing site for assembling satellite receivers from third-party components. Incidentally, satellite receivers make up only one segment of the complete product range. “We also supply LNBs, multi-switches and mounting material, which means we can offer everything a specialised satellite dealer needs,” explains Peter Löble. Christoph Hoefler then continues by providing some insight into how the company performed in the first year of business. “We had anticipated a first-year turnover along the lines of 20 million EUR, with a 10% increase for 2009.” All employees that had been involved in satellite technology were taken over from Wela Electronic. According to Christoph Hoefler “30 employees work in receiver manufacturing, while 15 members of staff take care of sales and 10 persons work in administration.” The marketing department was set up from scratch and already has a head count of four members of staff. Smart is in expansion mode, that’s for sure! So what are the actual goals of expansion? Peter Löble summarises the company’s markets as follows. “Some 50% of sales are generated in Germany, 20% each go to Western and Eastern Europe and 10% to North Africa.” For 2009 Peter Löble expects some shifting of markets in combination with increased turnover. “We believe that 45% of our sales will go to Germany, 15% to Western Europe, 25% to Eastern Europe and the North African share will rise to 15% as well.” He also explains why he is so optimistic about the development of sales in Northern Africa: “A few months ago we set up a branch there which means we are now able to supply our customers in that region very quickly and with reduced turnaround times.” ▲ Stab, Italy - Motors lives in England, has llite DXer since the His first antenna was model with a rotor. I used an Echostar sitioner to turn the ains Alan. Being ‘SMART’ in Germany’s Black Forest When you hold this issue of TELE-satellite in your hands the company Smart Electronic will only have been in existence for less than a year. It doubtlessly is a very young company, but still it can boast its own production facilities and dedicated sales channels. How can a start-up business develop so fast? That’s exactly what we wanted to find out when we set out on our journey to the south-western corner of Germany, home of the world-famous Black Forest cuckoo clocks and a by-word for precision and the art of craftsmanship. www.TELE-audiovision.com/TELE-satellite-0811/spaun.pdf He then explained how Spaun ended up with their company colors: “Those are the colors Technical of the building walls, blue and silver, and we decided to incorporate these colors into our Manager corporate identity.” Steffen Spaun has only existed as a stand-alone Kuck brand name since 1991. That was after the Years R Manu Distr Whol ITE SOFTWARE Shop Dish Alignment Serv R Manu R Distr Whol Shop R Serv Receiver Manufacturer Smart TELE-satellite World TELE-satellite World Giorgio 10 Certificate Holder R Manu Distr Whol Shop Serv COMPANY REPORT ▲ R Manu Distr Whol Shop Serv www.TELE-audiovision.com/TELE-satellite-0901/smart.pdf MD ▲ ▲ R Manu R Distr R Whol Shop Serv www.TELE-satellite.com — 04-05/2008 — TELE-satellite & Broadband SATELLITE SOFTWARE 57 Dish Alignment 02-03/2008 DISHPOINTER Software Solution that, with the help of Google Maps and its real images as SatcoDX and its up-to-date as well channel data, provides highly accurate satellite reception information. Alan, who lives in England, has been a satellite DXer since the year 2000. His first antenna was a 120 cm model with a rotor. “Back then I used an Echostar box with positioner to turn the motor”, explains Alan. Kevin Spaun wants to expand the export business: “At the moment we are in the process of locking in the North American market; we are looking for local distributors and also want to open our own distribution office in the USA”, reveals Kevin Spaun, “we also want a stronger presence in the Middle East.“ As a student in aereodynamics, writing his thesis, he’s completely at home working with PC programming. “I got my first PC when I was 16. It was a C64”, remembers Alan about his early software programming days. “It must have been in 2004 when I came across Multimaps; it’s a collection of geographic maps.” He came up with the idea to incorporate the display of satellite positions on these maps as a way to help with the set up of satellite dishes. But how was this going to work? These were fixed maps in differing display sizes. Alan could have programmed something but it would have required a lot of time and effort. So he dropped the idea; it would have been too much work. In 2005 he started a web site (www.uksatellitehelp.co.uk) in which he provided helpful tips on how to properly set up a satellite dish. To get an idea of how successful his website was, he enlisted the aid of Google Analytics, a free service that analyzes in great detail the traffic of a website. TELE-satelli ▲ Alan at home in front of his reception system. He uses the smaller dish to receive the Sky package and the larger dish for scanning the skies. He programmed Dishpointer; a tool that combines azimuth and elevation with Google Maps for positioning on the Earth and SatcoDX with its global satellite databank. TELE-satellite World Arabic Indonesian Bulgarian German English Spanish Farsi French Greek Croatian Italian Hungarian Mandarin Dutch Polish Portuguese Russian Swedish Turkish ‫ﺍﻟﻌﺮﺑﻴﺔ‬ Indonesia Български Deutsch English Español ‫ﻓﺎﺭﺳﻲ‬ Français Ελληνικά Hrvatski Italiano Magyar 中文 Nederlands Polski Português Русский Svenska Türkçe www.TELE-satellite.com/... www.TELE-satellite.com/TELE-satellite-0803/ara/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/bid/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/bul/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/deu/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/eng/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/esp/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/far/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/fra/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/hel/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/hrv/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/ita/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/mag/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/man/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/ned/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/pol/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/por/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/rus/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/sve/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/tur/dishpointer.pdf 36 TELE-satellite & Broadband — 02-03/2008 — www.TELE-satellite.com Spaun offers nearly 200 different products of which the best-selling products are, and always have been, multiswitches avail- He extracted his old idea from the back of his mind and began with a new sense of purpose to find a solution – and then promptly stumbled onto Google Maps. up with the idea to the display of satels on these maps as p with the set up of es. But how was this k? These were fixed ering display sizes. have programmed but it would have t of time and effort. ed the idea; it would oo much work. e started a web site ellitehelp.co.uk) in rovided helpful tips roperly set up a sat- dea of how successite was, he enlisted Google Analytics, a e that analyzes in the traffic of a webatellite also uses this alytics also contains graphically displays phical location of a sitors by displaying ■ Spaun general Manager Kevin Spaun also likes to get his hands dirty sometimes by testing multiswitches. The antenna signals from the roof land here and can be connected to the multiswitches in any arrangement. Customer problems can also be replicated and then checked out here. Suddenly, everything clicked: in August 2007 he programmed the first version of his Dishpointer. Click on a desired position on the map and the azimuth and elevation of a selected satellite is displayed. “Now it was only a question of programming in order to integrate additional features”, explains Alan about his work the last several months. The first step was: why should a user first have to click on a map or enter an address when the IP number alone identifies the position? There are professional companies that provide exactly this data. Online stores use this information to determine if a buyer really lives where he says he does. That was the first step. Now Dishpointer “knows” exactly where a user is and automatically sets the reception location to this point. This may not always be very precise; it depends on the accuracy of the virtual IP addresses compared to the real addresses. Next, Alan analyzed the popularity of satellites so that ▲ Alan at home in front of his reception system. He uses the smaller dish to receive the Sky package and the larger dish for scanning the skies. He programmed Dishpointer; a tool that combines azimuth and elevation with Google Maps for positioning on the Earth and SatcoDX with its global satellite databank. 60 TELE-satellite & Broadband — 10-1 1/2008 — www.TELE-satellite.com www.TELE-satellite.com/... TELE-satellite World Download this report in other languages from the Internet: Arabic Indonesian Bulgarian German English Spanish Farsi French Greek Croatian Italian Hungarian Mandarin Dutch Polish Portuguese Russian Swedish Turkish ‫ﺍﻟﻌﺮﺑﻴﺔ‬ Indonesia Български Deutsch English Español ‫ﻓﺎﺭﺳﻲ‬ Français Ελληνικά Hrvatski Italiano Magyar 中文 Nederlands Polski Português Русский Svenska Türkçe www.TELE-satellite.com/TELE-satellite-0803/ara/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/bid/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/bul/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/deu/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/eng/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/esp/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/far/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/fra/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/hel/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/hrv/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/ita/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/mag/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/man/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/ned/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/pol/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/por/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/rus/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/sve/dishpointer.pdf www.TELE-satellite.com/TELE-satellite-0803/tur/dishpointer.pdf ite & Broadband — 02-03/2008 — www.TELE-satellite.com www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 223
  • 224.
    DXer REPORT Siddharth Gautamin India HOTBIRD in India ■ Bangalore Satellite DXer Siddharth Gautam in front of his 3.65 m dish. With this equipment he receives some European signals, even though he is way out of their footprints. • extreme reception in southern India • European satellites – crystal clear • Ku band reception with large antenna • almost no difference noticeable between offset and PFA LNB 224 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 225.
    www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 225
  • 226.
    DXer REPORT Siddharth Gautamin India Satelliten DXer Siddharth Gautam in Bangalore How far does HOTBIRD’s footprint actually go? India and the European HOTBIRD position at 13°E are not exactly a perfect match. How’s that? In a word, the HOTBIRD footprint does not extend as far as India. But then again, never say never: Satellite DXer Siddharth Gautam from Bangalore is a regular viewer of channels broadcast from the HOTBIRD orbital position. If you take a look at Bangalore on the map it’s obvious that the capital of the province of Karnataka is definitely out of footprint, so how is Siddhart able to receive signals from HOTBIRD? “I use a 12-foot (3.65 m) antenna,” Siddhart reveals. “The entire installation set me back some 350 euros.” But that’s not the full story. If Siddhart moves the dish he can even receive EUROBIRD 9 and EUTELSAT 36B. “What I found out is that it hardly makes a difference whether I use an offset LNB or a PFA LNB,” although prime focus antennas (PFA) usually work best with a PFA LNB. Siddhart has even set up his own Internet forum by the name of ‘Dish Tuning’ which he uses to publish his extreme reception experience: http://dishtuning.com/Thread-Hotbird-In-South-India-13-East Apart from keeping his Internet forum up to date, Siddhart also runs an installation business. This provides an excellent way of showing custom- ■ Siddharth Gautam’s reception station 226 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com ë Bangalore
  • 228.
    1 1. The HOTBIRDfootprint does not reach India, but satellite DXer Siddharth Gautam is able to receive a number of European satellites nonetheless. 2. FunTV – sent from HOTBIRD, received in Bangalore 3. News channel France 24 – sent from EUTELSAT 36B, and also received in Bangalore 4. Hungarian HDTV channel Duna World HD from EUROBIRD 9A in Bangalore ers what can be achieved with extreme satellite reception. “Nobody around here even knows that European satellites can be received in southern India when you use a large enough antenna.” Now that he’s found out how it works Siddhart even contemplates producing those large antennas himself. “If demand is high enough, I’ll definitely grab that 2 3 4 chance,” he states with some optimism. Pre-orders can be made directly with Siddhart by contacting him using this email address: siddharth_pnb@hotmail.com Siddhart lends prove once again to the fact that the proof of the pudding is in the eating. If you try hard enough you may well achieve something that – in theory – seems to be out of the question. 228 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 230.
    UPLINK OVERVIEW BEST TELE-audiovision’s BestSatellite Uplink Earth Stations SATELLITE UPLINK EARTH STATIONS IN THE WORLD BT Madley UK ► ESPN ► Bristol, USA CASTOR Burum Netherlands ▼ SES ASTRA ► Luxembourg CBC Cologne ◄ Germany ◄ MEDIA BROADCAST Usingen, Germany SHENZHEN TV ► Shenzhen China Speedcast ► São Paulo, Brazil ◄ Nivalod da Silva São Paulo, Brazil ◄ TV Bandeirantes Campinas (São Paulo) Brazil ◄ TELEMEDIA Johannesburg South Africa 230 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com PTS Taipei ◄ Taiwan
  • 231.
    Speedcast Sao Paulo Brazil Read FullReport www.tavmag.com /13/09/speedcast ESPN Bristol USA Read Full Report www.tavmag.com /12/11/espn Nivaldo da Silva São Paulo Brazil Read Full Report www.tavmag.com /12/09/nivaldodasilva www.TELE-satellite.com — 06-07/20121-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 www.TELE-audiovision.com — 1 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine 231
  • 232.
    UPLINK OVERVIEW TELE-audiovision’s BestSatellite Uplink Earth Stations TV Bandeirantes São Paulo Brazil Read Full Report www.tavmag.com /12/07/tvbandeirantes Shenzhen TV Shenzhen China Read Full Report www.tavmag.com /12/05/shenzhen-tv Castor Burum Netherlands Read Full Report www.tavmag.com /12/03/castor 232 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 233.
    CBC Cologne Germany Read Full Report www.tavmag.com /12/01/cbc BT Madley UK ReadFull Report www.tavmag.com /11/11/bt SES ASTRA Luxembourg Read Full Report www.tavmag.com /11/09/ses www.TELE-satellite.com — 06-07/20121-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 www.TELE-audiovision.com — 1 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine 233
  • 234.
    UPLINK OVERVIEW TELE-audiovision’s BestSatellite Uplink Earth Stations Media Broadcast Usingen Germany Read Full Report www.tavmag.com /10/09/mediabroadcast Telemedia Johannesburg South Africa Read Full Report www.tavmag.com /07/09/telemedia PTS Taipei Taiwan Read Full Report www.tavmag.com /07/07/pts 234 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 235.
    www.TELE-satellite.com — 06-07/20121-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 www.TELE-audiovision.com — 1 — TELE-satellite International — The World‘s Largest Digital TV Trade Magazine 235
  • 236.
    TELE-audiovision M These Companies StartedTheir International DXANTENNA 1987 ASTRA 1987 MASPRO 1988 SHARP 1989 236 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 237.
    Made Them Big! Successwith TELE-audiovision Magazine TOPFIELD 2001 HUMAX 2001 MTI 2001 ARION 2001 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 237
  • 238.
    TELE-audiovision M These Companies StartedTheir International NDS 2002 KAON 2003 238 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com DREAM 2002 SAMSUNG 2003
  • 239.
    Made Them Big! Successwith TELE-audiovision Magazine SVEC 2003 CABSAT 2004 JONSA 2004 JIUZHOU 2004 CHANGHONG 2006 www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 239
  • 240.
    TELE-audiovision HISTORY 30 TELE-audiovision in1983 Years Ago British Company Sinclari presented its miniature tv Cover page of TELE-satellite 06-07/2002 The small tv set with a 5cm flat screen includes a 6V battery, which will allow the set to operate for 15 hours. This set is especially interesting for tv enthusaists as it can detect 525 and 625 line transmissions and can decode audio at 4.75, 5.75, 5.5 and 6.0 MHz 240 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 241.
    www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 241
  • 242.
    TELE-audiovision HISTORY 20 TELE-audiovision in1993 Years Ago Round Antenna Cover page of TELE-satellite 06-07/2002 Teleste from Littoinen from Finland offers the Multisat aerial for reception of an arbitrary number of satellites. The 90cm sphere incorporates a special dielectric tat works much like a lense, focussing incoming signals to a point on its rear side. Equal gain is achieved for all direftions with an opneing angle of 2 degrees. The backside rod can carry up to twenty LNBs. 242 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 243.
    www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 243
  • 244.
    TELE-audiovision HISTORY 10 TELE-audiovision in2003 Years Ago Satellite Reception in Frankfurt/ Oder, Germany Marko Sommer's dishes. Marko’s favorite programs can be found at 5°, 13° and 19° east. 244 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 245.
    Wavefrontier Toroidal-90 Wavefrontier Toroidal-90 thescrews are securely tightened, should the DiSEqC switches be integrated with the LNB’s. Antenna Tuning You might soon be asking yourself why the manufacturer doesn’t simply extend the original LNB rail of the Wavefrontier antenna. If the curve of the current rail were extended left and right, a 100% reflection of the signal would no longer be guaranteed. More than likely, because of TELE-satel- T lite reader Chris Mitiul, the engineers at he ability to receive 16 satellites Wavefrontier will start working on some with a fixed antenna is quite the kind of a solution. sensation. The “home made” After our exclusive construction discussed above still has a report of the Wavefrontier Toroidal lot of room for improvement in terms of 90 antenna in the 10-11/2001 edi- fine-tuning adjustments. tion of TELE-satellite magazine, this true multifeed antenna became an We tried the idea here ourselves in overnight success. Yet even the best the TELE-satellite test department. product is still for some people not the assembly and hardware for the additional perfect one. Naturally this includes Assembly of additional LNB’s The LNB holders and rails we acquired second- some hobbyists who, instead of doing The end result hand from a normal multifeed antenna. what everyone else does, rely more mounting bar was simply extended to the the far eastern or western end prove to be The extra costs for the feed holder ended The vision to be able to receive 20 heavily on their brain and of course left and right. And if this works for a Triax difficult, a multifeed holder for three LNB’s up between €10 (2 LNB’s) and €15 (3 satellites did not come completely true. their set of tools in order to tell the then it stands to reason that it should also could also be used. LNB’s) per piece. We managed an azimuth And with the DiSEqC switches we never manufacturers work for a Wavefrontier, even though the range of 56°. This is 40% more than what managed to get more than 17 satellites the Wavefrontier can do in its standard (see diagram). configuration. could be selected from a significantly that their products could still be made better. reflector design is different. Before the actual work – the search for all the desired satellites – starts, the Mitiul So the first thing was to fashion two multifeed holders that could each hold TELE-satellite reader Chris two LNB’s. Such an aluminum holder was made out of four feed mount halves, one and can be turned in various directions. would not be a problem with a motorized rail and seven screws. The rail is 15cm The screws should only be slightly tight- antenna but it would be for the neigh- long and the LNB holders each have a ened at first. This will help make it easier bors so some kind of noiseless solution width of 6cm. Normally the two LNB hold- to move the assembly while looking for was necessary. ers would be fastened to the rail with two the desired satellites. To prevent possible screws. Mounting to the Wavefrontier errors from occurring with the neces- antenna only required one screw. Because sary DiSEqC switches during the satellite of this an LNB offset of about 25 cm was search, it is a good idea to initially connect muth range was nothing new to him. The achieved. each LNB directly to the receiver or the first successful attempts were made with for any fine adjustments that may have antenna measurement unit. a Triax Multifocus antenna. been needed. this would be the only viable alternative. additional LNB holders are quite flexible West with a fixed antenna. This of course The bottom line: if the installation of a motorized antenna is not possible, then should be aligned as best as possible. The 20 satellites between 24.2° East and 30° before. Wavefrontier with its original LNB setup (www.satlex.de) had a vision: reception of But these 17 satellites larger azimuth range than was possible all the satellites have been found and all The Toroidal 90 was not designed for such a wide range. But for Chris Mitiul expanding an azi- Extravagant cabling The feed This provided plenty of room If the desired satellites at Only when This is how it is all switched www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 245
  • 246.
    and Read OldIssues of TELE-audiovision M a g a z i n e established 1981 the world's largest digital tv magazine is also the world's oldest magazine in the industry 246 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 247.
    1982 1986 19861987 1987 http://magazine.TELEaudiovision.com/vintage/ TELE-satellite-8211-deu.pdf http://magazine.TELEaudiovision.com/vintage/ TELE-satellite-8603-deu.pdf http://magazine.TELEaudiovision.com/vintage/ TELE-satellite-8605-deu.pdf http://magazine.TELEaudiovision.com/vintage/ TELE-satellite-8705-deu.pdf http://magazine.TELEaudiovision.com/vintage/ TELE-satellite-8711-deu.pdf 1988 1988 1988 1989 1989 http://magazine.TELEaudiovision.com/vintage/ TELE-satellite-8801-deu.pdf http://magazine.TELEaudiovision.com/vintage/ TELE-satellite-8805-deu.pdf http://magazine.TELEaudiovision.com/vintage/ TELE-satellite-8809-deu.pdf http://magazine.TELEaudiovision.com/vintage/ TELE-satellite-8905-deu.pdf http://magazine.TELEaudiovision.com/vintage/ TELE-satellite-8911-deu.pdf 1998 1998 1999 1999 1999 SATELLITE SATELLITE SATELLITE SATELLITE TELE INTERNATIONAL TELE INTERNATIONAL TELE INTERNATIONAL TELE Exclusive: Global Satellite Frequency Chart INTERNATIONAL Exclusive: Global Satellite Footprints Exclusive: Global Satellite Footprint Maps New TV Box MicroniK http://www.TELE-satellite.com http://magazine.TELEaudiovision.com/vintage/ TELE-satellite-9810-deu-eng.pdf B 9318 E 11-12 ISSN 1435-7003 http://magazine.TELEaudiovision.com/vintage/ TELE-satellite-9812-deu-eng.pdf http://www.TELE-satellite.com B 9318 E ISSN 1435-7003 http://magazine.TELEaudiovision.com/vintage/ 01-02 TELE-satellite-9902-deu-eng.pdf http://www.TELE-satellite.com B 9318 E ISSN 1435-7003 http://magazine.TELEaudiovision.com/vintage/ 03-04 TELE-satellite-9904-deu-eng.pdf http://www.TELE-satellite.com B 9318 E 05-06 ISSN 0931-4733 http://magazine.TELEaudiovision.com/vintage/ TELE-satellite-9906-deu-eng.pdf www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 247
  • 248.
    NEWS Ultra High DefinitionHDTV Edited by Branislav Pekic EUROPE EBU TESTS HIGHER FRAME RATES FOR UHDTV The EBU is conducting a series of tests on the impact of higher frame-rates for UHDTV services. The tests are being conducted by the EBU’s Broadcast Technology Futures group, make up of the heads of research labs of the BBC, IRT, Rai and NHK. The tests are designed to address questions including whether the current UHDTV standard, which includes only the 120Hz higher frame rate, needs to be revised to incorporate other rates. BBC, SKY LAUNCH UK UHD FORUM The UK industry association for digital TV, the Digital TV Group, has launched the UK UHD Forum, which will work closely with Forum for Advanced Media in Europe (FAME), an initiative led by the EBU and the Digital Interoperability Forum and supported by the European Commission. The group will co-ordinate national requirements to enable interoperability and examine whether there is a requirement for an Ultra HD profile for the UK. HISPASAT PLANS 4K CHANNEL Spanish satellite operator Hispasat plans to launch a 4K channel that will allow the industry to broadcast in the Ultra High Definition standard. It has already launched a trial demonstration of Ultra HD content delivery using the HEVC compression capabilities of the ViBE VS7000 multi-screen encoding platform powered by Thomson Video Networks, via the Hispasat 1E satellite platform. Hispasat has also partnered with RTVE, Abertis Telecom and Apuntolapospo for the production of a 50-minute documentary on the history of the Prado Museum in UHD/4K. CZECH OPERATOR TO RUN UHDTV TESTS Czech Radiokomunikace has received approval from the regulating body to continue DVB-T2 tests from a transmitter in Prague. The operator will use the license for testing pay-TV and Ultra HDTV, with Czech TV being the main content supplier. BSKYB AIRS 4K FOR FIRST TIME IN UK BSkyB has conducted the first ultra HD broadcast in the UK, by airing the football match Stoke City v West Ham on August 31. It has no plans to launch a commercial service for the moment. EUTELSAT AND SAMSUNG AIR ULTRA HD AT IFA On occasion of the IFA in Berlin, Eutelsat Communications and Samsung Electronics have partnered to demonstrate a consumer-ready Ultra HD satellite broadcast on a Samsung UHD TV. A DVB-S2 Ultra HD signal transmitted by the Eutelsat 10 A satellite was received on a commercially available UHD TV. NORTH AMERICA CEA PUBLISHES 4K ULTRA HD REPORT The Consumer Electronics Association (CEA) has released a new report—“Ultra High-Definition: State of the Industry” that projects shipments of Ultra HD sets to reach 57,000 units, worth US$ 314 million, by the end of this year. It forecasts Ultra HD shipments to surpass the one million-unit mark in 2015. The CEA’s study finds 4K production is ■Learn more about UHDTV in our Feature article: www.TELE-audiovision.com/TELE-satellite-1309/eng/feature-uhdtv.pdf increasing, thanks in part to the development of 4K-capable cameras and post-production tools. SONY SHOOTS ESPN X-GAMES IN 4K Sony has been shooting ESPN’s Summer X-Games in 4K, with a goal of creating entertainment content and drive demand for 4K “Ultra HD” TV sets. A 20-minutes story reel will be available for the Sony Media Player, created to deliver 4K movies and other content to owners of Sony’s Ultra HD TVs. forecast to hit 30,000 units in 2013, with Chimei products expected to take an 18 per cent share. WORLD MIRANDA, SONY COOPERATE ON 4K/UHDTV LIVE SOLUTIONS Miranda Technologies has teamed up with Sony LATIN AMERICA to realize 4K/UHDTV live production solutions, NET SERVICOS TO SWITCH TO 4K 4K technology solution involving both companies Brazilian cable TV operator Net Servicos plans to switch its HD broadcasts from 720p and 1080i directly to 4K, without going through 1080p. This is because transmission in 1080p would require a new decoder, as the current one only reads the 720p and 1080i formats. ASIA KCTA LAUNCHES 4K PILOT CHANNEL IN SOUTH KOREA Korea Cable Television & Telecommunications Association (KCTA) has just launched its pilot 4K channel in South Korea, six months ahead of its original schedule. Only limited households are currently involved in the pilot run, but the plan is to launch commercial broadcasts as early as next year. Meanwhile, satellite broadcaster KT Skylife announced plans to offer pilot UHD contents starting next year. CHUNGWHA TELECOM STARTS SALES OF 4K TV SETS Taiwanese operator Chunghwa Telecom began selling UHD 4K television sets as part of an effort to drive up local demand for UHD content. Chunghwa Telecom aims to sell 40,000 50-inch branded Chimei TVs by the end of this year, including the 4K model, available on a three-year subscription to the multimedia-on-demand (MOD) service. The company aims for a total of 100,000 TV sales by year-end. Taiwan’s 4K TV market is specifically targeting high profile sports. A seamless will be used in UK outside broadcast company Telegenic’s 4K-equipped OB truck expected to go into service later this year. Miranda and Sony held demonstrations of the integrated 4K/ UHDTV production scenarios at the NAB 2013. SONY TO LAUNCH 4K MOVIE DOWNLOADS Sony will offer 4K movies for download via Video Unlimited 4K service from the autumn 2013, featuring movies from Sony Pictures and independent producers. It will allow 4K TV owners to view native 4K content from Sony’s 4K media server. SONY LEADS 4K TV SHIPMENTS Sony emerges as the leader in 4K TV shipments, with a 37.8% share of the global market in the 1H 2013, according to NPD DisplaySearch. LG is in second place with 14.2%, followed by Samsung with 4%. NPD DisplaySearch says that the key reason for Sony’s dominance is its sales of smaller 55-inch and 65-inch Bravia X9 models. Powered by these sales, Sony has achieved revenues of $185 million from its Ultra HD TVs out of an industry-wide total of $490 million. 248 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 249.
    www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 249
  • 250.
    TELE-audiovision List WebTV Provider WebTV mostly www.nederlan www.kijkdirec WebTV mostly in English www.freeinternettvcanada.ca WebTV mostly in English www.europa-network.com www.whatsonthebox.net www.tvcatchup.com WebTV mostly in French www.vpnvision.com www.hubb-tv.com www.monvpn.com www.jcvpn.com WebTV mostly in English www.playon.tv www.ustvnow.com www.habu.tv www.watchustvoverseas.com www.tvandvideoguide.com WebTV mostly in Span www.teledirecto.es www.tutelevisiononlin WebTV mostly in Portugese www.tvportugalhd.com www.tvtuga.com WebTV Genre Listings: www.thefirstrow.eu www.livetv.ru/en/ WebTV mostly in Brasilian www.canaistv.net www.radios.com.br www.assistirtvonlinegratis.tv WebTV Provider around the WORLD 250 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 251.
    网络电视供应商 WebTV mostly inSwedish www.webbtv.se webtvpage.com y in Dutch nd.tv ct.nl WebTV mostly in Polish www.weeb.tv WebTV mostly in Russian www.kartina.tv www.telemax-tv.com WebTV mostly in German www.youfreetv.net www.zattoo.com www.tv-stream.to www.schoener-fernsehen.com WebTV mostly in Italian www.guardatv.it nish WebTV mostly in Greek www.megatv.com ne.com WebTV mostly in Arabic www.zaaptv.com www.arabtvnet.dk www.tvnetsolutions.com www.talfazat.com www.atnnetwork.com www.mediaboxtv.net www.atnnetwork.com.au/ WebTV mostly in Chinese www.kylintv.com www.pptv.com www.itv.cn www.italkbb.com WebTV mostly in Indian www.tv-desi.com www.jadootv.com www.btviptv.com www.wherever.tv WebTV Channel Listings: www.surfmusic.de/surftv.htm www.glotzdirekt.de www.wwitv.com www.delicast.com www.onlinetvi.com www.free-internet-tv.cz www.lookfortv.com www.beelinetv.com www.findinternettv.com www.tvweb360.tv www.webactu-webtv.com www.webtv.pk www.jumptv.com www.arabic-media.com www.broadband-television.com www.tv4web.net www.squidtv.net www.tvnewsradio.com www.argyletv.com www.tv-direct.fr www.playtv.fr www.tvuzz.com www.referenceur-tv.com www.vosflux.tv www.lookfortv.com www.teledirecto.es www.tvgratis.tv www.miratv.com.ar www.fulltv.com.ar www.tv-porinternet.com www.tvporinternet.tv www.timstream.com www.viewmy.tv www.livestation.com www.freeetv.com www.watchfomny.com www.tv-tube.tv www.tv4web.net www.findinternettv.com www.TELE-audiovision.com — 1 1-12/2013 — TELE-audiovision International — 全球发行量最大的数字电视杂志 251
  • 254.
    INTELSAT 10-02 -Europe, Middle East, North India ◄ 359.2 East (000.8 West) C-Band: INTELSAT 10-02 - Europe, Africa, South East Asia ◄ 359.2 East (000.8 West) THOR 5, 6 - Europe ◄ 359.2 East (000.8 West) AMOS 2, 3 - Europe, Middle East ◄ 356.0 East (004.0 West) EUTELSAT 5 WEST A - Europe ◄ 355.0 East (005.0 West) C-Band: EUTELSAT 5 WEST A - Europe ◄ 355.0 East (005.0 West) NILESAT 102, 201, EUTELSAT 7 WEST A - Middle East ◄ 353.0 East (007.0 West) EUTELSAT 8 WEST A - Europe, America, Middle East ◄ 352.0 East (008.0 West) EXPRESS AM44 - Middle East ◄ 349.0 East (011.0 West) C-Band: EXPRESS AM44 - Europe, North Africa, Middle East ◄ 349.0 East (011.0 West) EUTELSAT 12 WEST A - Europe, Africa ◄ 347.5 East (012.5 West) TELSTAR 12 - Europe, South Africa, Am. ◄ 345.0 East (015.0 West) INTELSAT 901 - Europe, Middle East ◄ 342.0 East (018.0 West) C-Band: INTELSAT 901 - Europe, Africa, Atlantic Ocean Region ◄ 342.0 East (018.0 West) NSS 7 - Europe, Africa ◄ 340.0 East (020.0 West) C-Band: NSS 7 - Africa ◄ 340.0 East (020.0 West) SES 4 - Europe, MIddle East ◄ 338.0 East (022.0 West) C-Band: SES 4 - America ◄ 338.0 East (022.0 West) INTELSAT 905 - Europe ◄ 335.5 East (024.5 West) C-Band: INTELSAT 905 - Europe, Africa, America ◄ 335.5 East (024.5 West) INTELSAT 907 - Europe ◄ 332.5 East (027.5 West) C-Band: INTELSAT 907 - Europe, Africa, America ◄ 332.5 East (027.5 West) HISPASAT 1C, 1D, 1E - Europe, America ◄ 330.0 East (030.0 West) INTELSAT 25 - Africa ◄ 328.5 East (031.5 West) C-Band: INTELSAT 25 - Europe, Africa ◄ 328.5 East (031.5 West) INTELSAT 903 - Europe ◄ 325.5 East (034.5 West) C-Band: INTELSAT 903 - Europe ◄ 325.5 East (034.5 West) TELSTAR 11N - Europe, Africa ◄ 322.5 East (037.5 West) C-Band: NSS 10 - Europe, Africa, America ◄ 322.5 East (037.5 West) NSS 806 - Europe ◄ 319.5 East (040.5 West) C-Band: NSS 806 - America, Europe ◄ 319.5 East (040.5 West) INTELSAT 11 - Brazil ◄ 317.0 East (043.0 West) C-Band: INTELSAT 11 - Brazil ◄ 315.0 East (043.0 West) INTELSAT 14 - Europe, North Africa, South America ◄ 315.0 East (045.0 West) C-Band: INTELSAT 14 - America ◄ 315.0 East (045.0 West) INTELSAT 1R - America ◄ 315.0 East (050.0 West) INTELSAT 23 - America ◄ 307.0 East (053.0 West) C-Band: INTELSAT 23 - America, Africa ◄ 307.0 East (053.0 West) Galaxy 11 - Brazil ◄ 304.5 East (055.5 West) C-Band: INTELSAT 805 - America ◄ 304.5 East (055.5 West) C-Band: INTELSAT 21 - Mexico ◄ 302.0 East (058.0 West) AMAZONAS 2 - South America ◄ 299.0 East (061.0 West) C-Band: AMAZONAS 3 - America ◄ 299.0 East (061.0 West) AMAZONAS 3 - Brazil ◄ 299.0 East (061.0 West) ECHOSTAR 16 - Conus ◄ 298.5 East (061.5 West) TELSTAR 14R - Brazil, Mercosul ◄ 297.0 East (063.0 West) STARONE C1 - Brazil ◄ 295.0 East (065.0 West) C-Band: STARONE C1 - South America ◄ 295.0 East (065.0 West) AMC 4 - North America ◄ 295.0 East (065.0 West) STARONE C2 - Brazil ◄ 290.0 East (070.0 West) C-Band: STARONE C2 - South America ◄ 290.0 East (070.0 West) AMC 6 - North America ◄ 288.0 East (072.0 West) C-Band: AMC 6 - North America ◄ 288.0 East (072.0 West) NIMIQ 5 - Conus ◄ 287.3 East (072.7 West) QUETZSAT 1 - Conus ◄ 283.0 East (077.0 West) ECHOSTAR 1 - America, Mexico ◄ 283.0 East (077.0 West) SIMON BOLIVAR - South America ◄ 282.0 East (078.0 West) C-Band: SIMON BOLIVAR - South America ◄ 282.0 East (078.0 West) NIMIQ 4 - Canada ◄ 278.0 East (082.0 West) AMC 9 - North America ◄ 277.0 East (083.0 West) C-Band: BRASILSAT B4 - Brazil ◄ 276.0 East (084.0 West) AMC 16 - North America ◄ 275.0 East (085.0 West) SES 2 - North America ◄ 273.0 East (087.0 West) C-Band: SES 2 - North America ◄ 273.0 East (087.0 West) GALAXY 28 - America ◄ 271.0 East (089.0 West) C-Band: GALAXY 28 - America ◄ 271.0 East (089.0 West) NIMIQ 6 - Canada ◄ 269.0 East (091.0 West) GALAXY 17 - North America ◄ 269.0 East (091.0 West) C-Band: GALAXY 17 - North America ◄ 269.0 East (091.0 West) GALAXY 25 - North America ◄ 266.9 East (093.1 West) GALAXY 3C - North America ◄ 265.0 East (095.0 West) C-Band: GALAXY 3C - North America ◄ 265.0 East (095.0 West) GALAXY 19 - North America ◄ 263.0 East (097.0 West) C-Band: GALAXY 19 - North America ◄ 263.0 East (097.0 West) GALAXY 16 - North America ◄ 261.0 East (099.0 West) C-Band: GALAXY 16 - North America ◄ 261.0 East (099.0 West) DIRECTV 4S, 8 - America ◄ 259.0 East (101.0 West) SES 1 - North America ◄ 259.0 East (101.0 West) C-Band: SES 1 - North America ◄ 259.0 East (101.0 West) AMC 1 - North America ◄ 257.0 East (103.0 West) C-Band: AMC 1 - North America ◄ 257.0 East (103.0 West) AMC 15 - North America ◄ 255.0 East (105.0 West) C-Band: AMC 18 - North America ◄ 255.0 East (105.0 West) ANIK F1R - North America ◄ 252.7 East (107.3 West) C-Band: ANIK F1R - North America ◄ 252.7 East (107.3 West) C-Band: ANIK F1 - South America ◄ 252.7 East (107.3 West) ANIK G1 - North America ◄ 252.7 East (107.3 West) ECHOSTAR 10, 11 - America ◄ 250.0 East (110.0 West) DIRECTV 5 - America ◄ 250.0 East (110.0 West) ANIK F2 - North America ◄ 248.9 East (111.1 West) C-Band: ANIK F2 - North America ◄ 248.9 East (111.1 West) SATMEX 6 - America ◄ 247.0 East (113.0 West) C-Band: SATMEX 6 - America ◄ 247.0 East (113.0 West) SATMEX 8 - America ◄ 243.2 East (116.8 West) C-Band: SATMEX 8 - America ◄ 247.0 East (113.0 West) ANIK F3 - Conus ◄ 243.2 East (116.8 West) C-Band: ANIK F3 - America ◄ 241.0 East (119.0 West) ECHOSTAR 14 - Conus ◄ 241.0 East (119.0 West) DIRECTV 7S - Conus ◄ 241.0 East (119.0 West) ECHOSTAR 9, GALAXY 23 - North America ◄ 239.0 East (121.0 West) C-Band: ECHOSTAR 9, GALAXY 23 - North America ◄ 239.0 East (121.0 West) GALAXY 18 - North America ◄ 237.0 East (123.0 West) C-Band: GALAXY 18 - North America ◄ 237.0 East (123.0 West) C-Band: GALAXY 14 - North America ◄ 235.0 East (125.0 West) AMC 21 - North America ◄ 235.0 East (125.0 West) GALAXY 13, HORIZONS 1 - North America ◄ 233.0 East (127.0 West) C-Band: GALAXY 13, HORIZONS 1 - North America ◄ 233.0 East (127.0 West) CIEL 2 - America ◄ 231.0 East (129.0 West) C-Band: AMC 11 - North America ◄ 229.0 East (131.0 West) C-Band: GALAXY 15- North America ◄ 227.0 East (133.0 West) C-Band: AMC 10 - North America ◄ 225.0 East (135.0 West) C-Band: AMC 7 - North America ◄ 223.0 East (137.0 West) C-Band: AMC 8 - North America ◄ 221.0 East (139.0 West) Satellites of the World
  • 255.
    003.1 East ►C-Band: RASCOM QAF 1R - Africa 003.1 East ► RASCOM QAF 1R - Africa 003.1 East ► EUTELSAT 3D - Europe 003.1 East ► C-Band: EUTELSAT 3A - EUROPE 004.9 East ► ASTRA 4A - Europe 004.9 East ► SES 5 - Europe, AFRICA 007.0 East ► EUTELSAT 7A - Europe, Africa 009.0 East ► EUTELSAT 9A - Europe 010.0 East ► EUTELSAT 10A - Europe 010.0 East ► C-Band: EUTELSAT 10A - Global 013.0 East ► EUTELSAT HOTBIRD 13B,13C,13D - Europe, Middle East 016.0 East ► EUTELSAT 16A - Europe, Africa 017.0 East ► AMOS 5 - North Africa, Middle East 017.0 East ► C-Band: AMOS 5 - Africa, Middle East 019.2 East ► ASTRA 1KR,1L,1M,2C - Europe 020.0 East ► C-Band: ARABSAT 5C - Africa, Middle East 021.5 East ► EUTELSAT 21B - Europe, Asia, West Africa 023.5 East ► ASTRA 3B - Europe 025.5 East ► EUTELSAT 25C - Europe, Asia 026.0 East ► BADR 4,5,6 - North Africa, Middle East 028.2 East ► EUTELSAT 28A, ASTRA 1N,2A,2F - Europe 030.5 East ► ARABSAT 5A - Middle East 030.5 East ► C-Band: ARABSAT 5A - Asia, Middle East 031.5 East ► ASTRA 1G - Europe 033.0 East ► EUTELSAT 33A - Europe 033.0 East ► INELSAT 28 - Africa 034.0 East ► ARABSAT 2B - Middle East 036.0 East ► EUTELSAT 36A,36B - Europe , South Africa, Asia, Russia 038.0 East ► PAKSAT 1R - Pakistan, North India 038.0 East ► C-Band: PAKSAT 1R - Pakistan, India, Middle East, Africa 039.0 East ► HELLAS SAT 2 - Europe, Middle East, Asia 042.0 East ► TURKSAT 2A,3A - Europe, Russia 045.0 East ► INTELSAT 12 - India, South Africa, Middle East, Europe 046.0 East ► AZERSPACE 1,AFRICASAT 1A - Asia, Africa 047.5 East ► INTELSAT 10 - Middle East, Europe 049.0 East ► C-Band: YAMAL 202 - Global 050.0 East ► INTELSAT 26 - Europe 050.5 East ► NSS 5 -Global 050.5 East ► C-Band: NSS 5 - Global 052.5 East ► YAHSAT 1A -Europe, Middle East, Africa 053.0 East ► EXPRESS AM22 -Europe, Middle East, North India 055.0 East ► GSAT-8, YAMAL 402 - Russia 056.0 East ► BONUM 1, DIREC TV 1R - East Russia 057.0 East ► NSS 12 - Europe, Russia, Africa, India 057.0 East ► C-Band: NSS 12 - Europe, Russia, Africa, India, Global 060.0 East ► INTELSAT 904 - Europe 060.0 East ► C-Band: INTELSAT 904 - Europe, Africa, Global 062.0 East ► INTELSAT 902 - Europe, Middle East 062.0 East ► C-Band: INTELSAT 902 - Europe, China, Australia, South Africa, Global 064.2 East ► C-Band: INTELSAT 906 - Europe, Africa, South India, Global 066.0 East ► INTELSAT 17 -Europe,Russia 068.5 East ► INTELSAT 20 - Africa, Europe, Middle East 068.5 East ► C-Band: INTELSAT 20 - Global 070.5 East ► EUTELSAT 70B - Europe,Middle East, India 072.1 East ► INTELSAT 22 - Middle East, Africa 074.0 East ► INSAT 4CR - India 074.0 East ► C-Band: INSAT 3C - India 075.0 East ► ABS-1 - Europe, Asia, Middle East 075.0 East ► C-Band: ABS-1 - Global 076.5 East ► APSTAR 7 - China 076.5 East ► C-Band: APSTAR 7 - Global 078.5 East ► THAICOM 5,6A - Thailand 078.5 East ► C-Band: THAICOM 5,6A - India,China,Thailand, Global 083.0 East ► INSAT 4A - India 083.0 East ► C-Band: INSAT 4A - India, Middle East 085.0 East ► INTELSAT 15 - Middle East 085.0 East ► HORIZONS 2 - Russia 086.5 East ► KAZSAT 2 - Russia 087.5 East ► C-Band: CHINASAT 12 - China, India, Midle East 088.0 East ► ST 2 - India, Malaysia 088.0 East ► C-Band: ST 2 - India, Thailand 090.0 East ► YAMAL 201,300K - Russia, North India 090.0 East ► C-Band: YAMAL 201,300K - Russia, North India 091.5 East ► MEASAT 3 - Malaysia, South Asia 091.5 East ► C-Band: MEASAT 3 -Global, Thailand, Australia, East Asia 091.5 East ► MEASAT 3A - Malaysia, South Asia 091.5 East ► C-Band: MEASAT 3A -Global 092.2 East ► CHINASAT 9 - China 093.5 East ► INSAT 3A,4B - India 093.5 East ► C-Band: INSAT 3A,4B - India, Middle East 095.0 East ► NSS 6 - India, Middle East, South Africa, North East Asia, Australia 096.5 East ► C-Band: EXPRESS AM 33 - Asia, Russia,China 100.5 East ► ASIASAT 5 - East Asia, India, Middle East, Thailand 100.5 East ► C-Band: ASIASAT 5 - Global 103.0 East ► C-Band: EXPRESS A2 - Russia, China 105.5 East ► ASIASAT 3S - East Asia, South Asia, Australia 105.5 East ► C-Band: ASIASAT 3S - Global 108.2 East ► NSS 11 - South Asia, North East Asia, China 108.2 East ► C-Band: TELKOM 1 - Indonesia 108.2 East ► SES 7 - South Asia, Australia 110.0 East ► BSAT 3A,2C,3C N-SAT 110,JCSAT 110R - Japan 110.5 East ► C-Band: CHINASAT 10 - China, Asia Pacific 113.0 East ► KOREASAT 5 - South Korea, North East Asia 113.0 East ► C-Band: PALAPA D - Asia, Australia 115.5 East ► C-Band: CHINASAT 6B - Global 116.0 East ► ABS 7 - South Korea 116.0 East ► KOREASAT 6 - South Korea 118.0 East ► C-Band: TELKOM 2 - Global 119.5 East ► THAICOM 4 - Indonesia, Cambodia 122.0 East ► ASIASAT 4 - East Asia, Australia 122.0 East ► C-Band: ASIASAT 4 - Global 124.0 East ► JCSAT 4B - Japan 125.0 East ► C-Band: CHINASAT 6A - China 128.0 East ► JCSAT 3A - Japan 128.0 East ► C-Band: JCSAT 3A - Asia 132.0 East ► VINASAT 1 - Vietnam 132.0 East ► C-Band:VINASAT 1 - Asia, Australia 132.0 East ► VINASAT 2 - Vietnam 132.0 East ► JCSAT 5A - Japan 134.0 East ► APSTAR 6 - China 134.0 East ► C-Band: APSTAR 6 - Asia, Australia 138.0 East ► TELSTAR 18 - India, China 138.0 East ► C-Band: TELSTAR 18 - Asia, Australia 140.0 East ► EXPRESS AM3 - Russia, China 140.0 East ► C-Band: EXPRESS AM3 - Russia, China 144.0 East ► SUPERBIRD C2 - Japan 152.0 East ► OPTUS D2 - Australia, Newzealand 154.0 East ► JCSAT 2A - Japan 154.0 East ► C-Band: JCSAT 2A - AsiaOceaniaHawaii 156.0 East ► OPTUS C1,D3 - Australia, Newzealand 160.0 East ► OPTUS D1 - Australia, Newzealand 162.0 East ► SUPERBIRD B2 - Japan 164.0 East ► OPTUS B3 - Asia 166.0 East ► INTELSAT 19 - Australia, Newzealand, North East Asia 166.0 East ► C-Band: INTELSAT 19 - Australia 169.0 East ► C-Band: INTELSAT 8 - Pacific 172.0 East ► EUTELSAT 172A - South Pacific, South East Pacific 172.0 East ► C-Band: EUTELSAT 172A - Pacific 180.0 East ► INTELSAT 18 - Australia, Pacific 180.0 East ► C-Band: INTELSAT 18 - Pacific Copyright 2013 by TELE-audiovision Magazine www.TELE-audiovision.com
  • 256.
    256 TELE-audiovision International— The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com
  • 257.
    www.TELE-audiovision.com — 1 1-12/2013— TELE-audiovision International — 全球发行量最大的数字电视杂志 257
  • 258.
    TELE-audiovision Deadlines Issue TELE-audiovision 11-12/2013 TELE-audiovision 01-02/2014 TELE-audiovision 03-04/2014 TELE-audiovision 05-06/2014 # 1311 1401 1403 1405 27 December2013 28 February 2014 Editorial Deadline 30 August 2013 1 November 2013 Advertisement Deadline 广告截止日期 6 September 6 November 2013 3 January 2014 7 March 2014 Hardcopies 18 October 2013 20 December 2013 14 February 2014 18 April 2014 Online 1 November 2013 3 January 2014 2 May 2014 28 February 2014 Digital TV Exhibitions 13 - 15 November 2013 InterBEE International Broadcast Equipment Exhibition Makuhari Messe, 2-1 Nakase, Mihama-ku, Chiba 261-0023, Japan 13 - 14 Nov.: 10:00am - 5:30pm 15 November: 10:00am - 5:00pm www.inter-bee.com 19 - 22 November 2013 ITU Telecom World Conversation that Matters IMPACT, 99 Popular Road, Banmai Subdistrict, Pakkred District, Nonthaburi 11120, Thailand world2013.itu.int 20 - 23 November 2013 Vietnam Electronics 2013 The Best Platform to Capture the Electronics Market in Vietnam Saigon Exhibition and Convention Center, 799 Nguyen Van Linh Parkway, District 7, Ho Chi Minh City, Vietnam www.vietnamelectronics.com 3 - 4 December 2013 Satellite Mobility 2013 London, UK mobility.vsatevent.com 7 - 10 January 2014 2014 International CES Manufacturers, developers and suppliers of consumer technology hardware, content, technology delivery systems and related products and services Las Vegas Convention Center, Las Vegas, Nevada, USA Opening Hours: 7 January: 10:00am - 6:00pm 8 - 9 Jan.: 9:00am - 6:00pm 10 January: 9:00am - 4:00pm www.cesweb.org 21 - 23 January 2014 Convergence India 2014 New Delhi, India 28 - 30 January 2014 CSTB 2014 Moscow, Russia 25 - 27 February 2014 Andina Link 2014 Cartagena, Colombia 10 - 12 March 2014 DVB World Prague, Czech 21 - 23 March 2014 CCBN 2014 China Content Broadcasting Network Exhibition - largest broadcasting technology and equipment expo in the Asia-Pacific region Beijing International Exhibition Center, Beijing, China Opening Hours: 21 - 22 March: 9:00am - 5:00pm 23 March: 9:00am - 4:30pm www.ccbn.tv 13 - 16 April 2014 HKTDC Spring Hongkong, China 7 - 10 April 2014 NAB Show 2014 For broader-casting® professionals Las Vegas Convention Center, Las Vegas, Nevada, USA Opening Hours: 7 - 9 April: 9:00am - 6:00pm 10 April: 9:00am - 2:00pm www.nabshow.com 20 - 21 May 2014 SatCom Africa Johannesburg, South Africa 11 - 13 March 2014 CABSAT 2014 Premier Broadcast Satellite Platform in the ME North Africa Dubai International Convention and Exhibition Centre, Dubai, UAE Opening Hours: 11 - 12 March: 10:00am - 6:00pm 13 March: 10:00am - 5:00pm www.cabsat.com 18 - 20 March 2014 TV Connect London, UK 20 - 22 May 2014 ANGACOM 2014 Cologne, Germany 17 - 20 June 2014 CommunicAsia 2014 Singapore 5 - 7 August 2014 ABTA 2014 São Paulo, Brasil August 2014 SET Broadcast Cable 2014 São Paulo, Brasil 258 TELE-audiovision International — The World‘s Largest Digital TV Trade Magazine — 1 1-12/2013 — www.TELE-audiovision.com