SlideShare a Scribd company logo
LEARN – DAY 31
Construction Foundation Course
Week Seven: Day 31 (Monday)
Content for the day
• Blueprints
• Tools and Equipment
Week Seven: Day 31 (Monday)
Materials for the day
Resource 5.26 – Name That
Week Seven: Day 31 (Monday)
First and Second Hours (7:30 – 9:30) - 1
• Check-in: Shake hands. Remind students:
binders, seating. Start class.
• Review the day: Review the day’s activities
from the list on the board or chart paper.
• Binder check: This can be done at any time
during the day.
Week Seven: Day 31 (Monday)
First and Second Hours (7:30 – 9:30) - 2
15 min: Have pair-shares complete their plot plan and rose project
cost sheet from the last meeting.
10 min: Have Work Teams meet to compare their members’
responses to the following:
• Placement of the house on the property: where did people place
the house and why? What is the best option?
• Placement of the rose bushes: do they meet Mr. Plaza’s
specifications: 3 sides of the perimeter with roses at 4’ intervals,
a bush at each corner, and one empty slot at the walkway to the
front door?
• Cost of the rose project: what was the total cost?
Then have Work Teams take one minute to report out, showing
(perhaps on various plot plans) what they think are the best
responses.
Blueprints
Week Seven: Day 31 (Monday)
First and Second Hours (7:30 – 9:30) - 3
5 min: Do Minute Math, slide 11
20 min: Explain that years ago, when Mr. Plaza was
getting ready to build his cabin on non-mountainous
land in Georgia, he was concerned about wood
damage, as many of the homeowners in his area had
problems. As a result of his study and inquiries, he
made an adjustment to the plans shown in Drawing
E. Let’s see if we can figure out what it was.
Have students turn to p. 328. Read the Causes of
Wood Damage (2 paragraphs) aloud as students take
notes.
Week Seven: Day 31 (Monday)
First and Second Hours (7:30 – 9:30) - 4
Then assign the following jigsaw reading to Work Teams, giving them 5
minutes to prepare and 2 minutes to report out:
• Wood decay
- Fungi
- Dry rot
• Preventing decay and Decay-resistant woods
• Termites (p. 329 only)
- Subterranean termites
• Formosan and dry-wood termites and carpenter ants
- Formosan termites
- Dry-wood termites
- Carpenter ants
• Beetles and carpenter bees
- Beetles
- Carpenter bees
Week Seven: Day 31 (Monday)
First and Second Hours (7:30 – 9:30) - 5
5 min: Have students look at the map on p.
330 and find Georgia. What does the legend
tell us? So, it’s likely that Mr. Plaza’s concern
about wood damage is related to termites.
Have Work Teams take 3 minutes to look at
Figure 12-12 on p. 330 and compare it to
Drawing E. Call on a Work Team to explain
what change they think Mr. Plaza made to the
plans. Ask for a second opinion.
Week Seven: Day 31 (Monday)
First and Second Hours (7:30 – 9:30) - 6
5 min: Play a fast game of Construction Cards.
Stretch Break: Everyone stands. You ask Work
Team 4 to present their math rap. They perform.
Everyone claps and sits down.
5 min: Do Minute Math, slide 12
5 min: Ask Work Teams to review the plans for the
Plaza Cabin and write down the kinds of windows
included, the location, and the size of each. Be
sure to look at both floor plan and elevation
drawings. .
Week Seven: Day 31 (Monday)
First and Second Hours (7:30 – 9:30) - 7
10 min: Let’s check to see if Mr. Plaza’s cabin meets
standard building code. Have students turn to p. 576. Read
Design Requirements aloud while they take notes about the
requirements:
• Total window area that can be opened must not be less
than 4% of floor area
• Bathrooms must have at least 3 SF of glazing
• Bedroom windows must have
- Sill height <44” from floor
- Height of opening > 24”
- Width of opening > 20”
- Unblocked open area > 5.7 SF (or 5.0 SF on main floor)
Week Seven: Day 31 (Monday)
First and Second Hours (7:30 – 9:30) - 8
Show students how you wrote the notes, using the
symbols for equal to or greater than and equal to
or less than. Explain that one way to remember
the greater and lesser arrows is that most people
have greater skill with their right hand (the
direction of the greater arrow) than they do with
their left. Have students make vocabulary cards
for the following symbols
• greater than (>),
• less than (<),
• equal to or greater than (>), and
• equal to or less than (<).
Ask them to use these symbols in their notes
Week Seven: Day 31 (Monday)
First and Second Hours (7:30 – 9:30) - 9
15 min: Now call on a Work Team to give you their list
of the windows in the Plaza cabin (and a second Team
as needed to generate this list):
• 2 2650 SL in living room
• 1 4040 SL in bedroom
• 0 in bathroom
• 1 3030 SL in kitchen
• 1 window in loft, size not known
Tell students how to read the size of the window: first
2 numbers is the width, second 2 numbers is the
length, all in inches. The width comes first because it
defines the header requirements. They say the size as
26 by 50 or 40 by 40.
Week Seven: Day 31 (Monday)
First and Second Hours (7:30 – 9:30) - 10
Ask if Mr. Plaza is out of compliance because he
has no window in the bathroom. (No, because
there is a fan.)
Check the window in the bedroom to see if it
meets the requirements.
• Is the sill height <44” from floor? (We don’t
know)
• Is the height of opening > 24”? (Yes)
• Is the width of opening > 20”? (Yes)
• Is there an unblocked open area > 5.7 SF (or
5.0 SF on main floor)?
Week Seven: Day 31 (Monday)
First and Second Hours (7:30 – 9:30) - 11
Ask Work Teams to take 2 minutes to figure
this out. Call on one Team to explain their
thinking and give their answer. Ask for a
second opinion.
Finally, does Mr. Plaza’s cabin meet the
overall requirement that the total window
area that can be opened must not be less
than 4% of floor area? Give Work Teams 3
minutes to figure this out. Call on one Team
to explain their thinking and give their
answer. Ask for a second opinion.
Week Seven: Day 31 (Monday)
First and Second Hours (7:30 – 9:30) - 12
10 min: Note that all Mr. Plaza’s windows are SL.
Have students turn to p. 577, and, as pair-shares,
fill out vocabulary cards for
• Window sash (where have they heard
that word before?)
• Muntin
• Casement windows
• Awning window
• Hopper window
• Horizontal sliding window
• Double hung window
• Stationary window (fixed glass)
• Glass block
Week Seven: Day 31 (Monday)
First and Second Hours (7:30 – 9:30) - 13
Compare definitions as a group and ask students to
add
• Mullion strips (p. 587)
•
15 min: Have Work Teams take 2 minutes to go back to
the Plaza cabin drawings to find the location of and
count the number of doors. Ask for a report out from
one Team. Have students make vocabulary cards for
• 1 exterior door—living room
• 2 interior doors—bathroom and bedroom
• 1 set bifold doors—closet (You may have
to ask for a second or third opinion to pick
up this one. See picture p. 615)
Week Seven: Day 31 (Monday)
First and Second Hours (7:30 – 9:30) - 14
Give pair-shares 1 minute to scan pp. 596 and
597 to determine what kind of core construction
the exterior door probably is and what kind the
interior doors probably are. Make out vocabulary
cards for
• Solid-core doors
• Hollow-core doors
Next have Work Teams read Direction of Swing on
pp. 601-2 and take another look at the Plaza
cabin floor plan. Which direction do the exterior
and interior doors swing? Does that make sense?
Week Seven: Day 31 (Monday)
First and Second Hours (7:30 – 9:30) - 15
Finally, have Work Teams read pp. 615-617
and make vocabulary cards for the following:
• Bifold doors
• Folding doors
• Double-Acting (or Café) doors
• Pocket doors
• Snack Break (9:30-9:40)
Week Seven: Day 31 (Monday)
Third and Fourth Hours (9:40 – 11:30) - 1
100 min: Students continue at work stations,
moving on when they’ve reached at least a
basic proficiency level. Students always
complete their vocabulary cards for each new
station before beginning work on proficiencies.
Continue to balance the groups at the work
stations so none are too crowded. Monitor
carefully; initial proficiencies on your file copy
and the student’s copy of the rubric as
students demonstrate competency.
Tools and Equipment– Hands-on-exposure
Week Seven: Day 31 (Monday)
Third and Fourth Hours (9:40 – 11:30) - 2
Monitor student proficiency completion, so that you
set up project stations as needed. Monitor individual
students for time management. Remind students that
Friday is the last day in shop.
10 min: Play “Name That…” (See Appendix A for
explanation of how to play Name That….) Use
Resource 5.26.
Reflection
Out the door:Model Notes,Reflection, binders on the
shelf, shake hands.
Week Seven: Day 31 (Monday)
AFTER HOURS
• Academics homework
• Open Computer Lab
END
If you continue to click forward, you will see links to
presentations of similar content available through
slideshare.com
Content prepared for the National Office of Job Corps through Contract No. DOLJ111A21695
Job Corps Professional Development Support - KUCRL

More Related Content

Similar to CFC Day 31

CFC Day 35
CFC Day 35 CFC Day 35
CFC Day 35
seejaynerun
 
CFC Day 23
CFC Day 23 CFC Day 23
CFC Day 23
seejaynerun
 
Day 30 learn cfc ppt
Day 30 learn cfc pptDay 30 learn cfc ppt
Day 30 learn cfc ppt
seejaynerun
 
CFC Day 26
CFC Day 26CFC Day 26
CFC Day 26
seejaynerun
 
Day 18 learn cfc ppt
Day 18 learn cfc pptDay 18 learn cfc ppt
Day 18 learn cfc ppt
seejaynerun
 
CFC Day 24
CFC Day 24 CFC Day 24
CFC Day 24
seejaynerun
 
CFC Day 10
CFC Day 10 CFC Day 10
CFC Day 10
Jayne James
 
CFC Day 21
CFC Day 21CFC Day 21
CFC Day 21
seejaynerun
 
CFC Day 32
CFC Day 32CFC Day 32
CFC Day 32
seejaynerun
 
CFC Day 8
CFC Day 8CFC Day 8
CFC Day 8
Jayne James
 
Week 35 May 5
Week 35 May 5Week 35 May 5
Week 35 May 5
missjade
 
CFC Day 8
CFC Day 8CFC Day 8
CFC Day 8
Jayne James
 
CFC Day 6
CFC Day 6CFC Day 6
CFC Day 6
Jayne James
 
CFC Day 17
CFC Day 17 CFC Day 17
CFC Day 17
Jayne James
 
CFC Day 28
CFC Day 28CFC Day 28
CFC Day 28
seejaynerun
 
CFC Day 37
CFC Day 37 CFC Day 37
CFC Day 37
seejaynerun
 
CFC Day 20
CFC Day 20 CFC Day 20
CFC Day 20
seejaynerun
 
CFC Day 9
CFC Day 9CFC Day 9
CFC Day 9
Jayne James
 
Module 4 lesson 15
Module 4 lesson 15Module 4 lesson 15
Module 4 lesson 15
NRWEG3
 
CFC Day 40
CFC Day 40 CFC Day 40
CFC Day 40
seejaynerun
 

Similar to CFC Day 31 (20)

CFC Day 35
CFC Day 35 CFC Day 35
CFC Day 35
 
CFC Day 23
CFC Day 23 CFC Day 23
CFC Day 23
 
Day 30 learn cfc ppt
Day 30 learn cfc pptDay 30 learn cfc ppt
Day 30 learn cfc ppt
 
CFC Day 26
CFC Day 26CFC Day 26
CFC Day 26
 
Day 18 learn cfc ppt
Day 18 learn cfc pptDay 18 learn cfc ppt
Day 18 learn cfc ppt
 
CFC Day 24
CFC Day 24 CFC Day 24
CFC Day 24
 
CFC Day 10
CFC Day 10 CFC Day 10
CFC Day 10
 
CFC Day 21
CFC Day 21CFC Day 21
CFC Day 21
 
CFC Day 32
CFC Day 32CFC Day 32
CFC Day 32
 
CFC Day 8
CFC Day 8CFC Day 8
CFC Day 8
 
Week 35 May 5
Week 35 May 5Week 35 May 5
Week 35 May 5
 
CFC Day 8
CFC Day 8CFC Day 8
CFC Day 8
 
CFC Day 6
CFC Day 6CFC Day 6
CFC Day 6
 
CFC Day 17
CFC Day 17 CFC Day 17
CFC Day 17
 
CFC Day 28
CFC Day 28CFC Day 28
CFC Day 28
 
CFC Day 37
CFC Day 37 CFC Day 37
CFC Day 37
 
CFC Day 20
CFC Day 20 CFC Day 20
CFC Day 20
 
CFC Day 9
CFC Day 9CFC Day 9
CFC Day 9
 
Module 4 lesson 15
Module 4 lesson 15Module 4 lesson 15
Module 4 lesson 15
 
CFC Day 40
CFC Day 40 CFC Day 40
CFC Day 40
 

Recently uploaded

amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
AnnySerafinaLove
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
hartfordclub1
 
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
my Pandit
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
ssuser567e2d
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
Susan Laney
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
aragme
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 

Recently uploaded (20)

amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
 
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 

CFC Day 31

  • 1. LEARN – DAY 31 Construction Foundation Course
  • 2. Week Seven: Day 31 (Monday) Content for the day • Blueprints • Tools and Equipment
  • 3. Week Seven: Day 31 (Monday) Materials for the day Resource 5.26 – Name That
  • 4. Week Seven: Day 31 (Monday) First and Second Hours (7:30 – 9:30) - 1 • Check-in: Shake hands. Remind students: binders, seating. Start class. • Review the day: Review the day’s activities from the list on the board or chart paper. • Binder check: This can be done at any time during the day.
  • 5. Week Seven: Day 31 (Monday) First and Second Hours (7:30 – 9:30) - 2 15 min: Have pair-shares complete their plot plan and rose project cost sheet from the last meeting. 10 min: Have Work Teams meet to compare their members’ responses to the following: • Placement of the house on the property: where did people place the house and why? What is the best option? • Placement of the rose bushes: do they meet Mr. Plaza’s specifications: 3 sides of the perimeter with roses at 4’ intervals, a bush at each corner, and one empty slot at the walkway to the front door? • Cost of the rose project: what was the total cost? Then have Work Teams take one minute to report out, showing (perhaps on various plot plans) what they think are the best responses. Blueprints
  • 6. Week Seven: Day 31 (Monday) First and Second Hours (7:30 – 9:30) - 3 5 min: Do Minute Math, slide 11 20 min: Explain that years ago, when Mr. Plaza was getting ready to build his cabin on non-mountainous land in Georgia, he was concerned about wood damage, as many of the homeowners in his area had problems. As a result of his study and inquiries, he made an adjustment to the plans shown in Drawing E. Let’s see if we can figure out what it was. Have students turn to p. 328. Read the Causes of Wood Damage (2 paragraphs) aloud as students take notes.
  • 7. Week Seven: Day 31 (Monday) First and Second Hours (7:30 – 9:30) - 4 Then assign the following jigsaw reading to Work Teams, giving them 5 minutes to prepare and 2 minutes to report out: • Wood decay - Fungi - Dry rot • Preventing decay and Decay-resistant woods • Termites (p. 329 only) - Subterranean termites • Formosan and dry-wood termites and carpenter ants - Formosan termites - Dry-wood termites - Carpenter ants • Beetles and carpenter bees - Beetles - Carpenter bees
  • 8. Week Seven: Day 31 (Monday) First and Second Hours (7:30 – 9:30) - 5 5 min: Have students look at the map on p. 330 and find Georgia. What does the legend tell us? So, it’s likely that Mr. Plaza’s concern about wood damage is related to termites. Have Work Teams take 3 minutes to look at Figure 12-12 on p. 330 and compare it to Drawing E. Call on a Work Team to explain what change they think Mr. Plaza made to the plans. Ask for a second opinion.
  • 9. Week Seven: Day 31 (Monday) First and Second Hours (7:30 – 9:30) - 6 5 min: Play a fast game of Construction Cards. Stretch Break: Everyone stands. You ask Work Team 4 to present their math rap. They perform. Everyone claps and sits down. 5 min: Do Minute Math, slide 12 5 min: Ask Work Teams to review the plans for the Plaza Cabin and write down the kinds of windows included, the location, and the size of each. Be sure to look at both floor plan and elevation drawings. .
  • 10. Week Seven: Day 31 (Monday) First and Second Hours (7:30 – 9:30) - 7 10 min: Let’s check to see if Mr. Plaza’s cabin meets standard building code. Have students turn to p. 576. Read Design Requirements aloud while they take notes about the requirements: • Total window area that can be opened must not be less than 4% of floor area • Bathrooms must have at least 3 SF of glazing • Bedroom windows must have - Sill height <44” from floor - Height of opening > 24” - Width of opening > 20” - Unblocked open area > 5.7 SF (or 5.0 SF on main floor)
  • 11. Week Seven: Day 31 (Monday) First and Second Hours (7:30 – 9:30) - 8 Show students how you wrote the notes, using the symbols for equal to or greater than and equal to or less than. Explain that one way to remember the greater and lesser arrows is that most people have greater skill with their right hand (the direction of the greater arrow) than they do with their left. Have students make vocabulary cards for the following symbols • greater than (>), • less than (<), • equal to or greater than (>), and • equal to or less than (<). Ask them to use these symbols in their notes
  • 12. Week Seven: Day 31 (Monday) First and Second Hours (7:30 – 9:30) - 9 15 min: Now call on a Work Team to give you their list of the windows in the Plaza cabin (and a second Team as needed to generate this list): • 2 2650 SL in living room • 1 4040 SL in bedroom • 0 in bathroom • 1 3030 SL in kitchen • 1 window in loft, size not known Tell students how to read the size of the window: first 2 numbers is the width, second 2 numbers is the length, all in inches. The width comes first because it defines the header requirements. They say the size as 26 by 50 or 40 by 40.
  • 13. Week Seven: Day 31 (Monday) First and Second Hours (7:30 – 9:30) - 10 Ask if Mr. Plaza is out of compliance because he has no window in the bathroom. (No, because there is a fan.) Check the window in the bedroom to see if it meets the requirements. • Is the sill height <44” from floor? (We don’t know) • Is the height of opening > 24”? (Yes) • Is the width of opening > 20”? (Yes) • Is there an unblocked open area > 5.7 SF (or 5.0 SF on main floor)?
  • 14. Week Seven: Day 31 (Monday) First and Second Hours (7:30 – 9:30) - 11 Ask Work Teams to take 2 minutes to figure this out. Call on one Team to explain their thinking and give their answer. Ask for a second opinion. Finally, does Mr. Plaza’s cabin meet the overall requirement that the total window area that can be opened must not be less than 4% of floor area? Give Work Teams 3 minutes to figure this out. Call on one Team to explain their thinking and give their answer. Ask for a second opinion.
  • 15. Week Seven: Day 31 (Monday) First and Second Hours (7:30 – 9:30) - 12 10 min: Note that all Mr. Plaza’s windows are SL. Have students turn to p. 577, and, as pair-shares, fill out vocabulary cards for • Window sash (where have they heard that word before?) • Muntin • Casement windows • Awning window • Hopper window • Horizontal sliding window • Double hung window • Stationary window (fixed glass) • Glass block
  • 16. Week Seven: Day 31 (Monday) First and Second Hours (7:30 – 9:30) - 13 Compare definitions as a group and ask students to add • Mullion strips (p. 587) • 15 min: Have Work Teams take 2 minutes to go back to the Plaza cabin drawings to find the location of and count the number of doors. Ask for a report out from one Team. Have students make vocabulary cards for • 1 exterior door—living room • 2 interior doors—bathroom and bedroom • 1 set bifold doors—closet (You may have to ask for a second or third opinion to pick up this one. See picture p. 615)
  • 17. Week Seven: Day 31 (Monday) First and Second Hours (7:30 – 9:30) - 14 Give pair-shares 1 minute to scan pp. 596 and 597 to determine what kind of core construction the exterior door probably is and what kind the interior doors probably are. Make out vocabulary cards for • Solid-core doors • Hollow-core doors Next have Work Teams read Direction of Swing on pp. 601-2 and take another look at the Plaza cabin floor plan. Which direction do the exterior and interior doors swing? Does that make sense?
  • 18. Week Seven: Day 31 (Monday) First and Second Hours (7:30 – 9:30) - 15 Finally, have Work Teams read pp. 615-617 and make vocabulary cards for the following: • Bifold doors • Folding doors • Double-Acting (or Café) doors • Pocket doors • Snack Break (9:30-9:40)
  • 19. Week Seven: Day 31 (Monday) Third and Fourth Hours (9:40 – 11:30) - 1 100 min: Students continue at work stations, moving on when they’ve reached at least a basic proficiency level. Students always complete their vocabulary cards for each new station before beginning work on proficiencies. Continue to balance the groups at the work stations so none are too crowded. Monitor carefully; initial proficiencies on your file copy and the student’s copy of the rubric as students demonstrate competency. Tools and Equipment– Hands-on-exposure
  • 20. Week Seven: Day 31 (Monday) Third and Fourth Hours (9:40 – 11:30) - 2 Monitor student proficiency completion, so that you set up project stations as needed. Monitor individual students for time management. Remind students that Friday is the last day in shop. 10 min: Play “Name That…” (See Appendix A for explanation of how to play Name That….) Use Resource 5.26. Reflection Out the door:Model Notes,Reflection, binders on the shelf, shake hands.
  • 21. Week Seven: Day 31 (Monday) AFTER HOURS • Academics homework • Open Computer Lab
  • 22. END If you continue to click forward, you will see links to presentations of similar content available through slideshare.com Content prepared for the National Office of Job Corps through Contract No. DOLJ111A21695 Job Corps Professional Development Support - KUCRL