SlideShare a Scribd company logo
1 of 22
Download to read offline
Specialized Consulting in
Engineering and Management
Company
Presentation
© 2024 Data Riders. All rights reserved.
2
Expert technical consulting services
Our global team of consultants, mining experts, provide comprehensive
solutions to optimize the management and strengthen the safety of
critical geotechnical assets, in line with international best practices
Establishment of governance, standards and adoption of
global best practices (Management Systems)
Participation as an active member in ITRB and GRB
Independent Technical Review committees
Analysis of adherence and auditing of global standards:
Guides and Protocols (GISTM/ICMM and TSM/MAC)
Development and review of normative documents, technical
and management procedures
Integrated project management using agile methodologies,
PMBOK and FEL (Front End Loading)
Hazard identification and risk assessment associated with
critical geotechnical assets
Engineering Services, Engineer of Records (EOR) and
Technical peer-review
Development and implementation of plans and strategies for
the Multi-Year Mining Master Plan
Evaluation of Alternatives and Multicriteria Analysis of TSFs
(Tailings Storage Structures)
Greenhouse Gas Management, through the development of
inventories and equivalent carbon credit projects
© 2024 Data Riders. All rights reserved.
© 2024 Data Riders. Todos os direitos reservados
Certifications
3
Certified Verifier Certified Assessor Certified Auditor
Analysis of adherence to global
standards (GISTM and TSM)
Compliance with technical and ESG requirements;
Plans and procedures; Corporate policy, governance
and TMS; Roles, responsibilities, functional and
organizational structure; Accountability, lines and
effectiveness of communication, relationships with
interface areas; Integration with site-wide systems and
information management; Environmental compliance;
Communication and community engagement
Participation as an active member in
ITRB and GRB Independent Technical
Review committees
Excavations, underground mine, waste dumps and
produce deposits, piles, excavation evaluation,
blasting. Provide Independent Technical Opinion of
engineering practices, without bias in the design,
construction, operation and maintenance of the
tailings facility
Engineering, EOR and Services of
Technical peer-review
Confirm that the structure is designed, constructed,
operated, and maintained in accordance with design
intent, safety standards, applicable regulations, and
integrated mine planning; Define modifications,
operational, maintenance and monitoring changes of
the installation; Definition of objectives, indicators and
performance criteria; EPRP
Establishment of global
best practice (TMS)
governance, standards,
and adoption
Systematic management methods to
identify, monitor and control risks on
an ongoing basis; Definition of roles
and responsibilities; Identification of
gaps, review and creation of
normative documents;
Organizational, compliance, and
resource change management
Hazard Identification and
Risk Assessments of
Geotechnical Critical Assets
Organization of multidisciplinary team
and workshops; Identification of
unwanted events (MUE); Failure mode
analysis, FMEA risk analysis, and Bow-
tie cause and consequence diagrams;
Definition of preventive controls and
mitigating barriers; Development of
critical control sheets and TARPs;
Evaluation and assurance of the
effectiveness of critical controls
Management macro processes
Our Services
Conception Design Construction Closure
Operation Post-closure
At all stages of the structure's life cycle:
Our services linked to macro safety
management processes
Asset Integrity
Assurance
Inspection
Monitoring
Maintenance
Security Risk
Management
Risk analysis
Critical Controls
Tarps
Promotion
of
Safety/Culture
Policy/Governance
Our services support a wide range of effective risk management and security processes in the
different lines of defense of organizations.
4
© 2024 Data Riders. All rights reserved.
Application of international best practices for Risk Management
Framework SMS (Safety Management Systems)
5
Safety Assurance
Safety Risk Management
System analysis
(Design)
Hazard Identification
Risk Analysis
Risk Controls
System Monitoring
Data Acquisition
System Assessment
Corrective Actions
Indicators and Results
Promoting
Safety
(Culture)
Description & Context
Specific information
Analysis and Evaluation
Action: Problem Solving
Policy and Governance
© 2024 Data Riders. All rights reserved.
Steps and tools of Safety Risk Management processes
Event Identification, Risk Analysis, Critical Controls and TARPs (Trigger Action Response Plans)
6
STEPS
1. Prior Preparation:
• Formation of a multidisciplinary team.
• Advance distribution of information and documentation
related to the Workshop.
2. Workshop and Technical Inspection:
• Identification and listing of Unwanted Events (MUEs).
• Elaboration of the Bow-Tie Diagram: Identifying Causes and
Consequences.
• Execution of the FMEA Analysis followed by the Risk Analysis.
• Complementing the Bow-Tie Diagram: Establishing Prevention
Controls and Mitigation Barriers.
3. Development of Sheets for Critical Controls and TARPs:
• Detailed elaboration, including objectives, location,
performance requirements, triggers, and verification activities.
4. Planning for the Implementation of Critical Controls:
• Definition of actions, responsibilities and timeline for
implementation.
5. Assessment and Assurance:
• Evaluation of the effectiveness of critical controls.
• Continuous process of assurance and refinement based on
periodic feedback and analysis.
BOW-TIE ANALYSIS
Consequences
Causes
Preventive
Controls
Mitigating
Controls
Unwanted Events
Risk Assessment
© 2024 Data Riders. All rights reserved.
Standards, good practice guides,
Normative and regulatory documents
7
Evaluation of alternatives and multicriteria analysis of Tailings Storage Facilities
Established methodology, in accordance with global standards and international best practices
Development Steps:
Multicriteria Decision Analysis
Baseline and Projections
1
Identification of
Alternatives and Pre-
selection
2
Characterization of
Alternatives
3
Definition of Multicriteria
and Indicators
4
Multi-Criteria Based
Decision
5
Documentation and
Validation
6
Pre-Screening
Screening
Pre-selection criteria
Characterization Criteria
Evaluation Criteria
Measurement Criteria
Weighting Criteria
Sensitivity Criteria
ICMM - International Council on Mining
and Metals:
• Tailings Management: Good Practice Guide
• Global Industry Standard on Tailings
Management: Conformance Protocols
• Tailings Reduction Roadmap
TSM - Towards Sustainable Mining:
• Tailings Guide Implementation Checklist
• A Guide to the Management of Tailings
Facilities
Mining and Processing Division,
Environment Canada:
• Guidelines for the Assessment of
Alternatives for Mine Waste Disposal
ANM Laws, Standards and Resolutions
Strategic Criteria
Evaluation of Alternatives
and Multicriteria Analysis
of Tailings Storage
Facilities
© 2024 Data Riders. All rights reserved.
Implementation, participation and support in the processes and
mechanisms of review of geotechnical structures and mining tailings dams
8
Independent Review
Objective and impartial
analysis of the various
aspects related to the
structures, including the
characterization of the site,
engineering models, and the
intention of the project,
assumptions and criteria
adopted. This review is
crucial to ensure that the
project is executed in
accordance with the
necessary safety and
efficacy standards.
Operational Assessment
Conducted to review the
operating procedures in
place, including the tailings
transportation and disposal
plan, water management,
and risk assessment and
management. Through
these assessments, it is
possible to identify potential
failure modes and
implement corrective
measures to ensure the safe
operation of the dam.
TMS (Tailings
Management System)
Review
The TMS review involves
analyzing the corporate
tailings management policy,
functional and
organizational structure,
lines of communication, and
the effectiveness of the
response in case of
emergencies. It is a crucial
mechanism to ensure that
tailings management is
carried out effectively and
safely.
Audit
An audit is a formal,
systematic, and
documented assessment of
a tailings facility's
compliance with explicit,
agreed, and prescribed
criteria. It includes the
review of legal
requirements, operator
policies and commitments,
applicable standards and
performance expectations.
Dam Safety Review
This review aims to provide
a statement on the safety of
the facility, including the
assessment of technical,
operational, and governance
aspects. The goal is to
ensure that the dam meets
the design intent and
applicable safety criteria,
without posing
unacceptable risks.
© 2024 Data Riders. All rights reserved.
Integrated scope to support the compliance process with international best practices
Framework DMAIC (Define, Measure, Analyze, Improve, Control)
9
DMAIC
1
2
3
4
5
Define
Measure
Analyze
Improve
Control
• Formation of the work team and identification of
stakeholders.
• Establishment of the follow-up routine based on the 5Ps
and creation of compliance control spreadsheets.
• Conducting the Kick-off meeting with initial presentation of
the scope.
• Request and take receipt of documentation on
governance and management model.
• Request and receipt of documentation related to
the site and structures.
• Conduct technical visits for on-site evaluation.
• Analysis of documentation to identify needs for
additional interviews, surveys, and requests,
followed by conducting these activities as needed.
• Execution of the Gap Assessment focusing on
Engineering, Processes and People, categorizing the
findings as: Meets, Partially Meets or Does Not
Meet.
• Conducting a workshop to validate the Gap Analysis
with the project team and key stakeholders, and
reviewing and validating the final version of the Gap
Analysis Report.
• Root cause analysis of the gaps from the
perspective of Engineering, Processes and People,
followed by a benchmarking study of international
best practices, and identification of
countermeasures and objectives to remedy the
identified gaps.
• Conducting workshops to define and validate
countermeasures, objectives, and required actions,
including responsibilities and duration. Use GUT
Analysis to prioritize actions and group interrelated
actions into macro activities, culminating in the
definition and validation of the Gap Closing
Roadmap with leadership.
• Preparation and presentation of the Gap Closure
Plan, followed by its implementation, in addition to
supporting change management through
communications, training and continuous
improvement initiatives.
• Perform project management and control activities
through the PMO (Project Management Office).
• Keep the Gap Analysis Report updated as the project
progresses.
• Continuously update the Gap Closure Plan to reflect
changes and progress made.
© 2024 Data Riders. All rights reserved.
The goal is for each facility to reach at least level A.
Note: Topics 3. Crisis Management and Communication Planning
and 4. Prevention of Child Labour and Forced Labour use a different
method of binary assessment: YES and NO.
TSM (Towards Sustainable Mining) Performance Rating System
In numbers: 8 topics, 30 performance indicators, and 428 evaluation items
10
TSM Performance Indicators Ev.
1 Indigenous and Community Relations 91
1.1 Identification of the Community of Interest (COI) 11
1.2 Effective Engagement with the COI and Dialogue 24
1.3 Effective Engagement with Indigenous People and Dialogue 18
1.4 Benefits and Community Impact Management 27
1.5 COI Response Mechanism 11
2 Health & Safety 83
2.1 Commitment and Accountability 15
2.2 Planning and Implementation 19
2.3 Training, Behavior, and Culture 20
2.4 Reporting & Monitoring 17
2.5 Performance 12
3 Crisis Management and Communication Planning 39
3.1 Crisis management and communication agility 24
3.2 Revision 10
3.3 Training 5
4 Prevention of Child Labor and Forced Labor 5
4.1 Prevention of Forced Labor 3
4.2 Prevention of Child Labor 2
5 Management of Energy Use and Greenhouse Gas (GHG) Emissions 69
5.1 Energy use and greenhouse gas (GHG) emissions management systems 29
5.2 Reporting systems for energy use and greenhouse gas (GHG) emissions 24
5.3 Energy performance and greenhouse gas (GHG) emissions targets 16
6 Biodiversity Management and Conservation 38
6.1 Corporate commitment to biodiversity conservation, accountability and communication 7
6.2 Biodiversity conservation planning in installation and implementation 26
6.3 Biodiversity Conservation Reports 5
7 Tailings Management 47
7.1 Tailings Management Policy and Commitment 12
7.2 Tailings Management and Emergency Preparedness System 12
7.3 Accountability and Responsibility for Tailings Management 10
7.4 Annual Review of Tailings Management 8
7.5 Operation, Maintenance and Control Manual 5
8 Water Management 56
8.1 Water Governance 15
8.2 Operational Water Management 22
8.3 Watershed Scale Planning 11
8.4 Water Performance & Reporting 8
Level Criteria
AAA Excellence and leadership.
AA
Systems and processes are integrated into
management decisions and business functions.
A
Good practice. Systems and processes are developed
and implemented.
B
Procedures exist, but they are not fully consistent or
documented. Systems and processes are planned and
being developed.
C
No system is in place. Activities tend to be reactive.
Procedures may exist, but they are not integrated
into policies and management systems.
Communities
and
People
Environment
and
Climate
Change
* Ev. It is the number of evaluation items required to rank each Performance Indicator.
© 2024 Data Riders. All rights reserved.
TSM Classification Process
References, Steps, and Outputs of the TSM Performance Rating Process
11
Preparation and Kick-off
Technical Visit
Interviews
Document Analysis
Evaluation, Rating and
Recommendation
Verification & Reporting
Validation and
Endorsement
ICMM Alignment
Supplement
Control and Continuous
Improvement
1
2
3
4
5
6
7
8
9
Global standards, international best practice guides,
and assessment protocols
TSM - Towards Sustainable Mining:
• TSM 101: A Primer
• TSM: Responsible Sourcing Alignment Supplement
• TSM Verification Guide
IBRAM – Towards Sustainable Mining:
1.Protocol for the relationship with communities,
Indigenous, quilombola and traditional peoples
2.Health & Safety Protocol
3.Protocol for Crisis Management Planning and
Communications
4.Protocol for the Verification of the Prevention of
Child Labor and Forced or Slave Labor
5.Climate Change Protocol
6.Biodiversity Conservation Management Protocol
7.Tailings Management Protocol
8.Sustainable Water Management Protocol
TSM Performance Rating
• 8 Topics
• 30 Performance Indicators
• 428 Ratings
• Observations and
Recommendations
• Reference Documentation
• Technical Support
• ICMM Supplement
• Ongoing technical support
TSM Classification Steps
© 2024 Data Riders. All rights reserved.
12
PEOPLE
Culture
Knowledge
Resilience
TECHNOLOGY
Engineering
Physical Resources
Digital Resources
Excellence in management through our
integrated approach from the perspective
of People, Processes and Technology
Board of Directors
(BoD)
Responsible Executive
(AEO)
Operation
Responsible Engineer
(RTFE)
Engineer of Records
(EOR)
Independent
Technical
Review
(ITRB/GRB)
Internal Stakeholders
External Stakeholders
The organizational structure for the management of
tailings and geotechnical assets is outlined by key roles that
perform important complementary functions
Proper management of geotechnical assets is critical to ensuring the safety, efficiency, and continuity
of operations in sectors such as mining. This management is underpinned by a robust organizational
structure and effective lines of communication.
PROCESSES
Methodologies
Standards
Procedures
© 2024 Data Riders. All rights reserved.
The Multi-Year Master Plan is an essential strategic tool for the mining industry. It serves as a
roadmap for the sustainable management of mineral resources, ensuring the continuity of
operations and the maximization of economic, social, and environmental benefits.
Long-Term Vision
Establish clear goals and
objectives for a multi-year
horizon, allowing for better
foresight and preparedness
for future challenges.
Resource Optimization
Ensure the efficient use of
mineral resources, reducing
waste and increasing
productivity.
Sustainability
Promote responsible mining
practices, considering
environmental and social
impacts.
Commitment
Strengthen relationships with
local communities,
governments and other
stakeholders through
transparent and effective
communication.
Benefits of the development of the Multi-Year Mining Master Plan
13
© 2024 Data Riders. All rights reserved.
Support to clients in the preparation and implementation of the components of the Multi-Year Mining
Master Plan, using a framework structured in 4 stages of development.
Strategic Business Planning
Planning for the Exploration
and Development of Mineral
Resources
Tailings and Dam
Management Planning
License Planning and
Regulations
Infrastructure and
Equipment Planning
Logistics and Supply Chain
Planning
Technology and Innovation
Planning
Sustainability Planning and
Social Responsibility
Communication Planning
and Public Relations
Human Resource Planning
STEP 3
Integrated Logistics and
Environmental Compliance
STEP 2
Technology and
Operational Infrastructure
STEP 1
Strategic Vision and
Mineral Exploration
STEP 4
Sustainability and
Human resources
Finance and Budget Planning
Risk Management
Monitoring and Evaluation
14
© 2024 Data Riders. All rights reserved.
© 2024 Data Riders. All rights reserved. 15
1. Planning
Definition of the scope,
identification of normative
documents and technical
procedures that need development
/ revision.
Mobilization of the team composed
of technical and management
specialists.
Preparation of the schedule and
distribution of the necessary
resources.
2. Collection and
Organization of
Documents
Collection of all relevant documents
and procedures.
Organization and distribution in a
logical and accessible way, for
example, on a secure digital
platform.
3. Preliminary Analysis
Conducting a preliminary analysis to
identify inconsistencies,
outdatedness, or areas for
improvement.
Comparison of documents and
procedures with global standards
and with international and local
legal and technical standards.
4. Stakeholder
Consultations
Conducting interviews and meetings
with internal and external
stakeholders to obtain comments
and feedback on the documents
and procedures.
Request for suggestions and
improvements, and identification of
areas of risk or non-compliance.
5. Technical and Legal
Review
Analysis and review of documents
and procedures in light of
applicable legal and technical
regulations.
Identification of implementation
and/or change needs to ensure
compliance and operational
efficiency.
10. Continuous
Monitoring and
Evaluation
Establishing an ongoing
monitoring and evaluation
process to ensure that
documents and procedures
remain relevant and compliant.
Collecting feedback and
performance data to inform
future reviews.
9. Implementation
Communication of documents
to all interested parties.
Provision of training as needed
to ensure understanding of and
compliance with documents
and procedures.
8. Final Approval
Submission of proposals for
final approval by company
leadership and relevant
committees.
Documentation of all approvals
and feedback received.
7. Internal Validation
Conducting workshops and
meetings to validate the
proposals with the relevant
teams.
Review and adjustment of
proposals based on feedback
received.
6. Development and
Proposed Changes
Development of
implementation and/or change
proposals based on findings.
Preparation of documents and
technical support that justify
the implementations and/or
proposed changes.
15
Development and review of normative documents, technical and management procedures
10 steps in the development and review process
Alignment of the business goal for the development of Greenhouse Gas (GHG)
inventories and Carbon Credit projects
16
Goal Objective
GHG Management
Compliance with GHG regulations
Access to market opportunities
Investment and acquisition decision support
Tracking and reducing GHG
emissions
Identification of emission hotspots and reduction opportunities
Support in setting GHG reduction targets
Measurement and reporting of GHG performance over time
Development of performance benchmark
GHG Stakeholder Reporting
Meeting Information Needs
Reporting to government and credit programs
Leveraging corporate reputation and accountability
© 2024 Data Riders. All rights reserved.
Greenhouse Gas (GHG) accounting and inventory
17
Operations Accounting
Project Accounting
Real GHG
reduction
relative to the
base year
Year -1 Year 0
GHG
Emission
Year 1 Year 2
GHG
Emission
Expected GHG
reduction
relative to the
base year
Definition of Organizational
Boundaries
Definition of Operational
Boundaries
Emissions Tracking
Identification of sources,
sinks and reservoirs
Selection of the calculation
approach
Data collection and application
of calculation tools
Development of the
inventory report
Detailed assistance to teams in
the preparation of exhaustive
inventories of Greenhouse Gas
(GHG) Emissions, as well as in the
planning and implementation of
robust projects for the mitigation
of these emissions, including the
identification and execution of
carbon reduction initiatives and
the generation of corresponding
carbon credits.
© 2024 Data Riders. All rights reserved.
Development of Carbon Credit projects
18
Identification of potential projects
Elaboration of the PIN (Project Idea Note)
Elaboration of the PDD (Project Design Document)
Preparation of Prior Consideration
Elaboration of the PD (Project Description)
Validation by the Designated Operating Entity (EOD)
Validation by the Validation and Verification Body (VVB)
Approval by the National Designated Authority (NDA)
Registration
Independent Verification/Evaluation
Certification
Implementation and Monitoring
Reductions Certified Emission (RCE) Reductions Verified Emission (RVE)
Regulated Market Voluntary Market
Conception
Validation
Implementation
and Verification
Certification
© 2024 Data Riders. All rights reserved.
19
Flexible and iterative approach to project
management. Promotes continuous
collaboration, quick adjustments, and
customer satisfaction using frameworks
such as Scrum and Kanban.
Standardized set of practices for project
management. It focuses on defined
processes, areas of knowledge and project
phases, promoting predictability and
control.
Detailed planning and scoping in the early
phases of complex projects. It emphasizes
risk assessment and stakeholder
engagement to prevent costly changes
later on.
Agile PMBok FEL (Front End Loading)
Mining Project Management Services
Implementation of established international methodologies and best practices
© 2024 Data Riders. All rights reserved.
20
Our international consultants bring together years of accumulated expertise in areas such as Mining,
Energy, Logistics and Technology, coming from different regions of the world.
With global experience, we offer complementary
expertise in:
 Geotechnical engineering and tailings
management
 Governance structures and management systems
 Change management and stakeholder
engagement
 Artificial intelligence and emerging technological
innovations
We actively contribute to global mining standards,
with renowned publications in geotechnics,
hydrogeology, governance, technology, and other
initiatives.
© 2024 Data Riders. All rights reserved.
© 2024 Data Riders. All rights reserved.
Presentation of the First Team
Dedicated professionals with global experience and specialized expertise
Johan du Toit
With a 25-year international consulting career,
Johan du Toit is a respected and recognized
consultant. But his passion for science began
much earlier, as a chemistry researcher in
South Africa, where he earned a prestigious
PhD. Since then, Johan has been dedicated to
identifying opportunities to enhance
operational excellence and build
organizational resilience across multiple
continents. In recent years, he has taken a
deep dive into tailings management, leading a
significant task force for a mining giant. His
commitment to the industry was recently
recognized when he was invited to be a
member of CQM (Madeira Chemistry Centre)
to advise Portugal's leading chemistry
research centre on career management for its
team of more than 20 PhD students.
johan.dutoit@datariders.com.br
Luís Cervantes
Dr. Luis Cervantes is an outstanding
geotechnical engineer with specializations in
soil mechanics, rock mechanics, and
hydrogeology. Over the course of his two-
decade career, he has contributed
significantly to the industry in both South
America and Australia. His articles, published
in world-renowned conferences and journals,
reflect his deep understanding and passion
for the field. Luís is recognized for his
expertise in open-pit mining, tailings dams
and geotechnics. In addition, he has played a
vital role in the planning, development and
evaluation of Tailings Management Systems,
always ensuring compliance with global
standards and promoting innovations in the
sector.
luis.cervantes@datariders.com.br
Fernando Damasio
Fernando Damasio is a multifaceted
professional with two decades of experience
spanning sectors such as technology, mining,
steel and logistics. His global journey has seen
him work across four continents, solidifying
his reputation as an expert in automation,
sensing, and process control. In addition to
leading the forefront in the development of
technologies for autonomous vehicles,
Fernando has also played a crucial role in the
deployment of tailings management systems
and dams. With a degree in Control and
Automation Engineering, he not only applied
his knowledge in the field but also shared his
expertise as a professor in graduate
programs. His ongoing dedication to
education and innovation is evident in her
regular participation in continuing education
programs at reputable institutions.
fernando.damasio@datariders.com.br
21
Business name: Data Riders Educação e Consultoria
LTDA
Business number: 29.742.713/0001-02
Address: Av. Jose Maria Alkimin 864
Belo Horizonte, MG / Brazil 30320-210
Thank you.
fernando.damasio@datariders.com.br
Specialized Consulting in
Engineering and Management
22
© 2024 Data Riders. All rights reserved.

More Related Content

Similar to Data Riders Consultancy and Education presentation

Berdian van wyk resume HSE manager v1
Berdian van wyk  resume HSE manager v1Berdian van wyk  resume HSE manager v1
Berdian van wyk resume HSE manager v1Berdian van wyk
 
2016-06-08 FDA Inspection Readiness - Mikael Yde
2016-06-08 FDA Inspection Readiness - Mikael Yde2016-06-08 FDA Inspection Readiness - Mikael Yde
2016-06-08 FDA Inspection Readiness - Mikael Ydemikaelyde
 
Risk Offering Summary
Risk Offering SummaryRisk Offering Summary
Risk Offering Summarydgeoghegan
 
Bootcamp Student-CSV-Presentation.pptx
Bootcamp Student-CSV-Presentation.pptxBootcamp Student-CSV-Presentation.pptx
Bootcamp Student-CSV-Presentation.pptxmugimbasmith2
 
Steve Anderson 2015A
Steve Anderson 2015ASteve Anderson 2015A
Steve Anderson 2015ASteven Anderson
 
CRO and Vendor Oversight: Clinical
CRO and Vendor Oversight: ClinicalCRO and Vendor Oversight: Clinical
CRO and Vendor Oversight: ClinicalManjusha Chowdhury
 
CCISO_Certification_Training_Course-Outline.pdf
CCISO_Certification_Training_Course-Outline.pdfCCISO_Certification_Training_Course-Outline.pdf
CCISO_Certification_Training_Course-Outline.pdfpriyanshamadhwal2
 
Audits & Inspections_Katalyst HLS
Audits & Inspections_Katalyst HLSAudits & Inspections_Katalyst HLS
Audits & Inspections_Katalyst HLSKatalyst HLS
 
Iso 27001 isms presentation
Iso 27001 isms presentationIso 27001 isms presentation
Iso 27001 isms presentationMidhun Nirmal
 
Transforming compliance and audit management with ServiceNow
Transforming compliance and audit management with ServiceNowTransforming compliance and audit management with ServiceNow
Transforming compliance and audit management with ServiceNowIceberg Networks Corporation
 
GRC - Isaca Training 16.9.2014
GRC - Isaca Training 16.9.2014GRC - Isaca Training 16.9.2014
GRC - Isaca Training 16.9.2014Paul Simidi
 
Enterprise governance risk_compliance_fcm slides
Enterprise governance risk_compliance_fcm slidesEnterprise governance risk_compliance_fcm slides
Enterprise governance risk_compliance_fcm slidesEnterpriseGRC Solutions, Inc.
 
Material Unwanted Events - Critical Control Mangement
Material Unwanted Events - Critical Control MangementMaterial Unwanted Events - Critical Control Mangement
Material Unwanted Events - Critical Control MangementSAMTRAC International
 
Haytham Mahmoud 27122014
Haytham Mahmoud 27122014Haytham Mahmoud 27122014
Haytham Mahmoud 27122014Haytham Elmowalled
 
Safety Standards
Safety Standards Safety Standards
Safety Standards Arjun Aarzoo
 
Webinar | Asset Management Health Check
Webinar | Asset Management Health CheckWebinar | Asset Management Health Check
Webinar | Asset Management Health CheckStork
 
Abidance Cip Presentation
Abidance Cip PresentationAbidance Cip Presentation
Abidance Cip Presentationjamesholler
 
Project Management & Technical Consultancy Services [Transportation, Rail...
Project Management & Technical Consultancy Services [Transportation, Rail...Project Management & Technical Consultancy Services [Transportation, Rail...
Project Management & Technical Consultancy Services [Transportation, Rail...gabriel_nistorescu
 

Similar to Data Riders Consultancy and Education presentation (20)

Profile_Kishore Sundar
Profile_Kishore SundarProfile_Kishore Sundar
Profile_Kishore Sundar
 
Berdian van wyk resume HSE manager v1
Berdian van wyk  resume HSE manager v1Berdian van wyk  resume HSE manager v1
Berdian van wyk resume HSE manager v1
 
2016-06-08 FDA Inspection Readiness - Mikael Yde
2016-06-08 FDA Inspection Readiness - Mikael Yde2016-06-08 FDA Inspection Readiness - Mikael Yde
2016-06-08 FDA Inspection Readiness - Mikael Yde
 
Risk Offering Summary
Risk Offering SummaryRisk Offering Summary
Risk Offering Summary
 
Bootcamp Student-CSV-Presentation.pptx
Bootcamp Student-CSV-Presentation.pptxBootcamp Student-CSV-Presentation.pptx
Bootcamp Student-CSV-Presentation.pptx
 
Insurance
InsuranceInsurance
Insurance
 
Steve Anderson 2015A
Steve Anderson 2015ASteve Anderson 2015A
Steve Anderson 2015A
 
CRO and Vendor Oversight: Clinical
CRO and Vendor Oversight: ClinicalCRO and Vendor Oversight: Clinical
CRO and Vendor Oversight: Clinical
 
CCISO_Certification_Training_Course-Outline.pdf
CCISO_Certification_Training_Course-Outline.pdfCCISO_Certification_Training_Course-Outline.pdf
CCISO_Certification_Training_Course-Outline.pdf
 
Audits & Inspections_Katalyst HLS
Audits & Inspections_Katalyst HLSAudits & Inspections_Katalyst HLS
Audits & Inspections_Katalyst HLS
 
Iso 27001 isms presentation
Iso 27001 isms presentationIso 27001 isms presentation
Iso 27001 isms presentation
 
Transforming compliance and audit management with ServiceNow
Transforming compliance and audit management with ServiceNowTransforming compliance and audit management with ServiceNow
Transforming compliance and audit management with ServiceNow
 
GRC - Isaca Training 16.9.2014
GRC - Isaca Training 16.9.2014GRC - Isaca Training 16.9.2014
GRC - Isaca Training 16.9.2014
 
Enterprise governance risk_compliance_fcm slides
Enterprise governance risk_compliance_fcm slidesEnterprise governance risk_compliance_fcm slides
Enterprise governance risk_compliance_fcm slides
 
Material Unwanted Events - Critical Control Mangement
Material Unwanted Events - Critical Control MangementMaterial Unwanted Events - Critical Control Mangement
Material Unwanted Events - Critical Control Mangement
 
Haytham Mahmoud 27122014
Haytham Mahmoud 27122014Haytham Mahmoud 27122014
Haytham Mahmoud 27122014
 
Safety Standards
Safety Standards Safety Standards
Safety Standards
 
Webinar | Asset Management Health Check
Webinar | Asset Management Health CheckWebinar | Asset Management Health Check
Webinar | Asset Management Health Check
 
Abidance Cip Presentation
Abidance Cip PresentationAbidance Cip Presentation
Abidance Cip Presentation
 
Project Management & Technical Consultancy Services [Transportation, Rail...
Project Management & Technical Consultancy Services [Transportation, Rail...Project Management & Technical Consultancy Services [Transportation, Rail...
Project Management & Technical Consultancy Services [Transportation, Rail...
 

Recently uploaded

Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Trucks in Minnesota
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 

Recently uploaded (20)

Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 

Data Riders Consultancy and Education presentation

  • 1. Specialized Consulting in Engineering and Management Company Presentation © 2024 Data Riders. All rights reserved.
  • 2. 2 Expert technical consulting services Our global team of consultants, mining experts, provide comprehensive solutions to optimize the management and strengthen the safety of critical geotechnical assets, in line with international best practices Establishment of governance, standards and adoption of global best practices (Management Systems) Participation as an active member in ITRB and GRB Independent Technical Review committees Analysis of adherence and auditing of global standards: Guides and Protocols (GISTM/ICMM and TSM/MAC) Development and review of normative documents, technical and management procedures Integrated project management using agile methodologies, PMBOK and FEL (Front End Loading) Hazard identification and risk assessment associated with critical geotechnical assets Engineering Services, Engineer of Records (EOR) and Technical peer-review Development and implementation of plans and strategies for the Multi-Year Mining Master Plan Evaluation of Alternatives and Multicriteria Analysis of TSFs (Tailings Storage Structures) Greenhouse Gas Management, through the development of inventories and equivalent carbon credit projects © 2024 Data Riders. All rights reserved.
  • 3. © 2024 Data Riders. Todos os direitos reservados Certifications 3 Certified Verifier Certified Assessor Certified Auditor
  • 4. Analysis of adherence to global standards (GISTM and TSM) Compliance with technical and ESG requirements; Plans and procedures; Corporate policy, governance and TMS; Roles, responsibilities, functional and organizational structure; Accountability, lines and effectiveness of communication, relationships with interface areas; Integration with site-wide systems and information management; Environmental compliance; Communication and community engagement Participation as an active member in ITRB and GRB Independent Technical Review committees Excavations, underground mine, waste dumps and produce deposits, piles, excavation evaluation, blasting. Provide Independent Technical Opinion of engineering practices, without bias in the design, construction, operation and maintenance of the tailings facility Engineering, EOR and Services of Technical peer-review Confirm that the structure is designed, constructed, operated, and maintained in accordance with design intent, safety standards, applicable regulations, and integrated mine planning; Define modifications, operational, maintenance and monitoring changes of the installation; Definition of objectives, indicators and performance criteria; EPRP Establishment of global best practice (TMS) governance, standards, and adoption Systematic management methods to identify, monitor and control risks on an ongoing basis; Definition of roles and responsibilities; Identification of gaps, review and creation of normative documents; Organizational, compliance, and resource change management Hazard Identification and Risk Assessments of Geotechnical Critical Assets Organization of multidisciplinary team and workshops; Identification of unwanted events (MUE); Failure mode analysis, FMEA risk analysis, and Bow- tie cause and consequence diagrams; Definition of preventive controls and mitigating barriers; Development of critical control sheets and TARPs; Evaluation and assurance of the effectiveness of critical controls Management macro processes Our Services Conception Design Construction Closure Operation Post-closure At all stages of the structure's life cycle: Our services linked to macro safety management processes Asset Integrity Assurance Inspection Monitoring Maintenance Security Risk Management Risk analysis Critical Controls Tarps Promotion of Safety/Culture Policy/Governance Our services support a wide range of effective risk management and security processes in the different lines of defense of organizations. 4 © 2024 Data Riders. All rights reserved.
  • 5. Application of international best practices for Risk Management Framework SMS (Safety Management Systems) 5 Safety Assurance Safety Risk Management System analysis (Design) Hazard Identification Risk Analysis Risk Controls System Monitoring Data Acquisition System Assessment Corrective Actions Indicators and Results Promoting Safety (Culture) Description & Context Specific information Analysis and Evaluation Action: Problem Solving Policy and Governance © 2024 Data Riders. All rights reserved.
  • 6. Steps and tools of Safety Risk Management processes Event Identification, Risk Analysis, Critical Controls and TARPs (Trigger Action Response Plans) 6 STEPS 1. Prior Preparation: • Formation of a multidisciplinary team. • Advance distribution of information and documentation related to the Workshop. 2. Workshop and Technical Inspection: • Identification and listing of Unwanted Events (MUEs). • Elaboration of the Bow-Tie Diagram: Identifying Causes and Consequences. • Execution of the FMEA Analysis followed by the Risk Analysis. • Complementing the Bow-Tie Diagram: Establishing Prevention Controls and Mitigation Barriers. 3. Development of Sheets for Critical Controls and TARPs: • Detailed elaboration, including objectives, location, performance requirements, triggers, and verification activities. 4. Planning for the Implementation of Critical Controls: • Definition of actions, responsibilities and timeline for implementation. 5. Assessment and Assurance: • Evaluation of the effectiveness of critical controls. • Continuous process of assurance and refinement based on periodic feedback and analysis. BOW-TIE ANALYSIS Consequences Causes Preventive Controls Mitigating Controls Unwanted Events Risk Assessment © 2024 Data Riders. All rights reserved.
  • 7. Standards, good practice guides, Normative and regulatory documents 7 Evaluation of alternatives and multicriteria analysis of Tailings Storage Facilities Established methodology, in accordance with global standards and international best practices Development Steps: Multicriteria Decision Analysis Baseline and Projections 1 Identification of Alternatives and Pre- selection 2 Characterization of Alternatives 3 Definition of Multicriteria and Indicators 4 Multi-Criteria Based Decision 5 Documentation and Validation 6 Pre-Screening Screening Pre-selection criteria Characterization Criteria Evaluation Criteria Measurement Criteria Weighting Criteria Sensitivity Criteria ICMM - International Council on Mining and Metals: • Tailings Management: Good Practice Guide • Global Industry Standard on Tailings Management: Conformance Protocols • Tailings Reduction Roadmap TSM - Towards Sustainable Mining: • Tailings Guide Implementation Checklist • A Guide to the Management of Tailings Facilities Mining and Processing Division, Environment Canada: • Guidelines for the Assessment of Alternatives for Mine Waste Disposal ANM Laws, Standards and Resolutions Strategic Criteria Evaluation of Alternatives and Multicriteria Analysis of Tailings Storage Facilities © 2024 Data Riders. All rights reserved.
  • 8. Implementation, participation and support in the processes and mechanisms of review of geotechnical structures and mining tailings dams 8 Independent Review Objective and impartial analysis of the various aspects related to the structures, including the characterization of the site, engineering models, and the intention of the project, assumptions and criteria adopted. This review is crucial to ensure that the project is executed in accordance with the necessary safety and efficacy standards. Operational Assessment Conducted to review the operating procedures in place, including the tailings transportation and disposal plan, water management, and risk assessment and management. Through these assessments, it is possible to identify potential failure modes and implement corrective measures to ensure the safe operation of the dam. TMS (Tailings Management System) Review The TMS review involves analyzing the corporate tailings management policy, functional and organizational structure, lines of communication, and the effectiveness of the response in case of emergencies. It is a crucial mechanism to ensure that tailings management is carried out effectively and safely. Audit An audit is a formal, systematic, and documented assessment of a tailings facility's compliance with explicit, agreed, and prescribed criteria. It includes the review of legal requirements, operator policies and commitments, applicable standards and performance expectations. Dam Safety Review This review aims to provide a statement on the safety of the facility, including the assessment of technical, operational, and governance aspects. The goal is to ensure that the dam meets the design intent and applicable safety criteria, without posing unacceptable risks. © 2024 Data Riders. All rights reserved.
  • 9. Integrated scope to support the compliance process with international best practices Framework DMAIC (Define, Measure, Analyze, Improve, Control) 9 DMAIC 1 2 3 4 5 Define Measure Analyze Improve Control • Formation of the work team and identification of stakeholders. • Establishment of the follow-up routine based on the 5Ps and creation of compliance control spreadsheets. • Conducting the Kick-off meeting with initial presentation of the scope. • Request and take receipt of documentation on governance and management model. • Request and receipt of documentation related to the site and structures. • Conduct technical visits for on-site evaluation. • Analysis of documentation to identify needs for additional interviews, surveys, and requests, followed by conducting these activities as needed. • Execution of the Gap Assessment focusing on Engineering, Processes and People, categorizing the findings as: Meets, Partially Meets or Does Not Meet. • Conducting a workshop to validate the Gap Analysis with the project team and key stakeholders, and reviewing and validating the final version of the Gap Analysis Report. • Root cause analysis of the gaps from the perspective of Engineering, Processes and People, followed by a benchmarking study of international best practices, and identification of countermeasures and objectives to remedy the identified gaps. • Conducting workshops to define and validate countermeasures, objectives, and required actions, including responsibilities and duration. Use GUT Analysis to prioritize actions and group interrelated actions into macro activities, culminating in the definition and validation of the Gap Closing Roadmap with leadership. • Preparation and presentation of the Gap Closure Plan, followed by its implementation, in addition to supporting change management through communications, training and continuous improvement initiatives. • Perform project management and control activities through the PMO (Project Management Office). • Keep the Gap Analysis Report updated as the project progresses. • Continuously update the Gap Closure Plan to reflect changes and progress made. © 2024 Data Riders. All rights reserved.
  • 10. The goal is for each facility to reach at least level A. Note: Topics 3. Crisis Management and Communication Planning and 4. Prevention of Child Labour and Forced Labour use a different method of binary assessment: YES and NO. TSM (Towards Sustainable Mining) Performance Rating System In numbers: 8 topics, 30 performance indicators, and 428 evaluation items 10 TSM Performance Indicators Ev. 1 Indigenous and Community Relations 91 1.1 Identification of the Community of Interest (COI) 11 1.2 Effective Engagement with the COI and Dialogue 24 1.3 Effective Engagement with Indigenous People and Dialogue 18 1.4 Benefits and Community Impact Management 27 1.5 COI Response Mechanism 11 2 Health & Safety 83 2.1 Commitment and Accountability 15 2.2 Planning and Implementation 19 2.3 Training, Behavior, and Culture 20 2.4 Reporting & Monitoring 17 2.5 Performance 12 3 Crisis Management and Communication Planning 39 3.1 Crisis management and communication agility 24 3.2 Revision 10 3.3 Training 5 4 Prevention of Child Labor and Forced Labor 5 4.1 Prevention of Forced Labor 3 4.2 Prevention of Child Labor 2 5 Management of Energy Use and Greenhouse Gas (GHG) Emissions 69 5.1 Energy use and greenhouse gas (GHG) emissions management systems 29 5.2 Reporting systems for energy use and greenhouse gas (GHG) emissions 24 5.3 Energy performance and greenhouse gas (GHG) emissions targets 16 6 Biodiversity Management and Conservation 38 6.1 Corporate commitment to biodiversity conservation, accountability and communication 7 6.2 Biodiversity conservation planning in installation and implementation 26 6.3 Biodiversity Conservation Reports 5 7 Tailings Management 47 7.1 Tailings Management Policy and Commitment 12 7.2 Tailings Management and Emergency Preparedness System 12 7.3 Accountability and Responsibility for Tailings Management 10 7.4 Annual Review of Tailings Management 8 7.5 Operation, Maintenance and Control Manual 5 8 Water Management 56 8.1 Water Governance 15 8.2 Operational Water Management 22 8.3 Watershed Scale Planning 11 8.4 Water Performance & Reporting 8 Level Criteria AAA Excellence and leadership. AA Systems and processes are integrated into management decisions and business functions. A Good practice. Systems and processes are developed and implemented. B Procedures exist, but they are not fully consistent or documented. Systems and processes are planned and being developed. C No system is in place. Activities tend to be reactive. Procedures may exist, but they are not integrated into policies and management systems. Communities and People Environment and Climate Change * Ev. It is the number of evaluation items required to rank each Performance Indicator. © 2024 Data Riders. All rights reserved.
  • 11. TSM Classification Process References, Steps, and Outputs of the TSM Performance Rating Process 11 Preparation and Kick-off Technical Visit Interviews Document Analysis Evaluation, Rating and Recommendation Verification & Reporting Validation and Endorsement ICMM Alignment Supplement Control and Continuous Improvement 1 2 3 4 5 6 7 8 9 Global standards, international best practice guides, and assessment protocols TSM - Towards Sustainable Mining: • TSM 101: A Primer • TSM: Responsible Sourcing Alignment Supplement • TSM Verification Guide IBRAM – Towards Sustainable Mining: 1.Protocol for the relationship with communities, Indigenous, quilombola and traditional peoples 2.Health & Safety Protocol 3.Protocol for Crisis Management Planning and Communications 4.Protocol for the Verification of the Prevention of Child Labor and Forced or Slave Labor 5.Climate Change Protocol 6.Biodiversity Conservation Management Protocol 7.Tailings Management Protocol 8.Sustainable Water Management Protocol TSM Performance Rating • 8 Topics • 30 Performance Indicators • 428 Ratings • Observations and Recommendations • Reference Documentation • Technical Support • ICMM Supplement • Ongoing technical support TSM Classification Steps © 2024 Data Riders. All rights reserved.
  • 12. 12 PEOPLE Culture Knowledge Resilience TECHNOLOGY Engineering Physical Resources Digital Resources Excellence in management through our integrated approach from the perspective of People, Processes and Technology Board of Directors (BoD) Responsible Executive (AEO) Operation Responsible Engineer (RTFE) Engineer of Records (EOR) Independent Technical Review (ITRB/GRB) Internal Stakeholders External Stakeholders The organizational structure for the management of tailings and geotechnical assets is outlined by key roles that perform important complementary functions Proper management of geotechnical assets is critical to ensuring the safety, efficiency, and continuity of operations in sectors such as mining. This management is underpinned by a robust organizational structure and effective lines of communication. PROCESSES Methodologies Standards Procedures © 2024 Data Riders. All rights reserved.
  • 13. The Multi-Year Master Plan is an essential strategic tool for the mining industry. It serves as a roadmap for the sustainable management of mineral resources, ensuring the continuity of operations and the maximization of economic, social, and environmental benefits. Long-Term Vision Establish clear goals and objectives for a multi-year horizon, allowing for better foresight and preparedness for future challenges. Resource Optimization Ensure the efficient use of mineral resources, reducing waste and increasing productivity. Sustainability Promote responsible mining practices, considering environmental and social impacts. Commitment Strengthen relationships with local communities, governments and other stakeholders through transparent and effective communication. Benefits of the development of the Multi-Year Mining Master Plan 13 © 2024 Data Riders. All rights reserved.
  • 14. Support to clients in the preparation and implementation of the components of the Multi-Year Mining Master Plan, using a framework structured in 4 stages of development. Strategic Business Planning Planning for the Exploration and Development of Mineral Resources Tailings and Dam Management Planning License Planning and Regulations Infrastructure and Equipment Planning Logistics and Supply Chain Planning Technology and Innovation Planning Sustainability Planning and Social Responsibility Communication Planning and Public Relations Human Resource Planning STEP 3 Integrated Logistics and Environmental Compliance STEP 2 Technology and Operational Infrastructure STEP 1 Strategic Vision and Mineral Exploration STEP 4 Sustainability and Human resources Finance and Budget Planning Risk Management Monitoring and Evaluation 14 © 2024 Data Riders. All rights reserved.
  • 15. © 2024 Data Riders. All rights reserved. 15 1. Planning Definition of the scope, identification of normative documents and technical procedures that need development / revision. Mobilization of the team composed of technical and management specialists. Preparation of the schedule and distribution of the necessary resources. 2. Collection and Organization of Documents Collection of all relevant documents and procedures. Organization and distribution in a logical and accessible way, for example, on a secure digital platform. 3. Preliminary Analysis Conducting a preliminary analysis to identify inconsistencies, outdatedness, or areas for improvement. Comparison of documents and procedures with global standards and with international and local legal and technical standards. 4. Stakeholder Consultations Conducting interviews and meetings with internal and external stakeholders to obtain comments and feedback on the documents and procedures. Request for suggestions and improvements, and identification of areas of risk or non-compliance. 5. Technical and Legal Review Analysis and review of documents and procedures in light of applicable legal and technical regulations. Identification of implementation and/or change needs to ensure compliance and operational efficiency. 10. Continuous Monitoring and Evaluation Establishing an ongoing monitoring and evaluation process to ensure that documents and procedures remain relevant and compliant. Collecting feedback and performance data to inform future reviews. 9. Implementation Communication of documents to all interested parties. Provision of training as needed to ensure understanding of and compliance with documents and procedures. 8. Final Approval Submission of proposals for final approval by company leadership and relevant committees. Documentation of all approvals and feedback received. 7. Internal Validation Conducting workshops and meetings to validate the proposals with the relevant teams. Review and adjustment of proposals based on feedback received. 6. Development and Proposed Changes Development of implementation and/or change proposals based on findings. Preparation of documents and technical support that justify the implementations and/or proposed changes. 15 Development and review of normative documents, technical and management procedures 10 steps in the development and review process
  • 16. Alignment of the business goal for the development of Greenhouse Gas (GHG) inventories and Carbon Credit projects 16 Goal Objective GHG Management Compliance with GHG regulations Access to market opportunities Investment and acquisition decision support Tracking and reducing GHG emissions Identification of emission hotspots and reduction opportunities Support in setting GHG reduction targets Measurement and reporting of GHG performance over time Development of performance benchmark GHG Stakeholder Reporting Meeting Information Needs Reporting to government and credit programs Leveraging corporate reputation and accountability © 2024 Data Riders. All rights reserved.
  • 17. Greenhouse Gas (GHG) accounting and inventory 17 Operations Accounting Project Accounting Real GHG reduction relative to the base year Year -1 Year 0 GHG Emission Year 1 Year 2 GHG Emission Expected GHG reduction relative to the base year Definition of Organizational Boundaries Definition of Operational Boundaries Emissions Tracking Identification of sources, sinks and reservoirs Selection of the calculation approach Data collection and application of calculation tools Development of the inventory report Detailed assistance to teams in the preparation of exhaustive inventories of Greenhouse Gas (GHG) Emissions, as well as in the planning and implementation of robust projects for the mitigation of these emissions, including the identification and execution of carbon reduction initiatives and the generation of corresponding carbon credits. © 2024 Data Riders. All rights reserved.
  • 18. Development of Carbon Credit projects 18 Identification of potential projects Elaboration of the PIN (Project Idea Note) Elaboration of the PDD (Project Design Document) Preparation of Prior Consideration Elaboration of the PD (Project Description) Validation by the Designated Operating Entity (EOD) Validation by the Validation and Verification Body (VVB) Approval by the National Designated Authority (NDA) Registration Independent Verification/Evaluation Certification Implementation and Monitoring Reductions Certified Emission (RCE) Reductions Verified Emission (RVE) Regulated Market Voluntary Market Conception Validation Implementation and Verification Certification © 2024 Data Riders. All rights reserved.
  • 19. 19 Flexible and iterative approach to project management. Promotes continuous collaboration, quick adjustments, and customer satisfaction using frameworks such as Scrum and Kanban. Standardized set of practices for project management. It focuses on defined processes, areas of knowledge and project phases, promoting predictability and control. Detailed planning and scoping in the early phases of complex projects. It emphasizes risk assessment and stakeholder engagement to prevent costly changes later on. Agile PMBok FEL (Front End Loading) Mining Project Management Services Implementation of established international methodologies and best practices © 2024 Data Riders. All rights reserved.
  • 20. 20 Our international consultants bring together years of accumulated expertise in areas such as Mining, Energy, Logistics and Technology, coming from different regions of the world. With global experience, we offer complementary expertise in:  Geotechnical engineering and tailings management  Governance structures and management systems  Change management and stakeholder engagement  Artificial intelligence and emerging technological innovations We actively contribute to global mining standards, with renowned publications in geotechnics, hydrogeology, governance, technology, and other initiatives. © 2024 Data Riders. All rights reserved.
  • 21. © 2024 Data Riders. All rights reserved. Presentation of the First Team Dedicated professionals with global experience and specialized expertise Johan du Toit With a 25-year international consulting career, Johan du Toit is a respected and recognized consultant. But his passion for science began much earlier, as a chemistry researcher in South Africa, where he earned a prestigious PhD. Since then, Johan has been dedicated to identifying opportunities to enhance operational excellence and build organizational resilience across multiple continents. In recent years, he has taken a deep dive into tailings management, leading a significant task force for a mining giant. His commitment to the industry was recently recognized when he was invited to be a member of CQM (Madeira Chemistry Centre) to advise Portugal's leading chemistry research centre on career management for its team of more than 20 PhD students. johan.dutoit@datariders.com.br Luís Cervantes Dr. Luis Cervantes is an outstanding geotechnical engineer with specializations in soil mechanics, rock mechanics, and hydrogeology. Over the course of his two- decade career, he has contributed significantly to the industry in both South America and Australia. His articles, published in world-renowned conferences and journals, reflect his deep understanding and passion for the field. Luís is recognized for his expertise in open-pit mining, tailings dams and geotechnics. In addition, he has played a vital role in the planning, development and evaluation of Tailings Management Systems, always ensuring compliance with global standards and promoting innovations in the sector. luis.cervantes@datariders.com.br Fernando Damasio Fernando Damasio is a multifaceted professional with two decades of experience spanning sectors such as technology, mining, steel and logistics. His global journey has seen him work across four continents, solidifying his reputation as an expert in automation, sensing, and process control. In addition to leading the forefront in the development of technologies for autonomous vehicles, Fernando has also played a crucial role in the deployment of tailings management systems and dams. With a degree in Control and Automation Engineering, he not only applied his knowledge in the field but also shared his expertise as a professor in graduate programs. His ongoing dedication to education and innovation is evident in her regular participation in continuing education programs at reputable institutions. fernando.damasio@datariders.com.br 21
  • 22. Business name: Data Riders Educação e Consultoria LTDA Business number: 29.742.713/0001-02 Address: Av. Jose Maria Alkimin 864 Belo Horizonte, MG / Brazil 30320-210 Thank you. fernando.damasio@datariders.com.br Specialized Consulting in Engineering and Management 22 © 2024 Data Riders. All rights reserved.