[1]
Theodora Kyparissi, MSc
11 Elefsinos st, Larissa
412 21 Greece
Email: acquam2@otenet.gr
Tel +30 2410234486
Fax: +30 2410234486
Mob.: +30 694481285
PROFILE
Electrical Engineer and MSc on Environmental Design of
Buildings and Towns engineer, specializing in:
 Management, design, construction and maintenance of
swimming pools projects
 Design, installation and maintenance of Water treatment
systems
 Design and construction of waste water treatment systems
 Design and construction of electromechanical nets of
buildings such as:
Hydraulic sewerage,
Electrical,
Fire protection and
Gas nets
Elevators
 Energy Audits
 Energy Studies of Energy Performance of Buildings according
to the “Energy Performance of Buildings Hellenic
Regulations, 2010” (K.EN.A.K)
Educational experience at the above described technologies
lecturing and developing the curriculum of seminars
EDUCATION
October 2006 MSc Environmental Design of Towns and Buildings
Hellenic Open University, 3 years training course
(MSc Thesis “Environmental design of student halls, case study:
Student Halls of Technological Educational Institute of Larissa”,
Grade 9/10).
November 1991 MSc Electrical and Computer Engineering specializing on
electronics
National Technical University of Athens (NTU), Department of
Electrical and Computer Engineering, 5 year training course
(MSc Thesis “Signal modulation at two carrier”, Grade 10/10)
[2]
July 1985 BSC Electrical Engineer.
Technological Educational Institute of Athens, Grade 5.9/10
PUBLICATIONS
1. “MEASURES TO IMPROVE THE COOLING ENERGY PERFORMANCE OF
STUDENT HALLS IN GREECE”, (Th. Kyparissi, A. Dimoudi September 2007, 2nd
International conference PALENC with judges)
2. “COOLING ENERGY SAVINGS POTENTIAL IN STUDENT HALLS”, (Kyparissi Th,
Dimoudi A, March 2008, “The International Journal of Ventilation”, International
Journal with judges)
COMPUTER SKILLS
Design in AUTOCAD 10, good knowledge of Microsoft office, knowledge of
software for Energy Audits developed by Technical Champer of Greece (TEE)
according to the “Energy Performance of Buildings Hellenic Regulations, 2010”
(K.EN.A.K) and software developed of 4-M for Studies of Energy Performance
of Buildings according to K.EN.A.K.
LANGUAGES
 Mother tongue: Greek
 Other languages: English Advanced
EMPLOYMENT HISTORY
1984-1989: Electrical Engineer (Contract)
Technical office owed by Mr Eustathios Melas (Electrical-Mechanical
Engineer), Athens, Greece
Responsibilities:
 Editing Electrical and Mechanical private projects of buildings such
as fire protection, hydraulic, sewerage and electrical networks.
1989-1991: Electrical Engineer (Permanent)
“ERGON S.A”, Athens, Greece
Responsibilities:
 Design of the electrical-electronic circuits of the panelboards and
switchboards of machines that treat iron wire (lining up, shaping
etc)
1992 -1993: Electrical Engineer (Permanent)
“A. KARKANIAS Ltd”, Larissa, Greece.
Responsibilities:
[3]
 Design and Construction of Waste Water Treatment projects
(private and public works)
1994 till now: Electrical Engineer (Permanent)
Freelancer, Larissa, Greece.
Responsibilities:
Management, design, supervision and construction of:
• Private electromechanical projects
• Fire protection and hydraulic networks of buildings
Management, design, construction and maintenance:
 of Swimming pools
Trade of:
• Equipments, spare parts and chemicals for swimming pools
• Fountains
• Water treatment systems (chlorination systems).
November 1995: Electrical Engineer (Permanent)
Freelancer, Larissa, Greece
.
Registered in the registry M.E.E.P at the sector “Eletcro-Mechanical,
classification 1st
”
Some of the projects that were managed by me:
• Lighting system of the main square at community of Agia
• Lighting system of Ioustinianou road (Larissa)
• Lighting system of a road without name at Pyrovolika region
(Larissa)
• Lighting system of Papaioannou road (Larissa)
• Lighting system of the coast Messaggala-Kastri-Lutro (community
of Kato Olympou)
• Lighting system of Paleologou Road
• Electro-mechanical systems of the Community Building
(Community of AssorosElassona)
• Electro-mechanical and air-conditioning systems of the Banquet hall
of Cemetery of Larissa (Larissa)
2011till now: Energy Auditor of Buildings (Permanent)
Freelancer, Larissa, Greece
• Energy Audits
• Energy Studies of Energy Performance of Buildings
According to the “Energy Performance of Buildings Hellenic
Regulations, 2010” (K.EN.A.K)
October 2014 - June 2015: KASTOR SA (Contract)
Construction Company, Larissa, Greece
[4]
Contract for work: “University of Thessaly, laboratories of Health
Sciences School, Faculty of Biotechnology: Construction of wing III”
Responsibilities:
 Management of the project
 Preparation of quantities and measurements for bill payments
October 2014 - June 2015: AKTOR Facility Managment (Contract)
Facilities Management Company, Athens, Greece
Contract for work: “Construction of Infrastructure for Highway
Management System - MMS Infrastructure works”
Responsibilities:
 Management of the project
 Supervisor of the works
 Time schedules of the works
 Measurements for bill payments
TEACHING EXPERIENCE
1996 Visiting Lecturer (contract)
Private Vocational Training Institutes (KEK)
a) I.A.T.A.P, Larissa
Course “APPLICATIONS IN ELECTRICAL INSTALLATIONS
IN DRAFTING AND DESIGN”. Duration of lecture 48 hours to
Larissa and 48 hours to Trikala.
Issues:
• Electrical net studies
• Studies and sewage treatment of pools
• Air conditioning nets
b) Manpower Employment Organization (OAED), Larissa
Education program for professional hydraulics on “HYDRAULIC
NETS, AIR CONDITIONING/HEATING, FIRE NETS”.
Duration of lecture 87 hours, Larissa.
Issues:
• Hydraulic nets
• Heating
• Air conditioning
• Fire protection nets
1999 Visiting Lecturer (contract)
Private Vocational Training Institutes AGRICULTURAL
DEVELOPMENT.
Course: “AUTOMATION SYSTEMS IN INDUSTRY”. Duration of
lecture 131 hours, Larissa.
[5]
Issues:
• Industrial automation - new technology
• Industrial automation - conventional technology
• Methods and techniques of search and job placement
• Complete automation in the organization of production
• Automation systems in industrial plants
2000 Visiting Lecturer (contract)
Private Vocational Training Institutes
a) AKTOR
Course: “MACHINE OPERATORS” with practice at the site of
the company J / CARS in Koutsochera Larissa project (NATO).
b) AGRICULTURAL DEVELOPMENT, Larissa
Course: “TECHNICIANS OF ELECTRICAL
INSTALLATIONS”
Duration of lecture 78 hours.
Issues:
• Low Voltage Installations
• Introduction to industrial applications
• Introduction to electricity
• Electrical studies - Facilities
• Regulations of indoor installations
• Domestic installations
• Studies of motion nets
c) “AGRICULTURAL DEVELOPMENT”, Larissa.
Course: “Thermo- hydraulic” Duration of lecture 24 hours.
Issues:
• Coupling components
• Piping
• Calculations of heating systems
2001 -2013 Visiting Lecturer (Contract)
Technological Educational Institute (TEI), Department of
Electrical Engineer, Larissa (TEI)
Course: Laboratories of “Automatic Control Systems” ,
Laboratories of “PLC systems”
“Technology-Society-Enviromental”.
Environmental assessment of industrial facilities and
buildings
2007 Visiting Lecturer (contract)
Private Vocational Training Institute DIMITRA, Larissa.
Course: “Electrical Installations – Prisoners” in collaboration with the
Prison of Larissa for the inmates of the Correctional Institution
[6]
Duration of lecture 85 hours.
Issues:
 AC/ introduction
 Electrical circuit analysis
 Shunt transformers
 Safety and health
 Capacity / self-induction
2011 Visiting Lecturer (Contract)
Private Vocational Training Institute G.E.S.E.V.E.
Course: “PV and RES” for professionals in Trikala (2 cycles) and
Volos (1 cycle)
Duration of lecture 75 hours.
Issues:
• RES/ basic principles
• Categories of energy production systems
• PV genarators
• Self standing energy production system
CERTIFICATIONS AND RELATED ACTIVITIES
- Member of TEE (Technical Chamber of Greece) Register No. 61978 – 14th of
March 1992.
- Energy auditor.
MARITAL STATUS
Married without children
Hobby
Theatre, cinema, travel, reading books and walking to the nature.

cv_kyparissi

  • 1.
    [1] Theodora Kyparissi, MSc 11Elefsinos st, Larissa 412 21 Greece Email: acquam2@otenet.gr Tel +30 2410234486 Fax: +30 2410234486 Mob.: +30 694481285 PROFILE Electrical Engineer and MSc on Environmental Design of Buildings and Towns engineer, specializing in:  Management, design, construction and maintenance of swimming pools projects  Design, installation and maintenance of Water treatment systems  Design and construction of waste water treatment systems  Design and construction of electromechanical nets of buildings such as: Hydraulic sewerage, Electrical, Fire protection and Gas nets Elevators  Energy Audits  Energy Studies of Energy Performance of Buildings according to the “Energy Performance of Buildings Hellenic Regulations, 2010” (K.EN.A.K) Educational experience at the above described technologies lecturing and developing the curriculum of seminars EDUCATION October 2006 MSc Environmental Design of Towns and Buildings Hellenic Open University, 3 years training course (MSc Thesis “Environmental design of student halls, case study: Student Halls of Technological Educational Institute of Larissa”, Grade 9/10). November 1991 MSc Electrical and Computer Engineering specializing on electronics National Technical University of Athens (NTU), Department of Electrical and Computer Engineering, 5 year training course (MSc Thesis “Signal modulation at two carrier”, Grade 10/10)
  • 2.
    [2] July 1985 BSCElectrical Engineer. Technological Educational Institute of Athens, Grade 5.9/10 PUBLICATIONS 1. “MEASURES TO IMPROVE THE COOLING ENERGY PERFORMANCE OF STUDENT HALLS IN GREECE”, (Th. Kyparissi, A. Dimoudi September 2007, 2nd International conference PALENC with judges) 2. “COOLING ENERGY SAVINGS POTENTIAL IN STUDENT HALLS”, (Kyparissi Th, Dimoudi A, March 2008, “The International Journal of Ventilation”, International Journal with judges) COMPUTER SKILLS Design in AUTOCAD 10, good knowledge of Microsoft office, knowledge of software for Energy Audits developed by Technical Champer of Greece (TEE) according to the “Energy Performance of Buildings Hellenic Regulations, 2010” (K.EN.A.K) and software developed of 4-M for Studies of Energy Performance of Buildings according to K.EN.A.K. LANGUAGES  Mother tongue: Greek  Other languages: English Advanced EMPLOYMENT HISTORY 1984-1989: Electrical Engineer (Contract) Technical office owed by Mr Eustathios Melas (Electrical-Mechanical Engineer), Athens, Greece Responsibilities:  Editing Electrical and Mechanical private projects of buildings such as fire protection, hydraulic, sewerage and electrical networks. 1989-1991: Electrical Engineer (Permanent) “ERGON S.A”, Athens, Greece Responsibilities:  Design of the electrical-electronic circuits of the panelboards and switchboards of machines that treat iron wire (lining up, shaping etc) 1992 -1993: Electrical Engineer (Permanent) “A. KARKANIAS Ltd”, Larissa, Greece. Responsibilities:
  • 3.
    [3]  Design andConstruction of Waste Water Treatment projects (private and public works) 1994 till now: Electrical Engineer (Permanent) Freelancer, Larissa, Greece. Responsibilities: Management, design, supervision and construction of: • Private electromechanical projects • Fire protection and hydraulic networks of buildings Management, design, construction and maintenance:  of Swimming pools Trade of: • Equipments, spare parts and chemicals for swimming pools • Fountains • Water treatment systems (chlorination systems). November 1995: Electrical Engineer (Permanent) Freelancer, Larissa, Greece . Registered in the registry M.E.E.P at the sector “Eletcro-Mechanical, classification 1st ” Some of the projects that were managed by me: • Lighting system of the main square at community of Agia • Lighting system of Ioustinianou road (Larissa) • Lighting system of a road without name at Pyrovolika region (Larissa) • Lighting system of Papaioannou road (Larissa) • Lighting system of the coast Messaggala-Kastri-Lutro (community of Kato Olympou) • Lighting system of Paleologou Road • Electro-mechanical systems of the Community Building (Community of AssorosElassona) • Electro-mechanical and air-conditioning systems of the Banquet hall of Cemetery of Larissa (Larissa) 2011till now: Energy Auditor of Buildings (Permanent) Freelancer, Larissa, Greece • Energy Audits • Energy Studies of Energy Performance of Buildings According to the “Energy Performance of Buildings Hellenic Regulations, 2010” (K.EN.A.K) October 2014 - June 2015: KASTOR SA (Contract) Construction Company, Larissa, Greece
  • 4.
    [4] Contract for work:“University of Thessaly, laboratories of Health Sciences School, Faculty of Biotechnology: Construction of wing III” Responsibilities:  Management of the project  Preparation of quantities and measurements for bill payments October 2014 - June 2015: AKTOR Facility Managment (Contract) Facilities Management Company, Athens, Greece Contract for work: “Construction of Infrastructure for Highway Management System - MMS Infrastructure works” Responsibilities:  Management of the project  Supervisor of the works  Time schedules of the works  Measurements for bill payments TEACHING EXPERIENCE 1996 Visiting Lecturer (contract) Private Vocational Training Institutes (KEK) a) I.A.T.A.P, Larissa Course “APPLICATIONS IN ELECTRICAL INSTALLATIONS IN DRAFTING AND DESIGN”. Duration of lecture 48 hours to Larissa and 48 hours to Trikala. Issues: • Electrical net studies • Studies and sewage treatment of pools • Air conditioning nets b) Manpower Employment Organization (OAED), Larissa Education program for professional hydraulics on “HYDRAULIC NETS, AIR CONDITIONING/HEATING, FIRE NETS”. Duration of lecture 87 hours, Larissa. Issues: • Hydraulic nets • Heating • Air conditioning • Fire protection nets 1999 Visiting Lecturer (contract) Private Vocational Training Institutes AGRICULTURAL DEVELOPMENT. Course: “AUTOMATION SYSTEMS IN INDUSTRY”. Duration of lecture 131 hours, Larissa.
  • 5.
    [5] Issues: • Industrial automation- new technology • Industrial automation - conventional technology • Methods and techniques of search and job placement • Complete automation in the organization of production • Automation systems in industrial plants 2000 Visiting Lecturer (contract) Private Vocational Training Institutes a) AKTOR Course: “MACHINE OPERATORS” with practice at the site of the company J / CARS in Koutsochera Larissa project (NATO). b) AGRICULTURAL DEVELOPMENT, Larissa Course: “TECHNICIANS OF ELECTRICAL INSTALLATIONS” Duration of lecture 78 hours. Issues: • Low Voltage Installations • Introduction to industrial applications • Introduction to electricity • Electrical studies - Facilities • Regulations of indoor installations • Domestic installations • Studies of motion nets c) “AGRICULTURAL DEVELOPMENT”, Larissa. Course: “Thermo- hydraulic” Duration of lecture 24 hours. Issues: • Coupling components • Piping • Calculations of heating systems 2001 -2013 Visiting Lecturer (Contract) Technological Educational Institute (TEI), Department of Electrical Engineer, Larissa (TEI) Course: Laboratories of “Automatic Control Systems” , Laboratories of “PLC systems” “Technology-Society-Enviromental”. Environmental assessment of industrial facilities and buildings 2007 Visiting Lecturer (contract) Private Vocational Training Institute DIMITRA, Larissa. Course: “Electrical Installations – Prisoners” in collaboration with the Prison of Larissa for the inmates of the Correctional Institution
  • 6.
    [6] Duration of lecture85 hours. Issues:  AC/ introduction  Electrical circuit analysis  Shunt transformers  Safety and health  Capacity / self-induction 2011 Visiting Lecturer (Contract) Private Vocational Training Institute G.E.S.E.V.E. Course: “PV and RES” for professionals in Trikala (2 cycles) and Volos (1 cycle) Duration of lecture 75 hours. Issues: • RES/ basic principles • Categories of energy production systems • PV genarators • Self standing energy production system CERTIFICATIONS AND RELATED ACTIVITIES - Member of TEE (Technical Chamber of Greece) Register No. 61978 – 14th of March 1992. - Energy auditor. MARITAL STATUS Married without children Hobby Theatre, cinema, travel, reading books and walking to the nature.