1. Mechanical Engineering
Power department 2009
Mohamed Hamdy Mohamed
Current Address: EL-Warak District, Giza, Egypt
Email: Mohamed.hamdy06@gmail.com Cell: (002) 012 2666 196
Personal Identity:
-Name: Mohamed Hmady Mohamed Abd El-rahem
- Place / Date of Birth: Egypt / November 10, 1983
- Nationality: Egyptian
- Gender: Male
- Religion: Muslim
- Military service: Exempted
- Marital status: Married
-------------------------------------------------------------------------------------------------------------------------------------
Academic information:
- University: Benha University
- Faculty: Benha University Engineering
- Scientific Degree: B.Sc in Mechanical Power
- Grade: Good degree 71.19 %
- Graduation Year: June 2009
- Graduation Project: Effect of Biofuel on Internal Combustion Engine Performance
and Pollution system
- Project Grade: Excellent.
-------------------------------------------------------------------------------------------------------------------------------------
Career Objective:
Full time work in a dynamic organization that would provide me with an opportunity to improve my
Skills in Mechanical field
-------------------------------------------------------------------------------------------------------------------------------------
Employment History:
Previous: 1- Budepro s.a.r.l (Lebanon) for (Water treatment) Position / Mechanical Engineer
2- Veolia Water Technologies (OTV) (Lebanon) Position / Mechanical Engineer
Current: Motwaset s.a.e (Egypt) Modern Techniques for Water & Sewage Treatment
Position / senior Mechanical Engineer
2. Job tasks:
* Pricing the Mechanical parts of the new projects
* Design and Shop Drawings mechanical for project
* Preparation Material Approval Submittal and data sheet for project
* Execution for all Mechanical and Electrical Works
WORK EXPERIENCE
Egypt Projects:
1- Sewage Treatment Station (El-fayrouz Village) at North Coast 4000 m³/d
2- Sewage Treatment Station (Mena4 Village) at North Coast 2000 m³/d
3- Sewage Treatment Station (Green Village) at North Coast 4500 m³/d
4-Swimming pool (Green Village) at North Coast
5-Swimming pool (El-fayrouz Village) at North Coast
6-Lifting water pumping stations (factory 81 Military) 14,000 m³/d
7-Station drinking water of (Factory 200 Military) 20,000 m³/d
8- Extension of Station drinking water of (Factory 200 Military) 20,000 m³/d
My tasks in projects
-The Participant in the design and Preparation Material Approval Submittal and data sheet for project
-The Participant in Preparation Shop Drawings
-Execution for all Mechanical and Electrical Works
-Supervisor on Operation and maintenance
-------------------------------------------------------------------------------------------------------------------------------------
Lebanon Projects:
1-Well Pumping Stations at North Lebanon (Bcharre Region) 1500 m³/d
2-Booster Pumping Stations at North Lebanon (Elkrayeb Region) 1500 m³/d
3-Break tank and Valve chamber at North Lebanon (Eldayrona Region) 1000 m³
4-Waste water treatment plant at South Lebanon (El Nabatieh Region yohmor) 3500 m³/d
5-Waste water treatment plant at South Lebanon (El Nabatieh Region Zaoutar) 3500 m³/d
6-Waste water treatment plant at South Lebanon (El Nabatieh Region kfar sir) 6000 m³/d
7- Two swimming pool in North Lebanon 500 m³, 700 m³
8- Six lifting Waste water pump stations at North Lebanon (El Batroun Region) in-between
1000 : 4000 m³/d
9-Well Pumping Stations at North Lebanon (Chekka Region) 4300 m³/d
10-Well Pumping Stations at North Lebanon (Enfe Region) 3800 m³/d
11-Booster Pumping Stations and Break tank at North Lebanon (Chekka Region) 5400 m³/d
12-Tibnine Wastewater Treatment Plant at South Lebanon (Tibnine Region) 4000 m³/d
My tasks in projects
-The Participant in the design and Preparation Material Approval Submittal and data sheet for project
-The Participant in Preparation Shop Drawings
-Execution for all Mechanical and Electrical Works
-Supervisor on Operation and maintenance
-------------------------------------------------------------------------------------------------------------------------------------
Uganda Projects:
1- AN INDUSTRIAL WASTE WATER TREATMENT PLANT (Factory Riham Cola) 16,000 m³/d
My tasks in projects
-The Participant in the design and Preparation Material Approval Submittal and data sheet for project
-Execution for all Mechanical and Electrical Works
-Supervisor on Operation and maintenance
3. SKILLS:
Language:
-Arabic: Mother tongue
-English: Good
Computer Skills:
-Engineering Software:
-AutoCAD 2D&3D
-Solid work …. Beginner
-Microsoft Office 2014
Machines:
-Mill, Lathes, Drill Press, Band Saw
-------------------------------------------------------------------------------------------------------------------------------------
Main Educational Courses
-Theory of machines
-System Dynamics and Modeling
-Machine element design
-Mechanical Design
-AutoCAD software
-Engineering Drawing
-Turbo Machine
-Automatic Process Control.
-Heat and Mass Transfer
-Gas dynamic
-Internal Combustion the Engine
All references are available upon request