SlideShare a Scribd company logo
1 of 3
K. Yashwanth kumar
Plot No. 17, LepakshiColony
West Marredpally, Mobile : 9441011498
Secunderabad– 500 026. Mail ID: kannekanti.yashu@gmail.com
CAREER OBJECTIVE
To work hard & sincerely for an organization which provides ample
opportunityto grow and trust me with responsibilities and put all efforts to learn
as well as to contribute to the organization in order to enhance technical,
conceptual & interpersonal skills.
EDUCATIONAL QUALIFICATION
Examination
Year of
passing
Institution Board/University Percentage
M.Tech
(Power
Electronics )
2014
Nishitha college
of Engineering
& Technology
JNTU Hyderabad 71%
B.Tech
(Eletrical And
Electronics
Engineering)
2012
Patnam
Rajendar Reddy
Memorial
Engineering
College.
Shabad
JNTU Hyderabad 63.4%
Higher
Secondary
2008
A.S.M
Junior
College
A. P.
Intermediate
Board
69%
Secondary
school
2006
MIRYLAGUDA
High School
A.P. Secondary
School Board
66%
POST-GRADUATION PROJECT WORK
Research project in Masters under the esteemed guidance of Academic Guide:
MD. ZAHEERUDDIN AHMED Professor, JNTUH University, Hyderabad.
Project Title: “Analysis and Improved Operation of a PEBB-Based
Voltage Source Converter for FACTS Applications.”
Description of Project
The demand of power-electronic devices is increasing in several
applications, and power-electronic building blocks (PEBBs) are a strategic
concept to increase the reliability of the power-electronic converters and to
minimize their cost. A possible solution to increase the power rate of these
converters is the use of series or parallel connected PEBBs in multipulse
configurations. Magnetic elements, such as zig-zag transformers, phase-shifted
transformers (pst), or zero-sequence blocking transformers (ZSBT), are used to
interconnect the PEBBs. In this paper, the operation of multipulse converters
will be analyzed, describing the harmonic cancellation and minimization
techniques that could be used in these multipulse converters, focusing on the
power-electronics flexible ac transmission systems devices installed at the
NYPA Marcy substation. In order to improve the dynamic response of this
system, the use of selective harmonic elimination modulation is proposed and
implemented.
GRADUATION PROJECT WORKS
 Minor project : Switch gear and protection in 33/11 sub-station
 Major project : Missile Detection by Ultrasonic Sensor Means and
Activate the Destroyer
EXPERIENCE
 Areas of work experience:
- I have experience on maintenance of 33/11 KV substation.
- I have experience on MATLAB and simulation projects.
SOFTWARE SKILLS
 MS Office
 Auto-Cad
PERSONAL INFORMATION
Gender : Male
Date of Birth : 2nd August , 1990.
Father's Name : K. Muralidhar
Languages : English, Telugu and Hindi
known
Permanent Address : H. No. 1-172,yadagarpalli,
Miryalaguda (M) Nalgonda (D)
Telangana 508207.
DECLARATION
I hereby declare that the above furnished information is correct to the
best of my knowledge. I also bear full responsibility for the above furnished
particulars.
Date:
Place:
K. Yashwanth kumar

More Related Content

What's hot (20)

Abhijit resume (1)
Abhijit resume (1)Abhijit resume (1)
Abhijit resume (1)
 
Afreen Akhtarresume2
Afreen Akhtarresume2Afreen Akhtarresume2
Afreen Akhtarresume2
 
resume of joy
resume of joyresume of joy
resume of joy
 
SARITA PALresume
SARITA PALresumeSARITA PALresume
SARITA PALresume
 
Resume12
Resume12Resume12
Resume12
 
Network Analysis and Synthesis - PHI Leaning
Network Analysis and Synthesis - PHI LeaningNetwork Analysis and Synthesis - PHI Leaning
Network Analysis and Synthesis - PHI Leaning
 
Mahender resume
Mahender resumeMahender resume
Mahender resume
 
cb thakur cv
cb thakur cvcb thakur cv
cb thakur cv
 
Savita resume
Savita resumeSavita resume
Savita resume
 
kannaaa modified
kannaaa modifiedkannaaa modified
kannaaa modified
 
CRTS doc
CRTS docCRTS doc
CRTS doc
 
Electrical and Electronics Engineer
Electrical and Electronics EngineerElectrical and Electronics Engineer
Electrical and Electronics Engineer
 
Bassey John CV
Bassey John CVBassey John CV
Bassey John CV
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
mynewrsumerg
mynewrsumergmynewrsumerg
mynewrsumerg
 
roopa.. resume (1)
roopa.. resume (1)roopa.. resume (1)
roopa.. resume (1)
 
Brv vardhan 2013
Brv vardhan 2013Brv vardhan 2013
Brv vardhan 2013
 
Lakshmi Resume
Lakshmi ResumeLakshmi Resume
Lakshmi Resume
 
Resume abdullah
Resume abdullahResume abdullah
Resume abdullah
 
pallavi EIE
pallavi EIEpallavi EIE
pallavi EIE
 

Viewers also liked

Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cvsaryhasabadly
 

Viewers also liked (9)

Cv electrical
Cv electricalCv electrical
Cv electrical
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
 

Similar to Curriculum Vitae (20)

resume
resumeresume
resume
 
MANISH MISHRA M.Tech(Energy system)
MANISH MISHRA M.Tech(Energy system)MANISH MISHRA M.Tech(Energy system)
MANISH MISHRA M.Tech(Energy system)
 
Danthi Resume
Danthi ResumeDanthi Resume
Danthi Resume
 
LAKSHM NARASIMHA 2 CV
LAKSHM NARASIMHA 2 CVLAKSHM NARASIMHA 2 CV
LAKSHM NARASIMHA 2 CV
 
Web developer
Web developerWeb developer
Web developer
 
cms resume
cms resumecms resume
cms resume
 
Madhu. (1)
Madhu. (1)Madhu. (1)
Madhu. (1)
 
Sreeanth Reddy N.L. Resume
Sreeanth Reddy N.L. ResumeSreeanth Reddy N.L. Resume
Sreeanth Reddy N.L. Resume
 
Resume
ResumeResume
Resume
 
Cv abhijit kale
Cv abhijit kale Cv abhijit kale
Cv abhijit kale
 
editing
editingediting
editing
 
Mukesh resume
Mukesh resumeMukesh resume
Mukesh resume
 
ravi resume latest 123
ravi resume latest 123ravi resume latest 123
ravi resume latest 123
 
Pavan Resume
Pavan ResumePavan Resume
Pavan Resume
 
Resume (me)
Resume (me)Resume (me)
Resume (me)
 
EkanathSairamYenduri_Resume
EkanathSairamYenduri_ResumeEkanathSairamYenduri_Resume
EkanathSairamYenduri_Resume
 
Mahesh_BE
Mahesh_BEMahesh_BE
Mahesh_BE
 
cv most preffered - Copy
cv most preffered - Copycv most preffered - Copy
cv most preffered - Copy
 
Resume
ResumeResume
Resume
 
Resume (Alok Ranjan)
Resume (Alok Ranjan)Resume (Alok Ranjan)
Resume (Alok Ranjan)
 

Curriculum Vitae

  • 1. K. Yashwanth kumar Plot No. 17, LepakshiColony West Marredpally, Mobile : 9441011498 Secunderabad– 500 026. Mail ID: kannekanti.yashu@gmail.com CAREER OBJECTIVE To work hard & sincerely for an organization which provides ample opportunityto grow and trust me with responsibilities and put all efforts to learn as well as to contribute to the organization in order to enhance technical, conceptual & interpersonal skills. EDUCATIONAL QUALIFICATION Examination Year of passing Institution Board/University Percentage M.Tech (Power Electronics ) 2014 Nishitha college of Engineering & Technology JNTU Hyderabad 71% B.Tech (Eletrical And Electronics Engineering) 2012 Patnam Rajendar Reddy Memorial Engineering College. Shabad JNTU Hyderabad 63.4% Higher Secondary 2008 A.S.M Junior College A. P. Intermediate Board 69% Secondary school 2006 MIRYLAGUDA High School A.P. Secondary School Board 66%
  • 2. POST-GRADUATION PROJECT WORK Research project in Masters under the esteemed guidance of Academic Guide: MD. ZAHEERUDDIN AHMED Professor, JNTUH University, Hyderabad. Project Title: “Analysis and Improved Operation of a PEBB-Based Voltage Source Converter for FACTS Applications.” Description of Project The demand of power-electronic devices is increasing in several applications, and power-electronic building blocks (PEBBs) are a strategic concept to increase the reliability of the power-electronic converters and to minimize their cost. A possible solution to increase the power rate of these converters is the use of series or parallel connected PEBBs in multipulse configurations. Magnetic elements, such as zig-zag transformers, phase-shifted transformers (pst), or zero-sequence blocking transformers (ZSBT), are used to interconnect the PEBBs. In this paper, the operation of multipulse converters will be analyzed, describing the harmonic cancellation and minimization techniques that could be used in these multipulse converters, focusing on the power-electronics flexible ac transmission systems devices installed at the NYPA Marcy substation. In order to improve the dynamic response of this system, the use of selective harmonic elimination modulation is proposed and implemented. GRADUATION PROJECT WORKS  Minor project : Switch gear and protection in 33/11 sub-station  Major project : Missile Detection by Ultrasonic Sensor Means and Activate the Destroyer
  • 3. EXPERIENCE  Areas of work experience: - I have experience on maintenance of 33/11 KV substation. - I have experience on MATLAB and simulation projects. SOFTWARE SKILLS  MS Office  Auto-Cad PERSONAL INFORMATION Gender : Male Date of Birth : 2nd August , 1990. Father's Name : K. Muralidhar Languages : English, Telugu and Hindi known Permanent Address : H. No. 1-172,yadagarpalli, Miryalaguda (M) Nalgonda (D) Telangana 508207. DECLARATION I hereby declare that the above furnished information is correct to the best of my knowledge. I also bear full responsibility for the above furnished particulars. Date: Place: K. Yashwanth kumar