eCurriculum Vita
Ahmed Youssef Abo Shama
Contacts:
Add ____ [20 Sidi Bishr St., SiDi Bishr, Alexandria]
Tel ____ [+2 03 5499836]
Mob ____ [+2 01144019839]
Email ____ [ahmedyousif28@yahoo.com]
Experience
-Dar Alhandsa for construction -
Working as a Civil Site Engineer in Construction phases of a residential
building: (Oct. 2012 – may.2013)
-civil marry for construction
Working as a Civil Site Engineer in Construction phases of a residential
building: (Jul. 2013 – Oct.2014)
Trainings
Al Futtaim–Carillion "AFC" {Cairo Festival City project}
.. Infra-Structure Phase (Summer of 2011)
-Al Abbdin for Construction & building (summer of 2009- 2010)
1) Civil Engineering Involvements:
a) Main Infra-Structure and its future connections
 Sewer Network (Glass Reinforced Plastic “GRP” pipes up to 600mm dia & Concrete Manholes up to 1500mm
dia gravity network including the gullies)
 Force Main (High Density Poly Ethylene “HDPE” pipe sewer pressured line)
 Irrigation Network ( “HDPE” pipes pressured network)
 Potable Water Supply Network ( “HDPE” pipes pressured network)
 District cooling (Chilled Water) Network (Pre-Insulated pipes pressured network)
 Medium Voltage Network (Armored Aluminum XLPE Cables)
b) Earthworks (Bulk Cut and Fill, Soil & Sand Compaction, Soil & Sand Replacement)
c) Roads Construction (Sub-grade preparation, Road base, Asphalt work, Kerbing, Service roads, Paved walkways)
d) Temporary works for supporting the existing services.
e) Concrete works (formwork & reinforcement & pouring)
f) Finishing works (Internal & external)
2) Quality:
a) Compliance with approved plans, specifications, standards and quality requirements.
b) Preparation of Quality Assurance Documents and Files.
c) Co-ordinating & submitting works to Resident Engineer.
3) Health & Safety:
a) Ensure operations are undertaken in a safe manner in accordance with National laws and
company HSE policies
4) Site/Project Management & Communication:
a) Management:
 Arranging Plans, materials and staff to enable project continuation.
 Monitoring and Controlling the project in accordance with schedule.
b) Communication:
 Working in harmony with Senior Management, Site Team, Designers, sub-contractors and the
client amongst others to ensure satisfactory project construction.
 Responsible for dealing with technical issues and liaising with the design team to ensure the
criteria's are met.
 Reporting to PM, project manager directly.
Education (Certificates available if required)
Faculty of Engineering. Alexandria University.-
Civil Department. [Sept 2006 – June 2012]
% }.68.52{GoodOverall cumulative grade:
Graduation Project : Testinging of Materials and Quailty Control. {my project was includes traditional tests on aggregate
and determination of cement properties ,the main program incorporates the following two phases:
-phase1: Experiments on mortars made of different cements.
-phase2:Experiments on concretes made of differents cements.
Excellentation project grade:Gradu
Master of engineering in Structural Engineering, Alexandria University, Egypt 2012 – 2015
Field of Specialization: Properties and Testing of Materials
Master Thesis “Utilizing of waste glass powder in concrete as a construction material"
Journal publications: Construction and Building Materials; under review
- “Utilization of waste glass powder in the production of cement and concrete”
Computer knowledge & Civil Programs (Certificates available if required)
-Advanced:
 AutoCAD 2D
-Core:
 Sap, Staad , Primavera v3.1and Excel.
Languages
Arabic : Mother Tongue
English : Reading , Writing , Speaking Good
Personal Data
Date of Birth : 14 August 1987.
Place of Birth : Alexandria, Egypt.
Nationality : Egyptian.
Marital Status : Single.
Military status : Postponed.
Car license : Not Valid.

Curriculum Vitae (2)

  • 1.
    eCurriculum Vita Ahmed YoussefAbo Shama Contacts: Add ____ [20 Sidi Bishr St., SiDi Bishr, Alexandria] Tel ____ [+2 03 5499836] Mob ____ [+2 01144019839] Email ____ [ahmedyousif28@yahoo.com] Experience -Dar Alhandsa for construction - Working as a Civil Site Engineer in Construction phases of a residential building: (Oct. 2012 – may.2013) -civil marry for construction Working as a Civil Site Engineer in Construction phases of a residential building: (Jul. 2013 – Oct.2014) Trainings Al Futtaim–Carillion "AFC" {Cairo Festival City project} .. Infra-Structure Phase (Summer of 2011) -Al Abbdin for Construction & building (summer of 2009- 2010) 1) Civil Engineering Involvements: a) Main Infra-Structure and its future connections  Sewer Network (Glass Reinforced Plastic “GRP” pipes up to 600mm dia & Concrete Manholes up to 1500mm dia gravity network including the gullies)  Force Main (High Density Poly Ethylene “HDPE” pipe sewer pressured line)  Irrigation Network ( “HDPE” pipes pressured network)  Potable Water Supply Network ( “HDPE” pipes pressured network)  District cooling (Chilled Water) Network (Pre-Insulated pipes pressured network)  Medium Voltage Network (Armored Aluminum XLPE Cables) b) Earthworks (Bulk Cut and Fill, Soil & Sand Compaction, Soil & Sand Replacement) c) Roads Construction (Sub-grade preparation, Road base, Asphalt work, Kerbing, Service roads, Paved walkways) d) Temporary works for supporting the existing services. e) Concrete works (formwork & reinforcement & pouring) f) Finishing works (Internal & external) 2) Quality: a) Compliance with approved plans, specifications, standards and quality requirements. b) Preparation of Quality Assurance Documents and Files. c) Co-ordinating & submitting works to Resident Engineer.
  • 2.
    3) Health &Safety: a) Ensure operations are undertaken in a safe manner in accordance with National laws and company HSE policies 4) Site/Project Management & Communication: a) Management:  Arranging Plans, materials and staff to enable project continuation.  Monitoring and Controlling the project in accordance with schedule. b) Communication:  Working in harmony with Senior Management, Site Team, Designers, sub-contractors and the client amongst others to ensure satisfactory project construction.  Responsible for dealing with technical issues and liaising with the design team to ensure the criteria's are met.  Reporting to PM, project manager directly. Education (Certificates available if required) Faculty of Engineering. Alexandria University.- Civil Department. [Sept 2006 – June 2012] % }.68.52{GoodOverall cumulative grade: Graduation Project : Testinging of Materials and Quailty Control. {my project was includes traditional tests on aggregate and determination of cement properties ,the main program incorporates the following two phases: -phase1: Experiments on mortars made of different cements. -phase2:Experiments on concretes made of differents cements. Excellentation project grade:Gradu Master of engineering in Structural Engineering, Alexandria University, Egypt 2012 – 2015 Field of Specialization: Properties and Testing of Materials Master Thesis “Utilizing of waste glass powder in concrete as a construction material" Journal publications: Construction and Building Materials; under review - “Utilization of waste glass powder in the production of cement and concrete” Computer knowledge & Civil Programs (Certificates available if required) -Advanced:  AutoCAD 2D -Core:  Sap, Staad , Primavera v3.1and Excel. Languages Arabic : Mother Tongue English : Reading , Writing , Speaking Good Personal Data Date of Birth : 14 August 1987. Place of Birth : Alexandria, Egypt.
  • 3.
    Nationality : Egyptian. MaritalStatus : Single. Military status : Postponed. Car license : Not Valid.