SlideShare a Scribd company logo
“On track to become Colombia's first Copper Producer”

                PDAC – March 2012
Forward Looking
 Statement
  Forward-looking statements: This report includes certain statements that may be deemed forward-
  looking. All statements in this release, other than statements of historical facts, that address future
  production, reserve potential, exploration drilling, exploitation activities and events or developments
  that the company expects, are forward-looking statements. Although the Company believes the
  expectations expressed in such forward-looking statements are based on reasonable assumptions,
  such statements are not guarantees of future performance and actual results or developments may
  differ materially from those in the forward looking statements. Factors that could cause actual results
  to differ materially from those in forward-looking statements include market prices, exploitation and
  exploration successes, availability of capital and financing, and general economic, market or business
  conditions. Investors are cautioned that actual results or developments may differ materially from
  those projected in the forward-looking statements.

  The information contained in this presentation has been prepared under the supervision of Michael
  Rowland, P.Geo., who is designated as a "Qualified Person" with the ability and authority to verify the
  authenticity and validity of the data.




March 2012                               www.CuOroResources.com                                             2
Cuoro Resources
  •   Developing two projects in Colombia
       – Santa Elena Copper Project located in Antioquia
            • 25,000 m drill program underway (4 drills on-site)
            • 42 drill holes and over 8,000m completed with 18 holes mineralized
            • Best hole SEDDH-39 returned 102.9 m at 1.44% copper including 14 m at
              2.9% copper
       – Barranco de Loba Gold Project located in Sur de Bolivar
            • Surface exploration program underway
  •   Raised $25M during 2011 ($10M at $1.00 and $15M at $2.00)
  •   Company is well financed with $17M in the treasury
  •   Experienced technical and management team that reside in Medellin

  Our focus for 2012:
  1. Advance drilling, studies and resource development of the Santa Elena Project
  2. Advance surface exploration of the Barranco de Loba Project
  3. Identify and acquire new assets in Colombia with a focus on copper and gold



March 2012                       www.CuOroResources.com                               3
Cuoro Share Structure
  •   Shares Outstanding                29,290,000
  •   Fully Diluted                     38,831,817
  •   Working Capital                   ~$17 million
  •   Market Capitalization             ~$50 million
        –   Share Price $1.65           (Feb 29, 2012)


  •   Options                            2,201,817
        –   $0.52 expiry Nov 16, 2013       1,171,817
        –   $1.00 expiry April 2014         1,030,000    •   Significant Holders
                                                              – Insider/Founder Ownership ~35%
  •   Warrants                           7,340,000            – HudBay Minerals          ~13%
        –   $1.20 expiry April 2013         4,000,000
        –   $2.50 expiry May 2013           3,340,000



      Symbol TSX-V: CUA



February 2012                              www.CuOroResources.com                                4
Management & BOD
  Robert Sedgemore, President & CEO and Director
        –    Mr. Sedgemore has over 25 years of international operating and project experience in senior management positions
             for engineering, procurement and construction management companies and junior exploration and mining operations
        –    Previously Mr. Sedgemore was working with the International Finance Corp.(IFC), the private sector of World Bank as
             the senior industry mining specialist providing technical and economic valuation on global mining investments
        –    Past experience includes chief engineer for Zaldivar, a Placer Dome operation, and chief engineer for BHP at Minera
             Escondida, the world's largest copper mine, where he was involved in several brownfield expansion projects with
             project values in excess of $1-billion (U.S.)


  Nick DeMare, CFO and Director
        –    President of Chase Management Ltd, which provides services to public companies engaged in mineral exploration and
             development. Mr. DeMare is also currently an officer or director of Mirasol Resources, Tasman Metals and Batero Gol


  John Seaman, Director and Chairman of Audit Committee
        –    Mr. Seaman has been involved with several successful mining projects and is currently the CFO for Premier Gold
             Mines. Previously held the position of CFO of Wolfden Resources Inc. & Pediment Resources until their sale


  Jorge Alberto Uribe
        –    Former Minister of Defense for Colombia
        –    Provides consultation on security and business strategy for Colombia




March 2012                                        www.CuOroResources.com                                                           5
Technical Personnel
  Michel Rowland, QP and Consulting Geologist for 43-101
       –     AUSMIN registered Professional Geologist and Qualified Person for the Santa Elena project with over
             40 years experience in South America specializing in base metals. Several major discoveries including
             Quimsacocha multi-million ounce gold deposit in Ecuador


  Andy Pystynen, Technical Manager for CuOro
       –     Professional Geoscientist with 15 years experience working in Chile, Peru, Colombia and Argentina.
             He has worked on over 300 mining projects as a senior geophysicist for a leading international
             consulting company
       –     Andy manages our geophysics exploration programs and project development, he is fluent in Spanish
             and lives in Medellin


  Jorge Gaviria, Senior Geologist for CuOro
       –     Professional Geologist with 15 years experience with a Masters in Mineral Resource Exploration and
             Evaluation, he is a national of Colombia, bilingual and resides in Medellin
       –     Jorge has worked as senior geologist at the Roble mine Colombia's only producing copper mine (VMS
             deposit) and Colombia Gold and Frontino Gold Mines responsible for exploration, resource
             development, and mine planning and production



March 2012                                   www.CuOroResources.com                                                  6
Project Locations

                                Barranco de Loba
                                Gold Project

                            Santa Elena
                            Copper Project
                           Medellin




March 2012      www.CuOroResources.com             7
Santa Elena
  Option to earn 100% of the Santa Elena project
  • 1,287.5 ha located in the province of Antioquia, 120km north east of
    Medellin
  • Historical TEM survey conducted by Noranda in 1997 identified a
    significant high conductive anomaly extending 900m long by 500m wide
  • Mineralized outcrops extend approximately 10 to 15m high by 10m wide
    over 70m in length (TEM1)
  • Excellent infrastructure, power, water, and paved road to site
  • 25,000 m exploration diamond drill program started in July 2011
       – Four DD rigs on site drilling HQ core (rigs 3 and 4 arrived in January 2012)
       – 42 holes completed to date with over 8,000 m drilled
       – 18 drill holes with mineralization have returned excellent results:
             • SE-DDH-5: 40 metres of 2.8% Cu and 1% Zn including 10 metres of 5.32% Cu
             • SE-DDH-39: 102.9 metres of 1.44% Cu including 14 metres at 2.9% Cu




March 2012                             www.CuOroResources.com                             8
Santa Elena Outcrop




March 2012     www.CuOroResources.com   9
Santa Elena
 Infrastructure




     Paved Road to Santa Elena Property Gate             2 Lane Bridge – Crossing the Porce River




              Hydro electric dam                                Switch yard 5km from site



March 2012                             www.CuOroResources.com                                       10
Santa Elena
     Concessions
•   The Santa Elena project is contained
    in 2 mining concessions totalling
    1,287.5 ha

•   Historical TEM survey conducted by
    Noranda identified a significant high
    conductive anomaly extending 900m
    long by 500m wide

•   The mineralization is primarily
    composed of chalcopyrite,
    pyrrhotite, and pyrite

•   The Santa Elena project has been
    classified as a Beshi-Type VMS
    deposit based on geological and
    geochemical characteristics.




    March 2012                              www.CuOroResources.com   11
Drill Pad Locations
                                                                                                        42                           North

                                                                          1,2,3,4,5,6,7
                                                                                                      39, 41, 43

                                                             27,29,31,33,35,37                               8,9,10,12,14,16


                                                                                                                38,40
                                                                                          TEM 1
                                11,13,15,17,19                                            (Outcrop)                32,34,36
  New Outcrops
                     21,23,25                                                TEM 3                                             18,20,22,24,26,
                                                                             (Outcrop)                                         28,30
                                                 TEM 2
                                                 (Outcrop)

                 TEM 4                                                                                 Tunnel
                 (Outcrop)                                                                             Entrance




                                                                     100 m




March 2012                                        www.CuOroResources.com                                                                         12
Drill
 Results




March 2012            www.CuOroResources.com
             www.CuOroResources.com            13
Historical TEM Survey

• Transient Electromagnetic
  Survey identifies conductive
  targets such polymetallic and
  massive sulphide bodies.




March 2012                        www.CuOroResources.com   14
IP SURVEY

                                         • IP detects the disseminated
                                           /stringer zones which constitute
                                           the footwall.

                                         • It will identify the lower-grade
                                           parts of the system, but does
                                           not detect the massive sulfides.


             SEDDH - 25




March 2012                www.CuOroResources.com                              15
Drill Program
•   The Drilling Program for Santa
    Elena during 2012 will
    systematically test the strike
    length of the IP, and TEM 1 and
    TEM 2 anomalies, initially at 100
    meter centers.

•   Down-hole EM surveys will be
    conducted on each hole to
    determine the strike direction and
    continuity of the massive sulphide
    mineralization.

•   We have completed 42 drill holes
    and 8,000m of drilling to date of
    our 25,000m program




March 2012                               www.CuOroResources.com   16
Air Borne
 Magnetic Survey                     Technical note by James Franklin


                                     •   Given the abundance of stringer mineralization in
                                         TEM 1 and TEM 2 and the SEDDH-025, and the
                                         relatively weak Na depletion to the north (holes
                                         SEDDH 11,13,15 17 and 19), the best sulfides may be
                                         to the south of SEDDH-25.
             Priority Target Area
                                     •   In addition to the high priority target area south of
                                         SEDDH-25 both TEM 1 and TEM2 are significant VMS
                                         occurrences.
                        Drill Area
                                     •   It is reasonable to expect that the Santa Elena district
                                         will contain several deposits, with one giant deposits
                                         (greater than 30 million tonnes) and one or two mid-
                                         sized deposits (10-15 million tonnes) and several
                     SEDDH - 25          smaller deposits (3-5 million tonnes each).




March 2012                    www.CuOroResources.com                                                17
Santa Elena
 2012 Work Program
                             Santa Elena Budget for 2012 - $9M USD




March 2012    www.CuOroResources.com                           18
Barranco de Loba
  Option to earn 100% of the Barranco de Loba project
  • The Barranco de Loba Project (Barranco) is located approximately 35 kilometers
     due south of the town of Barranco de Loba in Sur de Bolivar, Colombia.
  • Barranco comprises one mining concession (IEV-16061), having a total area of
     3,976 hectares.
  • Early staged project
      – Surrounds the Gloria mine with 2,000 artesian miners
  • We have identified a gold geochemical anomaly that continues over 5 km
  • Sample results of some of the underground workings returned assay values up to
     87.5 g/t gold
      – Talide 2 vein at 87.5g/t Au
      – Jerez 3 vein at 21.5 g/ Au
      – Las Aguacate 2 vein at 19.0 g/t Au
      – Nuvia vein at 17.3 g/t Au
      – Saballanes 3 vein at 12.9 g/t Au
      – Saballanes 1 vein at 6.7 g/t Au



March 2012                       www.CuOroResources.com                              19
Sample Locations




March 2012     www.CuOroResources.com   20
Barranco de Loba
 2012 Work Program
                               Barranco Budget for 2012 - $1M USD




March 2012    www.CuOroResources.com                           21
Drilling at Santa Elena




March 2012       www.CuOroResources.com   22
New Adits discovered
 at Santa Elena




March 2012     www.CuOroResources.com   23
New Outcrops discovered
 at Santa Elena




March 2012     www.CuOroResources.com   24
Man Portable
 4th drill rig arrives at site




March 2012         www.CuOroResources.com   25
Down Hole EM Survey




March 2012    www.CuOroResources.com   26
Santa Elena Field Team




March 2012     www.CuOroResources.com   27
Local Priest Blessing
 our Project




March 2012       www.CuOroResources.com   28
Cuoro Logging and
 Storage Facility




March 2012     www.CuOroResources.com   29
Drill Core SEDDH-5




             Including: 40m at 2.8 % Cu


March 2012        www.CuOroResources.com   30
Drill Core SEDDH-6




        Including: 1m at 17.97% Cu, 3.75 g/t Au, 94 g/t Ag and 1.35% Zn


March 2012                     www.CuOroResources.com                     31

More Related Content

What's hot

Resume Leonel Lopez May2016-Updated
Resume Leonel Lopez May2016-UpdatedResume Leonel Lopez May2016-Updated
Resume Leonel Lopez May2016-UpdatedHerbert F Edwards
 
Harvest Gold - Corporate Presentation - September 2010
Harvest Gold - Corporate Presentation - September 2010Harvest Gold - Corporate Presentation - September 2010
Harvest Gold - Corporate Presentation - September 2010Harvest Gold
 
Proyecto Oro Corcoesto - Corcoesto gold project
Proyecto Oro Corcoesto - Corcoesto gold projectProyecto Oro Corcoesto - Corcoesto gold project
Proyecto Oro Corcoesto - Corcoesto gold project
Anosacosta Costa da Morte
 
2019 11-01 nar corp presentation web no appendix small
2019 11-01 nar corp presentation web no appendix small2019 11-01 nar corp presentation web no appendix small
2019 11-01 nar corp presentation web no appendix small
narminerals
 
North Arrow Minerals - Investor Presentation, PDAC 2018
North Arrow Minerals - Investor Presentation, PDAC 2018North Arrow Minerals - Investor Presentation, PDAC 2018
North Arrow Minerals - Investor Presentation, PDAC 2018
narminerals
 
Red Metal Resources (OTCBB:RMES)
Red Metal Resources (OTCBB:RMES)Red Metal Resources (OTCBB:RMES)
Red Metal Resources (OTCBB:RMES)
Mic Stockwell
 
North American Nickel TSXV NAN Presentation
North American Nickel TSXV NAN PresentationNorth American Nickel TSXV NAN Presentation
North American Nickel TSXV NAN Presentation
Freeform Communications Inc.
 
ALTOS DE LIPANGUE PROJECT
ALTOS DE LIPANGUE PROJECTALTOS DE LIPANGUE PROJECT
ALTOS DE LIPANGUE PROJECT
pravikiranreddy21
 
Corporate Presentation February 2011
Corporate Presentation February 2011Corporate Presentation February 2011
Corporate Presentation February 2011
Lago Dourado Minerals Ltd.
 
Westminster Resources (TSX.V - WMR) Corporate Presentation
Westminster Resources (TSX.V - WMR) Corporate PresentationWestminster Resources (TSX.V - WMR) Corporate Presentation
Westminster Resources (TSX.V - WMR) Corporate Presentation
Viral Network Inc
 
Aben Resources - Investor Presentation
Aben Resources - Investor PresentationAben Resources - Investor Presentation
Aben Resources - Investor Presentation
Company Spotlight
 
Orestone corporate-presentation
Orestone corporate-presentationOrestone corporate-presentation
Orestone corporate-presentationDIR_GmbH
 
Rio Silver: Corporate Presentation, Dec 15 2019
Rio Silver: Corporate Presentation, Dec 15 2019Rio Silver: Corporate Presentation, Dec 15 2019
Rio Silver: Corporate Presentation, Dec 15 2019
MomentumPR
 
Ors corporate presentation october 2012
Ors corporate presentation october 2012Ors corporate presentation october 2012
Ors corporate presentation october 2012DIR_GmbH
 
Pan American Power Point Sept 2010
Pan American Power Point Sept 2010Pan American Power Point Sept 2010
Pan American Power Point Sept 2010
Christopher R Anderson
 

What's hot (20)

Resume Leonel Lopez May2016-Updated
Resume Leonel Lopez May2016-UpdatedResume Leonel Lopez May2016-Updated
Resume Leonel Lopez May2016-Updated
 
Harvest Gold - Corporate Presentation - September 2010
Harvest Gold - Corporate Presentation - September 2010Harvest Gold - Corporate Presentation - September 2010
Harvest Gold - Corporate Presentation - September 2010
 
Proyecto Oro Corcoesto - Corcoesto gold project
Proyecto Oro Corcoesto - Corcoesto gold projectProyecto Oro Corcoesto - Corcoesto gold project
Proyecto Oro Corcoesto - Corcoesto gold project
 
Fortunate Sun Mining Presentations Feb 2012
Fortunate Sun Mining Presentations Feb 2012Fortunate Sun Mining Presentations Feb 2012
Fortunate Sun Mining Presentations Feb 2012
 
2019 11-01 nar corp presentation web no appendix small
2019 11-01 nar corp presentation web no appendix small2019 11-01 nar corp presentation web no appendix small
2019 11-01 nar corp presentation web no appendix small
 
Extorre March Powerpoint
Extorre March PowerpointExtorre March Powerpoint
Extorre March Powerpoint
 
North Arrow Minerals - Investor Presentation, PDAC 2018
North Arrow Minerals - Investor Presentation, PDAC 2018North Arrow Minerals - Investor Presentation, PDAC 2018
North Arrow Minerals - Investor Presentation, PDAC 2018
 
Red Metal Resources (OTCBB:RMES)
Red Metal Resources (OTCBB:RMES)Red Metal Resources (OTCBB:RMES)
Red Metal Resources (OTCBB:RMES)
 
Spain Corcoesto Gold Project
Spain Corcoesto Gold ProjectSpain Corcoesto Gold Project
Spain Corcoesto Gold Project
 
North American Nickel TSXV NAN Presentation
North American Nickel TSXV NAN PresentationNorth American Nickel TSXV NAN Presentation
North American Nickel TSXV NAN Presentation
 
ALTOS DE LIPANGUE PROJECT
ALTOS DE LIPANGUE PROJECTALTOS DE LIPANGUE PROJECT
ALTOS DE LIPANGUE PROJECT
 
Corporate Presentation February 2011
Corporate Presentation February 2011Corporate Presentation February 2011
Corporate Presentation February 2011
 
Au ro resources a&f
Au ro resources a&fAu ro resources a&f
Au ro resources a&f
 
Westminster Resources (TSX.V - WMR) Corporate Presentation
Westminster Resources (TSX.V - WMR) Corporate PresentationWestminster Resources (TSX.V - WMR) Corporate Presentation
Westminster Resources (TSX.V - WMR) Corporate Presentation
 
Aben Resources - Investor Presentation
Aben Resources - Investor PresentationAben Resources - Investor Presentation
Aben Resources - Investor Presentation
 
Orestone corporate-presentation
Orestone corporate-presentationOrestone corporate-presentation
Orestone corporate-presentation
 
Nan aug 2012
Nan aug 2012Nan aug 2012
Nan aug 2012
 
Rio Silver: Corporate Presentation, Dec 15 2019
Rio Silver: Corporate Presentation, Dec 15 2019Rio Silver: Corporate Presentation, Dec 15 2019
Rio Silver: Corporate Presentation, Dec 15 2019
 
Ors corporate presentation october 2012
Ors corporate presentation october 2012Ors corporate presentation october 2012
Ors corporate presentation october 2012
 
Pan American Power Point Sept 2010
Pan American Power Point Sept 2010Pan American Power Point Sept 2010
Pan American Power Point Sept 2010
 

Similar to CuOro Corporate Presentation - March 2012

Minaurum Gold Corporate Presentation - Summer 2013
Minaurum Gold Corporate Presentation - Summer 2013Minaurum Gold Corporate Presentation - Summer 2013
Minaurum Gold Corporate Presentation - Summer 2013Adnet Communications
 
20130718 mgg investor_presentation
20130718 mgg investor_presentation20130718 mgg investor_presentation
20130718 mgg investor_presentationAdnet Communications
 
Minaurum Gold Corporate Presentation - Summer 2013
Minaurum Gold Corporate Presentation - Summer 2013Minaurum Gold Corporate Presentation - Summer 2013
Minaurum Gold Corporate Presentation - Summer 2013Adnet Communications
 
20130228 mgg investor_presentation
20130228 mgg investor_presentation20130228 mgg investor_presentation
20130228 mgg investor_presentationAdnet Communications
 
Minaurum Gold Investor Presentation
Minaurum Gold Investor PresentationMinaurum Gold Investor Presentation
Minaurum Gold Investor PresentationAdnet Communications
 
20130124 mgg-investor-presentation
20130124 mgg-investor-presentation20130124 mgg-investor-presentation
20130124 mgg-investor-presentationAdnet Communications
 
20130108 mgg-investor-presentation
20130108 mgg-investor-presentation20130108 mgg-investor-presentation
20130108 mgg-investor-presentationAdnet Communications
 
20130117 mgg-investor-presentation
20130117 mgg-investor-presentation20130117 mgg-investor-presentation
20130117 mgg-investor-presentationAdnet Communications
 
June 2021 - Sonoro Gold - Near Term Production
June 2021 - Sonoro Gold - Near Term ProductionJune 2021 - Sonoro Gold - Near Term Production
June 2021 - Sonoro Gold - Near Term Production
MomentumPR
 

Similar to CuOro Corporate Presentation - March 2012 (20)

Investor Presentation
Investor PresentationInvestor Presentation
Investor Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Presentation
PresentationPresentation
Presentation
 
Minaurum Investor Presentation
Minaurum Investor PresentationMinaurum Investor Presentation
Minaurum Investor Presentation
 
Minaurum - Corporate Presentation
Minaurum - Corporate PresentationMinaurum - Corporate Presentation
Minaurum - Corporate Presentation
 
Minaurum - Presentation
Minaurum - PresentationMinaurum - Presentation
Minaurum - Presentation
 
Minaurum Gold Corporate Presentation - Summer 2013
Minaurum Gold Corporate Presentation - Summer 2013Minaurum Gold Corporate Presentation - Summer 2013
Minaurum Gold Corporate Presentation - Summer 2013
 
20130718 mgg investor_presentation
20130718 mgg investor_presentation20130718 mgg investor_presentation
20130718 mgg investor_presentation
 
Minaurum Gold Corporate Presentation - Summer 2013
Minaurum Gold Corporate Presentation - Summer 2013Minaurum Gold Corporate Presentation - Summer 2013
Minaurum Gold Corporate Presentation - Summer 2013
 
Investor Presentation
Investor PresentationInvestor Presentation
Investor Presentation
 
Presentation
PresentationPresentation
Presentation
 
20130228 mgg investor_presentation
20130228 mgg investor_presentation20130228 mgg investor_presentation
20130228 mgg investor_presentation
 
April 2012
April 2012April 2012
April 2012
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Minaurum Gold Investor Presentation
Minaurum Gold Investor PresentationMinaurum Gold Investor Presentation
Minaurum Gold Investor Presentation
 
20130124 mgg-investor-presentation
20130124 mgg-investor-presentation20130124 mgg-investor-presentation
20130124 mgg-investor-presentation
 
20130108 mgg-investor-presentation
20130108 mgg-investor-presentation20130108 mgg-investor-presentation
20130108 mgg-investor-presentation
 
20130117 mgg-investor-presentation
20130117 mgg-investor-presentation20130117 mgg-investor-presentation
20130117 mgg-investor-presentation
 
June 2021 - Sonoro Gold - Near Term Production
June 2021 - Sonoro Gold - Near Term ProductionJune 2021 - Sonoro Gold - Near Term Production
June 2021 - Sonoro Gold - Near Term Production
 
Investor Presentation
Investor PresentationInvestor Presentation
Investor Presentation
 

Recently uploaded

Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
Probe Gold
 
Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024
Sysco_Investors
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
CollectiveMining1
 
Snam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial PresentationSnam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial Presentation
Valentina Ottini
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
Philip Rabenok
 
cyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdfcyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdf
CyberAgent, Inc.
 
2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf
Sysco_Investors
 
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
ybout
 

Recently uploaded (8)

Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
 
Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Snam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial PresentationSnam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial Presentation
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
 
cyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdfcyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdf
 
2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf
 
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
 

CuOro Corporate Presentation - March 2012

  • 1. “On track to become Colombia's first Copper Producer” PDAC – March 2012
  • 2. Forward Looking Statement Forward-looking statements: This report includes certain statements that may be deemed forward- looking. All statements in this release, other than statements of historical facts, that address future production, reserve potential, exploration drilling, exploitation activities and events or developments that the company expects, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that actual results or developments may differ materially from those projected in the forward-looking statements. The information contained in this presentation has been prepared under the supervision of Michael Rowland, P.Geo., who is designated as a "Qualified Person" with the ability and authority to verify the authenticity and validity of the data. March 2012 www.CuOroResources.com 2
  • 3. Cuoro Resources • Developing two projects in Colombia – Santa Elena Copper Project located in Antioquia • 25,000 m drill program underway (4 drills on-site) • 42 drill holes and over 8,000m completed with 18 holes mineralized • Best hole SEDDH-39 returned 102.9 m at 1.44% copper including 14 m at 2.9% copper – Barranco de Loba Gold Project located in Sur de Bolivar • Surface exploration program underway • Raised $25M during 2011 ($10M at $1.00 and $15M at $2.00) • Company is well financed with $17M in the treasury • Experienced technical and management team that reside in Medellin Our focus for 2012: 1. Advance drilling, studies and resource development of the Santa Elena Project 2. Advance surface exploration of the Barranco de Loba Project 3. Identify and acquire new assets in Colombia with a focus on copper and gold March 2012 www.CuOroResources.com 3
  • 4. Cuoro Share Structure • Shares Outstanding 29,290,000 • Fully Diluted 38,831,817 • Working Capital ~$17 million • Market Capitalization ~$50 million – Share Price $1.65 (Feb 29, 2012) • Options 2,201,817 – $0.52 expiry Nov 16, 2013 1,171,817 – $1.00 expiry April 2014 1,030,000 • Significant Holders – Insider/Founder Ownership ~35% • Warrants 7,340,000 – HudBay Minerals ~13% – $1.20 expiry April 2013 4,000,000 – $2.50 expiry May 2013 3,340,000 Symbol TSX-V: CUA February 2012 www.CuOroResources.com 4
  • 5. Management & BOD Robert Sedgemore, President & CEO and Director – Mr. Sedgemore has over 25 years of international operating and project experience in senior management positions for engineering, procurement and construction management companies and junior exploration and mining operations – Previously Mr. Sedgemore was working with the International Finance Corp.(IFC), the private sector of World Bank as the senior industry mining specialist providing technical and economic valuation on global mining investments – Past experience includes chief engineer for Zaldivar, a Placer Dome operation, and chief engineer for BHP at Minera Escondida, the world's largest copper mine, where he was involved in several brownfield expansion projects with project values in excess of $1-billion (U.S.) Nick DeMare, CFO and Director – President of Chase Management Ltd, which provides services to public companies engaged in mineral exploration and development. Mr. DeMare is also currently an officer or director of Mirasol Resources, Tasman Metals and Batero Gol John Seaman, Director and Chairman of Audit Committee – Mr. Seaman has been involved with several successful mining projects and is currently the CFO for Premier Gold Mines. Previously held the position of CFO of Wolfden Resources Inc. & Pediment Resources until their sale Jorge Alberto Uribe – Former Minister of Defense for Colombia – Provides consultation on security and business strategy for Colombia March 2012 www.CuOroResources.com 5
  • 6. Technical Personnel Michel Rowland, QP and Consulting Geologist for 43-101 – AUSMIN registered Professional Geologist and Qualified Person for the Santa Elena project with over 40 years experience in South America specializing in base metals. Several major discoveries including Quimsacocha multi-million ounce gold deposit in Ecuador Andy Pystynen, Technical Manager for CuOro – Professional Geoscientist with 15 years experience working in Chile, Peru, Colombia and Argentina. He has worked on over 300 mining projects as a senior geophysicist for a leading international consulting company – Andy manages our geophysics exploration programs and project development, he is fluent in Spanish and lives in Medellin Jorge Gaviria, Senior Geologist for CuOro – Professional Geologist with 15 years experience with a Masters in Mineral Resource Exploration and Evaluation, he is a national of Colombia, bilingual and resides in Medellin – Jorge has worked as senior geologist at the Roble mine Colombia's only producing copper mine (VMS deposit) and Colombia Gold and Frontino Gold Mines responsible for exploration, resource development, and mine planning and production March 2012 www.CuOroResources.com 6
  • 7. Project Locations Barranco de Loba Gold Project Santa Elena Copper Project Medellin March 2012 www.CuOroResources.com 7
  • 8. Santa Elena Option to earn 100% of the Santa Elena project • 1,287.5 ha located in the province of Antioquia, 120km north east of Medellin • Historical TEM survey conducted by Noranda in 1997 identified a significant high conductive anomaly extending 900m long by 500m wide • Mineralized outcrops extend approximately 10 to 15m high by 10m wide over 70m in length (TEM1) • Excellent infrastructure, power, water, and paved road to site • 25,000 m exploration diamond drill program started in July 2011 – Four DD rigs on site drilling HQ core (rigs 3 and 4 arrived in January 2012) – 42 holes completed to date with over 8,000 m drilled – 18 drill holes with mineralization have returned excellent results: • SE-DDH-5: 40 metres of 2.8% Cu and 1% Zn including 10 metres of 5.32% Cu • SE-DDH-39: 102.9 metres of 1.44% Cu including 14 metres at 2.9% Cu March 2012 www.CuOroResources.com 8
  • 9. Santa Elena Outcrop March 2012 www.CuOroResources.com 9
  • 10. Santa Elena Infrastructure Paved Road to Santa Elena Property Gate 2 Lane Bridge – Crossing the Porce River Hydro electric dam Switch yard 5km from site March 2012 www.CuOroResources.com 10
  • 11. Santa Elena Concessions • The Santa Elena project is contained in 2 mining concessions totalling 1,287.5 ha • Historical TEM survey conducted by Noranda identified a significant high conductive anomaly extending 900m long by 500m wide • The mineralization is primarily composed of chalcopyrite, pyrrhotite, and pyrite • The Santa Elena project has been classified as a Beshi-Type VMS deposit based on geological and geochemical characteristics. March 2012 www.CuOroResources.com 11
  • 12. Drill Pad Locations 42 North 1,2,3,4,5,6,7 39, 41, 43 27,29,31,33,35,37 8,9,10,12,14,16 38,40 TEM 1 11,13,15,17,19 (Outcrop) 32,34,36 New Outcrops 21,23,25 TEM 3 18,20,22,24,26, (Outcrop) 28,30 TEM 2 (Outcrop) TEM 4 Tunnel (Outcrop) Entrance 100 m March 2012 www.CuOroResources.com 12
  • 13. Drill Results March 2012 www.CuOroResources.com www.CuOroResources.com 13
  • 14. Historical TEM Survey • Transient Electromagnetic Survey identifies conductive targets such polymetallic and massive sulphide bodies. March 2012 www.CuOroResources.com 14
  • 15. IP SURVEY • IP detects the disseminated /stringer zones which constitute the footwall. • It will identify the lower-grade parts of the system, but does not detect the massive sulfides. SEDDH - 25 March 2012 www.CuOroResources.com 15
  • 16. Drill Program • The Drilling Program for Santa Elena during 2012 will systematically test the strike length of the IP, and TEM 1 and TEM 2 anomalies, initially at 100 meter centers. • Down-hole EM surveys will be conducted on each hole to determine the strike direction and continuity of the massive sulphide mineralization. • We have completed 42 drill holes and 8,000m of drilling to date of our 25,000m program March 2012 www.CuOroResources.com 16
  • 17. Air Borne Magnetic Survey Technical note by James Franklin • Given the abundance of stringer mineralization in TEM 1 and TEM 2 and the SEDDH-025, and the relatively weak Na depletion to the north (holes SEDDH 11,13,15 17 and 19), the best sulfides may be to the south of SEDDH-25. Priority Target Area • In addition to the high priority target area south of SEDDH-25 both TEM 1 and TEM2 are significant VMS occurrences. Drill Area • It is reasonable to expect that the Santa Elena district will contain several deposits, with one giant deposits (greater than 30 million tonnes) and one or two mid- sized deposits (10-15 million tonnes) and several SEDDH - 25 smaller deposits (3-5 million tonnes each). March 2012 www.CuOroResources.com 17
  • 18. Santa Elena 2012 Work Program Santa Elena Budget for 2012 - $9M USD March 2012 www.CuOroResources.com 18
  • 19. Barranco de Loba Option to earn 100% of the Barranco de Loba project • The Barranco de Loba Project (Barranco) is located approximately 35 kilometers due south of the town of Barranco de Loba in Sur de Bolivar, Colombia. • Barranco comprises one mining concession (IEV-16061), having a total area of 3,976 hectares. • Early staged project – Surrounds the Gloria mine with 2,000 artesian miners • We have identified a gold geochemical anomaly that continues over 5 km • Sample results of some of the underground workings returned assay values up to 87.5 g/t gold – Talide 2 vein at 87.5g/t Au – Jerez 3 vein at 21.5 g/ Au – Las Aguacate 2 vein at 19.0 g/t Au – Nuvia vein at 17.3 g/t Au – Saballanes 3 vein at 12.9 g/t Au – Saballanes 1 vein at 6.7 g/t Au March 2012 www.CuOroResources.com 19
  • 20. Sample Locations March 2012 www.CuOroResources.com 20
  • 21. Barranco de Loba 2012 Work Program Barranco Budget for 2012 - $1M USD March 2012 www.CuOroResources.com 21
  • 22. Drilling at Santa Elena March 2012 www.CuOroResources.com 22
  • 23. New Adits discovered at Santa Elena March 2012 www.CuOroResources.com 23
  • 24. New Outcrops discovered at Santa Elena March 2012 www.CuOroResources.com 24
  • 25. Man Portable 4th drill rig arrives at site March 2012 www.CuOroResources.com 25
  • 26. Down Hole EM Survey March 2012 www.CuOroResources.com 26
  • 27. Santa Elena Field Team March 2012 www.CuOroResources.com 27
  • 28. Local Priest Blessing our Project March 2012 www.CuOroResources.com 28
  • 29. Cuoro Logging and Storage Facility March 2012 www.CuOroResources.com 29
  • 30. Drill Core SEDDH-5 Including: 40m at 2.8 % Cu March 2012 www.CuOroResources.com 30
  • 31. Drill Core SEDDH-6 Including: 1m at 17.97% Cu, 3.75 g/t Au, 94 g/t Ag and 1.35% Zn March 2012 www.CuOroResources.com 31