This document provides a critical analysis of design options for renovating and extending the Birmingham Masonic Centre. It discusses three key issues: sustainability, design of the new roof, and the condition of the existing buildings. For sustainability, a rainwater harvesting system was selected over PV panels or heat recovery ventilation. A flat roof design was chosen over pitched or green roofs. For the party wall, rebuilding the entire wall was chosen over repairing or building a new adjacent wall to meet building regulations and structural needs of the new build.