BY
A unit of inTRM Solutions Pvt. Ltd.
Enterprise Training Services (ETS)
INDEX
SL NO. Particulars Page No.
1 Introduction of inStep- A Unit of inTRM Solutions Pvt Ltd.
3
2
Training verticals and programs 4
Technical Training Program 4
Non-Technical Training Program 7
3 inStep Learning Process 10
4 Our Clients 15
2
inTRM Solutions Pvt Ltd, co-founded by
highly experienced Industry professionals is
headquartered in New Delhi India is a fastest
growing solution provider in the field of
Education, IT, Consulting and Event
Management. We have continuously expanded
our operation and currently operate in all major
cities of India. With efforts of a strong team of
committed, dedicated and highly trained
technical experts and state of the art
Technological infrastructure, we provide
quality services to meet the over evolving need
of our clients, directly and through our business partners. Combining award winning experiences,
professional expertise, and innovative initiatives, our group provides customers with relevant
products and quality services.
We carry business associates in one side to jointly work hand in hand ensuring customers’ needs
are catered up to their satisfaction combining local flavor and principal support. On the other side
we have partnered with global technology venders to disseminate the knowledge flow from top of
the ladder to bottom.
ABOUT inSTEP
inSTEP is one out of 4 divisions of inTRM Solutions Pvt. Ltd, caters to Education and Training
vertical, imparting professional skill enhancement trainings in both IT and Non IT segment. IT
segment covers entire gamut of trainings on IT-IMS & Software, Telecom and Security
Surveillance. Non IT trainings the organization covers on Spoken English, Banking, SSC, GATE,
UPSC, Railway, and other competitive exams, Employability Skill like Soft Skill and Life Skill.
Under this umbrella we offer Career Assessment and Testing as a separate line of delivery for
students and working professionals too.
VISION STATEMENT
We cater solutions in the domain of IT, Education & Training, Consulting & Event Management
across the globe, thereby creating enterprises of tomorrow
MISSION STATEMENT
To provide world-class solutions and life time experience to our customers by seamless delivery,
quality products, embedded value system and continuously progress through partnership.
PHILOSOPHY ON QUALITY
We will deliver perfect products, services and solutions to meet the requirements of our external
and internal customers, the first time, every time and would always improve on the same.
OUR MANAGEMENT OBJECTIVES
To fuel initiative and foster activity by allowing individuals freedom of action and innovation in
attaining defined objectives.
OUR BELIEF
Challenges are endless and we are geared up to accept those professionally in true spirit of service
and delivery.
Our Strength and core competencies
Providing our customer an experience for life time and complete customer satisfaction through our
rich infrastructure, wide spread networks added with economy of skills, has been our greatest
strength. Innovative thinking, fast adoption of new technology and technological know-how to
provide cost effective optimized solutions to our client embedded with flexibility in all desired
direction is our core competencies.
Our Training Verticals
 I n d i v i d u a l Training Services (ITS) - Imparted at our Centre for individual career aspirant
 A c a d e m i c s & Institutional Training Services (AITS) – Imparted for groups at Alliance
college campus/ our center
 E n t e r p r i s e Training Services (ETS) – Imparted to corporate at their premises/Our center
Technical Training Programs
Technical Training Offerings (Partial List) from INSTEP -InTRM
Sr. No. Training Name
No. Of Days
(6 hours /
day)
Oracle 10g Series
1 SQL and PL/SQL 6
2 Fundamentals 1 4
3 Fundamentals 2 4
4 Performance Tuning 3
Oracle 9i
5 SQL and PL/SQL 5
6 Fundamentals 1 5
7 Fundamentals 2 3
SUN Technology
8 Core Java and J2EE 4
9 Design Pattern in Java 4
10 Hibernate 4
11
Enterprise JavaBean (EJB) Development Using Web Sphere Studio Application Developer
V5.0
4
12 Java Server Faces (JSF) 4
13 Advanced Java 1.6 with Strut 4
Microsoft Technology
14 Win Server 2008 With Advanced Active Directory 3
15 . NET 3.5 Framework With LINQ 4
16 MS-Exchange 3
17 MS - Excel Basics 3
18 Advanced Excel 3
19 MS - Excel -Basic and Advance 6
20 Ms-Office Basics 5
21 WinFX [.NET 3.0] 4
22 Office SharePoint [Server- 2007] 3
23 MS-Projects 2
24 Microsoft Biztalk Server 2006 3
25 Introduction to SQL Server 2005 3
26 SQL Server 2005 Business Intelligence 3
27 SQL Server 2005 Integration Service 3
28 SQL Server 2005 Reporting Service 3
29 SQL Server 2005 OLAP 3
30 Visual Studio 2008 4
31 Comprehensive . NET 4
32 Introduction To Design Patterns in Microsoft. NET 4
33 Microsoft. NET Application Block 4
IBM – Technologies
34 Tivoli Introduction 5
35 Websphere Introduction 5
36 Lotus Notes Introduction 5
Details of Training Domain
ORACLE Oracle Certified Administrator , Oracle Certified Professional DBA,
Oracle Certified Professional Internet Application Developer, Oracle
9i: New Features for Administrator, Oracle 9i:/ 10g New Features for
Application Developers, Oracle IDS Reports, Oracle 9i: Web Based
Applications with PL/SQL, Oracle 9i New Features, Oracle 9i RAC
Release 2,Oracle 9i Discoverer, Oracle 9iAS Advanced
Administration, Oracle10g Entire Series, Oracle Web Services using
Jdeveloper, Portlet Development with JAVA or PL/SQL using
Jdeveloper,Portal Development,J2EE Web Cache
Adminsitration,Designer 9i/6i, Forms 9i/6i, Reports 9i/6i.
Any technologies of ORACLE.
REDHAT
Red Hat Desktop Applications, RedHat Linux Essentials, Red Hat
Linux System Administration, RedHat Linux Security and Networking,
RedHat Certified Engineer, Red Hat Enterprise Deployment and
Systems Management , RedHat Security, RedHat Enterprise Linux,
RedHat Enterprise Linux Directory Services and Authentication,
Any technologies of REDHAT.
UNIX AIX, HP-UX.,TRU-64.
SUN MICROSYSTEMS
Java Programming, SUN Certified System Administrator Part 1,SUN
Certified System Administrator Part 2, J2EE Modules,J2ME
Modules(JMS,JAVA Mail,JTA,JTS,JMX) , SOLARIS System Performance
Management, Solaris Administration and Adv. Administration.
MICROSOFT MS-Office, Visual Basic 6.0 Desktop and Distributed, Visual Basic 6.0
Distributed, Visual C++ Using MFC, ISA ,Exchange Server, BizTalk
Server, Application Center, SMS Server, Mobile Application Server,
Sharepoint Portal Sever, Commerce Server, COM+, DCOM,XML
Services, Content Management Server, Biztalk Server.
Any technologies of MICROSOFT.
XML TECHNOLOGIES
Apache SOAP, Apache Struts/Tiles using XML, WebFocus,
WebMethods, Web Services
APPLICATION SERVERS WebSphere, WebLogic, iPlanet, 9iAS, Sybase EAS, JBOSS, Alliare
JRUN, HP BlueStone
OTHER LANGUAGES /
TECHNOLOGIES
Perl, PHP,CGI,VRML,BC++,Python,C, Advance C , C++ , CORBA,EAI
Informix, DB2
IT- Hardware & Networking A+, N+, MCSA, MCSE, MCITP, Wireless Technology, CCNA, CCNP,
Security Plus, CCSA, RHCE, RHCT, CISCO PIX / ASA, SOLARIS – SA.
OTHER APPLICATIONS Lotus Notes, Domino,Crystal Reports, Eclipse, Sybase, Power Bulider
PROJECT MANAGEMENT Rational Rose,Software Project Management,Software Quality
Management, MS-Project
AUTO CAD About Auto Cad, Explaining graphical User Interface of AutoCAD,
Drawing simple sketches (Line, Arc, Circle, Ellipse, Polygon etc),
Drawing settings, Modifying entities, Object selection methods,
Settings and modifying entity properties, Creating and Managing
Layers, Adding Annotations and Dimensions to your drawing,
Creating blocks and attributes, Working with Tables, Creating and
viewing slides, Slide library, Running scripts, Creating compound,
documents with OLE & External references, Electronic Transmit,
auto Cad Design center, Plotting your drawing, Layout Management,
Exporting AutoCAD objects
CATIA Sketch Part design, Assembly design, Drafting, Generative sheet
metal, Wireframe & surface design, D M U Kinematics, Core &
Cavity, Machining
PRO-E Sketch, Part modeling, Assembly, Manufacturing, Sheet metal,
Mechanism, Core & cavity extraction, Surface design, Drafting
Telecommunications: GSM Technology & implementation, Signaling System 7 , BTS
installation & commissioning, operation & maintenance, RF Drive
Test, Network optimization, BSS, OSS, TETRA, Transmission &
design, UMTS Technology & implementation, LTE, Wi MAX, 3G
Technology, Telecom Implementation (2G), PTID for NSN, PTID 3G
for NSN, 3G Implementation, GNOC, Service Management:
Datacom, Voice Communication, IP Telephony, VOIP, Routing &
Switching, BGP & MPLS, VPN, IP V6 Fundamental, Broad Band
Technologies ( ATM, Frame relay, XDSL)Intelligent Network (IN),
Optical Fibre Communication.
Electronic Surveillance Certificate in Building Automation, Solution Expert, Certificate
program in Electronic Surveillance. (( Access Control, intrusion
control, Fire Alarm, CCTV, Temperature Control & Power
Optimization)
Mobile Repairing Chip level service and repairing of mobile phones, working with SMD
Ball & Grid Array, IC’s , circuit tracing & trouble shooting
Non Technical Training Programs
Trainings for Managerial Cadres
Sr. No
1 Getting started as Manager in Pursuit of Managerial Excellence
2 Strategic Planning & Ogranisational Strategies
3 Leadership Skills - Excellence in Leadership / Transformational Leadership
4 High Impact Team Building yielding high performance
5 Man Management through motivation based on situations
6 Mentoring through Counseling, Listening & feedback
7 Power centric Leadership Vs. Delegating power to subordinates
8 Principle Centered Leadership Vs. Servant Leadership
9 Productivity & Performance Management-Leads subordinates to higer productvity through
managerial compitancies
10 Mnaging Success & Failure
11 "Manging" to "Leading" - Good to Great
12 Confilict Management workshop
13
Change Management -Leading and Managing Change with change orientation
14 Stress Management
15 Procrastination & Time Management
16 Developing Line Leaders
17 MDP - Management Development Program
Trainings for Middle Level Employees & Team Leaders
1 Driving through Leadership
2 Understanding various Leadership Skills and Styles
3 Team Building, Working in Teams, Team Bonding
4 Excellence in Presentation Skills
5 Creative Problem Solving
6 Executive Image and Grooming
7 Professional Work Attitude
8 Positive Work Attitude / Motivational workshop
9 Effective Communication Skill ( verbal & Non Verbal) and Interpersonal Communication
Skills
10 Don't say "YES" when you want to say "NO"
11 Problem Solving and Decision Making
12 Conflict Resolution & problem Solving
13 Working and Winning in Team
14 PEP - Personal Effectiveness Program
15 Analytical Thinking Skills
16 Planning and Organizing Skills
17 Supervisory Development
18 Written Communication
19 Mind Control Skills
20 Work Life Balance
21 Customer Service & Etiquette
22 Conducting Effective Meetings
23 Understanding various Leadership Skills and Styles
24 Business Writing Skills
25 Prioritizing, Planning, Organizing, Time & Task Management
26 Zap the Stress - Stress Management
27 Emotional Intelligence @ Work
28 Balancing Life & Work
29 Adapting to Change & Change Management
30 Personal Effectiveness
31 7 Habits
32 Goal Setting & Achievement
33 SDP - Supervisory Development Program
34 LDP - Leadership Development Program
35 Business & Corporate Etiquette
36 Managing a Sales Team
37 Counseling and Mentoring
38 Performance review and appraisals
39 Self Awareness and Personal Planning
40 Beyond Excellence
41 Change Management
42 OD Interventions
Training Programs for Sales, Marketing & Field Staffs
1 Sharpen the Axe - Building on Selling Strategies
2 Recharge your Battery - Attitudinal Workshop for being Resilient
3 Josh - Motivational Key Note Talk for Sales,
4 Marketing Events
5 Innovation in Marketing
6 Strategic Marketing and Planning Workshop
7 Selling Skills
8 Sales Presentation Skills / Effective Presentation Skills
9 Sales Negotiation Skills / Business Negotiation Skills
10 Business Communication Verbal & Non-Verbal
11 Assertive Communication Skills
12 Prioritizing, Planning, Organizing, Time & Task Management
13 Zap the Stress - Stress Management
14 Goal Setting & Achievement
15 Emotional Intelligence @ Work
16 Adapting to Change & Change Management
17 Personal Effectiveness
18 Effective Telemarketing
19 Target Orientation - The Bull’s Eye
20 How to sell successfully to corporate customers
21 Strategic Sales Planning
22 Managing the dealers
23 Overcoming Sales resistance
24 Business Writing Skills
25 Report Writing Skills
26 Effective Public Speaking Skills
27 Self Awareness and Personal Planning
28 Making Meetings Work
29 Creating Sales Professionals
Induction Training for New Joinees
1 Presentation Skills
2 Em-Power Yourself - Personality Development
3 Email, Phone & Office Etiquette
4 Winning Formula
5 Campus to Corporate
6 Corporate Spark
7 Attitude Gym
8 Business Etiquette & Manners
9 Communicating with Confidence
10 Overcoming Fear, Shyness & Limiting Belief
11 Networking Skills
12 Unleash your Potential
13 Rethinking about yourself
14 Present with Power
15 Stop-Think-Act
Training Program for Factory Workers
1 Hum Sub Saath Saath
2 Parivartan
3 Joshiley
Other Training Programs
1 Training Programs for Executive Assistants, Secretary, Admin Executives
2 Personal One-to-One Coaching for Executives, Managers & Leaders
3 Recharge your Emotions - Outbound Team Bonding Program
4 Spark your Potential - Self Motivational Program
5 Advanced Neuro Linguistic Programming
6 Monitoring and Measuring Training Effectiveness
7 Train The Trainer
8 New Product Development and Management
9 Effective Budgeting
10 Effective Credit Management
11 Finance for Non-Finance Managers/Executive
12 Retail Cash Management
13 Introduction to Neuro Linguistic Programming
14 Technical Writing Skills
15 360 degree feedback
16 Vision Alignment
Customized Trainings based on the Clients Need.
All the Training Programs are Customized, Designed & Developed after understanding the organization
Needs and Objectives.
The Training Programs are personally executed by experts to give organization the Value and Return of
Investment.
Please Note: -

In case there is any of your self identified training need is there and the same is not mentioned in the
standard list of training domain shown above, we welcome you to provide us the input and specify
your training needs, so that our product development team along with our content writers would be in
action to provide you solutions as desired by you. We assure you that, we would give our best and
ensure that your needs are catered with utmost care and dedication to see you delighted.
inStep-inTRM Learning Process
It is a comprehensive approach to training that guides each learner through all stages of the learning
lifecycle. It consists of three components – Pre Training Activity, Execution & Post training support.
Pre Training Session

This component initiates the process by helping our clients to meet their organizational goal and ensure
the return on investments. Customer’s need analysis is done here. Either needs known to the customer is
addressed or we ignite the latent need which would help them to excel. Sometimes we do give
Seminars, presentations or conduct tests to assess the competency level and understand the training
need of your candidates. I.e. These components are Analysis of Training Needs, Competency Analysis,
Training Identification & Budget Allocation by the customer.
Execution 

The training will be imparted by industry experienced and qualified group of Trainers. These trainers are
certified by inStep-InTRM and respective Product vendors (i.e Microsoft, Comptia, RedHat, Oracle, Sun,
and IBM etc.). Our Trainers are M Tech, B.E., B.Tech, MCA, and BCA. Almost all our trainers carry Global
Certification and they are Industry Experienced to make our Trainer’s pool the best and most demanded
professional in the industry.
The training can be conducted at our premise or client’s premise. We impart the training through CBT,
Customized Course and Learning guides.
Post Training Support 

inStep-inTRM learning process provides post-training support to every learner after completion of their
classroom training. If the client desire, a Mentor can be deputed at the client’s location for that to
provide them better post training experience. Post training supports like Help Desk support, Electronic
mail Support, Customized on site / of site mentor support, Campus support / placement opportunity are
either at a separate cost or free of cost that depends on the size of the business, future prospects and
Relationship with the client.
13
Post
Training
Support
Pre-
Training
Session
inStep-inTRM
Execution
Our Training Methodology
 Lectures
 Demonstrations
 Discussions
 Group Discussions
 Presentation
 Games and Simulations
 Exercises
 Group Discussion
 Behavior- Modeling
 Business Games
 Equipment Simulators
 In-basket Technique
 Hands on Exercise
 Self Evaluation Exercises
 Personal sharing of situations faced and solutions employed
 Role Plays
Blended Learning Approach

Delivery methodology considerations occur after the objectives, assessments, content types, and
learning sequence for the training have been decided. A mix of training methods can hence be devised
to ensure effective training in an appropriate time frame. This approach leads to what we call as
'Blended Learning' through ILT and MBT. Our "out-of-the-box thinking" provides comprehensive, market-
driven and performance-based training and development programs for skills upgrading and enhancing
professional competence as well as credibility of your workforce.
14
Our Clients

Corporate Mailer

  • 1.
    BY A unit ofinTRM Solutions Pvt. Ltd. Enterprise Training Services (ETS)
  • 2.
    INDEX SL NO. ParticularsPage No. 1 Introduction of inStep- A Unit of inTRM Solutions Pvt Ltd. 3 2 Training verticals and programs 4 Technical Training Program 4 Non-Technical Training Program 7 3 inStep Learning Process 10 4 Our Clients 15 2
  • 3.
    inTRM Solutions PvtLtd, co-founded by highly experienced Industry professionals is headquartered in New Delhi India is a fastest growing solution provider in the field of Education, IT, Consulting and Event Management. We have continuously expanded our operation and currently operate in all major cities of India. With efforts of a strong team of committed, dedicated and highly trained technical experts and state of the art Technological infrastructure, we provide quality services to meet the over evolving need of our clients, directly and through our business partners. Combining award winning experiences, professional expertise, and innovative initiatives, our group provides customers with relevant products and quality services. We carry business associates in one side to jointly work hand in hand ensuring customers’ needs are catered up to their satisfaction combining local flavor and principal support. On the other side we have partnered with global technology venders to disseminate the knowledge flow from top of the ladder to bottom. ABOUT inSTEP inSTEP is one out of 4 divisions of inTRM Solutions Pvt. Ltd, caters to Education and Training vertical, imparting professional skill enhancement trainings in both IT and Non IT segment. IT segment covers entire gamut of trainings on IT-IMS & Software, Telecom and Security Surveillance. Non IT trainings the organization covers on Spoken English, Banking, SSC, GATE, UPSC, Railway, and other competitive exams, Employability Skill like Soft Skill and Life Skill. Under this umbrella we offer Career Assessment and Testing as a separate line of delivery for students and working professionals too. VISION STATEMENT We cater solutions in the domain of IT, Education & Training, Consulting & Event Management across the globe, thereby creating enterprises of tomorrow MISSION STATEMENT To provide world-class solutions and life time experience to our customers by seamless delivery, quality products, embedded value system and continuously progress through partnership. PHILOSOPHY ON QUALITY We will deliver perfect products, services and solutions to meet the requirements of our external and internal customers, the first time, every time and would always improve on the same.
  • 4.
    OUR MANAGEMENT OBJECTIVES Tofuel initiative and foster activity by allowing individuals freedom of action and innovation in attaining defined objectives. OUR BELIEF Challenges are endless and we are geared up to accept those professionally in true spirit of service and delivery. Our Strength and core competencies Providing our customer an experience for life time and complete customer satisfaction through our rich infrastructure, wide spread networks added with economy of skills, has been our greatest strength. Innovative thinking, fast adoption of new technology and technological know-how to provide cost effective optimized solutions to our client embedded with flexibility in all desired direction is our core competencies. Our Training Verticals  I n d i v i d u a l Training Services (ITS) - Imparted at our Centre for individual career aspirant  A c a d e m i c s & Institutional Training Services (AITS) – Imparted for groups at Alliance college campus/ our center  E n t e r p r i s e Training Services (ETS) – Imparted to corporate at their premises/Our center Technical Training Programs Technical Training Offerings (Partial List) from INSTEP -InTRM Sr. No. Training Name No. Of Days (6 hours / day) Oracle 10g Series 1 SQL and PL/SQL 6 2 Fundamentals 1 4 3 Fundamentals 2 4 4 Performance Tuning 3 Oracle 9i 5 SQL and PL/SQL 5 6 Fundamentals 1 5 7 Fundamentals 2 3 SUN Technology 8 Core Java and J2EE 4 9 Design Pattern in Java 4 10 Hibernate 4 11 Enterprise JavaBean (EJB) Development Using Web Sphere Studio Application Developer V5.0 4 12 Java Server Faces (JSF) 4
  • 5.
    13 Advanced Java1.6 with Strut 4 Microsoft Technology 14 Win Server 2008 With Advanced Active Directory 3 15 . NET 3.5 Framework With LINQ 4 16 MS-Exchange 3 17 MS - Excel Basics 3 18 Advanced Excel 3 19 MS - Excel -Basic and Advance 6 20 Ms-Office Basics 5 21 WinFX [.NET 3.0] 4 22 Office SharePoint [Server- 2007] 3 23 MS-Projects 2 24 Microsoft Biztalk Server 2006 3 25 Introduction to SQL Server 2005 3 26 SQL Server 2005 Business Intelligence 3 27 SQL Server 2005 Integration Service 3 28 SQL Server 2005 Reporting Service 3 29 SQL Server 2005 OLAP 3 30 Visual Studio 2008 4 31 Comprehensive . NET 4 32 Introduction To Design Patterns in Microsoft. NET 4 33 Microsoft. NET Application Block 4 IBM – Technologies 34 Tivoli Introduction 5 35 Websphere Introduction 5 36 Lotus Notes Introduction 5 Details of Training Domain ORACLE Oracle Certified Administrator , Oracle Certified Professional DBA, Oracle Certified Professional Internet Application Developer, Oracle 9i: New Features for Administrator, Oracle 9i:/ 10g New Features for Application Developers, Oracle IDS Reports, Oracle 9i: Web Based Applications with PL/SQL, Oracle 9i New Features, Oracle 9i RAC Release 2,Oracle 9i Discoverer, Oracle 9iAS Advanced Administration, Oracle10g Entire Series, Oracle Web Services using Jdeveloper, Portlet Development with JAVA or PL/SQL using Jdeveloper,Portal Development,J2EE Web Cache Adminsitration,Designer 9i/6i, Forms 9i/6i, Reports 9i/6i. Any technologies of ORACLE. REDHAT Red Hat Desktop Applications, RedHat Linux Essentials, Red Hat Linux System Administration, RedHat Linux Security and Networking, RedHat Certified Engineer, Red Hat Enterprise Deployment and Systems Management , RedHat Security, RedHat Enterprise Linux, RedHat Enterprise Linux Directory Services and Authentication, Any technologies of REDHAT. UNIX AIX, HP-UX.,TRU-64.
  • 6.
    SUN MICROSYSTEMS Java Programming,SUN Certified System Administrator Part 1,SUN Certified System Administrator Part 2, J2EE Modules,J2ME Modules(JMS,JAVA Mail,JTA,JTS,JMX) , SOLARIS System Performance Management, Solaris Administration and Adv. Administration. MICROSOFT MS-Office, Visual Basic 6.0 Desktop and Distributed, Visual Basic 6.0 Distributed, Visual C++ Using MFC, ISA ,Exchange Server, BizTalk Server, Application Center, SMS Server, Mobile Application Server, Sharepoint Portal Sever, Commerce Server, COM+, DCOM,XML Services, Content Management Server, Biztalk Server. Any technologies of MICROSOFT. XML TECHNOLOGIES Apache SOAP, Apache Struts/Tiles using XML, WebFocus, WebMethods, Web Services APPLICATION SERVERS WebSphere, WebLogic, iPlanet, 9iAS, Sybase EAS, JBOSS, Alliare JRUN, HP BlueStone OTHER LANGUAGES / TECHNOLOGIES Perl, PHP,CGI,VRML,BC++,Python,C, Advance C , C++ , CORBA,EAI Informix, DB2 IT- Hardware & Networking A+, N+, MCSA, MCSE, MCITP, Wireless Technology, CCNA, CCNP, Security Plus, CCSA, RHCE, RHCT, CISCO PIX / ASA, SOLARIS – SA. OTHER APPLICATIONS Lotus Notes, Domino,Crystal Reports, Eclipse, Sybase, Power Bulider PROJECT MANAGEMENT Rational Rose,Software Project Management,Software Quality Management, MS-Project AUTO CAD About Auto Cad, Explaining graphical User Interface of AutoCAD, Drawing simple sketches (Line, Arc, Circle, Ellipse, Polygon etc), Drawing settings, Modifying entities, Object selection methods, Settings and modifying entity properties, Creating and Managing Layers, Adding Annotations and Dimensions to your drawing, Creating blocks and attributes, Working with Tables, Creating and viewing slides, Slide library, Running scripts, Creating compound, documents with OLE & External references, Electronic Transmit, auto Cad Design center, Plotting your drawing, Layout Management, Exporting AutoCAD objects CATIA Sketch Part design, Assembly design, Drafting, Generative sheet metal, Wireframe & surface design, D M U Kinematics, Core & Cavity, Machining PRO-E Sketch, Part modeling, Assembly, Manufacturing, Sheet metal, Mechanism, Core & cavity extraction, Surface design, Drafting
  • 7.
    Telecommunications: GSM Technology& implementation, Signaling System 7 , BTS installation & commissioning, operation & maintenance, RF Drive Test, Network optimization, BSS, OSS, TETRA, Transmission & design, UMTS Technology & implementation, LTE, Wi MAX, 3G Technology, Telecom Implementation (2G), PTID for NSN, PTID 3G for NSN, 3G Implementation, GNOC, Service Management: Datacom, Voice Communication, IP Telephony, VOIP, Routing & Switching, BGP & MPLS, VPN, IP V6 Fundamental, Broad Band Technologies ( ATM, Frame relay, XDSL)Intelligent Network (IN), Optical Fibre Communication. Electronic Surveillance Certificate in Building Automation, Solution Expert, Certificate program in Electronic Surveillance. (( Access Control, intrusion control, Fire Alarm, CCTV, Temperature Control & Power Optimization) Mobile Repairing Chip level service and repairing of mobile phones, working with SMD Ball & Grid Array, IC’s , circuit tracing & trouble shooting Non Technical Training Programs Trainings for Managerial Cadres Sr. No 1 Getting started as Manager in Pursuit of Managerial Excellence 2 Strategic Planning & Ogranisational Strategies 3 Leadership Skills - Excellence in Leadership / Transformational Leadership 4 High Impact Team Building yielding high performance 5 Man Management through motivation based on situations 6 Mentoring through Counseling, Listening & feedback 7 Power centric Leadership Vs. Delegating power to subordinates 8 Principle Centered Leadership Vs. Servant Leadership 9 Productivity & Performance Management-Leads subordinates to higer productvity through managerial compitancies 10 Mnaging Success & Failure 11 "Manging" to "Leading" - Good to Great 12 Confilict Management workshop 13 Change Management -Leading and Managing Change with change orientation 14 Stress Management 15 Procrastination & Time Management 16 Developing Line Leaders 17 MDP - Management Development Program
  • 8.
    Trainings for MiddleLevel Employees & Team Leaders 1 Driving through Leadership 2 Understanding various Leadership Skills and Styles 3 Team Building, Working in Teams, Team Bonding 4 Excellence in Presentation Skills 5 Creative Problem Solving 6 Executive Image and Grooming 7 Professional Work Attitude 8 Positive Work Attitude / Motivational workshop 9 Effective Communication Skill ( verbal & Non Verbal) and Interpersonal Communication Skills 10 Don't say "YES" when you want to say "NO" 11 Problem Solving and Decision Making 12 Conflict Resolution & problem Solving 13 Working and Winning in Team 14 PEP - Personal Effectiveness Program 15 Analytical Thinking Skills 16 Planning and Organizing Skills 17 Supervisory Development 18 Written Communication 19 Mind Control Skills 20 Work Life Balance 21 Customer Service & Etiquette 22 Conducting Effective Meetings 23 Understanding various Leadership Skills and Styles 24 Business Writing Skills 25 Prioritizing, Planning, Organizing, Time & Task Management 26 Zap the Stress - Stress Management 27 Emotional Intelligence @ Work 28 Balancing Life & Work 29 Adapting to Change & Change Management 30 Personal Effectiveness 31 7 Habits 32 Goal Setting & Achievement 33 SDP - Supervisory Development Program 34 LDP - Leadership Development Program 35 Business & Corporate Etiquette 36 Managing a Sales Team 37 Counseling and Mentoring 38 Performance review and appraisals 39 Self Awareness and Personal Planning 40 Beyond Excellence 41 Change Management 42 OD Interventions
  • 9.
    Training Programs forSales, Marketing & Field Staffs 1 Sharpen the Axe - Building on Selling Strategies 2 Recharge your Battery - Attitudinal Workshop for being Resilient 3 Josh - Motivational Key Note Talk for Sales, 4 Marketing Events 5 Innovation in Marketing 6 Strategic Marketing and Planning Workshop 7 Selling Skills 8 Sales Presentation Skills / Effective Presentation Skills 9 Sales Negotiation Skills / Business Negotiation Skills 10 Business Communication Verbal & Non-Verbal 11 Assertive Communication Skills 12 Prioritizing, Planning, Organizing, Time & Task Management 13 Zap the Stress - Stress Management 14 Goal Setting & Achievement 15 Emotional Intelligence @ Work 16 Adapting to Change & Change Management 17 Personal Effectiveness 18 Effective Telemarketing 19 Target Orientation - The Bull’s Eye 20 How to sell successfully to corporate customers 21 Strategic Sales Planning 22 Managing the dealers 23 Overcoming Sales resistance 24 Business Writing Skills 25 Report Writing Skills 26 Effective Public Speaking Skills 27 Self Awareness and Personal Planning 28 Making Meetings Work 29 Creating Sales Professionals Induction Training for New Joinees 1 Presentation Skills 2 Em-Power Yourself - Personality Development 3 Email, Phone & Office Etiquette 4 Winning Formula 5 Campus to Corporate 6 Corporate Spark 7 Attitude Gym 8 Business Etiquette & Manners 9 Communicating with Confidence 10 Overcoming Fear, Shyness & Limiting Belief
  • 10.
    11 Networking Skills 12Unleash your Potential 13 Rethinking about yourself 14 Present with Power 15 Stop-Think-Act Training Program for Factory Workers 1 Hum Sub Saath Saath 2 Parivartan 3 Joshiley Other Training Programs 1 Training Programs for Executive Assistants, Secretary, Admin Executives 2 Personal One-to-One Coaching for Executives, Managers & Leaders 3 Recharge your Emotions - Outbound Team Bonding Program 4 Spark your Potential - Self Motivational Program 5 Advanced Neuro Linguistic Programming 6 Monitoring and Measuring Training Effectiveness 7 Train The Trainer 8 New Product Development and Management 9 Effective Budgeting 10 Effective Credit Management 11 Finance for Non-Finance Managers/Executive 12 Retail Cash Management 13 Introduction to Neuro Linguistic Programming 14 Technical Writing Skills 15 360 degree feedback 16 Vision Alignment Customized Trainings based on the Clients Need. All the Training Programs are Customized, Designed & Developed after understanding the organization Needs and Objectives. The Training Programs are personally executed by experts to give organization the Value and Return of Investment. Please Note: -  In case there is any of your self identified training need is there and the same is not mentioned in the standard list of training domain shown above, we welcome you to provide us the input and specify your training needs, so that our product development team along with our content writers would be in action to provide you solutions as desired by you. We assure you that, we would give our best and ensure that your needs are catered with utmost care and dedication to see you delighted.
  • 11.
    inStep-inTRM Learning Process Itis a comprehensive approach to training that guides each learner through all stages of the learning lifecycle. It consists of three components – Pre Training Activity, Execution & Post training support. Pre Training Session  This component initiates the process by helping our clients to meet their organizational goal and ensure the return on investments. Customer’s need analysis is done here. Either needs known to the customer is addressed or we ignite the latent need which would help them to excel. Sometimes we do give Seminars, presentations or conduct tests to assess the competency level and understand the training need of your candidates. I.e. These components are Analysis of Training Needs, Competency Analysis, Training Identification & Budget Allocation by the customer. Execution   The training will be imparted by industry experienced and qualified group of Trainers. These trainers are certified by inStep-InTRM and respective Product vendors (i.e Microsoft, Comptia, RedHat, Oracle, Sun, and IBM etc.). Our Trainers are M Tech, B.E., B.Tech, MCA, and BCA. Almost all our trainers carry Global Certification and they are Industry Experienced to make our Trainer’s pool the best and most demanded professional in the industry. The training can be conducted at our premise or client’s premise. We impart the training through CBT, Customized Course and Learning guides. Post Training Support   inStep-inTRM learning process provides post-training support to every learner after completion of their classroom training. If the client desire, a Mentor can be deputed at the client’s location for that to provide them better post training experience. Post training supports like Help Desk support, Electronic mail Support, Customized on site / of site mentor support, Campus support / placement opportunity are either at a separate cost or free of cost that depends on the size of the business, future prospects and Relationship with the client. 13
  • 12.
    Post Training Support Pre- Training Session inStep-inTRM Execution Our Training Methodology Lectures  Demonstrations  Discussions  Group Discussions  Presentation  Games and Simulations  Exercises  Group Discussion  Behavior- Modeling  Business Games  Equipment Simulators  In-basket Technique  Hands on Exercise  Self Evaluation Exercises  Personal sharing of situations faced and solutions employed  Role Plays Blended Learning Approach  Delivery methodology considerations occur after the objectives, assessments, content types, and learning sequence for the training have been decided. A mix of training methods can hence be devised to ensure effective training in an appropriate time frame. This approach leads to what we call as 'Blended Learning' through ILT and MBT. Our "out-of-the-box thinking" provides comprehensive, market- driven and performance-based training and development programs for skills upgrading and enhancing professional competence as well as credibility of your workforce. 14
  • 13.