Contractor Capability Assessment
IOGP Processes
By: HSSE Team
EMPOWERING SAFETY TO THE FRONTLINE
Copyright of Meinhardt ID CONFIDENTIAL
General Process EMPOWERING SAFETY TO THE FRONTLINE
June 2023
When completing the questionnaire, the contractor should
include all associated contractor activities and relevant
support functions not only for a specific contract (supported
with attached documents for each section)
Questionnaire for contractor HSE capability assessment
Date: Location:
24-Jan-23 Jakarta
1.1 Commitment and
accountability to HSE
aspects
1.1 Commitment and
accountability to HSE
aspects
1.1 Commitment and
accountability to HSE
aspects
1.1 Commitment and
accountability to HSE
aspects
1.1 Commitment and
accountability to HSE
aspects
1.1 Commitment and
accountability to HSE
aspects
1.1 Commitment and
accountability to HSE
aspects
1.1 Commitment and
accountability to HSE
aspects
1.1 Commitment and
accountability to HSE
aspects
1.1 Commitment and
accountability to HSE
aspects
Top Level Management, Managers, HSSE & Site Supervisor accountable for the
oversight and coordination of HSSE activities as per HSSE-MS.
e) Is there a code of conduct in place to establish behavioural, ethical and
compliance obligations for employees? If yes, please provide a copy. (E1.4)
f) 1) What communication and engagement mechanisms are established?
(E1.6)
f) 2) How is responsibility assigned for prompt, appropriate and engaging
communication to those involved in delivering HSE performance? (P1)
a) 1. How are managers personally involved in HSE aspects? (E1.2)
a) 2. What is the responsibility of managers in this respect? (P1)
b) How do managers ensure commitment from the workforce to perform
activities in accordance with company policies, standards and objectives, and in
compliance with external requirements? (E1.3)
c) How does the contractor ensure learning from internal and external sources
and promote continuous risk reduction and performance improvement? (E1.8)
d) Provide evidence of accountability and commitment at all levels of the
organization. (E1.5)
g) 2) Who in your organization is accountable for the oversight and co-
ordination of activities within the scope of their part of the HSE-MS? (P1)
Company name:
Completed by : Fitri N. Muhasibi
PT. Heksagon Tiwikrama
Element 1: Commitment and accountability
Written response
g) 1) Provide evidence to show that the HSE-MS is in place across the
organization, with priorities established, authorities and
accountabilities assigned, and resources allocated. (E1.1)
Yes, as per attached
Yes, as per attached
Being able to demonstrate the context of the organisation to collect and support
internal and external requirements and ensure business to properly align its risk
management strategy with its overall risk appetite and risk tolerance in order
support continous improvement, risk reduction and to gain a competitive edge
without compromising business continuity
1. Establish an active workplace safety and health
2. Fully support and committed to eliminating hazards, protecting workers, and
continuously improving workplace safety and health.
3. Provide sufficient resources to implement and maintain the safety and health
program. 4.
Visibly demonstrate and communicate their safety and health commitment to
workers and others
5. Value employee input and feedback.
6. Do regular inspection & audit
7. Involve in safety meeting
8. Set safety goals and hold everyone accountable.
1. Management’s responsibility is to set goals and target, and to track or monitor
performance and success of these goals. Safety goals and targets are established
during management review meetings
2. Heads of Departments (PM, Prod Manager, HSSE Manager etc) sets their
departmental objectives and monitor for compliance.
3. Durector as top persons on the organization is responsible to overseeing the
development of safety goals as well as implementing them
1.As top persons on the organization of HSSE management
2.Regularly involve on the HSSE events as speaker or observer (e.g workshop/
training, briefing, induction, safety meeting, and MR meeting)
3.Do the inspections on HSSE implementation at premises and project site
4.Involve on the HSSE events conducted by clientele
5.As representative on the LCSC (Local Contractor Safety Council) ID
by involving and couraging in safety events and agenda
Formal Communication (email, project meeting etc), mid-formal communication
(Project WAG, Ms. Teams Message etc), display/ interface communication (buletin,
poster etc)
Validated by : Meinhardt
Yes, as per attached
Contractor will be given questionnaire that covers the information required to
assess the extent to which HSE and its management are organized by the
contractor
1
2
General Process EMPOWERING SAFETY TO THE FRONTLINE
June 2023
The submissions assessed by a scoring mechanism in the evaluation
process, such as that provided in HSE capability assessment: overview
and scoring system
Findings
(fill in below):
Select type of finding (hold marker on
field to see definitions):
Company HSE-MS does not
include identification, assessment
and treatment of HSE risk
considering
all potentially affected parties,
including external stakeholders. A
culture
of risk awareness that supports
decision-making at each level of
the organization does not exist.
Company HSE-MS makes
reference to the need
to conduct HSE risk assessment
but has no techniques to perform
identification, assessment and
treatment of risk considering all
potentially affected parties,
including external stakeholders. A
culture of risk awareness that
supports decision- making at each
level of the organization is not
established.
Company HSE-MS includes
techniques for the assessment of
task based and specific HSE
subject risk identification,
assessment and treatment of HSE
risk considering
all potentially affected parties,
including external stakeholders. A
culture
of risk awareness that supports
decision-making at each level of
the organization is established.
“Acceptable” together with
recognition of positive impacts
and the optimization of benefits
that the business activity may
provide. These could include the
development of people, local
capacity building, environmental
conservation opportunities and
infrastructure.
- No LFI included within the HIRADC
which likelihood measrurement is
questionable
- No Master Hazard Register that covers
all API's scope of work
- Company HIRADC available, evidence
of socialization available, but frontliner
still not aware of it
YELLOW
Unacceptable (D) Poor (C) Acceptable (B) Excellent (A)
Normal 3 C
Element 5: Risk assessment and control
5.1 - Risk assessment and control: a) 1) What processes and methods does your company have in place to manage risks to an
acceptable level for the scope of your activities? (E5.1)
a) 2) How does your company ensure no operation is performed without a specific risk assessment? (E5.1)
a) 3) How does your company monitor that all control and mitigation measures are in place before performing any operation? (E5.1)
b) 1) How are conflicting interests dealt with, within your risk management process? (P5)
b) 2) Is there commitment to review and improve risk management and associated processes periodically, and in response to an event or
change in circumstances? (P5)
c) Provide evidence of documentation and communication of the risk management processes for significant risks, including risk acceptance
approval at appropriate levels of the organization, scheduled reviews and updating of risk registers. (E5.2)
d) How do you manage changes and assess associated risks, e.g. temporary/permanent changes that affect the organization, activities,
assets, operations, products, plans or procedures? (E5.3)
e) How are vulnerabilities and non-conformances recognized, including deviations from operating procedures or weak signals that provide
indications of potentially increasing risk? (E5.4)
f) How is learning from incidents, events, non-conformities and good practices from internal and external sources incorporated into risk
assessments and their review? (M5)
g) Has your company established risk control and regulatory compliance plans to manage ‘normal’ conditions, allowing the organization to
manage HSE risks locally while maintaining full compliance with relevant requirements and legislation? If yes, please specify which areas of
risk, context or requirements. (P7)
Contractors
self
evaluation
Gaps found
during document
review
Classification
type of finding
Weight
Scoring
3
General Process EMPOWERING SAFETY TO THE FRONTLINE
June 2023
A follow-up discussion with the contractor’s management may be needed.
This checklist is provided to give auditors some guidance on desired
outcomes, or
objective evidence that should be seen from audits on various topics. It is by
no
means complete and is provided as guidance for use by an auditor if desired.
The
text used is based on IOGP 510, Operating Management System Framework
and
therefore refers to, for example, “OMS”. However, this guidance focuses on
HSE.
Gen.
Man.
HSE/HR/
Tec/Proc
man.
Saf.
del.
A X X 1,1
Please explain briefly how the management is committed and accountable to HSE aspects
With HSE we mean health and working environment, safety, security, environment and social responsibility
(emphasise first time with General manager)
- Does your company have appointed owners to ensure their part of the managment system is reviewed and
continuously improved, including updates to reflect learning from incidents and audits?
- How are strategies and clear objectives that drive the organization to achieve high levels of performance shared?
• How do you reinforce the importance of a strong culture, recognizing teamwork and valuing individual behaviours?
• Are all outcomes—good or bad— embraced as opportunities to learn and improve?
• Do you develop ‘constant vigilance’ to be acutely aware of things that could go wrong and facing up to these
risks?
• Do you communicate clearly that procedural short cuts or rule-bending are not tolerated?
EVIDENCE:
- Leaders demonstrate ownership through direct involvement in, and application of, system processes,
and by constantly mandating the workforce’s adherence to the OMS. Accountability based on well-
defined authority levels, acceptance of decision making and a clear understanding of job responsibilities.
Element 1: Commitment and accountability to HSE aspects
OGP423 - Checklist
Self
evaluation
Compliance
(Y/N)
Spes focus
(Y/N)
Questions to:
Item
no
Questions
Finding
(a finding is a documentet non-conformity with reference to an observation)
4
General Process EMPOWERING SAFETY TO THE FRONTLINE
June 2023
Gaps that found during the audit visit must be listed
along with the required action from contractors.
5
Action taken by
contractor to close
the gaps
Benefits & Challenges EMPOWERING SAFETY TO THE FRONTLINE
June 2023
BENEFITS CHALLENGES
The process is risk-based which applies both to
contractors and suppliers (available Full
Questionnaire and Short Questionnaire depends on
the risk faced)
New approach of process which require contractors
in re-banding program need times for adjustment
Guidance available and explained for the expected
outcome from contractors
More than 200 Questions which has to be filled
Has more complete questionnaires than previous
Greenbanding Process with new elements to
assess:
- Customer and Stakeholders
- Risk Assessment that more detailed and complex
in Security, Health, and Social
Scoring could be adjusted depend on the market
condition
The Process So Far EMPOWERING SAFETY TO THE FRONTLINE
June 2023
0 10 20 30 40 50 60 70 80 90
Makro
Heksagon Tiwikrama
Citra Karsa Dinamika
Anugerah Petro Indonesia
Usaha Engineering Services
Mitra Purnama Engineering
Full Questionnaire
Days
Haven’t submit any
document since given
questionnaire (March
2023)
Haven’t submit any document
since Audit Visit (March 2023)
Done and proceed to C-HSSE Plan
Wait for document after Audit
No submission more
than 2 months
0 20 40 60 80 100
Visualindo
Dapoer Creative Indonesia
Panca Jaya Setia
Himawan Putra Corporation
Multi Sistim Komunikasi
Short Questionnaire
EMPOWERING SAFETY TO THE FRONTLINE

More Related Content

Similar to Contractor Capability Assessment - IOGP.pptx

Global HSE Newsletter March 2014
Global HSE Newsletter March 2014Global HSE Newsletter March 2014
Global HSE Newsletter March 2014Mohammad Ghadban
 
Understanding the Roles and Responsibilities of ISMS Auditor.docx
Understanding the Roles and Responsibilities of ISMS Auditor.docxUnderstanding the Roles and Responsibilities of ISMS Auditor.docx
Understanding the Roles and Responsibilities of ISMS Auditor.docxINTERCERT
 
Assessment – SITXOHS004BStudent name ____________________________.docx
Assessment – SITXOHS004BStudent name ____________________________.docxAssessment – SITXOHS004BStudent name ____________________________.docx
Assessment – SITXOHS004BStudent name ____________________________.docxfredharris32
 
Auditor Training 2023 _ Safety General.pptx
Auditor Training 2023 _ Safety General.pptxAuditor Training 2023 _ Safety General.pptx
Auditor Training 2023 _ Safety General.pptxAngad45
 
BOS 3401, Construction Safety 1 UNIT V STUDY GUIDE .docx
BOS 3401, Construction Safety 1  UNIT V STUDY GUIDE .docxBOS 3401, Construction Safety 1  UNIT V STUDY GUIDE .docx
BOS 3401, Construction Safety 1 UNIT V STUDY GUIDE .docxhartrobert670
 
The IRM India- A Risk Management Standard
The IRM India- A Risk Management StandardThe IRM India- A Risk Management Standard
The IRM India- A Risk Management StandardThe IRM India
 
Risk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbazRisk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbazMohamed Saeed
 
White paper pragmatic safety solutions
White paper pragmatic safety solutionsWhite paper pragmatic safety solutions
White paper pragmatic safety solutionsCraig Tappel
 
Chapter 5 Environmental Safety, Security and Compliances(FASS)
Chapter 5  Environmental Safety, Security and Compliances(FASS)Chapter 5  Environmental Safety, Security and Compliances(FASS)
Chapter 5 Environmental Safety, Security and Compliances(FASS)Md Shaifullar Rabbi
 
Risk management: Principles, methodologies and techniques
Risk management: Principles, methodologies and techniquesRisk management: Principles, methodologies and techniques
Risk management: Principles, methodologies and techniquesILRI
 
QESH Training slides with Check list for
QESH Training slides with Check list forQESH Training slides with Check list for
QESH Training slides with Check list forGobiNava1
 
Safety Management System1SMS-1Jeffrey D Carpenter, CSP.docx
Safety Management System1SMS-1Jeffrey D Carpenter, CSP.docxSafety Management System1SMS-1Jeffrey D Carpenter, CSP.docx
Safety Management System1SMS-1Jeffrey D Carpenter, CSP.docxrtodd599
 
Risk Assessment and Internal Control 7 Key Strategies.pdf
Risk Assessment and Internal Control 7 Key Strategies.pdfRisk Assessment and Internal Control 7 Key Strategies.pdf
Risk Assessment and Internal Control 7 Key Strategies.pdfRT Compliance
 
u10a1-Risk Assessment Report-Beji Jacob
u10a1-Risk Assessment Report-Beji Jacobu10a1-Risk Assessment Report-Beji Jacob
u10a1-Risk Assessment Report-Beji JacobBeji Jacob
 
Eyad Sallam Saudi Safety and Security Conference 2014 presentation/ organizat...
Eyad Sallam Saudi Safety and Security Conference 2014 presentation/ organizat...Eyad Sallam Saudi Safety and Security Conference 2014 presentation/ organizat...
Eyad Sallam Saudi Safety and Security Conference 2014 presentation/ organizat...Eyad Sallam
 

Similar to Contractor Capability Assessment - IOGP.pptx (20)

Global HSE Newsletter March 2014
Global HSE Newsletter March 2014Global HSE Newsletter March 2014
Global HSE Newsletter March 2014
 
Understanding the Roles and Responsibilities of ISMS Auditor.docx
Understanding the Roles and Responsibilities of ISMS Auditor.docxUnderstanding the Roles and Responsibilities of ISMS Auditor.docx
Understanding the Roles and Responsibilities of ISMS Auditor.docx
 
Assessment – SITXOHS004BStudent name ____________________________.docx
Assessment – SITXOHS004BStudent name ____________________________.docxAssessment – SITXOHS004BStudent name ____________________________.docx
Assessment – SITXOHS004BStudent name ____________________________.docx
 
IAASB Webinar on Assurance on Sustainability Reporting
IAASB Webinar on Assurance on Sustainability ReportingIAASB Webinar on Assurance on Sustainability Reporting
IAASB Webinar on Assurance on Sustainability Reporting
 
Auditor Training 2023 _ Safety General.pptx
Auditor Training 2023 _ Safety General.pptxAuditor Training 2023 _ Safety General.pptx
Auditor Training 2023 _ Safety General.pptx
 
Osha
OshaOsha
Osha
 
BOS 3401, Construction Safety 1 UNIT V STUDY GUIDE .docx
BOS 3401, Construction Safety 1  UNIT V STUDY GUIDE .docxBOS 3401, Construction Safety 1  UNIT V STUDY GUIDE .docx
BOS 3401, Construction Safety 1 UNIT V STUDY GUIDE .docx
 
The IRM India- A Risk Management Standard
The IRM India- A Risk Management StandardThe IRM India- A Risk Management Standard
The IRM India- A Risk Management Standard
 
Risk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbazRisk 0-risk-guide book for pmi-rmp by amer elbaz
Risk 0-risk-guide book for pmi-rmp by amer elbaz
 
White paper pragmatic safety solutions
White paper pragmatic safety solutionsWhite paper pragmatic safety solutions
White paper pragmatic safety solutions
 
Chapter 5 Environmental Safety, Security and Compliances(FASS)
Chapter 5  Environmental Safety, Security and Compliances(FASS)Chapter 5  Environmental Safety, Security and Compliances(FASS)
Chapter 5 Environmental Safety, Security and Compliances(FASS)
 
Risk management: Principles, methodologies and techniques
Risk management: Principles, methodologies and techniquesRisk management: Principles, methodologies and techniques
Risk management: Principles, methodologies and techniques
 
QESH Training slides with Check list for
QESH Training slides with Check list forQESH Training slides with Check list for
QESH Training slides with Check list for
 
Safety Management System1SMS-1Jeffrey D Carpenter, CSP.docx
Safety Management System1SMS-1Jeffrey D Carpenter, CSP.docxSafety Management System1SMS-1Jeffrey D Carpenter, CSP.docx
Safety Management System1SMS-1Jeffrey D Carpenter, CSP.docx
 
ERM ppt.pptx
ERM ppt.pptxERM ppt.pptx
ERM ppt.pptx
 
Risk Assessment and Internal Control 7 Key Strategies.pdf
Risk Assessment and Internal Control 7 Key Strategies.pdfRisk Assessment and Internal Control 7 Key Strategies.pdf
Risk Assessment and Internal Control 7 Key Strategies.pdf
 
u10a1-Risk Assessment Report-Beji Jacob
u10a1-Risk Assessment Report-Beji Jacobu10a1-Risk Assessment Report-Beji Jacob
u10a1-Risk Assessment Report-Beji Jacob
 
BBS Projects List
BBS Projects ListBBS Projects List
BBS Projects List
 
Eyad Sallam Saudi Safety and Security Conference 2014 presentation/ organizat...
Eyad Sallam Saudi Safety and Security Conference 2014 presentation/ organizat...Eyad Sallam Saudi Safety and Security Conference 2014 presentation/ organizat...
Eyad Sallam Saudi Safety and Security Conference 2014 presentation/ organizat...
 
ANNEX_TO_CV_DR_FEHERVARI_Elisabeth
ANNEX_TO_CV_DR_FEHERVARI_ElisabethANNEX_TO_CV_DR_FEHERVARI_Elisabeth
ANNEX_TO_CV_DR_FEHERVARI_Elisabeth
 

Recently uploaded

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelDrAjayKumarYadav4
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdfKamal Acharya
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdfAlexander Litvinenko
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessorAshwiniTodkar4
 
Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...
Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...
Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...dannyijwest
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxhublikarsn
 

Recently uploaded (20)

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...
Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...
Cybercrimes in the Darknet and Their Detections: A Comprehensive Analysis and...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 

Contractor Capability Assessment - IOGP.pptx

  • 1. Contractor Capability Assessment IOGP Processes By: HSSE Team EMPOWERING SAFETY TO THE FRONTLINE Copyright of Meinhardt ID CONFIDENTIAL
  • 2. General Process EMPOWERING SAFETY TO THE FRONTLINE June 2023 When completing the questionnaire, the contractor should include all associated contractor activities and relevant support functions not only for a specific contract (supported with attached documents for each section) Questionnaire for contractor HSE capability assessment Date: Location: 24-Jan-23 Jakarta 1.1 Commitment and accountability to HSE aspects 1.1 Commitment and accountability to HSE aspects 1.1 Commitment and accountability to HSE aspects 1.1 Commitment and accountability to HSE aspects 1.1 Commitment and accountability to HSE aspects 1.1 Commitment and accountability to HSE aspects 1.1 Commitment and accountability to HSE aspects 1.1 Commitment and accountability to HSE aspects 1.1 Commitment and accountability to HSE aspects 1.1 Commitment and accountability to HSE aspects Top Level Management, Managers, HSSE & Site Supervisor accountable for the oversight and coordination of HSSE activities as per HSSE-MS. e) Is there a code of conduct in place to establish behavioural, ethical and compliance obligations for employees? If yes, please provide a copy. (E1.4) f) 1) What communication and engagement mechanisms are established? (E1.6) f) 2) How is responsibility assigned for prompt, appropriate and engaging communication to those involved in delivering HSE performance? (P1) a) 1. How are managers personally involved in HSE aspects? (E1.2) a) 2. What is the responsibility of managers in this respect? (P1) b) How do managers ensure commitment from the workforce to perform activities in accordance with company policies, standards and objectives, and in compliance with external requirements? (E1.3) c) How does the contractor ensure learning from internal and external sources and promote continuous risk reduction and performance improvement? (E1.8) d) Provide evidence of accountability and commitment at all levels of the organization. (E1.5) g) 2) Who in your organization is accountable for the oversight and co- ordination of activities within the scope of their part of the HSE-MS? (P1) Company name: Completed by : Fitri N. Muhasibi PT. Heksagon Tiwikrama Element 1: Commitment and accountability Written response g) 1) Provide evidence to show that the HSE-MS is in place across the organization, with priorities established, authorities and accountabilities assigned, and resources allocated. (E1.1) Yes, as per attached Yes, as per attached Being able to demonstrate the context of the organisation to collect and support internal and external requirements and ensure business to properly align its risk management strategy with its overall risk appetite and risk tolerance in order support continous improvement, risk reduction and to gain a competitive edge without compromising business continuity 1. Establish an active workplace safety and health 2. Fully support and committed to eliminating hazards, protecting workers, and continuously improving workplace safety and health. 3. Provide sufficient resources to implement and maintain the safety and health program. 4. Visibly demonstrate and communicate their safety and health commitment to workers and others 5. Value employee input and feedback. 6. Do regular inspection & audit 7. Involve in safety meeting 8. Set safety goals and hold everyone accountable. 1. Management’s responsibility is to set goals and target, and to track or monitor performance and success of these goals. Safety goals and targets are established during management review meetings 2. Heads of Departments (PM, Prod Manager, HSSE Manager etc) sets their departmental objectives and monitor for compliance. 3. Durector as top persons on the organization is responsible to overseeing the development of safety goals as well as implementing them 1.As top persons on the organization of HSSE management 2.Regularly involve on the HSSE events as speaker or observer (e.g workshop/ training, briefing, induction, safety meeting, and MR meeting) 3.Do the inspections on HSSE implementation at premises and project site 4.Involve on the HSSE events conducted by clientele 5.As representative on the LCSC (Local Contractor Safety Council) ID by involving and couraging in safety events and agenda Formal Communication (email, project meeting etc), mid-formal communication (Project WAG, Ms. Teams Message etc), display/ interface communication (buletin, poster etc) Validated by : Meinhardt Yes, as per attached Contractor will be given questionnaire that covers the information required to assess the extent to which HSE and its management are organized by the contractor 1 2
  • 3. General Process EMPOWERING SAFETY TO THE FRONTLINE June 2023 The submissions assessed by a scoring mechanism in the evaluation process, such as that provided in HSE capability assessment: overview and scoring system Findings (fill in below): Select type of finding (hold marker on field to see definitions): Company HSE-MS does not include identification, assessment and treatment of HSE risk considering all potentially affected parties, including external stakeholders. A culture of risk awareness that supports decision-making at each level of the organization does not exist. Company HSE-MS makes reference to the need to conduct HSE risk assessment but has no techniques to perform identification, assessment and treatment of risk considering all potentially affected parties, including external stakeholders. A culture of risk awareness that supports decision- making at each level of the organization is not established. Company HSE-MS includes techniques for the assessment of task based and specific HSE subject risk identification, assessment and treatment of HSE risk considering all potentially affected parties, including external stakeholders. A culture of risk awareness that supports decision-making at each level of the organization is established. “Acceptable” together with recognition of positive impacts and the optimization of benefits that the business activity may provide. These could include the development of people, local capacity building, environmental conservation opportunities and infrastructure. - No LFI included within the HIRADC which likelihood measrurement is questionable - No Master Hazard Register that covers all API's scope of work - Company HIRADC available, evidence of socialization available, but frontliner still not aware of it YELLOW Unacceptable (D) Poor (C) Acceptable (B) Excellent (A) Normal 3 C Element 5: Risk assessment and control 5.1 - Risk assessment and control: a) 1) What processes and methods does your company have in place to manage risks to an acceptable level for the scope of your activities? (E5.1) a) 2) How does your company ensure no operation is performed without a specific risk assessment? (E5.1) a) 3) How does your company monitor that all control and mitigation measures are in place before performing any operation? (E5.1) b) 1) How are conflicting interests dealt with, within your risk management process? (P5) b) 2) Is there commitment to review and improve risk management and associated processes periodically, and in response to an event or change in circumstances? (P5) c) Provide evidence of documentation and communication of the risk management processes for significant risks, including risk acceptance approval at appropriate levels of the organization, scheduled reviews and updating of risk registers. (E5.2) d) How do you manage changes and assess associated risks, e.g. temporary/permanent changes that affect the organization, activities, assets, operations, products, plans or procedures? (E5.3) e) How are vulnerabilities and non-conformances recognized, including deviations from operating procedures or weak signals that provide indications of potentially increasing risk? (E5.4) f) How is learning from incidents, events, non-conformities and good practices from internal and external sources incorporated into risk assessments and their review? (M5) g) Has your company established risk control and regulatory compliance plans to manage ‘normal’ conditions, allowing the organization to manage HSE risks locally while maintaining full compliance with relevant requirements and legislation? If yes, please specify which areas of risk, context or requirements. (P7) Contractors self evaluation Gaps found during document review Classification type of finding Weight Scoring 3
  • 4. General Process EMPOWERING SAFETY TO THE FRONTLINE June 2023 A follow-up discussion with the contractor’s management may be needed. This checklist is provided to give auditors some guidance on desired outcomes, or objective evidence that should be seen from audits on various topics. It is by no means complete and is provided as guidance for use by an auditor if desired. The text used is based on IOGP 510, Operating Management System Framework and therefore refers to, for example, “OMS”. However, this guidance focuses on HSE. Gen. Man. HSE/HR/ Tec/Proc man. Saf. del. A X X 1,1 Please explain briefly how the management is committed and accountable to HSE aspects With HSE we mean health and working environment, safety, security, environment and social responsibility (emphasise first time with General manager) - Does your company have appointed owners to ensure their part of the managment system is reviewed and continuously improved, including updates to reflect learning from incidents and audits? - How are strategies and clear objectives that drive the organization to achieve high levels of performance shared? • How do you reinforce the importance of a strong culture, recognizing teamwork and valuing individual behaviours? • Are all outcomes—good or bad— embraced as opportunities to learn and improve? • Do you develop ‘constant vigilance’ to be acutely aware of things that could go wrong and facing up to these risks? • Do you communicate clearly that procedural short cuts or rule-bending are not tolerated? EVIDENCE: - Leaders demonstrate ownership through direct involvement in, and application of, system processes, and by constantly mandating the workforce’s adherence to the OMS. Accountability based on well- defined authority levels, acceptance of decision making and a clear understanding of job responsibilities. Element 1: Commitment and accountability to HSE aspects OGP423 - Checklist Self evaluation Compliance (Y/N) Spes focus (Y/N) Questions to: Item no Questions Finding (a finding is a documentet non-conformity with reference to an observation) 4
  • 5. General Process EMPOWERING SAFETY TO THE FRONTLINE June 2023 Gaps that found during the audit visit must be listed along with the required action from contractors. 5 Action taken by contractor to close the gaps
  • 6. Benefits & Challenges EMPOWERING SAFETY TO THE FRONTLINE June 2023 BENEFITS CHALLENGES The process is risk-based which applies both to contractors and suppliers (available Full Questionnaire and Short Questionnaire depends on the risk faced) New approach of process which require contractors in re-banding program need times for adjustment Guidance available and explained for the expected outcome from contractors More than 200 Questions which has to be filled Has more complete questionnaires than previous Greenbanding Process with new elements to assess: - Customer and Stakeholders - Risk Assessment that more detailed and complex in Security, Health, and Social Scoring could be adjusted depend on the market condition
  • 7. The Process So Far EMPOWERING SAFETY TO THE FRONTLINE June 2023 0 10 20 30 40 50 60 70 80 90 Makro Heksagon Tiwikrama Citra Karsa Dinamika Anugerah Petro Indonesia Usaha Engineering Services Mitra Purnama Engineering Full Questionnaire Days Haven’t submit any document since given questionnaire (March 2023) Haven’t submit any document since Audit Visit (March 2023) Done and proceed to C-HSSE Plan Wait for document after Audit No submission more than 2 months 0 20 40 60 80 100 Visualindo Dapoer Creative Indonesia Panca Jaya Setia Himawan Putra Corporation Multi Sistim Komunikasi Short Questionnaire
  • 8. EMPOWERING SAFETY TO THE FRONTLINE