Programming & Preparation
Electrical Work Plumbing Work
Fire Work Air conditioning
PROPOSED METHOD OF CONSTRUCTION
Extra work
Foundation
R.C.C. Super Structure
• Conduits in slab
• Groove cutting &
conduits in wall
• Installation of
switch boards back
box.
• Installation of
distribution boards.
• Cable wiring.
• Switch , Socket
fitting.
•Location selection
•Indoor & outdoor
unit Installation
•Copper piping
Pressure test
•Gas Changing
&vacuum work
•Test run &
commissioning.
•Piping work
•Fitting fixtures
• Cable wiring
• Device installations
• Fire panel
installations.
• Commissioning &
programming.
Form Work
From Work Remove
Finishing
False Ceiling
•Brick wall
•Plaster
•Paint
•Door & Window
•Tiles/ Flooring
Casting
5.2.2 RCC SERVICE PILING WORK
The Process of Bored Flowchart for pile work construction is as follows :
Inspection
Setting out
Site leveling
Steel Casing
Driller in Position
Drilling
OK
Borehole clearing
Removing drilling rod
InspectionInspection
Reinforcement cage
placement
Final borehole clearing
OK
Tremie placement
Concrete casting
Fabricating reinforcement
cage
Concrete Mixing
Slurry Mixing
Slurry Pit
Programming & Preparation
Civil Work Electrical Work Plumbing Work Fire Work Air conditioning
PROPOSED METHOD OF CONSTRUCTION
Extra work
Foundation
R.C.C. Super Structure
• Conduits in slab
• Groove cutting &
conduits in wall
• Installation of
switch boards back
boxes.
• Installation of
distribution boards.
• Cable wiring
• Switch , Socket
fitting.
•Location selection
•Indoor & outdoor
unit Installation
•Copper piping
Pressure test
•Gas Changing
&vacuum work
•Test run &
commission
•Piping work
•Fitting fixtures
• Cable wiring
• Device installations
• Fire panel
installations.
• Commissioning &
programming.
Shuttering
• Casting
•Shutter Remove
Finishing False Ceiling
•Brick wall
•Plaster
•Paint
•Door & Window
•Tiles/ Flooring
Programming & Preparation
Electrical Work Plumbing Work
Fire Work Air conditioning
PROPOSED METHOD OF CONSTRUCTION
Extra work
Foundation
R.C.C. Super Structure
• Conduits in slab
• Groove cutting &
conduits in wall
• Installation of
switch boards back
boxes.
• Installation of
distribution boards.
• Cable wiring
• Switch , Socket
fitting.
•Location selection
•Indoor & outdoor
unit Installation
•Copper piping
Pressure test
•Gas Changing
&vacuum work
•Test run &
commission
•Piping work
•Fitting fixtures
• Cable wiring
• Device installations
• Fire panel
installations.
• Commissioning &
programming.
Form Work
From Work Remove
Finishing
False Ceiling
•Brick wall
•Plaster
•Paint
•Door & Window
•Tiles/ Flooring
Casting

Construction method

  • 1.
    Programming & Preparation ElectricalWork Plumbing Work Fire Work Air conditioning PROPOSED METHOD OF CONSTRUCTION Extra work Foundation R.C.C. Super Structure • Conduits in slab • Groove cutting & conduits in wall • Installation of switch boards back box. • Installation of distribution boards. • Cable wiring. • Switch , Socket fitting. •Location selection •Indoor & outdoor unit Installation •Copper piping Pressure test •Gas Changing &vacuum work •Test run & commissioning. •Piping work •Fitting fixtures • Cable wiring • Device installations • Fire panel installations. • Commissioning & programming. Form Work From Work Remove Finishing False Ceiling •Brick wall •Plaster •Paint •Door & Window •Tiles/ Flooring Casting
  • 2.
    5.2.2 RCC SERVICEPILING WORK The Process of Bored Flowchart for pile work construction is as follows : Inspection Setting out Site leveling Steel Casing Driller in Position Drilling OK Borehole clearing Removing drilling rod InspectionInspection Reinforcement cage placement Final borehole clearing OK Tremie placement Concrete casting Fabricating reinforcement cage Concrete Mixing Slurry Mixing Slurry Pit
  • 3.
    Programming & Preparation CivilWork Electrical Work Plumbing Work Fire Work Air conditioning PROPOSED METHOD OF CONSTRUCTION Extra work Foundation R.C.C. Super Structure • Conduits in slab • Groove cutting & conduits in wall • Installation of switch boards back boxes. • Installation of distribution boards. • Cable wiring • Switch , Socket fitting. •Location selection •Indoor & outdoor unit Installation •Copper piping Pressure test •Gas Changing &vacuum work •Test run & commission •Piping work •Fitting fixtures • Cable wiring • Device installations • Fire panel installations. • Commissioning & programming. Shuttering • Casting •Shutter Remove Finishing False Ceiling •Brick wall •Plaster •Paint •Door & Window •Tiles/ Flooring
  • 4.
    Programming & Preparation ElectricalWork Plumbing Work Fire Work Air conditioning PROPOSED METHOD OF CONSTRUCTION Extra work Foundation R.C.C. Super Structure • Conduits in slab • Groove cutting & conduits in wall • Installation of switch boards back boxes. • Installation of distribution boards. • Cable wiring • Switch , Socket fitting. •Location selection •Indoor & outdoor unit Installation •Copper piping Pressure test •Gas Changing &vacuum work •Test run & commission •Piping work •Fitting fixtures • Cable wiring • Device installations • Fire panel installations. • Commissioning & programming. Form Work From Work Remove Finishing False Ceiling •Brick wall •Plaster •Paint •Door & Window •Tiles/ Flooring Casting