This document provides reference sites for Able Data installations including:
1) A 405-apartment building in Milton Keynes where Able Data installed a TV and satellite system across multiple blocks.
2) A new campus for West Herts College where Able Data installed 7,000 Cat6a outlets over three months.
3) Veolia Three Valleys Water offices where Able Data installed a 3,000-outlet Cat6 system across four floors.
Data Cabling Reference Sites Winter 2010 (2)shaunbarnes
This document provides details on several data cabling reference sites completed by Able Data Installations Plc including:
1) Reed Smith - Installation of over 6,000 data outlets across 13 floors of a London building for a large international law firm.
2) Ashmolean Museum - Cabling of a major museum building extension with nearly 1,000 outlets across 6 floors.
3) Misys - Cabling and moves for 3,000 employees into a new London headquarters building.
The document provides contact details, location, systems installed, timelines and brief descriptions of the work completed at each reference site. Pictures are also included for some of the projects.
X007 E Data Cabling Reference Sites Winter 2010alex_hudson1
Able Data installed structured cabling systems for several large commercial projects, including over 13,000 data outlets across multiple sites for clients such as Reed Smith, Misys, Hampshire County Council, and Johnson & Johnson. The installations involved cabling across multiple floors and buildings, with challenges that included tight schedules and complex cable routing. Able Data also built a new data center for Hampshire County Council featuring advanced technologies.
The document provides information on several reference projects completed by Able Data, including:
1) Cabling installations for banks such as Bank of China and City of Westminster College involving thousands of outlets and fiber backbones.
2) A data center installation on the 50th floor of the Canary Wharf Tower for Bear Stearns, the highest cabling installation in Europe at the time.
3) Structured cabling systems for law firm Reynolds Porter Chamberlain and asset management firm AllianceBernstein involving several thousand outlets each.
4) An installation of 2,000 outlets for eBay's new headquarters building in Berlin.
Able Data installed over 7,000 Cat6a outlets and a 24-core OM3 fibre backbone at the new Paddington Green campus of City of Westminster College in London from March 2010 to January 2011. The installation included 60 equipment cabinets to provide remote monitoring of power and environmental conditions.
Trevor Holt has 18 years of experience in electrical installation, commissioning, inspection, testing and validation across various industries including rail, industrial, commercial and healthcare. He holds qualifications in inspection and testing, electrical installation, and signal works testing. Currently he works as an IRSE signal installer for Thales upgrading the Metrolink network, installing and testing traffic management systems.
This document contains the resume of Charles Ndoli Aguya. It summarizes his work experience including positions as a technical engineer for Teledata Technologies installing and maintaining telecom systems, and previous roles as a technician for Access Kenya, KDN Internet, and Pixar Enterprises installing internet, wireless, and fiber networks. It also lists his education including a diploma in electronic engineering from Kenya College of Communication Technology and previous self-employment and contract roles installing electrical systems. Referees and contact information are provided at the end.
This white paper discusses Gigabit Ethernet and 10 Gigabit Ethernet cabling solutions. It describes the fiber optic and copper cabling options for 1GbE and 10GbE networks, including cable types, connectors, and transceivers. It explains that single mode and multi-mode fiber cables can support distances from hundreds of meters to tens of kilometers for both 1GbE and 10GbE, while copper solutions like Cat5/6 can provide shorter connections up to 100 meters. Transceivers like SFP, SFP+, and XFP are used to connect the different cable types to networking equipment.
Lakesmere had one of its most successful years in 2012 despite the continuing recession. Careful planning and strong leadership allowed Lakesmere to exceed budget and profitability targets for the year. Major projects in the UK and largest-to-date contract in the Middle East contributed to increased revenues. Lakesmere also launched new divisions, acquired another company, and has major growth planned for 2013-2014 with 80% of revenue already secured. Lakesmere continues to invest in innovation, training, and expanding service offerings.
Data Cabling Reference Sites Winter 2010 (2)shaunbarnes
This document provides details on several data cabling reference sites completed by Able Data Installations Plc including:
1) Reed Smith - Installation of over 6,000 data outlets across 13 floors of a London building for a large international law firm.
2) Ashmolean Museum - Cabling of a major museum building extension with nearly 1,000 outlets across 6 floors.
3) Misys - Cabling and moves for 3,000 employees into a new London headquarters building.
The document provides contact details, location, systems installed, timelines and brief descriptions of the work completed at each reference site. Pictures are also included for some of the projects.
X007 E Data Cabling Reference Sites Winter 2010alex_hudson1
Able Data installed structured cabling systems for several large commercial projects, including over 13,000 data outlets across multiple sites for clients such as Reed Smith, Misys, Hampshire County Council, and Johnson & Johnson. The installations involved cabling across multiple floors and buildings, with challenges that included tight schedules and complex cable routing. Able Data also built a new data center for Hampshire County Council featuring advanced technologies.
The document provides information on several reference projects completed by Able Data, including:
1) Cabling installations for banks such as Bank of China and City of Westminster College involving thousands of outlets and fiber backbones.
2) A data center installation on the 50th floor of the Canary Wharf Tower for Bear Stearns, the highest cabling installation in Europe at the time.
3) Structured cabling systems for law firm Reynolds Porter Chamberlain and asset management firm AllianceBernstein involving several thousand outlets each.
4) An installation of 2,000 outlets for eBay's new headquarters building in Berlin.
Able Data installed over 7,000 Cat6a outlets and a 24-core OM3 fibre backbone at the new Paddington Green campus of City of Westminster College in London from March 2010 to January 2011. The installation included 60 equipment cabinets to provide remote monitoring of power and environmental conditions.
Trevor Holt has 18 years of experience in electrical installation, commissioning, inspection, testing and validation across various industries including rail, industrial, commercial and healthcare. He holds qualifications in inspection and testing, electrical installation, and signal works testing. Currently he works as an IRSE signal installer for Thales upgrading the Metrolink network, installing and testing traffic management systems.
This document contains the resume of Charles Ndoli Aguya. It summarizes his work experience including positions as a technical engineer for Teledata Technologies installing and maintaining telecom systems, and previous roles as a technician for Access Kenya, KDN Internet, and Pixar Enterprises installing internet, wireless, and fiber networks. It also lists his education including a diploma in electronic engineering from Kenya College of Communication Technology and previous self-employment and contract roles installing electrical systems. Referees and contact information are provided at the end.
This white paper discusses Gigabit Ethernet and 10 Gigabit Ethernet cabling solutions. It describes the fiber optic and copper cabling options for 1GbE and 10GbE networks, including cable types, connectors, and transceivers. It explains that single mode and multi-mode fiber cables can support distances from hundreds of meters to tens of kilometers for both 1GbE and 10GbE, while copper solutions like Cat5/6 can provide shorter connections up to 100 meters. Transceivers like SFP, SFP+, and XFP are used to connect the different cable types to networking equipment.
Lakesmere had one of its most successful years in 2012 despite the continuing recession. Careful planning and strong leadership allowed Lakesmere to exceed budget and profitability targets for the year. Major projects in the UK and largest-to-date contract in the Middle East contributed to increased revenues. Lakesmere also launched new divisions, acquired another company, and has major growth planned for 2013-2014 with 80% of revenue already secured. Lakesmere continues to invest in innovation, training, and expanding service offerings.
Fullback® Insulated Siding is an industry leading building product. Its moisture performance is only one of its many industry leading features. From the product’s introduction nearly 20 years ago, it was obvious that no siding system would be successful unless it allowed moisture to escape from the wall assembly, either as water vapor or bulk moisture. Progressive Foam completed moisture testing leading-up to the launch of Fullback® Insulated Siding, and has continued to test products as the Fullback® line has evolved.
This document discusses the relationship between persuasive communication and propaganda. It explores how persuasion is an essential part of public relations but also overlaps with propaganda. While propaganda aims to deliberately manipulate audiences, ethical persuasion allows audiences to make informed decisions. The key difference is that persuasion involves open dialogue, while propaganda is one-sided communication intended to benefit the communicator over the audience. Overall, the document examines the challenges for PR to use persuasion ethically and avoid the negative connotations of propaganda.
Able Data was contracted by BAM Construction to build an integrated reception system for 405 apartments at the Vizion Apartments development in Milton Keynes for £350K. The system included equipment from Fracarro and individual TV and data patch cabinets for each apartment to allow flexible reconfiguration. One challenge was building temporary head ends to provide service to new tenants as the main development continued to be built out over multiple blocks.
Shaun Barnes Data Cabling Reference Sitesshaunbarnes
Reynolds Porter Chamberlain: Able Data installed 6,000 Cat6 outlets and an OM3 fibre backbone at RPC's new London headquarters over four floors. An iTRACS cable management system was also installed to manage the cabling infrastructure.
AllianceBernstein: Able Data installed 5,000 new outlets and over 4,000 computer room links when AllianceBernstein refurbished offices in London, completing the work in under six weeks using pre-termination.
eBay Berlin: Able Data installed 2,000 outlets over five floors of eBay's new Berlin headquarters, implementing the standard of outlets grouped in fours on faceplates in yellow, green, blue and red colors. A data center was
Andrew Campbell is a data/telecoms engineer living in Broughty Ferry, Dundee with over 30 years of experience. He has held various roles including working directly for BT Openreach and as a subcontractor for several telecommunications companies. He has extensive accreditations and qualifications in copper jointing, fiber installation, structured cabling, and audio/visual systems.
This document provides information about Exceltek Broadcasting Services, a communications solutions provider based in Perth, Western Australia. It was established in 1994 and provides services such as engineering, systems design, manufacturing, installation, project management, and maintenance of wired and wireless communications solutions. It has experience in industries such as broadcasting, mining, and ports. The document outlines Exceltek's services, products, sample projects in Australia and internationally, and includes a testimonial praising Exceltek's professionalism and experience in broadcasting projects.
Kemrock Industries implemented a new fiber optic network across its 250-acre campus housing 26 departments to connect over 500 nodes and support reliable voice, data, and CCTV. Molex fiber optic cables and structured cabling products were selected to create a scalable, redundant network. The installation was completed on time despite challenges from production schedules. The new network has provided 100% uptime, increased security, and eliminated downtime, meeting Kemrock's needs and expectations. Molex continues to support Kemrock's network expansion plans.
This document is John Buckley's CV. It summarizes his experience as a Chartered Electrical Design Engineer with over 25 years of experience in various industries such as oil & gas, industrial, building services, CHP, mining, refrigeration, transportation, rail, highways, and telecommunications. It lists his areas of expertise, core competencies, and representative projects in areas like power generation, hazardous equipment, cabling, control systems, distributed control systems, and quality assurance. It also provides details of his educational background and professional affiliations.
PRECISION CABLES PROVIDES PERFECT PRODUCTS FOR UPS HQLee Stokes
The document discusses a cabling project for the UPS headquarters in Dublin involving around 100,000 meters of Cat6a and 2,000 meters of OM3 fiber optic cable. The fiber optic cable used was Draka's BendBright cable, which was tested for the first time on this project. The installation went smoothly and tested successfully, with the contractor pleased with the performance of the BendBright cable under stress. Precision Cables supplied the cable and ancillary products for the project, and credited Draka's technical support for ensuring the correct cable design was delivered on time.
PRECISION CABLES PROVIDES PERFECT PRODUCTS FOR UPS HQGeoff Byrne
The document discusses a cabling project for the UPS headquarters in Dublin involving around 100,000 meters of Cat6a cable and 2,000 meters of OM3 fiber optic cable run through false floors between two large comm rooms. It was the first project using Draka's BendBright fiber cable, which performed well under stress of bends. The installation went smoothly and tested successfully, with the contractor pleased with the fiber cable's performance in a challenging route. Precision Cables supplied the cable and ancillary products for the project as Ireland's leading Draka distributor.
This document is Lee Wilk's resume. It summarizes his contact information, objective of seeking a position to utilize his knowledge and experience, and employment history as a Communication Technician/Installer from 2014 to present for Ainsworth Communications Inc. in Fort McMurray, AB. It lists his job duties including installing network cabling, terminating cables, dressing cables, installing wireless access points, and fiber optic circuit builds. It also lists his certifications and education.
- The project involved constructing a 3,875km broadband fibre optic cable network linking Melbourne, Adelaide, and Perth to provide high speed data communication services as an alternative to existing networks.
- The $160 million network used DWDM technology capable of 160 wavelengths at 10 Gigabits/sec to transmit data without repeaters.
- The network was built over 14 months between 2000-2002, with Marconi providing the transmission products and services for design, installation, and commissioning of the network.
1) Draka's UC Connect Cat 6a cabling system has been selected for Dublin City University's new Nano-Bioanalytical Research Facility, a state-of-the-art three-story research building comprising laboratories and administration areas.
2) The slimline and high-density Cat 6a cable was proposed as an easy to install and cost-effective solution for the 1,500 outlet installation, enabled by its compact design allowing more cables in trays and conduits.
3) Elite Data Services is installing the slimline cable, which offers improved flexibility, reduced weight, and is supplied on reusable cardboard reels for ease of installation and recycling.
Brian Grant has over 30 years of experience engineering and installing telecommunications networks in northern Canada. He has extensive experience designing, testing, and installing satellite, microwave radio, fiber optic, and IP networks while working with Northwestel and other organizations. Some of his most notable projects include the installation of a $28 million satellite phone network in the Canadian Arctic, the upgrade of Northwestel's analog microwave systems to digital RD6 radios, and the establishment of Northwestel's Juniper-based IP core network.
The document outlines the agenda for Cybermoor Networks' AGM, including receiving reports from management and auditors, electing new board members, and applying profits. It provides an update on Cybermoor's South Tyne Valley fiber optic network project, including plans to build connections from Slaggyford to Park Village and extend to Haltwhistle. It also discusses seeking social investment to finance connecting rural areas and future plans to extend fiber coverage around Alston.
Samuel Kola Alabi is an experienced electrical and electronic engineer and telecommunications technician seeking a technical position where he can contribute to a company's growth. He has 8 years of experience in technical roles involving electrical and telecommunications structural cabling in construction, oil and gas production, and offshore drilling environments. He is proficient in terminating copper and fiber optic cables and has skills in networking, applications, operating systems, and telecommunications equipment.
This document contains the CV of Robin Adcock, including his personal details, qualifications, work experience, and security clearances. He has over 30 years of experience in electronics and broadcast systems work, including roles as an electrician, freelance wireman, and currently as the Managing Director of his own company Binmar Limited. He has extensive experience in cable installation, panel wiring, and broadcast projects for clients around the UK and internationally.
This document contains the resume of Isaac Yeboah Williams, a Ghanaian electrical engineer seeking a position in telecommunications. It outlines his educational background including an HND in electrical engineering and various technical certifications. It also details his over 10 years of experience in roles such as transmission engineer, field support technician, and electrician for companies in Ghana. His skills and responsibilities in these roles involved installation, maintenance and troubleshooting of telecom equipment, electrical systems, and wireless networks. References are also provided.
Fullback® Insulated Siding is an industry leading building product. Its moisture performance is only one of its many industry leading features. From the product’s introduction nearly 20 years ago, it was obvious that no siding system would be successful unless it allowed moisture to escape from the wall assembly, either as water vapor or bulk moisture. Progressive Foam completed moisture testing leading-up to the launch of Fullback® Insulated Siding, and has continued to test products as the Fullback® line has evolved.
This document discusses the relationship between persuasive communication and propaganda. It explores how persuasion is an essential part of public relations but also overlaps with propaganda. While propaganda aims to deliberately manipulate audiences, ethical persuasion allows audiences to make informed decisions. The key difference is that persuasion involves open dialogue, while propaganda is one-sided communication intended to benefit the communicator over the audience. Overall, the document examines the challenges for PR to use persuasion ethically and avoid the negative connotations of propaganda.
Able Data was contracted by BAM Construction to build an integrated reception system for 405 apartments at the Vizion Apartments development in Milton Keynes for £350K. The system included equipment from Fracarro and individual TV and data patch cabinets for each apartment to allow flexible reconfiguration. One challenge was building temporary head ends to provide service to new tenants as the main development continued to be built out over multiple blocks.
Shaun Barnes Data Cabling Reference Sitesshaunbarnes
Reynolds Porter Chamberlain: Able Data installed 6,000 Cat6 outlets and an OM3 fibre backbone at RPC's new London headquarters over four floors. An iTRACS cable management system was also installed to manage the cabling infrastructure.
AllianceBernstein: Able Data installed 5,000 new outlets and over 4,000 computer room links when AllianceBernstein refurbished offices in London, completing the work in under six weeks using pre-termination.
eBay Berlin: Able Data installed 2,000 outlets over five floors of eBay's new Berlin headquarters, implementing the standard of outlets grouped in fours on faceplates in yellow, green, blue and red colors. A data center was
Andrew Campbell is a data/telecoms engineer living in Broughty Ferry, Dundee with over 30 years of experience. He has held various roles including working directly for BT Openreach and as a subcontractor for several telecommunications companies. He has extensive accreditations and qualifications in copper jointing, fiber installation, structured cabling, and audio/visual systems.
This document provides information about Exceltek Broadcasting Services, a communications solutions provider based in Perth, Western Australia. It was established in 1994 and provides services such as engineering, systems design, manufacturing, installation, project management, and maintenance of wired and wireless communications solutions. It has experience in industries such as broadcasting, mining, and ports. The document outlines Exceltek's services, products, sample projects in Australia and internationally, and includes a testimonial praising Exceltek's professionalism and experience in broadcasting projects.
Kemrock Industries implemented a new fiber optic network across its 250-acre campus housing 26 departments to connect over 500 nodes and support reliable voice, data, and CCTV. Molex fiber optic cables and structured cabling products were selected to create a scalable, redundant network. The installation was completed on time despite challenges from production schedules. The new network has provided 100% uptime, increased security, and eliminated downtime, meeting Kemrock's needs and expectations. Molex continues to support Kemrock's network expansion plans.
This document is John Buckley's CV. It summarizes his experience as a Chartered Electrical Design Engineer with over 25 years of experience in various industries such as oil & gas, industrial, building services, CHP, mining, refrigeration, transportation, rail, highways, and telecommunications. It lists his areas of expertise, core competencies, and representative projects in areas like power generation, hazardous equipment, cabling, control systems, distributed control systems, and quality assurance. It also provides details of his educational background and professional affiliations.
PRECISION CABLES PROVIDES PERFECT PRODUCTS FOR UPS HQLee Stokes
The document discusses a cabling project for the UPS headquarters in Dublin involving around 100,000 meters of Cat6a and 2,000 meters of OM3 fiber optic cable. The fiber optic cable used was Draka's BendBright cable, which was tested for the first time on this project. The installation went smoothly and tested successfully, with the contractor pleased with the performance of the BendBright cable under stress. Precision Cables supplied the cable and ancillary products for the project, and credited Draka's technical support for ensuring the correct cable design was delivered on time.
PRECISION CABLES PROVIDES PERFECT PRODUCTS FOR UPS HQGeoff Byrne
The document discusses a cabling project for the UPS headquarters in Dublin involving around 100,000 meters of Cat6a cable and 2,000 meters of OM3 fiber optic cable run through false floors between two large comm rooms. It was the first project using Draka's BendBright fiber cable, which performed well under stress of bends. The installation went smoothly and tested successfully, with the contractor pleased with the fiber cable's performance in a challenging route. Precision Cables supplied the cable and ancillary products for the project as Ireland's leading Draka distributor.
This document is Lee Wilk's resume. It summarizes his contact information, objective of seeking a position to utilize his knowledge and experience, and employment history as a Communication Technician/Installer from 2014 to present for Ainsworth Communications Inc. in Fort McMurray, AB. It lists his job duties including installing network cabling, terminating cables, dressing cables, installing wireless access points, and fiber optic circuit builds. It also lists his certifications and education.
- The project involved constructing a 3,875km broadband fibre optic cable network linking Melbourne, Adelaide, and Perth to provide high speed data communication services as an alternative to existing networks.
- The $160 million network used DWDM technology capable of 160 wavelengths at 10 Gigabits/sec to transmit data without repeaters.
- The network was built over 14 months between 2000-2002, with Marconi providing the transmission products and services for design, installation, and commissioning of the network.
1) Draka's UC Connect Cat 6a cabling system has been selected for Dublin City University's new Nano-Bioanalytical Research Facility, a state-of-the-art three-story research building comprising laboratories and administration areas.
2) The slimline and high-density Cat 6a cable was proposed as an easy to install and cost-effective solution for the 1,500 outlet installation, enabled by its compact design allowing more cables in trays and conduits.
3) Elite Data Services is installing the slimline cable, which offers improved flexibility, reduced weight, and is supplied on reusable cardboard reels for ease of installation and recycling.
Brian Grant has over 30 years of experience engineering and installing telecommunications networks in northern Canada. He has extensive experience designing, testing, and installing satellite, microwave radio, fiber optic, and IP networks while working with Northwestel and other organizations. Some of his most notable projects include the installation of a $28 million satellite phone network in the Canadian Arctic, the upgrade of Northwestel's analog microwave systems to digital RD6 radios, and the establishment of Northwestel's Juniper-based IP core network.
The document outlines the agenda for Cybermoor Networks' AGM, including receiving reports from management and auditors, electing new board members, and applying profits. It provides an update on Cybermoor's South Tyne Valley fiber optic network project, including plans to build connections from Slaggyford to Park Village and extend to Haltwhistle. It also discusses seeking social investment to finance connecting rural areas and future plans to extend fiber coverage around Alston.
Samuel Kola Alabi is an experienced electrical and electronic engineer and telecommunications technician seeking a technical position where he can contribute to a company's growth. He has 8 years of experience in technical roles involving electrical and telecommunications structural cabling in construction, oil and gas production, and offshore drilling environments. He is proficient in terminating copper and fiber optic cables and has skills in networking, applications, operating systems, and telecommunications equipment.
This document contains the CV of Robin Adcock, including his personal details, qualifications, work experience, and security clearances. He has over 30 years of experience in electronics and broadcast systems work, including roles as an electrician, freelance wireman, and currently as the Managing Director of his own company Binmar Limited. He has extensive experience in cable installation, panel wiring, and broadcast projects for clients around the UK and internationally.
This document contains the resume of Isaac Yeboah Williams, a Ghanaian electrical engineer seeking a position in telecommunications. It outlines his educational background including an HND in electrical engineering and various technical certifications. It also details his over 10 years of experience in roles such as transmission engineer, field support technician, and electrician for companies in Ghana. His skills and responsibilities in these roles involved installation, maintenance and troubleshooting of telecom equipment, electrical systems, and wireless networks. References are also provided.
Robert Logan has over 25 years of experience in various roles relating to installation, service, and repair of technology equipment. He is currently a lead engineer and project manager overseeing installations in homes and businesses. His experience includes roles in telecommunications, IT, medical equipment, home cinema installation, and more. He has strong skills in areas like networking, cabling, control systems, TV/audio installation, and customer service.
Rentaphonesystem.com.au offers the NEC SV9100 Business Phone system. This system is designed specifically for small business and offers VOIP and PABX options.
Ip and vo ip phone system benefits nec sv9100 phone system_nec univerge sv9100Rentaphonesystem.com.au
Rentaphonesystem.com.au offers the NEC SV9100 Business Phone system. This system is designed specifically for small business and offers VOIP and PABX options.
The document discusses IP telephony and converged networks. It covers traditional telephony versus IP, IP trunks, extensions and terminals. It defines key network components like switches and routers. It explains the benefits of IP telephony like lower costs, easier moves/adds/changes, and enhanced services. It also covers considerations for implementing converged voice and data networks like quality of service and separating voice and data traffic.
Ip and vo ip phone system benefits nec sv9100 phone system_nec univerge sv9100
Consolidated
1. Able Data – Reference Sites
Vizion Apartments, Milton Keynes
Summary TV & Satellite System for 405 Apartments
Contact Rob Barker, Electrical Services, BAM Construction. 01727 894 203
Centrum Business Park, Building 4, St Albans, Herts. AL1 2RD
Location Part of the Abbey gate Sainsbury’s development, Milton Keynes
Contract £350K
Systems Fracarro IRS Equipment
Timescales March 2007 - November 2008
Contractor BAM
Project Able Data were contracted to build an IRS system for the new Abbey gate
Description Sainsbury’s development in Milton Keynes.
Over the large development, it was decided to build a separate aerial rig
and head end on each main block, subdividing the project into smaller
independent units. Each flat was provided with its own TV and Data patch
cabinet to allow flexible re-configuration of the services.
One of the challenges was to build temporary TV/Sat head ends to
accommodate new tenants moving whilst the main development continued.
Pictures
Able Data Installations Plc
Tel: 01442 219580
www.abledata.co.uk
2. Able Data – Reference Sites
West Herts College
Summary Cabling of new college campus
Contact Rob Barker
BAM Construction
Centrium Business Park, Building 4
St Albans, Herts. AL1 2RD
Tel: 020 8879 1188
Location Watford
Contract £500K
Systems SYSTIMAX GigaSPEED X10D, Prism Cabinets
Start & Finish Jan 2010 – April 2010
Contractor BAM
Project West Herts College has embarked on a long-term property strategy to
Description modernise its facilities and transform campus life. As part of their
plans they have built a new flagship Watford campus offering state-of-
the-art facilities in an inspiring environment.
Able Data were contracted to install a high performance campus wide
structured cabling system. Over three months Able Data installed
7,000 SYSTIMAX Cat6a UTP outlets.
Pictures
Able Data Installations Plc
Tel: 01442 219580
www.abledata.co.uk
3. Able Data – Reference Sites
Veolia Three Valleys Water
Summary Cabling of building
Contact Bob Davis, Senior ICT Consultant
Mace
Atelier House, 64 Pratt Street
London
NW1 0LF
Tel: 020 7554 8000
Location Hatfield Business Park, Hatfield
Contract £200K
Systems Molex PowerCat 6 UTP Cat6
Start & Finish Nov 2008 – Jan 2009
Consultant Mace
Contractor Como
Project Veolia Water (formally Three Valleys Water) consolidated their
Description offices into the new HUB building in Hatfield, a building to house 750
office staff.
Able Data were contracted by Como to install a 3,000 outlet Cat6 data
cabling system. Run over four floors, outlets were terminated in a grid
of 8-way consolidation points installed under the false floor. Desk
outlets were connected to the consolidation points through solid patch
lead connections.
The project was completed over a period of two months.
Pictures
Able Data Installations Plc
Tel: 01442 219580
www.abledata.co.uk
4. Able Data – Reference Sites
South Thames College
Summary Cat6 Cable installation in to a refurbished part of the College
Development.
Contact Rob Barker
BAM Construction
Centrium Business Park, Building 4
St Albans, Herts. AL1 2RD
Tel: 020 8879 1188
Location Wandsworth London
Contract £85K
Systems Brand-Rex Cat6 & OM3 Fibre Backbone
Installed
Start & April 2010 to Oct 2010
Finish
Consultant None
Main BAM
Contractor
Project Able Data installed 1200 Brand-Rex Cat6 Outlets and 288 Fibre Links.
Description This was an extremely difficult installation due to the Building
Restraints and the age of the Building An important scheduling
consideration was the requirement to fit around the School Terms.
Picture
Able Data Installations Plc
Tel: 01442 219580
www.abledata.co.uk
5. Able Data – Reference Sites
Misys
Summary Cabling & moves into new headquarters building
Contact Phil Davies, IT Manager.
Misys
One Kingdom Street, Paddington. W2 6BL
Tel: 020 8879 1188
Location Paddington, London
Contract £300K
Systems Brand-Rex Cat6 & OM3, Cooper B-Line Cabinets
Start & Finish Feb – Aug 2008
Consultant April Management
Contractor Mastercraft Design
Project Misys were consolidating four regional offices into one new
Description headquarters building.
The new offices required 3,000 Brand Rex LSOH Cat6 outlets
installed over three floors, each floor being cabled from two patch
rooms. Able Data connected the patch rooms through diversely routed
OM3 fibre and voice backbones. In the main computer room, Able
Data installed Cooper B-Line cabinets, fitted with the Unite Hawki-2
intelligent power monitor and control products.
Able Data also managed the movement of 500 users into the new
building. Scheduled over five weekends, this included providing an
asset register of all of their computer equipment and a full moves
service into the new offices, including connection and test of all of the
desktop equipment.
Pictures
Able Data Installations Plc
Tel: 01442 219580
www.abledata.co.uk
6. Able Data – Reference Sites
HBG – Crawley Schools
Summary Installation of Data/Voice & TV cabling in three Schools.
Contact Mr Steve Rooke
HBG Construction
Merit House, Edgware Road, Colindale, NW9 5AF.
Tel: 020 8200 7070
Location Crawley, West Sussex
Contract £300K
Systems Data: 6,000 Brand-Rex Cat5e Outlets plus OM3 fibre.
TV: 1,000 TV outlets. Fracarro K-series head end through Webro
CT167/CT100 cables.
Start & Finish Feb 2004 – Aug 2005
Consultant N/A
Contractor HBG Construction
Project HBG have built three new secondary schools in West Sussex, Oriel,
Description Ifield and Thomas Bennett. As part of this project, they contracted
Able Data to design and install a data cabling and TV distribution
system.
The data cabling systems are based on the Brand Rex Millenium
Cat5e system. In each school, Able Data installed 2,000 RJ45 outlets
in class rooms, staff rooms and other locations. These outlets were run
back to a number of local patch cabinets, which were in turn
connected back to the main computer room via OM3 fibre.
The TV distribution system includes 300 class room TV outlets per
school. Within each school, these are fed from a single central head
end, which is in turn fed from a single set of TV and radio aerials. The
head end equipment includes a high quality Fracarro K-series
processing system, which as well as providing high quality TV
terrestrial analogue and digital channels, presents FM and DAB radio
to all outlets. The school can also broadcast channels from their own
video sources, such as DVD players, tapes or cameras.
Picture
Oriel School
Able Data Installations Plc
Tel: 01442 219580
www.abledata.co.uk
7. Able Data – Reference Sites
Fidelity Oakhill Data Centre
Summary New Data Centre at the Fidelity HQ
Contact John Brogan, Project Manager
Fidelity International
Oakhill House, 130 Tonbridge Rd
Hildenborough, Kent, TN11 9DZ
Tel: 01732 361 144
Location Tonbridge, Kent
Contract £2.5M
Systems Systimax Cat 6, LazrSPEED 300 OM3, iPatch, CPI Patch Frames
Installed Jul – Oct 2009
Project Fidelity International is a world-wide leading investment provider. As
Description part of their UK data centre consolidation strategy, Fidelity required a
new Data Centre facility at its HQ facility at Tonbridge.
Spread over two underground data halls and two office floors, the
project required the installation of 30,000 Cat6 copper links and 11,000
OM3 duplex fibre links to 300 Rittal cabinets and used more than
700km of cable. All links connect to a patch field of 80 x CPI patch
frames, each monitored with the iPatch Intelligent patch system.
The Data Centre was cabled overhead on three levels of CPI ladder
racking. One of the biggest challenges faced by Able Data was to
deliver the required high quality of cabling. To work out the optimum
cable routing schemes, Able Data built an offsite mock up of a row of
patch frames and the associated cables. To speed up installation whilst
minimising unsightly cable slack, Able Data single end pre-terminated
all copper and fibre links. The entire installation was completed over a
14 week period.
As well as building and configuring a 40,000 port iPatch system to
manage patching and monitor network devices, Able Data implemented
additional bespoke functionality tailored to Fidelity’s requirements,
including auto server provisioning.
Pictures
Able Data Installations Plc
Tel: 01442 219580
www.abledata.co.uk
8. Able Data – Reference Sites
Fidelity Investments
Summary Cabling of Fidelity’s Date Centres
Contact Dexter Baird
Oakhill House, 130 Tonbridge Road
Hildenborough, Kent
TN11 9DZ
Tel: 01732 777627
Location Acton Colt Data Centre, London
Global Switch 2 Data Centre, London
Contract £650K (Total)
Systems SYSTIMAX GigaSPEED XL Cat6
SYSTIMAX LazrSPEED OM2, OM3
Start & Jan 2003 – May 2003
Finish Nov 2005 – Dec 2005
Jul 2006
Project In three separate projects, Able Data have cabled Fidelity’s London
Description based Data centres.
In the first project Able Data supplied and installed thirty data
cabinets and the required cabling infrastructure. The initial installation
of 4,000 copper links was completed within four weeks. All RJ45
patch panels are of the Avaya Fleximax variety, where standard outlet
modules are clipped into the panel.
The second and third projects were similar, but on a larger scale. The
third project at Global Switch involved 10,000 links, installed over a
period of one month, made possible by the use of off site pre-
termination,
As part of the initial project, Able Installed also 1,000 10Gbit OM2
fibre links, terminated onto SC connector outlets. The later projects
used LC connectors.
Pictures
Able Data Installations Plc
Tel: 01442 219580
www.abledata.co.uk
9. Able Data – Reference Sites
Debenhams
Summary Data Cabling for new and refurbished Department Stores
Contact Peter Craven, Project Manager.
Bedford Road, Park Street, Taunton,
Somerset, TA1 4DB
Tel: 01823 364 303
Location Various retail sites including Hemel Hempstead, Thanet, Woking,
Portsmouth & Slough.
Contract £150K
Systems SYSTIMAX PowerSUM Cat5e & Excel Cabinets
Start & November 2004 (Thanet)
Finish March 2005 (Portsmouth, Woking, Sough)
April 2005 (Hemel Hempstead)
Consultant N/A
Contractor Various
Project Debenhams has an ongoing program of opening new stores. In each
Description they install a structured cabling system to serve the shop floor tills and
pay points as well as the general offices. It is Debenhams policy to use
SYSTIMAX PowerSUM cabling throughout.
By the nature of shop premises, most of the cabling work is in the
ceiling void, requiring the extensive use of platforms.
Each store floor will normally have its own cabling cabinet. These
cabinets are joined to the master cabinet via either fibre or copper
interlinks, depending on the distances involved.
Part of this project involved the fast track conversion of three Alders
stores to Debenhams in March 2005. This involved the use of three
separate cabling teams working on the different sites.
Pictures
Able Data Installations Plc
Tel: 01442 219580
www.ablecable.co.uk
10. Able Data – Reference Sites
Church Commissioners
Summary Installation of Data & Voice Cabling over 6 floors
Contact Martyn Chadaway
CBI, ‘The Gherkin’, 30 St Mary Axe, London, EC3A 8AD.
Location The Corporation of Church House, Church House, Great Smith Street,
London. SW1P 3AZ.
Contract £180K
Systems Tyco Amp Cat6 STP & Quantum Cat5e UTP
Timescales September 2006 – March 2007
Consultant CBI
Project The Corporation of The Church House was founded in 1888 as the Church
Description of England's permanent tribute to Queen Victoria's Golden Jubilee. The
Church House, a grade II listed building, is the headquarters of the
Archbishops' Council and all its Boards and Councils as well as of the
Church of England Pensions Board and the National Society. It is the
meeting-place, twice each year, of the General Synod of the Church of
England.
Church House also contains a Conference Centre that provides
accommodation and facilities for a vast variety of events from AGMs,
conferences, dinners and receptions to exhibitions.
Able Data were contracted to install 1500 outlets over 6 floors and the
conference centre. The key challenge of delivering this project was the
complexity of the cable routes. The building is listed and most of the
original features of the conference centre, meeting & conference rooms on
the Ground and Lower Ground floors could not be changed or put in any
risk of being damaged.
Pictures
Able Data Installations Plc
Tel: 01442 219580
www.abledata.co.uk
11. Able Data – Reference Sites
Bucks New University (BNU)
Summary Installation of Data & Voice Cabling over 13 Floors
Contact Andy MacFarlane
BAM Construction
Centrium, Griffiths Way
St Albans, Herts. AL1 2RD
Location High Wycombe
Contract £150K
Systems Excel Cat6
Installed Apr 2009 – Dec 2009
Contractor BAM
Project Buckinghamshire New University’s camp has undergone an extensive
Description £60m programme of rebuilding in 2009. A new, high-tech learning
resources centre, known as the Gateway, forms the focal point of the
University’s technology-led learning experience.
Able Data were contracted by BAM to install an 1,800 Excel Cat6
UTP cabling system, spread over the six patch rooms on the six floors
of the new Gateway building extension. Able Data also installed an
Blown Fibre (OM3) & a voice link backbone cabling infrastructure
between each patch room and the main computer room on the 4th floor.
Picture
Able Data Installations Plc
Tel: 01442 219580
www.abledata.co.uk
12. Able Data – Reference Sites
Ashmolean Museum
Summary Cabling of Major New Building Extension
Contact Dr Jonathan Moffett
Ashmolean Museum,
Beaumont Street, Oxford
OX1 2PH
Contract £200K
Systems Molex Cat6
Installed Dec 2008 - Oct 2009
Builder BAM
Project The Ashmolean Museum, dating from the 17th century, is the oldest public
museum in the UK. Award-winning architect Rick Mather created a new
building that has doubled the Ashmolean’s gallery space and state-of-the-art
facilities. In November 2009, the £61M redevelopment opened to the public.
Able Data installed a structured cabling system, consisting of nearly a thousand
outlets, spread over 6 floors of the new building extension.
Each of the 13 remote patch cabinet locations had a fibre & copper backbone
linking to the Basement computer room. As well as the provision of the
computer cabinets at each location Able Data supplied & installed an APC UPS
& 3Comm Switch. The biggest challenge was the complexity and range of
cable routes. Whilst some outlets are located in low floor boxes, others for high
gallery points (overhead projectors etc) are at more than eight metres high.
Another challenge was fitting cabling around a complex building program;
many outlets could not be terminated or tested until after the exhibition cabinets
had been installed.
Pictures
Able Data Installations Plc
Tel: 01442 219580
www.abledata.co.uk
13. Able Data – Reference Sites
Ashburton Court
Summary Hampshire County Council Office HQ & Data Centre
Contact Bob Davis, Senior ICT Consultant
Mace
Atelier House, 64 Pratt Street
London
NW1 0LF
Tel: 020 7554 8000
Location Winchester City Centre
Contract £850K
Systems Nexans Lanmark-6 10G F/UTP, Nexans LANsense System, Excel Cat6
Installed Sep 2007 – May 2009
Consultant Mace
Contractor BAM
Project In 2009 Hamshire County Council (HCC) completed a major office
Description refurbishment of its HQ building at Ashburton Court. The conversion of
this 1960’s council office building to a naturally ventilated, low energy
facility included a heat recovery from the internal Data Centre as a source
of heat to service the office areas.
Able Data were contracted by BAM to install a data cabling system
providing 4,000 Cat6 outlets to the new offices and meeting rooms. Able
Data also won the contract to build the new Data Centre facility, completed
over eight weeks in Spring 2009. With 70 Prism server cabinets, 5,000
copper links and 2,000 fibre links, this new data centre has become HCC’s
primary Data Centre. The facility incorporates leading edge Data Centre
technologies to maximise space and power usage and to enable remote
operation. Functionality installed by Able Data included a Nexans 10G
Ca6a copper cabling system, a Nexans Intelligent Infrastructure
Management (IIM) system, Nexans remotely control Intelligent PDU’s and
a Data Centre wide Austin Hughes KVM system.
Pictures
Able Data Installations Plc
Tel: 01442 219580
www.abledata.co.uk
14. Able Data – Reference Sites
APAX
Summary Molex Cat 6 – OM3
Contact Stephen Grabiner
020 7872 6300
Location 33 Jermyn Street
London
SW1Y 6DN
Contract 130k
Systems Molex
Start & 6 Month Project
Finish
Consultant CBI
Contractor ISG
Project
Description Able Data Installations installed a Molex Cat 6 & OM3 Fibre Optic
cabling systems over 6 floors of the new London headquarters
Building of Apax and Partners in Jermym Street.
Apax Partners is a global private equity group that invests in five
industry sectors. Founded more than 30 years ago, the firm uses its
sector expertise, deep local presence and broad global platform to
create value for its stakeholders. The history of Apax is Interwoven
with the development of the private equity assest class on both sides
of the Atlantic.
Pictures
Able Data Installations Plc
Tel: 01442 219580