SlideShare a Scribd company logo
Atmo Jay Networks Sdn Bhd
(976891-A)
Company Profile
Who We Are
ATMO JAY NETWORKS SDN BHD was formed in February 2nd
2012 under the
Malaysia business rules regulations with the primary objective of excelling in the total
project management in the telecommunication industry, particularly activities relating to
on-grid & off-grid power solution, fiber optic cabling, active & passive network services
these includes equipment installation, testing, commissioning and maintenance. We are
proud to be a 100% local based company.
As a service oriented organization with collective team experience of more than 50 years,
we are firmly committed towards providing quality and excellent service to all clients. At
Atmo Jay, our core belief is simple: deploy the best craftsmanship for all its customers
and further strengthen the relationship by obtaining direct support from the
manufacturers and working with well reputable and experienced business partners.
2015 was an exciting year for Atmo Jay Networks Sdn Bhd as we have been awarded
3200 sites to install a system called “Remote Monitoring System” for Edotco Malaysia.
As end of December 2015 we have successfully installed 3008 sites all over Malaysia.
This has been a milestone project for the company and has elevated the company to
another level in delivering project successfully to our customer.
We at ATMO JAY have successfully trained a pool of competent technical staffs that are
totally committed to carrying out their duties to meet customer’s requirement and
standard. We are very happy of our achievements thus far, which we attribute entirely to
our group of qualified and experienced personnel’s who have performed their duties with
great dedication and skillfulness.
Atmo Jay Networks Sdn Bhd:
Your	partner	in	giving	your	customer	the	highest	quality	in	service.
Corporate Foundation
Atmo Jay’s Vision
• Our expression of work is an act of perfection
• Abundance to All is our success
Atmo Jay’s Mission
To achieve our vision, we are determined to do the following:
• Build relationship based on trust and integrity with our customers and partners.
• Implement good corporate governance in all expect of operating the business.
• To implement efficient strategy, dedicate and result-oriented characteristic in our
day to day business.
• Be the employer of choice that inspires performance excellence based on
empowerment.
Atmo Jay’s Guiding Values
• Honesty, integrity, courage and dedication are our core belief in working.
• Work is love made visible.
• Our employees are the key ingredient to our growth and success.
• Our actions should not only benefit our shareholders but also employees, society
and the environment.
• Excellent is our commitment.
• Entrepreneurship.
• May your success be the success for humanity at large.
(A Friends to Mankind Philosophy)
Corporate Formation Info
v ROC Date Incorporated:
o Atmo Jay Networks Sdn Bhd (976891-A) on 2nd
February 2012.
v Authorized Capital:
o RM 1,000,000.00
v Paid Up Capital:
o RM 100,000.00
v Bank:
o Public Bank, Tmn Seri Sentosa, Klang. Account Number: 3178443300
v Director:
o Mr. Kiruban
v Secretary Company:
o Ni Corporate Consultancy
v Corporate Office:
o GL 01, Block A, Kelana Square, Jalan SS7/26, Kelana Jaya, 47301 Selangor.
Tel: 03-78870284 Fax: 03-78870285
v Warehouse:
o No. 2, Block A, Lot 778 Jalan Subang 4, Subang Light Industrial Park,
47610 Subang, Selangor
v Company Website:
o http://www.ajnsb.com/ / http://www.atmojaynetworks.com/
The Team
We at Atmo Jay believe IN GROWING PEOPLE. We take responsibility in
facilitating that growth. For a team to be performing at its best, it starts with every
individual.
With combine technical experience of not less than 50 years, the management posts a
strong business force in the telecommunication industry, development and grooming of
the company. Among the management, the networking of relevant influential people in
both business and politics are clearly possessed and handled, and the business alliance
with various vendor companies and partners are clearly put in place.
The Team
Kiruban
Managing Director
He holds an honors Degree in Bachelor of Computer Science majoring in software engineering from
University of Malaya.
Prior to starting Atmo Jay Networks Sdn Bhd, earliest venture was Wizzbrain Technologies Sdn Bhd &
Alkemi Teguh Teknologi Sdn Bhd specializing in IT system integration, IP CCTV, Cat 5e & 6 Network
cabling, fibre optic cabling and software development.
Overall in charge in developing the business and steer-forward company direction.
Gunasegaran
Head of Project Department
A Bachelor of Business Administration from Ashley University and also certified PRINCE 2
practitioner, Mr. Gunasegaran started his career way back 2003. He has extensive experience handling
various type of projects. Prior joining with Atmo Jay Networks, the latter was with Nera (M) Sdn Bhd
for 8 years which he was responsible for various nationwide telecommunication project mainly for DIGI
(M) Sdn Bhd, PETRONAS & Nippon Oil & Gas.
Currently, Gunasegaran spearheading the project department to a greater height with below mantra as
the back boned of our project department: -
• On-Time Delivery, Quality & Safety
Ravi
Project Manager
Well experience in operation management with more than 10 years. Ravi was placed as an outsourced
Project Manager to multi-national companies such as Wincor/Dell/ BASF & at Shell RIOSS as
Operation Manager.
Extensive knowledge on handling partner, vendor, SLA and customer satisfaction.
Sri Devi
Head of Accounts & Admin Department
Equipped with 20 years of working experience in this field and currently helms the Accounts & Admin
Department in Atmo Jay Networks, mainly responsible for finance operations, among others, ensuring
effectiveness and efficiency of the financial controls in all over business operations.
Our Services
Telecommunication:
v Radio Base Station Installation, Testing & Commissioning.
v Antenna System Installation, Testing & Commissioning.
v Microwave Radio Installation, Testing & Commissioning.
v Bi-Sector / LTE Upgrade
v New Site / CME
v Battery Charging & Dis-charging services
v Battery Installation
v Rectifier Installation
v Solar Site Installation
v RF Optimization (Drive Test & SSV)
v Genset Installation / Configuration / Servicing / Maintenance / Minor Overhaul /
Major Overhaul
v Lightning Protection Installation / Earth Testing
v Hardening
v All type of survey with in-house AutoCad expertise
v Total turn-key Project Management
Network Infrastructure:
v Cat6, Cat5e network cabling
v Fiber Optic cabling / splicing / testing
v Network infrastructure design, installation & maintenance
List of Completed Jobs
1. Installation partner for Orissa Wicomm for Edotco Malaysia Remote Monitoring
System Project Nationwide
a. Project Value: RM 4,200,000.00
b. Project Duration: 2 Years (November 2015 – November 2016)
c. Project Scope: Total project management, inventory management c/w
delivery to sites & Outdoor sites material supply
d. Status: Successfully installed & commissioned 3165 Edotco sites
nationwide within 14 months. (November 2014 – January 2016 (November
2016: 15 Proof of Concepts sites)
2. Installation partner for Orissa Wicomm for Maxis POC Solar Sites (3 Sites)
a. Project Value: RM 50,000.00
b. Project Duration: 3 Years (January 2016 – March 2016)
c. Project Scope: Total project management, decomm old structure, new solar
structure & panel installation, Narada Lithium battery installation, battery
cabinet installation and commissioning of genset, battery and solar.
d. Status: Successfully installed & commissioned 3 POC sites (2 in KV & 1 in
Eastern).
3. Installation partner for Orissa Wicomm for Edotco Malaysia to monitor their
Genset Fuel level
a. Project Value: Part of Edotco’s Remote Monitoring Project
b. Project Duration: 2 Month (March 2016 – April 2016)
c. Project Scope: Installation could not be proceed during Remote Monitoring
System installation due to unforeseen scenarios. Got approval to proceed
installation on March. Mobilize team nationwide for the installation
d. Status: Within 1 ½ month, successfully installed & commissioned 221 sites
nationwide to monitor fuel level & fuel contamination for Edotco Malaysia
4. Installation partner for GTS-Sedaya for fiber optic cabling & spilicing for
condominium at Johor Iskandar
a. Project Value: RM 95, 000.00
b. Project Duration: 2 Month (May 2015 – August 2015)
c. Project Scope: Laying Fiber backbone cable for 20 storey condominium for
2 blocks including splicing & end to end testing.
5. Installation partner for Orissa Wicomm for UMobile 50 POC sites for Acsys
Padlock
a. Project Value: Proof of Concept Site (POC Sites)
b. Project Duration: Survey 2 Weeks (March 2015) & Installation on May
2015
c. Project Scope: To survey the sites and install Acsys padlocks at sites
d. Status: Successfully surveyed & installed 50 POC sites
6. Sub-Contractor for Ivocom (M) Sdn Bhd for Maxis – MXU Installation
a. Installation & configuration of MXU at Maxis sites
o Project Value: RM 40,000.00 (150 Sites)
o Project Duration: May 2014 – December 2014
o Project Scope: To install MXU at Maxis sites based on list given by
Main-Con.
7. Installation partner for Orissa Wicomm for UMobile for Hitachi Lightning
Protection:
a. Project Value: RM 100,00.00 (5 TOC Sites)
b. Project Duration: March 2012 – February 2013
c. Project Scope: To survey the sites and installation of Spline Ball, 2 units of
Ground Electrode, Auguring 2 metres deep for Chemical Rod (2 Units),
Hitachi Surge Protector installation & Exothermic Welding (CadWeld).
d. Status: Successfully completed the installation
8. Project Management for Jaring Mantap for Maxis – NEC IPasolink nationwide
installation.
a. Project Value: RM 50,00.00
b. Project Duration: 12 Months
c. Project Scope: To manage the project, attend meeting behalf Jaring Mantap
with NEC weekly meeting, manage sub-con and meeting the installation
SLA’s.
9. Installation partner for Jaring Mantap for Rohas: Installation of solar tower light
a. Project Value: RM 15,000.00
b. Project Duration: 1 Month
c. Project Scope: To install Solar based tower light for 40 sites at state of
Perak. To site which have malfunctioned solar, small circuit bypassed
performed and re-install back at site.
d. Status: Successfully completed the project within 3 weeks of time.
10. Sub-contractor for Tru Tech Engineering for Digi – SM Link Installation
a. Project Value: RM 50,000.00
b. Project Duration: January 2012 – March 2012
c. Project Scope: Installation of SM Micro-wave disk installation, alignment
& commissioning at state of Perak c/w report submission & acceptance (20
Links)
d. Status: Completed & Site has been accepted by Digi
11. Sub-contractor for NERA Communication for Digi:
a. Installation of NERA EVOLINK for Digi in Klang Valley (February 2013 –
September 2013: 56 Links)
o Project Value: RM 300,000.00 ++
o Project Duration: February 2013 – September 2013 (60 Links)
o Project Scope: Installation of Nera Evolink to 60 sites c/w cut-over, re-
route, report submission & acceptance by Digi.
o Status: Completed & Site has been accepted by Digi
b. Link Decommissioning for Digi under Nera Communication:
o Project Value: RM 112,000.00
o Project Duration: October 2013 – February 2015 (80 Hop)
o Project Scope: Decommissioning links, RMA submission and deliver to
Digi warehouse and acceptance by Digi. Link Decommissioning brand
e.g Ericsson Mini-Link & TN, Nera, Alcatel & SM.
o Status: Completed, delivered to Digi warehouse & Accepted by Digi
c. CME works for Digi at Johor: (October 2012 – February 2013)
o Project Value: RM 104,000.00
o Project Duration: October 2012 – February 2013
o Project Scope: CME installation c/w TI
o Status: Completed & Accepted by Digi
12. Sub-contractor to Alaf Baru Komputer & Sistem Sdn Bhd
a. Testing & Commissioning of Samsung Techwin CCTV at Samsung SDMA
(M) Sdn Bhd – Senawang
o Project Value: RM 15,000.00
o Project Scope: Configuration & Commissioning of Samsung Techwin
CCTV
o Status: Completed
b. Installation, Testing & Commissioning of Fiber Optic cable at Pusat Darah
Negara
o Project Value: RM 30,000.00
o Project Scope: Laying, splicing & end to end testing of fiber optic cable
o Status: Completed
c. Installation, Testing & Commissioning of Fiber Optic cable, Network
Cabling & Windows Server 2003 deployment at MMC Oil & Gas
Engineering Sdn Bhd
o Project Value: RM 150,000.00
o Project Scope: Laying, splicing & end to end testing of fiber optic cable
o Status: Completed
13. Premium Vegetable Oils Sdn Bhd
a. Design, Installation, Testing & Commissioning of office network
infrastructure
o Project Value: RM 70,000.00
o Project Scope: Supply & Install Cat5e & Cat6 (Back Bone) c/w 6U rack.
o Status: Completed
14.Felda Iffco (M) Sdn Bhd
a. Design, Installation, Testing & Commissioning of Axis Network Camera
& Design, Installation, Testing & Commissioning of Entrypass Biometric
Door Access system
o Project Value: RM 540,000.00
o Project Scope: Supply & Install Axis IP CCTV, supply & install RJ 45
cable, Switch, Server, configuration & commissioning. Supply & Install
EntryPass Biometric Door Access system c/w Attendance, supply &
install RJ 45 cable, Switch, Server, configuration, commissioning &
training.
o Status: Completed
List of Current On-going Jobs
1. Remote Monitoring System 24/7 on-site support & maintenance for Edotco’s
3165 sites. Project Owner: Orissa Wicomm Sdn Bhd
a. Project Value: NDA (Non-Disclosure Agreement)
b. Project Duration: 2 Years (April 2016 – April 2018)
c. Project Scope: TT (Trouble Ticket) Clearance by in-house helpdesk,
nationwide on-site RMS system support
2. 24/7 support for Maxis Solar site including Genset maintenance & fuel refueling
for 3 sites (2 in KV & 1 in Kelantan). Project Owner: Orissa Wicomm Sdn Bhd
a. Project Value: NDA (Non-Disclosure Agreement)
b. Project Duration: 2 Years (March 2016 – March 2018)
c. Project Scope: Fuel Refueling, On-Site site support & TT clearance
3. Install & commissioning of Narada batteries for Maxis sites including
warehousing, charging & discharging of the batteries. Project Owner: Orissa
Wicomm Sdn Bhd
a. Project Value: NDA (Non-Disclosure Agreement)
b. Project Duration: 1 Years (End December 2016)
c. Project Scope: Battery Installation c/w 10% charging & discharging test
report
4. Link Decomm for Maxis. Project owner: Samudera
a. Project Value: Estimated RM 50,000.00
b. Project Duration: 2 Months
c. Project Scope: Link Decommissioning, report submission,
decommissioning material delivery to warehouse.
5. Install & commissioning of Narada batteries for Telekom Malaysia including
warehousing, charging & discharging of the batteries. Project Owner: Orissa
Wicomm Sdn Bhd
a. Project Value: NDA (Non-Disclosure Agreement)
b. Project Duration: 3 Years (End May 2019)
c. Project Scope: Site survey & battery installation, project management,
warehousing & battery charging & dis-charging.
6. Installation of IoT concepts Beacon for Ebizu. Project Owner: Dynamica
a. Project Value: Estimated RM 300, 000.00
b. Project Duration: Projected to install 15,000 sites by end of 2016
c. Project Scope: Site survey & beacon installation
7. Invendis product on-site support & maintenance for Invendis Technologies
(Bangalore) in Malaysia
a. Project Value: NDA (Non-Disclosure Agreement)
b. Project Duration: Invendis’s hardware warranty support for 2 years
(Edotco Project) in Malaysia
c. Project Scope: To troubleshoot / replace faulty Invendis hardware
8. Bi-Sector upgrading job for Maxis. Project owner: Nera Malaysia
a. Project Value: Based on Line Item (BOQ)
b. Project Duration: On-Going
c. Project Scope: Site survey, report submission, installation & acceptance
*Last updated on May 2016
COMPANY DOCUMENTS
&
PHOTOS
Field Team
CIDB & NIOSH
CONTRACTS &
PURCHASE ORDER
EDOTCO MALAYSIA –
REMOTE MONITORING SYSTEM PROJECT
MAXIS SOLAR SITE – POC C/W
2 YEARS MAINTENANCE CONTRACT
Our Customer’s Reference: -
1. Mr. Nallen
CEO, Orissa Wicomm (M) Sdn Bhd
Tel : +603 7941 2288
2. Mr. Thavaruben Kamalaruben
Sales Director, Orissa Wicomm (M) Sdn Bhd
Mobile: +6010-4203731
3. Mr. Kamarul Zaman
Head of Special Project, Edotco Malaysia Sdn Bhd
Mobile: +6019-7887976
4. Mr. Azam Azim
Regional Head (Southern), Edotco Malaysia Sdn Bhd
Mobile: +019-7111039
5. Mr. Subash Raj Selvaraju
Programme Manager, Nera (M) Sdn Bhd
Mobile: +6016-2013885
6. Mr. Eddie
Regional Head (Sabah), Edotco Malaysia Sdn Bhd
Mobile: +6013-8655449
7. Mr. Zulkarnain
Kedah North Head, Celcom
Mobile: +6019-4771909
OUR MAIN CONTRACTOR
ORISSA WICOMM
WON THE BEST
SUPPLIER AWARD FOR THE
ENTIRE AXIATAGROUP
COMPANY PROFILE AJNSB 1_1_15
COMPANY PROFILE AJNSB 1_1_15
COMPANY PROFILE AJNSB 1_1_15

More Related Content

What's hot

engineering-africa
engineering-africaengineering-africa
engineering-africa
Filipe de Gouveia
 
Tanveer iqbal mohammad_cv
Tanveer iqbal mohammad_cv Tanveer iqbal mohammad_cv
Tanveer iqbal mohammad_cv
Tanveer Iqbal Awan
 
Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)
Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)
Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)
Shailesh Salvi
 
Resume for Telecom 6+ years Exp
Resume for Telecom 6+ years ExpResume for Telecom 6+ years Exp
Resume for Telecom 6+ years Exp
Balaji Sekar
 
Pinnacle Engineering Solutions IPL EPCM
Pinnacle Engineering Solutions IPL EPCM Pinnacle Engineering Solutions IPL EPCM
Pinnacle Engineering Solutions IPL EPCM
Maxpromotion
 
EPMS5396 eCompany Profile Aug2015
EPMS5396 eCompany Profile Aug2015EPMS5396 eCompany Profile Aug2015
EPMS5396 eCompany Profile Aug2015
Dave Robinson
 
SAEED RASOOL CV
SAEED RASOOL CVSAEED RASOOL CV
SAEED RASOOL CV
SaEeD RaSoOL Ch
 
Ehab Alabed CV
Ehab Alabed CVEhab Alabed CV
Ehab Alabed CV
Ehab Alabed
 
Gapesco Profile 2021
Gapesco Profile 2021Gapesco Profile 2021
Gapesco Profile 2021
Hesham ElMetwally
 
Fibersat network company profile
Fibersat network company profileFibersat network company profile
Fibersat network company profile
MOHDSUZALEEAMINUDDIN
 
JCC Company Profile
JCC Company ProfileJCC Company Profile
JCC Company Profile
AL-JHOOD Ltd.
 
Mega interior & construction ltd (pic profile)
Mega interior & construction ltd (pic profile)Mega interior & construction ltd (pic profile)
Mega interior & construction ltd (pic profile)
Mali Quamina
 
My CV
My CVMy CV
Construction Company Profile template
Construction Company Profile template Construction Company Profile template
Construction Company Profile template
jawad malik
 
Sano Rubin Company Brochure and Sample Projects
Sano Rubin Company Brochure and Sample ProjectsSano Rubin Company Brochure and Sample Projects
Sano Rubin Company Brochure and Sample Projects
davidjhollander
 
Rullex Presentation
Rullex PresentationRullex Presentation
Rullex Presentation
Guly E. Rothwell
 
2015 ZHV Fact Sheet
2015 ZHV Fact Sheet2015 ZHV Fact Sheet

What's hot (17)

engineering-africa
engineering-africaengineering-africa
engineering-africa
 
Tanveer iqbal mohammad_cv
Tanveer iqbal mohammad_cv Tanveer iqbal mohammad_cv
Tanveer iqbal mohammad_cv
 
Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)
Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)
Profile of Qualixa Turnkey Projects Pvt. Ltd.(1)
 
Resume for Telecom 6+ years Exp
Resume for Telecom 6+ years ExpResume for Telecom 6+ years Exp
Resume for Telecom 6+ years Exp
 
Pinnacle Engineering Solutions IPL EPCM
Pinnacle Engineering Solutions IPL EPCM Pinnacle Engineering Solutions IPL EPCM
Pinnacle Engineering Solutions IPL EPCM
 
EPMS5396 eCompany Profile Aug2015
EPMS5396 eCompany Profile Aug2015EPMS5396 eCompany Profile Aug2015
EPMS5396 eCompany Profile Aug2015
 
SAEED RASOOL CV
SAEED RASOOL CVSAEED RASOOL CV
SAEED RASOOL CV
 
Ehab Alabed CV
Ehab Alabed CVEhab Alabed CV
Ehab Alabed CV
 
Gapesco Profile 2021
Gapesco Profile 2021Gapesco Profile 2021
Gapesco Profile 2021
 
Fibersat network company profile
Fibersat network company profileFibersat network company profile
Fibersat network company profile
 
JCC Company Profile
JCC Company ProfileJCC Company Profile
JCC Company Profile
 
Mega interior & construction ltd (pic profile)
Mega interior & construction ltd (pic profile)Mega interior & construction ltd (pic profile)
Mega interior & construction ltd (pic profile)
 
My CV
My CVMy CV
My CV
 
Construction Company Profile template
Construction Company Profile template Construction Company Profile template
Construction Company Profile template
 
Sano Rubin Company Brochure and Sample Projects
Sano Rubin Company Brochure and Sample ProjectsSano Rubin Company Brochure and Sample Projects
Sano Rubin Company Brochure and Sample Projects
 
Rullex Presentation
Rullex PresentationRullex Presentation
Rullex Presentation
 
2015 ZHV Fact Sheet
2015 ZHV Fact Sheet2015 ZHV Fact Sheet
2015 ZHV Fact Sheet
 

Similar to COMPANY PROFILE AJNSB 1_1_15

latest resume
latest resumelatest resume
latest resume
SUMIT KUMAR
 
SES Pre-Qualification [Autosaved]
SES Pre-Qualification [Autosaved]SES Pre-Qualification [Autosaved]
SES Pre-Qualification [Autosaved]
Abdul Hadi Siddiqui - MBA, B.E
 
MKT-00-002-1.5.APR
MKT-00-002-1.5.APRMKT-00-002-1.5.APR
MKT-00-002-1.5.APR
Ruth Puem
 
Spectra televenture Pvt. Ltd.
Spectra televenture Pvt. Ltd.Spectra televenture Pvt. Ltd.
Spectra televenture Pvt. Ltd.
Sophia Johnson
 
Ajish_Resume_Updated
Ajish_Resume_UpdatedAjish_Resume_Updated
Ajish_Resume_Updated
Ajish KP
 
Training report
Training reportTraining report
Training report
Gimkelum Mendis
 
Acetel Technologies
Acetel TechnologiesAcetel Technologies
Acetel Technologies
acetel
 
SIPL_Company_Profile.pptx
SIPL_Company_Profile.pptxSIPL_Company_Profile.pptx
SIPL_Company_Profile.pptx
NaveenRavindran6
 
ABI Resources and Service Pte Ltd
ABI Resources and Service Pte LtdABI Resources and Service Pte Ltd
ABI Resources and Service Pte Ltd
Karp Appavoo 🔗
 
TSICOM profile
TSICOM profile TSICOM profile
TSICOM profile
Tsicom Info
 
vignesh CV
vignesh CVvignesh CV
CV shamsheer
CV shamsheerCV shamsheer
CV shamsheer
shamsheer ck
 
HARI RESUME
HARI RESUMEHARI RESUME
HARI RESUME
Srihari Raju
 
Hari resume
Hari resumeHari resume
Hari resume
Srihari Raju
 
Project report on tata telicomunication
Project report  on tata telicomunicationProject report  on tata telicomunication
Project report on tata telicomunication
nisarghpatel
 
Anas W Shaheen CV
Anas W Shaheen CVAnas W Shaheen CV
Anas W Shaheen CV
Anas Shaheen
 
Jayakailash menon 01_sept_2016
Jayakailash menon 01_sept_2016Jayakailash menon 01_sept_2016
Jayakailash menon 01_sept_2016
Jayakailash Menon
 
CV1- Varun C Mohanan
CV1- Varun C MohananCV1- Varun C Mohanan
CV1- Varun C Mohanan
Varun Mohanan
 
Green line profile
Green line profile Green line profile
Wan_Mohd_Azri_-_CV_Jan_2015
Wan_Mohd_Azri_-_CV_Jan_2015Wan_Mohd_Azri_-_CV_Jan_2015
Wan_Mohd_Azri_-_CV_Jan_2015
wan azri
 

Similar to COMPANY PROFILE AJNSB 1_1_15 (20)

latest resume
latest resumelatest resume
latest resume
 
SES Pre-Qualification [Autosaved]
SES Pre-Qualification [Autosaved]SES Pre-Qualification [Autosaved]
SES Pre-Qualification [Autosaved]
 
MKT-00-002-1.5.APR
MKT-00-002-1.5.APRMKT-00-002-1.5.APR
MKT-00-002-1.5.APR
 
Spectra televenture Pvt. Ltd.
Spectra televenture Pvt. Ltd.Spectra televenture Pvt. Ltd.
Spectra televenture Pvt. Ltd.
 
Ajish_Resume_Updated
Ajish_Resume_UpdatedAjish_Resume_Updated
Ajish_Resume_Updated
 
Training report
Training reportTraining report
Training report
 
Acetel Technologies
Acetel TechnologiesAcetel Technologies
Acetel Technologies
 
SIPL_Company_Profile.pptx
SIPL_Company_Profile.pptxSIPL_Company_Profile.pptx
SIPL_Company_Profile.pptx
 
ABI Resources and Service Pte Ltd
ABI Resources and Service Pte LtdABI Resources and Service Pte Ltd
ABI Resources and Service Pte Ltd
 
TSICOM profile
TSICOM profile TSICOM profile
TSICOM profile
 
vignesh CV
vignesh CVvignesh CV
vignesh CV
 
CV shamsheer
CV shamsheerCV shamsheer
CV shamsheer
 
HARI RESUME
HARI RESUMEHARI RESUME
HARI RESUME
 
Hari resume
Hari resumeHari resume
Hari resume
 
Project report on tata telicomunication
Project report  on tata telicomunicationProject report  on tata telicomunication
Project report on tata telicomunication
 
Anas W Shaheen CV
Anas W Shaheen CVAnas W Shaheen CV
Anas W Shaheen CV
 
Jayakailash menon 01_sept_2016
Jayakailash menon 01_sept_2016Jayakailash menon 01_sept_2016
Jayakailash menon 01_sept_2016
 
CV1- Varun C Mohanan
CV1- Varun C MohananCV1- Varun C Mohanan
CV1- Varun C Mohanan
 
Green line profile
Green line profile Green line profile
Green line profile
 
Wan_Mohd_Azri_-_CV_Jan_2015
Wan_Mohd_Azri_-_CV_Jan_2015Wan_Mohd_Azri_-_CV_Jan_2015
Wan_Mohd_Azri_-_CV_Jan_2015
 

COMPANY PROFILE AJNSB 1_1_15

  • 1. Atmo Jay Networks Sdn Bhd (976891-A) Company Profile
  • 2. Who We Are ATMO JAY NETWORKS SDN BHD was formed in February 2nd 2012 under the Malaysia business rules regulations with the primary objective of excelling in the total project management in the telecommunication industry, particularly activities relating to on-grid & off-grid power solution, fiber optic cabling, active & passive network services these includes equipment installation, testing, commissioning and maintenance. We are proud to be a 100% local based company. As a service oriented organization with collective team experience of more than 50 years, we are firmly committed towards providing quality and excellent service to all clients. At Atmo Jay, our core belief is simple: deploy the best craftsmanship for all its customers and further strengthen the relationship by obtaining direct support from the manufacturers and working with well reputable and experienced business partners. 2015 was an exciting year for Atmo Jay Networks Sdn Bhd as we have been awarded 3200 sites to install a system called “Remote Monitoring System” for Edotco Malaysia. As end of December 2015 we have successfully installed 3008 sites all over Malaysia. This has been a milestone project for the company and has elevated the company to another level in delivering project successfully to our customer. We at ATMO JAY have successfully trained a pool of competent technical staffs that are totally committed to carrying out their duties to meet customer’s requirement and standard. We are very happy of our achievements thus far, which we attribute entirely to our group of qualified and experienced personnel’s who have performed their duties with great dedication and skillfulness. Atmo Jay Networks Sdn Bhd: Your partner in giving your customer the highest quality in service.
  • 3. Corporate Foundation Atmo Jay’s Vision • Our expression of work is an act of perfection • Abundance to All is our success Atmo Jay’s Mission To achieve our vision, we are determined to do the following: • Build relationship based on trust and integrity with our customers and partners. • Implement good corporate governance in all expect of operating the business. • To implement efficient strategy, dedicate and result-oriented characteristic in our day to day business. • Be the employer of choice that inspires performance excellence based on empowerment. Atmo Jay’s Guiding Values • Honesty, integrity, courage and dedication are our core belief in working. • Work is love made visible. • Our employees are the key ingredient to our growth and success. • Our actions should not only benefit our shareholders but also employees, society and the environment. • Excellent is our commitment. • Entrepreneurship. • May your success be the success for humanity at large. (A Friends to Mankind Philosophy)
  • 4. Corporate Formation Info v ROC Date Incorporated: o Atmo Jay Networks Sdn Bhd (976891-A) on 2nd February 2012. v Authorized Capital: o RM 1,000,000.00 v Paid Up Capital: o RM 100,000.00 v Bank: o Public Bank, Tmn Seri Sentosa, Klang. Account Number: 3178443300 v Director: o Mr. Kiruban v Secretary Company: o Ni Corporate Consultancy v Corporate Office: o GL 01, Block A, Kelana Square, Jalan SS7/26, Kelana Jaya, 47301 Selangor. Tel: 03-78870284 Fax: 03-78870285 v Warehouse: o No. 2, Block A, Lot 778 Jalan Subang 4, Subang Light Industrial Park, 47610 Subang, Selangor v Company Website: o http://www.ajnsb.com/ / http://www.atmojaynetworks.com/
  • 5. The Team We at Atmo Jay believe IN GROWING PEOPLE. We take responsibility in facilitating that growth. For a team to be performing at its best, it starts with every individual. With combine technical experience of not less than 50 years, the management posts a strong business force in the telecommunication industry, development and grooming of the company. Among the management, the networking of relevant influential people in both business and politics are clearly possessed and handled, and the business alliance with various vendor companies and partners are clearly put in place.
  • 6. The Team Kiruban Managing Director He holds an honors Degree in Bachelor of Computer Science majoring in software engineering from University of Malaya. Prior to starting Atmo Jay Networks Sdn Bhd, earliest venture was Wizzbrain Technologies Sdn Bhd & Alkemi Teguh Teknologi Sdn Bhd specializing in IT system integration, IP CCTV, Cat 5e & 6 Network cabling, fibre optic cabling and software development. Overall in charge in developing the business and steer-forward company direction. Gunasegaran Head of Project Department A Bachelor of Business Administration from Ashley University and also certified PRINCE 2 practitioner, Mr. Gunasegaran started his career way back 2003. He has extensive experience handling various type of projects. Prior joining with Atmo Jay Networks, the latter was with Nera (M) Sdn Bhd for 8 years which he was responsible for various nationwide telecommunication project mainly for DIGI (M) Sdn Bhd, PETRONAS & Nippon Oil & Gas. Currently, Gunasegaran spearheading the project department to a greater height with below mantra as the back boned of our project department: - • On-Time Delivery, Quality & Safety Ravi Project Manager Well experience in operation management with more than 10 years. Ravi was placed as an outsourced Project Manager to multi-national companies such as Wincor/Dell/ BASF & at Shell RIOSS as Operation Manager. Extensive knowledge on handling partner, vendor, SLA and customer satisfaction. Sri Devi Head of Accounts & Admin Department Equipped with 20 years of working experience in this field and currently helms the Accounts & Admin Department in Atmo Jay Networks, mainly responsible for finance operations, among others, ensuring effectiveness and efficiency of the financial controls in all over business operations.
  • 7. Our Services Telecommunication: v Radio Base Station Installation, Testing & Commissioning. v Antenna System Installation, Testing & Commissioning. v Microwave Radio Installation, Testing & Commissioning. v Bi-Sector / LTE Upgrade v New Site / CME v Battery Charging & Dis-charging services v Battery Installation v Rectifier Installation v Solar Site Installation v RF Optimization (Drive Test & SSV) v Genset Installation / Configuration / Servicing / Maintenance / Minor Overhaul / Major Overhaul v Lightning Protection Installation / Earth Testing v Hardening v All type of survey with in-house AutoCad expertise v Total turn-key Project Management Network Infrastructure: v Cat6, Cat5e network cabling v Fiber Optic cabling / splicing / testing v Network infrastructure design, installation & maintenance
  • 8. List of Completed Jobs 1. Installation partner for Orissa Wicomm for Edotco Malaysia Remote Monitoring System Project Nationwide a. Project Value: RM 4,200,000.00 b. Project Duration: 2 Years (November 2015 – November 2016) c. Project Scope: Total project management, inventory management c/w delivery to sites & Outdoor sites material supply d. Status: Successfully installed & commissioned 3165 Edotco sites nationwide within 14 months. (November 2014 – January 2016 (November 2016: 15 Proof of Concepts sites) 2. Installation partner for Orissa Wicomm for Maxis POC Solar Sites (3 Sites) a. Project Value: RM 50,000.00 b. Project Duration: 3 Years (January 2016 – March 2016) c. Project Scope: Total project management, decomm old structure, new solar structure & panel installation, Narada Lithium battery installation, battery cabinet installation and commissioning of genset, battery and solar. d. Status: Successfully installed & commissioned 3 POC sites (2 in KV & 1 in Eastern). 3. Installation partner for Orissa Wicomm for Edotco Malaysia to monitor their Genset Fuel level a. Project Value: Part of Edotco’s Remote Monitoring Project b. Project Duration: 2 Month (March 2016 – April 2016) c. Project Scope: Installation could not be proceed during Remote Monitoring System installation due to unforeseen scenarios. Got approval to proceed installation on March. Mobilize team nationwide for the installation d. Status: Within 1 ½ month, successfully installed & commissioned 221 sites nationwide to monitor fuel level & fuel contamination for Edotco Malaysia
  • 9. 4. Installation partner for GTS-Sedaya for fiber optic cabling & spilicing for condominium at Johor Iskandar a. Project Value: RM 95, 000.00 b. Project Duration: 2 Month (May 2015 – August 2015) c. Project Scope: Laying Fiber backbone cable for 20 storey condominium for 2 blocks including splicing & end to end testing. 5. Installation partner for Orissa Wicomm for UMobile 50 POC sites for Acsys Padlock a. Project Value: Proof of Concept Site (POC Sites) b. Project Duration: Survey 2 Weeks (March 2015) & Installation on May 2015 c. Project Scope: To survey the sites and install Acsys padlocks at sites d. Status: Successfully surveyed & installed 50 POC sites 6. Sub-Contractor for Ivocom (M) Sdn Bhd for Maxis – MXU Installation a. Installation & configuration of MXU at Maxis sites o Project Value: RM 40,000.00 (150 Sites) o Project Duration: May 2014 – December 2014 o Project Scope: To install MXU at Maxis sites based on list given by Main-Con.
  • 10. 7. Installation partner for Orissa Wicomm for UMobile for Hitachi Lightning Protection: a. Project Value: RM 100,00.00 (5 TOC Sites) b. Project Duration: March 2012 – February 2013 c. Project Scope: To survey the sites and installation of Spline Ball, 2 units of Ground Electrode, Auguring 2 metres deep for Chemical Rod (2 Units), Hitachi Surge Protector installation & Exothermic Welding (CadWeld). d. Status: Successfully completed the installation 8. Project Management for Jaring Mantap for Maxis – NEC IPasolink nationwide installation. a. Project Value: RM 50,00.00 b. Project Duration: 12 Months c. Project Scope: To manage the project, attend meeting behalf Jaring Mantap with NEC weekly meeting, manage sub-con and meeting the installation SLA’s. 9. Installation partner for Jaring Mantap for Rohas: Installation of solar tower light a. Project Value: RM 15,000.00 b. Project Duration: 1 Month c. Project Scope: To install Solar based tower light for 40 sites at state of Perak. To site which have malfunctioned solar, small circuit bypassed performed and re-install back at site. d. Status: Successfully completed the project within 3 weeks of time.
  • 11. 10. Sub-contractor for Tru Tech Engineering for Digi – SM Link Installation a. Project Value: RM 50,000.00 b. Project Duration: January 2012 – March 2012 c. Project Scope: Installation of SM Micro-wave disk installation, alignment & commissioning at state of Perak c/w report submission & acceptance (20 Links) d. Status: Completed & Site has been accepted by Digi 11. Sub-contractor for NERA Communication for Digi: a. Installation of NERA EVOLINK for Digi in Klang Valley (February 2013 – September 2013: 56 Links) o Project Value: RM 300,000.00 ++ o Project Duration: February 2013 – September 2013 (60 Links) o Project Scope: Installation of Nera Evolink to 60 sites c/w cut-over, re- route, report submission & acceptance by Digi. o Status: Completed & Site has been accepted by Digi b. Link Decommissioning for Digi under Nera Communication: o Project Value: RM 112,000.00 o Project Duration: October 2013 – February 2015 (80 Hop) o Project Scope: Decommissioning links, RMA submission and deliver to Digi warehouse and acceptance by Digi. Link Decommissioning brand e.g Ericsson Mini-Link & TN, Nera, Alcatel & SM. o Status: Completed, delivered to Digi warehouse & Accepted by Digi
  • 12. c. CME works for Digi at Johor: (October 2012 – February 2013) o Project Value: RM 104,000.00 o Project Duration: October 2012 – February 2013 o Project Scope: CME installation c/w TI o Status: Completed & Accepted by Digi 12. Sub-contractor to Alaf Baru Komputer & Sistem Sdn Bhd a. Testing & Commissioning of Samsung Techwin CCTV at Samsung SDMA (M) Sdn Bhd – Senawang o Project Value: RM 15,000.00 o Project Scope: Configuration & Commissioning of Samsung Techwin CCTV o Status: Completed b. Installation, Testing & Commissioning of Fiber Optic cable at Pusat Darah Negara o Project Value: RM 30,000.00 o Project Scope: Laying, splicing & end to end testing of fiber optic cable o Status: Completed c. Installation, Testing & Commissioning of Fiber Optic cable, Network Cabling & Windows Server 2003 deployment at MMC Oil & Gas Engineering Sdn Bhd o Project Value: RM 150,000.00 o Project Scope: Laying, splicing & end to end testing of fiber optic cable o Status: Completed
  • 13. 13. Premium Vegetable Oils Sdn Bhd a. Design, Installation, Testing & Commissioning of office network infrastructure o Project Value: RM 70,000.00 o Project Scope: Supply & Install Cat5e & Cat6 (Back Bone) c/w 6U rack. o Status: Completed 14.Felda Iffco (M) Sdn Bhd a. Design, Installation, Testing & Commissioning of Axis Network Camera & Design, Installation, Testing & Commissioning of Entrypass Biometric Door Access system o Project Value: RM 540,000.00 o Project Scope: Supply & Install Axis IP CCTV, supply & install RJ 45 cable, Switch, Server, configuration & commissioning. Supply & Install EntryPass Biometric Door Access system c/w Attendance, supply & install RJ 45 cable, Switch, Server, configuration, commissioning & training. o Status: Completed
  • 14. List of Current On-going Jobs 1. Remote Monitoring System 24/7 on-site support & maintenance for Edotco’s 3165 sites. Project Owner: Orissa Wicomm Sdn Bhd a. Project Value: NDA (Non-Disclosure Agreement) b. Project Duration: 2 Years (April 2016 – April 2018) c. Project Scope: TT (Trouble Ticket) Clearance by in-house helpdesk, nationwide on-site RMS system support 2. 24/7 support for Maxis Solar site including Genset maintenance & fuel refueling for 3 sites (2 in KV & 1 in Kelantan). Project Owner: Orissa Wicomm Sdn Bhd a. Project Value: NDA (Non-Disclosure Agreement) b. Project Duration: 2 Years (March 2016 – March 2018) c. Project Scope: Fuel Refueling, On-Site site support & TT clearance 3. Install & commissioning of Narada batteries for Maxis sites including warehousing, charging & discharging of the batteries. Project Owner: Orissa Wicomm Sdn Bhd a. Project Value: NDA (Non-Disclosure Agreement) b. Project Duration: 1 Years (End December 2016) c. Project Scope: Battery Installation c/w 10% charging & discharging test report 4. Link Decomm for Maxis. Project owner: Samudera a. Project Value: Estimated RM 50,000.00 b. Project Duration: 2 Months c. Project Scope: Link Decommissioning, report submission, decommissioning material delivery to warehouse.
  • 15. 5. Install & commissioning of Narada batteries for Telekom Malaysia including warehousing, charging & discharging of the batteries. Project Owner: Orissa Wicomm Sdn Bhd a. Project Value: NDA (Non-Disclosure Agreement) b. Project Duration: 3 Years (End May 2019) c. Project Scope: Site survey & battery installation, project management, warehousing & battery charging & dis-charging. 6. Installation of IoT concepts Beacon for Ebizu. Project Owner: Dynamica a. Project Value: Estimated RM 300, 000.00 b. Project Duration: Projected to install 15,000 sites by end of 2016 c. Project Scope: Site survey & beacon installation 7. Invendis product on-site support & maintenance for Invendis Technologies (Bangalore) in Malaysia a. Project Value: NDA (Non-Disclosure Agreement) b. Project Duration: Invendis’s hardware warranty support for 2 years (Edotco Project) in Malaysia c. Project Scope: To troubleshoot / replace faulty Invendis hardware 8. Bi-Sector upgrading job for Maxis. Project owner: Nera Malaysia a. Project Value: Based on Line Item (BOQ) b. Project Duration: On-Going c. Project Scope: Site survey, report submission, installation & acceptance *Last updated on May 2016
  • 17.
  • 18.
  • 19.
  • 20.
  • 22.
  • 23.
  • 24.
  • 25.
  • 27. EDOTCO MALAYSIA – REMOTE MONITORING SYSTEM PROJECT
  • 28. MAXIS SOLAR SITE – POC C/W 2 YEARS MAINTENANCE CONTRACT
  • 29.
  • 30. Our Customer’s Reference: - 1. Mr. Nallen CEO, Orissa Wicomm (M) Sdn Bhd Tel : +603 7941 2288 2. Mr. Thavaruben Kamalaruben Sales Director, Orissa Wicomm (M) Sdn Bhd Mobile: +6010-4203731 3. Mr. Kamarul Zaman Head of Special Project, Edotco Malaysia Sdn Bhd Mobile: +6019-7887976 4. Mr. Azam Azim Regional Head (Southern), Edotco Malaysia Sdn Bhd Mobile: +019-7111039 5. Mr. Subash Raj Selvaraju Programme Manager, Nera (M) Sdn Bhd Mobile: +6016-2013885 6. Mr. Eddie Regional Head (Sabah), Edotco Malaysia Sdn Bhd Mobile: +6013-8655449 7. Mr. Zulkarnain Kedah North Head, Celcom Mobile: +6019-4771909
  • 31. OUR MAIN CONTRACTOR ORISSA WICOMM WON THE BEST SUPPLIER AWARD FOR THE ENTIRE AXIATAGROUP