The Waste Strategy Process
TORONTO
WASTE STRATEGY
The Strategy recommends
policies and programs, including
how to manage any leftover
garbage remaining after reusing,
recycling, and composting.
The Vision
Together, we will Reduce the amount of
waste we generate, Reuse what weย can,
and Recycle and recover the remaining
resources to reinvest back into the economy.
We will embrace a waste management
system that is userโ€‘friendly, with programs
and facilities that balance the needs of
the community and the environment
with long term financial sustainability.
Together, we will ensure a safe, clean,
beautiful and healthy City for the future.
1
WHERE ARE WE?
Review of current waste
management policies,
programs and facilities.
2
WHERE DO WE
NEED TO GO?
Identify the
systemโ€™s gaps
and challenges.
Examine Torontoโ€™s
anticipated needs
over the next
30-50 years.
3
HOW DO WE
GET THERE?
Determine what
options are
available to us.
4
WHAT ARE THE
OPTIONS?
Evaluate options to
manage Torontoโ€™s waste
into the future.
5
WHICH OPTIONS
SHOULD WE USE?
Establish recommended
options that are
appropriate for Toronto.
6
HOW AND WHEN?
Decide how and when
the recommendations
will be put into action.
7
WHATโ€™S THE STRATEGY?
WE ARE HERE Weโ€™re seeking public comments on the
Draft Waste Strategy to inform the final
version that will be submitted to Toronto
City Council for approval in July 2016.
Why Do We Need a
Waste Strategy?
DID YOU KNOW?
If we donโ€™t change the way we manage our waste,
we could generate 37 million tonnes of garbage over the next 50 years!
The development of a Long Term Waste
Management Strategy is one of the actions in
City Councilโ€™s 2013-2018 Strategic Action Plan.
The Waste Strategy is a high level decision
making document to guide waste management
policy decisions for the next 30 to 50 years.
The Waste Strategy will help Toronto:
โ€ข maximize the life of Green Lane Landfill;
โ€ข prioritize reduction, reuse and recycling;
โ€ข leverage programs and services already in
place to further improve waste diversion;
โ€ข minimize the need for new capital
infrastructure investments;
โ€ข work together with community partners to
enhance access to diversion programs; and
โ€ข maintain flexibility for future
waste management changes.
The City manages almost 1,000,000 TONNES of waste each year.
Integrated Waste
Management System
The Cityโ€™s integrated waste management system has a wide range of components that function as a
whole. The Waste Strategy looked at each of these components to identify future improvements.
INTERNAL SYSTEM
INFLUENCES/ PRESSURES:
City of Toronto Policy
Growing Population
Changing Demographics
Enforcement
EXTERNAL SYSTEM INFLUENCES
Federal and Provincial Legislation
Extended Producer Responsibility
Programs and Infrastructure Funding
Climate Change
Economic Conditions
Markets and Market Access
Changing Waste Composition
THIS FIGURE SHOWS:
โ€ข the integrated nature of the waste management system;
โ€ข the flow of waste from generation to disposal;
โ€ข internal and external influences on the system;
โ€ข the emphasis on waste as a resource with priority placed on
reduce, reuse and recycle; and
โ€ข how the 5Rs (reduce, reuse, recycle, recover, residual disposal) fit
in the system.
Drop-
Transfer
Recycling&
Processing
Recovery
Residual
Disposal
Overall System
Enforcement
System
Financing
Reduce & Reuse
Weโ€™ve Been Listening
Since 2014, the Waste Strategy development process has been supported
by widespread public and stakeholder engagement activities.
Surveys
4 surveys with
over 2,200
respondents
to date. Stakeholder
Advisory
Group
19 meetings of
the Stakeholder
Advisory Group
provided feedback
throughout
the process.
Key
Stakeholder
Meetings
5 meetings with
key stakeholders
including
environmental
groups, non-profit
organizations,
First Nations
representatives
and ratepayer
associations.
Community
Events and
Open Houses
12 Public
Consultation Events
and City attendance
at numerous
community
events reached
over 4,200
people to date.
Vendor
Days
Opportunity for
presentations
and information
from vendors
of technologies
and services.
Website and
Social Media
Dedicated project
website and social
media presence.
Project
Updates
6 Project Updates
distributed to
750 emails on
project contact
list as well as key
stakeholders.
Wast(ED)
Speaker
Series
4 Speaker Series
Events including
a Zero Waste
Conference in
partnership with
Metro Vancouver.
What We Heard
Thanks to Waste Strategy participants
for your great ideas!
Key Messages from the public,
Stakeholderย Advisory ย Group
and other key stakeholders:
โ€ข work to mitigate climate change;
โ€ข prioritize 3Rs, particularly reduce and reuse;
โ€ข consider partnerships;
โ€ข enhance enforcement;
โ€ข treat waste as a resource and reinforce
a circular economy; and
โ€ข prioritize our communityโ€™s health & environment.
Reduce. Reuse. Recycle.
The Draft Waste Strategy focuses on reducing, reusing and
recycling/composting waste to promote the importance of
resource conservation and reduced environmental impacts.
FOOD WASTE
REDUCTION
STRATEGY
$31 BILLION Develop a strategy
that promotes food
waste reduction.
MOBILE
DROP-OFF
SERVICE
Coordinate a
network of mobile
drop-off depots
that could transition
into permanent
neighbourhood
drop-off depots.
WASTE EXCHANGE
Support opportunities
or events that
allow residents to
obtain gently used
materials for reuse.
TEXTILE
COLLECTION AND
RE-USE STRATEGY
Introduce innovative
ways to reuse and
recycle used clothing
and other textiles.
SHARING LIBRARY
Help establish
locations to borrow
materials that are
infrequently used, like
sports equipment,
tools and toys.
REVERSE
VENDING
MACHINES
Introduce technologies
that allow for
depositing certain
products to receive
rewards/incentives.
Apartments & Condos
In addition to the 3Rs opportunities, the Draft Waste Strategy recommends
other ways to increase diversion at multi-residential buildings.
DATA MANAGEMENT
AND ACCESSIBILITY
Better data availability, like
waste container tracking.
COMMUNITY COMPOSTING
To further educate on the
benefits of composting and
foster a sense of community.
POLICIES AND ENFORCEMENT
Increased enforcement efforts and
exploration of policies to encourage
effective participation in waste
diversion programs in all buildings.
Apartments and
condominiums
make up over
half of Torontoโ€™s
housing.
Single family homes
currently divert
66% of their waste.
Apartments and condos
divert only 26%.
(Based on 2014 data)
45%
Diversion Opportunities
For Businesses
The City provides some waste management services to businesses, along with
disposal options at City transfer stations and Green Lane Landfill. Most businesses
in the city receive waste management services from private waste haulers.
The City is considering options that encourage
greater diversion of waste from businesses,
including new policies and programs.
Exploring recycling
by-laws and
incentives.
Adding more
small commercial
customers to the
Cityโ€™s Yellowย Bag
Program.
Diversion Opportunities
For Home Renovation Waste
Construction, Renovation and Demolition waste refers to materials that
are generated from house and yard renovations. These materials can
include items such as wood, drywall, plaster, asphalt, shingles, etc.
The Draft Waste Strategy recommendations
encourage greater diversion by:
Establishing construction,
renovation and
demolition waste drop-off
depots and policies.
Banning disposal
of construction,
renovation and
demolition materials
in the garbage stream.
WASTE-FREE ONTARIO ACT
The Province of Ontarioโ€™s proposed
Wasteโ€‘Freeย Ontarioย Act identifies
construction and renovation
materials as potential candidates for
a province-wide disposal ban. The
City will continue to work with the
Province on any effort to divert this
and other materials from landfill.
Recovering More Resources
Following the reduction, reuse and recycling of materials, there are opportunities to recover valuable resources
from the waste that remains, including: additional recyclables, organics or energy resources (e.g. gas and heat).
The Draft Waste Strategy is recommending the development of a Mixed Waste Processing Facility with Organics Recovery.
The need and/or timing for its development depends on the success of the reduction, reuse and recycling efforts
recommended in the Waste Strategy. It also depends on the details of the Waste-Free Ontario Act.
Q:
What is a Mixed Waste Processing
Facility with Organics Recovery?
A:
Itโ€™s a facility where waste is further
processed to remove recyclable
materials and organic materials.
BIOLOGICAL
TREATMENT
(ANAEROBIC DIGESTION)
MECHANICAL
SORTING
ENERGY
MARKETS
ORGANIC
MATERIALS
BIOGAS
GARBAGE SOLIDS
Garbage
remaining
after the
3Rs
RECYCLABLE MATERIALS
COMPOSTDISPOSAL
Green Lane Landfill
Torontoโ€™s residual waste goes to Green Lane Landfill. With
our 3Rs strategy, we can extend its lifespan.
Future Capacity of Green Lane Landfill
Green Lane Landfill is projected to have capacity for Torontoโ€™s
waste until approximately 2040, provided we:
โ€ข continue to focus on implementing 3Rs programs;
โ€ข encourage effective participation in existing diversion programs; and
โ€ข divert some City of Toronto waste to other disposal sites.
We Need You Toronto!
The promotion and education tools listed below will be used to help
implement the recommendations of the Waste Strategy.
Online Tools
Interactive online waste
management tools provide up-
to-date information on waste
management in Toronto.
Social Media
More use of social media as a way
to inform people about program
changes or 3Rs opportunities.
Support Volunteers
Additional tools and/or resources
to support waste management-
related volunteer programs
(e.g. 3Rs Ambassadors).
Targeted Communications
Communication to reach
Torontoโ€™s diverse population.
Targeted Outreach Conversations
Outreach and education
campaigns to encourage diversion
and educate people about
their consumption choices.
Create a Community
Partnership Unit
Establishing partnerships
with community groups to
promote waste diversion.
Establish new Advisory
Committees
Advisory committees (i.e. Circular
Economy, Multi-Residential) can
help us view waste as a resource.
Use these resources
to stay informed!
Additional Programs and
Implementation Tools
A range of additional programs and implementation tools have
been identified to support the recommended Waste Strategy.
RESEARCH
Create a Research,
Development and
Innovation Unit to advance
innovative ideas and
promote new markets for
recyclable materials.
LEGISLATION
Explore city-wide controls
to increase diversion
(e.g. disposal bans).
FINANCING
Explore ways to finance
waste management in
Toronto (e.g. full user pay
system, public-private
partnerships for major
capital works, increase
customer base, etc.).
.
Implementation Roadmap
The Waste Strategy will be implemented over the next 30+ years with most
of the reduction, reuse, and recycling recommendations being implemented
in the first ten years as part of a ten year waste reduction plan.
Promotion and education will occur throughout the Waste Strategy implementation.
Review of the Waste Strategy every 5 years provides flexibility to address future changes.
Note: Icons represent implementation. Planning begins earlier.
Planning begins
for approved
Waste Strategy
options.
City-Wide Controls
to Increase
Diversion
Reuse Events/
Waste Exchange
Expanding Yellow
Bag Program to
More Businesses
The Waste Strategy
recommendations
extend the life of
Green Lane Landfill to
approximately 2040.
The need and timing of a
Mixed Waste Processing
Facility with Organics
Recovery is based on the
success of other programs.
Pilot studies may occur
in the first 5-10 years.
Redirect Waste
from Green
Lane Landfill
Neighbourhood
Drop-off Depots
Reverse Vending
Machines
Community
Composting
Data Management
and Accessibility
Depots and
Policies for Home
Renovation Waste
Research,
Development and
Innovation Unit
Sharing Library
Mobile Drop-off
Depots
Recycling By-laws
and Incentives
for Businesses
$31 BILLION
Food Waste
Reduction
Strategy
Textile Collection
and Reuse
Strategy
2023 2026 20402022 20252019 202420202016 2017 2018 2021 โ€ฆ
We All Benefit
The Waste Strategy results in numerous benefits to Torontoย residents
and other stakeholders in the City of Toronto.
Increased
Reduction, Reuse
and Recycling
Reduced
Greenhouse
Gas Emissions
Creation of
Green Jobs
Greater
Environmental
Awareness
New Community
Partnerships
Promotion
of Equity
Waste as a
Resource
Toronto as an
Innovation
Leader
System
Flexibility
Behaviour
Change
Cost Savings
Longer
Landfill Life
CO2
Measuring Success
Monitoring performance and progress is important to ensure that the Waste Strategy is
effective in reducing waste overall. This allows us to see potential areas for improvement, future
trends, and the return on investment as new programs or facilities are implemented.
Information collected will be used to help us:
โ€ข understand the performance of the current waste management system;
โ€ข measure the impact of the Waste Strategyโ€™s recommended options;
โ€ข monitor how we do on reduction and reuse activities; and,
โ€ข measure our performance on customer service, safety, etc.
TOOLS TO MEASURE SUCCESS
Diversion
Rates
Waste
Generation
per household
Customer
Satisfaction
Enforcement
Actions
Taken
Greenhouse
Gas Emissions
Waste-Free Ontario Act
The Province of Ontarioโ€™s proposed
Wasteโ€‘Freeย Ontarioย Act will outline a new direction
for waste management. The intent is to move
towards an Extended Producer Responsibility system
where producers are responsible for managing
their products and packaging. This could impact
how the City of Toronto manages waste in the
future and the Waste Strategy will consider this
as recommendations are being implemented.
We Want Your Input on
the Draft Waste Strategy!
LEARN MORE
Review the panels and
public consultation event
presentations for an overview of the
Draftย Wasteย Strategy.
Review the Draft Waste Strategy
Document to understand the
recommendations to manage Torontoโ€™s
waste for the nextย 30-50 years.
Review Technical Memo #4 to
understand all the options that
were consideredย and how these
options were evaluated.
CONTINUE THE DISCUSSION
AT THESE PUBLIC CONSULTATION EVENTS
โ€ข Draft Waste Strategy Overview - March 29.
โ€ข Reduce, Reuse and Recycle: Waste Diversion in
Houses, Apartments and Condos - April 4.
โ€ข Diversion Opportunities: Business
and Home Renovators - April 7.
โ€ข Waste Recovery and Residual: How to
Handle Remaining Materials - April 12.
TAKE THE
SURVEY
Complete a survey
online or send
us an e-mail.
WHATโ€™S NEXT
City Council
The Final Waste Strategy will be presented
to Public Works and Infrastructure
Committee in June 2016, then to the
City Council for approval in July 2016.
Implementation
The City will begin implementation once
the Waste Strategy is approved.
details can be found on our website.:
toronto.ca/wastestrategy
If you have questions about the
Waste Strategy or upcoming
consultation, please contact:
Robyn Shyllit, Public Consultation Unit
55 John Street, Metro Hall 19th Floor
Toronto, ON M5V 3C6
wastestrategy@toronto.ca
416-392-3760 416-338-0889

More Related Content

What's hot

Itc E Choupal
Itc  E  ChoupalItc  E  Choupal
Itc E ChoupalAbhijit Yewale
ย 
What is Urban Agriculture?
What is Urban Agriculture?What is Urban Agriculture?
What is Urban Agriculture?Eileen Cullen
ย 
Carbon credit
Carbon creditCarbon credit
Carbon creditRehan Akhtar
ย 
Livestock and greenhouse gas emissions
Livestock and greenhouse gas emissionsLivestock and greenhouse gas emissions
Livestock and greenhouse gas emissionsILRI
ย 
Using agroecology to measure sustainability in agriculture TAPE โ€“ the Tool fo...
Using agroecology to measure sustainability in agriculture TAPE โ€“ the Tool fo...Using agroecology to measure sustainability in agriculture TAPE โ€“ the Tool fo...
Using agroecology to measure sustainability in agriculture TAPE โ€“ the Tool fo...Francois Stepman
ย 
Extended producer responsibility (epr)
Extended producer responsibility (epr)Extended producer responsibility (epr)
Extended producer responsibility (epr)jackass18
ย 
Pro poor solid waste management Pakistan- Saadullah Ayaz
Pro  poor solid waste management Pakistan- Saadullah AyazPro  poor solid waste management Pakistan- Saadullah Ayaz
Pro poor solid waste management Pakistan- Saadullah Ayazsaadayaz
ย 
The White Revolution in India: The end or a new beginning?
The White Revolution in India: The end or a new beginning?The White Revolution in India: The end or a new beginning?
The White Revolution in India: The end or a new beginning?ILRI
ย 
Smart Foods: Nutri-cereals for her - The creation of biofortified pearl millet
Smart Foods: Nutri-cereals for her - The creation of biofortified pearl milletSmart Foods: Nutri-cereals for her - The creation of biofortified pearl millet
Smart Foods: Nutri-cereals for her - The creation of biofortified pearl milletICRISAT
ย 
Sustainable agriculture for food security
Sustainable agriculture for food security Sustainable agriculture for food security
Sustainable agriculture for food security Rashid Al-Yahyai
ย 
Methane emission from paddy field.pptx
Methane emission from paddy field.pptxMethane emission from paddy field.pptx
Methane emission from paddy field.pptxSupun Madushanka
ย 
Corporate social responsibilities of itc
Corporate social responsibilities of itcCorporate social responsibilities of itc
Corporate social responsibilities of itcManjunath .V
ย 
A tribute to father of white revolution
A tribute to father of white revolutionA tribute to father of white revolution
A tribute to father of white revolutionIna Negi
ย 
White revolution
White revolutionWhite revolution
White revolutionKeval Patel
ย 
Minimization of Transportation Cost in Dairy Industry
Minimization of Transportation Cost in Dairy IndustryMinimization of Transportation Cost in Dairy Industry
Minimization of Transportation Cost in Dairy IndustryTHIRUPATHIRAJK
ย 
Watershed/Landscape Management for Multiple Benefits and Climate Resilience โ€จ...
Watershed/Landscape Management for Multiple Benefits and Climate Resilience โ€จ...Watershed/Landscape Management for Multiple Benefits and Climate Resilience โ€จ...
Watershed/Landscape Management for Multiple Benefits and Climate Resilience โ€จ...CIFOR-ICRAF
ย 
Waste to energy india
Waste to energy indiaWaste to energy india
Waste to energy indiaKishlay Kumar
ย 

What's hot (20)

Itc E Choupal
Itc  E  ChoupalItc  E  Choupal
Itc E Choupal
ย 
What is Urban Agriculture?
What is Urban Agriculture?What is Urban Agriculture?
What is Urban Agriculture?
ย 
Case study: Finnish deposit refund system (DRS)
Case study: Finnish deposit refund system (DRS)Case study: Finnish deposit refund system (DRS)
Case study: Finnish deposit refund system (DRS)
ย 
Carbon credit
Carbon creditCarbon credit
Carbon credit
ย 
Livestock and greenhouse gas emissions
Livestock and greenhouse gas emissionsLivestock and greenhouse gas emissions
Livestock and greenhouse gas emissions
ย 
Using agroecology to measure sustainability in agriculture TAPE โ€“ the Tool fo...
Using agroecology to measure sustainability in agriculture TAPE โ€“ the Tool fo...Using agroecology to measure sustainability in agriculture TAPE โ€“ the Tool fo...
Using agroecology to measure sustainability in agriculture TAPE โ€“ the Tool fo...
ย 
Extended producer responsibility (epr)
Extended producer responsibility (epr)Extended producer responsibility (epr)
Extended producer responsibility (epr)
ย 
Pro poor solid waste management Pakistan- Saadullah Ayaz
Pro  poor solid waste management Pakistan- Saadullah AyazPro  poor solid waste management Pakistan- Saadullah Ayaz
Pro poor solid waste management Pakistan- Saadullah Ayaz
ย 
Adaptation Measures for Africaโ€™s Climate Resilient Agriculture
Adaptation Measures for Africaโ€™s Climate Resilient AgricultureAdaptation Measures for Africaโ€™s Climate Resilient Agriculture
Adaptation Measures for Africaโ€™s Climate Resilient Agriculture
ย 
The White Revolution in India: The end or a new beginning?
The White Revolution in India: The end or a new beginning?The White Revolution in India: The end or a new beginning?
The White Revolution in India: The end or a new beginning?
ย 
GHG mitigation potential in rice production
GHG mitigation potential in rice productionGHG mitigation potential in rice production
GHG mitigation potential in rice production
ย 
Smart Foods: Nutri-cereals for her - The creation of biofortified pearl millet
Smart Foods: Nutri-cereals for her - The creation of biofortified pearl milletSmart Foods: Nutri-cereals for her - The creation of biofortified pearl millet
Smart Foods: Nutri-cereals for her - The creation of biofortified pearl millet
ย 
Sustainable agriculture for food security
Sustainable agriculture for food security Sustainable agriculture for food security
Sustainable agriculture for food security
ย 
Methane emission from paddy field.pptx
Methane emission from paddy field.pptxMethane emission from paddy field.pptx
Methane emission from paddy field.pptx
ย 
Corporate social responsibilities of itc
Corporate social responsibilities of itcCorporate social responsibilities of itc
Corporate social responsibilities of itc
ย 
A tribute to father of white revolution
A tribute to father of white revolutionA tribute to father of white revolution
A tribute to father of white revolution
ย 
White revolution
White revolutionWhite revolution
White revolution
ย 
Minimization of Transportation Cost in Dairy Industry
Minimization of Transportation Cost in Dairy IndustryMinimization of Transportation Cost in Dairy Industry
Minimization of Transportation Cost in Dairy Industry
ย 
Watershed/Landscape Management for Multiple Benefits and Climate Resilience โ€จ...
Watershed/Landscape Management for Multiple Benefits and Climate Resilience โ€จ...Watershed/Landscape Management for Multiple Benefits and Climate Resilience โ€จ...
Watershed/Landscape Management for Multiple Benefits and Climate Resilience โ€จ...
ย 
Waste to energy india
Waste to energy indiaWaste to energy india
Waste to energy india
ย 

Similar to City of Toronto - Long Term Waste Management Strategy - Phase 3 Consultation Display Panels

City of Toronto - Long Term Waste Management Strategy - Phase 3 - Overview Pr...
City of Toronto - Long Term Waste Management Strategy - Phase 3 - Overview Pr...City of Toronto - Long Term Waste Management Strategy - Phase 3 - Overview Pr...
City of Toronto - Long Term Waste Management Strategy - Phase 3 - Overview Pr...Toronto Public Consultation Unit
ย 
City of Toronto - Long Term Waste Management Strategy - April 12, 2016 - Wast...
City of Toronto - Long Term Waste Management Strategy - April 12, 2016 - Wast...City of Toronto - Long Term Waste Management Strategy - April 12, 2016 - Wast...
City of Toronto - Long Term Waste Management Strategy - April 12, 2016 - Wast...Toronto Public Consultation Unit
ย 
City of Toronto - LTWMS - April 4 -3Rs Presentation - Waste Diversion in Home...
City of Toronto - LTWMS - April 4 -3Rs Presentation - Waste Diversion in Home...City of Toronto - LTWMS - April 4 -3Rs Presentation - Waste Diversion in Home...
City of Toronto - LTWMS - April 4 -3Rs Presentation - Waste Diversion in Home...Toronto Public Consultation Unit
ย 
City of Toronto Long Term Waste Strategy - Public Consultation Presentation, ...
City of Toronto Long Term Waste Strategy - Public Consultation Presentation, ...City of Toronto Long Term Waste Strategy - Public Consultation Presentation, ...
City of Toronto Long Term Waste Strategy - Public Consultation Presentation, ...Toronto Public Consultation Unit
ย 
Sustainable Recycling Services
Sustainable Recycling ServicesSustainable Recycling Services
Sustainable Recycling ServicesHumanCentered
ย 
Summer green zone case studies 2 (6) (1) cg (3)
Summer green zone case studies 2 (6) (1) cg (3)Summer green zone case studies 2 (6) (1) cg (3)
Summer green zone case studies 2 (6) (1) cg (3)EdGaskin1
ย 
Waste management in budget 2015
Waste management in budget 2015Waste management in budget 2015
Waste management in budget 2015Saahas ZeroWaste
ย 
Murrindindi_Shire_Council_Waste_and_Resource_Recovery_Strategy_2014-2019_Final
Murrindindi_Shire_Council_Waste_and_Resource_Recovery_Strategy_2014-2019_FinalMurrindindi_Shire_Council_Waste_and_Resource_Recovery_Strategy_2014-2019_Final
Murrindindi_Shire_Council_Waste_and_Resource_Recovery_Strategy_2014-2019_FinalSarah James
ย 
Solid waste management and its effects on economical Growth
Solid waste management and its effects on economical GrowthSolid waste management and its effects on economical Growth
Solid waste management and its effects on economical GrowthSekhar Babu Venkata Velpuri
ย 
3rs presentation
3rs presentation3rs presentation
3rs presentationhimanshu gupta
ย 
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...sbgjbritishcouncil
ย 
2010 ZWSA BUSINESS PLAN
2010 ZWSA BUSINESS PLAN2010 ZWSA BUSINESS PLAN
2010 ZWSA BUSINESS PLANJoe Andelija
ย 
OECD UNDP Conference on Biodiversity Finance โ€“ Session 6 Tracey Cumming, CBD
OECD UNDP Conference on Biodiversity Finance โ€“ Session 6 Tracey Cumming, CBDOECD UNDP Conference on Biodiversity Finance โ€“ Session 6 Tracey Cumming, CBD
OECD UNDP Conference on Biodiversity Finance โ€“ Session 6 Tracey Cumming, CBDOECD Environment
ย 
Local agenda 21
Local agenda 21Local agenda 21
Local agenda 21Julia ariffin
ย 
Waste recycling strategy presentation sg
Waste recycling strategy presentation   sgWaste recycling strategy presentation   sg
Waste recycling strategy presentation sgSDGCounties
ย 
City of Toronto - Long Term Waste Management Strategy - April 7 2016 - Waste ...
City of Toronto - Long Term Waste Management Strategy - April 7 2016 - Waste ...City of Toronto - Long Term Waste Management Strategy - April 7 2016 - Waste ...
City of Toronto - Long Term Waste Management Strategy - April 7 2016 - Waste ...Toronto Public Consultation Unit
ย 
Abstract - More Blue and Green for a Better Planet
Abstract - More Blue and Green for a Better PlanetAbstract - More Blue and Green for a Better Planet
Abstract - More Blue and Green for a Better Planetwatsonjohn
ย 
Waste management strategies in India.
Waste management strategies in India.Waste management strategies in India.
Waste management strategies in India.Siddhi Sharma
ย 

Similar to City of Toronto - Long Term Waste Management Strategy - Phase 3 Consultation Display Panels (20)

City of Toronto - Long Term Waste Management Strategy - Phase 3 - Overview Pr...
City of Toronto - Long Term Waste Management Strategy - Phase 3 - Overview Pr...City of Toronto - Long Term Waste Management Strategy - Phase 3 - Overview Pr...
City of Toronto - Long Term Waste Management Strategy - Phase 3 - Overview Pr...
ย 
City of Toronto - Long Term Waste Management Strategy - April 12, 2016 - Wast...
City of Toronto - Long Term Waste Management Strategy - April 12, 2016 - Wast...City of Toronto - Long Term Waste Management Strategy - April 12, 2016 - Wast...
City of Toronto - Long Term Waste Management Strategy - April 12, 2016 - Wast...
ย 
City of Toronto - LTWMS - April 4 -3Rs Presentation - Waste Diversion in Home...
City of Toronto - LTWMS - April 4 -3Rs Presentation - Waste Diversion in Home...City of Toronto - LTWMS - April 4 -3Rs Presentation - Waste Diversion in Home...
City of Toronto - LTWMS - April 4 -3Rs Presentation - Waste Diversion in Home...
ย 
City of Toronto Long Term Waste Strategy - Public Consultation Presentation, ...
City of Toronto Long Term Waste Strategy - Public Consultation Presentation, ...City of Toronto Long Term Waste Strategy - Public Consultation Presentation, ...
City of Toronto Long Term Waste Strategy - Public Consultation Presentation, ...
ย 
Sustainable Recycling Services
Sustainable Recycling ServicesSustainable Recycling Services
Sustainable Recycling Services
ย 
Summer green zone case studies 2 (6) (1) cg (3)
Summer green zone case studies 2 (6) (1) cg (3)Summer green zone case studies 2 (6) (1) cg (3)
Summer green zone case studies 2 (6) (1) cg (3)
ย 
Waste management in budget 2015
Waste management in budget 2015Waste management in budget 2015
Waste management in budget 2015
ย 
Murrindindi_Shire_Council_Waste_and_Resource_Recovery_Strategy_2014-2019_Final
Murrindindi_Shire_Council_Waste_and_Resource_Recovery_Strategy_2014-2019_FinalMurrindindi_Shire_Council_Waste_and_Resource_Recovery_Strategy_2014-2019_Final
Murrindindi_Shire_Council_Waste_and_Resource_Recovery_Strategy_2014-2019_Final
ย 
Solid waste management and its effects on economical Growth
Solid waste management and its effects on economical GrowthSolid waste management and its effects on economical Growth
Solid waste management and its effects on economical Growth
ย 
3rs presentation
3rs presentation3rs presentation
3rs presentation
ย 
Lao Report
Lao ReportLao Report
Lao Report
ย 
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
ย 
2010 ZWSA BUSINESS PLAN
2010 ZWSA BUSINESS PLAN2010 ZWSA BUSINESS PLAN
2010 ZWSA BUSINESS PLAN
ย 
Lawson h pb-d slides - edra - 5-30-13
Lawson   h pb-d slides - edra - 5-30-13Lawson   h pb-d slides - edra - 5-30-13
Lawson h pb-d slides - edra - 5-30-13
ย 
OECD UNDP Conference on Biodiversity Finance โ€“ Session 6 Tracey Cumming, CBD
OECD UNDP Conference on Biodiversity Finance โ€“ Session 6 Tracey Cumming, CBDOECD UNDP Conference on Biodiversity Finance โ€“ Session 6 Tracey Cumming, CBD
OECD UNDP Conference on Biodiversity Finance โ€“ Session 6 Tracey Cumming, CBD
ย 
Local agenda 21
Local agenda 21Local agenda 21
Local agenda 21
ย 
Waste recycling strategy presentation sg
Waste recycling strategy presentation   sgWaste recycling strategy presentation   sg
Waste recycling strategy presentation sg
ย 
City of Toronto - Long Term Waste Management Strategy - April 7 2016 - Waste ...
City of Toronto - Long Term Waste Management Strategy - April 7 2016 - Waste ...City of Toronto - Long Term Waste Management Strategy - April 7 2016 - Waste ...
City of Toronto - Long Term Waste Management Strategy - April 7 2016 - Waste ...
ย 
Abstract - More Blue and Green for a Better Planet
Abstract - More Blue and Green for a Better PlanetAbstract - More Blue and Green for a Better Planet
Abstract - More Blue and Green for a Better Planet
ย 
Waste management strategies in India.
Waste management strategies in India.Waste management strategies in India.
Waste management strategies in India.
ย 

More from Toronto Public Consultation Unit

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
ย 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Toronto Public Consultation Unit
ย 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides Toronto Public Consultation Unit
ย 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information Toronto Public Consultation Unit
ย 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels finalToronto Public Consultation Unit
ย 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Toronto Public Consultation Unit
ย 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 finalToronto Public Consultation Unit
ย 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)Toronto Public Consultation Unit
ย 

More from Toronto Public Consultation Unit (20)

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
ย 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
ย 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
ย 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
ย 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
ย 
Sewer Outfall Project
Sewer Outfall ProjectSewer Outfall Project
Sewer Outfall Project
ย 
General information
General informationGeneral information
General information
ย 
Disinfection System
Disinfection SystemDisinfection System
Disinfection System
ย 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
ย 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
ย 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final
ย 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
ย 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
ย 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
ย 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
ย 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
ย 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
ย 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
ย 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
ย 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
ย 

Recently uploaded

Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...
Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...
Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...vershagrag
ย 
Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...
Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...
Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...Sareena Khatun
ย 
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...kumargunjan9515
ย 
PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438ahcitycouncil
ย 
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and NumberSareena Khatun
ย 
Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...Call Girls Mumbai
ย 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32JSchaus & Associates
ย 
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...Inaayaeventcompany
ย 
Adajan < Russian Call Girls Ahmedabad | Starting โ‚น,5K To @25k with A/C 800573...
Adajan < Russian Call Girls Ahmedabad | Starting โ‚น,5K To @25k with A/C 800573...Adajan < Russian Call Girls Ahmedabad | Starting โ‚น,5K To @25k with A/C 800573...
Adajan < Russian Call Girls Ahmedabad | Starting โ‚น,5K To @25k with A/C 800573...gragfaguni
ย 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberSareena Khatun
ย 
Just Call VIP Call Girls In Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...HyderabadDolls
ย 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31JSchaus & Associates
ย 
Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...
Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...
Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...Sareena Khatun
ย 
NGO working for orphan childrenโ€™s education
NGO working for orphan childrenโ€™s educationNGO working for orphan childrenโ€™s education
NGO working for orphan childrenโ€™s educationSERUDS INDIA
ย 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)NAP Global Network
ย 
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...Sareena Khatun
ย 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Sareena Khatun
ย 
independent Call Girls Tiruvannamalai 9332606886Call Girls Advance Cash On D...
independent Call Girls Tiruvannamalai  9332606886Call Girls Advance Cash On D...independent Call Girls Tiruvannamalai  9332606886Call Girls Advance Cash On D...
independent Call Girls Tiruvannamalai 9332606886Call Girls Advance Cash On D...Sareena Khatun
ย 
Call Girls Radhanpur - 8250092165 Our call girls are sure to provide you with...
Call Girls Radhanpur - 8250092165 Our call girls are sure to provide you with...Call Girls Radhanpur - 8250092165 Our call girls are sure to provide you with...
Call Girls Radhanpur - 8250092165 Our call girls are sure to provide you with...Sareena Khatun
ย 
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...kumargunjan9515
ย 

Recently uploaded (20)

Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...
Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...
Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...
ย 
Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...
Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...
Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...
ย 
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
ย 
PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438
ย 
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
ย 
Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...
ย 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
ย 
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...
ย 
Adajan < Russian Call Girls Ahmedabad | Starting โ‚น,5K To @25k with A/C 800573...
Adajan < Russian Call Girls Ahmedabad | Starting โ‚น,5K To @25k with A/C 800573...Adajan < Russian Call Girls Ahmedabad | Starting โ‚น,5K To @25k with A/C 800573...
Adajan < Russian Call Girls Ahmedabad | Starting โ‚น,5K To @25k with A/C 800573...
ย 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
ย 
Just Call VIP Call Girls In Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...
ย 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31
ย 
Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...
Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...
Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...
ย 
NGO working for orphan childrenโ€™s education
NGO working for orphan childrenโ€™s educationNGO working for orphan childrenโ€™s education
NGO working for orphan childrenโ€™s education
ย 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
ย 
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
ย 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
ย 
independent Call Girls Tiruvannamalai 9332606886Call Girls Advance Cash On D...
independent Call Girls Tiruvannamalai  9332606886Call Girls Advance Cash On D...independent Call Girls Tiruvannamalai  9332606886Call Girls Advance Cash On D...
independent Call Girls Tiruvannamalai 9332606886Call Girls Advance Cash On D...
ย 
Call Girls Radhanpur - 8250092165 Our call girls are sure to provide you with...
Call Girls Radhanpur - 8250092165 Our call girls are sure to provide you with...Call Girls Radhanpur - 8250092165 Our call girls are sure to provide you with...
Call Girls Radhanpur - 8250092165 Our call girls are sure to provide you with...
ย 
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
ย 

City of Toronto - Long Term Waste Management Strategy - Phase 3 Consultation Display Panels

  • 1. The Waste Strategy Process TORONTO WASTE STRATEGY The Strategy recommends policies and programs, including how to manage any leftover garbage remaining after reusing, recycling, and composting. The Vision Together, we will Reduce the amount of waste we generate, Reuse what weย can, and Recycle and recover the remaining resources to reinvest back into the economy. We will embrace a waste management system that is userโ€‘friendly, with programs and facilities that balance the needs of the community and the environment with long term financial sustainability. Together, we will ensure a safe, clean, beautiful and healthy City for the future. 1 WHERE ARE WE? Review of current waste management policies, programs and facilities. 2 WHERE DO WE NEED TO GO? Identify the systemโ€™s gaps and challenges. Examine Torontoโ€™s anticipated needs over the next 30-50 years. 3 HOW DO WE GET THERE? Determine what options are available to us. 4 WHAT ARE THE OPTIONS? Evaluate options to manage Torontoโ€™s waste into the future. 5 WHICH OPTIONS SHOULD WE USE? Establish recommended options that are appropriate for Toronto. 6 HOW AND WHEN? Decide how and when the recommendations will be put into action. 7 WHATโ€™S THE STRATEGY? WE ARE HERE Weโ€™re seeking public comments on the Draft Waste Strategy to inform the final version that will be submitted to Toronto City Council for approval in July 2016.
  • 2. Why Do We Need a Waste Strategy? DID YOU KNOW? If we donโ€™t change the way we manage our waste, we could generate 37 million tonnes of garbage over the next 50 years! The development of a Long Term Waste Management Strategy is one of the actions in City Councilโ€™s 2013-2018 Strategic Action Plan. The Waste Strategy is a high level decision making document to guide waste management policy decisions for the next 30 to 50 years. The Waste Strategy will help Toronto: โ€ข maximize the life of Green Lane Landfill; โ€ข prioritize reduction, reuse and recycling; โ€ข leverage programs and services already in place to further improve waste diversion; โ€ข minimize the need for new capital infrastructure investments; โ€ข work together with community partners to enhance access to diversion programs; and โ€ข maintain flexibility for future waste management changes. The City manages almost 1,000,000 TONNES of waste each year.
  • 3. Integrated Waste Management System The Cityโ€™s integrated waste management system has a wide range of components that function as a whole. The Waste Strategy looked at each of these components to identify future improvements. INTERNAL SYSTEM INFLUENCES/ PRESSURES: City of Toronto Policy Growing Population Changing Demographics Enforcement EXTERNAL SYSTEM INFLUENCES Federal and Provincial Legislation Extended Producer Responsibility Programs and Infrastructure Funding Climate Change Economic Conditions Markets and Market Access Changing Waste Composition THIS FIGURE SHOWS: โ€ข the integrated nature of the waste management system; โ€ข the flow of waste from generation to disposal; โ€ข internal and external influences on the system; โ€ข the emphasis on waste as a resource with priority placed on reduce, reuse and recycle; and โ€ข how the 5Rs (reduce, reuse, recycle, recover, residual disposal) fit in the system. Drop- Transfer Recycling& Processing Recovery Residual Disposal Overall System Enforcement System Financing Reduce & Reuse
  • 4. Weโ€™ve Been Listening Since 2014, the Waste Strategy development process has been supported by widespread public and stakeholder engagement activities. Surveys 4 surveys with over 2,200 respondents to date. Stakeholder Advisory Group 19 meetings of the Stakeholder Advisory Group provided feedback throughout the process. Key Stakeholder Meetings 5 meetings with key stakeholders including environmental groups, non-profit organizations, First Nations representatives and ratepayer associations. Community Events and Open Houses 12 Public Consultation Events and City attendance at numerous community events reached over 4,200 people to date. Vendor Days Opportunity for presentations and information from vendors of technologies and services. Website and Social Media Dedicated project website and social media presence. Project Updates 6 Project Updates distributed to 750 emails on project contact list as well as key stakeholders. Wast(ED) Speaker Series 4 Speaker Series Events including a Zero Waste Conference in partnership with Metro Vancouver.
  • 5. What We Heard Thanks to Waste Strategy participants for your great ideas! Key Messages from the public, Stakeholderย Advisory ย Group and other key stakeholders: โ€ข work to mitigate climate change; โ€ข prioritize 3Rs, particularly reduce and reuse; โ€ข consider partnerships; โ€ข enhance enforcement; โ€ข treat waste as a resource and reinforce a circular economy; and โ€ข prioritize our communityโ€™s health & environment.
  • 6. Reduce. Reuse. Recycle. The Draft Waste Strategy focuses on reducing, reusing and recycling/composting waste to promote the importance of resource conservation and reduced environmental impacts. FOOD WASTE REDUCTION STRATEGY $31 BILLION Develop a strategy that promotes food waste reduction. MOBILE DROP-OFF SERVICE Coordinate a network of mobile drop-off depots that could transition into permanent neighbourhood drop-off depots. WASTE EXCHANGE Support opportunities or events that allow residents to obtain gently used materials for reuse. TEXTILE COLLECTION AND RE-USE STRATEGY Introduce innovative ways to reuse and recycle used clothing and other textiles. SHARING LIBRARY Help establish locations to borrow materials that are infrequently used, like sports equipment, tools and toys. REVERSE VENDING MACHINES Introduce technologies that allow for depositing certain products to receive rewards/incentives.
  • 7. Apartments & Condos In addition to the 3Rs opportunities, the Draft Waste Strategy recommends other ways to increase diversion at multi-residential buildings. DATA MANAGEMENT AND ACCESSIBILITY Better data availability, like waste container tracking. COMMUNITY COMPOSTING To further educate on the benefits of composting and foster a sense of community. POLICIES AND ENFORCEMENT Increased enforcement efforts and exploration of policies to encourage effective participation in waste diversion programs in all buildings. Apartments and condominiums make up over half of Torontoโ€™s housing. Single family homes currently divert 66% of their waste. Apartments and condos divert only 26%. (Based on 2014 data) 45%
  • 8. Diversion Opportunities For Businesses The City provides some waste management services to businesses, along with disposal options at City transfer stations and Green Lane Landfill. Most businesses in the city receive waste management services from private waste haulers. The City is considering options that encourage greater diversion of waste from businesses, including new policies and programs. Exploring recycling by-laws and incentives. Adding more small commercial customers to the Cityโ€™s Yellowย Bag Program.
  • 9. Diversion Opportunities For Home Renovation Waste Construction, Renovation and Demolition waste refers to materials that are generated from house and yard renovations. These materials can include items such as wood, drywall, plaster, asphalt, shingles, etc. The Draft Waste Strategy recommendations encourage greater diversion by: Establishing construction, renovation and demolition waste drop-off depots and policies. Banning disposal of construction, renovation and demolition materials in the garbage stream. WASTE-FREE ONTARIO ACT The Province of Ontarioโ€™s proposed Wasteโ€‘Freeย Ontarioย Act identifies construction and renovation materials as potential candidates for a province-wide disposal ban. The City will continue to work with the Province on any effort to divert this and other materials from landfill.
  • 10. Recovering More Resources Following the reduction, reuse and recycling of materials, there are opportunities to recover valuable resources from the waste that remains, including: additional recyclables, organics or energy resources (e.g. gas and heat). The Draft Waste Strategy is recommending the development of a Mixed Waste Processing Facility with Organics Recovery. The need and/or timing for its development depends on the success of the reduction, reuse and recycling efforts recommended in the Waste Strategy. It also depends on the details of the Waste-Free Ontario Act. Q: What is a Mixed Waste Processing Facility with Organics Recovery? A: Itโ€™s a facility where waste is further processed to remove recyclable materials and organic materials. BIOLOGICAL TREATMENT (ANAEROBIC DIGESTION) MECHANICAL SORTING ENERGY MARKETS ORGANIC MATERIALS BIOGAS GARBAGE SOLIDS Garbage remaining after the 3Rs RECYCLABLE MATERIALS COMPOSTDISPOSAL
  • 11. Green Lane Landfill Torontoโ€™s residual waste goes to Green Lane Landfill. With our 3Rs strategy, we can extend its lifespan. Future Capacity of Green Lane Landfill Green Lane Landfill is projected to have capacity for Torontoโ€™s waste until approximately 2040, provided we: โ€ข continue to focus on implementing 3Rs programs; โ€ข encourage effective participation in existing diversion programs; and โ€ข divert some City of Toronto waste to other disposal sites.
  • 12. We Need You Toronto! The promotion and education tools listed below will be used to help implement the recommendations of the Waste Strategy. Online Tools Interactive online waste management tools provide up- to-date information on waste management in Toronto. Social Media More use of social media as a way to inform people about program changes or 3Rs opportunities. Support Volunteers Additional tools and/or resources to support waste management- related volunteer programs (e.g. 3Rs Ambassadors). Targeted Communications Communication to reach Torontoโ€™s diverse population. Targeted Outreach Conversations Outreach and education campaigns to encourage diversion and educate people about their consumption choices. Create a Community Partnership Unit Establishing partnerships with community groups to promote waste diversion. Establish new Advisory Committees Advisory committees (i.e. Circular Economy, Multi-Residential) can help us view waste as a resource. Use these resources to stay informed!
  • 13. Additional Programs and Implementation Tools A range of additional programs and implementation tools have been identified to support the recommended Waste Strategy. RESEARCH Create a Research, Development and Innovation Unit to advance innovative ideas and promote new markets for recyclable materials. LEGISLATION Explore city-wide controls to increase diversion (e.g. disposal bans). FINANCING Explore ways to finance waste management in Toronto (e.g. full user pay system, public-private partnerships for major capital works, increase customer base, etc.).
  • 14. . Implementation Roadmap The Waste Strategy will be implemented over the next 30+ years with most of the reduction, reuse, and recycling recommendations being implemented in the first ten years as part of a ten year waste reduction plan. Promotion and education will occur throughout the Waste Strategy implementation. Review of the Waste Strategy every 5 years provides flexibility to address future changes. Note: Icons represent implementation. Planning begins earlier. Planning begins for approved Waste Strategy options. City-Wide Controls to Increase Diversion Reuse Events/ Waste Exchange Expanding Yellow Bag Program to More Businesses The Waste Strategy recommendations extend the life of Green Lane Landfill to approximately 2040. The need and timing of a Mixed Waste Processing Facility with Organics Recovery is based on the success of other programs. Pilot studies may occur in the first 5-10 years. Redirect Waste from Green Lane Landfill Neighbourhood Drop-off Depots Reverse Vending Machines Community Composting Data Management and Accessibility Depots and Policies for Home Renovation Waste Research, Development and Innovation Unit Sharing Library Mobile Drop-off Depots Recycling By-laws and Incentives for Businesses $31 BILLION Food Waste Reduction Strategy Textile Collection and Reuse Strategy 2023 2026 20402022 20252019 202420202016 2017 2018 2021 โ€ฆ
  • 15. We All Benefit The Waste Strategy results in numerous benefits to Torontoย residents and other stakeholders in the City of Toronto. Increased Reduction, Reuse and Recycling Reduced Greenhouse Gas Emissions Creation of Green Jobs Greater Environmental Awareness New Community Partnerships Promotion of Equity Waste as a Resource Toronto as an Innovation Leader System Flexibility Behaviour Change Cost Savings Longer Landfill Life
  • 16. CO2 Measuring Success Monitoring performance and progress is important to ensure that the Waste Strategy is effective in reducing waste overall. This allows us to see potential areas for improvement, future trends, and the return on investment as new programs or facilities are implemented. Information collected will be used to help us: โ€ข understand the performance of the current waste management system; โ€ข measure the impact of the Waste Strategyโ€™s recommended options; โ€ข monitor how we do on reduction and reuse activities; and, โ€ข measure our performance on customer service, safety, etc. TOOLS TO MEASURE SUCCESS Diversion Rates Waste Generation per household Customer Satisfaction Enforcement Actions Taken Greenhouse Gas Emissions Waste-Free Ontario Act The Province of Ontarioโ€™s proposed Wasteโ€‘Freeย Ontarioย Act will outline a new direction for waste management. The intent is to move towards an Extended Producer Responsibility system where producers are responsible for managing their products and packaging. This could impact how the City of Toronto manages waste in the future and the Waste Strategy will consider this as recommendations are being implemented.
  • 17. We Want Your Input on the Draft Waste Strategy! LEARN MORE Review the panels and public consultation event presentations for an overview of the Draftย Wasteย Strategy. Review the Draft Waste Strategy Document to understand the recommendations to manage Torontoโ€™s waste for the nextย 30-50 years. Review Technical Memo #4 to understand all the options that were consideredย and how these options were evaluated. CONTINUE THE DISCUSSION AT THESE PUBLIC CONSULTATION EVENTS โ€ข Draft Waste Strategy Overview - March 29. โ€ข Reduce, Reuse and Recycle: Waste Diversion in Houses, Apartments and Condos - April 4. โ€ข Diversion Opportunities: Business and Home Renovators - April 7. โ€ข Waste Recovery and Residual: How to Handle Remaining Materials - April 12. TAKE THE SURVEY Complete a survey online or send us an e-mail. WHATโ€™S NEXT City Council The Final Waste Strategy will be presented to Public Works and Infrastructure Committee in June 2016, then to the City Council for approval in July 2016. Implementation The City will begin implementation once the Waste Strategy is approved. details can be found on our website.: toronto.ca/wastestrategy If you have questions about the Waste Strategy or upcoming consultation, please contact: Robyn Shyllit, Public Consultation Unit 55 John Street, Metro Hall 19th Floor Toronto, ON M5V 3C6 wastestrategy@toronto.ca 416-392-3760 416-338-0889