CI/CD Best Practices for Salesforce DX
www.autorabit.com
Click to d text
• Automation is used in this process to validate deployment packages, run
tests, and move work items along the pipeline. Individual CI jobs can be
set up using a Salesforce DevOps solution such as AutoRABIT, Gearset or
a standard automation tool such as Jenkins. The continuous integration
in DevOps processes runs on a regular basis or is triggered when
branches in Git merge, and they can conduct tests before deployments
across version control and Salesforce environments.
5/5/2022 www.autorabit.com 2
Components of CI/CD
ImplementationofCI/CDwithSalesforceDX
▪ Implementation of the Salesforce CI/CD pipeline is separated into four
stages:
▪ Source
▪ Build
▪ Test
▪ Deployment
5/5/2022 www.autorabit.com 3
Source
It is the first stage of Salesforce CI/CD workflow. Here the CI/CD pipeline in
DevOps will be activated by any change in the program or a predefined flag
in the code repository. This level is all about source control, including
version control and change tracking.
5/5/2022 www.autorabit.com 4
This stage of the pipeline converts the source code and all of its
dependencies into an executable/runnable instance of the development.
This stage addresses software builds as well as other types of buildable
objects such as Docker containers.
Build
Test
The test stage includes all automated testing to validate the software's
behavior. This stage's purpose is to keep software defects from reaching
end users. This stage might include a variety of methods of testing, ranging
from integration testing to functional testing. This stage will also reveal any
flaws in the product.
5/5/2022 www.autorabit.com 5
This is the Salesforce CI/CD pipeline's final stage. The package is now ready
to be deployed after passing all of the preceding phases. At this point, the
package is deployed to appropriate environments, first to a staging
environment for additional quality assurance (QA) and then to a production
environment.
Deploy
5/5/2022 www.autorabit.com 6
info@autorabit.com
+19255001004
548MarketStreetPMB98272
SanFranciscoCA
94104-5401
www.autorabit.com
ArticleSource:CI/CDBestPracticesforSalesforceDX
Contact us or Request a demo
Click to add text
Click to add text
https://www.autorabit.com/request-a-demo/

CI/CD Best Practices for Salesforce DX

  • 1.
    CI/CD Best Practicesfor Salesforce DX www.autorabit.com Click to d text
  • 2.
    • Automation isused in this process to validate deployment packages, run tests, and move work items along the pipeline. Individual CI jobs can be set up using a Salesforce DevOps solution such as AutoRABIT, Gearset or a standard automation tool such as Jenkins. The continuous integration in DevOps processes runs on a regular basis or is triggered when branches in Git merge, and they can conduct tests before deployments across version control and Salesforce environments. 5/5/2022 www.autorabit.com 2 Components of CI/CD
  • 3.
    ImplementationofCI/CDwithSalesforceDX ▪ Implementation ofthe Salesforce CI/CD pipeline is separated into four stages: ▪ Source ▪ Build ▪ Test ▪ Deployment 5/5/2022 www.autorabit.com 3
  • 4.
    Source It is thefirst stage of Salesforce CI/CD workflow. Here the CI/CD pipeline in DevOps will be activated by any change in the program or a predefined flag in the code repository. This level is all about source control, including version control and change tracking. 5/5/2022 www.autorabit.com 4 This stage of the pipeline converts the source code and all of its dependencies into an executable/runnable instance of the development. This stage addresses software builds as well as other types of buildable objects such as Docker containers. Build
  • 5.
    Test The test stageincludes all automated testing to validate the software's behavior. This stage's purpose is to keep software defects from reaching end users. This stage might include a variety of methods of testing, ranging from integration testing to functional testing. This stage will also reveal any flaws in the product. 5/5/2022 www.autorabit.com 5 This is the Salesforce CI/CD pipeline's final stage. The package is now ready to be deployed after passing all of the preceding phases. At this point, the package is deployed to appropriate environments, first to a staging environment for additional quality assurance (QA) and then to a production environment. Deploy
  • 6.