Friday 8th February- Park Scene

Time                              Plan
9.30 am                           Meet at Graces give actors an
                                  outline of the day
10.00 am                          Arrive at King George’s Park
                                  (Brentwood) with actors and
                                  equipment
10.20 am                          Set up filming equipment in the
                                  forest
10.30am                           Costume preparation and make-
                                  up
11.00 am                          Set up at first location- the forest
11.15 am                          Practice Shots
11.30 am                          Film forest scene
12.30 pm                          Re-locate to next scene- The park
12.35 pm                          Guide actors on what to do- zip
                                  wire etc.
1.00 pm                           Finish Filming in the park area
1.10 pm                           Break- supplying refreshments
                                  for actors
1.30 pm                           Locate to final filming location in
                                  the park- Skate park
1.35 pm                           Ask Skaters for permission to film
                                  them for the video
1.40 pm                           Film different angles of the
                                  skaters on bike, skateboards etc.
3.00 pm                           Make sure we have got all the
                                  finished footage and finish for
                                  the day!
Friday 1st March- Party Scene

Time                            Plan
4.00 pm                         Set up at graces house for party
                                scenes- blow up balloons etc.
4.30 pm                         Organise lighting and test
                                different settings
5.00 pm                         Actors for the party start to arrive
5.30 pm                         Everyone start drinking getting
                                drunk natural filming starting
6.00 pm                         Shots of everyone dancing
6.30 pm                         Film everyone playing drinking
                                games keg stand etc.
7.00 pm                         Make sure we have got all the
                                footage and then clear up

More Related Content

What's hot

Music video director research : Adam Jones
Music video director research : Adam JonesMusic video director research : Adam Jones
Music video director research : Adam JonesAndrew Johnson
 
Production diary day 2
Production diary day 2Production diary day 2
Production diary day 213brooksb
 
Teapot Valley Camp Albie
Teapot Valley Camp AlbieTeapot Valley Camp Albie
Teapot Valley Camp Albiencsstaff
 
Production diary day 1
Production diary day 1Production diary day 1
Production diary day 113brooksb
 
Shooting schedule-location day 2 BSS
Shooting schedule-location day 2 BSSShooting schedule-location day 2 BSS
Shooting schedule-location day 2 BSSrhsmediastudies
 
Final edit evaluation task 7
Final edit evaluation task 7Final edit evaluation task 7
Final edit evaluation task 7Sadie Bailey
 
Genre research little mix
Genre research  little mixGenre research  little mix
Genre research little mixsiobhanfox1
 
Task 5 music video production photo diary
Task 5 music video production photo diaryTask 5 music video production photo diary
Task 5 music video production photo diarySadie Bailey
 
Filming schedule
Filming scheduleFilming schedule
Filming scheduleilanrubens
 

What's hot (14)

Boe Cafe Opening
Boe Cafe OpeningBoe Cafe Opening
Boe Cafe Opening
 
Task 1
Task 1Task 1
Task 1
 
Music video director research : Adam Jones
Music video director research : Adam JonesMusic video director research : Adam Jones
Music video director research : Adam Jones
 
Production diary day 2
Production diary day 2Production diary day 2
Production diary day 2
 
Teapot Valley Camp Albie
Teapot Valley Camp AlbieTeapot Valley Camp Albie
Teapot Valley Camp Albie
 
Production diary day 1
Production diary day 1Production diary day 1
Production diary day 1
 
Shooting schedule-location day 2 BSS
Shooting schedule-location day 2 BSSShooting schedule-location day 2 BSS
Shooting schedule-location day 2 BSS
 
Final edit evaluation task 7
Final edit evaluation task 7Final edit evaluation task 7
Final edit evaluation task 7
 
Genre research little mix
Genre research  little mixGenre research  little mix
Genre research little mix
 
Task 5 music video production photo diary
Task 5 music video production photo diaryTask 5 music video production photo diary
Task 5 music video production photo diary
 
Filming schedule
Filming scheduleFilming schedule
Filming schedule
 
spencer p3
spencer p3spencer p3
spencer p3
 
Jennifer Anderson
Jennifer AndersonJennifer Anderson
Jennifer Anderson
 
Glitch effect
Glitch effectGlitch effect
Glitch effect
 

Viewers also liked (6)

avocat coltuc
avocat coltucavocat coltuc
avocat coltuc
 
Vantage Magazine march 2013
Vantage Magazine march 2013Vantage Magazine march 2013
Vantage Magazine march 2013
 
Escapada Regalo 91 278 03 91
Escapada Regalo  91 278 03 91Escapada Regalo  91 278 03 91
Escapada Regalo 91 278 03 91
 
Portfolio producto móvil marzo 2013
Portfolio producto móvil marzo 2013Portfolio producto móvil marzo 2013
Portfolio producto móvil marzo 2013
 
Community based recruitment
Community based recruitmentCommunity based recruitment
Community based recruitment
 
La virtualizzazione del luogo di lavoro
La virtualizzazione del luogo di lavoroLa virtualizzazione del luogo di lavoro
La virtualizzazione del luogo di lavoro
 

Filming schedule

  • 1. Filming Schedule Friday 8th February- Park Scene Time Plan 9.30 am Meet at Graces give actors an outline of the day 10.00 am Arrive at King George’s Park (Brentwood) with actors and equipment 10.20 am Set up filming equipment in the forest 10.30am Costume preparation and make- up 11.00 am Set up at first location- the forest 11.15 am Practice Shots 11.30 am Film forest scene 12.30 pm Re-locate to next scene- The park 12.35 pm Guide actors on what to do- zip wire etc. 1.00 pm Finish Filming in the park area 1.10 pm Break- supplying refreshments for actors 1.30 pm Locate to final filming location in the park- Skate park 1.35 pm Ask Skaters for permission to film them for the video 1.40 pm Film different angles of the skaters on bike, skateboards etc. 3.00 pm Make sure we have got all the finished footage and finish for the day!
  • 2. Friday 1st March- Party Scene Time Plan 4.00 pm Set up at graces house for party scenes- blow up balloons etc. 4.30 pm Organise lighting and test different settings 5.00 pm Actors for the party start to arrive 5.30 pm Everyone start drinking getting drunk natural filming starting 6.00 pm Shots of everyone dancing 6.30 pm Film everyone playing drinking games keg stand etc. 7.00 pm Make sure we have got all the footage and then clear up