The document provides instructions for disassembling and assembling the piston pump used in the steering system of a Caterpillar 966H wheel loader. It describes 28 steps to disassemble the pump by removing components like valves, springs, seals, pistons and bearings. It then describes 34 steps for reassembling the pump in reverse order and includes checks for proper assembly like measuring axial shaft end play. The overall document provides detailed technical instructions for maintenance personnel to disassemble, inspect, replace parts as needed, and reassemble the steering pump.
"๐ฉ๐ฌ๐ฎ๐ผ๐ต ๐พ๐ฐ๐ป๐ฏ ๐ป๐ฑ ๐ฐ๐บ ๐ฏ๐จ๐ณ๐ญ ๐ซ๐ถ๐ต๐ฌ"
๐๐ ๐๐จ๐ฆ๐ฌ (๐๐ ๐๐จ๐ฆ๐ฆ๐ฎ๐ง๐ข๐๐๐ญ๐ข๐จ๐ง๐ฌ) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
๐๐ ๐๐จ๐ฆ๐ฌ provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
โญ ๐ ๐๐๐ญ๐ฎ๐ซ๐๐ ๐ฉ๐ซ๐จ๐ฃ๐๐๐ญ๐ฌ:
โข 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
โข SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
โขFreenBecky 1st Fan Meeting in Vietnam
โขCHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
โข WOW K-Music Festival 2023
โข Winner [CROSS] Tour in HCM
โข Super Show 9 in HCM with Super Junior
โข HCMC - Gyeongsangbuk-do Culture and Tourism Festival
โข Korean Vietnam Partnership - Fair with LG
โข Korean President visits Samsung Electronics R&D Center
โข Vietnam Food Expo with Lotte Wellfood
"๐๐ฏ๐๐ซ๐ฒ ๐๐ฏ๐๐ง๐ญ ๐ข๐ฌ ๐ ๐ฌ๐ญ๐จ๐ซ๐ฒ, ๐ ๐ฌ๐ฉ๐๐๐ข๐๐ฅ ๐ฃ๐จ๐ฎ๐ซ๐ง๐๐ฒ. ๐๐ ๐๐ฅ๐ฐ๐๐ฒ๐ฌ ๐๐๐ฅ๐ข๐๐ฏ๐ ๐ญ๐ก๐๐ญ ๐ฌ๐ก๐จ๐ซ๐ญ๐ฅ๐ฒ ๐ฒ๐จ๐ฎ ๐ฐ๐ข๐ฅ๐ฅ ๐๐ ๐ ๐ฉ๐๐ซ๐ญ ๐จ๐ ๐จ๐ฎ๐ซ ๐ฌ๐ญ๐จ๐ซ๐ข๐๐ฌ."
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
ย
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.๐คฏ
We will dig deeper into:
1. How to capture video testimonials that convert from your audience ๐ฅ
2. How to leverage your testimonials to boost your sales ๐ฒ
3. How you can capture more CRM data to understand your audience better through video testimonials. ๐
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
Implicitly or explicitly all competing businesses employ a strategy to select a mix
of marketing resources. Formulating such competitive strategies fundamentally
involves recognizing relationships between elements of the marketing mix (e.g.,
price and product quality), as well as assessing competitive and market conditions
(i.e., industry structure in the language of economics).
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
ย
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
ย
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
Improving profitability for small businessBen Wann
ย
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
ย
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
ย
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
๐ข Email Access
๐ข Bank Added
๐ข Card Verified
๐ข Full SSN Provided
๐ข Phone Number Access
๐ข Driving License Copy
๐ข Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1โช(218) 203-5951โฌ
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
ย
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. Youโll also learn
โข Four (4) workplace discipline methods you should consider
โข The best and most practical approach to implementing workplace discipline.
โข Three (3) key tips to maintain a disciplined workplace.
2. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 966H WHEEL LOADER A6D
Configuration: 966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine
Disassembly and Assembly
966H and 972H Wheel Loaders Machine Systems
Media Number -RENR8859-07 Publication Date -01/03/2014 Date Updated -14/12/2016
i02288172
Piston Pump (Steering) - Disassemble
SMCS - 4306-015; 5070-015-ZH
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-4878 Plate(1)
1
B 1P-1861 Retaining Ring Pliers 1
(1)
33.3 mm (1.31 inch) diameter
Start By:
a. Remove the steering pump. Refer to Disassembly and Assembly, "Piston Pump (Steering) -
Remove".
Illustration 1 g01145338
1/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. 1. Remove bolts (1) and valve (2).
Illustration 2 g01145339
2. Remove O-ring seals (3) from valve (2).
Illustration 3 g01145340
Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
3. Remove plug (4), the O-ring seals, plug (5), and plug (6).
2/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 4 g01145341
4. Remove spool (7) and spool (8).
5. Remove the O-ring seals from plug (5) and plug (6).
Illustration 5 g01145342
Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
6. Remove adjustment screw (9) and adjustment screw (10).
3/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 6 g01145354
7. Remove retainer (14), spacer (13), spring (12), and retainer (11).
8. Remove retainer (17), spring (16), and retainer (15).
9. Remove the O-ring seals from adjustment screw (9) and adjustment screw (10).
Illustration 7 g01145355
10. Remove bolts (18) and elbow (19).
Illustration 8 g01145356
4/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
11. Remove bolts (20) and head (21).
Illustration 9 g01145522
12. Remove plate (22).
Illustration 10 g01145523
13. Remove bearing cup (23) and pin (24).
Note: Place the steering pump on suitable blocks, as shown.
5/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 11 g01145357
14. Remove bearing cone (26) and gasket (9).
Illustration 12 g01145358
15. Remove spacer (28) and barrel assembly (29).
16. Remove spring (27) and piston (30).
Illustration 13 g01145359
6/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 14 g01145360
Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
17. Use Tooling (A) and a suitable press to disassemble barrel assembly (29).
a. Compress spring (31) until Tooling (A) is below retaining ring (33).
b. Remove retaining ring (33) and slowly release the spring tension.
c. Remove spring (31) and washers (32).
Illustration 15 g01145361
18. Remove bolts (34) and cover (35).
7/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. 19. Remove plug (36).
Illustration 16 g01145362
20. Remove O-ring seal (38) from the cover. Remove O-ring seal (39) from the plug.
21. Remove shaft (37).
Illustration 17 g01145365
22. Remove bolts (40) and two spacer plates (41).
23. Remove pistons (42) and the plate.
8/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 18 g01145366
24. Remove spacer plates (43) and swashplate (44).
Illustration 19 g01145367
25. Remove bearing cone (45).
Illustration 20 g01145368
26. Use Tooling (B) in order to remove retaining ring (46) and seal (47).
Illustration 21 g01145369
9/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. 27. Remove bearing cup (48).
28. Remove screws (50). Remove bearings (49) and (51).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Mar 18 12:08:35 UTC+0800 2020
10/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEB...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 966H WHEEL LOADER A6D
Configuration: 966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine
Disassembly and Assembly
966H and 972H Wheel Loaders Machine Systems
Media Number -RENR8859-07 Publication Date -01/03/2014 Date Updated -14/12/2016
i02288174
Piston Pump (Steering) - Assemble
SMCS - 4306-016; 5070-016-ZH
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-4878 Plate(1)
1
B 1P-1861 Retaining Ring Pliers 1
(1)
33.3 mm (1.31 inch) diameter
Illustration 1 g01145369
1. Lower the temperature of bearing cup (48).
2. Install bearing cup (48).
1/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. 3. Install bearings (49) and (51).
4. Install screws (50).
Illustration 2 g01145368
5. Install seal (47).
6. Use Tooling (B) in order to install retaining ring (46).
Illustration 3 g01145367
7. Install bearing cone (45).
2/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 4 g01145366
8. Install swashplate (44) and spacer plates (43).
Illustration 5 g01145365
9. Install pistons (42) and the plate.
10. Install bolts (40) and spacer plates (41).
Illustration 6 g01145362
11. Install O-ring seal (38) onto the cover. Install O-ring seal (39) onto the plug.
12. Install shaft (37).
3/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Illustration 7 g01145361
13. Install cover (35) and bolts (34).
14. Install plug (36).
Illustration 8 g01145359
Illustration 9 g01145360
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
15. Use Tooling (A) and a suitable press to assemble barrel assembly (29).
a. Install spring (31) and washers (32).
4/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. b. Compress spring (31) until Tooling (A) is below retaining ring (33).
c. Install retaining ring (33) and slowly release the spring tension.
Illustration 10 g01145358
16. Install barrel assembly (29) and spacer (28).
17. Install spring (27) and piston (30).
Illustration 11 g01145357
18. Install bearing cone (26) and gasket (9).
5/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 12 g01145523
19. Install bearing cup (23) and pin (24).
Illustration 13 g01145522
20. Install plate (22).
Illustration 14 g01145356
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
21. Install head (21) and bolts (20).
22. Tighten bolts (20) to a torque of 91 ยฑ 4 Nยทm (67 ยฑ 3 lb ft).
6/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 15 g01145355
23. Install elbow (19) and bolts (18).
Illustration 16 g01145354
24. Install the O-ring seals onto adjustment screw (9) and adjustment screw (10).
25. Install retainer (15), spring (16), and retainer (17).
26. Remove retainer (11), spring (12), spacer (13), and retainer (14).
Illustration 17 g01145342
7/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
27. Install adjustment screw (9) and adjustment screw (10).
Illustration 18 g01145341
28. Install spool (7) and spool (8).
29. Install the O-ring seals onto plug (5) and plug (6).
Illustration 19 g01145340
30. Install the O-ring seal, plug (4), plug (5), and plug (6).
8/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
21. Illustration 20 g01145339
31. Install O-ring seals (3) onto valve (2).
Illustration 21 g01145338
32. Install valve (2) and bolts (1).
33. Tighten bolts (1) to a torque of 34 ยฑ 3 Nยทm (25 ยฑ 2 lb ft).
Illustration 22 g00359153
34. Use a dial indicator to check the axial shaft end play. Put the dial indicator on the end of the
shaft and pull on the shaft.
9/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. The correct axial shaft end play is 0.01 to 0.10 mm (0.0004 to 0.004 inch). Use the correct
shim to achieve this dimension.
End By:
a. Install the steering pump. Refer to Disassembly and Assembly, "Piston Pump (Steering) -
Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Mar 18 12:09:30 UTC+0800 2020
10/10966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEB...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 966H WHEEL LOADER A6D
Configuration: 966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine
Disassembly and Assembly
966H and 972H Wheel Loaders Machine Systems
Media Number -RENR8859-07 Publication Date -01/03/2014 Date Updated -14/12/2016
i02520130
Piston Pump (Steering) - Install
SMCS - 4306-012; 5070-012-ZH
Installation Procedure
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
Illustration 1 g01145374
1. Install O-ring seal (7) and coupling (8) to steering piston pump (6).
1/4966H Wheel Loader A6D00001-UP (MACHINE) POWERED BY C11 Engine(SEBP...
2020/3/18https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...