This document provides instructions for connecting the frame of a 950H wheel loader. It involves assembling top and lower hitch bearings using various tools, then lifting and connecting the loader frame to the rear frame. Various components like pins, plates, and seals are installed. Alignment of frame bores is important. Finally hoses and harnesses are connected and fluids filled before installing remaining parts.
Caterpillar cat 325 d l excavator (prefix nac) service repair manual (nac0000...fjsekdmmeed
This document provides repair instructions for a 325D L excavator transmission. It outlines 33 steps to disassemble and reassemble the transmission components. Key parts include the main housing, motor housing, bearings, seals, gears, carriers, plugs, and cover. The instructions emphasize cleanliness and applying anti-seize compound to parts during assembly. Precise measurements and shimming are required to set bearing preload.
Caterpillar cat 325 d l excavator (prefix nac) service repair manual (nac0000...fjsekkdmeik
This document provides repair instructions for a 325D L excavator transmission. It outlines 33 steps to disassemble and reassemble the transmission components. Key parts include the main housing, motor housing, bearings, seals, gears, carriers, plugs, covers, and bolts. The instructions emphasize cleanliness during repair and replacing all O-rings, gaskets, and seals. Precise measurements and shimming are required to properly set bearing preload.
This document provides assembly instructions for a torque converter in 3 steps or less:
1. Clean all parts thoroughly before assembly and apply oil to bearings. Install various internal components like sleeves, seals, and gears in sequential order while applying specified torques to fasteners.
2. Heat certain parts like bearings to specified temperatures before installation. Install the stator and ensure proper contact and positioning of components.
3. Attach the pump adapter and install guide pins to hold parts in place before removing them after installation is complete.
This document provides assembly instructions for a torque converter in 3 steps or less:
1. Clean all parts thoroughly before assembly and apply oil to bearings. Install various internal components like sleeves, seals, and gears in sequential order while applying specified torques to fasteners.
2. Heat certain parts like bearings to specified temperatures before installation. Install the stator and ensure proper contact and positioning of components.
3. Attach the pump adapter and install guide pins to hold parts in place before removing them after installation is complete.
This document provides assembly instructions for a torque converter in 3 steps or less:
1. Clean all parts thoroughly before assembly and apply oil to bearings. Install various internal components like sleeves, seals, and gears in sequential order while applying specified torques to fasteners.
2. Heat certain parts like bearings to specified temperatures before installation. Install the stator and ensure proper contact and positioning of components.
3. Attach the pump adapter and install guide pins to hold parts in place before removing them after installation is complete.
This document provides assembly instructions for a torque converter in 3 steps or less:
1. Clean all parts thoroughly before assembly and apply oil to bearings. Install various internal components like sleeves, seals, and gears in sequential order while applying specified torques to fasteners.
2. Heat certain parts like bearings to specified temperatures before installation. Install the stator and ensure proper contact and positioning of components.
3. Attach the pump adapter and install guide pins to hold parts in place before removing them after installation is complete.
This document provides assembly instructions for a torque converter in 3 steps or less:
1. Clean all parts thoroughly before assembly and apply oil to bearings. Install various internal components like sleeves, seals, and gears in sequential order while applying specified torques to fasteners.
2. Heat certain parts like bearings to specified temperatures before installation. Install the stator and ensure proper contact and positioning of components.
3. Attach the pump adapter and install guide pins to hold parts in place before removing them after installation is complete.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual Instant D...fijsekkdmdm2w
This service repair manual provides instructions for repairing a 325D L excavator transmission. It details 33 steps for disassembling and assembling the transmission components. Cleanliness is important during repair. O-rings and seals should always be replaced. Various tools are used to install bearings, seals, gears, and other parts in the correct order. Proper torque specifications and safety precautions are noted throughout the process.
Caterpillar cat 325 d l excavator (prefix nac) service repair manual (nac0000...fjsekdmmeed
This document provides repair instructions for a 325D L excavator transmission. It outlines 33 steps to disassemble and reassemble the transmission components. Key parts include the main housing, motor housing, bearings, seals, gears, carriers, plugs, and cover. The instructions emphasize cleanliness and applying anti-seize compound to parts during assembly. Precise measurements and shimming are required to set bearing preload.
Caterpillar cat 325 d l excavator (prefix nac) service repair manual (nac0000...fjsekkdmeik
This document provides repair instructions for a 325D L excavator transmission. It outlines 33 steps to disassemble and reassemble the transmission components. Key parts include the main housing, motor housing, bearings, seals, gears, carriers, plugs, covers, and bolts. The instructions emphasize cleanliness during repair and replacing all O-rings, gaskets, and seals. Precise measurements and shimming are required to properly set bearing preload.
This document provides assembly instructions for a torque converter in 3 steps or less:
1. Clean all parts thoroughly before assembly and apply oil to bearings. Install various internal components like sleeves, seals, and gears in sequential order while applying specified torques to fasteners.
2. Heat certain parts like bearings to specified temperatures before installation. Install the stator and ensure proper contact and positioning of components.
3. Attach the pump adapter and install guide pins to hold parts in place before removing them after installation is complete.
This document provides assembly instructions for a torque converter in 3 steps or less:
1. Clean all parts thoroughly before assembly and apply oil to bearings. Install various internal components like sleeves, seals, and gears in sequential order while applying specified torques to fasteners.
2. Heat certain parts like bearings to specified temperatures before installation. Install the stator and ensure proper contact and positioning of components.
3. Attach the pump adapter and install guide pins to hold parts in place before removing them after installation is complete.
This document provides assembly instructions for a torque converter in 3 steps or less:
1. Clean all parts thoroughly before assembly and apply oil to bearings. Install various internal components like sleeves, seals, and gears in sequential order while applying specified torques to fasteners.
2. Heat certain parts like bearings to specified temperatures before installation. Install the stator and ensure proper contact and positioning of components.
3. Attach the pump adapter and install guide pins to hold parts in place before removing them after installation is complete.
This document provides assembly instructions for a torque converter in 3 steps or less:
1. Clean all parts thoroughly before assembly and apply oil to bearings. Install various internal components like sleeves, seals, and gears in sequential order while applying specified torques to fasteners.
2. Heat certain parts like bearings to specified temperatures before installation. Install the stator and ensure proper contact and positioning of components.
3. Attach the pump adapter and install guide pins to hold parts in place before removing them after installation is complete.
This document provides assembly instructions for a torque converter in 3 steps or less:
1. Clean all parts thoroughly before assembly and apply oil to bearings. Install various internal components like sleeves, seals, and gears in sequential order while applying specified torques to fasteners.
2. Heat certain parts like bearings to specified temperatures before installation. Install the stator and ensure proper contact and positioning of components.
3. Attach the pump adapter and install guide pins to hold parts in place before removing them after installation is complete.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual Instant D...fijsekkdmdm2w
This service repair manual provides instructions for repairing a 325D L excavator transmission. It details 33 steps for disassembling and assembling the transmission components. Cleanliness is important during repair. O-rings and seals should always be replaced. Various tools are used to install bearings, seals, gears, and other parts in the correct order. Proper torque specifications and safety precautions are noted throughout the process.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual Instant D...fskekkdmdmdm3e
This service repair manual provides instructions for repairing a 325D L excavator transmission. It details 33 steps for disassembling and assembling the transmission components. Cleanliness is important during repair. O-rings and seals should always be replaced. Various tools are used to install bearings, seals, gears, and other parts in the correct order. Proper torque specifications and safety precautions are noted throughout the process.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual (NAC00001...f7usuejkdkddm3
This service repair manual provides instructions for repairing a 325D L excavator transmission. It details 33 steps for disassembling and assembling the transmission components. Cleanliness is important during repair. O-rings and seals should always be replaced. Various tools are used to install bearings, seals, gears, and other parts in the correct order. Proper torque specifications and safety precautions are noted throughout the process.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual (NAC00001...f8sejdkdmdijd
This service repair manual provides instructions for repairing a 325D L excavator transmission. It details 33 steps for disassembling and assembling the transmission components. Cleanliness is important during repair. O-rings and seals should always be replaced. Various tools are used to install bearings, seals, gears, and other parts in the correct order and with the proper torque specifications.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual (NAC00001...f8uesjdkdmdm
This service repair manual provides instructions for repairing a 325D L excavator transmission. It details 33 steps for disassembling and assembling the transmission components. Cleanliness is important during repair. O-rings and seals should always be replaced. Various tools are used to install bearings, seals, gears, and other parts in the correct order. Proper torque specifications and safety precautions are noted throughout the process.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual (NAC00001...pwg56547003
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Cleanliness, compound application and torque specifications are critical to the assembly process.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual (NAC00001...ufs89eodkdmdm
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Proper assembly requires cleanliness and adherence to torque specifications.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual (NAC00001...jdkskmdmdm
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Proper assembly requires cleanliness and adherence to torque specifications.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual Instant D...zan2736ban
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Proper assembly requires cleanliness and application of specified compounds to ensure correct sealing and functioning.
Caterpillar cat 325 d l excavator (prefix nac) service repair manual (nac0000...ifkkddmmd
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Proper assembly requires cleanliness and adherence to torque specifications.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Cleanliness, application of compounds, and proper torque are emphasized.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual (NAC00001...jdkskmmdmd1
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Cleanliness, inspection of parts, and use of replacement parts for any that are worn or damaged are emphasized.
Caterpillar cat 325 d l excavator (prefix nac) service repair manual (nac0000...hfjsejdkemmn
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Cleanliness, inspection of parts, and use of replacement parts for any that are worn or damaged are emphasized.
1) The document provides assembly instructions for output transfer gears in a 980H wheel loader transmission.
2) It describes over 60 individual assembly steps requiring various tools to install bearings, gears, seals, and other components into the transfer case.
3) The proper assembly of the output transfer gears is critical to ensure the transmission functions correctly and transfers power from the engine to the wheels.
This document provides assembly instructions for the output transfer gears of a 980H wheel loader. It involves installing various gears, bearings, seals and other components into the transfer case. Key steps include installing the input and idler gears, adjusting bearing end play using shims, installing the output gear assembly onto the transfer shaft, and inserting the assembled transfer shaft into the transfer case. Proper lifting equipment is required due to the heavy weights involved. Precise torque specifications and rotations are listed to ensure correct assembly.
1) The document provides assembly instructions for output transfer gears in a 980H wheel loader transmission.
2) It describes over 60 individual assembly steps requiring various tools to install bearings, gears, seals, and other components into the transfer case.
3) The proper assembly of the output transfer gears is critical to ensure the transmission functions correctly and transfers power from the engine to the wheels.
1) The document provides assembly instructions for output transfer gears in a 980H wheel loader transmission.
2) It describes over 60 individual assembly steps requiring various tools to install bearings, gears, seals, and other components into the transfer case.
3) The proper assembly of the output transfer gears is critical to ensure the transmission functions correctly and transfers power from the engine to the wheels.
1) The document provides assembly instructions for output transfer gears in a 980H wheel loader transmission.
2) It describes over 60 individual assembly steps requiring various tools to install bearings, gears, seals, and other components into the transfer case.
3) The proper assembly of the output transfer gears is critical to ensure the transmission functions correctly and transfers power from the engine to the wheels.
1) The document provides assembly instructions for output transfer gears in a 980H wheel loader transmission.
2) It describes over 60 individual assembly steps requiring various tools to install bearings, gears, seals, and other components into the transfer case.
3) The proper assembly of the output transfer gears is critical to ensure the transmission functions correctly and transfers power from the engine to the wheels.
1) The document provides assembly instructions for output transfer gears in a 980H wheel loader transmission.
2) It describes over 60 individual assembly steps requiring various tools to install bearings, gears, seals, and other components into the transfer case.
3) The proper assembly of the output transfer gears is critical to ensure the transmission functions correctly and transfers power from the engine to the wheels.
1) The document provides assembly instructions for output transfer gears in a 980H wheel loader transmission.
2) It describes over 60 individual assembly steps requiring various tools to install bearings, gears, seals, and other components into the transfer case.
3) The proper assembly of the output transfer gears is critical to ensure the transmission functions correctly and transfers power from the engine to the wheels.
Kobelco SK250-8 (HS Engine) HYDRAULIC EXCAVATOR Service Repair Manual.pdff8uuseijdkmd3e
This document provides an outline and safety precautions for repairing an excavator. It discusses general precautions for disassembling and assembling parts, handling hydraulic and electrical equipment, welding repairs, and international measurement units. The outline covers preparation before disassembling, safety when disassembling and assembling, procedures for hydraulic parts, and environmental considerations.
Kobelco SK85MSR-7 HYDRAULIC EXCAVATOR Service Repair Manual.pdff8uuseijdkmd3e
This document is a shop manual that provides guidelines and safety information for repairing and maintaining an excavator. It includes sections on general precautions, disassembling and assembling hydraulic equipment, electrical systems, and welding repairs. The manual is copyrighted by Kobelco Construction Machinery Co. and cannot be copied or distributed without permission. It is intended to instruct repair and maintenance of Kobelco excavators.
More Related Content
Similar to Caterpillar Cat 950H Wheel Loader (Prefix JLX) Service Repair Manual (JLX00001 and up).pdf
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual Instant D...fskekkdmdmdm3e
This service repair manual provides instructions for repairing a 325D L excavator transmission. It details 33 steps for disassembling and assembling the transmission components. Cleanliness is important during repair. O-rings and seals should always be replaced. Various tools are used to install bearings, seals, gears, and other parts in the correct order. Proper torque specifications and safety precautions are noted throughout the process.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual (NAC00001...f7usuejkdkddm3
This service repair manual provides instructions for repairing a 325D L excavator transmission. It details 33 steps for disassembling and assembling the transmission components. Cleanliness is important during repair. O-rings and seals should always be replaced. Various tools are used to install bearings, seals, gears, and other parts in the correct order. Proper torque specifications and safety precautions are noted throughout the process.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual (NAC00001...f8sejdkdmdijd
This service repair manual provides instructions for repairing a 325D L excavator transmission. It details 33 steps for disassembling and assembling the transmission components. Cleanliness is important during repair. O-rings and seals should always be replaced. Various tools are used to install bearings, seals, gears, and other parts in the correct order and with the proper torque specifications.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual (NAC00001...f8uesjdkdmdm
This service repair manual provides instructions for repairing a 325D L excavator transmission. It details 33 steps for disassembling and assembling the transmission components. Cleanliness is important during repair. O-rings and seals should always be replaced. Various tools are used to install bearings, seals, gears, and other parts in the correct order. Proper torque specifications and safety precautions are noted throughout the process.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual (NAC00001...pwg56547003
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Cleanliness, compound application and torque specifications are critical to the assembly process.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual (NAC00001...ufs89eodkdmdm
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Proper assembly requires cleanliness and adherence to torque specifications.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual (NAC00001...jdkskmdmdm
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Proper assembly requires cleanliness and adherence to torque specifications.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual Instant D...zan2736ban
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Proper assembly requires cleanliness and application of specified compounds to ensure correct sealing and functioning.
Caterpillar cat 325 d l excavator (prefix nac) service repair manual (nac0000...ifkkddmmd
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Proper assembly requires cleanliness and adherence to torque specifications.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Cleanliness, application of compounds, and proper torque are emphasized.
Caterpillar Cat 325D L Excavator (Prefix NAC) Service Repair Manual (NAC00001...jdkskmmdmd1
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Cleanliness, inspection of parts, and use of replacement parts for any that are worn or damaged are emphasized.
Caterpillar cat 325 d l excavator (prefix nac) service repair manual (nac0000...hfjsejdkemmn
This document provides assembly instructions for a final drive in 3 steps:
1. Clean all parts thoroughly before assembly and inspect for wear or damage.
2. Apply specified tools, compounds, and brackets to assemble components like bearings, gears, seals and housings.
3. Measure clearances and torque bolts to specified values to correctly assemble and install the final drive. Cleanliness, inspection of parts, and use of replacement parts for any that are worn or damaged are emphasized.
1) The document provides assembly instructions for output transfer gears in a 980H wheel loader transmission.
2) It describes over 60 individual assembly steps requiring various tools to install bearings, gears, seals, and other components into the transfer case.
3) The proper assembly of the output transfer gears is critical to ensure the transmission functions correctly and transfers power from the engine to the wheels.
This document provides assembly instructions for the output transfer gears of a 980H wheel loader. It involves installing various gears, bearings, seals and other components into the transfer case. Key steps include installing the input and idler gears, adjusting bearing end play using shims, installing the output gear assembly onto the transfer shaft, and inserting the assembled transfer shaft into the transfer case. Proper lifting equipment is required due to the heavy weights involved. Precise torque specifications and rotations are listed to ensure correct assembly.
1) The document provides assembly instructions for output transfer gears in a 980H wheel loader transmission.
2) It describes over 60 individual assembly steps requiring various tools to install bearings, gears, seals, and other components into the transfer case.
3) The proper assembly of the output transfer gears is critical to ensure the transmission functions correctly and transfers power from the engine to the wheels.
1) The document provides assembly instructions for output transfer gears in a 980H wheel loader transmission.
2) It describes over 60 individual assembly steps requiring various tools to install bearings, gears, seals, and other components into the transfer case.
3) The proper assembly of the output transfer gears is critical to ensure the transmission functions correctly and transfers power from the engine to the wheels.
1) The document provides assembly instructions for output transfer gears in a 980H wheel loader transmission.
2) It describes over 60 individual assembly steps requiring various tools to install bearings, gears, seals, and other components into the transfer case.
3) The proper assembly of the output transfer gears is critical to ensure the transmission functions correctly and transfers power from the engine to the wheels.
1) The document provides assembly instructions for output transfer gears in a 980H wheel loader transmission.
2) It describes over 60 individual assembly steps requiring various tools to install bearings, gears, seals, and other components into the transfer case.
3) The proper assembly of the output transfer gears is critical to ensure the transmission functions correctly and transfers power from the engine to the wheels.
1) The document provides assembly instructions for output transfer gears in a 980H wheel loader transmission.
2) It describes over 60 individual assembly steps requiring various tools to install bearings, gears, seals, and other components into the transfer case.
3) The proper assembly of the output transfer gears is critical to ensure the transmission functions correctly and transfers power from the engine to the wheels.
1) The document provides assembly instructions for output transfer gears in a 980H wheel loader transmission.
2) It describes over 60 individual assembly steps requiring various tools to install bearings, gears, seals, and other components into the transfer case.
3) The proper assembly of the output transfer gears is critical to ensure the transmission functions correctly and transfers power from the engine to the wheels.
Similar to Caterpillar Cat 950H Wheel Loader (Prefix JLX) Service Repair Manual (JLX00001 and up).pdf (20)
Kobelco SK250-8 (HS Engine) HYDRAULIC EXCAVATOR Service Repair Manual.pdff8uuseijdkmd3e
This document provides an outline and safety precautions for repairing an excavator. It discusses general precautions for disassembling and assembling parts, handling hydraulic and electrical equipment, welding repairs, and international measurement units. The outline covers preparation before disassembling, safety when disassembling and assembling, procedures for hydraulic parts, and environmental considerations.
Kobelco SK85MSR-7 HYDRAULIC EXCAVATOR Service Repair Manual.pdff8uuseijdkmd3e
This document is a shop manual that provides guidelines and safety information for repairing and maintaining an excavator. It includes sections on general precautions, disassembling and assembling hydraulic equipment, electrical systems, and welding repairs. The manual is copyrighted by Kobelco Construction Machinery Co. and cannot be copied or distributed without permission. It is intended to instruct repair and maintenance of Kobelco excavators.
Kobelco SK130LC-11 HYDRAULIC EXCAVATOR Service Repair Manual.pdff8uuseijdkmd3e
This document provides an outline and general precautions for repairing a hydraulic excavator shop manual. It discusses the copyright of the manual, safety precautions for disassembly and assembly, handling hydraulic and electrical equipment, welding repairs, and environmental issues. Measurement units used are also described. The manual is intended solely for repair and maintenance of machines sold by Kobelco and cannot be copied, distributed or used for other purposes without permission.
Kobelco SK260LC-8 (HS Engine) HYDRAULIC EXCAVATOR Service Repair Manual.pdff8uuseijdkmd3e
This document provides an outline and safety precautions for repairing an excavator. It discusses general precautions for disassembling and assembling parts, handling hydraulic and electrical equipment, welding repairs, and international measurement units. The outline covers preparation before disassembling, safety when disassembling and assembling, procedures for hydraulic and electrical parts, and environmental considerations. Measurement units and applicable machine models are also noted.
The document provides instructions for disassembling and assembling the service brake and final drive/wheel components of a Caterpillar 993K wheel loader. The disassembly procedure for the service brake involves removing reaction plates, discs, springs, pistons and seals. The assembly procedure specifies installing these components in reverse order while applying grease and torques. The final drive/wheel disassembly removes planetary carriers, gears, bushings, retainers and wheels. Tools and lifting devices are required due to component weights up to 1542 kg.
The document provides instructions for removing and installing various components of a Caterpillar 992K wheel loader, including:
1) Removing and disassembling the rear power take-off, which involves using various tools to remove nuts, bearings, and other parts.
2) Instructions for reassembling the rear power take-off by installing bearings and other components in the reverse order of disassembly.
3) Procedures for removing and installing the vibration damper and pulley, which includes using guide studs and lifting equipment to handle the heavy components.
The document contains detailed step-by-step instructions along with illustrations to correctly perform maintenance on specific parts of the 992K
This document provides instructions for removing and installing various engine components on a Caterpillar 993K wheel loader, including:
- Inlet and exhaust valves, guides, and seat inserts
- Engine oil filter base
- Engine oil cooler
The procedures describe using various tools to remove parts like the cylinder head, valves, guides, filters, hoses, and cooler assembly. Installation is generally the reverse of removal, with instructions to clean parts, apply sealant or lubricant, and torque fasteners to the specified values. Safety notices warn of spring hazards and keeping parts clean to prevent wear.
This document provides instructions for assembling and disassembling components of the steering system on a 966K wheel loader. The steps include installing bearings and seals in the piston pump, removing and installing the secondary steering pump and electric motor, removing and installing the secondary steering control valve, and disassembling the secondary steering valve. The document contains diagrams to illustrate the proper order and orientation of parts. Safety precautions are provided for spring loaded components.
This document provides instructions for removing and installing various components of a Caterpillar 993K wheel loader engine, including:
1) Removing and reinstalling the rear power take-off (RPTO) which involves removing several nuts, bearings, and gears.
2) Removing and installing the vibration damper and pulley by removing bolts, spacers, and lifting the damper and pulley components.
3) Two separate procedures for removing and installing the vibration damper and pulley depending on the machine model, both involving removing bolts and lifting various damper and pulley components.
This document provides instructions for installing, removing, disassembling, and assembling a fuel ratio control system on a Caterpillar 3306 engine. It describes how to install and remove fuel injection nozzles and the fuel ratio control unit. The disassembly and assembly procedures explain how to take apart and rebuild the fuel ratio control unit, replacing worn parts.
This document provides instructions for disassembling the transmission of a 962M wheel loader. It lists over 50 steps to remove various transmission components including clutches, shafts, gears, bearings and seals. Safety precautions are provided for releasing spring forces. Required tools include lifting devices, presses and specialized compression tools. Detailed illustrations accompany each step to show the component locations.
This document provides the disassembly procedure for a piston pump used in 962L wheel loaders. It lists 26 steps to fully disassemble the pump and its components. Required tools include lifting eyes, threaded rods, eyebolts, drivers, depth gauges, and bearing pullers. Safety precautions are provided to properly release spring forces when removing springs. Pictures accompany each step to illustrate the process.
This document provides instructions for assembling and disassembling components of the torque converter and transmission on a 962H wheel loader. It includes 29 steps to disassemble the transmission planetary, beginning with removing O-rings and bolts from the housing. Various tools are required including retaining ring pliers and a bearing puller. Detailed illustrations accompany each step. The goal is to disassemble the transmission components in preparation for inspection or repair.
This document provides assembly instructions for governors used on 3114, 3116, and 3126 engines. It describes 17 steps to assemble the governor, including installing various springs, levers, and other components. Key steps include installing the fuel ratio control lever assembly, output servo assembly, bearing block assembly, and adjusting the gap for the torque cam. The summary provides an overview of the major components and goal of assembling the governor.
This document provides instructions for disassembling and assembling the freewheel stator of a torque converter. It outlines 35 steps to disassemble the various components, including removing bolts, gears, bearings, seals and housing pieces. It then lists 12 steps for reassembling the components in reverse order, noting that cleanliness is important and worn parts should be replaced. Tools and torque specifications are provided for relevant steps.
This document provides assembly instructions for the transmission planetary system of a 950H wheel loader. It describes 59 assembly steps and includes illustrations of each step. The key components assembled are the input shaft, planetary gears, carrier assemblies, ring gears, output shaft, clutch plates and discs, seals, and housing. Cleanliness is emphasized and special tools are required for some steps like installing retaining rings and bearings.
Caterpillar Cat 950F SERIES II WHEEL LOADER (Prefix 4DJ) Service Repair Manua...f8uuseijdkmd3e
This document provides instructions for disassembling a Type IV governor used in Caterpillar 3114, 3116, and 3126 engines. It outlines 39 steps to disassemble the governor into its main components. Required tools include a governor repair fixture, retaining ring pliers, pin punch, clevis driver, and other standard shop tools. Cautions are provided regarding spring forces and containment of fluids.
Kobelco SK350LC-10 HYDRAULIC EXCAVATOR Service Repair Manual.pdff8uuseijdkmd3e
This document is a shop manual that contains specifications, maintenance, system, disassembly, troubleshooting, and engine sections for hydraulic excavator models SK330-10 and SK350LC-10. It provides safety information and precautions for operating and servicing the excavators. The manual outlines general safety messages and contains warnings for working on pressurized systems, lifting heavy components, hot parts, and ensuring all guards are in place before starting work.
Kobelco SK330-10 HYDRAULIC EXCAVATOR Service Repair Manual.pdff8uuseijdkmd3e
This document outlines general precautions and guidelines for repairing excavator shop manuals. It discusses copyright of the manual, safety procedures, hydraulic and electrical equipment, welding repairs, and international unit systems. Precautions include preparing the work area, using proper safety equipment, relieving pressures, blocking components, and handling hazardous materials. The manual is intended to instruct repair, maintenance, and adjustments of machines sold by Kobelco.
Kobelco SK230SRLC-5E HYDRAULIC EXCAVATOR Service Repair Manual.pdff8uuseijdkmd3e
This document is a shop manual that provides specifications, maintenance, system, disassembly, and troubleshooting information for a hydraulic excavator model. It contains sections on specifications, maintenance, systems, disassembly, troubleshooting, engine procedures, and installing options. The document provides important safety information that should be read and understood before working on the excavator.
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Charging Fueling & Infrastructure (CFI) Program by Kevin MillerForth
Kevin Miller, Senior Advisor, Business Models of the Joint Office of Energy and Transportation gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Dahua provides a comprehensive guide on how to install their security camera systems. Learn about the different types of cameras and system components, as well as the installation process.
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinForth
Brandt Hertenstein, Program Manager of the Electrification Coalition gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinForth
Cat Plein, Development & Communications Director of Forth, gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Understanding Catalytic Converter Theft:
What is a Catalytic Converter?: Learn about the function of catalytic converters in vehicles and why they are targeted by thieves.
Why are They Stolen?: Discover the valuable metals inside catalytic converters (such as platinum, palladium, and rhodium) that make them attractive to criminals.
Steps to Prevent Catalytic Converter Theft:
Parking Strategies: Tips on where and how to park your vehicle to reduce the risk of theft, such as parking in well-lit areas or secure garages.
Protective Devices: Overview of various anti-theft devices available, including catalytic converter locks, shields, and alarms.
Etching and Marking: The benefits of etching your vehicle’s VIN on the catalytic converter or using a catalytic converter marking kit to make it traceable and less appealing to thieves.
Surveillance and Monitoring: Recommendations for using security cameras and motion-sensor lights to deter thieves.
Statistics and Insights:
Theft Rates by Borough: Analysis of data to determine which borough in NYC experiences the highest rate of catalytic converter thefts.
Recent Trends: Current trends and patterns in catalytic converter thefts to help you stay aware of emerging hotspots and tactics used by thieves.
Benefits of This Presentation:
Awareness: Increase your awareness about catalytic converter theft and its impact on vehicle owners.
Practical Tips: Gain actionable insights and tips to effectively prevent catalytic converter theft.
Local Insights: Understand the specific risks in different NYC boroughs, helping you take targeted preventive measures.
This presentation aims to equip you with the knowledge and tools needed to protect your vehicle from catalytic converter theft, ensuring you are prepared and proactive in safeguarding your property.
EV Charging at MFH Properties by Whitaker JamiesonForth
Whitaker Jamieson, Senior Specialist at Forth, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitForth
Vanessa Warheit, Co-Founder of EV Charging for All, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
2. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 950H WHEEL LOADER JLX
Configuration: 950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine
Disassembly and Assembly
950H and 962H Wheel Loaders Machine Systems
Media Number -UENR1619-00 Publication Date -01/12/2012 Date Updated -04/12/2012
i05021371
Loader Frame to Rear Frame - Connect
SMCS - 7051-077; 7054-077
Connection Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
9U-7536 Stand 2
277-7200 Electric Hydraulic Pump Gp 1
B 138-7574 Link Bracket 2
G FT-2826 Lower Plate Gp 1
H 1P-0520 Driver Gp 1
J FT-2825 Upper Plate Gp 1
K - Loctite C5-A Copper Anti-Seize -
Note: The following steps are for the assembly of the top hitch bearings.
1/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
3. Illustration 1 g01192969
Typical Example
1. Position lower cap (22) on the upper frame. Hold the lower cap in place with three bolts
(20) that are equally spaced. Make sure that the lower cap is seated firmly against the upper
frame.
2. Apply Tooling (K) to the bores.
Illustration 2 g01192972
3. Lower the temperature of lower bearing cup (35) to −50° ± 5°C (−58° ± 9°F).
4. Install lower bearing cup (35). Use Tooling (H) in order to ensure that bearing cup (35)
contacts lower cap (22) .
2/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
4. Illustration 3 g01192974
5. Apply clean oil to bearing cone (36). Install bearing cone (36) in the correct position, as
shown.
Illustration 4 g01192977
6. Apply clean oil to bearing cone (37). Install bearing cone (37) in the correct position, as
shown.
Illustration 5 g01192978
3/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
5. 7. Lower the temperature of upper bearing cup (38) to −50° ± 5°C (−58° ± 9°F).
8. Install upper bearing cup (38). Use Tooling (H) in order to ensure that bearing cup (38)
lightly contacts the bearing cones.
Illustration 6 g01192983
9. Install the original shims (23) .
Illustration 7 g01192986
Note: Install the upper cap and lower cap in the original radial location.
10. Install upper cap (21). Install bolts (20) that are equally spaced at 120 degree intervals. The
torque for bolts (20) is 100 ± 20 N·m (75 ± 15 lb ft).
11. Install Tooling (G). Use a suitable torque wrench and Tooling (G) in order to determine the
amount of torque that is needed to rotate the bearing cones. As required, adjust the number
of shims in order to achieve a rolling torque between 1.1 N·m (9.7 lb in) and 5.6 N·m (49.6
lb in).
12. Remove Tooling (G) .
4/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
6. 13. Remove upper cap (21) and lower cap (22) .
Illustration 8 g03316643
Note: When you install the upper cap and the lower cap on the machine, the sealing lips of
each lip seal must face upward.
14. Position lip seal (25) so that the sealing lip is facing upward. Use Tooling (H) in order to
install lip seal (25) in upper cap (21) so that the seal contacts the counterbore in the upper
cap.
15. Apply Tooling (K) on the sealing lip.
Illustration 9 g03316645
16. Position lip seal (24) so that the sealing lip is facing downward. Use Tooling (H) in order to
install lip seal (24) in lower cap (22) so that the seal contacts the counterbore in the lower
cap.
17. ApplyTooling (K) on the sealing lip.
5/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
7. Illustration 10 g01192412
18. Install the proper thickness of shims. Install lower cap (22), upper cap (21), and bolts (20) .
Note: The following steps are used for the assembly of the lower hitch bearings.
Illustration 11 g01193000
19. Position lower cap (31) on the lower frame. Hold the lower cap in place with four bolts (29)
that are equally spaced. Make sure that the lower cap is seated firmly against the upper
frame.
20. Apply Tooling (K) to the bores.
6/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
8. Illustration 12 g01193004
21. Lower the temperature of lower bearing cup (39) to −45°C (−49°F).
22. Install lower bearing cup (39). Use Tooling (H) in order to ensure that bearing cup (39)
contacts lower cap (31) .
Illustration 13 g01193008
23. Apply clean oil to bearing cone (40). Install bearing cone (40) in the correct position, as
shown.
7/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
9. Illustration 14 g01193014
24. Apply clean oil to bearing cone (41). Install bearing cone (41) in the correct position, as
shown.
Illustration 15 g01193017
25. Lower the temperature of upper bearing cup (41) to −45°C (−49°F).
26. Install upper bearing cup (42). Use Tooling (H) in order to ensure that bearing cup (42)
lightly contacts the bearing cones.
Illustration 16 g01193021
27. Install the original shims (32) .
8/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
10. Illustration 17 g01193022
28. Install upper cap (30). Install bolts (29) and the washers that are equally spaced at 90 degree
intervals. The torque for bolts (29) is 100 ± 20 N·m (75 ± 15 lb ft).
29. Install Tooling (J). Use a suitable torque wrench and Tooling (J) in order to determine the
amount of torque that is needed to rotate the bearing cones. As required, adjust the number
of shims in order to achieve a rolling torque between 1.1 N·m (10 lb in) and 5.6 N·m (50 lb
in).
30. Remove Tooling (J) .
31. Remove upper cap (30) and lower cap (31) .
Illustration 18 g01192580
Note: When you install the upper cap and the lower cap on the machine, the sealing lips of
each lip seal must face downward.
32. Position lip seal (33) so that the sealing lip is facing upward. Use Tooling (H) in order to
install lip seal (33) in upper cap (30) so that the seal contacts the counterbore in the upper
cap.
33. ApplyTooling (K) on the sealing lip.
9/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
11. 34. Position lip seal (34) so that the sealing lip is facing downward. Use Tooling (H) in order to
install lip seal (34) in lower cap (31) so that the seal contacts the counterbore in the lower
cap.
35. ApplyTooling (K) on the sealing lip.
Illustration 19 g01193027
36. Install the proper thickness of shims. Install lower cap (31), upper cap (30), and bolts (29) .
Illustration 20 g01193029
37. Install upper spacer (28) .
10/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SE...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
12. Illustration 21 g01193031
38. Apply Tooling (K) to the bores.
39. Lower the temperature of lower sleeve bearing (26) and upper sleeve bearing (27) to −50° ±
5°C (−58° ± 9°F).
40. Install the sleeve bearings. Make sure that the sleeve bearings are flush with the bottom
surface of the bores.
Illustration 22 g01192014
Note: The following steps are used for the connection of the loader frame and the rear
frame.
41. Install Tooling (B) on the loader frame. Attach a suitable lifting device and lifting chains to
Tooling (B) .
42. Use a suitable lifting device in order to raise the loader frame.
11/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SE...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
13. Illustration 23 g01193034
Typical Example
43. Remove the suitable cribbing from the loader frame.
Illustration 24 g00364111
44. Use a suitable chain in order to secure the loader frame to the mast of the lift truck, as
shown.
45. Use a suitable lifting device and a suitable lift truck in order to connect the frames.
12/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SE...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
14. Illustration 25 g00432878
46. Use Tooling (A) and a suitable lifting device in order to align the bores.
Illustration 26 g01192123
47. ApplyTooling (K) to the upper bores.
Note: Proper alignment of the bores is important.
48. Install pin assembly (19). Install bolt (18) and the washer.
13/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SE...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
15. Illustration 27 g01193050
49. ApplyTooling (K) to the lower bores.
50. Install pin (16) .
51. Connect the steering frame lock.
Illustration 28 g01192098
Note: Proper alignment of the bores will ensure that spacer (17) will seat properly.
52. Install lower spacer (17) in the lower hitch. Make sure that the spacer is installed in the
original position.
Illustration 29 g01193052
14/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SE...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
16. 53. Install lower hitch mount plate (14). Install two bolts (13). The torque for bolts (13) is 68
N·m (50 lb ft).
54. Use a thickness feeler gauge in order to measure the distance between the frame and the
lower hitch mount plate. Check completely around the lower hitch mount plate. Record the
minimum measurement that is found.
Illustration 30 g01192772
55. Remove lower hitch mount plate (14) .
56. Install shims (15) under lower hitch mount plate (14). The shims thickness should equal the
measurement from Step 54 minus 0.25 mm (0.010 inch).
Illustration 31 g01192067
57. Install bolts (12) and (13). The torque for bolts (12) is 100 ± 20 N·m (75 ± 15 lb ft). The
torque for bolts (13) is 570 ± 80 N·m (420 ± 59 lb ft).
15/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SE...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
17. Illustration 32 g01192014
58. Remove the suitable lifting device and Tooling (B) from the loader frame.
Illustration 33 g01192031
59. Install bolt (11). Repeat on the other side of the loader frame.
Illustration 34 g03313458
60. Install light assemblies (9) and sensor (10) .
16/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SE...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
18. Illustration 35 g01192002
61. Remove the suitable cribbing from the front of the rear frame.
Illustration 36 g00432878
62. Remove Tooling (A) from the rear frame.
17/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SE...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
19. Illustration 37 g01193054
63. Install pin assembly (7) and bolt (6) to the rod end of both steering cylinders.
Illustration 38 g01191942
64. Connect hose assembly (3) .
65. Install bolt (4), the washer, and the clip.
66. Connect harness assembly (5) .
Illustration 39 g00847099
67. Connect hose assembly (2) to fixed axle (1) .
68. Fill the oil from the hydraulic tank. Refer to Operation and Maintenance Manual for the
correct procedure.
End By:
a. Install the steering frame lock.
b. Install the center drive shaft.
c. Install the cab.
18/19
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SE...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
20. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 950H WHEEL LOADER JLX
Configuration: 950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine
Disassembly and Assembly
950H and 962H Wheel Loaders C7 Engine Supplement
Media Number -UENR0788-00 Publication Date -01/10/2012 Date Updated -26/10/2012
i05016190
Steering Frame Lock - Separate and Connect
SMCS - 7506-029
Connection Procedure
Personal injury or death can result from machine articulation or
movement.
Machine frames can move and a person can be crushed.
Connect the steering frame lock link between the front and rear frames
before working on machine. Secure clevis pin with locking pin.
Before operating the machine, fasten the steering frame lock link into
the stored position and secure the clevis pin with locking pin.
Failure to lock into the stored position before operating can result in
loss of steering.
1. Move the machine to a hard, level surface. Park the machine in the straight ahead position
and engage the parking brake.
1/3
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
21. Illustration 1 g01172092
2. Remove locking pin (2) from pin (1) .
Illustration 2 g01172098
3. Position steering frame lock (3) to the front frame. Install pin (1) and locking pin (2) .
Note: To align the pin bores, move the front loader frame.
Separation Procedure
Personal injury or death can result from machine articulation or
movement.
Machine frames can move and a person can be crushed.
Connect the steering frame lock link between the front and rear frames
before working on machine. Secure clevis pin with locking pin.
2/3
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
22. Before operating the machine, fasten the steering frame lock link into
the stored position and secure the clevis pin with locking pin.
Failure to lock into the stored position before operating can result in
loss of steering.
Illustration 3 g01172098
1. Remove locking pin (2) and pin (1). Move steering frame lock (3) to the storage position.
Illustration 4 g01172092
2. Install pin (1) and locking pin (2) .
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sun Apr 5 14:14:03 UTC+0800 2020
3/3
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
23. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 950H WHEEL LOADER JLX
Configuration: 950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine
Disassembly and Assembly
950H and 962H Wheel Loaders C7 Engine Supplement
Media Number -UENR0788-00 Publication Date -01/10/2012 Date Updated -26/10/2012
i05016249
System Pressure - Release
SMCS - 4250-553-PX; 4300-553-PX; 5050-553-PX
Release Procedure
Start By:
A. Connect the steering frame lock.
Personal injury can result from hydraulic oil pressure and hot oil.
Hydraulic oil pressure can remain in the hydraulic system after the
engine has been stopped. Serious injury can be caused if this pressure is
not released before any service is done on the hydraulic system.
Make sure all of the work tools have been lowered to the ground, and
the oil is cool before removing any components or lines. Remove the oil
filler cap only when the engine is stopped, and the filler cap is cool
enough to touch with your bare hand.
Escaping fluid under pressure, even a pinhole size leak, can penetrate
body tissue, causing serious injury, and possible death. If fluid is
injected into your skin, it must be treated immediately by a doctor
familiar with this type of injury.
1/2
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
24. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
25. Always use a board or cardboard when checking for a leak.
1. Move the machine to a location that is smooth, level, and hard. The location should also be
dry and free of debris. Stop the engine.
2. Permit only one operator on the machine. All other personnel should be kept away from the
machine.
3. Lower the bucket and/or work tools to the ground.
4. Engage the parking brake.
5. Stop the engine.
Note: If the machine is equipped with electro-hydraulic controls, turn the engine start
switch key to the ON position before performing the next step. The engine start switch key
must then be turned back to the OFF position before proceeding.
6. Move the control levers several times through the full range of travel. This will relieve any
pressure that may be present in the implement hydraulic system.
7. Depress the brake pedal repeatedly. This will relieve any pressure that may be present in the
braking system.
8. Push in the plunger for the hydraulic tank breaker relief valve until all pressure is released.
Note: If the machine is not equipped with a hydraulic tank breaker relief valve, the
hydraulic tank cap may be removed slowly in order to relieve tank pressure.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sun Apr 5 14:14:53 UTC+0800 2020
2/2
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
26. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 950H WHEEL LOADER JLX
Configuration: 950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine
Disassembly and Assembly
950H and 962H Wheel Loaders C7 Engine Supplement
Media Number -UENR0788-00 Publication Date -01/10/2012 Date Updated -26/10/2012
i05016272
Hood - Remove
SMCS - 7251-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7575 Link Bracket 1
Illustration 1 g01173155
1. Remove plug (1) from hood (2) .
1/3
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
27. Illustration 2 g01173157
2. Open hood (2). Use Tooling (A) and a suitable lifting device in order to support hood (2).
The weight of hood (2) is approximately 181 kg (400 lb).
Illustration 3 g01173331
3. Remove cotter pin (3) and pin (4) from hood tilt actuator (5) in order to disconnect hood tilt
actuator (5) from hood (2) .
Illustration 4 g01173335
2/3
950H Wheel Loader JLX00001-UP (MACHINE) POWERED BY C7.2 Engine(SEBP...
2020/4/5
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...