Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
Why Is Your BMW X3 Hood Not Responding To Release CommandsDart Auto
Experiencing difficulty opening your BMW X3's hood? This guide explores potential issues like mechanical obstruction, hood release mechanism failure, electrical problems, and emergency release malfunctions. Troubleshooting tips include basic checks, clearing obstructions, applying pressure, and using the emergency release.
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs AttentionBertini's German Motors
IBS monitors and manages your BMW’s battery performance. If it malfunctions, you will have to deal with an array of electrical issues in your vehicle. Recognize warning signs like dimming headlights, frequent battery replacements, and electrical malfunctions to address potential IBS issues promptly.
Symptoms like intermittent starting and key recognition errors signal potential problems with your Mercedes’ EIS. Use diagnostic steps like error code checks and spare key tests. Professional diagnosis and solutions like EIS replacement ensure safe driving. Consult a qualified technician for accurate diagnosis and repair.
What Exactly Is The Common Rail Direct Injection System & How Does It WorkMotor Cars International
Learn about Common Rail Direct Injection (CRDi) - the revolutionary technology that has made diesel engines more efficient. Explore its workings, advantages like enhanced fuel efficiency and increased power output, along with drawbacks such as complexity and higher initial cost. Compare CRDi with traditional diesel engines and discover why it's the preferred choice for modern engines.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Hyundai Motor Group
What’s the force behind Hyundai Motor Group's EV performance and quality?
Maximized driving performance and quick charging time through high-density battery pack and fast charging technology and applicable to various vehicle types!
Discover more about Hyundai Motor Group’s EV platform ‘E-GMP’!
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
2. A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
D 138-7574 Link Bracket 2
G 126-3994 Duo-Cone Seal Installer 1
H 5P-3931 Anti-Seize Compound
F 1U-8846 Gasket Sealant
Note: Cleanliness is an important factor. Before assembly, all parts should be cleaned in
cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry
parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If
any parts are worn or damaged, use new parts for replacement. All disassembly and all
assembly procedures must be performed on a clean work surface and in a clean hydraulic
area. Keep cleaned parts covered and protected at all times.
Note: O-rings, gaskets, and seals should always be replaced. A used O-ring may not have
the same sealing properties as a new O-ring. Use 1U-6396 O-Ring Assembly Compound
during the assembly procedure.
Note: Apply a light film of hydraulic oil to all components before assembly.
1. Install the final drive sprocket if the sprocket was removed from the main housing.
2. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
Illustration 1 g00708215
3. Apply Tooling (H) to the outer diameter of the bearings.
4. Install bearings (32) and (33) in main housing (18) with a suitable press.
5. Make sure that bearing (32) and bearing (33) contact the counterbore in the main housing.
6. Use the following procedure to preload the bearings and determine the correct thickness of
shims.
3/15
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Illustration 2 g00713058
a. Fasten Tooling (D) and a suitable lifting device to main housing (18) . Install the main
housing on the motor housing.
b. Put the main housing and the motor housing in a suitable press.
Illustration 3 g00709278
(a) Bearing surface
(b) Housing surface
c. Use a suitable press and a spacer in order to apply a load of 4000 kg (8818.5 lb) on
the bearings. Rotate the housing in order to seat the bearings.
d. Reduce the load on the bearings to 1000 ± 100 kg (2204.6 ± 220.5 lb).
e. Use a depth micrometer in order to measure the step length between the bearing
surface and the housing surface. Take measurements at several different locations
around the housing. Compute the average of the measured dimensions and record the
number. Call this Dimension (Y) .
4/15
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 4 g00709276
f. Use a depth micrometer in order to measure the step length of the coupling gear (26) .
Take measurements at several different locations around the gear. Compute the
average of the measured dimensions and record the number. Call this Dimension (X) .
g. The thickness of the shims is equal to (X - Y) ± 0.05 mm (0.002 inch).
Note: Use no more than two shims. If two shims are required, install the thinner shim
next to the gear.
h. Remove the main housing from the motor housing.
Illustration 5 g01021370
7. Use Tooling (G) in order to install Duo-Cone seal (31) in main housing (18) . Refer to
Disassembly and Assembly, "Duo-Cone Conventional Seals - Install".
Note: The rubber seals and all surfaces that contact the seals must be clean and dry. After
installation of the seals, put clean SAE 30 oil on the contact surfaces of the metal seals.
5/15
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 6 g01021371
8. Use Tooling (G) in order to install Duo-Cone seal (29) in motor housing (28) .
Illustration 7 g00708214
9. Apply Tooling (H) to the surfaces that contact pins (30) .
10. Install alignment pins (30) .
Note: Do not damage the Duo-Cone seals in the main housing or in the motor housing
during the assembly of the two components. After installation of the main housing on the
motor housing, there will be a small gap between the components. The gap is caused by the
Duo-Cone seals. This gap will be eliminated during installation of gear (26) .
6/15
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 8 g00713058
11. Fasten Tooling (D) and a suitable lifting device to main housing (18) . Install the main
housing on the motor housing.
Illustration 9 g00708211
12. Install shims (27) that were determined in Step 6.g in the main housing.
Note: If two shims are required, install the thinner shim next to the gear.
7/15
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 10 g00708187
13. Install gear (26) .
14. Install bolts (25) in gear (26) . Install the bolts in an even pattern until the gear is seated
against the bearing. Tighten bolts (25) in a crisscross pattern.
Illustration 11 g00708186
15. Install O-ring seal (24) to main housing (18) .
Illustration 12 g00708175
16. Assemble carrier assembly (15) , as follows.
8/15
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 13 g00708220
a. Install bearings (22) in planetary gear (23) .
b. Install thrust washers (21) and planetary gear (23) in the carrier assembly.
c. Use a deburring tool in order to remove the metal burr from the openings in the
carrier. Install planetary shaft (19) in the carrier assembly.
d. Drive spring pin (20) into planetary shaft (19) with a hammer and a punch.
Illustration 14 g00513451
e. Orient the split in spring pin (20) vertically to the carrier. Align the split in the spring
pin to the top or to the bottom. Make a stake mark on each side of the spring pin hole
in the carrier. Each stake mark should be approximately 1.50 mm (0.059 inch) from
the outside diameter of the spring pin hole.
17. Repeat Steps 16.a through 16.e in order to install the remaining planetary gears in the carrier
assembly.
9/15
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 15 g00708172
18. Install a lifting sling through the middle of carrier assembly (15) . Fasten a 12.7 mm (0.50
inch) shackle to the suitable lifting device.
19. Install carrier assembly (15) on the final drive. The weight of carrier assembly (15) is
approximately 39 kg (85 lb).
20. Remove the shackle and the suitable lifting device.
Illustration 16 g00713148
21. Apply Tooling (F) to the mating surface of ring gear (17b) .
22. Install ring gear (17a) on ring gear (17b) .
10/15
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP5...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 17 g00708184
23. Fasten a suitable lifting device to ring gears (17) , as shown. Install the ring gears to main
housing (18) . The weight of ring gears (17) is approximately 45 kg (100 lb).
Illustration 18 g00708325
24. Install spacer (16) in the carrier assembly.
Illustration 19 g00708162
11/15
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP5...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. 25. Install sun gear (14) in carrier assembly (15) .
Illustration 20 g01304883
Illustration 21 g00708218
26. Assemble carrier assembly (7) , as follows.
a. Install bearing (12) in planetary gear (13) .
b. Install thrust washers (11) and planetary gear (13) in the carrier assembly.
c. Install planetary shaft (9) in the carrier assembly.
d. Drive spring pin (10) into planetary shaft (9) with a hammer and a punch.
12/15
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP5...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Illustration 22 g00513451
e. Orient the split in spring pin (10) vertically to the carrier. Align the split in the spring
pin to the top or to the bottom. Make a stake mark on each side of the spring pin hole
in the carrier. Each stake mark should be approximately 1.50 mm (0.059 inch) from
the outside diameter of the spring pin hole.
27. Repeat Steps 26.a through 26.e in order to install the remaining planetary gears in the carrier
assembly.
Illustration 23 g00708092
28. Install carrier assembly (7) in the ring gear. The weight of carrier assembly (7) is
approximately 14 kg (30 lb).
29. Install sun gear (8) in carrier assembly (7) .
30. Install spacer (6) in carrier assembly (7) .
13/15
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP5...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 24 g00708235
31. Install new O-ring seals (5) on plugs (4) that were in the cover.
Illustration 25 g00708091
32. Install plugs (4) in cover (2) . Tighten plugs (4) to a torque of 80 ± 10 N·m (59 ± 7 lb ft).
33. Install thrust plate (3) in cover (2) .
34. Apply Tooling (F) to the mating surface of the ring gear.
14/15
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP5...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 26 g00708090
35. Fasten Tooling (B) and a suitable lifting device to cover (2) , as shown. The weight of cover
(2) is approximately 32 kg (70 lb). Install cover (2) .
36. Remove Tooling (B) . Install the setscrews in cover (2) .
Illustration 27 g00708089
37. Install bolts (1) and the washers that hold the cover in position. Tighten bolts (1) in a
crisscross pattern.
38. Remove the final drive from Tooling (A) . The combined weight of the final drive and final
drive sprocket is approximately 310 kg (683 lb).
End By: Install the final drive. Refer to Disassembly and Assembly, "Final Drive - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sun May 31 10:29:18 UTC+0800 2020
15/15
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP5...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325D L EXCAVATOR NAC
Configuration: 325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
324D, 325D, 326D and 329D Excavators and 329D MHPU Mobile Hydraulic Power
Unit Machine Systems
Media Number -RENR8646-22 Publication Date -01/02/2015 Date Updated -12/09/2018
i04436849
Final Drive - Assemble
SMCS - 4050-016
S/N - A3R1-1021
S/N - AZP1-UP
S/N - DBH1-UP
S/N - EJC1-643
S/N - GBR1-UP
S/N - GPB1-801
S/N - JJG1-813
S/N - KBE1-UP
S/N - LAB1-415
S/N - LAL1-250
S/N - MCL1-201
S/N - NAC1-250
S/N - PAL1-UP
S/N - PKE1-814
S/N - SCR1-774
S/N - SYM1-617
1/20
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. S/N - T2D1-322
S/N - T2S1-UP
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
C 1P-1863 Retaining Ring Pliers 1
D
194-3878 Spanner Wrench As (1)
1
194-3884 Spacer (1)
1
208-6033 Spanner Socket As (2)
1
208-6034 Spacer (2)
1
E 138-7574 Link Bracket 2
H 6V-7030 Micrometer Depth Gauge Group 1
J FT-2770 Leak Down Test Tool 1
K 1U-6396 O-Ring Assembly Compound 1
L 5P-3931 Anti-Seize Compound 1
M 1U-8846 Gasket Sealant 1
N 8T-0531 Duo-Cone Seal Installer As 1
P 5P-3931 Anti-Seize Compound 1
Q 240-1886 Drill Fixture Gp 1
R 9S-3263 Thread Lock Compound 1
( 1 )
For S/N B6H1-398
( 2 )
For S/N B6H399-Up
Note: Cleanliness is an important factor. Before assembly, clean all parts thoroughly in cleaning
fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be
deposited on the parts which may cause later trouble. Inspect all parts. If any parts are worn or
damaged, use new parts for replacement. All disassembly and all assembly procedures must be
performed on a clean work surface and in a clean hydraulic area. Keep cleaned parts covered and
protected at all times.
2/20
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Note: O-ring seals, gaskets, and seals should always be replaced. A used O-ring seal may not have
the same sealing properties as a new O-ring. Use Tooling (K) during the assembly procedure.
Note: Apply a light film of hydraulic oil to all components before assembly.
Note: Some of the images that are in this procedure do not show the sprocket assembly that is
attached to the final drive housing. If necessary, the weights that are given include the weight of
the sprocket assembly.
Illustration 1 g01147975
1. Apply Tooling (P) to the outer diameter of the bearings.
2. Use a suitable press to Install bearings (40) and (41) . Make sure that bearing (41) and
bearing (40) contact the counterbore in housing (36) .
3. Use Tooling (N) to install Duo-Cone seal (39B) .
Illustration 2 g01147981
4. Use Tooling (N) to install Duo-Cone seal (39A) onto housing (38) .
3/20
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 3 g01147930
5. Use Tooling (E) and a suitable lifting device to install housing (36) onto housing (38) . The
weight of housing (36) is approximately 100 kg (220 lb).
6. Remove Tooling (E) from housing (36) .
Illustration 4 g01147724
7. Install stopper plate (35) . Do not tighten stopper plate assembly (35) at this time.
Note: Stopper plate (35) will secure housing (36) to housing (38) .
8. Install Tooling (E) and a suitable lifting device to housing (36) . The combined weight of
housing assembly (36) and (38) is approximately 120 kg (265 lb). Install housing assembly
(36) and (38) in a suitable press.
9. Remove stopper plate (35) .
4/20
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 5 g01147727
10. Assemble Tooling (D) , as shown.
Illustration 6 g01147731
11. Install Tooling (D) into housing (36) , as shown.
12. Apply a force of 4000 kg (8818 lb) to the top of Tooling (D) . Rotate housing (36) in order
to seat the bearings.
13. Reduce the force on the top of Tooling (D) to 3000 kg (6615 lb).
5/20
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 7 g01147737
14. Use Tooling (H) to take a measurement in three locations. Average the three measurements
and record the average measurement as Dimension (W) .
15. Remove Tooling (D) .
16. Separate Tooling (D) .
Illustration 8 g01147743
17. Use a micrometer in order to measure the thickness at three locations of the spacer from
Tooling (D) . Record the average measurement as Dimension (X) .
6/20
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 9 g01147742
18. Use a micrometer in order to measure the thickness at three locations of stopper plate (35) .
Record the average measurement as Dimension (Y) .
19. Subtract Dimension (X) from Dimension (Y) and record this figure as Dimension (Z) .
Illustration 10 g01147724
20. Install stopper plate (35) onto housing (38) . Do not tighten stopper plate (35) at this time.
Stopper plate (35) will secure the final drive assembly while the final drive assembly is
repositioned onto Tooling (A) .
21. Use Tooling (E) and a suitable lifting device to reposition the final drive assembly onto
Tooling (A) . The combined weight of housing assembly (36) and (38) is approximately 120
kg (265 lb).
22. Secure the final drive assembly to Tooling (A) .
7/20
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 11 g01148004
23. Secure the spanner socket from Tooling (D) to stopper plate (35) .
24. In order to determine the final bearing preload, add Dimension (W) to Dimension (Z) and
record this figure as Dimension (V) .
25. Use Tooling (H) to measure the distance in three locations.
26. Tighten stopper plate (35) until the average of the measurements is equal to Dimension (V) .
27. Remove Tooling (D) .
Illustration 12 g01372092
28. Install Tooling (Q) and a suitable vacuum onto stopper plate (35) .
8/20
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 13 g01147789
29. Use a suitable drill and Tooling (Q) in order to drill a hole to the depth of 15 mm (0.6 inch)
in the stopper palte and in housing (38) .
Illustration 14 g01147796
30. Install dowel (37) .
Illustration 15 g01147650
9/20
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP522...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. 31. Apply Tooling (R) on bolts (35A) . Install plate (35B) and bolts (35A) .
32. Repeat Steps 28 through 31 for the opposite side of stopper plate (35) .
Illustration 16 g00781807
33. Install O-ring seal (34) on housing (36) .
Illustration 17 g00781730
34. Install gear (33) on housing (36) .
10/20
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP5...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Illustration 18 g00781719
35. Assemble carrier assembly (27) , as follows.
Illustration 19 g00781607
a. Use a deburring tool in order to remove the metal burr from the openings in the
carrier.
b. Install two bearings (31) in planetary gear (32) .
c. Install thrust washers (30) and planetary gear (32) in the carrier assembly.
d. Install planetary shaft (28) in the carrier assembly.
e. Align the split in spring pin (29) to the top or to the bottom. Make a stake mark on
each side of the spring pin hole in the carrier. Each stake mark should be
approximately 1.50 mm (0.059 inch) from the outside diameter of the spring pin hole.
11/20
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP5...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
27. Illustration 20 g00903073
f. Drive spring pin (29) into planetary shaft (28) with a hammer and a punch.
36. Repeat Steps 35.a through 35.e in order to install the other two planetary gears in the carrier.
Illustration 21 g00781559
37. Use two people to install carrier assembly (27) in gear (33) . The weight of carrier assembly
(27) is approximately 38 kg (85 lb).
12/20
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP5...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
29. a. Use a deburring tool in order to remove the metal burr from the openings in the
carrier.
b. Install bearing (23) in planetary gear (24) .
c. Install thrust washers (22) and planetary gear (24) in the carrier assembly.
d. Install planetary shaft (21) in the carrier assembly.
Illustration 25 g00903073
e. Drive spring pin (20) into planetary shaft (21) with a hammer and a punch.
Illustration 26 g00879368
f. Align the split in the spring pin to the top or to the bottom. Make a stake mark on
each side of the spring pin hole in the carrier. Each stake mark should be
approximately 1.50 mm (0.059 inch) from the outside diameter of the spring pin hole.
14/20
325D L Excavator NAC00001-UP (MACHINE) POWERED BY C7 Engine(SEBP5...
2020/5/31
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...