Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
Why Is Your BMW X3 Hood Not Responding To Release CommandsDart Auto
Experiencing difficulty opening your BMW X3's hood? This guide explores potential issues like mechanical obstruction, hood release mechanism failure, electrical problems, and emergency release malfunctions. Troubleshooting tips include basic checks, clearing obstructions, applying pressure, and using the emergency release.
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingLancer Service
Discover why your Porsche 911 headlights might flicker out unexpectedly. From aging bulbs to electrical gremlins and moisture mishaps, we're delving into the reasons behind the blackout. Stay tuned to illuminate the road ahead and ensure your lights shine bright for safer journeys.
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
Symptoms like intermittent starting and key recognition errors signal potential problems with your Mercedes’ EIS. Use diagnostic steps like error code checks and spare key tests. Professional diagnosis and solutions like EIS replacement ensure safe driving. Consult a qualified technician for accurate diagnosis and repair.
Your VW's camshaft position sensor is crucial for engine performance. Signs of failure include engine misfires, difficulty starting, stalling at low speeds, reduced fuel efficiency, and the check engine light. Prompt inspection and replacement can prevent further damage and keep your VW running smoothly.
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...Import Motorworks
Learn how to respond when the red temperature light flashes in your VW with this presentation. From checking coolant levels to seeking professional help, follow these steps promptly to prevent engine damage and ensure safety on the road.
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...Autohaus Service and Sales
Learn what "PARKTRONIC Inoperative, See Owner's Manual" means for your Mercedes-Benz. This message indicates a malfunction in the parking assistance system, potentially due to sensor issues or electrical faults. Prompt attention is crucial to ensure safety and functionality. Follow steps outlined for diagnosis and repair in the owner's manual.
2. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 950H WHEEL LOADER JAD
Configuration: 950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
IT62H Integrated Toolcarrier and 950H and 962H Wheel Loaders Power Train
Media Number -RENR8867-05 Publication Date -01/06/2014 Date Updated -27/06/2014
i02356369
Gear Pump (Axle Oil Cooler) - Assemble
SMCS - 5073-016-AOC
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-1858 Retaining Ring Pliers 1
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
Illustration 1 g01177117
1. Install seal (33) and backup ring (34) on bearing (31) .
1/8
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
3. Illustration 2 g01177072
2. Install bearing (31) and O-ring seal (32) on body (20) .
Illustration 3 g01177071
3. Install seal (30) in flange (29) .
2/8
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
4. Illustration 4 g01177070
4. Install flange (29) on body (20) .
Illustration 5 g01177069
5. Install gear (27) and shaft (28) in body (20) .
Illustration 6 g01177067
6. Use Tooling (A) to install retaining ring (26) .
7. Install key (25) .
3/8
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
5. Illustration 7 g01177094
8. Install seal (23) and backup ring (24) on bearing (22) .
Illustration 8 g01177066
9. Install bearing (22) and O-ring seal (21) on body (20) .
Illustration 9 g01177064
10. Install flange (19) and coupling (18) on body (20) .
4/8
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
6. Illustration 10 g01177089
11. Install seal (16) and backup ring (17) on bearing (15) .
Illustration 11 g01177063
12. Install O-ring seal (14) and bearing (15) .
5/8
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
7. Illustration 12 g01177062
13. Install seal (13) in flange (12) .
Illustration 13 g01177059
14. Install flange (12) on body (11) .
Illustration 14 g01177058
15. Install gear (9) and shaft (10) in body (11) .
6/8
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
8. Illustration 15 g01177057
16. Use Tooling (A) to install retaining ring (7) .
17. Install O-ring seal (8) .
Illustration 16 g01177056
18. Install seal (5) and backup ring (6) in bearing (3) .
Illustration 17 g01177055
7/8
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
9. 19. Install bearing (3) and O-ring seal (4) .
Illustration 18 g01177054
20. Install cover (2) and bolts (1) .
End By: Install the axle oil cooler pump and the clutch. Refer to Disassembly and Assembly,
"Axle Oil Cooler Pump and Clutch - Remove and Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Apr 3 10:22:31 UTC+0800 2020
8/8
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
10. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 950H WHEEL LOADER JAD
Configuration: 950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
IT62H Integrated Toolcarrier and 950H and 962H Wheel Loaders Power Train
Media Number -RENR8867-05 Publication Date -01/06/2014 Date Updated -27/06/2014
i02357021
Axle Oil Cooler Pump and Clutch - Install
SMCS - 5073-012-AOC
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
FT-1114 Vacuum Cap 1
5P-0306 Vacuum Transducer 1
6V-4142 Fitting 1
5K-5068 Fitting 1
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
1/3
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
12. 3. Position clutch assembly (7), bracket assembly (6), and axle oil cooler pump (5), as shown.
4. Install bolts (8) .
Illustration 4 g01177310
5. Connect harness assembly (2), tube assemblies (3), and tube assemblies (4) .
6. Install belt (1). Refer to Operation and Maintenance Manual, "Belts - Inspect / Adjust /
Replace".
Illustration 5 g01165944
7. Remove Tooling (A) from the hydraulic tank.
8. Turn the battery disconnect switch to the ON position.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Apr 3 10:23:30 UTC+0800 2020
3/3
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
13. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 950H WHEEL LOADER JAD
Configuration: 950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
C7
Engines for Caterpillar Built Machines
Media Number -RENR9218-13 Publication Date -01/06/2014 Date Updated -04/06/2014
i02300738
Fuel Filter Base - Remove and Install
SMCS - 1262-010
Removal Procedure
Fuel leaked or spilled onto hot surfaces or electrical components can
cause a fire. To help prevent possible injury, turn the start switch off
when changing fuel filters or water separator elements. Clean up fuel
spills immediately.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
1/3
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
14. Illustration 1 g01152090
1. Disconnect hose assembly (1) and hose assembly (3) .
2. Disconnect harness assembly (2) .
3. Remove bolts (5) and fuel filter base (4) .
Installation Procedure
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
2/3
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
15. Illustration 2 g01152090
1. Position fuel filter base (4) on the engine.
2. Install bolts (5) .
3. Connect harness assembly (2) .
4. Connect hose assembly (3) and hose assembly (1) .
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Apr 3 10:24:56 UTC+0800 2020
3/3
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
16. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 950H WHEEL LOADER JAD
Configuration: 950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
C7
Engines for Caterpillar Built Machines
Media Number -RENR9218-13 Publication Date -01/06/2014 Date Updated -04/06/2014
i06716856
Fuel Transfer Pump - Remove
SMCS - 1256-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 256-0302 Bolt 1
Start By:
a. Remove the unit injector hydraulic pump. Refer to Disassembly and Assembly, "Unit
Injector Hydraulic Pump - Remove".
Note: Tooling (A) is required for replacement of the fuel transfer pump.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat®
products.
Dispose of all fluids according to local regulations and mandates.
1/3
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
17. Illustration 1 g01123057
1. Mount the unit injector hydraulic pump in a vertical position on a work bench.
Note: Failure to maintain a vertical position results in misalignment of the internal
components.
2. Remove bolts (3).
3. Remove tie bolt (1) that is located in the top left corner of the pump first.
4. Replace tie bolt (1) with Tooling (A).
Note: Tooling (A) has an undersized bolt head. Tooling (A) will prevent the body of the
unit injector hydraulic pump from separating during service.
5. Tighten Tooling (A) to a torque of 10 N·m (89 lb in).
6. Start with tie bolt (4) in the lower left corner and remove the remainder of the bolts from
fuel transfer pump (2).
7. Remove fuel transfer pump (2).
Fri Apr 3 10:25:55 UTC+0800 2020
2/3
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
18. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 950H WHEEL LOADER JAD
Configuration: 950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
C7
Engines for Caterpillar Built Machines
Media Number -RENR9218-13 Publication Date -01/06/2014 Date Updated -04/06/2014
i06716882
Fuel Transfer Pump - Install
SMCS - 1256-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 256-0302 Bolt 1
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1/2
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
19. Illustration 1 g01123057
1. Position fuel transfer pump (2) on the unit injector hydraulic pump. Be sure to align the
drive tang of the fuel transfer pump to the drive slot in the end of the pump shaft.
2. Install tie bolts (4). Tighten the bolts to a snug fit.
3. Remove Tooling (A) that is located in the upper left hole and install remaining tie bolt (1) to
a snug fit.
4. Install bolts (3) for fuel transfer pump (2). Tighten the bolts to a snug fit.
5. Start in the lower left corner of the unit injector hydraulic pump and tighten tie bolts (4) to a
torque of 28 ± 2 N·m (21 ± 1 lb ft) in a crisscross pattern. Torque the bolts again.
6. Tighten bolts (3) to a torque of 8.0 ± 0.4 N·m (71 ± 4 lb in).
End By:
a. Install the unit injector hydraulic pump. Refer to Disassembly and Assembly, "Unit Injector
Hydraulic Pump - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Apr 3 10:26:54 UTC+0800 2020
2/2
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
20. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 950H WHEEL LOADER JAD
Configuration: 950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
C7
Engines for Caterpillar Built Machines
Media Number -RENR9218-13 Publication Date -01/06/2014 Date Updated -04/06/2014
i04891950
Unit Injector - Remove
SMCS - 1290-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 367-3070 Fuel Injector Installation and Removal Tooling 1
Start By:
A. Remove the valve mechanism cover. Refer to Disassembly and Assembly, "Valve
Mechanism Cover - Remove and Install".
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1/4
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
21. Illustration 1 g03007076
1. Drain the coolant, oil, and fuel from the cylinder head. Remove the oil galley plug (1) , fuel
galley plug (2) , and coolant line (3) .
Illustration 2 g03028024
2. Disconnect harness assembly (4) .
3. Remove socket head bolts (6) from unit injector (5) .
2/4
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
22. Illustration 3 g03028041
4. Install Tooling (A) . Use Tooling (A) to remove unit injector (5) .
Note: Do not use a wire brush on the tip of the unit injector. Damage to the unit injector will
occur.
Illustration 4 g03009616
5. Remove O-ring seal (10) , O-ring seal (11) , and O-ring seal (12) from unit injector (5) .
6. Remove backup ring (8) , backup ring (9) , and backup ring (13) .
3/4
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
23. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
24. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 950H WHEEL LOADER JAD
Configuration: 950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
C7
Engines for Caterpillar Built Machines
Media Number -RENR9218-13 Publication Date -01/06/2014 Date Updated -04/06/2014
i05268572
Unit Injector - Install
SMCS - 1290-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 367-3070 Fuel Injector Installer As 1
D - Scotch Brite 1
E 149-2955 Seal Protector 1
F 149-2956 Seal Installer 1
G
1U-5718 Vacuum Pump 1
169-7372 Bottle Assembly 1
4C-4057
Clear Plastic Tubing
7.92 mm (0.312 inch) OD
1
4C-4055
Clear Plastic Tubing
6.35 mm (0.250 inch) OD
1
H 9U-5470 Reamer 1
J 4C-6161 Tube Brush 1
K 9U-6862 Tapered Brush 1
L 4C-6774 Vacuum Gun Kit 1
1/5
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
25. M 4C-5027 Tap Wrench 1
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1. Evacuate as much fuel and oil as possible from the cylinder head before installing the unit
injector. Several evacuations may be necessary. Use Tooling (G) to remove the fuel and oil
from the cylinder.
Note: Tooling (L) is available to clean loose material from the sleeve bore and the cylinder.
2. Clean the carbon from the sleeve, the sleeve bore, and the end of the unit injector. Clean the
carbon from the seat area that is inside of the cylinder head. A fine grade of Tooling (D) is
preferred. Clean the carbon from the cylinder head and sleeves. If the sleeve of the unit
injector has been removed from the engine, use Tooling (H) to remove the carbon. If the
sleeve of the unit injector is installed in the engine, use Tooling (J) to remove the carbon.
The following procedure is the preferred method of cleaning the sleeve bore.
Place a 38 mm (1.5 inch) square piece of Scotch Brite material on the end of Tooling (K) .
Twist Tooling (K) with Tooling (M) against the lower surface of the sleeve bore.
The surface should be cleaned until the surface is smooth and shiny. The entire sleeve bore
should be cleaned in order to remove any loose carbon particles.
Note: Tooling (L) is available to clean loose material from the sleeve bore and the cylinder.
NOTICE
The correct procedures and tooling specifications must always be used.
Failure to follow any of the procedures may result in damage,
malfunction, or possible engine failure.
NOTICE
The O-ring seals and the backup rings must be installed in the correct
orientation. Damaged seals will result in excessive oil consumption or
excessive leakage under the valve cover. Use care to prevent nicks or
damage to the seals.
2/5
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
26. Illustration 1 g01123753
3. Lubricate O-ring seal (6) , O-ring seal (7) , O-ring seal (8) , and the sleeve bore of the unit
injector sparingly with clean engine oil.
4. Use Tooling (E) and Tooling (F) to install backup ring (4) , backup ring (5) , O-ring seal
(6) , backup ring (9) , and O-ring seal (8) .
5. Install O-ring seal (7) .
6. Lubricate the O-ring seals and the backup rings on the unit injector with clean engine oil
before installation.
Note: Proper installation of the unit injector is important. Damage to the upper high-
pressure seals can cause excessive oil leakage under the valve cover. The damage may cause
the engine not to start due to a low actuation pressure. Damage to the lower high-pressure
seals may allow high-pressure oil to leak into the fuel supply passage resulting in excessive
oil consumption.
Note: Do not hit or strike the unit injector during installation.
7. Record the serial number for the injector and the confirmation code for the injector. When a
new unit injector is installed, the E-Trim value must be programmed into the Engine
Control Module. For more information, refer to Troubleshooting, "Injector Code -
Calibrate".
3/5
950H Wheel Loader JAD00001-UP (MACHINE) POWERED BY C7 Engine(SEBP54...
2020/4/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...