What Does the Active Steering Malfunction Warning Mean for Your BMWTanner Motors
Discover the reasons why your BMW’s Active Steering malfunction warning might come on. From electrical glitches to mechanical failures and software anomalies, addressing these promptly with professional inspection and maintenance ensures continued safety and performance on the road, maintaining the integrity of your driving experience.
Why Is Your BMW X3 Hood Not Responding To Release CommandsDart Auto
Experiencing difficulty opening your BMW X3's hood? This guide explores potential issues like mechanical obstruction, hood release mechanism failure, electrical problems, and emergency release malfunctions. Troubleshooting tips include basic checks, clearing obstructions, applying pressure, and using the emergency release.
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Hyundai Motor Group
What’s the force behind Hyundai Motor Group's EV performance and quality?
Maximized driving performance and quick charging time through high-density battery pack and fast charging technology and applicable to various vehicle types!
Discover more about Hyundai Motor Group’s EV platform ‘E-GMP’!
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...Autohaus Service and Sales
Learn what "PARKTRONIC Inoperative, See Owner's Manual" means for your Mercedes-Benz. This message indicates a malfunction in the parking assistance system, potentially due to sensor issues or electrical faults. Prompt attention is crucial to ensure safety and functionality. Follow steps outlined for diagnosis and repair in the owner's manual.
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
Symptoms like intermittent starting and key recognition errors signal potential problems with your Mercedes’ EIS. Use diagnostic steps like error code checks and spare key tests. Professional diagnosis and solutions like EIS replacement ensure safe driving. Consult a qualified technician for accurate diagnosis and repair.
"Trans Failsafe Prog" on your BMW X5 indicates potential transmission issues requiring immediate action. This safety feature activates in response to abnormalities like low fluid levels, leaks, faulty sensors, electrical or mechanical failures, and overheating.
What Exactly Is The Common Rail Direct Injection System & How Does It WorkMotor Cars International
Learn about Common Rail Direct Injection (CRDi) - the revolutionary technology that has made diesel engines more efficient. Explore its workings, advantages like enhanced fuel efficiency and increased power output, along with drawbacks such as complexity and higher initial cost. Compare CRDi with traditional diesel engines and discover why it's the preferred choice for modern engines.
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs AttentionBertini's German Motors
IBS monitors and manages your BMW’s battery performance. If it malfunctions, you will have to deal with an array of electrical issues in your vehicle. Recognize warning signs like dimming headlights, frequent battery replacements, and electrical malfunctions to address potential IBS issues promptly.
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
2. Shutdown SIS
Previous Screen
Product: EJECTOR TRUCK
Model: 740 EJECTOR TRUCK B1R
Configuration: 740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engine
Disassembly and Assembly
730 EJECTOR and 740 EJECTOR Articulated Trucks
Media Number -RENR5176-07 Publication Date -01/04/2018 Date Updated -13/04/2018
i02381152
Ejector Blade Floor Rollers - Assemble
SMCS - 6229-016
S/N - AZZ1-UP
S/N - B1R1-UP
Assembly Procedure
Table 1
Required Tools
Tools Part Number Part Description Qty
B 1P-0510 Driver Group 1
C 7X-7699 Grease 1
1. Clean all parts and inspect all parts. If any parts are worn or damaged, use new Caterpillar
parts for replacement.
Illustration 1 g01188833
1/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. 2. Use Tooling (B) in order to install lip seal (13) into housing (11).
Illustration 2 g01195296
3. Apply Tooling (C) to lip seal (13) on housing (11) before installing the housing onto bracket
(3).
Illustration 3 g01188834
4. Install bearing race (12) onto the floor roller with the shoulder on the bearing race toward
bracket (3).
Illustration 4 g01188835
2/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. 5. Apply Tooling (C) to the bearing cavity between bearing race (12) and housing (11).
Illustration 5 g00896615
6. Install roller bearing (9).
Illustration 6 g01195297
7. Install O-ring seal (7) onto housing (11) and roller bearing (9).
Illustration 7 g01188836
8. Apply Tooling (C) to roller bearing (9).
3/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 8 g00896631
9. Install inner plate (8) onto roller bearing (9).
Illustration 9 g00926131
10. Install O-ring seal (6) onto bracket (3).
Illustration 10 g00926132
11. Install cap (2) onto bracket (3) before securing the cap in place with bolt (1).
4/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 11 g01188837
12. Use Tooling (B) to install lip seal (10) into bottom wheel (5).
Illustration 12 g00926133
13. Apply Tooling (C) to lip seal (10) on bottom wheel (5) before positioning the bottom wheel
to housing (11). Install three bolts (4) and the washers. Tighten the bolts in equal amounts in
order to pull the bottom wheel onto the housing.
Illustration 13 g00896633
14. Install remaining bolts (4) and the washers in order to secure bottom wheel (5) to housing
(11).
5/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 14 g00926134
15. Repeat Step 2 through 14 in order to install the wheel on the opposite side of bracket (3).
End By:
a. Install the ejector blade floor roller onto the machine. Refer to Disassembly and Assembly
Manual, "Ejector Blade Floor Rollers - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Jan 18 17:21:02 UTC+0800 2020
6/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Shutdown SIS
Previous Screen
Product: EJECTOR TRUCK
Model: 740 EJECTOR TRUCK B1R
Configuration: 740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engine
Disassembly and Assembly
730 EJECTOR and 740 EJECTOR Articulated Trucks
Media Number -RENR5176-07 Publication Date -01/04/2018 Date Updated -13/04/2018
i02386576
Ejector Blade Floor Rollers - Install
SMCS - 6229-012
S/N - AZZ1-UP
S/N - B1R1-UP
Installation Procedure
Note: Cleanliness is an important factor. Before the installation procedure, the exterior of the
component should be thoroughly cleaned. This will help to prevent dirt from entering the internal
mechanism.
Illustration 1 g01191143
1. Use two people in order to install ejector roller (3) onto both ends of reaction plate (7). The
weight of one ejector roller (3) is approximately 27 kg (60 lb). Install block (11) onto both
ends of reaction plate (7).
1/4
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 2 g01191144
2. Install bolts (10) onto both ends of the reaction plate (7).
Illustration 3 g01191145
3. Install adapter plate (8) and install bolts (9) onto both ends of reaction plate (7).
Illustration 4 g01191121
4. Use a suitable lifting device in order to install the assembly of ejector rollers (3) and
reaction plate (7) onto the machine. The weight of the assembly is approximately 90 kg
(200 lb).
2/4
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. 5. Install shims (6). Use the correct shims that were noted during the removal procedure.
Carefully push the assembly of ejector rollers (3) and reaction plate (7) and shims (6) under
the ejector blade.
Illustration 5 g01191146
6. Install shims (5). Use the shims that were noted during the removal procedure. Install bolts
(4).
Illustration 6 g01191118
7. Turn bolts (1) on both sides of the ejector blade equally in order to lower ejector rollers (3)
onto the truck body. Continue turning bolts (1) until bolts (1) are clear of the surface of the
truck body. Use a feeler gauge in order to verify that ejector rollers (3) are in contact with
the truck body.
8. Tighten nut (2) on bolt (1) in order to prevent bolt (1) from rotating. Repeat Step 7 and Step
8 for bolt (1) on the opposite end of the ejector blade.
9. Turn the disconnect switch to the ON position. Start the engine and completely retract the
ejector. Shut off the engine.
10. Check and adjust the clearance of the ejector blade. Refer to Operation and Maintenance
Manual, "Ejector Blade Alignment - Check/Adjust".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Sat Jan 18 17:21:58 UTC+0800 2020
3/4
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Shutdown SIS
Previous Screen
Product: EJECTOR TRUCK
Model: 740 EJECTOR TRUCK B1R
Configuration: 740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engine
Disassembly and Assembly
730 EJECTOR and 740 EJECTOR Articulated Trucks
Media Number -RENR5176-07 Publication Date -01/04/2018 Date Updated -13/04/2018
i06279754
Ejector Blade Carriage - Remove
SMCS - 6229-011
S/N - AZZ1-UP
S/N - B1R1-UP
Removal Procedure
Table 1
Required Tools
Tools Part Number Part Description Qty
A 439-3940 Bracket As 2
B 154-6181 Forcing Bolt 3
Note: Cleanliness is an important factor. Before the removal procedure, the exterior of the
component should be thoroughly cleaned. This will help to prevent dirt from entering the internal
mechanism.
Note: The following procedure is for the removal of the carriage on the left side. Use the same
procedure to remove the carriage on the right side.
Personal injury or death can result from improper lifting or blocking.
When a hoist or jack is used to lift any part or component, stand clear of
the area. Be sure the hoist or jack has the correct capacity to lift a
component. Install blocks or stands before performance of any work
under a heavy component.
1/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Approximate weights of the components are shown. Clean all surfaces
where parts are to be installed.
1. Park the machine on a level surface. Install the steering frame locks. Refer to Operation and
Maintenance Manual, "Steering Frame Lock".
2. Lower the tailgate. Refer to Operation and Maintenance Manual, "Lowering the Tailgate
with Engine Stopped".
Illustration 1 g01192269
3. Use the following procedure in order to achieve the maximum clearance between ejector
pitch rollers (1) and the truck body.
Illustration 2 g01193290
2/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 3 g01193289
Illustration 4 g01193275
a. Loosen bolts (3). Remove three of bolts (3) that are installed into threaded holes in
outer lock ring (2).
b. Install Tooling (B) into the threaded holes in outer lock ring (2) in order to loosen the
outer lock ring, the inner lock ring, and the split rings. Refer to illustration 4.
c. Remove Tooling (B) and Install three bolts (3). Do not tighten bolts (3) at this time.
Illustration 5 g01192705
3/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. d. Install two M10x1.5 bolts into boss (4).
e. Use a suitable pry bar in order to rotate boss (4). Rotate boss (4) until the ejector pitch
roller is at the lowest point.
f. Tighten bolts (3) to a torque of 70 N·m (52 lb ft).
4. Raise the floor rollers in order to prevent the movement of the ejector blade during the
removal of the carriage. Refer to Disassembly and Assembly, "Ejector Blade Floor Rollers -
Remove".
Illustration 6 g01193279
5. Remove bolts (6) from cover (5). Remove cover (5).
Illustration 7 g01192272
6. Install Tooling (A) and a suitable lifting device onto carriage (7) in order to support carriage
(7). The weight of carriage (7) is approximately 210 kg (465 lb).
4/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Illustration 8 g01193229
7. Remove bolt (8) and spacer (9).
Illustration 9 g01192708
Illustration 10 g01193230
8. Install suitable blocking. Remove bolts (10) and washers (11). Note the number and the
position of washers (11) for installation purposes. Remove the blocking.
5/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 11 g01192710
9. Install suitable blocking. Remove bolts (12), nuts (13), and washers (14). Note of the
number and the position of washers (14) for installation purposes. Remove the blocking.
Illustration 12 g01192711
10. Remove carriage (7) from the machine.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Jan 18 17:22:54 UTC+0800 2020
6/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Shutdown SIS
Previous Screen
Product: EJECTOR TRUCK
Model: 740 EJECTOR TRUCK B1R
Configuration: 740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engine
Disassembly and Assembly
730 EJECTOR and 740 EJECTOR Articulated Trucks
Media Number -RENR5176-07 Publication Date -01/04/2018 Date Updated -13/04/2018
i06279764
Ejector Blade Carriage - Install
SMCS - 6229-012
S/N - AZZ1-UP
S/N - B1R1-UP
Installation Procedure
Table 1
Required Tools
Tools Part Number Part Description Qty
A 439-3940 Bracket As 2
B 154-6181 Forcing Bolt 3
Note: Cleanliness is an important factor. Before the installation procedure, the exterior of the
component should be thoroughly cleaned. This will help to prevent dirt from entering the internal
mechanism.
Note: The following procedure is for the installation of the carriage on the left side. Use the same
procedure to install the carriage on the right side.
Personal injury or death can result from improper lifting or blocking.
When a hoist or jack is used to lift any part or component, stand clear of
the area. Be sure the hoist or jack has the correct capacity to lift a
component. Install blocks or stands before performance of any work
under a heavy component.
1/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Approximate weights of the components are shown. Clean all surfaces
where parts are to be installed.
Illustration 1 g01192711
1. Use Tooling (A) and a suitable lifting device in order to position carriage (7) onto the
ejector blade and the truck body. The weight of carriage (7) is approximately 210 kg
(465 lb).
Illustration 2 g01192708
2/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
20. Illustration 3 g01193231
Illustration 4 g01192710
2. Install suitable blocking and Install bolts (10), washers (11), bolts (12) and washers (14) into
carriage (7) in order to guide carriage (7) onto the ejector blade. Refer to the removal
procedure for the position and the number of all of the washers.
3. Remove the blocking and Install nuts (13) onto bolts (12).
4. Tighten bolts (10) and tighten bolts (12).
Illustration 5 g01193229
5. Install spacer (9) and install bolt (8).
3/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 6 g01192272
6. Remove Tooling (A) from carriage (7).
Illustration 7 g01193279
7. Install cover (5) and bolts (6).
Illustration 8 g01192269
8. Use the following procedure in order to adjust the ejector pitch rollers (1).
Illustration 9 g01193273
4/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 10 g01193271
Illustration 11 g01193275
Outer lock ring, split rings, and inner lock ring
a. Loosen bolts (3). Remove three of bolts (3) that are installed into threaded holes in
outer lock ring (2).
b. Install Tooling (B) into the threaded holes in outer lock ring (2) in order to loosen the
outer lock ring, the inner lock ring, and split rings. Refer to illustration 11.
c. Remove Tooling (B) and Install three bolts (3). Do not tighten bolts (3) at this time.
5/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 12 g01192705
d. Install two M10x1.5 bolts into boss (4). Use a suitable pry bar in order to adjust the
position of the ejector pitch rollers. Refer to Operation and Maintenance Manual,
"Ejector Blade Alignment - Check/Adjust" for the procedure to set the position of the
spindle.
e. Remove the two M10x1.5 bolts that were installed in Step 8.d.
Illustration 13 g01193273
f. Tighten bolts (3) on lock ring (2). Refer to Operation and Maintenance Manual,
"Ejector Blade Alignment - Check/Adjust" for the procedure to tighten the bolts.
9. Lower the floor rollers. Refer to Disassembly and Assembly, "Ejector Blade Floor Rollers -
Install".
10. Ensure that the truck body is clear of any tools and foreign material. Turn the disconnect
switch to the ON position. Start the engine and retract the ejector blade. Stop the engine.
11. Close the tailgate. Refer to Operation and Maintenance Manual, "Tailgate".
12. Check the alignment of the ejector blade. Refer to Operation and Maintenance Manual,
"Ejector Blade Alignment - Check/Adjust".
13. Remove the steering frame locks. Refer to Operation and Maintenance Manual, "Steering
Frame Lock".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Jan 18 17:23:49 UTC+0800 2020
6/6
740 Ejector Articulated Truck B1R00001-UP (MACHINE) POWERED BY C15 Engi...
2020/1/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...