The document provides disassembly and assembly instructions for a final drive on an excavator. It involves removing over 30 individual parts in 26 steps for disassembly. Assembly is completed in 11 steps and requires applying anti-seize lubricant and Loctite, installing seals and bearings using specific tools, and determining the correct shim thickness. Cleanliness is emphasized throughout to prevent dirt from entering mechanisms.
Caterpillar cat 323 d ln excavator (prefix cyd) service repair manual (cyd000...fjjsekmsmmes
This document provides instructions for disassembling and assembling the final drive of 323D LN and 323D S excavators. It involves removing over 30 individual parts in 23 steps, including the carrier assembly, ring gears, main housing, and bearings. Cleanliness is important during disassembly and assembly. O-rings and seals should always be replaced. Parts should be lubricated before assembly and bearings are to be preloaded using a press to the correct thickness of shims.
Caterpillar cat 323 d s excavator (prefix cyd) service repair manual (cyd0000...fjjsekmsmmes
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists 23 steps for disassembly, including removing the final drive cover, carrier assembly, ring gears, and other components. It then lists 32 steps for assembly, beginning with installing bearings in the main housing and determining the correct shim thickness. Other steps include installing seals, pins, and gears to reassemble the final drive.
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...f8usejkdmmd8i
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...nkog14651119
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
The document provides instructions for disassembling and assembling a final drive on an excavator model 319D L. It involves removing over 30 individual parts in a specific order. Key steps include removing the final drive housing, carrier assembly, ring gears, and separating internal planetary gears. Assembly involves installing bearings, seals, shims, and aligning the main housing and motor housing, requiring precision measurements to set proper bearing preload. The process is detailed over multiple pages with illustrations to ensure correct reassembly.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...yu5676962
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It describes:
1) Removing over 30 components of the final drive including the carrier assembly, ring gears, sun gear, and housing pieces.
2) Disassembling the carrier assembly into individual planetary gears, shafts, and washers.
3) Cleaning all parts thoroughly before assembly to prevent damage.
4) Assembling the components in reverse order, ensuring proper torque and alignment of parts.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...hdjsjndndnd
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar cat 323 d ln excavator (prefix cyd) service repair manual (cyd000...fjjsekmsmmes
This document provides instructions for disassembling and assembling the final drive of 323D LN and 323D S excavators. It involves removing over 30 individual parts in 23 steps, including the carrier assembly, ring gears, main housing, and bearings. Cleanliness is important during disassembly and assembly. O-rings and seals should always be replaced. Parts should be lubricated before assembly and bearings are to be preloaded using a press to the correct thickness of shims.
Caterpillar cat 323 d s excavator (prefix cyd) service repair manual (cyd0000...fjjsekmsmmes
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists 23 steps for disassembly, including removing the final drive cover, carrier assembly, ring gears, and other components. It then lists 32 steps for assembly, beginning with installing bearings in the main housing and determining the correct shim thickness. Other steps include installing seals, pins, and gears to reassemble the final drive.
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...f8usejkdmmd8i
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...nkog14651119
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
The document provides instructions for disassembling and assembling a final drive on an excavator model 319D L. It involves removing over 30 individual parts in a specific order. Key steps include removing the final drive housing, carrier assembly, ring gears, and separating internal planetary gears. Assembly involves installing bearings, seals, shims, and aligning the main housing and motor housing, requiring precision measurements to set proper bearing preload. The process is detailed over multiple pages with illustrations to ensure correct reassembly.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...yu5676962
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It describes:
1) Removing over 30 components of the final drive including the carrier assembly, ring gears, sun gear, and housing pieces.
2) Disassembling the carrier assembly into individual planetary gears, shafts, and washers.
3) Cleaning all parts thoroughly before assembly to prevent damage.
4) Assembling the components in reverse order, ensuring proper torque and alignment of parts.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...hdjsjndndnd
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive system.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...tengtui535
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...fujskemdidk8u
The document provides instructions for disassembling and assembling the final drive of an excavator model 319D L. It lists 33 steps for disassembly, removing components like the cover, carrier assembly, ring gears, and seals. It then lists 13 steps for assembly, including installing bearings, determining shim thickness, installing seals and other components, and testing rotation. The purpose is to provide maintenance technicians with a procedure to fully disassemble and reassemble the final drive.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...f8seodkdmdmed3
The document provides instructions for disassembling and assembling the final drive of an excavator model 319D L. It begins by listing the required tools. The disassembly procedure involves removing over 30 individual parts in sequential order, including the cover, carrier assembly, planetary gears, ring gears, and seals. Cleanliness is emphasized. The assembly procedure reverses the disassembly steps and provides additional details like applying anti-seize lubricant and determining shim thickness to preload the bearings.
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...ze6074xunong
The document provides instructions for disassembling and assembling a final drive on an excavator model 319D L. It involves removing over 30 individual parts in a specific order. Key steps include removing the final drive housing, carrier assembly, ring gears, and separating internal planetary gears. Assembly involves installing bearings, seals, gears, and shims in reverse order while ensuring proper bearing preload using press tools and measurements. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...gongfuao7509
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...tingrm81805
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...fujjsekmdm3ed
The document provides instructions for disassembling and assembling the final drive of an excavator model 319D L. It begins by listing the required tools. The disassembly procedure involves removing over 30 individual parts in sequential order, including the cover, carrier assembly, planetary gears, ring gears, and seals. The assembly procedure similarly lists over 30 steps to reinstall the parts in reverse order, noting the importance of cleanliness and replacing all seals and O-rings. Proper lubrication and use of pressing/lifting tools are emphasized.
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive.
The document provides instructions for disassembling and assembling a final drive component of an excavator. It includes 33 steps for disassembly, removing components like the cover, carrier assembly, ring gears, and seals. The assembly section has 13 steps, including pressing bearings into the main housing, determining the correct shim thickness, installing seals and pins, and attaching the main housing to the motor housing. Precise cleaning and use of replacement parts is emphasized throughout.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix WBJ) Service Repair Manu...tengtui535
The document provides instructions for disassembling and assembling a final drive component of an excavator. It includes 33 steps for disassembly, removing components like the cover, carrier assembly, planetary gears, and seals. The assembly section has 13 steps, including pressing in bearings, installing seals and pins, and using shims to set proper bearing preload when installing the main housing onto the motor housing. Cleanliness is emphasized throughout to prevent contamination.
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfprmy389342
This document is the service manual for an SL30B skid steer loader. It provides safety precautions and instructions for operating and servicing the loader. Some key points:
- The manual outlines many safety rules for operating the loader safely, such as wearing protective equipment, not allowing passengers, and ensuring all equipment is lowered before servicing.
- It provides standard torque specifications for various types of hardware including decimal, metric, and hydraulic fittings to ensure correct tightening of components.
- The manual is organized into tabs covering general information, engines, fuel system, electrical systems, power train, hydraulics, and mounted equipment. Each tab contains an index of relevant sections.
- Sections provide instructions
Fiat Kobelco EX95W Mini Wheel Excavator Service Repair Manual.pdfprmy389342
This document provides safety precautions for operating an excavator. It advises reading the operator's manual carefully before starting or using the machine. Operators should be familiar with all safety signs and their meanings. Only authorized personnel should operate the machine. Personal protective equipment such as hard hats and safety glasses should always be worn. The operator's compartment and controls should be kept clean. Operators should not jump on or off the machine and should keep hands and feet inside the cab at all times. The machine should come to a complete stop before the operator exits. Height, width and weight limitations of the work site must be assessed. Underground utilities should be located and marked before digging.
Daewoo Doosan DE12TIS Diesel Engine Service Repair Manual.pdfprmy389342
This maintenance manual provides instructions for maintaining DAEWOO DE series diesel engines, models DE12, DE12T, DE12TI, and DE12TIS. It describes the engine components and specifications. Proper maintenance like checking coolant concentration and fan belt tension are important to maintain optimum engine performance and durability. The manual explains maintenance procedures and includes symbols to indicate removal, installation, cleaning, and other service operations.
Daewoo Doosan DE12TI Diesel Engine Service Repair Manual.pdfprmy389342
This maintenance manual provides instructions for maintaining DAEWOO DE series diesel engines, models DE12, DE12T, DE12TI, and DE12TIS. It describes the engine components and specifications. Proper maintenance like checking coolant concentration and fan belt tension are important to maintain optimum engine performance and durability. The manual explains maintenance procedures and includes symbols to indicate removal, installation, cleaning, and other service operations.
Daewoo Doosan DE12T Diesel Engine Service Repair Manual.pdfprmy389342
This maintenance manual provides instructions for maintaining DAEWOO DE series diesel engines, models DE12, DE12T, DE12TI, and DE12TIS. It describes the engine components and specifications. Proper maintenance like checking coolant concentration and fan belt tension are important to maintain optimum engine performance and durability. The manual explains maintenance procedures and includes symbols to indicate removal, installation, cleaning, and other service operations.
Daewoo Doosan DE12 Diesel Engine Service Repair Manual.pdfprmy389342
This maintenance manual provides instructions for maintaining DAEWOO DE series diesel engines, models DE12, DE12T, DE12TI, and DE12TIS. It describes the engine components and specifications. Proper maintenance like checking coolant concentration and fan belt tension are important to maintain optimum engine performance and durability. The manual explains maintenance procedures and includes symbols to indicate removal, installation, cleaning, and other service operations.
Crown TSP6000 Series Turret Order Picker Parts Catalogue Manual.pdfprmy389342
This document is a parts manual for the power unit of a TSP6000 series truck. It contains 30 numbered parts that make up the power unit, listed with their part numbers and the quantity required. Key components included are the power unit enclosure, rear doors, covers, fasteners, and guards. The parts are organized with an index and diagram to allow technicians to easily find replacement parts.
Crown LP3020 Lift Truck Service Repair Manual.pdfprmy389342
The document provides maintenance information for LP3010/3020 series trucks. It contains sections on lubrication and adjustment, hydraulics, the drive unit, electrics, brakes, steering, lifting mechanisms, cylinders, and electrical diagrams. The document includes overview diagrams of truck components, inspection and maintenance schedules, repair procedures, and part replacement instructions. Revisions provide corrections and additions to the text as well as changes to diagrams, tables, and descriptions.
More Related Content
Similar to Caterpillar Cat 323D S Excavator (Prefix CYD) Service Repair Manual (CYD00001 and up).pdf
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive system.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...tengtui535
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...fujskemdidk8u
The document provides instructions for disassembling and assembling the final drive of an excavator model 319D L. It lists 33 steps for disassembly, removing components like the cover, carrier assembly, ring gears, and seals. It then lists 13 steps for assembly, including installing bearings, determining shim thickness, installing seals and other components, and testing rotation. The purpose is to provide maintenance technicians with a procedure to fully disassemble and reassemble the final drive.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...f8seodkdmdmed3
The document provides instructions for disassembling and assembling the final drive of an excavator model 319D L. It begins by listing the required tools. The disassembly procedure involves removing over 30 individual parts in sequential order, including the cover, carrier assembly, planetary gears, ring gears, and seals. Cleanliness is emphasized. The assembly procedure reverses the disassembly steps and provides additional details like applying anti-seize lubricant and determining shim thickness to preload the bearings.
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...ze6074xunong
The document provides instructions for disassembling and assembling a final drive on an excavator model 319D L. It involves removing over 30 individual parts in a specific order. Key steps include removing the final drive housing, carrier assembly, ring gears, and separating internal planetary gears. Assembly involves installing bearings, seals, gears, and shims in reverse order while ensuring proper bearing preload using press tools and measurements. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix ZGZ) Service Repair Manu...gongfuao7509
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...tingrm81805
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and rejoining over a dozen internal components of the final drive system.
Caterpillar Cat 319D L Excavator (Prefix ZGZ) Service Repair Manual (ZGZ00001...fujjsekmdm3ed
The document provides instructions for disassembling and assembling the final drive of an excavator model 319D L. It begins by listing the required tools. The disassembly procedure involves removing over 30 individual parts in sequential order, including the cover, carrier assembly, planetary gears, ring gears, and seals. The assembly procedure similarly lists over 30 steps to reinstall the parts in reverse order, noting the importance of cleanliness and replacing all seals and O-rings. Proper lubrication and use of pressing/lifting tools are emphasized.
The document provides instructions for disassembling and assembling the final drive of a 319D L excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then outlines 28 steps for reassembling the final drive, including pressing in bearings, installing seals, and determining the correct shim thickness. The overall procedure involves separating, cleaning, and reassembling over 15 individual parts and components of the final drive.
The document provides instructions for disassembling and assembling a final drive component of an excavator. It includes 33 steps for disassembly, removing components like the cover, carrier assembly, ring gears, and seals. The assembly section has 13 steps, including pressing bearings into the main housing, determining the correct shim thickness, installing seals and pins, and attaching the main housing to the motor housing. Precise cleaning and use of replacement parts is emphasized throughout.
Caterpillar Cat 319D L and 319D LN Excavator (Prefix WBJ) Service Repair Manu...tengtui535
The document provides instructions for disassembling and assembling a final drive component of an excavator. It includes 33 steps for disassembly, removing components like the cover, carrier assembly, planetary gears, and seals. The assembly section has 13 steps, including pressing in bearings, installing seals and pins, and using shims to set proper bearing preload when installing the main housing onto the motor housing. Cleanliness is emphasized throughout to prevent contamination.
Similar to Caterpillar Cat 323D S Excavator (Prefix CYD) Service Repair Manual (CYD00001 and up).pdf (12)
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfprmy389342
This document is the service manual for an SL30B skid steer loader. It provides safety precautions and instructions for operating and servicing the loader. Some key points:
- The manual outlines many safety rules for operating the loader safely, such as wearing protective equipment, not allowing passengers, and ensuring all equipment is lowered before servicing.
- It provides standard torque specifications for various types of hardware including decimal, metric, and hydraulic fittings to ensure correct tightening of components.
- The manual is organized into tabs covering general information, engines, fuel system, electrical systems, power train, hydraulics, and mounted equipment. Each tab contains an index of relevant sections.
- Sections provide instructions
Fiat Kobelco EX95W Mini Wheel Excavator Service Repair Manual.pdfprmy389342
This document provides safety precautions for operating an excavator. It advises reading the operator's manual carefully before starting or using the machine. Operators should be familiar with all safety signs and their meanings. Only authorized personnel should operate the machine. Personal protective equipment such as hard hats and safety glasses should always be worn. The operator's compartment and controls should be kept clean. Operators should not jump on or off the machine and should keep hands and feet inside the cab at all times. The machine should come to a complete stop before the operator exits. Height, width and weight limitations of the work site must be assessed. Underground utilities should be located and marked before digging.
Daewoo Doosan DE12TIS Diesel Engine Service Repair Manual.pdfprmy389342
This maintenance manual provides instructions for maintaining DAEWOO DE series diesel engines, models DE12, DE12T, DE12TI, and DE12TIS. It describes the engine components and specifications. Proper maintenance like checking coolant concentration and fan belt tension are important to maintain optimum engine performance and durability. The manual explains maintenance procedures and includes symbols to indicate removal, installation, cleaning, and other service operations.
Daewoo Doosan DE12TI Diesel Engine Service Repair Manual.pdfprmy389342
This maintenance manual provides instructions for maintaining DAEWOO DE series diesel engines, models DE12, DE12T, DE12TI, and DE12TIS. It describes the engine components and specifications. Proper maintenance like checking coolant concentration and fan belt tension are important to maintain optimum engine performance and durability. The manual explains maintenance procedures and includes symbols to indicate removal, installation, cleaning, and other service operations.
Daewoo Doosan DE12T Diesel Engine Service Repair Manual.pdfprmy389342
This maintenance manual provides instructions for maintaining DAEWOO DE series diesel engines, models DE12, DE12T, DE12TI, and DE12TIS. It describes the engine components and specifications. Proper maintenance like checking coolant concentration and fan belt tension are important to maintain optimum engine performance and durability. The manual explains maintenance procedures and includes symbols to indicate removal, installation, cleaning, and other service operations.
Daewoo Doosan DE12 Diesel Engine Service Repair Manual.pdfprmy389342
This maintenance manual provides instructions for maintaining DAEWOO DE series diesel engines, models DE12, DE12T, DE12TI, and DE12TIS. It describes the engine components and specifications. Proper maintenance like checking coolant concentration and fan belt tension are important to maintain optimum engine performance and durability. The manual explains maintenance procedures and includes symbols to indicate removal, installation, cleaning, and other service operations.
Crown TSP6000 Series Turret Order Picker Parts Catalogue Manual.pdfprmy389342
This document is a parts manual for the power unit of a TSP6000 series truck. It contains 30 numbered parts that make up the power unit, listed with their part numbers and the quantity required. Key components included are the power unit enclosure, rear doors, covers, fasteners, and guards. The parts are organized with an index and diagram to allow technicians to easily find replacement parts.
Crown LP3020 Lift Truck Service Repair Manual.pdfprmy389342
The document provides maintenance information for LP3010/3020 series trucks. It contains sections on lubrication and adjustment, hydraulics, the drive unit, electrics, brakes, steering, lifting mechanisms, cylinders, and electrical diagrams. The document includes overview diagrams of truck components, inspection and maintenance schedules, repair procedures, and part replacement instructions. Revisions provide corrections and additions to the text as well as changes to diagrams, tables, and descriptions.
Crown LP3010 Lift Truck Service Repair Manual.pdfprmy389342
The document provides maintenance information for LP3010/3020 series trucks. It contains sections on lubrication and adjustment, hydraulics, the drive unit, electrics, brakes, steering, lifting mechanisms, cylinders, and electrical diagrams. The document includes safety notes, inspection and maintenance schedules, repair and replacement procedures, and diagrams. Revisions provide corrections and additions to the text as well as changes to diagrams, tables, and descriptions.
Crown GPC2000 Series Lift Truck Parts Catalogue Manual.pdfprmy389342
This document provides lubrication information for a parts manual. It lists the recommended lubricants and their specifications for various components of the product. Grease type 2 is recommended for bearings and grease type 2-P for ball bearings. Mobilex 00-200 is suitable for lower operating temperatures, while Mobilex 005-200 is recommended for higher temperatures.
Clark TMX12-25 Forklift Service Repair Manual.pdfprmy389342
This document provides instructions for safely maintaining electric forklifts. It discusses:
1. Identifying safety signs and messages and outlining safe maintenance practices such as blocking the wheels, disconnecting batteries, and checking for fuel leaks before working.
2. Procedures for lifting parts of the forklift like the drive wheels or rear, including using blocks and jacks of adequate capacity.
3. Chain securing an upright carriage when raised and shipping tie-down instructions.
Clark EPX 16-20S Forklift Service Repair Manual.pdfprmy389342
This document provides instructions for safely maintaining electric forklifts. It discusses:
1. Identifying safety signs and messages in the manual and on trucks to understand hazards.
2. Recommended safe maintenance practices such as properly ventilating work areas, using fire protection equipment, and disconnecting batteries before working on electrical systems.
3. Procedures for safely lifting, jacking, and blocking forklifts, including raising the drive wheels, upright, and entire truck, to access components for repair work.
Clark CMP 70 Forklift Service Repair Manual.pdfprmy389342
This document provides safety instructions for lifting, jacking, and blocking a CLARK forklift truck during maintenance. It identifies approved lifting points on the truck and describes procedures for safely raising different parts of the truck, including the drive wheels, front with a hoist, and upright carriage. Workers are instructed to use blocking and wheel cradles, and cautioned to ensure any lifting equipment is rated for the truck's weight.
Clark CMP 60 Forklift Service Repair Manual.pdfprmy389342
This document provides safety instructions for lifting, jacking, and blocking a CLARK forklift truck during maintenance. It identifies approved lifting points on the truck and describes procedures for safely raising different parts of the truck, including the drive wheels, front with a hoist, and upright carriage. Workers are instructed to use blocking and wheel cradles, and cautioned to ensure any lifting equipment is rated for the truck's weight.
Clark CMP 50 Forklift Service Repair Manual.pdfprmy389342
This document provides safety instructions for lifting, jacking, and blocking a CLARK forklift truck during maintenance. It identifies approved lifting points on the truck and describes procedures for safely raising different parts of the truck, including the drive wheels, front with a hoist, and upright carriage. Workers are instructed to use blocking and wheel cradles, and cautioned to ensure any lifting equipment is rated for the truck's weight.
Caterpillar Cat D400E II EJECTOR TRUCK (Prefix APF) Service Repair Manual (AP...prmy389342
This document provides instructions for removing and installing inlet and exhaust valves, valve guides, valve seat inserts, and the engine oil filter base on a D400E II Ejector Truck with a 3406E engine. The procedures describe draining fluids, using various specialty tools to compress springs, extract components, and properly position replacement parts. Safety notices warn of potential injury from compressed springs and ensure cleanliness when handling engine parts.
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinForth
Cat Plein, Development & Communications Director of Forth, gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitForth
Vanessa Warheit, Co-Founder of EV Charging for All, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinForth
Brandt Hertenstein, Program Manager of the Electrification Coalition gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Charging Fueling & Infrastructure (CFI) Program by Kevin MillerForth
Kevin Miller, Senior Advisor, Business Models of the Joint Office of Energy and Transportation gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Understanding Catalytic Converter Theft:
What is a Catalytic Converter?: Learn about the function of catalytic converters in vehicles and why they are targeted by thieves.
Why are They Stolen?: Discover the valuable metals inside catalytic converters (such as platinum, palladium, and rhodium) that make them attractive to criminals.
Steps to Prevent Catalytic Converter Theft:
Parking Strategies: Tips on where and how to park your vehicle to reduce the risk of theft, such as parking in well-lit areas or secure garages.
Protective Devices: Overview of various anti-theft devices available, including catalytic converter locks, shields, and alarms.
Etching and Marking: The benefits of etching your vehicle’s VIN on the catalytic converter or using a catalytic converter marking kit to make it traceable and less appealing to thieves.
Surveillance and Monitoring: Recommendations for using security cameras and motion-sensor lights to deter thieves.
Statistics and Insights:
Theft Rates by Borough: Analysis of data to determine which borough in NYC experiences the highest rate of catalytic converter thefts.
Recent Trends: Current trends and patterns in catalytic converter thefts to help you stay aware of emerging hotspots and tactics used by thieves.
Benefits of This Presentation:
Awareness: Increase your awareness about catalytic converter theft and its impact on vehicle owners.
Practical Tips: Gain actionable insights and tips to effectively prevent catalytic converter theft.
Local Insights: Understand the specific risks in different NYC boroughs, helping you take targeted preventive measures.
This presentation aims to equip you with the knowledge and tools needed to protect your vehicle from catalytic converter theft, ensuring you are prepared and proactive in safeguarding your property.
EV Charging at MFH Properties by Whitaker JamiesonForth
Whitaker Jamieson, Senior Specialist at Forth, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
2. Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 439-3938 Link Bracket 2
C 154-6181 Forcing Bolt 1
D 439-3940 Link Bracket 2
E
5F-7366 Forcing Bolt 1
1P-5546 Crossblock 1
1U-9889 Crossblock 1
1P-0520 Driver Group 1
6V-7888 Puller Leg 2
1H-3112 Puller Assembly 1
1P-5551 Adjustable Screw Assembly 1
F - Loctite 5127 1
Start By:
a. Remove the final drive.
Note: Cleanliness is an important factor. Before the disassembly procedure, thoroughly
clean the exterior of the component. This action will prevent dirt from entering the internal
mechanism.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled in the original locations.
2/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Illustration 1 g00708089
2. Fasten the final drive to Tooling (A), as shown. The combined weight of the final drive and
final drive sprocket is approximately 312 kg (688 lb).
3. Remove bolts (1) and the washers that hold the cover in position.
Illustration 2 g00708090
4. Remove the setscrews from cover (2), and fasten Tooling (B) and a suitable lifting device to
cover (2), as shown. The weight of cover (2) is approximately 32 kg (70 lb). Remove cover
(2).
Illustration 3 g00708091
3/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. 5. Remove thrust plate (3) from cover (2).
6. Remove plugs (4) from cover (2).
Illustration 4 g00708235
7. Remove O-ring seals (5) from both plugs (4) that were in the cover.
Illustration 5 g00708092
8. Remove spacer (6) from carrier assembly (7).
9. Remove sun gear (8) from carrier assembly (7).
10. Remove carrier assembly (7) by lifting the carrier assembly straight up. The weight of
carrier assembly (7) is approximately 14 kg (30 lb).
4/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 6 g01304883
11. Disassemble carrier assembly (7), as follows.
a. Drive spring pin (10) into planetary shaft (9) with a hammer and a punch.
Illustration 7 g00708144
b. Remove planetary shaft (9) with spring pin (10) from the carrier assembly.
c. Remove spring pin (10) from planetary shaft (9) with a hammer and a punch.
Illustration 8 g00708218
d. Remove thrust washers (11) and planetary gear (13) from the carrier assembly.
5/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. e. Remove bearing (12) from planetary gear (13).
12. Repeat Steps 11.a through 11.e in order to remove the remaining planetary gears from the
carrier assembly.
Illustration 9 g00708162
13. Remove sun gear (14) from carrier assembly (15).
Illustration 10 g00708325
14. Remove spacer (16).
Illustration 11 g00708184
6/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Note: It will be necessary to pry ring gears (17) away from main housing (18) in order to
install the lifting slings.
15. Fasten a suitable lifting device to ring gears (17), as shown. Remove the ring gears from
main housing (18). The weight of ring gears (17) is approximately 45 kg (100 lb).
Illustration 12 g00708360
16. Use a screwdriver or a chisel in order to separate two ring gears (17).
Note: Two ring gears (17) are held together with Tooling (F). It may be necessary to heat
ring gears (17) in order to soften the sealant. Do not heat over 135 °C (275 °F) for more
than thirty minutes.
Illustration 13 g00708172
17. Position a 12.7 mm (0.50 inch) shackle under carrier assembly (15).
18. Fasten a suitable lifting device to the shackle.
19. Slowly lift carrier assembly (15) from the final drive. The weight of carrier assembly (15) is
approximately 39 kg (85 lb).
20. Disassemble carrier assembly (15), as follows.
7/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 14 g00708175
a. Drive spring pin (20) into planetary shaft (19) with a hammer and a punch.
Illustration 15 g00708370
Illustration 16 g00708220
b. Remove planetary shaft (19) with spring pin (20) from the carrier assembly.
c. Remove spring pin (20) from planetary shaft (19) with a hammer and a punch.
d. Remove thrust washers (21) and planetary gear (23) from the carrier assembly.
e. Remove bearings (22) from planetary gear (23).
8/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. 21. Repeat Steps 20.a through 20.e in order to remove the remaining planetary gears from the
carrier.
Illustration 17 g00708186
22. Remove O-ring seal (24) from main housing (18).
Illustration 18 g00708187
23. Remove bolts (25) from gear (26).
Illustration 19 g00708202
24. Use Tooling (C) in order to remove gear (26) from main housing (18).
9/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Note: The motor housing will separate from main housing (18) once gear (26) is removed.
Make sure that the motor housing is supported.
Illustration 20 g00708211
25. Remove shims (27) from the main housing.
Illustration 21 g00708212
26. Fasten Tooling (D) and a suitable lifting device to main housing (18), as shown.
27. Use a hammer and a punch in order to separate main housing (18) and the final drive
sprocket from motor housing (28). The combined weight of main housing (18) and the final
drive sprocket is approximately 82 kg (180 lb).
10/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 22 g00708214
28. Remove Duo-Cone seal (29) from motor housing (28).
29. Remove alignment pins (30).
Illustration 23 g00708215
Illustration 24 g00708216
30. Remove Duo-Cone seal (31) from main housing (18).
31. Use Tooling (E) in order to remove bearings (32) and (33) from the main housing.
32. If necessary, remove the final drive sprocket from the main housing.
33. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Sep 12 01:10:46 UTC+0800 2020
11/11
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. S/N - WNE1-UP
S/N - YSD1-UP
S/N - ZMF1-UP
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 439-3938 Link Bracket 2
D 439-3940 Link Bracket 2
G 126-3994 Duo-Cone Seal Installer 1
H - Loctite C5-A Anti-Seize Lubricant
F - Loctite High Flex From-In-Place Gasket
Note: Cleanliness is an important factor. Before assembly, all parts should be cleaned in
cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry
parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If
any parts are worn or damaged, use new parts for replacement. All disassembly and all
assembly procedures must be performed on a clean work surface and in a clean hydraulic
area. Keep cleaned parts covered and protected at all times.
Note: O-rings, gaskets, and seals should always be replaced. A used O-ring may not have
the same sealing properties as a new O-ring. Use 1U-6396 O-Ring Assembly Compound
during the assembly procedure.
Note: Apply a light film of hydraulic oil to all components before assembly.
1. Install the final drive sprocket if the sprocket was removed from the main housing.
2. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
2/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 1 g00708215
3. Apply Tooling (H) to the outer diameter of the bearings.
4. Install bearings (32) and (33) in main housing (18) with a suitable press.
5. Make sure that bearing (32) and bearing (33) contact the counter bore in the main housing.
6. Use the following procedure to preload the bearings and determine the correct thickness of
shims.
Illustration 2 g00713058
a. Fasten Tooling (D) and a suitable lifting device to main housing (18). Install the main
housing on the motor housing.
b. Put the main housing and the motor housing in a suitable press.
Illustration 3 g00709278
(a) Bearing surface
(b) Housing surface
c. Use a suitable press and a spacer in order to apply a load of 4000 kg (8819 lb) on the
bearings. Rotate the housing in order to seat the bearings.
d. Reduce the load on the bearings to 1000 ± 100 kg (2205 ± 221 lb).
3/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. e. Use a depth micrometer in order to measure the step length between the bearing
surface and the housing surface. Take measurements at several different locations
around the housing. Compute the average of the measured dimensions and record the
number. Call this Dimension (Y).
Illustration 4 g00709276
f. Use a depth micrometer in order to measure the step length of gear (26). Take
measurements at several different locations around the gear. Compute the average of
the measured dimensions and record the number. Call this Dimension (X).
g. The thickness of the shims is equal to (X − Y) ± 0.05 mm (0.002 inch).
Note: Use no more than two shims. If two shims are required, install the thinner shim
next to the gear.
h. Remove the main housing from the motor housing.
Illustration 5 g01021370
7. Use Tooling (G) in order to install Duo-Cone seal (31) in main housing (18). Refer to
Disassembly and Assembly, "Duo-Cone Conventional Seals - Install".
Note: The rubber seals and all surfaces that contact the seals must be clean and dry. After
installation of the seals, put clean SAE 30 oil on the contact surfaces of the metal seals.
4/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 6 g01021371
8. Use Tooling (G) in order to install Duo-Cone seal (29) in motor housing (28).
Illustration 7 g00708214
9. Apply Tooling (H) to the surfaces that contact pins (30).
10. Install alignment pins (30).
Note: Do not damage the Duo-Cone seals in the main housing or in the motor housing
during the assembly of the two components. After installation of the main housing on the
motor housing, there will be a small gap between the components. The gap is caused by the
Duo-Cone seals. This gap will be eliminated during installation of gear (26).
5/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 8 g00713058
11. Fasten Tooling (D) and a suitable lifting device to main housing (18). Install the main
housing on the motor housing.
Illustration 9 g00708211
12. Install shims (27) that were determined in Step 6.g in the main housing.
Note: If two shims are required, install the thinner shim next to the gear.
Illustration 10 g00708187
13. Install gear (26).
14. Install bolts (25) in gear (26). Install the bolts in an even pattern until the gear is seated
against the bearing. Tighten bolts (25) in a crisscross pattern.
6/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 11 g00708186
15. Install O-ring seal (24) to main housing (18).
Illustration 12 g00708175
16. Assemble carrier assembly (15), as follows.
Illustration 13 g00708220
a. Install bearings (22) in planetary gear (23).
b. Install thrust washers (21) and planetary gear (23) in the carrier assembly.
7/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. c. Use a deburring tool in order to remove the metal burr from the openings in the
carrier. Install planetary shaft (19) in the carrier assembly.
d. Drive spring pin (20) into planetary shaft (19) with a hammer and a punch.
Illustration 14 g00513451
e. Orient the split in spring pin (20) vertically to the carrier. Align the split in the spring
pin to the top or to the bottom. Make a stake mark on each side of the spring pin hole
in the carrier. Each stake mark should be approximately 1.50 mm (0.059 inch) from
the outside diameter of the spring pin hole.
17. Repeat Steps 16.a through 16.e in order to install the remaining planetary gears in the carrier
assembly.
Illustration 15 g00708172
18. Install a lifting sling through the middle of carrier assembly (15). Fasten a 12.7 mm
(0.50 inch) shackle to the suitable lifting device.
19. Install carrier assembly (15) on the final drive. The weight of carrier assembly (15) is
approximately 39 kg (85 lb).
8/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. 20. Remove the shackle and the suitable lifting device.
Illustration 16 g00713148
21. Apply Tooling (F) to the mating surface of ring gear (17b).
22. Install ring gear (17a) on ring gear (17b).
Illustration 17 g00708184
23. Fasten a suitable lifting device to ring gears (17), as shown. Install the ring gears to main
housing (18). The weight of ring gears (17) is approximately 45 kg (100 lb).
Illustration 18 g00708325
9/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. 24. Install spacer (16) in the carrier assembly.
Illustration 19 g00708162
25. Install sun gear (14) in carrier assembly (15).
Illustration 20 g01304883
Illustration 21 g00708218
26. Assemble carrier assembly (7), as follows.
a. Install bearing (12) in planetary gear (13).
10/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. b. Install thrust washers (11) and planetary gear (13) in the carrier assembly.
c. Install planetary shaft (9) in the carrier assembly.
d. Drive spring pin (10) into planetary shaft (9) with a hammer and a punch.
Illustration 22 g00513451
e. Orient the split in spring pin (10) vertically to the carrier. Align the split in the spring
pin to the top or to the bottom. Make a stake mark on each side of the spring pin hole
in the carrier. Each stake mark should be approximately 1.50 mm (0.059 inch) from
the outside diameter of the spring pin hole.
27. Repeat Steps 26.a through 26.e in order to install the remaining planetary gears in the carrier
assembly.
Illustration 23 g00708092
28. Install carrier assembly (7) in the ring gear. The weight of carrier assembly (7) is
approximately 14 kg (30 lb).
29. Install sun gear (8) in carrier assembly (7).
11/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. 30. Install spacer (6) in carrier assembly (7).
Illustration 24 g00708235
31. Install new O-ring seals (5) on plugs (4) that were in the cover.
Illustration 25 g00708091
32. Install plugs (4) in cover (2). Tighten plugs (4) to a torque of 80 ± 10 N·m (59 ± 7 lb ft).
33. Install thrust plate (3) in cover (2).
34. Apply Tooling (F) to the mating surface of the ring gear.
12/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Illustration 26 g00708090
35. Fasten Tooling (B) and a suitable lifting device to cover (2), as shown. The weight of cover
(2) is approximately 32 kg (70 lb). Install cover (2).
36. Remove Tooling (B) and install the setscrews in cover (2).
Illustration 27 g00708089
37. Install bolts (1) and the washers that hold the cover in position. Tighten bolts (1) in a
crisscross pattern.
38. Remove the final drive from Tooling (A). The combined weight of the final drive and final
drive sprocket is approximately 310 kg (683 lb).
End By:
a. Install the final drive.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Sep 12 01:11:45 UTC+0800 2020
13/13
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
26. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 323D LN EXCAVATOR CYD
Configuration: 323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 Engine
Disassembly and Assembly
323D Excavator Machine Systems
Media Number -RENR7500-07 Publication Date -01/02/2012 Date Updated -14/02/2012
i07192988
Final Drive - Install
SMCS - 4050-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
8S-7611 Handle As 2
8S-7615 Pin As 2
283-1495 Stand Assembly 2
B 439-3939 Link Bracket As 2
C - Loctite C5A Copper Anti-Seize -
Table 2
Torque Values of Bolts (3)
Bolt Size Torque
M16 90 ± 15 N·m (66 ± 11 lb ft) and turn an additional angle of 60 ± 5 degrees.
M20 150 ± 25 N·m (111 ± 18 lb ft) and turn an additional angle of 55 ± 5 degrees.
M24 250 ± 25 N·m (184 ± 18 lb ft) and turn an additional angle of 45 ± 5 degrees.
M30 500 ± 50 N·m (369 ± 37 lb ft) and turn an additional angle of 50 ± 5 degrees.
1/3
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
27. Illustration 1 g00712767
1. Attach Tooling (B) and a suitable lifting device to final drive (1). The weight of final drive
(1) and the sprocket is approximately 312 kg (688 lb). Position the final drive in the frame.
Illustration 2 g00712737
Note: Make sure that bolt holes (2) for the travel motor are in the correct position.
Note: Make sure that bolts (3), the washers, the motor housing, and the frame are clean and
free of protective coating and oil.
2. Before assembly remove all compounds, oil, and dust from the female threads.
3. Apply Tooling (C) to the threads of bolt (3). Install bolts (3) and the washers in the final
drive. Tighten bolts (3) to a torque specified in Table 2.
4. Refer to Service Magazine, M0083843, "An Improved Bolt Tightening Procedure for the
Critical Joints Is Now Used on All Excavators" for more detail information.
5. Remove Tooling (B) and the suitable lifting device from the final drive.
2/3
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
28. Illustration 3 g00489826
Typical Example
6. Lift the side of the machine to remove Tooling (A).
End By:
a. Install the travel motor.
b. Connect the track assembly.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Sep 12 01:12:44 UTC+0800 2020
3/3
323D LN & 323D S Excavators CYD00001-UP (MACHINE) POWERED BY 3066 E...
2020/9/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...