This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and gives step-by-step instructions to remove components like the cover, planetary assembly, ring gear, and bearings. It then describes how to assemble the components in reverse order, noting that cleanliness is important and new seals and bearings should be used.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including draining fluids, separating housing components, and removing gears, seals, and bearings. The 27 steps for assembly describe installing new seals and bearings, pressing components together in the correct order, and torquing fasteners to the specified values. Cleanliness is emphasized throughout to prevent contamination.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including draining fluids, separating housing components, and removing gears, seals, and bearings. The 27 steps for assembly describe installing new seals and bearings, pressing components together in the correct order, and torquing fasteners to specifications. Cleanliness is emphasized throughout to prevent contamination.
1) The document provides disassembly and assembly instructions for the final drive of a 318C excavator.
2) It lists required tools and parts and gives step-by-step instructions to disassemble components like the cover, planetary assembly, ring gear, and carrier.
3) The assembly section instructs to clean all parts thoroughly and replace all seals before reinstalling components like the support ring, planetary gears, and retainer nut in the reverse order of disassembly.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including draining fluids, separating housing components, and removing gears, seals, and bearings. The 27 steps for assembly describe installing new seals and bearings, pressing components together in the correct order, and torquing fasteners to the specified values. Cleanliness is emphasized throughout to prevent contamination.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including draining fluids, separating housing components, and removing internal gears, shafts, seals, and bearings. The 27 steps for assembly describe installing these same parts in reverse order, with notes on cleaning, replacing seals and O-rings, and proper bearing installation techniques.
1) The document provides disassembly and assembly instructions for the final drive of a 318C excavator.
2) It lists required tools and parts and gives step-by-step instructions to disassemble components like the cover, planetary assembly, ring gear, and carrier.
3) The assembly section instructs to clean all parts thoroughly and replace all seals before reinstalling components like the support ring, planetary gears, and retainer nut in the reverse order of disassembly.
Caterpillar cat 318 c excavator (prefix dah) service repair manual (dah00001 ...f9oseikkdks
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including draining fluids, separating housing components, and removing internal gears, shafts, seals, and bearings. The 27 steps for assembly describe installing these same parts in reverse order, with notes on cleaning, replacing seals and O-rings, and proper bearing installation techniques.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including removing the final drive cover, planetary assembly, ring gear, and bearings. The 27 steps for assembly describe installing new seals, bearings, and adjusting the retainer nut torque to 3500 N·m. Cleanliness is emphasized throughout to prevent contamination.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including draining fluids, separating housing components, and removing gears, seals, and bearings. The 27 steps for assembly describe installing new seals and bearings, pressing components together in the correct order, and torquing fasteners to the specified values. Cleanliness is emphasized throughout to prevent contamination.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including draining fluids, separating housing components, and removing gears, seals, and bearings. The 27 steps for assembly describe installing new seals and bearings, pressing components together in the correct order, and torquing fasteners to specifications. Cleanliness is emphasized throughout to prevent contamination.
1) The document provides disassembly and assembly instructions for the final drive of a 318C excavator.
2) It lists required tools and parts and gives step-by-step instructions to disassemble components like the cover, planetary assembly, ring gear, and carrier.
3) The assembly section instructs to clean all parts thoroughly and replace all seals before reinstalling components like the support ring, planetary gears, and retainer nut in the reverse order of disassembly.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including draining fluids, separating housing components, and removing gears, seals, and bearings. The 27 steps for assembly describe installing new seals and bearings, pressing components together in the correct order, and torquing fasteners to the specified values. Cleanliness is emphasized throughout to prevent contamination.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including draining fluids, separating housing components, and removing internal gears, shafts, seals, and bearings. The 27 steps for assembly describe installing these same parts in reverse order, with notes on cleaning, replacing seals and O-rings, and proper bearing installation techniques.
1) The document provides disassembly and assembly instructions for the final drive of a 318C excavator.
2) It lists required tools and parts and gives step-by-step instructions to disassemble components like the cover, planetary assembly, ring gear, and carrier.
3) The assembly section instructs to clean all parts thoroughly and replace all seals before reinstalling components like the support ring, planetary gears, and retainer nut in the reverse order of disassembly.
Caterpillar cat 318 c excavator (prefix dah) service repair manual (dah00001 ...f9oseikkdks
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including draining fluids, separating housing components, and removing internal gears, shafts, seals, and bearings. The 27 steps for assembly describe installing these same parts in reverse order, with notes on cleaning, replacing seals and O-rings, and proper bearing installation techniques.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including removing the final drive cover, planetary assembly, ring gear, and bearings. The 27 steps for assembly describe installing new seals, bearings, and adjusting the retainer nut torque to 3500 N·m. Cleanliness is emphasized throughout to prevent contamination.
1) The document provides disassembly and assembly instructions for the final drive of a 318C excavator.
2) It lists required tools and parts and gives step-by-step instructions to disassemble components like the cover, planetary assembly, ring gear, and carrier.
3) The assembly section instructs to clean all parts thoroughly and replace all seals before reinstalling components like the support ring, planetary gears, and retainer nut in the reverse order of disassembly.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including draining fluids, separating housing components, and removing gears, seals, and bearings. The 27 steps for assembly describe installing new seals, bearings, and gears back into their original locations in reverse order of disassembly. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar cat 318 c excavator (prefix dah) service repair manual (dah00001 ...fjskekdmjekm
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including draining fluids, separating housing components, and removing internal gears, shafts, seals, and bearings. The 27 steps for assembly describe installing these same parts in reverse order, with notes on cleaning, replacing seals and O-rings, and proper bearing installation techniques.
The document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and gives step-by-step instructions to remove components like the final drive cover, planetary assembly, retaining rings, and seals. It then describes the assembly process in reverse, including cleaning parts, replacing seals and O-rings, and torquing the retainer nut to the specified value. The goal is to repair or replace worn parts while maintaining cleanliness for proper functioning of the final drive.
The document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists required tools and gives step-by-step instructions to remove components like the final drive cover, planetary assembly, retaining rings, and seals. It then describes the assembly process in reverse, including cleaning parts, replacing seals and O-rings, and torquing fasteners to the specified values. The goal is to repair or replace worn parts while maintaining cleanliness for proper functioning of the final drive.
The document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists 31 steps for disassembly, including draining fluids, removing covers, planetary gears, and seals. It also lists 8 steps for assembly, including installing new seals, bearings, and tightening the retainer nut to the specified torque. The purpose is to repair or replace components in the final drive transmission of the excavator.
Caterpillar Cat 318C, 318C L and 318C LN Excavator (Prefix MDY) Service Repai...gongfuao7509
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps to disassemble the final drive by removing components like the cover, carrier assembly, ring gears, and housing. It then lists 7 notes and 28 steps to reassemble the final drive by installing components like seals, bearings, shims, and housing pieces in the reverse order of disassembly. The goal is to carefully disassemble and reassemble the final drive to the original locations and specifications.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps to disassemble the final drive by removing components like the cover, carrier assembly, ring gears, and housing. It then lists 7 notes and 28 steps to reassemble the final drive by installing components like seals, bearings, shims, and housing pieces in the reverse order of disassembly. The goal is to carefully disassemble and reassemble the final drive while cleaning parts and applying sealant or anti-seize compound where needed.
Caterpillar Cat 318C, 318C L and 318C LN Excavator (Prefix MDY) Service Repai...f8usejkdmmd8i
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps to disassemble the final drive by removing components like the cover, carrier assembly, ring gears, and housing. It then lists 7 notes and 28 steps to reassemble the final drive by installing components like seals, bearings, shims, and housing pieces in the reverse order of disassembly. The goal is to carefully disassemble and reassemble all components to restore the final drive to working order.
Caterpillar Cat 318C, 318C L and 318C LN Excavator (Prefix MDY) Service Repai...ze6074xunong
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps to disassemble the final drive by removing components like the cover, carrier assembly, ring gears, and housing. It then lists 7 notes and 28 steps to reassemble the final drive by installing components like seals, bearings, shims, and housing pieces in the reverse order of disassembly. The goal is to carefully disassemble and reassemble the final drive while cleaning parts and applying sealant or anti-seize compound where needed.
Caterpillar Cat 318C L Excavator (Prefix MDY) Service Repair Manual (MDY00001...f8usiejdkmdd
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps for disassembly, including removing the final drive sprocket, cover, thrust plate, carrier assemblies, ring gears, and other components. It also lists 14 steps for assembly, including installing bearings, seals, carrier assemblies, ring gears, and other components back into the final drive housing. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 318C, 318C L and 318C LN Excavator (Prefix MDY) Service Repai...tengtui535
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps to disassemble the final drive by removing components like the cover, carrier assembly, ring gears, and housing. It then lists 7 notes and 28 steps to reassemble the final drive by installing components like seals, bearings, shims, and housing pieces in the reverse order of disassembly. The goal is to carefully disassemble and reassemble the final drive while cleaning parts and applying sealant or anti-seize compound where needed.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps for disassembly, including removing the final drive sprocket, cover, thrust plate, carrier assemblies, ring gears, and other components. It also lists 14 steps for assembly, including installing bearings, seals, carrier assemblies, ring gears, and other components back into the final drive housing. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 318C, 318C L and 318C LN Excavator (Prefix MDY) Service Repai...f8seodkdmdmed3
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps for disassembly, including removing the final drive sprocket, cover, thrust plate, carrier assemblies, ring gears, and other components. It also lists 14 steps for assembly, noting the importance of cleanliness and providing details on installing bearings, shims, seals, and other parts.
Caterpillar Cat 318C, 318C L and 318C LN Excavator (Prefix MDY) Service Repai...yu5676962
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps to disassemble the final drive by removing components like the cover, carrier assembly, ring gears, and housing. It then lists 7 notes and 28 steps to reassemble the final drive by installing components like seals, bearings, shims, and housing pieces in the reverse order of disassembly. The goal is to carefully disassemble and reassemble the final drive while cleaning parts and applying sealant or anti-seize compound where needed.
Caterpillar cat 318 c excavator (prefix mdy) service repair manual (mdy00001 ...f9oseikkdks
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps for disassembly, including removing components like the cover, carrier assembly, ring gears, and seals. It then lists 4 notes about cleanliness and applying lubricants before presenting 29 steps for assembly, reversing the disassembly process and adding components like bearings and seals.
Caterpillar cat 318 c ln excavator (prefix mdy) service repair manual (mdy000...f9oseikkdks
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps for disassembly, including removing the final drive sprocket, cover, thrust plate, carrier assemblies, ring gears, and other components. It also lists 14 steps for assembly, noting the importance of cleanliness and providing details on installing bearings, shims, seals, and other parts.
Caterpillar cat 318 c l excavator (prefix mdy) service repair manual (mdy0000...f9oseikkdks
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps for disassembly, including removing the final drive sprocket, cover, thrust plate, carrier assemblies, ring gears, and other components. It also lists 14 steps for assembly, noting the importance of cleanliness and providing details on installing bearings, shims, seals, and other parts.
Caterpillar cat 318 c l excavator (prefix mdy) service repair manual (mdy0000...fjskekdmjekm
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and main housing. It then lists 7 notes and 28 steps to reassemble the final drive, installing components like seals, bearings, shims, and alignment pins in the reverse order of disassembly.
Caterpillar Cat 318C L Excavator (Prefix MDY) Service Repair Manual (MDY00001...jfkskmmdmdm
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps for disassembly, including removing the final drive sprocket, cover, thrust plate, carrier assemblies, ring gears, and other components. It also lists 14 steps for assembly, noting the importance of cleanliness and providing details on installing bearings, shims, seals, and other parts.
JCB 2DX Backhoe Loader Service Repair Manual Instant Download.pdfshanruliu7360
This service manual provides instructions for servicing the backhoe loader model 2DX. It contains 15 sections covering various systems of the machine including the engine, fuel system, cooling system, brakes, steering, hydraulics, and electrical systems. The excerpt focuses on servicing instructions for the engine, including safety procedures, technical specifications, operating instructions, and steps to drain and fill oil, clean parts, check oil levels, and remove and install engine components.
1) The document provides disassembly and assembly instructions for the final drive of a 318C excavator.
2) It lists required tools and parts and gives step-by-step instructions to disassemble components like the cover, planetary assembly, ring gear, and carrier.
3) The assembly section instructs to clean all parts thoroughly and replace all seals before reinstalling components like the support ring, planetary gears, and retainer nut in the reverse order of disassembly.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including draining fluids, separating housing components, and removing gears, seals, and bearings. The 27 steps for assembly describe installing new seals, bearings, and gears back into their original locations in reverse order of disassembly. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar cat 318 c excavator (prefix dah) service repair manual (dah00001 ...fjskekdmjekm
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 31 steps for disassembly, including draining fluids, separating housing components, and removing internal gears, shafts, seals, and bearings. The 27 steps for assembly describe installing these same parts in reverse order, with notes on cleaning, replacing seals and O-rings, and proper bearing installation techniques.
The document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and gives step-by-step instructions to remove components like the final drive cover, planetary assembly, retaining rings, and seals. It then describes the assembly process in reverse, including cleaning parts, replacing seals and O-rings, and torquing the retainer nut to the specified value. The goal is to repair or replace worn parts while maintaining cleanliness for proper functioning of the final drive.
The document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists required tools and gives step-by-step instructions to remove components like the final drive cover, planetary assembly, retaining rings, and seals. It then describes the assembly process in reverse, including cleaning parts, replacing seals and O-rings, and torquing fasteners to the specified values. The goal is to repair or replace worn parts while maintaining cleanliness for proper functioning of the final drive.
The document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists 31 steps for disassembly, including draining fluids, removing covers, planetary gears, and seals. It also lists 8 steps for assembly, including installing new seals, bearings, and tightening the retainer nut to the specified torque. The purpose is to repair or replace components in the final drive transmission of the excavator.
Caterpillar Cat 318C, 318C L and 318C LN Excavator (Prefix MDY) Service Repai...gongfuao7509
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps to disassemble the final drive by removing components like the cover, carrier assembly, ring gears, and housing. It then lists 7 notes and 28 steps to reassemble the final drive by installing components like seals, bearings, shims, and housing pieces in the reverse order of disassembly. The goal is to carefully disassemble and reassemble the final drive to the original locations and specifications.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps to disassemble the final drive by removing components like the cover, carrier assembly, ring gears, and housing. It then lists 7 notes and 28 steps to reassemble the final drive by installing components like seals, bearings, shims, and housing pieces in the reverse order of disassembly. The goal is to carefully disassemble and reassemble the final drive while cleaning parts and applying sealant or anti-seize compound where needed.
Caterpillar Cat 318C, 318C L and 318C LN Excavator (Prefix MDY) Service Repai...f8usejkdmmd8i
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps to disassemble the final drive by removing components like the cover, carrier assembly, ring gears, and housing. It then lists 7 notes and 28 steps to reassemble the final drive by installing components like seals, bearings, shims, and housing pieces in the reverse order of disassembly. The goal is to carefully disassemble and reassemble all components to restore the final drive to working order.
Caterpillar Cat 318C, 318C L and 318C LN Excavator (Prefix MDY) Service Repai...ze6074xunong
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps to disassemble the final drive by removing components like the cover, carrier assembly, ring gears, and housing. It then lists 7 notes and 28 steps to reassemble the final drive by installing components like seals, bearings, shims, and housing pieces in the reverse order of disassembly. The goal is to carefully disassemble and reassemble the final drive while cleaning parts and applying sealant or anti-seize compound where needed.
Caterpillar Cat 318C L Excavator (Prefix MDY) Service Repair Manual (MDY00001...f8usiejdkmdd
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps for disassembly, including removing the final drive sprocket, cover, thrust plate, carrier assemblies, ring gears, and other components. It also lists 14 steps for assembly, including installing bearings, seals, carrier assemblies, ring gears, and other components back into the final drive housing. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 318C, 318C L and 318C LN Excavator (Prefix MDY) Service Repai...tengtui535
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps to disassemble the final drive by removing components like the cover, carrier assembly, ring gears, and housing. It then lists 7 notes and 28 steps to reassemble the final drive by installing components like seals, bearings, shims, and housing pieces in the reverse order of disassembly. The goal is to carefully disassemble and reassemble the final drive while cleaning parts and applying sealant or anti-seize compound where needed.
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps for disassembly, including removing the final drive sprocket, cover, thrust plate, carrier assemblies, ring gears, and other components. It also lists 14 steps for assembly, including installing bearings, seals, carrier assemblies, ring gears, and other components back into the final drive housing. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 318C, 318C L and 318C LN Excavator (Prefix MDY) Service Repai...f8seodkdmdmed3
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps for disassembly, including removing the final drive sprocket, cover, thrust plate, carrier assemblies, ring gears, and other components. It also lists 14 steps for assembly, noting the importance of cleanliness and providing details on installing bearings, shims, seals, and other parts.
Caterpillar Cat 318C, 318C L and 318C LN Excavator (Prefix MDY) Service Repai...yu5676962
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps to disassemble the final drive by removing components like the cover, carrier assembly, ring gears, and housing. It then lists 7 notes and 28 steps to reassemble the final drive by installing components like seals, bearings, shims, and housing pieces in the reverse order of disassembly. The goal is to carefully disassemble and reassemble the final drive while cleaning parts and applying sealant or anti-seize compound where needed.
Caterpillar cat 318 c excavator (prefix mdy) service repair manual (mdy00001 ...f9oseikkdks
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps for disassembly, including removing components like the cover, carrier assembly, ring gears, and seals. It then lists 4 notes about cleanliness and applying lubricants before presenting 29 steps for assembly, reversing the disassembly process and adding components like bearings and seals.
Caterpillar cat 318 c ln excavator (prefix mdy) service repair manual (mdy000...f9oseikkdks
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps for disassembly, including removing the final drive sprocket, cover, thrust plate, carrier assemblies, ring gears, and other components. It also lists 14 steps for assembly, noting the importance of cleanliness and providing details on installing bearings, shims, seals, and other parts.
Caterpillar cat 318 c l excavator (prefix mdy) service repair manual (mdy0000...f9oseikkdks
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps for disassembly, including removing the final drive sprocket, cover, thrust plate, carrier assemblies, ring gears, and other components. It also lists 14 steps for assembly, noting the importance of cleanliness and providing details on installing bearings, shims, seals, and other parts.
Caterpillar cat 318 c l excavator (prefix mdy) service repair manual (mdy0000...fjskekdmjekm
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and main housing. It then lists 7 notes and 28 steps to reassemble the final drive, installing components like seals, bearings, shims, and alignment pins in the reverse order of disassembly.
Caterpillar Cat 318C L Excavator (Prefix MDY) Service Repair Manual (MDY00001...jfkskmmdmdm
This document provides instructions for disassembling and assembling the final drive of a 318C excavator. It lists the required tools and presents 33 steps for disassembly, including removing the final drive sprocket, cover, thrust plate, carrier assemblies, ring gears, and other components. It also lists 14 steps for assembly, noting the importance of cleanliness and providing details on installing bearings, shims, seals, and other parts.
Similar to Caterpillar Cat 318C Excavator (Prefix BTG) Service Repair Manual Instant Download.pdf (20)
JCB 2DX Backhoe Loader Service Repair Manual Instant Download.pdfshanruliu7360
This service manual provides instructions for servicing the backhoe loader model 2DX. It contains 15 sections covering various systems of the machine including the engine, fuel system, cooling system, brakes, steering, hydraulics, and electrical systems. The excerpt focuses on servicing instructions for the engine, including safety procedures, technical specifications, operating instructions, and steps to drain and fill oil, clean parts, check oil levels, and remove and install engine components.
This document provides instructions for removing and reassembling the final drives on an excavator model 330B. The summary is:
1. The final drive is disassembled by removing components like the ring gear, carrier assemblies, planetary gears, and seals.
2. To reassemble, the components are cleaned and seals/bearings installed before refitting parts like the carrier assemblies, ring gear and sprocket.
3. The correct bearing preload is set using a load test and shims are used to set the gear spacing.
This document provides instructions for removing and installing a cylinder head on a 325B L excavator powered by a 3116 engine. The removal procedure involves removing several other components first, like the fuel filter base and injectors. To remove the cylinder head, lifting devices are attached and bolts holding it to the cylinder block are removed. A new cylinder head gasket is installed when reinstalling the cylinder head. Precautions are given to contain fluids and keep parts clean from contaminants.
Caterpillar Cat 325B L Excavator (Prefix 5BS) Service Repair Manual Instant D...shanruliu7360
This document provides instructions for removing and installing a cylinder head on a 325B L excavator powered by a 3116 engine. The removal procedure involves removing several other components first, like the fuel filter base and injectors. To remove the cylinder head, lifting devices are attached and bolts holding it to the cylinder block are removed. When installing, the mating surfaces are cleaned and a new cylinder head gasket is used. Torque values and cleaning contaminants are emphasized.
This document provides instructions for disassembling and assembling the travel motor on 324E L and 324E LN Excavator models. It lists the required tools and parts and provides step-by-step instructions and illustrations for removing and installing components like the motor head, brake piston, rotating assembly, bearings, seals, and more. Precautions are included to properly handle springs and ensure correct positioning of parts.
1. The document provides step-by-step instructions for disassembling and assembling the travel motor of a 324E LN excavator.
2. It details 27 steps to disassemble components like the head, brake piston, rotating assembly, and seals.
3. The 28 steps for assembly instruct to reinstall these components in reverse order and include lubricating mating surfaces.
Caterpillar Cat 324E L Excavator (Prefix TLF) Service Repair Manual Instant D...shanruliu7360
This document provides instructions for disassembling and assembling the travel motor of 324E L and 324E LN Excavator models. It lists the required tools and parts and provides step-by-step instructions and illustrations for removing and installing components like the motor head, brake piston, rotating assembly, bearings, seals, and more. Precautions are included to properly handle springs and ensure correct positioning of parts.
Caterpillar Cat 324E L Excavator (Prefix LDG) Service Repair Manual Instant D...shanruliu7360
1. The document provides step-by-step instructions for disassembling and assembling the travel motor of a 324E LN excavator.
2. It details 27 steps to disassemble components like the head, brake piston, rotating assembly, and seals.
3. The 28 steps for assembly instruct to reinstall these components in reverse order and include lubricating mating surfaces.
Caterpillar Cat 324E L Excavator (Prefix KTE) Service Repair Manual Instant D...shanruliu7360
This document provides instructions for disassembling and assembling the travel motor on 324E and 324E L excavator models. The disassembly process includes removing 28 components from the travel motor housing including the head, brake piston, plates, springs, seals and bearings. The assembly section outlines 28 steps to reinstall these components in reverse order using various tools. Special care must be taken when working with pressurized components or parts under spring force.
Caterpillar Cat 324E L Excavator (Prefix JCZ) Service Repair Manual Instant D...shanruliu7360
This document provides instructions for disassembling and assembling the travel motor on 324E and 324E L excavator models. The disassembly process includes removing 28 components from the travel motor housing including the head, brake piston, plates, springs, seals and bearings. The assembly section outlines putting the travel motor back together in the reverse order and notes the proper installation of components and use of retaining rings, seals and alignment marks. Tools required include retaining ring pliers, drivers, pullers and press equipment.
This document provides instructions for disassembling and assembling the travel motor on 324E and 324E L excavator models. The disassembly process includes removing 28 components from the travel motor housing including the head, brake piston, plates, springs, seals and bearings. The assembly section outlines 28 steps to reinstall these components in reverse order using various tools. Special care must be taken when working with pressurized components or parts under spring force.
This document provides instructions for disassembling and assembling the travel motor on 324E and 324E L excavator models. The disassembly process includes removing 28 components from the travel motor housing including the head, brake piston, plates, springs and seals. The assembly section outlines 29 steps to reinstall these components in reverse order using various tools. Special care must be taken when working with pressurized components or parts under spring force.
This document provides the disassembly and assembly procedures for a 324D LN excavator travel motor. It includes 28 steps for disassembly that remove components like the motor head, seals, plates, discs, bearings, and housing pieces. The 28 steps for assembly install these same components in reverse order and include notes about cleaning, applying lubricant, and ensuring correct part positioning. Tools required are also listed.
The document provides instructions for disassembling the final drive of an excavator. Key steps include:
1. Marking the final drive for alignment and securing it to a repair stand.
2. Removing bolts and lifting devices to extract the cover and internal gears and shafts.
3. Using retaining ring pliers and presses to separate additional components like carriers.
4. Hammering out pins to dismantle planetary gear sets from within the carriers.
This document provides the disassembly and assembly procedures for a travel motor on excavator models 324D L and 324D LN. The disassembly procedure is outlined in 28 steps and includes removing components like the head, seals, springs, plates, and bearings. The assembly procedure is outlined in 15 steps and includes installing components in the reverse order of disassembly and applying thread lock compound to seals. Tools required are also listed.
Caterpillar Cat 324D L Excavator (Prefix TRH) Service Repair Manual Instant D...shanruliu7360
This document provides the disassembly and assembly procedures for a 324D LN excavator travel motor. It includes 28 steps for disassembly that remove components like the motor head, seals, plates, discs, bearings, and housing pieces. The 28 steps for assembly install these same components in reverse order and include notes about cleaning, applying lubricant, and ensuring proper positioning of parts. Tools required are also listed.
Caterpillar Cat 324D L Excavator (Prefix SYM) Service Repair Manual Instant D...shanruliu7360
This document provides disassembly instructions for the final drive of an excavator model 324D L and 324D LN. The 31 step procedure includes removing the final drive housing, cover, gears, carriers, shafts, seals and other components. Special tools are listed that are required, and safety notes about cleanliness and part markings for reassembly are provided. Detailed illustrations accompany each step to show how to disassemble the various parts of the final drive.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...shanruliu7360
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix JJG) Service Repair Manual Instant D...shanruliu7360
The document provides instructions for disassembling a final drive on an excavator. It lists required tools and a multi-step process involving removing bolts, gears, washers, seals, and other components. Key parts that are disassembled include the cover, carrier assemblies, planetary gears, and housings. Cleanliness is emphasized throughout the procedure.
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingLancer Service
Discover why your Porsche 911 headlights might flicker out unexpectedly. From aging bulbs to electrical gremlins and moisture mishaps, we're delving into the reasons behind the blackout. Stay tuned to illuminate the road ahead and ensure your lights shine bright for safer journeys.
Your VW's camshaft position sensor is crucial for engine performance. Signs of failure include engine misfires, difficulty starting, stalling at low speeds, reduced fuel efficiency, and the check engine light. Prompt inspection and replacement can prevent further damage and keep your VW running smoothly.
What Is Recruitment Processing Outsourcing (RPO) Services?Impeccable HR
Impeccable HR provides a wide range of RPO services for your bulk hiring needs within a stipulated period. They meticulously build RPO solutions to improve your recruitment process. RPO services are great for budget-conscious recruiters who want high-quality personnel.
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...Import Motorworks
Learn how to respond when the red temperature light flashes in your VW with this presentation. From checking coolant levels to seeking professional help, follow these steps promptly to prevent engine damage and ensure safety on the road.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Learn why monitoring your Mercedes' Exhaust Back Pressure (EBP) sensor is crucial. Understand its role in engine performance and emission reduction. Discover five warning signs of EBP sensor failure, from loss of power to increased emissions. Take action promptly to avoid costly repairs and maintain your Mercedes' reliability and efficiency.
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 318C EXCAVATOR BTG
Configuration: 318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine
Disassembly and Assembly
318C Excavator Machine Systems
Media Number -RENR6647-04 Publication Date -01/03/2009 Date Updated -05/03/2009
i02275023
Final Drive - Disassemble
SMCS - 4050-015
S/N - BTG1-UP
S/N - DAH1-UP
S/N - FAA1-UP
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 154-6360 Forcing Bolt 2
C 1P-2320 Combination Puller 1
D 138-7576 Link Bracket 2
E
8B-7554 Bearing Cup Puller Gp 1
7S-7786 Puller Leg 2
8B-7560 Step Plate 1
F 246-7504 Socket 1
G
6V-6080 Torque Multiplier Gp 1
9U-5006 Torque Wrench 1
H FT-2993 Reaction Bar 1
1/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. J 154-9316 Metric Thread File 1
K 1P-1864 Retaining Ring Pliers As 1
L 1U-8151 Drill Bit (5 mm) 1
Start By:
A. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove".
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
1. Drain the final drive into a suitable container. Refer to Operation and Maintenance Manual,
"Capacities (Refill)".
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of
the component should be thoroughly cleaned. This will prevent dirt from entering the
internal mechanism.
2. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled in the part's original locations.
Illustration 1 g01139499
2/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. 3. Fasten the final drive to Tooling (A), as shown. If necessary, remove the final drive
sprocket. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
The weight of the final drive is approximately 250 kg (550 lb).
Illustration 2 g01139500
4. Remove drain plugs (1) .
5. Remove bolts (2) .
Illustration 3 g01139501
6. Use Tooling (B) to separate cover (3) from the final drive. Remove cover (3) .
3/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 4 g01139502
7. Remove planetary assembly (4) .
8. Remove O-ring seal (5) .
Illustration 5 g01139503
9. Remove retaining ring (6) (not shown).
10. Use Tooling (C) in order to remove planetary gear (7) .
4/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 6 g01139504
11. Remove retaining ring (8) and bearing (9) .
12. Repeat Steps 9 through 11 for the remaining planetary gears.
Illustration 7 g01139506
13. Remove retaining ring (11) and shaft (10) from carrier (12) .
Illustration 8 g01139507
14. Use Tooling (D) to remove ring gear (13). The weight of ring gear (13) is approximately 32
kg (70 lb).
5/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 9 g01139508
Illustration 10 g01139509
15. Use Tooling (K) in order to remove retaining ring (14) .
16. Use Tooling (E) in order to remove planetary gear (15) .
Illustration 11 g01139510
17. Use a suitable press in order to remove bearings (16) from gear (15) .
6/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Note: If the bearings are removed, the bearings must be replaced with new bearings.
18. Repeat Steps 15 through 17 for the remaining planetary gears.
Illustration 12 g01139511
Illustration 13 g01139513
19. Remove O-ring seal (17) .
20. Straighten the tab on lock washers (18) .
21. Remove bolts (20), lock washers (18), and balls (21) from bearing retainer nut (19) .
7/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 14 g01139514
22. Use Tooling (L) to clean the threads in the housing. Remove approximately 2.0 mm (0.08
inch) of material from the housing. This is done in order to prevent the retaining nut threads
from being damaged when retaining nut (19) is removed.
Illustration 15 g01139515
23. Install Tooling (F) on retainer nut (19). Install bolts (22) through Tooling (F) and into the
drilled holes in retainer nut (19) .
8/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 16 g01139518
24. Install Tooling (F), (G), and (H) (not shown).
Illustration 17 g01139519
25. Use Tooling (D) and a suitable lifting device in order to remove support ring (23). The
weight of support ring (23) is approximately 23 kg (50 lb).
Illustration 18 g01139520
26. Remove bearing cone (24) from support ring (23) .
9/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 19 g01139775
27. Remove Duo-Cone seal (25) from support ring (23) .
Illustration 20 g01139776
28. Remove bearing cups (26) .
Illustration 21 g01139777
29. Remove bearing cone (27) from housing (28) .
10/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Illustration 22 g01139778
30. Remove Duo-Cone seal (29) from housing (28) .
Illustration 23 g01139779
31. Use Tooling (J) in order to repair any damaged threads on housing (28) .
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Nov 28 11:07:54 UTC+0800 2020
11/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 318C EXCAVATOR BTG
Configuration: 318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine
Disassembly and Assembly
318C Excavator Machine Systems
Media Number -RENR6647-04 Publication Date -01/03/2009 Date Updated -05/03/2009
i02275024
Final Drive - Assemble
SMCS - 4050-016
S/N - BTG1-UP
S/N - DAH1-UP
S/N - FAA1-UP
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
D 138-7576 Link Bracket 2
F 246-7504 Socket 1
G
6V-6080 Torque Multiplier Gp 1
9U-5006 Torque Wrench 1
H FT-2993 Reaction Bar 1
K 1P-1864 Retaining Ring Pliers As 1
M 1U-6396 O-Ring Assembly Compound 1
N 1U-6434 Duo-Cone Seal Installer As 1
P 246-7503 Punch 1
1/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement. All disassembly and all assembly procedures
must be performed on a clean work surface and in a clean hydraulic area. Keep cleaned parts
covered and protected at all times.
Note: O-rings, gaskets, and seals should always be replaced. A used O-ring seal may not have the
same sealing properties as a new O-ring seal. Use Tooling (M) during the assembly procedure.
Illustration 1 g01139778
1. Use Tooling (N) to install Duo-Cone seal (29) onto housing (28) .
Illustration 2 g01139777
2. Install bearing cone (27) onto housing (28) .
2/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Illustration 3 g01139776
3. Lower the temperature of bearing cups (26). Install bearing cups (26) into support ring (23) .
Illustration 4 g01139775
4. Use Tooling (N) to install Duo-Cone seal (25) into support ring (23) .
Illustration 5 g01139519
3/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. 5. Use Tooling (D) and a suitable lifting device in order to install support ring (23) onto
housing (28) .
Illustration 6 g01140214
6. Install bearing cone (24), as shown.
Illustration 7 g01140215
7. Install retainer nut (19) .
4/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 8 g01139518
Illustration 9 g01139515
8. Install Tooling (F), (G), and (H) (not shown).
9. Install bolts (22) through Tooling (F) and into retainer nut (19). Tighten retainer nut (19) to
a torque of 3500 N·m (2581 lb ft).
Illustration 10 g01140089
5/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. 10. Use Tooling (P) and a suitable hammer to make a dimple 0.9 mm to 1.25 mm (0.04 to 0.050
inch) deep in housing (28) .
Illustration 11 g01139513
Illustration 12 g01139511
11. Install balls (21), lock washers (18), and bolts (20) .
12. Fold the tab on lock washers (18) over bolts (20), as shown.
13. Install O-ring seal (17) .
6/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 13 g01139510
14. Install bearing (16) into gear (15) .
Illustration 14 g01140222
15. Raise the temperature of gear (15). Install gear (15) onto housing (28) .
Note: Make sure that the chamfered side of the bearing is installed against the carrier.
Illustration 15 g01139508
7/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. 16. Use Tooling (K) to install retaining ring (14) .
17. Repeat Steps 14 through 16 for the other two gears.
Illustration 16 g01139507
18. Use Tooling (D) and a suitable lifting device in order to install ring gear (13) onto housing
(28). The weight of ring gear (13) is approximately 32 kg (70 lb).
Illustration 17 g01139506
19. Install shaft (10) and retaining ring (11) onto carrier (12) .
8/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 18 g01139504
20. Install bearing (9) and retaining ring (8) into the planetary gear.
Illustration 19 g01139889
21. Raise the temperature of planetary gear assembly (7). Install planetary gear assembly (7)
onto carrier (12) and install retaining ring (6) .
22. Repeat Steps 20 through 21 for the remaining two gears.
9/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 20 g01139502
23. Install planetary assembly (4) into the final drive housing.
24. Install O-ring seal (5) .
Illustration 21 g01140103
25. Measure the distance between thrust button (3A) and shaft (10). The distance between shaft
(10) and thrust button (3A) should be 1.0 ± 0.5 mm (0.04 ± 0.02 inch).
10/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 22 g01139910
26. Install cover (3) and bolts (2). Tighten bolts (2) evenly to a torque of 295 ± 50 N·m (218 ±
37 lb ft).
27. Install drain plugs (1). Tighten drain plugs (1) to a torque of 40 ± 5 N·m (30 ± 4 lb ft).
28. Make sure that the final drive is filled with oil before the final drive is put back into service.
Refer to Operation and Maintenance Manual, "Capacities (Refill)".
29. Install the final drive sprocket if the sprocket was removed from the main housing. Refer to
Disassembly and Assembly, "Final Drive Sprocket - Remove and Install" in this manual for
the installation of the final drive sprocket.
30. Remove the final drive from Tooling (A). The weight of the final drive is approximately
250 kg (550 lb).
End By: Install the final drive. Refer to Disassembly and Assembly, "Final Drive - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Nov 28 11:08:54 UTC+0800 2020
11/11
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 318C EXCAVATOR BTG
Configuration: 318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine
Disassembly and Assembly
318C Excavator Machine Systems
Media Number -RENR6647-04 Publication Date -01/03/2009 Date Updated -05/03/2009
i07192988
Final Drive - Install
SMCS - 4050-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
8S-7611 Handle As 2
8S-7615 Pin As 2
283-1495 Stand Assembly 2
B 439-3939 Link Bracket As 2
C - Loctite C5A Copper Anti-Seize -
Table 2
Torque Values of Bolts (3)
Bolt Size Torque
M16 90 ± 15 N·m (66 ± 11 lb ft) and turn an additional angle of 60 ± 5 degrees.
M20 150 ± 25 N·m (111 ± 18 lb ft) and turn an additional angle of 55 ± 5 degrees.
M24 250 ± 25 N·m (184 ± 18 lb ft) and turn an additional angle of 45 ± 5 degrees.
M30 500 ± 50 N·m (369 ± 37 lb ft) and turn an additional angle of 50 ± 5 degrees.
1/3
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Suggest:
If the above button click is invalid.
Please download this document
first, and then click the above link
to download the complete manual.
Thank you so much for reading
26. Illustration 1 g00712767
1. Attach Tooling (B) and a suitable lifting device to final drive (1). The weight of final drive
(1) and the sprocket is approximately 312 kg (688 lb). Position the final drive in the frame.
Illustration 2 g00712737
Note: Make sure that bolt holes (2) for the travel motor are in the correct position.
Note: Make sure that bolts (3), the washers, the motor housing, and the frame are clean and
free of protective coating and oil.
2. Before assembly remove all compounds, oil, and dust from the female threads.
3. Apply Tooling (C) to the threads of bolt (3). Install bolts (3) and the washers in the final
drive. Tighten bolts (3) to a torque specified in Table 2.
4. Refer to Service Magazine, M0083843, "An Improved Bolt Tightening Procedure for the
Critical Joints Is Now Used on All Excavators" for more detail information.
5. Remove Tooling (B) and the suitable lifting device from the final drive.
2/3
318C Excavators BTG00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP35...
2020/11/28
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...