The document provides disassembly and assembly instructions for the final drive of a 312B excavator. It consists of 47 steps to disassemble the final drive and 18 steps to reassemble it. The disassembly process involves removing components like the travel motor, brake assembly, piston, shaft link, disks, seals, planetary gears, carriers, and spindle nut. The assembly requires installing new seals, checking heights with dial indicators, and torquing the spindle nut to 1500 N·m. Precise alignment marks are made on parts to ensure correct reinstallation.
Caterpillar cat 312 b excavator (prefix 9nw) service repair manual (9nw00001 ...fjsekksmemm
This document provides instructions for disassembling and assembling the final drive of a Caterpillar 312B excavator. The disassembly process involves 47 steps to remove components like the brake assembly, planetary gears, seals, and bearings. The assembly follows the reverse order, noting that specific tools are required to reinstall components like the spindle nut which requires 1500 Nm of torque. The summary provides an overview while focusing on the key steps and components involved in the process.
Caterpillar cat 312 b l excavator (prefix 9nw) service repair manual (9nw0000...fjskkksmemm
The document provides instructions for disassembling and assembling the final drive of a 312B excavator. Some key steps include:
1. Removing the final drive and travel motor and disassembling components like springs, pistons, disks, gears, and seals.
2. Using various tools to remove parts like retaining rings, snap rings, nuts, and shafts.
3. Inspecting and repairing parts as needed before assembly.
4. Reassembling components in reverse order and verifying clearances and heights using tools like dial indicators.
The document provides instructions for disassembling and assembling the final drive of a 312B excavator. It lists 47 steps to fully disassemble the final drive including removing gears, shafts, seals, and other components. The assembly procedure is described in reverse order and includes installing new seals, bearings, and torquing fasteners to the specified values. Tools required are listed to complete both the disassembly and assembly processes.
The document provides instructions for disassembling and assembling the final drive of a 312B excavator. It lists 47 steps to fully disassemble the final drive including removing gears, shafts, seals, and other components. The assembly procedure is described in reverse order and requires specific tools including a repair stand, crossblock, push-puller plates, spring compressor plates, internal pliers, link brackets, and torque wrenches. Thorough cleaning is important before disassembly and assembly to ensure proper reinstallation of parts.
This document provides instructions for disassembling and assembling the final drive of a 312B excavator. The disassembly process involves 47 steps to remove components like the brake assembly, planetary gears, spindle nut, and seals. The assembly process reverses the disassembly with 13 steps, including installing new seals and checking spindle nut alignment using indicators. Tools required include a repair stand, pullers, pliers, and torque wrench.
Caterpillar Cat 312C L Excavator (Prefix CBT) Service Repair Manual (CBT00001...tuzhiyou2
The document provides instructions for disassembling and assembling the swing drive of a 312C excavator. It describes removing over 20 individual parts in 16 steps to fully disassemble the older style swing drive. These include removing the sun gear, carrier assembly, planetary shafts, bearings, and housing components. Reassembly is described in 17 steps, covering pressing components back together and installing seals, washers, and fasteners using specific tools. The level of detail provided aims to fully disassemble and reassemble the swing drive system.
The document provides instructions for disassembling and assembling the swing drive of a 312C excavator. It describes removing over 20 individual parts in 16 steps to fully disassemble the older style swing drive. These include removing the sun gear, carrier assembly, planetary shafts, bearings, and housing components. Reassembly is the reverse of disassembly, applying sealant or locking agents as needed and torquing fasteners to specifications. The process is similar for the newer swing drive style, involving removing over 15 parts across 14 illustrated steps.
Caterpillar Cat 312C L Excavator (Prefix CBT) Service Repair Manual (CBT00001...qfyc504378
This document provides instructions for disassembling and assembling the swing drive of a 312C excavator. The disassembly procedure involves using tools to remove over 20 individual parts from the carrier assembly, planetary gears, and housing. The assembly procedure instructs cleaning and applying sealant to parts before installing components in reverse order, such as pressing bearings onto shafts and installing cups into the housing. Proper cleaning and application of sealant to mating surfaces is emphasized to prevent contamination.
Caterpillar cat 312 b excavator (prefix 9nw) service repair manual (9nw00001 ...fjsekksmemm
This document provides instructions for disassembling and assembling the final drive of a Caterpillar 312B excavator. The disassembly process involves 47 steps to remove components like the brake assembly, planetary gears, seals, and bearings. The assembly follows the reverse order, noting that specific tools are required to reinstall components like the spindle nut which requires 1500 Nm of torque. The summary provides an overview while focusing on the key steps and components involved in the process.
Caterpillar cat 312 b l excavator (prefix 9nw) service repair manual (9nw0000...fjskkksmemm
The document provides instructions for disassembling and assembling the final drive of a 312B excavator. Some key steps include:
1. Removing the final drive and travel motor and disassembling components like springs, pistons, disks, gears, and seals.
2. Using various tools to remove parts like retaining rings, snap rings, nuts, and shafts.
3. Inspecting and repairing parts as needed before assembly.
4. Reassembling components in reverse order and verifying clearances and heights using tools like dial indicators.
The document provides instructions for disassembling and assembling the final drive of a 312B excavator. It lists 47 steps to fully disassemble the final drive including removing gears, shafts, seals, and other components. The assembly procedure is described in reverse order and includes installing new seals, bearings, and torquing fasteners to the specified values. Tools required are listed to complete both the disassembly and assembly processes.
The document provides instructions for disassembling and assembling the final drive of a 312B excavator. It lists 47 steps to fully disassemble the final drive including removing gears, shafts, seals, and other components. The assembly procedure is described in reverse order and requires specific tools including a repair stand, crossblock, push-puller plates, spring compressor plates, internal pliers, link brackets, and torque wrenches. Thorough cleaning is important before disassembly and assembly to ensure proper reinstallation of parts.
This document provides instructions for disassembling and assembling the final drive of a 312B excavator. The disassembly process involves 47 steps to remove components like the brake assembly, planetary gears, spindle nut, and seals. The assembly process reverses the disassembly with 13 steps, including installing new seals and checking spindle nut alignment using indicators. Tools required include a repair stand, pullers, pliers, and torque wrench.
Caterpillar Cat 312C L Excavator (Prefix CBT) Service Repair Manual (CBT00001...tuzhiyou2
The document provides instructions for disassembling and assembling the swing drive of a 312C excavator. It describes removing over 20 individual parts in 16 steps to fully disassemble the older style swing drive. These include removing the sun gear, carrier assembly, planetary shafts, bearings, and housing components. Reassembly is described in 17 steps, covering pressing components back together and installing seals, washers, and fasteners using specific tools. The level of detail provided aims to fully disassemble and reassemble the swing drive system.
The document provides instructions for disassembling and assembling the swing drive of a 312C excavator. It describes removing over 20 individual parts in 16 steps to fully disassemble the older style swing drive. These include removing the sun gear, carrier assembly, planetary shafts, bearings, and housing components. Reassembly is the reverse of disassembly, applying sealant or locking agents as needed and torquing fasteners to specifications. The process is similar for the newer swing drive style, involving removing over 15 parts across 14 illustrated steps.
Caterpillar Cat 312C L Excavator (Prefix CBT) Service Repair Manual (CBT00001...qfyc504378
This document provides instructions for disassembling and assembling the swing drive of a 312C excavator. The disassembly procedure involves using tools to remove over 20 individual parts from the carrier assembly, planetary gears, and housing. The assembly procedure instructs cleaning and applying sealant to parts before installing components in reverse order, such as pressing bearings onto shafts and installing cups into the housing. Proper cleaning and application of sealant to mating surfaces is emphasized to prevent contamination.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The disassembly process involves removing 37 individual components in a specific order, including gears, shafts, seals, washers, and housings. The assembly section provides instructions for installing these components in reverse order and notes on cleaning, lubricating, and setting proper bearing preload using shims.
Caterpillar Cat 325D L Excavator (Prefix GBR) Service Repair Manual Instant D...fujkskemdmdm4r
The document provides instructions to disassemble a final drive over 33 steps. Key steps include removing the cover, gears, carrier assemblies, planetary gears, and seals. Cleanliness is important to prevent dirt entering during disassembly. Various tools are required including a transmission repair stand, link brackets, retaining ring pliers, and a slide hammer puller. The total weight of disassembled parts is provided.
Caterpillar Cat 323D L Excavator (Prefix JLG) Service Repair Manual Instant D...fujkskemdmdm4r
1. The document provides instructions for removing and installing inlet and exhaust valve seat inserts for a C6.4 engine. It describes the required tools and steps to remove the old inserts and install new ones.
2. Procedures are provided for removing, disassembling, and assembling the engine oil cooler. Parts are to be kept clean from contaminants to prevent damage.
3. Instructions are given for removing and installing the engine oil relief valve, including replacing the gasket. Cleanliness is important to prevent premature wear.
1) The document provides assembly instructions for a final drive on an excavator.
2) It involves over 40 steps to assemble bearings, seals, gears, carriers, housing and cover components.
3) Special tools and procedures are required to set bearing preloads, install seals, and test for leaks. Proper torque values and sealants are specified.
Caterpillar Cat 345D L Excavator (Prefix BYC) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for removing and installing various components of the rear gear group and flywheel on a C13 engine, which powers a 345D L excavator. The procedures include removing the electric starting motor, flywheel, rear crankshaft seal, and other rear gear components. Detailed illustrations show the components and tools used. Precautions are provided to properly support heavy components and contain fluids.
Caterpillar Cat 336D L Excavator (Prefix MDS) Service Repair Manual Instant D...fujkskemdmdm4r
The document provides instructions for disassembling and assembling a piston pump (hydraulic fan) on a Caterpillar 336D L excavator. The disassembly process involves using tools to remove retaining rings, seals, bearings, pistons and other components. The assembly process specifies cleaning parts and provides 30 steps for installing components in the correct order and ensuring proper operation, including adjusting end play and installing springs and seals.
Caterpillar Cat 345D L Excavator (Prefix RAE) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for disassembling and assembling the travel motor of a 345D L excavator. It lists the required tools and gives step-by-step instructions for removing components like the head, brake piston, rotating group, and seals. The instructions emphasize cleaning parts and ensuring they are reinstalled in their original locations to avoid damage and contamination.
Caterpillar Cat 345D L Excavator (Prefix PBT) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for disassembling and assembling the swing drive of a 345D L excavator. It lists the required tools and gives step-by-step procedures to remove components such as the carrier assembly, ring gear, and bearings. Cleanliness is emphasized during assembly, with seals, O-rings and other parts replaced as needed. The instructions ensure the swing drive is properly disassembled and reassembled.
Caterpillar Cat 345D L Excavator (Prefix RAJ) Service Repair Manual Instant D...fujkskemdmdm4r
The document provides instructions for disassembling and assembling a travel motor. It lists the required tools and gives step-by-step instructions to remove components like the head, plates, seals, and piston assemblies. The disassembly process is described in 31 steps. The assembly section then lists 13 steps to reinstall components in reverse order, making sure to clean parts and apply new seals and lubricants.
This document provides instructions for removing and installing fuel injection pumps and disassembling and assembling fuel ratio control components on a Caterpillar 3406C diesel engine. The steps include using various tools to remove the fuel injection pumps from the pump housing, install new pumps, and check pump installation. Instructions are also provided to disassemble the fuel ratio control housing by removing bolts, springs, diaphragms and other parts and cleaning components before reassembly.
Caterpillar Cat 345C and 345C L Excavator (Prefix BWY) Service Repair Manual ...fujkskemdmdm4r
This document provides instructions for disassembling and assembling a travel motor. The disassembly procedure involves 31 steps to remove parts like the head, plates, disks, seals, pistons, and housing. The assembly procedure reverses the disassembly with 13 steps like installing seals, spacers, pistons, plates and tightening components. Precautions are provided to keep parts clean and in correct orientation to prevent contamination of the hydraulic system.
Caterpillar Cat 345C and 345C L Excavator (Prefix TBA) Service Repair Manual ...fujkskemdmdm4r
This document provides instructions for disassembling and assembling a travel motor. The disassembly procedure involves 31 steps to remove parts like the head, pins, plates, seals, pistons, disks, and bearings. The assembly procedure reverses the disassembly process in 30 steps and provides notes about cleaning parts, applying lubricant, and ensuring proper orientation of components like washers. Tools required are listed for both procedures.
Caterpillar Cat 345D L Excavator (Prefix MLK) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for assembling and installing a travel motor. It outlines 34 steps for assembling components like pistons, seals, plates, and bearings. It also describes using tools to measure clearances and distances during assembly. Finally, it details installing the assembled travel motor using lifting devices and bolts, and connecting hydraulic hose assemblies.
The document provides instructions for removing and installing the drive shaft group with retarder on a 621E, 623E, or 627E tractor. It describes disconnecting hydraulic lines and removing bolts, covers, and housing to access the drive shaft group. Special care must be taken when removing plates and springs from the retarder, as they are under pressure. The process is reversed for installation, reconnecting hydraulic lines and replacing removed components.
Caterpillar Cat 336D2 and 336D2 L Excavator (Prefix WBC) Service Repair Manua...fujkskemdmdm4r
The document provides instructions for removing and installing various engine components, including:
- Valve guides are removed from the cylinder head using a valve guide driver tool. New guides are installed using driver tools until the proper height is reached.
- Valve seat inserts are removed from the cylinder head using extractors. New inserts are installed using a driver tool after being cooled.
- The engine oil filter base, oil filter, and oil cooler are removed. Hoses are disconnected and bolts removed to access these components.
Caterpillar Cat 336D L Excavator (Prefix PTB) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides assembly instructions for a 336D L excavator transmission in 3 sentences:
It lists the required tools and parts, gives step-by-step instructions for assembling the transmission housing, installing planetary gears and carriers, and attaching the transmission cover, and notes that cleanliness is important during assembly and O-rings and seals should always be replaced.
The document provides step-by-step instructions for disassembling and assembling the final drives of a 350L excavator. Key steps include removing the final drives and travel motors, disassembling the internal components of the final drives which include multiple planetary gear sets, carriers, and a sun gear, and then reassembling the final drives in reverse order. Proper cleaning, application of lubricants, and torque specifications are noted throughout to ensure correct reassembly.
Caterpillar Cat 350 and 350 L Excavator (Prefix 8HK) Service Repair Manual In...fujkskemdmdm4r
The document provides instructions for removing and installing various engine components on a 350-A EXCAVATOR 8HK excavator powered by a 3306 engine, including:
- Removing the cylinder head by first removing the fuel injection lines, exhaust manifold, rocker shaft and pushrods, then removing bolts and lifting the cylinder head off the engine block.
- Instructions for disassembling, assembling, and installing the rocker shaft, including removing/installing rocker arms, supports, springs and O-rings.
- Steps for installing a compression brake on the engine, including installing brackets, bolts and connecting wires.
Caterpillar Cat 345D L Excavator (Prefix YEE) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for removing and installing various engine components on a Caterpillar 345D L excavator, including:
- Removing and installing the rear gear group. This involves removing several gears, seals, bolts and bearings. Precise positioning of bearings is required during installation.
- Removing the flywheel using lifting equipment and tools. The flywheel weighs approximately 79 kg.
- Removing and installing the crankshaft rear seal using bolts, sealant and cleaning of parts. Proper inspection of the crankshaft surface is also noted.
Caterpillar Cat 350 and 350 L Excavator (Prefix 3ML) Service Repair Manual In...fujkskemdmdm4r
This document provides instructions for disassembling and assembling the governor of a 350-A excavator powered by a 3306 engine. The disassembly process involves removing 34 parts from the governor including the fuel ratio control, housing, springs, levers, pins, plates, screws, solenoid, shaft and other components. The assembly process describes installing these 34 parts in the reverse order and includes ensuring parts are clean and lubricated before installation. Special tools are required for some steps.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The disassembly process involves removing 37 individual components in a specific order, including gears, shafts, seals, washers, and housings. The assembly section provides instructions for installing these components in reverse order and notes on cleaning, lubricating, and setting proper bearing preload using shims.
Caterpillar Cat 325D L Excavator (Prefix GBR) Service Repair Manual Instant D...fujkskemdmdm4r
The document provides instructions to disassemble a final drive over 33 steps. Key steps include removing the cover, gears, carrier assemblies, planetary gears, and seals. Cleanliness is important to prevent dirt entering during disassembly. Various tools are required including a transmission repair stand, link brackets, retaining ring pliers, and a slide hammer puller. The total weight of disassembled parts is provided.
Caterpillar Cat 323D L Excavator (Prefix JLG) Service Repair Manual Instant D...fujkskemdmdm4r
1. The document provides instructions for removing and installing inlet and exhaust valve seat inserts for a C6.4 engine. It describes the required tools and steps to remove the old inserts and install new ones.
2. Procedures are provided for removing, disassembling, and assembling the engine oil cooler. Parts are to be kept clean from contaminants to prevent damage.
3. Instructions are given for removing and installing the engine oil relief valve, including replacing the gasket. Cleanliness is important to prevent premature wear.
1) The document provides assembly instructions for a final drive on an excavator.
2) It involves over 40 steps to assemble bearings, seals, gears, carriers, housing and cover components.
3) Special tools and procedures are required to set bearing preloads, install seals, and test for leaks. Proper torque values and sealants are specified.
Caterpillar Cat 345D L Excavator (Prefix BYC) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for removing and installing various components of the rear gear group and flywheel on a C13 engine, which powers a 345D L excavator. The procedures include removing the electric starting motor, flywheel, rear crankshaft seal, and other rear gear components. Detailed illustrations show the components and tools used. Precautions are provided to properly support heavy components and contain fluids.
Caterpillar Cat 336D L Excavator (Prefix MDS) Service Repair Manual Instant D...fujkskemdmdm4r
The document provides instructions for disassembling and assembling a piston pump (hydraulic fan) on a Caterpillar 336D L excavator. The disassembly process involves using tools to remove retaining rings, seals, bearings, pistons and other components. The assembly process specifies cleaning parts and provides 30 steps for installing components in the correct order and ensuring proper operation, including adjusting end play and installing springs and seals.
Caterpillar Cat 345D L Excavator (Prefix RAE) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for disassembling and assembling the travel motor of a 345D L excavator. It lists the required tools and gives step-by-step instructions for removing components like the head, brake piston, rotating group, and seals. The instructions emphasize cleaning parts and ensuring they are reinstalled in their original locations to avoid damage and contamination.
Caterpillar Cat 345D L Excavator (Prefix PBT) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for disassembling and assembling the swing drive of a 345D L excavator. It lists the required tools and gives step-by-step procedures to remove components such as the carrier assembly, ring gear, and bearings. Cleanliness is emphasized during assembly, with seals, O-rings and other parts replaced as needed. The instructions ensure the swing drive is properly disassembled and reassembled.
Caterpillar Cat 345D L Excavator (Prefix RAJ) Service Repair Manual Instant D...fujkskemdmdm4r
The document provides instructions for disassembling and assembling a travel motor. It lists the required tools and gives step-by-step instructions to remove components like the head, plates, seals, and piston assemblies. The disassembly process is described in 31 steps. The assembly section then lists 13 steps to reinstall components in reverse order, making sure to clean parts and apply new seals and lubricants.
This document provides instructions for removing and installing fuel injection pumps and disassembling and assembling fuel ratio control components on a Caterpillar 3406C diesel engine. The steps include using various tools to remove the fuel injection pumps from the pump housing, install new pumps, and check pump installation. Instructions are also provided to disassemble the fuel ratio control housing by removing bolts, springs, diaphragms and other parts and cleaning components before reassembly.
Caterpillar Cat 345C and 345C L Excavator (Prefix BWY) Service Repair Manual ...fujkskemdmdm4r
This document provides instructions for disassembling and assembling a travel motor. The disassembly procedure involves 31 steps to remove parts like the head, plates, disks, seals, pistons, and housing. The assembly procedure reverses the disassembly with 13 steps like installing seals, spacers, pistons, plates and tightening components. Precautions are provided to keep parts clean and in correct orientation to prevent contamination of the hydraulic system.
Caterpillar Cat 345C and 345C L Excavator (Prefix TBA) Service Repair Manual ...fujkskemdmdm4r
This document provides instructions for disassembling and assembling a travel motor. The disassembly procedure involves 31 steps to remove parts like the head, pins, plates, seals, pistons, disks, and bearings. The assembly procedure reverses the disassembly process in 30 steps and provides notes about cleaning parts, applying lubricant, and ensuring proper orientation of components like washers. Tools required are listed for both procedures.
Caterpillar Cat 345D L Excavator (Prefix MLK) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for assembling and installing a travel motor. It outlines 34 steps for assembling components like pistons, seals, plates, and bearings. It also describes using tools to measure clearances and distances during assembly. Finally, it details installing the assembled travel motor using lifting devices and bolts, and connecting hydraulic hose assemblies.
The document provides instructions for removing and installing the drive shaft group with retarder on a 621E, 623E, or 627E tractor. It describes disconnecting hydraulic lines and removing bolts, covers, and housing to access the drive shaft group. Special care must be taken when removing plates and springs from the retarder, as they are under pressure. The process is reversed for installation, reconnecting hydraulic lines and replacing removed components.
Caterpillar Cat 336D2 and 336D2 L Excavator (Prefix WBC) Service Repair Manua...fujkskemdmdm4r
The document provides instructions for removing and installing various engine components, including:
- Valve guides are removed from the cylinder head using a valve guide driver tool. New guides are installed using driver tools until the proper height is reached.
- Valve seat inserts are removed from the cylinder head using extractors. New inserts are installed using a driver tool after being cooled.
- The engine oil filter base, oil filter, and oil cooler are removed. Hoses are disconnected and bolts removed to access these components.
Caterpillar Cat 336D L Excavator (Prefix PTB) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides assembly instructions for a 336D L excavator transmission in 3 sentences:
It lists the required tools and parts, gives step-by-step instructions for assembling the transmission housing, installing planetary gears and carriers, and attaching the transmission cover, and notes that cleanliness is important during assembly and O-rings and seals should always be replaced.
The document provides step-by-step instructions for disassembling and assembling the final drives of a 350L excavator. Key steps include removing the final drives and travel motors, disassembling the internal components of the final drives which include multiple planetary gear sets, carriers, and a sun gear, and then reassembling the final drives in reverse order. Proper cleaning, application of lubricants, and torque specifications are noted throughout to ensure correct reassembly.
Caterpillar Cat 350 and 350 L Excavator (Prefix 8HK) Service Repair Manual In...fujkskemdmdm4r
The document provides instructions for removing and installing various engine components on a 350-A EXCAVATOR 8HK excavator powered by a 3306 engine, including:
- Removing the cylinder head by first removing the fuel injection lines, exhaust manifold, rocker shaft and pushrods, then removing bolts and lifting the cylinder head off the engine block.
- Instructions for disassembling, assembling, and installing the rocker shaft, including removing/installing rocker arms, supports, springs and O-rings.
- Steps for installing a compression brake on the engine, including installing brackets, bolts and connecting wires.
Caterpillar Cat 345D L Excavator (Prefix YEE) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides instructions for removing and installing various engine components on a Caterpillar 345D L excavator, including:
- Removing and installing the rear gear group. This involves removing several gears, seals, bolts and bearings. Precise positioning of bearings is required during installation.
- Removing the flywheel using lifting equipment and tools. The flywheel weighs approximately 79 kg.
- Removing and installing the crankshaft rear seal using bolts, sealant and cleaning of parts. Proper inspection of the crankshaft surface is also noted.
Caterpillar Cat 350 and 350 L Excavator (Prefix 3ML) Service Repair Manual In...fujkskemdmdm4r
This document provides instructions for disassembling and assembling the governor of a 350-A excavator powered by a 3306 engine. The disassembly process involves removing 34 parts from the governor including the fuel ratio control, housing, springs, levers, pins, plates, screws, solenoid, shaft and other components. The assembly process describes installing these 34 parts in the reverse order and includes ensuring parts are clean and lubricated before installation. Special tools are required for some steps.
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinForth
Brandt Hertenstein, Program Manager of the Electrification Coalition gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Understanding Catalytic Converter Theft:
What is a Catalytic Converter?: Learn about the function of catalytic converters in vehicles and why they are targeted by thieves.
Why are They Stolen?: Discover the valuable metals inside catalytic converters (such as platinum, palladium, and rhodium) that make them attractive to criminals.
Steps to Prevent Catalytic Converter Theft:
Parking Strategies: Tips on where and how to park your vehicle to reduce the risk of theft, such as parking in well-lit areas or secure garages.
Protective Devices: Overview of various anti-theft devices available, including catalytic converter locks, shields, and alarms.
Etching and Marking: The benefits of etching your vehicle’s VIN on the catalytic converter or using a catalytic converter marking kit to make it traceable and less appealing to thieves.
Surveillance and Monitoring: Recommendations for using security cameras and motion-sensor lights to deter thieves.
Statistics and Insights:
Theft Rates by Borough: Analysis of data to determine which borough in NYC experiences the highest rate of catalytic converter thefts.
Recent Trends: Current trends and patterns in catalytic converter thefts to help you stay aware of emerging hotspots and tactics used by thieves.
Benefits of This Presentation:
Awareness: Increase your awareness about catalytic converter theft and its impact on vehicle owners.
Practical Tips: Gain actionable insights and tips to effectively prevent catalytic converter theft.
Local Insights: Understand the specific risks in different NYC boroughs, helping you take targeted preventive measures.
This presentation aims to equip you with the knowledge and tools needed to protect your vehicle from catalytic converter theft, ensuring you are prepared and proactive in safeguarding your property.
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinForth
Cat Plein, Development & Communications Director of Forth, gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitForth
Vanessa Warheit, Co-Founder of EV Charging for All, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Charging Fueling & Infrastructure (CFI) Program by Kevin MillerForth
Kevin Miller, Senior Advisor, Business Models of the Joint Office of Energy and Transportation gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
EV Charging at MFH Properties by Whitaker JamiesonForth
Whitaker Jamieson, Senior Specialist at Forth, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Dahua provides a comprehensive guide on how to install their security camera systems. Learn about the different types of cameras and system components, as well as the installation process.
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 312B EXCAVATOR 9NW
Configuration: 312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engine
Disassembly and Assembly
312B Excavator Machine Systems
Media Number -RENR1113-01 Publication Date -01/06/1999 Date Updated -29/11/2001
i02061750
Final Drive - Disassemble
SMCS - 4050-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Repair Stand 1
B
9S-7338 Crossblock 1
3H-0465 Push-Puller Plate 2
154-9326 Spring Compressor Plate 1
154-9323 Spacer 2
C 5P-4758 Internal Pliers 1
D 138-7575 Link Bracket 2
E 1U-5839 Puller 1
F
199-4925
Wrench
(1) 1
165-1670 Wrench 1
165-1671 Reaction Shaft 1
132-8119 Torque Wrench 1
132-8223 110 V Power Pack 1
132-8231 220 V Power Pack 1
1/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. G 154-9315 Thread File 1
( 1 )
Use this wrench for the newer shaft nut that has four slots.
Start By:
A. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove" in this
manual.
1. Thoroughly clean the outside of the travel motor and the final drive prior to disassembly.
2. Put an alignment mark across the sections of the travel motor and the final drive for
assembly purposes. The parts must be reinstalled in the original locations of the parts.
Illustration 1 g00526895
3. Fasten the travel motor and the final drive to Tooling (A) with the travel motor in the up
position. Remove drain plugs (1) in order to drain the oil. The capacity of the final drive is
2.5 L (.66 US gal).
Illustration 2 g00526930
4. Remove the bolts (2) and use the lifting strap in order to remove the travel motor from the
final drive.
2/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 3 g00527283
5. Use Tooling (B) to compress the brake assembly and remove the retaining ring.
Illustration 4 g00527299
6. Remove spacer ring (3) and twenty springs (4) .
3/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 5 g00527333
Typical example
7. Apply a suitable amount of air pressure in the oil passage in order to partially remove piston
(5) .
Illustration 6 g00527337
8. Remove piston (5) .
Illustration 7 g00527353
9. Remove shaft link (6) .
4/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 8 g00527355
10. Remove brake disks (7) .
Illustration 9 g00527404
11. Remove supporting ring (8) .
Illustration 10 g00527398
12. Use Tooling (C) to remove snap ring (9) .
5/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. 13. Remove seal (10) from spindle (11) .
Illustration 11 g00527410
Typical example
14. Remove seals (12) from piston (5) .
15. Use lifting straps and Tooling (D) in order to lift the final drive off Tooling (A) .
16. Carefully rotate the final drive so that the planetary cover is up.
17. Fasten the final drive to Tooling (A) .
Illustration 12 g00527492
18. Remove twelve bolts (13) that secure cover (14) to the final drive. Remove the O-ring seal
from the cover.
6/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 13 g00527496
19. Remove sun gear shaft (15) from the final drive.
Illustration 14 g00527500
20. Remove the first stage of planetary gear assembly (16) from the final drive.
Illustration 15 g00527501
7/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. 21. Use snap ring pliers to remove snap ring (17) that secures planetary gear (18) to the
planetary carrier.
Illustration 16 g00527505
22. Use Tooling (E) in order to remove planetary gear (18). Remove the disk from planetary
carrier (19) .
23. Repeat Step 21 and Step 22.
Illustration 17 g00527583
24. Use snap ring pliers to remove snap ring (20) from sun gear (21) .
8/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 18 g00527597
25. Remove sun gear (21) from planetary carrier (19) .
Illustration 19 g00527606
26. Remove the second stage of planetary gear assembly (22) from the final drive.
Illustration 20 g00527613
27. Use snap ring pliers to remove snap ring (23) from planetary gear (24) .
9/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 21 g00527622
28. Use Tooling (E) to remove planetary gear (24). Remove the disk from planetary carrier
(25) .
29. Repeat Steps 27 and 28 for the other two planetary gears and disks.
Illustration 22 g00527625
30. Use snap ring pliers to remove snap ring (26) from sun gear (27) .
10/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 En...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Illustration 23 g00527629
31. Remove sun gear (27) from planetary carrier (25) .
Illustration 24 g00527656
32. Use snap ring pliers to remove snap ring (28) that secures planetary gear (29) to spindle
(30) .
33. Use Tooling (E) to remove planetary gear (29) from spindle (30) .
34. Repeat Steps 32 and 33 for the other four planetary gears.
11/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 En...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 25 g00527840
Illustration 26 g00528079
35. Remove bolt (31), tab (32) and ball (33) from spindle nut (34).
Note: Use the access hole in ring gear (35) to access bolt (31). Ring gear (35) can be rotated
in order to align the access hole with bolt (31) .
12/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 En...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 27 g00530820
Note: The procedure for drilling will create a small amount of steel chips. Do not allow the
chips to fall into bearing kit (35) .
36. Use a 4.76 mm (.188 inch) drill bit (41) to remove the damaged portion of threads which
was caused by ball (33). This will require drilling into spindle (30) to a depth of
approximately 1.5 mm (.06 inch).
37. Clear the steel chips from the hole. Do not allow the chips to fall into bearing kit (35) .
38. Repeat Steps 35 through 37 in order to remove the remaining bolt assembly.
Illustration 28 g00527917
39. Install the reaction shaft from Tooling (F) on spindle (30), as shown.
13/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 En...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Illustration 29 g00527930
40. Install the socket from Tooling (F) over spindle nut (34), as shown.
41. Use Tooling (F) to remove spindle nut (34). The torque that is required to remove the
spindle nut is approximately 1500 N·m (1100 lb ft).
Illustration 30 g00528669
42. Remove bearing kit (35) from spindle (30) .
Note: It may be necessary to remove bearing kit (35) by pulling bearing kit (35) with ring
gear (36) .
14/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 En...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 31 g00528772
43. Remove ring gear (36) from spindle (30) .
Illustration 32 g00528781
44. Remove one half of Duo-cone seal kit (37) from ring gear (36) .
Illustration 33 g00528793
45. Remove bearing kit (38) from ring gear (36) .
15/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 En...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 34 g00528800
46. Remove the second half of Duo-cone seal kit (37) from spindle (30) .
Illustration 35 g00528814
Typical example
47. Use Tooling (G) to shape spindle threads (39), if the threads appear damaged.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Jun 26 20:01:33 UTC+0800 2020
16/16
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 En...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 312B EXCAVATOR 9NW
Configuration: 312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engine
Disassembly and Assembly
312B Excavator Machine Systems
Media Number -RENR1113-01 Publication Date -01/06/1999 Date Updated -29/11/2001
i02061751
Final Drive - Assemble
SMCS - 4050-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
(A) 1P-2420 Repair Stand 1
(B)
9S-7338 Crossblock 1
3H-0465 Push-Puller Plate 2
154-9326 Spring Compressor Plate 1
154-9323 Spacer 2
(C) 5P-4758 Internal Pliers 1
(D) 138-7575 Link Bracket 2
(E) 161-4350 Duo-cone Seal Kit 1
(F)
199-4925
Socket
(1) 1
165-1670 Socket 1
165-1671 Reaction Shaft 1
132-8119 Torque Wrench 1
132-8223 110 V Power Pack 1
132-8231 220 V Power Pack 1
1/18
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. (G)
6V-3075 Dial Indicator 1
6V-6167 Contact Point 1
3P-1565 Collet Clamp 1
165-8958 Plastic Base for Indicator 1
(H) 165-3977 Punch 1
(J)
155-1709 Hydraulic Test Adapter 1
3J-1907 O-ring Seal 1
6V-3965 Nipple Assembly 1
6V-4143 Coupler Assembly 2
6V-3014 Hose Assembly 1
8T-0855 Pressure Gauge 1
1U-5230 Hand Pump 1
5S-2403 Fitting 1
1S-8937 Valve 1
2D-7325 Tee 1
6V-3966 Nipple Assembly 1
( 1 )
Use this wrench for the newer shaft nut that has four slots.
Note: Make sure that all of the parts of the final drive and the travel motor are thoroughly clean
and free of dirt and debris prior to assembly. Replace all O-ring seals that are used in the final
drive with new O-ring seals. Reassemble the final drive and the travel motor on Tooling (A) .
Illustration 1 g00581889
2/18
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 2 g00528800
1. Use Tooling (E) to install one half of Duo-cone seal kit (37) into spindle (30). Refer to
Disassembly and Assembly, "Duo-Cone Conventional Seals - Install" in this manual.
2. Put a mark (40) on spindle (30). The mark indicates the position of the original balls (33).
The mark is used in Step 18.
Illustration 3 g00581916
3. Use Tooling (G) to check assembled height (X) in at least four places at 90 degree intervals.
The difference in height around the ring must not be more than 1.0 mm (.04 inch).
3/18
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 4 g00528793
4. Install bearing kit (38) into ring gear (36) .
Note: Check the condition of the bearing kit. If the bearing kit is worn or damaged, use a
new bearing kit.
Illustration 5 g00528781
5. Use Tooling (E) to install the second one half of Duo-cone seal kit (37) into ring gear (36).
Refer to Disassembly and Assembly, "Duo-Cone Conventional Seals - Install" in this
manual.
6. Repeat step 3.
4/18
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 6 g00528772
7. Install spindle (30) onto Tooling (A) .
Note: Turn over ring gear (36) very carefully. Make sure that Duo-cone seal kit (37) is not
dislodged.
8. Install ring gear (36) onto spindle (30) .
Illustration 7 g00530753
9. Install bearing kit (35) onto spindle (30) .
5/18
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 8 g00527917
10. Install the reaction shaft from Tooling (F) on spindle (30), as shown.
Illustration 9 g00527930
Note: Lubricate the threads with oil before installation. Use caution. The threads are easy to
cross thread.
11. Install spindle nut (34) onto spindle (30) .
12. Install the socket from Tooling (F) on spindle nut (34) .
Note: Rotate the spindle in one direction during the tightening procedure in order to seat the
bearings properly.
13. Use Tooling (F) to tighten spindle nut (34) to a torque of 1500 N·m (1100 lb ft).
14. Mark spindle nut (34) in relation to spindle (30) .
Note: Do not confuse this mark with mark (40) for the location of balls (33) .
15. Tighten spindle nut (34) to a torque of 2500 N·m (1840 lb ft).
16. Loosen spindle nut (34) so that the mark on the spindle nut is 5 to 10 degrees from the mark
on the spindle.
6/18
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. 17. Tighten spindle nut (34) to a torque of 1500 N·m (1100 lb ft).
Illustration 10 g00530793
18. Measure the distance from the new bolt (31) to mark (40). The distance must be at least 10
mm (.4 inch). If the distance is less than 10 mm (.4 inch), use a new spindle nut (34) .
Illustration 11 g00581917
19. Use Tooling (H) to peen the threads of spindle (30) .
7/18
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Illustration 12 g00528079
20. Install bolt (31), tab (32) and ball (33) into spindle nut (34). Tighten bolt (31) to a torque of
8.5 N·m (6 lb ft).
Note: Use the access hole in ring gear (35) to install bolt (31). Ring gear (35) can be rotated
in order to align the access hole with bolt (31) .
Note: Bend the long tab on tab (32) over the "ear" of ring gear (35). Bend the short tab of
tab (32) over bolt (31) .
21. Repeat step 19 and step 20 in order to install the remaining bolt assembly.
8/18
312B & 312B L Excavators 9NW00001-UP (MACHINE) POWERED BY 3054 Engin...
2020/6/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. Suggest:
If the above button click is invalid.
Please download this document
first, and then click the above link
to download the complete manual.
Thank you so much for reading
27. Illustration 13 g00527656
22. If necessary, heat gears (29) to 135 °C (275 °F). Install gears (29) on spindle (30). Use snap
ring pliers to install snap ring (28) that secures planetary gear (29) to spindle (30) .
Illustration 14 g00527629
23. Install sun gear (27) into planetary carrier (25) .
Illustration 15 g00527625
24. Use snap ring pliers to install snap ring (26) on sun gear (27) .