CASE STUDY – SAFELY WORKING WITH SYLENTMITE® 
 
Concrete and Rock Solutions worked with UK company AWCS Holdings Ltd to excavate a lift pit safely 
within a building so as not to disturb the existing works and structure.  
 
AWCS Holdings Ltd is a small specialist civil engineering company based in Launceston, Cornwall. They 
carry out sheet piling works, installation of temporary works and civil engineering /building works that 
usually different to the norm and this work takes them all over the country working for many of the 
main and regional contractors.  
 
All  their  operatives  are  fully  trained  and  multi‐skilled,  and  are  used  to  dealing  and  adapting  to  the 
unusual or unexpected. 
 
AWCS were contracted by BAM Construction Ltd to undertake the excavation of a lift pit (1600mm wide 
by 2000mm long and 1100mm deep) within an existing building which forms part of the new University 
Technical College (UTC) Plymouth.  
 
Alastair Hegarty, Construction Director of AWCS Holdings Ltd explains, “There was an existing lift shaft 
but the pit itself needed to be deepened to accommodate the new lift. Preliminary investigations led 
the contractor to believe the existing “ground” consisted of 1200mm of mass concrete and the contract 
was let on this basis.”  
 
After looking at all the possibilities AWCS met with CRS and Colin Gaunt explained and demonstrated 
the unique qualities of Sylentmite® and why it was the best option for this project.  
 
Colin Gaunt, Sales Director of CRS, describes how Sylentmite® would work in this situation, “Sylentmite® 
fitted the profile for its qualities of noise reduction, limited space, no heavy equipment needed and its 
green  ecological  capability.  Additionally,  there  would  be  no  contamination  with  the  waste  as 
Sylentmite® is pH neutral when used, as a result there were no additional costs for waste disposal.”  
 
From  this,  AWCS  proposed  using  Sylentmite®  to  break  this  concrete  out minimising  the  amount  of 
noise, dust and disturbance inside a building that was nearing completion. 
 
Their initial proposal was to stitch drill around the perimeter of the lift shaft  to create a movement 
zone for the concrete to expand into and then drill 40mm holes in a grid at 200mm centres to pour the 
Sylentmite® into. 
 
However on commencement of drilling it soon became clear that the existing mass concrete was not as 
initially  expected.  Further  test  drilling  revealed  a  300  thick  slab,  on  top  of  a  bitumen  based 
waterproofing membrane on top of a 500mm thick heavily reinforced concrete slab. A re‐ appraisal of 
their methods was required as the rock drill struggled to penetrate the bitumen layer and was unable to 
touch the reinforcement bars.  
 
Their chosen method, therefore, was to stitch drill around the perimeter of the lift shaft as previously 
but this time they used a 100mm diamond core drill bit, which allowed them to drill and remove the 
bitumen layer and also allowed them to drill straight through the reinforcement. 
 
A grid of 42mm holes were then drilled using the diamond drilling rig again on the top 300mm of the 
slab. Sylentmite® Pour ‘N’ Crack was then poured into the slab and left overnight. The slab cracked and 
split as predicted into manageable lumps, which could be removed by hand from the lift pit area.  
Photograph  02* shows  the  lumps  of  concrete  after  removal,  as  well  as  the  core  bits  from  the 
perimeter of the lift shaft. 
 
After  the  area  was  cleaned  up  the  grid  of  42  mm  hole  was  repeated  again  through  the  reinforced 
concrete slab. Sylentmite® was poured into these holes and left overnight.  The following morning the 
concrete was shattered around the reinforcement bars. The small lumps of concrete were removed by 
hand and small hand breakers were used merely to prise lumps away from each other. The whole slab 
was removed in a couple of hours. Photograph 17* shows the broken out lumps of concrete with the  
reinforcement bar removed lying behind. 
 
Hegarty  concluded,  “The  use  of  Sylentmite®  exceeded  all  expectations  from  both  ourselves  and  the 
main  contractor  and  allowed  us  to  remove  both  mass  and  heavily  reinforced  concrete  quickly  and 
efficiently. We had no health and safety concerns either from the product itself but also with regards to 
vibration, noise, dust, fumes etc inside a building. It was a very successful product to use.”  
 
www.awcsholdings.co.uk 
 

More Related Content

Similar to CASE STUDY - working with sylentmite 230713

Marine_Brochure_For_Web
Marine_Brochure_For_WebMarine_Brochure_For_Web
Marine_Brochure_For_Web
Mike Bisland
 
CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul Magee
Paul Magee
 
MCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdfMCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdf
KAWMAW
 
profix portfolio 2016
profix portfolio 2016profix portfolio 2016
profix portfolio 2016
Phil Syers
 
CRS - Case Study Holtshill Accord Group 020914
CRS - Case Study Holtshill Accord Group 020914CRS - Case Study Holtshill Accord Group 020914
CRS - Case Study Holtshill Accord Group 020914
Colin Gaunt
 
Callum Black Portfolio_V3_180716
Callum Black Portfolio_V3_180716Callum Black Portfolio_V3_180716
Callum Black Portfolio_V3_180716
callum black
 
Rupert Davison latest CV
Rupert Davison latest CVRupert Davison latest CV
Rupert Davison latest CV
Rupert Davison
 
number 1. pro cv
number 1. pro cvnumber 1. pro cv
number 1. pro cv
Dave Chase
 

Similar to CASE STUDY - working with sylentmite 230713 (20)

Burj al arab
Burj al arabBurj al arab
Burj al arab
 
Marine_Brochure_For_Web
Marine_Brochure_For_WebMarine_Brochure_For_Web
Marine_Brochure_For_Web
 
Project Management - Marina bay Sands
Project Management - Marina bay SandsProject Management - Marina bay Sands
Project Management - Marina bay Sands
 
CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul Magee
 
McConnell Dowell Mastermyne - Made to Mine
McConnell Dowell Mastermyne - Made to MineMcConnell Dowell Mastermyne - Made to Mine
McConnell Dowell Mastermyne - Made to Mine
 
MCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdfMCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdf
 
Bothar brochure
Bothar brochureBothar brochure
Bothar brochure
 
Asbestos Removal London Case Study – Residential
Asbestos Removal London Case Study – ResidentialAsbestos Removal London Case Study – Residential
Asbestos Removal London Case Study – Residential
 
profix portfolio 2016
profix portfolio 2016profix portfolio 2016
profix portfolio 2016
 
Concrete Lego Block Ideas
Concrete Lego Block IdeasConcrete Lego Block Ideas
Concrete Lego Block Ideas
 
Newcastle Construction Division Newsletter Issue No.9
Newcastle Construction Division Newsletter Issue No.9Newcastle Construction Division Newsletter Issue No.9
Newcastle Construction Division Newsletter Issue No.9
 
Asbestos Removal London Case Study – Healthcare
Asbestos Removal London Case Study – HealthcareAsbestos Removal London Case Study – Healthcare
Asbestos Removal London Case Study – Healthcare
 
Abergeldie Brochure
Abergeldie BrochureAbergeldie Brochure
Abergeldie Brochure
 
CRS - Case Study Holtshill Accord Group 020914
CRS - Case Study Holtshill Accord Group 020914CRS - Case Study Holtshill Accord Group 020914
CRS - Case Study Holtshill Accord Group 020914
 
Callum Black Portfolio_V3_180716
Callum Black Portfolio_V3_180716Callum Black Portfolio_V3_180716
Callum Black Portfolio_V3_180716
 
TRE July 2016 - Stirling
TRE July 2016 - StirlingTRE July 2016 - Stirling
TRE July 2016 - Stirling
 
Rupert Davison latest CV
Rupert Davison latest CVRupert Davison latest CV
Rupert Davison latest CV
 
Anstruther Pier
Anstruther PierAnstruther Pier
Anstruther Pier
 
number 1. pro cv
number 1. pro cvnumber 1. pro cv
number 1. pro cv
 
Innovative solutions for complex geotechnical and tunnelling projects, april ...
Innovative solutions for complex geotechnical and tunnelling projects, april ...Innovative solutions for complex geotechnical and tunnelling projects, april ...
Innovative solutions for complex geotechnical and tunnelling projects, april ...
 

CASE STUDY - working with sylentmite 230713

  • 1.   CASE STUDY – SAFELY WORKING WITH SYLENTMITE®    Concrete and Rock Solutions worked with UK company AWCS Holdings Ltd to excavate a lift pit safely  within a building so as not to disturb the existing works and structure.     AWCS Holdings Ltd is a small specialist civil engineering company based in Launceston, Cornwall. They  carry out sheet piling works, installation of temporary works and civil engineering /building works that  usually different to the norm and this work takes them all over the country working for many of the  main and regional contractors.     All  their  operatives  are  fully  trained  and  multi‐skilled,  and  are  used  to  dealing  and  adapting  to  the  unusual or unexpected.    AWCS were contracted by BAM Construction Ltd to undertake the excavation of a lift pit (1600mm wide  by 2000mm long and 1100mm deep) within an existing building which forms part of the new University  Technical College (UTC) Plymouth.     Alastair Hegarty, Construction Director of AWCS Holdings Ltd explains, “There was an existing lift shaft  but the pit itself needed to be deepened to accommodate the new lift. Preliminary investigations led  the contractor to believe the existing “ground” consisted of 1200mm of mass concrete and the contract  was let on this basis.”     After looking at all the possibilities AWCS met with CRS and Colin Gaunt explained and demonstrated  the unique qualities of Sylentmite® and why it was the best option for this project.     Colin Gaunt, Sales Director of CRS, describes how Sylentmite® would work in this situation, “Sylentmite®  fitted the profile for its qualities of noise reduction, limited space, no heavy equipment needed and its  green  ecological  capability.  Additionally,  there  would  be  no  contamination  with  the  waste  as  Sylentmite® is pH neutral when used, as a result there were no additional costs for waste disposal.”     From  this,  AWCS  proposed  using  Sylentmite®  to  break  this  concrete  out minimising  the  amount  of  noise, dust and disturbance inside a building that was nearing completion.    Their initial proposal was to stitch drill around the perimeter of the lift shaft  to create a movement  zone for the concrete to expand into and then drill 40mm holes in a grid at 200mm centres to pour the  Sylentmite® into.    However on commencement of drilling it soon became clear that the existing mass concrete was not as  initially  expected.  Further  test  drilling  revealed  a  300  thick  slab,  on  top  of  a  bitumen  based  waterproofing membrane on top of a 500mm thick heavily reinforced concrete slab. A re‐ appraisal of  their methods was required as the rock drill struggled to penetrate the bitumen layer and was unable to  touch the reinforcement bars.     Their chosen method, therefore, was to stitch drill around the perimeter of the lift shaft as previously  but this time they used a 100mm diamond core drill bit, which allowed them to drill and remove the  bitumen layer and also allowed them to drill straight through the reinforcement.    A grid of 42mm holes were then drilled using the diamond drilling rig again on the top 300mm of the  slab. Sylentmite® Pour ‘N’ Crack was then poured into the slab and left overnight. The slab cracked and  split as predicted into manageable lumps, which could be removed by hand from the lift pit area.  
  • 2. Photograph  02* shows  the  lumps  of  concrete  after  removal,  as  well  as  the  core  bits  from  the  perimeter of the lift shaft.    After  the  area  was  cleaned  up  the  grid  of  42  mm  hole  was  repeated  again  through  the  reinforced  concrete slab. Sylentmite® was poured into these holes and left overnight.  The following morning the  concrete was shattered around the reinforcement bars. The small lumps of concrete were removed by  hand and small hand breakers were used merely to prise lumps away from each other. The whole slab  was removed in a couple of hours. Photograph 17* shows the broken out lumps of concrete with the   reinforcement bar removed lying behind.    Hegarty  concluded,  “The  use  of  Sylentmite®  exceeded  all  expectations  from  both  ourselves  and  the  main  contractor  and  allowed  us  to  remove  both  mass  and  heavily  reinforced  concrete  quickly  and  efficiently. We had no health and safety concerns either from the product itself but also with regards to  vibration, noise, dust, fumes etc inside a building. It was a very successful product to use.”     www.awcsholdings.co.uk