Syntel's Pune campus is spread over 40 acres and houses more than 9000 employees. To provide cool the 350,000 square feet area of the current phase of the Pune campus, it was estimated that a capacity of 100,000 CFM would be required. Cooling this huge amount of fresh air with a conventional HVAC with DX or CWC would incur heavy operating expenses. HMX helped Syntel resolve this dilemma through heat recovery by capturing return air and using it to pre-cool fresh air.