The document provides steps for checking lighting equipment, including verifying that 10 CCT fresnel lights are present along with barn doors and gel frames installed correctly in each light. It also involves checking that 10 plugs are plugged into the dimmer pack to match the 10 lights. Further steps include inspecting individual lights that fail to turn on by checking internal components and replacing bulbs carefully. The final step is to check that the grand master switch is turned on, as the lights will not work if this main control is off.