A sprinkler head activated in the roof of a school in Bridgend, Wales, saturating approximately 20 square meters of insulation and 350 square meters of the ground floor. Rainbow Restoration was called in to remove the wet insulation and damaged ceiling tiles to prevent further damage. They lifted and disposed of all soaked carpets and flooring before installing a drying system. Rainbow worked with builders to restore the school so students could return as soon as possible, minimizing disruption to their education.