Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
I’m so efficient
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Good work!
Keep it up.
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Everyone is busy but
we seem to be very
slow getting things
to our customers!
How are
we doing?
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Håkan Forss
Lean Coach, Delivery Assistance
Hakan.forss@netent.com
@hakanforss
Flow Sensei / The Plumber
International Speaker
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
I’m a huge LEGO fan!
DISCLAIMER
LEGO® is a trademark of the LEGO Group,
which does not sponsor, authorize or
endorse this presentation.
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
> 1000 hours < 60 hours
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
A Question of focus
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Strategy to increase utilization
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Strategy to fulfill needs a.s.a.p.
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Niklas Modig
Stockholm School of Economics
@LeanOnMyself
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Strategytoincreaseutilization
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Strategy to fulfill needs a.s.a.p.
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Non value adding: Wait time
Non value adding: Required waste
Value adding: Actual demand
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Which process is most expensive?
≥
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Flow efficiency
Touch time
Total lead-time
Flow efficiency =
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Flow efficiency
Green + Yellow
Green + Yellow + Red
Flow efficiency =
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Flow efficiency in numbers
Usually 1-5% value added of
total lead-time
20% value added is a high
number
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
How many
and
bricks do you have?
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
The three ”Laws”
Little’s Law
Law of bottlenecks
Law of variation
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
𝑳𝒆𝒂𝒅𝐓𝒊𝒎𝒆 ≈
𝑾𝒐𝒓𝒌𝑰𝒏𝑷𝒓𝒐𝒄𝒆𝒔𝒔
𝟏
𝟏 − 𝑼𝒕𝒊𝒍𝒊𝒛𝒂𝒕𝒊𝒐𝒏
𝑻𝐡𝐫𝐨𝐮𝐠𝐡𝐩𝐮𝐭 ≤ 𝑩𝒐𝒕𝒕𝒍𝒆𝒏𝒆𝒄𝒌
The three “Laws”
The three ”Laws”
Little’s Law
Law of bottlenecks
Law of variation
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Little’s Law
Work-in-Process
Throughput
Lead Time =
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Little’s Law
12
12 / min
1 min =
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Little’s Law
6
12 / min
0.5 min =
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Little’s Law
24
12 / min
2 min =
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
ABC ABC ABC
AAA BBB CCC
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
ABC ABC ABC
AAA BBB CCC
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
ABC ABC ABC
AAA BBB CCC
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Time
Capability
100%
Utilization
planed at 70%
Plan for less than 100% utilization
Inspired by Mårten Pehrson
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Time
Capability
100%
Lower planned utilization
Inspired by Mårten Pehrson
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Lead-time Insurance
Time
Capability
100%
Utilization
planed at 70%
Acts as an insurance policy for
shorter lead-time
Inspired by Mårten Pehrson
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Options
Time
Capability
100%
Utilization
planed at 70%
Creates option to do the important
things when you need it
Inspired by Mårten Pehrson
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Time
Capability
100%
Utilization
planed at 70%
Creates the time for increasing capability
Inspired by Mårten Pehrson
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Time
Capability
100%
Utilization
planed at 70%
Plan for less than 100% utilization
Inspired by Mårten Pehrson
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
The three ”Laws”
Little’s Law
Law of bottlenecks
Law of variation
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Law of Bottlenecks
Every process has one
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Capacity = 6 Capacity = 4 Capacity = 6
Throughput = 4
You can’t go faster than your bottleneck
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Full use of a higher capacity in front of the bottleneck will make
lead-time go up
You can’t go faster than your bottleneck
Capacity = 6 Capacity = 4 Capacity > 4
Throughput = 4
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
The three ”Laws”
Little’s Law
Law of bottlenecks
Law of variation
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Low variation
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
High variation
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Low variation
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
High variation
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Time
Capability
100%
Utilization
planed at 70%
Plan for less than 100% utilization
Absorbs unwanted variation
Inspired by Mårten Pehrson
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
“A bad system will beat a
good person every time.”
W. Edwards Deming
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
Q & AHåkan Forss
Mail: hakan.forss@netent.se
Twitter: @hakanforss
Blog: http://hakanforss.wordpress.com
Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com

Busy Bee Paradox Krakow 2018-03-21

  • 1.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 2.
    I’m so efficient Createdby Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 3.
    Good work! Keep itup. Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 4.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 5.
    Everyone is busybut we seem to be very slow getting things to our customers! How are we doing? Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 6.
    Håkan Forss Lean Coach,Delivery Assistance Hakan.forss@netent.com @hakanforss Flow Sensei / The Plumber International Speaker Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 7.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 8.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 9.
    I’m a hugeLEGO fan! DISCLAIMER LEGO® is a trademark of the LEGO Group, which does not sponsor, authorize or endorse this presentation. Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 10.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 11.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 12.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 13.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 14.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 15.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 16.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 17.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 18.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 19.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 20.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 21.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 22.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 23.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 24.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 25.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 26.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 27.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 28.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 29.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 30.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 31.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 32.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 33.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 34.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 35.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 36.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand
  • 37.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 38.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 39.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 40.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 41.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 42.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand
  • 43.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 44.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 45.
    > 1000 hours< 60 hours Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 46.
    A Question offocus Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 47.
    Strategy to increaseutilization Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 48.
    Strategy to fulfillneeds a.s.a.p. Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 49.
    Niklas Modig Stockholm Schoolof Economics @LeanOnMyself Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 50.
    Strategytoincreaseutilization Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 51.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 52.
    Strategy to fulfillneeds a.s.a.p. Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 53.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 54.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 55.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 56.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 57.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 58.
    Non value adding:Wait time Non value adding: Required waste Value adding: Actual demand Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 59.
    Which process ismost expensive? ≥ Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 60.
    Flow efficiency Touch time Totallead-time Flow efficiency = Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 61.
    Flow efficiency Green +Yellow Green + Yellow + Red Flow efficiency = Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 62.
    Flow efficiency innumbers Usually 1-5% value added of total lead-time 20% value added is a high number Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 63.
    How many and bricks doyou have? Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 64.
    The three ”Laws” Little’sLaw Law of bottlenecks Law of variation Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 65.
    𝑳𝒆𝒂𝒅𝐓𝒊𝒎𝒆 ≈ 𝑾𝒐𝒓𝒌𝑰𝒏𝑷𝒓𝒐𝒄𝒆𝒔𝒔 𝟏 𝟏 −𝑼𝒕𝒊𝒍𝒊𝒛𝒂𝒕𝒊𝒐𝒏 𝑻𝐡𝐫𝐨𝐮𝐠𝐡𝐩𝐮𝐭 ≤ 𝑩𝒐𝒕𝒕𝒍𝒆𝒏𝒆𝒄𝒌 The three “Laws”
  • 66.
    The three ”Laws” Little’sLaw Law of bottlenecks Law of variation Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 67.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 68.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 69.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 70.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 71.
    Little’s Law Work-in-Process Throughput Lead Time= Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 72.
    Little’s Law 12 12 /min 1 min = Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 73.
    Little’s Law 6 12 /min 0.5 min = Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 74.
    Little’s Law 24 12 /min 2 min = Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 75.
    ABC ABC ABC AAABBB CCC Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 76.
    ABC ABC ABC AAABBB CCC Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 77.
    ABC ABC ABC AAABBB CCC Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 78.
    Time Capability 100% Utilization planed at 70% Planfor less than 100% utilization Inspired by Mårten Pehrson Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 79.
    Time Capability 100% Lower planned utilization Inspiredby Mårten Pehrson Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 80.
    Lead-time Insurance Time Capability 100% Utilization planed at70% Acts as an insurance policy for shorter lead-time Inspired by Mårten Pehrson Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 81.
    Options Time Capability 100% Utilization planed at 70% Createsoption to do the important things when you need it Inspired by Mårten Pehrson Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 82.
    Time Capability 100% Utilization planed at 70% Createsthe time for increasing capability Inspired by Mårten Pehrson Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 83.
    Time Capability 100% Utilization planed at 70% Planfor less than 100% utilization Inspired by Mårten Pehrson Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 84.
    The three ”Laws” Little’sLaw Law of bottlenecks Law of variation Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 85.
    Law of Bottlenecks Everyprocess has one Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 86.
    Capacity = 6Capacity = 4 Capacity = 6 Throughput = 4 You can’t go faster than your bottleneck Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 87.
    Full use ofa higher capacity in front of the bottleneck will make lead-time go up You can’t go faster than your bottleneck Capacity = 6 Capacity = 4 Capacity > 4 Throughput = 4 Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 88.
    The three ”Laws” Little’sLaw Law of bottlenecks Law of variation Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 89.
    Low variation Created byHåkan Forss @hakanforss http://hakanforss.wordpress.com
  • 90.
    High variation Created byHåkan Forss @hakanforss http://hakanforss.wordpress.com
  • 91.
    Low variation Created byHåkan Forss @hakanforss http://hakanforss.wordpress.com
  • 92.
    High variation Created byHåkan Forss @hakanforss http://hakanforss.wordpress.com
  • 93.
    Time Capability 100% Utilization planed at 70% Planfor less than 100% utilization Absorbs unwanted variation Inspired by Mårten Pehrson Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 94.
    “A bad systemwill beat a good person every time.” W. Edwards Deming Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com
  • 95.
    Created by HåkanForss @hakanforss http://hakanforss.wordpress.com
  • 96.
    Q & AHåkanForss Mail: hakan.forss@netent.se Twitter: @hakanforss Blog: http://hakanforss.wordpress.com Created by Håkan Forss @hakanforss http://hakanforss.wordpress.com