A new bridge was constructed overnight connecting the Hadassah Medical Center to a new parking lot. The bridge pieces were delivered by truck and then lifted into place by crane between 2-4:30am, as witnessed from the Davidson Tower windows. By 6am, the final adjustments were made and the bridge construction was completed, connecting the Medical Center with the new parking lot.