S/N        CONTRACT TITTLE                                         PROJECT DESCRIPTION             IMPLEMENTING MDA's           MDA's ESTIMATE        REVIEW PROJECT COST    CONTRACTOR                      SAVINGS
      Sinking of Borehole with overhead Tank for washing of
  1   Waste Management Trucks.                                     Borehole.                      Waste Mgt Authority.                   1,747,126.44           1,593,300.00 Direct Labour.                          153,826.44
  2   The Computerization of Ekiti State Government Assets         Computerization.               GAD.                                 105,370,240.00          49,843,007.28 Messrs New Money Link Ltd.           55,527,232.72
  3   Renovation of Fire Station, Ado.                             Renovation.                    Min. of Special Duties.                7,380,580.20           7,380,580.20 Main Business Venture Ltd.      -
  4   Renovation of Fire Station, Ikere                            Renovation.                    Min. of Special Duties.               21,205,039.80          20,384,915.00 First contract Inv. Ltd.                      820,124.80
  5   Renovation of Fire station, Ikole.                           Renovation.                    Min. of Special Duties.                6,495,289.50           6,490,575.00 Antrimacx Ltd.                                  4,714.50
  6   Procurement of Vehicles.                                     Vehicles.                      Min. of Agriculture.                  22,433,000.00          22,170,600.00        -                                      262,400.00
      Renovation of the Department of Public Building Office                                                                                                                 Antlantic Offshore Property
  7   Complex at Min. of Works                                     Renovation.                    Bureau of Special Project             35,276,583.30          32,970,081.90 Dev. And Marketing Coy.                     2,306,501.40
      Construction of Access Road and Installation of interlocking
  8   to the surrounding of the project site.                      Construction and Installation. EEDA.                                 36,761,000.00          36,228,535.88 Tripple Engrs. Nig Ltd.                       532,464.12
      Survey cost to relocate the Redeemed Christian Church
  9   from Iworoko Road to Afao Road                               Relocation.                    Office of Surveyor General               298,546.00             298,546.00 Direct Labour.                      -
 10   Purchase of Petroleum Product Equipment.                     Petroleum Equipment            PPCPA.                                 1,055,000.00           1,055,000.00 Jonats Impex.                        -
 11   Annual De-Infestation of Registered produce Stores in Ekiti. Fumigation.                    Min. of Agriculture.                     300,000.00             300,000.00 Direct Labour.                      -
 12   Repair and Rebind of torn textbooks in the Library.          Rebind & Repair.               Library Board.                           530,000.00             400,000.00 Direct Labour.                                130,000.00
 13   Purchase of Office Furniture and Equipment.                  Office Furniture.              EKSTMA.                                1,966,920.00           1,500,000.00 Direct Labour.                                466,920.00
 14   Purchase of Office Furniture.                                Office Furniture.              Waste Mgt Authority.                   1,000,000.00           1,000,000.00 Direct Labour.                            -
 15   Servicing of 6 nos. Generating Set                           Servicing.                     Electricity Board.                       559,345.00             559,345.00 Direct Labour.                           -
      Supply and Installation of 800KVA Gen. Set at Government
 16   House                                                        Installation.                  Electricity Board.                    37,000,000.00          37,000,000.00 Mikano Int. Ltd.                        -
 17   Production of ESKAMBUS Uniform and Accessories.              Uniform.                       Min. of Special Duties.                  907,095.00             823,620.00 Sam & Sara Exclusive Uniforms                    834.75
      Acquisition of Land for the creation of Legacy Estates in
 18   Ado.                                                         Land.                          Bureau of Land.                        1,572,900.00           1,572,900.00 Direct Labour.                      -
      Renovation of Internal Revenue Service accommodation at
 19   Efon Alaaye                                                  Renovation.                    Revenue Board.                         3,517,156.13           3,517,156.13 Direct Labour.                          -
 20   Earth dredging of some stream channels within Ado Ekiti.     Earth Dredging.                S.E.P.A                              359,286,900.00         359,286,900.00 Rafjo Interbiz Services Ltd.            -
      Procurement of Fumigation Equipment and accessories for
 21   pests and vectors control.                                   Fumigation Equipment           Min. of Housing & Environment            500,000.00             500,000.00 Direct Labour.                      -
 22   Production of TV and Radio Studio with the supply of other   Information gadget.            Min. of Information.                  15,000,000.00          15,000,000.00          -                           -
      Information gadget.




                                                                                                        www.ekitistate.gov.ng
23   Purchase of Boundary verification Equipments                   Equipments.                      Boundary Commission.                          1,900,000.00          1,900,000.00       -                            -
     Financial Advisory service between Govt and international
24   Financial Corporation                                             -                             Min. of Health.                             23,700,000.00          23,700,000.00           -                        -
25   Procurement of Equipment in the TIC                            Equipments.                      Min. of Education.                           2,500,000.00           2,500,000.00         -
26   Procurement of 3 nos Gen. Sets.                                Gen. Set.                        Liaison Office, Abuja.                       7,471,264.20           7,471,264.20   Messrs Dafemtos Int. Nig. Ltd.   -
     TOTAL                                                                                                                                      695,733,985.57         635,446,326.59                                    60,287,658.98

                                                                                                    SUMMARY
1    The sum of N695,733,985.27 is the total cost of projects and services that passed through Due Process for vetting and Certifications in the month of Nov, 2012.
2    The sum of N635,446,326.59 is the B.P.P vetted cost in the month of Nov, 2012.
3    The sum of N60,205,018.73 is the amount saved in the month of November




                                                                                                                  www.ekitistate.gov.ng

More Related Content

Viewers also liked

Proyecto oral 2
Proyecto oral 2Proyecto oral 2
Proyecto oral 2
hannahschryer
 
Temario primer bimestre 1
Temario primer bimestre 1Temario primer bimestre 1
Temario primer bimestre 1
Colegio Euro Liceo
 
Karen Carty testimonial
Karen Carty testimonialKaren Carty testimonial
Karen Carty testimonial
Jamal Thompson
 
Embarc sobrvivencia e resgate cert 2
Embarc sobrvivencia e resgate   cert 2Embarc sobrvivencia e resgate   cert 2
Embarc sobrvivencia e resgate cert 2
Carlos Enrique Loaiza
 
The hidden org
The hidden orgThe hidden org
The hidden org
Ray Sheppard
 
Trinity Kings World Leadership: A Model To Be Followed
Trinity Kings World Leadership: A Model To Be FollowedTrinity Kings World Leadership: A Model To Be Followed
Trinity Kings World Leadership: A Model To Be Followed
Terrell Patillo
 
Announcement
AnnouncementAnnouncement
Announcement
Eric Halfen
 
flora
floraflora

Viewers also liked (9)

Proyecto oral 2
Proyecto oral 2Proyecto oral 2
Proyecto oral 2
 
Temario primer bimestre 1
Temario primer bimestre 1Temario primer bimestre 1
Temario primer bimestre 1
 
Diploma_Friends
Diploma_FriendsDiploma_Friends
Diploma_Friends
 
Karen Carty testimonial
Karen Carty testimonialKaren Carty testimonial
Karen Carty testimonial
 
Embarc sobrvivencia e resgate cert 2
Embarc sobrvivencia e resgate   cert 2Embarc sobrvivencia e resgate   cert 2
Embarc sobrvivencia e resgate cert 2
 
The hidden org
The hidden orgThe hidden org
The hidden org
 
Trinity Kings World Leadership: A Model To Be Followed
Trinity Kings World Leadership: A Model To Be FollowedTrinity Kings World Leadership: A Model To Be Followed
Trinity Kings World Leadership: A Model To Be Followed
 
Announcement
AnnouncementAnnouncement
Announcement
 
flora
floraflora
flora
 

Similar to BPP Vetted Contracts For November 2012

BPP Vetted Contracts For December 2012
BPP Vetted Contracts For December 2012BPP Vetted Contracts For December 2012
BPP Vetted Contracts For December 2012
Government of Ekiti State, Nigeria
 
BPP vetted contracts for August 2012
BPP vetted contracts for August 2012BPP vetted contracts for August 2012
BPP vetted contracts for August 2012
Government of Ekiti State, Nigeria
 
Bpp Vetted Contracts For May 2012
Bpp Vetted Contracts For May 2012Bpp Vetted Contracts For May 2012
Bpp Vetted Contracts For May 2012
Government of Ekiti State, Nigeria
 
BPP Vetted Contracts For February 2013
BPP Vetted Contracts For February 2013BPP Vetted Contracts For February 2013
BPP Vetted Contracts For February 2013
Government of Ekiti State, Nigeria
 
BPP vetted contracts for feb. 2012
BPP vetted contracts for feb. 2012BPP vetted contracts for feb. 2012
BPP vetted contracts for feb. 2012
Government of Ekiti State, Nigeria
 
BPP vetted contracts for the month of April 2012
BPP vetted contracts for the month of April 2012BPP vetted contracts for the month of April 2012
BPP vetted contracts for the month of April 2012
Government of Ekiti State, Nigeria
 
Vetted Contracts For The Month Of June 2013
Vetted Contracts For The Month Of June 2013Vetted Contracts For The Month Of June 2013
Vetted Contracts For The Month Of June 2013
Government of Ekiti State, Nigeria
 
BPP Vetted Contracts For April 2012
BPP Vetted Contracts For April 2012BPP Vetted Contracts For April 2012
BPP Vetted Contracts For April 2012
Government of Ekiti State, Nigeria
 
Ejecucion de gastos a junio 2016
Ejecucion de gastos a junio 2016Ejecucion de gastos a junio 2016
Ejecucion de gastos a junio 2016
German Rodriguez
 
Acc tutorial 8
Acc tutorial 8Acc tutorial 8
Acc tutorial 8
Shu Shin
 
BPP vetted contracts for Mar. 2012
BPP vetted contracts for Mar. 2012BPP vetted contracts for Mar. 2012
BPP vetted contracts for Mar. 2012
Government of Ekiti State, Nigeria
 
Newletter draft law 10183 adopted eng
Newletter draft law 10183 adopted engNewletter draft law 10183 adopted eng
Newletter draft law 10183 adopted eng
Maksym Sysoiev
 
2012 budget
2012 budget2012 budget
BPP vetted contracts for jan. 2012
BPP vetted contracts for jan. 2012BPP vetted contracts for jan. 2012
BPP vetted contracts for jan. 2012
Government of Ekiti State, Nigeria
 
Mayo%202010 presupuesto centro
Mayo%202010 presupuesto centroMayo%202010 presupuesto centro
Mayo%202010 presupuesto centro
winstonrivera
 
Mayo de 2010 presupuesto centro
Mayo de 2010 presupuesto centroMayo de 2010 presupuesto centro
Mayo de 2010 presupuesto centro
winstonrivera
 
02. recent transactions
02. recent transactions02. recent transactions
02. recent transactions
Kdolby
 
4 eco tourism development2012
4 eco tourism development20124 eco tourism development2012
4 eco tourism development2012
Samuel Hernandez
 
JICA Solar Project
JICA Solar ProjectJICA Solar Project
Olmito project aquaculture with investors numbers & graphics fish & prawns
Olmito project aquaculture with investors numbers & graphics   fish & prawnsOlmito project aquaculture with investors numbers & graphics   fish & prawns
Olmito project aquaculture with investors numbers & graphics fish & prawns
PaulSkillicorn
 

Similar to BPP Vetted Contracts For November 2012 (20)

BPP Vetted Contracts For December 2012
BPP Vetted Contracts For December 2012BPP Vetted Contracts For December 2012
BPP Vetted Contracts For December 2012
 
BPP vetted contracts for August 2012
BPP vetted contracts for August 2012BPP vetted contracts for August 2012
BPP vetted contracts for August 2012
 
Bpp Vetted Contracts For May 2012
Bpp Vetted Contracts For May 2012Bpp Vetted Contracts For May 2012
Bpp Vetted Contracts For May 2012
 
BPP Vetted Contracts For February 2013
BPP Vetted Contracts For February 2013BPP Vetted Contracts For February 2013
BPP Vetted Contracts For February 2013
 
BPP vetted contracts for feb. 2012
BPP vetted contracts for feb. 2012BPP vetted contracts for feb. 2012
BPP vetted contracts for feb. 2012
 
BPP vetted contracts for the month of April 2012
BPP vetted contracts for the month of April 2012BPP vetted contracts for the month of April 2012
BPP vetted contracts for the month of April 2012
 
Vetted Contracts For The Month Of June 2013
Vetted Contracts For The Month Of June 2013Vetted Contracts For The Month Of June 2013
Vetted Contracts For The Month Of June 2013
 
BPP Vetted Contracts For April 2012
BPP Vetted Contracts For April 2012BPP Vetted Contracts For April 2012
BPP Vetted Contracts For April 2012
 
Ejecucion de gastos a junio 2016
Ejecucion de gastos a junio 2016Ejecucion de gastos a junio 2016
Ejecucion de gastos a junio 2016
 
Acc tutorial 8
Acc tutorial 8Acc tutorial 8
Acc tutorial 8
 
BPP vetted contracts for Mar. 2012
BPP vetted contracts for Mar. 2012BPP vetted contracts for Mar. 2012
BPP vetted contracts for Mar. 2012
 
Newletter draft law 10183 adopted eng
Newletter draft law 10183 adopted engNewletter draft law 10183 adopted eng
Newletter draft law 10183 adopted eng
 
2012 budget
2012 budget2012 budget
2012 budget
 
BPP vetted contracts for jan. 2012
BPP vetted contracts for jan. 2012BPP vetted contracts for jan. 2012
BPP vetted contracts for jan. 2012
 
Mayo%202010 presupuesto centro
Mayo%202010 presupuesto centroMayo%202010 presupuesto centro
Mayo%202010 presupuesto centro
 
Mayo de 2010 presupuesto centro
Mayo de 2010 presupuesto centroMayo de 2010 presupuesto centro
Mayo de 2010 presupuesto centro
 
02. recent transactions
02. recent transactions02. recent transactions
02. recent transactions
 
4 eco tourism development2012
4 eco tourism development20124 eco tourism development2012
4 eco tourism development2012
 
JICA Solar Project
JICA Solar ProjectJICA Solar Project
JICA Solar Project
 
Olmito project aquaculture with investors numbers & graphics fish & prawns
Olmito project aquaculture with investors numbers & graphics   fish & prawnsOlmito project aquaculture with investors numbers & graphics   fish & prawns
Olmito project aquaculture with investors numbers & graphics fish & prawns
 

More from Government of Ekiti State, Nigeria

Ekiti state 2016 approved budget details
Ekiti state 2016 approved budget detailsEkiti state 2016 approved budget details
Ekiti state 2016 approved budget details
Government of Ekiti State, Nigeria
 
Ekiti state 2016 approved budget details
Ekiti state 2016 approved budget detailsEkiti state 2016 approved budget details
Ekiti state 2016 approved budget details
Government of Ekiti State, Nigeria
 
Ekiti state 2016 approved budget details
Ekiti state 2016 approved budget detailsEkiti state 2016 approved budget details
Ekiti state 2016 approved budget details
Government of Ekiti State, Nigeria
 
Ekiti State 2016 Approved Budget Details
Ekiti State 2016 Approved Budget DetailsEkiti State 2016 Approved Budget Details
Ekiti State 2016 Approved Budget Details
Government of Ekiti State, Nigeria
 
Ekiti State Public Procurement Law
Ekiti State Public Procurement LawEkiti State Public Procurement Law
Ekiti State Public Procurement Law
Government of Ekiti State, Nigeria
 
Scholarship for Post Graduate Ng
Scholarship for Post Graduate NgScholarship for Post Graduate Ng
Scholarship for Post Graduate Ng
Government of Ekiti State, Nigeria
 
Scholarship for Overseas Students
Scholarship for Overseas StudentsScholarship for Overseas Students
Scholarship for Overseas Students
Government of Ekiti State, Nigeria
 
Scholarsrhip for Undergraduate
Scholarsrhip for UndergraduateScholarsrhip for Undergraduate
Scholarsrhip for Undergraduate
Government of Ekiti State, Nigeria
 
Physically Challenged
Physically ChallengedPhysically Challenged
Physically Challenged
Government of Ekiti State, Nigeria
 
2015 Budget Speech Delivered by the Executive Governor of Ekiti State
2015 Budget Speech Delivered by the Executive Governor of Ekiti State2015 Budget Speech Delivered by the Executive Governor of Ekiti State
2015 Budget Speech Delivered by the Executive Governor of Ekiti State
Government of Ekiti State, Nigeria
 
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Government of Ekiti State, Nigeria
 
Bursary Award 2012/2013
Bursary Award 2012/2013Bursary Award 2012/2013
Bursary Award 2012/2013
Government of Ekiti State, Nigeria
 
Effective service delivery
Effective service deliveryEffective service delivery
Effective service delivery
Government of Ekiti State, Nigeria
 
Prof. ade ajayi ad. approved
Prof. ade ajayi ad. approvedProf. ade ajayi ad. approved
Prof. ade ajayi ad. approved
Government of Ekiti State, Nigeria
 
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
Government of Ekiti State, Nigeria
 
Champion Newspapers' Governor of the year
Champion Newspapers' Governor of the yearChampion Newspapers' Governor of the year
Champion Newspapers' Governor of the year
Government of Ekiti State, Nigeria
 
1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA
1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA
1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA
Government of Ekiti State, Nigeria
 
One Year After...Moremi Lives on
One Year After...Moremi Lives onOne Year After...Moremi Lives on
One Year After...Moremi Lives on
Government of Ekiti State, Nigeria
 
Overview of 2014 Budget
Overview of 2014 BudgetOverview of 2014 Budget
Overview of 2014 Budget
Government of Ekiti State, Nigeria
 

More from Government of Ekiti State, Nigeria (20)

Ekiti state 2016 approved budget details
Ekiti state 2016 approved budget detailsEkiti state 2016 approved budget details
Ekiti state 2016 approved budget details
 
Ekiti state 2016 approved budget details
Ekiti state 2016 approved budget detailsEkiti state 2016 approved budget details
Ekiti state 2016 approved budget details
 
Ekiti state 2016 approved budget details
Ekiti state 2016 approved budget detailsEkiti state 2016 approved budget details
Ekiti state 2016 approved budget details
 
Ekiti State 2016 Approved Budget Details
Ekiti State 2016 Approved Budget DetailsEkiti State 2016 Approved Budget Details
Ekiti State 2016 Approved Budget Details
 
Ekiti State Public Procurement Law
Ekiti State Public Procurement LawEkiti State Public Procurement Law
Ekiti State Public Procurement Law
 
Scholarship for Post Graduate Ng
Scholarship for Post Graduate NgScholarship for Post Graduate Ng
Scholarship for Post Graduate Ng
 
Scholarship for Overseas Students
Scholarship for Overseas StudentsScholarship for Overseas Students
Scholarship for Overseas Students
 
Scholarsrhip for Undergraduate
Scholarsrhip for UndergraduateScholarsrhip for Undergraduate
Scholarsrhip for Undergraduate
 
Physically Challenged
Physically ChallengedPhysically Challenged
Physically Challenged
 
Busary form 1
Busary form 1Busary form 1
Busary form 1
 
2015 Budget Speech Delivered by the Executive Governor of Ekiti State
2015 Budget Speech Delivered by the Executive Governor of Ekiti State2015 Budget Speech Delivered by the Executive Governor of Ekiti State
2015 Budget Speech Delivered by the Executive Governor of Ekiti State
 
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
 
Bursary Award 2012/2013
Bursary Award 2012/2013Bursary Award 2012/2013
Bursary Award 2012/2013
 
Effective service delivery
Effective service deliveryEffective service delivery
Effective service delivery
 
Prof. ade ajayi ad. approved
Prof. ade ajayi ad. approvedProf. ade ajayi ad. approved
Prof. ade ajayi ad. approved
 
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
 
Champion Newspapers' Governor of the year
Champion Newspapers' Governor of the yearChampion Newspapers' Governor of the year
Champion Newspapers' Governor of the year
 
1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA
1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA
1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA
 
One Year After...Moremi Lives on
One Year After...Moremi Lives onOne Year After...Moremi Lives on
One Year After...Moremi Lives on
 
Overview of 2014 Budget
Overview of 2014 BudgetOverview of 2014 Budget
Overview of 2014 Budget
 

BPP Vetted Contracts For November 2012

  • 1. THE PROJECTS AND SERVICES THAT PASSED THROUGH BUREAU OF PUBLIC PROCUREMENT FOR CERTIFICATION AND VETTING IN THE MONTH OF NOVEMBER, 2012. RECOMMENDED S/N CONTRACT TITTLE PROJECT DESCRIPTION IMPLEMENTING MDA's MDA's ESTIMATE REVIEW PROJECT COST CONTRACTOR SAVINGS Sinking of Borehole with overhead Tank for washing of 1 Waste Management Trucks. Borehole. Waste Mgt Authority. 1,747,126.44 1,593,300.00 Direct Labour. 153,826.44 2 The Computerization of Ekiti State Government Assets Computerization. GAD. 105,370,240.00 49,843,007.28 Messrs New Money Link Ltd. 55,527,232.72 3 Renovation of Fire Station, Ado. Renovation. Min. of Special Duties. 7,380,580.20 7,380,580.20 Main Business Venture Ltd. - 4 Renovation of Fire Station, Ikere Renovation. Min. of Special Duties. 21,205,039.80 20,384,915.00 First contract Inv. Ltd. 820,124.80 5 Renovation of Fire station, Ikole. Renovation. Min. of Special Duties. 6,495,289.50 6,490,575.00 Antrimacx Ltd. 4,714.50 6 Procurement of Vehicles. Vehicles. Min. of Agriculture. 22,433,000.00 22,170,600.00 - 262,400.00 Renovation of the Department of Public Building Office Antlantic Offshore Property 7 Complex at Min. of Works Renovation. Bureau of Special Project 35,276,583.30 32,970,081.90 Dev. And Marketing Coy. 2,306,501.40 Construction of Access Road and Installation of interlocking 8 to the surrounding of the project site. Construction and Installation. EEDA. 36,761,000.00 36,228,535.88 Tripple Engrs. Nig Ltd. 532,464.12 Survey cost to relocate the Redeemed Christian Church 9 from Iworoko Road to Afao Road Relocation. Office of Surveyor General 298,546.00 298,546.00 Direct Labour. - 10 Purchase of Petroleum Product Equipment. Petroleum Equipment PPCPA. 1,055,000.00 1,055,000.00 Jonats Impex. - 11 Annual De-Infestation of Registered produce Stores in Ekiti. Fumigation. Min. of Agriculture. 300,000.00 300,000.00 Direct Labour. - 12 Repair and Rebind of torn textbooks in the Library. Rebind & Repair. Library Board. 530,000.00 400,000.00 Direct Labour. 130,000.00 13 Purchase of Office Furniture and Equipment. Office Furniture. EKSTMA. 1,966,920.00 1,500,000.00 Direct Labour. 466,920.00 14 Purchase of Office Furniture. Office Furniture. Waste Mgt Authority. 1,000,000.00 1,000,000.00 Direct Labour. - 15 Servicing of 6 nos. Generating Set Servicing. Electricity Board. 559,345.00 559,345.00 Direct Labour. - Supply and Installation of 800KVA Gen. Set at Government 16 House Installation. Electricity Board. 37,000,000.00 37,000,000.00 Mikano Int. Ltd. - 17 Production of ESKAMBUS Uniform and Accessories. Uniform. Min. of Special Duties. 907,095.00 823,620.00 Sam & Sara Exclusive Uniforms 834.75 Acquisition of Land for the creation of Legacy Estates in 18 Ado. Land. Bureau of Land. 1,572,900.00 1,572,900.00 Direct Labour. - Renovation of Internal Revenue Service accommodation at 19 Efon Alaaye Renovation. Revenue Board. 3,517,156.13 3,517,156.13 Direct Labour. - 20 Earth dredging of some stream channels within Ado Ekiti. Earth Dredging. S.E.P.A 359,286,900.00 359,286,900.00 Rafjo Interbiz Services Ltd. - Procurement of Fumigation Equipment and accessories for 21 pests and vectors control. Fumigation Equipment Min. of Housing & Environment 500,000.00 500,000.00 Direct Labour. - 22 Production of TV and Radio Studio with the supply of other Information gadget. Min. of Information. 15,000,000.00 15,000,000.00 - - Information gadget. www.ekitistate.gov.ng
  • 2. 23 Purchase of Boundary verification Equipments Equipments. Boundary Commission. 1,900,000.00 1,900,000.00 - - Financial Advisory service between Govt and international 24 Financial Corporation - Min. of Health. 23,700,000.00 23,700,000.00 - - 25 Procurement of Equipment in the TIC Equipments. Min. of Education. 2,500,000.00 2,500,000.00 - 26 Procurement of 3 nos Gen. Sets. Gen. Set. Liaison Office, Abuja. 7,471,264.20 7,471,264.20 Messrs Dafemtos Int. Nig. Ltd. - TOTAL 695,733,985.57 635,446,326.59 60,287,658.98 SUMMARY 1 The sum of N695,733,985.27 is the total cost of projects and services that passed through Due Process for vetting and Certifications in the month of Nov, 2012. 2 The sum of N635,446,326.59 is the B.P.P vetted cost in the month of Nov, 2012. 3 The sum of N60,205,018.73 is the amount saved in the month of November www.ekitistate.gov.ng