1. The document summarizes 26 projects that passed through the Bureau of Public Procurement in November 2012 for certification and vetting, listing the project description, implementing agency, agency's estimated cost, reviewed project cost, recommended contractor, and savings.
2. The total cost of the projects was N695,733,985.27, while the total vetted cost approved by BPP was N635,446,326.59, resulting in total savings of N60,287,658.98.
1. The Bureau of Public Procurement certified and vetted various projects and services in July 2012 totaling 6.873 billion naira in estimated costs.
2. The vetted prices for these projects and services was 6.408 billion naira.
3. Vetting resulted in savings of 464.27 million naira.
1. The Bureau of Public Procurement certified and vetted various projects and services in October 2012 totaling 1,051,003,617.54 Nigerian Naira.
2. These projects included the renovation of buildings, supply of instructional materials, renovation of ambulance bays, supply of uniforms and wheelie bins.
3. After review and recommending contractors, the Bureau determined the total vetted cost to be 920,846,684.26 Naira, resulting in savings of 127,123,885.64 Naira.
This document was created to entice investors into a snare - the words Nigerian Scam ring a bell - Investors Beware it screams....scam, fraud all come to mind....
Search for John Cutten Fraudster....Caveat Emptor - watch out!!!!
The document describes research aiming to develop stress tolerant soybean plants through overexpression of the SIZ1 gene. SIZ1 regulates sumoylation, a post-translational protein modification involved in stress response. The researchers transformed soybean plants using Agrobacterium containing an additional SIZ1 gene. Preliminary results show the transformed plants are regenerating shoots on selection media, indicating successful transformation and regeneration. Overexpression of SIZ1 has potential to increase stress tolerance through improved growth, photosynthesis, and adaptation to drought, temperature fluctuations, and low phosphate conditions.
This certificate of completion was granted to Pat Whooley for successfully completing Social Selling Mastery on July 7, 2016. Pat Whooley earned a certificate for finishing a social selling training program.
1. The Bureau of Public Procurement certified and vetted various projects and services in July 2012 totaling 6.873 billion naira in estimated costs.
2. The vetted prices for these projects and services was 6.408 billion naira.
3. Vetting resulted in savings of 464.27 million naira.
1. The Bureau of Public Procurement certified and vetted various projects and services in October 2012 totaling 1,051,003,617.54 Nigerian Naira.
2. These projects included the renovation of buildings, supply of instructional materials, renovation of ambulance bays, supply of uniforms and wheelie bins.
3. After review and recommending contractors, the Bureau determined the total vetted cost to be 920,846,684.26 Naira, resulting in savings of 127,123,885.64 Naira.
This document was created to entice investors into a snare - the words Nigerian Scam ring a bell - Investors Beware it screams....scam, fraud all come to mind....
Search for John Cutten Fraudster....Caveat Emptor - watch out!!!!
The document describes research aiming to develop stress tolerant soybean plants through overexpression of the SIZ1 gene. SIZ1 regulates sumoylation, a post-translational protein modification involved in stress response. The researchers transformed soybean plants using Agrobacterium containing an additional SIZ1 gene. Preliminary results show the transformed plants are regenerating shoots on selection media, indicating successful transformation and regeneration. Overexpression of SIZ1 has potential to increase stress tolerance through improved growth, photosynthesis, and adaptation to drought, temperature fluctuations, and low phosphate conditions.
This certificate of completion was granted to Pat Whooley for successfully completing Social Selling Mastery on July 7, 2016. Pat Whooley earned a certificate for finishing a social selling training program.
Los Cleveland Cavaliers y Golden State Warriors son equipos de baloncesto profesionales de Estados Unidos. Los Cavaliers son de Cleveland, Ohio y ganaron el campeonato, mientras que los Warriors son de Oakland, California y perdieron contra los Cavaliers en el juego final, a pesar de que Steph Curry es su mejor jugador.
El documento presenta el temario del primer bimestre para los grupos 1° "A, B, C, D y E". En español, los temas son convivencia, organización de bibliotecas, viajes de libros y ortografía. En matemáticas, los temas son registro de información, números, colecciones, series numéricas, figuras geométricas, patrones e identificación de cuerpos. Exploración de la naturaleza y la sociedad cubre características personales, Miguel Hidalgo, actividades diarias y locales. Formación c
The author was approaching 200 lbs at 5'4 height and set a goal to lose 30 lbs. She started working with personal trainer Jamal Thompson in November 2015, and with his help exercising regularly, eating healthier, and counting calories, she has lost 25 lbs. The author recommends Jamal Thompson for anyone needing help with weight loss, saying that working with him has changed her life and empowered her to be more active and lose weight.
The document discusses problems in a business that are known at different levels of management. 4% of problems are known to top management, 74% to middle management, and 99% to frontline staff. It suggests that the biggest unknown problems that can destroy a business are often the easiest to address.
Trinity Kings World Leadership: A Model To Be FollowedTerrell Patillo
Follow the right Model:
Titus 2:1Amplified Bible, Classic Edition (AMPC)
2 But [as for] you, teach what is fitting and becoming to sound (wholesome) doctrine [the character and right living that identify true Christians].
Titus 2:7-8Amplified Bible, Classic Edition (AMPC)
7 And show your own self in all respects to be a pattern and a model of good deeds and works, teaching what is unadulterated, showing gravity [having the strictest regard for truth and purity of motive], with dignity and seriousness.
8 And let your instruction be sound and fit and wise and wholesome, vigorous and [a]irrefutable and above censure, so that the opponent may be put to shame, finding nothing discrediting or evil to say about us.
Eric Halfen will present on his research growing HEK-293 kidney cells on 3D scaffolds to better understand kidney development and potentially create artificial organs for transplant. Over 102,000 people are waiting for kidney transplants. His ongoing study at UWRF cultures HEK-293 cells, originally isolated from human embryonic kidney tissue, on natural scaffolds to see how far the cells will develop and their differentiation over time.
Flora Sharmin is seeking a challenging position that allows her to utilize her capabilities and grow professionally. She has a BBA from National University and is currently pursuing an MBA from Dhaka University. Her computer skills include Microsoft Office applications and she has strong communication skills in both English and Bengali. She completed a 3-month internship at First Security Islami Bank Ltd and is looking to further develop her professional experience.
The document summarizes procurement records for the month of December 2012 in Nigeria. It lists 14 contracts totaling 2,563,415,716.38 Naira for various construction, renovation, and supply projects. The implementing agencies and recommended contractors are also included. The Bureau of Public Procurement vetted all projects and certified the total cost of 2,563,415,716.38 Naira without finding any savings opportunities.
The document summarizes 39 projects reviewed by the Bureau for Vetting and Certifications in May 2012. It lists the project description, implementing agency, recommended contractor, agency's estimated cost, and cost savings. Several projects involved procurement of vehicles, equipment, or infrastructure repairs. The Bureau recommended contractors that could complete many of the projects at a lower cost than the agencies' original estimates, resulting in overall savings of several million naira.
The document summarizes procurement records from February 2013, listing 13 contracts for various projects in Ekiti State. It provides the project description, recommending contractor, estimated cost, reviewed project cost, and savings. In total, the estimated cost was N13.05 billion while the reviewed cost approved was N11.26 billion, resulting in savings of N1.79 billion due to review by the Bureau of Public Procurement.
1. The document details 20 projects and services that passed through the Bureau of Public Procurement in February 2012, with a total quoted amount of ₦455,018,755.20 and a total vetted price of ₦446,509,395.02.
2. The price differences between the quoted and vetted amounts for each project resulted in total savings of ₦8,509,380.20 through the vetting process in February 2012.
3. One notable project was the electrification of Ado city street lights, where the Electricity Board's quoted amount of ₦1,699,181,336.38 was vetted to ₦1,867,
The procurement record for June 2013 lists 41 contracts totaling N2,214,625,859.59 in estimated costs. The Bureau of Public Procurement (BPP) vetted these contracts, certifying costs of N2,022,004,782.58, resulting in cost savings of N192,621,077.01.
1. The document lists 35 projects that passed through the Bureau for vetting in April 2012 with a total quoted price of N500,247,414.25.
2. The total vetted price was N472,128,872.07.
3. Vetting resulted in savings of N28,118,542.18.
The document contains a detailed budget breakdown for various expense categories (GASTOS, INVERSION) with subcategories. It lists planned expenses, additions, reductions, credits against credits, and totals for each category and subcategory. The largest expense categories are GASTOS DE FUNCIONAMIENTO at 351,591,108.53 and INVERSION at 178,408,891.47. The document provides a comprehensive listing of budget line items and expected costs.
Suzuka Enterprise's trial balance as of December 31, 2007 is provided. Additional information includes adjustments needed for insurance, provision for doubtful debts, accrued expenses, and depreciation calculations. The required tasks are to [1] prepare the Trading and Profit and Loss Account for the year ended December 31, 2007 and [2] prepare the Balance Sheet as of December 31, 2007 using the information provided.
1. The Bureau vetted and certified projects and services totaling N2,479,944,875.11 in March 2012.
2. The vetted price of these projects was N2,416,446,764.39.
3. Vetting resulted in savings of N63,498,110.72.
The Ukrainian parliament adopted Draft Law No. 10183 which amends the country's feed-in tariff scheme for supporting electricity production from renewable energy sources. Some key changes include establishing fixed minimum "green" tariff rates for different renewable technologies that decrease over time. It also introduces local content requirements for renewable energy projects, mandating a certain percentage of components, materials and labor come from Ukraine. If projects do not meet these local content thresholds, the tariff rate will be set at the wholesale electricity price instead of the higher feed-in tariff. The law is awaiting signature from Ukraine's president and could face a potential veto.
This document outlines the internally generated revenue estimates for Ekiti State of Nigeria for 2012. It provides a summary of actual revenues collected in 2010 and January-October 2011, approved estimates for 2011, and estimated revenues for 2012 for various ministries and departments. The Board of Internal Revenue and Education Endowment Fund are projected to be the largest sources of revenue in 2012 at N4.1 billion and N500 million respectively. Total internally generated revenue for Ekiti State is estimated to increase to over N3 billion in 2012.
Los Cleveland Cavaliers y Golden State Warriors son equipos de baloncesto profesionales de Estados Unidos. Los Cavaliers son de Cleveland, Ohio y ganaron el campeonato, mientras que los Warriors son de Oakland, California y perdieron contra los Cavaliers en el juego final, a pesar de que Steph Curry es su mejor jugador.
El documento presenta el temario del primer bimestre para los grupos 1° "A, B, C, D y E". En español, los temas son convivencia, organización de bibliotecas, viajes de libros y ortografía. En matemáticas, los temas son registro de información, números, colecciones, series numéricas, figuras geométricas, patrones e identificación de cuerpos. Exploración de la naturaleza y la sociedad cubre características personales, Miguel Hidalgo, actividades diarias y locales. Formación c
The author was approaching 200 lbs at 5'4 height and set a goal to lose 30 lbs. She started working with personal trainer Jamal Thompson in November 2015, and with his help exercising regularly, eating healthier, and counting calories, she has lost 25 lbs. The author recommends Jamal Thompson for anyone needing help with weight loss, saying that working with him has changed her life and empowered her to be more active and lose weight.
The document discusses problems in a business that are known at different levels of management. 4% of problems are known to top management, 74% to middle management, and 99% to frontline staff. It suggests that the biggest unknown problems that can destroy a business are often the easiest to address.
Trinity Kings World Leadership: A Model To Be FollowedTerrell Patillo
Follow the right Model:
Titus 2:1Amplified Bible, Classic Edition (AMPC)
2 But [as for] you, teach what is fitting and becoming to sound (wholesome) doctrine [the character and right living that identify true Christians].
Titus 2:7-8Amplified Bible, Classic Edition (AMPC)
7 And show your own self in all respects to be a pattern and a model of good deeds and works, teaching what is unadulterated, showing gravity [having the strictest regard for truth and purity of motive], with dignity and seriousness.
8 And let your instruction be sound and fit and wise and wholesome, vigorous and [a]irrefutable and above censure, so that the opponent may be put to shame, finding nothing discrediting or evil to say about us.
Eric Halfen will present on his research growing HEK-293 kidney cells on 3D scaffolds to better understand kidney development and potentially create artificial organs for transplant. Over 102,000 people are waiting for kidney transplants. His ongoing study at UWRF cultures HEK-293 cells, originally isolated from human embryonic kidney tissue, on natural scaffolds to see how far the cells will develop and their differentiation over time.
Flora Sharmin is seeking a challenging position that allows her to utilize her capabilities and grow professionally. She has a BBA from National University and is currently pursuing an MBA from Dhaka University. Her computer skills include Microsoft Office applications and she has strong communication skills in both English and Bengali. She completed a 3-month internship at First Security Islami Bank Ltd and is looking to further develop her professional experience.
The document summarizes procurement records for the month of December 2012 in Nigeria. It lists 14 contracts totaling 2,563,415,716.38 Naira for various construction, renovation, and supply projects. The implementing agencies and recommended contractors are also included. The Bureau of Public Procurement vetted all projects and certified the total cost of 2,563,415,716.38 Naira without finding any savings opportunities.
The document summarizes 39 projects reviewed by the Bureau for Vetting and Certifications in May 2012. It lists the project description, implementing agency, recommended contractor, agency's estimated cost, and cost savings. Several projects involved procurement of vehicles, equipment, or infrastructure repairs. The Bureau recommended contractors that could complete many of the projects at a lower cost than the agencies' original estimates, resulting in overall savings of several million naira.
The document summarizes procurement records from February 2013, listing 13 contracts for various projects in Ekiti State. It provides the project description, recommending contractor, estimated cost, reviewed project cost, and savings. In total, the estimated cost was N13.05 billion while the reviewed cost approved was N11.26 billion, resulting in savings of N1.79 billion due to review by the Bureau of Public Procurement.
1. The document details 20 projects and services that passed through the Bureau of Public Procurement in February 2012, with a total quoted amount of ₦455,018,755.20 and a total vetted price of ₦446,509,395.02.
2. The price differences between the quoted and vetted amounts for each project resulted in total savings of ₦8,509,380.20 through the vetting process in February 2012.
3. One notable project was the electrification of Ado city street lights, where the Electricity Board's quoted amount of ₦1,699,181,336.38 was vetted to ₦1,867,
The procurement record for June 2013 lists 41 contracts totaling N2,214,625,859.59 in estimated costs. The Bureau of Public Procurement (BPP) vetted these contracts, certifying costs of N2,022,004,782.58, resulting in cost savings of N192,621,077.01.
1. The document lists 35 projects that passed through the Bureau for vetting in April 2012 with a total quoted price of N500,247,414.25.
2. The total vetted price was N472,128,872.07.
3. Vetting resulted in savings of N28,118,542.18.
The document contains a detailed budget breakdown for various expense categories (GASTOS, INVERSION) with subcategories. It lists planned expenses, additions, reductions, credits against credits, and totals for each category and subcategory. The largest expense categories are GASTOS DE FUNCIONAMIENTO at 351,591,108.53 and INVERSION at 178,408,891.47. The document provides a comprehensive listing of budget line items and expected costs.
Suzuka Enterprise's trial balance as of December 31, 2007 is provided. Additional information includes adjustments needed for insurance, provision for doubtful debts, accrued expenses, and depreciation calculations. The required tasks are to [1] prepare the Trading and Profit and Loss Account for the year ended December 31, 2007 and [2] prepare the Balance Sheet as of December 31, 2007 using the information provided.
1. The Bureau vetted and certified projects and services totaling N2,479,944,875.11 in March 2012.
2. The vetted price of these projects was N2,416,446,764.39.
3. Vetting resulted in savings of N63,498,110.72.
The Ukrainian parliament adopted Draft Law No. 10183 which amends the country's feed-in tariff scheme for supporting electricity production from renewable energy sources. Some key changes include establishing fixed minimum "green" tariff rates for different renewable technologies that decrease over time. It also introduces local content requirements for renewable energy projects, mandating a certain percentage of components, materials and labor come from Ukraine. If projects do not meet these local content thresholds, the tariff rate will be set at the wholesale electricity price instead of the higher feed-in tariff. The law is awaiting signature from Ukraine's president and could face a potential veto.
This document outlines the internally generated revenue estimates for Ekiti State of Nigeria for 2012. It provides a summary of actual revenues collected in 2010 and January-October 2011, approved estimates for 2011, and estimated revenues for 2012 for various ministries and departments. The Board of Internal Revenue and Education Endowment Fund are projected to be the largest sources of revenue in 2012 at N4.1 billion and N500 million respectively. Total internally generated revenue for Ekiti State is estimated to increase to over N3 billion in 2012.
1. The document lists 23 projects and services that passed through the Bureau of Public Procurement for vetting and certification in January 2012, with a total quoted amount of ₦1,490,526,271.85.
2. The Bureau vetted the prices and certified a total of ₦1,486,882,484.97 for the projects and services.
3. Vetting by the Bureau resulted in savings of ₦3,643,786.88 for the month of January 2012.
This document provides budget execution details for expenses by cost center and area for the period of January 2010 to May 2010 for the SENA Regional Narino. It shows the budget, obligations, balance, commitments, available budget, balance of commitments, accumulated payments and percentage of payments and execution for various cost centers including contracting of instructors, materials for professional training, student welfare expenses, logistical support, travel expenses for training and certification, curriculum development, and expenses for displaced persons training. The overall percentage of payments was 28.62% and execution was 71.32% across cost centers.
This document provides a budget execution report for expenses by cost center and area for the period of January 2010 to May 2010 for the SENA Regional Narino. It includes budget allocations, obligations incurred, balances, commitments, available budget, and percentages spent for various line items across multiple cost centers, including contracting instructors, materials for professional training, student wellbeing expenses, utilities, rentals, maintenance, and transportation. The overall budget execution rate for the period was 71.32%.
IFG provided services that allowed one of their clients to significantly grow their business, tripling their workforce and increasing revenue tenfold. The document includes a table showing the revenue of various businesses that used IFG's invoice discounting program, which provides short-term cash flow as invoices become "cash-on-delivery" sales. The program has no long-term contracts, hidden fees, or minimum/maximum volume requirements. IFG aims to provide short-term working capital to businesses of all sizes through this program.
The document outlines a mangrove reforestation project in Gumaca, Philippines over 5 years from 2011-2016. It aims to plant 108 hectares of mangroves across 16 barangays and build 60 eco-tourism cottages. Each year identifies specific activities like planting, maintenance and fence installation. It provides estimated costs, sources of funding from government agencies and organizations, and a projected implementation schedule.
The document outlines Japan's grant project to introduce solar PV systems in the Federated States of Micronesia (FSM) using 530 million yen in funding. The project will install a 160 kW grid-connected PV system, including a 20 kW system at the President's Office and a 140 kW system at the College of Micronesia-FSM campus. It establishes a committee to oversee the project and discusses schedules, equipment procurement, installation, training, funding procedures, and obligations of the FSM government to ensure successful completion of the solar PV systems.
Olmito project aquaculture with investors numbers & graphics fish & prawnsPaulSkillicorn
The Olmito Agriquatics project will treat wastewater from Olmito and Los Fresnos, Texas to produce high quality treated effluent. It will use an innovative system to produce biogas, harvested duckweed, and fish and prawns through aquaculture. The project is expected to generate $3.5 million in pre-tax profits in 2016 from sales of over 1,000 tonnes of tilapia and 100 tonnes of prawns. It will seek $1.3 million from third party investors, offering a 22% dividend on the investment after 4 years along with an option to convert to company shares.
Similar to BPP Vetted Contracts For November 2012 (20)
The document summarizes the approved budget for Ekiti State of Nigeria for 2016. It provides estimates for revenue sources including federal allocations, internally generated revenue, and VAT, totaling over 42 billion Naira. It also provides estimates for recurrent and capital expenditures, with the largest allocations going to personnel costs, grants to parastatals, and capital projects. The budget aims to support priorities across sectors such as agriculture, education, health, and infrastructure development.
The document summarizes the approved budget for Ekiti State of Nigeria for 2016. It outlines the total revenue as 63% of the budget which includes federal allocations (39%), internally generated revenue (15%), and VAT (9%). It also details the total recurrent expenditure as 63% of the budget which includes personnel costs (12%), grants to parastatals (25%), and consolidated revenue fund charges (18%). The document further provides a breakdown of internally generated revenue and capital receipts which make up 37% of the budget.
The document summarizes the approved budget for Ekiti State of Nigeria for 2016. It provides estimates for revenue sources including federal allocations, internally generated revenue, and VAT, totaling over 42 billion Naira. It also provides estimates for recurrent and capital expenditures, with the largest allocations going to personnel costs, grants to parastatals, and capital projects. The budget aims to support priorities across sectors such as agriculture, education, health, and infrastructure development.
The document summarizes the approved budget for Ekiti State of Nigeria for 2016. It outlines the total revenue as 63% of the budget which includes federal allocations (39%), internally generated revenue (15%), and VAT (9%). It also outlines the total recurrent expenditure as 63% of the budget which includes personnel costs (12%), grants to parastatals (25%), and consolidated revenue fund charges (18%). The document further provides details of internally generated revenue estimates for various ministries and departments.
This document is the Ekiti State Public Procurement Law which establishes the Ekiti State Council on Public Procurement and the Bureau of Public Procurement. The law outlines the objectives, functions, and powers of these regulatory authorities. Specifically, it establishes the Council to approve procurement policies and the Bureau's directors, and receive the Bureau's audited accounts. It also establishes the Bureau to formulate procurement policies, certify procurements, monitor prices and contracts, and enforce the law. The law provides for procurement planning, methods, reviews and audits to ensure transparency and value for money.
This document is an application form for postgraduate awards for a Masters degree or PhD program in Nigeria from the Ekiti State Scholarship Board.
The form requests personal information about the applicant such as name, date of birth, educational background, employment status, references, and program details. It also requires documents like admission letters, transcripts, and certificates to be attached.
Applicants must submit the completed form through their department head or employer by the advertised deadline. Incomplete or late applications will not be processed. Employed applicants need certification from their employer that they can be released for the scholarship if selected.
The governor of Ekiti State, Mr. Peter Ayodele Fayose, presented the 2015 budget speech to the State House of Assembly. The N80.7 billion budget aims to continue projects from the governor's first term and focus on empowerment, agriculture, infrastructure, education, health, and good governance. The budget allocates 60% to recurrent expenditures like salaries and 40% to capital projects. It is expected to improve the lives of citizens and support economic growth through job creation and improved infrastructure and social services.
The document provides details of the analysis of Ekiti State's 2015 budget presented by the Commissioner for Finance and Economic Planning. Some key points:
- The 2015 budget size was N80.78 billion, with 60% for recurrent expenditure and 40% for capital expenditure.
- Revenue performance for 2014 was 65% of target due to lower internally generated revenue. Expenditure was 58% of the budget.
- Measures to boost revenue and reduce debt include restructuring MDAs, increasing internally generated revenue, reducing grants to MDAs, and renegotiating loans.
- The 2015 budget focuses on six programs: citizen empowerment, agriculture, infrastructure, education, healthcare, and security. It
The document discusses the benefits of exercise for mental health. Regular physical activity can help reduce anxiety and depression and improve mood and cognitive function. Exercise causes chemical changes in the brain that may help protect against developing mental illness and improve symptoms for those who already suffer from conditions like anxiety and depression.
The document provides an overview of the 2014 budget for Ekiti State of Nigeria. It summarizes the state's estimated revenue sources for 2014 which total 103.88 billion Naira. It also outlines the budget allocation with 48.3% or 50.11 billion Naira allocated for recurrent expenditures like personnel costs and other charges. The remaining 51.7% or 53.78 billion Naira is allocated for capital expenditures across economic, social, environmental, and administrative sectors. Personnel costs account for the largest portion of recurrent spending at 7.9% or 8.21 billion Naira of the total budget.
1. THE PROJECTS AND SERVICES THAT PASSED THROUGH BUREAU OF PUBLIC PROCUREMENT FOR CERTIFICATION AND VETTING IN THE MONTH OF NOVEMBER, 2012.
RECOMMENDED
S/N CONTRACT TITTLE PROJECT DESCRIPTION IMPLEMENTING MDA's MDA's ESTIMATE REVIEW PROJECT COST CONTRACTOR SAVINGS
Sinking of Borehole with overhead Tank for washing of
1 Waste Management Trucks. Borehole. Waste Mgt Authority. 1,747,126.44 1,593,300.00 Direct Labour. 153,826.44
2 The Computerization of Ekiti State Government Assets Computerization. GAD. 105,370,240.00 49,843,007.28 Messrs New Money Link Ltd. 55,527,232.72
3 Renovation of Fire Station, Ado. Renovation. Min. of Special Duties. 7,380,580.20 7,380,580.20 Main Business Venture Ltd. -
4 Renovation of Fire Station, Ikere Renovation. Min. of Special Duties. 21,205,039.80 20,384,915.00 First contract Inv. Ltd. 820,124.80
5 Renovation of Fire station, Ikole. Renovation. Min. of Special Duties. 6,495,289.50 6,490,575.00 Antrimacx Ltd. 4,714.50
6 Procurement of Vehicles. Vehicles. Min. of Agriculture. 22,433,000.00 22,170,600.00 - 262,400.00
Renovation of the Department of Public Building Office Antlantic Offshore Property
7 Complex at Min. of Works Renovation. Bureau of Special Project 35,276,583.30 32,970,081.90 Dev. And Marketing Coy. 2,306,501.40
Construction of Access Road and Installation of interlocking
8 to the surrounding of the project site. Construction and Installation. EEDA. 36,761,000.00 36,228,535.88 Tripple Engrs. Nig Ltd. 532,464.12
Survey cost to relocate the Redeemed Christian Church
9 from Iworoko Road to Afao Road Relocation. Office of Surveyor General 298,546.00 298,546.00 Direct Labour. -
10 Purchase of Petroleum Product Equipment. Petroleum Equipment PPCPA. 1,055,000.00 1,055,000.00 Jonats Impex. -
11 Annual De-Infestation of Registered produce Stores in Ekiti. Fumigation. Min. of Agriculture. 300,000.00 300,000.00 Direct Labour. -
12 Repair and Rebind of torn textbooks in the Library. Rebind & Repair. Library Board. 530,000.00 400,000.00 Direct Labour. 130,000.00
13 Purchase of Office Furniture and Equipment. Office Furniture. EKSTMA. 1,966,920.00 1,500,000.00 Direct Labour. 466,920.00
14 Purchase of Office Furniture. Office Furniture. Waste Mgt Authority. 1,000,000.00 1,000,000.00 Direct Labour. -
15 Servicing of 6 nos. Generating Set Servicing. Electricity Board. 559,345.00 559,345.00 Direct Labour. -
Supply and Installation of 800KVA Gen. Set at Government
16 House Installation. Electricity Board. 37,000,000.00 37,000,000.00 Mikano Int. Ltd. -
17 Production of ESKAMBUS Uniform and Accessories. Uniform. Min. of Special Duties. 907,095.00 823,620.00 Sam & Sara Exclusive Uniforms 834.75
Acquisition of Land for the creation of Legacy Estates in
18 Ado. Land. Bureau of Land. 1,572,900.00 1,572,900.00 Direct Labour. -
Renovation of Internal Revenue Service accommodation at
19 Efon Alaaye Renovation. Revenue Board. 3,517,156.13 3,517,156.13 Direct Labour. -
20 Earth dredging of some stream channels within Ado Ekiti. Earth Dredging. S.E.P.A 359,286,900.00 359,286,900.00 Rafjo Interbiz Services Ltd. -
Procurement of Fumigation Equipment and accessories for
21 pests and vectors control. Fumigation Equipment Min. of Housing & Environment 500,000.00 500,000.00 Direct Labour. -
22 Production of TV and Radio Studio with the supply of other Information gadget. Min. of Information. 15,000,000.00 15,000,000.00 - -
Information gadget.
www.ekitistate.gov.ng
2. 23 Purchase of Boundary verification Equipments Equipments. Boundary Commission. 1,900,000.00 1,900,000.00 - -
Financial Advisory service between Govt and international
24 Financial Corporation - Min. of Health. 23,700,000.00 23,700,000.00 - -
25 Procurement of Equipment in the TIC Equipments. Min. of Education. 2,500,000.00 2,500,000.00 -
26 Procurement of 3 nos Gen. Sets. Gen. Set. Liaison Office, Abuja. 7,471,264.20 7,471,264.20 Messrs Dafemtos Int. Nig. Ltd. -
TOTAL 695,733,985.57 635,446,326.59 60,287,658.98
SUMMARY
1 The sum of N695,733,985.27 is the total cost of projects and services that passed through Due Process for vetting and Certifications in the month of Nov, 2012.
2 The sum of N635,446,326.59 is the B.P.P vetted cost in the month of Nov, 2012.
3 The sum of N60,205,018.73 is the amount saved in the month of November
www.ekitistate.gov.ng