SlideShare a Scribd company logo
1 of 39
Download to read offline
RISK BASED INSPECTION
BOS PLANT ‘B’ VESSEL
HOOD & GAS CLEANING
SYSTEM
RBI 1
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Date 22 FEBRUARY 2015
Plant STEELMAKING
Item BOS PRIMARY ‘B’ VESSEL HOOD
& GAS CLEANING SYSTEM
Assessment
Team
FABRICATION ENGINEER; TONY SMITH
MECHANICAL ENGINEER; ROB BLAKE
PRODUCTION MANAGER; STUART DUNBAR /
ALEX SMITH
STRUCTURAL INSPECTOR; GLYN SHERWOOD
FABRICATION TEAM LEADER; COLIN WAITT
MATERIALS SPECIALIST; IAN RICHARDSON
2
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
ASSESSMENT GROUP AND TASK DETAIL
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
3
INDEX PAGE
PAGE No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
SKETCH IDENTIFYING INSPECTION AREAS
SIGNATORIES OF REVIEW GROUP
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
MINIMUMTHICKNESS DRAWING
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL FEEDBACK FROMFABRICATION GROUP
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
TYPICAL DETAILED INSPECTION REQUIREMENT
LIST OF COMPONENTS FOR RISK BASED ASSESSMENT
ASSESSMENT OF THE RISK
RESULT OF THE REVIEW PROCEDURE & CHANGE OF SCOPE / INSPECTION
STRUCTURAL INSPECTORS WORKLIST & SAP INFORMATION
TYPICAL STRUCTURAL INSPECTORS SAP TASK
TYPICAL NOTIFICATION TASK FOLLOWING INSPECTION
PAGE TITLE
TITLE PAGE
ASSESSMENT GROUP AND TASK DETAIL
INDEX PAGE
STEPS FOR QUALITATIVE RISK BASED INSPECTION
STEPS FOR QUALITATIVE RISK BASED INSPECTION (CONT)
BASIC INFORMATION
DAMAGE MECHANISM'S
STEPS FOR QUALITATIVE RISK BASED INSPECTION
STEP (1)
Identify the equipment, the structure or the system to be risk assessed. BOS PRIMARY ‘B’ VESSEL HOOD & GAS
CLEANING SYSTEM
STEP (2)
Define the system boundaries – Agree the boundary limits (i.e. isolation valves) then decide which systems, components, or
items etc, within the boundary, should be included within the scope of the RBI assessment. These will be those that have the
most influence on safety, production or environment should a failure occur, especially those that have history of failure.
THE LOWER HOOD, THE MOVEABLE HOOD, THE FIXED HOOD FROM ITS MOUTH TO THE 60M HEADERS. THE
QUENCHER WATER SEAL WITHIN THE 60M VENTURI, DOWN STREAM TO THE EXIT DUCT OF THE PRIMARY I.D.FAN
INCUDING ALL TANKS AND DRAIN PIPES WITHIN THIS DESCRIPTION.
STEP (3)
Assemble the RBI team – Five (minimum) competent persons with relevant experience or knowledge of the system/item, its
design, inspection history or maintenance history.
Five experts (one of which will act as facilitator) are typically;
Structural Engineer or Pipe Design Engineer (Design Standards knowledge)
Structural Inspector (Report on past/current conditions)
Maintenance Engineer (Past repair/failure history)
Production Manager/Owner (Costing future repair/renewal)
Damage mechanism Expert (Metallurgist/structural inspector to identify the relevant corrosion or other damage
mechanisms)
STEP (4)
Gather the information - List the relevant equipment or Plant items within the system, item or structure, incl breaking the
system down into circuits where appropriate (areas exposed to similar environments incl proximity to personnel).
Make a list of all the critical items, along with their characteristics including;
Modification/repair history
Previous inspection report findings
Original design/construction data
Maintenance records
Age
Likely damage mechanisms and consequence
4
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
STEP (5)
Evaluate all the critical items – Evaluate each item with regard to likelihood and consequence of failure within the existing
Inspection time frame. Consider all available information, such as the effectiveness of current maintenance regimes, existing
condition, design, past history/failures, modifications (incl temp repairs), inspection records, operating/process conditions, etc.
Note – any items identified at this stage as being unfit for purpose (integrity already compromised) will not be entered on to the
Matrix, until an action to repair/renew has been agreed by the Plant Engineer.
STEP (6)
Compile the Risk Matrix's – The team will need to agree the definitions in the consequence table, i.e what is acceptable.
(In some cases a leak might be acceptable, in others it will not, for instance a water leak as apposed to a toxic fluid leak)
Place each item on the Matrix (consequence x likelihood = RISK)
STEP (7)
Consider ways to reduce the RISK – Consider actions to reduce the likelihood or consequence of the highest risk items.
Note – the responsibility for carrying out agreed actions remains with the Plant Manager/Owner.
STEP (8)
Decide new inspection frequencies/scope –Prioritise the risks and decide new inspection periods and scope.
Consider creating separate inspections for items in Risk Cat 3 or 4. (shorter inspection periods)
The highest remaining risk item will determine the new inspection frequency.
After agreeing new inspection frequencies, repeat step 6 to quantify your result.
5
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
BASIC INFORMATION
DEPARTMENT STEELMAKING PRODUCT BOS GAS
PLANT BOS PRODUCT CLASS COMAH
LOCATION PRIMARY ‘B’
VESSEL HOOD AND
GAS CLEANING
DESIGN
PRESSURE
25 - 200mbarg
REPORT
NUMBERS
DESIGN
TEMPERATURE
1700deg C max
EXISTING
INSPECTION
VISUAL /
THICKNESS
MINIMUM
THICKNESS
Variable, 4mm at
flooded disc
EXISTING
FREQUENCY
32 WEEKLY
6
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
DAMAGE MECHANISM’s / SYSTEM CONSTRUCTION
TYPICAL DAMAGE MECHANISM TYPICAL SYSTEM COMPONENTS
INTERNAL CORROSION / EROSION X SUPPORT STRUCTURE X
EXTERNAL CORROSION X PIPE SUPPORTS X
CREVICE CORROSION X PIPE MAIN
CORROSION UNDER INSULATION AUXILIARY PIPEWORK X
MECHANICAL IMPACT X DEAD LEGS
VIBRATION BELLOWS X
FLANGE JOINTS X
CLADDING
DRAIN POTS
7
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
LIST COMPONENTS AND CIRCUITS FOR RISK BASED ASSESSMENT
8
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
MATRIX
KEY
COMPONENT DAMAGE MECHANISM
MINIMAL
THICKNESS
ALLOWED
EXTERNAL CONDITION
ESTIMATED
RETIREMENT DATE
PRODUCT CHARACTERISTIC
PROXIMITY TO
PERSONNEL
DESIGN QUALITY /
FITNESS FOR
PURPOSE
EFFECTIVENESS OF
CURRENT
INSPECTION REGIME
AGE AND PAST FAILURE
INFO
POTENTIAL FAILURE MODE
1
ID Fan inlet duct internal / external
corrosion
7mm Paint breakdown,
localised rusting
Not Planned Unpredicted external
corrosion
regularly 2/3
persons
Good Good None Air ingress, explosion
2
ID Fan casing internal erosion /
external corrosion
7mm Poor condition, regular
repairs required due
to localised rusting,
process erosion
prior to end 2015 Unpredicted internal
erosion / internal
corrosion
regularly 2/3
persons
Good Good Several years past,
system fail due to
explosion, (air ingress)
Air ingress, explosion
3
ID Fan exit duct internal / external
corrosion
5.8mm Paint breakdown,
localised rusting
Not Planned Unpredicted external
corrosion
regularly 2/3
persons
Good Good None Release of CO
4
ID Fan sump drain legs internal / external
corrosion
3mm Stainless steel Not Planned Non predicted regularly 2/3
persons
Good Good None Air ingress, explosion
5
Slag Gantry east
vertical leg
internal / external
corrosion
6.4mm Paint breakdown,
localised rusting
Not Planned Unpredicted external
corrosion
regularly 2/3
persons
Good Good None Air ingress, explosion
6
Slag gantry horizontal
duct
internal / external
corrosion
6.4mm Paint breakdown,
localised rusting
Not Planned Unpredicted external
corrosion
Occasionally Good Good None Air ingress, explosion
7
Slag Gantry west
vertical leg
internal / external
corrosion
6.4mm Paint breakdown,
localised rusting
Not Planned Unpredicted external
corrosion
regularly 2/3
persons
Good Good None Air ingress, explosion
8
Radiation section
explosion door
internal erosion /
external corrosion
2.0mm (hood
tubes)
Poor condition, thinning
tubes, regular failures,
several Structural P1
notifications
New Hood planned
for 2017
installation
Unpredicted internal
erosion / internal
corrosion
Occasionally Good Good Several years past,
system fail due to
explosion, (air ingress)
Release of CO, water
leakage
9
Quencher Venturi internal / external
corrosion
7mm Paint breakdown,
covering of process
debris
Plan to replace as
part of Hood
replacement 2017
Unpredicted internal
erosion / internal
corrosion
regularly 2/3
persons
Good Good None Release of CO, water
leakage
10
Primary Elbow internal / external
corrosion
7mm Poor condition, regular
repairs required due to
localised rusting, process
erosion
Considering replacing
as part of Secondary
Scrubbing upgrade
Unpredicted internal
erosion / internal
corrosion
regularly 2/3
persons
Good Good None Release of CO, water
leakage
11
Quencher Seal tank &
drain legs
internal / external
corrosion
4mm Paint breakdown,
covering of process
debris
Not Planned Unpredicted external
corrosion
regularly 2/3
persons
Good Good None Release of CO, water
leakage
12
Disc Scrubber internal / external
corrosion
4.3mm Poor condition, regular
repairs required due to
localised rusting, process
erosion
Considering replacing
as part of Secondary
Scrubbing upgrade
Unpredicted internal
erosion / internal
corrosion
regularly 2/3
persons
Good Good None Release of CO, water
leakage
13
Secondary Elbow internal / external
corrosion
7mm Paint breakdown,
covering of process
debris
Not Planned Unpredicted external
corrosion
regularly 2/3
persons
Good Good None Release of CO, water
leakage
14
Quencher Feed tank &
drain legs
internal / external
corrosion
5mm Paint breakdown,
covering of process
debris
Not Planned Unpredicted external
corrosion
Occasionally Good Good None Release of CO, water
leakage
15
Mist Eliminator internal / external
corrosion
6.4mm Paint breakdown,
covering of process
debris
Not Planned Unpredicted external
corrosion
Occasionally Good Good None Release of CO, water
leakage
16
Ground Floor duct internal / external
corrosion, metal
splash
5.6mm Paint breakdown,
covering of process
debris
Not Planned Unpredicted external
corrosion
regularly 2/3
persons
Good Good Several years past,
system fail due to
explosion, (air ingress)
Air ingress, explosion
17
Duct Seal tank & drain
legs
internal / external
corrosion
4.0mm Paint breakdown,
covering of process
debris
Not Planned Unpredicted external
corrosion
regularly 2/3
persons
Good Good None Air ingress, explosion,
release of CO. Water
leakage
18
OG System manway
doors
internal / external
corrosion
relative to
system
location
Paint breakdown Not Planned Unpredicted external
corrosion
regularly 2/3
persons
Good Good Several years past, G F
Duct door failed. Other
doors no reported fails
Air ingress, explosion,
release of CO. Water
leakage
19
Lower Hood internal / external
corrosion
2.0mm (hood
tubes)
Paint breakdown,
covering of process
debris
Plan to replace as
part of Hood
replacement 2017
Unpredicted internal
erosion / internal
corrosion
Occasionally Good Good None Release of CO, water
leakage, flame
release
20
Moveable Hood internal / external
corrosion
2.0mm (hood
tubes)
Paint breakdown,
covering of process
debris
Plan to replace as
part of Hood
replacement 2017
Unpredicted internal
erosion / internal
corrosion
Occasionally Good Good None Release of CO, water
leakage, flame
release
21
Lower fixed hood internal / external
corrosion
2.0mm (hood
tubes)
Poor condition, thinning
tubes, regular failures,
several Structural P1
notifications
Plan to replace as
part of Hood
replacement 2017
Unpredicted internal
erosion / internal
corrosion
regularly 2/3
persons
Good Good Several years past,
system overpressure
damaged Hood
Release of CO, water
leakage, flame
release
22
Upper Fixed hood internal / external
corrosion
2.0mm (hood
tubes)
Poor condition, thinning
tubes, regular failures,
several Structural P1
notifications
Plan to replace as
part of Hood
replacement 2017
Unpredicted internal
erosion / internal
corrosion
regularly 2/3
persons
Good Good Several years past,
system overpressure
damaged Hood
Release of CO, water
leakage, flame
release
CATASTROPHIC 1 2 2 4 4
SUBSTANTIAL 1 2 2
16,18
3
19,20
4 2,8,21,22
MARGINAL 1 1 1 2
1,3,4,5,6,7,9,
10,11,12,
13,14,15,17
2
NEGLIGABLE 0 1 1 1 1
UNFORSEABLE IMPROBABLE REMOTE POSSIBLE LIKELY
COMPONENTS AND CIRCUITS RISK ASSESSMENT MATRIX
UNACCEPTABLE RISK - 4
Inspection / scope increased
MODERATE RISK - 3
Scope of inspection increased
LOW RISK - 2
Inspection and scope adequate
VERY LOW RISK - 1
Inspection can be decreased
NO RISK - 0
Inspection not required
KEY
NEGLIGABLE
Little or no structural damage or deterioration of protective coatings, no
risk to safety or environment
MARGINAL
Breakdown in protective coatings, surface corrosion, light impact
damage, minor injury
SUBSTANTIAL
Severe deflection, loss of member thickness > 25%, partial collapse /
detachment leading to unsafe structure, major injury, production
stoppage, minor loss of containment
CATASTROPHIC
Total failure / buckling / collapse, major leakage, loss of containment,
fatal injury, environmental damage, loss of production
LIKELY TO BE EXPECTED
POSSIBLE COULD OCCUR
REMOTE UNLIKELY
IMPROBABLE VERY UNLIKELY
UNFORSEABLE CLOSE TO ZERO
RISK / PROBABILITY DESCRIPTION
9
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
ASSESSMENT OF THE RISK
ITEM DAMAGE MECHANISM RISK (DESCRIPTION) RISK LEVEL
ACTIONS TO REDUCE
RISK
NEW RISK RATING
16,18
Internal / external
corrosion
Thinning of parent
metal (air ingress)
2
Consider renewing of
paint protection 2
1,3,4,5,6,7,9,10,11,
12,13,14,15,17
Internal / external
corrosion
Thinning of parent
metal (air ingress)
2 Consider renewing of
paint protection
2
19,20
Internal erosion /
external corrosion
Thinning of tubes
(water / HM mix) 3
Inspection frequency to
be increased 3
2,8,21,22
Internal erosion /
external corrosion
Thinning of tubes
(water / HM mix)
Thinning of parent
metal (air ingress)
4
Inspection frequency
to be increased
4
ACTIONS TO BE TAKEN TO REDUCE THE LIKELYHOOD OF FAILURE
ITEM
CURRENT INSPECTION
FREQUENCY
TYPE / SCOPE
OVERALL RISK
CATEGORY
REVISED INSPECTION
FREQUENCY
REVISED SCOPE
16,18
Reline major stop / 32
weekly
Visual and U/T
thickness readings
2
No Change
None
1,3,4,5,6,7,9,10,11,
12,13,14,15,17
Reline major stop / 32
weekly
Visual and U/T
thickness readings
2
No Change
None
19,20
Reline major stop / 32
weekly
Visual and U/T
thickness readings
3 Additional inspections on
1500 Lives Maint outage
Additional Thermovision
prior to Reline outage
2,8,21,22
Reline major stop / 32
weekly
Visual and U/T
thickness readings
4
Additional inspections
on 1500 Lives Maint
outage
Additional
Thermovision prior to
Reline outage
NEW INSPECTION FREQUENCY AND SCOPE
10
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
RESULT OF THIS REVIEW PROCEDURE
INSPECTION / SCOPE CHANGE AS A RESULT OF THE REVIEW
B VESSEL Maint plan + Func Location
WASTE GAS ID FAN (VENTILATOR)
ID Fan Inlet Ducting 216841 1000-080-1968-0024-0027
ID Fan Casing 216851 1000-080-1968-0024-0027
ID Fan Exit Ducting 216851 1000-080-1968-0024-0027
ID Fan Sump Drain Legs 212649 1000-080-1968-0024-0037
PRIMARY WASTE GAS SYSTEM
Slag Gantry East Vertical Leg 215627 1000-080-1968-0024-0009
Slag Gantry Hortizontal Duct 215261 1000-080-1968-0024-0009
Slag Gantry West Vertical Leg 212533 1000-080-1968-0024-0009
Radiation Section Explosion Door 213217 1000-080-1968-0024-0002
Quencher Venturi 215926 1000-080-1968-0024-0005
Primary Elbow 217164 1000-080-1968-0024-0006
Quencher Seal Tank & Drain Legs 214850 1000-080-1968-0024-0008
Disc Scrubber 216832 1000-080-1968-0024-0012
Secondary Elbow 217562 1000-080-1968-0024-0007
Quencher Feed Tank & Drain Legs 213679 1000-080-1968-0024-0022
Mist Eliminator 213608 1000-080-1968-0024-0014
Ground Floor Duct 212834 1000-080-1968-0024-0009
Duct Seal Tank & Drain Legs 214930 1000-080-1968-0024-0043
OG System Inspection Doors 229753 1000-080-1968-0001-0011
HOOD INSPECTIONS
Lower Hood 213171 000-080-1968-0024-0001
Moveable Hood 213656 1000-080-1968-0024-0004
Lower Fixed Hood 213181 1000-080-1968-0024-0001
Upper Fixed Hood 216706 1000-080-1968-0024-0001
Vessel reline - structural inspection
checklist
11
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
STRUCTURAL INSPECTORS WORKLIST & SAP INFORMATION
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
12
TYPICAL STRUCTURAL INSPECTORS SAP INSPECTION TASK
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
13
TYPICAL NOTIFICATION (WORK RAISED) TASK FOLLOWING INSPECTION
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
14
TYPICAL FEEDBACK FROM FABRICATION MAINTENANCE GROUP
ID Fan Inlet Ducting Procedure
INSPECTION LIST
Carry out a visual inspection of casing,system
supports, access platform,visualy inspect vane
cylinder linkage & supports,vane box,fabric bellows.
1.Inspect casing-Carry out assessment of the
protective coating,detailing the
condition(blistering/flaking).Do a random UT
thickness test of the full casing at max spacings of
500mm,including any areas suspect of suffering
internal corrosion/any areas rea
2. Access ladder and platforms. Check the
condition and security of ladder rungs stringers and
safety hoops including securing brackets / bolts.
Detail all impact damage, corrosion, condition of
anchorage points / brackets, check handrail for
security and
3.System suports- Identify any missing or loose
bolts at connections including any weld defects such
as cracks,marking up for repair.
4.Vane cylinder-Visualy inspect the vane cylinder
linkage and supports.
5.Fabric bellows-Check for signs of
deteroration,wear and leakage.
KC4200 V0 Job Catalogue Enquiry-Basic Details 27/09/07 15:08
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 27 3700HP I/D FAN & FLARE STACK RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
075 STRUCT INSPECTION 02 RELINE INSPECTION OF FAN INLET DUCTING 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF CASING TO 1994 01
ENSURE INTEGRITY OF SYSTEM, CARRY OUT Priority
RANDOM THICKNESS CHECKS TO FULL SECTION, Critical C
CARRY OUT VISUAL INSPECTION OF SYSTEM Cost Allocation
SUPPORTS, VISUALLY INSPECT VANE CYLINDER
LINKAGE & SUPPORTS. VISUAL INSPECTION OF SI 2 4.00 OrderNo
ACCESS PLATFORM & LADDERS. Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 1 16 0 0 00 0 A 01 4 7 02 01
15
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
ID Fan Casing Procedure
INSPECTION PROCEDURE
Carry visual inspection of I.D fan casing, holding down
structures access walkway and staircase.
1. ID Fan casing-carry out a visual inspection of all the ID
Fan casing plates and identify any areas suffering from
corrosion or internal wear. Check also for signs of buckling
or distortion possibly caused by thinning of the casing
plates,(problem areas are around the shaft on the drive side
and around the casing on the fan path) carry out a visual
inspection of the welds and report all weld fractures.
2.Carry out a systematic UT thickness test of the fan casing
at a max spacing of 500mm including any areas suspect of
suffering from internal erosion, any areas found showing
readings of <3mm should be subject to a UT scan (letter
box) of 100mm x 100mm. All readings below 3mm should
be reported to the relevent supervisor, who will organise
immediate repair.
Visual inspection
3.Holding down structures-inspect the fan stuctures
concrete foundation and identify any spalling or cracked
concrete.Check all holding down bolts are secure and
report any corrosion.
4.Access walkway and staircase-Inspect all stair treads
for wear/deformed including security bolts for corrosion.
Check all handrailing for corrosion and security, check the
condition of the protective coating. Inspect all open mesh
gratings including the grating support structure.
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 27 3700HP I/D FAN & FLARE STACK RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
076 STRUCT INSPECTION 02 RELINE INSPECTION OF I.D. FAN CASING 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF CASING TO 1994 01
ENSURE SYSTEM SECURITY, CARRY OUT RANDOM Priority
THICKNESS CHECKS OF CASING AREA, VISUAL Critical C
INSPECTION OF HOLDING DOWN STRUCTURES, Cost Allocation
VISUAL INSPECTION OF ACCESS WALKWAY &
STAIRCASE. SI 2 6.00 OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 15 0 0 00 0 A 01 4 7 02 01
16
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
ID Fan Exit Ducting Procedure
Carry out a visual inspection of:
Swan neck, Stainless steel expansion Bellows, Silencer, T piece,
Transition duct and Fabric bellows to ensure integrity of ducting.
1. Swan neck, check for paint deterioration / corrosion, check
welds on channel stiffeners / between ducting and stiffeners for
crevice corrosion. Carry out visual inspection of swan neck to Stack
flanged connection looking for signs of leakage. Check bolts for
severe corrosion and identify any found missing or loose. Carry out
thickness checks to ducting at a max spacing of 500mm, including
any areas suspected of suffering internal errosion or severe external
corrosion (i.e above channel stiffeners where plant process debris
collects, signs of buckling or distortion). Any areas showing
readings < 3mm should be subject to a scan (Min 100mm x
100mmm) to dermine the area requiring repair. Mark all areas
requiring repair and report to relevant plant supervisor who will
organise immediate repair.
2. Stainless expansion Bellows Check convolutes for signs of
fatigue/cracking. Any suspect areas should be subject to DPI.
Check and report any signs of impact damage and misalignment.
3. Silencer Thickness check ducting at a max spacing of 500mm /
check for paint deterioation signs of corrosion. Check welds for
defects
4. T piece and transition ducting Check for paint deterioration /
corrosion to casings,Check bolts in flanges for severe corrosion and
identify any missing or loose. Check around welded connection of "T"
piece for leakage thinning of shell casing .Carry out thickness checks
to ducting at a max spacing of 400mm including any areas suspected
of suffering internal errosion or severe external corrosion i.e. signs of
buckling, distortion, pin holes . Any areas showing readings <3mm
should be subject to a scan (min 100mm x 100mm) to dermine the
area requiring repair, mark all areas requiring repair and report to
relevant plant supervisor who will organise immediate repair.Check
bolted connections in north and south sides supporting columns.
5.Fabric bellows Check bellows for signs of deterioration, tears, holes, .
any signs of leakage
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 27 3700HP I/D FAN & FLARE STACK RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
077 STRUCT INSPECTION 02 RELINE INSPECTION OF FAN EXIT DUCTING 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF CASING TO 1994 01
ENSURE SYSTEM SECURITY, CARRY OUT RANDOM Priority
THICKNESS CHECKS TO FULL SECTION, REPORT Critical C
ON FABRIC BELLOWS CONDITION, VISUAL Cost Allocation
INSPECTION OF SILENCER SECTION, VISUAL
INSPECTION OF SWAN NECK ENTERING INTO SI 2 4.00 OrderNo
CHIMNEY. Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 15 0 0 00 0 A 01 4 7 02 01
17
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
ID Fan Sump Drain Legs Procedure
INSPECTION LIST
Carry out inspection of I.D. Fan Sump Drain Legs to ensure
integrity and length of.
Visual inspect
Drain Legs Check for paint deterioration and corrosion. Check
all flanges for signs of leakage, loose, missing or severly
corroded bolts. Carry out thickness checks to full length of
carbon pipe (Original thickness recorded at 7.6mm). Carry out
visual inspection of stainless steel (sump end) leg length to
ensure that they are below sump water level and form a seal.
1 Sump drain legs
Sump Handrail Check handrail for defects I.e. missing or loose
bolts impact damage to rails, paint deterioration, corrosion.
Check access gate
2 Ensure pipe work is of correct length
UT thickness tests
1 Ut thickness testing of pipe work
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 37 3700HP I/D FAN - SUMP PUMP RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
010 STRUCT INSPECTION 02 RELINE INSPECTION OF SUMP DRAIN LEGS 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF SUMP 1994 01
DRAIN LEGS TO ENSURE INTEGRITY OF SYSTEM Priority
ENSURE PIPEWORK IS OF CORRECT LENGTH, Critical C
CARRY OUT THICKNESS CHECKS OF PIPEWORK. SI 2 3.00 Cost Allocation
OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZBP 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 21 0 0 00 0 A 01 4 7 02 01
18
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Slag Gantry East Vertical Leg Procedure
INSPECTION LIST
Carry out inspection of casing, 20metre level pivot point
frames and pin connections to casing, crane drivers access
walkway level slide bearing frame
Visual inspect
1.Inspect casing-Carry out assessment of the protective
coating,detailing the condition(blistering/flaking).Do a
random UT thickness test of the full casing at max spacings
of 500mm,including any areas suspect of suffering internal
erosion / any areas reading <3mm should be subject to a
scan (min 100mmx100mm) to determine the area to repair.
1 Inspect casings
2. Pivot point frame. Check around pin to esure welded
connection to ducting is intact and pin is horizontal. Check
frame for defects I.e. distortion, welds cracking and if frame
is vertical on supporting steelwork.
2 System supports at 20m level
3. Slide bearing and frame. Check channel bracings for
integrity I.e. bolted connections any signs of distortion. Check
wear plates on shell casing and channel bracings to ensure
integrity off.
3 Slide bearing frame
4 Pivot point frame
UT thickness tests
1 Random Ut Thickness tesing of full section
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 09 DAHL TUBE RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
025 STRUCT INSPECTION 02 RELINE INSPECTION OF EAST VERTICAL LEG 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF CASING TO 1994 01
ENSURE INTEGRITY OF SYSTEM, CARRY OUT Priority
RANDOM THICKNESS CHECKS TO FULL SECTION, Critical C
VISUALLY INSPECT SYSTEM SUPPORTS @ 20M Cost Allocation
LEVEL, VISUAL INSPECTION OF SLIDE
BEARING FRAME, VISUAL INSPECTION OF SI 2 12.00 OrderNo
PIVOT POINT FRAME. Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 15 0 0 00 0 A 01 4 7 02 01
19
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Slag Gantry Hortizontal Duct Procedure
INSPECTION LIST
Carry out inspection of Slag Gantry horizontal duct,
platforms G and platform F.
Slag Gantry Horizontal duct. Carry out a visual
inspection of Ducting looking for signs of leakage, paint
deterioration or corrosion. Check door flanges for crevice
corrosion. Carry out Visual inspection of internal
handrailing. Carry out thickness checks to ducting at a max
spacing of 1metre, including any areas suspected of
suffering internal erosion or severe external corrosion. Any
areas showing readings< 3mm should be subject to a scan
(min 100mm x 100mm) to determine the area requiring
repair. Mark all areas requiring repair and report to relevant
plant supervisor who will organise immediate repair.
Visual inspect
Platforms G and F. Check supporting steelwork and
welded connections to duct casing. Check Bolted
connections for crevice corrosion. Check open mesh
panels for defects and if secured with clips. Check
handrailing and ladder access. Check connecting walkway
for same.
1 Inspect casings
2 Access walkways and ladders
UT thickness tests
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 09 DAHL TUBE RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
026 STRUCT INSPECTION 02 RELINE INSPECTION OF SLAG GANTRY DUCT 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF CASING TO 1994 01
ENSURE INTEGRITY OF SYSTEM, CARRY OUT Priority
RANDOM THICKNESS CHECKS TO FULL SECTION, Critical C
VISUAL INSPECTION OF ACCESS WALKWAYS AND Cost Allocation
LADDERS. SI 2 12.00
OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 64 4 2 47 0 0 00 0 A 02 4 7 02 02
20
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Slag Gantry West Vertical Leg Procedure
INSPECTION LIST
carry out a visual inspection of casing,system supports
and vertical access ladder.
1.Inspect casing-Carry out assessment of the
protective coating,detailing the
condition(blistering/flaking).Do a random UT thickness
test of the full casing at max spacings of
500mm,including any areas suspect of suffering internal
corrosion/any areas reading <3mm should be subject to
a scan (min 100mmx100mm) to determine the area to
repair.
2.System suports- Identify any missing or loose bolts at
connections including any weld defects such as
cracks,marking up for repair.
3.Vertical access ladder-Check the condition and
security of the ladder rungs,stringers and safety hoops
including securing brackets/bolts.Detail all impact
damage,corrosion,contition of protective
coating,condition of anchorage point.
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 09 DAHL TUBE RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
027 STRUCT INSPECTION 02 RELINE INSPECTION OF WEST VERTICAL LEG 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF CASING TO 1994 01
ENSURE INTEGRITY OF SYSTEM, CARRY OUT Priority
RANDOM THICKNESS CHECKS TO FULL SECTION, Critical C
CARRY OUT VISUAL INSPECTION OF SYSTEM Cost Allocation
SUPPORTS, VISUAL INSPECTION OF VERTICAL
LADDER ACCESS. SI 2 4.00 OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 64 4 2 47 0 0 00 0 A 02 4 7 02 02
21
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Radiation Section Explosion Door Procedure
INSPECTION LIST
Carry out inspection of Explosion door and pivot structure.
Water seal trough and associated access platforms.
Visual inspect
Explosion door and pivot structure. Carry out visual
inspection of door checking for severe corrosion and condition
of door seal plate. Check pivot assembly for defects
1 Explosion door
Water seal trough. Visual inspection of trough looking for
severe corrosion wall height of trough and over flow pipe work
2 Explosion door pivot structure ans supports
Access platforms. Check Bolted connections for crevice
corrosion. Check open mesh panels for defects and if secured
with clips. Check handrailing and ladder access. Check Internal
walkway and ladders for same.
3 Water seal trough
4 access platforms and ladder
Chimney. Check for defects I.e. Holes, impact damage.
Check condition of refactory.
5 chimney
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 02 FURNACE HOOD - EXPLOSION DOOR RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
032 STRUCT INSPECTION 02 RELINE INSPECTION OF EXPLOSION DOOR 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF 1994 01
EXPLOSION DOOR AND ITS PIVOT STRUCTURE Priority
AND SUPPORTS, INTEGRITY OF WATER SEAL Critical C
TROUGH. VISUAL INSPECTION OF ACCESS Cost Allocation
PLATFORMS & LADDER, VISUAL INSPECTION
OF CHIMNEY. SI 2 6.00 OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 15 0 0 00 0 A 01 4 7 02 01
22
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Quencher Venturi Procedure
INSPECTION LIST
Carry out visual inspection of outer casing, internal
inspection of wear plates water seal trough and dipper
arrangement.
Outer casing. Check for paint deterioration / corrosion to
casings,Check bolts in flanges of vane assembly
(underslung platform) for severe corrosion and identify any
missing or loose. Carry out thickness checks to ducting at
a max spacing of 400mm including any areas suspected of
suffering internal errosion or severe external corrosion
i.e.leakage, signs of buckling, distortion (north wall around
spray water inlet pipes). Any areas showing readings
<3mm should be subject to a scan (min 100mm x 100mm)
to dermine the area requiring repair, mark all areas
requiring repair and report to relevant plant supervisor who
will organise immediate repair.
Visual inspect
Wear plates. Carry out internal inspection of wear plates
looking for distortion caused through heat damage . Check
wear plates for cracking in securing welds. Visual
inspection of wear plate face checking for erosion.
1 Outer casing
2 Water seal trough
Water seal trough and Dipper arrangement. Visual
inspection of trough and dipper arrangement checking that
dipper plate sits lower than water level in trough and
forming gas tight seal. Check for heat distortion to internal
trough walls.
3 Dipper arrangement
UT thickness tests
1 UT thickness test walls
Measure
Venturi vanes and report
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 05 VENTURI HOPPER/QUENCHER TROUGHS RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
031 STRUCT INSPECTION 02 RELINE INSPECTION OF QUENCHER VENTURI 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF OUTER 1994 01
CASING TO ENSURE INTEGRITY OF SYSTEM, Priority
CARRY OUT VARIOUS THICKNESS READINGS Critical C
OF WALLS, REPORT ON CONDITION OF WATER Cost Allocation
SEAL TROUGH AND ASSOCIATED DIPPER
ARRANGEMENT, MEASURE VENTURI VANES AND SI 2 8.00 OrderNo
REPORT. Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 15 0 0 00 0 A 01 4 7 02 01
23
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Primary Elbow Procedure
INSPECTION LIST
Carry out inspection to The outer casing,system
supports, access ladders, platforms andExpansion
bellows
1. Outer casing, Check for paint deterioration /
corrosion. Check welds on channel stiffeners / between
ducting and stiffeners for crevice corrosion. Carry out
visual inspection of elbow casing looking forsigns of
leakage. Check bolts for severe corrosion and
identifyany found missing or loose. Carry out thickness
checks to the ducting at a max imum spacing of 500mm,
including any suspected of suffering from internal
erosion, areas showing signs buckling or distortion.Any
areas showing readings< 3mm should be subject to a
scan (min 100mm x 100mm) to determine the area
requiring repair.
Visual inspect
2.System supports Identify any missing or loose bolts
at connections, including any defects such as cracks,
marking up any for repair
1 Outer casing
3. Access ladder and platforms. Check the condition
and security of ladder rungs stringers and safety hoops
including securing brackets / bolts. Detail all impact
damage, corrosion, condition of anchorage points /
brackets, check handrail for security and damage,
check Kennedy grating for security i.e. clips
4. Expansion Bellows. Check the convolutes for signs
of fatigue / cracking. Any suspect areas should be
subject to D,P,I. Check and report any signs of impact
damage and misalignment.
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 06 PRIMARY ELBOW RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
023 STRUCT INSPECTION 02 RELINE INSPECTION OF PRIMARY ELBOW 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF OUTER 01
CASING TO ENSURE INTEGRITY OF SYSTEM, Priority
REPORT ON STRUCTURAL SUPPORTS FOR SYSTEM Critical C
VISUAL INSPECTION OF ACCESS LADDER & Cost Allocation
PLATFORMS, REPORT ON CONDITION OF
EXPANSION BELLOWS. SI 2 8.00 1994 OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 64 4 2 07 1 0 00 0 A 02 4 7 02 02
24
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Quencher Seal Tank & Drain Legs Procedure
Carry out inspection of Quencher seal tank and drain
leg checking for paint deterioration, corrosion, wear
and any signs of leakage
INSPECTION LIST
1. Tank body. Carry out visual inspection of Quencher
seal tank main body. Check all flanges and cover
plates for signs of crevice corrosion. Check all welds
for cracking / defects. Check internal Tri-may base
plates for deterioration / and securing welds. Carry out
thickness checks to tank body at a max spacing of
400mm including any areas suspected of suffering
internal errosion or severe external corrosion. Check
bolted flanges for loose or missing bolts."Mark up"
and report any areas requiring repair to relevant plant
supervisor for immediate repair.
Visual inspect
1 Tank body
2. Drain leg. Scaffold access required for this part of
the inspection. Carry out visual inspection of down leg
looking for paint deterioration, corrosion and any signs
of leakage.Take thickness readings at regular
intervals on down pipe subject to access. A line scan
should be taken accross the (extrados) top bend to
determine any errosion and areas requiring repair.
Carry out internal inspection to ensure down leg
length is below exit trough level and a gas seal will be
formed.
2 Supply pipe work
3 Export pipe work
3. Exit pipe work. Carry out visual inspection of pipe
and flanged connection looking for paint deterioration,
corrosion and any sign of leakage. Check bolts for
severe corrosion, loose or any missing. Carry out
thickness checks to bottom of bend and sides of pipe
also below inspection hatch to determine any erosion.
"Mark up" and report any areas requiring repair to
relevant plant supervisor for immediate repair.
UT thickness tests
1 UT thickness tests of tank body
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 08 QUENCHER SEAL TANK RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
028 STRUCT INSPECTION 02 RELINE INSPECTION OF TANK & DRAIN LEGS 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF TANK BODY SI 2 8.00 1994 8.00 01
AND SUPPLY & EXIT PIPEWORK TO ENSURE Priority
SYSTEM INTEGRITY, CARRY OUT THICKNESS Critical C
CHECKS TO TANK BODY. Cost Allocation
OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
90M ZYX ZBP 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 15 0 0 00 0 A 01 4 7 02 01
25
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Disc Scrubber Procedure
INSPECTION LIST
Carry out inspection of shell casing from primary elbow to
secondary elbow,ducting supports, expansion bellows,access
platforms and ladders.
Ducting. Check for paint deterioration / corrosion to
casing,Check bolts in flanges for severe corrosion and identify
any missing or loose. Carry out thickness checks to ducting at
a max spacing of 500mm including any areas suspected of
suffering internal errosion or severe external corrosion i.e.
signs of buckling, distortion. Any areas showing readings
<3mm should be subject to a scan (min 100mm x 100mm) to
dermine the area requiring repair, mark all areas requiring
repair and report to relevant plant supervisor who will organise
immediate repair.
Visual inspect
Ducting supports. Visual inspection of supports identifying
any missing or loose bolts at connections including any weld
defects such as cracks,marking up and inform relevant
supervisor.
1 Outer casing
Expansion bellows. Check convolutes for signs of
fatigue/cracking. Any suspect areas should be subject to DPI.
Check and report any signs of impact damage and
misalignment.
Access ladder and platforms. Check the condition and
security of ladder rungs stringers and safety hoops including
securing brackets / bolts. Detail all impact damage, corrosion,
condition of anchorage points / brackets, check handrail for
security and damage, check Kennedy grating for security i.e.
clips
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 12 DISC SCRUBBER RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
041 STRUCT INSPECTION 02 RELINE INSPECTION OF DISC SCRUBBER 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF OUTER 1994 01
CASING TO ENSURE INTEGRITY OF SYSTEM, Priority
REPORT ON SYSTEM SUPPORTS @ 50M LEVEL AN Critical C
40M LEVEL, REPORT ON CONDITION OF Cost Allocation
EXPANSION BELLOWS, VISUAL INSPECTION OF
ACCESS PLATFORMS AND LADDERS. SI 2 8.00 OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 15 0 0 00 0 A 01 4 7 02 01
26
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Secondary Elbow Procedure
INSPECTION LIST
Carry inspection of secondary elbow shell casing and
drain leg
Visual inspect
Secondary Elbow. Carry out visual inspection to
internal and external shell casing to identify any defects
i.e. Impact damage, crevice corrosion on door flanges
condition of internal seperator plate. Carry out thickness
checks to shell casing at max 500 spacing. Including
any areas suspected of suffering internal errosion or
severe external corrosion. Any areas showing readings
<3mm should be subject to a scan (100mmx100mm) to
determine the area requiring repair. Mark all areas
requiring repair and report to relevant plant supervisor
who willorganise immediate repair.
1 Outer casing
Drain leg.Carry out visual inspection of down leg
looking for paint deterioration, corrosion and any signs
of leakage.Take thickness readings at regular intervals
on down pipe subject to access. A line scan should be
taken accross the (extrados) top bend to determine any
errosion and areas requiring repair. Mark all areas
requiring repair and report to relevant plant supervisor
who will organise immediate repair.
2 External walkways
UT thickness tests
1 Random UT thickness tests of casing
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 07 SECONDARY ELBOW RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
012 STRUCT INSPECTION 02 RELINE INSPECTION OF SECONDARY ELBOW 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF OUTER 01
CASING TO ENSURE INTEGRITY OF SYSTEM, 1994 Priority
CARRY OUT RANDOM THICKNESS CHECKS OF Critical C
CASING, VISUAL INSPECTION OF EXTERNAL Cost Allocation
WALKWAYS. SI 2 8.00
OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 15 0 0 00 0 A 01 4 7 02 01
27
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Quencher Feed Tank & Drain Legs Procedure
INSPECTION LIST
Carry out inspection to Tank body, inlet and out let
pipework, weir wall and man hole door access.
Visual inspect
Tank body. Carry out a visual inspection of Tank
looking for signs of leakage, paint deterioration or
corrosion. Check door flanges for crevice corrosion.
Carry out Visual inspection of internal ladder. Carry out
thickness checks to tank walls roof and floor at a max
spacing of 1metre, including any areas suspected of
suffering internal erosion or severe external corrosion.
Any areas showing readings< 3mm should be subject
to a scan (min 100mm x 100mm) to determine the area
requiring repair. Mark all areas requiring repair and
report to relevant plant supervisor who will organise
immediate repair.
1 Tank body
Weir wall. Check integrity of wall, height of wall is
higher than east side internal drain legs to form seal.
Carry out random thickness checks to weir wall.
2 Supply pipe work
Inlet and outlet pipework (drain legs).Carry out
visual inspection of all pipework looking for signs of
leakage, paint deterioration and corrosion. Check all
flanged connections checking for loose severly
corroded or missing bolts. Carry out thickness checks
to all pipe work at random areas and areas liable to
suffer from internal errosion (extrados).
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 22 QUENCHER FEED TANK RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
022 STRUCT INSPECTION 02 RELINE INSPECTION OF TANK & DRAIN LEGS 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF TANK BODY 01
AND SUPPLY & EXIT PIPEWORK TO ENSURE Priority
SYSTEM INTEGRITY, CARRY OUT RANDOM Critical C
THICKNESS CHECKS TO TANK BODY AND PIPE - Cost Allocation
WORK, ENSURE WEIR WALL IS FIT FOR PURPOS
AND CARRY OUT RANDOM THICKNESS CHECKS. SI 2 12.00 OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZBP 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 29 0 0 00 0 A 01 4 7 02 01
28
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Mist Eliminator Procedure
INSPECTION LIST
Carry out inspection of Mist eliminator shell casing, drain leg
access walkways, ladders and system supports.
1. Shell casing, Check for paint deterioration / corrosion.
Check welds on channel stiffeners / between ducting and
stiffeners for crevice corrosion. Carry out visual inspection of
casing looking for signs of leakage. Check bolts for severe
corrosion and identify any found missing or loose. Carry out
thickness checks to the ducting at a maximum spacing of
500mm, including any suspected of suffering from internal
erosion, areas showing signs buckling or distortion.Any
areas showing readings< 3mm should be subject to a scan
(min 100mm x 100mm) to determine the area requiring
repair.
Visual inspect
Drain leg. Carry out visual inspection of down leg looking for
paint deterioration, corrosion and any signs of leakage.Take
thickness readings at regular intervals on down pipe subject
to access. A line scan should be taken accross the
(extrados) top bend to determine any errosion and areas
requiring repair.
1 Outer casing
4.Access walkway and ladders-Inspect all ladder rungs
for wear/deformed including security bolts for corrosion.
Check all handrailing for corrosion and security, check the
condition of the protective coating. Inspect all open mesh
gratings including the grating support structure.
2 Access walk ways and ladders
3.System suports- Identify any missing or loose bolts at
connections including any weld defects such as
cracks,marking up for repair.
3 System supports at 20m level
4 System supports at 30m level
UT thickness tests
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 14 MIST ELIMINATOR RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
011 STRUCT INSPECTION 02 RELINE INSPECTION OF MIST ELIMINATOR 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF OUTER 1994 01
CASING TO ENSURE INTEGRITY OF SYSTEM, Priority
CARRY OUT RANDOM THICKNESS CHECKS OF Critical C
CASING, VISUAL INSPECTION OF ACCESS Cost Allocation
WALKWAYS AND LADDERS, VISUAL INSPECTION
OF SYSTEM SUPPORTS @ 20M/30M LEVEL SI 2 8.00 OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 15 0 0 00 0 A 01 4 7 02 01
29
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Ground Floor Duct Procedure
INSPECTION LIST
Ducting. Check for paint deterioration / corrosion. Check
ducting for signs of leakage. Check all welds for defects /
cracking. Check man hole door for crevice corrosion to
door and shell casing flanges. Carry out thickness testing
to ducting at maximum spacing of 1metre, including any
areas suspected of suffering internal erosion or showing
severe external corrosion. Any areas showing < 3mm
should be subject to a scan (min 100mm x 100mm) to
determine the area requiring repair / replacement.
Mark all areas requiring repair and report to relevant plant
supervisor.
Twin Expansion bellows. Check convolutes for signs of
fatigue / cracking. Any suspect areas should be subject to
DPI. Check and report any signs of impact damage and
misalignment.
Visual inspect
Support tension bars. Carry out visual inspection of
tension bars checking welded connections to ducting and
supporting steelwork. Check pins for any signs of
movement.
1 Casing
Drain Legs. Check for any signs of leakage. Check
welded connection to shell casing for defects / cracking.
Check bolts in flanged pipe connections. Thickness
check pipework on all bends and in random areas to
pipework.
2 Support tension bars
Access ladders and platform. Check the condition and
security of ladder rungs stringers and safety hoops
including securing brackets / bolts. Detail all impact
damage, corrosion, condition of anchorage points /
brackets, check handrail for security and damage, check
Kennedy grating for security i.e. clips
3 Access platforms and ladders
4 Twin expansion bellows
UT thickness tests
1 Random UT thickness tests of full ducting
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 24 PRIMARY WASTE GAS CLEANING - B VESSEL
Plant Item 09 DAHL TUBE RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
021 STRUCT INSPECTION 04 RELINE INSPECTION OF GROUND FLOOR DUCT 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF CASING TO 1994 01
ENSURE INTEGRITY OF SYSTEM, VISUAL Priority
INSPECTION OF SUPPORT TENSION BARS, Critical C
CARRY OUT RANDOM THICKNESS CHECKS TO Cost Allocation
FULL SECTION OF DUCT, VISUAL INSPECTION
OF ACCESS PLATFORMS AND LADDERS, VISUAL SI 2 8.00 OrderNo
INSPECTION OF TWIN EXPANSION BELLOWS. Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 32 0 0 00 0 B 01 4 7 02 01
30
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Duct Seal Tank & Drain Legs Procedure
INSPECTION LIST Carry out inspection of Duct seal tank and drain legs
Visual inspect
Duct seal tank. Carry out a visual inspection of tank
body looking for signs of leakage, paint deterioration or
corrosion. Check around all pipe work connections into
tank for defects I.e. Weld defects / cracks / corrosion.
Check door flange for crevice corrosion.Carry out Visual
inspection of weir wall checking that height of wall is
greater than drain leg length. Carry out thickness checks
to tank body and internal weir wall at a max spacing of
500mm, including any areas suspected of suffering
internal erosion or severe external corrosion. Any areas
showing readings< 3mm should be subject to a scan
(min 100mm x 100mm) to determine the area requiring
repair. Mark all areas requiring repair and report to
relevant plant supervisor who will organise immediate
repair.
1 Tank body
2 Drain legs
Drain legs Carry out visual inspection of all pipework
looking for signs of leakage, paint deterioration and
corrosion. Check all flanged connections checking for
loose severly corroded or missing bolts. Carry out
thickness checks to all pipe work at random areas and
areas liable to suffer from internal errosion (extrados).
3 Access platforms and ladders
4 Twin expansion bellows
Bund wall. Check bund wall for integrity, height·
· The bund walls have to be strong enough to contain the
contents of the tank without danger of collapse.
· The bund walls have to be high enough to avoid jetting
failure – i.e. jets of liquid out over the bund wall.
· The bund has to be impervious to water
UT thickness tests
1 Random UT thickness tests of Tank
2 Random UT thickness tests of Pipe work
3 Carry out thickness tests of Weir wall
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 43 DUCT SEAL TANK RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
015 STRUCT INSPECTION 02 RELINE INSPECTION OF TANK & DRAIN LEGS 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF TANK BODY 01
AND DRAIN LEGS TO ENSURE SYSTEM Priority
INTEGRITY, CARRY OUT RANDOM THICKNESS Critical C
CHECKS TO TANG AND PIPEWORK. ENSURE WEIR Cost Allocation
WALL IS FIT FOR PURPOSE, CARRY OUT
RANDOM THICKNESS CHECKS. SI 2 12.00 1994 OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZBP 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 15 0 0 00 0 A 01 4 7 02 01
31
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
OG System Inspection Doors Procedure
INSPECTION LIST Carry out inspection of O.G. system doors
CARRYOUT INSPECTION OF ALL SYSTEM DOORS
AS PER LIST
System Doors. Carry out visual inspection of open doors as per
list, looking for crevice corrosion to flange / door faces. Any
flanges with a loss of 50% to be replaced relevant plant
supervisor informed. Inspect door hinges for wear, Check welded
connection of hinges to ducting and door.
ENSURE ALL DOORS MEET THE REQUIRED
STANDARDS AS
DETAILED ON RELEVANT DRAWINGS
DOOR LIST
1) 70M EXPLOSION DOOR
2) 60M EAST RADIATION DOOR
3) 60M WEST RADIATION DOOR
4) 60M VENTURI HOPPER DOOR
5) 60M EAST VENTURI THROAT DOOR
6) 60M WEST VENTURI THROAT DOOR
7) 45M HOOD DOOR
8) 50M PRIMARYELBOW TOP DOOR
9) 50M PRIMARYELBOW BOTTOM DOOR
10) 50M FLOODED DISC DOOR
11) 40M SECONDARYELBOW SQUARE DOOR
12) 40M SECONDARYELBOW ROUND DOOR
13) 35M MIST ELIMINATOR SOUTH DOOR Example of crevice corrosion
14) 35M MIST ELIMINATOR NORTH DOOR
15) 30M VERTICAL DUCT ROUND DOOR
16) GROUND FLOOR DAHL TUBE DOOR
17) SLAG GANTRYHIGH LEVEL EAST DOOR
18) SLAG GANTRYHIGH LEVEL WEST DOOR
19) I.D. FAN INLET DUCT DOOR
20) I.D. FAN IMPELLER COMPARTMENT DOOR
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 01 CIVIL ENG WORKS - BUILDINGS,DRAINAGE,ETC
Plant Item 11 STRUCTURE RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
032 STRUCT INSPECTION 02 RELINE INSP 'A' VESSEL SYSTEM DOORS 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT INSPECTION OF ALL SYSTEM DOORS 1994 01
AS PER ELEMENTS LIST, ENSURE ALL DOORS Priority
MEET THE STANDARDS REQUIRED ON RELEVANT Critical C
DRAWINGS. SI 2 8.00 Cost Allocation
OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZBP 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 15 0 0 00 0 A 01 4 7 02 01
32
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Lower Hood Procedure
INSPECTION LIST
CARRY OUT INSPECTION OF HOOD TUBES AND
MEMBRANES,VISUAL INSPECTION OF RING MAIN.
Tubes and membrane. Visual inspection of tubes
looking for leakage, cracking, pitting and condition of
membrane. Carry out thickness testing to tubes
covering 10% (1 in every 10) of hood. Any tubes
<3mm thickness test tubes adjacent to it.
Visual inspect
Water Ring main.Visual inspection of pipe looking
for leakage, cracking, pitting and condition of pipe
connections.
1 Lower hood tubes amd membranes
2 Ring main and feed pipes
UT thickness tests
1 UT Thickness test tubes. Coverage 10%. Length 1m from lower bend up over and
with probe as close as posible to the membranes.
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 01 FURNACE HOOD RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
138 STRUCT INSPECTION 02 RELINE INSPECTION OF LOWER HOOD 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF HOOD SI 2 4.00 1994 01
TUBES AND MEMBRANES, REPORT THICKNESS Priority
READINGS OF VARIATION OF TUBES ALONG Critical C
LENGTH, VISUAL INSPECTION OF RING Cost Allocation
MAINS AND FEED PIPES.
OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 15 0 0 00 0 A 01 4 7 02 01
33
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Moveable Hood Procedure
INSPECTION LIST
Carry out inspection of moveable hood Tubes and
membranes, water ring mains, walkways and support
structure.
Tubes and membrane. Visual inspection of tubes looking
for leakage, cracking, pitting and condition of membrane.
Carry out thickness testing to tubes with probe as close as
posible to the membranes covering 10% (1 in every 10) of
hood. Any tubes < 3mm thickness test tubes adjacent to it.
Visual inspect
Water Ring main.Visual inspection of pipe looking for
leakage, cracking, pitting and condition of pipe outlet
connections.
1 Movable hood tubes amd membranes
Access ladders and platforms. Check the condition and
security of ladder rungs stringers and safety hoops including
securing brackets / bolts. Check and detail all impact
damage, corrosion, condition of anchorage points /
brackets, check handrail for security and damage, check
Kennedy grating for security i.e. clips
2 Ring main and feed pipes
Support structure. Check all beams joists and angle bars
that form supporting structure for impact damage. Check
bolted connections for loose or missing bolts
3 Walk ways and support structure
UT thickness tests
1 UT Thickness test tubes. Coverage 10%. Length 1m from lower bend up over
and with probe as close as posible to the membranes.
TEM's
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 04 MOVEABLE HOOD RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
060 STRUCT INSPECTION 02 RELINE INSPECTION OF MOVEABLE HOOD 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF HOOD 1994 01
TUBES AND MEMBRANES, REPORT ON THICKNESS Priority
READINGS OF VARIATION OF TUBES ALONG Critical C
LENGTH, VISUAL INSPECTION OF RING MAINS Cost Allocation
AND FEEDER PIPES, VISUAL INSPECTION OF
WALKWAYS & SUPPORT STRUCTURE. SI 2 8.00 OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 4 15 0 0 00 0 A 01 4 7 02 01
34
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Lower Fixed Hood Procedure
INSPECTION LIST
Carry out inspection of Hood tubes and membranes,Hood
support rollers on 40metre level, hood supports on
50metre level.
Tubes and membrane. Visual inspection of tubes
looking for leakage, cracking, pitting and condition of
membrane. Carry out thickness testing to tubes with probe
as close as posible to the membranes covering 10% (1 in
every 10) of hood. Any tubes <3mm thickness test tubes
adjacent to it. Report all defects and low reading area to
plant supervisor
Visual inspect
Hood support rollers. Check alignment of supporting
steelwork and roller. Check around welded connection to
hood for cracking
1 Lower fixed hood tubes amd membranes
2 Ring main and feed pipes
3 Walk ways and support structure
4 Support rollers on 40m level
5 Hood support on 50m level
6 N2/02 Mains pipe work
50metre Hood supports.Check condition of welded
connections to hood any signs of cracking should be
further investigated with a N.D.T. method. check packing
under hood supports to ensure hood is supported.
UT thickness tests
1 UT Thickness test tubes at 35m level. Coverage 10%. Length 1m from lower
bend up over and with probe as close as posible to the membranes.
2 UT Thickness test tubes below 50m expansion joint and at the intermediate
positions. Coverage 10%. Length 1m from lower bend up over and with probe
as close as posible to the membranes.
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 01 FURNACE HOOD RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
139 STRUCT INSPECTION 02 RELINE INSPECTION OF LOWER FIXED HOOD 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPCTION OF HOOD TUBES 1994 01
AND MEMBRANES, REPORT ON THICKNESS Priority
READINGS OF TUBES @ 35M LEVEL AND ALSO Critical C
BELOW 50M EXPANSION JOINT AND AT INTER- SI 2 6.00 Cost Allocation
MEDIATE POSITIONS, REPORT ON HOOD
SUPPORT ROLLER @ 40M LEVEL. REPORT ON OrderNo
HOOD SUPPORT @50M LEVEL.INC N2/02 MAINS Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 15 0 0 00 0 A 01 4 7 02 01
35
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
Upper Fixed Hood Procedure
INSPECTION LIST
Carry out inspection of upper Fixed Hood, Hood
supports and 70m tension rods 50 Metre level link pipes
Fixed hood. Visual inspection of tubes looking for
leakage, cracking, pitting and condition of membrane.
Carry out thickness testing to tubes covering 10% (1 in
every 10) of hood. Any tubes <3mm thickness test tubes
next to it
Visual inspect
Hood supports. Check condition of welded
connections to hood any signs of cracking should be
further investigated with a N.D.T. method. check packing
under hood supports to ensure hood is supported.
1 Upper fixed hood tubes amd membranes
Tension Rods. Check springs on 70metre level for
fatigue, stress fractures. Check 60metre level east and
west side welded connections to hood for cracking.
Check pin and alignment of rod
2 Hood support at 60m level
Link pipes. Check 50metre level Link pipes and
header pipe for any signs of leakage. Carry out
thickness tests to random areas of each Link pipe and
header pipe.
3 70m tension rods
UT thickness tests
1 UT Thickness test tubes at 50m level. Coverage 10%. Length 1m from lower
bend up over and with probe as close as posible to the membranes.
2 UT Thickness test link pipes at 50m level.
3 UT Thickness test tubes at 60m venturi. Coverage 10%. Length 1m from lower
bend up over and with probe as close as posible to the membranes.
Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING
Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL
Plant Item 01 FURNACE HOOD RCM Ind
Job ------Key Name----- Class -------------Job Title------------------ P/Req
140 STRUCT INSPECTION 02 RELINE INSPECTION OF UPPER FIXED HOOD 1
------------Job Description------------- Grade No Time Dept Dur Cards
CARRY OUT VISUAL INSPECTION OF HOOD TUBE 01
AND MEMBRANES, REPORT ON THICKNESS Priority
READINGS OF TUBES @ 50M LEVEL AND ALSO Critical C
60M VENTURI, THICKNESS READINGS OF 50M Cost Allocation
LINK PIPES, REPORT ON HOOD SUPPORT @
60M LEVEL AND 70M TENSION RODS. SI 2 12.00 1994 OrderNo
Drawings
Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal
23D ZYX ZPA 1
---------------Frequency Details---------------- ---Major Stop Details----
Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start
Cycle Sh Day Week Yr Sh Day Week Yr
W 32 4 2 15 0 0 00 0 A 01 4 7 02 01
36
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
MINIMUM THICKNESS DRAWING
37
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
38
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
SKETCH IDENTIFYING INSPECTION AREAS
39
BOS 'B' VESSEL HOOD & GAS
CLEANING RBI DOCUMENT
SIGNATORIES OF WORKING GROUP AGREEING WITH RBI REVIEW

More Related Content

What's hot

Bruperite Testing Report
Bruperite Testing ReportBruperite Testing Report
Bruperite Testing Reportstrama3
 
A New Standard for FRP Piping
A New Standard for FRP PipingA New Standard for FRP Piping
A New Standard for FRP PipingNathan Dolbear
 
2 appendix ii technical conditions, requirements and ma (1)
2 appendix ii   technical conditions, requirements and ma (1)2 appendix ii   technical conditions, requirements and ma (1)
2 appendix ii technical conditions, requirements and ma (1)SERPETBOL.LTDA
 
ASME B31.3 Training Course
ASME B31.3 Training CourseASME B31.3 Training Course
ASME B31.3 Training CourseMeena Rezkallah
 
Codes and standards by madhur mahajan
Codes and standards by madhur mahajanCodes and standards by madhur mahajan
Codes and standards by madhur mahajanMadhur Mahajan
 
Testing/Manufacture/Equipmetns - FEC Catalouge -www.fecproduct.com
Testing/Manufacture/Equipmetns - FEC Catalouge -www.fecproduct.comTesting/Manufacture/Equipmetns - FEC Catalouge -www.fecproduct.com
Testing/Manufacture/Equipmetns - FEC Catalouge -www.fecproduct.comfec2020
 
What Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning jobWhat Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning jobjoseph william
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1BHARAT BELLAD
 
Seamless pipes API 5L grade x52 psl 2
Seamless pipes API 5L grade x52 psl 2Seamless pipes API 5L grade x52 psl 2
Seamless pipes API 5L grade x52 psl 2Aisyah Widjaja
 
52240 plumbingfixtures
52240 plumbingfixtures52240 plumbingfixtures
52240 plumbingfixturestagalamut143
 

What's hot (19)

Bruperite Testing Report
Bruperite Testing ReportBruperite Testing Report
Bruperite Testing Report
 
arun megarme
arun megarmearun megarme
arun megarme
 
A New Standard for FRP Piping
A New Standard for FRP PipingA New Standard for FRP Piping
A New Standard for FRP Piping
 
2 appendix ii technical conditions, requirements and ma (1)
2 appendix ii   technical conditions, requirements and ma (1)2 appendix ii   technical conditions, requirements and ma (1)
2 appendix ii technical conditions, requirements and ma (1)
 
Minggu3 pid
Minggu3 pidMinggu3 pid
Minggu3 pid
 
ASME B31.3 Training Course
ASME B31.3 Training CourseASME B31.3 Training Course
ASME B31.3 Training Course
 
Codes and standards by madhur mahajan
Codes and standards by madhur mahajanCodes and standards by madhur mahajan
Codes and standards by madhur mahajan
 
Process Plant design fundementals
Process Plant design fundementalsProcess Plant design fundementals
Process Plant design fundementals
 
presentation
presentationpresentation
presentation
 
Testing/Manufacture/Equipmetns - FEC Catalouge -www.fecproduct.com
Testing/Manufacture/Equipmetns - FEC Catalouge -www.fecproduct.comTesting/Manufacture/Equipmetns - FEC Catalouge -www.fecproduct.com
Testing/Manufacture/Equipmetns - FEC Catalouge -www.fecproduct.com
 
What Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning jobWhat Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning job
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1
 
Quality
QualityQuality
Quality
 
Process plant design
Process plant designProcess plant design
Process plant design
 
Codes &amp; standards
Codes &amp; standardsCodes &amp; standards
Codes &amp; standards
 
Piping Design Engineering
Piping Design EngineeringPiping Design Engineering
Piping Design Engineering
 
ANAND CV
ANAND CVANAND CV
ANAND CV
 
Seamless pipes API 5L grade x52 psl 2
Seamless pipes API 5L grade x52 psl 2Seamless pipes API 5L grade x52 psl 2
Seamless pipes API 5L grade x52 psl 2
 
52240 plumbingfixtures
52240 plumbingfixtures52240 plumbingfixtures
52240 plumbingfixtures
 

Similar to RBI Assessment of BOS Plant 'B' Vessel Hood & Gas Cleaning System

EZ Relief Systems Consulting Capabilities with Selected Bibliography
EZ Relief Systems Consulting Capabilities with Selected BibliographyEZ Relief Systems Consulting Capabilities with Selected Bibliography
EZ Relief Systems Consulting Capabilities with Selected BibliographyEd Zamejc
 
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdfStandard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdfParmeshworVetwal1
 
Raj kumar betala snr inspection engineer
Raj kumar betala snr inspection engineerRaj kumar betala snr inspection engineer
Raj kumar betala snr inspection engineerRajkumar Betala
 
Air Permitting Biomass Combustion Units
Air Permitting Biomass Combustion UnitsAir Permitting Biomass Combustion Units
Air Permitting Biomass Combustion UnitsAll4 Inc.
 
Shop fabrication of structural steel
Shop fabrication of structural steelShop fabrication of structural steel
Shop fabrication of structural steelAhmed Allam
 
Final well control rule (blowout preventer and well control operations)
Final well control rule (blowout preventer and well control operations)Final well control rule (blowout preventer and well control operations)
Final well control rule (blowout preventer and well control operations)Dr Dev Kambhampati
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docxSharad Naik
 
8D Sample -JC 19inch Sidewall Crack
8D Sample -JC 19inch Sidewall Crack8D Sample -JC 19inch Sidewall Crack
8D Sample -JC 19inch Sidewall CrackPeter Zhou
 
Process Safety Management in Design, Construction & Commissioning | Lalit K...
Process Safety Management in Design, Construction &  Commissioning | Lalit  K...Process Safety Management in Design, Construction &  Commissioning | Lalit  K...
Process Safety Management in Design, Construction & Commissioning | Lalit K...Cairn India Limited
 
Pipeline Operations & Maintenance Corrosion Field Testing - Where, When & How
Pipeline Operations & Maintenance Corrosion  Field Testing - Where, When & HowPipeline Operations & Maintenance Corrosion  Field Testing - Where, When & How
Pipeline Operations & Maintenance Corrosion Field Testing - Where, When & HowAudubon Engineering Company
 
90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filterFilter Expert Co.,Ltd.
 
Eric Smith, International Institute of Ammonia Refrigeration (IIAR)
Eric Smith, International Institute of Ammonia Refrigeration (IIAR)Eric Smith, International Institute of Ammonia Refrigeration (IIAR)
Eric Smith, International Institute of Ammonia Refrigeration (IIAR)ATMOsphere Conferences & Events
 

Similar to RBI Assessment of BOS Plant 'B' Vessel Hood & Gas Cleaning System (20)

EZ Relief Systems Consulting Capabilities with Selected Bibliography
EZ Relief Systems Consulting Capabilities with Selected BibliographyEZ Relief Systems Consulting Capabilities with Selected Bibliography
EZ Relief Systems Consulting Capabilities with Selected Bibliography
 
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdfStandard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
 
PPT-on-false-air.ppt
PPT-on-false-air.pptPPT-on-false-air.ppt
PPT-on-false-air.ppt
 
8D Catalog.pdf
8D Catalog.pdf8D Catalog.pdf
8D Catalog.pdf
 
Raj kumar betala snr inspection engineer
Raj kumar betala snr inspection engineerRaj kumar betala snr inspection engineer
Raj kumar betala snr inspection engineer
 
Air Permitting Biomass Combustion Units
Air Permitting Biomass Combustion UnitsAir Permitting Biomass Combustion Units
Air Permitting Biomass Combustion Units
 
Shop fabrication of structural steel
Shop fabrication of structural steelShop fabrication of structural steel
Shop fabrication of structural steel
 
Final well control rule (blowout preventer and well control operations)
Final well control rule (blowout preventer and well control operations)Final well control rule (blowout preventer and well control operations)
Final well control rule (blowout preventer and well control operations)
 
Hot spots
Hot spots Hot spots
Hot spots
 
Mithun Banjan CV
Mithun Banjan CVMithun Banjan CV
Mithun Banjan CV
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
 
343312365 mt-ppt
343312365 mt-ppt343312365 mt-ppt
343312365 mt-ppt
 
Deterioration of Concrete
Deterioration of ConcreteDeterioration of Concrete
Deterioration of Concrete
 
Minimal Requirements for Relief Systems Documentation
Minimal Requirements for Relief Systems DocumentationMinimal Requirements for Relief Systems Documentation
Minimal Requirements for Relief Systems Documentation
 
8D Sample -JC 19inch Sidewall Crack
8D Sample -JC 19inch Sidewall Crack8D Sample -JC 19inch Sidewall Crack
8D Sample -JC 19inch Sidewall Crack
 
Process Safety Management in Design, Construction & Commissioning | Lalit K...
Process Safety Management in Design, Construction &  Commissioning | Lalit  K...Process Safety Management in Design, Construction &  Commissioning | Lalit  K...
Process Safety Management in Design, Construction & Commissioning | Lalit K...
 
Pipeline Operations & Maintenance Corrosion Field Testing - Where, When & How
Pipeline Operations & Maintenance Corrosion  Field Testing - Where, When & HowPipeline Operations & Maintenance Corrosion  Field Testing - Where, When & How
Pipeline Operations & Maintenance Corrosion Field Testing - Where, When & How
 
90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter
 
Resume S B Mohapatra -SEP2015
Resume S B Mohapatra -SEP2015Resume S B Mohapatra -SEP2015
Resume S B Mohapatra -SEP2015
 
Eric Smith, International Institute of Ammonia Refrigeration (IIAR)
Eric Smith, International Institute of Ammonia Refrigeration (IIAR)Eric Smith, International Institute of Ammonia Refrigeration (IIAR)
Eric Smith, International Institute of Ammonia Refrigeration (IIAR)
 

RBI Assessment of BOS Plant 'B' Vessel Hood & Gas Cleaning System

  • 1. RISK BASED INSPECTION BOS PLANT ‘B’ VESSEL HOOD & GAS CLEANING SYSTEM RBI 1 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 2. Date 22 FEBRUARY 2015 Plant STEELMAKING Item BOS PRIMARY ‘B’ VESSEL HOOD & GAS CLEANING SYSTEM Assessment Team FABRICATION ENGINEER; TONY SMITH MECHANICAL ENGINEER; ROB BLAKE PRODUCTION MANAGER; STUART DUNBAR / ALEX SMITH STRUCTURAL INSPECTOR; GLYN SHERWOOD FABRICATION TEAM LEADER; COLIN WAITT MATERIALS SPECIALIST; IAN RICHARDSON 2 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT ASSESSMENT GROUP AND TASK DETAIL
  • 3. BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT 3 INDEX PAGE PAGE No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 SKETCH IDENTIFYING INSPECTION AREAS SIGNATORIES OF REVIEW GROUP TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT MINIMUMTHICKNESS DRAWING TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL FEEDBACK FROMFABRICATION GROUP TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT TYPICAL DETAILED INSPECTION REQUIREMENT LIST OF COMPONENTS FOR RISK BASED ASSESSMENT ASSESSMENT OF THE RISK RESULT OF THE REVIEW PROCEDURE & CHANGE OF SCOPE / INSPECTION STRUCTURAL INSPECTORS WORKLIST & SAP INFORMATION TYPICAL STRUCTURAL INSPECTORS SAP TASK TYPICAL NOTIFICATION TASK FOLLOWING INSPECTION PAGE TITLE TITLE PAGE ASSESSMENT GROUP AND TASK DETAIL INDEX PAGE STEPS FOR QUALITATIVE RISK BASED INSPECTION STEPS FOR QUALITATIVE RISK BASED INSPECTION (CONT) BASIC INFORMATION DAMAGE MECHANISM'S
  • 4. STEPS FOR QUALITATIVE RISK BASED INSPECTION STEP (1) Identify the equipment, the structure or the system to be risk assessed. BOS PRIMARY ‘B’ VESSEL HOOD & GAS CLEANING SYSTEM STEP (2) Define the system boundaries – Agree the boundary limits (i.e. isolation valves) then decide which systems, components, or items etc, within the boundary, should be included within the scope of the RBI assessment. These will be those that have the most influence on safety, production or environment should a failure occur, especially those that have history of failure. THE LOWER HOOD, THE MOVEABLE HOOD, THE FIXED HOOD FROM ITS MOUTH TO THE 60M HEADERS. THE QUENCHER WATER SEAL WITHIN THE 60M VENTURI, DOWN STREAM TO THE EXIT DUCT OF THE PRIMARY I.D.FAN INCUDING ALL TANKS AND DRAIN PIPES WITHIN THIS DESCRIPTION. STEP (3) Assemble the RBI team – Five (minimum) competent persons with relevant experience or knowledge of the system/item, its design, inspection history or maintenance history. Five experts (one of which will act as facilitator) are typically; Structural Engineer or Pipe Design Engineer (Design Standards knowledge) Structural Inspector (Report on past/current conditions) Maintenance Engineer (Past repair/failure history) Production Manager/Owner (Costing future repair/renewal) Damage mechanism Expert (Metallurgist/structural inspector to identify the relevant corrosion or other damage mechanisms) STEP (4) Gather the information - List the relevant equipment or Plant items within the system, item or structure, incl breaking the system down into circuits where appropriate (areas exposed to similar environments incl proximity to personnel). Make a list of all the critical items, along with their characteristics including; Modification/repair history Previous inspection report findings Original design/construction data Maintenance records Age Likely damage mechanisms and consequence 4 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 5. STEP (5) Evaluate all the critical items – Evaluate each item with regard to likelihood and consequence of failure within the existing Inspection time frame. Consider all available information, such as the effectiveness of current maintenance regimes, existing condition, design, past history/failures, modifications (incl temp repairs), inspection records, operating/process conditions, etc. Note – any items identified at this stage as being unfit for purpose (integrity already compromised) will not be entered on to the Matrix, until an action to repair/renew has been agreed by the Plant Engineer. STEP (6) Compile the Risk Matrix's – The team will need to agree the definitions in the consequence table, i.e what is acceptable. (In some cases a leak might be acceptable, in others it will not, for instance a water leak as apposed to a toxic fluid leak) Place each item on the Matrix (consequence x likelihood = RISK) STEP (7) Consider ways to reduce the RISK – Consider actions to reduce the likelihood or consequence of the highest risk items. Note – the responsibility for carrying out agreed actions remains with the Plant Manager/Owner. STEP (8) Decide new inspection frequencies/scope –Prioritise the risks and decide new inspection periods and scope. Consider creating separate inspections for items in Risk Cat 3 or 4. (shorter inspection periods) The highest remaining risk item will determine the new inspection frequency. After agreeing new inspection frequencies, repeat step 6 to quantify your result. 5 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 6. BASIC INFORMATION DEPARTMENT STEELMAKING PRODUCT BOS GAS PLANT BOS PRODUCT CLASS COMAH LOCATION PRIMARY ‘B’ VESSEL HOOD AND GAS CLEANING DESIGN PRESSURE 25 - 200mbarg REPORT NUMBERS DESIGN TEMPERATURE 1700deg C max EXISTING INSPECTION VISUAL / THICKNESS MINIMUM THICKNESS Variable, 4mm at flooded disc EXISTING FREQUENCY 32 WEEKLY 6 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 7. DAMAGE MECHANISM’s / SYSTEM CONSTRUCTION TYPICAL DAMAGE MECHANISM TYPICAL SYSTEM COMPONENTS INTERNAL CORROSION / EROSION X SUPPORT STRUCTURE X EXTERNAL CORROSION X PIPE SUPPORTS X CREVICE CORROSION X PIPE MAIN CORROSION UNDER INSULATION AUXILIARY PIPEWORK X MECHANICAL IMPACT X DEAD LEGS VIBRATION BELLOWS X FLANGE JOINTS X CLADDING DRAIN POTS 7 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 8. LIST COMPONENTS AND CIRCUITS FOR RISK BASED ASSESSMENT 8 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT MATRIX KEY COMPONENT DAMAGE MECHANISM MINIMAL THICKNESS ALLOWED EXTERNAL CONDITION ESTIMATED RETIREMENT DATE PRODUCT CHARACTERISTIC PROXIMITY TO PERSONNEL DESIGN QUALITY / FITNESS FOR PURPOSE EFFECTIVENESS OF CURRENT INSPECTION REGIME AGE AND PAST FAILURE INFO POTENTIAL FAILURE MODE 1 ID Fan inlet duct internal / external corrosion 7mm Paint breakdown, localised rusting Not Planned Unpredicted external corrosion regularly 2/3 persons Good Good None Air ingress, explosion 2 ID Fan casing internal erosion / external corrosion 7mm Poor condition, regular repairs required due to localised rusting, process erosion prior to end 2015 Unpredicted internal erosion / internal corrosion regularly 2/3 persons Good Good Several years past, system fail due to explosion, (air ingress) Air ingress, explosion 3 ID Fan exit duct internal / external corrosion 5.8mm Paint breakdown, localised rusting Not Planned Unpredicted external corrosion regularly 2/3 persons Good Good None Release of CO 4 ID Fan sump drain legs internal / external corrosion 3mm Stainless steel Not Planned Non predicted regularly 2/3 persons Good Good None Air ingress, explosion 5 Slag Gantry east vertical leg internal / external corrosion 6.4mm Paint breakdown, localised rusting Not Planned Unpredicted external corrosion regularly 2/3 persons Good Good None Air ingress, explosion 6 Slag gantry horizontal duct internal / external corrosion 6.4mm Paint breakdown, localised rusting Not Planned Unpredicted external corrosion Occasionally Good Good None Air ingress, explosion 7 Slag Gantry west vertical leg internal / external corrosion 6.4mm Paint breakdown, localised rusting Not Planned Unpredicted external corrosion regularly 2/3 persons Good Good None Air ingress, explosion 8 Radiation section explosion door internal erosion / external corrosion 2.0mm (hood tubes) Poor condition, thinning tubes, regular failures, several Structural P1 notifications New Hood planned for 2017 installation Unpredicted internal erosion / internal corrosion Occasionally Good Good Several years past, system fail due to explosion, (air ingress) Release of CO, water leakage 9 Quencher Venturi internal / external corrosion 7mm Paint breakdown, covering of process debris Plan to replace as part of Hood replacement 2017 Unpredicted internal erosion / internal corrosion regularly 2/3 persons Good Good None Release of CO, water leakage 10 Primary Elbow internal / external corrosion 7mm Poor condition, regular repairs required due to localised rusting, process erosion Considering replacing as part of Secondary Scrubbing upgrade Unpredicted internal erosion / internal corrosion regularly 2/3 persons Good Good None Release of CO, water leakage 11 Quencher Seal tank & drain legs internal / external corrosion 4mm Paint breakdown, covering of process debris Not Planned Unpredicted external corrosion regularly 2/3 persons Good Good None Release of CO, water leakage 12 Disc Scrubber internal / external corrosion 4.3mm Poor condition, regular repairs required due to localised rusting, process erosion Considering replacing as part of Secondary Scrubbing upgrade Unpredicted internal erosion / internal corrosion regularly 2/3 persons Good Good None Release of CO, water leakage 13 Secondary Elbow internal / external corrosion 7mm Paint breakdown, covering of process debris Not Planned Unpredicted external corrosion regularly 2/3 persons Good Good None Release of CO, water leakage 14 Quencher Feed tank & drain legs internal / external corrosion 5mm Paint breakdown, covering of process debris Not Planned Unpredicted external corrosion Occasionally Good Good None Release of CO, water leakage 15 Mist Eliminator internal / external corrosion 6.4mm Paint breakdown, covering of process debris Not Planned Unpredicted external corrosion Occasionally Good Good None Release of CO, water leakage 16 Ground Floor duct internal / external corrosion, metal splash 5.6mm Paint breakdown, covering of process debris Not Planned Unpredicted external corrosion regularly 2/3 persons Good Good Several years past, system fail due to explosion, (air ingress) Air ingress, explosion 17 Duct Seal tank & drain legs internal / external corrosion 4.0mm Paint breakdown, covering of process debris Not Planned Unpredicted external corrosion regularly 2/3 persons Good Good None Air ingress, explosion, release of CO. Water leakage 18 OG System manway doors internal / external corrosion relative to system location Paint breakdown Not Planned Unpredicted external corrosion regularly 2/3 persons Good Good Several years past, G F Duct door failed. Other doors no reported fails Air ingress, explosion, release of CO. Water leakage 19 Lower Hood internal / external corrosion 2.0mm (hood tubes) Paint breakdown, covering of process debris Plan to replace as part of Hood replacement 2017 Unpredicted internal erosion / internal corrosion Occasionally Good Good None Release of CO, water leakage, flame release 20 Moveable Hood internal / external corrosion 2.0mm (hood tubes) Paint breakdown, covering of process debris Plan to replace as part of Hood replacement 2017 Unpredicted internal erosion / internal corrosion Occasionally Good Good None Release of CO, water leakage, flame release 21 Lower fixed hood internal / external corrosion 2.0mm (hood tubes) Poor condition, thinning tubes, regular failures, several Structural P1 notifications Plan to replace as part of Hood replacement 2017 Unpredicted internal erosion / internal corrosion regularly 2/3 persons Good Good Several years past, system overpressure damaged Hood Release of CO, water leakage, flame release 22 Upper Fixed hood internal / external corrosion 2.0mm (hood tubes) Poor condition, thinning tubes, regular failures, several Structural P1 notifications Plan to replace as part of Hood replacement 2017 Unpredicted internal erosion / internal corrosion regularly 2/3 persons Good Good Several years past, system overpressure damaged Hood Release of CO, water leakage, flame release
  • 9. CATASTROPHIC 1 2 2 4 4 SUBSTANTIAL 1 2 2 16,18 3 19,20 4 2,8,21,22 MARGINAL 1 1 1 2 1,3,4,5,6,7,9, 10,11,12, 13,14,15,17 2 NEGLIGABLE 0 1 1 1 1 UNFORSEABLE IMPROBABLE REMOTE POSSIBLE LIKELY COMPONENTS AND CIRCUITS RISK ASSESSMENT MATRIX UNACCEPTABLE RISK - 4 Inspection / scope increased MODERATE RISK - 3 Scope of inspection increased LOW RISK - 2 Inspection and scope adequate VERY LOW RISK - 1 Inspection can be decreased NO RISK - 0 Inspection not required KEY NEGLIGABLE Little or no structural damage or deterioration of protective coatings, no risk to safety or environment MARGINAL Breakdown in protective coatings, surface corrosion, light impact damage, minor injury SUBSTANTIAL Severe deflection, loss of member thickness > 25%, partial collapse / detachment leading to unsafe structure, major injury, production stoppage, minor loss of containment CATASTROPHIC Total failure / buckling / collapse, major leakage, loss of containment, fatal injury, environmental damage, loss of production LIKELY TO BE EXPECTED POSSIBLE COULD OCCUR REMOTE UNLIKELY IMPROBABLE VERY UNLIKELY UNFORSEABLE CLOSE TO ZERO RISK / PROBABILITY DESCRIPTION 9 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT ASSESSMENT OF THE RISK
  • 10. ITEM DAMAGE MECHANISM RISK (DESCRIPTION) RISK LEVEL ACTIONS TO REDUCE RISK NEW RISK RATING 16,18 Internal / external corrosion Thinning of parent metal (air ingress) 2 Consider renewing of paint protection 2 1,3,4,5,6,7,9,10,11, 12,13,14,15,17 Internal / external corrosion Thinning of parent metal (air ingress) 2 Consider renewing of paint protection 2 19,20 Internal erosion / external corrosion Thinning of tubes (water / HM mix) 3 Inspection frequency to be increased 3 2,8,21,22 Internal erosion / external corrosion Thinning of tubes (water / HM mix) Thinning of parent metal (air ingress) 4 Inspection frequency to be increased 4 ACTIONS TO BE TAKEN TO REDUCE THE LIKELYHOOD OF FAILURE ITEM CURRENT INSPECTION FREQUENCY TYPE / SCOPE OVERALL RISK CATEGORY REVISED INSPECTION FREQUENCY REVISED SCOPE 16,18 Reline major stop / 32 weekly Visual and U/T thickness readings 2 No Change None 1,3,4,5,6,7,9,10,11, 12,13,14,15,17 Reline major stop / 32 weekly Visual and U/T thickness readings 2 No Change None 19,20 Reline major stop / 32 weekly Visual and U/T thickness readings 3 Additional inspections on 1500 Lives Maint outage Additional Thermovision prior to Reline outage 2,8,21,22 Reline major stop / 32 weekly Visual and U/T thickness readings 4 Additional inspections on 1500 Lives Maint outage Additional Thermovision prior to Reline outage NEW INSPECTION FREQUENCY AND SCOPE 10 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT RESULT OF THIS REVIEW PROCEDURE INSPECTION / SCOPE CHANGE AS A RESULT OF THE REVIEW
  • 11. B VESSEL Maint plan + Func Location WASTE GAS ID FAN (VENTILATOR) ID Fan Inlet Ducting 216841 1000-080-1968-0024-0027 ID Fan Casing 216851 1000-080-1968-0024-0027 ID Fan Exit Ducting 216851 1000-080-1968-0024-0027 ID Fan Sump Drain Legs 212649 1000-080-1968-0024-0037 PRIMARY WASTE GAS SYSTEM Slag Gantry East Vertical Leg 215627 1000-080-1968-0024-0009 Slag Gantry Hortizontal Duct 215261 1000-080-1968-0024-0009 Slag Gantry West Vertical Leg 212533 1000-080-1968-0024-0009 Radiation Section Explosion Door 213217 1000-080-1968-0024-0002 Quencher Venturi 215926 1000-080-1968-0024-0005 Primary Elbow 217164 1000-080-1968-0024-0006 Quencher Seal Tank & Drain Legs 214850 1000-080-1968-0024-0008 Disc Scrubber 216832 1000-080-1968-0024-0012 Secondary Elbow 217562 1000-080-1968-0024-0007 Quencher Feed Tank & Drain Legs 213679 1000-080-1968-0024-0022 Mist Eliminator 213608 1000-080-1968-0024-0014 Ground Floor Duct 212834 1000-080-1968-0024-0009 Duct Seal Tank & Drain Legs 214930 1000-080-1968-0024-0043 OG System Inspection Doors 229753 1000-080-1968-0001-0011 HOOD INSPECTIONS Lower Hood 213171 000-080-1968-0024-0001 Moveable Hood 213656 1000-080-1968-0024-0004 Lower Fixed Hood 213181 1000-080-1968-0024-0001 Upper Fixed Hood 216706 1000-080-1968-0024-0001 Vessel reline - structural inspection checklist 11 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT STRUCTURAL INSPECTORS WORKLIST & SAP INFORMATION
  • 12. BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT 12 TYPICAL STRUCTURAL INSPECTORS SAP INSPECTION TASK
  • 13. BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT 13 TYPICAL NOTIFICATION (WORK RAISED) TASK FOLLOWING INSPECTION
  • 14. BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT 14 TYPICAL FEEDBACK FROM FABRICATION MAINTENANCE GROUP
  • 15. ID Fan Inlet Ducting Procedure INSPECTION LIST Carry out a visual inspection of casing,system supports, access platform,visualy inspect vane cylinder linkage & supports,vane box,fabric bellows. 1.Inspect casing-Carry out assessment of the protective coating,detailing the condition(blistering/flaking).Do a random UT thickness test of the full casing at max spacings of 500mm,including any areas suspect of suffering internal corrosion/any areas rea 2. Access ladder and platforms. Check the condition and security of ladder rungs stringers and safety hoops including securing brackets / bolts. Detail all impact damage, corrosion, condition of anchorage points / brackets, check handrail for security and 3.System suports- Identify any missing or loose bolts at connections including any weld defects such as cracks,marking up for repair. 4.Vane cylinder-Visualy inspect the vane cylinder linkage and supports. 5.Fabric bellows-Check for signs of deteroration,wear and leakage. KC4200 V0 Job Catalogue Enquiry-Basic Details 27/09/07 15:08 Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 27 3700HP I/D FAN & FLARE STACK RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 075 STRUCT INSPECTION 02 RELINE INSPECTION OF FAN INLET DUCTING 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF CASING TO 1994 01 ENSURE INTEGRITY OF SYSTEM, CARRY OUT Priority RANDOM THICKNESS CHECKS TO FULL SECTION, Critical C CARRY OUT VISUAL INSPECTION OF SYSTEM Cost Allocation SUPPORTS, VISUALLY INSPECT VANE CYLINDER LINKAGE & SUPPORTS. VISUAL INSPECTION OF SI 2 4.00 OrderNo ACCESS PLATFORM & LADDERS. Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 1 16 0 0 00 0 A 01 4 7 02 01 15 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 16. ID Fan Casing Procedure INSPECTION PROCEDURE Carry visual inspection of I.D fan casing, holding down structures access walkway and staircase. 1. ID Fan casing-carry out a visual inspection of all the ID Fan casing plates and identify any areas suffering from corrosion or internal wear. Check also for signs of buckling or distortion possibly caused by thinning of the casing plates,(problem areas are around the shaft on the drive side and around the casing on the fan path) carry out a visual inspection of the welds and report all weld fractures. 2.Carry out a systematic UT thickness test of the fan casing at a max spacing of 500mm including any areas suspect of suffering from internal erosion, any areas found showing readings of <3mm should be subject to a UT scan (letter box) of 100mm x 100mm. All readings below 3mm should be reported to the relevent supervisor, who will organise immediate repair. Visual inspection 3.Holding down structures-inspect the fan stuctures concrete foundation and identify any spalling or cracked concrete.Check all holding down bolts are secure and report any corrosion. 4.Access walkway and staircase-Inspect all stair treads for wear/deformed including security bolts for corrosion. Check all handrailing for corrosion and security, check the condition of the protective coating. Inspect all open mesh gratings including the grating support structure. Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 27 3700HP I/D FAN & FLARE STACK RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 076 STRUCT INSPECTION 02 RELINE INSPECTION OF I.D. FAN CASING 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF CASING TO 1994 01 ENSURE SYSTEM SECURITY, CARRY OUT RANDOM Priority THICKNESS CHECKS OF CASING AREA, VISUAL Critical C INSPECTION OF HOLDING DOWN STRUCTURES, Cost Allocation VISUAL INSPECTION OF ACCESS WALKWAY & STAIRCASE. SI 2 6.00 OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 15 0 0 00 0 A 01 4 7 02 01 16 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 17. ID Fan Exit Ducting Procedure Carry out a visual inspection of: Swan neck, Stainless steel expansion Bellows, Silencer, T piece, Transition duct and Fabric bellows to ensure integrity of ducting. 1. Swan neck, check for paint deterioration / corrosion, check welds on channel stiffeners / between ducting and stiffeners for crevice corrosion. Carry out visual inspection of swan neck to Stack flanged connection looking for signs of leakage. Check bolts for severe corrosion and identify any found missing or loose. Carry out thickness checks to ducting at a max spacing of 500mm, including any areas suspected of suffering internal errosion or severe external corrosion (i.e above channel stiffeners where plant process debris collects, signs of buckling or distortion). Any areas showing readings < 3mm should be subject to a scan (Min 100mm x 100mmm) to dermine the area requiring repair. Mark all areas requiring repair and report to relevant plant supervisor who will organise immediate repair. 2. Stainless expansion Bellows Check convolutes for signs of fatigue/cracking. Any suspect areas should be subject to DPI. Check and report any signs of impact damage and misalignment. 3. Silencer Thickness check ducting at a max spacing of 500mm / check for paint deterioation signs of corrosion. Check welds for defects 4. T piece and transition ducting Check for paint deterioration / corrosion to casings,Check bolts in flanges for severe corrosion and identify any missing or loose. Check around welded connection of "T" piece for leakage thinning of shell casing .Carry out thickness checks to ducting at a max spacing of 400mm including any areas suspected of suffering internal errosion or severe external corrosion i.e. signs of buckling, distortion, pin holes . Any areas showing readings <3mm should be subject to a scan (min 100mm x 100mm) to dermine the area requiring repair, mark all areas requiring repair and report to relevant plant supervisor who will organise immediate repair.Check bolted connections in north and south sides supporting columns. 5.Fabric bellows Check bellows for signs of deterioration, tears, holes, . any signs of leakage Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 27 3700HP I/D FAN & FLARE STACK RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 077 STRUCT INSPECTION 02 RELINE INSPECTION OF FAN EXIT DUCTING 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF CASING TO 1994 01 ENSURE SYSTEM SECURITY, CARRY OUT RANDOM Priority THICKNESS CHECKS TO FULL SECTION, REPORT Critical C ON FABRIC BELLOWS CONDITION, VISUAL Cost Allocation INSPECTION OF SILENCER SECTION, VISUAL INSPECTION OF SWAN NECK ENTERING INTO SI 2 4.00 OrderNo CHIMNEY. Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 15 0 0 00 0 A 01 4 7 02 01 17 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 18. ID Fan Sump Drain Legs Procedure INSPECTION LIST Carry out inspection of I.D. Fan Sump Drain Legs to ensure integrity and length of. Visual inspect Drain Legs Check for paint deterioration and corrosion. Check all flanges for signs of leakage, loose, missing or severly corroded bolts. Carry out thickness checks to full length of carbon pipe (Original thickness recorded at 7.6mm). Carry out visual inspection of stainless steel (sump end) leg length to ensure that they are below sump water level and form a seal. 1 Sump drain legs Sump Handrail Check handrail for defects I.e. missing or loose bolts impact damage to rails, paint deterioration, corrosion. Check access gate 2 Ensure pipe work is of correct length UT thickness tests 1 Ut thickness testing of pipe work Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 37 3700HP I/D FAN - SUMP PUMP RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 010 STRUCT INSPECTION 02 RELINE INSPECTION OF SUMP DRAIN LEGS 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF SUMP 1994 01 DRAIN LEGS TO ENSURE INTEGRITY OF SYSTEM Priority ENSURE PIPEWORK IS OF CORRECT LENGTH, Critical C CARRY OUT THICKNESS CHECKS OF PIPEWORK. SI 2 3.00 Cost Allocation OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZBP 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 21 0 0 00 0 A 01 4 7 02 01 18 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 19. Slag Gantry East Vertical Leg Procedure INSPECTION LIST Carry out inspection of casing, 20metre level pivot point frames and pin connections to casing, crane drivers access walkway level slide bearing frame Visual inspect 1.Inspect casing-Carry out assessment of the protective coating,detailing the condition(blistering/flaking).Do a random UT thickness test of the full casing at max spacings of 500mm,including any areas suspect of suffering internal erosion / any areas reading <3mm should be subject to a scan (min 100mmx100mm) to determine the area to repair. 1 Inspect casings 2. Pivot point frame. Check around pin to esure welded connection to ducting is intact and pin is horizontal. Check frame for defects I.e. distortion, welds cracking and if frame is vertical on supporting steelwork. 2 System supports at 20m level 3. Slide bearing and frame. Check channel bracings for integrity I.e. bolted connections any signs of distortion. Check wear plates on shell casing and channel bracings to ensure integrity off. 3 Slide bearing frame 4 Pivot point frame UT thickness tests 1 Random Ut Thickness tesing of full section Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 09 DAHL TUBE RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 025 STRUCT INSPECTION 02 RELINE INSPECTION OF EAST VERTICAL LEG 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF CASING TO 1994 01 ENSURE INTEGRITY OF SYSTEM, CARRY OUT Priority RANDOM THICKNESS CHECKS TO FULL SECTION, Critical C VISUALLY INSPECT SYSTEM SUPPORTS @ 20M Cost Allocation LEVEL, VISUAL INSPECTION OF SLIDE BEARING FRAME, VISUAL INSPECTION OF SI 2 12.00 OrderNo PIVOT POINT FRAME. Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 15 0 0 00 0 A 01 4 7 02 01 19 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 20. Slag Gantry Hortizontal Duct Procedure INSPECTION LIST Carry out inspection of Slag Gantry horizontal duct, platforms G and platform F. Slag Gantry Horizontal duct. Carry out a visual inspection of Ducting looking for signs of leakage, paint deterioration or corrosion. Check door flanges for crevice corrosion. Carry out Visual inspection of internal handrailing. Carry out thickness checks to ducting at a max spacing of 1metre, including any areas suspected of suffering internal erosion or severe external corrosion. Any areas showing readings< 3mm should be subject to a scan (min 100mm x 100mm) to determine the area requiring repair. Mark all areas requiring repair and report to relevant plant supervisor who will organise immediate repair. Visual inspect Platforms G and F. Check supporting steelwork and welded connections to duct casing. Check Bolted connections for crevice corrosion. Check open mesh panels for defects and if secured with clips. Check handrailing and ladder access. Check connecting walkway for same. 1 Inspect casings 2 Access walkways and ladders UT thickness tests Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 09 DAHL TUBE RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 026 STRUCT INSPECTION 02 RELINE INSPECTION OF SLAG GANTRY DUCT 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF CASING TO 1994 01 ENSURE INTEGRITY OF SYSTEM, CARRY OUT Priority RANDOM THICKNESS CHECKS TO FULL SECTION, Critical C VISUAL INSPECTION OF ACCESS WALKWAYS AND Cost Allocation LADDERS. SI 2 12.00 OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 64 4 2 47 0 0 00 0 A 02 4 7 02 02 20 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 21. Slag Gantry West Vertical Leg Procedure INSPECTION LIST carry out a visual inspection of casing,system supports and vertical access ladder. 1.Inspect casing-Carry out assessment of the protective coating,detailing the condition(blistering/flaking).Do a random UT thickness test of the full casing at max spacings of 500mm,including any areas suspect of suffering internal corrosion/any areas reading <3mm should be subject to a scan (min 100mmx100mm) to determine the area to repair. 2.System suports- Identify any missing or loose bolts at connections including any weld defects such as cracks,marking up for repair. 3.Vertical access ladder-Check the condition and security of the ladder rungs,stringers and safety hoops including securing brackets/bolts.Detail all impact damage,corrosion,contition of protective coating,condition of anchorage point. Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 09 DAHL TUBE RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 027 STRUCT INSPECTION 02 RELINE INSPECTION OF WEST VERTICAL LEG 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF CASING TO 1994 01 ENSURE INTEGRITY OF SYSTEM, CARRY OUT Priority RANDOM THICKNESS CHECKS TO FULL SECTION, Critical C CARRY OUT VISUAL INSPECTION OF SYSTEM Cost Allocation SUPPORTS, VISUAL INSPECTION OF VERTICAL LADDER ACCESS. SI 2 4.00 OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 64 4 2 47 0 0 00 0 A 02 4 7 02 02 21 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 22. Radiation Section Explosion Door Procedure INSPECTION LIST Carry out inspection of Explosion door and pivot structure. Water seal trough and associated access platforms. Visual inspect Explosion door and pivot structure. Carry out visual inspection of door checking for severe corrosion and condition of door seal plate. Check pivot assembly for defects 1 Explosion door Water seal trough. Visual inspection of trough looking for severe corrosion wall height of trough and over flow pipe work 2 Explosion door pivot structure ans supports Access platforms. Check Bolted connections for crevice corrosion. Check open mesh panels for defects and if secured with clips. Check handrailing and ladder access. Check Internal walkway and ladders for same. 3 Water seal trough 4 access platforms and ladder Chimney. Check for defects I.e. Holes, impact damage. Check condition of refactory. 5 chimney Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 02 FURNACE HOOD - EXPLOSION DOOR RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 032 STRUCT INSPECTION 02 RELINE INSPECTION OF EXPLOSION DOOR 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF 1994 01 EXPLOSION DOOR AND ITS PIVOT STRUCTURE Priority AND SUPPORTS, INTEGRITY OF WATER SEAL Critical C TROUGH. VISUAL INSPECTION OF ACCESS Cost Allocation PLATFORMS & LADDER, VISUAL INSPECTION OF CHIMNEY. SI 2 6.00 OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 15 0 0 00 0 A 01 4 7 02 01 22 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 23. Quencher Venturi Procedure INSPECTION LIST Carry out visual inspection of outer casing, internal inspection of wear plates water seal trough and dipper arrangement. Outer casing. Check for paint deterioration / corrosion to casings,Check bolts in flanges of vane assembly (underslung platform) for severe corrosion and identify any missing or loose. Carry out thickness checks to ducting at a max spacing of 400mm including any areas suspected of suffering internal errosion or severe external corrosion i.e.leakage, signs of buckling, distortion (north wall around spray water inlet pipes). Any areas showing readings <3mm should be subject to a scan (min 100mm x 100mm) to dermine the area requiring repair, mark all areas requiring repair and report to relevant plant supervisor who will organise immediate repair. Visual inspect Wear plates. Carry out internal inspection of wear plates looking for distortion caused through heat damage . Check wear plates for cracking in securing welds. Visual inspection of wear plate face checking for erosion. 1 Outer casing 2 Water seal trough Water seal trough and Dipper arrangement. Visual inspection of trough and dipper arrangement checking that dipper plate sits lower than water level in trough and forming gas tight seal. Check for heat distortion to internal trough walls. 3 Dipper arrangement UT thickness tests 1 UT thickness test walls Measure Venturi vanes and report Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 05 VENTURI HOPPER/QUENCHER TROUGHS RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 031 STRUCT INSPECTION 02 RELINE INSPECTION OF QUENCHER VENTURI 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF OUTER 1994 01 CASING TO ENSURE INTEGRITY OF SYSTEM, Priority CARRY OUT VARIOUS THICKNESS READINGS Critical C OF WALLS, REPORT ON CONDITION OF WATER Cost Allocation SEAL TROUGH AND ASSOCIATED DIPPER ARRANGEMENT, MEASURE VENTURI VANES AND SI 2 8.00 OrderNo REPORT. Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 15 0 0 00 0 A 01 4 7 02 01 23 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 24. Primary Elbow Procedure INSPECTION LIST Carry out inspection to The outer casing,system supports, access ladders, platforms andExpansion bellows 1. Outer casing, Check for paint deterioration / corrosion. Check welds on channel stiffeners / between ducting and stiffeners for crevice corrosion. Carry out visual inspection of elbow casing looking forsigns of leakage. Check bolts for severe corrosion and identifyany found missing or loose. Carry out thickness checks to the ducting at a max imum spacing of 500mm, including any suspected of suffering from internal erosion, areas showing signs buckling or distortion.Any areas showing readings< 3mm should be subject to a scan (min 100mm x 100mm) to determine the area requiring repair. Visual inspect 2.System supports Identify any missing or loose bolts at connections, including any defects such as cracks, marking up any for repair 1 Outer casing 3. Access ladder and platforms. Check the condition and security of ladder rungs stringers and safety hoops including securing brackets / bolts. Detail all impact damage, corrosion, condition of anchorage points / brackets, check handrail for security and damage, check Kennedy grating for security i.e. clips 4. Expansion Bellows. Check the convolutes for signs of fatigue / cracking. Any suspect areas should be subject to D,P,I. Check and report any signs of impact damage and misalignment. Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 06 PRIMARY ELBOW RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 023 STRUCT INSPECTION 02 RELINE INSPECTION OF PRIMARY ELBOW 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF OUTER 01 CASING TO ENSURE INTEGRITY OF SYSTEM, Priority REPORT ON STRUCTURAL SUPPORTS FOR SYSTEM Critical C VISUAL INSPECTION OF ACCESS LADDER & Cost Allocation PLATFORMS, REPORT ON CONDITION OF EXPANSION BELLOWS. SI 2 8.00 1994 OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 64 4 2 07 1 0 00 0 A 02 4 7 02 02 24 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 25. Quencher Seal Tank & Drain Legs Procedure Carry out inspection of Quencher seal tank and drain leg checking for paint deterioration, corrosion, wear and any signs of leakage INSPECTION LIST 1. Tank body. Carry out visual inspection of Quencher seal tank main body. Check all flanges and cover plates for signs of crevice corrosion. Check all welds for cracking / defects. Check internal Tri-may base plates for deterioration / and securing welds. Carry out thickness checks to tank body at a max spacing of 400mm including any areas suspected of suffering internal errosion or severe external corrosion. Check bolted flanges for loose or missing bolts."Mark up" and report any areas requiring repair to relevant plant supervisor for immediate repair. Visual inspect 1 Tank body 2. Drain leg. Scaffold access required for this part of the inspection. Carry out visual inspection of down leg looking for paint deterioration, corrosion and any signs of leakage.Take thickness readings at regular intervals on down pipe subject to access. A line scan should be taken accross the (extrados) top bend to determine any errosion and areas requiring repair. Carry out internal inspection to ensure down leg length is below exit trough level and a gas seal will be formed. 2 Supply pipe work 3 Export pipe work 3. Exit pipe work. Carry out visual inspection of pipe and flanged connection looking for paint deterioration, corrosion and any sign of leakage. Check bolts for severe corrosion, loose or any missing. Carry out thickness checks to bottom of bend and sides of pipe also below inspection hatch to determine any erosion. "Mark up" and report any areas requiring repair to relevant plant supervisor for immediate repair. UT thickness tests 1 UT thickness tests of tank body Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 08 QUENCHER SEAL TANK RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 028 STRUCT INSPECTION 02 RELINE INSPECTION OF TANK & DRAIN LEGS 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF TANK BODY SI 2 8.00 1994 8.00 01 AND SUPPLY & EXIT PIPEWORK TO ENSURE Priority SYSTEM INTEGRITY, CARRY OUT THICKNESS Critical C CHECKS TO TANK BODY. Cost Allocation OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 90M ZYX ZBP 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 15 0 0 00 0 A 01 4 7 02 01 25 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 26. Disc Scrubber Procedure INSPECTION LIST Carry out inspection of shell casing from primary elbow to secondary elbow,ducting supports, expansion bellows,access platforms and ladders. Ducting. Check for paint deterioration / corrosion to casing,Check bolts in flanges for severe corrosion and identify any missing or loose. Carry out thickness checks to ducting at a max spacing of 500mm including any areas suspected of suffering internal errosion or severe external corrosion i.e. signs of buckling, distortion. Any areas showing readings <3mm should be subject to a scan (min 100mm x 100mm) to dermine the area requiring repair, mark all areas requiring repair and report to relevant plant supervisor who will organise immediate repair. Visual inspect Ducting supports. Visual inspection of supports identifying any missing or loose bolts at connections including any weld defects such as cracks,marking up and inform relevant supervisor. 1 Outer casing Expansion bellows. Check convolutes for signs of fatigue/cracking. Any suspect areas should be subject to DPI. Check and report any signs of impact damage and misalignment. Access ladder and platforms. Check the condition and security of ladder rungs stringers and safety hoops including securing brackets / bolts. Detail all impact damage, corrosion, condition of anchorage points / brackets, check handrail for security and damage, check Kennedy grating for security i.e. clips Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 12 DISC SCRUBBER RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 041 STRUCT INSPECTION 02 RELINE INSPECTION OF DISC SCRUBBER 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF OUTER 1994 01 CASING TO ENSURE INTEGRITY OF SYSTEM, Priority REPORT ON SYSTEM SUPPORTS @ 50M LEVEL AN Critical C 40M LEVEL, REPORT ON CONDITION OF Cost Allocation EXPANSION BELLOWS, VISUAL INSPECTION OF ACCESS PLATFORMS AND LADDERS. SI 2 8.00 OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 15 0 0 00 0 A 01 4 7 02 01 26 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 27. Secondary Elbow Procedure INSPECTION LIST Carry inspection of secondary elbow shell casing and drain leg Visual inspect Secondary Elbow. Carry out visual inspection to internal and external shell casing to identify any defects i.e. Impact damage, crevice corrosion on door flanges condition of internal seperator plate. Carry out thickness checks to shell casing at max 500 spacing. Including any areas suspected of suffering internal errosion or severe external corrosion. Any areas showing readings <3mm should be subject to a scan (100mmx100mm) to determine the area requiring repair. Mark all areas requiring repair and report to relevant plant supervisor who willorganise immediate repair. 1 Outer casing Drain leg.Carry out visual inspection of down leg looking for paint deterioration, corrosion and any signs of leakage.Take thickness readings at regular intervals on down pipe subject to access. A line scan should be taken accross the (extrados) top bend to determine any errosion and areas requiring repair. Mark all areas requiring repair and report to relevant plant supervisor who will organise immediate repair. 2 External walkways UT thickness tests 1 Random UT thickness tests of casing Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 07 SECONDARY ELBOW RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 012 STRUCT INSPECTION 02 RELINE INSPECTION OF SECONDARY ELBOW 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF OUTER 01 CASING TO ENSURE INTEGRITY OF SYSTEM, 1994 Priority CARRY OUT RANDOM THICKNESS CHECKS OF Critical C CASING, VISUAL INSPECTION OF EXTERNAL Cost Allocation WALKWAYS. SI 2 8.00 OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 15 0 0 00 0 A 01 4 7 02 01 27 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 28. Quencher Feed Tank & Drain Legs Procedure INSPECTION LIST Carry out inspection to Tank body, inlet and out let pipework, weir wall and man hole door access. Visual inspect Tank body. Carry out a visual inspection of Tank looking for signs of leakage, paint deterioration or corrosion. Check door flanges for crevice corrosion. Carry out Visual inspection of internal ladder. Carry out thickness checks to tank walls roof and floor at a max spacing of 1metre, including any areas suspected of suffering internal erosion or severe external corrosion. Any areas showing readings< 3mm should be subject to a scan (min 100mm x 100mm) to determine the area requiring repair. Mark all areas requiring repair and report to relevant plant supervisor who will organise immediate repair. 1 Tank body Weir wall. Check integrity of wall, height of wall is higher than east side internal drain legs to form seal. Carry out random thickness checks to weir wall. 2 Supply pipe work Inlet and outlet pipework (drain legs).Carry out visual inspection of all pipework looking for signs of leakage, paint deterioration and corrosion. Check all flanged connections checking for loose severly corroded or missing bolts. Carry out thickness checks to all pipe work at random areas and areas liable to suffer from internal errosion (extrados). Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 22 QUENCHER FEED TANK RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 022 STRUCT INSPECTION 02 RELINE INSPECTION OF TANK & DRAIN LEGS 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF TANK BODY 01 AND SUPPLY & EXIT PIPEWORK TO ENSURE Priority SYSTEM INTEGRITY, CARRY OUT RANDOM Critical C THICKNESS CHECKS TO TANK BODY AND PIPE - Cost Allocation WORK, ENSURE WEIR WALL IS FIT FOR PURPOS AND CARRY OUT RANDOM THICKNESS CHECKS. SI 2 12.00 OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZBP 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 29 0 0 00 0 A 01 4 7 02 01 28 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 29. Mist Eliminator Procedure INSPECTION LIST Carry out inspection of Mist eliminator shell casing, drain leg access walkways, ladders and system supports. 1. Shell casing, Check for paint deterioration / corrosion. Check welds on channel stiffeners / between ducting and stiffeners for crevice corrosion. Carry out visual inspection of casing looking for signs of leakage. Check bolts for severe corrosion and identify any found missing or loose. Carry out thickness checks to the ducting at a maximum spacing of 500mm, including any suspected of suffering from internal erosion, areas showing signs buckling or distortion.Any areas showing readings< 3mm should be subject to a scan (min 100mm x 100mm) to determine the area requiring repair. Visual inspect Drain leg. Carry out visual inspection of down leg looking for paint deterioration, corrosion and any signs of leakage.Take thickness readings at regular intervals on down pipe subject to access. A line scan should be taken accross the (extrados) top bend to determine any errosion and areas requiring repair. 1 Outer casing 4.Access walkway and ladders-Inspect all ladder rungs for wear/deformed including security bolts for corrosion. Check all handrailing for corrosion and security, check the condition of the protective coating. Inspect all open mesh gratings including the grating support structure. 2 Access walk ways and ladders 3.System suports- Identify any missing or loose bolts at connections including any weld defects such as cracks,marking up for repair. 3 System supports at 20m level 4 System supports at 30m level UT thickness tests Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 14 MIST ELIMINATOR RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 011 STRUCT INSPECTION 02 RELINE INSPECTION OF MIST ELIMINATOR 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF OUTER 1994 01 CASING TO ENSURE INTEGRITY OF SYSTEM, Priority CARRY OUT RANDOM THICKNESS CHECKS OF Critical C CASING, VISUAL INSPECTION OF ACCESS Cost Allocation WALKWAYS AND LADDERS, VISUAL INSPECTION OF SYSTEM SUPPORTS @ 20M/30M LEVEL SI 2 8.00 OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 15 0 0 00 0 A 01 4 7 02 01 29 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 30. Ground Floor Duct Procedure INSPECTION LIST Ducting. Check for paint deterioration / corrosion. Check ducting for signs of leakage. Check all welds for defects / cracking. Check man hole door for crevice corrosion to door and shell casing flanges. Carry out thickness testing to ducting at maximum spacing of 1metre, including any areas suspected of suffering internal erosion or showing severe external corrosion. Any areas showing < 3mm should be subject to a scan (min 100mm x 100mm) to determine the area requiring repair / replacement. Mark all areas requiring repair and report to relevant plant supervisor. Twin Expansion bellows. Check convolutes for signs of fatigue / cracking. Any suspect areas should be subject to DPI. Check and report any signs of impact damage and misalignment. Visual inspect Support tension bars. Carry out visual inspection of tension bars checking welded connections to ducting and supporting steelwork. Check pins for any signs of movement. 1 Casing Drain Legs. Check for any signs of leakage. Check welded connection to shell casing for defects / cracking. Check bolts in flanged pipe connections. Thickness check pipework on all bends and in random areas to pipework. 2 Support tension bars Access ladders and platform. Check the condition and security of ladder rungs stringers and safety hoops including securing brackets / bolts. Detail all impact damage, corrosion, condition of anchorage points / brackets, check handrail for security and damage, check Kennedy grating for security i.e. clips 3 Access platforms and ladders 4 Twin expansion bellows UT thickness tests 1 Random UT thickness tests of full ducting Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 24 PRIMARY WASTE GAS CLEANING - B VESSEL Plant Item 09 DAHL TUBE RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 021 STRUCT INSPECTION 04 RELINE INSPECTION OF GROUND FLOOR DUCT 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF CASING TO 1994 01 ENSURE INTEGRITY OF SYSTEM, VISUAL Priority INSPECTION OF SUPPORT TENSION BARS, Critical C CARRY OUT RANDOM THICKNESS CHECKS TO Cost Allocation FULL SECTION OF DUCT, VISUAL INSPECTION OF ACCESS PLATFORMS AND LADDERS, VISUAL SI 2 8.00 OrderNo INSPECTION OF TWIN EXPANSION BELLOWS. Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 32 0 0 00 0 B 01 4 7 02 01 30 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 31. Duct Seal Tank & Drain Legs Procedure INSPECTION LIST Carry out inspection of Duct seal tank and drain legs Visual inspect Duct seal tank. Carry out a visual inspection of tank body looking for signs of leakage, paint deterioration or corrosion. Check around all pipe work connections into tank for defects I.e. Weld defects / cracks / corrosion. Check door flange for crevice corrosion.Carry out Visual inspection of weir wall checking that height of wall is greater than drain leg length. Carry out thickness checks to tank body and internal weir wall at a max spacing of 500mm, including any areas suspected of suffering internal erosion or severe external corrosion. Any areas showing readings< 3mm should be subject to a scan (min 100mm x 100mm) to determine the area requiring repair. Mark all areas requiring repair and report to relevant plant supervisor who will organise immediate repair. 1 Tank body 2 Drain legs Drain legs Carry out visual inspection of all pipework looking for signs of leakage, paint deterioration and corrosion. Check all flanged connections checking for loose severly corroded or missing bolts. Carry out thickness checks to all pipe work at random areas and areas liable to suffer from internal errosion (extrados). 3 Access platforms and ladders 4 Twin expansion bellows Bund wall. Check bund wall for integrity, height· · The bund walls have to be strong enough to contain the contents of the tank without danger of collapse. · The bund walls have to be high enough to avoid jetting failure – i.e. jets of liquid out over the bund wall. · The bund has to be impervious to water UT thickness tests 1 Random UT thickness tests of Tank 2 Random UT thickness tests of Pipe work 3 Carry out thickness tests of Weir wall Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 43 DUCT SEAL TANK RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 015 STRUCT INSPECTION 02 RELINE INSPECTION OF TANK & DRAIN LEGS 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF TANK BODY 01 AND DRAIN LEGS TO ENSURE SYSTEM Priority INTEGRITY, CARRY OUT RANDOM THICKNESS Critical C CHECKS TO TANG AND PIPEWORK. ENSURE WEIR Cost Allocation WALL IS FIT FOR PURPOSE, CARRY OUT RANDOM THICKNESS CHECKS. SI 2 12.00 1994 OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZBP 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 15 0 0 00 0 A 01 4 7 02 01 31 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 32. OG System Inspection Doors Procedure INSPECTION LIST Carry out inspection of O.G. system doors CARRYOUT INSPECTION OF ALL SYSTEM DOORS AS PER LIST System Doors. Carry out visual inspection of open doors as per list, looking for crevice corrosion to flange / door faces. Any flanges with a loss of 50% to be replaced relevant plant supervisor informed. Inspect door hinges for wear, Check welded connection of hinges to ducting and door. ENSURE ALL DOORS MEET THE REQUIRED STANDARDS AS DETAILED ON RELEVANT DRAWINGS DOOR LIST 1) 70M EXPLOSION DOOR 2) 60M EAST RADIATION DOOR 3) 60M WEST RADIATION DOOR 4) 60M VENTURI HOPPER DOOR 5) 60M EAST VENTURI THROAT DOOR 6) 60M WEST VENTURI THROAT DOOR 7) 45M HOOD DOOR 8) 50M PRIMARYELBOW TOP DOOR 9) 50M PRIMARYELBOW BOTTOM DOOR 10) 50M FLOODED DISC DOOR 11) 40M SECONDARYELBOW SQUARE DOOR 12) 40M SECONDARYELBOW ROUND DOOR 13) 35M MIST ELIMINATOR SOUTH DOOR Example of crevice corrosion 14) 35M MIST ELIMINATOR NORTH DOOR 15) 30M VERTICAL DUCT ROUND DOOR 16) GROUND FLOOR DAHL TUBE DOOR 17) SLAG GANTRYHIGH LEVEL EAST DOOR 18) SLAG GANTRYHIGH LEVEL WEST DOOR 19) I.D. FAN INLET DUCT DOOR 20) I.D. FAN IMPELLER COMPARTMENT DOOR Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 01 CIVIL ENG WORKS - BUILDINGS,DRAINAGE,ETC Plant Item 11 STRUCTURE RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 032 STRUCT INSPECTION 02 RELINE INSP 'A' VESSEL SYSTEM DOORS 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT INSPECTION OF ALL SYSTEM DOORS 1994 01 AS PER ELEMENTS LIST, ENSURE ALL DOORS Priority MEET THE STANDARDS REQUIRED ON RELEVANT Critical C DRAWINGS. SI 2 8.00 Cost Allocation OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZBP 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 15 0 0 00 0 A 01 4 7 02 01 32 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 33. Lower Hood Procedure INSPECTION LIST CARRY OUT INSPECTION OF HOOD TUBES AND MEMBRANES,VISUAL INSPECTION OF RING MAIN. Tubes and membrane. Visual inspection of tubes looking for leakage, cracking, pitting and condition of membrane. Carry out thickness testing to tubes covering 10% (1 in every 10) of hood. Any tubes <3mm thickness test tubes adjacent to it. Visual inspect Water Ring main.Visual inspection of pipe looking for leakage, cracking, pitting and condition of pipe connections. 1 Lower hood tubes amd membranes 2 Ring main and feed pipes UT thickness tests 1 UT Thickness test tubes. Coverage 10%. Length 1m from lower bend up over and with probe as close as posible to the membranes. Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 01 FURNACE HOOD RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 138 STRUCT INSPECTION 02 RELINE INSPECTION OF LOWER HOOD 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF HOOD SI 2 4.00 1994 01 TUBES AND MEMBRANES, REPORT THICKNESS Priority READINGS OF VARIATION OF TUBES ALONG Critical C LENGTH, VISUAL INSPECTION OF RING Cost Allocation MAINS AND FEED PIPES. OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 15 0 0 00 0 A 01 4 7 02 01 33 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 34. Moveable Hood Procedure INSPECTION LIST Carry out inspection of moveable hood Tubes and membranes, water ring mains, walkways and support structure. Tubes and membrane. Visual inspection of tubes looking for leakage, cracking, pitting and condition of membrane. Carry out thickness testing to tubes with probe as close as posible to the membranes covering 10% (1 in every 10) of hood. Any tubes < 3mm thickness test tubes adjacent to it. Visual inspect Water Ring main.Visual inspection of pipe looking for leakage, cracking, pitting and condition of pipe outlet connections. 1 Movable hood tubes amd membranes Access ladders and platforms. Check the condition and security of ladder rungs stringers and safety hoops including securing brackets / bolts. Check and detail all impact damage, corrosion, condition of anchorage points / brackets, check handrail for security and damage, check Kennedy grating for security i.e. clips 2 Ring main and feed pipes Support structure. Check all beams joists and angle bars that form supporting structure for impact damage. Check bolted connections for loose or missing bolts 3 Walk ways and support structure UT thickness tests 1 UT Thickness test tubes. Coverage 10%. Length 1m from lower bend up over and with probe as close as posible to the membranes. TEM's Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 04 MOVEABLE HOOD RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 060 STRUCT INSPECTION 02 RELINE INSPECTION OF MOVEABLE HOOD 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF HOOD 1994 01 TUBES AND MEMBRANES, REPORT ON THICKNESS Priority READINGS OF VARIATION OF TUBES ALONG Critical C LENGTH, VISUAL INSPECTION OF RING MAINS Cost Allocation AND FEEDER PIPES, VISUAL INSPECTION OF WALKWAYS & SUPPORT STRUCTURE. SI 2 8.00 OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 4 15 0 0 00 0 A 01 4 7 02 01 34 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 35. Lower Fixed Hood Procedure INSPECTION LIST Carry out inspection of Hood tubes and membranes,Hood support rollers on 40metre level, hood supports on 50metre level. Tubes and membrane. Visual inspection of tubes looking for leakage, cracking, pitting and condition of membrane. Carry out thickness testing to tubes with probe as close as posible to the membranes covering 10% (1 in every 10) of hood. Any tubes <3mm thickness test tubes adjacent to it. Report all defects and low reading area to plant supervisor Visual inspect Hood support rollers. Check alignment of supporting steelwork and roller. Check around welded connection to hood for cracking 1 Lower fixed hood tubes amd membranes 2 Ring main and feed pipes 3 Walk ways and support structure 4 Support rollers on 40m level 5 Hood support on 50m level 6 N2/02 Mains pipe work 50metre Hood supports.Check condition of welded connections to hood any signs of cracking should be further investigated with a N.D.T. method. check packing under hood supports to ensure hood is supported. UT thickness tests 1 UT Thickness test tubes at 35m level. Coverage 10%. Length 1m from lower bend up over and with probe as close as posible to the membranes. 2 UT Thickness test tubes below 50m expansion joint and at the intermediate positions. Coverage 10%. Length 1m from lower bend up over and with probe as close as posible to the membranes. Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 01 FURNACE HOOD RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 139 STRUCT INSPECTION 02 RELINE INSPECTION OF LOWER FIXED HOOD 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPCTION OF HOOD TUBES 1994 01 AND MEMBRANES, REPORT ON THICKNESS Priority READINGS OF TUBES @ 35M LEVEL AND ALSO Critical C BELOW 50M EXPANSION JOINT AND AT INTER- SI 2 6.00 Cost Allocation MEDIATE POSITIONS, REPORT ON HOOD SUPPORT ROLLER @ 40M LEVEL. REPORT ON OrderNo HOOD SUPPORT @50M LEVEL.INC N2/02 MAINS Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 15 0 0 00 0 A 01 4 7 02 01 35 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 36. Upper Fixed Hood Procedure INSPECTION LIST Carry out inspection of upper Fixed Hood, Hood supports and 70m tension rods 50 Metre level link pipes Fixed hood. Visual inspection of tubes looking for leakage, cracking, pitting and condition of membrane. Carry out thickness testing to tubes covering 10% (1 in every 10) of hood. Any tubes <3mm thickness test tubes next to it Visual inspect Hood supports. Check condition of welded connections to hood any signs of cracking should be further investigated with a N.D.T. method. check packing under hood supports to ensure hood is supported. 1 Upper fixed hood tubes amd membranes Tension Rods. Check springs on 70metre level for fatigue, stress fractures. Check 60metre level east and west side welded connections to hood for cracking. Check pin and alignment of rod 2 Hood support at 60m level Link pipes. Check 50metre level Link pipes and header pipe for any signs of leakage. Carry out thickness tests to random areas of each Link pipe and header pipe. 3 70m tension rods UT thickness tests 1 UT Thickness test tubes at 50m level. Coverage 10%. Length 1m from lower bend up over and with probe as close as posible to the membranes. 2 UT Thickness test link pipes at 50m level. 3 UT Thickness test tubes at 60m venturi. Coverage 10%. Length 1m from lower bend up over and with probe as close as posible to the membranes. Resp TSM Cost Centre 1968 BOS WASTE GAS CLEANING Plant Reg 22 PRIMARY WASTE GAS CLEANING - A VESSEL Plant Item 01 FURNACE HOOD RCM Ind Job ------Key Name----- Class -------------Job Title------------------ P/Req 140 STRUCT INSPECTION 02 RELINE INSPECTION OF UPPER FIXED HOOD 1 ------------Job Description------------- Grade No Time Dept Dur Cards CARRY OUT VISUAL INSPECTION OF HOOD TUBE 01 AND MEMBRANES, REPORT ON THICKNESS Priority READINGS OF TUBES @ 50M LEVEL AND ALSO Critical C 60M VENTURI, THICKNESS READINGS OF 50M Cost Allocation LINK PIPES, REPORT ON HOOD SUPPORT @ 60M LEVEL AND 70M TENSION RODS. SI 2 12.00 1994 OrderNo Drawings Orig ----Prior Job----- Gen Proc -----Safety Procedures----- Gp.Id S/R Recal 23D ZYX ZPA 1 ---------------Frequency Details---------------- ---Major Stop Details---- Code Freq --Start(Base) 1--- --Start(Base) 2--- Code Freq Sh Day Wk Start Cycle Sh Day Week Yr Sh Day Week Yr W 32 4 2 15 0 0 00 0 A 01 4 7 02 01 36 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 37. MINIMUM THICKNESS DRAWING 37 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT
  • 38. 38 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT SKETCH IDENTIFYING INSPECTION AREAS
  • 39. 39 BOS 'B' VESSEL HOOD & GAS CLEANING RBI DOCUMENT SIGNATORIES OF WORKING GROUP AGREEING WITH RBI REVIEW