Innovation in Government
Booz | Allen | Hamilton
Morgan Capilla, Joe Fleming, Chenying Huang, and Katherine Knight
April 23, 2015
SANFORD SCHOOL OF PUBLIC POLICY | DUKE UNIVERSITY
This student presentation was prepared during the spring of 2015 in partial completion of the
requirements for PUBPOL 804, a course in the Master of Public Policy Program at the Sanford
School of Public Policy at Duke University. The research, analysis, policy alternatives, and
recommendations contained in this report are the work of the student team that authored the report,
and do not represent the official or unofficial views of the Sanford School of Public Policy or of
Duke University. Without the specific permission of its authors, this report may not be used or cited
for any purpose other than to inform the client organization about the subject matter. The authors
relied in many instances on data provided to them by the client and related organizations and make
no independent representations as to the accuracy of the data.
2
Table of Contents
Overview................................................................................................................................. 3
Case Studies ........................................................................................................................... 5
1. Boston’s Mayor’s Office of New Urban Mechanics......................................................................... 5
Best Practices ................................................................................................................................... 6
Limitations ........................................................................................................................................ 7
2. The New York City Center for Economic Opportunity.................................................................... 8
Best Practices ................................................................................................................................. 10
Limitations ...................................................................................................................................... 10
3. Defense Advanced Research Projects Agency ............................................................................... 11
Best Practices ................................................................................................................................. 12
DARPA Hard Test........................................................................................................................... 14
Limitations ...................................................................................................................................... 15
4. Xerox’s Palo Alto Research Center ................................................................................................ 16
Best Practices ................................................................................................................................. 16
Limitations ...................................................................................................................................... 17
5. Office of Personnel Management Innovation Lab.......................................................................... 18
Best Practices ................................................................................................................................. 19
Limitations ...................................................................................................................................... 20
Recommendations................................................................................................................ 21
1. Absorb Risk on Behalf of the Government by Piloting Projects .................................................... 21
2. Build Small Innovation Teams to Pilot Projects............................................................................. 22
3. Innovation Teams Should Crowd and Open-Source Ideas ............................................................. 24
4. Scale Up Successful Pilot Projects.................................................................................................. 25
5. Develop Meaningful Interim Performance Metrics ........................................................................ 25
Conclusion............................................................................................................................ 28
Works Cited ......................................................................................................................... 29
3
Overview
Federal agencies often struggle to innovate the services that they provide to
American citizens. The government faces such barriers as: 1) a failure to mitigate risk; 2)
difficulty in managing the impact of failures; 3) slow decision-making processes; 4)
inability to adapt to changing circumstances; and 5) a lack of collaboration across agencies
(Criado et al., 2013, p. 324; Hull et al., 2006, p. 59; Mergel, 2012, p. 282; Torfing et al.,
2012, p. 845).
On behalf of Booz Allen Hamilton (BAH), we researched the question: How should
BAH effectively spur innovation in federal agencies?
In order to answer this question, we highlight the best practices and limitations
regarding government and private sector innovation teams:
1. Boston’s Mayor’s Office of New Urban Mechanics (MONUM)
2. The New York City Center for Economic Opportunity
3. Department of Defense’s Defense Advanced Research Projects Agency (DARPA)
4. Xerox’s Palo Alto Research Center (PARC)
5. Office of Personnel Management (OPM)
We identified the most successful practices from each example and analyzed how these
practices could best fit BAH’s own innovation strategy. We have made five
recommendations to BAH based on our five case studies:
1. Absorb risk on behalf of the government by piloting projects. Innovation teams
should pilot projects that absorb government risk. Innovation teams can mitigate
government risk by creating a physical space that distinguishes it from the rest of the
agency. Innovation teams can fully test pilot projects and protect the government
4
from implementing failed projects. Teams that pilot projects to absorb risk will
benefit from engaging in public-private partnerships. This partnership will allow for
diverse perspectives to flow into the organizations.
2. Build small innovation teams to pilot projects. We recommend that BAH’s
innovation teams consist of 5-8 people with diverse experiential knowledge. Team
members should be adaptable and flexible, and project managers should have strong
academic and leadership backgrounds.
3. Crowd- and open-source ideas from within BAH and government agencies.
BAH and government agencies should crowd-source ideas from within their
organizations through internal forums. The government will be able to collaborate in
the innovation process while not having to bear the responsibility of producing
innovative solutions entirely on its own.
4. Scale up successful pilot projects. BAH should then scale up successful pilot
projects. BAH and the government will share resources to increase the likelihood of
project success and reduce the cost of scaling.
5. Develop meaningful interim performance metrics. BAH should adapt
performance tests, such as the DARPA Hard Test, to measure a project’s potential
innovation and ensure that pilots are achieving the desired outcomes. Performance
metrics will save time as well as funds and direct resources towards successful
projects.
5
Case Studies
1. Boston’s Mayor’s Office of New Urban Mechanics
The Boston Mayor’s Office of New Urban Mechanics (MONUM) is a government
innovation team that offers creative solutions to challenges within city government.
MONUM engages public and private participants in its innovation projects. It focuses on
using new technologies to improve public services (Puttick et al., 2014, p. 42).
In 2009, Boston Mayor Thomas Menino created MONUM as a way to drive
innovation within city government without taking city employees away from their primary
duties. While MONUM collects, pilots, and scales projects, regular city employees can
remain focused on their daily responsibilities (Puttick et al., 2014, p. 42). As Menino’s
former Chief of Staff Mitch Weiss puts it, “MONUM allows us to be ‘ambidextrous’—to
have agencies focus on the traditional work residents expect but meanwhile also experiment
on more boundary-pushing, citizen-engaged innovation” (Goldsmith, 2012).
With five highly skilled team members and an annual budget of around $600,000,
MONUM works on issues related to education, civic engagement, city design, and economic
development (Puttick et al., 2014, p. 104; New Urban Mechanics, 2015). In each area, team
members form partnerships with public, private, academic, and nonprofit groups. These
dynamic collaborations help it address a broad range of ideas and expertise to address city
challenges (Puttick et al., 2014, p. 42; Trenkner, 2011a). Following MONUM’s success,
Philadelphia and Utah Valley adapted Boston’s New Urban Mechanics model into their
municipal governments (New Urban Mechanics, 2015).
One of the team’s most successful projects is Citizens Connect, an award-winning
smartphone application that allows residents to readily report such public problems as
6
potholes and graffiti (Lawrence, 2013; Desouza, 2014).1
City workers can easily access the
reports through a partner smartphone application (Farrell, 2012). From 2009 to 2013,
Citizens Connect assisted the city in efficiently resolving over 29,000 reported problems.
Today the application handles 28% of Boston’s service requests (Wood, 2012; The Urban
Vision, 2013; New Urban Mechanics, 2015). MONUM helped to introduce the application
to 54 other Massachusetts communities (Laidler, 2013). Roughly 20 other countries across
the world have adopted the Citizens Connect model (Trenkner, 2011a).
Best Practices
MONUM helps the Boston city government overcome a traditional barrier to
innovation: it assumes the risk affiliated with failed innovation projects. When we asked
Nigel Jacob, co-chair of New Urban Mechanics about MONUM’s role, he explained:
Everyone understands that innovation requires risk. But what they don’t usually
understand is … who bears the brunt of that risk? Asking public officials to do that
isn’t fair. Instead, we have devised a mechanism by which we will own it, and that’s
a core part of the value-add…We can essentially de-risk [a] project for the
government by making that a New Urban Mechanics project. This is really just slight
of hand, but it actually does work in practice” (Interview with Nigel Jacob, 2015).
So while the fear of failure generally inhibits government agencies from exploring
new solutions to public challenges, MONUM can take on the risk and more freely explore
innovative projects.
MONUM’s effective experimentation method allows it to mitigate the impact of
failures. The team first sources ideas from various government and non-government actors.
1
In 2011, Citizens Connect received Harvard’s Ash Center for Democratic Governance Bright Ideas
award for its innovative use of technology to engage citizens ("Harvard Announces Bright Ideas in
Government, 2011, p. 4). In recognition for their accomplishments with MONUM, co-chairs Nigel Jacob
and Chris Osgood won Governing Magazine’s 2011 Public Official of the Year award (Trenkner, 2011b).
They also received the White House’s Local Innovation Champions of Change award in 2012 (Rocheleau,
2012; “Local Innovation”, 2015).
7
After selecting the best ideas, the team pilots the innovation on a small scale with the goal of
“maximizing public impact and minimizing public costs” (Puttick et al., 2014, p. 43).
MONUM packages only the most successful pilots and disseminates its findings to other
cities (Puttick et al., 2014, p. 43). Thus, by identifying and eliminating failures early in the
experimentation process, MONUM can minimize the costs of failed projects and provide the
city with only the most effective outcomes (Georges et al., 2013, p. 3).
MONUM co-chairs Chris Osgood and Nigel Jacob make sure that its projects
involve a broad range of participants. Private corporations, university students, public
employees, and city residents can actively participate in MONUM initiatives through
contributing specialized knowledge or supplying general feedback (Georges et al., 2013, p.
2). In forming these partnerships, MONUM acquires specialized knowledge while
maintaining the quick response time of a small, agile team.
MONUM also maintains an open line of communication with the public to crowd
source innovation proposals. MONUM’s website encourages any citizen with a thoroughly
developed innovation proposal to submit their project plans. The team reviews and assesses
proposals based on: 1) the citizen’s ability to follow through with the project; 2) the scope of
the audience the initiative is projected to serve; and 3) the ability to transform the proposal
into a pilot project (Interview with Nigel Jacobs, 2015). Enlisting public participation helps
MONUM keep fresh ideas flowing into the agency and engage Boston residents.
Limitations
One limitation that MONUM faces involves its tendency to undertake relatively low-
risk and low-reward projects, such as those made possible through smartphone applications.
City innovation teams generally work with tight budgets, and they can get stuck picking the
8
“low-hanging fruit” (The Urban Vision, 2013). Exploring additional funding opportunities
and attracting more private investments could assist MONUM in attaining the resources
necessary to experiment with high-risk, high reward innovations.
2. The New York City Center for Economic Opportunity
The New York City Center for Economic Opportunity (CEO) seeks to reduce New
York City’s poverty rates by developing innovative assistance programs for low-income
residents (Gais et al., 2014, p. 2). CEO works with a broad range of city agencies,
universities, nonprofits, and private companies to design, pilot, monitor, and scale
initiatives. Since it opened in 2006, the Center for Economic Opportunity has worked with
40 agencies to test nearly 70 initiatives that provide health, education, professional
development, and youth programs for impoverished New York residents (Puttick et al.,
2014, p. 66-67).2
Its 23 employment programs have enrolled over 40,000 citizens, helping
participants earn, on average, about $2.00 more per hour than nonparticipants (CEO Annual
Report, 2014, p. 29).3
2
According to CEO’s 2012-2013 progress report, the agency ranked their top 12 most successful
programs as follows: Advance in Work, Child Care Tax Credit, Community Partners, CUNY ASAP,
NYC Training Guide, Office of Financial Empowerment, School-Based Health Centers, Sector-Focused
Career Centers, EITC Mailings, Jobs-Plus, CEO Poverty Measure, and Food Policy Coordinator (CEO
Annual Report, 2014, p. 16).
3
Linda Gibbs, NYC Deputy Mayor and co-creator of CEO, won the Harvard University Innovation in
Government Award in 2006 and 2009 for her role in creating the agency (Goldsmith et al., 2010, p. 107).
In 2012, the agency won this same award for its progress in advancing educational and employment
opportunities across the city (“Center for Economic Opportunity”, 2011). In an effort to replicate CEO’s
successes, the Obama Administration awarded the agency and its collaborators a $5.7 million grant from
the Social Innovation Fund to implement five of its projects in seven other US cities (“Center for
Economic Opportunity”, 2015; Hoagland, 2012). Through Bloomberg Philanthropies, CEO co-founder
and former Mayor Michael Bloomberg is currently scaling his innovation approach in 17 other US cities
and two international cities ("Innovation Teams - Bloomberg Philanthropies", 2015).
9
The City University of New York’s Accelerated Study in Associate Programs
(CUNY ASAP) is one of CEO’s most successful projects. The program aims to improve
community college graduation rates, which were dismally low before ASAP started (Puttick
et al., 2014, p. 68; “Innovations to Build On”, 2013). ASAP addresses financial, structural,
and learning barriers that traditionally inhibit students from graduating. In addition to
financial assistance, it provides students with academic mentoring, career services, and
tutoring sessions. In return for these services, ASAP requires students to maintain full-time
enrollment status and strongly encourages students to adhere to a three-year graduation track
(Scrivener et al., 2015, p. 18).
In a 2013 study, the Manpower Demonstration Research Corporation (MDRC), an
independent social policy research institution, found that 40% of participating students
graduated from New York community colleges within three-years, while only 22% of
nonparticipants graduated within that timeframe. After receiving their associate degrees,
25% of participating students went on to enroll in four-year institutions while only 17% of
nonparticipants did so (Scrivener et al., 2015, p. 51; p. 62).
The program has also proved to be cost-effective. ASAP invested more money per
student than traditional community college assistance programs. But the program succeeded
in graduating a far greater percentage of students within a timely fashion. So while
traditional programs invested less money per student, their failure to graduate students on
time incurred greater long-term costs. Overall, ASAP helped the city save about $13,423 per
degree earned (Scrivener et al., 2015, p. 81). Following these impressive results, the
program is undergoing an expansion; its goal is to serve over 13,000 students across six
communities by the fall of 2016 (Scrivener et al., 2015, p. 92).
10
Best Practices
CEO first pilots its projects on a small scale. In carefully monitoring the effects of its
pilots, CEO can stop underperforming programs early on and reduce the impact of failed
initiatives. Rather than completely disregarding unsuccessful projects, CEO maintains
detailed information about the nature of its failures, which helps prevent similar mistakes
from occurring in the future (CEO Annual Report, 2014, p. 15).
To accurately measure the impact of its anti-poverty initiatives, CEO emphasizes
rigorous monitoring and evaluation practices. Of its 19 staff members, 13 focus on project
design, evaluation, and poverty research (Center for Economic Opportunity, 2015). It also
collaborates with nine independent research institutions to conduct randomized control trials
and other studies to evaluate its programs (CEO Annual Report, 2014, p. 15). Throughout
the piloting and implementation phases, CEO closely monitors the outcomes of its projects
and collects extensive data to convey its findings. Whether a project succeeds or fails, CEO
publishes evaluations reports on its website. This practice establishes a high level of
transparency and credibility for its work (Center for Economic Opportunity, 2013).
CEO forms a variety of partnerships across the public and private sectors to attract
specialized knowledge and attain funding. Collaborating with participants of various
expertise and backgrounds allows CEO to remain relatively small and agile while achieving
the critical knowledge and resources.
Limitations
CEO’s ambitious goal—alleviating citywide poverty— poses a number of challenges
for the agency. In order to witness results on a city level, CEO would need extensive
resources to expand its projects. CEO works with an annual budget of around $100 million,
11
yet it still lacks the resources needed to scale programs across the city (Puttick et al., 2014,
p. 66; Gais et al., 2014, p. 29). As one city council staff member noted, “The biggest
criticism of CEO…has been that the programs have not been ramped up to scale. The total
number of people served…needs to expand” (Gais et al., 2014, p. 28).
Though CEO effectively monitors and evaluates the impacts of its programs on
target communities, it has trouble estimating its performance in the context of citywide
poverty. First deputy mayor Anthony E. Shorris explained:
Poverty is reflective of larger national and global phenomena…We’re not unrealistic
about what a city can do. But after four years, we’ll be asking whether our
interventions were effective in changing what would have been the course of poverty
in New York (Roberts, 2014).4
CEO’s programs have undoubtedly improved economic conditions for many New
Yorkers. But, in dealing with such an ambitious objective, the agency has made it difficult
to assess its overall impact and attain the resources necessary to achieve large-scale progress
against poverty.
3. Defense Advanced Research Projects Agency
The Defense Advanced Research Projects Agency (DARPA) is the central research
organization within the Department of Defense (DoD). The agency’s goal is to provide
innovations in the field of national security. DARPA aims for “transformational change”
rather than “incremental advancement” (DARPA). DARPA has developed significant
technological innovations, such as stealth technology, ARPANET, and unmanned aerial
vehicles.
4
The New York Times, online article.
12
Best Practices
DARPA has a flat management hierarchy to allow the swift movement of ideas
throughout the DoD. Ideas can often travel slowly through government agencies with multi-
layered top-down bureaucracies (Mergel, 2012, p. 286). Removing that obstacle is
especially important for DARPA because its projects are sensitive to predetermined
deadlines. With its 220 total employees, DARPA has only one level of separating project
managers from the agency director (Dubois, 2003, p. 5).
The program managers fulfill numerous logistical responsibilities. They have the
flexibility and autonomy to design and select their teams. Managers also have the authority
to identify opportunities for innovation and act upon those opportunities in the role of
“techno-scout” (Dubois, 2003, p.8; Dugan, 2013). Program managers have tenures of only
four years, which instills a sense of urgency and purpose into the process. To allow the team
to continue its work unabated, project managers oversee project development and handle
logistical responsibilities.
A project manger is usually a PhD because deep technical knowledge is a
prerequisite for the position (Dugan, 2013). That requirement may seem contrary to the
culture of DARPA. However, the organization’s innovation model is one of “constant flux,”
and project managers need technical knowledge to understand how to adapt projects. This
PhD preference may be specific to DARPA due its emphasis on physical sciences. Yet the
idea may have some general application because project managers should have deep
knowledge of the specific field in which the innovation is occurring.
According to former DARPA director Regina Dugan, previous failed efforts to
imitate DARPA outside of the Department of Defense have led individuals to wrongly
13
conclude that the DARPA’s model cannot be replicated (Dugan, 2013). She argues that
these mistaken conclusions stem from a misunderstanding about the three core concepts of
the agency: ambitious goals, temporary teams, and independence from the parent
organization. DARPA aims to develop revolutionary rather than incremental change.
DARPA’s independence insulates the agency from DoD culture and lets it pursue projects
that may threaten existing DoD business practices. The agency can contract with specialists
from a number of different private organizations who would not otherwise collaborate
(Dugan, 2013).
Temporary project teams are a core element of DARPA’s operations. Fixed-term
managers bring together capable specialists to form project teams that last no more than five
years. Dugan has argued that this process allows DARPA to attract high-quality talent.
Furthermore, she states that this model is pragmatic because a “high-risk effort by a diverse
set of world-class experts can be sustained for only a limited period” (Dugan, 2013).
DARPA allows these performers to work away from DoD in their different organizations
(Dugan, 2013). Dugan argues that permanently hiring high-quality individuals would be the
wrong method to encourage performers to take on high-risk projects (Dugan, 2013).
Adapting DARPA’s fixed project timeframes can benefit a firm’s project portfolio.
By assigning benchmarks for project success, DARPA is able to move funds away from
projects that will not reach their benchmarks and towards promising new proposals (Dugan,
2013).
Project proposals are subjected to a strict set of criteria reviewed by the DARPA
offices that solicit proposals before project managers can recruit their teams and receive
funding (Dubois, 2003, p.6). Former DARPA director George Heilmeier established what is
14
known as the Heilmeier Catechism, which serves as the foundation for DARPA’s project
criteria (Greenwald, 2013):
1. What are you trying to accomplish?
2. How is it done today, and what are the limitations?
a. What is truly new in your approach that will remove current limitations and
improve performance? By how much? (A factor of 10? 100? More?)
3. If successful, what difference will it make, and to whom?
b. What are the midterm exams, final exams, or full-scale applications required
to prove your hypothesis? When will they be done?
c. What is the DARPA exit strategy? Who will take the technologies that you
have developed and turn them into a new capability or a real product?
4. How much will it cost? (Dubois, 2003, p.7)
DARPA Hard Test
BAH innovation teams can use the DARPA Hard Test to gauge their perspectives on a
project’s potential and co-develop average scores from team members and stakeholders.
The Hard Test measures a project’s potential innovation on a scale of 1 to 7 based on
four criteria:
1) Far-reaching: It fundamentally changes how sizeable populations interact with a
concept.
2) Technically challenging: New technologies are needed to push innovations forward.
3) Multidisciplinary: It requires multiple stakeholders from diverse professional and
academic fields to implement the solution.
4) Actionable: It invokes direct action by stakeholders to incorporate ideas (Carleton et
al., 2013, p. 213).
15
Dimension 1 (Lowest) 7 (Highest)
I. Far-Reaching Does not alter the way
people think about an issue
Societal shift in paradigm
on how people think about
a solution
II. Technically
challenging
No new expertise is
required
Advanced specialized
proficiency
III. Multidisciplinary No collaboration is required Diverse skill set is needed
IV. Actionable Little incentive to begin
adapting the solution
Easily adaptable
DARPA created the Hard Test to test projects that are both high-risk and high-
reward. For example, DARPA’s Biological Technologies Office recently solicited proposals
on how to reduce the effects of infectious diseases. The Office wants novel approaches to
identifying the harmful effects of diseases, which can be difficult to accomplish.
The DARPA Hard Test can be easily adopted and implemented by any innovation
team. However, the team must recognize that the Hard Test heavily emphasizes
technological advances. The Hard Test still provides valuable metrics for innovation teams
to test prospective projects. Teams may decide to alter the Hard Test to exclude the
technology criteria and fit their project’s needs.
Limitations
DARPA develops projects that deal with deep technical knowledge of physical and
material sciences. BAH may want its team members and project managers to possess
technical knowledge as well. Suitable project managers and team members will need
experiential or academic knowledge in the field of public policy to identify potentially
innovative practices.
16
4. Xerox’s Palo Alto Research Center
The Palo Alto Research Center (PARC) has an impressive history of developing
innovative and disruptive technologies, such as personal computers, Ethernet, and fiber
optics. In his book, “Dealers of Lightning: Xerox PARC and the Dawn of the Computer
Age”, Michael Hiltzik catalogued these achievements. Xerox established PARC as its
independent research wing in 1970. It centered on a consolidated team of engineers and
information scientists who designed or redefined disruptive technologies. PARC was
designed to explore technologies not directly related Xerox’s photocopying business
(Dennis). PARC did not having to tie its innovations back to the Xerox’s central practices.
Best Practices
According to PARC CEO Stephen Hoover, multiple methods exist for embracing
open innovation. Open innovation may involve crowdsourcing or open-sourcing innovation,
yet it is ultimately premised on the understanding that not all of the best performers work
within the firm (Hoover, 2012).
Hoover argues that the best forms of open innovation rely upon three principles: 1)
understanding the right problem that needs solving; 2) a willingness to experiment with new
processes; and 3) specialized industry knowledge (Hoover, 2012). A firm needs strategic
insight about its client’s visions and goals and must work in collaboration with the client
using those three principles (Hoover, 2012).
The concept of open innovation is particularly salient for Booz Allen Hamilton.
BAH’s client-based dynamic with government agencies allows the firm to utilize
crowdsourcing in collecting ideas from employees within the client agency as well as from
within BAH itself.
17
Alan Kay, who helped develop innovative technologies at PARC, has made the case
that more companies should embrace the PARC model. In following PARC’s model,
companies should find exemplary individuals within the respective field and fund those
individuals so that they can achieve successful innovations—even if that success rate is as
low as 30% (Mui, 2012, p.2). Kay argues that the right question to ask about spurring
innovation is: “Are we funding great people in sufficient quantity to allow 30% of success to
change the world and create a cornucopia of new wealth?” (Mui, 2012, p.2).
In Malcolm Gladwell’s profile of PARC, University of California, Davis
psychologist Dean Simonton similarly argued for an iterative process of creativity.
According to Simonton, “quality is a probabilistic function of quantity” (Gladwell, 2011). In
Simonton’s view, to correctly manage creative methods, managers must recognize the
tradeoff between a higher number of successes and a higher number of failures (Gladwell,
2011). While government agencies may hesitate to embrace that concept, BAH may find it
most applicable in a client-based project model, since it may be able to absorb the risk from
the higher number of failures.
As a private firm, BAH may be well suited to absorb risk from innovating practices
on behalf of government agencies. Agencies are often averse to taking on high-risk, high-
reward projects due to concerns about how failures may reflect on their performance. BAH
can experiment with riskier practices and then pass the successful methods on to the agency.
Limitations
PARC’s model is unique in that it encourages an iterative design process defined by
the trade-off between failures and successes. Before PARC’s incorporation, engineers were
not obligated to report to managers for status updates on projects. They did have to
18
demonstrate the value in their proposals to receive funding. However, the proposal’s value
was not contingent upon the innovation having pragmatic application. Rather, the issue was
how far the proposal planned on pushing the limits of the technology (Gladwell, 2011).
Lawrence Lee, senior director of innovation at PARC, argued that using the iterative
approach provides myriad benefits. It allows the organization to better understand how the
product fits into the market, as well as to anticipate expected returns from the process (Lee,
L., 2012). The caveat to those benefits, however, is that they are best realized in the absence
of deadlines. For BAH’s contracted projects, open-ended projects would not provide the
timely results that government agencies may require.
5. Office of Personnel Management Innovation Lab
In 2012, the Office of Personnel Management (OPM) opened its innovation lab in
the basement of its Washington, D.C. headquarters. The Innovation Lab has its own office
space, which allows for a venue for community engagement and collaborative work (Office
of Personnel Management, 2015). The lab develops and tests solutions to problems within
both the OPM and the federal government (Mann, 2013, p.1). In the fiscal year 2013, the lab
hired six full-time employees and operated at a reported annual cost of $476,000 (United
States Government Accountability Office, 2014, p. 1).
The OPM Lab mitigates the risk of failure by reviewing and facilitating each project
employees bring to the table in problem-solving processes. The public sector has significant
deterrents to innovation, such as limited funding and risk-averse cultures (GAO, 2014, p. 5).
Additionally, public sector officials may fear the political consequences of underperforming
projects (GAO, 2014, p. 5). The OPM Lab assumes that risk for the agency. The Lab allows
19
for federal employees to learn quickly from early mistakes by prototyping and piloting
projects (GAO, 2014, p. 5). The Lab seeks to change governments’ risk-averse nature by
diminishing the political consequences of failure.
Best Practices
A lab needs to accommodate a wide variety of activities, often including
brainstorming sessions, skills workshops, formal project reviews, office duties, meetings,
and presentations. Thus, a space should be easily adaptable to accommodate the various
initiatives that it will help cultivate (UNICEF, 2012, p. 24).
The OPM Lab is a good example of how to wisely manage a physical space. The
Lab provides physical space where innovators can convene. It hosts weekly training sessions
on best practices and ensures the sharing of information across OPM and other federal
agencies. The Lab fills the space with whiteboards, couches, and open carpeted space to
promote creativity. The Lab also uses the communal space to establish inter-organizational
networks, which can be powerful drivers for supporting innovation (GAO, 2014, p. 2).
For example, the Office of Science and Technology Policy (OSTP) partnered with
OPM and the Federal Community of Practice on Crowdsourcing and Citizen Science
(FCPCCS) to develop a workshop to engage different stakeholders to innovate government
services. The OSTP, OPM and FCPCCS collaborated and developed a ToolKit through
crowdsourcing methods to help Federal agencies innovate countrywide scientific and
societal problems (Gustetic et al., 2014).
Designing services from the point of view of the targeted audience is a concept that
has been recognized as crucial in the public sector. It helps to avoid approaches that do not
improve the experience of users beyond the status quo (Puttick et al., 2014, p. 38).
20
The OPM Lab supports efforts to address complex policy issues by
incorporating the “human-centered design” approach to problem solving. This approach is
intended to generate concrete solutions driven by the needs of the targeted audience. The
Lab, for example, helped reframe the problem of integrating veterans by focusing on the
experience of the end-users. Previously, the OPM assisted veterans by requiring them to
participate in job training programs (Lee, J., 2012). Now the agency more selectively places
veterans into training programs, ensuring that the right individuals receive the right training.
Limitations
Internal surveys on whether employees would recommend the Lab to colleagues and
the efficacy of human-centered designs have shown overwhelmingly positive responses
(GAO, 2014, p. 19). However, OPM has not fully developed meaningful performance
measures (GAO, 2014, p. 1). A year after the Lab opened, OPM began to measure the Lab’s
performance more systematically. Lab staff use a series of surveys to measure participant
experience through pre-session and post-session check-ins, and to capture specific project-
related outcomes for the different services they offer. However, according to the GAO
survey, instruments are unlikely to yield data of sufficient credibility and relevance to
indicate the extent of the lab's achievements (GAO, 2014, p. 19). The surveys have been
susceptible to various types of respondent bias. Moreover, when employees attempted to
analyze the responses to measure performance, the results proved difficult to interpret
(GAO, 2014, p. 17).
21
Therefore, we highlight the MindLab5
to show that projects benefit when managers
set quantifiable interim goals, establish performance measures, and use data to adjust their
practices (GAO, 2014, p. 21). Meaningful measures could help the OPM Lab assess its
progress toward improving participants’ abilities to solve problems. BAH should adopt
performance metrics to track project costs, benefits, and performance improvements.
Recommendations
1. Absorb Risk on Behalf of the Government by Piloting Projects
Based on our case studies, we recommend that BAH form its own innovative teams
to mitigate the risk of failed innovation projects. The government is risk-averse by nature,
and agencies are inhibited from exploring innovative solutions to public challenges. BAH
innovation teams can help the government overcome this barrier by being accountable for
project outcomes.
BAH’s teams can absorb government risk by piloting projects before applying them
to public challenges. The teams should work in physical spaces separated from the agency.
Within these designated spaces, BAH’s teams can fully test projects and absorb the risk of
failed projects. As demonstrated by the successes of the OPM Lab, projects benefit when
teams have physical space to convene and collaborate. Agencies will be protected from
project failures and minimize the implementation of poor solutions.
5
MindLab is a U.S. cross-governmental innovation unit, which involves citizens and businesses in
creating new solutions for society. It is a part of three ministries and one municipality: the Ministry of
Business and Growth, the Ministry of Education, the Ministry of Employment and Odense Municipality
and it forms a collaboration with the Ministry for Economic Affairs and the Interior. It addresses areas
such as entrepreneurship, digital self-service, education and employment. It is also a physical space—a
neutral zone for inspiring creativity, innovation and collaboration.
22
When piloting projects, the BAH teams should consider legal, political, and social
concerns, such as:
1) Is this something BAH will actually be able to do?
2) Do political considerations prevent the project from being viable?
3) Will the innovative solutions be accepted by the public?
If a piloted project does not meet these requirements, BAH should stop developing
that project.
According to Bloomberg Innovation Playbook,6
piloting is a way to “live test” an
idea (Bloomberg Philanthropies, 2014, p. 40). The goal is to create a scenario in which the
essence of the idea can be tested. For example, NYC CEO pilots its projects on a small scale
before introducing the initiatives to a larger audience. The organization then scales
successful pilots and discontinues underperforming ones. The OPM Lab also functions as a
risk-taking agency to experiment, prototype, and pilot projects.
Innovation projects benefit when teams engage in public-private partnerships. For
example, MONUM incorporates private corporations, university students, public employees,
and city residents into its initiatives (Georges et al., 2013, p. 2). Enlisting diverse
participants allows MONUM to evaluate a variety of perspectives and keep fresh ideas
flowing into the organization, which are processes that BAH could adopt.
2. Build Small Innovation Teams to Pilot Projects
BAH innovation teams should consist of 5-8 members, and each member should
possess diverse knowledge. Most team members, even the project managers, do not need
6
Bloomberg Innovation Playbook presents the Innovation Delivery Model created to provide cities with a
method to reduce barriers and deliver change more effectively to their citizens. In November 2011,
Atlanta, Chicago, Louisville, Memphis, and New Orleans began to use the Innovation Delivery Model.
The Bloomberg Innovation Playbook functions as a guideline for creating innovation teams.	
  
23
expertise in a specific policy field. Yet they should be able to adapt to new projects once the
goals of previous projects have been accomplished. More specifically, team members should
have an array of skills suited to adaptability and flexibility. BAH project managers should
look for performers with more general technical knowledge (in the fields of public policy
and/or public administration). Members of successful teams generally possess the following
skills: project management; quantitative and qualitative research and analytical capabilities;
creative and critical thinking skills; and strong oral and written communication skills (Putick
et al., 2014).
Project managers should play crucial roles in the BAH innovation teams. They
should be responsible for logistical concerns, such as identifying potential projects (after the
government agency defines the priority area), crafting proposals, recruiting members of the
team, managing budgets and contracts, and handling public engagements and execution
issues. In building the team, managers should have the project area in mind, but not recruit
to the specific subject area. For that reason, project managers need not wait until the
proposal has been approved by the principal administration before they start building their
team.
Unlike their team members, project managers should possess a rigorous academic
background in addition to possessing strong leadership abilities and experience with dealing
with management hierarchy. Managers need a strong academic background because they are
required to identify which projects are both feasible and paradigm altering, as well as the
industry trends that might affect the project goals or processes. Examples of previous
academic and professional experience for project managers includes: a partner at a large
24
consulting firm, a law degree, a researcher at an institute for governmental service and
research, and/or a master of public administration degree.
3. Innovation Teams Should Crowd and Open-Source Ideas
Booz Allen Hamilton has multiple avenues by which it can source ideas both
internally and within government agencies. MONUM, for example, welcomes anyone with
a cogent, well-designed innovation to submit it via email. Team members then evaluate the
proposals and select compelling projects for the piloting phase. BAH can apply these
crowdsourcing techniques through websites and social media channels. If open-sourcing
ideas pose a confidentiality issue, BAH can assist federal agencies in adopting their own
crowdsourcing methods. The agencies, in turn, can assume responsibility in managing the
ideas.
The innovation team within BAH may not necessarily have to bear the burden of
monitoring the crowdsourcing process. Booz Allen Hamilton could help the client
government agency to conduct its own crowdsourcing by developing criteria for reviewing
the crowdsourced ideas. In this dynamic, BAH deconstructs the barriers government
employees face in proposing innovative ideas and effectively builds up the agency as well as
its employees.
Identifying good ideas is pivotal. Teams should review every single proposal, though
they do not give comprehensive attention to those ideas that are clearly lacking.
Additionally, BAH should be clear with the person(s) who submitted the proposal about the
idea becoming an experiment. The government agency should also be comfortable with
playing a significant role in scaling the pilot, after BAH drives the pilot and determines that
the experiment has been successful.
25
4. Scale Up Successful Pilot Projects
After crowdsourcing ideas, BAH teams should then aid the government agency in
implementing the pilot program on a larger scale. To determine which projects are scalable,
BAH teams can adopt MONUM’s goals of piloting those that are "maximizing public
impact and minimizing public costs" (Goldsmith, 2012). BAH teams should help the
government agency to scale those pilots that effectively address the challenges faced by the
agency and do so in a cost-effective manner.
The BAH team should also ensure that the programs to be scaled have reached the
pre-determined benchmarks for piloting success (CEO, 2013, p.15). The principal
administration may want to rely upon strict criteria, such as the aforementioned Heilmeier
Catechism, to determine whether pilots have been successful enough to scale. The metrics
themselves may have to be project-dependent, but the application of the criteria can be
repeatable.
Engaging the federal agency in the scaling process has two main advantages. First, it
engages the government as a collaborator in the innovative process much in the same way
that the crowdsourcing process does. By sharing the process with BAH, the agency is able to
pool resources and increase the probability of success. Second, BAH is able to reduce the
cost of scaling by capitalizing on the government agency’s financial and personnel
resources.
5. Develop Meaningful Interim Performance Metrics
Performance metrics that dictate whether a project has been successful will often
depend on the project itself. Metrics will depend upon the goals and aims of the project.
26
Identifying an appropriate means to measure pilot and scaled program successes will depend
upon the values of the client agency, as well as the nature of the program.
If a project does lend itself to rigorous quantitative evaluation, the DARPA Hard
Test should help to identify beforehand the measurable benchmarks that a project must
reach. If the intended outcomes are less tangible or do not require specific metrics, then
MONUM may be a better model. MONUM, for example, has a central goal of civic
engagement. Thus, if one of their programs does not provide a quantifiable output but has an
identifiable effect on improving citizens’ well-being, MONUM views that project as a
success.
Regardless of whether a program should be evaluated holistically or quantitatively,
setting evaluative criteria can help the client agency and BAH swiftly drop unsuccessful
projects. Using process evaluation methods is better than simply evaluating projects after
they have reached a conclusion. Interim evaluation enables BAH and government agencies
to abandon foundering projects before the scaling process. The practice saves resources
since funds from those projects can then be diverted towards other projects with greater
promise.
27
As an example, our team applied the DARPA Hard Test to the CUNY ASAP project
to demonstrate how BAH could apply the Hard Test to potential projects:
• On the far-reaching criterion, the ASAP project received a 6 out of 7 because 40% of
participating students graduated within three-years and is projected to serve over
13,000 students across six communities by 2016 (Scrivener et al., 2015, p. 92).
• We assigned ASAP a 1 out of 7 on the technically challenging criterion because it did
not require the development of new technologies to integrate the program into the
community.
• For the multidisciplinary criterion, we ranked ASAP a 6 out of 7 because the project
involves the cooperation of multiple community stakeholders, such as students,
parents, educators and government officials.
• Finally, we ranked ASAP a 6 out of 7 on the actionable criterion because it involved
all community stakeholders to implement the ASAP program. It resulted in 25% of
participating students enrolling in four-year institutions (Scrivener et al., 2015, p. ES-
6).
28
Conclusion
Our recommendations based on the five case studies demonstrate how Booz Allen
Hamilton can build innovation teams to effectively spur innovation within government
agencies. Our recommendations will allow BAH to absorb risk on behalf of government
agencies and facilitate innovative processes.
1. We recommend that innovation teams absorb government risk by piloting
solutions to challenges that the government identifies. Teams should have their
own physical spaces. Innovation teams will benefit from public-private partnerships.
The collaboration will gather a variety of perspectives.
2. BAH should build small innovation teams of 5-8 people with diverse
experiential knowledge to pilot projects. Innovation team members should be
adaptable and flexible, and project managers should have strong leadership
experience and familiarity with management hierarchies.
3. Teams should crowdsource ideas from within BAH and government agencies
through internal forums. This will allow the government to be a collaborator in the
innovation process.
4. Innovation teams should scale pilots that have fulfilled predetermined criteria
by pooling resources with government agencies, which can reduce project-
scaling costs.
5. BAH’s teams should develop performance metrics, such as the DARPA Hard
Test, to measure a project’s potential innovation and to ensure that pilots are
achieving the desired outcomes.
29
Works Cited
Bloomberg Philanthropies. “Transform Your City Through Innovation”. 2014.
Carleton, T., W. Cockayne, and A. Tahvanainen. “Playbook for Strategic Foresight and
Innovation”. Innovation Leadership Board. 2013.
Center for Economic Opportunity. 2015.
Center for Economic Opportunity. Replicating Our Results. 2013.
CEO Annual Report. Toronto: Bantam. 2014.
Criado, J. Ignacio; Gil-Garcia, Ramon and Sandoval-Almazan, Rodrigo. “Government
Innovation Through Social Media”. Government Information Quarterly 20.4 (2013).
Defense Advanced Research Projects Agency. DARPA: Creating Breakthrough
Technologies for National Security. 2014.
Dennis, M. “Xerox PARC”. Encyclopedia Britannica.
Desouza, Kevin C. "Turning Governments into Innovation Machines." Governing.com. 10
Nov. 2014.
Dubois, L. “DARPA’s Approach to Innovation and Its Reflection in Industry”. National
Research Council Chemical Sciences Roundtable. 2003.
Dugan, R. “Special Forces” Innovation: How DARPA Attacks Problems”. Harvard
Business Review. Oct. 2013.
Farrell, Michael B. “Boston Deploys Smartphone App for City Workers”. Boston Globe, 15
Feb. 2012.
Gais, Thomas, Patricia Strach, and Katie Zuber. “Poverty and Evidence-Based
Governance”. Rockefeller Report, 2014.
Georges, Gigi, Tim Glynn Burke, Andrea McGrath. “Improving the Local Landscape for
Innovation (Part 1): Mechanics, Partners and Clusters.” Ash Center for Democratic
Governance and Innovation, 20 June 2013.
Gladwell, M. “Creation Myth: Xerox PARC, Apple, and the Truth About Innovation”. The
New Yorker. 16 May 2011.
Goldsmith, Stephen. "Boston's Pioneering Way of Innovating." Governing.com. 12 Sept.
2012.
30
Greenwald, T. “Secrets of DARPA’s Innovation Machine“. Forbes. 15 Feb. 2013.
Gustetic, Jenn, Lea Shanley, Jay Benforado, and Arianne Miller. "Designing a Citizen
Science and Crowdsourcing Toolkit for the Federal Government." The White House.
2 Dec. 2014.
Harvard Announces Bright Ideas in Government. Harvard Kennedy School Ash Center, 29
Mar. 2011.
Hoagland, Kate. "Center for Economic Opportunity Wins Harvard Innovations in American
Government Award." Harvard Kennedy School. 13 Feb. 2012.
Hoover, S. “Defining (and Practicing) ‘Open Innovation“. PARC. 2012.
Hull, Clyde and Brian Lio. “Innovation in Non-profit and For-profit Organizations:
Visionary, Strategic, and Financial Constraints.” Journal of Change Management 6.1
(2006): 53-65.
Innovation Teams. Bloomberg Philanthropies. 2015. Web.
Innovations to Build On. Center for an Urban Future. 2013.
Interview with Nigel Jacob, Co-Chair of New Urban Mechanics. Skype interview.
20 Mar. 2015.
Laidler, John. "Free App Helps Residents Report Problems, Get Action." Boston Globe, 11
July 2013.
Lawrence, Alex. "Ten Innovation that Reimagine City Services.” Ash Center. Harvard
Kennedy Center, 2013.
Lee, Jolle. "OPM's Innovation Lab Spurs New Way of Problem-
solving." FederalNewsRadio.com. 14 Sept. 2012.
Lee, L. “What PARC Learned About Executing on Open Innovation”. Harvard Business
Review. 15 Oct. 2012.
Local Innovation. The White House. 2015.
Mann, Amelia. "Commentary: Every Federal Agency Needs an Innovation Lab." Nextgov.
National Journal Group, 9 Dec. 2013.
Mergel, I. “The Social Media Innovation Challenge in the Public Sector”. Information
Polity. 17 Dec. 2012.
Mui, C. “The Lesson That Market Leaders Are Failing to Learn From Xerox PARC”.
Forbes. 1 Aug. 2012.
31
New Urban Mechanics, 2015.
Office of Personnel Management, Innovation Lab. Creative States. 2015.
Puttick, Ruth, Peter Baeck, and Philip Colligan. "The Teams and Funds Making Innovation
Happen in Governments Around the World." Nesta. Bloomberg Philanthropies,
2014.
Rocheleau, Matt. "White House Honors 2 City of Boston Workers as Local Innovators." The
New York Times, 27 Sept. 2012.
Roberts, Sam. "Nearly Half of New Yorkers Are Struggling to Get By, Study Finds." The
New York Times. 29 Apr. 2014.
Scrivener, Susan, Michael J. Weiss, Alyssa Ratledge, Timothy Rudd, Colleen Sommo, and
Hannah Fresques. “Doubling Graduation Rates: Three-Year Effects of CUNY’s
Accelerated Study in Associate Programs (ASAP) for Developmental Education
Students”. MDRC, 2015.
Torfing, Jacob and Eva Sorensen. “Enhancing Collaborative Innovation in the Public
Sector”. Administration and Society 43.8 (2011): 842-868.
Trenkner, Tina. “Nigel Jacob and Chris Osgood: 2011 Honoree.” Governing.com. 2011a.
Trenkner, Tina. "Public Officials of the Year." Governing.com. 2011b.
UNICEF. Innovation Labs: A Do-It-Yourself Guide. 2012.
United States Government Accountability Office. “Office of Personal Management: Agency
Needs to Improve Outcome Measures to Demonstrate the Value of Its Innovation
Lab”. Rep. no. GAO-14-306. 2014.
Urban Vision, The. "Boston's Mayor's Office of New Urban Mechanics." YouTube. 2 Apr.
2013.
Wood, Colin. "Transportation." Boston's Reporting App Expands Statewide. Govtech.com,
18 Dec. 2012.

Booz Allen Innovation Report

  • 1.
    Innovation in Government Booz| Allen | Hamilton Morgan Capilla, Joe Fleming, Chenying Huang, and Katherine Knight April 23, 2015 SANFORD SCHOOL OF PUBLIC POLICY | DUKE UNIVERSITY This student presentation was prepared during the spring of 2015 in partial completion of the requirements for PUBPOL 804, a course in the Master of Public Policy Program at the Sanford School of Public Policy at Duke University. The research, analysis, policy alternatives, and recommendations contained in this report are the work of the student team that authored the report, and do not represent the official or unofficial views of the Sanford School of Public Policy or of Duke University. Without the specific permission of its authors, this report may not be used or cited for any purpose other than to inform the client organization about the subject matter. The authors relied in many instances on data provided to them by the client and related organizations and make no independent representations as to the accuracy of the data.
  • 2.
    2 Table of Contents Overview.................................................................................................................................3 Case Studies ........................................................................................................................... 5 1. Boston’s Mayor’s Office of New Urban Mechanics......................................................................... 5 Best Practices ................................................................................................................................... 6 Limitations ........................................................................................................................................ 7 2. The New York City Center for Economic Opportunity.................................................................... 8 Best Practices ................................................................................................................................. 10 Limitations ...................................................................................................................................... 10 3. Defense Advanced Research Projects Agency ............................................................................... 11 Best Practices ................................................................................................................................. 12 DARPA Hard Test........................................................................................................................... 14 Limitations ...................................................................................................................................... 15 4. Xerox’s Palo Alto Research Center ................................................................................................ 16 Best Practices ................................................................................................................................. 16 Limitations ...................................................................................................................................... 17 5. Office of Personnel Management Innovation Lab.......................................................................... 18 Best Practices ................................................................................................................................. 19 Limitations ...................................................................................................................................... 20 Recommendations................................................................................................................ 21 1. Absorb Risk on Behalf of the Government by Piloting Projects .................................................... 21 2. Build Small Innovation Teams to Pilot Projects............................................................................. 22 3. Innovation Teams Should Crowd and Open-Source Ideas ............................................................. 24 4. Scale Up Successful Pilot Projects.................................................................................................. 25 5. Develop Meaningful Interim Performance Metrics ........................................................................ 25 Conclusion............................................................................................................................ 28 Works Cited ......................................................................................................................... 29
  • 3.
    3 Overview Federal agencies oftenstruggle to innovate the services that they provide to American citizens. The government faces such barriers as: 1) a failure to mitigate risk; 2) difficulty in managing the impact of failures; 3) slow decision-making processes; 4) inability to adapt to changing circumstances; and 5) a lack of collaboration across agencies (Criado et al., 2013, p. 324; Hull et al., 2006, p. 59; Mergel, 2012, p. 282; Torfing et al., 2012, p. 845). On behalf of Booz Allen Hamilton (BAH), we researched the question: How should BAH effectively spur innovation in federal agencies? In order to answer this question, we highlight the best practices and limitations regarding government and private sector innovation teams: 1. Boston’s Mayor’s Office of New Urban Mechanics (MONUM) 2. The New York City Center for Economic Opportunity 3. Department of Defense’s Defense Advanced Research Projects Agency (DARPA) 4. Xerox’s Palo Alto Research Center (PARC) 5. Office of Personnel Management (OPM) We identified the most successful practices from each example and analyzed how these practices could best fit BAH’s own innovation strategy. We have made five recommendations to BAH based on our five case studies: 1. Absorb risk on behalf of the government by piloting projects. Innovation teams should pilot projects that absorb government risk. Innovation teams can mitigate government risk by creating a physical space that distinguishes it from the rest of the agency. Innovation teams can fully test pilot projects and protect the government
  • 4.
    4 from implementing failedprojects. Teams that pilot projects to absorb risk will benefit from engaging in public-private partnerships. This partnership will allow for diverse perspectives to flow into the organizations. 2. Build small innovation teams to pilot projects. We recommend that BAH’s innovation teams consist of 5-8 people with diverse experiential knowledge. Team members should be adaptable and flexible, and project managers should have strong academic and leadership backgrounds. 3. Crowd- and open-source ideas from within BAH and government agencies. BAH and government agencies should crowd-source ideas from within their organizations through internal forums. The government will be able to collaborate in the innovation process while not having to bear the responsibility of producing innovative solutions entirely on its own. 4. Scale up successful pilot projects. BAH should then scale up successful pilot projects. BAH and the government will share resources to increase the likelihood of project success and reduce the cost of scaling. 5. Develop meaningful interim performance metrics. BAH should adapt performance tests, such as the DARPA Hard Test, to measure a project’s potential innovation and ensure that pilots are achieving the desired outcomes. Performance metrics will save time as well as funds and direct resources towards successful projects.
  • 5.
    5 Case Studies 1. Boston’sMayor’s Office of New Urban Mechanics The Boston Mayor’s Office of New Urban Mechanics (MONUM) is a government innovation team that offers creative solutions to challenges within city government. MONUM engages public and private participants in its innovation projects. It focuses on using new technologies to improve public services (Puttick et al., 2014, p. 42). In 2009, Boston Mayor Thomas Menino created MONUM as a way to drive innovation within city government without taking city employees away from their primary duties. While MONUM collects, pilots, and scales projects, regular city employees can remain focused on their daily responsibilities (Puttick et al., 2014, p. 42). As Menino’s former Chief of Staff Mitch Weiss puts it, “MONUM allows us to be ‘ambidextrous’—to have agencies focus on the traditional work residents expect but meanwhile also experiment on more boundary-pushing, citizen-engaged innovation” (Goldsmith, 2012). With five highly skilled team members and an annual budget of around $600,000, MONUM works on issues related to education, civic engagement, city design, and economic development (Puttick et al., 2014, p. 104; New Urban Mechanics, 2015). In each area, team members form partnerships with public, private, academic, and nonprofit groups. These dynamic collaborations help it address a broad range of ideas and expertise to address city challenges (Puttick et al., 2014, p. 42; Trenkner, 2011a). Following MONUM’s success, Philadelphia and Utah Valley adapted Boston’s New Urban Mechanics model into their municipal governments (New Urban Mechanics, 2015). One of the team’s most successful projects is Citizens Connect, an award-winning smartphone application that allows residents to readily report such public problems as
  • 6.
    6 potholes and graffiti(Lawrence, 2013; Desouza, 2014).1 City workers can easily access the reports through a partner smartphone application (Farrell, 2012). From 2009 to 2013, Citizens Connect assisted the city in efficiently resolving over 29,000 reported problems. Today the application handles 28% of Boston’s service requests (Wood, 2012; The Urban Vision, 2013; New Urban Mechanics, 2015). MONUM helped to introduce the application to 54 other Massachusetts communities (Laidler, 2013). Roughly 20 other countries across the world have adopted the Citizens Connect model (Trenkner, 2011a). Best Practices MONUM helps the Boston city government overcome a traditional barrier to innovation: it assumes the risk affiliated with failed innovation projects. When we asked Nigel Jacob, co-chair of New Urban Mechanics about MONUM’s role, he explained: Everyone understands that innovation requires risk. But what they don’t usually understand is … who bears the brunt of that risk? Asking public officials to do that isn’t fair. Instead, we have devised a mechanism by which we will own it, and that’s a core part of the value-add…We can essentially de-risk [a] project for the government by making that a New Urban Mechanics project. This is really just slight of hand, but it actually does work in practice” (Interview with Nigel Jacob, 2015). So while the fear of failure generally inhibits government agencies from exploring new solutions to public challenges, MONUM can take on the risk and more freely explore innovative projects. MONUM’s effective experimentation method allows it to mitigate the impact of failures. The team first sources ideas from various government and non-government actors. 1 In 2011, Citizens Connect received Harvard’s Ash Center for Democratic Governance Bright Ideas award for its innovative use of technology to engage citizens ("Harvard Announces Bright Ideas in Government, 2011, p. 4). In recognition for their accomplishments with MONUM, co-chairs Nigel Jacob and Chris Osgood won Governing Magazine’s 2011 Public Official of the Year award (Trenkner, 2011b). They also received the White House’s Local Innovation Champions of Change award in 2012 (Rocheleau, 2012; “Local Innovation”, 2015).
  • 7.
    7 After selecting thebest ideas, the team pilots the innovation on a small scale with the goal of “maximizing public impact and minimizing public costs” (Puttick et al., 2014, p. 43). MONUM packages only the most successful pilots and disseminates its findings to other cities (Puttick et al., 2014, p. 43). Thus, by identifying and eliminating failures early in the experimentation process, MONUM can minimize the costs of failed projects and provide the city with only the most effective outcomes (Georges et al., 2013, p. 3). MONUM co-chairs Chris Osgood and Nigel Jacob make sure that its projects involve a broad range of participants. Private corporations, university students, public employees, and city residents can actively participate in MONUM initiatives through contributing specialized knowledge or supplying general feedback (Georges et al., 2013, p. 2). In forming these partnerships, MONUM acquires specialized knowledge while maintaining the quick response time of a small, agile team. MONUM also maintains an open line of communication with the public to crowd source innovation proposals. MONUM’s website encourages any citizen with a thoroughly developed innovation proposal to submit their project plans. The team reviews and assesses proposals based on: 1) the citizen’s ability to follow through with the project; 2) the scope of the audience the initiative is projected to serve; and 3) the ability to transform the proposal into a pilot project (Interview with Nigel Jacobs, 2015). Enlisting public participation helps MONUM keep fresh ideas flowing into the agency and engage Boston residents. Limitations One limitation that MONUM faces involves its tendency to undertake relatively low- risk and low-reward projects, such as those made possible through smartphone applications. City innovation teams generally work with tight budgets, and they can get stuck picking the
  • 8.
    8 “low-hanging fruit” (TheUrban Vision, 2013). Exploring additional funding opportunities and attracting more private investments could assist MONUM in attaining the resources necessary to experiment with high-risk, high reward innovations. 2. The New York City Center for Economic Opportunity The New York City Center for Economic Opportunity (CEO) seeks to reduce New York City’s poverty rates by developing innovative assistance programs for low-income residents (Gais et al., 2014, p. 2). CEO works with a broad range of city agencies, universities, nonprofits, and private companies to design, pilot, monitor, and scale initiatives. Since it opened in 2006, the Center for Economic Opportunity has worked with 40 agencies to test nearly 70 initiatives that provide health, education, professional development, and youth programs for impoverished New York residents (Puttick et al., 2014, p. 66-67).2 Its 23 employment programs have enrolled over 40,000 citizens, helping participants earn, on average, about $2.00 more per hour than nonparticipants (CEO Annual Report, 2014, p. 29).3 2 According to CEO’s 2012-2013 progress report, the agency ranked their top 12 most successful programs as follows: Advance in Work, Child Care Tax Credit, Community Partners, CUNY ASAP, NYC Training Guide, Office of Financial Empowerment, School-Based Health Centers, Sector-Focused Career Centers, EITC Mailings, Jobs-Plus, CEO Poverty Measure, and Food Policy Coordinator (CEO Annual Report, 2014, p. 16). 3 Linda Gibbs, NYC Deputy Mayor and co-creator of CEO, won the Harvard University Innovation in Government Award in 2006 and 2009 for her role in creating the agency (Goldsmith et al., 2010, p. 107). In 2012, the agency won this same award for its progress in advancing educational and employment opportunities across the city (“Center for Economic Opportunity”, 2011). In an effort to replicate CEO’s successes, the Obama Administration awarded the agency and its collaborators a $5.7 million grant from the Social Innovation Fund to implement five of its projects in seven other US cities (“Center for Economic Opportunity”, 2015; Hoagland, 2012). Through Bloomberg Philanthropies, CEO co-founder and former Mayor Michael Bloomberg is currently scaling his innovation approach in 17 other US cities and two international cities ("Innovation Teams - Bloomberg Philanthropies", 2015).
  • 9.
    9 The City Universityof New York’s Accelerated Study in Associate Programs (CUNY ASAP) is one of CEO’s most successful projects. The program aims to improve community college graduation rates, which were dismally low before ASAP started (Puttick et al., 2014, p. 68; “Innovations to Build On”, 2013). ASAP addresses financial, structural, and learning barriers that traditionally inhibit students from graduating. In addition to financial assistance, it provides students with academic mentoring, career services, and tutoring sessions. In return for these services, ASAP requires students to maintain full-time enrollment status and strongly encourages students to adhere to a three-year graduation track (Scrivener et al., 2015, p. 18). In a 2013 study, the Manpower Demonstration Research Corporation (MDRC), an independent social policy research institution, found that 40% of participating students graduated from New York community colleges within three-years, while only 22% of nonparticipants graduated within that timeframe. After receiving their associate degrees, 25% of participating students went on to enroll in four-year institutions while only 17% of nonparticipants did so (Scrivener et al., 2015, p. 51; p. 62). The program has also proved to be cost-effective. ASAP invested more money per student than traditional community college assistance programs. But the program succeeded in graduating a far greater percentage of students within a timely fashion. So while traditional programs invested less money per student, their failure to graduate students on time incurred greater long-term costs. Overall, ASAP helped the city save about $13,423 per degree earned (Scrivener et al., 2015, p. 81). Following these impressive results, the program is undergoing an expansion; its goal is to serve over 13,000 students across six communities by the fall of 2016 (Scrivener et al., 2015, p. 92).
  • 10.
    10 Best Practices CEO firstpilots its projects on a small scale. In carefully monitoring the effects of its pilots, CEO can stop underperforming programs early on and reduce the impact of failed initiatives. Rather than completely disregarding unsuccessful projects, CEO maintains detailed information about the nature of its failures, which helps prevent similar mistakes from occurring in the future (CEO Annual Report, 2014, p. 15). To accurately measure the impact of its anti-poverty initiatives, CEO emphasizes rigorous monitoring and evaluation practices. Of its 19 staff members, 13 focus on project design, evaluation, and poverty research (Center for Economic Opportunity, 2015). It also collaborates with nine independent research institutions to conduct randomized control trials and other studies to evaluate its programs (CEO Annual Report, 2014, p. 15). Throughout the piloting and implementation phases, CEO closely monitors the outcomes of its projects and collects extensive data to convey its findings. Whether a project succeeds or fails, CEO publishes evaluations reports on its website. This practice establishes a high level of transparency and credibility for its work (Center for Economic Opportunity, 2013). CEO forms a variety of partnerships across the public and private sectors to attract specialized knowledge and attain funding. Collaborating with participants of various expertise and backgrounds allows CEO to remain relatively small and agile while achieving the critical knowledge and resources. Limitations CEO’s ambitious goal—alleviating citywide poverty— poses a number of challenges for the agency. In order to witness results on a city level, CEO would need extensive resources to expand its projects. CEO works with an annual budget of around $100 million,
  • 11.
    11 yet it stilllacks the resources needed to scale programs across the city (Puttick et al., 2014, p. 66; Gais et al., 2014, p. 29). As one city council staff member noted, “The biggest criticism of CEO…has been that the programs have not been ramped up to scale. The total number of people served…needs to expand” (Gais et al., 2014, p. 28). Though CEO effectively monitors and evaluates the impacts of its programs on target communities, it has trouble estimating its performance in the context of citywide poverty. First deputy mayor Anthony E. Shorris explained: Poverty is reflective of larger national and global phenomena…We’re not unrealistic about what a city can do. But after four years, we’ll be asking whether our interventions were effective in changing what would have been the course of poverty in New York (Roberts, 2014).4 CEO’s programs have undoubtedly improved economic conditions for many New Yorkers. But, in dealing with such an ambitious objective, the agency has made it difficult to assess its overall impact and attain the resources necessary to achieve large-scale progress against poverty. 3. Defense Advanced Research Projects Agency The Defense Advanced Research Projects Agency (DARPA) is the central research organization within the Department of Defense (DoD). The agency’s goal is to provide innovations in the field of national security. DARPA aims for “transformational change” rather than “incremental advancement” (DARPA). DARPA has developed significant technological innovations, such as stealth technology, ARPANET, and unmanned aerial vehicles. 4 The New York Times, online article.
  • 12.
    12 Best Practices DARPA hasa flat management hierarchy to allow the swift movement of ideas throughout the DoD. Ideas can often travel slowly through government agencies with multi- layered top-down bureaucracies (Mergel, 2012, p. 286). Removing that obstacle is especially important for DARPA because its projects are sensitive to predetermined deadlines. With its 220 total employees, DARPA has only one level of separating project managers from the agency director (Dubois, 2003, p. 5). The program managers fulfill numerous logistical responsibilities. They have the flexibility and autonomy to design and select their teams. Managers also have the authority to identify opportunities for innovation and act upon those opportunities in the role of “techno-scout” (Dubois, 2003, p.8; Dugan, 2013). Program managers have tenures of only four years, which instills a sense of urgency and purpose into the process. To allow the team to continue its work unabated, project managers oversee project development and handle logistical responsibilities. A project manger is usually a PhD because deep technical knowledge is a prerequisite for the position (Dugan, 2013). That requirement may seem contrary to the culture of DARPA. However, the organization’s innovation model is one of “constant flux,” and project managers need technical knowledge to understand how to adapt projects. This PhD preference may be specific to DARPA due its emphasis on physical sciences. Yet the idea may have some general application because project managers should have deep knowledge of the specific field in which the innovation is occurring. According to former DARPA director Regina Dugan, previous failed efforts to imitate DARPA outside of the Department of Defense have led individuals to wrongly
  • 13.
    13 conclude that theDARPA’s model cannot be replicated (Dugan, 2013). She argues that these mistaken conclusions stem from a misunderstanding about the three core concepts of the agency: ambitious goals, temporary teams, and independence from the parent organization. DARPA aims to develop revolutionary rather than incremental change. DARPA’s independence insulates the agency from DoD culture and lets it pursue projects that may threaten existing DoD business practices. The agency can contract with specialists from a number of different private organizations who would not otherwise collaborate (Dugan, 2013). Temporary project teams are a core element of DARPA’s operations. Fixed-term managers bring together capable specialists to form project teams that last no more than five years. Dugan has argued that this process allows DARPA to attract high-quality talent. Furthermore, she states that this model is pragmatic because a “high-risk effort by a diverse set of world-class experts can be sustained for only a limited period” (Dugan, 2013). DARPA allows these performers to work away from DoD in their different organizations (Dugan, 2013). Dugan argues that permanently hiring high-quality individuals would be the wrong method to encourage performers to take on high-risk projects (Dugan, 2013). Adapting DARPA’s fixed project timeframes can benefit a firm’s project portfolio. By assigning benchmarks for project success, DARPA is able to move funds away from projects that will not reach their benchmarks and towards promising new proposals (Dugan, 2013). Project proposals are subjected to a strict set of criteria reviewed by the DARPA offices that solicit proposals before project managers can recruit their teams and receive funding (Dubois, 2003, p.6). Former DARPA director George Heilmeier established what is
  • 14.
    14 known as theHeilmeier Catechism, which serves as the foundation for DARPA’s project criteria (Greenwald, 2013): 1. What are you trying to accomplish? 2. How is it done today, and what are the limitations? a. What is truly new in your approach that will remove current limitations and improve performance? By how much? (A factor of 10? 100? More?) 3. If successful, what difference will it make, and to whom? b. What are the midterm exams, final exams, or full-scale applications required to prove your hypothesis? When will they be done? c. What is the DARPA exit strategy? Who will take the technologies that you have developed and turn them into a new capability or a real product? 4. How much will it cost? (Dubois, 2003, p.7) DARPA Hard Test BAH innovation teams can use the DARPA Hard Test to gauge their perspectives on a project’s potential and co-develop average scores from team members and stakeholders. The Hard Test measures a project’s potential innovation on a scale of 1 to 7 based on four criteria: 1) Far-reaching: It fundamentally changes how sizeable populations interact with a concept. 2) Technically challenging: New technologies are needed to push innovations forward. 3) Multidisciplinary: It requires multiple stakeholders from diverse professional and academic fields to implement the solution. 4) Actionable: It invokes direct action by stakeholders to incorporate ideas (Carleton et al., 2013, p. 213).
  • 15.
    15 Dimension 1 (Lowest)7 (Highest) I. Far-Reaching Does not alter the way people think about an issue Societal shift in paradigm on how people think about a solution II. Technically challenging No new expertise is required Advanced specialized proficiency III. Multidisciplinary No collaboration is required Diverse skill set is needed IV. Actionable Little incentive to begin adapting the solution Easily adaptable DARPA created the Hard Test to test projects that are both high-risk and high- reward. For example, DARPA’s Biological Technologies Office recently solicited proposals on how to reduce the effects of infectious diseases. The Office wants novel approaches to identifying the harmful effects of diseases, which can be difficult to accomplish. The DARPA Hard Test can be easily adopted and implemented by any innovation team. However, the team must recognize that the Hard Test heavily emphasizes technological advances. The Hard Test still provides valuable metrics for innovation teams to test prospective projects. Teams may decide to alter the Hard Test to exclude the technology criteria and fit their project’s needs. Limitations DARPA develops projects that deal with deep technical knowledge of physical and material sciences. BAH may want its team members and project managers to possess technical knowledge as well. Suitable project managers and team members will need experiential or academic knowledge in the field of public policy to identify potentially innovative practices.
  • 16.
    16 4. Xerox’s PaloAlto Research Center The Palo Alto Research Center (PARC) has an impressive history of developing innovative and disruptive technologies, such as personal computers, Ethernet, and fiber optics. In his book, “Dealers of Lightning: Xerox PARC and the Dawn of the Computer Age”, Michael Hiltzik catalogued these achievements. Xerox established PARC as its independent research wing in 1970. It centered on a consolidated team of engineers and information scientists who designed or redefined disruptive technologies. PARC was designed to explore technologies not directly related Xerox’s photocopying business (Dennis). PARC did not having to tie its innovations back to the Xerox’s central practices. Best Practices According to PARC CEO Stephen Hoover, multiple methods exist for embracing open innovation. Open innovation may involve crowdsourcing or open-sourcing innovation, yet it is ultimately premised on the understanding that not all of the best performers work within the firm (Hoover, 2012). Hoover argues that the best forms of open innovation rely upon three principles: 1) understanding the right problem that needs solving; 2) a willingness to experiment with new processes; and 3) specialized industry knowledge (Hoover, 2012). A firm needs strategic insight about its client’s visions and goals and must work in collaboration with the client using those three principles (Hoover, 2012). The concept of open innovation is particularly salient for Booz Allen Hamilton. BAH’s client-based dynamic with government agencies allows the firm to utilize crowdsourcing in collecting ideas from employees within the client agency as well as from within BAH itself.
  • 17.
    17 Alan Kay, whohelped develop innovative technologies at PARC, has made the case that more companies should embrace the PARC model. In following PARC’s model, companies should find exemplary individuals within the respective field and fund those individuals so that they can achieve successful innovations—even if that success rate is as low as 30% (Mui, 2012, p.2). Kay argues that the right question to ask about spurring innovation is: “Are we funding great people in sufficient quantity to allow 30% of success to change the world and create a cornucopia of new wealth?” (Mui, 2012, p.2). In Malcolm Gladwell’s profile of PARC, University of California, Davis psychologist Dean Simonton similarly argued for an iterative process of creativity. According to Simonton, “quality is a probabilistic function of quantity” (Gladwell, 2011). In Simonton’s view, to correctly manage creative methods, managers must recognize the tradeoff between a higher number of successes and a higher number of failures (Gladwell, 2011). While government agencies may hesitate to embrace that concept, BAH may find it most applicable in a client-based project model, since it may be able to absorb the risk from the higher number of failures. As a private firm, BAH may be well suited to absorb risk from innovating practices on behalf of government agencies. Agencies are often averse to taking on high-risk, high- reward projects due to concerns about how failures may reflect on their performance. BAH can experiment with riskier practices and then pass the successful methods on to the agency. Limitations PARC’s model is unique in that it encourages an iterative design process defined by the trade-off between failures and successes. Before PARC’s incorporation, engineers were not obligated to report to managers for status updates on projects. They did have to
  • 18.
    18 demonstrate the valuein their proposals to receive funding. However, the proposal’s value was not contingent upon the innovation having pragmatic application. Rather, the issue was how far the proposal planned on pushing the limits of the technology (Gladwell, 2011). Lawrence Lee, senior director of innovation at PARC, argued that using the iterative approach provides myriad benefits. It allows the organization to better understand how the product fits into the market, as well as to anticipate expected returns from the process (Lee, L., 2012). The caveat to those benefits, however, is that they are best realized in the absence of deadlines. For BAH’s contracted projects, open-ended projects would not provide the timely results that government agencies may require. 5. Office of Personnel Management Innovation Lab In 2012, the Office of Personnel Management (OPM) opened its innovation lab in the basement of its Washington, D.C. headquarters. The Innovation Lab has its own office space, which allows for a venue for community engagement and collaborative work (Office of Personnel Management, 2015). The lab develops and tests solutions to problems within both the OPM and the federal government (Mann, 2013, p.1). In the fiscal year 2013, the lab hired six full-time employees and operated at a reported annual cost of $476,000 (United States Government Accountability Office, 2014, p. 1). The OPM Lab mitigates the risk of failure by reviewing and facilitating each project employees bring to the table in problem-solving processes. The public sector has significant deterrents to innovation, such as limited funding and risk-averse cultures (GAO, 2014, p. 5). Additionally, public sector officials may fear the political consequences of underperforming projects (GAO, 2014, p. 5). The OPM Lab assumes that risk for the agency. The Lab allows
  • 19.
    19 for federal employeesto learn quickly from early mistakes by prototyping and piloting projects (GAO, 2014, p. 5). The Lab seeks to change governments’ risk-averse nature by diminishing the political consequences of failure. Best Practices A lab needs to accommodate a wide variety of activities, often including brainstorming sessions, skills workshops, formal project reviews, office duties, meetings, and presentations. Thus, a space should be easily adaptable to accommodate the various initiatives that it will help cultivate (UNICEF, 2012, p. 24). The OPM Lab is a good example of how to wisely manage a physical space. The Lab provides physical space where innovators can convene. It hosts weekly training sessions on best practices and ensures the sharing of information across OPM and other federal agencies. The Lab fills the space with whiteboards, couches, and open carpeted space to promote creativity. The Lab also uses the communal space to establish inter-organizational networks, which can be powerful drivers for supporting innovation (GAO, 2014, p. 2). For example, the Office of Science and Technology Policy (OSTP) partnered with OPM and the Federal Community of Practice on Crowdsourcing and Citizen Science (FCPCCS) to develop a workshop to engage different stakeholders to innovate government services. The OSTP, OPM and FCPCCS collaborated and developed a ToolKit through crowdsourcing methods to help Federal agencies innovate countrywide scientific and societal problems (Gustetic et al., 2014). Designing services from the point of view of the targeted audience is a concept that has been recognized as crucial in the public sector. It helps to avoid approaches that do not improve the experience of users beyond the status quo (Puttick et al., 2014, p. 38).
  • 20.
    20 The OPM Labsupports efforts to address complex policy issues by incorporating the “human-centered design” approach to problem solving. This approach is intended to generate concrete solutions driven by the needs of the targeted audience. The Lab, for example, helped reframe the problem of integrating veterans by focusing on the experience of the end-users. Previously, the OPM assisted veterans by requiring them to participate in job training programs (Lee, J., 2012). Now the agency more selectively places veterans into training programs, ensuring that the right individuals receive the right training. Limitations Internal surveys on whether employees would recommend the Lab to colleagues and the efficacy of human-centered designs have shown overwhelmingly positive responses (GAO, 2014, p. 19). However, OPM has not fully developed meaningful performance measures (GAO, 2014, p. 1). A year after the Lab opened, OPM began to measure the Lab’s performance more systematically. Lab staff use a series of surveys to measure participant experience through pre-session and post-session check-ins, and to capture specific project- related outcomes for the different services they offer. However, according to the GAO survey, instruments are unlikely to yield data of sufficient credibility and relevance to indicate the extent of the lab's achievements (GAO, 2014, p. 19). The surveys have been susceptible to various types of respondent bias. Moreover, when employees attempted to analyze the responses to measure performance, the results proved difficult to interpret (GAO, 2014, p. 17).
  • 21.
    21 Therefore, we highlightthe MindLab5 to show that projects benefit when managers set quantifiable interim goals, establish performance measures, and use data to adjust their practices (GAO, 2014, p. 21). Meaningful measures could help the OPM Lab assess its progress toward improving participants’ abilities to solve problems. BAH should adopt performance metrics to track project costs, benefits, and performance improvements. Recommendations 1. Absorb Risk on Behalf of the Government by Piloting Projects Based on our case studies, we recommend that BAH form its own innovative teams to mitigate the risk of failed innovation projects. The government is risk-averse by nature, and agencies are inhibited from exploring innovative solutions to public challenges. BAH innovation teams can help the government overcome this barrier by being accountable for project outcomes. BAH’s teams can absorb government risk by piloting projects before applying them to public challenges. The teams should work in physical spaces separated from the agency. Within these designated spaces, BAH’s teams can fully test projects and absorb the risk of failed projects. As demonstrated by the successes of the OPM Lab, projects benefit when teams have physical space to convene and collaborate. Agencies will be protected from project failures and minimize the implementation of poor solutions. 5 MindLab is a U.S. cross-governmental innovation unit, which involves citizens and businesses in creating new solutions for society. It is a part of three ministries and one municipality: the Ministry of Business and Growth, the Ministry of Education, the Ministry of Employment and Odense Municipality and it forms a collaboration with the Ministry for Economic Affairs and the Interior. It addresses areas such as entrepreneurship, digital self-service, education and employment. It is also a physical space—a neutral zone for inspiring creativity, innovation and collaboration.
  • 22.
    22 When piloting projects,the BAH teams should consider legal, political, and social concerns, such as: 1) Is this something BAH will actually be able to do? 2) Do political considerations prevent the project from being viable? 3) Will the innovative solutions be accepted by the public? If a piloted project does not meet these requirements, BAH should stop developing that project. According to Bloomberg Innovation Playbook,6 piloting is a way to “live test” an idea (Bloomberg Philanthropies, 2014, p. 40). The goal is to create a scenario in which the essence of the idea can be tested. For example, NYC CEO pilots its projects on a small scale before introducing the initiatives to a larger audience. The organization then scales successful pilots and discontinues underperforming ones. The OPM Lab also functions as a risk-taking agency to experiment, prototype, and pilot projects. Innovation projects benefit when teams engage in public-private partnerships. For example, MONUM incorporates private corporations, university students, public employees, and city residents into its initiatives (Georges et al., 2013, p. 2). Enlisting diverse participants allows MONUM to evaluate a variety of perspectives and keep fresh ideas flowing into the organization, which are processes that BAH could adopt. 2. Build Small Innovation Teams to Pilot Projects BAH innovation teams should consist of 5-8 members, and each member should possess diverse knowledge. Most team members, even the project managers, do not need 6 Bloomberg Innovation Playbook presents the Innovation Delivery Model created to provide cities with a method to reduce barriers and deliver change more effectively to their citizens. In November 2011, Atlanta, Chicago, Louisville, Memphis, and New Orleans began to use the Innovation Delivery Model. The Bloomberg Innovation Playbook functions as a guideline for creating innovation teams.  
  • 23.
    23 expertise in aspecific policy field. Yet they should be able to adapt to new projects once the goals of previous projects have been accomplished. More specifically, team members should have an array of skills suited to adaptability and flexibility. BAH project managers should look for performers with more general technical knowledge (in the fields of public policy and/or public administration). Members of successful teams generally possess the following skills: project management; quantitative and qualitative research and analytical capabilities; creative and critical thinking skills; and strong oral and written communication skills (Putick et al., 2014). Project managers should play crucial roles in the BAH innovation teams. They should be responsible for logistical concerns, such as identifying potential projects (after the government agency defines the priority area), crafting proposals, recruiting members of the team, managing budgets and contracts, and handling public engagements and execution issues. In building the team, managers should have the project area in mind, but not recruit to the specific subject area. For that reason, project managers need not wait until the proposal has been approved by the principal administration before they start building their team. Unlike their team members, project managers should possess a rigorous academic background in addition to possessing strong leadership abilities and experience with dealing with management hierarchy. Managers need a strong academic background because they are required to identify which projects are both feasible and paradigm altering, as well as the industry trends that might affect the project goals or processes. Examples of previous academic and professional experience for project managers includes: a partner at a large
  • 24.
    24 consulting firm, alaw degree, a researcher at an institute for governmental service and research, and/or a master of public administration degree. 3. Innovation Teams Should Crowd and Open-Source Ideas Booz Allen Hamilton has multiple avenues by which it can source ideas both internally and within government agencies. MONUM, for example, welcomes anyone with a cogent, well-designed innovation to submit it via email. Team members then evaluate the proposals and select compelling projects for the piloting phase. BAH can apply these crowdsourcing techniques through websites and social media channels. If open-sourcing ideas pose a confidentiality issue, BAH can assist federal agencies in adopting their own crowdsourcing methods. The agencies, in turn, can assume responsibility in managing the ideas. The innovation team within BAH may not necessarily have to bear the burden of monitoring the crowdsourcing process. Booz Allen Hamilton could help the client government agency to conduct its own crowdsourcing by developing criteria for reviewing the crowdsourced ideas. In this dynamic, BAH deconstructs the barriers government employees face in proposing innovative ideas and effectively builds up the agency as well as its employees. Identifying good ideas is pivotal. Teams should review every single proposal, though they do not give comprehensive attention to those ideas that are clearly lacking. Additionally, BAH should be clear with the person(s) who submitted the proposal about the idea becoming an experiment. The government agency should also be comfortable with playing a significant role in scaling the pilot, after BAH drives the pilot and determines that the experiment has been successful.
  • 25.
    25 4. Scale UpSuccessful Pilot Projects After crowdsourcing ideas, BAH teams should then aid the government agency in implementing the pilot program on a larger scale. To determine which projects are scalable, BAH teams can adopt MONUM’s goals of piloting those that are "maximizing public impact and minimizing public costs" (Goldsmith, 2012). BAH teams should help the government agency to scale those pilots that effectively address the challenges faced by the agency and do so in a cost-effective manner. The BAH team should also ensure that the programs to be scaled have reached the pre-determined benchmarks for piloting success (CEO, 2013, p.15). The principal administration may want to rely upon strict criteria, such as the aforementioned Heilmeier Catechism, to determine whether pilots have been successful enough to scale. The metrics themselves may have to be project-dependent, but the application of the criteria can be repeatable. Engaging the federal agency in the scaling process has two main advantages. First, it engages the government as a collaborator in the innovative process much in the same way that the crowdsourcing process does. By sharing the process with BAH, the agency is able to pool resources and increase the probability of success. Second, BAH is able to reduce the cost of scaling by capitalizing on the government agency’s financial and personnel resources. 5. Develop Meaningful Interim Performance Metrics Performance metrics that dictate whether a project has been successful will often depend on the project itself. Metrics will depend upon the goals and aims of the project.
  • 26.
    26 Identifying an appropriatemeans to measure pilot and scaled program successes will depend upon the values of the client agency, as well as the nature of the program. If a project does lend itself to rigorous quantitative evaluation, the DARPA Hard Test should help to identify beforehand the measurable benchmarks that a project must reach. If the intended outcomes are less tangible or do not require specific metrics, then MONUM may be a better model. MONUM, for example, has a central goal of civic engagement. Thus, if one of their programs does not provide a quantifiable output but has an identifiable effect on improving citizens’ well-being, MONUM views that project as a success. Regardless of whether a program should be evaluated holistically or quantitatively, setting evaluative criteria can help the client agency and BAH swiftly drop unsuccessful projects. Using process evaluation methods is better than simply evaluating projects after they have reached a conclusion. Interim evaluation enables BAH and government agencies to abandon foundering projects before the scaling process. The practice saves resources since funds from those projects can then be diverted towards other projects with greater promise.
  • 27.
    27 As an example,our team applied the DARPA Hard Test to the CUNY ASAP project to demonstrate how BAH could apply the Hard Test to potential projects: • On the far-reaching criterion, the ASAP project received a 6 out of 7 because 40% of participating students graduated within three-years and is projected to serve over 13,000 students across six communities by 2016 (Scrivener et al., 2015, p. 92). • We assigned ASAP a 1 out of 7 on the technically challenging criterion because it did not require the development of new technologies to integrate the program into the community. • For the multidisciplinary criterion, we ranked ASAP a 6 out of 7 because the project involves the cooperation of multiple community stakeholders, such as students, parents, educators and government officials. • Finally, we ranked ASAP a 6 out of 7 on the actionable criterion because it involved all community stakeholders to implement the ASAP program. It resulted in 25% of participating students enrolling in four-year institutions (Scrivener et al., 2015, p. ES- 6).
  • 28.
    28 Conclusion Our recommendations basedon the five case studies demonstrate how Booz Allen Hamilton can build innovation teams to effectively spur innovation within government agencies. Our recommendations will allow BAH to absorb risk on behalf of government agencies and facilitate innovative processes. 1. We recommend that innovation teams absorb government risk by piloting solutions to challenges that the government identifies. Teams should have their own physical spaces. Innovation teams will benefit from public-private partnerships. The collaboration will gather a variety of perspectives. 2. BAH should build small innovation teams of 5-8 people with diverse experiential knowledge to pilot projects. Innovation team members should be adaptable and flexible, and project managers should have strong leadership experience and familiarity with management hierarchies. 3. Teams should crowdsource ideas from within BAH and government agencies through internal forums. This will allow the government to be a collaborator in the innovation process. 4. Innovation teams should scale pilots that have fulfilled predetermined criteria by pooling resources with government agencies, which can reduce project- scaling costs. 5. BAH’s teams should develop performance metrics, such as the DARPA Hard Test, to measure a project’s potential innovation and to ensure that pilots are achieving the desired outcomes.
  • 29.
    29 Works Cited Bloomberg Philanthropies.“Transform Your City Through Innovation”. 2014. Carleton, T., W. Cockayne, and A. Tahvanainen. “Playbook for Strategic Foresight and Innovation”. Innovation Leadership Board. 2013. Center for Economic Opportunity. 2015. Center for Economic Opportunity. Replicating Our Results. 2013. CEO Annual Report. Toronto: Bantam. 2014. Criado, J. Ignacio; Gil-Garcia, Ramon and Sandoval-Almazan, Rodrigo. “Government Innovation Through Social Media”. Government Information Quarterly 20.4 (2013). Defense Advanced Research Projects Agency. DARPA: Creating Breakthrough Technologies for National Security. 2014. Dennis, M. “Xerox PARC”. Encyclopedia Britannica. Desouza, Kevin C. "Turning Governments into Innovation Machines." Governing.com. 10 Nov. 2014. Dubois, L. “DARPA’s Approach to Innovation and Its Reflection in Industry”. National Research Council Chemical Sciences Roundtable. 2003. Dugan, R. “Special Forces” Innovation: How DARPA Attacks Problems”. Harvard Business Review. Oct. 2013. Farrell, Michael B. “Boston Deploys Smartphone App for City Workers”. Boston Globe, 15 Feb. 2012. Gais, Thomas, Patricia Strach, and Katie Zuber. “Poverty and Evidence-Based Governance”. Rockefeller Report, 2014. Georges, Gigi, Tim Glynn Burke, Andrea McGrath. “Improving the Local Landscape for Innovation (Part 1): Mechanics, Partners and Clusters.” Ash Center for Democratic Governance and Innovation, 20 June 2013. Gladwell, M. “Creation Myth: Xerox PARC, Apple, and the Truth About Innovation”. The New Yorker. 16 May 2011. Goldsmith, Stephen. "Boston's Pioneering Way of Innovating." Governing.com. 12 Sept. 2012.
  • 30.
    30 Greenwald, T. “Secretsof DARPA’s Innovation Machine“. Forbes. 15 Feb. 2013. Gustetic, Jenn, Lea Shanley, Jay Benforado, and Arianne Miller. "Designing a Citizen Science and Crowdsourcing Toolkit for the Federal Government." The White House. 2 Dec. 2014. Harvard Announces Bright Ideas in Government. Harvard Kennedy School Ash Center, 29 Mar. 2011. Hoagland, Kate. "Center for Economic Opportunity Wins Harvard Innovations in American Government Award." Harvard Kennedy School. 13 Feb. 2012. Hoover, S. “Defining (and Practicing) ‘Open Innovation“. PARC. 2012. Hull, Clyde and Brian Lio. “Innovation in Non-profit and For-profit Organizations: Visionary, Strategic, and Financial Constraints.” Journal of Change Management 6.1 (2006): 53-65. Innovation Teams. Bloomberg Philanthropies. 2015. Web. Innovations to Build On. Center for an Urban Future. 2013. Interview with Nigel Jacob, Co-Chair of New Urban Mechanics. Skype interview. 20 Mar. 2015. Laidler, John. "Free App Helps Residents Report Problems, Get Action." Boston Globe, 11 July 2013. Lawrence, Alex. "Ten Innovation that Reimagine City Services.” Ash Center. Harvard Kennedy Center, 2013. Lee, Jolle. "OPM's Innovation Lab Spurs New Way of Problem- solving." FederalNewsRadio.com. 14 Sept. 2012. Lee, L. “What PARC Learned About Executing on Open Innovation”. Harvard Business Review. 15 Oct. 2012. Local Innovation. The White House. 2015. Mann, Amelia. "Commentary: Every Federal Agency Needs an Innovation Lab." Nextgov. National Journal Group, 9 Dec. 2013. Mergel, I. “The Social Media Innovation Challenge in the Public Sector”. Information Polity. 17 Dec. 2012. Mui, C. “The Lesson That Market Leaders Are Failing to Learn From Xerox PARC”. Forbes. 1 Aug. 2012.
  • 31.
    31 New Urban Mechanics,2015. Office of Personnel Management, Innovation Lab. Creative States. 2015. Puttick, Ruth, Peter Baeck, and Philip Colligan. "The Teams and Funds Making Innovation Happen in Governments Around the World." Nesta. Bloomberg Philanthropies, 2014. Rocheleau, Matt. "White House Honors 2 City of Boston Workers as Local Innovators." The New York Times, 27 Sept. 2012. Roberts, Sam. "Nearly Half of New Yorkers Are Struggling to Get By, Study Finds." The New York Times. 29 Apr. 2014. Scrivener, Susan, Michael J. Weiss, Alyssa Ratledge, Timothy Rudd, Colleen Sommo, and Hannah Fresques. “Doubling Graduation Rates: Three-Year Effects of CUNY’s Accelerated Study in Associate Programs (ASAP) for Developmental Education Students”. MDRC, 2015. Torfing, Jacob and Eva Sorensen. “Enhancing Collaborative Innovation in the Public Sector”. Administration and Society 43.8 (2011): 842-868. Trenkner, Tina. “Nigel Jacob and Chris Osgood: 2011 Honoree.” Governing.com. 2011a. Trenkner, Tina. "Public Officials of the Year." Governing.com. 2011b. UNICEF. Innovation Labs: A Do-It-Yourself Guide. 2012. United States Government Accountability Office. “Office of Personal Management: Agency Needs to Improve Outcome Measures to Demonstrate the Value of Its Innovation Lab”. Rep. no. GAO-14-306. 2014. Urban Vision, The. "Boston's Mayor's Office of New Urban Mechanics." YouTube. 2 Apr. 2013. Wood, Colin. "Transportation." Boston's Reporting App Expands Statewide. Govtech.com, 18 Dec. 2012.