SlideShare a Scribd company logo
10th May-16
Bhabua Sadar
Sr. No.Block level indicators Response Bhabua Sadar
1
Did BRG meeting cum training held
in this month
Y/N Yes
2 How many HSC meeting held
(Give No) 25/27
As per plan:-
(Give No) 17
Rescheduled:-
(Give No) 8
3
Did ANM Meeting held as per
schedule (No.)
(Give No) 3/4
4
Did Sector meeting held as per plan
(No.)
N 0
5
Did Block level review meeting held
Sr. no. Outreach Indicators Response
Name of
Block
1
No of ANM meetings held where BRG members
participated.
CDPO:-1
LS:-4
BM:-3
Others:-3
3
2 No of ANM meeting used IL content(specify) 2
3
No of ANM Meeting where Data sharing of WNB &
maternal(MC) & neonatal complications(NC) from field
visit and LR register
WNB-2
MC-0
NC-0
4
4
No of sub centre level platform meetings where BRG
members participated in the reporting month
CDPO:-2
LS:-4
BM:-1
Others:-1
8
5
No of sub-centre platform meetings where Incremental
Learning approach (ILA) cycle delivered as per agenda.
25/27
Sr. no. Outreach Indicators Responses Block
1 No. of Weak New Born (7-15 days) visited 2/6
2 No. of weak New Born still alive A (6) 2/6
3
No. of New born contacted within 24 hrs of birth or after coming from
institution B(16)
2/5
4 No. of WNB contacted at least 3 times in first week by any FLW A(12) 0
5 No of NB in last 30 days(delivery) visited (B) 2/6
6 No. of mothers were contacted during pregnancy B SL(6) 2/6
7 No. of Mother were counseled on Emergency Birth Preparedness (B7) 2/6
8 No. of Mothers were counseled on PNC B (10) 1/6
9 No. of Mothers breast feed within LR B (9) 1/6
10 No. of New born still alive B(14) 2/5
Sr. no. Outreach Indicators Responses Block
1 No. of children visited (6 -8 months) C2 2/6
2 No. of mothers were contacted in last month . C2 (8) 1/6
3
No. of mothers counselled on complementary feeding with BF
C2 (9)
2/2
4 No. of mother was counselled for using any FP method C2 (12) 0/6
5 No. of mother were invited on last VHSND/RI day C2(15) 2/6
6
No. of mother was Follow up by FLW for using any FP method
C2(12)
0/6
7
No. of Mother received demonstration on Annaprasan Diwas C2
(17)
0/6
8 No. of AWW/ASHA were found using HVP D2(2) 1/6
9
No. of AWW/ASHA updating HVP (last visit date mentioned,
name of new pregnant mother inserted) D2(5)
1/6
Sr. no.Facility indicators
Response
(No.)
Block
1
Facilities conducted Quality Improvement meeting in the
reporting month(Give Number)
No
2. How many Clinical Discussion held in the reporting month 0
3 Total number of live birth in the month 369
4
Total number of live birth born with less than 2 kg. birth
weight
09
5
Out of total identified LBW babies (< 2kg), No. of children
details shared with ANMs/ ASHA/ AWW
09
6 Number of new-born complication identified 11
7 Number of new-born complications managed in the facility 03
8
Number of child referred with new-born complication in the
reporting month
08
Sr. Facility indicators Response Block
1 Total number of deliveries in the facility in reporting month 369
2 Number of maternal complication identified (PPH/PIH/Sepsis) 10
3 Number of maternal complications Managed in the facility 8
4
Number of case referred with maternal complication in the
reporting month
2
5
How many LBW/preterm Newborns or Newborn complication
died
2
6 How many mothers with maternal complication died 0
7
Facility out of stock for more than 3 days for Misoprostol tab/inj.
Oxytocin (No. Of days)
0
8. Autoclave –Availability & Functionality (Y/N) Yes
Sr. No Family Planning Indicators Responses Block
1 Did facility providing fixed day TL service (Day’s name) No
2 Did facility providing fixed day of IUCD service No
3 Number of TL conducted in the reporting month 13
4 Total no of IUCD done in the month 5
5 Did facility providing PPIUCD service, if YES give no Yes
6 Did facility using Autoclaved instruments in FP services Yes
7
Facility where consent of beneficiary is taken in
prescribed format before TL/IUCD
Yes
8
Facility where follow up mechanism establish for Family
Planning beneficiary
Yes
Sr. No Family Planning Indicators Response
Block
1 Facility having adequate IUCD tray as per IUCD load Yes
2 Did facility planed for IUCD Camp No
2
Block where FP counselling is done to the women came for
delivery
Yes
3
Block where separate TL/IUCD register available in
prescribed) format
Yes
5
Block where post operative care( medicines, counselling) is
provided in FP operation
Yes
6
No. of sites with adequate supply of both condom and OCP
/ECP (VHND block-Adhaura)
1.Discuss with D.S for conduct QI meeting in the month and RCH
register follow-up at VHSND sites and field .
2. To visit AWC for observation of ICDS all registers.
3. To fill up gaps of LR .
4. Monitoring of HSC meeting by all BRG members and
regular follow-up.
5. Monitoring of sector meeting by all BRG members.
6. Listing and tracking of weak new born.
7.Listing and tracking complication cases of delivered women.
1. Case Sheet and PNC card is stsrted
and fill up > 60%.
2. L.R. Register and other record
keeping registers are improving.
1. Improvement of Record keeping.
2. Clinical Discussion.
3. Poor activity of L.R. Incharge.
4. Cleaning.
5. Arrangement of L.R.
6. Shortage of Staff.
BM Reviev Meeting PPT of Bhabua Sadar May.16

More Related Content

Similar to BM Reviev Meeting PPT of Bhabua Sadar May.16

Introduction FM2 [2014]
Introduction FM2 [2014]Introduction FM2 [2014]
Introduction FM2 [2014]
FayzaRayes
 
Introduction FM3 [2014]
Introduction FM3 [2014]Introduction FM3 [2014]
Introduction FM3 [2014]
FayzaRayes
 
Shopan Project Evaluation 1st Qtr.
Shopan Project Evaluation 1st Qtr.Shopan Project Evaluation 1st Qtr.
Shopan Project Evaluation 1st Qtr.
Sumit Banik
 
Make them count using the best data for maximum impact
Make them count   using the best data for maximum impactMake them count   using the best data for maximum impact
Make them count using the best data for maximum impact
newborn1
 
Shopan Project Eva_1&2 Qtr. and Plan 3Qtr
Shopan Project Eva_1&2 Qtr. and Plan 3QtrShopan Project Eva_1&2 Qtr. and Plan 3Qtr
Shopan Project Eva_1&2 Qtr. and Plan 3Qtr
Sumit Banik
 
Engaging a rural community in identifying actions
Engaging a rural community in identifying actionsEngaging a rural community in identifying actions
Engaging a rural community in identifying actions
Sansfica
 
Mass drugs administration IDA DCC meeting .pptx
Mass drugs administration IDA DCC meeting .pptxMass drugs administration IDA DCC meeting .pptx
Mass drugs administration IDA DCC meeting .pptx
SekhNisar
 
Presentation Template for TB free initiative review.pptx
Presentation Template for TB free initiative review.pptxPresentation Template for TB free initiative review.pptx
Presentation Template for TB free initiative review.pptx
Surkhet technical Institute
 
Launching Program of CMAM Project
Launching Program of CMAM ProjectLaunching Program of CMAM Project
Launching Program of CMAM Project
Iñaki Alegria Coll
 
Extension agent reorganization for CLTS implementation and monitoring
Extension agent reorganization for CLTS implementation and monitoringExtension agent reorganization for CLTS implementation and monitoring
Extension agent reorganization for CLTS implementation and monitoring
IRC
 
Karur
KarurKarur
End-year Review Cross River
End-year Review Cross RiverEnd-year Review Cross River
End-year Review Cross River
Joachim Chijide
 
PR-SR Meeting P4
PR-SR Meeting P4PR-SR Meeting P4
PR-SR Meeting P4
MUHAMMAD JUNAID
 
Sumit_KalaCORE_PP_June
Sumit_KalaCORE_PP_JuneSumit_KalaCORE_PP_June
Sumit_KalaCORE_PP_June
Sumit Banik
 
UP status Child Death Review.ppt
UP status Child Death Review.pptUP status Child Death Review.ppt
UP status Child Death Review.ppt
SanjeevDavey1
 
Book_G_Anaesthesiology_2021_color.pdf
Book_G_Anaesthesiology_2021_color.pdfBook_G_Anaesthesiology_2021_color.pdf
Book_G_Anaesthesiology_2021_color.pdf
AizatHelmiAli
 
Improving Chronic Care - a NZ experience using a breakthrough series collabor...
Improving Chronic Care - a NZ experience using a breakthrough series collabor...Improving Chronic Care - a NZ experience using a breakthrough series collabor...
Improving Chronic Care - a NZ experience using a breakthrough series collabor...
Health Informatics New Zealand
 
Speaking the same language: Harmonizing how we measure stockouts and availabi...
Speaking the same language: Harmonizing how we measure stockouts and availabi...Speaking the same language: Harmonizing how we measure stockouts and availabi...
Speaking the same language: Harmonizing how we measure stockouts and availabi...
JSI
 
Final PPT of CBTP.pptx
Final PPT of CBTP.pptxFinal PPT of CBTP.pptx
Final PPT of CBTP.pptx
HHSC
 
Adverse events, client satisfaction and method discontinuation following outr...
Adverse events, client satisfaction and method discontinuation following outr...Adverse events, client satisfaction and method discontinuation following outr...
Adverse events, client satisfaction and method discontinuation following outr...
Marie Stopes International
 

Similar to BM Reviev Meeting PPT of Bhabua Sadar May.16 (20)

Introduction FM2 [2014]
Introduction FM2 [2014]Introduction FM2 [2014]
Introduction FM2 [2014]
 
Introduction FM3 [2014]
Introduction FM3 [2014]Introduction FM3 [2014]
Introduction FM3 [2014]
 
Shopan Project Evaluation 1st Qtr.
Shopan Project Evaluation 1st Qtr.Shopan Project Evaluation 1st Qtr.
Shopan Project Evaluation 1st Qtr.
 
Make them count using the best data for maximum impact
Make them count   using the best data for maximum impactMake them count   using the best data for maximum impact
Make them count using the best data for maximum impact
 
Shopan Project Eva_1&2 Qtr. and Plan 3Qtr
Shopan Project Eva_1&2 Qtr. and Plan 3QtrShopan Project Eva_1&2 Qtr. and Plan 3Qtr
Shopan Project Eva_1&2 Qtr. and Plan 3Qtr
 
Engaging a rural community in identifying actions
Engaging a rural community in identifying actionsEngaging a rural community in identifying actions
Engaging a rural community in identifying actions
 
Mass drugs administration IDA DCC meeting .pptx
Mass drugs administration IDA DCC meeting .pptxMass drugs administration IDA DCC meeting .pptx
Mass drugs administration IDA DCC meeting .pptx
 
Presentation Template for TB free initiative review.pptx
Presentation Template for TB free initiative review.pptxPresentation Template for TB free initiative review.pptx
Presentation Template for TB free initiative review.pptx
 
Launching Program of CMAM Project
Launching Program of CMAM ProjectLaunching Program of CMAM Project
Launching Program of CMAM Project
 
Extension agent reorganization for CLTS implementation and monitoring
Extension agent reorganization for CLTS implementation and monitoringExtension agent reorganization for CLTS implementation and monitoring
Extension agent reorganization for CLTS implementation and monitoring
 
Karur
KarurKarur
Karur
 
End-year Review Cross River
End-year Review Cross RiverEnd-year Review Cross River
End-year Review Cross River
 
PR-SR Meeting P4
PR-SR Meeting P4PR-SR Meeting P4
PR-SR Meeting P4
 
Sumit_KalaCORE_PP_June
Sumit_KalaCORE_PP_JuneSumit_KalaCORE_PP_June
Sumit_KalaCORE_PP_June
 
UP status Child Death Review.ppt
UP status Child Death Review.pptUP status Child Death Review.ppt
UP status Child Death Review.ppt
 
Book_G_Anaesthesiology_2021_color.pdf
Book_G_Anaesthesiology_2021_color.pdfBook_G_Anaesthesiology_2021_color.pdf
Book_G_Anaesthesiology_2021_color.pdf
 
Improving Chronic Care - a NZ experience using a breakthrough series collabor...
Improving Chronic Care - a NZ experience using a breakthrough series collabor...Improving Chronic Care - a NZ experience using a breakthrough series collabor...
Improving Chronic Care - a NZ experience using a breakthrough series collabor...
 
Speaking the same language: Harmonizing how we measure stockouts and availabi...
Speaking the same language: Harmonizing how we measure stockouts and availabi...Speaking the same language: Harmonizing how we measure stockouts and availabi...
Speaking the same language: Harmonizing how we measure stockouts and availabi...
 
Final PPT of CBTP.pptx
Final PPT of CBTP.pptxFinal PPT of CBTP.pptx
Final PPT of CBTP.pptx
 
Adverse events, client satisfaction and method discontinuation following outr...
Adverse events, client satisfaction and method discontinuation following outr...Adverse events, client satisfaction and method discontinuation following outr...
Adverse events, client satisfaction and method discontinuation following outr...
 

BM Reviev Meeting PPT of Bhabua Sadar May.16

  • 2. Sr. No.Block level indicators Response Bhabua Sadar 1 Did BRG meeting cum training held in this month Y/N Yes 2 How many HSC meeting held (Give No) 25/27 As per plan:- (Give No) 17 Rescheduled:- (Give No) 8 3 Did ANM Meeting held as per schedule (No.) (Give No) 3/4 4 Did Sector meeting held as per plan (No.) N 0 5 Did Block level review meeting held
  • 3. Sr. no. Outreach Indicators Response Name of Block 1 No of ANM meetings held where BRG members participated. CDPO:-1 LS:-4 BM:-3 Others:-3 3 2 No of ANM meeting used IL content(specify) 2 3 No of ANM Meeting where Data sharing of WNB & maternal(MC) & neonatal complications(NC) from field visit and LR register WNB-2 MC-0 NC-0 4 4 No of sub centre level platform meetings where BRG members participated in the reporting month CDPO:-2 LS:-4 BM:-1 Others:-1 8 5 No of sub-centre platform meetings where Incremental Learning approach (ILA) cycle delivered as per agenda. 25/27
  • 4. Sr. no. Outreach Indicators Responses Block 1 No. of Weak New Born (7-15 days) visited 2/6 2 No. of weak New Born still alive A (6) 2/6 3 No. of New born contacted within 24 hrs of birth or after coming from institution B(16) 2/5 4 No. of WNB contacted at least 3 times in first week by any FLW A(12) 0 5 No of NB in last 30 days(delivery) visited (B) 2/6 6 No. of mothers were contacted during pregnancy B SL(6) 2/6 7 No. of Mother were counseled on Emergency Birth Preparedness (B7) 2/6 8 No. of Mothers were counseled on PNC B (10) 1/6 9 No. of Mothers breast feed within LR B (9) 1/6 10 No. of New born still alive B(14) 2/5
  • 5. Sr. no. Outreach Indicators Responses Block 1 No. of children visited (6 -8 months) C2 2/6 2 No. of mothers were contacted in last month . C2 (8) 1/6 3 No. of mothers counselled on complementary feeding with BF C2 (9) 2/2 4 No. of mother was counselled for using any FP method C2 (12) 0/6 5 No. of mother were invited on last VHSND/RI day C2(15) 2/6 6 No. of mother was Follow up by FLW for using any FP method C2(12) 0/6 7 No. of Mother received demonstration on Annaprasan Diwas C2 (17) 0/6 8 No. of AWW/ASHA were found using HVP D2(2) 1/6 9 No. of AWW/ASHA updating HVP (last visit date mentioned, name of new pregnant mother inserted) D2(5) 1/6
  • 6. Sr. no.Facility indicators Response (No.) Block 1 Facilities conducted Quality Improvement meeting in the reporting month(Give Number) No 2. How many Clinical Discussion held in the reporting month 0 3 Total number of live birth in the month 369 4 Total number of live birth born with less than 2 kg. birth weight 09 5 Out of total identified LBW babies (< 2kg), No. of children details shared with ANMs/ ASHA/ AWW 09 6 Number of new-born complication identified 11 7 Number of new-born complications managed in the facility 03 8 Number of child referred with new-born complication in the reporting month 08
  • 7. Sr. Facility indicators Response Block 1 Total number of deliveries in the facility in reporting month 369 2 Number of maternal complication identified (PPH/PIH/Sepsis) 10 3 Number of maternal complications Managed in the facility 8 4 Number of case referred with maternal complication in the reporting month 2 5 How many LBW/preterm Newborns or Newborn complication died 2 6 How many mothers with maternal complication died 0 7 Facility out of stock for more than 3 days for Misoprostol tab/inj. Oxytocin (No. Of days) 0 8. Autoclave –Availability & Functionality (Y/N) Yes
  • 8. Sr. No Family Planning Indicators Responses Block 1 Did facility providing fixed day TL service (Day’s name) No 2 Did facility providing fixed day of IUCD service No 3 Number of TL conducted in the reporting month 13 4 Total no of IUCD done in the month 5 5 Did facility providing PPIUCD service, if YES give no Yes 6 Did facility using Autoclaved instruments in FP services Yes 7 Facility where consent of beneficiary is taken in prescribed format before TL/IUCD Yes 8 Facility where follow up mechanism establish for Family Planning beneficiary Yes
  • 9. Sr. No Family Planning Indicators Response Block 1 Facility having adequate IUCD tray as per IUCD load Yes 2 Did facility planed for IUCD Camp No 2 Block where FP counselling is done to the women came for delivery Yes 3 Block where separate TL/IUCD register available in prescribed) format Yes 5 Block where post operative care( medicines, counselling) is provided in FP operation Yes 6 No. of sites with adequate supply of both condom and OCP /ECP (VHND block-Adhaura)
  • 10. 1.Discuss with D.S for conduct QI meeting in the month and RCH register follow-up at VHSND sites and field . 2. To visit AWC for observation of ICDS all registers. 3. To fill up gaps of LR . 4. Monitoring of HSC meeting by all BRG members and regular follow-up. 5. Monitoring of sector meeting by all BRG members. 6. Listing and tracking of weak new born. 7.Listing and tracking complication cases of delivered women.
  • 11. 1. Case Sheet and PNC card is stsrted and fill up > 60%. 2. L.R. Register and other record keeping registers are improving.
  • 12. 1. Improvement of Record keeping. 2. Clinical Discussion. 3. Poor activity of L.R. Incharge. 4. Cleaning. 5. Arrangement of L.R. 6. Shortage of Staff.