IPTV
2013 Product Catalogue
2          the company                                                                                                                                                                                                                                 the company                  3


Blusens started its commercial activity      Blusens has far exceeded these Plan objectives by becoming the MP3 sales leading                                                                                                         the horizontal integration by developing

in 2002 with a firm and determined           manufacturer within the Spanish market in a time span of only four years, achieving up                                                                                                   HDTV distribution systems via IP and

step in a field traditionally controlled     to 300% annual exponential growths and showing no hints of decrease.                                                                                                                     coaxial cable.

by multinational brands. The targets at      Blusens, with its range of products, can be found in more than 6,000 points of sale                                                                                                      Having a fare presence in the GCC area

that moment were ambitious but they          comprehended in the largest distribution chains in the country and it is now starting an                                                                                                 our systems are installed in a wide variety

were perfectly reflected in the 2002-2005    unprecedented internationalization stage.                                                                                                                                                of projects and developments. From

Strategy Plan. The Plan was thoroughly       Our distinguishing features -constant innovation, good value for money, guaranteed                                                                                                       Luxurious hotels like the Vision Hotel

designed for us to be different and          profitability, creative marketing and after-sales service- have been exceptionally                                                                                                       in Abu Dhabi, Diva Hotel in Bahrain and

innovative, to grow at an unforeseen pace    received by our customers. Blusens compromise to continuously improve the product                                                                                                        Lamborghini Hotel in Syria to universities

and provide the consumer electronics         quality and the customer service is mirrored in the creation of our own Support Centre                                                                                                   like Princess Noura in Saudi Arabia and

sector, so in need of a change, with new     located in Santiago de Compostela, Spain, with a Call Centre where all the customers’

blood. We have created a quality brand       calls are directly received and dealt with in order to provide a better and faster response

from scratch, from the Spanish region of     to Blusens product users.

Galicia and for everybody, a quality brand                                                                                                 In line with our young, vibrant and restless image, we are sponsors of Miss Spain

guided by its excellence on every single                                                                                                   Pageant, which has associated our brand with the world of Fashion, we also sponsor

operative aspect with the objective of                                                                                                     the Blusens MotoGP Team, a promising endeavour that supports young and bright

being the best at what we do.                                                                                                              new pilots who are already making a dent in their championships, and the Spanish

                                                                                                                                           Professional Blusens Basketball Team.

                                                                                                                                           Further to these efforts, we have thrown ourselves into the virtual world of social

                                                                                                                                           networking with our BlusensTV one2one community, Blusens Music Digital music label

                                                                                                                                           and many other initiatives that keep us in the forefront of technology, communication      mega projects like the Reemram project

                                                                                                                                           and marketing while closing the gap between the user and the brand.                        in Dubailand, Dubai.

                                                                                                                                           Our next step was the implementation of our young and forward looking mindset on           Our commitment to QC and continuous

                                                                                                                                           the export markets. Starting in Dubai (2007), we have embarked in a very aggressive        R&D, along with a focused customer

                                                                                                                                           globalization campaign under the same motto that made Blusens successful in Spain.         service     philosophy      guarantee        the

                                                                                                                                                                                                                                      performance      and     reliability   of    our
                                                                                                                                                                                       That is being young, fresh, reliable,
                                                                                                                                                                                                                                      systems. Capable now, as we are, of
                                                                                                                                                                                       innovative and, most of all, closing the gap
                                                                                                                                                                                                                                      designing    and    implementing            HDTV
                                                                                                                                                                                       between the brand and the user. Today we
                                                                                                                                                                                                                                      systems that range from the small single
INNOVATION: R&D                                                                                                                                                                        are present in China (2007), Middle East
                                                                                                                                                                                                                                      apartment to the most luxurious hotel
Constant innovation is one of the pillars of Blusens’ success. That is the reason why we have increased the investments in Research,                                                   (2007), Mexico (2008), Uruguay (2008) and
                                                                                                                                                                                                                                      complex or cable TV operator...
Development and Innovation up to exceed 10% of the estimated annual turnover. These investments have culminated in the creation                                                        Brazil (2012).
                                                                                                                                                                                                                                      We will stretch ever more to become
of our own research team made up by over 35 people. Such a commitment with innovation has fostered the creation of groundbreaking                                                      We continue to strive and develop
                                                                                                                                                                                                                                      the reference in innovation, technology,
new products such us the G01, the first European GPS navigator that uses pictometry, the web:tv, a powerful internetTV server and                                                      ever more technological products by
                                                                                                                                                                                                                                      marketing and customer service.
home entertainment controller, the integration of IPTV protocols over power line...                                                                                                    launching our new communications line
                                                                                                                                                                                                                                      We can afford to be unique, different.
These advanced products provide a powerful statement that says that technological breakthroughs can be born, developed                                                                 in which we have taken a new step in
                                                                                                                                                                                                                                      To be Blusens.
and implemented in Spain. Innovation is the aspect that more clearly defines our Marketing strategy. Blusens has always been

characterized by a creative and aggressive Marketing, with actions often associated with large conglomerates. Blusens innovative

and creative strategies have made a deep impression in the field, revealing the firm as a company always on the look-out for different

mediums and strategies with the aim of providing freshness to our Marketing.


                                                                                                                                                                                                                                                   www.blusensnetworks.com
Table of Contents      5




IPTV                                                       7
   ·· What is IPTV?                                        9
   ·· What can IPTV do for you?                           11
   ·· What can Blusens do for you?                        16
   ·· IPTV Concepts                                       17
   ·· IPTV Components                                     19
   ·· System Architecture                                 20
  Middleware23
   ·· Middleware Nodes                                    24
   ·· Management Interface                                27
   ·· Software Licenses                                   31
  Set Top Box                                             35
   ·· High definition STB                                 36
  VoD Streaming Cluster                                   41
   ·· Storage nodes                                       42
   ·· Streaming nodes                                     45
   ·· Optional Features                                   47
  IP Contribution Head-end                                49
   ·· Digital Contribution                                50
   ·· Analog Contribution                                 54
  Net PVR                                                 57
   ·· Net PVR                                             58
DIGITAL SIGNAGE                                           61
   ·· What is Digital Signage?                            62
   ·· What can Digital Signage do for you?                63
  DS Servers                                              71
   ·· Playout Server                                      72
   ·· Signage Server                                      73
  Channel Generators                                      77
   ·· High Connectivity                                   78
   ·· Low Connectivity                                    79
FACIAL RECOGNITION                                        81
   ·· What´s Facial Recognition?                          83
   ·· Technical Specifications                            84
TECHNICAL SPECIFICATIONS                                  87
   ·· MPEG-2 Profiles and Levels                          88
   ·· Glossary of Measurements                            88
   ·· Network Technologies                                89
   ·· H.264 Profiles and Levels                           90
   ·· Wiring92
   ·· Cable Recommendations                               93




                                                 www.blusensnetworks.com
IPTV
8         IPTV                                                                                                                                                                                                                       IPTV    9



                                                                                                                                                                                                                           What is IPTV?


                                                                                                                                                                                          The cooperation between Interoud and
                                                                                                                                                                                          Blusens, as software and hardware
                                                                                                                                                                                          developers, has resulted in the birth
                                                                                                                                                                                          of a true NEXTGEN IPTV system that
                                                                                                                                                                                          is able to fulfil every requirement the
                                                                                                                                                                                          Operator may need. From standard
                                                                                                                                                                                          TV channels distribution, to HDTV,
                                                                                                                                                                                          Video-on-Demand,             Time-shift,
                                                                                                                                                                                          personalized advertisement schemes
                                                                                                                                                                                          and sponsorships, direct purchase
                                                                                                                                                                                          from the TV, Digital Signage and more.




                                                  IPTV Standard Platform




    The development of new technologies over IP Networks continues to contribute to the integration of a variety of          Such solutions play a very important role in the
    services. These expand from the basic Ethernet network for computer interconnection, to DSL lines for internet           hospitality sector as they provide the tools to increase
    access, IP telephony or the most advanced automation and control systems.                                                the comfort level of their guests/patients, as well as the
                                                                                                                             overall revenue. With this IPTV system, the hotel can
    The advantage of a standard communication technology over a single network allows the simplification of the cabling      offer enhanced entertainment services at a Premium,
    network, enables the integration of varied services, which guarantees the compatibility with future technological        increase the availability of other hotel services (Room
    developments, and facilitates the monitoring, security and control of any installation.                                  Service, Laundry, Restaurant Reservations, Spa, Sports
                                                                                                                             activities, Gift Shops, etc.) while getting valuable data
    Internet Protocol Television (IPTV) is one of the services that now can also integrate with the structured cable         as to what their guests are watching, what channels are
    network of a building. Such revolutionary change in the way TV signal is distributed significantly improves the signal   popular, what content type gets the most income, what
    quality, interactivity and control, giving the operators a plethora of options to monitor, add services, maximize        hotel services have more demand, etc.
    audience and improve the return on the investment.
                                                                                                                             Thus, IPTV by Blusens provides a true added-value tool
                                                                                                                             to the operator that will, unobtrusively and reliably,
                                                                                                                             increase the revenue on a system that otherwise only
                                                                                                                             represents an added cost.




                                                                                                                                                                                                                         www.blusensnetworks.com
10   IPTV                                                                                           IPTV   11



                                                                  What can IPTV do for you?



            Cable TV Operators
            IPTV by Blusens full-fledged solution enhances the services the operator
            can provide as it is fully interactive in every possible way. Direct TV purchase
            becomes a true reality for varied forms of products and services. Also, it allows
            the creation of Portals for different On-Demand content, Pay-per-View, and Live
            events. Our system enhances the data gathering of user consumption, enabling
            the use of complex statistics that will serve as a tool for continuous improvement
            and detection of overlooked niche markets.

            Hotels, Resorts, Compounds, Restaurants
            The complete solution offers a centralized point to control and monitor the guest’s
            consumption and usage of the entertainment system, providing useful statistics
            that can be used to tailor make the packages offered based on their origin, age
            group, income, occupation, etc. The On-Demand content and some LiveTV chan-
            nels can be offered in various languages and with captions to provide the closest
            sensation to a Home Cinema that a hotel can offer, while giving the Operator a
            variety of tools to insert various types of advertising formulas. All fully linked to
            the central Building Management System. Billing is, thus, seamlessly integrated.




            Hospitals
            Added to the general Hospitality functionality, IPTV can record, and make available
            to the user network, any workshop, lecture, seminar or procedure carried out in
            the facility, thus enhancing the practise and resources available to the Hospital.
            The offer to the patient can even include the meal selection from his physician’s
            approved menu.

            Corporate or Government Networks
            The integration of the video streams in an existing IP infrastructure makes
            possible the reception of any content on any facility, even on mobile devices. With
            an IPTV platform all the multimedia content generated in courses, seminars or
            master lectures can be recorded and redistributed live during the event or later,
            to feed STB, PCs inside the complex, Digital Signage panels or via an internet web
            portal.

            Educational Facilities
            Using the Corporate services as a base, an education institution may be interested
            in adding notes to the video or a real time messaging feature to allow the users
            watching a live event like a surgery to share opinions and comments with other
            users.


                                                                                     www.blusensnetworks.com
12        IPTV                                                                                                                                                                                                                            IPTV        13




MAIN MENU                                 WATCHING LIVE TV                          PVR                                       WATCHING ON DEMAND TV                      APPS                                       Sponsorship  TELETEXT
•  All the menus and descriptions in      •  Complete EPG to help the user to       •  Time Shifting support enables the      •  Browse through content categories,      •  Increases the capacity of the STB via   •  Sponsor logos on the Menu System.
   the mother tongue of the guest.           find the desired program.                 user to pause live contents and           subcategories, individual content          external applications.                  •  Banners on different sections and
•  Main services easily accessible from   •  Both Live TV and playout channels.        resume it later.                          titles and their synopsis.              •  Third party API available to develop       areas of the screen.
   the main menu.                         •  Program search.                        •  CatchUP TV allows the guest to         •  Suggestions, popular contents, etc.        specific   applications     for   the   •  Static and dynamic text and
•  Help.                                  •  Check metadata information.               watch a content from the beginning.    •  Browse the active rentals and rental       platform.                                  graphical banner options.
                                                                                                                                                                         •  Multitasking support.
                                          •  Channel view and calendar view.        •  NetPVR makes possible to watch            history.                                                                           •  To be defined based on customer
WELCOME SCREEN                            •  Navigate channels through the mini-       on demand contents that were           •  Full control: play, pause, stop, fast   •  The A/V content is not interrupted by      needs.
•  Welcomes the guest when he arrives        guide.                                    broadcasted in the past.                  forward  rewind at several speeds.        using an app.
   to his room for the first time.        •  Advertising    capabilities  (static   •  Manual recording schedule managed      •  Parental control available.
•  Name of the guest.                        banners, dynamic banners, RSS             from the STB.
•  Check in and out dates.                   feeds…)                                •  Complete integration with EPG.
•  Welcome TV channel in the language     •  Channel change under one second.       •  Possibility of recording in external
   of the guest.                          •  Miniguide allowing a fast, smart          usb key or netPVR server.
•  The channel can be a live TV or a         zapping.
   playout channel.




                                                                                                                                                                                                                              www.blusensnetworks.com
14        IPTV                                                                                                                                                                                                                    IPTV         15




INFORMATION PAGES                           CITY INFORMATION                        HOTEL INFORMATION                        EMERGENCY                               GAMES AND SERVICES                    ROOM SERVICE  e-SHOPPING
•  Suitable     for   displaying    local   •  Shopping malls list.                 •  Emergency telephones.                 •  Alarm message on every screen.       •  World Time clock.                  •  Food ordering direct to the kitchen
   information about the hotel, the city    •  Tourism points of interest.          •  Hotel telephone extensions.           •  Centralized control.                 •  Shows the different GMT zones.        printer.
   and its surroundings.                    •  Recommended Restaurants.                                                      •  Evacuation map.                      •  Daylight saving control.           •  Laundry request with specification
•  Predefined library of styles and         •  Pharmacies.                                                                   •  Once the alarm has been triggered,   •  Currency exchange helper.             of the clothes rent.
   layouts.                                 •  Unlimited possibilities...                                                       the middleware locks the STB         •  High quality games.                •  Housekeeping.
•  Easy edition of the content, no HTML                                                                                         interactivity, the guest can not
   needed.                                                                                                                      override the message.
•  Easy addition of pictures used to                                                                                         •  Automatic volume rise.
   illustrate the page.
•  Easy sorting of pages according to
   assigned categories into menus and
   submenus.




BILLING                                                                             NEWS                                     INTERNET
                                            MESSAGING                                                                                                                WAKE UP CALL                          PIN CODE
•  Shows the bill with real-time                                                    •  Integration of real time RSS news     •  Internet Browsing.
                                            •  Text messaging from hotel desk to                                                                                     •  Selection of TV or Radio Channel   •  Possibility of protecting the access
   information coming from the hotel                                                   feeds.                                •  Advanced Java Script Support.
                                               the guest room.                                                                                                          used as Wake Up channel.              to certain services via pin code.
   PMS.                                                                             •  Chronological sorting of the latest   •  Full featured Web Browser.
                                            •  Text messaging from the guest room
•  The platform has its own minimal                                                    news.
                                               to the hotel desk.
   PMS system for hotels without a
                                            •  Optional text messaging between
   third-party PMS.
                                               rooms.
•  Possibility of accepting the bill for
   express check-out.


                                                                                                                                                                                                                      www.blusensnetworks.com
16         IPTV                                                                                                                                                                                                          IPTV     17



          What can Blusens do for you?                                                                                                                                                                     IPTV Concepts

     Blusens is your One-Stop Shop for any IPTV requirements, providing a wide and scalable range of products,
                                                                                                                                                                            Playout Channel
     solutions and content that will fit every sized project:
                                                                                                                    IPTV Contribution System                                Live channel generated from local stored contents.
                                                                                                                    Equipment responsible of tuning live TV or radio        For example advertising videos of the hotel or a
     •  Latest generation technology for hospitality and cable TV environments based on Blusens Technologies                                                                recent movie in a continuous loop. Both live and
                                                                                                                    streams and its injection into the IP network.
        devices and Interoud platforms that provide a full end-2-end solution.                                                                                              playout channels will be treated the same way by
     •  Immediate consultancy and maintenance services throughout the life cycle of the project from inception to                                                           the middleware. Playout channels are also Multicast
                                                                                                                    Middleware                                              traffic.
        execution and operation.
                                                                                                                    Core of the system. Orchestrates interactions with
     •  Wide international experience to help define appropriate requirements and commercial services.
                                                                                                                    every other part of the IPTV platform. It manages
                                                                                                                    the access rights to LiveTV channels, movies or         Unicast Traffic
                                                                                                                    sections for specific users. It also manages the
                                                                                                                                                                            Communication between one origin and one
                                                                                                                    interaction with the hotel PMS system for pay per
                                                                                                                                                                            destination. Used when one stream per user is
                                                                                                                    view purposes.
                                                                                                                                                                            required, for example in VoD streams. Multicast
                                                                                                                                                                            TrafficCommunication between one origin and
                                                                                                                                                                            several destinations. sed when the same stream
                                                                                                                    Video on Demand. VoD                                    can be delivered simultaneously to several users,
                                                                                                                    Interactive video delivery technology which allows      for example in LiveTV streams.
                                                                                                                    each user to be provided with its own video stream,
                                                                                                                    as if it were coming from a local DVD player. The
                                                                                                                    user can pause, fast forward, rewind, etc. the movie    Multicast Traffic
                                                                                                                    at several speeds without interfering with the video
                                                                                                                                                                            Communication between one origin and several
                                                                                                                    beign watched by other users. VoD is unicast traffic.
                                                                                                                                                                            destinations. Used when the same stream can be
                                                                                                                                                                            delivered simultaneously to several users, for
                                                                                                                                                                            example in LiveTV streams.
                                                                                                                    Set Top Box. STB
                                                                                                                    Device used to decode IP video streams delivered
                                                                                                                    through the network in a format suitable for being      Number of on Demand Media
                                                                                                                    watched in a standard TV Set. Is also responsible       Number of demand contents (i.e. movies or
                                                                                                                    of displaying the menus used to browse all the          videoclips) stored in the VoD storage node server.
                                                                                                                    contents of both VoD and LiveTV media library as        Each content can be watched simultaneously by an
                                                                                                                    well as the interactive info pages.                     undefined number of users with a single copy of the
                                                                                                                                                                            content on the server.

                                                                                                                    Live Channel
                                                                                                                    Stream coming from the satellite dish or any            On Demand Media Bitrate
                                                                                                                    broadcast technology like DTT. Usually a TV or radio    Bandwidth consumed by each stream transferred
                                                                                                                    channel. A channel coming from a CCTV IP camera         through the network. 5Mbps is the same quality
                                                                                                                    is also considered a Live Channel. Live channels are    as the live television channels coming from the
                                                                                                                    Multicast traffic.                                      satellite. 8 to 12Mbps are required for HD content.
                                                                                              IP      RF
                          Expandable in number of services                                    Yes   Limited
                          Expandable in number of users                                       Yes   Limited         Number of Users                                         Maximum Concurrency
                          HD capabilities                                                     Yes     No            It refers to the number of STB to consider. Each STB    Represents the maximum number of users expected
                          Interaction with other systems (telephony, internet…)               Yes     No            will be capable of playing one content independently    to be consuming VoD contents at the same time with
                          Availability of VoD                                                 Yes     No            from the others. One STB per TV screen is required.     a percentage (notice that there’s no limitation on
                          Interaction with PMS                                                Yes   Limited                                                                 concurrent users for Live or Playout channels as
                                                                                                                                                                            concurrency applies only for VoD)
                          Recording and time shifting                                         Yes     No
                          Network Monitoring                                                  Yes     No
                          Access restrictions and parental control                            Yes     No
                          Hotel interface personalization                                     Yes   Limited
                          Multi-language capabilities both on the interface and on contents   Yes     No
                          Flexible pricing for different contents                             Yes     No
                          Contents categorization                                             Yes   Limited
                          Remote centralized control of the STBs                              Yes     No
                          In-line editing of local information pages                          Yes   Limited
                          Messaging capabilities                                              Yes   Limited
                          Dynamic banner facilities                                           Yes   Limited
                          Emergency alerts and warnings                                       Yes   Limited
                          Several services over the same cabling network                      Yes     No
                          Easy integration with several required services                     Yes     No




                                                                                                                                                                                                           www.blusensnetworks.com
18   IPTV                                                                                                                                          IPTV     19



     IPTV Components




                       IP CONTRIBUTION                                          PLAYOUT SERVER

                       Performs the tuning of Live satellite video streams      Generates multicast Live channels with local contents
                       and its conversion into IP streams.                      according to a time schedule.
                       One DVB-S module can tune all the channels in a          Suitable for advertising channels, local promotion or
                       transponder simultaneously                               pay per view movies
                       Responsible of channel descrambling when necessary       Seamless splicing allows to smooth the transition
                                                                                between two videos to avoid video noise
                       Each CAS module can descramble several channels



                       VoD CLUSTER                                              NET PVR
                       Serves individual and independent video streams to       Stores cyclic recordings for several days of Live TV
                       each user.                                               Channels or CCTV Cameras.
                       Each stream is unique for each user                                        The recordings can be accessed
                                                                                                  later so one user can watch what
                                                     Fast Forward               Live Archive
                       Manages behavior of VCR                                                    was on certain channel on certain
                                                     Rewind                                       moment in the past
                       controls
                                                     Pause                      The user is not tied to the broadcast scheduling
                       VCR operations performed at several speeds               anymore
                       Stores contents to be streamed
                       Stores metadata for this contents
                       Controls the bandwidth for each stream
                                                                                STRUCTURED NETWORK CABLING
                                                                                Performs the connections between servers, routers,
                       MIDDLEWARE                                               switches and STBs.
                       Core of the IPTV system. Manages interactions            Maximum length of each connection: 100 mt.
                       between each part of the system.                         The network is divided in a hierarchical way
                       Menu generation                                          The switches can be cascaded
                       Content authorization                                    The network has star shape, not bus shape
                       Billing and PMS integration
                       Statistics collection
                       Media cataloging                                         SET TOP BOX
                       EPG generation                                           Decodes the IP audio/video streams for playing it in a
                                                                                standard TV set.
                                                                                Generation of the GUI
                       ROUTERS AND SWITCHES                                     Manages interaction with Keyboard
                       Carries IPTV info packets to the correct destinations.   the user                       Remote control
                       Each one acts as a repeater so there is no attenuation   Can be remotely controlled via the middleware
                       of signal
                       Responsible of broadcast and multicast replication of
                       streams




                                                                                                                                         www.blusensnetworks.com
20    IPTV                                                                                                                                              IPTV      21



     System Architecture


     1.	The VoDKAST Middleware server creates the STB menus by accessing the metadata information of the
        videos from the VoD cluster (movie name, actors, director, etc.) and the EPG information from the live
        and playout channels while considering the user access rights and credit information obtained from the
        PMS. Thus, the menu is customized for each guest.

     2.	The hotel operator can fine tune the platform through the management console. The Middleware
        Server also monitors the current state of each part of the system and triggers the proper alerts to the
        management consoles in case of any problem.

     3.	The VoD Streaming Cluster stores all the videos in its storage nodes and streams it to the network
        through the streaming nodes. The platform allows an unlimited number of streamer and storage nodes
        to increase the storage or streaming capacity independently from each other according to the operator
        needs.

     4.	The IP Contribution System obtains the live DVB-S, DVB-C and DVB-T MPEG-2 streams from satellite,
        cable or terrestrial feeds and injects them into the IP network as IP multicast streams.

     5.	The Playout Server generates continuous loop streams of stored contents as IP multicast streams.

     6.	The NetPVR server stores local recordings of live TV channels to provide time-shifting features to the
        platform.

     7.	The Digital Signage server controls the digital signage screens and split its layout in several regions
        that can be filled with any multimedia content, even Adobe Flash.

     8.	The Ethernet Switches aggregate the outputs of all the servers and carry the video streams to the
        screens through the IP network.

     9.	The integrated solution allows several types of STB and screens working together: Standalone STB
        screen, Standard PCs screens and Low or High Connectivity Digital signage screen. Any IPTV content
        (live, playout, VoD, etc.) can be displayed in any of the STB types.                                      IPTV Architecture Graphic




                                                                                                                                              www.blusensnetworks.com
Middleware
24         Middleware                                                                                                                                                                                                                                                    Middleware                 25


                                                                                                                                   2000 User Clustered Middleware Node

            The middleware server is the core of the Blusens IPTV solution. It controls the interaction between
                                                                                                                                                                                       This node is aimed to provide a solution for larger deployments such as cable
            each part of the system and the interaction of the system itself with the rest of the hotel services. It is
                                                                                                                                                                                       operators, universities, etc. Due to its clustering approach this nodes allow
            also the entry point for the hotel operator, where he can check the status of the network, the connected
                                                                                                                                                                                       unlimited growing capacity via clustering. This servers are capable of working
            STB, trigger alerts to pop up in one or a group of STB etc.
                                                                                                                                                                                       together to provide one middleware controlling an unlimited number of users.
                                                                                                                                                                                       With its cluster approach, a system created with this nodes can integrate spare
            VoDKAST will generate menu screens for browsing all the media library in an integrated way. The
                                                                                                                                                                                       servers that are automatically hot swapped when an anomaly occurs without
            interface is coherent among all the applications of the system (i.e. TV, VoD, NetPVR, services). It’s
                                                                                                                                                                                       service interruption.
            also able of providing screens with local information of the hotel and surroundings. This information
            screens are very simple to create and edit via collection of templates that the operator can modify
            online through the management interface. All the modules of this middleware are multilingual and can                                                                         IM.12000                   IPT V Clustered Middleware for 2000 users
            support any language with any font, for example, Arabic.

            The VoDKAST middleware provides mechanisms to interact with several hotel services (room service,                                                                          •  Up to 2000 middleware users per node.
            laundry, housekeeping, etc…) providing direct communication with the departments where this services                                                                       •  Intel Xeon Quad core processors.
            are stored and being able also to print text messages with the service required.                                                                                           •  4GB 800Mhz FB-DIMMs RAM.
                                                                                                                                                                                       •  Up to 4 RAID 1+0 mirrored 250Gb Hard disks.
            VoDKAST has the ability of overimpressing banners over the video of all or only some of the Set Top                                                                        •  4 x Gigabit Ethernet network interfaces.
            Boxes. It’s also able of blocking the ability of override the message by locking remotely the IR control                                                                   •  Optional 10 Gigabit Ethernet interface.
            of the STB.

                                                                                                                                                                                                                     IM.1500
                                                                                                                                                         Processor                  One or Two Quad-Core Intel Xeon L5420 Processor, 2.50 GHz, 1333 MHz FSB, 50W.
          Middleware Nodes                                                                                                                               Cache                      Quad Core Processors: 12 MB L2 cache per core
                                                                                                                                        Architecture
                                                                                                                                                                                    DIMM Slots Memory Type        Up to 32 GB of 800 MHz ECC FB-DIMM or 667 MHz ECC FB-DIMM
                                                                                                                                                         Main memory
                                                                                                                                                                                    Memory Configuration          4 GB total memory. System configurations from 1 GB up to 32 GB
     The middleware nodes are the servers that conform the middleware cluster. Depending on the number
                                                                                                                                        Graphics Controller                         ASPEED AST2000
     of users the middleware can be a single server or a cluster of multiple machines working together to
                                                                                                                                        System architecture                         Intel Quad Core technology
     provide unlimited growing capabilities to the platform.                                                                                                                        Network: Four Integrated 10/100/1000 Base-T Ethernet ports
                                                                                                                                                                                    Management: Service processor with embedded Lights Out Manager (LOM) standard
     In hospitality environments a cluster of nodes is rarely required, but, in other case scenarios, like telco                                                                    Serial: RJ-45
                                                                                                                                        Standard/integrated interfaces
     operators for example, this requirement becomes more common. Please ask your sales representative                                                                              SATA: Up to two hot-pluggable SATA bays, 2 TB max.
     to give you more information about the telco approach for larger installations.                                                                                                USB: Five USB 2.0 ports (two front, two rear, one internal)
                                                                                                                                                                                    Expansion bus: One PCIe slot (x16 electrical/x16 mechanical), half-length, half-height
     The middleware nodes are built with the lastest and highest quality components sharing the group of                                                                            Solaris OS 10 or GNU/Linux
                                                                                                                                        Software         Operating systems          IPMI 2.0 compliant Service Processor with embedded. Lights Out Management offering remote power, KVM
     features that configure them as high reliability “state-of-the-art” ones.
                                                                                                                                                                                    (keyboard, video, mouse) and media capability
                                                                                                                                                     Internal disk option           Two hot-pluggable 250-750 GB 7200 rpm 3.5” SATA II HD
                                                                                                                                        Mass storage
                                                                                                                                                     Removable Media                Up to one EIDE DVD-ROM or DVD+/-RW DL drive
      500 User Standalone Middleware Node                                                                                               and media
                                                                                                                                                     RAID                           RAID 1 hardware mirroring to provide fault tolerance
                                                                                                                                                                                    Operating temperature: 5° to 35° C (41° to 95° F) at sea level
                                                                                                                                                                                    Non operating temperature: -40° to 68° C (-40° to 154° F), up to 93% relative humidity, non condensing, 38° C
                                            This node is focused in providing the middleware for small/medium sized
                                                                                                                                                                                    max. wet bulb
                                            installations. With its two dual core processors, this server is able of managing           Environment                                 Operating altitude: Up to 3,000m (9,000 ft.), max. ambient temperature is derated by 1° C per 300m above 900m
                                            up to 500 users concurrently.                                                                                                           Non operating altitude: up to 12,000m (=~36,000 ft.)
                                            The RAID1 mirroring between the two 7200rpm SATA hard disks guarantees the                                                              Acoustic noise: 70 dBA operating, 69 dBA idle (declared noise emissions in accordance with ISO 9296
                                            lowest cost per GB of storage space and reveals this unit as a high reliability one.                                                    A-weighted, sound power)
                                            The 1RU form factor highlights this server as one of the most dense ones in what                                                        Single PSU
                                                                                                                                        Power
                                                                                                                                                                                    AC power: 100–240 V AC (47–63 Hz)
                                            is referred to number of users per RU.
                                                                                                                                                         Safety                     IEC 60950, UL/CSA 60950, EN 60950, CB Scheme with all country differences
                                                                                                                                        Regulations      RFI/EMI                    FCC CFR 47 Part 15 Class A, EN 300 386 v1.3.3, EN 55022 Class A, EN 61000-3-2, EN 61000-3-3
                                                                                                                                                         Immunity                   EN 55024, EN 300 386 v1.3.3
                                              IM.1500             IPT V Standalone Middleware for 500 users
                                                                                                                                                         Safety                     CE, CB Scheme, UL, CSA, CCC, BSMI, AR-S, GOST-R
                                                                                                                                        Certifications EMC                          CE, FCC, VCCI, ICES, BSMI, CCC, MIC, C-Tick, AR-S, GOST-R
                                                                                                                                                         Other                      RoHS-compliant labeled, per WEEE (Waste Electrical and Electronics Equipment) Directive (2002/95/EC)
                                            •  Up to 500 middleware users.
                                                                                                                                                         Height                     44 mm (1.7”)
                                            •  Intel Xeon Dual core processors.
                                                                                                                                        Dimensions       Width                      425.5 mm (16.8”)
                                            •  2GB 800Mhz FB-DIMMs RAM.                                                                 and weight       Depth                      633.7 mm (25”)
                                            •  2 RAID 1 mirrored 250Gb Hard disks.                                                                       Weight                     13.3 kg (27.2 lbs.)
                                            •  4 x Gigabit Ethernet network interfaces.                                                 Warranty                                    One year, next business day
                                            •  Optional 10 Gigabit Ethernet interface.                                                 Hardware Specifications may change without prior notice.




                                                                                                                                                                                                                                                                     www.blusensnetworks.com
26              Middleware                                                                                                                                                                                  Middleware     27



                                                                                                                                                                                            Management Interface




                                                                                                                                                                                 The LiveTV and playout channels
                                           IM.12000                                                                            IM.12000
                                                                                                                                                                                 can be shown or hidden to certain
                  Processor       Two Intel Xeon processors 5500 series                                                   Operating temperature: 5° C to 35° C (41° to 95°
                                                                                                                          F) at sea level                                        STB or rooms. It’s numbering can
                                  Level 1: 32 KB instruction and 32 KB data L1 cache
                                  per core                                                                                Non operating temperature: -40° C to 68° C (-40°       be easily resorted and, if provided
                                   Level 2: 256 KB unified (data and instruction) L2                                      to 154° F)                                             by the operator, teletext and
                  Cache
                                  cache per core                                                                          Operating relative humidity: up to 93%, non            subtitles are fully supported.
 Architecture
                                  Level 3: 4 MB or 8 MB shared inclusive L3 cache per                                     condensing, 38° C max. wet bulb
                                  processor                                                                               Non operating relative humidity: Up to 93%, non
                                  12 DDR3 DIMM slots (six DIMM slots per CPU socket);                                     condensing
                  Main                                                                   Environment
                                  system supports from 2 GB (1x 2 GB to 96 GB (12x 8                                      Operating altitude: Up to 3,000m (9,000 ft.), max.
                  memory
                                  GB) of memory                                                                           ambient temperature is derated by 1° C per 300m
                                  Based on Intel Xeon processor 5500 series and Intel                                     above 900m
 System architecture
                                  5500 Chipset                                                                            Non operating altitude: 10,000m (35,000 ft.)
                                  Network: Two 10/100/1000Base-T Ethernet ports                                           Acoustic noise: 7.5 B operating, 7 B idling / 70 dBA
                                  Serial: One RJ-45 port                                                                  operating, 60 dBA idle (declared noise emissions
                                                                                                                          in accordance with ISO 9296 A-weighted, sound
 Standard/integrated              USB: Five USB 2.0 ports (two front, two rear, one                                       power)
 interfaces                       internal)
                                                                                                                          Single non redundant power supply; max. power
                                  Expansion bus: One PCIe 2.0 slot (x16 electrical/x16                                    supply rating 600 W at 80% efficiency
                                                                                         Power
                                  mechanical, low-profile)
                                                                                                                          AC power: 100–240 V AC (47–63 Hz)
                                  Solaris 10 OS
                                                                                                                          IEC 60950, UL/CSA 60950, EN 60950, CB Scheme
                                  OpenSolaris™ OS                                                         Safety
                                                                                                                          with all country differences
                                  Red Hat Enterprise Linux 4                             Regulations                      FCC CFR 47 Part 15 Class A, EN 300 386 v1.3.3, EN      The contents can be marked
                                                                                                          RFI/EMI
                                  Red Hat Enterprise Linux 5                                                              55022 Class A, EN 61000-3-2, EN 61000-3-3              with any tag defined by the
                  Operating       SUSE Linux Enterprise Server 10                                         Immunity        EN 55024, EN 300 386 v1.3.3                            administrator,     like     action,
 Software
                  systems         VMware ESX 3.5                                                                          CE, CB Scheme, UL, CSA, CCC, BSMI, AR-S,
                                                                                                          Safety                                                                 High Definition, Music Video,
                                  Windows Server 2003 Standard/Enterprise Editions                                        GOST-R
                                                                                                                                                                                 Documentary,        advertisement,
                                  Windows Server 2008 Standard/Enterprise Editions                                        CE, FCC, VCCI, ICES, BSMI, CCC, MIC, C-Tick,
                                                                                                          EMC                                                                    Black and White movie etc.
                                                                                         Certifications                   AR-S, GOST-R
                                  Windows Server 2008 Standard/Enterprise/
                                  Datacenter Editions                                                                     RoHS-compliant labeled, per WEEE (Waste                The     middleware    allows    the
                                                                                                          Other           Electrical and Electronics Equipment) Directive        administrator to sort this tags in
 Networking                       Two GbE ports integrated on motherboard
                                                                                                                          (2002/95/EC)
                                  Optional Sun Integrated Lights Out Manager (ILOM)
                                                                                                          Height          43mm (1.7 in.)
                                                                                                                                                                                 any menu/submenu configuration,
                                  service processor module                                                                                                                       so browsing thousands of contents
                                                                                                          Width           436mm (17.2 in.)
                                  – VGA 8 MB: 1,024x768 at 60 Hz                         Dimensions
                                                                                                          Depth           650mm (25.6 in.)                                       is very comfortable.
                                  – Management port: One 10/100 RJ-45 port               and weight
                                                                                                                    MIN   9.8 kg (21.7 lbs.)
                                  Enables remote power control; remote keyboard,                          Weight
                                  video, mouse (KVM) graphical                                                      MAX   13.9 kg (30.6 lbs.)
 Management                       access; and remote media (DVD, CD, floppy)                                              Rackmounting slide rail kit

                                  Secure remote access using Web interface over SSL,     Mounting option                  Toolless rackmounting slide rail kit
                                  or CLI over SSH                                                                         Cable management arm
                                  Sun™ xVM Ops Center software support                   Warranty                         One year, next business day
                                  IPMI 2.0, SNMP v1, v2c, and v3
                                  In-band, out-of-band, and side-band remote
                                  management
                                  Up to four hot-pluggable 3.5 in. SATA disk drives, 4
                                  TB max.: 1 TB, 500 GB (7,200 rpm)
 Mass storage Internal
                                  Up to four hot-pluggable solid-state drives (SSDs),
 and media    disk option                                                                                                                                                        The price ruling system is very
                                  128 GB max.: 32 GB3
                                  Up to two Sun Flash Modules, 48 GB max.: 24 GB3
                                                                                                                                                                                 flexible, allowing the hotel to
                                                                                                                                                                                 provide different prices according
Hardware Specifications may change without prior notice.
                                                                                                                                                                                 to categories like movie genre,
                                                                                                                                                                                 director, length, etc. The system
                                                                                                                                                                                 provides a price simulator to check
                                                                                                                                                                                 the price charged for the movie to
                                                                                                                                                                                 the guest for a particular situation.




                                                                                                                                                                                                        www.blusensnetworks.com
28    Middleware                                                            Middleware     29


     The administrator is capable of
     monitoring what is being played
     in any room at each STB for any
     given moment. It’s also capable of
     rebooting a group or a single STB
     or even forcing it to tune a specific
     channel or content and locking the
     IR control of the STB.




     The administrator can check the
     current billing for any given STB or
     room at any moment.




     The logging system is continuously
     monitoring the status of the
     system an can provide alerts when
     a STB is disconnected from the
     network or a live TV channel is not     The price of the media contents are
     receiving content. This prevents        determined by a very flexible price
     any unauthorized access to the          rule mechanism. This provides the
     distribution network.                   operator the flexibility of grouping
                                             some channels into one pack and
     The middleware is also capable of       price it.
     gathering use statistics for both       The price rules are also defined
     VoD and live contents.                  according to a calendar, so
                                             creating an “action weekend offer“
                                             is very simple.




                                                                        www.blusensnetworks.com
30          Middleware                                                                                                                     Middleware                31



                                                                                                                                  Software Licenses


                                              PMS integration

                                                                             The system can be integrated with the PMS that is part of the IT infrastructure of
     The    system     supports    any
                                                                             the hotel. This way the hospitality system is able to generate per-user contents
     language in every part of the
                                                                             with the information acquired from the PMS.
     system: The interface in the STB,
                                                                             This service will be used for automatic charging the costs of the film rental or
     the management interface, and
                                                                             whatever pay service that the hotel must decide to implement on the billing of
     even the names of the tags can
                                                                             the customer.
     be internationalized. This way
                                                                             If the connection with the PMS system is not available for whatever reason,
     the system recognizes that the
                                                                             VoDKAST includes a minimal PMS for this purpose.
     “Action movies” will we shown
                                                                             The system also includes applications for viewing the billing of the user from the
     as “Peliculas de accion” for an
                                                                             comfort of the room.
     Spanish speaker.
                                              User Interface Modification

                                                                             The graphical interface of the IPTV system for the rooms can be completely
     It’s possible to select an specific
                                                                             customized to the needs of the customer. Custom logos, colors and even menu
     welcome TV channel according to
                                                                             elements can be integrated in the user interface to provide a coherent, tailor made
     the nationality of the guest. If the
                                                                             visual language with the rest of the systems in the hotel, hospital, university, etc.
     nationality is not registered in the
     system the welcome channel will
     be the default one. It’s also possible
                                              Development of specific application
     to run a specific advertisement
     as welcome video in the mother
     language of the guest.                                                  As the system proposed is a 100% end2end solution, any added value application
                                                                             designed specifically to fit the customer needs can be integrated in the menus
                                                                             of the STB. The flexibility is almost unlimited. Contact with a sales manager to
                                                                             evaluate the viability of a custom development for your needs.


     The edition of the local information
     pages is very easily done via the
     web interface. The administrator
     does not need any programming
     or web developing knowledge
     to create high quality local
     information pages.




                                                                                                                                        www.blusensnetworks.com
32     Middleware                                                                                                                                                                                        Middleware      33



 VoDKAST Middleware
                                                                                                               VTL-FUL-1.0        VoDKAST Lite Base license

                                                                                                                                  Full VoDKAST middleware license for a maximum of 15 users.
       VTV-MID-1.0    VoDK AST Middleware Base License
                                                                                                               VTL-DEM-1.0        VoDKAST Lite Demonstrator
                      Middleware base license. Provides basic services as STB monitoring
                                                                                                                                  Full middleware HW+SW bundle limited to 10 users.
       VTV-LTV-1.0    VoDKAST Middleware LiveTV option
                                                                                                         Pulsar Digital Signage
                      Upgrades the middleware with live TV channel management capabilities.

       VTV-STB-1.0    25 STB Base license
                                                                                                               PDS-BAS-1.0        Pulsar server license
                      Base license for a package of 25 STB
                                                                                                                                  Standalone Digital signage server base license. Not required if a Vodkast
       VTV-SAP-1.0    25 STB Simple applications license                                                                          Middleware (VTV-BAS-1.0) with digital signage module upgrade (VTV-DSM-1.0) is
                                                                                                                                  present.
                      Upgrades the STB basic license with capabilities required for TV zapping, EPG
                      browsing or decoding of a Digital Signage channel. Not required if a VTV-AAP-1.0         PDS-MUL-1.0        Pulsar server multi organization option
                      advanced applications license is present.
                                                                                                                                  Upgrades the Pulsar Digital Signage server with multi-role, multi organization
       VTV-AAP-1.0    25 STB Advanced applications license                                                                        capabilities. Allows the management of several Digiltal Signage networks with the
                                                                                                                                  same server. Allows the management of certain elements of the digital signage
                      Upgrades the STB basic license with hospitality capabilities, wake-up alarm,                                schedule/templates to third party subsidaries.
                      billing check, etc. Includes the VTV-SAP-1.0 basic applications license.
                                                                                                               PDS-LCX-1.0        Pulsar low connectivity channel generator license ( 10)
       VTV-IAP-1.0    25 STB Internet Applications license
                                                                                                                                  Low connectivity channel generator license, price per unit if less than 10 units.
                      Upgrades the STB basic license with internet browsing capabilities, RSS feeds,
                      weather, etc.                                                                            PDS-LCL-1.0        Pulsar low connectivity channel generator license ( 50)

       VTV-VOD-1.0    25 STB Video on Demand support license                                                                      Low connectivity channel generator license, price per unit if less than 50 units.

                      Upgrades the STB basic license with Video on Demand capabilities for videoclub           PDS-LCC-1.0        Pulsar low connectivity channel generator license ( 100)
                      purposes.
                                                                                                                                  Low connectivity channel generator license, price per unit if less than 100 units.
       VTV-PVR-1.0    25 STB netPVR license
                                                                                                               PDS-LCM-1.0        Pulsar low connectivity channel generator license ( 100)
                      Upgrades the STB basic license with network PVR capabilities for recording
                      purposes.                                                                                                   Low connectivity channel generator license, price per unit if more than 100 units.

       VTV-DSM-1.0    VoDKAST Digital Signage Module Upgrade                                                   PLT-BAS-1.0        Pulsar Lite Digital signage system

                      Upgrades the middleware with both high and low connnectivity Digital Signage                                Low connectivity digital signage server and channel genrator for small deployments.
                      management capabilities                                                                                     Up to 10 low connectivity lite channel generators (PLT-EXT-1.0) are suported

       VTV-DSC-1.0    VoDKAST Digital Signage Channel Upgrade                                                  PLT-EXT-1.0        Pulsar Digital Signage Lite extended channel generator

                      Adds one Digital Signage High Connectivity Channel to the middleware. Requires a                            Upgrades a Pulsar Lite Digital signage system (PLT-BAS-1.0) with an extra low
                      middleware with digital signage module (VTV-DSM-1.0) installed.                                             connectivity channel generator. Up to 10 channel generators are supported.


       VTV-PMS-1.0    IPTV Middleware PMS integration Option

                      Upgrades the middleware with integration with a third party PMS system such as
                      Micros Opera.




                                                                                                                                                                                                      www.blusensnetworks.com
Set Top Box
36      Set Top Box                                                                                                                                                                                                                                                 Set Top Box     37


                                                                                                                                               T.14+
        High definition STB

                              The STB is the device in charge of decoding IPTV streams to display                                                                                 High definition DVB-T (MPEG4/H264), able of playing high definition
                              them in a standard TV set. Blusens STB includes the state-of-the-art                                                                                Matroska MKV/H264 and compatible with Full HD (1080p - 24fps).
                              technologies to provide the ultimate end user experience in terms of                                                                                Compatible with multiple multimedia formats and allows AV and
                              speed and interactivity with the IPTV system. It features HD capabilities                                                                           component outputs including HDMI high definition output.
                              up to 1080p with H.264 video and 5.1 optical audio output while providing                                                                           Allows recording from conventional  HD DVB-T, recording all audios and
                              a minimal lag between channel zapping.                                                                                                              subtitles.Timeshift function incorporated.

     WebTV
                                                                                                                                                                                     T.14+                        Multimedia DVB-T HDT V TUNER


                               WebTV is a sophisticated Multimedia Center with the ability to manage,
                              play and distribute audiovisual contents coming from Digital Terrestrial                                                                            •  High Definition DVB-T Tuner (MPEG4/H264 and DVB-T MPEG2 definition.
                              Television, Internet, WiFI connectivity or external audio, video or storage                                                                         •  High definition Matroska MKV/H264 files playback.
                              sources.                                                                                                                                            •  Full HD (supports 1080p – 24fps)
                              Allows the connection with Internet TV platforms (OTT), IPTV and RSS’s                                                                              •  USB 2.0 Host port.
                              thematic service access and other applications.                                                                                                     •  EPG, Parental channel control, teletext and timer.
                              Conectivity with wireless networks (802.11g) up to 54Mbps and Ethernet                                                                              •  Allows channel sort.
                              Networs 10/100Mbps.                                                                                                                                 •  Recording: directly or programmed.
                                                                                                                                                                                  •  Rename/Delete records.
                                                                                                                                                                                  •  Delete files.
                                                                                                                                                                                  •  Timeshift.
                               IP-14.1/WebTV           IP/OTT Set Top Box                                                                                                         •  Multilanguage OSD menu.
                                                                                                                                                                                  •  Customized for Iranian Market.
                              •  Compatible with Internet TV (OTT).
                              •  IPTV server and player.
                              •  HD Media Player.
                              •  Allows new application installations.



                                                                      IP-14.1/WebTV
                               Dimensions                                                  13 x 12 x 4 cm
                               Weight                                                          230 gr
                               USB                                                  2 USB Host Ports (USB 2.0)                                                                                                    T.14+
                               Compatible Devices                                      USB Storage Devices                                              Dimensions                                                            219 x 135 x 38 mm
                                                                                             Composite                                                  Weight                                                                     400 gr
                                                                                            Component                                                   USB                                                           USB Host 2.0 Port High Speed
                               Video Outputs
                                                                                               S-Video                                                                                                                           Composite
                                                                                             HDMI v1.2                                                  Video Outputs                                                         YPbPr Component
                                                                                    S/PDIF (optical and coaxial)                                                                                             HDMI 1.3 High Definition (Full HD 1080p Supports)
                               Audio Outputs
                                                                                            2 composite                                                 Audio Outputs                                                              Stereo
                                                                                      Ethernet 10/100 Mbps                                              RF antenna in                                               IEC connector + loopthrough output
                               Network Connection
                                                                            WLAN 802.11b/g up to 54Mbps and Ethernet                                                                                MPEG 1-2, MPEG 4.2-XVID, MPEG AVC 4.10 H264, MPEG 4.14 NERO
                                                                                                                                                                             Video
                                                                                                                                                                                                                          DIGITAL, AVCHD
                                                    Video               ASF, AVI, MP4, MPEG ES/PS/TS and Matroska (MKV)
                                                                                                                                                        Compatible           Image                                           JPEG, BMP and PNG
                               Compatible formats   Image                           BMP, GIF, JPEG, JPG, PNG                                            formats
                                                                                                                                                                             Audio                                             MP3, AAC, WMA
                                                    Audio                                  MP3 and WMA
                                                                                                                                                                             Containers            AVI, MP4, MPG, VOB, TS, TP, MKV, MP3, AAC, M4A, WMA, MOV, M2TS
                                                    Video         MPEG-1, MPEG-2, MPEG-4, WMV9, VC-1, MPEG-4.10 (H.264), DivX
                               Compatible Codecs                                                                                                        Compatible                                                        2GB, 4GB, 8GB, 16GB, 32GB
                                                    Audio              MP3, AAC, MPEG-1 Layers I, II and III (MP3) 2.0, WMA9
                                                                                                                                                        USB drives           FAT32/NTFS                             128GB, 256GB, 500GB, 1TB, 1.5TB
                               Subtitles                                                     Files “.srt”
                               Client                                                   UPnP, NFS, Samba                                               Hardware Specifications may change without prior notice.
                               Streaming Protocol                             HTTP, MMS (MMS-T), MMS-H and RTSP
                                                                                    Hardware Specifications may change without prior notice.




                                                                                                                                                                                                                                                                 www.blusensnetworks.com
38          Set Top Box                                                                                                               Set Top Box      39




     T.14




                             T.14                          HD DTT Set Top Box


                          •  High definition DVB-T (MPEG4/ H264), able of playing high definition Matroska
                             MKV/H264 High Profile L4.0 files and compatible with Full HD (1080p - 24fps).
                          •  Compatible with multiple multimedia formats and allows multiple AV outputs
                             including HDMI high definition output.
                          •  Allows 24 hours of continuous recording from conventional  HD DVB-T and
                             programmable channel recordings.
                          •  High Definition DVB-T Tuner (MPEG4/H264) and DVB-T MPEG2 definition.
                          •  High definition Matroska MKV/H264, High Profile L4.0 files playback.
                          •  Full HD (supports 1080p - 24fps).
                          •  USB Host port.
                          •  EPG, Parental channel control, teletext and timer.
                          •  Allows channel sort.
                          •  Recording: directly or programmed.
                          •  English, spanish, galician, basque and catalonian OSD language menu.




                                                                                        T.14
                           Dimensions                                                          22,8 x16,5 x 4 cm
                           Weight                                                                    694 g
                           USB                                                                  USB Host Port
                                                                                         Antenna RF input and output
                           Video Outputs
                                                                        HDMI 1.3 high definition output (Full HD, supports 1080p)
                           Audio Outputs                                             SPDIF Coaxial and optical audio output
                                                             MPEG 1-2, MPEG 4.2-XVID, MPEG AVC 4.10 H264, MPEG 4.14 NERO DIGITAL,
                                          Video
                                                                                           AVCHD
                           Compatible     Image                                                JPEG, BMP y PNG
                           formats
                                          Audio                                           MP3, AAC, AC3, WMA, EAC3
                                          Containers             AAVI, MP4, MPG, VOB, TS, TP, MKV, MP3, AAC, M4A, WMA, MOV, M2TS
                          Hardware Specifications may change without prior notice.




                                                                                                                                    www.blusensnetworks.com
VoD Streaming Cluster
42   VoD Streaming Cluster                                                                                                                                                                                                           VoD Streaming Cluster                             43


                 The VoD cluster is the group of servers responsible of storing and streaming the on-
                 demand contents to each STB managed by the middleware. The cluster can be divided                 Up to 2 Tb Storage Node
                 into several storage and caching levels with one or more specific node at each level. The
                 most common approach is to have one or two levels with one node each.

                 In the first level, the storage nodes store and replicate the multimedia content library.
                                                                                                                                                                       SN.12                     Up to 2 Tb Storage Node
                 At the second and further levels, the streaming nodes act as both streamers and caching
                 nodes, providing the capacity to answer the queries from the STB faster than from the
                 first level.                                                                                                                                       •  Up to 2 TB storage node.
                 When a STB asks for a movie to a streamer, the streamer checks if the movie is stored                                                              •  Capable of storing up to 450 hours of SD video or 180 hours of HD video.
                 locally in its own memory. If the content is available locally, the streaming starts                                                               •  RAID 1 mirroring to ensure data redundancy.
                 immediately, otherwise, the streamer asks the storage to stream the content to itself.                                                             •  Gigabit Ethernet output.
                 The content is then served through the streamer to the STB. At the same time, the content                                                          •  Optional 10 Gigabit Ethernet output.
                 is split in two and cached locally in the streamer to speed up the subsequent accesses                                                             •  1 Disk Maximum fail tolerance.
                 from other users to the same movie.

                 This clustering approach means that the storing and streaming requirements can grow                                               SN.12                                                                                     SN.12
                 independently from each other making it possible to adapt the system to any installation                     Processor   Two Intel Xeon processors 5500 series                                                      Operating temperature: 5° C to 35° C (41° to 95°
                                                                                                                                          Level 1: 32 KB instruction and 32 KB data L1 cache                                         F) at sea level
                 size.
                                                                                                                                          per core                                                                                   Non operating temperature: -40° C to 68° C (-40°
                                                                                                                                           Level 2: 256 KB unified (data and instruction) L2                                         to 154° F)
                                                                                                                              Cache
                                                                                                                                          cache per core                                                                             Operating relative humidity: up to 93%, non
                                                                                                               Architecture
                                                                                                                                          Level 3: 4 MB or 8 MB shared inclusive L3 cache per                                        condensing, 38° C max. wet bulb
                                                                                                                                          processor                                                                                  Non operating relative humidity: Up to 93%, non
                                                                                                                                          12 DDR3 DIMM slots (six DIMM slots per CPU socket);                                        condensing
                                                                                                                              Main                                                               Environment
                                                                                                                                          system supports from 2 GB (1x 2 GB to 96 GB (12x 8                                         Operating altitude: Up to 3,000m (9,000 ft.), max.
                                                                                                                              memory
                                                                                                                                          GB) of memory                                                                              ambient temperature is derated by 1° C per 300m
                                                                                                                                          Based on Intel Xeon processor 5500 series and Intel                                        above 900m
                                                                                                               System architecture
                                                                                                                                          5500 Chipset                                                                               Non operating altitude: 10,000m (35,000 ft.)
                                                                                                                                          Network: Two 10/100/1000Base-T Ethernet ports                                              Acoustic noise: 7.5 B operating, 7 B idling / 70 dBA
                                                                                                                                          Serial: One RJ-45 port                                                                     operating, 60 dBA idle (declared noise emissions
                                                                                                                                                                                                                                     in accordance with ISO 9296 A-weighted, sound
                                                                                                               Standard/integrated        USB: Five USB 2.0 ports (two front, two rear, one                                          power)
                                                                                                               interfaces                 internal)
                                                                                                                                                                                                                                     Single non redundant power supply; max. power
                                                                                                                                          Expansion bus: One PCIe 2.0 slot (x16 electrical/x16                                       supply rating 600 W at 80% efficiency
                                                                                                                                                                                                 Power
                                                                                                                                          mechanical, low-profile)
                                                                                                                                                                                                                                     AC power: 100–240 V AC (47–63 Hz)
                                                                                                                                          Solaris 10 OS
                                                                                                                                                                                                                                     IEC 60950, UL/CSA 60950, EN 60950, CB Scheme
                                                                                                                                          OpenSolaris™ OS                                                          Safety
                                                                                                                                                                                                                                     with all country differences
                                                                                                                                          Red Hat Enterprise Linux 4                             Regulations                         FCC CFR 47 Part 15 Class A, EN 300 386 v1.3.3, EN
                                                                                                                                                                                                                   RFI/EMI
                                                                                                                                          Red Hat Enterprise Linux 5                                                                 55022 Class A, EN 61000-3-2, EN 61000-3-3
                                                                                                                              Operating   SUSE Linux Enterprise Server 10                                          Immunity          EN 55024, EN 300 386 v1.3.3
                                                                                                               Software
                                                                                                                              systems     VMware ESX 3.5                                                                             CE, CB Scheme, UL, CSA, CCC, BSMI, AR-S,
                                                                                                                                                                                                                   Safety
                                                                                                                                          Windows Server 2003 Standard/Enterprise Editions                                           GOST-R
                                                                                                                                          Windows Server 2008 Standard/Enterprise Editions                                           CE, FCC, VCCI, ICES, BSMI, CCC, MIC, C-Tick,
                                                                                                                                                                                                                   EMC
                                                                                                                                                                                                 Certifications                      AR-S, GOST-R
                                                                                                                                          Windows Server 2008 Standard/Enterprise/
                                      VoDKAST Architecture Graphic                                                                        Datacenter Editions                                                                        RoHS-compliant labeled, per WEEE (Waste
                                                                                                                                                                                                                   Other             Electrical and Electronics Equipment) Directive
                                                                                                               Networking                 Two GbE ports integrated on motherboard
                                                                                                                                                                                                                                     (2002/95/EC)
                                                                                                                                          Optional Sun Integrated Lights Out Manager (ILOM)
                                                                                                                                                                                                                   Height            43mm (1.7 in.)
                                                                                                                                          service processor module
     Storage nodes                                                                                                                        – VGA 8 MB: 1,024x768 at 60 Hz                         Dimensions
                                                                                                                                                                                                                   Width             436mm (17.2 in.)
                                                                                                                                                                                                                   Depth             650mm (25.6 in.)
                                                                                                                                          – Management port: One 10/100 RJ-45 port               and weight
                                                                                                                                                                                                                              MIN    9.8 kg (21.7 lbs.)
                                                                                                                                          Enables remote power control; remote keyboard,                           Weight
                                                                                                                                                                                                                              MAX    13.9 kg (30.6 lbs.)
                                 The storage nodes, with an optional external disk array, provide storage                                 video, mouse (KVM) graphical
                                                                                                               Management                 access; and remote media (DVD, CD, floppy)                                                 Rackmounting slide rail kit
                                 of any content of the media library, ensuring fast access, fault tolerance,
                                                                                                                                          Secure remote access using Web interface over SSL,     Mounting option                     Toolless rackmounting slide rail kit
                                 continuous data output and the capacity of redimensioning the network                                                                                                                               Cable management arm
                                                                                                                                          or CLI over SSH
                                 while in operation.                                                                                      Sun™ xVM Ops Center software support                   Warranty                            One year, next business day
                                 The storage facility will store both the VoD, NetPVR, playout and metadata                               IPMI 2.0, SNMP v1, v2c, and v3
                                                                                                                                                                                                 Hardware Specifications may change without prior notice.
                                 of the whole media library of the hospitality system.                                                    In-band, out-of-band, and side-band remote
                                 The storage capabilities of the platform can be increased by adding more                                 management
                                 storage nodes, independently from the streaming capacity required.                                       Up to four hot-pluggable 3.5 in. SATA disk drives, 4
                                                                                                                                          TB max.: 1 TB, 500 GB (7,200 rpm)
                                                                                                               Mass storage Internal
                                                                                                                                          Up to four hot-pluggable solid-state drives (SSDs),
                                                                                                               and media    disk option
                                                                                                                                          128 GB max.: 32 GB3
                                                                                                                                          Up to two Sun Flash Modules, 48 GB max.: 24 GB3




                                                                                                                                                                                                                                                      www.blusensnetworks.com
44              VoD Streaming Cluster                                                                                                                                                                                                                                                          VoD Streaming Cluster                 45



       Up to 48 Tb Storage Node                                                                                                                                                                                                                                                                      Streaming nodes

                                                                                                                                                                               300 Mbps Streamer Cache Node

                                                                SN.148                      Up to 48 Tb Storage Node
                                                                                                                                                                                                                                         Up to 300 Mbps of streaming capacity. It can stream up 60 SD streams
                                                                                                                                                                                                                                         or up to 25 HD streams.
                                                              •  Scales from 6 to 48TB storage space.
                                                              •  RAID 5 redundancy.
                                                              •  Capable of storing 20000 hours of SD video or 8000 hours of HD video.                                                                                                    CN.1300                   300 Mbps Streamer Cache Node
                                                              •  Gigabit Ethernet output.
                                                              •  Optional 10 Gigabit Ethernet output.                                                                                                                                                                                      •  Up to two hard disks.
                                                              •  More than 1 Disk Maximum fail tolerance.                                                                                                                                                                                  •  RAID 1 redundancy.
                                                                                                                                                                                                                                   CN.1300                                                 •  Gigabit Ethernet output.
                                                                                                                                                                                                                          One or Two Quad-Core Intel Xeon L5420 Processor, 2.50 GHz,       •  Optional 10 Gigabit Ethernet output.
                                                                                                                                                                                                 Processor
                                                                                                                                                                                                                          1333 MHz FSB, 50W.
                                                                                                                                                                                                                                                                                           •  1 Disk Maximum fail tolerance.
                                                                                                                                                                                                 Cache                    Quad Core Processors: 12 MB L2 cache per core
                                           SN.148                                                                               SN.148                                         Architecture                               DIMM Slots            Up to 32 GB of 800 MHz ECC FB-DIMM or
                                     Six on board LSI disk controller chips each                                      100-240 V AC, 50-60 Hz, 10 A, 100 V support is with 3                                               Memory Type           667 MHz ECC FB-DIMM
                                                                                                                                                                                                 Main memory
                                     directly connects to 8 SATA drives for max data                                  power supply unit configuration with 2+1 redundancy                                                 Memory                4 GB total memory. System configurations
                                     throughput                                                                       Operating temperature/humidity                                                                      Configuration         from 1 GB up to 32 GB
                                     48 hot-swappable, 3.5-in. SATA II HDD internal                                   5°C to 32°C (37°F to 91°F), 10-90 percent relative       Graphics Controller                        ASPEED AST2000
                    Disk system
                                     disks: 250 GB, 500 GB, 1000 GB 7200-RPM disks                                    humidity, non condensing, 27°C max. wet bulb             System architecture                        Intel Quad Core technology
                                     available; 48 TB total capacity
                                                                                                                      Non operating temperature/humidity                                                                  Network: Four Integrated 10/100/1000 Base-T Ethernet ports
                                     Software RAID enabled by RAID-Z, RAID-Z2 in
                                     Solaris ZFS, other Linux, or Windows RAID code                                                                                                                                       Management: Service processor with embedded Lights Out
                                                                                                                      -40°C to 65°C (-40°F to 149°F), up to 93 percent                                                    Manager (LOM) standard
                                     Two quad-core AMD™ Opteron processors, Model                                     relative humidity, non condensing, 38°C max. wet bulb
                                     2356                                                                                                                                                                                 Serial: RJ-45
                     Processor                                                                                AC                                                               Standard/integrated interfaces
                                     One 512Kb Level 2 cache per core 2 MB L3 cache        Environment                Operating altitude                                                                                  SATA: Up to two hot-pluggable SATA bays, 2 TB max.
                                                                                                             power
                                     per processor                                                                    Up to 3048 m; maximum ambient temperature is                                                        USB: Five USB 2.0 ports (two front, two rear, one internal)
                                     Sixteen DDR-2 DIMM slots (eight DIMM slots                                       derated by 1°C per 300 m above 900 m                                                                Expansion bus: One PCIe slot (x16 electrical/x16 mechanical),
 Architecture                        per CPU socket); 32 GB with 2 GB DIMMs, 64 GB                                    Non operating altitude                                                                              half-length, half-height
                                     with 4 GB DIMMs and 128 GB when 8GB DIMM is                                                                                                                                          Solaris OS 10 or GNU/Linux
                                     qualified                                                                        Up to 12000 m
                                                                                                                      Acoustic noise                                           Software          Operating systems        IPMI 2.0 compliant Service Processor with embedded. Lights
                                     Four 10/100/1000Base-T Ethernet ports                                                                                                                                                Out Management offering remote power, KVM (keyboard,
                                     Network management: One dedicated                                                LwAd (1B = 10 dB): At or below 25°C, 7.5B, at max.                                                  video, mouse) and media capability
                                     10/100Base-T Ethernet port                                                       ambient, 8.5B
                                                                                                                                                                                            Internal disk option          Two hot-pluggable 250-750 GB 7200 rpm 3.5” SATA II HD
                   Main memory Serial: One TIA/EIA-232-F asynchronous, RJ45                                           LpAm bystander: At or below 25°C, 65 dB, at max.         Mass storage
                                                                                                                      ambient, 75 dB                                                        Removable Media               Up to one EIDE DVD-ROM or DVD+/-RW DL drive
                               connector                                                                                                                                       and media
                                                                                           Mounting option            19-inch rackmount kit                                                 RAID                          RAID 1 hardware mirroring to provide fault tolerance
                                     USB: Four USB 2.0 ports (two front and two rear)
                                                                                                                      Dual-redundant, hot-swappable power supply                                                          Operating temperature: 5° to 35° C (41° to 95° F) at sea level
                                     Video: VGA video port
                                                                                           Power                      Power supply output rating: 1,500 W                                                                 Non operating temperature: -40° to 68° C (-40° to 154° F), up
                                     Expansion slots: Three internal MD2 low-profile                                                                                                                                      to 93% relative humidity, non condensing, 38° C max. wet bulb
                                     PCI-E slots, 8x wide each                                                        Maximum system consumption 1,180 W
                                                                                                                                                                                                                          Operating altitude: Up to 3,000m (9,000 ft.), max. ambient
                                     One compact flash disk port for OS booting                                       Safety: IEC60950, UL/CSA60950, EN60950,                  Environment                                temperature is derated by 1° C per 300m above 900m
                                     Solaris 10 05/08 preinstalled                                                    CB scheme with all country differences                                                              Non operating altitude: up to 12,000m (=~36,000 ft.)
                                                                                           Regulations (meets or
                                     Standard Linux distributions, SLES10 SP1 64 bit,      exceeds)                   RFI/EMI: FCC Class A, Part 15 47 CFR, EN, 55022,                                                    Acoustic noise: 70 dBA operating, 69 dBA idle (declared noise
                     Operating                                                                                        CISPR 22, EN300-396: v1.31, ICES-003
 Software                            Rhel4.6  5.1 64 bit                                                                                                                                                                 emissions in accordance with ISO 9296 A-weighted, sound
                      systems
                                     Windows 2003 Standard and Enterprise version                                     Immunity: EN55024, EN300-386:v1.3.2                                                                 power)
                                     32 bit and 64 bit                                                                Safety: cULus Mark, CE Mark, GOST R, S-Mark                                                         Single PSU
                                                                                                                                                                               Power
                                     Booting from the flash disk is supported by                                      EMC: CE Mark (93/68/3EEC); Emissions and Immunity                                                   AC power: 100–240 V AC (47–63 Hz)
                                     Solaris, Linux and windows, the external flash                                   — Class A Emissions Levels: FCC, VCCI, C-Tick, MIC,                                                 IEC 60950, UL/CSA 60950, EN 60950, CB Scheme with all
                                                                                           Certifications                                                                                        Safety
                                     Disk OS booting saves up to 2 TB HDD capacity                                    GOST R2, BSMI2                                                                                      country differences
 OS Booting                          for data                                                                         Other: Labeled per WEEE (Waste Electrical and            Regulations                                FCC CFR 47 Part 15 Class A, EN 300 386 v1.3.3, EN 55022
                                     Two mirrored OS drives are also configured on                                    Electronic Equipment) Directive                                            RFI/EMI
                                                                                                                                                                                                                          Class A, EN 61000-3-2, EN 61000-3-3
                                     two different disk controllers for max availability                     Height   6.89 in./175.05 mm                                                         Immunity                 EN 55024, EN 300 386 v1.3.3
                                     ONC™, ONC+TM, NFS, WebNFS, TCP/IP,                    Dimensions        Width    17.28 in./439 mm                                                           Safety                   CE, CB Scheme, UL, CSA, CCC, BSMI, AR-S, GOST-R
                                     SunLink™, OSI, MHS, IPXTM/SPX, SMB                    and weight        Depth    29.52 in./749.90 mm                                                        EMC                      CE, FCC, VCCI, ICES, BSMI, CCC, MIC, C-Tick, AR-S, GOST-R
                                                                                                                                                                               Certifications
                                     technologies, and XML                                                   Weight   170 lbs./77 kg                                                                                      RoHS-compliant labeled, per WEEE (Waste Electrical and
                                                                                                                                                                                                 Other
                                     Integrated Lights Out Manager (ILOM) service                                                                                                                                         Electronics Equipment) Directive (2002/95/EC)
 Networking                          processor providing: CLI (in-band and out-of-                                                                                                               Height                   44 mm (1.7”)
                                     band), IPMI 2.0 (in-band and out-ofband), SNMP
                   Management        (out-of-band only)                                                                                                                        Dimensions        Width                    425.5 mm (16.8”)
                                                                                                                                                                               and weight        Depth                    633.7 mm (25”)
                                     Sun xVM Ops Center — manage from one to
                                     hundreds of systems from a central location                                                                                                                 Weight                   13.3 kg (27.2 lbs.)

Hardware Specifications may change without prior notice.
                                                                                                                                                                               Warranty                                   One year, next business day
                                                                                                                                                                              Hardware Specifications may change without prior notice.




                                                                                                                                                                                                                                                                                                          www.blusensnetworks.com
46              VoD Streaming Cluster                                                                                                                                                                                                                                  VoD Streaming Cluster                47



   1200 Mbps Streamer Cache Node                                                                                                                                                          The streaming nodes are the connection points between the VoD cluster and the STB with VoD
                                                                                                                                                                                          capabilities. Its responsibility is to store locally the most demanded contents to provide fast
                                                           Up to 1200 Mbps of streaming capacity. It can stream up to 240 SD                                                              response and to automatically get the least demanded contents from the storage nodes and store
                                                           streams, or up to 100 HD streams.                                                                                              it locally for further queries for the same content.
                                                                                                                                                                                          The streaming capabilities of the platform can be increased by adding more streaming nodes
                                                                                                                                                                                          independently from the storage space required.
                                                            CN.11200                     1200 Mbps. Streamer Cache Node

                                                                                                                                                                                          STREAMING POWER
                                                           •  Up to four hard disks.                                                                                                      Unlimited growing capacity by addition of new nodes.
                                                           •  RAID 1+0 redundancy.
                                                           •  Gigabit Ethernet output.                                                                                                    VoD FUNCTIONS
                                                           •  Optional 10 Gigabit Ethernet output.                                                                                        VCR functions Play, Pause, Stop, Reverse and Fast-forward.
                                                           •  2 Disk Maximum fail tolerance.                                                                                              Trick modes default x6 x12 FF and REW speeds (the available speeds are configurable at installation time)

                                                                                                                                                                                          SUPPORTED STREAMING FORMATS
                                           CN.11200                                                                               CN.11200                                                Video MPEG-1/2, MPEG-4/AVC(h.264), both SD and HD qualities.
                  Processor       Two Intel Xeon processors 5500 series                                                       Operating temperature: 5° C to 35° C (41° to 95°            Audio MPEG-1/2, MP3, AAC.
                                  Level 1: 32 KB instruction and 32 KB data L1 cache                                          F) at sea level
                                  per core                                                                                    Non operating temperature: -40° C to 68° C (-40°
                                                                                                                              to 154° F)
                                                                                                                                                                                          SUPPORTED STREAMING PROTOCOLS
                                   Level 2: 256 KB unified (data and instruction) L2
                  Cache
                                  cache per core                                                                              Operating relative humidity: up to 93%, non                 Streaming Transport Stream over RTP, HTTP, etc.
 Architecture
                                  Level 3: 4 MB or 8 MB shared inclusive L3 cache per                                         condensing, 38° C max. wet bulb                             Control RTSP with OVS extensions.
                                  processor                                                                                   Non operating relative humidity: Up to 93%, non
                                  12 DDR3 DIMM slots (six DIMM slots per CPU socket);                                         condensing
                  Main                                                                       Environment
                                  system supports from 2 GB (1x 2 GB to 96 GB (12x 8                                          Operating altitude: Up to 3,000m (9,000 ft.), max.
                  memory
                                  GB) of memory                                                                               ambient temperature is derated by 1° C per 300m
                                  Based on Intel Xeon processor 5500 series and Intel                                         above 900m                                                                                                                                   Optional Features
 System architecture
                                  5500 Chipset                                                                                Non operating altitude: 10,000m (35,000 ft.)
                                  Network: Two 10/100/1000Base-T Ethernet ports                                               Acoustic noise: 7.5 B operating, 7 B idling / 70 dBA
                                  Serial: One RJ-45 port                                                                      operating, 60 dBA idle (declared noise emissions
                                                                                                                              in accordance with ISO 9296 A-weighted, sound
 Standard/integrated              USB: Five USB 2.0 ports (two front, two rear, one
 interfaces                       internal)
                                                                                                                              power)                                                 Transcoding
                                                                                                                              Single non redundant power supply; max. power
                                  Expansion bus: One PCIe 2.0 slot (x16 electrical/x16                                        supply rating 600 W at 80% efficiency
                                                                                             Power
                                  mechanical, low-profile)
                                                                                                                              AC power: 100–240 V AC (47–63 Hz)                                                     VoD streaming require that the content is encoded in a certain way so that all the
                                  Solaris 10 OS
                                                                                                                              IEC 60950, UL/CSA 60950, EN 60950, CB Scheme                                          elements of the network know how to handle the data. A transcoding node will
                                  OpenSolaris™ OS                                                             Safety
                                                                                                                              with all country differences                                                          enable the operator to load the content in any format and store it in as many ones as
                                  Red Hat Enterprise Linux 4                                 Regulations                      FCC CFR 47 Part 15 Class A, EN 300 386 v1.3.3, EN
                                  Red Hat Enterprise Linux 5
                                                                                                              RFI/EMI
                                                                                                                              55022 Class A, EN 61000-3-2, EN 61000-3-3
                                                                                                                                                                                                                    required, so that the same content can be streamed in different qualities.
                  Operating       SUSE Linux Enterprise Server 10                                             Immunity        EN 55024, EN 300 386 v1.3.3
 Software
                  systems         VMware ESX 3.5                                                                              CE, CB Scheme, UL, CSA, CCC, BSMI, AR-S,               Virtual Ticketing
                                                                                                              Safety
                                  Windows Server 2003 Standard/Enterprise Editions                                            GOST-R
                                  Windows Server 2008 Standard/Enterprise Editions                                            CE, FCC, VCCI, ICES, BSMI, CCC, MIC, C-Tick,
                                                                                             Certifications
                                                                                                              EMC
                                                                                                                              AR-S, GOST-R                                                                          Virtual ticketing is a technology which ensures that the access URL for a media
                                  Windows Server 2008 Standard/Enterprise/
                                  Datacenter Editions                                                                         RoHS-compliant labeled, per WEEE (Waste                                               content is created for one specific STB, so it can be only watched by this STB even if
 Networking                       Two GbE ports integrated on motherboard
                                                                                                              Other           Electrical and Electronics Equipment) Directive                                       the URL is stolen by another user. The unauthorized access to any content is blocked
                                                                                                                              (2002/95/EC)
                                  Optional Sun Integrated Lights Out Manager (ILOM)                                                                                                                                 and the incidence is reported.
                                                                                                              Height          43mm (1.7 in.)
                                  service processor module                                                                                                                                                          Virtual ticketing is not a DRM mechanism, is an access control mechanism.
                                                                                                              Width           436mm (17.2 in.)
                                  – VGA 8 MB: 1,024x768 at 60 Hz                             Dimensions
                                                                                                              Depth           650mm (25.6 in.)
                                  – Management port: One 10/100 RJ-45 port                   and weight
                                                                                                                        MIN   9.8 kg (21.7 lbs.)                                     Load Balancing
                                  Enables remote power control; remote keyboard,                              Weight
                                  video, mouse (KVM) graphical                                                          MAX   13.9 kg (30.6 lbs.)
 Management                       access; and remote media (DVD, CD, floppy)                                                  Rackmounting slide rail kit                                                           Load balancing is an optional feature that is continually monitoring the current
                                                                                             Mounting option                  Toolless rackmounting slide rail kit
                                  Secure remote access using Web interface over SSL,                                                                                                                                streaming load of every streamer. The queries of a STB for a specific content can be
                                  or CLI over SSH                                                                             Cable management arm
                                                                                                                                                                                                                    automatically redirected to the least busy streamer so the total load of the cluster is
                                  Sun™ xVM Ops Center software support                       Warranty                         One year, next business day
                                                                                                                                                                                                                    equitably distributed through all the streamers.
                                  IPMI 2.0, SNMP v1, v2c, and v3
                                  In-band, out-of-band, and side-band remote
                                  management                                                                                                                                         Storage Replication
                                  Up to four hot-pluggable 3.5 in. SATA disk drives, 4
                                  TB max.: 1 TB, 500 GB (7,200 rpm)
 Mass storage Internal                                                                                                                                                                                              Storage replication is an optional feature that allows the stored media to be
                                  Up to four hot-pluggable solid-state drives (SSDs),
 and media    disk option
                                  128 GB max.: 32 GB3                                                                                                                                                               automatically replicated in another server, even in another building to provide fault
                                  Up to two Sun Flash Modules, 48 GB max.: 24 GB3                                                                                                                                   tolerance and transparent backup features to the VoD cluster.
Hardware Specifications may change without prior notice.




                                                                                                                                                                                                                                                                                  www.blusensnetworks.com
IP Contribution Head-end
50         IP Contribution Head-End                                                                                                                                                                      IP Contribution Head-End                   51


                                                                                                                                       •  GB IP (electrical or optical), ASI, DVB-S/S2, DVB-T and DVB-C inputs.
                                                                                                                                       •  GB IP (electrical or optical) and ASI output MPTS or SPTS. Supports multiple of output modules.
                                                                                                                                       •  Multiplexing.
                                                                                                                                       •  PSI/SI regeneration.
                                                                                                                                       •  Support for AES SW descrambling.
                                                                                                                                       •  Support DVB and AES scrambling, simulcrypt interface based.
                                                                                                                                       •  Intuitive web-based user control.
                                                                                                                                       •  SNMP Alarm MIB.
                                                                                                                                       •  SOAP/XML Interface.

                                                                                                                                                                 SC/CAB1PSSW        10 Slot Contribution Chassis

                                                                                                                                                                 SC/CAB1PSSW-       10 Slot Contribution Chassis
                                                                                                                                                                 IPOUT
                                                                                                                                                                 SC/CAB1PSSW-       10 Slot Contribution Chassis
                                                                                                                                                                 IPOUT4CI

                                                                                                                                                               •  Up to 24 ASI or 16 DVB-S/S2, DVB-T, DVB-C Inputs.
                                                                                                                                                               •  Up to 8 DVB common interface slots for DVB descrambling.


                                                                                                                                                                 SC/CAB4PS-03       16 Slot Contribution Chassis


                                                                                                                                                                 SC/CAB4PS-04       16 Slot Contribution Chassis

     The contribution head-end, part of the Blusens blu:core line, is the part of the system in charge of                                                      •  Up to 45 ASI or 28 DVB-S/S2, DVB-T, DVB-C Inputs.
     obtaining live content from any source and perform the appropriate operations to transform this feeds                                                     •  Up to 14 DVB common interface slots for DVB descrambling.
     into multicast IP streams capable of being transferred through the IP network. Once these streams are
     in IP format, the middleware is the responsible of granting or revoking the access of each STB to them.                 Chassis

     According to the source of the live video the contribution can be digital or analog. In the first case the
     feeds will come from satellite (DVB-S) terrestrial (DVB-T) or cable (DVB-C) broadcasts. On the other                                                                           SC/SWM
     hand, for the analog contribution, the input will be composite or s-video, both in PAL or NTSC formats.
                                                                                                                                                                                        •  Gbit/s routing between modules in a chassis.
     As the content distributed in DVB-S/T/C is already an MPEG2-TS stream, the operation performed                                                                                     •  Integrated from the front.
     by the digital contribution is remove the QPSK, QAM or any other transport layer and substitute it
     by IP. That's why the digital video stream is not modified in any moment and the broadcast quality is                                                                          SC/CAB1PSSW-IPOUT-IPOUT4CI
     maintained during the whole distribution of the channel through the IP network.
                                                                                                                                                                                        •  Modular configuration with up to 9+1 board positions.
     For the analog contribution option, the first step is encoding the original analog source into MPEG-2                                                                              •  WEB based configuration, SNMP Alarms, SOAP/XML
     digital format. Once this step is done, the stream behaves exactly the same as a digital stream being                                                                                 interface.
     transferred through the network.                                                                                                                                                   •  Forced air-cooling.
                                                                                                                                                                                        •  Hot-swappable modules in back.
                                                                                                                                                                                        •  Optional IP IO and descramblers in front.


          Digital Contribution
                                                                                                                                                                                    SC/SWM
     The digital contribution IP Streamer offers a complete professional video head-end solution. It is built around a
                                                                                                                                                                                        •  Gbit/s routing between modules in a chassis.
     modular platform, that brings the capability of hosting as many tuning modules as required.                                                                                        •  Integrated from the front.
     This way, the scalability of the platform is assured by providing a higher density, lower cost and better reliability
     system due to its integrated architecture.
                                                                                                                                                                                    SC/CAB4PS-03
     The IP Streamers can receive MPEG-2 transport streams from a variety of input sources (ASI, DVB-S/S2, DVB-T,
     IP and DVB-C, with QPSK, 8PSK, COFDM or QAM modulations) and can descramble and re-scramble selected
                                                                                                                                                                                        •  Modular configuration with up to 16+2 board positions.
     services, before streaming it via IP or ASI.
                                                                                                                                                                                        •  WEB based configuration, SNMP Alarms, SOAP/XML
     All the elements of the system are continuously monitored, including decoding CAM modules via a web-based                                                                             interface.
     Management Interface, which enables remote configuration of all modules,real time status of their performance,                                                                     •  Forced air-cooling.
     and presentation of service related information. The streamer supports full analysis of PSI/SI (PSIP in later                                                                      •  Hot-swappable modules.
     release) and regenerates all tables as required.                                                                                                                                   •  Dual redundant hot-swappable 300 W power supply.
                                                                                                                                                                                        •  4 individually monitored hot-swappable fans.



                                                                                                                                                                                                                        www.blusensnetworks.com
52     IP Contribution Head-End                                                                                                                                                                             IP Contribution Head-End                   53




 Input Modules                                                                                                                Processing Modules

 SC/GBIPIN-MMI    Ethernet Input                             SC/3ASI-MMI        ASI Input w/Management                        SC/2CI            Descrambler                               SC/DVBSCS250      Scrambling


                                                                                                                                                                                                   •  DVB CA compliant scrambling (CSA) and AES
                                                                                                                                                                                                      compliant scrambling.
          •  10/100/1000BaseT input card (RJ45)                       •  3xASI input.                                                                                                              •  Scrambles up to 250 services, maximum 850
          •  Mini-GBIC interface (SFP) for optical input.             •  BNC connectors.                                                                                                              Mbit/s.
                                                                                                                                       •  2xDVB Common interface.
                                                                                                                                                                                                   •  Supports partial scrambling and PVR.
          •  Supports UDP/RTP Multicast/Unicast reception.            •  213 Mbit/s per input.                                         •  Descrambling of 2-8 services (depends on
                                                                                                                                          common interface)                                        •  Support scrambling of MPEG-2 and H.264 in
          •  Supports reception of MPTS and SPTS.                     •  Supports reception of MPTS and SPTS.
                                                                                                                                                                                                      SDHD.
          •  Service filtering.                                       •  Service filtering.                                            •  Support for all major CA systems and CAMS.
                                                                                                                                                                                                   •  DVB Simulcrypt compliant.
          •  PCR regeneration.                                        •  PCR regeneration.                                             •  1 slot wide.
                                                                                                                                                                                                   •  10/100/1000BaseT IP interface towards CA
          •  10/100/1000BaseT management port (RJ45)                  •  10/100/1000BaseT management port (RJ45)
                                                                                                                                                                                                      system (RJ45)
          •  Enables WEB management.                                  •  Enables WEB management.
                                                                                                                                                                                                   •  Handles up to 250 ECM’s.
          •  1 slot wide.                                             •  1 slot wide.
                                                                                                                                                                                                   •  1 slots wide.


                                                                                                                              Output Modules
 SC/4DVBS-MMI     DVB-S Input w/Management                   SC/4DVBSS2-MMI     DVB-S/S2 Input w/Management

                                                                                                                              SC/GBIPOUT        Ethernet Output                           SC/ASIOUTMX       ASI output
          •  4xQPSK inputs.                                           •  4xDVB-S/S2 inputs.
          •  F connectors.                                            •  F connectors.                                                 •  10/100/1000BaseT input card (RJ45)
          •  DVB-S mode.                                              •  DVB-S, DVB-S2 QPSK and 8PSK modes.                            •  Mini-GBIC interface (SFP) for optical input.
                                                                                                                                                                                                   •  4xASI outputs.
          •  950 – 2150 MHz Frequency Range.                          •  950 – 2150 MHz Frequency Range.                               •  Supports UDP/RTP Multicast/Unicast
                                                                                                                                          transmission.                                            •  BNC connectors.
          •  1-45 MSym/s.                                             •  1-45 MSym/s (mode dependent)
          •  1/2, 2/3, 3/4, 5/6, 7/8 FEC.                             •  1/2, 2/3, 3/4, 5/6, 7/8, 8/9, 9/10 FEC (mode dep.)            •  Supports multiple of output cards.                       •  213 Mbit/s per output.
          •  Supports reception of MPTS and SPTS.                     •  Supports reception of MPTS and SPTS.                          •  Streaming of up to 850 Mbit/s.                           •  4 Different multiplexed outputs.
          •  Service filtering.                                       •  Service filtering.                                            •  Maximum 250 service per output card.                     •  Maximum 250 services per card.
          •  ASI Monitoring port.                                     •  ASI Monitoring port.                                          •  Supports streaming of SPTS.                              •  PSI/SI regeneration.
          •  10/100/1000BaseT management port (RJ45)                  •  10/100/1000BaseT management port (RJ45)                       •  Support streaming of MPTS with Multiplexing              •  PCR regeneration.
          •  Enables WEB management.                                  •  Enables WEB management.                                          (optional)                                               •  1 slot wide.
          •  2 slots wide.                                            •  2 slots wide.                                                 •  PSI/SI regeneration.
                                                                                                                                       •  PCR regeneration.
                                                                                                                                       •  1 slot wide.
 SC/4QAM-MMI      DVB-C Input w/Management                   SC/4COFDM-MMI     DVB-T Input w/Management

                                                                                                                              SC/ADMSDIHD       4HD Decoder with SDI Output               SD/HPDDMRF        Dual Decoder w/RF output and NICAM/A2

                                                                      •  4xCOFDM inputs.                                                                                                           •  2 decoders per module
                                                                      •  F connector.                                                                                                              •  MPEG-2 DVB 4:2:0 MP@ML decoding
          •  4xQAM inputs.                                                                                                                                                                         •  VBI re-insertion (WSS, WST/EBU Teletext, VPS,
                                                                      •  1/2, 2/3, 3/4, 5/6, 7/8 FEC.
          •  F connector.                                                                                                                                                                             VITS)
                                                                      •  2k and 8k carrier mode.                                       •  2 SDI/HDSDI outputs per decoder
          •  0.87-6.9 Ms/s.                                                                                                            •  MPEG2 and MPEG4 (H264) SD and HD                         •  DVB and EBU subtitling
                                                                      •  QPSK, 16QAM, 64QAM modulation.
          •  Supports reception of MPTS and SPTS.                     •  Supports reception of MPTS and SPTS.                          •  VBI re-insertion (WSS, WST/EBU Teletext, VPS,            •  2 DVB Common Interfaces. One per channel
          •  Service filtering.                                       •  Service filtering.                                               VITS)                                                    •  High performance RF modulation and up-
          •  ASI Monitoring port.                                     •  ASI Monitoring port.                                          •  DVB and EBU subtitling                                      conversion
          •  10/100/1000 BaseT management port (RJ45)                 •  10/100/1000 BaseT management port (RJ45)                      •  2 SDI /HDSDI outputs per decoder                         •  47 – 862 MHz frequency range
          •  Enables WEB management.                                  •  Enables WEB management.                                       •  1 slot wide                                              •  F connector output with both channels combined
          •  2 slots wide.                                            •  2 slots wide.                                                                                                             •  Ttest output – F connector
                                                                                                                                                                                                   •  External mute of RF output
                                                                                                                                                                                                   •  NICAM or A2 stereo audio (option)
                                                                                                                                                                                                   •  2 slots wide




                                                                                                                                                                                                                           www.blusensnetworks.com
54         IP Contribution Head-End                                                                                                                                                                                          IP Contribution Head-End                      55



                                                                                             Analog Contribution                                                             AM.200               MPEG-2 SD encoder blade with Y/C, S-Video input


     The analog contribution modules can receive any analog signal in composite or S-Video format and transform
     it into MPEG2-TS multicast IP streams to inject it into the IP network providing a convenient way to integrate
     legacy video generating systems in the IPTV system. Once transformed by this modules, the streams can be
     treated exactly the same as the live TV streams coming from the digital contribution head-end, the playout
     server or the Digital Signage server.
                                                                                                                                                                             AM.300               MPEG-2 SD encoder blade with SDI Video input
     The analog contribution series consists of 3 different sized models, enabling custom-sized streaming systems:
     Ranging from the ultra-compact 1 slot chassis (max. one blade) up to the rackable 21 slot chassis (max. 21
     blades) for high-density and multichannel streaming applications, the later one with dual redundant power
     supplies. All the chassis series supports easy replacement and hot-swapping/hot-plugging of inserted blades.
                                                                                                                      PROFESSIONAL QUALITY
     The chassis models are professional and industrial grade enclosures. The chassis ensure ideal operating
     conditions for video blades and enable 24/7 operation.                                                           The encoders incorporate low-latency compression technology and professional signal processing, creating full
                                                                                                                      resolution and smooth motion DVD-quality video streams.
      Chassis
                                                                                                                      Simple setup
                                                                                                                      Connect LAN Ethernet and a video/audio input signal and the AM encoder will turn into a true video networking
                                           AC.11                                                                      “port”, transmitting your video in digital form over IP networks.

                                           •  Single channel blade chassis, 5V DC, 10W, 100-240V AC.                  Easy configuration
                                           •  External power supply included.                                         To access the intuitive graphical user interface use your standard web browser from any PC on the network, no
                                           •  Dimensions (H/W/D): 45mm x 145mm x 240mm.                               special or additional tools required.
                                           •  Weight: 650 grams.
                                           •  No forced cooling required (fanless)
                                                                                                                      Extremely robust and durable
                                                                                                                      The AM encoders runs on an embedded real-time platform. This blade is designed without any moving parts, as
                                           AC.12                                                                      hard drives/fans, to ensure system uptime, reliability and noiseless operation. The AM can be used in extreme
                                                                                                                      operating conditions and at temperatures up to 65°C.
                                           •  Dual channel blade chassis, 5V DC, 10W, 100-240V AC.
                                           •  External power supply included.
                                           •  Dimensions (H/W/D): 75mm x 145mm x 240mm.                                AM encoders
                                           •  Weight: 950 grams.                                                                             Standards                                                                   PAL, NTSC
                                           •  No forced cooling required (fanless)
                                                                                                                                                              Composite Input                                       1 VPP, 75 Ohm (BNC)
                                                                                                                                             Video Inputs       S-Video Input                1 VPP (Y), 0,3 VPP (C - Pal), 0,286 VPP (C - NTSC), 75 Ohm (miniDIN)
                                                                                                                                                                  SDI Input             0,8 VPP, 75 Ohm (BNC), embedded audio supported for orders of min. 50 units
                                           AC.121
                                                                                                                                             Video                 Full D1                                720h x 480/576v, 2/3-D1: 704h x 576/480v
                                                                                                                                             Resolutions           Half D1                               384h x 480/576v, CIF/SIF: 384h x 240/288v
                                           •  High-density, multichannel chassis, holds max. 21 blades.                                      Audio Inputs                                       Unbalanced Analog Stereo, Line level, 3.5mm jack (mini jack)
                                                                                                                       Encoding
                                           •  Internal dual, redundant power supply: Max. 150W with 21                 Specifications        Audio Outputs (TALKBACK)                               Analog Dual Mono, Line level 3.5mm jack (mini jack)
                                              blades, 90-240V AC.
                                           •  Dimensions (H/W/D): 176(4RU) x 480 x 400 mm.                                                   MPEG-2 Video Encoding                          MPEG-2 (ISO/IEC 13818-2), Main Profile at Main Level (MP@ML), 4:2:0
                                           •  Weight: 9,5 Kg empty.                                                                                                                                              ISO/IEC 13818-1 Transport
                                                                                                                                             Stream Types                                                            ISO/IEC 13818-2,3
                                                                                                                                                                                                                       Elementary A/V
      Encoding Blades
                                                                                                                                             Video Encoding Bitrates                           800Kb/s – 15Mb/s (CIF/SIF min. 800Kbit/s, Full D1 min. 2Mbit/s)
                                                                                                                                             MPEG-2 Audio Encoding                                    MPEG-1 Audio Layer 2 (ISO/IEC 11172-3 Layer 2)
                                          All video blade models process input streams in full DVD-quality for                               Network                                              10/100TX Ethernet, RJ45, half/full duplex, Auto-sensing
                                          professional MPEG-2 SD streaming to any kind of device. AM encoder                                 Streaming Traffic                                             Unicast and Multicast traffic supported
                                                                                                                       I/O                                                        HTTP (Web Browser), TCP/IP Control Protocol, UDP/IP Streaming, IGMPv2, Supports SAPv1,
                                          blades are built for robust 24/7 LIVE encoding operations and can be                               IP Protocols
                                                                                                                       Specifications                                                                                  SNMP, DHCP
                                          used in tough environmental conditions. They are designed without any                              RS-232/485 port                            Remote control for non IP devices via TCP/IP RS-232/485 command tunnelling
                                          moving parts, making them diskless, fanless and noiseless.                                         GPI                                                 1 INPUT, for device control: streaming on/off configuration
                                                                                                                                             Agency Approvals                                                             CE, RoHS
                                                                                                                                             Humidity                                                            Up to 80%, non-condensing
                                                                                                                                             Temperature                           0 to +65°C environment temperature; fanless when operated in FR-110 or FR-210 chassis
                                            AM.100               MPEG-2 SD encoder blade with COMPOSITE input          Environmental         Weight                                                                  Approx. 150 grams
                                                                                                                                             Blade dimensions (H/W/D)                                             20mm x 130mm x 190mm
                                                                                                                                             Power                                                                      5W per blade
                                                                                                                                             Limited Warranty                                 1 year standard limited warranty. Warranty extensions available.
                                                                                                                      Hardware Specifications may change without prior notice.




                                                                                                                                                                                                                                                www.blusensnetworks.com
Net PVR
58   Net PVR                                                                                                                                                                                                                                             Net PVR              59



     Net PVR

               VoDKAST Network Personal Video Recorder (VoDKAST nPVR) increases the
               possibilities of the VoDKAST platform with the capability of recording, indexing
                                                                                                                                                                                                                                      VR.100
               and managing live video sources. This way, it is possible for the user to record live                                                                                                                            ONC™, ONC+TM, NFS, WebNFS, TCP/IP,
               broadcasts, and store it in the VoD streaming cluster storage space for later on                                                                                                                                 SunLink™, OSI, MHS, IPXTM/SPX, SMB
               demand recovery, providing several services, for example:                                                                                                                                                        technologies, and XML
                                                                                                                                                                                                                                Integrated Lights Out Manager (ILOM) service
                                                                                                                                                                                                  Networking
               - Schedule network recordings. The recordings can be managed directly from the                                                                                                                                   processor providing: CLI (in-band and out-of-
                                                                                                                                                                                                                                band), IPMI 2.0 (in-band and out-ofband), SNMP
               EPG or manually programmed. The users decide which programs they want to                                                                                                                            Management   (out-of-band only)
               record and this programs are automatically recorded in VoDKAST servers. Later,                                                                                                                                   Sun xVM Ops Center — manage from one to
               the users will be able to watch the recordings on demand when needed.                                                                                                                                            hundreds of systems from a central location
                                                                                                                                                                                                                                100-240 V AC, 50-60 Hz, 10 A, 100 V support is
                                                                                                                                                                                                                                with 3 power supply unit configuration with 2+1
               - Legal filing systems. For continuous recording of video broadcasting and their                                                                                                                                 redundancy
               later recovering. The Legal filing systems incorporates the EPG information for                                                                                                                                  Operating temperature/humidity
                                                                                                                                                   VR.100
               easy browsing of the recorded contents. This kind of cyclic recordings can be                                                                                                                                    5°C to 32°C (37°F to 91°F), 10-90 percent relative
                                                                                                                                            Six on board LSI disk controller chips each
               integrated with video surveillance systems. It also supports Catch Up TV services,                                                                                                                               humidity, non condensing, 27°C max. wet bulb
                                                                                                                                            directly connects to 8 SATA drives for max data
                                                                                                                                            throughput                                                                          Non operating temperature/humidity
               or live shows recording for the later on demand re-broadcasting.
                                                                                                                                            48 hot-swappable, 3.5-in. SATA II HDD internal                                      -40°C to 65°C (-40°F to 149°F), up to 93 percent
                                                                                                                           Disk system
                                                                                                                                            disks: 250 GB, 500 GB, 1000 GB 7200-RPM disks                                       relative humidity, non condensing, 38°C max. wet
                                                                                                                                            available; 48 TB total capacity                                                     bulb
                                                                                                                                            Software RAID enabled by RAID-Z, RAID-Z2 in           Environment       AC power
                VR.100              NetPVR Server Node
                                                                                                                                            Solaris ZFS, other Linux, or Windows RAID code
                                                                                                                                                                                                                                Operating altitude
                                                                                                                                                                                                                                Up to 3048 m; maximum ambient temperature is
                                                                                                                                            Two quad-core AMD™ Opteron processors, Model
                                                                                                                                                                                                                                derated by 1°C per 300 m above 900 m
                                                                                                                                            2356
                                                                                                                            Processor                                                                                           Non operating altitude
                                                                                                                                            One 512Kb Level 2 cache per core 2 MB L3 cache
                                                                                                                                            per processor                                                                       Up to 12000 m
               The NetPVR allows the implementation of Time Shifting for TV channels which
                                                                                                                                            Sixteen DDR-2 DIMM slots (eight DIMM slots                                          Acoustic noise
               allows to the users that are watching a TV channel, to pause and recover it from         Architecture                        per CPU socket); 32 GB with 2 GB DIMMs, 64 GB                                       LwAd (1B = 10 dB): At or below 25°C, 7.5B, at max.
               the beginning of its broadcast using on demand video controls.                                                               with 4 GB DIMMs and 128 GB when 8GB DIMM is                                         ambient, 8.5B
                                                                                                                                            qualified
                                                                                                                                                                                                                                LpAm bystander: At or below 25°C, 65 dB, at max.
                                                                                                                                            Four 10/100/1000Base-T Ethernet ports                                               ambient, 75 dB
               Due to legal reasons, VoDKAST nPVR offers several configuration options of the
                                                                                                                                            Network management: One dedicated                     Mounting option               19-inch rackmount kit
               filling systems:                                                                                                             10/100Base-T Ethernet port
                                                                                                                                                                                                                                Dual-redundant, hot-swappable power supply
                                                                                                                          Main memory Serial: One TIA/EIA-232-F asynchronous, RJ45
                                                                                                                                                                                                  Power                         Power supply output rating: 1,500 W
               •  Option “one single copy” to manage a single physical recording and several                                          connector
                                                                                                                                                                                                                                Maximum system consumption 1,180 W
                  logical recordings.                                                                                                       USB: Four USB 2.0 ports (two front and two rear)
                                                                                                                                                                                                                                Safety: IEC60950, UL/CSA60950, EN60950,
                                                                                                                                            Video: VGA video port
               •  Option “multiple copies” to manage multiple physical copies                                                                                                                                                   CB scheme with all country differences
                                                                                                                                            Expansion slots: Three internal MD2 low-profile       Regulations (meets or
               •  Option “legal file”. Live indexing of the recordings to allow recovering via                                              PCI-E slots, 8x wide each                                                           RFI/EMI: FCC Class A, Part 15 47 CFR, EN, 55022,
                                                                                                                                                                                                  exceeds)
                  positioning inside the recorded media.                                                                                    One compact flash disk port for OS booting
                                                                                                                                                                                                                                CISPR 22, EN300-396: v1.31, ICES-003
                                                                                                                                                                                                                                Immunity: EN55024, EN300-386:v1.3.2
                                                                                                                                            Solaris 10 05/08 preinstalled
                                                                                                                                                                                                                                Safety: cULus Mark, CE Mark, GOST R, S-Mark
                                                                                                                                            Standard Linux distributions, SLES10 SP1 64 bit,
                                                                                                                            Operating                                                                                           EMC: CE Mark (93/68/3EEC); Emissions and
                                                                                                        Software                            Rhel4.6  5.1 64 bit
                                                                                                                             systems                                                                                            Immunity — Class A Emissions Levels: FCC, VCCI,
                                                                                                                                            Windows 2003 Standard and Enterprise version          Certifications
                                                                                                                                                                                                                                C-Tick, MIC, GOST R2, BSMI2
                                                                                                                                            32 bit and 64 bit
                                                                                                                                                                                                                                Other: Labeled per WEEE (Waste Electrical and
                                                                                                                                            Booting from the flash disk is supported by                                         Electronic Equipment) Directive
                                                                                                                                            Solaris, Linux and windows, the external flash
                                                                                                                                                                                                                     Height     6.89 in./175.05 mm
                                                                                                                                            Disk OS booting saves up to 2 TB HDD capacity
                                                                                                        OS Booting                          for data                                              Dimensions         Width      17.28 in./439 mm
                                                                                                                                            Two mirrored OS drives are also configured on         and weight         Depth      29.52 in./749.90 mm
                                                                                                                                            two different disk controllers for max availability                      Weight     170 lbs./77 kg
                                                                                                       Hardware Specifications may change without prior notice.




                                                                                                                                                                                                                                           www.blusensnetworks.com
DIGITAL SIGNAGE
62         Digital Signage                                                                                                                                                                              Digital Signage          63



                                                                                       What is Digital Signage?                                                         What can Digital Signage do for you?

     It is a new and cost effective way of increasing brand or product visibility in
     public areas. Using IP technology we can create advertising channels that provide                                    Pulsar Digital signage solution allows you to create a multimedia advertising solution for
     wanted information and, thus, attract an attention that static advertising may not.                                  providing content to hundreds of screens simultaneously. It also allows you to manage
     Furthermore, the marketing campaign can be much more defined and focused,                                            and monitor on real time what is being broadcast on each screen.
     issuing the message to the appropriate market profile, at the right location and
     time, and creating a far more indelible impression.                                                                  The playout solution is the simplest digital signage platform and allows you to feed the
                                                                                                                          signage screens with a full screen sequence of videos, but, if you want more flexibility
                                                                                                                          for, for example showing more than one video at once, Pulsar Digital Signage platform
                                                                                                                          is your answer.

                                                                                                                          The Pulsar video distribution is supported by the most advanced IPTV technologies
                                                                                                                          providing a high connectivity solution in which the video streams are transferred through
                                                                                                                          the network as multicast IP streams low connectivity solution in which the multimedia
                                                                                                                          contents are distributed and then stored locally in each screen, so a problem in the
                                                                                                                          network won’t affect to the video shown in the screens.




                                        The extensive experience and knowledge of the Pulsar product team, in
                                        both large installation and VoD management, makes it the right tool to
                                        face any challenges related to security, user experience, immediacy and
                                        management of remote locations.

                                        Pulsar is a complete product that enables the operator to have full control,
                                        from a central location, of the full system, including screen layouts, content,
                                        program grill, etc.

                                                                                                                                                   Shopping malls, Showrooms, Retail Shops
                                                                                                                                                   By melting the powerful advertisement capabilities of the Digital Signage solution
                                                                                                                                                   and the flexibility of content distribution through an IPTV platform, a commercial
                                                                                                                                                   surface of any size can deploy from one to hundreds of advertising screens in
                                                                                                                                                   all its branches reaching more customers and having full control from the
                                                                                                                                                   headquarters.




                                                                                                                                                                                                          www.blusensnetworks.com
64   Digital Signage                                     Digital Signage     65




            Pulsar gives you the simplest mechanism to
            provide the most advanced Digital Signage
            experience in four easy steps.




                                                          www.blusensnetworks.com
66   Digital Signage                                                                        Digital Signage      67




     STEP 1
     Select the resolution of the output
     screen, Pulsar can work with SD,
     HD, 16:9, 4:3, etc. Any resolution is
     supported.

     Divide the output screen space into
     any number of regions and select
     the size for each region with the
     drag and drop interface

     It’s even possible to overlap the
     regions if desired.




                                             STEP 2
                                             Upload the multimedia content to the server. Any content
                                             is supported MPEG-2, MPEG-4, DIVX, h.264, Adobe Flash
                                             animations and video, JPEG, TIFF, etc.

                                             It’s also possible to associate an external information source
                                             to any resource. This way you can deploy a flash animation
                                             with weather information, and the information to fill the
                                             template will be gathered form Internet.




                                                                                              www.blusensnetworks.com
68   Digital Signage                                         Digital Signage             69




                                                  STEP 4
                                                  Assign one of the schedules defined
                                                  in the step 3 to any of the screens
                                                  available in the network.

                                                  The administrator can check in real
                                                  time what is being broadcast in each
                                                  screen at any moment.




          STEP 3
          Compose a schedule of programs
          by filling the layouts defined in the
          step 1 with the resources defined
          in the step 2.

          The layout can change within
          a schedule so you can deploy a
          full screen video and then split
          the screen in four regions with a
          different RSS feed in each.




                                                               www.blusensnetworks.com
DS Servers
72         Digital Signage Servers                                                                                                                                                                   Digital Signage Servers                73



          Playout Server                                                                                              Seamless Splicing


                                                                                                                                  Optionally, VoDKAST Playout can perform seamless splicing for MPEG-2 content, thus generating a
     With the playout server, the administrator can generate continuous loops of full screen pre-scheduled contents
                                                                                                                                  continuous, clean stream out of multiple input sources and switches.
     and inject it in the network as multicast streams. This is the easiest and simplest way of creating Digital
     Signage information channels.
                                                                                                                                  Seamless splicing is a technology which calculates on real time the intermediate video frames during
                                                                                                                                  the transition between two videos in a sequence. This means when switching from one video to following,
     These streams are created in MPEG-2 TS format and the original contents must be MPEG-2 video as well.
                                                                                                                                  the resulting stream won’t be affected by MPEG-2 video noise providing a clean, smooth transition.
     The platform supports both standard and high definition streaming and can schedule even stored and live TV
     contents under a common schedule.

                                                                                                                         Signage Server

                                                                                                                                  With Pulsar Digital Signage server the administrator can manage the whole Digital Signage platform. It
                                                                                                                                  controls the channel generators, composes schedules of screen templates and manages the resources
                                                                                                                                  used to fill these templates.
                                                                                                                                  It’s also responsible of uploading the resources to the channel generators in a completely bandwidth
                                                                                                                                  controlled way. Finally, the server will monitor on real time what is being broadcast in each screen
                                                                                                                                  with the local time in the screen location, triggering the proper SNMP alerts in case of any incidence.




                                                 Playout Server Architecture


     By using the advanced scheduling functions the administrator can compose multicast TV channels interspersing
     Live TV streaming from the satellite or a CCTV camera with local stored advertisements, each 10 minutes for
     example.

     As the stream created shows only one video at once, a channel generator is not required, but high bandwidth
     network is a must. Any problem in the network connection will be reflected in the video on the screens.


                                            PS.100             Playout Server

                                                                                                                                                               Signage Server Architecture

     •  Generates TV channels from realtime video feeds and stored content.
     •  Connects to VoDKAST servers to retrieve stored on-demand multimedia, or to access remote real-time
        encoders.
     •  Generates an IPTV multicast or broadcast channel.
     •  Scheduling can be controlled from the graphical user interface integrated in the VoDKAST Management
        Desktop.
     •  An XML/HTTP API is also provided for easy integration with third party control systems.
     •  Both RTP and Transport Stream output formats are supported.



                                                                                                                                                                                                                 www.blusensnetworks.com
74      Digital Signage Servers                                                                                                                                                                                                                                                                 Digital Signage Servers                            75


     Pulsar Digital Signage server can generate any screen composition by dividing the screen into a template with
     smaller regions. Each region can have any loop of contents in almost any media format and the layout of the                                                                                                                  DS.100                    Digital Signage Server
     template can change accordingly to the time schedule.

     A web server gives access to the platform in a hierarchical way, allowing the Digital Signage contractor to resell                                                                                                        •  Flexible screen template definition and scheduling.
     time slots for specific regions of certain screens to third parties making it possible to get direct revenue from this                                                                                                    •  Mixed Low and High connectivity channel generators management.
     platform.                                                                                                                                                                                                                 •  Screen provisioning based on the most advanced IPTV technologies.
                                                                                                                                                                                                                               •  Managed screen content provision bandwidth and scheduling.
     Pulsar Digital Signage server can drive as many low and high connectivity channel generators as desired,                                                                                                                  •  Individual or group screen addressing.
     independently from the IP technology used to connect the server to the channel generators. It can also upload any                                                                                                         •  Third parties information integration and caching.
     given template to one or a group of Channel Generators to provide an easy and fast management of large amounts                                                                                                            •  Real Time screen monitoring.
     of screens. The server will also manage the synchronization of the channel generators even if they are distributed                                                                                                        •  Multiformat content.
     across different time zones.                                                                                                                                                                                              •  Connection to the screens via any IP technology (Ethernet, Wifi, 3G, Satellite,
                                                                                                                                                                                                                                  DSL, analog modem, etc.)
     It’s possible to link specific contents to a external information system, like weather RSS feeds or queue ticketing                                                                                                       •  Integration of LiveTV, Playout or VoD contents in the templates.
     systems. The server will get the information from the external sources periodically and will upload the updated
     info to each screen. In case the internet connection with the server is lost, the signage screens will work with the                                                                                      DS.100                                                                                  DS.100
     latest available information avoiding empty spaces in the screens’ templates, for both low and high connectivity                                                                Processor       Two Intel Xeon processors 5500 series                                                       Operating temperature: 5° C to 35° C (41° to 95°
     channel generators.                                                                                                                                                                             Level 1: 32 KB instruction and 32 KB data L1 cache                                          F) at sea level
                                                                                                                                                                                                     per core                                                                                    Non operating temperature: -40° C to 68° C (-40°
                                                                                                                                                                                                      Level 2: 256 KB unified (data and instruction) L2                                          to 154° F)
                                                                                    PS.100                                                                                           Cache
                                                                                                                                                                                                     cache per core                                                                              Operating relative humidity: up to 93%, non
                                                                                                                                                                    Architecture
                        Processor                  One or Two Quad-Core Intel Xeon L5420 Processor, 2.50 GHz, 1333 MHz FSB, 50W.                                                                     Level 3: 4 MB or 8 MB shared inclusive L3 cache per                                         condensing, 38° C max. wet bulb
                        Cache                      Quad Core Processors: 12 MB L2 cache per core                                                                                                     processor                                                                                   Non operating relative humidity: Up to 93%, non
       Architecture                                                                                                                                                                                                                                                                              condensing
                                                   DIMM Slots Memory Type        Up to 32 GB of 800 MHz ECC FB-DIMM or 667 MHz ECC FB-DIMM                                                           12 DDR3 DIMM slots (six DIMM slots per CPU socket);       Environment
                        Main memory                                                                                                                                                  Main
                                                   Memory Configuration          4 GB total memory. System configurations from 1 GB up to 32 GB                                                      system supports from 2 GB (1x 2 GB to 96 GB (12x 8                                          Operating altitude: Up to 3,000m (9,000 ft.), max.
                                                                                                                                                                                     memory
                                                                                                                                                                                                     GB) of memory                                                                               ambient temperature is derated by 1° C per 300m
       Graphics Controller                         ASPEED AST2000                                                                                                                                                                                                                                above 900m
                                                                                                                                                                                                     Based on Intel Xeon processor 5500 series and Intel
       System architecture                         Intel Quad Core technology                                                                                       System architecture
                                                                                                                                                                                                     5500 Chipset                                                                                Non operating altitude: 10,000m (35,000 ft.)
                                                   Network: Four Integrated 10/100/1000 Base-T Ethernet ports                                                                                        Network: Two 10/100/1000Base-T Ethernet ports                                               Acoustic noise: 7.5 B operating, 7 B idling / 70 dBA
                                                   Management: Service processor with embedded Lights Out Manager (LOM) standard                                                                      Serial: One RJ-45 port                                                                     operating, 60 dBA idle (declared noise emissions
                                                   Serial: RJ-45                                                                                                                                                                                                                                 in accordance with ISO 9296 A-weighted, sound
                                                                                                                                                                    Standard/integrated              USB: Five USB 2.0 ports (two front, two rear, one
       Standard/integrated interfaces                                                                                                                                                                                                                                                            power)
                                                   SATA: Up to two hot-pluggable SATA bays, 2 TB max.                                                               interfaces                       internal)
                                                                                                                                                                                                                                                                                                 Single non redundant power supply; max. power
                                                   USB: Five USB 2.0 ports (two front, two rear, one internal)                                                                                       Expansion bus: One PCIe 2.0 slot (x16 electrical/x16                                        supply rating 600 W at 80% efficiency
                                                                                                                                                                                                                                                               Power
                                                   Expansion bus: One PCIe slot (x16 electrical/x16 mechanical), half-length, half-height                                                            mechanical, low-profile)
                                                                                                                                                                                                                                                                                                 AC power: 100–240 V AC (47–63 Hz)
                                                   Solaris OS 10 or GNU/Linux                                                                                                                        Solaris 10 OS
                                                                                                                                                                                                                                                                                                 IEC 60950, UL/CSA 60950, EN 60950, CB Scheme
       Software         Operating systems          IPMI 2.0 compliant Service Processor with embedded. Lights Out Management offering remote power, KVM                                              OpenSolaris™ OS                                                            Safety
                                                                                                                                                                                                                                                                                                 with all country differences
                                                   (keyboard, video, mouse) and media capability                                                                                                     Red Hat Enterprise Linux 4                                Regulations                       FCC CFR 47 Part 15 Class A, EN 300 386 v1.3.3, EN
                        Internal disk option       Two hot-pluggable 250-750 GB 7200 rpm 3.5” SATA II HD                                                                                                                                                                        RFI/EMI
                                                                                                                                                                                                     Red Hat Enterprise Linux 5                                                                  55022 Class A, EN 61000-3-2, EN 61000-3-3
       Mass storage
                    Removable Media                Up to one EIDE DVD-ROM or DVD+/-RW DL drive                                                                                       Operating       SUSE Linux Enterprise Server 10                                            Immunity         EN 55024, EN 300 386 v1.3.3
       and media                                                                                                                                                    Software
                    RAID                           RAID 1 hardware mirroring to provide fault tolerance                                                                              systems         VMware ESX 3.5                                                                              CE, CB Scheme, UL, CSA, CCC, BSMI, AR-S,
                                                                                                                                                                                                                                                                                Safety
                                                   Operating temperature: 5° to 35° C (41° to 95° F) at sea level                                                                                    Windows Server 2003 Standard/Enterprise Editions                                            GOST-R
                                                   Non operating temperature: -40° to 68° C (-40° to 154° F), up to 93% relative humidity, non condensing, 38° C                                     Windows Server 2008 Standard/Enterprise Editions                                            CE, FCC, VCCI, ICES, BSMI, CCC, MIC, C-Tick,
                                                                                                                                                                                                                                                                                EMC
                                                   max. wet bulb                                                                                                                                                                                               Certifications                    AR-S, GOST-R
                                                                                                                                                                                                     Windows Server 2008 Standard/Enterprise/
       Environment                                 Operating altitude: Up to 3,000m (9,000 ft.), max. ambient temperature is derated by 1° C per 300m above 900m                                     Datacenter Editions                                                                         RoHS-compliant labeled, per WEEE (Waste
                                                                                                                                                                                                                                                                                Other            Electrical and Electronics Equipment) Directive
                                                   Non operating altitude: up to 12,000m (=~36,000 ft.)                                                             Networking                       Two GbE ports integrated on motherboard
                                                                                                                                                                                                                                                                                                 (2002/95/EC)
                                                   Acoustic noise: 70 dBA operating, 69 dBA idle (declared noise emissions in accordance with ISO 9296                                               Optional Sun Integrated Lights Out Manager (ILOM)
                                                                                                                                                                                                                                                                                Height           43mm (1.7 in.)
                                                   A-weighted, sound power)                                                                                                                          service processor module
                                                                                                                                                                                                                                                                                Width            436mm (17.2 in.)
                                                   Single PSU                                                                                                                                        – VGA 8 MB: 1,024x768 at 60 Hz                            Dimensions
       Power                                                                                                                                                                                                                                                                    Depth            650mm (25.6 in.)
                                                   AC power: 100–240 V AC (47–63 Hz)                                                                                                                 – Management port: One 10/100 RJ-45 port                  and weight
                                                                                                                                                                                                                                                                                          MIN    9.8 kg (21.7 lbs.)
                        Safety                     IEC 60950, UL/CSA 60950, EN 60950, CB Scheme with all country differences                                                                         Enables remote power control; remote keyboard,                             Weight
                                                                                                                                                                                                     video, mouse (KVM) graphical                                                         MAX    13.9 kg (30.6 lbs.)
       Regulations      RFI/EMI                    FCC CFR 47 Part 15 Class A, EN 300 386 v1.3.3, EN 55022 Class A, EN 61000-3-2, EN 61000-3-3
                                                                                                                                                                    Management                       access; and remote media (DVD, CD, floppy)                                                  Rackmounting slide rail kit
                        Immunity                   EN 55024, EN 300 386 v1.3.3
                                                                                                                                                                                                     Secure remote access using Web interface over SSL,        Mounting option                   Toolless rackmounting slide rail kit
                        Safety                     CE, CB Scheme, UL, CSA, CCC, BSMI, AR-S, GOST-R
                                                                                                                                                                                                     or CLI over SSH                                                                             Cable management arm
       Certifications EMC                          CE, FCC, VCCI, ICES, BSMI, CCC, MIC, C-Tick, AR-S, GOST-R
                                                                                                                                                                                                     Sun™ xVM Ops Center software support                      Warranty                          One year, next business day
                        Other                      RoHS-compliant labeled, per WEEE (Waste Electrical and Electronics Equipment) Directive (2002/95/EC)
                                                                                                                                                                                                     IPMI 2.0, SNMP v1, v2c, and v3
                        Height                     44 mm (1.7”)
                                                                                                                                                                                                     In-band, out-of-band, and side-band remote
       Dimensions       Width                      425.5 mm (16.8”)
                                                                                                                                                                                                     management
       and weight       Depth                      633.7 mm (25”)
                                                                                                                                                                                                     Up to four hot-pluggable 3.5 in. SATA disk drives, 4
                        Weight                     13.3 kg (27.2 lbs.)                                                                                                                               TB max.: 1 TB, 500 GB (7,200 rpm)
       Warranty                                    One year, next business day                                                                                      Mass storage Internal
                                                                                                                                                                                                     Up to four hot-pluggable solid-state drives (SSDs),
                                                                                                                                                                    and media    disk option
      Hardware Specifications may change without prior notice.                                                                                                                                       128 GB max.: 32 GB3
                                                                                                                                                                                                     Up to two Sun Flash Modules, 48 GB max.: 24 GB3
                                                                                                                                                                   Hardware Specifications may change without prior notice.




                                                                                                                                                                                                                                                                                                                www.blusensnetworks.com
Channel Generators
78            Channel
 Generators                                                                                                                                                                                                                                          Channel
 Generators          79



     The Channel Generators are the devices responsible of composing the final video stream by filling the
     template defined at the Pulsar Signage Server with the media contents in a single video stream.

     Depending on the reliability of the network the streams can be generated at the head-end level with
     high connectivity channel generators.

     The low connectivity solution is best suited to deployments where the permanent connection with the
     screens can not be 100% assured. In this situations, the STB connected to the screen must have local
     storage space to ensure 24x7 signage generation even during a network outing.


            High Connectivity


                                                   The channel generator can be deployed at the head-end level, and its
                                                   output can be transferred through a trusted network.


                                                      GH.100                    High Connectivity Channel Generator
                                                                                                                                                                                                 High Connectivity Digital Signage Architecture

                                                   Each high connectivity channel generator creates one multicast stream
                                                   that can be tuned by several STB, so it can feed an unlimited number
                                                                                                                                                                                                                                                                              Low Connectivity
                                                   of screens with the same content. The connection between the STB and
                                                   the screen can be Composite, S-Video, components, VGA, DVI or HDMI                                             With the low connectivity Channel Generator, the connection between the server and the screens can be wired
                                                   connection.                                                                                                    or wireless, through Ethernet, Wi-Fi, a 3G mobile network or any other IP based technology. It’s even possible
                                                                                                                                                                  to connect the server in one location and the screens in any other location in the world through internet. A
                                                                                  GH.100
                                                                                                                                                                  VPN will ensure that the data is secure while it’s being transferred through internet to the destination Channel
                                                                                                             Dual-Core                                            Generators.
                                     Intel Core™ 2 Duo                                            1066/1333 MHz Front Side Bus
        Available Processors         processors with Intel 64
                                     architecture                                                      3, 4, or 6 MB L2 cache
                                                                                                     Virtualization Technology
        Chipset	                     Intel X38 Express chipset
                                                                  3 PCI slots (full-height, full-length)
                                                                                                                                                                                                  GL.100                         Low Connectivity Channel Generator

        Expansion Slots (see system board section for more 1 PCI Express x8 slot (x4 functionality)
        details)                                           1 PCI Express x1 slot (half length)
                                                                                                                                                                                                The low connectivity channel generator can be directly connected to a screen via
                                                                  2 PCI Express x16 Gen2 slots (one dedicated for graphics)
                                                                                                                                                                                                Composite, S-Video, components, VGA, DVI or HDMI connection. The audio can be
                                                                  2 internal 3.5” bays
        Expansion Bays (see storage section for more
                                                                  1 external 3.5” bay, 3 external 5.25” bays*
                                                                                                                                                                                                analog stereo or digital optical output.
        details)
                                                                  * Third external 5.25” bay is not full depth in side orientation.
                                                                                                                                                                                                                                                           GL.100
        Front I/O                    2 USB 2.0, 1 IEEE 1394 (requires optional PCI card to function), 1 audio out, and 1 microphone.
                                                                                                                                                                                                 Processor                    Intel® Core™ 2 Duo T8100 (2.1GHz/800Mhz FSB/3MB cache)
        Internal I/O                 1 USB 2.0 Type A Receptacle, 2 USB 2.0 headers
                                                                                                                                                                                                 Memory                       Up to 4GB7 667MHz Dual Channel DDR2 SDRAM 	
                                     7 USB 2.0, 1 serial, 1 optional serial port, parallel port, 2 PS/2, RJ-45 (NIC), 1 External SATA, 1 audio line in, 1 audio
        Rear I/O                                                                                                                                                                                 Storage                      Up to 320GB 3 Serial ATA Hard Drive (5400 RPM)
                                     line out, 1 microphone in; audio ports can be retasked to function as line in, line out, microphone, or headphone.
        Interfaces Supported         1 SATA 3 Gb/s interface (5 internal, 1 external SATA connectors)                                                                                                                         Additional drives can connect to IEEE1394 and/or USB 2.0 ports
                                                                                                                                                                                                 External Connections
        On-board RAID Support SATA                                                                                                                                                                                            Intel® Integrated Graphics Media Accelerator X3100
                                     Standard mini tower          Orientation: 6.6 x 17.9 x 17.7 inches                                                                                          Audio                        Intel High Definition Audio 2.0
                                                                  16.8 x 45.6 x 45.0 cm                                                                                                                                       Integrated           10/100/1000 (Gigabit) Ethernet LAN on system board
        Chassis Dimensions                                                                                                                                                                       Wireless
        (W x D x H)                                               Orientation: 17.7 x 17.9 x 6.6 inches                                                                                                                       Wi-Fi Options        Built-in Draft-N Wireless Networking (Optional)
                                     Converted desktop                                                                                                                                                                        Five USB 2.0 compliant ports
                                                                  45.0 x 45.6 x 16.8 cm
                                                                  Minimum: 29.9 lbs (13.6 kg)                                                                                                                                 IEEE1394a port (4-pin)
                                     Exact weights depend
        Weight                       upon configuration           Standard: 33.3 lbs (15.1 kg)                                                                                                                                HDMI video connector
                                                                  Maximum: 43.3 lbs (19.6 kg)                                                                                                    Externally Accessible        DVI video connector
                                                                                                                                                                                                 Ports                        Integrated network connector 10/100/1000 LAN (RJ45)
                                     Operating:                   40° to 95°F (5° to 35°C)
        Temperature                                                                                                                                                                                                           AC adapter connector
                                     Non-operating                -40° to 140°F (-40° to 60°C)
                                     Operating:                   8% to 85%                                                                                                                                                   Digital Audio: S/P DIF Out
        Humidity                                                                                                                                                                                                              Analog Audio: Headphone (front); Line-in / Line-out (back)
                                     Non-operating                8% to 90%
                                     Operating:                   10,000 feet; 3,000 m                                                                                                                                        Tall                 8.8             3.9         2.8
        Maximum Altitude
        (non-pressurized)            Non-operating                30,000 feet; 9,100 m                                                                                                           Dimensions  Weight          Wide                 3.0             7.9         7.7
        Power Supply                 475 watts wide-ranging, active Power Factor Correction, 80 PLUS Efficient                                                                                                                Deep                 8.3             8.3         8.3
        NIC                          Integrated Gbit LAN by Broadcom                                                                                                                             Security                     Cable lock chassis security slot
                                                                                                                                                                                                Hardware Specifications may change without prior notice.
       Hardware Specifications may change without prior notice.



                                                                                                                                                                                                                                                                                    www.blusensnetworks.com
FACIAL RECOGNITION
82   Facial Recognition                                                                                       Facial Recognition                83



                                                                                                 What´s Facial Recognition?


                          The Blusens Facial Recognition system allows the manager of a public crowded place to gather information
                          about the people visiting such venue in real time. Shopping malls, Hospitals, Bank branches, Airports, etc. are
                          places suitable for this kind of systems.

                          The system consists in a series of small cameras strategically deployed on specific places, such as
                          adverstisement or ailes, where the crowd is expected to walk or to stop and pay attention to the advertisement
                          shown. The system is capable of detecting the face of each person in range and identify the gender and the age,
                          so the administrator can gather statistics about the kind of people at the venue at any given moment.

                          The Facial Recognition system can even calculate the number of seconds each person spends in front of the
                          camera and determine for how long the person was looking to the camera directly during this period. By using
                          this mechanism the property owner can discover what is the age and gender distribution on a specific moment
                          of the day as well as if the latest changes in decoration or advertising are increasing the attention spans of the
                          visitors.

                          All the information gathered via different cameras is integrated into one single server to create statistics
                          defined specifically to fit the necessities of every authorized user of the platform. The access to this statistics
                          and reports can be done from any device (tablets, phones, computers, etc.)




                          The 4 Factors

                          1. Gender analisis: difference between menwomen

                          2. Attendance and Attention. Attitude in front of the camera: Identifies who is looking at the screen or just
                          standing in front of it

                          3. Age group: And gives you the possibility to personalize real-time advertisement depending on the age and
                          gender

                          4. Traffic Monitoring: Relates people and time as we can know how many people stops in every point per hour.




                                                                                                                    www.blusensnetworks.com
84             Facial Recognition                                                                                    Facial Recognition     85



             Technical Specifications

                                          Facial Recognition
                                       Camera          Frame Rate Web Cam 30 fps
                                                       Intel Core 2 Duo
                                       MiniPC          2.66 GHz
     Contents
                                                       2 GB RAM
                                       Software License
                                       Application License


                                       Statistical count
     Functionality                     Gender segregation
                                       Graphics Package
     Availability                      45 days from PO
     Hardware Specifications may change without prior notice.




     Flexible configuration of the widgets                                            Customizable layout per user




                                                                  Facial Recognition System Architecture




                                                                                                                         www.blusensnetworks.com
TECHNICAL SPECIFICATIONS
88             Technical Specs                                                                                                                                                                                                                                                                         Technical Specs                    89



      Glossary of Measurements                                                                                                                                                                                                                                                              Network Technologies
ADJACENT      CHANNEL     REJECTION                         FM Amplifier: UNE 523/79 standard                           THROUGH       LOSSES      (dB):     The                IEEE 802.X STANDARDS
(dB): The difference between the                            Intermodulation distance= 54 dB                             attenuation that is undergone by signal                      Name                                  Description                               Note
minimum gain in the channel and the                                                                                     in a specific band between the input                       IEEE 802.1          Bridging (networking) and Network Management              --------------
maximum gain (minimum attenuation)                          IF Amplifier: DIN VDE 0855/12 standard                      and output of a device.                                    IEEE 802.2                          Logical link control                        Inactive
in the adjacent channel. The adjacent                       Intermodulation distance= 35 dB                                                                                        IEEE 802.3                                Ethernet                            --------------

channel in UHF is C±2 and in VHF is                                                                                     BER (Bit Error Ratio): Measurement                         IEEE 802.4                               Token bus                             Disbanded
                                                                                                                                                                                   IEEE 802.5               Defines the MAC layer for a Token Ring                 Inactive
C±1).                                                       PAL broadband amplifiers: DIN45004B                         of signal quality after demodulation.
                                                                                                                                                                                   IEEE 802.6                     Metropolitan Area Networks                      Disbanded
                                                            standard Intermodulation distance= 60                       It simply indicates what proportion of
                                                                                                                                                                                   IEEE 802.7                Broadband LAN using Coaxial Cable                    Disbanded
AGC RANGE (dB): The difference                              dB                                                          the received binary digits (bits) are
                                                                                                                                                                                   IEEE 802.8                            Fiber Optic TAG                          Disbanded
between the maximum and minimum                                                                                         incorrect – 0 received as 1 or vice-                       IEEE 802.9                        Integrated Services LAN                      Disbanded
signal that is necessary for a system                       Single channel amplifiers: EN50083-5                        versa. BER is ultimately the best                         IEEE 802.10                       Interoperable LAN Security                    Disbanded
with AGC to keep a constant output.                         standard Intermodulation distance= 54                       measure of digital signal quality since                IEEE 802.11 a/b/g/n         Wireless LAN  Mesh (Wi-Fi certification)             --------------
                                                            dB                                                          it tells us directly whether a picture                    IEEE 802.12                            Demand Priority                          Disbanded
BAND REJECTION (dB): The difference                                                                                     can be displayed. In practice, when                       IEEE 802.13                             --------------                     Not used (officially)
between the minimum gain in the                             NOISE FIGURE: The ratio of the actual                       investigating reception problems, a                       IEEE 802.14                             Cable Modems                            Disbanded
amplified band and the maximum                              noise power generated at the output                         CSI display is often more useful and                      IEEE 802.15                             Wireless PAN                           --------------
                                                                                                                                                                                  IEEE 802.15.1                       Bluetooth Certification                    --------------
attenuation in the rejected band.                           of an amplifier to that which would                         MER measurements may be more
                                                                                                                                                                                  IEEE 802.15.4                        ZigBee Certification                      --------------
                                                            be generated in an ideal resistor. The                      appropriate, with a direct indication in
                                                                                                                                                                                  IEEE 802.16          Broadband Wireless Access (WiMAX certification)           --------------
FLATNESS (dB):        The    difference                     lower the noise figure, the better                          dB of the ability of a receiver to decode
                                                                                                                                                                                  IEEE 802.16e               (Mobile) Broadband Wireless Access                  --------------
between the maximum and minimum                             the performance. The noise figure is                        the signal. A satisfactory result in a                    IEEE 802.16.1              Local Multipoint Distribution Service               --------------      The IEEE 802 family of standards is
gain in a certain band or channel.                          expressed in (dB): NF=10 log F.                             Digital installation such as DTT or                       IEEE 802.17                          Resilient packet ring                     --------------
                                                                                                                                                                                                                                                                                     maintained by the IEEE 802 LAN/
                                                                                                                        Satellite would be 2 x 10-4                              IEEE 802.18                         Radio Regulatory TAG                       --------------
                                                                                                                                                                                                                                                                                     MAN Standards Committee (LMSC).
FREQUENCY RESPONSE: The variation                           REJECTION     BETWEEN     INPUTS/                                                                                     IEEE 802.19                            Coexistence TAG                         --------------
                                                                                                                                                                                                                                                                                     The most widely used standards are
in amplitude within a certain band or                       OUTPUTS (dB): The band attenuation                          MER (Modulation Error Ratio): is a                        IEEE 802.20                 Mobile Broadband Wireless Access                   --------------
                                                                                                                                                                                                                                                                                     for the Ethernet family, Token Ring,
channel.                                                    between inputs/outputs.                                     very similar parameter to C/N and is                      IEEE 802.21                       Media Independent Handoff                    --------------
                                                                                                                                                                                                                                                                                     Wireless LAN, Bridging and Virtual
                                                                                                                        also a ratio measured in dB. It includes                  IEEE 802.22                    Wireless Regional Area Network                  --------------
                                                                                                                                                                                  IEEE 802.23                        Broadband ISDN system                       Experimental        Bridged LANs.
GAIN (dB): This is the difference                           SPURIOUS (dBc): The difference in                           all other signal impairments, not just
between the output power of an                              levels between the channel carrier                          noise. It can therefore be used to give                                                                                                                            Information extracted from www.wikipedia.org
amplifier with the characteristic                           created by a modulator or conversor                         a more direct indication of decoding                   ETHERNET TECHNOLOGIES
impedance (75 Ω) and the input power.                       and the lower side band or local                            margin when, as is often the case,                                           Transmission
                                                                                                                                                                                Technology                                              Cable Type                Maximum Distance                     Topology
                                                            oscillator. This only applies when there                    there is co-channel interference as                                             Speed
                                                                                                                                                                                 10Base2               10 Mbps                           Coaxial                        185 m                     Bus (T Connector)
MAXIMUM OUTPUT LEVEL (dBμV)                                 is a broadband channel.                                     well as noise in the channel.
                                                                                                                                                                                 10BaseT               10 Mbps                       Twisted Pair                       100 m                    Star (Hub or Switch)
DAB Amplifier: Intermodulation distance=
                                                                                                                                                                                 10BaseF               10 Mbps                          Optic Fiber                     2000 m                   Star (Hub or Switch)
50 dB (2 channels 4 MHz)
                                                                                                                                                                                100BaseT4              100Mbps               Twisted Pair (category 3UTP)               100 m        Star. Half Duplex (hub)  Full Duplex (switch)
                                                                                                                                                                                100BaseTX              100Mbps               Twisted Pair (category 5UTP)               100 m        Star. Half Duplex (hub)  Full Duplex (switch)
MPEG-2 Profiles and Levels                                                                                                                                                      100BaseFX              100Mbps                          Optic Fiber                     2000 m                          No hubs
                                                                                                                                                                                1000BaseT             1000Mbps           4 Twisted Pair (category 5e or 6UTP )          100 m                  Star. Full Duplex (switch)
                                                                                                                                                                                1000BaseSX            1000Mbps                 Optic Fiber (multimode)                  550 m                  Star. Full Duplex (switch)
     MPEG-2 LEVELS                                                                                                                                                              1000BaseLX            1000Mbps                 Optic Fiber (monomode)                   5000 m                 Star. Full Duplex (switch)
                                                             Max horizontal      Max vertical       Max luminance samples per second                Max bit rate in Main
     Abbr.       Name            Frame rates (Hz)
                                                              resolution          resolution     (approximately height x width x framerate)           profile (Mbit/s)
      LL       Low Level     23.976, 24, 25, 29.97, 30              352              288                          3,041,280                                   4
                                                                                                  10,368,000, except in High profile, where
      ML       Main Level    23.976, 24, 25, 29.97, 30              720              576            constraint is 14,475,600 for 4:2:0 and                    15
                                                                                                            11,059,200 for 4:2:2
                             23.976, 24, 25, 29.97, 30,                                          47,001,600, except that in High profile with
     H-14      High 1440                                            1440             1152                                                                     60
                                  50, 59.94, 60                                                        4:2:0, constraint is 62,668,800
                             23.976, 24, 25, 29.97, 30,                                          62,668,800, except that in High profile with
      HL       High Level                                           1920             1152                                                                     80
                                  50, 59.94, 60                                                        4:2:0, constraint is 83,558,400


     MPEG-2 PROFILES
      Abbr.                 Name                Picture Coding Types       Chroma Format              Aspect Ratios                         Scalable modes
       SP               Simple profile                     I, P                   4:2:0         Square pixels, 4:3, or 16:9                       None
       MP                Main profile                     I, P, B                 4:2:0         Square pixels, 4:3, or 16:9                       None
      SNR           SNR Scalable profile                  I, P, B                 4:2:0         Square pixels, 4:3, or 16:9     SNR (signal-to-noise ratio) scalable
     Spatial      Spatially Scalable profile              I, P, B                 4:2:0         Square pixels, 4:3, or 16:9            SNR- or spatial-scalable
       HP                High profile                     I, P, B             4:2:2 or 4:2:0    Square pixels, 4:3, or 16:9            SNR- or spatial-scalable

                                                                                                                                                                                                                                           Common Video Resolutions
                                                                                                                              Information extracted from www.wikipedia.org
                                                                                                                               Information extracted from www.wikipedia.org
                                                                                                                                Information extracted from www.wikipedia.org



                                                                                                                                                                                                                                                                                                         www.blusensnetworks.com
90        Technical Specs                                                                                                                                                                                                                                                    Technical Specs             91


                                                                                                                                                     H.264 LEVELS
      H.264 Profiles and Levels                                                                                                                               Max macroblocks             Max video bit rate (VCL) (kbit/s)             Examples for high
                                                                                                                                                     Level                                                                    Hi422P,   resolution @ frame rate
                                                                                                                                                              per second per frame        BP, XP, MP     HiP      Hi10P                 (max stored frames)
                                                                                                                                                                                                                              Hi444PP
H.264 PROFILES                               High 4:2:2 Profile (Hi422P)
                                                                                                                                                                                                                                              128×96@30.9
                                                                                                                                                                                                                                                                  The High 4:4:4 Profile constrained to
The standard includes the following          Primarily targeting professional applications that use interlaced video, this                              1         1485           99            64         80       192          256
                                                                                                                                                                                                                                             176×144@15.0
                                                                                                                                                                                                                                                                  all-Intra use.
sets of capabilities, which are referred     profile builds on top of the High 10 Profile, adding support for the 4:2:2 chroma                                                                                                                128×96@30.9
                                                                                                                                                                                                                                                                  CAVLC 4:4:4 Intra Profile
to as profiles, targeting specific           subsampling format while using up to 10 bits per sample of decoded picture                                1b         1485           99            128       160       384          512
                                                                                                                                                                                                                                             176×144@15.0
                                                                                                                                                                                                                                                                  The High 4:4:4 Profile constrained to
classes of applications:                     precision.                                                                                                                                                                                      176×144@30.3         all-Intra use and to CAVLC entropy
Constrained Baseline Profile                 High 4:4:4 Predictive Profile (Hi444PP)                                                                   1.1        3000          396            192       240       576          768          320×240@10.0         coding (i.e., not supporting CABAC).
(CBP)                                        This profile builds on top of the High 4:2:2 Profile, supporting up to 4:4:4 chroma                                                                                                              352×288@7.5

Primarily for low-cost applications          sampling, up to 14 bits per sample, and additionally supporting efficient lossless                                                                                                              320×240@20.0         As a result of the Scalable Video Coding
                                                                                                                                                       1.2        6000          396            384       480       1152        1536
this profile is used widely in               region coding and the coding of each picture as three separate color planes.                                                                                                                    352×288@15.2         extension, the standard contains three
videoconference         and        mobile    High Stereo Profile                                                                                                                                                                             320×240@36.0         additional scalable profiles, which are
                                                                                                                                                       1.3       11880          396            768       960       2304        3072
applications. It corresponds to the          This profile targets two-view stereoscopic 3D video and combines tools from the                                                                                                                 352×288@30.0         defined as a combination of the H.264/
                                             High profile with inter-view prediction capabilities of Multiview Video Coding                                                                                                                  320×240@36.0         AVC profile for the base layer (2nd word
subset of features that are in common                                                                                                                   2        11880          396           2000       2500     6000         8000
                                             extension.                                                                                                                                                                                      352×288@30.0         in scalable profile name) and tools that
between the Baseline, Main, and High                                                                                                                                                                                                         352×480@30.0
Profiles described below.                    In addition, the standard contains four additional all-Intra profiles, which are                          2.1       19800          792           4000       5000     12000        16000                              achieve the scalable extension:
                                                                                                                                                                                                                                             352×576@25.0
Baseline Profile (BP)                        defined as simple subsets of other corresponding profiles. These are mostly for                                                                                                                                      Scalable Baseline Profile
                                                                                                                                                                                                                                             352×480@30.7
Primarily for low-cost applications          professional (e.g., camera and editing system) applications:                                                                                                                                                         Primarily targeting video conference,
                                                                                                                                                                                                                                             352×576@25.6
that     requires     additional     error   High 10 Intra Profile                                                                                     2.2       20250          1620          4000       5000     12000        16000                              mobile, and surveillance applications,
                                                                                                                                                                                                                                             720×480@15.0
robustness, while this profile is            The High 10 Profile constrained to all-Intra use.                                                                                                                                               720×576@12.5
                                                                                                                                                                                                                                                                  this profile builds on top of a
used rarely in videoconference and           High 4:2:2 Intra Profile                                                                                                                                                                        352×480@61.4         constrained version of the H.264/AVC
mobile applications, it does add             The High 4:2:2 Profile constrained to all-Intra use.                                                                                                                                            352×576@51.1         Baseline profile to which the base
                                             High 4:4:4 Intra Profile                                                                                   3        40500          1620         10000      12500     30000        40000
additional error resilience tools to                                                                                                                                                                                                         720×480@30.0         layer (a subset of the bitstream) must
the Constrained Baseline Profile. The                                                                                                                                                                                                        720×576@25.0         conform. For the scalability tools, a
                                             H.264 PROFILES                                                                                                                                                                                  720×480@80.0         subset of the available tools is enabled.
importance of this profile is fading
                                             Feature                              CBP   BP    XP    MP    HiP     Hi10P    Hi422P Hi444PP              3.1      108000          3600         14000      17500     42000        56000         720×576@66.7         Scalable High Profile
after the Constrained Baseline Profile       I and P slices                       Yes   Yes   Yes   Yes   Yes      Yes       Yes        Yes
has been defined.                                                                                                                                                                                                                            1280×720@30.0        Primarily targeting broadcast and
                                             B slices                             No    No    Yes   Yes   Yes      Yes       Yes        Yes
Main Profile (MP)                                                                                                                                      3.2      216000          5120         20000      25000     60000        80000
                                                                                                                                                                                                                                             1280×720@60.0        streaming applications, this profile
                                             SI and SP slices                     No    No    Yes   No     No       No        No         No
                                                                                                                                                                                                                                            1280×1024@42.2        builds on top of the H.264/AVC High
Originally intended as the mainstream        Flexible macroblock ordering (FMO)   No    Yes   Yes   No     No       No        No         No
                                                                                                                                                                                                                                             1280×720@68.3
consumer profile for broadcast and           Arbitrary slice ordering (ASO)       No    Yes   Yes   No     No       No        No         No
                                                                                                                                                                                                                                                                  Profile to which the base layer must
                                                                                                                                                        4       245760          8192         20000      25000     60000        80000        1920×1080@30.1
storage applications, the importance of      Redundant slices (RS)                No    Yes   Yes   No     No       No        No         No                                                                                                                       conform.
                                                                                                                                                                                                                                            2048×1024@30.0
this profile faded when the High profile     Data partitioning                    No    No    Yes   No     No       No        No         No                                                                                                                       Scalable High Intra Profile
                                                                                                                                                                                                                                             1280×720@68.3
was developed for those applications.        Interlaced coding (PicAFF, MBAFF)    No    No    Yes   Yes   Yes      Yes       Yes        Yes                                                                                                                       Primarily       targeting       production
                                                                                                                                                       4.1      245760          8192         50000      62500    150000       200000        1920×1080@30.1
Extended Profile (XP)                        Multiple reference frames            Yes   Yes   Yes   Yes   Yes      Yes       Yes        Yes                                                                                                                       applications, this profile is the Scalable
                                                                                                                                                                                                                                            2048×1024@30.0
Intended as the streaming video
                                             In-loop deblocking filter            Yes   Yes   Yes   Yes   Yes      Yes       Yes        Yes
                                                                                                                                                                                                                                            1920×1080@64.0
                                                                                                                                                                                                                                                                  High Profile constrained to all-Intra
                                             CAVLC entropy coding                 Yes   Yes   Yes   Yes   Yes      Yes       Yes        Yes            4.2      522240          8704         50000      62500    150000       200000                              use.
profile, this profile has relatively high                                                                                                                                                                                                   2048×1080@60.0
                                             CABAC entropy coding                 No    No    No    Yes   Yes      Yes       Yes        Yes
compression capability and some extra        8×8 vs. 4×4 transform adaptability   No    No    No    No    Yes      Yes       Yes        Yes
                                                                                                                                                                                                                                            1920×1080@72.3
tricks for robustness to data losses         Quantization scaling matrices        No    No    No    No    Yes      Yes       Yes        Yes
                                                                                                                                                                                                                                            2048×1024@72.0
and server stream switching.                                                                                                                            5       589824         22080         135000    168750 405000          540000        2048×1080@67.8
                                             Separate Cb and Cr QP control        No    No    No    No    Yes      Yes       Yes        Yes
High Profile (HiP)                                                                                                                                                                                                                          2560×1920@30.7
                                             Monochrome (4:0:0)                   No    No    No    No    Yes      Yes       Yes        Yes
The primary profile for broadcast and                                                                                                                                                                                                       3680×1536@26.7
                                             Chroma formats (4:2:x)                0    0     0     0       0       0        0, 2      0, 2, 4
                                                                                                                                                                                                                                           1920×1080@120.5
disc storage applications, particularly      Largest sample depth                  8    8     8     8       8       10        10         14
                                                                                                                                                       5.1      983040         36864         240000    300000 720000          960000        4096×2048@30.0
for       high-definition       television   Separate color plane coding          No    No    No    No     No       No        No        Yes         Information extracted from www.wikipedia.org
                                             Predictive lossless coding           No    No    No    No     No       No        No        Yes                                                                                                 4096×2304@26.7
applications (this is the profile adopted
into HD DVD and Blu-ray Disc, for                                                                    Information extracted from www.wikipedia.org
example).
High 10 Profile (Hi10P)
Going beyond today’s mainstream
consumer product capabilities, this
profile builds on top of the High Profile,
adding support for up to 10 bits per
sample of decoded picture precision.




                                                                                                                                                                                                                                                                              www.blusensnetworks.com
92            Technical Specs                                                                                                                                                                                                                                                   Technical Specs                    93



                                                                                                                                             Gigabit Ethernet Crossover RJ45 Pinout                                               Gigabit Ethernet Crossover RJ45 Pinout
       Wiring                                                                                                                                                 Connection 1: T568A             Connection 2: T568A Crossed                        Connection 1: T568B               Connection 2: T568B Crossed
                                                                                                                                             Pin                                                                                  Pin
                                                                                                                                                     Signal    Pair           Color         Signal   Pair         Color                 Signal     Pair         Color            Signal   Pair         Color
Horizontal cables should be terminated using the T568A pin/pair assignments, “or, optionally, per [T568B] if necessary to
accommodate certain 8-pin cabling systems”. Despite this instruction, many organizations continue to implement T568B                           1     BI_DA+      3                          BI_DB+    2                            1    BI_DB+      2                            BI_DA+    3
for various reasons, chiefly associated with tradition (T568B is equivalent to ATT 258A). The United States National                                                 white/green stripe                    white/orange stripe                           white/orange stripe                    white/green stripe
Communication Systems Federal Telecommunications Recommendations do not recognize T568B.
                                                                                                                                               2     BI_DA-      3                          BI_DB-    2                            2    BI_DB-      2                            BI_DA-    3
 Ethernet Cable RJ45 Pinout                                                                                                                                               green solid                          orange solid                                  orange solid                            green solid
       Pin             T568A Pair         T568B Pair    Wire                  T568A Color                        T568B Color

                                                                                                                                               3     BI_DB+      2                          BI_DA+    3                            3    BI_DA+      3                            BI_DB+    2
         1                  3                  2         tip
                                                                                                                                                                      white/orange stripe                   white/green stripe                            white/green stripe                     white/orange stripe
                                                                           white/green stripe                 white/orange stripe
                                                                                                                                                                                                                                                                                  BI_
                                                                                                                                               4     BI_DB+      1                          BI_DD+    4                            4    BI_DB+      1                                      4
                                                                                                                                                                                                                                                                                  DD+
         2                  3                  2         ring
                                                                                                                                                                           blue solid                       white/brown stripe                                blue solid                         white/brown stripe
                                                                               green solid                       orange solid

                                                                                                                                               5     BI_DB-      1                          BI_DD-    4                            5    BI_DB-      1                            BI_DD-    4
         3                  2                  3         tip
                                                                                                                                                                       white/blue stripe                       brown solid                                 white/blue stripe                        brown solid
                                                                           white/orange stripe                white/green stripe

                                                                                                                                               6     BI_DB-      2                          BI_DA-    3                            6    BI_DA-      3                            BI_DB-    2
         4                  1                  1         ring
                                                                                                                                                                          orange solid                          green solid                                   green solid                           orange solid
                                                                               blue solid                         blue solid

                                                                                                                                               7     BI_DD+      4                          BI_DC+    1                            7    BI_DD+      4                            BI_DC+    1
         5                  1                  1         tip
                                                                                                                                                                                                                blue solid                                                                           blue solid
                                                                            white/blue stripe                  white/blue stripe                                      white/brown stripe                                                                  white/brown stripe


         6                  2                  3         ring                                                                                  8     BI_DD-      4                          BI_DC-    1                            8    BI_DD-      4                            BI_DC-    1
                                                                              orange solid                        green solid                                             brown solid                        white/blue stripe                               brown solid                          white/blue stripe

                                                                                                                                            Information extracted from www.wikipedia.org
         7                  4                  4         tip
                                                                           white/brown stripe                 white/brown stripe


         8                  4                  4         ring
                                                                                                                                                                                                                                                                 Cable Recommendations
                                                                              brown solid                        brown solid
Information extracted from www.wikipedia.org




                                                       An Ethernet crossover cable is a type of Ethernet cable used to connect computing
                                                       devices together directly where they would normally be connected via a network
                                                       switch, hub or router, such as directly connecting two personal computers via
                                                       their network adapters.

                                                                                                                                                                                                                                                                           Use shielded connections
                                                       Automatic MDI/MDI-X Configuration is specified as an optional feature in the
                                                       1000BASE-T standard, meaning that straight-through cables will often work
                                                       between Gigabit capable interfaces. This feature eliminates the need for crossover
                                                       cables, making obsolete the uplink/normal ports and manual selector switches                Avoid heavy weights on the cable
                                                       found on many older hubs and switches and greatly reducing installation errors.




                                                                                                                                                                                                                  Use appropriate clamps



                                                                                                                                                                                                                                                                               Avoid heat sources

                                                                                                                                                       Respect bending radius




                                                                                                                                                                                                                                                                                www.blusensnetworks.com
94   References table                                                                                Certification     95




                 AC.1154                        VTL-DEM-1.033
                 AC.1254                        VTL-FUL-1.033
                 AC.12154                       VTV-AAP-1.032
                 AM.10054                       VTV-DSC-1.032
                 AM.20055                       VTV-DSM-1.032
                 AM.30055                       VTV-IAP-1.032
                 CN.130045                      VTV-LTV-1.032
                 CN.1120046                     VTV-MID-1.032
                 DS.10075                       VTV-PVR-1.032
                 GH.10078                       VTV-SAP-1.032
                 GL.10079                       VTV-STB-1.032
                 IM.150024                      VTV-VOD-1.032
                 IM.1200025
                 IP-14.136
                 PDS-BAS-1.033
                 PDS-LCC-1.033
                 PDS-LCL-1.033
                 PDS-LCM-1.033
                 PDS-LCX-1.033
                 PDS-MUL-1.033
                 PLT-BAS-1.033
                 PLT-EXT-1.033
                 PS.10072
                 SC/2CI53
                 SC/3ASI-MMI52
                 SC/4COFDM-MMI52
                 SC/4DVBS-MMI52
                 SC/4DVBSS2-MMI52
                 SC/4QAM-MMI52
                 SC/ADMSDIHD53
                 SC/ASIOUTMX53
                 SC/CAB1PSSW51
                 SC/CAB1PSSW-IPOUT51
                 SC/CAB1PSSW-IPOUT4CI51
                 SC/CAB1PSSW-IPOUT-IPOUT4CI51
                 SC/CAB4PS-0351
                 SC/CAB4PS-0351
                 SC/CAB4PS-0451
                 SC/DVBSCS25053
                 SC/GBIPIN-MMI52
                 SC/GBIPOUT53
                 SC/SWM51
                 SC/SWM51
                 SD/HPDDMRF53
                 SN.1243
                 SN.14844
                 T.1438
                 T.14+37                                         UNE 166002:2006 for RD Quality
                 VR.10058




                                                                                                    www.blusensnetworks.com
Blusens Technology . Blusens Middle East . Blusens Sudamérica . Blusens México . Blusens Music . Blusens Interactive

                             www.blusensnetworks.com

Blusens Networks IPTV 2013

  • 1.
  • 2.
    2 the company the company 3 Blusens started its commercial activity Blusens has far exceeded these Plan objectives by becoming the MP3 sales leading the horizontal integration by developing in 2002 with a firm and determined manufacturer within the Spanish market in a time span of only four years, achieving up HDTV distribution systems via IP and step in a field traditionally controlled to 300% annual exponential growths and showing no hints of decrease. coaxial cable. by multinational brands. The targets at Blusens, with its range of products, can be found in more than 6,000 points of sale Having a fare presence in the GCC area that moment were ambitious but they comprehended in the largest distribution chains in the country and it is now starting an our systems are installed in a wide variety were perfectly reflected in the 2002-2005 unprecedented internationalization stage. of projects and developments. From Strategy Plan. The Plan was thoroughly Our distinguishing features -constant innovation, good value for money, guaranteed Luxurious hotels like the Vision Hotel designed for us to be different and profitability, creative marketing and after-sales service- have been exceptionally in Abu Dhabi, Diva Hotel in Bahrain and innovative, to grow at an unforeseen pace received by our customers. Blusens compromise to continuously improve the product Lamborghini Hotel in Syria to universities and provide the consumer electronics quality and the customer service is mirrored in the creation of our own Support Centre like Princess Noura in Saudi Arabia and sector, so in need of a change, with new located in Santiago de Compostela, Spain, with a Call Centre where all the customers’ blood. We have created a quality brand calls are directly received and dealt with in order to provide a better and faster response from scratch, from the Spanish region of to Blusens product users. Galicia and for everybody, a quality brand In line with our young, vibrant and restless image, we are sponsors of Miss Spain guided by its excellence on every single Pageant, which has associated our brand with the world of Fashion, we also sponsor operative aspect with the objective of the Blusens MotoGP Team, a promising endeavour that supports young and bright being the best at what we do. new pilots who are already making a dent in their championships, and the Spanish Professional Blusens Basketball Team. Further to these efforts, we have thrown ourselves into the virtual world of social networking with our BlusensTV one2one community, Blusens Music Digital music label and many other initiatives that keep us in the forefront of technology, communication mega projects like the Reemram project and marketing while closing the gap between the user and the brand. in Dubailand, Dubai. Our next step was the implementation of our young and forward looking mindset on Our commitment to QC and continuous the export markets. Starting in Dubai (2007), we have embarked in a very aggressive R&D, along with a focused customer globalization campaign under the same motto that made Blusens successful in Spain. service philosophy guarantee the performance and reliability of our That is being young, fresh, reliable, systems. Capable now, as we are, of innovative and, most of all, closing the gap designing and implementing HDTV between the brand and the user. Today we systems that range from the small single INNOVATION: R&D are present in China (2007), Middle East apartment to the most luxurious hotel Constant innovation is one of the pillars of Blusens’ success. That is the reason why we have increased the investments in Research, (2007), Mexico (2008), Uruguay (2008) and complex or cable TV operator... Development and Innovation up to exceed 10% of the estimated annual turnover. These investments have culminated in the creation Brazil (2012). We will stretch ever more to become of our own research team made up by over 35 people. Such a commitment with innovation has fostered the creation of groundbreaking We continue to strive and develop the reference in innovation, technology, new products such us the G01, the first European GPS navigator that uses pictometry, the web:tv, a powerful internetTV server and ever more technological products by marketing and customer service. home entertainment controller, the integration of IPTV protocols over power line... launching our new communications line We can afford to be unique, different. These advanced products provide a powerful statement that says that technological breakthroughs can be born, developed in which we have taken a new step in To be Blusens. and implemented in Spain. Innovation is the aspect that more clearly defines our Marketing strategy. Blusens has always been characterized by a creative and aggressive Marketing, with actions often associated with large conglomerates. Blusens innovative and creative strategies have made a deep impression in the field, revealing the firm as a company always on the look-out for different mediums and strategies with the aim of providing freshness to our Marketing. www.blusensnetworks.com
  • 3.
    Table of Contents 5 IPTV 7 ·· What is IPTV? 9 ·· What can IPTV do for you? 11 ·· What can Blusens do for you? 16 ·· IPTV Concepts 17 ·· IPTV Components 19 ·· System Architecture 20 Middleware23 ·· Middleware Nodes 24 ·· Management Interface 27 ·· Software Licenses 31 Set Top Box 35 ·· High definition STB 36 VoD Streaming Cluster 41 ·· Storage nodes 42 ·· Streaming nodes 45 ·· Optional Features 47 IP Contribution Head-end 49 ·· Digital Contribution 50 ·· Analog Contribution 54 Net PVR 57 ·· Net PVR 58 DIGITAL SIGNAGE 61 ·· What is Digital Signage? 62 ·· What can Digital Signage do for you? 63 DS Servers 71 ·· Playout Server 72 ·· Signage Server 73 Channel Generators 77 ·· High Connectivity 78 ·· Low Connectivity 79 FACIAL RECOGNITION 81 ·· What´s Facial Recognition? 83 ·· Technical Specifications 84 TECHNICAL SPECIFICATIONS 87 ·· MPEG-2 Profiles and Levels 88 ·· Glossary of Measurements 88 ·· Network Technologies 89 ·· H.264 Profiles and Levels 90 ·· Wiring92 ·· Cable Recommendations 93 www.blusensnetworks.com
  • 4.
  • 5.
    8 IPTV IPTV 9 What is IPTV? The cooperation between Interoud and Blusens, as software and hardware developers, has resulted in the birth of a true NEXTGEN IPTV system that is able to fulfil every requirement the Operator may need. From standard TV channels distribution, to HDTV, Video-on-Demand, Time-shift, personalized advertisement schemes and sponsorships, direct purchase from the TV, Digital Signage and more. IPTV Standard Platform The development of new technologies over IP Networks continues to contribute to the integration of a variety of Such solutions play a very important role in the services. These expand from the basic Ethernet network for computer interconnection, to DSL lines for internet hospitality sector as they provide the tools to increase access, IP telephony or the most advanced automation and control systems. the comfort level of their guests/patients, as well as the overall revenue. With this IPTV system, the hotel can The advantage of a standard communication technology over a single network allows the simplification of the cabling offer enhanced entertainment services at a Premium, network, enables the integration of varied services, which guarantees the compatibility with future technological increase the availability of other hotel services (Room developments, and facilitates the monitoring, security and control of any installation. Service, Laundry, Restaurant Reservations, Spa, Sports activities, Gift Shops, etc.) while getting valuable data Internet Protocol Television (IPTV) is one of the services that now can also integrate with the structured cable as to what their guests are watching, what channels are network of a building. Such revolutionary change in the way TV signal is distributed significantly improves the signal popular, what content type gets the most income, what quality, interactivity and control, giving the operators a plethora of options to monitor, add services, maximize hotel services have more demand, etc. audience and improve the return on the investment. Thus, IPTV by Blusens provides a true added-value tool to the operator that will, unobtrusively and reliably, increase the revenue on a system that otherwise only represents an added cost. www.blusensnetworks.com
  • 6.
    10 IPTV IPTV 11 What can IPTV do for you? Cable TV Operators IPTV by Blusens full-fledged solution enhances the services the operator can provide as it is fully interactive in every possible way. Direct TV purchase becomes a true reality for varied forms of products and services. Also, it allows the creation of Portals for different On-Demand content, Pay-per-View, and Live events. Our system enhances the data gathering of user consumption, enabling the use of complex statistics that will serve as a tool for continuous improvement and detection of overlooked niche markets. Hotels, Resorts, Compounds, Restaurants The complete solution offers a centralized point to control and monitor the guest’s consumption and usage of the entertainment system, providing useful statistics that can be used to tailor make the packages offered based on their origin, age group, income, occupation, etc. The On-Demand content and some LiveTV chan- nels can be offered in various languages and with captions to provide the closest sensation to a Home Cinema that a hotel can offer, while giving the Operator a variety of tools to insert various types of advertising formulas. All fully linked to the central Building Management System. Billing is, thus, seamlessly integrated. Hospitals Added to the general Hospitality functionality, IPTV can record, and make available to the user network, any workshop, lecture, seminar or procedure carried out in the facility, thus enhancing the practise and resources available to the Hospital. The offer to the patient can even include the meal selection from his physician’s approved menu. Corporate or Government Networks The integration of the video streams in an existing IP infrastructure makes possible the reception of any content on any facility, even on mobile devices. With an IPTV platform all the multimedia content generated in courses, seminars or master lectures can be recorded and redistributed live during the event or later, to feed STB, PCs inside the complex, Digital Signage panels or via an internet web portal. Educational Facilities Using the Corporate services as a base, an education institution may be interested in adding notes to the video or a real time messaging feature to allow the users watching a live event like a surgery to share opinions and comments with other users. www.blusensnetworks.com
  • 7.
    12 IPTV IPTV 13 MAIN MENU WATCHING LIVE TV PVR WATCHING ON DEMAND TV APPS Sponsorship TELETEXT •  All the menus and descriptions in •  Complete EPG to help the user to •  Time Shifting support enables the •  Browse through content categories, •  Increases the capacity of the STB via •  Sponsor logos on the Menu System. the mother tongue of the guest. find the desired program. user to pause live contents and subcategories, individual content external applications. •  Banners on different sections and •  Main services easily accessible from •  Both Live TV and playout channels. resume it later. titles and their synopsis. •  Third party API available to develop areas of the screen. the main menu. •  Program search. •  CatchUP TV allows the guest to •  Suggestions, popular contents, etc. specific applications for the •  Static and dynamic text and •  Help. •  Check metadata information. watch a content from the beginning. •  Browse the active rentals and rental platform. graphical banner options. •  Multitasking support. •  Channel view and calendar view. •  NetPVR makes possible to watch history. •  To be defined based on customer WELCOME SCREEN •  Navigate channels through the mini- on demand contents that were •  Full control: play, pause, stop, fast •  The A/V content is not interrupted by needs. •  Welcomes the guest when he arrives guide. broadcasted in the past. forward rewind at several speeds. using an app. to his room for the first time. •  Advertising capabilities (static •  Manual recording schedule managed •  Parental control available. •  Name of the guest. banners, dynamic banners, RSS from the STB. •  Check in and out dates. feeds…) •  Complete integration with EPG. •  Welcome TV channel in the language •  Channel change under one second. •  Possibility of recording in external of the guest. •  Miniguide allowing a fast, smart usb key or netPVR server. •  The channel can be a live TV or a zapping. playout channel. www.blusensnetworks.com
  • 8.
    14 IPTV IPTV 15 INFORMATION PAGES CITY INFORMATION HOTEL INFORMATION EMERGENCY GAMES AND SERVICES ROOM SERVICE e-SHOPPING •  Suitable for displaying local •  Shopping malls list. •  Emergency telephones. •  Alarm message on every screen. •  World Time clock. •  Food ordering direct to the kitchen information about the hotel, the city •  Tourism points of interest. •  Hotel telephone extensions. •  Centralized control. •  Shows the different GMT zones. printer. and its surroundings. •  Recommended Restaurants. •  Evacuation map. •  Daylight saving control. •  Laundry request with specification •  Predefined library of styles and •  Pharmacies. •  Once the alarm has been triggered, •  Currency exchange helper. of the clothes rent. layouts. •  Unlimited possibilities... the middleware locks the STB •  High quality games. •  Housekeeping. •  Easy edition of the content, no HTML interactivity, the guest can not needed. override the message. •  Easy addition of pictures used to •  Automatic volume rise. illustrate the page. •  Easy sorting of pages according to assigned categories into menus and submenus. BILLING NEWS INTERNET MESSAGING WAKE UP CALL PIN CODE •  Shows the bill with real-time •  Integration of real time RSS news •  Internet Browsing. •  Text messaging from hotel desk to •  Selection of TV or Radio Channel •  Possibility of protecting the access information coming from the hotel feeds. •  Advanced Java Script Support. the guest room. used as Wake Up channel. to certain services via pin code. PMS. •  Chronological sorting of the latest •  Full featured Web Browser. •  Text messaging from the guest room •  The platform has its own minimal news. to the hotel desk. PMS system for hotels without a •  Optional text messaging between third-party PMS. rooms. •  Possibility of accepting the bill for express check-out. www.blusensnetworks.com
  • 9.
    16 IPTV IPTV 17 What can Blusens do for you? IPTV Concepts Blusens is your One-Stop Shop for any IPTV requirements, providing a wide and scalable range of products, Playout Channel solutions and content that will fit every sized project: IPTV Contribution System Live channel generated from local stored contents. Equipment responsible of tuning live TV or radio For example advertising videos of the hotel or a •  Latest generation technology for hospitality and cable TV environments based on Blusens Technologies recent movie in a continuous loop. Both live and streams and its injection into the IP network. devices and Interoud platforms that provide a full end-2-end solution. playout channels will be treated the same way by •  Immediate consultancy and maintenance services throughout the life cycle of the project from inception to the middleware. Playout channels are also Multicast Middleware traffic. execution and operation. Core of the system. Orchestrates interactions with •  Wide international experience to help define appropriate requirements and commercial services. every other part of the IPTV platform. It manages the access rights to LiveTV channels, movies or Unicast Traffic sections for specific users. It also manages the Communication between one origin and one interaction with the hotel PMS system for pay per destination. Used when one stream per user is view purposes. required, for example in VoD streams. Multicast TrafficCommunication between one origin and several destinations. sed when the same stream Video on Demand. VoD can be delivered simultaneously to several users, Interactive video delivery technology which allows for example in LiveTV streams. each user to be provided with its own video stream, as if it were coming from a local DVD player. The user can pause, fast forward, rewind, etc. the movie Multicast Traffic at several speeds without interfering with the video Communication between one origin and several beign watched by other users. VoD is unicast traffic. destinations. Used when the same stream can be delivered simultaneously to several users, for example in LiveTV streams. Set Top Box. STB Device used to decode IP video streams delivered through the network in a format suitable for being Number of on Demand Media watched in a standard TV Set. Is also responsible Number of demand contents (i.e. movies or of displaying the menus used to browse all the videoclips) stored in the VoD storage node server. contents of both VoD and LiveTV media library as Each content can be watched simultaneously by an well as the interactive info pages. undefined number of users with a single copy of the content on the server. Live Channel Stream coming from the satellite dish or any On Demand Media Bitrate broadcast technology like DTT. Usually a TV or radio Bandwidth consumed by each stream transferred channel. A channel coming from a CCTV IP camera through the network. 5Mbps is the same quality is also considered a Live Channel. Live channels are as the live television channels coming from the Multicast traffic. satellite. 8 to 12Mbps are required for HD content. IP RF Expandable in number of services Yes Limited Expandable in number of users Yes Limited Number of Users Maximum Concurrency HD capabilities Yes No It refers to the number of STB to consider. Each STB Represents the maximum number of users expected Interaction with other systems (telephony, internet…) Yes No will be capable of playing one content independently to be consuming VoD contents at the same time with Availability of VoD Yes No from the others. One STB per TV screen is required. a percentage (notice that there’s no limitation on Interaction with PMS Yes Limited concurrent users for Live or Playout channels as concurrency applies only for VoD) Recording and time shifting Yes No Network Monitoring Yes No Access restrictions and parental control Yes No Hotel interface personalization Yes Limited Multi-language capabilities both on the interface and on contents Yes No Flexible pricing for different contents Yes No Contents categorization Yes Limited Remote centralized control of the STBs Yes No In-line editing of local information pages Yes Limited Messaging capabilities Yes Limited Dynamic banner facilities Yes Limited Emergency alerts and warnings Yes Limited Several services over the same cabling network Yes No Easy integration with several required services Yes No www.blusensnetworks.com
  • 10.
    18 IPTV IPTV 19 IPTV Components IP CONTRIBUTION PLAYOUT SERVER Performs the tuning of Live satellite video streams Generates multicast Live channels with local contents and its conversion into IP streams. according to a time schedule. One DVB-S module can tune all the channels in a Suitable for advertising channels, local promotion or transponder simultaneously pay per view movies Responsible of channel descrambling when necessary Seamless splicing allows to smooth the transition between two videos to avoid video noise Each CAS module can descramble several channels VoD CLUSTER NET PVR Serves individual and independent video streams to Stores cyclic recordings for several days of Live TV each user. Channels or CCTV Cameras. Each stream is unique for each user The recordings can be accessed later so one user can watch what Fast Forward Live Archive Manages behavior of VCR was on certain channel on certain Rewind moment in the past controls Pause The user is not tied to the broadcast scheduling VCR operations performed at several speeds anymore Stores contents to be streamed Stores metadata for this contents Controls the bandwidth for each stream STRUCTURED NETWORK CABLING Performs the connections between servers, routers, MIDDLEWARE switches and STBs. Core of the IPTV system. Manages interactions Maximum length of each connection: 100 mt. between each part of the system. The network is divided in a hierarchical way Menu generation The switches can be cascaded Content authorization The network has star shape, not bus shape Billing and PMS integration Statistics collection Media cataloging SET TOP BOX EPG generation Decodes the IP audio/video streams for playing it in a standard TV set. Generation of the GUI ROUTERS AND SWITCHES Manages interaction with Keyboard Carries IPTV info packets to the correct destinations. the user Remote control Each one acts as a repeater so there is no attenuation Can be remotely controlled via the middleware of signal Responsible of broadcast and multicast replication of streams www.blusensnetworks.com
  • 11.
    20 IPTV IPTV 21 System Architecture 1. The VoDKAST Middleware server creates the STB menus by accessing the metadata information of the videos from the VoD cluster (movie name, actors, director, etc.) and the EPG information from the live and playout channels while considering the user access rights and credit information obtained from the PMS. Thus, the menu is customized for each guest. 2. The hotel operator can fine tune the platform through the management console. The Middleware Server also monitors the current state of each part of the system and triggers the proper alerts to the management consoles in case of any problem. 3. The VoD Streaming Cluster stores all the videos in its storage nodes and streams it to the network through the streaming nodes. The platform allows an unlimited number of streamer and storage nodes to increase the storage or streaming capacity independently from each other according to the operator needs. 4. The IP Contribution System obtains the live DVB-S, DVB-C and DVB-T MPEG-2 streams from satellite, cable or terrestrial feeds and injects them into the IP network as IP multicast streams. 5. The Playout Server generates continuous loop streams of stored contents as IP multicast streams. 6. The NetPVR server stores local recordings of live TV channels to provide time-shifting features to the platform. 7. The Digital Signage server controls the digital signage screens and split its layout in several regions that can be filled with any multimedia content, even Adobe Flash. 8. The Ethernet Switches aggregate the outputs of all the servers and carry the video streams to the screens through the IP network. 9. The integrated solution allows several types of STB and screens working together: Standalone STB screen, Standard PCs screens and Low or High Connectivity Digital signage screen. Any IPTV content (live, playout, VoD, etc.) can be displayed in any of the STB types. IPTV Architecture Graphic www.blusensnetworks.com
  • 12.
  • 13.
    24 Middleware Middleware 25 2000 User Clustered Middleware Node The middleware server is the core of the Blusens IPTV solution. It controls the interaction between This node is aimed to provide a solution for larger deployments such as cable each part of the system and the interaction of the system itself with the rest of the hotel services. It is operators, universities, etc. Due to its clustering approach this nodes allow also the entry point for the hotel operator, where he can check the status of the network, the connected unlimited growing capacity via clustering. This servers are capable of working STB, trigger alerts to pop up in one or a group of STB etc. together to provide one middleware controlling an unlimited number of users. With its cluster approach, a system created with this nodes can integrate spare VoDKAST will generate menu screens for browsing all the media library in an integrated way. The servers that are automatically hot swapped when an anomaly occurs without interface is coherent among all the applications of the system (i.e. TV, VoD, NetPVR, services). It’s service interruption. also able of providing screens with local information of the hotel and surroundings. This information screens are very simple to create and edit via collection of templates that the operator can modify online through the management interface. All the modules of this middleware are multilingual and can IM.12000 IPT V Clustered Middleware for 2000 users support any language with any font, for example, Arabic. The VoDKAST middleware provides mechanisms to interact with several hotel services (room service, •  Up to 2000 middleware users per node. laundry, housekeeping, etc…) providing direct communication with the departments where this services •  Intel Xeon Quad core processors. are stored and being able also to print text messages with the service required. •  4GB 800Mhz FB-DIMMs RAM. •  Up to 4 RAID 1+0 mirrored 250Gb Hard disks. VoDKAST has the ability of overimpressing banners over the video of all or only some of the Set Top •  4 x Gigabit Ethernet network interfaces. Boxes. It’s also able of blocking the ability of override the message by locking remotely the IR control •  Optional 10 Gigabit Ethernet interface. of the STB. IM.1500 Processor One or Two Quad-Core Intel Xeon L5420 Processor, 2.50 GHz, 1333 MHz FSB, 50W. Middleware Nodes Cache Quad Core Processors: 12 MB L2 cache per core Architecture DIMM Slots Memory Type Up to 32 GB of 800 MHz ECC FB-DIMM or 667 MHz ECC FB-DIMM Main memory Memory Configuration 4 GB total memory. System configurations from 1 GB up to 32 GB The middleware nodes are the servers that conform the middleware cluster. Depending on the number Graphics Controller ASPEED AST2000 of users the middleware can be a single server or a cluster of multiple machines working together to System architecture Intel Quad Core technology provide unlimited growing capabilities to the platform. Network: Four Integrated 10/100/1000 Base-T Ethernet ports Management: Service processor with embedded Lights Out Manager (LOM) standard In hospitality environments a cluster of nodes is rarely required, but, in other case scenarios, like telco Serial: RJ-45 Standard/integrated interfaces operators for example, this requirement becomes more common. Please ask your sales representative SATA: Up to two hot-pluggable SATA bays, 2 TB max. to give you more information about the telco approach for larger installations. USB: Five USB 2.0 ports (two front, two rear, one internal) Expansion bus: One PCIe slot (x16 electrical/x16 mechanical), half-length, half-height The middleware nodes are built with the lastest and highest quality components sharing the group of Solaris OS 10 or GNU/Linux Software Operating systems IPMI 2.0 compliant Service Processor with embedded. Lights Out Management offering remote power, KVM features that configure them as high reliability “state-of-the-art” ones. (keyboard, video, mouse) and media capability Internal disk option Two hot-pluggable 250-750 GB 7200 rpm 3.5” SATA II HD Mass storage Removable Media Up to one EIDE DVD-ROM or DVD+/-RW DL drive 500 User Standalone Middleware Node and media RAID RAID 1 hardware mirroring to provide fault tolerance Operating temperature: 5° to 35° C (41° to 95° F) at sea level Non operating temperature: -40° to 68° C (-40° to 154° F), up to 93% relative humidity, non condensing, 38° C This node is focused in providing the middleware for small/medium sized max. wet bulb installations. With its two dual core processors, this server is able of managing Environment Operating altitude: Up to 3,000m (9,000 ft.), max. ambient temperature is derated by 1° C per 300m above 900m up to 500 users concurrently. Non operating altitude: up to 12,000m (=~36,000 ft.) The RAID1 mirroring between the two 7200rpm SATA hard disks guarantees the Acoustic noise: 70 dBA operating, 69 dBA idle (declared noise emissions in accordance with ISO 9296 lowest cost per GB of storage space and reveals this unit as a high reliability one. A-weighted, sound power) The 1RU form factor highlights this server as one of the most dense ones in what Single PSU Power AC power: 100–240 V AC (47–63 Hz) is referred to number of users per RU. Safety IEC 60950, UL/CSA 60950, EN 60950, CB Scheme with all country differences Regulations RFI/EMI FCC CFR 47 Part 15 Class A, EN 300 386 v1.3.3, EN 55022 Class A, EN 61000-3-2, EN 61000-3-3 Immunity EN 55024, EN 300 386 v1.3.3 IM.1500 IPT V Standalone Middleware for 500 users Safety CE, CB Scheme, UL, CSA, CCC, BSMI, AR-S, GOST-R Certifications EMC CE, FCC, VCCI, ICES, BSMI, CCC, MIC, C-Tick, AR-S, GOST-R Other RoHS-compliant labeled, per WEEE (Waste Electrical and Electronics Equipment) Directive (2002/95/EC) •  Up to 500 middleware users. Height 44 mm (1.7”) •  Intel Xeon Dual core processors. Dimensions Width 425.5 mm (16.8”) •  2GB 800Mhz FB-DIMMs RAM. and weight Depth 633.7 mm (25”) •  2 RAID 1 mirrored 250Gb Hard disks. Weight 13.3 kg (27.2 lbs.) •  4 x Gigabit Ethernet network interfaces. Warranty One year, next business day •  Optional 10 Gigabit Ethernet interface. Hardware Specifications may change without prior notice. www.blusensnetworks.com
  • 14.
    26 Middleware Middleware 27 Management Interface The LiveTV and playout channels IM.12000 IM.12000 can be shown or hidden to certain Processor Two Intel Xeon processors 5500 series Operating temperature: 5° C to 35° C (41° to 95° F) at sea level STB or rooms. It’s numbering can Level 1: 32 KB instruction and 32 KB data L1 cache per core Non operating temperature: -40° C to 68° C (-40° be easily resorted and, if provided Level 2: 256 KB unified (data and instruction) L2 to 154° F) by the operator, teletext and Cache cache per core Operating relative humidity: up to 93%, non subtitles are fully supported. Architecture Level 3: 4 MB or 8 MB shared inclusive L3 cache per condensing, 38° C max. wet bulb processor Non operating relative humidity: Up to 93%, non 12 DDR3 DIMM slots (six DIMM slots per CPU socket); condensing Main Environment system supports from 2 GB (1x 2 GB to 96 GB (12x 8 Operating altitude: Up to 3,000m (9,000 ft.), max. memory GB) of memory ambient temperature is derated by 1° C per 300m Based on Intel Xeon processor 5500 series and Intel above 900m System architecture 5500 Chipset Non operating altitude: 10,000m (35,000 ft.) Network: Two 10/100/1000Base-T Ethernet ports Acoustic noise: 7.5 B operating, 7 B idling / 70 dBA Serial: One RJ-45 port operating, 60 dBA idle (declared noise emissions in accordance with ISO 9296 A-weighted, sound Standard/integrated USB: Five USB 2.0 ports (two front, two rear, one power) interfaces internal) Single non redundant power supply; max. power Expansion bus: One PCIe 2.0 slot (x16 electrical/x16 supply rating 600 W at 80% efficiency Power mechanical, low-profile) AC power: 100–240 V AC (47–63 Hz) Solaris 10 OS IEC 60950, UL/CSA 60950, EN 60950, CB Scheme OpenSolaris™ OS Safety with all country differences Red Hat Enterprise Linux 4 Regulations FCC CFR 47 Part 15 Class A, EN 300 386 v1.3.3, EN The contents can be marked RFI/EMI Red Hat Enterprise Linux 5 55022 Class A, EN 61000-3-2, EN 61000-3-3 with any tag defined by the Operating SUSE Linux Enterprise Server 10 Immunity EN 55024, EN 300 386 v1.3.3 administrator, like action, Software systems VMware ESX 3.5 CE, CB Scheme, UL, CSA, CCC, BSMI, AR-S, Safety High Definition, Music Video, Windows Server 2003 Standard/Enterprise Editions GOST-R Documentary, advertisement, Windows Server 2008 Standard/Enterprise Editions CE, FCC, VCCI, ICES, BSMI, CCC, MIC, C-Tick, EMC Black and White movie etc. Certifications AR-S, GOST-R Windows Server 2008 Standard/Enterprise/ Datacenter Editions RoHS-compliant labeled, per WEEE (Waste The middleware allows the Other Electrical and Electronics Equipment) Directive administrator to sort this tags in Networking Two GbE ports integrated on motherboard (2002/95/EC) Optional Sun Integrated Lights Out Manager (ILOM) Height 43mm (1.7 in.) any menu/submenu configuration, service processor module so browsing thousands of contents Width 436mm (17.2 in.) – VGA 8 MB: 1,024x768 at 60 Hz Dimensions Depth 650mm (25.6 in.) is very comfortable. – Management port: One 10/100 RJ-45 port and weight MIN 9.8 kg (21.7 lbs.) Enables remote power control; remote keyboard, Weight video, mouse (KVM) graphical MAX 13.9 kg (30.6 lbs.) Management access; and remote media (DVD, CD, floppy) Rackmounting slide rail kit Secure remote access using Web interface over SSL, Mounting option Toolless rackmounting slide rail kit or CLI over SSH Cable management arm Sun™ xVM Ops Center software support Warranty One year, next business day IPMI 2.0, SNMP v1, v2c, and v3 In-band, out-of-band, and side-band remote management Up to four hot-pluggable 3.5 in. SATA disk drives, 4 TB max.: 1 TB, 500 GB (7,200 rpm) Mass storage Internal Up to four hot-pluggable solid-state drives (SSDs), and media disk option The price ruling system is very 128 GB max.: 32 GB3 Up to two Sun Flash Modules, 48 GB max.: 24 GB3 flexible, allowing the hotel to provide different prices according Hardware Specifications may change without prior notice. to categories like movie genre, director, length, etc. The system provides a price simulator to check the price charged for the movie to the guest for a particular situation. www.blusensnetworks.com
  • 15.
    28 Middleware Middleware 29 The administrator is capable of monitoring what is being played in any room at each STB for any given moment. It’s also capable of rebooting a group or a single STB or even forcing it to tune a specific channel or content and locking the IR control of the STB. The administrator can check the current billing for any given STB or room at any moment. The logging system is continuously monitoring the status of the system an can provide alerts when a STB is disconnected from the network or a live TV channel is not The price of the media contents are receiving content. This prevents determined by a very flexible price any unauthorized access to the rule mechanism. This provides the distribution network. operator the flexibility of grouping some channels into one pack and The middleware is also capable of price it. gathering use statistics for both The price rules are also defined VoD and live contents. according to a calendar, so creating an “action weekend offer“ is very simple. www.blusensnetworks.com
  • 16.
    30 Middleware Middleware 31 Software Licenses PMS integration The system can be integrated with the PMS that is part of the IT infrastructure of The system supports any the hotel. This way the hospitality system is able to generate per-user contents language in every part of the with the information acquired from the PMS. system: The interface in the STB, This service will be used for automatic charging the costs of the film rental or the management interface, and whatever pay service that the hotel must decide to implement on the billing of even the names of the tags can the customer. be internationalized. This way If the connection with the PMS system is not available for whatever reason, the system recognizes that the VoDKAST includes a minimal PMS for this purpose. “Action movies” will we shown The system also includes applications for viewing the billing of the user from the as “Peliculas de accion” for an comfort of the room. Spanish speaker. User Interface Modification The graphical interface of the IPTV system for the rooms can be completely It’s possible to select an specific customized to the needs of the customer. Custom logos, colors and even menu welcome TV channel according to elements can be integrated in the user interface to provide a coherent, tailor made the nationality of the guest. If the visual language with the rest of the systems in the hotel, hospital, university, etc. nationality is not registered in the system the welcome channel will be the default one. It’s also possible Development of specific application to run a specific advertisement as welcome video in the mother language of the guest. As the system proposed is a 100% end2end solution, any added value application designed specifically to fit the customer needs can be integrated in the menus of the STB. The flexibility is almost unlimited. Contact with a sales manager to evaluate the viability of a custom development for your needs. The edition of the local information pages is very easily done via the web interface. The administrator does not need any programming or web developing knowledge to create high quality local information pages. www.blusensnetworks.com
  • 17.
    32 Middleware Middleware 33 VoDKAST Middleware VTL-FUL-1.0 VoDKAST Lite Base license Full VoDKAST middleware license for a maximum of 15 users. VTV-MID-1.0 VoDK AST Middleware Base License VTL-DEM-1.0 VoDKAST Lite Demonstrator Middleware base license. Provides basic services as STB monitoring Full middleware HW+SW bundle limited to 10 users. VTV-LTV-1.0 VoDKAST Middleware LiveTV option Pulsar Digital Signage Upgrades the middleware with live TV channel management capabilities. VTV-STB-1.0 25 STB Base license PDS-BAS-1.0 Pulsar server license Base license for a package of 25 STB Standalone Digital signage server base license. Not required if a Vodkast VTV-SAP-1.0 25 STB Simple applications license Middleware (VTV-BAS-1.0) with digital signage module upgrade (VTV-DSM-1.0) is present. Upgrades the STB basic license with capabilities required for TV zapping, EPG browsing or decoding of a Digital Signage channel. Not required if a VTV-AAP-1.0 PDS-MUL-1.0 Pulsar server multi organization option advanced applications license is present. Upgrades the Pulsar Digital Signage server with multi-role, multi organization VTV-AAP-1.0 25 STB Advanced applications license capabilities. Allows the management of several Digiltal Signage networks with the same server. Allows the management of certain elements of the digital signage Upgrades the STB basic license with hospitality capabilities, wake-up alarm, schedule/templates to third party subsidaries. billing check, etc. Includes the VTV-SAP-1.0 basic applications license. PDS-LCX-1.0 Pulsar low connectivity channel generator license ( 10) VTV-IAP-1.0 25 STB Internet Applications license Low connectivity channel generator license, price per unit if less than 10 units. Upgrades the STB basic license with internet browsing capabilities, RSS feeds, weather, etc. PDS-LCL-1.0 Pulsar low connectivity channel generator license ( 50) VTV-VOD-1.0 25 STB Video on Demand support license Low connectivity channel generator license, price per unit if less than 50 units. Upgrades the STB basic license with Video on Demand capabilities for videoclub PDS-LCC-1.0 Pulsar low connectivity channel generator license ( 100) purposes. Low connectivity channel generator license, price per unit if less than 100 units. VTV-PVR-1.0 25 STB netPVR license PDS-LCM-1.0 Pulsar low connectivity channel generator license ( 100) Upgrades the STB basic license with network PVR capabilities for recording purposes. Low connectivity channel generator license, price per unit if more than 100 units. VTV-DSM-1.0 VoDKAST Digital Signage Module Upgrade PLT-BAS-1.0 Pulsar Lite Digital signage system Upgrades the middleware with both high and low connnectivity Digital Signage Low connectivity digital signage server and channel genrator for small deployments. management capabilities Up to 10 low connectivity lite channel generators (PLT-EXT-1.0) are suported VTV-DSC-1.0 VoDKAST Digital Signage Channel Upgrade PLT-EXT-1.0 Pulsar Digital Signage Lite extended channel generator Adds one Digital Signage High Connectivity Channel to the middleware. Requires a Upgrades a Pulsar Lite Digital signage system (PLT-BAS-1.0) with an extra low middleware with digital signage module (VTV-DSM-1.0) installed. connectivity channel generator. Up to 10 channel generators are supported. VTV-PMS-1.0 IPTV Middleware PMS integration Option Upgrades the middleware with integration with a third party PMS system such as Micros Opera. www.blusensnetworks.com
  • 18.
  • 19.
    36 Set Top Box Set Top Box 37 T.14+ High definition STB The STB is the device in charge of decoding IPTV streams to display High definition DVB-T (MPEG4/H264), able of playing high definition them in a standard TV set. Blusens STB includes the state-of-the-art Matroska MKV/H264 and compatible with Full HD (1080p - 24fps). technologies to provide the ultimate end user experience in terms of Compatible with multiple multimedia formats and allows AV and speed and interactivity with the IPTV system. It features HD capabilities component outputs including HDMI high definition output. up to 1080p with H.264 video and 5.1 optical audio output while providing Allows recording from conventional HD DVB-T, recording all audios and a minimal lag between channel zapping. subtitles.Timeshift function incorporated. WebTV T.14+ Multimedia DVB-T HDT V TUNER WebTV is a sophisticated Multimedia Center with the ability to manage, play and distribute audiovisual contents coming from Digital Terrestrial •  High Definition DVB-T Tuner (MPEG4/H264 and DVB-T MPEG2 definition. Television, Internet, WiFI connectivity or external audio, video or storage •  High definition Matroska MKV/H264 files playback. sources. •  Full HD (supports 1080p – 24fps) Allows the connection with Internet TV platforms (OTT), IPTV and RSS’s •  USB 2.0 Host port. thematic service access and other applications. •  EPG, Parental channel control, teletext and timer. Conectivity with wireless networks (802.11g) up to 54Mbps and Ethernet •  Allows channel sort. Networs 10/100Mbps. •  Recording: directly or programmed. •  Rename/Delete records. •  Delete files. •  Timeshift. IP-14.1/WebTV IP/OTT Set Top Box •  Multilanguage OSD menu. •  Customized for Iranian Market. •  Compatible with Internet TV (OTT). •  IPTV server and player. •  HD Media Player. •  Allows new application installations. IP-14.1/WebTV Dimensions 13 x 12 x 4 cm Weight 230 gr USB 2 USB Host Ports (USB 2.0) T.14+ Compatible Devices USB Storage Devices Dimensions 219 x 135 x 38 mm Composite Weight 400 gr Component USB USB Host 2.0 Port High Speed Video Outputs S-Video Composite HDMI v1.2 Video Outputs YPbPr Component S/PDIF (optical and coaxial) HDMI 1.3 High Definition (Full HD 1080p Supports) Audio Outputs 2 composite Audio Outputs Stereo Ethernet 10/100 Mbps RF antenna in IEC connector + loopthrough output Network Connection WLAN 802.11b/g up to 54Mbps and Ethernet MPEG 1-2, MPEG 4.2-XVID, MPEG AVC 4.10 H264, MPEG 4.14 NERO Video DIGITAL, AVCHD Video ASF, AVI, MP4, MPEG ES/PS/TS and Matroska (MKV) Compatible Image JPEG, BMP and PNG Compatible formats Image BMP, GIF, JPEG, JPG, PNG formats Audio MP3, AAC, WMA Audio MP3 and WMA Containers AVI, MP4, MPG, VOB, TS, TP, MKV, MP3, AAC, M4A, WMA, MOV, M2TS Video MPEG-1, MPEG-2, MPEG-4, WMV9, VC-1, MPEG-4.10 (H.264), DivX Compatible Codecs Compatible 2GB, 4GB, 8GB, 16GB, 32GB Audio MP3, AAC, MPEG-1 Layers I, II and III (MP3) 2.0, WMA9 USB drives FAT32/NTFS 128GB, 256GB, 500GB, 1TB, 1.5TB Subtitles Files “.srt” Client UPnP, NFS, Samba Hardware Specifications may change without prior notice. Streaming Protocol HTTP, MMS (MMS-T), MMS-H and RTSP Hardware Specifications may change without prior notice. www.blusensnetworks.com
  • 20.
    38 Set Top Box Set Top Box 39 T.14 T.14 HD DTT Set Top Box •  High definition DVB-T (MPEG4/ H264), able of playing high definition Matroska MKV/H264 High Profile L4.0 files and compatible with Full HD (1080p - 24fps). •  Compatible with multiple multimedia formats and allows multiple AV outputs including HDMI high definition output. •  Allows 24 hours of continuous recording from conventional HD DVB-T and programmable channel recordings. •  High Definition DVB-T Tuner (MPEG4/H264) and DVB-T MPEG2 definition. •  High definition Matroska MKV/H264, High Profile L4.0 files playback. •  Full HD (supports 1080p - 24fps). •  USB Host port. •  EPG, Parental channel control, teletext and timer. •  Allows channel sort. •  Recording: directly or programmed. •  English, spanish, galician, basque and catalonian OSD language menu. T.14 Dimensions 22,8 x16,5 x 4 cm Weight 694 g USB USB Host Port Antenna RF input and output Video Outputs HDMI 1.3 high definition output (Full HD, supports 1080p) Audio Outputs SPDIF Coaxial and optical audio output MPEG 1-2, MPEG 4.2-XVID, MPEG AVC 4.10 H264, MPEG 4.14 NERO DIGITAL, Video AVCHD Compatible Image JPEG, BMP y PNG formats Audio MP3, AAC, AC3, WMA, EAC3 Containers AAVI, MP4, MPG, VOB, TS, TP, MKV, MP3, AAC, M4A, WMA, MOV, M2TS Hardware Specifications may change without prior notice. www.blusensnetworks.com
  • 21.
  • 22.
    42 VoD Streaming Cluster VoD Streaming Cluster 43 The VoD cluster is the group of servers responsible of storing and streaming the on- demand contents to each STB managed by the middleware. The cluster can be divided Up to 2 Tb Storage Node into several storage and caching levels with one or more specific node at each level. The most common approach is to have one or two levels with one node each. In the first level, the storage nodes store and replicate the multimedia content library. SN.12 Up to 2 Tb Storage Node At the second and further levels, the streaming nodes act as both streamers and caching nodes, providing the capacity to answer the queries from the STB faster than from the first level. •  Up to 2 TB storage node. When a STB asks for a movie to a streamer, the streamer checks if the movie is stored •  Capable of storing up to 450 hours of SD video or 180 hours of HD video. locally in its own memory. If the content is available locally, the streaming starts •  RAID 1 mirroring to ensure data redundancy. immediately, otherwise, the streamer asks the storage to stream the content to itself. •  Gigabit Ethernet output. The content is then served through the streamer to the STB. At the same time, the content •  Optional 10 Gigabit Ethernet output. is split in two and cached locally in the streamer to speed up the subsequent accesses •  1 Disk Maximum fail tolerance. from other users to the same movie. This clustering approach means that the storing and streaming requirements can grow SN.12 SN.12 independently from each other making it possible to adapt the system to any installation Processor Two Intel Xeon processors 5500 series Operating temperature: 5° C to 35° C (41° to 95° Level 1: 32 KB instruction and 32 KB data L1 cache F) at sea level size. per core Non operating temperature: -40° C to 68° C (-40° Level 2: 256 KB unified (data and instruction) L2 to 154° F) Cache cache per core Operating relative humidity: up to 93%, non Architecture Level 3: 4 MB or 8 MB shared inclusive L3 cache per condensing, 38° C max. wet bulb processor Non operating relative humidity: Up to 93%, non 12 DDR3 DIMM slots (six DIMM slots per CPU socket); condensing Main Environment system supports from 2 GB (1x 2 GB to 96 GB (12x 8 Operating altitude: Up to 3,000m (9,000 ft.), max. memory GB) of memory ambient temperature is derated by 1° C per 300m Based on Intel Xeon processor 5500 series and Intel above 900m System architecture 5500 Chipset Non operating altitude: 10,000m (35,000 ft.) Network: Two 10/100/1000Base-T Ethernet ports Acoustic noise: 7.5 B operating, 7 B idling / 70 dBA Serial: One RJ-45 port operating, 60 dBA idle (declared noise emissions in accordance with ISO 9296 A-weighted, sound Standard/integrated USB: Five USB 2.0 ports (two front, two rear, one power) interfaces internal) Single non redundant power supply; max. power Expansion bus: One PCIe 2.0 slot (x16 electrical/x16 supply rating 600 W at 80% efficiency Power mechanical, low-profile) AC power: 100–240 V AC (47–63 Hz) Solaris 10 OS IEC 60950, UL/CSA 60950, EN 60950, CB Scheme OpenSolaris™ OS Safety with all country differences Red Hat Enterprise Linux 4 Regulations FCC CFR 47 Part 15 Class A, EN 300 386 v1.3.3, EN RFI/EMI Red Hat Enterprise Linux 5 55022 Class A, EN 61000-3-2, EN 61000-3-3 Operating SUSE Linux Enterprise Server 10 Immunity EN 55024, EN 300 386 v1.3.3 Software systems VMware ESX 3.5 CE, CB Scheme, UL, CSA, CCC, BSMI, AR-S, Safety Windows Server 2003 Standard/Enterprise Editions GOST-R Windows Server 2008 Standard/Enterprise Editions CE, FCC, VCCI, ICES, BSMI, CCC, MIC, C-Tick, EMC Certifications AR-S, GOST-R Windows Server 2008 Standard/Enterprise/ VoDKAST Architecture Graphic Datacenter Editions RoHS-compliant labeled, per WEEE (Waste Other Electrical and Electronics Equipment) Directive Networking Two GbE ports integrated on motherboard (2002/95/EC) Optional Sun Integrated Lights Out Manager (ILOM) Height 43mm (1.7 in.) service processor module Storage nodes – VGA 8 MB: 1,024x768 at 60 Hz Dimensions Width 436mm (17.2 in.) Depth 650mm (25.6 in.) – Management port: One 10/100 RJ-45 port and weight MIN 9.8 kg (21.7 lbs.) Enables remote power control; remote keyboard, Weight MAX 13.9 kg (30.6 lbs.) The storage nodes, with an optional external disk array, provide storage video, mouse (KVM) graphical Management access; and remote media (DVD, CD, floppy) Rackmounting slide rail kit of any content of the media library, ensuring fast access, fault tolerance, Secure remote access using Web interface over SSL, Mounting option Toolless rackmounting slide rail kit continuous data output and the capacity of redimensioning the network Cable management arm or CLI over SSH while in operation. Sun™ xVM Ops Center software support Warranty One year, next business day The storage facility will store both the VoD, NetPVR, playout and metadata IPMI 2.0, SNMP v1, v2c, and v3 Hardware Specifications may change without prior notice. of the whole media library of the hospitality system. In-band, out-of-band, and side-band remote The storage capabilities of the platform can be increased by adding more management storage nodes, independently from the streaming capacity required. Up to four hot-pluggable 3.5 in. SATA disk drives, 4 TB max.: 1 TB, 500 GB (7,200 rpm) Mass storage Internal Up to four hot-pluggable solid-state drives (SSDs), and media disk option 128 GB max.: 32 GB3 Up to two Sun Flash Modules, 48 GB max.: 24 GB3 www.blusensnetworks.com
  • 23.
    44 VoD Streaming Cluster VoD Streaming Cluster 45 Up to 48 Tb Storage Node Streaming nodes 300 Mbps Streamer Cache Node SN.148 Up to 48 Tb Storage Node Up to 300 Mbps of streaming capacity. It can stream up 60 SD streams or up to 25 HD streams. •  Scales from 6 to 48TB storage space. •  RAID 5 redundancy. •  Capable of storing 20000 hours of SD video or 8000 hours of HD video. CN.1300 300 Mbps Streamer Cache Node •  Gigabit Ethernet output. •  Optional 10 Gigabit Ethernet output. •  Up to two hard disks. •  More than 1 Disk Maximum fail tolerance. •  RAID 1 redundancy. CN.1300 •  Gigabit Ethernet output. One or Two Quad-Core Intel Xeon L5420 Processor, 2.50 GHz, •  Optional 10 Gigabit Ethernet output. Processor 1333 MHz FSB, 50W. •  1 Disk Maximum fail tolerance. Cache Quad Core Processors: 12 MB L2 cache per core SN.148 SN.148 Architecture DIMM Slots Up to 32 GB of 800 MHz ECC FB-DIMM or Six on board LSI disk controller chips each 100-240 V AC, 50-60 Hz, 10 A, 100 V support is with 3 Memory Type 667 MHz ECC FB-DIMM Main memory directly connects to 8 SATA drives for max data power supply unit configuration with 2+1 redundancy Memory 4 GB total memory. System configurations throughput Operating temperature/humidity Configuration from 1 GB up to 32 GB 48 hot-swappable, 3.5-in. SATA II HDD internal 5°C to 32°C (37°F to 91°F), 10-90 percent relative Graphics Controller ASPEED AST2000 Disk system disks: 250 GB, 500 GB, 1000 GB 7200-RPM disks humidity, non condensing, 27°C max. wet bulb System architecture Intel Quad Core technology available; 48 TB total capacity Non operating temperature/humidity Network: Four Integrated 10/100/1000 Base-T Ethernet ports Software RAID enabled by RAID-Z, RAID-Z2 in Solaris ZFS, other Linux, or Windows RAID code Management: Service processor with embedded Lights Out -40°C to 65°C (-40°F to 149°F), up to 93 percent Manager (LOM) standard Two quad-core AMD™ Opteron processors, Model relative humidity, non condensing, 38°C max. wet bulb 2356 Serial: RJ-45 Processor AC Standard/integrated interfaces One 512Kb Level 2 cache per core 2 MB L3 cache Environment Operating altitude SATA: Up to two hot-pluggable SATA bays, 2 TB max. power per processor Up to 3048 m; maximum ambient temperature is USB: Five USB 2.0 ports (two front, two rear, one internal) Sixteen DDR-2 DIMM slots (eight DIMM slots derated by 1°C per 300 m above 900 m Expansion bus: One PCIe slot (x16 electrical/x16 mechanical), Architecture per CPU socket); 32 GB with 2 GB DIMMs, 64 GB Non operating altitude half-length, half-height with 4 GB DIMMs and 128 GB when 8GB DIMM is Solaris OS 10 or GNU/Linux qualified Up to 12000 m Acoustic noise Software Operating systems IPMI 2.0 compliant Service Processor with embedded. Lights Four 10/100/1000Base-T Ethernet ports Out Management offering remote power, KVM (keyboard, Network management: One dedicated LwAd (1B = 10 dB): At or below 25°C, 7.5B, at max. video, mouse) and media capability 10/100Base-T Ethernet port ambient, 8.5B Internal disk option Two hot-pluggable 250-750 GB 7200 rpm 3.5” SATA II HD Main memory Serial: One TIA/EIA-232-F asynchronous, RJ45 LpAm bystander: At or below 25°C, 65 dB, at max. Mass storage ambient, 75 dB Removable Media Up to one EIDE DVD-ROM or DVD+/-RW DL drive connector and media Mounting option 19-inch rackmount kit RAID RAID 1 hardware mirroring to provide fault tolerance USB: Four USB 2.0 ports (two front and two rear) Dual-redundant, hot-swappable power supply Operating temperature: 5° to 35° C (41° to 95° F) at sea level Video: VGA video port Power Power supply output rating: 1,500 W Non operating temperature: -40° to 68° C (-40° to 154° F), up Expansion slots: Three internal MD2 low-profile to 93% relative humidity, non condensing, 38° C max. wet bulb PCI-E slots, 8x wide each Maximum system consumption 1,180 W Operating altitude: Up to 3,000m (9,000 ft.), max. ambient One compact flash disk port for OS booting Safety: IEC60950, UL/CSA60950, EN60950, Environment temperature is derated by 1° C per 300m above 900m Solaris 10 05/08 preinstalled CB scheme with all country differences Non operating altitude: up to 12,000m (=~36,000 ft.) Regulations (meets or Standard Linux distributions, SLES10 SP1 64 bit, exceeds) RFI/EMI: FCC Class A, Part 15 47 CFR, EN, 55022, Acoustic noise: 70 dBA operating, 69 dBA idle (declared noise Operating CISPR 22, EN300-396: v1.31, ICES-003 Software Rhel4.6 5.1 64 bit emissions in accordance with ISO 9296 A-weighted, sound systems Windows 2003 Standard and Enterprise version Immunity: EN55024, EN300-386:v1.3.2 power) 32 bit and 64 bit Safety: cULus Mark, CE Mark, GOST R, S-Mark Single PSU Power Booting from the flash disk is supported by EMC: CE Mark (93/68/3EEC); Emissions and Immunity AC power: 100–240 V AC (47–63 Hz) Solaris, Linux and windows, the external flash — Class A Emissions Levels: FCC, VCCI, C-Tick, MIC, IEC 60950, UL/CSA 60950, EN 60950, CB Scheme with all Certifications Safety Disk OS booting saves up to 2 TB HDD capacity GOST R2, BSMI2 country differences OS Booting for data Other: Labeled per WEEE (Waste Electrical and Regulations FCC CFR 47 Part 15 Class A, EN 300 386 v1.3.3, EN 55022 Two mirrored OS drives are also configured on Electronic Equipment) Directive RFI/EMI Class A, EN 61000-3-2, EN 61000-3-3 two different disk controllers for max availability Height 6.89 in./175.05 mm Immunity EN 55024, EN 300 386 v1.3.3 ONC™, ONC+TM, NFS, WebNFS, TCP/IP, Dimensions Width 17.28 in./439 mm Safety CE, CB Scheme, UL, CSA, CCC, BSMI, AR-S, GOST-R SunLink™, OSI, MHS, IPXTM/SPX, SMB and weight Depth 29.52 in./749.90 mm EMC CE, FCC, VCCI, ICES, BSMI, CCC, MIC, C-Tick, AR-S, GOST-R Certifications technologies, and XML Weight 170 lbs./77 kg RoHS-compliant labeled, per WEEE (Waste Electrical and Other Integrated Lights Out Manager (ILOM) service Electronics Equipment) Directive (2002/95/EC) Networking processor providing: CLI (in-band and out-of- Height 44 mm (1.7”) band), IPMI 2.0 (in-band and out-ofband), SNMP Management (out-of-band only) Dimensions Width 425.5 mm (16.8”) and weight Depth 633.7 mm (25”) Sun xVM Ops Center — manage from one to hundreds of systems from a central location Weight 13.3 kg (27.2 lbs.) Hardware Specifications may change without prior notice. Warranty One year, next business day Hardware Specifications may change without prior notice. www.blusensnetworks.com
  • 24.
    46 VoD Streaming Cluster VoD Streaming Cluster 47 1200 Mbps Streamer Cache Node The streaming nodes are the connection points between the VoD cluster and the STB with VoD capabilities. Its responsibility is to store locally the most demanded contents to provide fast Up to 1200 Mbps of streaming capacity. It can stream up to 240 SD response and to automatically get the least demanded contents from the storage nodes and store streams, or up to 100 HD streams. it locally for further queries for the same content. The streaming capabilities of the platform can be increased by adding more streaming nodes independently from the storage space required. CN.11200 1200 Mbps. Streamer Cache Node STREAMING POWER •  Up to four hard disks. Unlimited growing capacity by addition of new nodes. •  RAID 1+0 redundancy. •  Gigabit Ethernet output. VoD FUNCTIONS •  Optional 10 Gigabit Ethernet output. VCR functions Play, Pause, Stop, Reverse and Fast-forward. •  2 Disk Maximum fail tolerance. Trick modes default x6 x12 FF and REW speeds (the available speeds are configurable at installation time) SUPPORTED STREAMING FORMATS CN.11200 CN.11200 Video MPEG-1/2, MPEG-4/AVC(h.264), both SD and HD qualities. Processor Two Intel Xeon processors 5500 series Operating temperature: 5° C to 35° C (41° to 95° Audio MPEG-1/2, MP3, AAC. Level 1: 32 KB instruction and 32 KB data L1 cache F) at sea level per core Non operating temperature: -40° C to 68° C (-40° to 154° F) SUPPORTED STREAMING PROTOCOLS Level 2: 256 KB unified (data and instruction) L2 Cache cache per core Operating relative humidity: up to 93%, non Streaming Transport Stream over RTP, HTTP, etc. Architecture Level 3: 4 MB or 8 MB shared inclusive L3 cache per condensing, 38° C max. wet bulb Control RTSP with OVS extensions. processor Non operating relative humidity: Up to 93%, non 12 DDR3 DIMM slots (six DIMM slots per CPU socket); condensing Main Environment system supports from 2 GB (1x 2 GB to 96 GB (12x 8 Operating altitude: Up to 3,000m (9,000 ft.), max. memory GB) of memory ambient temperature is derated by 1° C per 300m Based on Intel Xeon processor 5500 series and Intel above 900m Optional Features System architecture 5500 Chipset Non operating altitude: 10,000m (35,000 ft.) Network: Two 10/100/1000Base-T Ethernet ports Acoustic noise: 7.5 B operating, 7 B idling / 70 dBA Serial: One RJ-45 port operating, 60 dBA idle (declared noise emissions in accordance with ISO 9296 A-weighted, sound Standard/integrated USB: Five USB 2.0 ports (two front, two rear, one interfaces internal) power) Transcoding Single non redundant power supply; max. power Expansion bus: One PCIe 2.0 slot (x16 electrical/x16 supply rating 600 W at 80% efficiency Power mechanical, low-profile) AC power: 100–240 V AC (47–63 Hz) VoD streaming require that the content is encoded in a certain way so that all the Solaris 10 OS IEC 60950, UL/CSA 60950, EN 60950, CB Scheme elements of the network know how to handle the data. A transcoding node will OpenSolaris™ OS Safety with all country differences enable the operator to load the content in any format and store it in as many ones as Red Hat Enterprise Linux 4 Regulations FCC CFR 47 Part 15 Class A, EN 300 386 v1.3.3, EN Red Hat Enterprise Linux 5 RFI/EMI 55022 Class A, EN 61000-3-2, EN 61000-3-3 required, so that the same content can be streamed in different qualities. Operating SUSE Linux Enterprise Server 10 Immunity EN 55024, EN 300 386 v1.3.3 Software systems VMware ESX 3.5 CE, CB Scheme, UL, CSA, CCC, BSMI, AR-S, Virtual Ticketing Safety Windows Server 2003 Standard/Enterprise Editions GOST-R Windows Server 2008 Standard/Enterprise Editions CE, FCC, VCCI, ICES, BSMI, CCC, MIC, C-Tick, Certifications EMC AR-S, GOST-R Virtual ticketing is a technology which ensures that the access URL for a media Windows Server 2008 Standard/Enterprise/ Datacenter Editions RoHS-compliant labeled, per WEEE (Waste content is created for one specific STB, so it can be only watched by this STB even if Networking Two GbE ports integrated on motherboard Other Electrical and Electronics Equipment) Directive the URL is stolen by another user. The unauthorized access to any content is blocked (2002/95/EC) Optional Sun Integrated Lights Out Manager (ILOM) and the incidence is reported. Height 43mm (1.7 in.) service processor module Virtual ticketing is not a DRM mechanism, is an access control mechanism. Width 436mm (17.2 in.) – VGA 8 MB: 1,024x768 at 60 Hz Dimensions Depth 650mm (25.6 in.) – Management port: One 10/100 RJ-45 port and weight MIN 9.8 kg (21.7 lbs.) Load Balancing Enables remote power control; remote keyboard, Weight video, mouse (KVM) graphical MAX 13.9 kg (30.6 lbs.) Management access; and remote media (DVD, CD, floppy) Rackmounting slide rail kit Load balancing is an optional feature that is continually monitoring the current Mounting option Toolless rackmounting slide rail kit Secure remote access using Web interface over SSL, streaming load of every streamer. The queries of a STB for a specific content can be or CLI over SSH Cable management arm automatically redirected to the least busy streamer so the total load of the cluster is Sun™ xVM Ops Center software support Warranty One year, next business day equitably distributed through all the streamers. IPMI 2.0, SNMP v1, v2c, and v3 In-band, out-of-band, and side-band remote management Storage Replication Up to four hot-pluggable 3.5 in. SATA disk drives, 4 TB max.: 1 TB, 500 GB (7,200 rpm) Mass storage Internal Storage replication is an optional feature that allows the stored media to be Up to four hot-pluggable solid-state drives (SSDs), and media disk option 128 GB max.: 32 GB3 automatically replicated in another server, even in another building to provide fault Up to two Sun Flash Modules, 48 GB max.: 24 GB3 tolerance and transparent backup features to the VoD cluster. Hardware Specifications may change without prior notice. www.blusensnetworks.com
  • 25.
  • 26.
    50 IP Contribution Head-End IP Contribution Head-End 51 •  GB IP (electrical or optical), ASI, DVB-S/S2, DVB-T and DVB-C inputs. •  GB IP (electrical or optical) and ASI output MPTS or SPTS. Supports multiple of output modules. •  Multiplexing. •  PSI/SI regeneration. •  Support for AES SW descrambling. •  Support DVB and AES scrambling, simulcrypt interface based. •  Intuitive web-based user control. •  SNMP Alarm MIB. •  SOAP/XML Interface. SC/CAB1PSSW 10 Slot Contribution Chassis SC/CAB1PSSW- 10 Slot Contribution Chassis IPOUT SC/CAB1PSSW- 10 Slot Contribution Chassis IPOUT4CI •  Up to 24 ASI or 16 DVB-S/S2, DVB-T, DVB-C Inputs. •  Up to 8 DVB common interface slots for DVB descrambling. SC/CAB4PS-03 16 Slot Contribution Chassis SC/CAB4PS-04 16 Slot Contribution Chassis The contribution head-end, part of the Blusens blu:core line, is the part of the system in charge of •  Up to 45 ASI or 28 DVB-S/S2, DVB-T, DVB-C Inputs. obtaining live content from any source and perform the appropriate operations to transform this feeds •  Up to 14 DVB common interface slots for DVB descrambling. into multicast IP streams capable of being transferred through the IP network. Once these streams are in IP format, the middleware is the responsible of granting or revoking the access of each STB to them. Chassis According to the source of the live video the contribution can be digital or analog. In the first case the feeds will come from satellite (DVB-S) terrestrial (DVB-T) or cable (DVB-C) broadcasts. On the other SC/SWM hand, for the analog contribution, the input will be composite or s-video, both in PAL or NTSC formats. •  Gbit/s routing between modules in a chassis. As the content distributed in DVB-S/T/C is already an MPEG2-TS stream, the operation performed •  Integrated from the front. by the digital contribution is remove the QPSK, QAM or any other transport layer and substitute it by IP. That's why the digital video stream is not modified in any moment and the broadcast quality is SC/CAB1PSSW-IPOUT-IPOUT4CI maintained during the whole distribution of the channel through the IP network. •  Modular configuration with up to 9+1 board positions. For the analog contribution option, the first step is encoding the original analog source into MPEG-2 •  WEB based configuration, SNMP Alarms, SOAP/XML digital format. Once this step is done, the stream behaves exactly the same as a digital stream being interface. transferred through the network. •  Forced air-cooling. •  Hot-swappable modules in back. •  Optional IP IO and descramblers in front. Digital Contribution SC/SWM The digital contribution IP Streamer offers a complete professional video head-end solution. It is built around a •  Gbit/s routing between modules in a chassis. modular platform, that brings the capability of hosting as many tuning modules as required. •  Integrated from the front. This way, the scalability of the platform is assured by providing a higher density, lower cost and better reliability system due to its integrated architecture. SC/CAB4PS-03 The IP Streamers can receive MPEG-2 transport streams from a variety of input sources (ASI, DVB-S/S2, DVB-T, IP and DVB-C, with QPSK, 8PSK, COFDM or QAM modulations) and can descramble and re-scramble selected •  Modular configuration with up to 16+2 board positions. services, before streaming it via IP or ASI. •  WEB based configuration, SNMP Alarms, SOAP/XML All the elements of the system are continuously monitored, including decoding CAM modules via a web-based interface. Management Interface, which enables remote configuration of all modules,real time status of their performance, •  Forced air-cooling. and presentation of service related information. The streamer supports full analysis of PSI/SI (PSIP in later •  Hot-swappable modules. release) and regenerates all tables as required. •  Dual redundant hot-swappable 300 W power supply. •  4 individually monitored hot-swappable fans. www.blusensnetworks.com
  • 27.
    52 IP Contribution Head-End IP Contribution Head-End 53 Input Modules Processing Modules SC/GBIPIN-MMI Ethernet Input SC/3ASI-MMI ASI Input w/Management SC/2CI Descrambler SC/DVBSCS250 Scrambling •  DVB CA compliant scrambling (CSA) and AES compliant scrambling. •  10/100/1000BaseT input card (RJ45) •  3xASI input. •  Scrambles up to 250 services, maximum 850 •  Mini-GBIC interface (SFP) for optical input. •  BNC connectors. Mbit/s. •  2xDVB Common interface. •  Supports partial scrambling and PVR. •  Supports UDP/RTP Multicast/Unicast reception. •  213 Mbit/s per input. •  Descrambling of 2-8 services (depends on common interface) •  Support scrambling of MPEG-2 and H.264 in •  Supports reception of MPTS and SPTS. •  Supports reception of MPTS and SPTS. SDHD. •  Service filtering. •  Service filtering. •  Support for all major CA systems and CAMS. •  DVB Simulcrypt compliant. •  PCR regeneration. •  PCR regeneration. •  1 slot wide. •  10/100/1000BaseT IP interface towards CA •  10/100/1000BaseT management port (RJ45) •  10/100/1000BaseT management port (RJ45) system (RJ45) •  Enables WEB management. •  Enables WEB management. •  Handles up to 250 ECM’s. •  1 slot wide. •  1 slot wide. •  1 slots wide. Output Modules SC/4DVBS-MMI DVB-S Input w/Management SC/4DVBSS2-MMI DVB-S/S2 Input w/Management SC/GBIPOUT Ethernet Output SC/ASIOUTMX ASI output •  4xQPSK inputs. •  4xDVB-S/S2 inputs. •  F connectors. •  F connectors. •  10/100/1000BaseT input card (RJ45) •  DVB-S mode. •  DVB-S, DVB-S2 QPSK and 8PSK modes. •  Mini-GBIC interface (SFP) for optical input. •  4xASI outputs. •  950 – 2150 MHz Frequency Range. •  950 – 2150 MHz Frequency Range. •  Supports UDP/RTP Multicast/Unicast transmission. •  BNC connectors. •  1-45 MSym/s. •  1-45 MSym/s (mode dependent) •  1/2, 2/3, 3/4, 5/6, 7/8 FEC. •  1/2, 2/3, 3/4, 5/6, 7/8, 8/9, 9/10 FEC (mode dep.) •  Supports multiple of output cards. •  213 Mbit/s per output. •  Supports reception of MPTS and SPTS. •  Supports reception of MPTS and SPTS. •  Streaming of up to 850 Mbit/s. •  4 Different multiplexed outputs. •  Service filtering. •  Service filtering. •  Maximum 250 service per output card. •  Maximum 250 services per card. •  ASI Monitoring port. •  ASI Monitoring port. •  Supports streaming of SPTS. •  PSI/SI regeneration. •  10/100/1000BaseT management port (RJ45) •  10/100/1000BaseT management port (RJ45) •  Support streaming of MPTS with Multiplexing •  PCR regeneration. •  Enables WEB management. •  Enables WEB management. (optional) •  1 slot wide. •  2 slots wide. •  2 slots wide. •  PSI/SI regeneration. •  PCR regeneration. •  1 slot wide. SC/4QAM-MMI DVB-C Input w/Management SC/4COFDM-MMI DVB-T Input w/Management SC/ADMSDIHD 4HD Decoder with SDI Output SD/HPDDMRF Dual Decoder w/RF output and NICAM/A2 •  4xCOFDM inputs. •  2 decoders per module •  F connector. •  MPEG-2 DVB 4:2:0 MP@ML decoding •  4xQAM inputs. •  VBI re-insertion (WSS, WST/EBU Teletext, VPS, •  1/2, 2/3, 3/4, 5/6, 7/8 FEC. •  F connector. VITS) •  2k and 8k carrier mode. •  2 SDI/HDSDI outputs per decoder •  0.87-6.9 Ms/s. •  MPEG2 and MPEG4 (H264) SD and HD •  DVB and EBU subtitling •  QPSK, 16QAM, 64QAM modulation. •  Supports reception of MPTS and SPTS. •  Supports reception of MPTS and SPTS. •  VBI re-insertion (WSS, WST/EBU Teletext, VPS, •  2 DVB Common Interfaces. One per channel •  Service filtering. •  Service filtering. VITS) •  High performance RF modulation and up- •  ASI Monitoring port. •  ASI Monitoring port. •  DVB and EBU subtitling conversion •  10/100/1000 BaseT management port (RJ45) •  10/100/1000 BaseT management port (RJ45) •  2 SDI /HDSDI outputs per decoder •  47 – 862 MHz frequency range •  Enables WEB management. •  Enables WEB management. •  1 slot wide •  F connector output with both channels combined •  2 slots wide. •  2 slots wide. •  Ttest output – F connector •  External mute of RF output •  NICAM or A2 stereo audio (option) •  2 slots wide www.blusensnetworks.com
  • 28.
    54 IP Contribution Head-End IP Contribution Head-End 55 Analog Contribution AM.200 MPEG-2 SD encoder blade with Y/C, S-Video input The analog contribution modules can receive any analog signal in composite or S-Video format and transform it into MPEG2-TS multicast IP streams to inject it into the IP network providing a convenient way to integrate legacy video generating systems in the IPTV system. Once transformed by this modules, the streams can be treated exactly the same as the live TV streams coming from the digital contribution head-end, the playout server or the Digital Signage server. AM.300 MPEG-2 SD encoder blade with SDI Video input The analog contribution series consists of 3 different sized models, enabling custom-sized streaming systems: Ranging from the ultra-compact 1 slot chassis (max. one blade) up to the rackable 21 slot chassis (max. 21 blades) for high-density and multichannel streaming applications, the later one with dual redundant power supplies. All the chassis series supports easy replacement and hot-swapping/hot-plugging of inserted blades. PROFESSIONAL QUALITY The chassis models are professional and industrial grade enclosures. The chassis ensure ideal operating conditions for video blades and enable 24/7 operation. The encoders incorporate low-latency compression technology and professional signal processing, creating full resolution and smooth motion DVD-quality video streams. Chassis Simple setup Connect LAN Ethernet and a video/audio input signal and the AM encoder will turn into a true video networking AC.11 “port”, transmitting your video in digital form over IP networks. •  Single channel blade chassis, 5V DC, 10W, 100-240V AC. Easy configuration •  External power supply included. To access the intuitive graphical user interface use your standard web browser from any PC on the network, no •  Dimensions (H/W/D): 45mm x 145mm x 240mm. special or additional tools required. •  Weight: 650 grams. •  No forced cooling required (fanless) Extremely robust and durable The AM encoders runs on an embedded real-time platform. This blade is designed without any moving parts, as AC.12 hard drives/fans, to ensure system uptime, reliability and noiseless operation. The AM can be used in extreme operating conditions and at temperatures up to 65°C. •  Dual channel blade chassis, 5V DC, 10W, 100-240V AC. •  External power supply included. •  Dimensions (H/W/D): 75mm x 145mm x 240mm. AM encoders •  Weight: 950 grams. Standards PAL, NTSC •  No forced cooling required (fanless) Composite Input 1 VPP, 75 Ohm (BNC) Video Inputs S-Video Input 1 VPP (Y), 0,3 VPP (C - Pal), 0,286 VPP (C - NTSC), 75 Ohm (miniDIN) SDI Input 0,8 VPP, 75 Ohm (BNC), embedded audio supported for orders of min. 50 units AC.121 Video Full D1 720h x 480/576v, 2/3-D1: 704h x 576/480v Resolutions Half D1 384h x 480/576v, CIF/SIF: 384h x 240/288v •  High-density, multichannel chassis, holds max. 21 blades. Audio Inputs Unbalanced Analog Stereo, Line level, 3.5mm jack (mini jack) Encoding •  Internal dual, redundant power supply: Max. 150W with 21 Specifications Audio Outputs (TALKBACK) Analog Dual Mono, Line level 3.5mm jack (mini jack) blades, 90-240V AC. •  Dimensions (H/W/D): 176(4RU) x 480 x 400 mm. MPEG-2 Video Encoding MPEG-2 (ISO/IEC 13818-2), Main Profile at Main Level (MP@ML), 4:2:0 •  Weight: 9,5 Kg empty. ISO/IEC 13818-1 Transport Stream Types ISO/IEC 13818-2,3 Elementary A/V Encoding Blades Video Encoding Bitrates 800Kb/s – 15Mb/s (CIF/SIF min. 800Kbit/s, Full D1 min. 2Mbit/s) MPEG-2 Audio Encoding MPEG-1 Audio Layer 2 (ISO/IEC 11172-3 Layer 2) All video blade models process input streams in full DVD-quality for Network 10/100TX Ethernet, RJ45, half/full duplex, Auto-sensing professional MPEG-2 SD streaming to any kind of device. AM encoder Streaming Traffic Unicast and Multicast traffic supported I/O HTTP (Web Browser), TCP/IP Control Protocol, UDP/IP Streaming, IGMPv2, Supports SAPv1, blades are built for robust 24/7 LIVE encoding operations and can be IP Protocols Specifications SNMP, DHCP used in tough environmental conditions. They are designed without any RS-232/485 port Remote control for non IP devices via TCP/IP RS-232/485 command tunnelling moving parts, making them diskless, fanless and noiseless. GPI 1 INPUT, for device control: streaming on/off configuration Agency Approvals CE, RoHS Humidity Up to 80%, non-condensing Temperature 0 to +65°C environment temperature; fanless when operated in FR-110 or FR-210 chassis AM.100 MPEG-2 SD encoder blade with COMPOSITE input Environmental Weight Approx. 150 grams Blade dimensions (H/W/D) 20mm x 130mm x 190mm Power 5W per blade Limited Warranty 1 year standard limited warranty. Warranty extensions available. Hardware Specifications may change without prior notice. www.blusensnetworks.com
  • 29.
  • 30.
    58 Net PVR Net PVR 59 Net PVR VoDKAST Network Personal Video Recorder (VoDKAST nPVR) increases the possibilities of the VoDKAST platform with the capability of recording, indexing VR.100 and managing live video sources. This way, it is possible for the user to record live ONC™, ONC+TM, NFS, WebNFS, TCP/IP, broadcasts, and store it in the VoD streaming cluster storage space for later on SunLink™, OSI, MHS, IPXTM/SPX, SMB demand recovery, providing several services, for example: technologies, and XML Integrated Lights Out Manager (ILOM) service Networking - Schedule network recordings. The recordings can be managed directly from the processor providing: CLI (in-band and out-of- band), IPMI 2.0 (in-band and out-ofband), SNMP EPG or manually programmed. The users decide which programs they want to Management (out-of-band only) record and this programs are automatically recorded in VoDKAST servers. Later, Sun xVM Ops Center — manage from one to the users will be able to watch the recordings on demand when needed. hundreds of systems from a central location 100-240 V AC, 50-60 Hz, 10 A, 100 V support is with 3 power supply unit configuration with 2+1 - Legal filing systems. For continuous recording of video broadcasting and their redundancy later recovering. The Legal filing systems incorporates the EPG information for Operating temperature/humidity VR.100 easy browsing of the recorded contents. This kind of cyclic recordings can be 5°C to 32°C (37°F to 91°F), 10-90 percent relative Six on board LSI disk controller chips each integrated with video surveillance systems. It also supports Catch Up TV services, humidity, non condensing, 27°C max. wet bulb directly connects to 8 SATA drives for max data throughput Non operating temperature/humidity or live shows recording for the later on demand re-broadcasting. 48 hot-swappable, 3.5-in. SATA II HDD internal -40°C to 65°C (-40°F to 149°F), up to 93 percent Disk system disks: 250 GB, 500 GB, 1000 GB 7200-RPM disks relative humidity, non condensing, 38°C max. wet available; 48 TB total capacity bulb Software RAID enabled by RAID-Z, RAID-Z2 in Environment AC power VR.100 NetPVR Server Node Solaris ZFS, other Linux, or Windows RAID code Operating altitude Up to 3048 m; maximum ambient temperature is Two quad-core AMD™ Opteron processors, Model derated by 1°C per 300 m above 900 m 2356 Processor Non operating altitude One 512Kb Level 2 cache per core 2 MB L3 cache per processor Up to 12000 m The NetPVR allows the implementation of Time Shifting for TV channels which Sixteen DDR-2 DIMM slots (eight DIMM slots Acoustic noise allows to the users that are watching a TV channel, to pause and recover it from Architecture per CPU socket); 32 GB with 2 GB DIMMs, 64 GB LwAd (1B = 10 dB): At or below 25°C, 7.5B, at max. the beginning of its broadcast using on demand video controls. with 4 GB DIMMs and 128 GB when 8GB DIMM is ambient, 8.5B qualified LpAm bystander: At or below 25°C, 65 dB, at max. Four 10/100/1000Base-T Ethernet ports ambient, 75 dB Due to legal reasons, VoDKAST nPVR offers several configuration options of the Network management: One dedicated Mounting option 19-inch rackmount kit filling systems: 10/100Base-T Ethernet port Dual-redundant, hot-swappable power supply Main memory Serial: One TIA/EIA-232-F asynchronous, RJ45 Power Power supply output rating: 1,500 W •  Option “one single copy” to manage a single physical recording and several connector Maximum system consumption 1,180 W logical recordings. USB: Four USB 2.0 ports (two front and two rear) Safety: IEC60950, UL/CSA60950, EN60950, Video: VGA video port •  Option “multiple copies” to manage multiple physical copies CB scheme with all country differences Expansion slots: Three internal MD2 low-profile Regulations (meets or •  Option “legal file”. Live indexing of the recordings to allow recovering via PCI-E slots, 8x wide each RFI/EMI: FCC Class A, Part 15 47 CFR, EN, 55022, exceeds) positioning inside the recorded media. One compact flash disk port for OS booting CISPR 22, EN300-396: v1.31, ICES-003 Immunity: EN55024, EN300-386:v1.3.2 Solaris 10 05/08 preinstalled Safety: cULus Mark, CE Mark, GOST R, S-Mark Standard Linux distributions, SLES10 SP1 64 bit, Operating EMC: CE Mark (93/68/3EEC); Emissions and Software Rhel4.6 5.1 64 bit systems Immunity — Class A Emissions Levels: FCC, VCCI, Windows 2003 Standard and Enterprise version Certifications C-Tick, MIC, GOST R2, BSMI2 32 bit and 64 bit Other: Labeled per WEEE (Waste Electrical and Booting from the flash disk is supported by Electronic Equipment) Directive Solaris, Linux and windows, the external flash Height 6.89 in./175.05 mm Disk OS booting saves up to 2 TB HDD capacity OS Booting for data Dimensions Width 17.28 in./439 mm Two mirrored OS drives are also configured on and weight Depth 29.52 in./749.90 mm two different disk controllers for max availability Weight 170 lbs./77 kg Hardware Specifications may change without prior notice. www.blusensnetworks.com
  • 31.
  • 32.
    62 Digital Signage Digital Signage 63 What is Digital Signage? What can Digital Signage do for you? It is a new and cost effective way of increasing brand or product visibility in public areas. Using IP technology we can create advertising channels that provide Pulsar Digital signage solution allows you to create a multimedia advertising solution for wanted information and, thus, attract an attention that static advertising may not. providing content to hundreds of screens simultaneously. It also allows you to manage Furthermore, the marketing campaign can be much more defined and focused, and monitor on real time what is being broadcast on each screen. issuing the message to the appropriate market profile, at the right location and time, and creating a far more indelible impression. The playout solution is the simplest digital signage platform and allows you to feed the signage screens with a full screen sequence of videos, but, if you want more flexibility for, for example showing more than one video at once, Pulsar Digital Signage platform is your answer. The Pulsar video distribution is supported by the most advanced IPTV technologies providing a high connectivity solution in which the video streams are transferred through the network as multicast IP streams low connectivity solution in which the multimedia contents are distributed and then stored locally in each screen, so a problem in the network won’t affect to the video shown in the screens. The extensive experience and knowledge of the Pulsar product team, in both large installation and VoD management, makes it the right tool to face any challenges related to security, user experience, immediacy and management of remote locations. Pulsar is a complete product that enables the operator to have full control, from a central location, of the full system, including screen layouts, content, program grill, etc. Shopping malls, Showrooms, Retail Shops By melting the powerful advertisement capabilities of the Digital Signage solution and the flexibility of content distribution through an IPTV platform, a commercial surface of any size can deploy from one to hundreds of advertising screens in all its branches reaching more customers and having full control from the headquarters. www.blusensnetworks.com
  • 33.
    64 Digital Signage Digital Signage 65 Pulsar gives you the simplest mechanism to provide the most advanced Digital Signage experience in four easy steps. www.blusensnetworks.com
  • 34.
    66 Digital Signage Digital Signage 67 STEP 1 Select the resolution of the output screen, Pulsar can work with SD, HD, 16:9, 4:3, etc. Any resolution is supported. Divide the output screen space into any number of regions and select the size for each region with the drag and drop interface It’s even possible to overlap the regions if desired. STEP 2 Upload the multimedia content to the server. Any content is supported MPEG-2, MPEG-4, DIVX, h.264, Adobe Flash animations and video, JPEG, TIFF, etc. It’s also possible to associate an external information source to any resource. This way you can deploy a flash animation with weather information, and the information to fill the template will be gathered form Internet. www.blusensnetworks.com
  • 35.
    68 Digital Signage Digital Signage 69 STEP 4 Assign one of the schedules defined in the step 3 to any of the screens available in the network. The administrator can check in real time what is being broadcast in each screen at any moment. STEP 3 Compose a schedule of programs by filling the layouts defined in the step 1 with the resources defined in the step 2. The layout can change within a schedule so you can deploy a full screen video and then split the screen in four regions with a different RSS feed in each. www.blusensnetworks.com
  • 36.
  • 37.
    72 Digital Signage Servers Digital Signage Servers 73 Playout Server Seamless Splicing Optionally, VoDKAST Playout can perform seamless splicing for MPEG-2 content, thus generating a With the playout server, the administrator can generate continuous loops of full screen pre-scheduled contents continuous, clean stream out of multiple input sources and switches. and inject it in the network as multicast streams. This is the easiest and simplest way of creating Digital Signage information channels. Seamless splicing is a technology which calculates on real time the intermediate video frames during the transition between two videos in a sequence. This means when switching from one video to following, These streams are created in MPEG-2 TS format and the original contents must be MPEG-2 video as well. the resulting stream won’t be affected by MPEG-2 video noise providing a clean, smooth transition. The platform supports both standard and high definition streaming and can schedule even stored and live TV contents under a common schedule. Signage Server With Pulsar Digital Signage server the administrator can manage the whole Digital Signage platform. It controls the channel generators, composes schedules of screen templates and manages the resources used to fill these templates. It’s also responsible of uploading the resources to the channel generators in a completely bandwidth controlled way. Finally, the server will monitor on real time what is being broadcast in each screen with the local time in the screen location, triggering the proper SNMP alerts in case of any incidence. Playout Server Architecture By using the advanced scheduling functions the administrator can compose multicast TV channels interspersing Live TV streaming from the satellite or a CCTV camera with local stored advertisements, each 10 minutes for example. As the stream created shows only one video at once, a channel generator is not required, but high bandwidth network is a must. Any problem in the network connection will be reflected in the video on the screens. PS.100 Playout Server Signage Server Architecture •  Generates TV channels from realtime video feeds and stored content. •  Connects to VoDKAST servers to retrieve stored on-demand multimedia, or to access remote real-time encoders. •  Generates an IPTV multicast or broadcast channel. •  Scheduling can be controlled from the graphical user interface integrated in the VoDKAST Management Desktop. •  An XML/HTTP API is also provided for easy integration with third party control systems. •  Both RTP and Transport Stream output formats are supported. www.blusensnetworks.com
  • 38.
    74 Digital Signage Servers Digital Signage Servers 75 Pulsar Digital Signage server can generate any screen composition by dividing the screen into a template with smaller regions. Each region can have any loop of contents in almost any media format and the layout of the DS.100 Digital Signage Server template can change accordingly to the time schedule. A web server gives access to the platform in a hierarchical way, allowing the Digital Signage contractor to resell •  Flexible screen template definition and scheduling. time slots for specific regions of certain screens to third parties making it possible to get direct revenue from this •  Mixed Low and High connectivity channel generators management. platform. •  Screen provisioning based on the most advanced IPTV technologies. •  Managed screen content provision bandwidth and scheduling. Pulsar Digital Signage server can drive as many low and high connectivity channel generators as desired, •  Individual or group screen addressing. independently from the IP technology used to connect the server to the channel generators. It can also upload any •  Third parties information integration and caching. given template to one or a group of Channel Generators to provide an easy and fast management of large amounts •  Real Time screen monitoring. of screens. The server will also manage the synchronization of the channel generators even if they are distributed •  Multiformat content. across different time zones. •  Connection to the screens via any IP technology (Ethernet, Wifi, 3G, Satellite, DSL, analog modem, etc.) It’s possible to link specific contents to a external information system, like weather RSS feeds or queue ticketing •  Integration of LiveTV, Playout or VoD contents in the templates. systems. The server will get the information from the external sources periodically and will upload the updated info to each screen. In case the internet connection with the server is lost, the signage screens will work with the DS.100 DS.100 latest available information avoiding empty spaces in the screens’ templates, for both low and high connectivity Processor Two Intel Xeon processors 5500 series Operating temperature: 5° C to 35° C (41° to 95° channel generators. Level 1: 32 KB instruction and 32 KB data L1 cache F) at sea level per core Non operating temperature: -40° C to 68° C (-40° Level 2: 256 KB unified (data and instruction) L2 to 154° F) PS.100 Cache cache per core Operating relative humidity: up to 93%, non Architecture Processor One or Two Quad-Core Intel Xeon L5420 Processor, 2.50 GHz, 1333 MHz FSB, 50W. Level 3: 4 MB or 8 MB shared inclusive L3 cache per condensing, 38° C max. wet bulb Cache Quad Core Processors: 12 MB L2 cache per core processor Non operating relative humidity: Up to 93%, non Architecture condensing DIMM Slots Memory Type Up to 32 GB of 800 MHz ECC FB-DIMM or 667 MHz ECC FB-DIMM 12 DDR3 DIMM slots (six DIMM slots per CPU socket); Environment Main memory Main Memory Configuration 4 GB total memory. System configurations from 1 GB up to 32 GB system supports from 2 GB (1x 2 GB to 96 GB (12x 8 Operating altitude: Up to 3,000m (9,000 ft.), max. memory GB) of memory ambient temperature is derated by 1° C per 300m Graphics Controller ASPEED AST2000 above 900m Based on Intel Xeon processor 5500 series and Intel System architecture Intel Quad Core technology System architecture 5500 Chipset Non operating altitude: 10,000m (35,000 ft.) Network: Four Integrated 10/100/1000 Base-T Ethernet ports Network: Two 10/100/1000Base-T Ethernet ports Acoustic noise: 7.5 B operating, 7 B idling / 70 dBA Management: Service processor with embedded Lights Out Manager (LOM) standard Serial: One RJ-45 port operating, 60 dBA idle (declared noise emissions Serial: RJ-45 in accordance with ISO 9296 A-weighted, sound Standard/integrated USB: Five USB 2.0 ports (two front, two rear, one Standard/integrated interfaces power) SATA: Up to two hot-pluggable SATA bays, 2 TB max. interfaces internal) Single non redundant power supply; max. power USB: Five USB 2.0 ports (two front, two rear, one internal) Expansion bus: One PCIe 2.0 slot (x16 electrical/x16 supply rating 600 W at 80% efficiency Power Expansion bus: One PCIe slot (x16 electrical/x16 mechanical), half-length, half-height mechanical, low-profile) AC power: 100–240 V AC (47–63 Hz) Solaris OS 10 or GNU/Linux Solaris 10 OS IEC 60950, UL/CSA 60950, EN 60950, CB Scheme Software Operating systems IPMI 2.0 compliant Service Processor with embedded. Lights Out Management offering remote power, KVM OpenSolaris™ OS Safety with all country differences (keyboard, video, mouse) and media capability Red Hat Enterprise Linux 4 Regulations FCC CFR 47 Part 15 Class A, EN 300 386 v1.3.3, EN Internal disk option Two hot-pluggable 250-750 GB 7200 rpm 3.5” SATA II HD RFI/EMI Red Hat Enterprise Linux 5 55022 Class A, EN 61000-3-2, EN 61000-3-3 Mass storage Removable Media Up to one EIDE DVD-ROM or DVD+/-RW DL drive Operating SUSE Linux Enterprise Server 10 Immunity EN 55024, EN 300 386 v1.3.3 and media Software RAID RAID 1 hardware mirroring to provide fault tolerance systems VMware ESX 3.5 CE, CB Scheme, UL, CSA, CCC, BSMI, AR-S, Safety Operating temperature: 5° to 35° C (41° to 95° F) at sea level Windows Server 2003 Standard/Enterprise Editions GOST-R Non operating temperature: -40° to 68° C (-40° to 154° F), up to 93% relative humidity, non condensing, 38° C Windows Server 2008 Standard/Enterprise Editions CE, FCC, VCCI, ICES, BSMI, CCC, MIC, C-Tick, EMC max. wet bulb Certifications AR-S, GOST-R Windows Server 2008 Standard/Enterprise/ Environment Operating altitude: Up to 3,000m (9,000 ft.), max. ambient temperature is derated by 1° C per 300m above 900m Datacenter Editions RoHS-compliant labeled, per WEEE (Waste Other Electrical and Electronics Equipment) Directive Non operating altitude: up to 12,000m (=~36,000 ft.) Networking Two GbE ports integrated on motherboard (2002/95/EC) Acoustic noise: 70 dBA operating, 69 dBA idle (declared noise emissions in accordance with ISO 9296 Optional Sun Integrated Lights Out Manager (ILOM) Height 43mm (1.7 in.) A-weighted, sound power) service processor module Width 436mm (17.2 in.) Single PSU – VGA 8 MB: 1,024x768 at 60 Hz Dimensions Power Depth 650mm (25.6 in.) AC power: 100–240 V AC (47–63 Hz) – Management port: One 10/100 RJ-45 port and weight MIN 9.8 kg (21.7 lbs.) Safety IEC 60950, UL/CSA 60950, EN 60950, CB Scheme with all country differences Enables remote power control; remote keyboard, Weight video, mouse (KVM) graphical MAX 13.9 kg (30.6 lbs.) Regulations RFI/EMI FCC CFR 47 Part 15 Class A, EN 300 386 v1.3.3, EN 55022 Class A, EN 61000-3-2, EN 61000-3-3 Management access; and remote media (DVD, CD, floppy) Rackmounting slide rail kit Immunity EN 55024, EN 300 386 v1.3.3 Secure remote access using Web interface over SSL, Mounting option Toolless rackmounting slide rail kit Safety CE, CB Scheme, UL, CSA, CCC, BSMI, AR-S, GOST-R or CLI over SSH Cable management arm Certifications EMC CE, FCC, VCCI, ICES, BSMI, CCC, MIC, C-Tick, AR-S, GOST-R Sun™ xVM Ops Center software support Warranty One year, next business day Other RoHS-compliant labeled, per WEEE (Waste Electrical and Electronics Equipment) Directive (2002/95/EC) IPMI 2.0, SNMP v1, v2c, and v3 Height 44 mm (1.7”) In-band, out-of-band, and side-band remote Dimensions Width 425.5 mm (16.8”) management and weight Depth 633.7 mm (25”) Up to four hot-pluggable 3.5 in. SATA disk drives, 4 Weight 13.3 kg (27.2 lbs.) TB max.: 1 TB, 500 GB (7,200 rpm) Warranty One year, next business day Mass storage Internal Up to four hot-pluggable solid-state drives (SSDs), and media disk option Hardware Specifications may change without prior notice. 128 GB max.: 32 GB3 Up to two Sun Flash Modules, 48 GB max.: 24 GB3 Hardware Specifications may change without prior notice. www.blusensnetworks.com
  • 39.
  • 40.
    78 Channel Generators Channel Generators 79 The Channel Generators are the devices responsible of composing the final video stream by filling the template defined at the Pulsar Signage Server with the media contents in a single video stream. Depending on the reliability of the network the streams can be generated at the head-end level with high connectivity channel generators. The low connectivity solution is best suited to deployments where the permanent connection with the screens can not be 100% assured. In this situations, the STB connected to the screen must have local storage space to ensure 24x7 signage generation even during a network outing. High Connectivity The channel generator can be deployed at the head-end level, and its output can be transferred through a trusted network. GH.100 High Connectivity Channel Generator High Connectivity Digital Signage Architecture Each high connectivity channel generator creates one multicast stream that can be tuned by several STB, so it can feed an unlimited number Low Connectivity of screens with the same content. The connection between the STB and the screen can be Composite, S-Video, components, VGA, DVI or HDMI With the low connectivity Channel Generator, the connection between the server and the screens can be wired connection. or wireless, through Ethernet, Wi-Fi, a 3G mobile network or any other IP based technology. It’s even possible to connect the server in one location and the screens in any other location in the world through internet. A GH.100 VPN will ensure that the data is secure while it’s being transferred through internet to the destination Channel Dual-Core Generators. Intel Core™ 2 Duo 1066/1333 MHz Front Side Bus Available Processors processors with Intel 64 architecture 3, 4, or 6 MB L2 cache Virtualization Technology Chipset Intel X38 Express chipset 3 PCI slots (full-height, full-length) GL.100 Low Connectivity Channel Generator Expansion Slots (see system board section for more 1 PCI Express x8 slot (x4 functionality) details) 1 PCI Express x1 slot (half length) The low connectivity channel generator can be directly connected to a screen via 2 PCI Express x16 Gen2 slots (one dedicated for graphics) Composite, S-Video, components, VGA, DVI or HDMI connection. The audio can be 2 internal 3.5” bays Expansion Bays (see storage section for more 1 external 3.5” bay, 3 external 5.25” bays* analog stereo or digital optical output. details) * Third external 5.25” bay is not full depth in side orientation. GL.100 Front I/O 2 USB 2.0, 1 IEEE 1394 (requires optional PCI card to function), 1 audio out, and 1 microphone. Processor Intel® Core™ 2 Duo T8100 (2.1GHz/800Mhz FSB/3MB cache) Internal I/O 1 USB 2.0 Type A Receptacle, 2 USB 2.0 headers Memory Up to 4GB7 667MHz Dual Channel DDR2 SDRAM 7 USB 2.0, 1 serial, 1 optional serial port, parallel port, 2 PS/2, RJ-45 (NIC), 1 External SATA, 1 audio line in, 1 audio Rear I/O Storage Up to 320GB 3 Serial ATA Hard Drive (5400 RPM) line out, 1 microphone in; audio ports can be retasked to function as line in, line out, microphone, or headphone. Interfaces Supported 1 SATA 3 Gb/s interface (5 internal, 1 external SATA connectors) Additional drives can connect to IEEE1394 and/or USB 2.0 ports External Connections On-board RAID Support SATA Intel® Integrated Graphics Media Accelerator X3100 Standard mini tower Orientation: 6.6 x 17.9 x 17.7 inches Audio Intel High Definition Audio 2.0 16.8 x 45.6 x 45.0 cm Integrated 10/100/1000 (Gigabit) Ethernet LAN on system board Chassis Dimensions Wireless (W x D x H) Orientation: 17.7 x 17.9 x 6.6 inches Wi-Fi Options Built-in Draft-N Wireless Networking (Optional) Converted desktop Five USB 2.0 compliant ports 45.0 x 45.6 x 16.8 cm Minimum: 29.9 lbs (13.6 kg) IEEE1394a port (4-pin) Exact weights depend Weight upon configuration Standard: 33.3 lbs (15.1 kg) HDMI video connector Maximum: 43.3 lbs (19.6 kg) Externally Accessible DVI video connector Ports Integrated network connector 10/100/1000 LAN (RJ45) Operating: 40° to 95°F (5° to 35°C) Temperature AC adapter connector Non-operating -40° to 140°F (-40° to 60°C) Operating: 8% to 85% Digital Audio: S/P DIF Out Humidity Analog Audio: Headphone (front); Line-in / Line-out (back) Non-operating 8% to 90% Operating: 10,000 feet; 3,000 m Tall 8.8 3.9 2.8 Maximum Altitude (non-pressurized) Non-operating 30,000 feet; 9,100 m Dimensions Weight Wide 3.0 7.9 7.7 Power Supply 475 watts wide-ranging, active Power Factor Correction, 80 PLUS Efficient Deep 8.3 8.3 8.3 NIC Integrated Gbit LAN by Broadcom Security Cable lock chassis security slot Hardware Specifications may change without prior notice. Hardware Specifications may change without prior notice. www.blusensnetworks.com
  • 41.
  • 42.
    82 Facial Recognition Facial Recognition 83 What´s Facial Recognition? The Blusens Facial Recognition system allows the manager of a public crowded place to gather information about the people visiting such venue in real time. Shopping malls, Hospitals, Bank branches, Airports, etc. are places suitable for this kind of systems. The system consists in a series of small cameras strategically deployed on specific places, such as adverstisement or ailes, where the crowd is expected to walk or to stop and pay attention to the advertisement shown. The system is capable of detecting the face of each person in range and identify the gender and the age, so the administrator can gather statistics about the kind of people at the venue at any given moment. The Facial Recognition system can even calculate the number of seconds each person spends in front of the camera and determine for how long the person was looking to the camera directly during this period. By using this mechanism the property owner can discover what is the age and gender distribution on a specific moment of the day as well as if the latest changes in decoration or advertising are increasing the attention spans of the visitors. All the information gathered via different cameras is integrated into one single server to create statistics defined specifically to fit the necessities of every authorized user of the platform. The access to this statistics and reports can be done from any device (tablets, phones, computers, etc.) The 4 Factors 1. Gender analisis: difference between menwomen 2. Attendance and Attention. Attitude in front of the camera: Identifies who is looking at the screen or just standing in front of it 3. Age group: And gives you the possibility to personalize real-time advertisement depending on the age and gender 4. Traffic Monitoring: Relates people and time as we can know how many people stops in every point per hour. www.blusensnetworks.com
  • 43.
    84 Facial Recognition Facial Recognition 85 Technical Specifications Facial Recognition Camera Frame Rate Web Cam 30 fps Intel Core 2 Duo MiniPC 2.66 GHz Contents 2 GB RAM Software License Application License Statistical count Functionality Gender segregation Graphics Package Availability 45 days from PO Hardware Specifications may change without prior notice. Flexible configuration of the widgets Customizable layout per user Facial Recognition System Architecture www.blusensnetworks.com
  • 44.
  • 45.
    88 Technical Specs Technical Specs 89 Glossary of Measurements Network Technologies ADJACENT CHANNEL REJECTION FM Amplifier: UNE 523/79 standard THROUGH LOSSES (dB): The IEEE 802.X STANDARDS (dB): The difference between the Intermodulation distance= 54 dB attenuation that is undergone by signal Name Description Note minimum gain in the channel and the in a specific band between the input IEEE 802.1 Bridging (networking) and Network Management -------------- maximum gain (minimum attenuation) IF Amplifier: DIN VDE 0855/12 standard and output of a device. IEEE 802.2 Logical link control Inactive in the adjacent channel. The adjacent Intermodulation distance= 35 dB IEEE 802.3 Ethernet -------------- channel in UHF is C±2 and in VHF is BER (Bit Error Ratio): Measurement IEEE 802.4 Token bus Disbanded IEEE 802.5 Defines the MAC layer for a Token Ring Inactive C±1). PAL broadband amplifiers: DIN45004B of signal quality after demodulation. IEEE 802.6 Metropolitan Area Networks Disbanded standard Intermodulation distance= 60 It simply indicates what proportion of IEEE 802.7 Broadband LAN using Coaxial Cable Disbanded AGC RANGE (dB): The difference dB the received binary digits (bits) are IEEE 802.8 Fiber Optic TAG Disbanded between the maximum and minimum incorrect – 0 received as 1 or vice- IEEE 802.9 Integrated Services LAN Disbanded signal that is necessary for a system Single channel amplifiers: EN50083-5 versa. BER is ultimately the best IEEE 802.10 Interoperable LAN Security Disbanded with AGC to keep a constant output. standard Intermodulation distance= 54 measure of digital signal quality since IEEE 802.11 a/b/g/n Wireless LAN Mesh (Wi-Fi certification) -------------- dB it tells us directly whether a picture IEEE 802.12 Demand Priority Disbanded BAND REJECTION (dB): The difference can be displayed. In practice, when IEEE 802.13 -------------- Not used (officially) between the minimum gain in the NOISE FIGURE: The ratio of the actual investigating reception problems, a IEEE 802.14 Cable Modems Disbanded amplified band and the maximum noise power generated at the output CSI display is often more useful and IEEE 802.15 Wireless PAN -------------- IEEE 802.15.1 Bluetooth Certification -------------- attenuation in the rejected band. of an amplifier to that which would MER measurements may be more IEEE 802.15.4 ZigBee Certification -------------- be generated in an ideal resistor. The appropriate, with a direct indication in IEEE 802.16 Broadband Wireless Access (WiMAX certification) -------------- FLATNESS (dB): The difference lower the noise figure, the better dB of the ability of a receiver to decode IEEE 802.16e (Mobile) Broadband Wireless Access -------------- between the maximum and minimum the performance. The noise figure is the signal. A satisfactory result in a IEEE 802.16.1 Local Multipoint Distribution Service -------------- The IEEE 802 family of standards is gain in a certain band or channel. expressed in (dB): NF=10 log F. Digital installation such as DTT or IEEE 802.17 Resilient packet ring -------------- maintained by the IEEE 802 LAN/ Satellite would be 2 x 10-4 IEEE 802.18 Radio Regulatory TAG -------------- MAN Standards Committee (LMSC). FREQUENCY RESPONSE: The variation REJECTION BETWEEN INPUTS/ IEEE 802.19 Coexistence TAG -------------- The most widely used standards are in amplitude within a certain band or OUTPUTS (dB): The band attenuation MER (Modulation Error Ratio): is a IEEE 802.20 Mobile Broadband Wireless Access -------------- for the Ethernet family, Token Ring, channel. between inputs/outputs. very similar parameter to C/N and is IEEE 802.21 Media Independent Handoff -------------- Wireless LAN, Bridging and Virtual also a ratio measured in dB. It includes IEEE 802.22 Wireless Regional Area Network -------------- IEEE 802.23 Broadband ISDN system Experimental Bridged LANs. GAIN (dB): This is the difference SPURIOUS (dBc): The difference in all other signal impairments, not just between the output power of an levels between the channel carrier noise. It can therefore be used to give Information extracted from www.wikipedia.org amplifier with the characteristic created by a modulator or conversor a more direct indication of decoding ETHERNET TECHNOLOGIES impedance (75 Ω) and the input power. and the lower side band or local margin when, as is often the case, Transmission Technology Cable Type Maximum Distance Topology oscillator. This only applies when there there is co-channel interference as Speed 10Base2 10 Mbps Coaxial 185 m Bus (T Connector) MAXIMUM OUTPUT LEVEL (dBμV) is a broadband channel. well as noise in the channel. 10BaseT 10 Mbps Twisted Pair 100 m Star (Hub or Switch) DAB Amplifier: Intermodulation distance= 10BaseF 10 Mbps Optic Fiber 2000 m Star (Hub or Switch) 50 dB (2 channels 4 MHz) 100BaseT4 100Mbps Twisted Pair (category 3UTP) 100 m Star. Half Duplex (hub) Full Duplex (switch) 100BaseTX 100Mbps Twisted Pair (category 5UTP) 100 m Star. Half Duplex (hub) Full Duplex (switch) MPEG-2 Profiles and Levels 100BaseFX 100Mbps Optic Fiber 2000 m No hubs 1000BaseT 1000Mbps 4 Twisted Pair (category 5e or 6UTP ) 100 m Star. Full Duplex (switch) 1000BaseSX 1000Mbps Optic Fiber (multimode) 550 m Star. Full Duplex (switch) MPEG-2 LEVELS 1000BaseLX 1000Mbps Optic Fiber (monomode) 5000 m Star. Full Duplex (switch) Max horizontal Max vertical Max luminance samples per second Max bit rate in Main Abbr. Name Frame rates (Hz) resolution resolution (approximately height x width x framerate) profile (Mbit/s) LL Low Level 23.976, 24, 25, 29.97, 30 352 288 3,041,280 4 10,368,000, except in High profile, where ML Main Level 23.976, 24, 25, 29.97, 30 720 576 constraint is 14,475,600 for 4:2:0 and 15 11,059,200 for 4:2:2 23.976, 24, 25, 29.97, 30, 47,001,600, except that in High profile with H-14 High 1440 1440 1152 60 50, 59.94, 60 4:2:0, constraint is 62,668,800 23.976, 24, 25, 29.97, 30, 62,668,800, except that in High profile with HL High Level 1920 1152 80 50, 59.94, 60 4:2:0, constraint is 83,558,400 MPEG-2 PROFILES Abbr. Name Picture Coding Types Chroma Format Aspect Ratios Scalable modes SP Simple profile I, P 4:2:0 Square pixels, 4:3, or 16:9 None MP Main profile I, P, B 4:2:0 Square pixels, 4:3, or 16:9 None SNR SNR Scalable profile I, P, B 4:2:0 Square pixels, 4:3, or 16:9 SNR (signal-to-noise ratio) scalable Spatial Spatially Scalable profile I, P, B 4:2:0 Square pixels, 4:3, or 16:9 SNR- or spatial-scalable HP High profile I, P, B 4:2:2 or 4:2:0 Square pixels, 4:3, or 16:9 SNR- or spatial-scalable Common Video Resolutions Information extracted from www.wikipedia.org Information extracted from www.wikipedia.org Information extracted from www.wikipedia.org www.blusensnetworks.com
  • 46.
    90 Technical Specs Technical Specs 91 H.264 LEVELS H.264 Profiles and Levels Max macroblocks Max video bit rate (VCL) (kbit/s) Examples for high Level Hi422P, resolution @ frame rate per second per frame BP, XP, MP HiP Hi10P (max stored frames) Hi444PP H.264 PROFILES High 4:2:2 Profile (Hi422P) 128×96@30.9 The High 4:4:4 Profile constrained to The standard includes the following Primarily targeting professional applications that use interlaced video, this 1 1485 99 64 80 192 256 176×144@15.0 all-Intra use. sets of capabilities, which are referred profile builds on top of the High 10 Profile, adding support for the 4:2:2 chroma 128×96@30.9 CAVLC 4:4:4 Intra Profile to as profiles, targeting specific subsampling format while using up to 10 bits per sample of decoded picture 1b 1485 99 128 160 384 512 176×144@15.0 The High 4:4:4 Profile constrained to classes of applications: precision. 176×144@30.3 all-Intra use and to CAVLC entropy Constrained Baseline Profile High 4:4:4 Predictive Profile (Hi444PP) 1.1 3000 396 192 240 576 768 320×240@10.0 coding (i.e., not supporting CABAC). (CBP) This profile builds on top of the High 4:2:2 Profile, supporting up to 4:4:4 chroma 352×288@7.5 Primarily for low-cost applications sampling, up to 14 bits per sample, and additionally supporting efficient lossless 320×240@20.0 As a result of the Scalable Video Coding 1.2 6000 396 384 480 1152 1536 this profile is used widely in region coding and the coding of each picture as three separate color planes. 352×288@15.2 extension, the standard contains three videoconference and mobile High Stereo Profile 320×240@36.0 additional scalable profiles, which are 1.3 11880 396 768 960 2304 3072 applications. It corresponds to the This profile targets two-view stereoscopic 3D video and combines tools from the 352×288@30.0 defined as a combination of the H.264/ High profile with inter-view prediction capabilities of Multiview Video Coding 320×240@36.0 AVC profile for the base layer (2nd word subset of features that are in common 2 11880 396 2000 2500 6000 8000 extension. 352×288@30.0 in scalable profile name) and tools that between the Baseline, Main, and High 352×480@30.0 Profiles described below. In addition, the standard contains four additional all-Intra profiles, which are 2.1 19800 792 4000 5000 12000 16000 achieve the scalable extension: 352×576@25.0 Baseline Profile (BP) defined as simple subsets of other corresponding profiles. These are mostly for Scalable Baseline Profile 352×480@30.7 Primarily for low-cost applications professional (e.g., camera and editing system) applications: Primarily targeting video conference, 352×576@25.6 that requires additional error High 10 Intra Profile 2.2 20250 1620 4000 5000 12000 16000 mobile, and surveillance applications, 720×480@15.0 robustness, while this profile is The High 10 Profile constrained to all-Intra use. 720×576@12.5 this profile builds on top of a used rarely in videoconference and High 4:2:2 Intra Profile 352×480@61.4 constrained version of the H.264/AVC mobile applications, it does add The High 4:2:2 Profile constrained to all-Intra use. 352×576@51.1 Baseline profile to which the base High 4:4:4 Intra Profile 3 40500 1620 10000 12500 30000 40000 additional error resilience tools to 720×480@30.0 layer (a subset of the bitstream) must the Constrained Baseline Profile. The 720×576@25.0 conform. For the scalability tools, a H.264 PROFILES 720×480@80.0 subset of the available tools is enabled. importance of this profile is fading Feature CBP BP XP MP HiP Hi10P Hi422P Hi444PP 3.1 108000 3600 14000 17500 42000 56000 720×576@66.7 Scalable High Profile after the Constrained Baseline Profile I and P slices Yes Yes Yes Yes Yes Yes Yes Yes has been defined. 1280×720@30.0 Primarily targeting broadcast and B slices No No Yes Yes Yes Yes Yes Yes Main Profile (MP) 3.2 216000 5120 20000 25000 60000 80000 1280×720@60.0 streaming applications, this profile SI and SP slices No No Yes No No No No No 1280×1024@42.2 builds on top of the H.264/AVC High Originally intended as the mainstream Flexible macroblock ordering (FMO) No Yes Yes No No No No No 1280×720@68.3 consumer profile for broadcast and Arbitrary slice ordering (ASO) No Yes Yes No No No No No Profile to which the base layer must 4 245760 8192 20000 25000 60000 80000 1920×1080@30.1 storage applications, the importance of Redundant slices (RS) No Yes Yes No No No No No conform. 2048×1024@30.0 this profile faded when the High profile Data partitioning No No Yes No No No No No Scalable High Intra Profile 1280×720@68.3 was developed for those applications. Interlaced coding (PicAFF, MBAFF) No No Yes Yes Yes Yes Yes Yes Primarily targeting production 4.1 245760 8192 50000 62500 150000 200000 1920×1080@30.1 Extended Profile (XP) Multiple reference frames Yes Yes Yes Yes Yes Yes Yes Yes applications, this profile is the Scalable 2048×1024@30.0 Intended as the streaming video In-loop deblocking filter Yes Yes Yes Yes Yes Yes Yes Yes 1920×1080@64.0 High Profile constrained to all-Intra CAVLC entropy coding Yes Yes Yes Yes Yes Yes Yes Yes 4.2 522240 8704 50000 62500 150000 200000 use. profile, this profile has relatively high 2048×1080@60.0 CABAC entropy coding No No No Yes Yes Yes Yes Yes compression capability and some extra 8×8 vs. 4×4 transform adaptability No No No No Yes Yes Yes Yes 1920×1080@72.3 tricks for robustness to data losses Quantization scaling matrices No No No No Yes Yes Yes Yes 2048×1024@72.0 and server stream switching. 5 589824 22080 135000 168750 405000 540000 2048×1080@67.8 Separate Cb and Cr QP control No No No No Yes Yes Yes Yes High Profile (HiP) 2560×1920@30.7 Monochrome (4:0:0) No No No No Yes Yes Yes Yes The primary profile for broadcast and 3680×1536@26.7 Chroma formats (4:2:x) 0 0 0 0 0 0 0, 2 0, 2, 4 1920×1080@120.5 disc storage applications, particularly Largest sample depth 8 8 8 8 8 10 10 14 5.1 983040 36864 240000 300000 720000 960000 4096×2048@30.0 for high-definition television Separate color plane coding No No No No No No No Yes Information extracted from www.wikipedia.org Predictive lossless coding No No No No No No No Yes 4096×2304@26.7 applications (this is the profile adopted into HD DVD and Blu-ray Disc, for Information extracted from www.wikipedia.org example). High 10 Profile (Hi10P) Going beyond today’s mainstream consumer product capabilities, this profile builds on top of the High Profile, adding support for up to 10 bits per sample of decoded picture precision. www.blusensnetworks.com
  • 47.
    92 Technical Specs Technical Specs 93 Gigabit Ethernet Crossover RJ45 Pinout Gigabit Ethernet Crossover RJ45 Pinout Wiring Connection 1: T568A Connection 2: T568A Crossed Connection 1: T568B Connection 2: T568B Crossed Pin Pin Signal Pair Color Signal Pair Color Signal Pair Color Signal Pair Color Horizontal cables should be terminated using the T568A pin/pair assignments, “or, optionally, per [T568B] if necessary to accommodate certain 8-pin cabling systems”. Despite this instruction, many organizations continue to implement T568B 1 BI_DA+ 3 BI_DB+ 2 1 BI_DB+ 2 BI_DA+ 3 for various reasons, chiefly associated with tradition (T568B is equivalent to ATT 258A). The United States National white/green stripe white/orange stripe white/orange stripe white/green stripe Communication Systems Federal Telecommunications Recommendations do not recognize T568B. 2 BI_DA- 3 BI_DB- 2 2 BI_DB- 2 BI_DA- 3 Ethernet Cable RJ45 Pinout green solid orange solid orange solid green solid Pin T568A Pair T568B Pair Wire T568A Color T568B Color 3 BI_DB+ 2 BI_DA+ 3 3 BI_DA+ 3 BI_DB+ 2 1 3 2 tip white/orange stripe white/green stripe white/green stripe white/orange stripe white/green stripe white/orange stripe BI_ 4 BI_DB+ 1 BI_DD+ 4 4 BI_DB+ 1 4 DD+ 2 3 2 ring blue solid white/brown stripe blue solid white/brown stripe green solid orange solid 5 BI_DB- 1 BI_DD- 4 5 BI_DB- 1 BI_DD- 4 3 2 3 tip white/blue stripe brown solid white/blue stripe brown solid white/orange stripe white/green stripe 6 BI_DB- 2 BI_DA- 3 6 BI_DA- 3 BI_DB- 2 4 1 1 ring orange solid green solid green solid orange solid blue solid blue solid 7 BI_DD+ 4 BI_DC+ 1 7 BI_DD+ 4 BI_DC+ 1 5 1 1 tip blue solid blue solid white/blue stripe white/blue stripe white/brown stripe white/brown stripe 6 2 3 ring 8 BI_DD- 4 BI_DC- 1 8 BI_DD- 4 BI_DC- 1 orange solid green solid brown solid white/blue stripe brown solid white/blue stripe Information extracted from www.wikipedia.org 7 4 4 tip white/brown stripe white/brown stripe 8 4 4 ring Cable Recommendations brown solid brown solid Information extracted from www.wikipedia.org An Ethernet crossover cable is a type of Ethernet cable used to connect computing devices together directly where they would normally be connected via a network switch, hub or router, such as directly connecting two personal computers via their network adapters. Use shielded connections Automatic MDI/MDI-X Configuration is specified as an optional feature in the 1000BASE-T standard, meaning that straight-through cables will often work between Gigabit capable interfaces. This feature eliminates the need for crossover cables, making obsolete the uplink/normal ports and manual selector switches Avoid heavy weights on the cable found on many older hubs and switches and greatly reducing installation errors. Use appropriate clamps Avoid heat sources Respect bending radius www.blusensnetworks.com
  • 48.
    94 References table Certification 95 AC.1154 VTL-DEM-1.033 AC.1254 VTL-FUL-1.033 AC.12154 VTV-AAP-1.032 AM.10054 VTV-DSC-1.032 AM.20055 VTV-DSM-1.032 AM.30055 VTV-IAP-1.032 CN.130045 VTV-LTV-1.032 CN.1120046 VTV-MID-1.032 DS.10075 VTV-PVR-1.032 GH.10078 VTV-SAP-1.032 GL.10079 VTV-STB-1.032 IM.150024 VTV-VOD-1.032 IM.1200025 IP-14.136 PDS-BAS-1.033 PDS-LCC-1.033 PDS-LCL-1.033 PDS-LCM-1.033 PDS-LCX-1.033 PDS-MUL-1.033 PLT-BAS-1.033 PLT-EXT-1.033 PS.10072 SC/2CI53 SC/3ASI-MMI52 SC/4COFDM-MMI52 SC/4DVBS-MMI52 SC/4DVBSS2-MMI52 SC/4QAM-MMI52 SC/ADMSDIHD53 SC/ASIOUTMX53 SC/CAB1PSSW51 SC/CAB1PSSW-IPOUT51 SC/CAB1PSSW-IPOUT4CI51 SC/CAB1PSSW-IPOUT-IPOUT4CI51 SC/CAB4PS-0351 SC/CAB4PS-0351 SC/CAB4PS-0451 SC/DVBSCS25053 SC/GBIPIN-MMI52 SC/GBIPOUT53 SC/SWM51 SC/SWM51 SD/HPDDMRF53 SN.1243 SN.14844 T.1438 T.14+37 UNE 166002:2006 for RD Quality VR.10058 www.blusensnetworks.com
  • 49.
    Blusens Technology .Blusens Middle East . Blusens Sudamérica . Blusens México . Blusens Music . Blusens Interactive www.blusensnetworks.com