SlideShare a Scribd company logo
Bilal Zaheer
Address: House# 138-G, Makkah Garden, Canal Bank Road, Faisalabad
Cell: 0092-331-3918348; Res: 0092-41-2426153
E-mail: bilalzaheer99@hotmail.com
Objective:
To work in a challenging and stimulating environment to apply and improve my professional skills and my theoretical knowledge and
contribute for the progress of the organization.
Work Experience:
Unilever Pakistan Rahim Yar Khan – Mar’2016 to Present
Assistant Safety Coordinator
Trainings on:
 Construction Safety Standards
 Behavior Safety Excellence (BeSafe)
 MMP Code - OEE losses
 Safety Pillar (WCM)
 Risk Assessment
 Safe use of Fork lifter and Mobile Crane
 Scaffolding erection
 Emergency transportation and Basic Life support
 Electrical Safety
Responsibilities include:
 WCM Audit (Safety Pillar)
 OHSAS Audit
 FWS Audit
 Risk Assessment on model lines
 HAZOP Reviews
 Incident Investigation
 Management of Change Procedure
 Deep Compliance Audits for RYK Site
 Development and launch of Android App for Safety and Environment Observations on the site
 Contractor Safety Management
SMEC Oil and Gas (Pvt) Ltd. – May’2015 to Jan’2015
Project Engineer
Responsibilities:
 Schedule Preparation using Primavera and MS Project
 Preparation of Project Execution Plan
 Preparation of Project Quality Plan
 Internal Coordination with design team and Squad Check monitoring.
 Document Control
 Progress Monitoring and feedback for progress reports
 PFD, P&ID preparation using AutoCAD
 Project planning and scheduling
MECAS Engineering and Foundry – Apr’2014 to May’2015
Maintenance and Operations Engineer
Project: Mechanical Set-up and Commissioning of HWS Molding Line and Sand Preparation Plant (Lahore Pakistan)
Responsibilities:
 Supervision of Civil works completion according to the drawings
 Erection of sand plant and molding line according to the original drawings of the plant
 Electrical connections of electrical equipment and PLCs
 Commissioning and final testing of the plant
 Mould Pattern preparation and start of production
 Training on electrical efficiency on the plant especially lighting.
Wartsila Pakistan – Jul’2012 to Aug’2012
Intern in Maintenance and Operations Dept.
Responsibilities:
 Overhauling procedures of different parts of diesel engines.
 Operations of the diesel engine power plant.
 Block diagram of whole power plant and tracing of major processes.
Capability Matrix:
Course Project Title
Application Software
Project Management Software
PLC Systems
Programming Software
Programming Languages
Mechanical Workshop
AutoCAD, Pro-Engineering, Solidworks, MS Office, MATLAB, ANSYS
MS Project, MS Office, Primavera
Siemens: S7 & S5 series
Siemens SIMATIC Step S7
C/C++
Lathe, Milling, Shaper and Mechanical Workbench
Academic Qualification:
2009-13 Ghulam Ishaq Khan Institute of Engineering Sciences and
Technology, Topi, Pakistan
B.S (Mechanical Engineering)
(CGPA)
70/100 %
2007-09 F.Sc Pre-Engineering
Divisional Model College, Faisalabad, Pakistan
867/1100
2004-07 O Levels
Divisional Model College, Faisalabad, Pakistan
4 A’s, 4 B’s
Semester Projects:
Course Project Title
Final Year Project
Electronics-I
CAD/CAM
Design of Machine Elements
Design and manufacturing of movable flexi-seal nozzle and its controller for Thrust Vector Controlling
(TVC)
Design and Implementation of Line Tracking Robot Circuit
Car Jack made on AutoCAD
Lubrication system of Car engine
Trainings, Achievements and Extra-Curricular Activities:
 Training on Scaffolding erection, Safe use of Fork lifter and Mobile Crane
 Emergency transportation and Basic Life support
 Construction Safety Standards training
 Electrical Safety Training
 Training on MMP Code - OEE losses
 Training on Safety Pillar (WCM)
 Training Session on: Safety and Health Basics, Hazard & Risk Assessment, Communication & Consultation, Safety Management
Plans & SWMS, Incident Management, Accident / Emergency Management, Ergonomics.
 Training Session for OHS Champions: OHS Leadership and Accountability, Management system processes, Pre Task Review,
Operational Controls, Management of Change, Safe work practices, Third Party Services, Incident investigation, Emergency
Management, Compliance Assurance, Document and data control.
 Training on Communication Methods, Introductory Course on Thinking, Presentation on Motivation and Meditation.
 Training workshop on electrical efficiency in plants with special focus on lighting systems.
 President SPIE GIKI Chapter (Society of Photo-optics and Instrumentation Engineers).
 Vice-President of the ASME (American Society of Mechanical Engineers) [Student Chapter]
 Executive Member of Project Topi - GIKI's Student-run Welfare Society.
 Among the organizers of an event of more than 700 people (Farewell 2011 for GIKI’s Batch 17).
 Team Head of SPIE 1st All Pakistan Optics Olympiad 2011.
 Organized SPIE 2nd All Pakistan Optics Olympiad 2012 under my complete supervision.(303 Participants)
 Among the organizers of ASME 4th All Pakistan Mechanical Engineering Convention and International Mechanical Engineering
Convention’12 and 2nd International Mechanical Engineering Convention’13.

More Related Content

What's hot

Vijayaraghavan.K-CV
Vijayaraghavan.K-CVVijayaraghavan.K-CV
Vijayaraghavan.K-CV
Vijayaraghavan K
 
M.OSAMA Curriculum Vitae
M.OSAMA Curriculum VitaeM.OSAMA Curriculum Vitae
M.OSAMA Curriculum Vitae
Muhammad Osama
 
Roshan Mishra (Electrical Engineer)
Roshan Mishra (Electrical Engineer)Roshan Mishra (Electrical Engineer)
Roshan Mishra (Electrical Engineer)
Roshan Mishra
 
OMAR AHMED C V.doc
OMAR AHMED C V.docOMAR AHMED C V.doc
OMAR AHMED C V.doc
Omar Ahmed
 
Ibrahim Mohamed Attia
Ibrahim Mohamed AttiaIbrahim Mohamed Attia
Ibrahim Mohamed Attia
IBRAHIM MOHAMED ATEIA
 
zohir mohsen cv
zohir mohsen cvzohir mohsen cv
zohir mohsen cv
Zohir Mohsen
 
Hafedh_CV
Hafedh_CVHafedh_CV
Hafedh_CV
Hafedh Al Halhli
 
Omar Diaa CV
Omar Diaa CVOmar Diaa CV
Omar Diaa CV
Omar Diaa
 
mohamed mostfa
mohamed mostfamohamed mostfa
mohamed mostfa
mohamed kamel
 
Mallouh CV 1
Mallouh CV 1Mallouh CV 1
Mallouh CV 1
Mahmoud Abumallouh
 
ENG.Sarea Lasheen 2014
ENG.Sarea Lasheen 2014ENG.Sarea Lasheen 2014
ENG.Sarea Lasheen 2014
Saria Lashin
 
Sales Engg
Sales EnggSales Engg
Sales Engg
Partheepan C
 
resume 2016
resume 2016resume 2016
resume 2016
Mohamed Assim
 
Mahmoud Amer instrument 10-2016
Mahmoud Amer instrument 10-2016Mahmoud Amer instrument 10-2016
Mahmoud Amer instrument 10-2016
Mahmoud Amer
 
CV
CVCV
karim CV 2016
karim CV 2016karim CV 2016
karim CV 2016
Karim Elmamlouk
 
SUPPLY CHAIN UPDATED
SUPPLY CHAIN UPDATEDSUPPLY CHAIN UPDATED
SUPPLY CHAIN UPDATED
MUHAMMAD Shahzad Jahangir
 
FMBM-Resume
FMBM-ResumeFMBM-Resume
FMBM-Resume
Mae Mohammad
 

What's hot (18)

Vijayaraghavan.K-CV
Vijayaraghavan.K-CVVijayaraghavan.K-CV
Vijayaraghavan.K-CV
 
M.OSAMA Curriculum Vitae
M.OSAMA Curriculum VitaeM.OSAMA Curriculum Vitae
M.OSAMA Curriculum Vitae
 
Roshan Mishra (Electrical Engineer)
Roshan Mishra (Electrical Engineer)Roshan Mishra (Electrical Engineer)
Roshan Mishra (Electrical Engineer)
 
OMAR AHMED C V.doc
OMAR AHMED C V.docOMAR AHMED C V.doc
OMAR AHMED C V.doc
 
Ibrahim Mohamed Attia
Ibrahim Mohamed AttiaIbrahim Mohamed Attia
Ibrahim Mohamed Attia
 
zohir mohsen cv
zohir mohsen cvzohir mohsen cv
zohir mohsen cv
 
Hafedh_CV
Hafedh_CVHafedh_CV
Hafedh_CV
 
Omar Diaa CV
Omar Diaa CVOmar Diaa CV
Omar Diaa CV
 
mohamed mostfa
mohamed mostfamohamed mostfa
mohamed mostfa
 
Mallouh CV 1
Mallouh CV 1Mallouh CV 1
Mallouh CV 1
 
ENG.Sarea Lasheen 2014
ENG.Sarea Lasheen 2014ENG.Sarea Lasheen 2014
ENG.Sarea Lasheen 2014
 
Sales Engg
Sales EnggSales Engg
Sales Engg
 
resume 2016
resume 2016resume 2016
resume 2016
 
Mahmoud Amer instrument 10-2016
Mahmoud Amer instrument 10-2016Mahmoud Amer instrument 10-2016
Mahmoud Amer instrument 10-2016
 
CV
CVCV
CV
 
karim CV 2016
karim CV 2016karim CV 2016
karim CV 2016
 
SUPPLY CHAIN UPDATED
SUPPLY CHAIN UPDATEDSUPPLY CHAIN UPDATED
SUPPLY CHAIN UPDATED
 
FMBM-Resume
FMBM-ResumeFMBM-Resume
FMBM-Resume
 

Similar to Bilal Zaheer CV

Eng. nabeel rashid personnel resume
Eng. nabeel rashid personnel resumeEng. nabeel rashid personnel resume
Eng. nabeel rashid personnel resume
Nabeel Rashid
 
POM opening by sir Shahid Khalil of .ppt
POM opening by sir Shahid Khalil of .pptPOM opening by sir Shahid Khalil of .ppt
POM opening by sir Shahid Khalil of .ppt
SheikhWasay1
 
MUHAMMAD SHUMAIL CV.compressed
MUHAMMAD SHUMAIL CV.compressedMUHAMMAD SHUMAIL CV.compressed
MUHAMMAD SHUMAIL CV.compressed
Engr Muahammad Shumail
 
Muhammad Awais mechanical
Muhammad Awais mechanicalMuhammad Awais mechanical
Muhammad Awais mechanical
Muhammad Awais
 
Haamid Resume
Haamid ResumeHaamid Resume
Haamid Resume
Haamid Shah
 
ASHIQ.CV.
ASHIQ.CV.ASHIQ.CV.
ASHIQ.CV.
Muhammad Ashiq
 
SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11
sudarsan boopathi
 
Sayan-CV 2015
Sayan-CV 2015Sayan-CV 2015
Sayan-CV 2015
Sayan Ml
 
Cv murugesan alagar
Cv murugesan alagarCv murugesan alagar
Cv murugesan alagar
Murugesan Alagar
 
fzkhan HR
fzkhan HRfzkhan HR
Muhammad Mohsin Updated Resume
Muhammad Mohsin Updated ResumeMuhammad Mohsin Updated Resume
Muhammad Mohsin Updated Resume
Muhammad Mohsin
 
PANKAJ KUMAR CV
PANKAJ KUMAR CVPANKAJ KUMAR CV
PANKAJ KUMAR CV
Pankaj kumar
 
Yasir CV
Yasir CVYasir CV
Yasir CV
Yasir Zaidi
 
Yasir cv
Yasir cvYasir cv
Yasir cv
Yasir Zaidi
 
Resume New
Resume NewResume New
Resume New
arun kumar
 
Nishit agarwal resume
Nishit agarwal resume Nishit agarwal resume
Nishit agarwal resume
Nishit Agarwal
 
C.V_Faizan-I- WS -2-
C.V_Faizan-I- WS -2-C.V_Faizan-I- WS -2-
C.V_Faizan-I- WS -2-
M.Faizan Yaqoob-MBA,B.E.
 
Rafay Ahmed Tariq
Rafay Ahmed TariqRafay Ahmed Tariq
Rafay Ahmed Tariq
Rafay Ahmed
 
Prasanna09_CV_BE_Electronics
Prasanna09_CV_BE_ElectronicsPrasanna09_CV_BE_Electronics
Prasanna09_CV_BE_Electronics
Prasanna Sakhalkar
 
M.Jaleel Mechanical Engineer May 2015
M.Jaleel Mechanical Engineer May 2015M.Jaleel Mechanical Engineer May 2015
M.Jaleel Mechanical Engineer May 2015
Mohamed Abdul-Jaleel
 

Similar to Bilal Zaheer CV (20)

Eng. nabeel rashid personnel resume
Eng. nabeel rashid personnel resumeEng. nabeel rashid personnel resume
Eng. nabeel rashid personnel resume
 
POM opening by sir Shahid Khalil of .ppt
POM opening by sir Shahid Khalil of .pptPOM opening by sir Shahid Khalil of .ppt
POM opening by sir Shahid Khalil of .ppt
 
MUHAMMAD SHUMAIL CV.compressed
MUHAMMAD SHUMAIL CV.compressedMUHAMMAD SHUMAIL CV.compressed
MUHAMMAD SHUMAIL CV.compressed
 
Muhammad Awais mechanical
Muhammad Awais mechanicalMuhammad Awais mechanical
Muhammad Awais mechanical
 
Haamid Resume
Haamid ResumeHaamid Resume
Haamid Resume
 
ASHIQ.CV.
ASHIQ.CV.ASHIQ.CV.
ASHIQ.CV.
 
SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11
 
Sayan-CV 2015
Sayan-CV 2015Sayan-CV 2015
Sayan-CV 2015
 
Cv murugesan alagar
Cv murugesan alagarCv murugesan alagar
Cv murugesan alagar
 
fzkhan HR
fzkhan HRfzkhan HR
fzkhan HR
 
Muhammad Mohsin Updated Resume
Muhammad Mohsin Updated ResumeMuhammad Mohsin Updated Resume
Muhammad Mohsin Updated Resume
 
PANKAJ KUMAR CV
PANKAJ KUMAR CVPANKAJ KUMAR CV
PANKAJ KUMAR CV
 
Yasir CV
Yasir CVYasir CV
Yasir CV
 
Yasir cv
Yasir cvYasir cv
Yasir cv
 
Resume New
Resume NewResume New
Resume New
 
Nishit agarwal resume
Nishit agarwal resume Nishit agarwal resume
Nishit agarwal resume
 
C.V_Faizan-I- WS -2-
C.V_Faizan-I- WS -2-C.V_Faizan-I- WS -2-
C.V_Faizan-I- WS -2-
 
Rafay Ahmed Tariq
Rafay Ahmed TariqRafay Ahmed Tariq
Rafay Ahmed Tariq
 
Prasanna09_CV_BE_Electronics
Prasanna09_CV_BE_ElectronicsPrasanna09_CV_BE_Electronics
Prasanna09_CV_BE_Electronics
 
M.Jaleel Mechanical Engineer May 2015
M.Jaleel Mechanical Engineer May 2015M.Jaleel Mechanical Engineer May 2015
M.Jaleel Mechanical Engineer May 2015
 

Bilal Zaheer CV

  • 1. Bilal Zaheer Address: House# 138-G, Makkah Garden, Canal Bank Road, Faisalabad Cell: 0092-331-3918348; Res: 0092-41-2426153 E-mail: bilalzaheer99@hotmail.com Objective: To work in a challenging and stimulating environment to apply and improve my professional skills and my theoretical knowledge and contribute for the progress of the organization. Work Experience: Unilever Pakistan Rahim Yar Khan – Mar’2016 to Present Assistant Safety Coordinator Trainings on:  Construction Safety Standards  Behavior Safety Excellence (BeSafe)  MMP Code - OEE losses  Safety Pillar (WCM)  Risk Assessment  Safe use of Fork lifter and Mobile Crane  Scaffolding erection  Emergency transportation and Basic Life support  Electrical Safety Responsibilities include:  WCM Audit (Safety Pillar)  OHSAS Audit  FWS Audit  Risk Assessment on model lines  HAZOP Reviews  Incident Investigation  Management of Change Procedure  Deep Compliance Audits for RYK Site  Development and launch of Android App for Safety and Environment Observations on the site  Contractor Safety Management SMEC Oil and Gas (Pvt) Ltd. – May’2015 to Jan’2015 Project Engineer Responsibilities:  Schedule Preparation using Primavera and MS Project  Preparation of Project Execution Plan  Preparation of Project Quality Plan  Internal Coordination with design team and Squad Check monitoring.  Document Control  Progress Monitoring and feedback for progress reports  PFD, P&ID preparation using AutoCAD  Project planning and scheduling MECAS Engineering and Foundry – Apr’2014 to May’2015 Maintenance and Operations Engineer Project: Mechanical Set-up and Commissioning of HWS Molding Line and Sand Preparation Plant (Lahore Pakistan) Responsibilities:  Supervision of Civil works completion according to the drawings  Erection of sand plant and molding line according to the original drawings of the plant  Electrical connections of electrical equipment and PLCs  Commissioning and final testing of the plant  Mould Pattern preparation and start of production  Training on electrical efficiency on the plant especially lighting.
  • 2. Wartsila Pakistan – Jul’2012 to Aug’2012 Intern in Maintenance and Operations Dept. Responsibilities:  Overhauling procedures of different parts of diesel engines.  Operations of the diesel engine power plant.  Block diagram of whole power plant and tracing of major processes. Capability Matrix: Course Project Title Application Software Project Management Software PLC Systems Programming Software Programming Languages Mechanical Workshop AutoCAD, Pro-Engineering, Solidworks, MS Office, MATLAB, ANSYS MS Project, MS Office, Primavera Siemens: S7 & S5 series Siemens SIMATIC Step S7 C/C++ Lathe, Milling, Shaper and Mechanical Workbench Academic Qualification: 2009-13 Ghulam Ishaq Khan Institute of Engineering Sciences and Technology, Topi, Pakistan B.S (Mechanical Engineering) (CGPA) 70/100 % 2007-09 F.Sc Pre-Engineering Divisional Model College, Faisalabad, Pakistan 867/1100 2004-07 O Levels Divisional Model College, Faisalabad, Pakistan 4 A’s, 4 B’s Semester Projects: Course Project Title Final Year Project Electronics-I CAD/CAM Design of Machine Elements Design and manufacturing of movable flexi-seal nozzle and its controller for Thrust Vector Controlling (TVC) Design and Implementation of Line Tracking Robot Circuit Car Jack made on AutoCAD Lubrication system of Car engine Trainings, Achievements and Extra-Curricular Activities:  Training on Scaffolding erection, Safe use of Fork lifter and Mobile Crane  Emergency transportation and Basic Life support  Construction Safety Standards training  Electrical Safety Training  Training on MMP Code - OEE losses  Training on Safety Pillar (WCM)  Training Session on: Safety and Health Basics, Hazard & Risk Assessment, Communication & Consultation, Safety Management Plans & SWMS, Incident Management, Accident / Emergency Management, Ergonomics.  Training Session for OHS Champions: OHS Leadership and Accountability, Management system processes, Pre Task Review, Operational Controls, Management of Change, Safe work practices, Third Party Services, Incident investigation, Emergency Management, Compliance Assurance, Document and data control.  Training on Communication Methods, Introductory Course on Thinking, Presentation on Motivation and Meditation.  Training workshop on electrical efficiency in plants with special focus on lighting systems.  President SPIE GIKI Chapter (Society of Photo-optics and Instrumentation Engineers).  Vice-President of the ASME (American Society of Mechanical Engineers) [Student Chapter]  Executive Member of Project Topi - GIKI's Student-run Welfare Society.  Among the organizers of an event of more than 700 people (Farewell 2011 for GIKI’s Batch 17).  Team Head of SPIE 1st All Pakistan Optics Olympiad 2011.  Organized SPIE 2nd All Pakistan Optics Olympiad 2012 under my complete supervision.(303 Participants)  Among the organizers of ASME 4th All Pakistan Mechanical Engineering Convention and International Mechanical Engineering Convention’12 and 2nd International Mechanical Engineering Convention’13.