Best Practices for Mobility
Copyright 2014
1 Mobility overview
2 Best practices for mobility – factors to consider
(i) Charting out the business strategy
(ii) Creating project plan & roadmap
(iii) Considering organizational changes required
(iv) Measuring usage & end-user feedback
3 Sales & Marketing (Promoting consumer apps)
4 Customer Learnings - KarmaLoop, University of Phoenix Case Studies
5 Summary
Agenda & Abstract
2
This presentation explains the best practices of enabling the mobile channel for organizations.
The talk will delve into how to structure your IT org for mobile development, the technology &
business changes you will need to consider.
Through customer learnings we will share best practices on improving conversions, increasing
sales and promoting the mobile app usage.
Copyright 2014
What Industry Experts Say
• US smartphone penetration has reached 65.2% within 6 years
since 2007 when Apple first launched its iPhone.
Source: comScore
• 55% web traffic usage in US is through mobiles & tablets in
Jan 2014. (47% from mobile apps and 8% fro mobile browser).
Source: comScore
• Touch-screen devices (including iPad, iPhone ) will account
for 59% of all PCs shipped in 2016.
Source: Canalys
3
Copyright 2014
Transforming Web Business to a Mobile First Strategy
4
Results
• Of the 699 million daily active users who logged onto the
site in June 2013, more than two-thirds did so from a
mobile device
• Mobile revenues accounted for 41% of the company's
revenues in Q2 2013
• Mobile users spend one in every five minutes online
using Facebook, web users spend one in every seven
minutes
Facebook had zero revenues from mobile and was identified as the biggest risk when it went
IPO. Facebook’s share was driven down by over 40% due to this perceived risk.
Facebook then implemented native mobile apps for Android and iOS. And focused on mobile first
strategy.
Source: Mashable.com
Copyright 2014
Few Thoughts
• Incorporate Mobile First Strategy into your roadmap
• Today, the question should be how to implement, and not
should we go mobile?
• For your mobile strategy to be successful, you need to adopt
the 360-degree approach and include mobile in every aspect
of your business
5
Mobile is just the beginning...
Transformation is happening across the Ecosystem
6
Watch the Video
6Copyright 2014
Mobile is just the beginning...Transformation is happening across the Ecosystem
Copyright 2014
Best Practices for Mobility – Factors to consider
Strategy
Project
Roadmap
Organization
structuring
Measuring
Usage &
User Feedback
7
• Business objectives
• Corporate
ecosystem
• Budget
• Timelines
• Define features &
functionality
• Set timelines
• Implement in
iterations
(phase-wise
approach)
• Business changes
• Technical changes
• Release Beta
version
• Measure usage
• Capture user pain
points
• Improve in next
iteration
Different factors become important at different stages of the lifecycle
Copyright 2014
Charting out the Strategy
8
1
Start by analyzing the right mobile strategy to fit your business goals
1. What is the importance of mobile in your firm?
• Added convenience / Revenue Generation / Cost cutting / Customer Service
2. What is your customer profile?
• Number of customers
• Geographical spread of customers
• Customer Value
3. Diversity of mobiles
• Types of devices / OSes ( iOS, Android, Windows, Feature phones etc.)
4. Technology Strategy
• Native or Mobile Web or Hybrid
• Existing Systems
5. Execution Strategy
• Design
• In-house vs Outsourced Dev
• Infrastructure
• Maintenance
6. Marketing / Go-to-Market strategy
• App promotion
• Driving Sales
Copyright 2014
Project Roadmap
9
2
Next you need to work on the implementation plan to fit your timeline
1. User Experience Design
• Mobile is all about Design Design & Design
2. Technical Design
• Features
• Platforms
• Backend Integration
3. Infrastructure Design
4. Resourcing
5. Timelines
• Initial version
• Iterations
• Roadmap
Mobile Evolution
• Utility apps ( meets the functionality for one or two platforms)
• Responsive Apps on multiple platforms ( broad coverage)
• Intelligent Apps which deep personalization features
• Innovation – Augmented reality
Mobile is not a one time build and forget. It is a business and hence investments have to
be treated that way. Far too often, customers don’t get benefits due to insufficient
spending on this platform.
Copyright 2014
Technical Considerations
Considering Organizational Changes
• Service Oriented Approach
• User Experience
• Technology Options
• Development Approach
o Test Driven
o Continuous Integration
• Testing Setup
• Continuous Improvement
• Organization Structure
• Monetization on mobile
• Multi-Screen Audiences
10
Business Considerations
3
Copyright 2014
Technology Perspective
Service Oriented Architecture
• API, API, API - APIs for everything
• Move from building features to building APIs for each of those
• You are not building for one surface but multiple surfaces which you may have not seen yet
Technology Options – Native vs. Mobile Web ; Mobile Web vs. Responsive Web
• Should you choose Native or Web or Cross-Platform
• Understand the tradeoffs
• Make a decision along with business teams like Sales & Marketing – its not just a technology
decision
• More often than not its not either or but its multiple platforms co-existing together
11
Copyright 2014
Technology Perspective
• Robust UI / UX team
• User experience has to be
spot on mobile
• Follow standards for each
platform
• Less space – so create more
personalized experiences
• Ask Less – Learn more with
every interaction
• Use deep analytics to present
the data
12
User Experience
Approach
Development
Approach
Testing
Approach
Test Driven Development
• Allows developers to define
test cases for the module
planned to code
• Unit Testing performed
continuously through
automation of test-cases
• Newer code checked-in will
capture automatic bugs with
the failure of test-cases
Continuous Integration
• Daily integrated builds
created and sent as
notifications to the whole
team (Dev, QA)
• Builds integrated to
TestFlight, the app can be
downloaded by all
stakeholders for testing and
observing the progress of
development
Testing Approach
• Test Driven Development
Approach
• Automated Testing
o Leverage platform
sdks/third party library to
automate unit test cases
with code coverage of 60%
o Automate Integration Test
cases using tools like
Experitest etc.
• Establish a Device Lab – procure
the most commonly used devices
• Manual Testing
o Execute manual unit test
cases to capture the UI
issues
• Test for Non-functional scenarios
like Load Test, Performance Test,
Stress Test
Copyright 2014
Business Perspective
Analytics
Capabilities
Measurement
• Identify the KPIs
• Find out the budgets
• Determine the metrics
• Figure out the Sales Value
• Know your target audience
• Know your competition
• Understand market insights
• Find out the devices used
• Identify mobile expertise team
• Figure out expertise in IT team
• Plan for a marketing agency with
mobile experience
13
• Marketers are displaying TV ads to get
consumers browse their site instantly
• More marketers now are focusing first on
mobile for integrated campaigns
• Companies are running brand campaigns
across devices to reach larger audience
• Advertisers are focused on performance-
based campaigns
Addressing Multi-screen Viewing Audience
Source: Part of infographics by Uberflip
“90% of consumers move between devices to complete a task. And 40% of smartphone users watch
TV while browsing from their smartphones” – Google
Copyright 2014 14
Teams required within the Organization
Right Team with
Relevant Experience
Organization Structure
There are two options 1) Centralized Solution and 2) Decentralized Solution. Both are driven
by one single mobile leader.
Mobile Leader
(Cross-functional Team Head)
Single Centralized
Mobile Team
Decentralized
Mobile Team
• Start with a
centralized group
initially
• One team leader to
manage all units
• Separate mobile teams for
each business unit with
growth in traffic
• One group leader to handle
each business unit
Copyright 2014 15
Copyright 2014
Trulia – A Case Study
App Philosophy
MonetizationTeam
• Centralized Team for UI / UX
across all apps
• Mobile Engineering Team
organised by technology
competency – iOS, Android,
mobile web site etc
• Determine the metrics
• Responsive approach by front
end Trulia.com website
• Develop apps on multiple platforms – OS, iPad, Android, Android Tablets, Kindle Fire,
Windows 8 Tablets, Mobile Web
• Specific purpose apps on specific platforms like Renters, Real Estate Agents, Mortgage
Shoppers. Provide essential functionality for fast and efficient mobile experience
• Like Foursquare, agents can check in to specific properties using agent app and
distinguish themselves from other agents
• Built from the start – along with
apps, launched an ad system
• Show context sensitive
information with zero clicks and
ensure user gets to the call to
action with little browsing
• 60% of leads come from mobile
today
Source: Forbes
16
Copyright 2014
• Use Analytics for feature prioritization
and testing
• Active review management
• Continuous improvement with feature
releases
Continuous Improvement Process
Release 1
– Deploy
User
Feedback
Usage
Analytics
(Google/Flurry/
Omniture)
Product
Management
Requirements
Release 1.1 Build & Test
Improve Build Cycle
Release 1.1 – Deploy
1
2
3
Improve
Iterate
& Build
Measure & End-User Feedback - Continuous Improvement
17
4
Sales & Marketing
(For Consumer Apps)
Copyright 2014
Invest in Analytics Tools to Target Right Audience
To Increase Product Sales, Improve Conversions and Promote App Usage
1. Analyze the user behavior and preferences
2. Target the audience with right content based on demographics and geography
3. Personalize the content based on preference
4. Push ‘promotional messages’ as notifications
19
Copyright 2014
Monetization on Mobile
• Serve more ads without losing User Attention
(Facebook is done this successfully and grew its revenues
on mobile to 41% from almost zero within 6 quarters).
o In-stream ads and branded posts
o Contextual advertisement
o Hyper-local mobile ad targeting
o Real-Time Bidding exchange for high value mobile
user targets
• Mobile Video Ads – Pre-roll, Mid-roll and Post roll. Pre-roll is
the most popular in video ads with 10-15 secs clips.
• Interstitials – Full or half page ads appears between content
pages. Best format, since it utilizes the complete screen
size.
Worldwide mobile advertising revenue to reach $24.5 billion in 2016.
Revenue from global mobile advertising to grow 400 % between 2011 and 2016 - Gartner
20
Customer Learning
“We have noticed difference in technology requirement across
geographical regions. In the US, iOS and Android is more popular, whereas
customers in India look for mobility solutions on Android. Mobility solutions
requirement on Windows Phone OS and Nokia phones are more popular in
European regions.”
– Rinish KN, CTO, RapidValue Solutions
Copyright 2014 22
Mobile Commerce Application
Copyright 2014 23
Traffic Close to 30% through Mobile Channel
24
What we did
1. Usability improvements
• Reduced number of clicks from purchase
to payment
• Design changes
• Reduced logic validations
• Introduced more payment mechanisms
2. Social Shopping Experience
• Sharing Wishlists / Buys
3. Analytics
• Better Analytics
• Targeted Push Notifications
4. Performance Improvement
• Crash Analytics / Performance monitoring
5. Process & Results
• New features added in iterations every couple of months
• High CSAT score and 4.6 rating on app stores
A leading streetwear retailer with over $200mn in sales. KarmaLoop sells clothes
and accessories online.
Issues / Opportunities
• Revenues from Mobile Channel
(Apps & Mobile Web)
• Improve conversion rates
Copyright 2014
Improved Student engagement in online classrooms via mobile
channel
.
One of the largest higher education providers in North America (Apollo Group)
with over $ 4 billion in revenues.
What We did
• 3 years roadmap to build and support apps
for students and faculty
• Accessed by over million users with 4+ rating
on app stores
• Established dedicated mobile testing lab for
manual and automated
Copyright 2014 25
Copyright 2014
Summary – Key Factors to Consider
Start with basic features on one device platform. Measure the impact and then expand
to include new features in iterations across more devices. Get feedback from your
users to correct the mistakes in app in the next releases.
Mobile First Strategy
Mobile strategy impacts all areas of business. Analyze the backend system integration,
corporate ecosystem, corporate expansion plans to provide seamless experience
across channels and devices. Set a mobile champion or leader in the firm.
Invest in Analytics &
User Experience
Integrate with strong analytics tool to understand the user behavior, personalize
content, push promotional messages & mobile ads based on user preference,
demographic, and geography.
Measure & Iterate
Right Team with
Mobile Champion
Get the right team with skills across platforms – iOS, Android, HTML5, Responsive
Web, UI/ UX Design, Analytics, Testing. Have a clear mobile leader / champion in the
firm.
Take Full Advantage
of Mobile Technology
Make complete use of mobile technologies supported by devices. Specially, include
features related to GPS functionality, barcode scanning and camera capabilities.
26
THANK YOU
Presented by:
Sirish Kosaraju
Chief Operating Officer, RapidValue Solutions
Email: sirishk@rapidvaluesolutions.com
Phone: +91 99454 81164
www.linkedin.com/in/sirishkosaraju
27Copyright 2014
RapidValue in a Slide – Largest Independent Enterprise Mobility Firm
200+ STRONG
MOBILITY
CONSULTING
TEAM
350+
MOBILITY
PROJECTS
EXPERIENCE
LARGE SCALE
& COMPLEX
MOBILE
PROJECTS
Recognized as the 2013
Top 100 Red Herring
Global Finalist and prior
to that selected as
2013 Top 100 Red Herring
North America Finalist
Awarded TOP 15
Emerging Companies in
the Field of Innovation.
Won the prestigious
NASSCOM emerge 50
award in 2011
HEADQUARTERS
PLEASANTON, CA,
USA
GLOBAL DELIVERY
CENTERS IN
BANGALORE & KOCHI,
INDIA
Operations Across…
USA | Canada | Finland | UAE | India
‘Mobility Driven Transformations’ to unlock
value from your enterprise systems…
Razor –
Sharp
Focus on
Mobility
Enterprise
Mobility
Specialists
Cutting Edge
Delivery
Processes
Experience working with Fortune 500 customers and many
Fortune 1000 companies…
Experts in
Enterprise Field Applications including
Field Service app, Geo location apps and
Integrations with ERPs like SAP, Oracle
and others
Copyright 2014 28

Best Practices for Mobility

  • 1.
  • 2.
    Copyright 2014 1 Mobilityoverview 2 Best practices for mobility – factors to consider (i) Charting out the business strategy (ii) Creating project plan & roadmap (iii) Considering organizational changes required (iv) Measuring usage & end-user feedback 3 Sales & Marketing (Promoting consumer apps) 4 Customer Learnings - KarmaLoop, University of Phoenix Case Studies 5 Summary Agenda & Abstract 2 This presentation explains the best practices of enabling the mobile channel for organizations. The talk will delve into how to structure your IT org for mobile development, the technology & business changes you will need to consider. Through customer learnings we will share best practices on improving conversions, increasing sales and promoting the mobile app usage.
  • 3.
    Copyright 2014 What IndustryExperts Say • US smartphone penetration has reached 65.2% within 6 years since 2007 when Apple first launched its iPhone. Source: comScore • 55% web traffic usage in US is through mobiles & tablets in Jan 2014. (47% from mobile apps and 8% fro mobile browser). Source: comScore • Touch-screen devices (including iPad, iPhone ) will account for 59% of all PCs shipped in 2016. Source: Canalys 3
  • 4.
    Copyright 2014 Transforming WebBusiness to a Mobile First Strategy 4 Results • Of the 699 million daily active users who logged onto the site in June 2013, more than two-thirds did so from a mobile device • Mobile revenues accounted for 41% of the company's revenues in Q2 2013 • Mobile users spend one in every five minutes online using Facebook, web users spend one in every seven minutes Facebook had zero revenues from mobile and was identified as the biggest risk when it went IPO. Facebook’s share was driven down by over 40% due to this perceived risk. Facebook then implemented native mobile apps for Android and iOS. And focused on mobile first strategy. Source: Mashable.com
  • 5.
    Copyright 2014 Few Thoughts •Incorporate Mobile First Strategy into your roadmap • Today, the question should be how to implement, and not should we go mobile? • For your mobile strategy to be successful, you need to adopt the 360-degree approach and include mobile in every aspect of your business 5
  • 6.
    Mobile is justthe beginning... Transformation is happening across the Ecosystem 6 Watch the Video 6Copyright 2014 Mobile is just the beginning...Transformation is happening across the Ecosystem
  • 7.
    Copyright 2014 Best Practicesfor Mobility – Factors to consider Strategy Project Roadmap Organization structuring Measuring Usage & User Feedback 7 • Business objectives • Corporate ecosystem • Budget • Timelines • Define features & functionality • Set timelines • Implement in iterations (phase-wise approach) • Business changes • Technical changes • Release Beta version • Measure usage • Capture user pain points • Improve in next iteration Different factors become important at different stages of the lifecycle
  • 8.
    Copyright 2014 Charting outthe Strategy 8 1 Start by analyzing the right mobile strategy to fit your business goals 1. What is the importance of mobile in your firm? • Added convenience / Revenue Generation / Cost cutting / Customer Service 2. What is your customer profile? • Number of customers • Geographical spread of customers • Customer Value 3. Diversity of mobiles • Types of devices / OSes ( iOS, Android, Windows, Feature phones etc.) 4. Technology Strategy • Native or Mobile Web or Hybrid • Existing Systems 5. Execution Strategy • Design • In-house vs Outsourced Dev • Infrastructure • Maintenance 6. Marketing / Go-to-Market strategy • App promotion • Driving Sales
  • 9.
    Copyright 2014 Project Roadmap 9 2 Nextyou need to work on the implementation plan to fit your timeline 1. User Experience Design • Mobile is all about Design Design & Design 2. Technical Design • Features • Platforms • Backend Integration 3. Infrastructure Design 4. Resourcing 5. Timelines • Initial version • Iterations • Roadmap Mobile Evolution • Utility apps ( meets the functionality for one or two platforms) • Responsive Apps on multiple platforms ( broad coverage) • Intelligent Apps which deep personalization features • Innovation – Augmented reality Mobile is not a one time build and forget. It is a business and hence investments have to be treated that way. Far too often, customers don’t get benefits due to insufficient spending on this platform.
  • 10.
    Copyright 2014 Technical Considerations ConsideringOrganizational Changes • Service Oriented Approach • User Experience • Technology Options • Development Approach o Test Driven o Continuous Integration • Testing Setup • Continuous Improvement • Organization Structure • Monetization on mobile • Multi-Screen Audiences 10 Business Considerations 3
  • 11.
    Copyright 2014 Technology Perspective ServiceOriented Architecture • API, API, API - APIs for everything • Move from building features to building APIs for each of those • You are not building for one surface but multiple surfaces which you may have not seen yet Technology Options – Native vs. Mobile Web ; Mobile Web vs. Responsive Web • Should you choose Native or Web or Cross-Platform • Understand the tradeoffs • Make a decision along with business teams like Sales & Marketing – its not just a technology decision • More often than not its not either or but its multiple platforms co-existing together 11
  • 12.
    Copyright 2014 Technology Perspective •Robust UI / UX team • User experience has to be spot on mobile • Follow standards for each platform • Less space – so create more personalized experiences • Ask Less – Learn more with every interaction • Use deep analytics to present the data 12 User Experience Approach Development Approach Testing Approach Test Driven Development • Allows developers to define test cases for the module planned to code • Unit Testing performed continuously through automation of test-cases • Newer code checked-in will capture automatic bugs with the failure of test-cases Continuous Integration • Daily integrated builds created and sent as notifications to the whole team (Dev, QA) • Builds integrated to TestFlight, the app can be downloaded by all stakeholders for testing and observing the progress of development Testing Approach • Test Driven Development Approach • Automated Testing o Leverage platform sdks/third party library to automate unit test cases with code coverage of 60% o Automate Integration Test cases using tools like Experitest etc. • Establish a Device Lab – procure the most commonly used devices • Manual Testing o Execute manual unit test cases to capture the UI issues • Test for Non-functional scenarios like Load Test, Performance Test, Stress Test
  • 13.
    Copyright 2014 Business Perspective Analytics Capabilities Measurement •Identify the KPIs • Find out the budgets • Determine the metrics • Figure out the Sales Value • Know your target audience • Know your competition • Understand market insights • Find out the devices used • Identify mobile expertise team • Figure out expertise in IT team • Plan for a marketing agency with mobile experience 13
  • 14.
    • Marketers aredisplaying TV ads to get consumers browse their site instantly • More marketers now are focusing first on mobile for integrated campaigns • Companies are running brand campaigns across devices to reach larger audience • Advertisers are focused on performance- based campaigns Addressing Multi-screen Viewing Audience Source: Part of infographics by Uberflip “90% of consumers move between devices to complete a task. And 40% of smartphone users watch TV while browsing from their smartphones” – Google Copyright 2014 14
  • 15.
    Teams required withinthe Organization Right Team with Relevant Experience Organization Structure There are two options 1) Centralized Solution and 2) Decentralized Solution. Both are driven by one single mobile leader. Mobile Leader (Cross-functional Team Head) Single Centralized Mobile Team Decentralized Mobile Team • Start with a centralized group initially • One team leader to manage all units • Separate mobile teams for each business unit with growth in traffic • One group leader to handle each business unit Copyright 2014 15
  • 16.
    Copyright 2014 Trulia –A Case Study App Philosophy MonetizationTeam • Centralized Team for UI / UX across all apps • Mobile Engineering Team organised by technology competency – iOS, Android, mobile web site etc • Determine the metrics • Responsive approach by front end Trulia.com website • Develop apps on multiple platforms – OS, iPad, Android, Android Tablets, Kindle Fire, Windows 8 Tablets, Mobile Web • Specific purpose apps on specific platforms like Renters, Real Estate Agents, Mortgage Shoppers. Provide essential functionality for fast and efficient mobile experience • Like Foursquare, agents can check in to specific properties using agent app and distinguish themselves from other agents • Built from the start – along with apps, launched an ad system • Show context sensitive information with zero clicks and ensure user gets to the call to action with little browsing • 60% of leads come from mobile today Source: Forbes 16
  • 17.
    Copyright 2014 • UseAnalytics for feature prioritization and testing • Active review management • Continuous improvement with feature releases Continuous Improvement Process Release 1 – Deploy User Feedback Usage Analytics (Google/Flurry/ Omniture) Product Management Requirements Release 1.1 Build & Test Improve Build Cycle Release 1.1 – Deploy 1 2 3 Improve Iterate & Build Measure & End-User Feedback - Continuous Improvement 17 4
  • 18.
    Sales & Marketing (ForConsumer Apps)
  • 19.
    Copyright 2014 Invest inAnalytics Tools to Target Right Audience To Increase Product Sales, Improve Conversions and Promote App Usage 1. Analyze the user behavior and preferences 2. Target the audience with right content based on demographics and geography 3. Personalize the content based on preference 4. Push ‘promotional messages’ as notifications 19
  • 20.
    Copyright 2014 Monetization onMobile • Serve more ads without losing User Attention (Facebook is done this successfully and grew its revenues on mobile to 41% from almost zero within 6 quarters). o In-stream ads and branded posts o Contextual advertisement o Hyper-local mobile ad targeting o Real-Time Bidding exchange for high value mobile user targets • Mobile Video Ads – Pre-roll, Mid-roll and Post roll. Pre-roll is the most popular in video ads with 10-15 secs clips. • Interstitials – Full or half page ads appears between content pages. Best format, since it utilizes the complete screen size. Worldwide mobile advertising revenue to reach $24.5 billion in 2016. Revenue from global mobile advertising to grow 400 % between 2011 and 2016 - Gartner 20
  • 21.
  • 22.
    “We have noticeddifference in technology requirement across geographical regions. In the US, iOS and Android is more popular, whereas customers in India look for mobility solutions on Android. Mobility solutions requirement on Windows Phone OS and Nokia phones are more popular in European regions.” – Rinish KN, CTO, RapidValue Solutions Copyright 2014 22
  • 23.
  • 24.
    Traffic Close to30% through Mobile Channel 24 What we did 1. Usability improvements • Reduced number of clicks from purchase to payment • Design changes • Reduced logic validations • Introduced more payment mechanisms 2. Social Shopping Experience • Sharing Wishlists / Buys 3. Analytics • Better Analytics • Targeted Push Notifications 4. Performance Improvement • Crash Analytics / Performance monitoring 5. Process & Results • New features added in iterations every couple of months • High CSAT score and 4.6 rating on app stores A leading streetwear retailer with over $200mn in sales. KarmaLoop sells clothes and accessories online. Issues / Opportunities • Revenues from Mobile Channel (Apps & Mobile Web) • Improve conversion rates Copyright 2014
  • 25.
    Improved Student engagementin online classrooms via mobile channel . One of the largest higher education providers in North America (Apollo Group) with over $ 4 billion in revenues. What We did • 3 years roadmap to build and support apps for students and faculty • Accessed by over million users with 4+ rating on app stores • Established dedicated mobile testing lab for manual and automated Copyright 2014 25
  • 26.
    Copyright 2014 Summary –Key Factors to Consider Start with basic features on one device platform. Measure the impact and then expand to include new features in iterations across more devices. Get feedback from your users to correct the mistakes in app in the next releases. Mobile First Strategy Mobile strategy impacts all areas of business. Analyze the backend system integration, corporate ecosystem, corporate expansion plans to provide seamless experience across channels and devices. Set a mobile champion or leader in the firm. Invest in Analytics & User Experience Integrate with strong analytics tool to understand the user behavior, personalize content, push promotional messages & mobile ads based on user preference, demographic, and geography. Measure & Iterate Right Team with Mobile Champion Get the right team with skills across platforms – iOS, Android, HTML5, Responsive Web, UI/ UX Design, Analytics, Testing. Have a clear mobile leader / champion in the firm. Take Full Advantage of Mobile Technology Make complete use of mobile technologies supported by devices. Specially, include features related to GPS functionality, barcode scanning and camera capabilities. 26
  • 27.
    THANK YOU Presented by: SirishKosaraju Chief Operating Officer, RapidValue Solutions Email: sirishk@rapidvaluesolutions.com Phone: +91 99454 81164 www.linkedin.com/in/sirishkosaraju 27Copyright 2014
  • 28.
    RapidValue in aSlide – Largest Independent Enterprise Mobility Firm 200+ STRONG MOBILITY CONSULTING TEAM 350+ MOBILITY PROJECTS EXPERIENCE LARGE SCALE & COMPLEX MOBILE PROJECTS Recognized as the 2013 Top 100 Red Herring Global Finalist and prior to that selected as 2013 Top 100 Red Herring North America Finalist Awarded TOP 15 Emerging Companies in the Field of Innovation. Won the prestigious NASSCOM emerge 50 award in 2011 HEADQUARTERS PLEASANTON, CA, USA GLOBAL DELIVERY CENTERS IN BANGALORE & KOCHI, INDIA Operations Across… USA | Canada | Finland | UAE | India ‘Mobility Driven Transformations’ to unlock value from your enterprise systems… Razor – Sharp Focus on Mobility Enterprise Mobility Specialists Cutting Edge Delivery Processes Experience working with Fortune 500 customers and many Fortune 1000 companies… Experts in Enterprise Field Applications including Field Service app, Geo location apps and Integrations with ERPs like SAP, Oracle and others Copyright 2014 28