Benchmarking
Ahmed Mohammed
Seth Shafer
Shou-Jen Steve Wang
Benchmarking
►Chalk and bench activity
Who
► Robert C. Camp 1989
► Bachelors degree in civil
engineering from Cornell
University
► MBA from Cornell University's
Johnson School of Management
► Ph.D. in logistics and operations
research from The Pennsylvania
State University
Benchmarking
►Is a process
►Is secrets of success
Four Forms
►Generic
►Functional
►Competitive
►Internal
Types
► Process benchmarking
► Financial benchmarking
► Benchmarking from an investor perspective
► Performance benchmarking
► Product benchmarking
► Strategic benchmarking
► Functional benchmarking
► Best-in-class benchmarking
► Operational benchmarking
Activity
► Connect the dots
► Rules
1. Draw in a straight line.
2. Pen does not leave the blackboard.
3. All dots have to be connected
Goal:
As few lines as possible.
Prerequisites
►Will and commitment
►Vision and strategic objective link
►Goals to becoming the best
►Openness to new ideas
Prerequisites (cont.)
►Understanding of existing processes,
products, services, practices, and customer
needs
►Documented Processes
►Process analysis
►Research, communication, and team-
building skills
Obstacles
►Internal Focus
►Objective too broad
►Unrealistic timetables
►Poor team composition
►OK-in-class
►Improper emphasis
►Insensitivity to partners
►Limited top-management support
Rationale
►Global competition
►Current standing of company
►A best-in-class model
►Customers are better informed
►Support of total quality
Examples
►Xerox
►Computer Hardware
Computer Hardware
►Comparison of performance
Xerox
►Started in 1908
►Big company by the 1960s
►Rapid expansion of the middle management
►Competition from Japanese companies by
1980s
Benchmarked Processes
►Supplier management system
►Inventory management
►Manufacturing system
►Marketing
►Quality
Benefits of benchmarking
►Fewer customer complaints
►Reduction of defects
►Reduction in service response time
►Reduction in defective incoming parts
►Reduction in inventory costs
►Reduction in labor costs
►Reduction in billing errors
Benefits of benchmarking
►Increase in customer satisfaction
►Increase in marketing productivity
►Increase in distribution productivity
►Increase in product reliability
Seven steps to benchmarking
1. Identify what to benchmark
2. Determine what to measure
3. Identify who to benchmark
4. Collect the data
5. Analyze the data and determine the gap
6. Set goals and develop an action plan
7. Monitor the process
Seven steps to benchmarking
► Step-1
► Identify what to benchmark
► Activities involved in step-1 are
► Clarifying the benchmarking objective
► Decide whom to involve
► Define the process
► Consider the scope
► Set the boundaries
► Agree on what happens in the process
► Flow chart the process
Step-1 continue
►Identify what to benchmark
►Two approaches of benchmarking
1) Strategic benchmarking
Financial function could benchmark it activities
(billing process)
2) Organizational benchmarking
Considerable research is done. Like soldering
process, driver motor assembly benchmarking
Step-1 continue
►As a starting point benchmark your
customer interfaces by not limiting
benchmarking to products. Like contract
truckers, answering phone calls, accuracy of
bills.
►Benchmarking Product, manufacturing
process, equipment, and business processes.
Benchmarking: A Practical Example
►ATO, INC., is a manufacturer of small to
medium air conditioners.
►Approximately 60%- home and office use
only
►The remaining 40%-trucking industry,
where ATO’s unique respected position in
supplying units for refrigerated trucks and
trailer rigs.
ATO, Inc.,
►ATO Inc’s production supervisor for Model 724
series (home models) manufacturing area-
Seth
►Seth’s group is a customer for an outside
supplier of external control panel.
►Responsibility of Seth’s production area
►Building the chassis and housing for the units
►Installing internal components and wiring
►Assembling the final products
ATO, Inc.,
►The model 724 series manufacturing group is
organized into three work areas:
►Lastly. Seth’s team processes the units
through the warehouse for packing and
shipping to final destination.
Chassis
Production
Component
Install
Final Assembly
►Build Chassis
Components
►Build Housing
►Install internally-
supplied control wire
unit
►Install vendor panels
►Affix product lables
ATO, Inc.,
►What is cooking in ATO’s
►Each of the work area is organized into
work teams responsible for setting and
attaining their goals and managing their
work processes.
►Seth handles most of the interaction
between the work team to ensure
coordination and planning.
ATO, Inc.,
►Seth’s production group members are working
towards continuously improving the process.
►Revamping of the production line and
installation of new equipment. The feel they
have reached the plateau.
►Steve, most experienced assembler, put it this
way “Look, we’ve done all we can on this
process. We’ve tried everything and our
numbers are as good as they are going to get.
Got it?”
ATO, Inc.,
►Ahmed: “Steve’s feelings are
understandable, you got to do something
Seth…wake up.”
►They have been working hard and their
recent most improvement produced smaller
gains.
►Seth wakes up…
►Let us do benchmarking study for the entire
assembly process.
Step-1
►The first step identify what to benchmark has
following sub steps
►Clarify the benchmarking objectives
►Decide whom to involve
►Define the process
►Consider the scope
►Set the boundaries
►Agree on the process
►Flow chart the process
Clarify The Benchmarking Objective
►We have already discussed why we have
decided to benchmark-setting priorities for
improvement, addressing a specific problem
which needs attention and not meeting goals.
►Why Seth has decided to do benchmark 
► They have upgraded equipment, everyone had
needed skills, and taken steps to improve
quality but they are still searching for way to
improve. Their objective was to have best in
class final assembly process. 
Seth is deciding whom to involve in
benchmarking team
►Management support to the team
►Include employees who are close to the
process. Include employees who have interest
and knowledge about what goes on outside the
boundaries of process.
►“Let us also consider internal suppliers and
customers of the process. Who supply products,
information, or other key inputs. Customers
receive our service, products or output.”
Benchmarking team
► Seth-Production supervisor for the Model 724 series.
Given decision making authority.
► Steve- A senior assembler, member of the quality
improvement team.
► Bill- An assembler a new employee at ATO
► Maria-An inspector got promoted from the shipping
department and just completed training for final
assembly area. She installs the labels and information
plates at the end of the process (is some sense she is a
final customer for the process)
► Simon-A former assembler who now works in
component installation area, but occasionally done
assembly when team requires backup (brings internal
supplier perspective)
Sub steps of step-1
►Define the process
►One need to clearly define process. A
process is a series of interrelated task that
are organized to produce an output.
►Consider the scope
►Not to be too broad or too narrow.
ATO, Inc.’s final assembly
benchmarking team
►The decide to benchmark control panel
installation because they had recently
experienced troubled with connections
coming loose.
►Steve-”That’s a good place to focus, and it is
broad enough to achieve something and
narrow enough that we can wrap our arms
around it”
ATO, Inc.’s final assembly
benchmarking team
►Simon-” Sure. Let us define the starting and
ending point of the process so that we all know
exactly what we are working on?”….
►Set the boundaries
►After a few minutes of discussion the team
reached an agreement.
►Starting point-receive the panel from the
inventory clerk
►Ending boundary-place the unit back to the
conveyor belt.
ATO, Inc.’s final assembly
benchmarking team
►Agree on the process
1. Receive the panel from the inventory clerk
2. Unpack the panel as needed and visually check
for completeness (no broken wires etc)
3. Place the control panel on unit and attach
fasteners
4. Solder the connections
5. Test the circuitry and secure the cover
6. Place the unit back on the conveyor belt
Step-2 of seven step model
►Determine what to measure has three major
sub steps to consider
1. Examine the flow chart
2. Establish the process measures
3. Verify that measures match objectives
Flow chart
►Review the flow chart. Some of the measurable
items we are looking for might be
1. Overall time to complete the process
2. Completion time for each individual task
3. Time spent at each decision point
4. Number of loops or repeats
5. Variation of task time
6. Number of defects showing up
7. Costs
8. Scrap
Place unit
on belt
Secure
Cover
Test
circuitry
Solder
connections
Attach
fasteners
Place
panels in
position
Unpack
panels
Receive
panels
Verify
panels
OK
Position
of
mounting
holes OK
Circuits
OK
Start
End
1 min. 1 min.
2 min.
1.5 min.
.5 min.
9-13 min.
15-18 min.
10 min.
5 min.
4 min. .5 min.
Yes
No
Yes
Yes
No
No
Total time = 45 - 52 min.
Step-2
►Bill-” Since we know where our inputs and
outputs are coming from, shouldn’t we
consider measuring that are important to our
internal suppliers and customers too?”..
2)Establish process measures
►Consider measures outside the process
►Measures of your external customers should
influence the choice of process measures to
benchmark (even though it is distant from
customers contact)
Step-2
►Measures of your internal suppliers and
customers requirement. Since their
performance is linked to yours, your
measures should be linked as well
►ATO, Inc internal customers are the
shipping and warehouse department and
their internal suppliers are component
installation area and inventory department.
Step-2
►Link supplier and customer measures with
in-process measures.(fig)
►Seth’s benchmarking team took the
interview of both internal suppliers and
customers.
►As the team looked back they concluded
based on the flow chart, internal suppliers
and customer measures.
►They concluded that the total time for the
process varied due to several reasons.
Step-2
►Seth’s decided to benchmark three measures
►Time for completion.
►Downtime
►Number of reworks
►Verify that measures match objectives
►For example, if a group’s goal was to increase
productivity, they would need to look at
measures such as time quantities of output,
cost per unit
Step-3 Identify who to
benchmark
►Conduct general research
►Choose the level to benchmark
►Internal
►Competitive and noncompetitive
►World class
►Seth’s team considered their ATO’s plant in
northwest region and best in class Bestco,
Inc.
Step-4 :collect the data
►It’s time to gather information on the
performance level of your benchmarking
target and how they mange their processes.
►Three main sources
►Internal
►Public information
►Other companies: this is the most exciting
part, we actually go out and discover new
ideas and make careful observation.
Step-4
►The techniques for gathering benchmarking
information.
►Using a questionnaire
►Conducting a benchmarking site visit
►Using a questionnaire: things to remember
►Include a detail information of the process
►List task included
►List problem or concerns relating to it
Step-4
►Including information and questions on the
how the process is measures and
performance criteria
1. Quality
2. Time
3. Cost, etc.
Step-4
►Focus on process improvement the benchmark
target has developed
1. What kind
2. How
3. Cost versus the best result
4. Technical difficulties
5. Determine the area of support for the process
like training, methods, technology,
6. Staff background and documentation methods
Step-4
►Conducting a benchmarking visit:
►Prepare for the visit
►Organizational climate
►How many and who will be going
►How will the visit be conducted
►Who will take notes and how
►Document the visit
Process Your Process Organization #1
Product or services that is
produced (output)
Key characteristics of
output
Measures that will be
compared
Measurement data
(findings, comparisons)
Gaps between our
process and another
organizations’
(positive or negative)
Step-4
►Seth’s team have the results
Measurement data – (findings, comparison)
Key
measures
ATO, Inc.
Model 724
ATO, Inc.
Northwest
Region
Plant
Bestco, Inc.
Total time 45 – 52 min. 44- 46 min. 22.5 min.
Downtime
(per unit)
3 – 5 min. 3 – 5 min. 1 – 2 min.
Percentage
of reworks
4% 3.5% 0.25%
Step-5: Analyze data and
determining gap
1 2 3 4
Our
Organizati
on
0
20
40
60
Our Organization
Orginazation A
Organization B
Average Process Time
0
5
10
15
20
25
30
35
40
45
50
ATO, Inc.
Model 724
control panel
installation
ATO, Inc.
Northwest
Region Plant
Bestco, Inc.
Average Downtime Per Unit
0
0.5
1
1.5
2
2.5
3
3.5
4
ATO, Inc.
Model 724
control panel
installation
ATO, Inc.
Northwest
Region Plant
Bestco, Inc.
Average Percent of Reworks
0
1
2
3
4
5
ATO, Inc.
Model 724
control panel
installation
ATO, Inc.
Northwest
Region Plant
Bestco, Inc.
Step-5
►Seth’s team was surprised after looking at
the gap between their processes and that of
Bestco, Inc.
►Steve added “ You know, if someone have
told me a month ago that you could get
these kind of numbers, I wouldn’t have
believed it,”
►Seth” we thought we have improved our
process as much as we could.”
Step-6: Set goals and develop and
action plan
►Set performance goal
►Goal should be achievable in
increment( 3*5=15 hrs)
►Goals should realistic (time, res, abilities, skills
and budget)
►Goal should be measurable ( reducing three
hours)
►Goal should be finite (starting and ending pt)
►Goal should be supported
Step-6
►Seth’s team benchmarking goals
►Reduce total task time to 30 minutes (5m
per Q)
►Reduce downtime from three to one minute
per unit (end goals to be reached in 9 m)
►Reduce reworks from 4 percent to 2.5
percent (6m)
Step-6
►Developing action plan
►Step One-determine tasks, timelines, and
responsibilities
►Points to consider-who will be affected and
responsible for implementation?
►What resources will the person responsible
for task need. How the information will be
shared
►Step Two-develop contingency plan
Action Plan
Action Step Responsible
Person or
Group
Begin – End
Date
Estimated
Duration
Estimated
Cost
1. Feasibility
study to install
new technology
in final
processing area
Benchmark
Team
10/1 – 10/30 One Month $5,000
Action Plan
Action Step Responsible
Person or
Group
Begin – End
Date
Estimated
Duration
Estimated
Cost
2. Vendor
selection for
new technology
Final
assembly
10/1 – 10/7 35 hours $600
3. Design
project plan for
installation
Senior
management
10/7 – 10/14 28 hours $1,200
Action Plan
Action Step Responsible
Person or
Group
Begin – End
Date
Estimated
Duration
Estimated
Cost
4. Purchase and
install new
equipment
Vendors plus
three staff
members
11/1 – 3/2 1,280
hours
$44,800
5. Test Vendor plus 2
staff
members
1/30 – 2/15 40 hours #1,200
Step-7: Monitor the process
►Track the change
►Make benchmarking a habit
►Benchmarking progress report
►Regular progress meeting
►Monitor customers (internal and external)
►Monitor suppliers (internal and customer)
Discussion
Conclusion
►VS continuous improvement
►VS reengineering
►7 Step benchmarking model
Thank you for your time.

More Related Content

Similar to Benchmarking.ppt

Lean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptLean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptssuser09851b1
 
T 1 industry preparedness training course
T 1 industry preparedness training courseT 1 industry preparedness training course
T 1 industry preparedness training coursenewar_07
 
Building best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturingBuilding best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturingTony Lopez
 
Process capability relation between yield and number of parts in assembly und...
Process capability relation between yield and number of parts in assembly und...Process capability relation between yield and number of parts in assembly und...
Process capability relation between yield and number of parts in assembly und...REXMATTHEW1
 
Session 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraintsSession 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraintsritukaushikmba25
 
Sample sem 2 winter 2015
Sample sem 2 winter 2015Sample sem 2 winter 2015
Sample sem 2 winter 2015naveen kumar
 
Proven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingProven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingSafetyChain Software
 
Kabir Kassam: 6 – sigma training - Midterm Review
Kabir Kassam: 6 – sigma training - Midterm Review Kabir Kassam: 6 – sigma training - Midterm Review
Kabir Kassam: 6 – sigma training - Midterm Review Kabir Kassam
 
ISO 9001:2008 training
ISO 9001:2008 trainingISO 9001:2008 training
ISO 9001:2008 trainingTechnoSysCon
 
SIX-SIGMA-GROUP-5.powerpoint presentation
SIX-SIGMA-GROUP-5.powerpoint presentationSIX-SIGMA-GROUP-5.powerpoint presentation
SIX-SIGMA-GROUP-5.powerpoint presentationcheldulceconstan28
 
4 Steps to Drive Process Innovation
4 Steps to Drive Process Innovation4 Steps to Drive Process Innovation
4 Steps to Drive Process InnovationJuran Global
 
Operatiional Audit
Operatiional AuditOperatiional Audit
Operatiional AuditMalay Paul
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)Abhishek Kumar
 
National Quality Infrastructure (NQI) and associated control mechanisms for t...
National Quality Infrastructure (NQI) and associated control mechanisms for t...National Quality Infrastructure (NQI) and associated control mechanisms for t...
National Quality Infrastructure (NQI) and associated control mechanisms for t...Caribbean Development Bank
 
05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppt05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppthari534691
 
2011 business process management
2011 business process management2011 business process management
2011 business process managementAreté Partners
 

Similar to Benchmarking.ppt (20)

Qc story
Qc storyQc story
Qc story
 
Lean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptLean Vs Six Sigma.ppt
Lean Vs Six Sigma.ppt
 
T 1 industry preparedness training course
T 1 industry preparedness training courseT 1 industry preparedness training course
T 1 industry preparedness training course
 
Building best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturingBuilding best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturing
 
Process capability relation between yield and number of parts in assembly und...
Process capability relation between yield and number of parts in assembly und...Process capability relation between yield and number of parts in assembly und...
Process capability relation between yield and number of parts in assembly und...
 
Session 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraintsSession 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraints
 
Sample sem 2 winter 2015
Sample sem 2 winter 2015Sample sem 2 winter 2015
Sample sem 2 winter 2015
 
Proven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingProven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error Proofing
 
8 D Report
8 D Report8 D Report
8 D Report
 
Kabir Kassam: 6 – sigma training - Midterm Review
Kabir Kassam: 6 – sigma training - Midterm Review Kabir Kassam: 6 – sigma training - Midterm Review
Kabir Kassam: 6 – sigma training - Midterm Review
 
ISO 9001:2008 training
ISO 9001:2008 trainingISO 9001:2008 training
ISO 9001:2008 training
 
CPI Training overview
CPI Training overviewCPI Training overview
CPI Training overview
 
SIX-SIGMA-GROUP-5.powerpoint presentation
SIX-SIGMA-GROUP-5.powerpoint presentationSIX-SIGMA-GROUP-5.powerpoint presentation
SIX-SIGMA-GROUP-5.powerpoint presentation
 
Understand SPC Fundamentals
Understand SPC FundamentalsUnderstand SPC Fundamentals
Understand SPC Fundamentals
 
4 Steps to Drive Process Innovation
4 Steps to Drive Process Innovation4 Steps to Drive Process Innovation
4 Steps to Drive Process Innovation
 
Operatiional Audit
Operatiional AuditOperatiional Audit
Operatiional Audit
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)
 
National Quality Infrastructure (NQI) and associated control mechanisms for t...
National Quality Infrastructure (NQI) and associated control mechanisms for t...National Quality Infrastructure (NQI) and associated control mechanisms for t...
National Quality Infrastructure (NQI) and associated control mechanisms for t...
 
05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppt05. Process Mapping tools for 6 sigma.ppt
05. Process Mapping tools for 6 sigma.ppt
 
2011 business process management
2011 business process management2011 business process management
2011 business process management
 

Recently uploaded

Top Rated Pune Call Girls Chakan ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Chakan ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Chakan ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Chakan ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
9892124323 Pooja Nehwal Call Girls Services Call Girls service in Santacruz A...
9892124323 Pooja Nehwal Call Girls Services Call Girls service in Santacruz A...9892124323 Pooja Nehwal Call Girls Services Call Girls service in Santacruz A...
9892124323 Pooja Nehwal Call Girls Services Call Girls service in Santacruz A...Pooja Nehwal
 
Dubai Call Girls O528786472 Call Girls In Dubai Wisteria
Dubai Call Girls O528786472 Call Girls In Dubai WisteriaDubai Call Girls O528786472 Call Girls In Dubai Wisteria
Dubai Call Girls O528786472 Call Girls In Dubai WisteriaUnited Arab Emirates
 
9004554577, Get Adorable Call Girls service. Book call girls & escort service...
9004554577, Get Adorable Call Girls service. Book call girls & escort service...9004554577, Get Adorable Call Girls service. Book call girls & escort service...
9004554577, Get Adorable Call Girls service. Book call girls & escort service...Pooja Nehwal
 
(PARI) Alandi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(PARI) Alandi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(PARI) Alandi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(PARI) Alandi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Call Girls in Vashi Escorts Services - 7738631006
Call Girls in Vashi Escorts Services - 7738631006Call Girls in Vashi Escorts Services - 7738631006
Call Girls in Vashi Escorts Services - 7738631006Pooja Nehwal
 
Call Girls in Nagpur Sakshi Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Sakshi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Sakshi Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Sakshi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
定制加拿大滑铁卢大学毕业证(Waterloo毕业证书)成绩单(文凭)原版一比一
定制加拿大滑铁卢大学毕业证(Waterloo毕业证书)成绩单(文凭)原版一比一定制加拿大滑铁卢大学毕业证(Waterloo毕业证书)成绩单(文凭)原版一比一
定制加拿大滑铁卢大学毕业证(Waterloo毕业证书)成绩单(文凭)原版一比一zul5vf0pq
 
Call Girls Service Kolkata Aishwarya 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girls Service Kolkata Aishwarya 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girls Service Kolkata Aishwarya 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girls Service Kolkata Aishwarya 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查
如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查
如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查awo24iot
 
VIP Call Girls Kavuri Hills ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With ...
VIP Call Girls Kavuri Hills ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With ...VIP Call Girls Kavuri Hills ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With ...
VIP Call Girls Kavuri Hills ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With ...Suhani Kapoor
 
(ZARA) Call Girls Jejuri ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Jejuri ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Jejuri ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Jejuri ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Low Rate Call Girls Nashik Vedika 7001305949 Independent Escort Service Nashik
Low Rate Call Girls Nashik Vedika 7001305949 Independent Escort Service NashikLow Rate Call Girls Nashik Vedika 7001305949 Independent Escort Service Nashik
Low Rate Call Girls Nashik Vedika 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Lucknow 💋 Call Girls Adil Nagar | ₹,9500 Pay Cash 8923113531 Free Home Delive...
Lucknow 💋 Call Girls Adil Nagar | ₹,9500 Pay Cash 8923113531 Free Home Delive...Lucknow 💋 Call Girls Adil Nagar | ₹,9500 Pay Cash 8923113531 Free Home Delive...
Lucknow 💋 Call Girls Adil Nagar | ₹,9500 Pay Cash 8923113531 Free Home Delive...anilsa9823
 
Russian Escorts in lucknow 💗 9719455033 💥 Lovely Lasses: Radiant Beauties Shi...
Russian Escorts in lucknow 💗 9719455033 💥 Lovely Lasses: Radiant Beauties Shi...Russian Escorts in lucknow 💗 9719455033 💥 Lovely Lasses: Radiant Beauties Shi...
Russian Escorts in lucknow 💗 9719455033 💥 Lovely Lasses: Radiant Beauties Shi...nagunakhan
 
Kalyan callg Girls, { 07738631006 } || Call Girl In Kalyan Women Seeking Men ...
Kalyan callg Girls, { 07738631006 } || Call Girl In Kalyan Women Seeking Men ...Kalyan callg Girls, { 07738631006 } || Call Girl In Kalyan Women Seeking Men ...
Kalyan callg Girls, { 07738631006 } || Call Girl In Kalyan Women Seeking Men ...Pooja Nehwal
 
Call Girls Dubai Slut Wife O525547819 Call Girls Dubai Gaped
Call Girls Dubai Slut Wife O525547819 Call Girls Dubai GapedCall Girls Dubai Slut Wife O525547819 Call Girls Dubai Gaped
Call Girls Dubai Slut Wife O525547819 Call Girls Dubai Gapedkojalkojal131
 
(MEGHA) Hinjewadi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...
(MEGHA) Hinjewadi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...(MEGHA) Hinjewadi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...
(MEGHA) Hinjewadi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...ranjana rawat
 
9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...
9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...
9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...Pooja Nehwal
 

Recently uploaded (20)

Top Rated Pune Call Girls Chakan ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Chakan ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Chakan ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Chakan ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
9892124323 Pooja Nehwal Call Girls Services Call Girls service in Santacruz A...
9892124323 Pooja Nehwal Call Girls Services Call Girls service in Santacruz A...9892124323 Pooja Nehwal Call Girls Services Call Girls service in Santacruz A...
9892124323 Pooja Nehwal Call Girls Services Call Girls service in Santacruz A...
 
Dubai Call Girls O528786472 Call Girls In Dubai Wisteria
Dubai Call Girls O528786472 Call Girls In Dubai WisteriaDubai Call Girls O528786472 Call Girls In Dubai Wisteria
Dubai Call Girls O528786472 Call Girls In Dubai Wisteria
 
9004554577, Get Adorable Call Girls service. Book call girls & escort service...
9004554577, Get Adorable Call Girls service. Book call girls & escort service...9004554577, Get Adorable Call Girls service. Book call girls & escort service...
9004554577, Get Adorable Call Girls service. Book call girls & escort service...
 
(PARI) Alandi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(PARI) Alandi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(PARI) Alandi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(PARI) Alandi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
🔝 9953056974🔝 Delhi Call Girls in Ajmeri Gate
🔝 9953056974🔝 Delhi Call Girls in Ajmeri Gate🔝 9953056974🔝 Delhi Call Girls in Ajmeri Gate
🔝 9953056974🔝 Delhi Call Girls in Ajmeri Gate
 
Call Girls in Vashi Escorts Services - 7738631006
Call Girls in Vashi Escorts Services - 7738631006Call Girls in Vashi Escorts Services - 7738631006
Call Girls in Vashi Escorts Services - 7738631006
 
Call Girls in Nagpur Sakshi Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Sakshi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Sakshi Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Sakshi Call 7001035870 Meet With Nagpur Escorts
 
定制加拿大滑铁卢大学毕业证(Waterloo毕业证书)成绩单(文凭)原版一比一
定制加拿大滑铁卢大学毕业证(Waterloo毕业证书)成绩单(文凭)原版一比一定制加拿大滑铁卢大学毕业证(Waterloo毕业证书)成绩单(文凭)原版一比一
定制加拿大滑铁卢大学毕业证(Waterloo毕业证书)成绩单(文凭)原版一比一
 
Call Girls Service Kolkata Aishwarya 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girls Service Kolkata Aishwarya 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girls Service Kolkata Aishwarya 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girls Service Kolkata Aishwarya 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查
如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查
如何办理(Adelaide毕业证)阿德莱德大学毕业证成绩单Adelaide学历认证真实可查
 
VIP Call Girls Kavuri Hills ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With ...
VIP Call Girls Kavuri Hills ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With ...VIP Call Girls Kavuri Hills ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With ...
VIP Call Girls Kavuri Hills ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With ...
 
(ZARA) Call Girls Jejuri ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Jejuri ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Jejuri ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Jejuri ( 7001035870 ) HI-Fi Pune Escorts Service
 
Low Rate Call Girls Nashik Vedika 7001305949 Independent Escort Service Nashik
Low Rate Call Girls Nashik Vedika 7001305949 Independent Escort Service NashikLow Rate Call Girls Nashik Vedika 7001305949 Independent Escort Service Nashik
Low Rate Call Girls Nashik Vedika 7001305949 Independent Escort Service Nashik
 
Lucknow 💋 Call Girls Adil Nagar | ₹,9500 Pay Cash 8923113531 Free Home Delive...
Lucknow 💋 Call Girls Adil Nagar | ₹,9500 Pay Cash 8923113531 Free Home Delive...Lucknow 💋 Call Girls Adil Nagar | ₹,9500 Pay Cash 8923113531 Free Home Delive...
Lucknow 💋 Call Girls Adil Nagar | ₹,9500 Pay Cash 8923113531 Free Home Delive...
 
Russian Escorts in lucknow 💗 9719455033 💥 Lovely Lasses: Radiant Beauties Shi...
Russian Escorts in lucknow 💗 9719455033 💥 Lovely Lasses: Radiant Beauties Shi...Russian Escorts in lucknow 💗 9719455033 💥 Lovely Lasses: Radiant Beauties Shi...
Russian Escorts in lucknow 💗 9719455033 💥 Lovely Lasses: Radiant Beauties Shi...
 
Kalyan callg Girls, { 07738631006 } || Call Girl In Kalyan Women Seeking Men ...
Kalyan callg Girls, { 07738631006 } || Call Girl In Kalyan Women Seeking Men ...Kalyan callg Girls, { 07738631006 } || Call Girl In Kalyan Women Seeking Men ...
Kalyan callg Girls, { 07738631006 } || Call Girl In Kalyan Women Seeking Men ...
 
Call Girls Dubai Slut Wife O525547819 Call Girls Dubai Gaped
Call Girls Dubai Slut Wife O525547819 Call Girls Dubai GapedCall Girls Dubai Slut Wife O525547819 Call Girls Dubai Gaped
Call Girls Dubai Slut Wife O525547819 Call Girls Dubai Gaped
 
(MEGHA) Hinjewadi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...
(MEGHA) Hinjewadi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...(MEGHA) Hinjewadi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...
(MEGHA) Hinjewadi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune E...
 
9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...
9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...
9892124323, Call Girl in Juhu Call Girls Services (Rate ₹8.5K) 24×7 with Hote...
 

Benchmarking.ppt

  • 3. Who ► Robert C. Camp 1989 ► Bachelors degree in civil engineering from Cornell University ► MBA from Cornell University's Johnson School of Management ► Ph.D. in logistics and operations research from The Pennsylvania State University
  • 6. Types ► Process benchmarking ► Financial benchmarking ► Benchmarking from an investor perspective ► Performance benchmarking ► Product benchmarking ► Strategic benchmarking ► Functional benchmarking ► Best-in-class benchmarking ► Operational benchmarking
  • 7. Activity ► Connect the dots ► Rules 1. Draw in a straight line. 2. Pen does not leave the blackboard. 3. All dots have to be connected Goal: As few lines as possible.
  • 8.
  • 9. Prerequisites ►Will and commitment ►Vision and strategic objective link ►Goals to becoming the best ►Openness to new ideas
  • 10. Prerequisites (cont.) ►Understanding of existing processes, products, services, practices, and customer needs ►Documented Processes ►Process analysis ►Research, communication, and team- building skills
  • 11. Obstacles ►Internal Focus ►Objective too broad ►Unrealistic timetables ►Poor team composition ►OK-in-class ►Improper emphasis ►Insensitivity to partners ►Limited top-management support
  • 12. Rationale ►Global competition ►Current standing of company ►A best-in-class model ►Customers are better informed ►Support of total quality
  • 15. Xerox ►Started in 1908 ►Big company by the 1960s ►Rapid expansion of the middle management ►Competition from Japanese companies by 1980s
  • 16. Benchmarked Processes ►Supplier management system ►Inventory management ►Manufacturing system ►Marketing ►Quality
  • 17. Benefits of benchmarking ►Fewer customer complaints ►Reduction of defects ►Reduction in service response time ►Reduction in defective incoming parts ►Reduction in inventory costs ►Reduction in labor costs ►Reduction in billing errors
  • 18. Benefits of benchmarking ►Increase in customer satisfaction ►Increase in marketing productivity ►Increase in distribution productivity ►Increase in product reliability
  • 19. Seven steps to benchmarking 1. Identify what to benchmark 2. Determine what to measure 3. Identify who to benchmark 4. Collect the data 5. Analyze the data and determine the gap 6. Set goals and develop an action plan 7. Monitor the process
  • 20. Seven steps to benchmarking ► Step-1 ► Identify what to benchmark ► Activities involved in step-1 are ► Clarifying the benchmarking objective ► Decide whom to involve ► Define the process ► Consider the scope ► Set the boundaries ► Agree on what happens in the process ► Flow chart the process
  • 21. Step-1 continue ►Identify what to benchmark ►Two approaches of benchmarking 1) Strategic benchmarking Financial function could benchmark it activities (billing process) 2) Organizational benchmarking Considerable research is done. Like soldering process, driver motor assembly benchmarking
  • 22. Step-1 continue ►As a starting point benchmark your customer interfaces by not limiting benchmarking to products. Like contract truckers, answering phone calls, accuracy of bills. ►Benchmarking Product, manufacturing process, equipment, and business processes.
  • 23. Benchmarking: A Practical Example ►ATO, INC., is a manufacturer of small to medium air conditioners. ►Approximately 60%- home and office use only ►The remaining 40%-trucking industry, where ATO’s unique respected position in supplying units for refrigerated trucks and trailer rigs.
  • 24. ATO, Inc., ►ATO Inc’s production supervisor for Model 724 series (home models) manufacturing area- Seth ►Seth’s group is a customer for an outside supplier of external control panel. ►Responsibility of Seth’s production area ►Building the chassis and housing for the units ►Installing internal components and wiring ►Assembling the final products
  • 25. ATO, Inc., ►The model 724 series manufacturing group is organized into three work areas: ►Lastly. Seth’s team processes the units through the warehouse for packing and shipping to final destination. Chassis Production Component Install Final Assembly ►Build Chassis Components ►Build Housing ►Install internally- supplied control wire unit ►Install vendor panels ►Affix product lables
  • 26. ATO, Inc., ►What is cooking in ATO’s ►Each of the work area is organized into work teams responsible for setting and attaining their goals and managing their work processes. ►Seth handles most of the interaction between the work team to ensure coordination and planning.
  • 27. ATO, Inc., ►Seth’s production group members are working towards continuously improving the process. ►Revamping of the production line and installation of new equipment. The feel they have reached the plateau. ►Steve, most experienced assembler, put it this way “Look, we’ve done all we can on this process. We’ve tried everything and our numbers are as good as they are going to get. Got it?”
  • 28. ATO, Inc., ►Ahmed: “Steve’s feelings are understandable, you got to do something Seth…wake up.” ►They have been working hard and their recent most improvement produced smaller gains. ►Seth wakes up… ►Let us do benchmarking study for the entire assembly process.
  • 29. Step-1 ►The first step identify what to benchmark has following sub steps ►Clarify the benchmarking objectives ►Decide whom to involve ►Define the process ►Consider the scope ►Set the boundaries ►Agree on the process ►Flow chart the process
  • 30. Clarify The Benchmarking Objective ►We have already discussed why we have decided to benchmark-setting priorities for improvement, addressing a specific problem which needs attention and not meeting goals. ►Why Seth has decided to do benchmark  ► They have upgraded equipment, everyone had needed skills, and taken steps to improve quality but they are still searching for way to improve. Their objective was to have best in class final assembly process. 
  • 31. Seth is deciding whom to involve in benchmarking team ►Management support to the team ►Include employees who are close to the process. Include employees who have interest and knowledge about what goes on outside the boundaries of process. ►“Let us also consider internal suppliers and customers of the process. Who supply products, information, or other key inputs. Customers receive our service, products or output.”
  • 32. Benchmarking team ► Seth-Production supervisor for the Model 724 series. Given decision making authority. ► Steve- A senior assembler, member of the quality improvement team. ► Bill- An assembler a new employee at ATO ► Maria-An inspector got promoted from the shipping department and just completed training for final assembly area. She installs the labels and information plates at the end of the process (is some sense she is a final customer for the process) ► Simon-A former assembler who now works in component installation area, but occasionally done assembly when team requires backup (brings internal supplier perspective)
  • 33. Sub steps of step-1 ►Define the process ►One need to clearly define process. A process is a series of interrelated task that are organized to produce an output. ►Consider the scope ►Not to be too broad or too narrow.
  • 34. ATO, Inc.’s final assembly benchmarking team ►The decide to benchmark control panel installation because they had recently experienced troubled with connections coming loose. ►Steve-”That’s a good place to focus, and it is broad enough to achieve something and narrow enough that we can wrap our arms around it”
  • 35. ATO, Inc.’s final assembly benchmarking team ►Simon-” Sure. Let us define the starting and ending point of the process so that we all know exactly what we are working on?”…. ►Set the boundaries ►After a few minutes of discussion the team reached an agreement. ►Starting point-receive the panel from the inventory clerk ►Ending boundary-place the unit back to the conveyor belt.
  • 36. ATO, Inc.’s final assembly benchmarking team ►Agree on the process 1. Receive the panel from the inventory clerk 2. Unpack the panel as needed and visually check for completeness (no broken wires etc) 3. Place the control panel on unit and attach fasteners 4. Solder the connections 5. Test the circuitry and secure the cover 6. Place the unit back on the conveyor belt
  • 37. Step-2 of seven step model ►Determine what to measure has three major sub steps to consider 1. Examine the flow chart 2. Establish the process measures 3. Verify that measures match objectives
  • 38. Flow chart ►Review the flow chart. Some of the measurable items we are looking for might be 1. Overall time to complete the process 2. Completion time for each individual task 3. Time spent at each decision point 4. Number of loops or repeats 5. Variation of task time 6. Number of defects showing up 7. Costs 8. Scrap
  • 39. Place unit on belt Secure Cover Test circuitry Solder connections Attach fasteners Place panels in position Unpack panels Receive panels Verify panels OK Position of mounting holes OK Circuits OK Start End 1 min. 1 min. 2 min. 1.5 min. .5 min. 9-13 min. 15-18 min. 10 min. 5 min. 4 min. .5 min. Yes No Yes Yes No No Total time = 45 - 52 min.
  • 40. Step-2 ►Bill-” Since we know where our inputs and outputs are coming from, shouldn’t we consider measuring that are important to our internal suppliers and customers too?”.. 2)Establish process measures ►Consider measures outside the process ►Measures of your external customers should influence the choice of process measures to benchmark (even though it is distant from customers contact)
  • 41. Step-2 ►Measures of your internal suppliers and customers requirement. Since their performance is linked to yours, your measures should be linked as well ►ATO, Inc internal customers are the shipping and warehouse department and their internal suppliers are component installation area and inventory department.
  • 42. Step-2 ►Link supplier and customer measures with in-process measures.(fig) ►Seth’s benchmarking team took the interview of both internal suppliers and customers. ►As the team looked back they concluded based on the flow chart, internal suppliers and customer measures. ►They concluded that the total time for the process varied due to several reasons.
  • 43. Step-2 ►Seth’s decided to benchmark three measures ►Time for completion. ►Downtime ►Number of reworks ►Verify that measures match objectives ►For example, if a group’s goal was to increase productivity, they would need to look at measures such as time quantities of output, cost per unit
  • 44. Step-3 Identify who to benchmark ►Conduct general research ►Choose the level to benchmark ►Internal ►Competitive and noncompetitive ►World class ►Seth’s team considered their ATO’s plant in northwest region and best in class Bestco, Inc.
  • 45. Step-4 :collect the data ►It’s time to gather information on the performance level of your benchmarking target and how they mange their processes. ►Three main sources ►Internal ►Public information ►Other companies: this is the most exciting part, we actually go out and discover new ideas and make careful observation.
  • 46. Step-4 ►The techniques for gathering benchmarking information. ►Using a questionnaire ►Conducting a benchmarking site visit ►Using a questionnaire: things to remember ►Include a detail information of the process ►List task included ►List problem or concerns relating to it
  • 47. Step-4 ►Including information and questions on the how the process is measures and performance criteria 1. Quality 2. Time 3. Cost, etc.
  • 48. Step-4 ►Focus on process improvement the benchmark target has developed 1. What kind 2. How 3. Cost versus the best result 4. Technical difficulties 5. Determine the area of support for the process like training, methods, technology, 6. Staff background and documentation methods
  • 49. Step-4 ►Conducting a benchmarking visit: ►Prepare for the visit ►Organizational climate ►How many and who will be going ►How will the visit be conducted ►Who will take notes and how ►Document the visit
  • 50. Process Your Process Organization #1 Product or services that is produced (output) Key characteristics of output Measures that will be compared Measurement data (findings, comparisons) Gaps between our process and another organizations’ (positive or negative)
  • 52. Measurement data – (findings, comparison) Key measures ATO, Inc. Model 724 ATO, Inc. Northwest Region Plant Bestco, Inc. Total time 45 – 52 min. 44- 46 min. 22.5 min. Downtime (per unit) 3 – 5 min. 3 – 5 min. 1 – 2 min. Percentage of reworks 4% 3.5% 0.25%
  • 53. Step-5: Analyze data and determining gap 1 2 3 4 Our Organizati on 0 20 40 60 Our Organization Orginazation A Organization B
  • 54. Average Process Time 0 5 10 15 20 25 30 35 40 45 50 ATO, Inc. Model 724 control panel installation ATO, Inc. Northwest Region Plant Bestco, Inc.
  • 55. Average Downtime Per Unit 0 0.5 1 1.5 2 2.5 3 3.5 4 ATO, Inc. Model 724 control panel installation ATO, Inc. Northwest Region Plant Bestco, Inc.
  • 56. Average Percent of Reworks 0 1 2 3 4 5 ATO, Inc. Model 724 control panel installation ATO, Inc. Northwest Region Plant Bestco, Inc.
  • 57. Step-5 ►Seth’s team was surprised after looking at the gap between their processes and that of Bestco, Inc. ►Steve added “ You know, if someone have told me a month ago that you could get these kind of numbers, I wouldn’t have believed it,” ►Seth” we thought we have improved our process as much as we could.”
  • 58. Step-6: Set goals and develop and action plan ►Set performance goal ►Goal should be achievable in increment( 3*5=15 hrs) ►Goals should realistic (time, res, abilities, skills and budget) ►Goal should be measurable ( reducing three hours) ►Goal should be finite (starting and ending pt) ►Goal should be supported
  • 59. Step-6 ►Seth’s team benchmarking goals ►Reduce total task time to 30 minutes (5m per Q) ►Reduce downtime from three to one minute per unit (end goals to be reached in 9 m) ►Reduce reworks from 4 percent to 2.5 percent (6m)
  • 60. Step-6 ►Developing action plan ►Step One-determine tasks, timelines, and responsibilities ►Points to consider-who will be affected and responsible for implementation? ►What resources will the person responsible for task need. How the information will be shared ►Step Two-develop contingency plan
  • 61. Action Plan Action Step Responsible Person or Group Begin – End Date Estimated Duration Estimated Cost 1. Feasibility study to install new technology in final processing area Benchmark Team 10/1 – 10/30 One Month $5,000
  • 62. Action Plan Action Step Responsible Person or Group Begin – End Date Estimated Duration Estimated Cost 2. Vendor selection for new technology Final assembly 10/1 – 10/7 35 hours $600 3. Design project plan for installation Senior management 10/7 – 10/14 28 hours $1,200
  • 63. Action Plan Action Step Responsible Person or Group Begin – End Date Estimated Duration Estimated Cost 4. Purchase and install new equipment Vendors plus three staff members 11/1 – 3/2 1,280 hours $44,800 5. Test Vendor plus 2 staff members 1/30 – 2/15 40 hours #1,200
  • 64. Step-7: Monitor the process ►Track the change ►Make benchmarking a habit ►Benchmarking progress report ►Regular progress meeting ►Monitor customers (internal and external) ►Monitor suppliers (internal and customer)
  • 66. Conclusion ►VS continuous improvement ►VS reengineering ►7 Step benchmarking model
  • 67. Thank you for your time.