SlideShare a Scribd company logo
Robin John Hill
Architecture BIM Co - ordinator
I have many years experience working within the building
industry in various architectural practices and housing
development companies. A variety of experience in
competitions, feasibility, and concept design and in working
drawing programmes has developed into a varied and
interesting portfolio of work. My work experience for the past
18 years has been mainly in Healthcare.
I am currently working as BIM Co-ordinator and package
lead.
Dates: December 2014 to present date
With BDP
Brighton 3 T s’ and Sussex University Hospital
Two new hospital buildings will bring Elderly Care, General
Medicine, HIV and Clinical Infection Wards up to modern
standards and establish the Hospital as the Major Trauma
Centre for the region. Will include 361 beds, 75% of which
will be in single en-suite roome a helipad and additional
parking spaces underground.
Position: BIM Co-ordinator
Completion:
Pinderfields Hospital, Wakefield.
Pinderfields Hospital is a PFI 708 bed new build acute
hospital and consists of inpatient wards, women’s and
children’s facilities, a rehabilitation institute, full acute
services and a diagnostic and treatment centre.
Position: Cad co-ordinator and package lead.
Completion: 2007
Cost: £450m
University College London (UCLH)
Part of the University College London Hospitals NHS
Foundation Trust and is closely associated with University
College London. The hospital has 665 in-patient beds, 12
operating. Services offered at University College Hospital
include accident & emergency, hyper-acute stroke unit,
cancer care, critical care, endocrinology, general surgery,
ophthalmology, dermatology, general medicine, general
neurology, rheumatology, orthopaedics, paediatric &
adolescents, and urology. It is a major teaching hospital and
a key location for the UCL Medical School. It has also a
major centre for medical research and part of both
UCLH/UCL Biomedical Research Centre and the UCL
Partner academic health science centre. Plus Elizabeth
Garrett Anderson Meternity Wing
Position: Cad Architectural Assistant/Package lead.
Completion/officially opened: 2005
Cost: £400m
Belfast Oncology Centre.
The Oncology Services based in the Cancer centre at
Belfast City Hospital is part of Th Royal Victoria Hospital
Complex and provides Inpatient, Outpatient and Day Care
services.The Cancer Centre provides cancer treatment living
in Befast as wellas a number of specialist regional services
for people throughout Northern Ireland. The maim treatments
include: Chemotherapy, Radiotherapy, Brachytherapy and
Ablation Therapy.
Posiion: Cad Architectural Assistant/Package lead.
Completion: 2003
Cost: £15m
Santander Data Centre, Leicester.
The project comprises of two subterranean buildings, each
with six data halls of 500m2 with a Tier 4 resilience level –
the most stringent level of requirements for data centre
infrastructure.
Position: BIM/Revit manager
Completion: 2013
Cost: £100m
Chongqing Jiangbei International Airport
Located 21 km north of the city-centre of Chongqing,
Jiangbei Airport serves as an important aviation hub for
southwestern China. Terminal 1 serving international flights,
and Terminal 2 with halls A and B serving domestic flights.
The first, second, and third phase of the airport came into
operation in January 1990, December 2004, and December
2010 respectively. The domestic terminal is capable of
handling 30 million passengers and its international terminal
is able to handle more than 1 million passengers annually.
Position: CAD Architectural Assistant
BKD Bank Budapest
Refurbishment of a 19th
Century building in budapest’s
financial area. The courtyard was transformed into an
elegant atrium by inserting a new glass roof which creates a
bright amenity space overlooking the banking facilities
below.The project has been identified by the City of
Budapest as a Building of merit, and features in the definitive
guide to modern architecture in Budapest by the Hungarian
Institute of Architects.
Position: CAD Architectural Assistant
Completed: 1994
Cost: £8m
Education : HND Construction.
Professional
Institutions
:

More Related Content

What's hot

UK and Portugal Partnering for Infrastructure Projects
UK and Portugal Partnering for Infrastructure ProjectsUK and Portugal Partnering for Infrastructure Projects
UK and Portugal Partnering for Infrastructure Projects
UK Trade and Investment, Portugal
 
SAMBA - Hegedus Tomas - 9.9.2014
SAMBA - Hegedus Tomas - 9.9.2014SAMBA - Hegedus Tomas - 9.9.2014
SAMBA - Hegedus Tomas - 9.9.2014
Anton Bittner
 
Case Study - North Middlesex Hospital
Case Study - North Middlesex HospitalCase Study - North Middlesex Hospital
Case Study - North Middlesex Hospital
FlexiDry Global Ltd
 
100823 Prezentace Vtp Up Aj
100823 Prezentace Vtp Up Aj100823 Prezentace Vtp Up Aj
100823 Prezentace Vtp Up Aj
herinek
 
LRE Capital: Humber Enterprise Park and Charlie clean up
LRE Capital: Humber Enterprise Park and Charlie clean upLRE Capital: Humber Enterprise Park and Charlie clean up
LRE Capital: Humber Enterprise Park and Charlie clean up
William Harford
 
BISOL Solar Company: Being innovative
BISOL Solar Company: Being innovativeBISOL Solar Company: Being innovative
BISOL Solar Company: Being innovative
BISOL Solar Company
 
Jim Somers - Eblana Photonics H2020 seminar - June 5th 2014, Athlone
Jim Somers - Eblana Photonics H2020 seminar - June 5th 2014, AthloneJim Somers - Eblana Photonics H2020 seminar - June 5th 2014, Athlone
Jim Somers - Eblana Photonics H2020 seminar - June 5th 2014, Athlone
ei_Midlands
 
Presentation belspo & event objectives
Presentation belspo & event objectivesPresentation belspo & event objectives
Presentation belspo & event objectives
Space-Applications
 
Most active investor
Most active investorMost active investor
Most active investor
Diego Gutierrez
 
prof. Ivo Orlić: STeP Ri
prof. Ivo Orlić: STeP Riprof. Ivo Orlić: STeP Ri
prof. Ivo Orlić: STeP Ri
Initium
 

What's hot (10)

UK and Portugal Partnering for Infrastructure Projects
UK and Portugal Partnering for Infrastructure ProjectsUK and Portugal Partnering for Infrastructure Projects
UK and Portugal Partnering for Infrastructure Projects
 
SAMBA - Hegedus Tomas - 9.9.2014
SAMBA - Hegedus Tomas - 9.9.2014SAMBA - Hegedus Tomas - 9.9.2014
SAMBA - Hegedus Tomas - 9.9.2014
 
Case Study - North Middlesex Hospital
Case Study - North Middlesex HospitalCase Study - North Middlesex Hospital
Case Study - North Middlesex Hospital
 
100823 Prezentace Vtp Up Aj
100823 Prezentace Vtp Up Aj100823 Prezentace Vtp Up Aj
100823 Prezentace Vtp Up Aj
 
LRE Capital: Humber Enterprise Park and Charlie clean up
LRE Capital: Humber Enterprise Park and Charlie clean upLRE Capital: Humber Enterprise Park and Charlie clean up
LRE Capital: Humber Enterprise Park and Charlie clean up
 
BISOL Solar Company: Being innovative
BISOL Solar Company: Being innovativeBISOL Solar Company: Being innovative
BISOL Solar Company: Being innovative
 
Jim Somers - Eblana Photonics H2020 seminar - June 5th 2014, Athlone
Jim Somers - Eblana Photonics H2020 seminar - June 5th 2014, AthloneJim Somers - Eblana Photonics H2020 seminar - June 5th 2014, Athlone
Jim Somers - Eblana Photonics H2020 seminar - June 5th 2014, Athlone
 
Presentation belspo & event objectives
Presentation belspo & event objectivesPresentation belspo & event objectives
Presentation belspo & event objectives
 
Most active investor
Most active investorMost active investor
Most active investor
 
prof. Ivo Orlić: STeP Ri
prof. Ivo Orlić: STeP Riprof. Ivo Orlić: STeP Ri
prof. Ivo Orlić: STeP Ri
 

Similar to BDP CV R Hill

IHEEM 2013 Design Award Entries
IHEEM 2013 Design Award EntriesIHEEM 2013 Design Award Entries
IHEEM 2013 Design Award Entries
Architects for Health
 
Coda AfH Tour Boards
Coda AfH Tour BoardsCoda AfH Tour Boards
Coda AfH Tour Boards
Architects for Health
 
HKR Architects Healthcare portfolio
HKR Architects Healthcare portfolioHKR Architects Healthcare portfolio
HKR Architects Healthcare portfolio
HKR Architects
 
Hkr Health Portfolio
Hkr Health PortfolioHkr Health Portfolio
Hkr Health Portfolio
HKR Dublin
 
AddenbrookesHospital((phase 1)
AddenbrookesHospital((phase 1)AddenbrookesHospital((phase 1)
AddenbrookesHospital((phase 1)
Nigel Denham
 
Gazette Issue 1 2016
Gazette Issue 1 2016Gazette Issue 1 2016
Gazette Issue 1 2016
Ruaidhrí Murray Assoc CIPD
 
65_Barts_v001
65_Barts_v00165_Barts_v001
65_Barts_v001
Rob Andrews
 
Ambercycle Case Studies
Ambercycle Case StudiesAmbercycle Case Studies
Ambercycle Case Studies
Ambercycle Consulting
 
Project Overviews
Project OverviewsProject Overviews
Project Overviews
Hazel Stephens - Maguire
 
Strategic Estate Planning - case studies
Strategic Estate Planning - case studiesStrategic Estate Planning - case studies
Strategic Estate Planning - case studies
Ambercycle Consulting
 
South Wales Architect
South Wales ArchitectSouth Wales Architect
Premier modular case_studies_-_north_middlesex_hospital_-final
Premier modular case_studies_-_north_middlesex_hospital_-finalPremier modular case_studies_-_north_middlesex_hospital_-final
Premier modular case_studies_-_north_middlesex_hospital_-final
wandysgal
 
Mountford Pigott LLP Leisure Portfolio 2013
Mountford Pigott LLP Leisure Portfolio 2013Mountford Pigott LLP Leisure Portfolio 2013
Mountford Pigott LLP Leisure Portfolio 2013
mountfordpigott
 
44494 Tom McCarthy Master CV
44494 Tom McCarthy Master CV44494 Tom McCarthy Master CV
44494 Tom McCarthy Master CV
Thomas McCarthy
 
BPF-Quality-Buildings-Quality-Care-Nov-15-web_0
BPF-Quality-Buildings-Quality-Care-Nov-15-web_0BPF-Quality-Buildings-Quality-Care-Nov-15-web_0
BPF-Quality-Buildings-Quality-Care-Nov-15-web_0
Karen West
 
QDA - Health Team Brochure
QDA - Health Team BrochureQDA - Health Team Brochure
QDA - Health Team Brochure
Robert Walder
 
Eden Company Profile
Eden Company ProfileEden Company Profile
Eden Company Profile
Neil Stanley BA (Hons) MCIM DipM
 
ECH Campus Leadership Summit: Alastair Hamilton
ECH Campus Leadership Summit: Alastair HamiltonECH Campus Leadership Summit: Alastair Hamilton
ECH Campus Leadership Summit: Alastair Hamilton
3GDR
 
John Cooper, "Everything is design. Everything!" - Paul Rand
John Cooper, "Everything is design. Everything!" - Paul RandJohn Cooper, "Everything is design. Everything!" - Paul Rand
John Cooper, "Everything is design. Everything!" - Paul Rand
Architects for Health
 
Cpl Interiors Plc
Cpl Interiors PlcCpl Interiors Plc
Cpl Interiors Plc
Kerry_Carpenter
 

Similar to BDP CV R Hill (20)

IHEEM 2013 Design Award Entries
IHEEM 2013 Design Award EntriesIHEEM 2013 Design Award Entries
IHEEM 2013 Design Award Entries
 
Coda AfH Tour Boards
Coda AfH Tour BoardsCoda AfH Tour Boards
Coda AfH Tour Boards
 
HKR Architects Healthcare portfolio
HKR Architects Healthcare portfolioHKR Architects Healthcare portfolio
HKR Architects Healthcare portfolio
 
Hkr Health Portfolio
Hkr Health PortfolioHkr Health Portfolio
Hkr Health Portfolio
 
AddenbrookesHospital((phase 1)
AddenbrookesHospital((phase 1)AddenbrookesHospital((phase 1)
AddenbrookesHospital((phase 1)
 
Gazette Issue 1 2016
Gazette Issue 1 2016Gazette Issue 1 2016
Gazette Issue 1 2016
 
65_Barts_v001
65_Barts_v00165_Barts_v001
65_Barts_v001
 
Ambercycle Case Studies
Ambercycle Case StudiesAmbercycle Case Studies
Ambercycle Case Studies
 
Project Overviews
Project OverviewsProject Overviews
Project Overviews
 
Strategic Estate Planning - case studies
Strategic Estate Planning - case studiesStrategic Estate Planning - case studies
Strategic Estate Planning - case studies
 
South Wales Architect
South Wales ArchitectSouth Wales Architect
South Wales Architect
 
Premier modular case_studies_-_north_middlesex_hospital_-final
Premier modular case_studies_-_north_middlesex_hospital_-finalPremier modular case_studies_-_north_middlesex_hospital_-final
Premier modular case_studies_-_north_middlesex_hospital_-final
 
Mountford Pigott LLP Leisure Portfolio 2013
Mountford Pigott LLP Leisure Portfolio 2013Mountford Pigott LLP Leisure Portfolio 2013
Mountford Pigott LLP Leisure Portfolio 2013
 
44494 Tom McCarthy Master CV
44494 Tom McCarthy Master CV44494 Tom McCarthy Master CV
44494 Tom McCarthy Master CV
 
BPF-Quality-Buildings-Quality-Care-Nov-15-web_0
BPF-Quality-Buildings-Quality-Care-Nov-15-web_0BPF-Quality-Buildings-Quality-Care-Nov-15-web_0
BPF-Quality-Buildings-Quality-Care-Nov-15-web_0
 
QDA - Health Team Brochure
QDA - Health Team BrochureQDA - Health Team Brochure
QDA - Health Team Brochure
 
Eden Company Profile
Eden Company ProfileEden Company Profile
Eden Company Profile
 
ECH Campus Leadership Summit: Alastair Hamilton
ECH Campus Leadership Summit: Alastair HamiltonECH Campus Leadership Summit: Alastair Hamilton
ECH Campus Leadership Summit: Alastair Hamilton
 
John Cooper, "Everything is design. Everything!" - Paul Rand
John Cooper, "Everything is design. Everything!" - Paul RandJohn Cooper, "Everything is design. Everything!" - Paul Rand
John Cooper, "Everything is design. Everything!" - Paul Rand
 
Cpl Interiors Plc
Cpl Interiors PlcCpl Interiors Plc
Cpl Interiors Plc
 

BDP CV R Hill

  • 1. Robin John Hill Architecture BIM Co - ordinator I have many years experience working within the building industry in various architectural practices and housing development companies. A variety of experience in competitions, feasibility, and concept design and in working drawing programmes has developed into a varied and interesting portfolio of work. My work experience for the past 18 years has been mainly in Healthcare. I am currently working as BIM Co-ordinator and package lead. Dates: December 2014 to present date With BDP Brighton 3 T s’ and Sussex University Hospital Two new hospital buildings will bring Elderly Care, General Medicine, HIV and Clinical Infection Wards up to modern standards and establish the Hospital as the Major Trauma Centre for the region. Will include 361 beds, 75% of which will be in single en-suite roome a helipad and additional parking spaces underground. Position: BIM Co-ordinator Completion: Pinderfields Hospital, Wakefield. Pinderfields Hospital is a PFI 708 bed new build acute hospital and consists of inpatient wards, women’s and children’s facilities, a rehabilitation institute, full acute services and a diagnostic and treatment centre. Position: Cad co-ordinator and package lead. Completion: 2007 Cost: £450m University College London (UCLH) Part of the University College London Hospitals NHS Foundation Trust and is closely associated with University College London. The hospital has 665 in-patient beds, 12 operating. Services offered at University College Hospital include accident & emergency, hyper-acute stroke unit, cancer care, critical care, endocrinology, general surgery, ophthalmology, dermatology, general medicine, general neurology, rheumatology, orthopaedics, paediatric & adolescents, and urology. It is a major teaching hospital and a key location for the UCL Medical School. It has also a major centre for medical research and part of both UCLH/UCL Biomedical Research Centre and the UCL Partner academic health science centre. Plus Elizabeth Garrett Anderson Meternity Wing Position: Cad Architectural Assistant/Package lead. Completion/officially opened: 2005 Cost: £400m Belfast Oncology Centre. The Oncology Services based in the Cancer centre at Belfast City Hospital is part of Th Royal Victoria Hospital Complex and provides Inpatient, Outpatient and Day Care services.The Cancer Centre provides cancer treatment living in Befast as wellas a number of specialist regional services for people throughout Northern Ireland. The maim treatments include: Chemotherapy, Radiotherapy, Brachytherapy and Ablation Therapy. Posiion: Cad Architectural Assistant/Package lead. Completion: 2003 Cost: £15m Santander Data Centre, Leicester. The project comprises of two subterranean buildings, each with six data halls of 500m2 with a Tier 4 resilience level – the most stringent level of requirements for data centre infrastructure. Position: BIM/Revit manager Completion: 2013 Cost: £100m Chongqing Jiangbei International Airport Located 21 km north of the city-centre of Chongqing, Jiangbei Airport serves as an important aviation hub for southwestern China. Terminal 1 serving international flights, and Terminal 2 with halls A and B serving domestic flights. The first, second, and third phase of the airport came into operation in January 1990, December 2004, and December 2010 respectively. The domestic terminal is capable of handling 30 million passengers and its international terminal is able to handle more than 1 million passengers annually. Position: CAD Architectural Assistant BKD Bank Budapest Refurbishment of a 19th Century building in budapest’s financial area. The courtyard was transformed into an elegant atrium by inserting a new glass roof which creates a bright amenity space overlooking the banking facilities below.The project has been identified by the City of Budapest as a Building of merit, and features in the definitive guide to modern architecture in Budapest by the Hungarian Institute of Architects. Position: CAD Architectural Assistant Completed: 1994 Cost: £8m Education : HND Construction. Professional Institutions :