開放、創新、領航者- AXIS 產品與服務的創新- Eric Chiu, Key Account Director, Taiwan邱富億, 台灣區業務協理, eric.chiu@axis.com
在創新技術上 – 安迅士,始終領先一步!我們想到了IP……1996年安迅士發明了世界上第一台網路攝影機,1998年安迅士發明了世界第一台視訊編碼器……人們還在談論模擬監控……我們想到了高畫質HD……人們還在談論D1解析度……2008年安迅士率先將HDTV高清標準引入監控領域……我們想到了開放……2008年安迅士發起ONVIF開放化介面標準論壇……人們還在談論封閉的系統……
專注,是安迅士的精神!15年來安迅士一直致力於網路視訊監控領域,並始終保持網路視訊產品市場的領導地位.*擁有全系列具有競爭力的產品*Source: IMS Research report, “The world market for CCTV and Video Surveillance Equipment, 2009 edition”
AXIS的產品特色與優勢
業界最完整的原廠保固服務P, Q, T系列均提供三年原廠保固M系列(M31-R除外)均提供一年原廠保固保固範圍:非人為損壞非天然災害設備需無明顯外傷保固方式:1 v.s 1 原廠良(新)品替換常見的損壞原因雷擊摔落
有效的減少安裝成本完整的PoE供電產品線縮短施工期才能確保利潤Axis 戶外型產品(-E)Axis T8412 Installation DisplayLED 安裝幫手背調焦(back-focus)
Axis重要的核心技術- ARTPEC系列晶片市場上唯一自有品牌的設備與晶片原廠為了網路監控所發展的特殊晶片符合監控的需要:H.264, I/O, Audio, SD….etc有效的降低傳輸頻寬目前採用的晶片:AXISARTPEC-3AXISARTPEC-4 (2011 Q3)低耗電卻不影響效能可控制的溫度綠色環保
美國電影電視工程師協會 Society of Motion Picture and Television Engineers (SMPTE)訂定了HDTV的標準SMPTE 定義的HDTV標準有以下的重點:解析度:1280x720 (SMPTE296M– 720p)1920x1080 (SMPTE 274M – 1080i/p)畫面更新率: 25/30  fps寬螢幕顯示比例的支援:16 : 9支援更多的色彩HDTV高畫質攝影機的領導廠商
A natural looking image...專業監控需要的是好的辨色力!!Sharpening
Cropped-outview4CIF viewCropped-outviewHDTVview
Cropped-outview4CIF – PTZ full teleCropped-outviewHDTV view – PTZ full tele
4CIF viewHDTV view
HDTV 影像比較Non-HDTVAXIS P1344 (HDTV)
Megapixel, HD 不等於HDTV標準HDTV必須滿足SMPTE的四大要素HD 只代表保證解析度畫面輸出比例Megapixel 只代表很高的影像解析度更高的頻寬消耗有限的畫面更新率進光量控制的挑戰超高解析度(2MP以上)的攝影機應該以單點監控來考量
完整的視訊智慧化應用- 入門版位移偵測多達10個區域的“包含(Include)”與”不包含(Exclude)“設定主動式防破壞偵測鏡頭遮蔽鏡頭失焦場景變換聲音偵測(具語音機種)高頻聲音異常聲音無聲
完整的視訊智慧化應用- 進階版先進守門員(Advanced GateKeeper)可在觸發警報時,立刻監看自動追蹤(Auto-Tracking)攝影機自動跟隨移動物體主動守門員(Active GateKeeper)多方向標題顯示(Multi Preset Title)Multi-connector cableAXIS P8221 Network I/O Audio Module
完整的視訊智慧化的終極應用- Axis Camera Application Platform位移偵測、遮蔽警報…已經是基本配備視訊分析需要全部或者部分在“前端”完成,以保證真正的可升級性 “前端” 包含了網路攝影機和視訊編碼器等確保視訊分析基於原始的未損失的視訊最小化網路中的視訊流量 輕松支援系統規模的不斷升級視訊分析需要與後臺軟體緊密整合以保證真正的可用性軟件接收前端設備視訊分析的資料登錄,再處理並將結果呈現給用戶需要基於開放的標準以保證互通性和靈活性視訊分析功能視訊分析功能視訊分析功能視訊分析功能視訊分析功能
創新的攝像機應用平臺- Axis Camera Application Platform基於AXIS ARTPEC晶片技術,是目前唯一內建於攝影機的開放型智慧平台APP Store
使用案例:AXIS Cross Line DetectionAXIS Cross Line Detection 可應用於電子圍籬的基本應用
基於事件的視訊監控管理基於事件的監控管理模式多種查詢模式(區域、報警、時間)快速查詢檢索主動化報警通告生成多種報表節省總體擁有成本只錄製必要的事件錄影節省頻寬和存儲減少人員投入實現全天候智慧工作
AXIS’ Corridor Format™ – 一個獨特且創新的監看方法讓AXIS的影像可以適用在各種場合將影像品質最大化有效的抓取所需要的空間依樣可提供完整的解析度減少頻寬以及儲存空間的浪費HDTV 攝影機才能應用的特殊用途16:9 變成9:16 來最大化可視範圍可應用在多種行業別教育零售運輸辦公室可應用在AXIS全系列HDTV機種
AXIS’ Corridor Format™ – 永遠給你想要的畫面
P-Iris 更精準的鏡頭控制
P-Iris: 未來的新標準P-Iris已經在AXIS P1346/P1347實作AXIS期望可以取代傳統的DC-Iris由AXIS and KOWA共同發展P-Iris 非商標保護的名詞,有利於市場的推廣市場詢問度相當高
P-Iris 有效增加深景的銳利度Old technology P-Iris
P-Iris 在光亮環境可避免模糊P-IrisOld technology
領先業界的壓縮控制技術– 別的廠商不願意告訴你的真相同樣的設定,並不一定會有同樣的檔案大小H.264, 30fps, 24 hr recording, 1280x720(HDTV), 專案需求為50支XXX-XXXXUSD$749AXISP1344USD$849USD$100價格資料來源:http://www.ipcamerasupply.com
AXISHDTV Result81.2 Mbps, 5.8TP及Q全系列採三年原廠保固
已經包含優異的日系監控專用鏡頭
 支援雙向語音
 支援離線儲存(SD卡)
 優異的夜間環境
 多樣化的產品選擇
 在地的技術支援、全球領導品牌其他廠商的結果300Mbps, 22T但是 售價不包含鏡頭
 僅一年保固
 沒有寬動態(WDR)

Axis_產品與服務的創新_1107

Editor's Notes

  • #24 Many benefits
  • #25 Corridor Format as presented in AXIS Camera Station
  • #35 Axis introduces 5-megapixel network cameras with precise iris controlAxis Communications today introduces its top-of-the-line, 5-megapixel fixed network cameras with HDTV 1080p performance, precise iris control for optimal image clarity and H.264 compression. The indoor AXIS P1347 Network Camera and the outdoor-ready AXIS P1347-E model are suitable for use at airports, banks, shops, for city surveillance and any application that requires coverage of a large area or extremely high image detail. “The indoor and outdoor AXIS P1347 cameras are optimized to provide exceptional performance for demanding surveillance applications,” says Erik Frännlid, Director of Product Management, Axis Communications. “An AXIS P1347 camera can cover a large area due to its high resolution and can take the place of several standard cameras. With narrower viewing angles, the camera can provide extremely good detail for identification purposes and for defining distant objects. AXIS P1347/-E cameras will be part of our successful AXIS P13 Series and will provide all of the series’ unique, easy installation features and sophisticated functionalities.” The cameras’ revolutionary P-Iris enables automatic and precise control of the iris position to optimize depth of field and lens resolution for optimal image sharpness. DC-iris lenses are also supported for backward compatibility. The day and night cameras deliver 5-megapixel resolution video at 12 frames per second. They also support 16:9, HDTV 1080p full frame rate video. To help minimize bandwidth and storage needs, the cameras provide digital pan/tilt/zoom and multi-view streaming, which enables several cropped view areas to be streamed simultaneously. The cameras support multiple, individually configurable video streams in H.264 and Motion JPEG. The cameras’ easy installation features include remote back focus for fine-tuning the focus from a computer, and pixel counter, which helps verify that the pixel resolution of an object fulfills regulatory or customer requirements for identification purposes. AXIS P1347 and AXIS P1347-E support Power over Ethernet, which simplifies installation since only one cable is required for video and power. Other supported features include two-way audio, audio detection, active tampering alarm, input/output ports, and built-in SD/SDHC card slot for local storage of recordings. The IP66-rated AXIS P1347-E, which comes with a wall mount bracket, sunshield and Ethernet cable, is protected from dust, rain, snow and sun, and can operate in temperatures from -40 °C to 50°C (-40 °F to 122 °F). AXIS P1347/-E network cameras are supported by the industry’s largest base of video management software through the Axis Application Development Partner program as well as by AXIS Camera Station. AXIS P1347 will be available in June and AXIS P1347-E, in July 2010.
  • #36 Axis introduces 5-megapixel network cameras with precise iris controlAxis Communications today introduces its top-of-the-line, 5-megapixel fixed network cameras with HDTV 1080p performance, precise iris control for optimal image clarity and H.264 compression. The indoor AXIS P1347 Network Camera and the outdoor-ready AXIS P1347-E model are suitable for use at airports, banks, shops, for city surveillance and any application that requires coverage of a large area or extremely high image detail. “The indoor and outdoor AXIS P1347 cameras are optimized to provide exceptional performance for demanding surveillance applications,” says Erik Frännlid, Director of Product Management, Axis Communications. “An AXIS P1347 camera can cover a large area due to its high resolution and can take the place of several standard cameras. With narrower viewing angles, the camera can provide extremely good detail for identification purposes and for defining distant objects. AXIS P1347/-E cameras will be part of our successful AXIS P13 Series and will provide all of the series’ unique, easy installation features and sophisticated functionalities.” The cameras’ revolutionary P-Iris enables automatic and precise control of the iris position to optimize depth of field and lens resolution for optimal image sharpness. DC-iris lenses are also supported for backward compatibility. The day and night cameras deliver 5-megapixel resolution video at 12 frames per second. They also support 16:9, HDTV 1080p full frame rate video. To help minimize bandwidth and storage needs, the cameras provide digital pan/tilt/zoom and multi-view streaming, which enables several cropped view areas to be streamed simultaneously. The cameras support multiple, individually configurable video streams in H.264 and Motion JPEG. The cameras’ easy installation features include remote back focus for fine-tuning the focus from a computer, and pixel counter, which helps verify that the pixel resolution of an object fulfills regulatory or customer requirements for identification purposes. AXIS P1347 and AXIS P1347-E support Power over Ethernet, which simplifies installation since only one cable is required for video and power. Other supported features include two-way audio, audio detection, active tampering alarm, input/output ports, and built-in SD/SDHC card slot for local storage of recordings. The IP66-rated AXIS P1347-E, which comes with a wall mount bracket, sunshield and Ethernet cable, is protected from dust, rain, snow and sun, and can operate in temperatures from -40 °C to 50°C (-40 °F to 122 °F). AXIS P1347/-E network cameras are supported by the industry’s largest base of video management software through the Axis Application Development Partner program as well as by AXIS Camera Station. AXIS P1347 will be available in June and AXIS P1347-E, in July 2010.