Project engineer: John P O’ Brien
After my design was approved, I sent away the design for
professional drafting
Using the design provided by the engineering department, we constructed
4 new bin cover lids
Next step was to fit the lid frames with the new rams to ensure perfect fit
Once satisfied with lid fitting, we completed the sheet work on each lid
 The next stage of our project involved the
purchase and installation of the hydraulic
pump to operate the opening/closing of the bin
covers.
 The Pump was supplied by Dowden's along
with the installation of the stainless steel
pipework.
 The sprinkler system is used for dust
suppression as an environmental measure.
 The old system operated on a timer activating
hourly for four minutes.
 It operated by spraying through holes on an
old bar running along the bins.
 The new system would incorporate rotating
sprinklers in each corner and would continue
to use the old timer as before.
 This new system proved very successful for
dust suppression.
Old Timer system
Electrical control panel
Partly opened bin door
Hydraulic ram system
Hydraulic pump fully installed
 Project Design__________John P O’ Brien
 Project Management____John P O’ Brien
 Electrical Design_______Rodney Griffin
 Hydraulic Design______John P O’ Brien/
Rodney Griffin
 Welding Team________John P O’Brien
/Jonathan Walter/ Gene Wilson
 Painting Team________Shaun Sant /Chris
Fenech
 Crane Operator_______Leon Oosen

More Related Content

Similar to Automated Sand Bin Covers

Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012
richlandcollegetx
 
Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15
Harshad Patel, P.E.
 
EJ Roe and Michael Watson-Deep Sea Soil Collector
EJ Roe and Michael Watson-Deep Sea Soil CollectorEJ Roe and Michael Watson-Deep Sea Soil Collector
EJ Roe and Michael Watson-Deep Sea Soil Collector
Evan (E.J.) Roe
 
Chiller repair, condenser & refrigerant loop test, pump alignment, videos...
Chiller repair, condenser & refrigerant loop test, pump alignment, videos...Chiller repair, condenser & refrigerant loop test, pump alignment, videos...
Chiller repair, condenser & refrigerant loop test, pump alignment, videos...
pkpravin89
 
Nu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCANu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCA
Eric Hopkins
 
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - Final
Chris Humphries
 
Rehabilitation insert presentation
Rehabilitation insert presentationRehabilitation insert presentation
Rehabilitation insert presentation
AlecGrogan
 
ProTec Recent Projects Brochure
ProTec Recent Projects BrochureProTec Recent Projects Brochure
ProTec Recent Projects Brochure
Steven MacDonald
 
Nu flow sales presentation
Nu flow sales presentationNu flow sales presentation
Nu flow sales presentation
WaterDamageServices
 
Project List
Project ListProject List
Project List
Michael Coulombe
 
GSE Workshop Week
GSE Workshop WeekGSE Workshop Week
GSE Workshop Week
Alitzel Tamayo
 
GSE Workshop presentation
GSE Workshop presentationGSE Workshop presentation
GSE Workshop presentation
Kyle Funk
 
ENERGY EFFICIENCY EXPERIENCE
ENERGY EFFICIENCY EXPERIENCEENERGY EFFICIENCY EXPERIENCE
ENERGY EFFICIENCY EXPERIENCE
Sorin Ioana
 
Smart Sensors, Gas detecting oven
Smart Sensors, Gas detecting ovenSmart Sensors, Gas detecting oven
engr103_grp06710_finRep (1)
engr103_grp06710_finRep (1)engr103_grp06710_finRep (1)
engr103_grp06710_finRep (1)
Austin Omolo
 
Hi Bay Presentation
Hi Bay PresentationHi Bay Presentation
Hi Bay Presentation
Scott Murgatroyd
 
Green one- The first 5 Star Rated SVAGRIHA Project
Green one- The first 5 Star Rated SVAGRIHA ProjectGreen one- The first 5 Star Rated SVAGRIHA Project
Green one- The first 5 Star Rated SVAGRIHA Project
Nilanjan Bhowal
 
MinnePHit House Case Study
MinnePHit House Case StudyMinnePHit House Case Study
MinnePHit House Case Study
TE Studio
 
Final Portfolio
Final PortfolioFinal Portfolio
Final Portfolio
Christopher Davies
 
Work Term Overview
Work Term OverviewWork Term Overview
Work Term Overview
Matthew Hoffman
 

Similar to Automated Sand Bin Covers (20)

Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012
 
Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15
 
EJ Roe and Michael Watson-Deep Sea Soil Collector
EJ Roe and Michael Watson-Deep Sea Soil CollectorEJ Roe and Michael Watson-Deep Sea Soil Collector
EJ Roe and Michael Watson-Deep Sea Soil Collector
 
Chiller repair, condenser & refrigerant loop test, pump alignment, videos...
Chiller repair, condenser & refrigerant loop test, pump alignment, videos...Chiller repair, condenser & refrigerant loop test, pump alignment, videos...
Chiller repair, condenser & refrigerant loop test, pump alignment, videos...
 
Nu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCANu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCA
 
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - Final
 
Rehabilitation insert presentation
Rehabilitation insert presentationRehabilitation insert presentation
Rehabilitation insert presentation
 
ProTec Recent Projects Brochure
ProTec Recent Projects BrochureProTec Recent Projects Brochure
ProTec Recent Projects Brochure
 
Nu flow sales presentation
Nu flow sales presentationNu flow sales presentation
Nu flow sales presentation
 
Project List
Project ListProject List
Project List
 
GSE Workshop Week
GSE Workshop WeekGSE Workshop Week
GSE Workshop Week
 
GSE Workshop presentation
GSE Workshop presentationGSE Workshop presentation
GSE Workshop presentation
 
ENERGY EFFICIENCY EXPERIENCE
ENERGY EFFICIENCY EXPERIENCEENERGY EFFICIENCY EXPERIENCE
ENERGY EFFICIENCY EXPERIENCE
 
Smart Sensors, Gas detecting oven
Smart Sensors, Gas detecting ovenSmart Sensors, Gas detecting oven
Smart Sensors, Gas detecting oven
 
engr103_grp06710_finRep (1)
engr103_grp06710_finRep (1)engr103_grp06710_finRep (1)
engr103_grp06710_finRep (1)
 
Hi Bay Presentation
Hi Bay PresentationHi Bay Presentation
Hi Bay Presentation
 
Green one- The first 5 Star Rated SVAGRIHA Project
Green one- The first 5 Star Rated SVAGRIHA ProjectGreen one- The first 5 Star Rated SVAGRIHA Project
Green one- The first 5 Star Rated SVAGRIHA Project
 
MinnePHit House Case Study
MinnePHit House Case StudyMinnePHit House Case Study
MinnePHit House Case Study
 
Final Portfolio
Final PortfolioFinal Portfolio
Final Portfolio
 
Work Term Overview
Work Term OverviewWork Term Overview
Work Term Overview
 

Automated Sand Bin Covers

  • 1. Project engineer: John P O’ Brien
  • 2. After my design was approved, I sent away the design for professional drafting
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13. Using the design provided by the engineering department, we constructed 4 new bin cover lids
  • 14.
  • 15. Next step was to fit the lid frames with the new rams to ensure perfect fit
  • 16.
  • 17. Once satisfied with lid fitting, we completed the sheet work on each lid
  • 18.
  • 19.
  • 20.  The next stage of our project involved the purchase and installation of the hydraulic pump to operate the opening/closing of the bin covers.  The Pump was supplied by Dowden's along with the installation of the stainless steel pipework.
  • 21.
  • 22.  The sprinkler system is used for dust suppression as an environmental measure.  The old system operated on a timer activating hourly for four minutes.  It operated by spraying through holes on an old bar running along the bins.  The new system would incorporate rotating sprinklers in each corner and would continue to use the old timer as before.  This new system proved very successful for dust suppression.
  • 23.
  • 24.
  • 25.
  • 26.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 36. Hydraulic pump fully installed
  • 37.  Project Design__________John P O’ Brien  Project Management____John P O’ Brien  Electrical Design_______Rodney Griffin  Hydraulic Design______John P O’ Brien/ Rodney Griffin  Welding Team________John P O’Brien /Jonathan Walter/ Gene Wilson  Painting Team________Shaun Sant /Chris Fenech  Crane Operator_______Leon Oosen