SlideShare a Scribd company logo
1 of 26
Download to read offline
1
2
ATP-1.2 Program Wastewater Treatment Plant Design, Estimating and the costs associated with
planning for the needs and save time by all accounts is an integrated solution. Practical use, automatic
calculation AutoCAD drawings with automatic scheduling enables you to use your time most efficiently.
Practical Data Entry
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
Wastewater Input Values
User to input desired Q m³ / h, BOD entry
mg / l, SS (MLSS) entry mg / l, BOD and SS
output value is entered. In addition, the
Central Bank with the current exchange
value of the connection must be specified.
Accept the Desiggn Account For
Wastewater Input Values indicated after the
design to have made to the facility for some
acceptances are necessary. This admission
during the program you have adopted are
appropriate if the "to approve" or "to
deprecate" phrase with the user's most
i l ti t h ill id
Optimal Data Management
ATP-1.2 Home Page on the data entered the
most appropriate and clearly by ordering
your project management easier for you.
Specific Functions;
• Wastewater Treatment Plant Sizes
• Wastewater Treatment Plant Exploration
• Unit Based Reconnaissance new
• Construction Materials and Cost
• Construction Labour Cost
• Transfortations
• Mechanical Manufacturing and
• Electricity production costs and cost
• Piping and Plumbing
• Plan and P & I Diagram
• AutoCAD Drawing Unit Prices
• Final Total
System And Application Preference
ATP-1.2 makes it easy to use thanks to modular
system is preferred.
1 SYSTEM PREFERENCES New-Classic-long
Aerated Activated Sludge Activated Sludge.
2 CHOICE VENTILATION New Ventilation with -
air exhauster blower with air-
3 DEWATERING CHOICE New-Belt Filter
Dewatering-Drying Beds Choıce
4 CHOOSE SIZE New Conditioning Program By-
auto opportunity to enter the
5 DIMENSION USER New
6 HYDRAULIC PROFILE New
7 CONCRETE ACCOUNTS STATIC New
3
System Preferences
Aerobic biological treatment methods most commonly used today, two of them with Atp1.2 design
calculations are made.
1 Activated Sludge System classic
2 Long Aerated Activated Sludge System
Activated Sludge System Classic , Long Aerated Activated Sludge System
Aerobic biological treatment method is the most widely used and accepted ones. Atp1.2 program
design in these systems to make the above calculations in the form of classical or long Aerated
Activated Sludge Activated Sludge is checked against our interests in the form below. Requested on
this form, MLSS and F / M ratio is entered in all the calculations for those standards, mechanical
equipment and electrical systems will be made according to this system.
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
4
Aeration System of Preferences
Activated Sludge from the ventilation system with two of them are Atp1.2 design calculations.
1 Pressure Ventilation System (BLOWER)
2 Mechanical ventilation system (AERATOR)
to prefer this system, one of the ventilation profile button is clicked the form below and we will come
across. Design will be made according to preference.
Dewatering System of Preferences
Hydration process, reducing the water content of sludge is used for physical (mechanical) is a basic
process. Sludge from the water to get the two of them with the methods used are Atp1.2 design
calculations.
1 SLUDGE DRYING BED natural water intake method
2 PRESSURE FILTER(Belt-FILTER) mechanical method of water intake
This is one of the preferred method for Dewatering against the profile button is clicked the form
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
5
Dimensional Preferences
As a result of design calculations Atp1.2 automatically determine the size as well which allows the
user to enter their preferences by size, have the opportunity to Sizing Preferences button is pressed,
you will counter in the form below ..
1 Size of the unit will enter my own
2 Auto Setup Program
by sizing the system to prefer one of the ventilation profile button is clicked the form below and we
will come across. Design will be made according to preference.
Be Entered By the User of
the Size
As a result of design calculations
Atp1.2 automatically determine
the size, as well as being entered
by the user which allows the
preferred dimensions are possible.
This means the user greater
convenience is just happens;
Wastewater Treatment Contract
there and all the dimensions
specified in the tender of this size
from top to bid as appearing in
section units in size by the user is
entered, all calculations of this
size on the mechanical equipment
and electrical instrumentation
entered BOD, TSS values observed
Given the type, capacity, and
calculations are performed. Thus,
preparation for an auction to
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
6
Data Entry
Atp1.2 Wastewater Treatment Plant Design Program, the calculations needed to make the choices
after the design will be the plant, factory or residential area Wastewater Values Input section by
entering all the calculations, design and feature automatically is done. Login button is clicked the
data against our income in the form below.
1 - Introduction to the wastewater treatment plant Q (Flow), BOD, TSS, nitrogen values.
Data Warning
Atp1.2 design calculations
result in itself the standards
compliance checking thanks
to the user as seen in the
home account, accept section,
the entered value of the
standard of compliance with
the "to approve" or "to
deprecate" warning with a
warning and values tailored to
the size of the optimum value
in keeps. thereby increasing
the costs would have
prevented.'s "to deprecate"
red warning of "to approve"
allow it to become
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
7
Transport Distances
Atp1.2 design calculations as a
result of discovery and the cost
of the best values out for
Design on the facility is located
in the region, transport
distance of the user-entered by
allows. Thus, Discovery, and
Quantity of the regional values,
compliance would have
achieved. Transport distances
button is clicked the side forms
are present. In this form the
desired distance "km" is
entered as a provincial bank
accounts of all shipping is
calculated according to the
transportation formula
Estimating Unit Basis
As a result of design calculations
Atp1.2 Discovery 'i is determined
automatically. If you plant the
unit, each of the separate
discoveries values to see if the
unit-based Discovery button is
clicked. In this section, all the
units the discovery of the values
are also requested the unit next
to the button is clicked, this unit
the sum of their care facilities
are. This user wants to add or
remove the unit would have to
show results.
Currency
Atp1.2 Mechanical Equipment
that automatically determines
the price, this price "$" because
it is based, and discovery "TL" is
removed as a current "$" price is
necessary to enter. If you have
Internet access by this Atp1.2 he
received the Central Bank
exchange rate, or if the user
wants, "Currency" button and
then set their own wants to
build
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
8
Print
To print "print" button is clicked
and the desired profile will be
printed when saved.
Photos
The pictures on your computer
section, "jpeg" extension buttons
can be used to achieve
Save To
Save your file to be used for button
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
9
Static-Concrete Accounts
Atp1.2 Static-reinforced concrete accounts
of all units is done automatically. In this
section, all units and buildings of the
vertical and earthquake loading on the
concrete section and the carrier element
calculations TS500 concrete design and
construction of Rules 2000 and the
earthquake will take place in Building
Rights in the regulation of conduct in 2007
mainly taken. ITU also rectangular and
circular cross section with a water tank
used method Account. Rectangles, and the
full and free download pool Dairesl against
Section curtain accounts, basic accounts
Atp1.2 Building Static Concrete
Calculator their TS500
Standards Earthquake
Investigation were made and
each building separate account
performs. The user in this
section only to use the BA
concrete type, BA Steel type
and soil factor of safety-
related form specific
coefficient choose to enter will
be enough.
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
10
Hydraulic Profile
Atp1.2 to AutoCAD Program Design to his plant's hydraulic profile calculations and hydraulic profile
out. It's only in the homepage the hydraulic jeans section last Settling around the geographic level
of the entering is enough. This level according to the hydraulic calculations to automate the entire
unit, the water level ' s are determined, and hydraulic flow profile is produced.
All units are also used in hydraulic
profile that mechanical equipment
has equipment, technical sheets.
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
11
Wastewater Treatment Plant Size
ATP-1.2 Wastewater Treatment Plant
Design calculations classical activated
sludge system, according to the make and
resizes. Wastewater input values and
Design Account acceptances after
Treatment Plant forming units of B (width),
L (length), H (height) and D (diameter)
values Wastewater Treatment Plant Sizes
table is located. In this table all the
structures of most, length, height,
diameter and quantity available as well as
all the facilities needed for the area will be
identified. Optionally, the process Trickling
Filter Sludge Digestion pool design
accounts in will be made, but the total area
Sizing
System during the data entry process is the
most economical and will save the values
you enter will be needed to make warning.
This routing results required in the
calculations done WWTP forming unit size
automatically belirliyecektir. Dimensions
and be certain that the results of the ATP-
1.2 Treatment concrete accounts, small
construction feature automatically
hesaplıyarak, construction, exploration,
mechanical equipment selection by
mechanical discovery, pipe and pump
selection by making Tubing discovery and
finally the power sections made
calculations to explore the Electrical and
Instrumentation Department of Public
Works Price, Value and Single Value based
ATP-1.2 with very complex and large
projects account and planning can easily
do. ATP-1.2 in the planning of the basic
automatic section selection account is
based and specifications depending on the
will happen. Planning during the ATP-1.2
many different automated technical parts
of uses. Process accounts; According to the
specifications of effluent entering the
water values and taking into account the
size of the system automatically makes.
Which accounts are made for the size of
the specification against which the
warning is displayed on the home page.
ATP-1.2 generated by the size or the size entered by the user
according to the AutoCAD drawing in AutoCAD transfer button on
this page to create Clicking be transferred to the page size is drawn.
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
12
Estimating Wastewater Treatment Plants
ATP-1.2 fully in an automated way
process calculations as a result of
certain of the size according to the
facility's concrete calculations,
small construction jobs, quantity
and, mechanical and piping sections
and Quantity of Electric Cable,
Transformer, Panel Section and
Area by removing Estimating ready.
Reconnaissance construction
update Bay.Bak exposure according
to the mechanical equipment on the
basis of current equipment prices, $
converted to £, the piping and pump
according to current market prices
and Bay.Bak exposure, the current
TEK Instruments Electrical and
price estimating is prepared
Estimating Benefits
ATP-1. 2 definitive account level
close to the calculation with the
material requirements of the list
occurs, the material cost of the real
figures are much closer to occur for
the purpose of users will be offered
the number of current market
conditions, according to provide.
Cost According to the profit margin
allows you to choose. Employer and
bilateral talks According to data
from different wastewater
treatment plants olbileceği
questions about how to price your
answer you can give .. Laptop will
be as close as a few keystrokes to
save time is ... .. Treatment Plant
with the normal conditions of the
tender dossier preparation and
determination of the amount of
discovery. Will be seven days. ATP-
1. 2 if there will be five minutes in
front of you discovered Then he
Experience Will Win
ATP-1.2 Wastewater Treatment Plant Design
for the needs of his many years of experience
developed fully formed as a result of the
transfer is the first design program. From your
business planning, bid preparation of your file,
you will make the cost of construction of
treatment plants to know the real figures that
meets all your needs ..
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
13
Wastewater Treatment Plant Final Total
Discovery on the one hand, the cost of other .. $ Basis, how much profit or how much more can be
subtracted you can instantly ...!
Discovery
Amount
Prepared
discovery page
taken from the
plant's Works
Unit Price and
issued bid is the
price. Cost
Amount
construction
material costs,
labor costs,
transportation,
Mechanical
Equipment and
installation
costs, piping
and pump
installation
materials and
installation
costs, electrical
and
instrumentation
equipment and
installation cost
covers. Amount
of Amount of
Cost of snow
Days of
construction
completion for
the time Month
Day of the
Month was
translated into
the state.
Construction
Area Sizing page
specified in the
total
construction
area m² Person
/ Cost / $ $
Some in the per
capita discovery
volume and cost
amount .. Flow
System into
Wastewater
Flow cum / h
Total Treatment
Plant
Exploration and
cost totals £
Total $
Treatment Plant
Exploration and
Cost Total of $
PAGE FİNAL TOTAL Wastewater Treatment Plant Costs are the best you can track the status page.
Main Page entered the project value as a result, profit and loss status, USA, $ basis price of% in the
rate of profit the amount of construction, your building your time that you answer every question on
this page instantly find, have the ability to be able to. ATP-1.2 saves you time, as well as your plant
allows you to see real and true costs, with a few elements to create your own things and allows you
to make as true.
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
14
General Layaout Of Wastewater Treatment Plants
ATP-1.2 was identified as a result of the construction process of account size is transferred to the plan
page. In this page layout of the facility, the unit of the field, the flow chart and the construction will
have the opportunity to see the total area.
ATP-1.2 System Active Classic sludge or extended aeration activated sludge system, according to the
system makes the solution. Log in sand taken from the grid holder, waste water from the coarse and
fine sieves by passing free of coarse particles is provided. After the wastewater is contained grid-based
minerals, weathering of the material was kept and easy to sand down the holder unit can be built. After
the pre-sedimentation tank, the water heavier particles of the gravitational acceleration and downward
settling preliminary sedimentation tank comes. Rectangular or circular, as are designed preamble, the
precipitation zone, mud area and output area are available. Oxygen supplements are made with floating
aerators are removed the mud from the mud tank. Distribution of the sedimentation tank with
submersible pumps are enclosed structure, was built here and the Activated Sludge Process for
Biological Treatment of the pool is transferred to the air. Activated sludge process, microorganisms use
oxygen as organic matter decomposition developed primarily by utilizing an aerobic biological
treatment system. F / M ratio, hydraulic retention time, oxygen requirement can be made automatic
calculations are sized swimming pool, air-conditioning system as capacity blower and diffuser system
according to calculations by making the selection is done automatically. Back up and transfer rate of
the sludge in the system are determined. The next step of the last settling ponds, the pool of
microorganisms (sludge) as a complete biological and sedimentary processes in a way was cleared to
leave the water will be provided. The settled sludge back to the era of biological sludge level is sent as
a cleaned wastewater will drain from the sediment pool. Type are designed as a circular pool. from top
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
15
to bottom sediments in the foam and filling the reservoir allowing the mud 0.03 cycles / min speed mud
scrapers are mounted. Drain end of the sedimentation tank in the water chlorinated pool is subjected to
disinfection. The chemicals used in disinfection with chlorine disinfection is the most common.
Thickening of Sewage Sludge Sludge is designed to eliminated. Concentrators is the first unit of sludge
disposal unit. So that other units will be active in terms of volume depletion. With this unit gravity
sedimentation of clay or light clay to face with some of the contributions is based. Circular is intended.
Centrally driven and scrapers are mounted condenser. drain water from the sludge is removed from the
upper left. As an optional pool accounts in sludge digestion for sludge stabilization is done
automatically. Belt filters are designed to be done with sludge dewatering. sludge dewatering process,
almost always a component of the mud conditions. Chemically conditioned sludge spread on the moving
belt passing sıkıştırlarak plant is removed from the rolls.
P&I Diagram Of Wastewater Treatments Plants
ATP-1.2 Pool and Flow cross-section diagram of the facility will be used automatically as pipe diameter
and length is shown on page.
ATP-1.2 P & I diagrams in extemporaneous pipes, pumps sections account in accordance with the pipe
diameter and type of the unit and the connection between the plan is drawn. P & I diagrams also the
unit between the pipes mesafelerinide see the possibilities you can have. The pipe diameter and the
amount shown here, are used to account for the cost of piping and pumps.
Visual Analysis
The best part of the system that you have entered the Home as a result of wastewater for immediate
cross-section consisting of P & I. Have the possibility to see in your diagram. As a result of this analysis
for the cross-section and may have the opportunity to review.
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
16
Wastewater Treatment Plant Costs
Pumping
Wastewater and sludge flow into
the system which according to the
values calculated by the ATP-1.2 is
automatically selected.
Submersible, horizontal shaft
centrifugal sludge pumps, drainage
pumps to determine the amount
and type of cals.
Fast Solutions
. ATP-1.2 by analyzing your needs
best, fastest way to bring your
program is the Wastewater
Treatment Design
Construction material costs
ATP-1.2 calculation process unit as a result of
the rough construction of a certain size
Excavation Concrete + mold + Iron +
automatically detects the amount and the
current material prices and the price. Likewise,
thin construction materials metrajıda
automatically be updated material prices and
priced. User requested updated material prices
relevant section is to enter. The home page is
entered Wastewater Values neticeside how
much cement, how much iron and how the tiles
with sealing tape to use the instant opportunity
to have a can ..
Construction labor costs
ATP-1.2 with the mold, iron, concrete
labor and opportunity to have the
labor-date rates to the appropriate
section to enter is enough. Similarly,
thin construction worker the amount
and the amount of visual possibilities
are available. Rough construction
labor cost and fine construction labor
costs separately issued is.
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
17
Manufacture Of Mechanical Wastewater Treatment Plants
Transportations
ATP-1.2 Wastewater Plant Design
Program during the construction cost
of shipping the materials you need to
do to make their account information
you are presented to users.
Mekhanical Equipment
ATP-1.2 Wastewater Design Program Facility unit basis, you should use all the equipment to calculate
automatically, and kW, diameter, Q Flow, değerlerinide shows. Price certifications automatically as
the market price of $ on the basis of the evaluation of ATP-1.2 by the automatic yapılır.kullanıcı only
the main page update Enter $ value is sufficient. Moreover, mechanical equipment, the prices given a
coefficient multiplied by the diminution or decrease if requested, "Coefficient" button for the desired
coefficient by entering all the equipments rates available request will be adjusted to. If the
mechanical equipment prices some of the price change if desired, changing thinking of the
equipment next to "BF" button Clicking only that the equipment price change. In addition to the
Mechanical Equipment section if you want to add new equipment, "Y.E" Button is clicked and the
form comes up when you enter the requested equipment specifications and prices are
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
18
Wastewater Treatment Plant Electrical Instrument Manufacturing
Electrical Equipment
ATP-1.2 Wastewater Design Program Facility unit basis, you should use all the power-Instrument
equipment to calculate automatically, and hp, m, capacity değerlerinide shows. Price certifications.
User's unit price section enters into the Bay-see and TEDAŞ rates also Mechanical Equipment section,
a new If you want to add equipment, "EY" Button is clicked and the form comes up when you enter
the requested equipment specifications and prices are
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
19
130 M3/H
1
SIRA EKİP.NO
TOPLAM KW/ADET TOP.GÜÇ DEVREDEKİ
1 H-102 1 1,10 1,10 1,10
2 Z-102 1 0,55 0,55 0,55
3 P-103/A 1 0,75 0,75 0,75
4 F-103 1 1,50 1,50 1,50
5 Z-105 1 2,20 2,20 2,20
6 P-104 3 22,00 66,00 44,00
7 P-104/1 1 0,75 0,75 0,75
8 Z-104 1 1,10 1,10 0,55
9 B-AP 1 4,33 4,33 3,03
10 LT 102 1 0,05 0,05 0,05
11 FT 102 1 0,05 0,05 0,05
12 L1 1 0,54 0,54 0,27
13 L3 1 0,30 0,30 0,15
14 YR 104/1 1 2,00 2,00 0,00
81,22
54,95
1
0,5
TOPLAM KURULU GÜÇ (kW)
1
1
1
2
İŞLETME GÜCÜ (kW)
0,7
1
1
0,5
0,5
DEBİMETRE
AYDINLATMA 220 V
PRİZ
YEDEK
DRENAJ POMPASI
MONORAY VİNÇ
DIŞ AYDINLATMA
SEVİYE ÖLÇÜM LT 104
KUM TUTUCU POMPASI
KUM TUTUCU KÖPRÜSÜ
KUM AYIRICI
GİRİŞ POMPALARI
DEVREDEKİ
ANMA GÜCÜ
MEKANİK TEMİZLEMELİ İNCE IZGARA
BANT KONVEYÖR
1
1
PANO YERİ
BSLNCK ÜNİT
EKİPMAN ADI MİKTAR ADET
ÖN ARITMA BÖLÜMÜ
İNCE IZGARA TERFİ POMPALARI
ADET
ELEKTRİK GÜÇ HESAPLARI
TESİS ADI
PANO İSMİ
BESLEN.PANO
YENİ KARPUZLU ATIKSU ARITMA TESİSİ
MCC 1
AG PANOSU
NO KABLO NO POZ NO MOTOR YOL MESAFE KABLO MOTOR DÜZ.
GÜÇ KW VERME MT CİNSİ ANMA FAK.
1 AG PANOSU P1 AG PANOSU 350,00 1 TRAFO AG PANOSU 50,00 NYY-J 1 530,3025 1
2 AG PANOSU P1 AG PANOSU 300,00 1 GENERATÖR AG PANOSU 10,00 NYY-J 1 454,55 1
3 MCC 1 MCC 1 54,95 1 AG PANOSU MCC 1 29,50 NYY-J 0,8 104,07 0,85
4 MCC 2 MCC 2 49,68 1 AG PANOSU MCC 2 5,00 NYY-J 0,8 94,09 0,85
5 MCC 3 MCC 3 62,80 1 AG PANOSU MCC 3 22,23 NYY-J 0,8 118,94 0,85
6 MCC 4 MCC 4 28,72 1 AG PANOSU MCC 4 12,12 NYY-J 0,8 54,38 0,85
7 H-102 H-102 1,10 1 MCC 1 H-102 25,00 NYY-J 0,8 2,08 0,85
8 Z-102 Z-102 0,55 1 MCC 1 Z-102 25,00 NYY-J 0,8 1,04 0,85
9 P-103/A P-103/A 0,75 1 MCC 1 P-103/A 20,00 NYY-J 0,8 1,42 0,85
10 F-103 F-103 1,50 1 MCC 1 F-103 20,00 NYY-J 0,8 2,84 0,85
11 Z-105 Z-105 2,20 1 MCC 1 Z-105 25,00 NYY-J 0,8 4,17 0,85
12 P-104 P-104 22,00 2 MCC 1 P-104 5,00 NYY-J 0,8 41,67 0,85
13 P-104 P-104 22,00 2 MCC 1 P-104 5,00 NYY-J 0,8 41,67 0,85
14 P-104 P-104 22,00 2 MCC 1 P-104 5,00 NYY-J 0,8 41,67 0,85
15 P-104/1 P-104/1 0,75 1 MCC 1 P-104/1 5,00 NYY-J 0,8 1,42 0,85
16 Z-104 Z-104 1,10 1 MCC 1 Z-104 5,00 NYY-J 0,8 2,08 0,85
17 B-AP B-AP 4,33 1 MCC 1 B-AP 60,00 NYM 0,8 8,20 0,85
18 LT 102 LT 102 0,05 1 MCC 1 LT 102 10,00 NYY-J 0,8 0,09 0,85
19 FT 102 FT 102 0,05 1 MCC 1 FT 102 10,00 NYY-J 0,8 0,09 0,85
20 L1 L1 0,54 1 MCC 1 L1 4,00 NYM 0,8 1,02 0,85
21 L3 L3 0,30 1 MCC 1 L3 4,00 NYM 0,8 0,57 0,85
22 F 105 F 105 15,00 2 MCC 2 F 105 25,00 NYY-J 0,8 28,41 0,85
23 F 107 F 107 11,00 1 MCC 2 F 107 76,78 NYY-J 0,8 20,83 0,85
24 F 109 F 109 0,37 1 MCC 2 F 109 39,20 NYY-J 0,8 0,70 0,85
25 P 111 P 111 0,75 1 MCC 2 P 111 15,00 NYY-J 0,8 1,42 0,85
26 L1 L1 0,42 1 MCC 2 L1 3,00 NYM 0,8 0,80 0,85
27 L2 L2 0,30 1 MCC 2 L2 3,00 NYM 0,8 0,57 0,85
28 AE 107/1 AE 107/1 0,10 1 MCC 2 AE 107/1 30,31 NYY-J 0,8 0,19 0,85
29 AE 107/2 AE 107/2 0,10 1 MCC 2 AE 107/2 34,35 NYY-J 0,8 0,19 0,85
30 P 103 P 103 5,50 1 MCC 2 P 103 25,00 NYY-J 0,8 10,42 0,85
31 P-110/1 P-110/1 22,00 2 MCC 3 P-110/1 5,00 NYY-J 0,8 41,67 0,85
32 P-110/1 P-110/1 22,00 2 MCC 3 P-110/1 5,00 NYY-J 0,8 41,67 0,85
33 P-110/1 P-110/1 22,00 2 MCC 3 P-110/1 5,00 NYY-J 0,8 41,67 0,85
34 P-110/2 P-110/2 5,50 1 MCC 3 P-110/2 5,00 NYY-J 0,8 10,42 0,85
35 P-110/2 P-110/2 5,50 1 MCC 3 P-110/2 5,00 NYY-J 0,8 10,42 0,85
36 P-110/3 P-110/3 0,75 1 MCC 3 P-110/3 5,00 NYY-J 0,8 1,42 0,85
37 I-AP I-AP 21,76 1 MCC 3 I-AP 19,80 NYY-J 0,8 41,21 0,85
38 L1 L1 0,54 1 MCC 3 L1 3,00 NYM 0,8 1,02 0,85
39 L2 L2 0,40 1 MCC 3 L2 3,00 NYM 0,8 0,76 0,85
40 L3 L3 0,30 1 MCC 3 L3 3,00 NYM 0,8 0,57 0,85
41 LT110 LT110 0,05 1 MCC 3 LT110 10,00 NYY-J 0,8 0,09 0,85
42 F 112/1 F 112/1 0,55 1 MCC 4 F 112/1 10,00 NYY-J 0,8 1,04 0,85
43 T 112 T 112 0,55 1 MCC 4 T 112 10,00 NYY-J 0,8 1,04 0,85
44 F 112/2 F 112/2 0,18 1 MCC 4 F 112/2 10,00 NYY-J 0,8 0,34 0,85
45 P 112 P 112 0,18 1 MCC 4 P 112 10,00 NYY-J 0,8 0,34 0,85
46 Z 112 Z 112 0,55 1 MCC 4 Z 112 10,00 NYY-J 0,8 1,04 0,85
47 Z 112/1 Z 112/1 2,05 1 MCC 4 Z 112/1 10,00 NYY-J 0,8 3,88 0,85
48 C 112 C 112 0,55 1 MCC 4 C 112 10,00 NYY-J 0,8 1,04 0,85
49 P 112/2 P 112/2 5,50 1 MCC 4 P 112/2 10,00 NYY-J 0,8 10,42 0,85
50 F 114 F 114 0,37 1 MCC 4 F 114 34,35 NYY-J 0,8 0,70 0,85
51 P 114 P 114 18,50 2 MCC 4 P 114 30,31 NYY-J 0,8 35,04 0,85
52 L1 L1 0,62 1 MCC 4 L1 3,00 NYM 0,8 1,17 0,85
MOTOR İSMİ
NERDEN NEREYE
MEKANİK TEMİZLEMELİ İNCE
KABLO
KESİTİ COS
2(3x150/70)
2(3x150/70)
3x25
3x25
3x50+25
3x16
4x1,5
4x1,5
4x1,5
4x1,5
4x2,5
4x10
4x10
4x10
4x1,5
4x1,5
4x2,5
4x1,5
4x1,5
4x1,5
4x1,5
4x4
4x4
4x1,5
4x1,5
4x1,5
4x1,5
4x1,5
4x1,5
4x2,5
4x10
4x10
4x10
4x2,5
4x2,5
4x1,5
4x10
4x1,5
4x1,5
4x1,5
4x1,5
4x1,5
4x1,5
4x1,5
4x1,5
4x1,5
4x2,5
4x1,5
4x2,5
4x1,5
4x4
4x1,5
KUVVET KABLO HESAPLARI
TRAFO
GENERATÖR
MCC 1 PANO BESLEMESİ
MCC 2 PANO BESLEMESİ
MCC 3 PANO BESLEMESİ
MCC 4 PANO BESLEMESİ
BANT KONVEYÖR
KUM TUTUCU POMPASI
KUM TUTUCU KÖPRÜSÜ
KUM AYIRICI
GİRİŞ POMPALARI
GİRİŞ POMPALARI
GİRİŞ POMPALARI
DRENAJ POMPASI
MONORAY VİNÇ
DIŞ AYDINLATMA
SEVİYE ÖLÇÜM LT 104
DEBİMETRE
AYDINLATMA 220 V
PRİZ
DUBALI AERATÖR KARIŞTIRIC
BLOWER SİSTEMİ
SIYIRICILAR
DRENAJ POMPASI
AYDINLATMA 220 V
PRİZ
OKSİJEN ÖLÇÜM BESLEME
OKSİJEN ÖLÇÜM BESLEME
ÖNÇÖKELTME DALGIÇ POMP
GERİ DEVİR POMPALARI
GERİ DEVİR POMPALARI
GERİ DEVİR POMPALARI
FAZLA ÇAMUR POMPALARI
FAZLA ÇAMUR POMPALARI
DRENAJ POMPASI
İDARE BİNA PANO BESLEME
AYDINLATMA 220 V
AYDINLATMA 220 V
PRİZ
SEVİYE ÖLÇÜM LT 110
STATİK MİKSER
BELT FİLTRE
POLİELEKTROLİT HAZ. KARIŞ
POLİELEKTROLİT DOZ. POMP
BANT KONVEYÖR
MONORAY VİNÇ
KOMPRESÖR
HİDROFOR
YOĞUNLAŞTIRCI
YOĞUN ÇAMUR POMPASI
AYDINLATMA 220 V
Electrical Instrument.
ATP-1.2 Waste Design Program of the
electrical power system calculations,
the total amount of energy needed to
automatically determine
Generator transformer
ATP-1.2 Wastewater Design Program
of the system that need it the
transformer capacity and
automatically determines the need
for generators.
Power Cables
ATP-1.2 Wastewater Design Program
of the system with power control
cables Instrument Information Sheet
kablove instant account automatically
by the amount of cable sections and
instruments and makes the
determination.
Control Cables
Command and Control Cable
Instrument cable account to the
relevant units of distance from the
main AKEP board considering doing
the accounts, and determine the
cross section takes place in the table
20
Wastewater Treatment Plant Electrical Instrument Costs
TOPLAM 3.867,33
GÜÇ KABLO
KUMANDA KABLO
DIŞ AYDINLATMA
ENERJİ NAKİL HATTI , TRAFO POSTASI,ENSTRUMAN,PANO,AG GÜÇ VE KUMANDO KABLO
POZ NO MİKTARIİŞİN NEVİ BİRİMİ BİRİM FİYAT TUTARI
EÖBF15 Enerji Nakil Hattı m 1
8.348,40 8.348,40
31 4 2 12 400 kVA Direğe Güç Trafosu Adet 1
39.534,75 39.534,75
13.620,63 13.620,63
4.037,85 8.075,70
EÖBF01 Debi Ölçüm Seti
EÖBF02 Seviye Ölçüm Seti Adet 2
Adet 1
EÖBF03 Oksijen Ölçer Adet 2
95,85 287,55
EÖBF04 6 Kanallı Yazıcı Adet 1
3.824,55 7.649,10
1.837,35 1.837,35
101,25 303,75
EÖBF05 Armut Tip Seviye Anahtarı
EÖBF06 Armut Tip Seviye Anahtarı Seviye Ayarlı Adet 3
Adet 3
EÖBF07 Zaman Kontrol Cihazı Tek Adet 1
7.103,70 7.103,70
EÖBF08 Zaman Kontrol Cihazı Çift Adet 1
95,85 95,85
144,45 144,45
19.920,60 19.920,60
EÖBF09 AKEP Panosu
EÖBF10 A.G.Panosu Adet 1
Adet 1
EÖBF11 MCC1 Panosu Adet 1
3.923,10 3.923,10
EÖBF12 MCC2 Panosu Adet 1
4.966,65 4.966,65
11.994,75 11.994,75
3.773,25 3.773,25
EÖBF13 MCC3 Panosu
EÖBF14 MCC4 Panosu Adet 1
Adet 1
135,72 8.143,20
M
TOPLAM 131.579,58
10,85 374,32
2(3x150/70) NYY KABLO
3x25 NYY KABLO M 34,50
M 60,00
4x10 NYY KABLO M 49,80
1,612 225,68
4x4 NYY KABLO M 132,09
5,62 279,88
2,42 319,65
1,096 416,70
4x2,5 NYY KABLO
4x1,5 NYY KABLO M 380,20
M 140,00
3x16 NYY KABLO M 12,12 6,88 83,41
TOPLAM 9.842,84
10,39 1.322,5630x1,5 TTR KABLO 127,29
21x1,5 TTR KABLO 138,53
2,45 49,00
10x1,5 TTR KABLO 28,29
7,34 1.016,78
3,7 104,66
1,096 54,80
7x1,5 TTR KABLO
4x1,5 NYY KABLO 50,00
20,00
3x1,5 NYY KABLO 384,59
0,929 50,63
2x1,5 NYY KABLO 430,29
0,865 332,67
0,675 290,44
TOPLAM 3.221,55
2x2,5 NYY KABLO 54,50
782-102 GLVNZ.KABLO RAFI KG 468,76
4,10 41,00
201-208 2'' GALVANİZLİ BORU MT 391,98
5,97 2.798,47
10,80 4.233,35
5,50 266,71
204-204 50 LİK PVC BORU
204-211 110 LUK PVC BORU MT 48,49
MT 10,00
ÖZEL1 TOPRAK KANAL MT 78,40
TOPLAM 13.172,31
ÖZEL2 BETON KANAL MT 60,62
11,00 862,35
82,00 4.970,43
94,94 372,145 6 3 1 AD1 8/1 GLVNZ AYDINLATMA DİREĞİ ADET 4
5 6 3 2 AD1 8/2 GLVNZ AYDINLATMA DİREĞİ ADET 2
4,36 49,64
20 4 CİVA BUHARLI ARMATÜR ADET 11
105,03 258,90
58,66 667,83
15,02 631,24
20 6 CİVA BUHARLI AMPÜL
32 1 1 2x2,5 NYY KABLO TOPRAĞA GÖMME MT 42,03
ADET 11
32 1 2 3x2,5 NYY KABLO TOPRAĞA GÖMME MT 32,33
3,39 138,19
32 1 3 4x2,5 NYY KABLO TOPRAĞA GÖMME MT 43,24
15,43 498,82
15,64 676,25
3,39 58,91
32 1 4 3x2,5 DİREK ÇIKIŞLARI
32 12 1 3x2,5 NYY KABLO KANALDA MT 17,38
ADET 41
32 12 2 4x2,5 NYY KABLO KANALDA MT 11,72
8,40 95,63
32 12 3 1x4 NYY KABLO KANALDA MT 129,31
3,60 42,19
2,92 377,59
30 2 1 TOPRAKLAMA LEVHASI ADET 11
Electricity Cost:
ATP-1.2 Wastewater Design
Program of the facility in need
of transformers, generators,
panels, power and control
cables, Instruments cost
specified in the pricing makes.
This page will be used in the
materials the total list, as is
also the only unit prices,
current Cable and instrument
pricing using The discovery will
be removed.
Instrument Costs:
Again, calculations
automatically configure the
system's instrument list and
pricing in this table is located
see, the ATP-1.2 employers,
contractors, engineers of
friends needed a treatment
system must be calculated each
unit and the material
automatically calculated
against the offer to observe are
.. The rest your job is not to
know.
New Electric Equipment:
ATP-1.2 Electrical Equipment section if you want to add new equipment, "EY" Button is clicked and the
form comes up when you enter the requested equipment specifications and prices are
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
21
Piping and Plumbing:
ATP-1.2 program, Water Treatment Plant design calculations purification unit lines and other details are
settled, then along the pipeline friction and treatment units in the losses taken into account the pipe and
hydraulic calculations performed by the unit between the pipe diameters and lengths are determined.
Adding new pipeline:
ATP-1.2 program automatically accounts, as did all the pipeline in addition to be added by the user
has the ability to enter new lines.
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
22
Wastewater Treatment Plant Unit Prices
Ministry of Public Works of the exposure unit price pages, ONE has a bra and pose EÖBF user changing
prices each year is enough to enter this page.
Design Calculations:
Design calculations of the ATP-1.2 program. Wastewater Treatment Plant project, according to bank
standards and provinces does all the calculations. This process design, hydraulic, Department of
Electrical and Instrument ACCOUNTS accounts have the opportunity to see and it is getting out.
Material and labor prices:
current material and labor prices are entered
in this section.
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
23
AutoCAD Drawing:
ATP-1.2 with the program design has been completed the unit the size of the final you've Dimensions
section in the size of the AutoCAD drawing page onto the button and all sizes will be transferred and
the draw is the syfasından all unit plans and sections of AutoCAD automatically, and scale drawings
are made.
AutoCAD Drawing is a page :
ATP-1.2 program and the size department
AutoCAD's draw page, and transferred to the
size of the relevant page in the drawing to
be desired section next to the draw is the
button is clicked next to the appropriate unit
coordinate page revenue. Here is drawn
from AutoCAD asks for the user when the x
coordinate since the mouse approximately
10-15 seconds if you press the X button after
the waiting period occurs in the lower right
corner of the AutoCAD files with Emblem. by
passing the required examinations will be
made to this file.
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
24
AutoCAD Drawing:
ATP-1.2 program, plan drawings of the unit 1 / 100 scale, AutoCAD will automatically draw.
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
25
Environmental Engineers, Civil Engineers, Mechanical and Electrical Engineers, Contractors and
sub-contractors for Water Treatment Plant Wastewater Treatment Plant Design 1.2 ATP, a great
convenience which allows the program are to help. Sincerely,
Civil Engineer Hasan GÖRKEY
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
26
AAAtttppp111...222 vvviiidddeeeooo ppprrreeesssaaannntttaaatttiiiooonnn
YouTube : https://youtu.be/9ZQwXOgyuvE
CCCooommmmmmuuunnniiicccaaatttiiiooonnn
ATP 1.2 Wastewater Treatment Plant design software to get the following e-mail or phone
contact can be established.
Computer Assisted Programs
e-mail : atp1demo@hotmail.com
e-mail : hgky@hotmail.com
www.atptoautocad.com
GSM :+90 532 2682323
AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm

More Related Content

What's hot

Treatment of water
Treatment of waterTreatment of water
Treatment of waterdhavalsshah
 
lecture Design of Alluvial Canal -.pdf
lecture Design of Alluvial Canal -.pdflecture Design of Alluvial Canal -.pdf
lecture Design of Alluvial Canal -.pdfAhsanMurtaza13
 
L 12 contaminent concentration reduction
L 12  contaminent concentration reductionL 12  contaminent concentration reduction
L 12 contaminent concentration reductionDr. shrikant jahagirdar
 
02 Types of Intake Structures
02 Types of Intake Structures02 Types of Intake Structures
02 Types of Intake Structuresakashpadole
 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewersathyan s
 
Industrial wastewater reuse_Anil Sharma_2013
Industrial wastewater reuse_Anil Sharma_2013Industrial wastewater reuse_Anil Sharma_2013
Industrial wastewater reuse_Anil Sharma_2013India Water Portal
 
Green Infrastructure Design Principles and Considerations
Green Infrastructure Design Principles and ConsiderationsGreen Infrastructure Design Principles and Considerations
Green Infrastructure Design Principles and ConsiderationsDan Christian
 
variation in demand of water
variation in demand of water variation in demand of water
variation in demand of water Hayat khan
 
Estimation of storm sewage
Estimation of storm sewageEstimation of storm sewage
Estimation of storm sewagesidrarashiddar
 
Biological wastewater treatment
Biological wastewater treatmentBiological wastewater treatment
Biological wastewater treatmentssuserad8df0
 
Laying, jointing and testing of pipes
Laying, jointing and testing of pipesLaying, jointing and testing of pipes
Laying, jointing and testing of pipessathyan s
 
Traffic signal co ordination
Traffic signal co ordinationTraffic signal co ordination
Traffic signal co ordinationKartik Yadiyapur
 
areation and types of aeration in waste water treatment
areation and types of aeration in waste water treatmentareation and types of aeration in waste water treatment
areation and types of aeration in waste water treatmentAmi jasani
 

What's hot (20)

Treatment of water
Treatment of waterTreatment of water
Treatment of water
 
Chp 9
Chp 9Chp 9
Chp 9
 
lecture Design of Alluvial Canal -.pdf
lecture Design of Alluvial Canal -.pdflecture Design of Alluvial Canal -.pdf
lecture Design of Alluvial Canal -.pdf
 
L 12 contaminent concentration reduction
L 12  contaminent concentration reductionL 12  contaminent concentration reduction
L 12 contaminent concentration reduction
 
02 Types of Intake Structures
02 Types of Intake Structures02 Types of Intake Structures
02 Types of Intake Structures
 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewer
 
Waste water reuse1
Waste water reuse1Waste water reuse1
Waste water reuse1
 
Industrial wastewater reuse_Anil Sharma_2013
Industrial wastewater reuse_Anil Sharma_2013Industrial wastewater reuse_Anil Sharma_2013
Industrial wastewater reuse_Anil Sharma_2013
 
L 13 grit chamber
L 13 grit chamberL 13 grit chamber
L 13 grit chamber
 
Green Infrastructure Design Principles and Considerations
Green Infrastructure Design Principles and ConsiderationsGreen Infrastructure Design Principles and Considerations
Green Infrastructure Design Principles and Considerations
 
variation in demand of water
variation in demand of water variation in demand of water
variation in demand of water
 
Estimation of storm sewage
Estimation of storm sewageEstimation of storm sewage
Estimation of storm sewage
 
L 24 filtration
L 24 filtrationL 24 filtration
L 24 filtration
 
Sustainable urban drainage
Sustainable urban drainageSustainable urban drainage
Sustainable urban drainage
 
Wet scrubber
Wet scrubberWet scrubber
Wet scrubber
 
Biological wastewater treatment
Biological wastewater treatmentBiological wastewater treatment
Biological wastewater treatment
 
Water treatment
Water treatmentWater treatment
Water treatment
 
Laying, jointing and testing of pipes
Laying, jointing and testing of pipesLaying, jointing and testing of pipes
Laying, jointing and testing of pipes
 
Traffic signal co ordination
Traffic signal co ordinationTraffic signal co ordination
Traffic signal co ordination
 
areation and types of aeration in waste water treatment
areation and types of aeration in waste water treatmentareation and types of aeration in waste water treatment
areation and types of aeration in waste water treatment
 

Viewers also liked

Gemli̇k Atıksu Arıtma Tesisi Projesi-5 Basamaklı Bardenpho
Gemli̇k Atıksu Arıtma Tesisi Projesi-5 Basamaklı BardenphoGemli̇k Atıksu Arıtma Tesisi Projesi-5 Basamaklı Bardenpho
Gemli̇k Atıksu Arıtma Tesisi Projesi-5 Basamaklı BardenphoMurat Buluç
 
Ozone and climate-friendly alternatives in developing countries
Ozone  and climate-friendly alternatives in developing countries Ozone  and climate-friendly alternatives in developing countries
Ozone and climate-friendly alternatives in developing countries UNEP OzonAction
 
O3 greentech Ozone for waste water
O3 greentech Ozone for waste waterO3 greentech Ozone for waste water
O3 greentech Ozone for waste waterO3 Greentech
 
Disinfection and Chlorination of Potable Water Lines
Disinfection and Chlorination of Potable Water LinesDisinfection and Chlorination of Potable Water Lines
Disinfection and Chlorination of Potable Water LinesEngineer Imtiaz Rehman
 
Water Treatment Plant Design CEE157B
Water Treatment Plant Design CEE157BWater Treatment Plant Design CEE157B
Water Treatment Plant Design CEE157BAdam Richardson, EIT
 
Advanced Oxidation Process for Industrial Water Treatment and Waste Water
Advanced Oxidation Process for  Industrial Water Treatment and Waste WaterAdvanced Oxidation Process for  Industrial Water Treatment and Waste Water
Advanced Oxidation Process for Industrial Water Treatment and Waste WaterUus Soedjak
 
advanced oxidation process
advanced oxidation processadvanced oxidation process
advanced oxidation processMahendheran Mech
 
Disinfection of water
Disinfection of waterDisinfection of water
Disinfection of waterAshwani Kumar
 
Design criteria for waste water treatment
Design criteria for waste water treatmentDesign criteria for waste water treatment
Design criteria for waste water treatmentBibhabasu Mohanty
 
Waste Water Treatment Process Presentation
Waste Water Treatment Process PresentationWaste Water Treatment Process Presentation
Waste Water Treatment Process PresentationAshish Kakadia
 
water treatment slides
water treatment slideswater treatment slides
water treatment slidesAnand Keshri
 
28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-ppt28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-pptabhiiii4558
 
Water Treatment Plant Design project
Water Treatment Plant Design projectWater Treatment Plant Design project
Water Treatment Plant Design projectchris30277
 
Waste water treatment processes
Waste water treatment processesWaste water treatment processes
Waste water treatment processesAshish Agarwal
 

Viewers also liked (19)

Gemli̇k Atıksu Arıtma Tesisi Projesi-5 Basamaklı Bardenpho
Gemli̇k Atıksu Arıtma Tesisi Projesi-5 Basamaklı BardenphoGemli̇k Atıksu Arıtma Tesisi Projesi-5 Basamaklı Bardenpho
Gemli̇k Atıksu Arıtma Tesisi Projesi-5 Basamaklı Bardenpho
 
Ozone and climate-friendly alternatives in developing countries
Ozone  and climate-friendly alternatives in developing countries Ozone  and climate-friendly alternatives in developing countries
Ozone and climate-friendly alternatives in developing countries
 
Qmax Greentech
Qmax GreentechQmax Greentech
Qmax Greentech
 
O3 greentech Ozone for waste water
O3 greentech Ozone for waste waterO3 greentech Ozone for waste water
O3 greentech Ozone for waste water
 
Disinfection and Chlorination of Potable Water Lines
Disinfection and Chlorination of Potable Water LinesDisinfection and Chlorination of Potable Water Lines
Disinfection and Chlorination of Potable Water Lines
 
Water Treatment Plant Design CEE157B
Water Treatment Plant Design CEE157BWater Treatment Plant Design CEE157B
Water Treatment Plant Design CEE157B
 
Advanced Oxidation Process for Industrial Water Treatment and Waste Water
Advanced Oxidation Process for  Industrial Water Treatment and Waste WaterAdvanced Oxidation Process for  Industrial Water Treatment and Waste Water
Advanced Oxidation Process for Industrial Water Treatment and Waste Water
 
advanced oxidation process
advanced oxidation processadvanced oxidation process
advanced oxidation process
 
Disinfection
DisinfectionDisinfection
Disinfection
 
Wastewater
WastewaterWastewater
Wastewater
 
Disinfection of water
Disinfection of waterDisinfection of water
Disinfection of water
 
Water treatment plant design
Water treatment plant designWater treatment plant design
Water treatment plant design
 
Design criteria for waste water treatment
Design criteria for waste water treatmentDesign criteria for waste water treatment
Design criteria for waste water treatment
 
Waste Water Treatment Process Presentation
Waste Water Treatment Process PresentationWaste Water Treatment Process Presentation
Waste Water Treatment Process Presentation
 
water treatment slides
water treatment slideswater treatment slides
water treatment slides
 
28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-ppt28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-ppt
 
Water Treatment Plant Design project
Water Treatment Plant Design projectWater Treatment Plant Design project
Water Treatment Plant Design project
 
Water Treatment Plant
Water Treatment PlantWater Treatment Plant
Water Treatment Plant
 
Waste water treatment processes
Waste water treatment processesWaste water treatment processes
Waste water treatment processes
 

Similar to Atp1.2 to AutoCAD Wastewater Treatment Plant Design Program

Multivariable Flow Measurement
Multivariable Flow MeasurementMultivariable Flow Measurement
Multivariable Flow MeasurementMustafa Ali
 
Discussion on modern trend in measurement, Combustion control,optimization.pptx
Discussion on modern trend in measurement, Combustion control,optimization.pptxDiscussion on modern trend in measurement, Combustion control,optimization.pptx
Discussion on modern trend in measurement, Combustion control,optimization.pptxkazi galib
 
MARIA NDAGO PROJECT.pptx
MARIA NDAGO  PROJECT.pptxMARIA NDAGO  PROJECT.pptx
MARIA NDAGO PROJECT.pptxSungaleliYuen
 
Minor_Project_Report
Minor_Project_ReportMinor_Project_Report
Minor_Project_ReportVansh Kumar
 
OFFPIPE Assistant User Manual 2.0.3
OFFPIPE Assistant User Manual 2.0.3OFFPIPE Assistant User Manual 2.0.3
OFFPIPE Assistant User Manual 2.0.3OFFPIPE Assistant
 
IRJET- Implementation of Building Management System using Renewable Energ...
IRJET-  	  Implementation of Building Management System using Renewable Energ...IRJET-  	  Implementation of Building Management System using Renewable Energ...
IRJET- Implementation of Building Management System using Renewable Energ...IRJET Journal
 
Development of Software for Estimation of Structural Dynamic Characteristics ...
Development of Software for Estimation of Structural Dynamic Characteristics ...Development of Software for Estimation of Structural Dynamic Characteristics ...
Development of Software for Estimation of Structural Dynamic Characteristics ...IRJET Journal
 
Real time exhaust analyzer - icat 2014
Real time exhaust analyzer - icat 2014Real time exhaust analyzer - icat 2014
Real time exhaust analyzer - icat 2014Pushkar Limaye
 
Yokogawa Multivariable Transmitter EJX910
Yokogawa Multivariable Transmitter EJX910Yokogawa Multivariable Transmitter EJX910
Yokogawa Multivariable Transmitter EJX910Miller Energy, Inc.
 
Multivariable Transmitter for Mass Flow Measurement
Multivariable Transmitter for Mass Flow MeasurementMultivariable Transmitter for Mass Flow Measurement
Multivariable Transmitter for Mass Flow MeasurementFlow-Tech, Inc.
 
Introduction of CHEMcAD Software
Introduction of CHEMcAD Software Introduction of CHEMcAD Software
Introduction of CHEMcAD Software MyTech8
 
A Generalized Multistage Economic Planning Model for Distribution System Cont...
A Generalized Multistage Economic Planning Model for Distribution System Cont...A Generalized Multistage Economic Planning Model for Distribution System Cont...
A Generalized Multistage Economic Planning Model for Distribution System Cont...IJERD Editor
 
Fluid flow product-overview
Fluid flow product-overviewFluid flow product-overview
Fluid flow product-overviewMarino Valjak
 
Condition monitoring of screw compressors and induction motors in a food proc...
Condition monitoring of screw compressors and induction motors in a food proc...Condition monitoring of screw compressors and induction motors in a food proc...
Condition monitoring of screw compressors and induction motors in a food proc...IRJET Journal
 
ADVANCED TOOL FOR FLUID DYNAMICS-CFD AND ITS APPLICATIONS IN AUTOMOTIVE, AERO...
ADVANCED TOOL FOR FLUID DYNAMICS-CFD AND ITS APPLICATIONS IN AUTOMOTIVE, AERO...ADVANCED TOOL FOR FLUID DYNAMICS-CFD AND ITS APPLICATIONS IN AUTOMOTIVE, AERO...
ADVANCED TOOL FOR FLUID DYNAMICS-CFD AND ITS APPLICATIONS IN AUTOMOTIVE, AERO...IAEME Publication
 
IRJET- Review Study on Analysis of Venturimeter using Computational Fluid Dyn...
IRJET- Review Study on Analysis of Venturimeter using Computational Fluid Dyn...IRJET- Review Study on Analysis of Venturimeter using Computational Fluid Dyn...
IRJET- Review Study on Analysis of Venturimeter using Computational Fluid Dyn...IRJET Journal
 
References1. HCS 2010 online manuals.2. Data Data provi.docx
References1. HCS 2010 online manuals.2. Data  Data provi.docxReferences1. HCS 2010 online manuals.2. Data  Data provi.docx
References1. HCS 2010 online manuals.2. Data Data provi.docxdebishakespeare
 
IRJET - Design and Analysis of Kogge Stone Adder using Approximate Compressor
IRJET - Design and Analysis of Kogge Stone Adder using Approximate CompressorIRJET - Design and Analysis of Kogge Stone Adder using Approximate Compressor
IRJET - Design and Analysis of Kogge Stone Adder using Approximate CompressorIRJET Journal
 
GSM Besed prepaid energy meter
GSM Besed prepaid energy meterGSM Besed prepaid energy meter
GSM Besed prepaid energy meterGovil sharma
 

Similar to Atp1.2 to AutoCAD Wastewater Treatment Plant Design Program (20)

Multivariable Flow Measurement
Multivariable Flow MeasurementMultivariable Flow Measurement
Multivariable Flow Measurement
 
Discussion on modern trend in measurement, Combustion control,optimization.pptx
Discussion on modern trend in measurement, Combustion control,optimization.pptxDiscussion on modern trend in measurement, Combustion control,optimization.pptx
Discussion on modern trend in measurement, Combustion control,optimization.pptx
 
MARIA NDAGO PROJECT.pptx
MARIA NDAGO  PROJECT.pptxMARIA NDAGO  PROJECT.pptx
MARIA NDAGO PROJECT.pptx
 
Minor_Project_Report
Minor_Project_ReportMinor_Project_Report
Minor_Project_Report
 
OFFPIPE Assistant User Manual 2.0.3
OFFPIPE Assistant User Manual 2.0.3OFFPIPE Assistant User Manual 2.0.3
OFFPIPE Assistant User Manual 2.0.3
 
IRJET- Implementation of Building Management System using Renewable Energ...
IRJET-  	  Implementation of Building Management System using Renewable Energ...IRJET-  	  Implementation of Building Management System using Renewable Energ...
IRJET- Implementation of Building Management System using Renewable Energ...
 
Development of Software for Estimation of Structural Dynamic Characteristics ...
Development of Software for Estimation of Structural Dynamic Characteristics ...Development of Software for Estimation of Structural Dynamic Characteristics ...
Development of Software for Estimation of Structural Dynamic Characteristics ...
 
Real time exhaust analyzer - icat 2014
Real time exhaust analyzer - icat 2014Real time exhaust analyzer - icat 2014
Real time exhaust analyzer - icat 2014
 
Yokogawa Multivariable Transmitter EJX910
Yokogawa Multivariable Transmitter EJX910Yokogawa Multivariable Transmitter EJX910
Yokogawa Multivariable Transmitter EJX910
 
Multivariable Transmitter for Mass Flow Measurement
Multivariable Transmitter for Mass Flow MeasurementMultivariable Transmitter for Mass Flow Measurement
Multivariable Transmitter for Mass Flow Measurement
 
Introduction of CHEMcAD Software
Introduction of CHEMcAD Software Introduction of CHEMcAD Software
Introduction of CHEMcAD Software
 
A Generalized Multistage Economic Planning Model for Distribution System Cont...
A Generalized Multistage Economic Planning Model for Distribution System Cont...A Generalized Multistage Economic Planning Model for Distribution System Cont...
A Generalized Multistage Economic Planning Model for Distribution System Cont...
 
Fluid flow product-overview
Fluid flow product-overviewFluid flow product-overview
Fluid flow product-overview
 
Condition monitoring of screw compressors and induction motors in a food proc...
Condition monitoring of screw compressors and induction motors in a food proc...Condition monitoring of screw compressors and induction motors in a food proc...
Condition monitoring of screw compressors and induction motors in a food proc...
 
ADVANCED TOOL FOR FLUID DYNAMICS-CFD AND ITS APPLICATIONS IN AUTOMOTIVE, AERO...
ADVANCED TOOL FOR FLUID DYNAMICS-CFD AND ITS APPLICATIONS IN AUTOMOTIVE, AERO...ADVANCED TOOL FOR FLUID DYNAMICS-CFD AND ITS APPLICATIONS IN AUTOMOTIVE, AERO...
ADVANCED TOOL FOR FLUID DYNAMICS-CFD AND ITS APPLICATIONS IN AUTOMOTIVE, AERO...
 
IRJET- Review Study on Analysis of Venturimeter using Computational Fluid Dyn...
IRJET- Review Study on Analysis of Venturimeter using Computational Fluid Dyn...IRJET- Review Study on Analysis of Venturimeter using Computational Fluid Dyn...
IRJET- Review Study on Analysis of Venturimeter using Computational Fluid Dyn...
 
[IJET-V1I4P12] Authors :Nang Khin Su Yee, Theingi, Kyaw Thiha
[IJET-V1I4P12] Authors :Nang Khin Su Yee, Theingi, Kyaw Thiha[IJET-V1I4P12] Authors :Nang Khin Su Yee, Theingi, Kyaw Thiha
[IJET-V1I4P12] Authors :Nang Khin Su Yee, Theingi, Kyaw Thiha
 
References1. HCS 2010 online manuals.2. Data Data provi.docx
References1. HCS 2010 online manuals.2. Data  Data provi.docxReferences1. HCS 2010 online manuals.2. Data  Data provi.docx
References1. HCS 2010 online manuals.2. Data Data provi.docx
 
IRJET - Design and Analysis of Kogge Stone Adder using Approximate Compressor
IRJET - Design and Analysis of Kogge Stone Adder using Approximate CompressorIRJET - Design and Analysis of Kogge Stone Adder using Approximate Compressor
IRJET - Design and Analysis of Kogge Stone Adder using Approximate Compressor
 
GSM Besed prepaid energy meter
GSM Besed prepaid energy meterGSM Besed prepaid energy meter
GSM Besed prepaid energy meter
 

Recently uploaded

Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseribangash
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 

Recently uploaded (20)

Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 

Atp1.2 to AutoCAD Wastewater Treatment Plant Design Program

  • 1. 1
  • 2. 2 ATP-1.2 Program Wastewater Treatment Plant Design, Estimating and the costs associated with planning for the needs and save time by all accounts is an integrated solution. Practical use, automatic calculation AutoCAD drawings with automatic scheduling enables you to use your time most efficiently. Practical Data Entry AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm Wastewater Input Values User to input desired Q m³ / h, BOD entry mg / l, SS (MLSS) entry mg / l, BOD and SS output value is entered. In addition, the Central Bank with the current exchange value of the connection must be specified. Accept the Desiggn Account For Wastewater Input Values indicated after the design to have made to the facility for some acceptances are necessary. This admission during the program you have adopted are appropriate if the "to approve" or "to deprecate" phrase with the user's most i l ti t h ill id Optimal Data Management ATP-1.2 Home Page on the data entered the most appropriate and clearly by ordering your project management easier for you. Specific Functions; • Wastewater Treatment Plant Sizes • Wastewater Treatment Plant Exploration • Unit Based Reconnaissance new • Construction Materials and Cost • Construction Labour Cost • Transfortations • Mechanical Manufacturing and • Electricity production costs and cost • Piping and Plumbing • Plan and P & I Diagram • AutoCAD Drawing Unit Prices • Final Total System And Application Preference ATP-1.2 makes it easy to use thanks to modular system is preferred. 1 SYSTEM PREFERENCES New-Classic-long Aerated Activated Sludge Activated Sludge. 2 CHOICE VENTILATION New Ventilation with - air exhauster blower with air- 3 DEWATERING CHOICE New-Belt Filter Dewatering-Drying Beds Choıce 4 CHOOSE SIZE New Conditioning Program By- auto opportunity to enter the 5 DIMENSION USER New 6 HYDRAULIC PROFILE New 7 CONCRETE ACCOUNTS STATIC New
  • 3. 3 System Preferences Aerobic biological treatment methods most commonly used today, two of them with Atp1.2 design calculations are made. 1 Activated Sludge System classic 2 Long Aerated Activated Sludge System Activated Sludge System Classic , Long Aerated Activated Sludge System Aerobic biological treatment method is the most widely used and accepted ones. Atp1.2 program design in these systems to make the above calculations in the form of classical or long Aerated Activated Sludge Activated Sludge is checked against our interests in the form below. Requested on this form, MLSS and F / M ratio is entered in all the calculations for those standards, mechanical equipment and electrical systems will be made according to this system. AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 4. 4 Aeration System of Preferences Activated Sludge from the ventilation system with two of them are Atp1.2 design calculations. 1 Pressure Ventilation System (BLOWER) 2 Mechanical ventilation system (AERATOR) to prefer this system, one of the ventilation profile button is clicked the form below and we will come across. Design will be made according to preference. Dewatering System of Preferences Hydration process, reducing the water content of sludge is used for physical (mechanical) is a basic process. Sludge from the water to get the two of them with the methods used are Atp1.2 design calculations. 1 SLUDGE DRYING BED natural water intake method 2 PRESSURE FILTER(Belt-FILTER) mechanical method of water intake This is one of the preferred method for Dewatering against the profile button is clicked the form AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 5. 5 Dimensional Preferences As a result of design calculations Atp1.2 automatically determine the size as well which allows the user to enter their preferences by size, have the opportunity to Sizing Preferences button is pressed, you will counter in the form below .. 1 Size of the unit will enter my own 2 Auto Setup Program by sizing the system to prefer one of the ventilation profile button is clicked the form below and we will come across. Design will be made according to preference. Be Entered By the User of the Size As a result of design calculations Atp1.2 automatically determine the size, as well as being entered by the user which allows the preferred dimensions are possible. This means the user greater convenience is just happens; Wastewater Treatment Contract there and all the dimensions specified in the tender of this size from top to bid as appearing in section units in size by the user is entered, all calculations of this size on the mechanical equipment and electrical instrumentation entered BOD, TSS values observed Given the type, capacity, and calculations are performed. Thus, preparation for an auction to AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 6. 6 Data Entry Atp1.2 Wastewater Treatment Plant Design Program, the calculations needed to make the choices after the design will be the plant, factory or residential area Wastewater Values Input section by entering all the calculations, design and feature automatically is done. Login button is clicked the data against our income in the form below. 1 - Introduction to the wastewater treatment plant Q (Flow), BOD, TSS, nitrogen values. Data Warning Atp1.2 design calculations result in itself the standards compliance checking thanks to the user as seen in the home account, accept section, the entered value of the standard of compliance with the "to approve" or "to deprecate" warning with a warning and values tailored to the size of the optimum value in keeps. thereby increasing the costs would have prevented.'s "to deprecate" red warning of "to approve" allow it to become AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 7. 7 Transport Distances Atp1.2 design calculations as a result of discovery and the cost of the best values out for Design on the facility is located in the region, transport distance of the user-entered by allows. Thus, Discovery, and Quantity of the regional values, compliance would have achieved. Transport distances button is clicked the side forms are present. In this form the desired distance "km" is entered as a provincial bank accounts of all shipping is calculated according to the transportation formula Estimating Unit Basis As a result of design calculations Atp1.2 Discovery 'i is determined automatically. If you plant the unit, each of the separate discoveries values to see if the unit-based Discovery button is clicked. In this section, all the units the discovery of the values are also requested the unit next to the button is clicked, this unit the sum of their care facilities are. This user wants to add or remove the unit would have to show results. Currency Atp1.2 Mechanical Equipment that automatically determines the price, this price "$" because it is based, and discovery "TL" is removed as a current "$" price is necessary to enter. If you have Internet access by this Atp1.2 he received the Central Bank exchange rate, or if the user wants, "Currency" button and then set their own wants to build AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 8. 8 Print To print "print" button is clicked and the desired profile will be printed when saved. Photos The pictures on your computer section, "jpeg" extension buttons can be used to achieve Save To Save your file to be used for button AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 9. 9 Static-Concrete Accounts Atp1.2 Static-reinforced concrete accounts of all units is done automatically. In this section, all units and buildings of the vertical and earthquake loading on the concrete section and the carrier element calculations TS500 concrete design and construction of Rules 2000 and the earthquake will take place in Building Rights in the regulation of conduct in 2007 mainly taken. ITU also rectangular and circular cross section with a water tank used method Account. Rectangles, and the full and free download pool Dairesl against Section curtain accounts, basic accounts Atp1.2 Building Static Concrete Calculator their TS500 Standards Earthquake Investigation were made and each building separate account performs. The user in this section only to use the BA concrete type, BA Steel type and soil factor of safety- related form specific coefficient choose to enter will be enough. AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 10. 10 Hydraulic Profile Atp1.2 to AutoCAD Program Design to his plant's hydraulic profile calculations and hydraulic profile out. It's only in the homepage the hydraulic jeans section last Settling around the geographic level of the entering is enough. This level according to the hydraulic calculations to automate the entire unit, the water level ' s are determined, and hydraulic flow profile is produced. All units are also used in hydraulic profile that mechanical equipment has equipment, technical sheets. AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 11. 11 Wastewater Treatment Plant Size ATP-1.2 Wastewater Treatment Plant Design calculations classical activated sludge system, according to the make and resizes. Wastewater input values and Design Account acceptances after Treatment Plant forming units of B (width), L (length), H (height) and D (diameter) values Wastewater Treatment Plant Sizes table is located. In this table all the structures of most, length, height, diameter and quantity available as well as all the facilities needed for the area will be identified. Optionally, the process Trickling Filter Sludge Digestion pool design accounts in will be made, but the total area Sizing System during the data entry process is the most economical and will save the values you enter will be needed to make warning. This routing results required in the calculations done WWTP forming unit size automatically belirliyecektir. Dimensions and be certain that the results of the ATP- 1.2 Treatment concrete accounts, small construction feature automatically hesaplıyarak, construction, exploration, mechanical equipment selection by mechanical discovery, pipe and pump selection by making Tubing discovery and finally the power sections made calculations to explore the Electrical and Instrumentation Department of Public Works Price, Value and Single Value based ATP-1.2 with very complex and large projects account and planning can easily do. ATP-1.2 in the planning of the basic automatic section selection account is based and specifications depending on the will happen. Planning during the ATP-1.2 many different automated technical parts of uses. Process accounts; According to the specifications of effluent entering the water values and taking into account the size of the system automatically makes. Which accounts are made for the size of the specification against which the warning is displayed on the home page. ATP-1.2 generated by the size or the size entered by the user according to the AutoCAD drawing in AutoCAD transfer button on this page to create Clicking be transferred to the page size is drawn. AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 12. 12 Estimating Wastewater Treatment Plants ATP-1.2 fully in an automated way process calculations as a result of certain of the size according to the facility's concrete calculations, small construction jobs, quantity and, mechanical and piping sections and Quantity of Electric Cable, Transformer, Panel Section and Area by removing Estimating ready. Reconnaissance construction update Bay.Bak exposure according to the mechanical equipment on the basis of current equipment prices, $ converted to £, the piping and pump according to current market prices and Bay.Bak exposure, the current TEK Instruments Electrical and price estimating is prepared Estimating Benefits ATP-1. 2 definitive account level close to the calculation with the material requirements of the list occurs, the material cost of the real figures are much closer to occur for the purpose of users will be offered the number of current market conditions, according to provide. Cost According to the profit margin allows you to choose. Employer and bilateral talks According to data from different wastewater treatment plants olbileceği questions about how to price your answer you can give .. Laptop will be as close as a few keystrokes to save time is ... .. Treatment Plant with the normal conditions of the tender dossier preparation and determination of the amount of discovery. Will be seven days. ATP- 1. 2 if there will be five minutes in front of you discovered Then he Experience Will Win ATP-1.2 Wastewater Treatment Plant Design for the needs of his many years of experience developed fully formed as a result of the transfer is the first design program. From your business planning, bid preparation of your file, you will make the cost of construction of treatment plants to know the real figures that meets all your needs .. AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 13. 13 Wastewater Treatment Plant Final Total Discovery on the one hand, the cost of other .. $ Basis, how much profit or how much more can be subtracted you can instantly ...! Discovery Amount Prepared discovery page taken from the plant's Works Unit Price and issued bid is the price. Cost Amount construction material costs, labor costs, transportation, Mechanical Equipment and installation costs, piping and pump installation materials and installation costs, electrical and instrumentation equipment and installation cost covers. Amount of Amount of Cost of snow Days of construction completion for the time Month Day of the Month was translated into the state. Construction Area Sizing page specified in the total construction area m² Person / Cost / $ $ Some in the per capita discovery volume and cost amount .. Flow System into Wastewater Flow cum / h Total Treatment Plant Exploration and cost totals £ Total $ Treatment Plant Exploration and Cost Total of $ PAGE FİNAL TOTAL Wastewater Treatment Plant Costs are the best you can track the status page. Main Page entered the project value as a result, profit and loss status, USA, $ basis price of% in the rate of profit the amount of construction, your building your time that you answer every question on this page instantly find, have the ability to be able to. ATP-1.2 saves you time, as well as your plant allows you to see real and true costs, with a few elements to create your own things and allows you to make as true. AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 14. 14 General Layaout Of Wastewater Treatment Plants ATP-1.2 was identified as a result of the construction process of account size is transferred to the plan page. In this page layout of the facility, the unit of the field, the flow chart and the construction will have the opportunity to see the total area. ATP-1.2 System Active Classic sludge or extended aeration activated sludge system, according to the system makes the solution. Log in sand taken from the grid holder, waste water from the coarse and fine sieves by passing free of coarse particles is provided. After the wastewater is contained grid-based minerals, weathering of the material was kept and easy to sand down the holder unit can be built. After the pre-sedimentation tank, the water heavier particles of the gravitational acceleration and downward settling preliminary sedimentation tank comes. Rectangular or circular, as are designed preamble, the precipitation zone, mud area and output area are available. Oxygen supplements are made with floating aerators are removed the mud from the mud tank. Distribution of the sedimentation tank with submersible pumps are enclosed structure, was built here and the Activated Sludge Process for Biological Treatment of the pool is transferred to the air. Activated sludge process, microorganisms use oxygen as organic matter decomposition developed primarily by utilizing an aerobic biological treatment system. F / M ratio, hydraulic retention time, oxygen requirement can be made automatic calculations are sized swimming pool, air-conditioning system as capacity blower and diffuser system according to calculations by making the selection is done automatically. Back up and transfer rate of the sludge in the system are determined. The next step of the last settling ponds, the pool of microorganisms (sludge) as a complete biological and sedimentary processes in a way was cleared to leave the water will be provided. The settled sludge back to the era of biological sludge level is sent as a cleaned wastewater will drain from the sediment pool. Type are designed as a circular pool. from top AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 15. 15 to bottom sediments in the foam and filling the reservoir allowing the mud 0.03 cycles / min speed mud scrapers are mounted. Drain end of the sedimentation tank in the water chlorinated pool is subjected to disinfection. The chemicals used in disinfection with chlorine disinfection is the most common. Thickening of Sewage Sludge Sludge is designed to eliminated. Concentrators is the first unit of sludge disposal unit. So that other units will be active in terms of volume depletion. With this unit gravity sedimentation of clay or light clay to face with some of the contributions is based. Circular is intended. Centrally driven and scrapers are mounted condenser. drain water from the sludge is removed from the upper left. As an optional pool accounts in sludge digestion for sludge stabilization is done automatically. Belt filters are designed to be done with sludge dewatering. sludge dewatering process, almost always a component of the mud conditions. Chemically conditioned sludge spread on the moving belt passing sıkıştırlarak plant is removed from the rolls. P&I Diagram Of Wastewater Treatments Plants ATP-1.2 Pool and Flow cross-section diagram of the facility will be used automatically as pipe diameter and length is shown on page. ATP-1.2 P & I diagrams in extemporaneous pipes, pumps sections account in accordance with the pipe diameter and type of the unit and the connection between the plan is drawn. P & I diagrams also the unit between the pipes mesafelerinide see the possibilities you can have. The pipe diameter and the amount shown here, are used to account for the cost of piping and pumps. Visual Analysis The best part of the system that you have entered the Home as a result of wastewater for immediate cross-section consisting of P & I. Have the possibility to see in your diagram. As a result of this analysis for the cross-section and may have the opportunity to review. AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 16. 16 Wastewater Treatment Plant Costs Pumping Wastewater and sludge flow into the system which according to the values calculated by the ATP-1.2 is automatically selected. Submersible, horizontal shaft centrifugal sludge pumps, drainage pumps to determine the amount and type of cals. Fast Solutions . ATP-1.2 by analyzing your needs best, fastest way to bring your program is the Wastewater Treatment Design Construction material costs ATP-1.2 calculation process unit as a result of the rough construction of a certain size Excavation Concrete + mold + Iron + automatically detects the amount and the current material prices and the price. Likewise, thin construction materials metrajıda automatically be updated material prices and priced. User requested updated material prices relevant section is to enter. The home page is entered Wastewater Values neticeside how much cement, how much iron and how the tiles with sealing tape to use the instant opportunity to have a can .. Construction labor costs ATP-1.2 with the mold, iron, concrete labor and opportunity to have the labor-date rates to the appropriate section to enter is enough. Similarly, thin construction worker the amount and the amount of visual possibilities are available. Rough construction labor cost and fine construction labor costs separately issued is. AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 17. 17 Manufacture Of Mechanical Wastewater Treatment Plants Transportations ATP-1.2 Wastewater Plant Design Program during the construction cost of shipping the materials you need to do to make their account information you are presented to users. Mekhanical Equipment ATP-1.2 Wastewater Design Program Facility unit basis, you should use all the equipment to calculate automatically, and kW, diameter, Q Flow, değerlerinide shows. Price certifications automatically as the market price of $ on the basis of the evaluation of ATP-1.2 by the automatic yapılır.kullanıcı only the main page update Enter $ value is sufficient. Moreover, mechanical equipment, the prices given a coefficient multiplied by the diminution or decrease if requested, "Coefficient" button for the desired coefficient by entering all the equipments rates available request will be adjusted to. If the mechanical equipment prices some of the price change if desired, changing thinking of the equipment next to "BF" button Clicking only that the equipment price change. In addition to the Mechanical Equipment section if you want to add new equipment, "Y.E" Button is clicked and the form comes up when you enter the requested equipment specifications and prices are AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 18. 18 Wastewater Treatment Plant Electrical Instrument Manufacturing Electrical Equipment ATP-1.2 Wastewater Design Program Facility unit basis, you should use all the power-Instrument equipment to calculate automatically, and hp, m, capacity değerlerinide shows. Price certifications. User's unit price section enters into the Bay-see and TEDAŞ rates also Mechanical Equipment section, a new If you want to add equipment, "EY" Button is clicked and the form comes up when you enter the requested equipment specifications and prices are AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 19. 19 130 M3/H 1 SIRA EKİP.NO TOPLAM KW/ADET TOP.GÜÇ DEVREDEKİ 1 H-102 1 1,10 1,10 1,10 2 Z-102 1 0,55 0,55 0,55 3 P-103/A 1 0,75 0,75 0,75 4 F-103 1 1,50 1,50 1,50 5 Z-105 1 2,20 2,20 2,20 6 P-104 3 22,00 66,00 44,00 7 P-104/1 1 0,75 0,75 0,75 8 Z-104 1 1,10 1,10 0,55 9 B-AP 1 4,33 4,33 3,03 10 LT 102 1 0,05 0,05 0,05 11 FT 102 1 0,05 0,05 0,05 12 L1 1 0,54 0,54 0,27 13 L3 1 0,30 0,30 0,15 14 YR 104/1 1 2,00 2,00 0,00 81,22 54,95 1 0,5 TOPLAM KURULU GÜÇ (kW) 1 1 1 2 İŞLETME GÜCÜ (kW) 0,7 1 1 0,5 0,5 DEBİMETRE AYDINLATMA 220 V PRİZ YEDEK DRENAJ POMPASI MONORAY VİNÇ DIŞ AYDINLATMA SEVİYE ÖLÇÜM LT 104 KUM TUTUCU POMPASI KUM TUTUCU KÖPRÜSÜ KUM AYIRICI GİRİŞ POMPALARI DEVREDEKİ ANMA GÜCÜ MEKANİK TEMİZLEMELİ İNCE IZGARA BANT KONVEYÖR 1 1 PANO YERİ BSLNCK ÜNİT EKİPMAN ADI MİKTAR ADET ÖN ARITMA BÖLÜMÜ İNCE IZGARA TERFİ POMPALARI ADET ELEKTRİK GÜÇ HESAPLARI TESİS ADI PANO İSMİ BESLEN.PANO YENİ KARPUZLU ATIKSU ARITMA TESİSİ MCC 1 AG PANOSU NO KABLO NO POZ NO MOTOR YOL MESAFE KABLO MOTOR DÜZ. GÜÇ KW VERME MT CİNSİ ANMA FAK. 1 AG PANOSU P1 AG PANOSU 350,00 1 TRAFO AG PANOSU 50,00 NYY-J 1 530,3025 1 2 AG PANOSU P1 AG PANOSU 300,00 1 GENERATÖR AG PANOSU 10,00 NYY-J 1 454,55 1 3 MCC 1 MCC 1 54,95 1 AG PANOSU MCC 1 29,50 NYY-J 0,8 104,07 0,85 4 MCC 2 MCC 2 49,68 1 AG PANOSU MCC 2 5,00 NYY-J 0,8 94,09 0,85 5 MCC 3 MCC 3 62,80 1 AG PANOSU MCC 3 22,23 NYY-J 0,8 118,94 0,85 6 MCC 4 MCC 4 28,72 1 AG PANOSU MCC 4 12,12 NYY-J 0,8 54,38 0,85 7 H-102 H-102 1,10 1 MCC 1 H-102 25,00 NYY-J 0,8 2,08 0,85 8 Z-102 Z-102 0,55 1 MCC 1 Z-102 25,00 NYY-J 0,8 1,04 0,85 9 P-103/A P-103/A 0,75 1 MCC 1 P-103/A 20,00 NYY-J 0,8 1,42 0,85 10 F-103 F-103 1,50 1 MCC 1 F-103 20,00 NYY-J 0,8 2,84 0,85 11 Z-105 Z-105 2,20 1 MCC 1 Z-105 25,00 NYY-J 0,8 4,17 0,85 12 P-104 P-104 22,00 2 MCC 1 P-104 5,00 NYY-J 0,8 41,67 0,85 13 P-104 P-104 22,00 2 MCC 1 P-104 5,00 NYY-J 0,8 41,67 0,85 14 P-104 P-104 22,00 2 MCC 1 P-104 5,00 NYY-J 0,8 41,67 0,85 15 P-104/1 P-104/1 0,75 1 MCC 1 P-104/1 5,00 NYY-J 0,8 1,42 0,85 16 Z-104 Z-104 1,10 1 MCC 1 Z-104 5,00 NYY-J 0,8 2,08 0,85 17 B-AP B-AP 4,33 1 MCC 1 B-AP 60,00 NYM 0,8 8,20 0,85 18 LT 102 LT 102 0,05 1 MCC 1 LT 102 10,00 NYY-J 0,8 0,09 0,85 19 FT 102 FT 102 0,05 1 MCC 1 FT 102 10,00 NYY-J 0,8 0,09 0,85 20 L1 L1 0,54 1 MCC 1 L1 4,00 NYM 0,8 1,02 0,85 21 L3 L3 0,30 1 MCC 1 L3 4,00 NYM 0,8 0,57 0,85 22 F 105 F 105 15,00 2 MCC 2 F 105 25,00 NYY-J 0,8 28,41 0,85 23 F 107 F 107 11,00 1 MCC 2 F 107 76,78 NYY-J 0,8 20,83 0,85 24 F 109 F 109 0,37 1 MCC 2 F 109 39,20 NYY-J 0,8 0,70 0,85 25 P 111 P 111 0,75 1 MCC 2 P 111 15,00 NYY-J 0,8 1,42 0,85 26 L1 L1 0,42 1 MCC 2 L1 3,00 NYM 0,8 0,80 0,85 27 L2 L2 0,30 1 MCC 2 L2 3,00 NYM 0,8 0,57 0,85 28 AE 107/1 AE 107/1 0,10 1 MCC 2 AE 107/1 30,31 NYY-J 0,8 0,19 0,85 29 AE 107/2 AE 107/2 0,10 1 MCC 2 AE 107/2 34,35 NYY-J 0,8 0,19 0,85 30 P 103 P 103 5,50 1 MCC 2 P 103 25,00 NYY-J 0,8 10,42 0,85 31 P-110/1 P-110/1 22,00 2 MCC 3 P-110/1 5,00 NYY-J 0,8 41,67 0,85 32 P-110/1 P-110/1 22,00 2 MCC 3 P-110/1 5,00 NYY-J 0,8 41,67 0,85 33 P-110/1 P-110/1 22,00 2 MCC 3 P-110/1 5,00 NYY-J 0,8 41,67 0,85 34 P-110/2 P-110/2 5,50 1 MCC 3 P-110/2 5,00 NYY-J 0,8 10,42 0,85 35 P-110/2 P-110/2 5,50 1 MCC 3 P-110/2 5,00 NYY-J 0,8 10,42 0,85 36 P-110/3 P-110/3 0,75 1 MCC 3 P-110/3 5,00 NYY-J 0,8 1,42 0,85 37 I-AP I-AP 21,76 1 MCC 3 I-AP 19,80 NYY-J 0,8 41,21 0,85 38 L1 L1 0,54 1 MCC 3 L1 3,00 NYM 0,8 1,02 0,85 39 L2 L2 0,40 1 MCC 3 L2 3,00 NYM 0,8 0,76 0,85 40 L3 L3 0,30 1 MCC 3 L3 3,00 NYM 0,8 0,57 0,85 41 LT110 LT110 0,05 1 MCC 3 LT110 10,00 NYY-J 0,8 0,09 0,85 42 F 112/1 F 112/1 0,55 1 MCC 4 F 112/1 10,00 NYY-J 0,8 1,04 0,85 43 T 112 T 112 0,55 1 MCC 4 T 112 10,00 NYY-J 0,8 1,04 0,85 44 F 112/2 F 112/2 0,18 1 MCC 4 F 112/2 10,00 NYY-J 0,8 0,34 0,85 45 P 112 P 112 0,18 1 MCC 4 P 112 10,00 NYY-J 0,8 0,34 0,85 46 Z 112 Z 112 0,55 1 MCC 4 Z 112 10,00 NYY-J 0,8 1,04 0,85 47 Z 112/1 Z 112/1 2,05 1 MCC 4 Z 112/1 10,00 NYY-J 0,8 3,88 0,85 48 C 112 C 112 0,55 1 MCC 4 C 112 10,00 NYY-J 0,8 1,04 0,85 49 P 112/2 P 112/2 5,50 1 MCC 4 P 112/2 10,00 NYY-J 0,8 10,42 0,85 50 F 114 F 114 0,37 1 MCC 4 F 114 34,35 NYY-J 0,8 0,70 0,85 51 P 114 P 114 18,50 2 MCC 4 P 114 30,31 NYY-J 0,8 35,04 0,85 52 L1 L1 0,62 1 MCC 4 L1 3,00 NYM 0,8 1,17 0,85 MOTOR İSMİ NERDEN NEREYE MEKANİK TEMİZLEMELİ İNCE KABLO KESİTİ COS 2(3x150/70) 2(3x150/70) 3x25 3x25 3x50+25 3x16 4x1,5 4x1,5 4x1,5 4x1,5 4x2,5 4x10 4x10 4x10 4x1,5 4x1,5 4x2,5 4x1,5 4x1,5 4x1,5 4x1,5 4x4 4x4 4x1,5 4x1,5 4x1,5 4x1,5 4x1,5 4x1,5 4x2,5 4x10 4x10 4x10 4x2,5 4x2,5 4x1,5 4x10 4x1,5 4x1,5 4x1,5 4x1,5 4x1,5 4x1,5 4x1,5 4x1,5 4x1,5 4x2,5 4x1,5 4x2,5 4x1,5 4x4 4x1,5 KUVVET KABLO HESAPLARI TRAFO GENERATÖR MCC 1 PANO BESLEMESİ MCC 2 PANO BESLEMESİ MCC 3 PANO BESLEMESİ MCC 4 PANO BESLEMESİ BANT KONVEYÖR KUM TUTUCU POMPASI KUM TUTUCU KÖPRÜSÜ KUM AYIRICI GİRİŞ POMPALARI GİRİŞ POMPALARI GİRİŞ POMPALARI DRENAJ POMPASI MONORAY VİNÇ DIŞ AYDINLATMA SEVİYE ÖLÇÜM LT 104 DEBİMETRE AYDINLATMA 220 V PRİZ DUBALI AERATÖR KARIŞTIRIC BLOWER SİSTEMİ SIYIRICILAR DRENAJ POMPASI AYDINLATMA 220 V PRİZ OKSİJEN ÖLÇÜM BESLEME OKSİJEN ÖLÇÜM BESLEME ÖNÇÖKELTME DALGIÇ POMP GERİ DEVİR POMPALARI GERİ DEVİR POMPALARI GERİ DEVİR POMPALARI FAZLA ÇAMUR POMPALARI FAZLA ÇAMUR POMPALARI DRENAJ POMPASI İDARE BİNA PANO BESLEME AYDINLATMA 220 V AYDINLATMA 220 V PRİZ SEVİYE ÖLÇÜM LT 110 STATİK MİKSER BELT FİLTRE POLİELEKTROLİT HAZ. KARIŞ POLİELEKTROLİT DOZ. POMP BANT KONVEYÖR MONORAY VİNÇ KOMPRESÖR HİDROFOR YOĞUNLAŞTIRCI YOĞUN ÇAMUR POMPASI AYDINLATMA 220 V Electrical Instrument. ATP-1.2 Waste Design Program of the electrical power system calculations, the total amount of energy needed to automatically determine Generator transformer ATP-1.2 Wastewater Design Program of the system that need it the transformer capacity and automatically determines the need for generators. Power Cables ATP-1.2 Wastewater Design Program of the system with power control cables Instrument Information Sheet kablove instant account automatically by the amount of cable sections and instruments and makes the determination. Control Cables Command and Control Cable Instrument cable account to the relevant units of distance from the main AKEP board considering doing the accounts, and determine the cross section takes place in the table
  • 20. 20 Wastewater Treatment Plant Electrical Instrument Costs TOPLAM 3.867,33 GÜÇ KABLO KUMANDA KABLO DIŞ AYDINLATMA ENERJİ NAKİL HATTI , TRAFO POSTASI,ENSTRUMAN,PANO,AG GÜÇ VE KUMANDO KABLO POZ NO MİKTARIİŞİN NEVİ BİRİMİ BİRİM FİYAT TUTARI EÖBF15 Enerji Nakil Hattı m 1 8.348,40 8.348,40 31 4 2 12 400 kVA Direğe Güç Trafosu Adet 1 39.534,75 39.534,75 13.620,63 13.620,63 4.037,85 8.075,70 EÖBF01 Debi Ölçüm Seti EÖBF02 Seviye Ölçüm Seti Adet 2 Adet 1 EÖBF03 Oksijen Ölçer Adet 2 95,85 287,55 EÖBF04 6 Kanallı Yazıcı Adet 1 3.824,55 7.649,10 1.837,35 1.837,35 101,25 303,75 EÖBF05 Armut Tip Seviye Anahtarı EÖBF06 Armut Tip Seviye Anahtarı Seviye Ayarlı Adet 3 Adet 3 EÖBF07 Zaman Kontrol Cihazı Tek Adet 1 7.103,70 7.103,70 EÖBF08 Zaman Kontrol Cihazı Çift Adet 1 95,85 95,85 144,45 144,45 19.920,60 19.920,60 EÖBF09 AKEP Panosu EÖBF10 A.G.Panosu Adet 1 Adet 1 EÖBF11 MCC1 Panosu Adet 1 3.923,10 3.923,10 EÖBF12 MCC2 Panosu Adet 1 4.966,65 4.966,65 11.994,75 11.994,75 3.773,25 3.773,25 EÖBF13 MCC3 Panosu EÖBF14 MCC4 Panosu Adet 1 Adet 1 135,72 8.143,20 M TOPLAM 131.579,58 10,85 374,32 2(3x150/70) NYY KABLO 3x25 NYY KABLO M 34,50 M 60,00 4x10 NYY KABLO M 49,80 1,612 225,68 4x4 NYY KABLO M 132,09 5,62 279,88 2,42 319,65 1,096 416,70 4x2,5 NYY KABLO 4x1,5 NYY KABLO M 380,20 M 140,00 3x16 NYY KABLO M 12,12 6,88 83,41 TOPLAM 9.842,84 10,39 1.322,5630x1,5 TTR KABLO 127,29 21x1,5 TTR KABLO 138,53 2,45 49,00 10x1,5 TTR KABLO 28,29 7,34 1.016,78 3,7 104,66 1,096 54,80 7x1,5 TTR KABLO 4x1,5 NYY KABLO 50,00 20,00 3x1,5 NYY KABLO 384,59 0,929 50,63 2x1,5 NYY KABLO 430,29 0,865 332,67 0,675 290,44 TOPLAM 3.221,55 2x2,5 NYY KABLO 54,50 782-102 GLVNZ.KABLO RAFI KG 468,76 4,10 41,00 201-208 2'' GALVANİZLİ BORU MT 391,98 5,97 2.798,47 10,80 4.233,35 5,50 266,71 204-204 50 LİK PVC BORU 204-211 110 LUK PVC BORU MT 48,49 MT 10,00 ÖZEL1 TOPRAK KANAL MT 78,40 TOPLAM 13.172,31 ÖZEL2 BETON KANAL MT 60,62 11,00 862,35 82,00 4.970,43 94,94 372,145 6 3 1 AD1 8/1 GLVNZ AYDINLATMA DİREĞİ ADET 4 5 6 3 2 AD1 8/2 GLVNZ AYDINLATMA DİREĞİ ADET 2 4,36 49,64 20 4 CİVA BUHARLI ARMATÜR ADET 11 105,03 258,90 58,66 667,83 15,02 631,24 20 6 CİVA BUHARLI AMPÜL 32 1 1 2x2,5 NYY KABLO TOPRAĞA GÖMME MT 42,03 ADET 11 32 1 2 3x2,5 NYY KABLO TOPRAĞA GÖMME MT 32,33 3,39 138,19 32 1 3 4x2,5 NYY KABLO TOPRAĞA GÖMME MT 43,24 15,43 498,82 15,64 676,25 3,39 58,91 32 1 4 3x2,5 DİREK ÇIKIŞLARI 32 12 1 3x2,5 NYY KABLO KANALDA MT 17,38 ADET 41 32 12 2 4x2,5 NYY KABLO KANALDA MT 11,72 8,40 95,63 32 12 3 1x4 NYY KABLO KANALDA MT 129,31 3,60 42,19 2,92 377,59 30 2 1 TOPRAKLAMA LEVHASI ADET 11 Electricity Cost: ATP-1.2 Wastewater Design Program of the facility in need of transformers, generators, panels, power and control cables, Instruments cost specified in the pricing makes. This page will be used in the materials the total list, as is also the only unit prices, current Cable and instrument pricing using The discovery will be removed. Instrument Costs: Again, calculations automatically configure the system's instrument list and pricing in this table is located see, the ATP-1.2 employers, contractors, engineers of friends needed a treatment system must be calculated each unit and the material automatically calculated against the offer to observe are .. The rest your job is not to know. New Electric Equipment: ATP-1.2 Electrical Equipment section if you want to add new equipment, "EY" Button is clicked and the form comes up when you enter the requested equipment specifications and prices are AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 21. 21 Piping and Plumbing: ATP-1.2 program, Water Treatment Plant design calculations purification unit lines and other details are settled, then along the pipeline friction and treatment units in the losses taken into account the pipe and hydraulic calculations performed by the unit between the pipe diameters and lengths are determined. Adding new pipeline: ATP-1.2 program automatically accounts, as did all the pipeline in addition to be added by the user has the ability to enter new lines. AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 22. 22 Wastewater Treatment Plant Unit Prices Ministry of Public Works of the exposure unit price pages, ONE has a bra and pose EÖBF user changing prices each year is enough to enter this page. Design Calculations: Design calculations of the ATP-1.2 program. Wastewater Treatment Plant project, according to bank standards and provinces does all the calculations. This process design, hydraulic, Department of Electrical and Instrument ACCOUNTS accounts have the opportunity to see and it is getting out. Material and labor prices: current material and labor prices are entered in this section. AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 23. 23 AutoCAD Drawing: ATP-1.2 with the program design has been completed the unit the size of the final you've Dimensions section in the size of the AutoCAD drawing page onto the button and all sizes will be transferred and the draw is the syfasından all unit plans and sections of AutoCAD automatically, and scale drawings are made. AutoCAD Drawing is a page : ATP-1.2 program and the size department AutoCAD's draw page, and transferred to the size of the relevant page in the drawing to be desired section next to the draw is the button is clicked next to the appropriate unit coordinate page revenue. Here is drawn from AutoCAD asks for the user when the x coordinate since the mouse approximately 10-15 seconds if you press the X button after the waiting period occurs in the lower right corner of the AutoCAD files with Emblem. by passing the required examinations will be made to this file. AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 24. 24 AutoCAD Drawing: ATP-1.2 program, plan drawings of the unit 1 / 100 scale, AutoCAD will automatically draw. AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 25. 25 Environmental Engineers, Civil Engineers, Mechanical and Electrical Engineers, Contractors and sub-contractors for Water Treatment Plant Wastewater Treatment Plant Design 1.2 ATP, a great convenience which allows the program are to help. Sincerely, Civil Engineer Hasan GÖRKEY AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm
  • 26. 26 AAAtttppp111...222 vvviiidddeeeooo ppprrreeesssaaannntttaaatttiiiooonnn YouTube : https://youtu.be/9ZQwXOgyuvE CCCooommmmmmuuunnniiicccaaatttiiiooonnn ATP 1.2 Wastewater Treatment Plant design software to get the following e-mail or phone contact can be established. Computer Assisted Programs e-mail : atp1demo@hotmail.com e-mail : hgky@hotmail.com www.atptoautocad.com GSM :+90 532 2682323 AAAtttppp 111...222 WWWaaasssttteeewwwaaattteeerrr TTTrrreeeaaatttmmmeeennnttt PPPlllaaannnttt DDDeeesssiiigggnnn PPPrrrooogggrrraaammm