Resume 
Ashwani Kumar 
Mobile No: +919908996779 
Email: ashwani.k21@gmail.com 
ashwani.j21@rediffmail.com 
ashwani.k2020@gmail.com 
Blog: http://ashwanikumar2020.blogspot.com/ 
LinkedIn: https://www.linkedin.com/pub/ashwani-kumar/27/2bb/0 
PROFESSIONAL SUMMARY: 
 9.6 years of experience in Software Testing and Implementation on various 
domains like Telecom & Communication, Networking, Insurance, Banking, 
Finance, E-Learning, Retail, Real Estate, Mobile, Travel & Hospitality, 
Ecommerce, HRMS, Logistics, Marketing, Media,CRM,ERP and Health 
Care. 
 5.0+ years of Experience as Leading Team 
 7.0+ years of experience in Automation Testing using Selenium, Grid, Web 
driver, QTP and SoapUI Tools. 
 5.0 years of experience in Selenium,Grid, Web driver 
 1.0 year of experience in QTP 
 1.0 year of experience in SoapUI Tool for web services testing 
 2.6 years of experience in Performance Testing using Jmeter tool. 
 9.6 years of experience in Manual Testing. 
 2.0+ years of Experience in Mobile application testing using Android, iOS, 
Windows and Blackberry platforms. 
 Good exposure in writing and executing the complex SQL queries. 
 Experience in Cloud testing using Amazon EC2 and Blazemeter. 
 Expertise in designing test automation frameworks like Datadriven, 
Keyword Driven, Hybrid, Page Object Model and Behaviour Driven 
Development (BDD) Frameworks. 
 An individual contributor and capable to handle and automate a complex 
application without any help and support. 
 Involved in UAT and production sanity testing. 
 Given Selenium Test Automation Training to various team members 
 Certified Internal Auditor on QMS as per ISO 9001:2008 Standard from 
DNV(DET NORSKE VERITAS) 
 Successfully handled multiple projects and teams parallel. 
 Strong leadership quality and managed a team of 25 members and capable to 
handle bigger team. 
 Visited to onsite at client location Vancouver, Canada in 2012. 
 Worked as QMS/SQA group for CMMi and ISO quality process 
 Documented ISO & CMMi documents and attended the ISO and CMMi internal 
audit as auditor and auditee.
 Coordinating with business analyst, developers and testers on development and 
testing of features and maintenance releases 
 Coordinating with project manager and engagement manager 
 Excellent in technology and good understanding of Web Server, App 
Server,Middleware and database servers. 
 Identifying the client needs and doing POCs, working on RFP, RFI etc. 
 Demonstrated abilities in handling projects independently, analyzing the client 
requirements, translating new ideas into clients solutions include opportunity 
identification, requirements development, delivery, support & analysis and 
documentation. 
 Experience in Test & Project Management i.e. manages people, process, tools, 
quality, schedule, infrastructure and knowledge management, vendor management 
for delivery within budget and time limits. 
 Good understanding of Web Services, Managing Test environments, Build 
deployment etc. 
 Strong foundation in Test Automation and Performance Testing. 
 Worked on Client-server and Web-based/Enterprise applications. 
 Extensively Performed Functional and Non Functional Testing, Manual Testing, 
Database Testing, GUI Testing, Mobile Testing, Usability Testing, Integration 
Testing, System Testing, Regression Testing, Smoke Testing, User Acceptance 
Testing, Performance Testing, Load Testing, Stress Testing, Endurance Testing, 
Spike Testing, Capacity Testing and Scalability Testing . 
 Single technical point of contact as a Test Lead from testing perspective for a 
release/feature/testing phase. 
 Created the Test Plan, Test Strategy for the Releases and Project. 
 Prepare & Review Test case matrix. 
 Write & Review Test cases, test conditions, pre-requisites. 
 Ensure that all KT sessions from development to testing are organized and within 
schedule. 
 Plan Environment setup and pre-configuration requirements for the features to be 
tested. 
 Attend handoff from development/IT for the enhancement. 
 Provide technical support to the Enhancement test leads and testers. 
 Identify and resolve issues during the test execution. 
 Ensure compliance to documented process during the planning and execution 
phases. 
 Responsible for setting up daily assignments based on the TRs turned around by 
the development team and the available functionalities that can be tested. 
 Monitor and track the test execution progress on daily basis to ensure that testing 
is advancing as scheduled. 
 Participate as needed in project closure activities & prepare Test Completion 
Report. 
 Work with Manager on Continuous process improvement, Utilization of 
resources, Test Metrics & Strategies & Org/dept Goals.
 Provide the leadership, strategy and tactical expertise to translate the opportunity 
into real bottom line value added that is tangible and can be measured. 
 Good experience in reporting Bug/Defects. 
 Strong working experience in Open Source Automation Testing Tools like 
Selenium, Webdriver, Sikuli, Robot, Flex Monkey, TestNG, Ant and Autoit, etc. 
 Experience in an onsite-offshore model. 
 Having strong experience in driving the complete Testing Cycle right from the 
requirement analysis stage till production check out. 
 Exposed to ISO and CMMi processes 
 Exposed to Waterfall, V-Model and Scrum/Agile Model. 
 Extensive experience in using Build Management / CI / Deployment Tools such 
as Jenkins , Hudson, SVN, GitHub. 
 Having exposed to SDLC, STLC and testing methodologies. 
 Good experience in Database Testing (SQL) and querying the database to check 
Successful transactions. 
 Strong Experience in test management and Bug Reporting tools like Quality 
Center, BugZilla, Jira, Eventum, Test Link, Mantis, RTH, Trac,Redmine and 
Xstudio. 
 Knowledge in Security Testing. 
 Strong experience in testing of the SOA/Web services/API based application. 
 Involved in Web Services testing. 
 Strong Experience in SOA technologies Like: ESB, WE, WSDL, UDDI, SOAP, 
XML. 
 High degree of flexibility and ability to adapt to change in direction. 
 Has flair to adapt to new software technologies, self-starter, good communication 
and interpersonal skills and documentations skills. 
CORE COMPETENCIES INVOLVEMENT: 
LEADERSHIP: 
 Test Management/ Project Management, Vendor Management, Resource 
Management, Gap Analysis, Release Management. 
 Providing Presales support to higher management & sales team. 
 Mentoring the existing team & new resources across the projects. 
 Mapping client's requirements & providing best solutions involving evaluation & 
definition of scope and finalizing project requirements. 
 Managing stakeholders, risks, issues, quality, project controls and resources. 
 Holding review meetings to monitor progress of the project as per schedule / budgets, 
and ensuring timely completion and delivery of the project to the client, extending 
production support of multiple applications. 
 Handling resource allocations and setting up communication channels across the 
various horizons of the organization structure. 
 Managing large / multidisciplinary teams, recruiting, mentoring, coaching and 
developing project teams after evaluating the project scope.
FUNCTIONAL: 
 Defining Test Scope, Preparing Test Lab, Preparing test strategy at account / project 
level and participating in test planning, test cases design & end to end testing 
Introducing techniques/ processes new to the Organization and also Profitable to the 
Project & Client. 
 Providing testing services in an offshore-onshore integrated delivery model and 
helping to increase the delivery of testing work from offshore by cost effective testing 
services. 
 Handling the capability development within testing group by participating in 
recruitment process and conducting interviews, building teams (both at Onsite & 
offshore). 
AUTOMATION TESTING: 
 Guiding the client & Project Management on Test Automation. 
 Evaluating the tools for Automation testing for functional requirements. 
 Designed Hybrid Framework using open source tools like Hudson, Selenium 
RC,Webdriver,Selenium Grid,Sikuli,Autoit,Ant,TestLink,Eventum and SVN.This 
framework is 100% reusable and robust. 
 Used Selenium, Webdriver, Sikuli, Robot, Flex Monkey, Autoit and QTP for 
Functional Testing.TestLink, Quality Center, BugZilla, Eventum, Jira, Mantis etc, as 
test management and defect reporting tools. 
PERFORMANCE TESTING: 
 Guiding the client & Project Management on Performance Test. 
 Evaluating the tools for Performance testing for non functional requirements. 
 Expertise in performance testing of Http/Https based web applications 
 Good understanding of client and server side performance metrics. 
 Proficient in generating customized reports for Jmeter tool. 
 Proficient in Performance Testing in Cloud using Blazemeter and Amazon. 
WORK EXPERIENCE: 
· Currently working with Maven Wave Partners, Chandigarh, India as QA 
Lead from 20th Nov -2014 to till date. 
· Worked with Spectraforce Technologies Ltd., Hyderabad, India as Senior 
Test Lead from 3rd Sept -2012 to 10th Nov -2014. 
· Worked with Cigniti Technologies Ltd (Formerly known as Chakkilam 
InfoTech Ltd.), Hyderabad, India as Test Lead from 1st June-2010 to 7th 
August-2012. 
· Worked with Keane India Ltd., Hyderabad, India as SSE (QA) from 16th – 
May - 2005 to 31st - May – 2010. 
EDUCATIONAL QUALIFICATION: 
· B.Tech in Computer Science and Engineering from Dr. Kedar Nath Modi Institute 
of Engineering and Technology,Modinagar,Ghaziabad(U.P.) affiliated to Uttar
Pradesh Technical University,Lucknow,India (2005,66.6%). 
· 12th from U.P. Board, India (1998, 71%). 
· 10th from U.P. Board, India (1996, 72%). 
TECHNOLOGY AWARENESS: 
· Testing: Manual Testing, Functional Testing, Database Testing, Web Services Testing, 
Mobile Testing, Automation and Performance Testing. 
· Testing Tools: Selenium IDE, Selenium RC, Selenium GRID, Webdriver, Eclipse, 
TestNG, TestNG-Xslt, Ant, Junit, ReportNG, Hudson, Jenkins, Sikuli, Robot, Flex 
Monkey, Autoit,QTP,Load Runner, Quality Center, Test Director, TestLink,Jira, 
Eventum,Mantis, BugZilla, Testopia, Xstudio, RTH, SoapUI, SoapUIPro, JMeter, 
Ranorex, Firebug. 
· Other Tools: SVN, XMLSPY, VPN, Citrix, VSS,Git. 
· Programming Languages: C, C++, JAVA, VBScript, JavaScript and MS.NET. 
· Web Technologies: HTML, CSS, XML, SOAP,LAMP,Drupal,CMS,JSP,Sitecore. 
· Database: ORACLE, SQL, MS-ACCESS, SQL Server, PL/SQL, TOAD. 
· Operating Systems: Windows 98/XP/Vista/7/8, Mac, LINUX, UNIX. 
· Computer Application: MS-OFFICE. 
SOFTWARE PROJECTS: 
Project 
PROJECT Name: Reportory 
DESCRIPTION: Reportory lets you pick which news sources you read, which 
sections you enjoy, and which keywords you want to track. Each day you will then 
receive your customized news, only from those sources, topics and keywords … no 
two news digests are alike! Receive your news in your inbox each morning, or simply 
log in online or via your mobile to read on-the-go. As your news preferences change, 
simply update your settings and your next news digest will update accordingly. 
Tools: Spectraforce Project Portal, Jmeter,Webdriver, Jenkins, Test Link, 
Mantis,SoapUI, 
iPhone,iPad,Samsung Galaxy,etc. 
Environment: Windows7, iOS,Android 
Technologies: LAMP and Drupal Technologies, SCRUM/Agile development 
Types of Testing: Manual Functional Testing, Regression Testing, Integration 
Testing, System Testing, Browser Compatibility and Platform compatibility Testing, 
Web Services Testing, Test Automation, Mobile Application Testing and Performance 
Testing 
Duration: 4 months 
TESTING TEAM SIZE: 3 
DEV TEAM SIZE: 3 
ROLE IN THE PROJECT: Worked as Sr. Test Lead and Individual Contributor 
RESPONSIBILITIES: 
· Involved in gathering the requirements, analysis and understanding the 
existing/new systems. Closely worked with business analyst for finalizing the
business rules and requirements. 
· Closely worked with designer for creating the mockup/wireframe screens and 
followup. 
· Understanding and review of the functional and system requirements. 
· Creating SOW,Proposal, Scope finalizing, Project Plan,Test Plan, Test Strategy 
Plan, Project Estimations, RTM,Test Cases,etc. 
· Created product backlog and sprint backlog based on the priority of the work. 
· Keep regular contacts with Onsite Team and handling the offshore team. 
· Involved in writing Manual Test cases and executing them as well as reporting 
defects. 
· Environment setup and Automation Framework designing. 
· Scripted and automated scenarios using selenium Web driver. 
· Mentoring team and guiding them for designing, executing the automation 
scripts and defect reporting for automation scenarios. 
· Created performance testing scripts using Jmeter and did load testing with 
different number of user load. 
· Analysis of results and creating performance report.Given suggestions to 
development and DB team for performance tunning. 
· Involved in UAT and production sanity testing. 
· Defect reporting and ensuring defects gathering, verification, validation of 
reported defects, Close and analyze the defects. 
· Creating and sharing QA reports to entire team and worked closely with 
developers to fix the defects. 
· Tested web services using SoapUI tool. 
· Involved in end to end testing activities. 
· Created Release Notes and sharing to stake holders. 
· Identified the work priority, Review the deliverables and ensure that all the 
processes have been followed before delivery to the client. 
· Resolved technical issues, Mentor team members at offshore and helping 
them for any queries. 
· Mentor team members to continuously improve quality, Conducted Peer 
Review, Analyze Verification results/ peer review data, Plan for Testing. 
· Involved in defect triage, conducting daily Scrum status meeting call with 
onshore and offshore teams. 
· Keep regular contacts with clients over phone/Skype/email and identified the 
work priority. 
· Sending daily status updates to stakeholders. 
· Creating Weekly, Monthly Status Reports and sharing to stakeholders. 
· Participating in monthly steering committee meeting. 
Project 
PROJECT Name: PASSPORT 
DESCRIPTION: 1-800-PACK-RAT, LLC is a portable storage container and moving 
company that delivers the easiest way to move and/or store customer’s material 
based on the miles, various applications have been designed for Packrat. Passport is 
one of the web applications used within Packrat’s Storage and Logistics Domain. It is 
designed to create, search, and manage customers, quotes and orders. It is a web 
application for the call centers agents will utilize to sell, quote, schedule all the 
touches for Local, Long Distance and Trailer Moves.
Tools: Spectraforce Project Portal, Google Docs, Web driver, Jmeter,Hudson, Test 
Link, Mantis,SoapUI 
Environment: Windows7, IIS 
Technologies: Microsoft Technologies, Sql Server, SCRUM/Agile development 
Types of Testing: Manual Functional Testing, Regression Testing, Integration 
Testing, System Testing, Browser Compatibility Testing, Web Services Testing, Test 
Automation, Mobile Application Testing and Performance Testing 
Duration: 12 months 
TESTING TEAM SIZE: 3 
DEV TEAM SIZE: 6 
ROLE IN THE PROJECT: Worked as Sr. Test Lead and Individual Contributor. 
RESPONSIBILITIES: Same as the above project roles and responsibilities. 
Project 
PROJECT Name: BeverageIO 
DESCRIPTION: BeverageIO is a web application and developed to cater the order 
processing needs of Distributors & Retailers associated with beverage distribution. 
The application acts as a centralized platform for order processing between Retailers 
& Distributors and allows the Retailers to place orders to Distributors. Main modules 
are Dashboard,Sales,Orders,Reports,Promotions,Accounts,Retailer,Payments,Search 
Customer Notes,Distributor,Roles and Permissions,etc. 
Tools: Google Docs, Test Link, Mantis. 
Environment: Windows7, 
Technologies: LAMP Technologies, HTML5, Angularjs & Bootstrap UI framework, 
SCRUM/Agile development 
Types of Testing: Manual Testing, Browser Compatibility Testing 
Duration: 4 months 
TESTING TEAM SIZE: 3 
DEV TEAM SIZE: 3 
ROLE IN THE PROJECT: Worked as Sr. Test Lead and Individual Contributor. 
RESPONSIBILITIES: Understanding and review of the functional and system 
requirements. Prepared Test Plan, Test Strategy Plan, Keep regular contacts with 
Onsite Team and handling the offshore team. Involved in writing Manual Test cases 
and executing them as well as reporting defects. Creating and sharing QA reports to 
entire team and worked closely with developers to fix the defects. Identified the work 
priority, Review the deliverables and ensure that all the processes have been 
followed before delivery to the client, Resolved technical issues, Mentor team 
members at offshore and helping them for any queries. Involved in defect triage, 
conducting weekly/daily status meeting call with onshore and offshore teams. 
Creating Monthly Status Reports and sharing to stakeholders. 
Project 
PROJECT Name: BTD(BookThatDoc) and AC(Amazing Charts Console) 
DESCRIPTION: BookThatDoc is a web application that acts as a connecting bridge 
between patients and doctors. It is designed to cater the needs of patients in finding 
the right doctor instantly and allows online booking for doctors listed on 
BookThatDoc. Main functionalities included in the BookThatDoc application are Allows 
online registration, Book appointment for doctors, Manage doctor appointments, 
Manage and maintain patient information, Ensure data storage and security, 
Accepts patient insurance, Helps patient to find the right doctor instantly, 
Schedule Appointment, Cancel an Appointment.
Amazing Charts is an EHR/EMR standalone desktop application that acts as a 
database for doctor’s details. It is installed in the Windows OS on doctor’s system. 
The main features of AC are Appointment availability, Appointment status, Doctor’s 
Calendar,Resources,Patient status,etc. 
Environment: Windows7 
Technologies: LAMP Technologies, SCRUM/Agile development 
Types of Testing: Manual Testing, Browser Compatibility Testing 
Duration: 3 months 
TESTING TEAM SIZE: 3 
DEV TEAM SIZE: 3 
ROLE IN THE PROJECT: Worked as Sr. Test Lead and Individual Contributor. 
RESPONSIBILITIES: Understanding and review of the functional and system 
requirements. Prepared Test Plan, Test Strategy Plan, Keep regular contacts with 
Onsite Team and handling the offshore team. Involved in writing Manual Test cases 
and executing them as well as reporting defects. Creating and sharing QA reports to 
entire team and worked closely with developers to fix the defects. Identified the work 
priority, Review the deliverables and ensure that all the processes have been 
followed before delivery to the client, Resolved technical issues, Mentor team 
members at offshore and helping them for any queries. Involved in defect triage, 
conducting weekly/daily status meeting call with onshore and offshore teams. 
Creating Monthly Status Reports and sharing to stakeholders. 
Project 
PROJECT Name: TUNet 
Location: Onsite, Vancouver-Burnaby, Canada 
DESCRIPTION: Tantalus provides Smart Grid communications solutions for 
Advanced Metering, Demand Response & Distribution Automation. TUNet – the 
Tantalus Utility Network – is a rapid & reliable two-way network that enables electric, 
water & gas distributors to automate processes, improve business operations and 
deliver top-tier customer service. TUNet is deployed at utilities determined to 
manage resources intelligently and meet ambitious conservation goals. 
Tools: Jira 
Environment: Linux, Oracle, Windows7 
Types of Testing: Manual Testing, Database Testing and Automation Testing using 
Perl 
Duration: 6 months 
TESTING TEAM SIZE: 4 
DEV TEAM SIZE: 10 
ROLE IN THE PROJECT: Worked as Test Lead and Individual Contributor. 
RESPONSIBILITIES: Understanding and review of the functional and system 
requirements at onsite location. Prepared Proposal, Test Plan, and Test Strategy 
Plan, Keep regular contacts with Tantalus Team and supporting the offshore team 
over phone/Team Viewer /Skype. Involved in writing Manual Test cases and 
executing them as well as reporting defects. Involved database testing. Identified the 
work priority, Review the deliverables and ensure that all the processes have been 
followed before delivery to the client, Resolve technical issues, Mentor team 
members at offshore and helping them for any queries. Conducting weekly status 
meeting call with onshore and offshore teams. 
Project 
NAME OF PROJECT: mibibo, tradus 
CLIENT: ibibo
PLATFORM: Web and Mobiles: BlackBerry, iPhone, Nokia, HTC, Samsung devices on 
different platform like Java, iOS, Symbian, Windows and Android. 
Tools: Selenium RC, Eclipse, TestNG, Sikuli 
Types of Testing: System Testing, Regression Testing, Test Automation, Manual 
Functional Mobile Application Testing and Mobile Automation Testing. 
DURATION: 4 months 
TESTING TEAM SIZE: 8 
PROJECT DESCRIPTION: ibibo is a fast growing focused Internet and mobile product 
company. They focus on Social gaming and e-commerce platforms. 
ROLE IN THE PROJECT: Worked as Test Lead and Individual Contributor. 
RESPONSIBILITIES: Understanding and review of the Functional system requirements. 
Design, develop and execute Manual Scenarios, Manual Test cases, and associated test 
data based on requirements. Defect reporting and ensuring defects gathering, verification, 
validation of reported defects, Close and analyze the defects. Creating and deliver the 
documents as per software delivery process, Created Test Strategy Documents and Test 
Plan for Functional Testing, review and baseline test plan, Obtain Client approval for 
design. Test Automation and mobile automation testing using sikuli tool. Keep regular 
contacts with clients over phone. Identify work priority. Involved in understanding the 
design documents, Maintain Traceability of requirements and update requirements 
traceability matrix, Review the deliverables and ensure that all the processes have been 
followed before delivery to the client, Resolve technical issues, extensively performed 
System Testing, Regression Testing, Test Automation Manual Mobile functional 
application Testing and Mobile Automation Testing on mobiles and web 
applications. Sending daily status report, weekly collective status report to the test 
manager and Client. 
Project 
NAME OF PROJECT: UIM Cable Tech Pack 
CLIENT: Oracle 
Environment: WindowsXP 
Technologies: Java Technologies, Oracle11G and SCRUM/Agile development 
Server: Jboss 
Tools: SOAPUI, 
Types of Testing: Manual Testing, System Testing, SOA Testing 
DURATION: 6 months 
TESTING TEAM SIZE: 3 
PROJECT DESCRIPTION: Unified Inventory Management (UIM) is a web based 
application on Telecom Domain. Cable TV Technology Pack is an add-on to maintain the 
inventory of resources used in Cable Industry.The Cable TV Subscription Technology 
Pack will provide capabilities for Oracle customers to support the delivery of Video 
Stream Services or access to various television channels (e.g., Basic, Premium, and 
HBO).It will also manage the inventory of the devices on which these services are 
provisioned which include Programmable Video Receivers (Set Top Boxes) and Cable 
Cards.Inventory of Subscription services, Subscription devices and Headend resources 
are maintained in UIM. 
ROLE IN THE PROJECT: Worked as Senior Software Engineer (QA).
RESPONSIBILITIES: Understanding and review of the Functional system requirements. 
Design, develop and execute Manual Test Cases as well as Automation Scenarios, Test 
Scripts, and associated test data based on requirements. Defect reporting and ensuring 
defects gathering, verification, validation of reported defects, Close and analyze the 
defects. Creating and deliver the documents as per software delivery process, Created 
Test Strategy Documents and Test Plan for Functional automation Testing, review and 
baseline test plan, Obtain Client approval for design. Keep regular contacts with onsite 
clients over phone. Identify work priority, coordinating with development team on 
issues/defects if necessary. Involved in understanding the design documents, Maintain 
Traceability of requirements and update requirements traceability matrix, Review the 
deliverables and ensure that all the processes have been followed before delivery to the 
client, Resolve technical issues, Mentor team members to continuously improve quality, 
Conduct Peer Review, Analyze Verification results/ peer review data, Plan for Testing, 
Extensively performed System Testing, Web Services Testing, Regression Testing 
and Automation Testing. Sending daily status report, weekly collective status report and 
monthly collective status report to the test manager and Client. 
Project 
NAME OF PROJECT: DCII 
CLIENT: Hiscox 
Server: Jboss 
Environment: WindowsXP 
Technologies: Java Technologies, Oracle9i and SCRUM/Agile development 
Tools: XMLSPY5.0, Quality Center, SOAPUI Pro3.0.1 
Testing Environment: Manual, Database and SOA Testing. 
DURATION: 7 months 
TESTING TEAM SIZE: 3 
PROJECT DESCRIPTION: Hiscox is a leader in specialist insurance. Hiscox is one of the 
major companies in UK that provides Insurance to the Business and Property. They have 
web applications which allow the user to do online transactions with Hiscox. Direct 
Commercial II is a web based application which facilitates the end users to communicate 
and avail the Insurance for their business or Properties from the Client (Hiscox).It’s a 
centralized interface where the user can request for multiple covers in a single request. 
This application coordinates with other applications like GRE, CalcEngine and Web 
methods to get the premiums as per user Business Criteria. 
ROLE IN THE PROJECT: Worked as Software Engineer (QA). 
RESPONSIBILITIES: Same as the above project 
PERSONAL DETAILS: 
1. Date of Birth: 8th Dec. 1981. 
2. Gender: Male. 
3. Marital Status: Married. 
4. Spouse: House Wife 
5. Kids: One in first grade and second in play group 
6. Passport Details: G4065744,Exp. Date:22/07/2017 
7. PAN Number:AJJPA5310M
8. Language Known: English, Hindi. 
9. Permanent address: Jaiswal Villa,House No. B-53-2nd, 
Divya Nagar Colony, Gorakhpur (U.P.)-273010, India 
10. Current Address: Flat No-402, Spring Field,Alakapoor 
Township,Puppalguda, Hyderabad-500089, India 
11. Phone Number: +919908996779 
PLACE: HYDERABAD, INDIA 
DATE: _____/_____/2014 
ASHWANI KUMAR

Ashwani Profile

  • 1.
    Resume Ashwani Kumar Mobile No: +919908996779 Email: ashwani.k21@gmail.com ashwani.j21@rediffmail.com ashwani.k2020@gmail.com Blog: http://ashwanikumar2020.blogspot.com/ LinkedIn: https://www.linkedin.com/pub/ashwani-kumar/27/2bb/0 PROFESSIONAL SUMMARY:  9.6 years of experience in Software Testing and Implementation on various domains like Telecom & Communication, Networking, Insurance, Banking, Finance, E-Learning, Retail, Real Estate, Mobile, Travel & Hospitality, Ecommerce, HRMS, Logistics, Marketing, Media,CRM,ERP and Health Care.  5.0+ years of Experience as Leading Team  7.0+ years of experience in Automation Testing using Selenium, Grid, Web driver, QTP and SoapUI Tools.  5.0 years of experience in Selenium,Grid, Web driver  1.0 year of experience in QTP  1.0 year of experience in SoapUI Tool for web services testing  2.6 years of experience in Performance Testing using Jmeter tool.  9.6 years of experience in Manual Testing.  2.0+ years of Experience in Mobile application testing using Android, iOS, Windows and Blackberry platforms.  Good exposure in writing and executing the complex SQL queries.  Experience in Cloud testing using Amazon EC2 and Blazemeter.  Expertise in designing test automation frameworks like Datadriven, Keyword Driven, Hybrid, Page Object Model and Behaviour Driven Development (BDD) Frameworks.  An individual contributor and capable to handle and automate a complex application without any help and support.  Involved in UAT and production sanity testing.  Given Selenium Test Automation Training to various team members  Certified Internal Auditor on QMS as per ISO 9001:2008 Standard from DNV(DET NORSKE VERITAS)  Successfully handled multiple projects and teams parallel.  Strong leadership quality and managed a team of 25 members and capable to handle bigger team.  Visited to onsite at client location Vancouver, Canada in 2012.  Worked as QMS/SQA group for CMMi and ISO quality process  Documented ISO & CMMi documents and attended the ISO and CMMi internal audit as auditor and auditee.
  • 2.
     Coordinating withbusiness analyst, developers and testers on development and testing of features and maintenance releases  Coordinating with project manager and engagement manager  Excellent in technology and good understanding of Web Server, App Server,Middleware and database servers.  Identifying the client needs and doing POCs, working on RFP, RFI etc.  Demonstrated abilities in handling projects independently, analyzing the client requirements, translating new ideas into clients solutions include opportunity identification, requirements development, delivery, support & analysis and documentation.  Experience in Test & Project Management i.e. manages people, process, tools, quality, schedule, infrastructure and knowledge management, vendor management for delivery within budget and time limits.  Good understanding of Web Services, Managing Test environments, Build deployment etc.  Strong foundation in Test Automation and Performance Testing.  Worked on Client-server and Web-based/Enterprise applications.  Extensively Performed Functional and Non Functional Testing, Manual Testing, Database Testing, GUI Testing, Mobile Testing, Usability Testing, Integration Testing, System Testing, Regression Testing, Smoke Testing, User Acceptance Testing, Performance Testing, Load Testing, Stress Testing, Endurance Testing, Spike Testing, Capacity Testing and Scalability Testing .  Single technical point of contact as a Test Lead from testing perspective for a release/feature/testing phase.  Created the Test Plan, Test Strategy for the Releases and Project.  Prepare & Review Test case matrix.  Write & Review Test cases, test conditions, pre-requisites.  Ensure that all KT sessions from development to testing are organized and within schedule.  Plan Environment setup and pre-configuration requirements for the features to be tested.  Attend handoff from development/IT for the enhancement.  Provide technical support to the Enhancement test leads and testers.  Identify and resolve issues during the test execution.  Ensure compliance to documented process during the planning and execution phases.  Responsible for setting up daily assignments based on the TRs turned around by the development team and the available functionalities that can be tested.  Monitor and track the test execution progress on daily basis to ensure that testing is advancing as scheduled.  Participate as needed in project closure activities & prepare Test Completion Report.  Work with Manager on Continuous process improvement, Utilization of resources, Test Metrics & Strategies & Org/dept Goals.
  • 3.
     Provide theleadership, strategy and tactical expertise to translate the opportunity into real bottom line value added that is tangible and can be measured.  Good experience in reporting Bug/Defects.  Strong working experience in Open Source Automation Testing Tools like Selenium, Webdriver, Sikuli, Robot, Flex Monkey, TestNG, Ant and Autoit, etc.  Experience in an onsite-offshore model.  Having strong experience in driving the complete Testing Cycle right from the requirement analysis stage till production check out.  Exposed to ISO and CMMi processes  Exposed to Waterfall, V-Model and Scrum/Agile Model.  Extensive experience in using Build Management / CI / Deployment Tools such as Jenkins , Hudson, SVN, GitHub.  Having exposed to SDLC, STLC and testing methodologies.  Good experience in Database Testing (SQL) and querying the database to check Successful transactions.  Strong Experience in test management and Bug Reporting tools like Quality Center, BugZilla, Jira, Eventum, Test Link, Mantis, RTH, Trac,Redmine and Xstudio.  Knowledge in Security Testing.  Strong experience in testing of the SOA/Web services/API based application.  Involved in Web Services testing.  Strong Experience in SOA technologies Like: ESB, WE, WSDL, UDDI, SOAP, XML.  High degree of flexibility and ability to adapt to change in direction.  Has flair to adapt to new software technologies, self-starter, good communication and interpersonal skills and documentations skills. CORE COMPETENCIES INVOLVEMENT: LEADERSHIP:  Test Management/ Project Management, Vendor Management, Resource Management, Gap Analysis, Release Management.  Providing Presales support to higher management & sales team.  Mentoring the existing team & new resources across the projects.  Mapping client's requirements & providing best solutions involving evaluation & definition of scope and finalizing project requirements.  Managing stakeholders, risks, issues, quality, project controls and resources.  Holding review meetings to monitor progress of the project as per schedule / budgets, and ensuring timely completion and delivery of the project to the client, extending production support of multiple applications.  Handling resource allocations and setting up communication channels across the various horizons of the organization structure.  Managing large / multidisciplinary teams, recruiting, mentoring, coaching and developing project teams after evaluating the project scope.
  • 4.
    FUNCTIONAL:  DefiningTest Scope, Preparing Test Lab, Preparing test strategy at account / project level and participating in test planning, test cases design & end to end testing Introducing techniques/ processes new to the Organization and also Profitable to the Project & Client.  Providing testing services in an offshore-onshore integrated delivery model and helping to increase the delivery of testing work from offshore by cost effective testing services.  Handling the capability development within testing group by participating in recruitment process and conducting interviews, building teams (both at Onsite & offshore). AUTOMATION TESTING:  Guiding the client & Project Management on Test Automation.  Evaluating the tools for Automation testing for functional requirements.  Designed Hybrid Framework using open source tools like Hudson, Selenium RC,Webdriver,Selenium Grid,Sikuli,Autoit,Ant,TestLink,Eventum and SVN.This framework is 100% reusable and robust.  Used Selenium, Webdriver, Sikuli, Robot, Flex Monkey, Autoit and QTP for Functional Testing.TestLink, Quality Center, BugZilla, Eventum, Jira, Mantis etc, as test management and defect reporting tools. PERFORMANCE TESTING:  Guiding the client & Project Management on Performance Test.  Evaluating the tools for Performance testing for non functional requirements.  Expertise in performance testing of Http/Https based web applications  Good understanding of client and server side performance metrics.  Proficient in generating customized reports for Jmeter tool.  Proficient in Performance Testing in Cloud using Blazemeter and Amazon. WORK EXPERIENCE: · Currently working with Maven Wave Partners, Chandigarh, India as QA Lead from 20th Nov -2014 to till date. · Worked with Spectraforce Technologies Ltd., Hyderabad, India as Senior Test Lead from 3rd Sept -2012 to 10th Nov -2014. · Worked with Cigniti Technologies Ltd (Formerly known as Chakkilam InfoTech Ltd.), Hyderabad, India as Test Lead from 1st June-2010 to 7th August-2012. · Worked with Keane India Ltd., Hyderabad, India as SSE (QA) from 16th – May - 2005 to 31st - May – 2010. EDUCATIONAL QUALIFICATION: · B.Tech in Computer Science and Engineering from Dr. Kedar Nath Modi Institute of Engineering and Technology,Modinagar,Ghaziabad(U.P.) affiliated to Uttar
  • 5.
    Pradesh Technical University,Lucknow,India(2005,66.6%). · 12th from U.P. Board, India (1998, 71%). · 10th from U.P. Board, India (1996, 72%). TECHNOLOGY AWARENESS: · Testing: Manual Testing, Functional Testing, Database Testing, Web Services Testing, Mobile Testing, Automation and Performance Testing. · Testing Tools: Selenium IDE, Selenium RC, Selenium GRID, Webdriver, Eclipse, TestNG, TestNG-Xslt, Ant, Junit, ReportNG, Hudson, Jenkins, Sikuli, Robot, Flex Monkey, Autoit,QTP,Load Runner, Quality Center, Test Director, TestLink,Jira, Eventum,Mantis, BugZilla, Testopia, Xstudio, RTH, SoapUI, SoapUIPro, JMeter, Ranorex, Firebug. · Other Tools: SVN, XMLSPY, VPN, Citrix, VSS,Git. · Programming Languages: C, C++, JAVA, VBScript, JavaScript and MS.NET. · Web Technologies: HTML, CSS, XML, SOAP,LAMP,Drupal,CMS,JSP,Sitecore. · Database: ORACLE, SQL, MS-ACCESS, SQL Server, PL/SQL, TOAD. · Operating Systems: Windows 98/XP/Vista/7/8, Mac, LINUX, UNIX. · Computer Application: MS-OFFICE. SOFTWARE PROJECTS: Project PROJECT Name: Reportory DESCRIPTION: Reportory lets you pick which news sources you read, which sections you enjoy, and which keywords you want to track. Each day you will then receive your customized news, only from those sources, topics and keywords … no two news digests are alike! Receive your news in your inbox each morning, or simply log in online or via your mobile to read on-the-go. As your news preferences change, simply update your settings and your next news digest will update accordingly. Tools: Spectraforce Project Portal, Jmeter,Webdriver, Jenkins, Test Link, Mantis,SoapUI, iPhone,iPad,Samsung Galaxy,etc. Environment: Windows7, iOS,Android Technologies: LAMP and Drupal Technologies, SCRUM/Agile development Types of Testing: Manual Functional Testing, Regression Testing, Integration Testing, System Testing, Browser Compatibility and Platform compatibility Testing, Web Services Testing, Test Automation, Mobile Application Testing and Performance Testing Duration: 4 months TESTING TEAM SIZE: 3 DEV TEAM SIZE: 3 ROLE IN THE PROJECT: Worked as Sr. Test Lead and Individual Contributor RESPONSIBILITIES: · Involved in gathering the requirements, analysis and understanding the existing/new systems. Closely worked with business analyst for finalizing the
  • 6.
    business rules andrequirements. · Closely worked with designer for creating the mockup/wireframe screens and followup. · Understanding and review of the functional and system requirements. · Creating SOW,Proposal, Scope finalizing, Project Plan,Test Plan, Test Strategy Plan, Project Estimations, RTM,Test Cases,etc. · Created product backlog and sprint backlog based on the priority of the work. · Keep regular contacts with Onsite Team and handling the offshore team. · Involved in writing Manual Test cases and executing them as well as reporting defects. · Environment setup and Automation Framework designing. · Scripted and automated scenarios using selenium Web driver. · Mentoring team and guiding them for designing, executing the automation scripts and defect reporting for automation scenarios. · Created performance testing scripts using Jmeter and did load testing with different number of user load. · Analysis of results and creating performance report.Given suggestions to development and DB team for performance tunning. · Involved in UAT and production sanity testing. · Defect reporting and ensuring defects gathering, verification, validation of reported defects, Close and analyze the defects. · Creating and sharing QA reports to entire team and worked closely with developers to fix the defects. · Tested web services using SoapUI tool. · Involved in end to end testing activities. · Created Release Notes and sharing to stake holders. · Identified the work priority, Review the deliverables and ensure that all the processes have been followed before delivery to the client. · Resolved technical issues, Mentor team members at offshore and helping them for any queries. · Mentor team members to continuously improve quality, Conducted Peer Review, Analyze Verification results/ peer review data, Plan for Testing. · Involved in defect triage, conducting daily Scrum status meeting call with onshore and offshore teams. · Keep regular contacts with clients over phone/Skype/email and identified the work priority. · Sending daily status updates to stakeholders. · Creating Weekly, Monthly Status Reports and sharing to stakeholders. · Participating in monthly steering committee meeting. Project PROJECT Name: PASSPORT DESCRIPTION: 1-800-PACK-RAT, LLC is a portable storage container and moving company that delivers the easiest way to move and/or store customer’s material based on the miles, various applications have been designed for Packrat. Passport is one of the web applications used within Packrat’s Storage and Logistics Domain. It is designed to create, search, and manage customers, quotes and orders. It is a web application for the call centers agents will utilize to sell, quote, schedule all the touches for Local, Long Distance and Trailer Moves.
  • 7.
    Tools: Spectraforce ProjectPortal, Google Docs, Web driver, Jmeter,Hudson, Test Link, Mantis,SoapUI Environment: Windows7, IIS Technologies: Microsoft Technologies, Sql Server, SCRUM/Agile development Types of Testing: Manual Functional Testing, Regression Testing, Integration Testing, System Testing, Browser Compatibility Testing, Web Services Testing, Test Automation, Mobile Application Testing and Performance Testing Duration: 12 months TESTING TEAM SIZE: 3 DEV TEAM SIZE: 6 ROLE IN THE PROJECT: Worked as Sr. Test Lead and Individual Contributor. RESPONSIBILITIES: Same as the above project roles and responsibilities. Project PROJECT Name: BeverageIO DESCRIPTION: BeverageIO is a web application and developed to cater the order processing needs of Distributors & Retailers associated with beverage distribution. The application acts as a centralized platform for order processing between Retailers & Distributors and allows the Retailers to place orders to Distributors. Main modules are Dashboard,Sales,Orders,Reports,Promotions,Accounts,Retailer,Payments,Search Customer Notes,Distributor,Roles and Permissions,etc. Tools: Google Docs, Test Link, Mantis. Environment: Windows7, Technologies: LAMP Technologies, HTML5, Angularjs & Bootstrap UI framework, SCRUM/Agile development Types of Testing: Manual Testing, Browser Compatibility Testing Duration: 4 months TESTING TEAM SIZE: 3 DEV TEAM SIZE: 3 ROLE IN THE PROJECT: Worked as Sr. Test Lead and Individual Contributor. RESPONSIBILITIES: Understanding and review of the functional and system requirements. Prepared Test Plan, Test Strategy Plan, Keep regular contacts with Onsite Team and handling the offshore team. Involved in writing Manual Test cases and executing them as well as reporting defects. Creating and sharing QA reports to entire team and worked closely with developers to fix the defects. Identified the work priority, Review the deliverables and ensure that all the processes have been followed before delivery to the client, Resolved technical issues, Mentor team members at offshore and helping them for any queries. Involved in defect triage, conducting weekly/daily status meeting call with onshore and offshore teams. Creating Monthly Status Reports and sharing to stakeholders. Project PROJECT Name: BTD(BookThatDoc) and AC(Amazing Charts Console) DESCRIPTION: BookThatDoc is a web application that acts as a connecting bridge between patients and doctors. It is designed to cater the needs of patients in finding the right doctor instantly and allows online booking for doctors listed on BookThatDoc. Main functionalities included in the BookThatDoc application are Allows online registration, Book appointment for doctors, Manage doctor appointments, Manage and maintain patient information, Ensure data storage and security, Accepts patient insurance, Helps patient to find the right doctor instantly, Schedule Appointment, Cancel an Appointment.
  • 8.
    Amazing Charts isan EHR/EMR standalone desktop application that acts as a database for doctor’s details. It is installed in the Windows OS on doctor’s system. The main features of AC are Appointment availability, Appointment status, Doctor’s Calendar,Resources,Patient status,etc. Environment: Windows7 Technologies: LAMP Technologies, SCRUM/Agile development Types of Testing: Manual Testing, Browser Compatibility Testing Duration: 3 months TESTING TEAM SIZE: 3 DEV TEAM SIZE: 3 ROLE IN THE PROJECT: Worked as Sr. Test Lead and Individual Contributor. RESPONSIBILITIES: Understanding and review of the functional and system requirements. Prepared Test Plan, Test Strategy Plan, Keep regular contacts with Onsite Team and handling the offshore team. Involved in writing Manual Test cases and executing them as well as reporting defects. Creating and sharing QA reports to entire team and worked closely with developers to fix the defects. Identified the work priority, Review the deliverables and ensure that all the processes have been followed before delivery to the client, Resolved technical issues, Mentor team members at offshore and helping them for any queries. Involved in defect triage, conducting weekly/daily status meeting call with onshore and offshore teams. Creating Monthly Status Reports and sharing to stakeholders. Project PROJECT Name: TUNet Location: Onsite, Vancouver-Burnaby, Canada DESCRIPTION: Tantalus provides Smart Grid communications solutions for Advanced Metering, Demand Response & Distribution Automation. TUNet – the Tantalus Utility Network – is a rapid & reliable two-way network that enables electric, water & gas distributors to automate processes, improve business operations and deliver top-tier customer service. TUNet is deployed at utilities determined to manage resources intelligently and meet ambitious conservation goals. Tools: Jira Environment: Linux, Oracle, Windows7 Types of Testing: Manual Testing, Database Testing and Automation Testing using Perl Duration: 6 months TESTING TEAM SIZE: 4 DEV TEAM SIZE: 10 ROLE IN THE PROJECT: Worked as Test Lead and Individual Contributor. RESPONSIBILITIES: Understanding and review of the functional and system requirements at onsite location. Prepared Proposal, Test Plan, and Test Strategy Plan, Keep regular contacts with Tantalus Team and supporting the offshore team over phone/Team Viewer /Skype. Involved in writing Manual Test cases and executing them as well as reporting defects. Involved database testing. Identified the work priority, Review the deliverables and ensure that all the processes have been followed before delivery to the client, Resolve technical issues, Mentor team members at offshore and helping them for any queries. Conducting weekly status meeting call with onshore and offshore teams. Project NAME OF PROJECT: mibibo, tradus CLIENT: ibibo
  • 9.
    PLATFORM: Web andMobiles: BlackBerry, iPhone, Nokia, HTC, Samsung devices on different platform like Java, iOS, Symbian, Windows and Android. Tools: Selenium RC, Eclipse, TestNG, Sikuli Types of Testing: System Testing, Regression Testing, Test Automation, Manual Functional Mobile Application Testing and Mobile Automation Testing. DURATION: 4 months TESTING TEAM SIZE: 8 PROJECT DESCRIPTION: ibibo is a fast growing focused Internet and mobile product company. They focus on Social gaming and e-commerce platforms. ROLE IN THE PROJECT: Worked as Test Lead and Individual Contributor. RESPONSIBILITIES: Understanding and review of the Functional system requirements. Design, develop and execute Manual Scenarios, Manual Test cases, and associated test data based on requirements. Defect reporting and ensuring defects gathering, verification, validation of reported defects, Close and analyze the defects. Creating and deliver the documents as per software delivery process, Created Test Strategy Documents and Test Plan for Functional Testing, review and baseline test plan, Obtain Client approval for design. Test Automation and mobile automation testing using sikuli tool. Keep regular contacts with clients over phone. Identify work priority. Involved in understanding the design documents, Maintain Traceability of requirements and update requirements traceability matrix, Review the deliverables and ensure that all the processes have been followed before delivery to the client, Resolve technical issues, extensively performed System Testing, Regression Testing, Test Automation Manual Mobile functional application Testing and Mobile Automation Testing on mobiles and web applications. Sending daily status report, weekly collective status report to the test manager and Client. Project NAME OF PROJECT: UIM Cable Tech Pack CLIENT: Oracle Environment: WindowsXP Technologies: Java Technologies, Oracle11G and SCRUM/Agile development Server: Jboss Tools: SOAPUI, Types of Testing: Manual Testing, System Testing, SOA Testing DURATION: 6 months TESTING TEAM SIZE: 3 PROJECT DESCRIPTION: Unified Inventory Management (UIM) is a web based application on Telecom Domain. Cable TV Technology Pack is an add-on to maintain the inventory of resources used in Cable Industry.The Cable TV Subscription Technology Pack will provide capabilities for Oracle customers to support the delivery of Video Stream Services or access to various television channels (e.g., Basic, Premium, and HBO).It will also manage the inventory of the devices on which these services are provisioned which include Programmable Video Receivers (Set Top Boxes) and Cable Cards.Inventory of Subscription services, Subscription devices and Headend resources are maintained in UIM. ROLE IN THE PROJECT: Worked as Senior Software Engineer (QA).
  • 10.
    RESPONSIBILITIES: Understanding andreview of the Functional system requirements. Design, develop and execute Manual Test Cases as well as Automation Scenarios, Test Scripts, and associated test data based on requirements. Defect reporting and ensuring defects gathering, verification, validation of reported defects, Close and analyze the defects. Creating and deliver the documents as per software delivery process, Created Test Strategy Documents and Test Plan for Functional automation Testing, review and baseline test plan, Obtain Client approval for design. Keep regular contacts with onsite clients over phone. Identify work priority, coordinating with development team on issues/defects if necessary. Involved in understanding the design documents, Maintain Traceability of requirements and update requirements traceability matrix, Review the deliverables and ensure that all the processes have been followed before delivery to the client, Resolve technical issues, Mentor team members to continuously improve quality, Conduct Peer Review, Analyze Verification results/ peer review data, Plan for Testing, Extensively performed System Testing, Web Services Testing, Regression Testing and Automation Testing. Sending daily status report, weekly collective status report and monthly collective status report to the test manager and Client. Project NAME OF PROJECT: DCII CLIENT: Hiscox Server: Jboss Environment: WindowsXP Technologies: Java Technologies, Oracle9i and SCRUM/Agile development Tools: XMLSPY5.0, Quality Center, SOAPUI Pro3.0.1 Testing Environment: Manual, Database and SOA Testing. DURATION: 7 months TESTING TEAM SIZE: 3 PROJECT DESCRIPTION: Hiscox is a leader in specialist insurance. Hiscox is one of the major companies in UK that provides Insurance to the Business and Property. They have web applications which allow the user to do online transactions with Hiscox. Direct Commercial II is a web based application which facilitates the end users to communicate and avail the Insurance for their business or Properties from the Client (Hiscox).It’s a centralized interface where the user can request for multiple covers in a single request. This application coordinates with other applications like GRE, CalcEngine and Web methods to get the premiums as per user Business Criteria. ROLE IN THE PROJECT: Worked as Software Engineer (QA). RESPONSIBILITIES: Same as the above project PERSONAL DETAILS: 1. Date of Birth: 8th Dec. 1981. 2. Gender: Male. 3. Marital Status: Married. 4. Spouse: House Wife 5. Kids: One in first grade and second in play group 6. Passport Details: G4065744,Exp. Date:22/07/2017 7. PAN Number:AJJPA5310M
  • 11.
    8. Language Known:English, Hindi. 9. Permanent address: Jaiswal Villa,House No. B-53-2nd, Divya Nagar Colony, Gorakhpur (U.P.)-273010, India 10. Current Address: Flat No-402, Spring Field,Alakapoor Township,Puppalguda, Hyderabad-500089, India 11. Phone Number: +919908996779 PLACE: HYDERABAD, INDIA DATE: _____/_____/2014 ASHWANI KUMAR