• Prepare reconciliation of materials on a weekly/ monthly basis, calculate quantities of materials for ordering, i.e. concrete, block work etc.
• Monitoring and Supervising of Shuttering and finishing works (Block work, Plastering, Tiling, Waterproofing, False ceiling, Stone Cladding, Marble and Granite Flooring etc.
• Control of Materials, Manpower and Vehicle movements.
• Monitor and communicate all technical requirements of the works to Foreman on site throughout the construction process.
• Raise inspection request and carried out inspection on site liaison with the QA/QC Engineer.
• Progress & Monitoring of works on site to ensure technical compliance with the specifications and drawings
• Monitoring and recording day to day progress and resources on site.
• Identify & Monitor the Critical activities and guide the execution team accordingly.
• Coordination with Project team, Consultants, Client and Subcontractors on Project control issues and management of project key deliverables.
• Certifying the sub contractor’s monthly valuations & Forwarding to Commercial Department for Payments certificate preparation
• Prepare reconciliation of materials on a weekly/ monthly basis, calculate quantities of materials for ordering, i.e. concrete, block work etc.
• Monitoring and Supervising of Shuttering and finishing works (Block work, Plastering, Tiling, Waterproofing, False ceiling, Stone Cladding, Marble and Granite Flooring etc.
• Control of Materials, Manpower and Vehicle movements.
• Monitor and communicate all technical requirements of the works to Foreman on site throughout the construction process.
• Raise inspection request and carried out inspection on site liaison with the QA/QC Engineer.
• Progress & Monitoring of works on site to ensure technical compliance with the specifications and drawings
• Monitoring and recording day to day progress and resources on site.
• Identify & Monitor the Critical activities and guide the execution team accordingly.
• Coordination with Project team, Consultants, Client and Subcontractors on Project control issues and management of project key deliverables.
• Certifying the sub contractor’s monthly valuations & Forwarding to Commercial Department for Payments certificate preparation
Enabling your team to become more productive.
Setting goals has been proven to be beneficial in many ways, including leading to improved performance. In this talk, we will explore how to set goals on every organisational level, what tools we can make use of and have a look at best practices to get the most out of setting and achieving goals.
This talk will help leaders understand the importance of goals and equip them with tools to get their team more engaged and productive. It also highlights that to get the most out of setting goals, as a leader you have to be a mentor and coach rather than mandating targets.
1. Curriculum Vitae
`
Contact No.
00971567456866 ASADULLAH
asad.swabian@yahoo.com
Post applied for: Land surveyor
Visa status : Employment visa
Profile:
To seek new horizons in the field of national and then at international aspects, I provide my
services to different companies and maintain a level of dignity at all levels
A strong leader with ability to motivate and inspire associates to achieve their maximum
potential
Self-directed and self-motivated, desiring a career avenue that will provide a challenging
opportunity to significantly contribute to company’s operation and growth
Effective written/verbal and interpersonal communication skills
PERSONAL:- LANGUAGE SKILL:-
Father’s Name : ALISHER 1. PASHTO
Nationality : PAKISTANI 2. URDU
Date of Birth : 30-09-1980 3. ENGLISH
Marital Status : MARIED 4. ARABIC
EDUCATIONAL BACKGROUND:-
1. Secondary school certificate- April, 1996
2. Intermediate from Govt. degree college Daggar - 2000
3. Survey certificate from Govt. Technical institute Nowshera – September, 2005
PROFESIONAL SKILLS (Initial)
AutoCAD,
Aligning the drawing, scaling, making coordinates sheets by excel, printing drawings,
2. Data downloading & uploading,
MS world MS excel
INSTRUMENTS USED:-
Any kind of total station
All kind of level instruments
FIELD EXPERIENCE IN UAE :-
From December 2006 to April 2008
Organization : SAIF BIN DARWESH
Client : RTA
Project R-801 : Road in albarsha south
Position : Surveyor
Duties and Responsibilities:
Responsible for all survey work pertaining to site development plan such as: Leveling
of Sub Grade, Sub base, Base Course and Asphalt etc.
Establishment of horizontal and vertical control
Conduct topographic survey
Lay-out and as-built all structure facilities based on designed plan such as: drainage
pipe line and alignment of concrete bridge.
Form Jan 2009 to Jun 2009
Organization : MS Capital Survey Abu Dhabi UAE
Contractor : N S C C
Project : AIDE (Abu Dhabi air port extension)
Position : Surveyor
Duties and Responsibilities:
Conduct topographic survey.
Mark limitation of work area for excavation.
Mark points for pile and level checking.
From Jun 2009 Jul 2011
Organization : MS Capital Survey Abu Dhabi UAE
Contractor : Al habtoor and Murry Robborts(JV)
Project : Sheikh Zayed University Abu Dhabi
Position : Senior Surveyor
Duties and Responsibilities:
3. Responsible for all survey work pertaining to site development plan such as: Leveling
of service roads.
In-charge with the use of the major survey instrument utilized in the field.
Leveling and setting out of column, walls and roof.
From October 2014 up to Date
Organization : CIVILCO Engineering & Const Company
Client : DAMAC
Project : Upper Crest tower
Position : Surveyor
Duties and Responsibilities:
Work Experience in Pakistan
Form Sep 2005 to Aug 2006
Client : NHA
Company : Lilly international
Project : N-5 Turnol-cheblat Section
Position : Surveyor
Services : Roads and under utilities
Duties and Responsibilities:
Responsible for all survey work pertaining to site development plan such as: Leveling
of Sub Grade, Sub base, Base Course and Asphalt etc.
Surveyor work of Road junction, roundabout and kerb stone.
Lay-out and as-built all structure facilities based on designed plan such as: drainage
pipe line
From Aug 2006 to Nov 2006
Company : NLC
Project : N-45 Dargai-chakdara section
Position : Surveyor
Services : Roads and under utilities
Duties and Responsibilities:
Responsible for all survey work pertaining to site development plan such as: Leveling
of Sub Grade, Sub base, Base Course and Asphalt etc.
In-charge with the use of the major survey instrument utilized in the field.
4. From Feb. 2012 to Aug 2014
Company. faisel contracting company
Position. Surveyor
Project. canal bridge toru mayar