ARK CREATIVES, Inc
building for a better place




                                      2124 Race Street
                                Philadelphia, PA 19103

                                    215-569-9030
                              www.arkcreativesinc.com
REPRESENTATIVE CLIENT LIST




We are a 100% woman-owned design collaborative of experienced designers, each with
a minimum of 15 years experience in the field of interior design.

Ark Creatives Inc. has forged a reputation for working as an active partner with our clients
in realizing their business plans and goals. Our attention to design detail, strong facilities
planning and industry knowledge bring our clients back to us for repeat projects.
The following list of clients represents the combined experience of our company and our
staff of design professionals.

Cozen O’Connor                                         Mc Master Carr Supply
Charming Shoppes, Inc.                                 A.I Dupont Hospital for Children
S A P Americas, Inc                                    The Star Group
Algorithmics                                           Genuardi’s Corporate Headquarters
First Industrial Realty Trust                          Running Press Publications
Princeton Insurance Company                            Rich Products
PSEG Nuclear LLC                                       The Bryn Mawr Trust Company
Drexel University                                      Tokai Financial Group
ProQuest Information & Learning Company                The Inn at the Union League
Brandywine Realty Trust                                Greeley & Hansen
Mid America Group                                      First Union Corporation
Becker Ventures, LLC                                   Merrill Lynch
East Stroudsburg Savings Bank                          Rohm & Haas
Hudson Valley Federal Credit Union                     Novacare Corporate Headquarters
Revolution Development Group                           Saul Ewing LLP
Summit Financial Group
Philadelphia School District                           Cingular Wireless
Warren General Hospital                                Datek Online
                                                       Adventis Pharmaceutical
Johnson & Johnson                                      Comcast
Beneficial Savings Bank                                 S A P Americas, Inc.
First Union Bank                                       The Vanguard Group
Wachovia Bank                                          Dupont
Mellon Bank                                            Mellon Bank
Logicstream                                            GSA: Federal Supply Services
BigChalk.com                                           Agfa Corporation
Merck                                                  Lucent Technologies
CDnow                                                  Pinkus & Saltz
SmithKline Beecham                                     Day & Zimmerman
Mc Neil Consumer Products                              ARAMCO
Novartis                                               3 Dimensional Pharmaceutical
                                                       US Pharmacopoeia
                                                       Buchanan Ingersoll, PC
                                                       Mc Gettigan Corporate Planning




                                                                                                 ARK CREATIVES, Inc
                                                                                                 building for a better place
CORPORATE STANDARDS PROGRAMS




Beneficial Savings Bank                   90K SF

Mellon Bank                             2.5M SF

Cozen O’Connor                          200K SF

McNeil Consumer Products                300K SF

CD now                                   90K SF

PSE&G                                   257K SF

Johnson & Johnson (various companies)   650K SF

ProQuest                                250K SF




                                                  ARK CREATIVES, Inc
                                                  building for a better place
HOW WE WORK


Pro j e c t V a l u e s


                • Resolution to design changes

                             • Constructability

                              • Maintainability

            • Cost effective use of finish levels

             • Resolution of client’s objectives




                                                   ARK CREATIVES, Inc
                                                   building for a better place
REFERENCES


What our clients say about us...
90,000 SF Corporate Headquarters Fit Out
Beneficial Savings Bank
Philadelphia, PA
“Ann Hoffman, Principal at Ark Creatives, Inc. provided interior design services and was the Team Leader for
the architectural services when Beneficial Savings Bank moved its entire back office operations into the Penn
Mutual Building located at 510-530 Walnut Street, Philadelphia, PA 19106.

The Bank moved operations from four building spread throughout Center City and a function in South
Philadelphia and landed in 90,000 slf of space in Penn Mutual on several floors. Ann was able to create space
that was a 3-dimensional interpretation of management's vision. The design and form was crisp and light.
Ann was able to provide the appropriate sizing and function for the allotted levels of operations. She
understands our business. Her ability to work with the contractor and sub-contractors allowed our project to
meet budgets without sacrificing quality.”

                                             Gerald F. Hagarty, Vice President
                                             Facilities Department
                                             Recently retired 11/2010
                                             Email: ggus89@verizon.net
                                             Phone: (215) 620-1190

                                             Contact:
                                             Joseph Coyle, Executive VP
                                             Email: jcoyle@beneficialsavingsbank.com
                                             Phone: (215) 864-6118


40,000 SF Business Service Center
30,000 SF Building Annex
10,000 SF Lobby Renovation (design)
Charming Shoppes Inc.
Bensalem, PA
“My experience with the Ark Creatives team yielded tremendous results for my company. They consistently
deliver leading edge, practical and affordable designs across a wide range of project types. Although a
boutique firm, they produce large firm results with low overhead resources….It’s a win-win solution for
all….”
                                             Jon Goldberg
                                             VP Strategic Procurement
                                             Charming Shoppes, Inc
                                             Relocated 2010
                                             Email: jgoldberg@FISHMANTOBIN.com
                                             Phone: (609) 209-7105




                                                                                                         ARK CREATIVES, Inc
                                                                                                         building for a better place
REFERENCES


What our clients say about us...
250,000 sf Master Plan, Phased Renovations
10,000 sf Employee Cafeteria Renovation and Design
PSEG Nuclear, LLC
Salem, NJ

…this was an extensive restoration, involving some 250,000 square feet and directly affecting over 90% of
the employees. It involved office, laboratory and cafeteria spaces. Her team was able to quickly determine
the specific needs of the various work groups through direct employee interviews and space
inspections. They then designed layouts using modern office and laboratory furnishings that met the
workers needs, were easier to maintain, and if needed, simple to modify. They also developed a
workable and efficient plan to roll through the work with minimum disruption to the employees daily
work flow. The result was a more efficient, clean and functionally supportive work environment. In
addition, Ann Hoffman's direct and frequent involvement with the development and delivery of design
and engineering products helped ensure the project progressed as planned and completed on time and
budget.
I recommend her team without reservation.
                                              Stephen Bernasconi
                                              E-mail: steveberna@aol.com
                                              Phone: (610) 742-0284




                                                                                                           ARK CREATIVES, Inc
                                                                                                           building for a better place
PROJECT PAGES

CHARMING SHOPPES, INC
B e n s a l e m , PA
                       70,000 SF
                       Warehouse Conversion
                       Corporate Cafeteria
                       Business Service Center
                       Outlets Administration
                       Executive Suite
                       Main Lobby Renovation




                                                      ARK CREATIVES, Inc
                                                      building for a better place
PROJECT PAGES

WACHOVIA BANK
P h i l a d e l p h i a , PA
                               INVESTMENT CENTER
                               2,200 SF
                               Strategic Demolition
                               Structural, Mechanical, Electrical Design
                                           Integration
                               Technology Integration & Development
                               Furniture Selection & Installation
                               Graphic Applications
                               Project animation & presentation to local
                                           authorities
                               Fit-Out Cost: $220 per square foot




                                                                                ARK CREATIVES, Inc
                                                                                building for a better place
PROJECT PAGES

WACHOVIA BANK
P h i l a d e l p h i a , PA
                               CENTRE SQUARE BRANCH
                               13,500 SF
                               Flagship Branch
                               Renovation & Refurbishment
                               Full Service Interior Design
                               Lighting Design
                               Merchandising Placement
                               Fit-Out Cost: $45 per square foot




                                                                        ARK CREATIVES, Inc
                                                                        building for a better place
PROJECT PAGES

IDOU HOTEL
Ta n g i e r , M o r o c c o
                               350,000 SF
                               Interior Design & Furniture Specification
                               Custom Fabrications
                               Main Lobby
                               Auditorium / Meeting Room
                               3 Cafes
                               2 Restaurants
                               110 Guest Rooms
                               20 Premium Suites
                               Manager’s Quarters
                               Fitness Center




                                                                           ARK CREATIVES, Inc
                                                                           building for a better place
PROJECT PAGES

BENEFICIAL SAVINGS BANK
P h i l a d e l p h i a , PA
                               90,000 SF HEADQUARTERS
                               3,500 SF BRANCH BANK
                               Site Search & Building Evaluation
                               Programming
                               Consolidation & Integration of Headquarters
                               Test Fit Planning
                               Corporate Standards Program
                               Furniture Bid Management & Analysis
                               Graphic Applications of Historical Archives
                               Architecture, Interior Design & Engineering
                               Areas Included:
                                           Executive Suite
                                           Main Reception
                                           Lunch Room
                                           Training
                                           IT & Data Center
                                           Mail & Distribution Center
                                           Call Center
                                           Vault Storage
                               Fit-Out Cost: $ 25 (from finished clg) per square foot




                                                                                            ARK CREATIVES, Inc
                                                                                            building for a better place
PROJECT PAGES

BIOCON RESEARCH & DEVELOPMENT CENTER
Bangalore, India
                      150,000 SF
                      Interior Design
                      Offices
                      Lab Space
                      Auditorium
                      Interior Finishes & Furniture
                      Signage Package




                                                           ARK CREATIVES, Inc
                                                           building for a better place
PROJECT PAGES

COZEN O,CONNOR
P h i l a d e l p h i a , PA
                               220,000 SF
                               Building Evaluation
                               Master Planning
                               Programming
                               Test Fit Planning
                               Facilities Management
                               Full Service Interior Design
                               Headquarters & Various Locations, US & London
                               Fit-Out Costs $25 - $ 60 per SF




                                                                                    ARK CREATIVES, Inc
                                                                                    building for a better place
PROJECT PAGES

EAST STROUDSBURG SAVINGS ASSOCIATION
S t r o u d s b u r g , PA
                             OPERATIONS CENTER & BRANCH FACILITY
                             36,000 SF
                             In collaboration with R.W. Larson Architects
                             New Building
                             Office Programming
                             Corporate Standards Program
                             Furniture Standards
                             Interior Design
                             Furniture Specifications Bid Analysis
                             Audio Visual Center
                             Executive Areas
                             Graphic Design of History Wall
                             Fit-Out: WND




                                                                                 ARK CREATIVES, Inc
                                                                                 building for a better place
PROJECT PAGES

JOHNSON & JOHNSON, Health Care Systems Inc.
Piscataway, NJ
                  150,000 SF
                  Master Plan
                  Strategic Plan
                  Programming
                  Test Fit Planning
                  Full Service Interior Design
                  Change Management Services
                  Fit Out Costs: $45 per SF




                                                      ARK CREATIVES, Inc
                                                      building for a better place
PROJECT PAGES

LOGISTREAM
E x t o n , PA
                 CUSTOMER HEADQUARTERS & CUSTOMER SERVICE CENTER
                 35,000 SF
                 Office & Sales Area Fit-Out
                 IT Hosting Company
                 Programming
                 Corporate Standards Program
                 Full Service Interior Design
                 Data Center & Network Operation Center
                 Sales Center
                 Lunch & Team Areas
                 Fit-Out Cost: $35 per square foot




                                                                        ARK CREATIVES, Inc
                                                                        building for a better place
PROJECT PAGES

McGRAW-HILL EMPLOYEE FEDERAL CREDIT UNION
East Windsor, NJ
                   OPERATIONS CENTER & BRANCH FACILITY
                   20,000 SF
                   In collaboration with R.W. Larson Architects
                   Programming & Space Planning
                   Interior Design
                   Corporate Standards Program
                   Branch Interiors
                   Furniture Specification & Evaluation
                   Graphics & Merchandising Areas
                   Fit-Out Cost: n/a




                                                                       ARK CREATIVES, Inc
                                                                       building for a better place
PROJECT PAGES

FURNITURE SHOWROOM & CORPORATE OFFICES

                 40,000 SF
                 Concept Design for new Showroom & Corporate Offices




                                                                          ARK CREATIVES, Inc
                                                                          building for a better place
OUR REFERENCES




Rose O’Drain                                 Gerald Hagarty
Director of Facilities and Administration    Assistant Vice President, Purchasing
Cozen O’Connor Attorneys                     Retired 2011
1900 Market Street                           (215) 620 1190
Philadelphia, PA 19103                       ggus89@aol.com
215 665 4122
rodrain@cozen.com
                                             Jay Pew
Diane Reimer                                 Director of Construction & Facilities
Vice President, Administration               Charming Shoppes, Inc.
East Stroudsburg Savings Bank                400 Winks Lane
744 Main Street                              Bensalem, PA 19020
PO Box L                                     (215) 638-6721
Stroudsburg, PA 18360                        jay.pew@charming.com
(570) 421-3773 ext. 222
dreimer@essabank.com
                                             Stephen Bernasconi
G. Bruce Tomevi                              Independent Consultant
Manager, Real Estate & Planning              PSEG Nuclear, LLC
Johnson & Johnson                            (610) 742 0284
One Johnson & Johnson Plaza                  steveberna@aol.com
New Brunswick, NJ 08933
(732) 524-3173
btomevi@corus.jnj.com


Charles Morlock
PSEG Nuclear LLC
P.O. Box 236, N24
Hancocks Bridge, NJ 08038-1236
(856) 339-1761
charles.morlock@pseg.com




                                                                                     ARK CREATIVES, Inc
                                                                                     building for a better place

Ark Binder1 42611

  • 1.
    ARK CREATIVES, Inc buildingfor a better place 2124 Race Street Philadelphia, PA 19103 215-569-9030 www.arkcreativesinc.com
  • 2.
    REPRESENTATIVE CLIENT LIST Weare a 100% woman-owned design collaborative of experienced designers, each with a minimum of 15 years experience in the field of interior design. Ark Creatives Inc. has forged a reputation for working as an active partner with our clients in realizing their business plans and goals. Our attention to design detail, strong facilities planning and industry knowledge bring our clients back to us for repeat projects. The following list of clients represents the combined experience of our company and our staff of design professionals. Cozen O’Connor Mc Master Carr Supply Charming Shoppes, Inc. A.I Dupont Hospital for Children S A P Americas, Inc The Star Group Algorithmics Genuardi’s Corporate Headquarters First Industrial Realty Trust Running Press Publications Princeton Insurance Company Rich Products PSEG Nuclear LLC The Bryn Mawr Trust Company Drexel University Tokai Financial Group ProQuest Information & Learning Company The Inn at the Union League Brandywine Realty Trust Greeley & Hansen Mid America Group First Union Corporation Becker Ventures, LLC Merrill Lynch East Stroudsburg Savings Bank Rohm & Haas Hudson Valley Federal Credit Union Novacare Corporate Headquarters Revolution Development Group Saul Ewing LLP Summit Financial Group Philadelphia School District Cingular Wireless Warren General Hospital Datek Online Adventis Pharmaceutical Johnson & Johnson Comcast Beneficial Savings Bank S A P Americas, Inc. First Union Bank The Vanguard Group Wachovia Bank Dupont Mellon Bank Mellon Bank Logicstream GSA: Federal Supply Services BigChalk.com Agfa Corporation Merck Lucent Technologies CDnow Pinkus & Saltz SmithKline Beecham Day & Zimmerman Mc Neil Consumer Products ARAMCO Novartis 3 Dimensional Pharmaceutical US Pharmacopoeia Buchanan Ingersoll, PC Mc Gettigan Corporate Planning ARK CREATIVES, Inc building for a better place
  • 3.
    CORPORATE STANDARDS PROGRAMS BeneficialSavings Bank 90K SF Mellon Bank 2.5M SF Cozen O’Connor 200K SF McNeil Consumer Products 300K SF CD now 90K SF PSE&G 257K SF Johnson & Johnson (various companies) 650K SF ProQuest 250K SF ARK CREATIVES, Inc building for a better place
  • 4.
    HOW WE WORK Proj e c t V a l u e s • Resolution to design changes • Constructability • Maintainability • Cost effective use of finish levels • Resolution of client’s objectives ARK CREATIVES, Inc building for a better place
  • 5.
    REFERENCES What our clientssay about us... 90,000 SF Corporate Headquarters Fit Out Beneficial Savings Bank Philadelphia, PA “Ann Hoffman, Principal at Ark Creatives, Inc. provided interior design services and was the Team Leader for the architectural services when Beneficial Savings Bank moved its entire back office operations into the Penn Mutual Building located at 510-530 Walnut Street, Philadelphia, PA 19106. The Bank moved operations from four building spread throughout Center City and a function in South Philadelphia and landed in 90,000 slf of space in Penn Mutual on several floors. Ann was able to create space that was a 3-dimensional interpretation of management's vision. The design and form was crisp and light. Ann was able to provide the appropriate sizing and function for the allotted levels of operations. She understands our business. Her ability to work with the contractor and sub-contractors allowed our project to meet budgets without sacrificing quality.” Gerald F. Hagarty, Vice President Facilities Department Recently retired 11/2010 Email: ggus89@verizon.net Phone: (215) 620-1190 Contact: Joseph Coyle, Executive VP Email: jcoyle@beneficialsavingsbank.com Phone: (215) 864-6118 40,000 SF Business Service Center 30,000 SF Building Annex 10,000 SF Lobby Renovation (design) Charming Shoppes Inc. Bensalem, PA “My experience with the Ark Creatives team yielded tremendous results for my company. They consistently deliver leading edge, practical and affordable designs across a wide range of project types. Although a boutique firm, they produce large firm results with low overhead resources….It’s a win-win solution for all….” Jon Goldberg VP Strategic Procurement Charming Shoppes, Inc Relocated 2010 Email: jgoldberg@FISHMANTOBIN.com Phone: (609) 209-7105 ARK CREATIVES, Inc building for a better place
  • 6.
    REFERENCES What our clientssay about us... 250,000 sf Master Plan, Phased Renovations 10,000 sf Employee Cafeteria Renovation and Design PSEG Nuclear, LLC Salem, NJ …this was an extensive restoration, involving some 250,000 square feet and directly affecting over 90% of the employees. It involved office, laboratory and cafeteria spaces. Her team was able to quickly determine the specific needs of the various work groups through direct employee interviews and space inspections. They then designed layouts using modern office and laboratory furnishings that met the workers needs, were easier to maintain, and if needed, simple to modify. They also developed a workable and efficient plan to roll through the work with minimum disruption to the employees daily work flow. The result was a more efficient, clean and functionally supportive work environment. In addition, Ann Hoffman's direct and frequent involvement with the development and delivery of design and engineering products helped ensure the project progressed as planned and completed on time and budget. I recommend her team without reservation. Stephen Bernasconi E-mail: steveberna@aol.com Phone: (610) 742-0284 ARK CREATIVES, Inc building for a better place
  • 7.
    PROJECT PAGES CHARMING SHOPPES,INC B e n s a l e m , PA 70,000 SF Warehouse Conversion Corporate Cafeteria Business Service Center Outlets Administration Executive Suite Main Lobby Renovation ARK CREATIVES, Inc building for a better place
  • 8.
    PROJECT PAGES WACHOVIA BANK Ph i l a d e l p h i a , PA INVESTMENT CENTER 2,200 SF Strategic Demolition Structural, Mechanical, Electrical Design Integration Technology Integration & Development Furniture Selection & Installation Graphic Applications Project animation & presentation to local authorities Fit-Out Cost: $220 per square foot ARK CREATIVES, Inc building for a better place
  • 9.
    PROJECT PAGES WACHOVIA BANK Ph i l a d e l p h i a , PA CENTRE SQUARE BRANCH 13,500 SF Flagship Branch Renovation & Refurbishment Full Service Interior Design Lighting Design Merchandising Placement Fit-Out Cost: $45 per square foot ARK CREATIVES, Inc building for a better place
  • 10.
    PROJECT PAGES IDOU HOTEL Tan g i e r , M o r o c c o 350,000 SF Interior Design & Furniture Specification Custom Fabrications Main Lobby Auditorium / Meeting Room 3 Cafes 2 Restaurants 110 Guest Rooms 20 Premium Suites Manager’s Quarters Fitness Center ARK CREATIVES, Inc building for a better place
  • 11.
    PROJECT PAGES BENEFICIAL SAVINGSBANK P h i l a d e l p h i a , PA 90,000 SF HEADQUARTERS 3,500 SF BRANCH BANK Site Search & Building Evaluation Programming Consolidation & Integration of Headquarters Test Fit Planning Corporate Standards Program Furniture Bid Management & Analysis Graphic Applications of Historical Archives Architecture, Interior Design & Engineering Areas Included: Executive Suite Main Reception Lunch Room Training IT & Data Center Mail & Distribution Center Call Center Vault Storage Fit-Out Cost: $ 25 (from finished clg) per square foot ARK CREATIVES, Inc building for a better place
  • 12.
    PROJECT PAGES BIOCON RESEARCH& DEVELOPMENT CENTER Bangalore, India 150,000 SF Interior Design Offices Lab Space Auditorium Interior Finishes & Furniture Signage Package ARK CREATIVES, Inc building for a better place
  • 13.
    PROJECT PAGES COZEN O,CONNOR Ph i l a d e l p h i a , PA 220,000 SF Building Evaluation Master Planning Programming Test Fit Planning Facilities Management Full Service Interior Design Headquarters & Various Locations, US & London Fit-Out Costs $25 - $ 60 per SF ARK CREATIVES, Inc building for a better place
  • 14.
    PROJECT PAGES EAST STROUDSBURGSAVINGS ASSOCIATION S t r o u d s b u r g , PA OPERATIONS CENTER & BRANCH FACILITY 36,000 SF In collaboration with R.W. Larson Architects New Building Office Programming Corporate Standards Program Furniture Standards Interior Design Furniture Specifications Bid Analysis Audio Visual Center Executive Areas Graphic Design of History Wall Fit-Out: WND ARK CREATIVES, Inc building for a better place
  • 15.
    PROJECT PAGES JOHNSON &JOHNSON, Health Care Systems Inc. Piscataway, NJ 150,000 SF Master Plan Strategic Plan Programming Test Fit Planning Full Service Interior Design Change Management Services Fit Out Costs: $45 per SF ARK CREATIVES, Inc building for a better place
  • 16.
    PROJECT PAGES LOGISTREAM E xt o n , PA CUSTOMER HEADQUARTERS & CUSTOMER SERVICE CENTER 35,000 SF Office & Sales Area Fit-Out IT Hosting Company Programming Corporate Standards Program Full Service Interior Design Data Center & Network Operation Center Sales Center Lunch & Team Areas Fit-Out Cost: $35 per square foot ARK CREATIVES, Inc building for a better place
  • 17.
    PROJECT PAGES McGRAW-HILL EMPLOYEEFEDERAL CREDIT UNION East Windsor, NJ OPERATIONS CENTER & BRANCH FACILITY 20,000 SF In collaboration with R.W. Larson Architects Programming & Space Planning Interior Design Corporate Standards Program Branch Interiors Furniture Specification & Evaluation Graphics & Merchandising Areas Fit-Out Cost: n/a ARK CREATIVES, Inc building for a better place
  • 18.
    PROJECT PAGES FURNITURE SHOWROOM& CORPORATE OFFICES 40,000 SF Concept Design for new Showroom & Corporate Offices ARK CREATIVES, Inc building for a better place
  • 19.
    OUR REFERENCES Rose O’Drain Gerald Hagarty Director of Facilities and Administration Assistant Vice President, Purchasing Cozen O’Connor Attorneys Retired 2011 1900 Market Street (215) 620 1190 Philadelphia, PA 19103 ggus89@aol.com 215 665 4122 rodrain@cozen.com Jay Pew Diane Reimer Director of Construction & Facilities Vice President, Administration Charming Shoppes, Inc. East Stroudsburg Savings Bank 400 Winks Lane 744 Main Street Bensalem, PA 19020 PO Box L (215) 638-6721 Stroudsburg, PA 18360 jay.pew@charming.com (570) 421-3773 ext. 222 dreimer@essabank.com Stephen Bernasconi G. Bruce Tomevi Independent Consultant Manager, Real Estate & Planning PSEG Nuclear, LLC Johnson & Johnson (610) 742 0284 One Johnson & Johnson Plaza steveberna@aol.com New Brunswick, NJ 08933 (732) 524-3173 btomevi@corus.jnj.com Charles Morlock PSEG Nuclear LLC P.O. Box 236, N24 Hancocks Bridge, NJ 08038-1236 (856) 339-1761 charles.morlock@pseg.com ARK CREATIVES, Inc building for a better place