SlideShare a Scribd company logo
Arenas & Asociados
                                       Bridge designers


            Arenas & Asociados
                Ingeniería de Diseño
www.arenasing.com                                         Arenas & Asociados
ARENAS & ASOCIADOS PRESENTATION
•Structural consulting specialized in bridge
design and analysis.
                                                    AWARDS
•Created in 1999 by Juan José Arenas in            •2010 FIB AWARD for outstanding concrete
Santander, Spain.                                  structure (Third Millennium Bridge).
                                                   Washington, USA.
•Dr. Civil Engineer, Bridge Professor (UC)
with over 40 years experience in bridge            •2009 Gustave Magnel Golden Medal. J.J.
design                                             Arenas. Gent, Belgium.
•Structural architecture: aesthetics through       •2011, 1st ACHE Engineering Award.
Structural authenticity to achieve maximum         Barcelona, Spain. (Third Millennium Bridge)
formal expressiveness
                                                   •Alcantara Bridge Award 1996-98. (Spain)
•Applied in over 300 projects of bridges,          Arco de la Regenta.
footbridges and signature structures, in
                                                   •“Riconoscimento a grande personalitá
Spain and all over the world.
                                                   dell'ingegneria” Premio C.T.E. 2006. Parma
•Multidisciplinary team of over 30                 (Italia)
professionals.


                                                                               Barcelona Harbor
                                     Third Millennium Bridge,
                                                                                 Bascule Bridge
                                     Zaragoza
Seville, Spain
                                     LA BARQUETA BRIDGE
                    (La Barqueta Pedestrian Bridge Expo’92)
                                 Owner: Seville City Council (Expo’92)
             Project: Juan José Arenas de Pablo (A&A), M. Pantaléon.
Project management: Juan José Arenas de Pablo (A&A), M. Pantaléon.
                       Length: 204 m. Width: 24 m. Main span: 168 m
                                     Date of Construction: 1988-1989
                                                 Works: Entire Project
                            Project management and Site supervision
Asturias, Spain
LA REGENTA ARCH BRIDGE
Owner: Ministry of Infraestructures. Roads General Direction
Project: Juan José Arenas
Project Magagement: Juan José Arenas
Length: 382 m. Width: 12 m. Span: 194 m
Construction date: 1996
Works: Entire Project
Project Management and Site Supervision
Galicia, Spain
BETANZOS BRIDGE
Owner: Autopistas del Cantabrico (AUDASA)
Project: Juan José Arenas
Project Management : Juan José Arenas
Length: 1050 m. Width: 23 m. Span: 3x150 m
Construction date: 1996
Works: Entire Project
Project Management and Site Supervision
Valladolid, Spain
HISPANOAMÉRICA BRIDGE OVER THE PISUERGA RIVER
  Owner: Gobierno de Castille-Leon Government, Ayuntamiento de Valladolid
                                                Project: Arenas & Asociados
                                   Project management: Arenas & Asociados
                              Length: 156 m. Width: 35 m. Main span: 120 m
                                            Date of construction: 1996-1998
                                                       Works: Entire project
                                   Project management and Site supervision
HISPANOAMERICA BRIDGE. VALLADOLID (SPAIN), 1999
Salamanca, Spain
BRIDGE OVER THE TORMES RIVER
Owner: Government de Castille-Leon, Salamanca City Council
Project: Arenas & Asociados
Project management: Arenas & Asociados
Length: 210 m. Width: 20 m. Main span: 50 m
Date of construction: 1999-2000
Works: Entire Project
Project management and Site supervision
PONTE DEI CONGRESSI. ROME (ITALY), 2000.   Design Contest Award
Barcelona, Spain
MOVABLE BRIDGE LA PUERTA DE EUROPA
Owner: Port de Barcelona
Project: Arenas & Asociados
Project management: Arenas & Asociados
Length: 137 m. Width: 15 m. Main span: 109 m
Date of construction: 1999-2000
Works: Entire project
Project management and Site supervision
MOVABLE BRIDGE LA PUERTA DE EUROPA.
BARCELONA HARBOR (SPAIN), 2000
CABLE STAYED MOVABLE BRIDGE LUTXANA. BILBAO (SPAIN), 2002
(Preliminary design)
Las Rozas de Madrid, Spain
CABLE STAYED ACCESS BRIDGE TO LAS
                         LAS ROZAS
                Owner: Ayuntamiento de las Rozas
                 Project: Arenas & Asociados-IDOM
   Project management: IDOM-Arenas & Asociados
     Length: 136 m. Width: 22 m. Main span: 102 m
                   Date of construction: 2005-2006
                              Works: Entire project
          Project management and Site supervision
LAS ROZAS CABLE STAYED BRIDGE. MADRID (SPAIN), 2006



Propiedad:
Ayuntamiento de las Rozas
Proyecto:
Arenas & Asociados
Dirección de Obra:
Arenas & Asociados-IDOM
Contrata: Ferrovial
Año: 2006
Santander, Spain
ACCESS BRIDGE TO THE SCIENCE AND TECNOLOGY PARK OF
CANTABRIA (PCTCAN)
Owner: PCTCAN
Project: Arenas & Asociados
Project management: Arenas & Asociados
Length: 97 m. Width: 21 m. Main span: 72 m
Date of construction: 2006-2008
Works : Entire project
Project management and Site supervision
ACCESS BRIDGE TO THE SCIENCE AND TECHNOLOGY PARK.
SANTANDER (SPAIN), 2006




                                                    Arenas & Asociados
Zaragoza, Spain
ACCESS PEDESTRIAN BRIDGE TO DELICIAS
STATION
Owner: Zaragoza Alta Velocidad
Project: Arenas & Asociados
Project management: Arenas & Asociados
Length: 250 m. Width: 5 m. Main span: 90 m
Date of Construction: 2007-2008
Works: Entire Project
Project management and Site supervision
Zaragoza, Spain
    THIRD MILLENNIUM BRIDGE
              Owner: Zaragoza Alta Velocidad
                  Project: Arenas & Asociados
    Project management : Arenas & Asociados
Length: 270 m. Width: 43 m. Main span: 216 m
              Date of construction: 2005-2008
                         Works: Entire project
     Project management and Site supervision
THIRD MILLENNIUM BRIDGE. ZARAGOZA (SPAIN), 2008




 Central arch and inclined legs node construction
                                                                               Wind tunnel scale Model.
                                                                (University of Western Ontario, Canada)




                                                    12.000 ton jack loading in arch
                                                    Key section.

                                                                                 Arenas & Asociados
THIRD MILLENNIUM BRIDGE. ZARAGOZA (SPAIN), 2008
SOTO DE RIVERA BRIDGE. ASTURIAS (SPAIN), 2011


Owner:
Gob. Principado de
Asturias
Designer:
Arenas & Asociados
Work supervision:
Arenas & Asociados
Contractor: Isolux
CORSAN
Year: 2011
Span: 90 m.

Cantilever conctruction




                                                Arenas & Asociados
Santander, Spain
                LAS LLAMAS BRIDGE
              ( Juan José Arenas Bridge)
               Owner : Santander City Council
                 Project: Arenas & Asociados
    Project management: Arenas & Asociados
Length: 102 m. Width: 24 m. Main span: 102 m
                Date construction: 2009-2011
                         Works: Entire project
     Project management and Site supervision
LAS LLAMAS BRIDGE. SANTANDER (SPAIN), 2010
La Valletta, Malta
STEEL FOOTBRIDGE RECONSTRUCTION IN THE ST. ELMO
                 DOCK (BREAKWATER FOOTBRIDGE)
                                           Owner: Transport Malta
                                      Project: Arenas & Asociados
                        Project management : Arenas & Asociados
                       Length: 70 m. Width: 6 m. Main span: 70 m
                                  Date of Construction: 2011-2012
                                             Works: Entire Project
                         Project management and Site supervision
BREAKWATER FOOTBRIDGE. LA VALLETTA (MALTA), 2012
Bilbao, Spain
MOVABLE BRIDGE FOR THE TRAM LEIOA-URBINAGA
Owner: ETS (Euskal Trenbide Sarea)
Project: Arenas & Asociados
Length: 1390 m. Width: 12 m. Span: 161.1 m
Construction date: start due 2013
Works: Entire Project
Cáceres, Spain
VIADUCT OVER THE ALCANTARA RESERVOIR
(HSR line Madrid-Lisboa)
Owner: ADIF
Project: Arenas & Asociados - IDOM
Project Management : Arenas & Asociados - IDOM
Length: 996 m. Width: 14 m. Span: 384 m
Construction date: 2011-2014
Works: Entire Project
Project Management and Site Supervision
ARCH BRIDGE OVER THE ALMONTE RIVER AT THE ALCANTARA RESERVOIR.
CACERES (SPAIN), 2014




384 m Arch span for the High Speed
Train, now under construction
CHILINA BRIDGE, AREQUIPA (PERÚ)

-130 m span cantilerver Bridge for the
Arequipa Regional Government.

-Construction companies: CORSAN,
Incot, Metric

-Construction dates: 2012-2014

-Project: Arenas & Asociados

-Project Management: Arenas &
Asociados

More Related Content

Similar to Arenas bridges - Inc group

ROMA 2003.ppt
ROMA 2003.pptROMA 2003.ppt
ROMA 2003.ppt
QuangDatTran5
 
Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis
 
Infrastructure (English)
Infrastructure (English)Infrastructure (English)
Infrastructure (English)
COMSA Corporación
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
Abi Abagun
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
Abi Abagun
 
Metal Cladding References -Quinta Metalica (English)
Metal Cladding References -Quinta Metalica (English)Metal Cladding References -Quinta Metalica (English)
Metal Cladding References -Quinta Metalica (English)
Silos Cordoba
 
Santiago calatrava
Santiago calatravaSantiago calatrava
Santiago calatrava
Parul Sharma
 
2016.12 Social spaces
2016.12 Social spaces2016.12 Social spaces
2016.12 Social spaces
Oscar Fernandez - Aguayo
 
CGC 2016
CGC 2016CGC 2016
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Javier Cantera
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
Abi Abagun
 
Anese brochure
Anese brochure Anese brochure
Anese brochure
Marco Berti
 
Oct 2009 acp
Oct 2009 acpOct 2009 acp
Oct 2009 acp
Gert van der Ent
 
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
DEGIMA SA
 
Madrid+barcelona+bilbao emilio ontiveros
Madrid+barcelona+bilbao emilio ontiverosMadrid+barcelona+bilbao emilio ontiveros
Madrid+barcelona+bilbao emilio ontiveros
www.theurbanvision.com
 
19.2 CV M. Arteaga updated on August, 2015_engl version
19.2 CV M. Arteaga updated on August, 2015_engl version19.2 CV M. Arteaga updated on August, 2015_engl version
19.2 CV M. Arteaga updated on August, 2015_engl version
Mario Arteaga
 
SANT JOSEP BUILDING REFURBISHMENT
SANT JOSEP BUILDING REFURBISHMENTSANT JOSEP BUILDING REFURBISHMENT
SANT JOSEP BUILDING REFURBISHMENT
ESTRUCAD METÀL·LICS
 
CV_150917_JMV_EN
CV_150917_JMV_ENCV_150917_JMV_EN
Catalogo Lastra y Zorrilla.pdf
Catalogo Lastra y Zorrilla.pdfCatalogo Lastra y Zorrilla.pdf
Catalogo Lastra y Zorrilla.pdf
raul
 
Europhar Meeting Valencia 2013 Navicelli
Europhar Meeting Valencia 2013 NavicelliEurophar Meeting Valencia 2013 Navicelli
Europhar Meeting Valencia 2013 Navicelli
Navicelli S.p.A. di Pisa
 

Similar to Arenas bridges - Inc group (20)

ROMA 2003.ppt
ROMA 2003.pptROMA 2003.ppt
ROMA 2003.ppt
 
Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1
 
Infrastructure (English)
Infrastructure (English)Infrastructure (English)
Infrastructure (English)
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
 
Metal Cladding References -Quinta Metalica (English)
Metal Cladding References -Quinta Metalica (English)Metal Cladding References -Quinta Metalica (English)
Metal Cladding References -Quinta Metalica (English)
 
Santiago calatrava
Santiago calatravaSantiago calatrava
Santiago calatrava
 
2016.12 Social spaces
2016.12 Social spaces2016.12 Social spaces
2016.12 Social spaces
 
CGC 2016
CGC 2016CGC 2016
CGC 2016
 
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
 
Anese brochure
Anese brochure Anese brochure
Anese brochure
 
Oct 2009 acp
Oct 2009 acpOct 2009 acp
Oct 2009 acp
 
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
 
Madrid+barcelona+bilbao emilio ontiveros
Madrid+barcelona+bilbao emilio ontiverosMadrid+barcelona+bilbao emilio ontiveros
Madrid+barcelona+bilbao emilio ontiveros
 
19.2 CV M. Arteaga updated on August, 2015_engl version
19.2 CV M. Arteaga updated on August, 2015_engl version19.2 CV M. Arteaga updated on August, 2015_engl version
19.2 CV M. Arteaga updated on August, 2015_engl version
 
SANT JOSEP BUILDING REFURBISHMENT
SANT JOSEP BUILDING REFURBISHMENTSANT JOSEP BUILDING REFURBISHMENT
SANT JOSEP BUILDING REFURBISHMENT
 
CV_150917_JMV_EN
CV_150917_JMV_ENCV_150917_JMV_EN
CV_150917_JMV_EN
 
Catalogo Lastra y Zorrilla.pdf
Catalogo Lastra y Zorrilla.pdfCatalogo Lastra y Zorrilla.pdf
Catalogo Lastra y Zorrilla.pdf
 
Europhar Meeting Valencia 2013 Navicelli
Europhar Meeting Valencia 2013 NavicelliEurophar Meeting Valencia 2013 Navicelli
Europhar Meeting Valencia 2013 Navicelli
 

Recently uploaded

System Design Case Study: Building a Scalable E-Commerce Platform - Hiike
System Design Case Study: Building a Scalable E-Commerce Platform - HiikeSystem Design Case Study: Building a Scalable E-Commerce Platform - Hiike
System Design Case Study: Building a Scalable E-Commerce Platform - Hiike
Hiike
 
A Comprehensive Guide to DeFi Development Services in 2024
A Comprehensive Guide to DeFi Development Services in 2024A Comprehensive Guide to DeFi Development Services in 2024
A Comprehensive Guide to DeFi Development Services in 2024
Intelisync
 
Columbus Data & Analytics Wednesdays - June 2024
Columbus Data & Analytics Wednesdays - June 2024Columbus Data & Analytics Wednesdays - June 2024
Columbus Data & Analytics Wednesdays - June 2024
Jason Packer
 
Recommendation System using RAG Architecture
Recommendation System using RAG ArchitectureRecommendation System using RAG Architecture
Recommendation System using RAG Architecture
fredae14
 
Generating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and MilvusGenerating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and Milvus
Zilliz
 
Azure API Management to expose backend services securely
Azure API Management to expose backend services securelyAzure API Management to expose backend services securely
Azure API Management to expose backend services securely
Dinusha Kumarasiri
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
Taking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdfTaking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdf
ssuserfac0301
 
Deep Dive: Getting Funded with Jason Jason Lemkin Founder & CEO @ SaaStr
Deep Dive: Getting Funded with Jason Jason Lemkin Founder & CEO @ SaaStrDeep Dive: Getting Funded with Jason Jason Lemkin Founder & CEO @ SaaStr
Deep Dive: Getting Funded with Jason Jason Lemkin Founder & CEO @ SaaStr
saastr
 
Main news related to the CCS TSI 2023 (2023/1695)
Main news related to the CCS TSI 2023 (2023/1695)Main news related to the CCS TSI 2023 (2023/1695)
Main news related to the CCS TSI 2023 (2023/1695)
Jakub Marek
 
Salesforce Integration for Bonterra Impact Management (fka Social Solutions A...
Salesforce Integration for Bonterra Impact Management (fka Social Solutions A...Salesforce Integration for Bonterra Impact Management (fka Social Solutions A...
Salesforce Integration for Bonterra Impact Management (fka Social Solutions A...
Jeffrey Haguewood
 
AWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptxAWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptx
HarisZaheer8
 
Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
tolgahangng
 
Introduction of Cybersecurity with OSS at Code Europe 2024
Introduction of Cybersecurity with OSS  at Code Europe 2024Introduction of Cybersecurity with OSS  at Code Europe 2024
Introduction of Cybersecurity with OSS at Code Europe 2024
Hiroshi SHIBATA
 
Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
Brandon Minnick, MBA
 
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdfMonitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Tosin Akinosho
 
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development ProvidersYour One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
akankshawande
 
WeTestAthens: Postman's AI & Automation Techniques
WeTestAthens: Postman's AI & Automation TechniquesWeTestAthens: Postman's AI & Automation Techniques
WeTestAthens: Postman's AI & Automation Techniques
Postman
 
Nunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdf
Nunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdfNunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdf
Nunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdf
flufftailshop
 
Digital Marketing Trends in 2024 | Guide for Staying Ahead
Digital Marketing Trends in 2024 | Guide for Staying AheadDigital Marketing Trends in 2024 | Guide for Staying Ahead
Digital Marketing Trends in 2024 | Guide for Staying Ahead
Wask
 

Recently uploaded (20)

System Design Case Study: Building a Scalable E-Commerce Platform - Hiike
System Design Case Study: Building a Scalable E-Commerce Platform - HiikeSystem Design Case Study: Building a Scalable E-Commerce Platform - Hiike
System Design Case Study: Building a Scalable E-Commerce Platform - Hiike
 
A Comprehensive Guide to DeFi Development Services in 2024
A Comprehensive Guide to DeFi Development Services in 2024A Comprehensive Guide to DeFi Development Services in 2024
A Comprehensive Guide to DeFi Development Services in 2024
 
Columbus Data & Analytics Wednesdays - June 2024
Columbus Data & Analytics Wednesdays - June 2024Columbus Data & Analytics Wednesdays - June 2024
Columbus Data & Analytics Wednesdays - June 2024
 
Recommendation System using RAG Architecture
Recommendation System using RAG ArchitectureRecommendation System using RAG Architecture
Recommendation System using RAG Architecture
 
Generating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and MilvusGenerating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and Milvus
 
Azure API Management to expose backend services securely
Azure API Management to expose backend services securelyAzure API Management to expose backend services securely
Azure API Management to expose backend services securely
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
Taking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdfTaking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdf
 
Deep Dive: Getting Funded with Jason Jason Lemkin Founder & CEO @ SaaStr
Deep Dive: Getting Funded with Jason Jason Lemkin Founder & CEO @ SaaStrDeep Dive: Getting Funded with Jason Jason Lemkin Founder & CEO @ SaaStr
Deep Dive: Getting Funded with Jason Jason Lemkin Founder & CEO @ SaaStr
 
Main news related to the CCS TSI 2023 (2023/1695)
Main news related to the CCS TSI 2023 (2023/1695)Main news related to the CCS TSI 2023 (2023/1695)
Main news related to the CCS TSI 2023 (2023/1695)
 
Salesforce Integration for Bonterra Impact Management (fka Social Solutions A...
Salesforce Integration for Bonterra Impact Management (fka Social Solutions A...Salesforce Integration for Bonterra Impact Management (fka Social Solutions A...
Salesforce Integration for Bonterra Impact Management (fka Social Solutions A...
 
AWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptxAWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptx
 
Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
 
Introduction of Cybersecurity with OSS at Code Europe 2024
Introduction of Cybersecurity with OSS  at Code Europe 2024Introduction of Cybersecurity with OSS  at Code Europe 2024
Introduction of Cybersecurity with OSS at Code Europe 2024
 
Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
 
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdfMonitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdf
 
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development ProvidersYour One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
 
WeTestAthens: Postman's AI & Automation Techniques
WeTestAthens: Postman's AI & Automation TechniquesWeTestAthens: Postman's AI & Automation Techniques
WeTestAthens: Postman's AI & Automation Techniques
 
Nunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdf
Nunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdfNunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdf
Nunit vs XUnit vs MSTest Differences Between These Unit Testing Frameworks.pdf
 
Digital Marketing Trends in 2024 | Guide for Staying Ahead
Digital Marketing Trends in 2024 | Guide for Staying AheadDigital Marketing Trends in 2024 | Guide for Staying Ahead
Digital Marketing Trends in 2024 | Guide for Staying Ahead
 

Arenas bridges - Inc group

  • 1. Arenas & Asociados Bridge designers Arenas & Asociados Ingeniería de Diseño www.arenasing.com Arenas & Asociados
  • 2. ARENAS & ASOCIADOS PRESENTATION •Structural consulting specialized in bridge design and analysis. AWARDS •Created in 1999 by Juan José Arenas in •2010 FIB AWARD for outstanding concrete Santander, Spain. structure (Third Millennium Bridge). Washington, USA. •Dr. Civil Engineer, Bridge Professor (UC) with over 40 years experience in bridge •2009 Gustave Magnel Golden Medal. J.J. design Arenas. Gent, Belgium. •Structural architecture: aesthetics through •2011, 1st ACHE Engineering Award. Structural authenticity to achieve maximum Barcelona, Spain. (Third Millennium Bridge) formal expressiveness •Alcantara Bridge Award 1996-98. (Spain) •Applied in over 300 projects of bridges, Arco de la Regenta. footbridges and signature structures, in •“Riconoscimento a grande personalitá Spain and all over the world. dell'ingegneria” Premio C.T.E. 2006. Parma •Multidisciplinary team of over 30 (Italia) professionals. Barcelona Harbor Third Millennium Bridge, Bascule Bridge Zaragoza
  • 3. Seville, Spain LA BARQUETA BRIDGE (La Barqueta Pedestrian Bridge Expo’92) Owner: Seville City Council (Expo’92) Project: Juan José Arenas de Pablo (A&A), M. Pantaléon. Project management: Juan José Arenas de Pablo (A&A), M. Pantaléon. Length: 204 m. Width: 24 m. Main span: 168 m Date of Construction: 1988-1989 Works: Entire Project Project management and Site supervision
  • 4. Asturias, Spain LA REGENTA ARCH BRIDGE Owner: Ministry of Infraestructures. Roads General Direction Project: Juan José Arenas Project Magagement: Juan José Arenas Length: 382 m. Width: 12 m. Span: 194 m Construction date: 1996 Works: Entire Project Project Management and Site Supervision
  • 5. Galicia, Spain BETANZOS BRIDGE Owner: Autopistas del Cantabrico (AUDASA) Project: Juan José Arenas Project Management : Juan José Arenas Length: 1050 m. Width: 23 m. Span: 3x150 m Construction date: 1996 Works: Entire Project Project Management and Site Supervision
  • 6. Valladolid, Spain HISPANOAMÉRICA BRIDGE OVER THE PISUERGA RIVER Owner: Gobierno de Castille-Leon Government, Ayuntamiento de Valladolid Project: Arenas & Asociados Project management: Arenas & Asociados Length: 156 m. Width: 35 m. Main span: 120 m Date of construction: 1996-1998 Works: Entire project Project management and Site supervision
  • 8. Salamanca, Spain BRIDGE OVER THE TORMES RIVER Owner: Government de Castille-Leon, Salamanca City Council Project: Arenas & Asociados Project management: Arenas & Asociados Length: 210 m. Width: 20 m. Main span: 50 m Date of construction: 1999-2000 Works: Entire Project Project management and Site supervision
  • 9. PONTE DEI CONGRESSI. ROME (ITALY), 2000. Design Contest Award
  • 10. Barcelona, Spain MOVABLE BRIDGE LA PUERTA DE EUROPA Owner: Port de Barcelona Project: Arenas & Asociados Project management: Arenas & Asociados Length: 137 m. Width: 15 m. Main span: 109 m Date of construction: 1999-2000 Works: Entire project Project management and Site supervision
  • 11. MOVABLE BRIDGE LA PUERTA DE EUROPA. BARCELONA HARBOR (SPAIN), 2000
  • 12. CABLE STAYED MOVABLE BRIDGE LUTXANA. BILBAO (SPAIN), 2002 (Preliminary design)
  • 13. Las Rozas de Madrid, Spain CABLE STAYED ACCESS BRIDGE TO LAS LAS ROZAS Owner: Ayuntamiento de las Rozas Project: Arenas & Asociados-IDOM Project management: IDOM-Arenas & Asociados Length: 136 m. Width: 22 m. Main span: 102 m Date of construction: 2005-2006 Works: Entire project Project management and Site supervision
  • 14. LAS ROZAS CABLE STAYED BRIDGE. MADRID (SPAIN), 2006 Propiedad: Ayuntamiento de las Rozas Proyecto: Arenas & Asociados Dirección de Obra: Arenas & Asociados-IDOM Contrata: Ferrovial Año: 2006
  • 15. Santander, Spain ACCESS BRIDGE TO THE SCIENCE AND TECNOLOGY PARK OF CANTABRIA (PCTCAN) Owner: PCTCAN Project: Arenas & Asociados Project management: Arenas & Asociados Length: 97 m. Width: 21 m. Main span: 72 m Date of construction: 2006-2008 Works : Entire project Project management and Site supervision
  • 16. ACCESS BRIDGE TO THE SCIENCE AND TECHNOLOGY PARK. SANTANDER (SPAIN), 2006 Arenas & Asociados
  • 17. Zaragoza, Spain ACCESS PEDESTRIAN BRIDGE TO DELICIAS STATION Owner: Zaragoza Alta Velocidad Project: Arenas & Asociados Project management: Arenas & Asociados Length: 250 m. Width: 5 m. Main span: 90 m Date of Construction: 2007-2008 Works: Entire Project Project management and Site supervision
  • 18. Zaragoza, Spain THIRD MILLENNIUM BRIDGE Owner: Zaragoza Alta Velocidad Project: Arenas & Asociados Project management : Arenas & Asociados Length: 270 m. Width: 43 m. Main span: 216 m Date of construction: 2005-2008 Works: Entire project Project management and Site supervision
  • 19. THIRD MILLENNIUM BRIDGE. ZARAGOZA (SPAIN), 2008 Central arch and inclined legs node construction Wind tunnel scale Model. (University of Western Ontario, Canada) 12.000 ton jack loading in arch Key section. Arenas & Asociados
  • 20. THIRD MILLENNIUM BRIDGE. ZARAGOZA (SPAIN), 2008
  • 21. SOTO DE RIVERA BRIDGE. ASTURIAS (SPAIN), 2011 Owner: Gob. Principado de Asturias Designer: Arenas & Asociados Work supervision: Arenas & Asociados Contractor: Isolux CORSAN Year: 2011 Span: 90 m. Cantilever conctruction Arenas & Asociados
  • 22. Santander, Spain LAS LLAMAS BRIDGE ( Juan José Arenas Bridge) Owner : Santander City Council Project: Arenas & Asociados Project management: Arenas & Asociados Length: 102 m. Width: 24 m. Main span: 102 m Date construction: 2009-2011 Works: Entire project Project management and Site supervision
  • 23. LAS LLAMAS BRIDGE. SANTANDER (SPAIN), 2010
  • 24. La Valletta, Malta STEEL FOOTBRIDGE RECONSTRUCTION IN THE ST. ELMO DOCK (BREAKWATER FOOTBRIDGE) Owner: Transport Malta Project: Arenas & Asociados Project management : Arenas & Asociados Length: 70 m. Width: 6 m. Main span: 70 m Date of Construction: 2011-2012 Works: Entire Project Project management and Site supervision
  • 25. BREAKWATER FOOTBRIDGE. LA VALLETTA (MALTA), 2012
  • 26. Bilbao, Spain MOVABLE BRIDGE FOR THE TRAM LEIOA-URBINAGA Owner: ETS (Euskal Trenbide Sarea) Project: Arenas & Asociados Length: 1390 m. Width: 12 m. Span: 161.1 m Construction date: start due 2013 Works: Entire Project
  • 27. Cáceres, Spain VIADUCT OVER THE ALCANTARA RESERVOIR (HSR line Madrid-Lisboa) Owner: ADIF Project: Arenas & Asociados - IDOM Project Management : Arenas & Asociados - IDOM Length: 996 m. Width: 14 m. Span: 384 m Construction date: 2011-2014 Works: Entire Project Project Management and Site Supervision
  • 28. ARCH BRIDGE OVER THE ALMONTE RIVER AT THE ALCANTARA RESERVOIR. CACERES (SPAIN), 2014 384 m Arch span for the High Speed Train, now under construction
  • 29. CHILINA BRIDGE, AREQUIPA (PERÚ) -130 m span cantilerver Bridge for the Arequipa Regional Government. -Construction companies: CORSAN, Incot, Metric -Construction dates: 2012-2014 -Project: Arenas & Asociados -Project Management: Arenas & Asociados