DRAFTPERSON APPROVAL CHECKLIST FORM
Plant of Intent (POI) Revision Name
ID Number
Date (DD/MM/YY)
No. Description
POI Notation
Yes No Comments
1
2
3
Is the drawing number consistent with the codename?
Is the revision number precise?
Are there any recent references or updates, and have any versions been dated?
POI Creation
4
5
Is the Life of Mine POI used in the creation of the POI?
Are all symbols (vent controls, wins, etc.) scaled properly?
Are slashing/stripping locations identified in the plan and section? If there is no
stripping or slashing, write "N/A."
Are all reference data displayed at a 30-meter height meters above and below the
POI, respectively?
6
7
POI Solids
8 Is there only one POI solid per LOM centerline?
9 Do the POI solids match the neighboring approved POI solids?
POI Readiness
10 Has the POI drafting worksheet been completed and started the workflow
Is the plan ready in its entirety? include round support, geology, and engineering plan
and section.
11
Approvals
Drafting Notes Extra Comments
LOM ENGINEER APPROVAL CHECKLIST FORM
Plant of Intent (POI) Revision Name
ID Number
Date (DD/MM/YY)
No. Description
References
Yes No Comments
1
2
3
Is LOM design current (+/- 30m of POI design)?
Is survey as-built current (+/- 30m of POI design)?
Are geology layers current (wireframes, DDHs, block model)?
Lateral Development
4
5
6
7
Are the drifts named according to convention?
Does profile adhere to general arrangements standards?
Is there any stripping required?
Are the callouts and control points accurate?
Vertical Development
8 Is there new vertical development to be approved?
9 Is current vertical development identified (with winze symbols)?
General
10 Has a drainage strategy been defined
11 Does the Design Connect to Existing POI/Survey Appropriately?
Approvals
Drafting Notes Extra Comments
UG SURVEY APPROVAL CHECKLIST FORM
Plant of Intent (POI)
No. Description
Revision Name
ID Number
Date (DD/MM/YY)
Yes No Comments
1
2
3
4
5
Do the POI centerlines match the Life of Mine (from MDM) centerline?
Are azimuths shown correctly (Degrees, Minutes & Seconds)?
Are survey asbuilts and solids correct to date referenced?
Are all excavations within 30m radius of the POI displayed in plan and section?
Have the annotations been checked? (IP Coordinate, Azimuth, Gradient, and Profile)
Approvals
Drafting Notes Extra Comments

Approval CHECKLIST pekerjaan konstruksi.pptx

  • 1.
    DRAFTPERSON APPROVAL CHECKLISTFORM Plant of Intent (POI) Revision Name ID Number Date (DD/MM/YY) No. Description POI Notation Yes No Comments 1 2 3 Is the drawing number consistent with the codename? Is the revision number precise? Are there any recent references or updates, and have any versions been dated? POI Creation 4 5 Is the Life of Mine POI used in the creation of the POI? Are all symbols (vent controls, wins, etc.) scaled properly? Are slashing/stripping locations identified in the plan and section? If there is no stripping or slashing, write "N/A." Are all reference data displayed at a 30-meter height meters above and below the POI, respectively? 6 7 POI Solids 8 Is there only one POI solid per LOM centerline? 9 Do the POI solids match the neighboring approved POI solids? POI Readiness 10 Has the POI drafting worksheet been completed and started the workflow Is the plan ready in its entirety? include round support, geology, and engineering plan and section. 11 Approvals Drafting Notes Extra Comments
  • 2.
    LOM ENGINEER APPROVALCHECKLIST FORM Plant of Intent (POI) Revision Name ID Number Date (DD/MM/YY) No. Description References Yes No Comments 1 2 3 Is LOM design current (+/- 30m of POI design)? Is survey as-built current (+/- 30m of POI design)? Are geology layers current (wireframes, DDHs, block model)? Lateral Development 4 5 6 7 Are the drifts named according to convention? Does profile adhere to general arrangements standards? Is there any stripping required? Are the callouts and control points accurate? Vertical Development 8 Is there new vertical development to be approved? 9 Is current vertical development identified (with winze symbols)? General 10 Has a drainage strategy been defined 11 Does the Design Connect to Existing POI/Survey Appropriately? Approvals Drafting Notes Extra Comments
  • 3.
    UG SURVEY APPROVALCHECKLIST FORM Plant of Intent (POI) No. Description Revision Name ID Number Date (DD/MM/YY) Yes No Comments 1 2 3 4 5 Do the POI centerlines match the Life of Mine (from MDM) centerline? Are azimuths shown correctly (Degrees, Minutes & Seconds)? Are survey asbuilts and solids correct to date referenced? Are all excavations within 30m radius of the POI displayed in plan and section? Have the annotations been checked? (IP Coordinate, Azimuth, Gradient, and Profile) Approvals Drafting Notes Extra Comments