I 
CURRICULUM VITAE
Personal information
 Name: Ali Habibzadeh
 Cell phone: (+98912) 607 7792 / (+98911) 2382742
 Email: Habibzade_a@yahoo.com ; Habibzade.a@gmail.com
 Date of birth: Jul, 10, 1983
 Nationality: Iranian
 Languages: Persian (native language) and well, in English
 Marital status: Married
 Military services: Done
Education
 B. S. in Industries Engineering (Industrial Safety), Azad university, ISFAHAN / IRAN
 M. S. in Environmental management, Azad university, TEHRAN / IRAN (student)
Work experiences
 Offshore HSE head of I.O.E.C co.(Iranian offshore engineering and construction Co) / Tehran
 Engagement in phases 17 & 18 (platforms 17A & 18A) Hook-up & commissioning
Project / south pars gas field–Persian gulf
 HSE representative in phase 12 SPM installation and condensate export operations / Tonbak
 Engagement in phase 12 (platforms A, B, C) Hook-up & commissioning project / south pars
gas field–Persian gulf
 HSE representative in phase 12 sea line project / south pars gas field–Persian gulf
 HSE representative in jackets fabrication, offshore transportation & installation operations /
FOROOZAN oil field – Persian gulf
 HSE representative in phase 16 ISP/FSP installation project / south pars gas field–Persian gulf
 HSE representative in phase 15 ISP/FSP installation project / south pars gas field–Persian gulf
 HSE senior supervisor in HLV ABOUZAR 1200, pipe laying barge
 HSE head of the project in Deep Offshore Technology co. (DOT) / Tehran
 HSE head in F4 flare jacket offshore transportation & installation operations / RESHADAT
oil field – Persian gulf
 HSE head in W4 wellhead jacket preparation for topside installation & temporary drilling
ancillary deck (TDAD) removal / RESHADAT oil field – Persian gulf
 
 
 
II 
 HSE head in W0 wellhead jacket preparation for topside installation & temporary drilling
ancillary deck (TDAD) removal / RESHADAT oil field – Persian gulf
 HSE head in P4 production jacket offshore transportation & installation operations /
RESHADAT oil field – Persian gulf
 HSE officer in SPD 12 B wellhead jacket offshore transportation & installation operations /
South pars gas field – Persian gulf
 HSE officer in W4 wellhead jacket offshore transportation & installation operations /
RESHADAT oil field – Persian gulf
 HSE officer in Q4 quarter jacket offshore transportation & installation operations /
RESHADAT oil field – Persian gulf
 HSE officer in jack up working barge – JWB 252 / SALMAN oil field – Persian gulf
 HSE officer in SADRA SADAF PLB 132, SEMI-DP pipe laying accommodation barge
 Responsible of HSE in project of towing out the semi submersible drilling unit (SSDU)
AMIR KABIR from jetty to anchorage / Caspian sea
 Responsible of safety in drilling unit`s BOP load out & offshore transportation & installation
operations / Caspian sea
 HSE representative in North Drilling co. operation site / NEKA
 Expert of quality assurance (QA) in Industries & Mines Org. for 15 months / GUILAN
 Responsible of safety in ESPADANE RAHJU co. for 5 months / ISFAHAN
 Expert of quality control (QC) in FULAD MOBARAKE co. for 1 year / ISFAHAN
Technical & special abilities
 Proficient in ISO 9000
 Proficient in ISO 14000
 Proficient in OHSAS 18001
 Proficient in Fire Fighting Appliances (FFA) & Life Saving Appliances (LSA)
 Proficient in Job Safety Analysis (JSA)
 Proficient in `confined space entry` PTW – precautions – gas indicating
 Familiarity with Safety of Life at Sea (SOLAS)
 Familiarity with marine pollution (MARPOL)
 Familiarity with International Safety Management (ISM)
 Familiarity with Integrated Management System (IMS)
 Familiarity with Project Control
 Familiarity with Mines Safety
 Familiarity with Standards of LO/TO
 
 
 
III 
Training Course & Seminar Attended
 Incident investigation and analysis – 24 hours in GL , TEHRAN / IRAN
 IMS (Integrate management system) – 24 hours in MOODY INTERNATIONAL , TEHRAN
 H2S awareness – 8 hours in UNITED SAFETY INTERNATIONAL , TEHRAN / IRAN
 HLO (Helicopter Landing Officer) – 24 hours in SSS, KISH ISLAND / IRAN
 Advanced fire fighting – 24 hours in SSS, KISH ISLAND / IRAN
 VHF – 24 hours in SSS, KISH ISLAND / IRAN
 HUET (Helicopter underwater escape training)–12 hours in SSS,KISH ISLAND/ IRAN
 HSE – 284 hours in NIGC, BANDAR ANZALI / IRAN
 NDT – 24 hours in industrial safety society, ISFAHAN / IRAN
 HSE in gas pipelines – 25 hours in NIGC, BANDAR ANZALI / IRAN
 Fire fighting – 25 hours in NIGC, BANDAR ANZALI / IRAN
 Innovation in industry – 8 hours in Industries & Mines Org, RASHT / IRAN
 Maintenance and Repairs – 8 hours in Azad university, NAJAF ABAD / IRAN
 OHSAS 18001 : 2007 – 24 hours in I.K.H, TEHRAN / IRAN
 ISO 9001 : 2008 – 24 hours in I.K.H, TEHRAN / IRAN
 ISO 14001 : 2004 – 24 hours in I.K.H, TEHRAN / IRAN
 Risk assessment & HAZOP – 24 hours in D.O.T, TEHRAN / IRAN
 Occupational health & safety management system(SMS)–24 hours in D.O.T,TEHRAN/IRAN
 Medical certificate for service at sea – port & maritime Org, BANDAR ANZALI / IRAN
 Basic safety (STCW) – port & shipping Org, TEHRAN / IRAN
 Safety management – 48 hours in industrial safety society, ISFAHAN / IRAN
 Risk management – 48 hours in Azad university, ISFAHAN / IRAN
Teaching experiences
 Audiometry
 Hazard assessment / JSA
 Fire safety – welding / grinding / flame cutting / PTW system -
 H2S
 Physical / chemical agents
 Fire fighting
 OHSAS (Occupational Health & Safety Assessment Series)
 
 
 
IV 
Computer experiences
 Proficient in Windows OS and Troubleshooter of Hardware
 Proficient in Microsoft Office (Word, Excel, Power Point, …)
 Proficient in Microsoft Project
 Familiarity with Microsoft Primavera

Ali Habibzade Resume-E-2015

  • 1.
          I  CURRICULUM VITAE Personal information Name: Ali Habibzadeh  Cell phone: (+98912) 607 7792 / (+98911) 2382742  Email: Habibzade_a@yahoo.com ; Habibzade.a@gmail.com  Date of birth: Jul, 10, 1983  Nationality: Iranian  Languages: Persian (native language) and well, in English  Marital status: Married  Military services: Done Education  B. S. in Industries Engineering (Industrial Safety), Azad university, ISFAHAN / IRAN  M. S. in Environmental management, Azad university, TEHRAN / IRAN (student) Work experiences  Offshore HSE head of I.O.E.C co.(Iranian offshore engineering and construction Co) / Tehran  Engagement in phases 17 & 18 (platforms 17A & 18A) Hook-up & commissioning Project / south pars gas field–Persian gulf  HSE representative in phase 12 SPM installation and condensate export operations / Tonbak  Engagement in phase 12 (platforms A, B, C) Hook-up & commissioning project / south pars gas field–Persian gulf  HSE representative in phase 12 sea line project / south pars gas field–Persian gulf  HSE representative in jackets fabrication, offshore transportation & installation operations / FOROOZAN oil field – Persian gulf  HSE representative in phase 16 ISP/FSP installation project / south pars gas field–Persian gulf  HSE representative in phase 15 ISP/FSP installation project / south pars gas field–Persian gulf  HSE senior supervisor in HLV ABOUZAR 1200, pipe laying barge  HSE head of the project in Deep Offshore Technology co. (DOT) / Tehran  HSE head in F4 flare jacket offshore transportation & installation operations / RESHADAT oil field – Persian gulf  HSE head in W4 wellhead jacket preparation for topside installation & temporary drilling ancillary deck (TDAD) removal / RESHADAT oil field – Persian gulf
  • 2.
          II   HSE headin W0 wellhead jacket preparation for topside installation & temporary drilling ancillary deck (TDAD) removal / RESHADAT oil field – Persian gulf  HSE head in P4 production jacket offshore transportation & installation operations / RESHADAT oil field – Persian gulf  HSE officer in SPD 12 B wellhead jacket offshore transportation & installation operations / South pars gas field – Persian gulf  HSE officer in W4 wellhead jacket offshore transportation & installation operations / RESHADAT oil field – Persian gulf  HSE officer in Q4 quarter jacket offshore transportation & installation operations / RESHADAT oil field – Persian gulf  HSE officer in jack up working barge – JWB 252 / SALMAN oil field – Persian gulf  HSE officer in SADRA SADAF PLB 132, SEMI-DP pipe laying accommodation barge  Responsible of HSE in project of towing out the semi submersible drilling unit (SSDU) AMIR KABIR from jetty to anchorage / Caspian sea  Responsible of safety in drilling unit`s BOP load out & offshore transportation & installation operations / Caspian sea  HSE representative in North Drilling co. operation site / NEKA  Expert of quality assurance (QA) in Industries & Mines Org. for 15 months / GUILAN  Responsible of safety in ESPADANE RAHJU co. for 5 months / ISFAHAN  Expert of quality control (QC) in FULAD MOBARAKE co. for 1 year / ISFAHAN Technical & special abilities  Proficient in ISO 9000  Proficient in ISO 14000  Proficient in OHSAS 18001  Proficient in Fire Fighting Appliances (FFA) & Life Saving Appliances (LSA)  Proficient in Job Safety Analysis (JSA)  Proficient in `confined space entry` PTW – precautions – gas indicating  Familiarity with Safety of Life at Sea (SOLAS)  Familiarity with marine pollution (MARPOL)  Familiarity with International Safety Management (ISM)  Familiarity with Integrated Management System (IMS)  Familiarity with Project Control  Familiarity with Mines Safety  Familiarity with Standards of LO/TO
  • 3.
          III  Training Course &Seminar Attended  Incident investigation and analysis – 24 hours in GL , TEHRAN / IRAN  IMS (Integrate management system) – 24 hours in MOODY INTERNATIONAL , TEHRAN  H2S awareness – 8 hours in UNITED SAFETY INTERNATIONAL , TEHRAN / IRAN  HLO (Helicopter Landing Officer) – 24 hours in SSS, KISH ISLAND / IRAN  Advanced fire fighting – 24 hours in SSS, KISH ISLAND / IRAN  VHF – 24 hours in SSS, KISH ISLAND / IRAN  HUET (Helicopter underwater escape training)–12 hours in SSS,KISH ISLAND/ IRAN  HSE – 284 hours in NIGC, BANDAR ANZALI / IRAN  NDT – 24 hours in industrial safety society, ISFAHAN / IRAN  HSE in gas pipelines – 25 hours in NIGC, BANDAR ANZALI / IRAN  Fire fighting – 25 hours in NIGC, BANDAR ANZALI / IRAN  Innovation in industry – 8 hours in Industries & Mines Org, RASHT / IRAN  Maintenance and Repairs – 8 hours in Azad university, NAJAF ABAD / IRAN  OHSAS 18001 : 2007 – 24 hours in I.K.H, TEHRAN / IRAN  ISO 9001 : 2008 – 24 hours in I.K.H, TEHRAN / IRAN  ISO 14001 : 2004 – 24 hours in I.K.H, TEHRAN / IRAN  Risk assessment & HAZOP – 24 hours in D.O.T, TEHRAN / IRAN  Occupational health & safety management system(SMS)–24 hours in D.O.T,TEHRAN/IRAN  Medical certificate for service at sea – port & maritime Org, BANDAR ANZALI / IRAN  Basic safety (STCW) – port & shipping Org, TEHRAN / IRAN  Safety management – 48 hours in industrial safety society, ISFAHAN / IRAN  Risk management – 48 hours in Azad university, ISFAHAN / IRAN Teaching experiences  Audiometry  Hazard assessment / JSA  Fire safety – welding / grinding / flame cutting / PTW system -  H2S  Physical / chemical agents  Fire fighting  OHSAS (Occupational Health & Safety Assessment Series)
  • 4.
          IV  Computer experiences  Proficientin Windows OS and Troubleshooter of Hardware  Proficient in Microsoft Office (Word, Excel, Power Point, …)  Proficient in Microsoft Project  Familiarity with Microsoft Primavera