 Company Introduction
 Internship overview
 Project description and roles and responsibilities
 skills development
 Action plan for the upcoming internship period
 Conclusion
Company Introduction
 The Sattva Group, a leading real estate developer and consulting firm,
has been shaping India’s urban landscape since 1993. Headquartered
in Bengaluru.
 it has expanded across seven cities, delivering over 142 projects with
80 million sq. ft. completed and another 80 million sq. ft. in
development. Renowned for innovation and sustainability, its iconic
Sattva Knowledge City in Hyderabad is among Asia’s top tech parks.
 Led by visionary MD Bijay Agarwal, the company has diversified into
education, co-living, co-working, warehousing, data centers, and e-
commerce, reinforcing its reputation as a market leader.
Internship overview
• The internship at Sattva Group offers hands-on experience in real estate development,
construction management, and structural design.
• It provides exposure to site supervision, quality control and safety management, cost
estimation, and sustainable construction techniques.
• Interns receive mentorship from experienced engineers, work on real-world projects, and
gain expertise in the latest industry technologies.
• The internship enhances professional skills, offers networking opportunities, and
provides valuable industry experience to kickstart a career in civil engineering.
Project description
Sattva Springs – Luxury 4BHK Villas Off Kanakapura Road,
South Bangalore
• Overview: Sattva Springs offers ultra-luxury 4BHK row house
villas (B+G+2 floors), located just 250 meters off Kanakapura
Road in South Bangalore.
• Spanning 5 acres and 25 guntas(245,025 sq. ft.), the project
comprises 66 lavish villas ranging from 3,607 to 5,287 sq. ft.
• Each villa features spacious balconies, a huge private terrace, a
store room, and an elevator provision, providing an
unparalleled living experience.
 Vendors List:
 Earthwork: M/s SLV Enterprises
 Civil: M/s T&T Engineers & Contractors
 Waterproofing: M/s Alliance Waterproofing
 Electrical: M/s Fangos Electricals
 Plumbing: M/s Santhosh Plumbing & Sanitary.
 Project Start Date: 12-Apr-2024
 Project End Date: 12-Oct-2025.
 Villa Types & Specifications:
 Type 1 – West Facing, 3,720 sq. ft. – 20 Units
 Type 2 – East Facing, 3,824 sq. ft. – 17 Units
 Type 3 – West Facing, 4,025 sq. ft. – 8 Units
 Type 4 – East Facing, 4,156 sq. ft. – 8 Units
 Type 5 – North Facing, 5,287 sq. ft. – 18 Units
 Type 6 – West Facing, 3,606 sq. ft. – 1 Unit
 Blocks Types :
• Block 1- Club house
• Block 2- 9 Villas
• Block 3- 12 Villas
• Block 4- 15 Villas
• Block 5- 12 Villas
• Block 6- 18 Villas
Roles and responsibilities
1. Site Supervision & Execution
 Monitor construction activities and ensure compliance with
project plans.
 Assist in maintaining safety protocols and quality standards.
2. Structural Analysis & Design
 Assist in drafting and reviewing structural drawings using
AutoCAD.
 Support engineers in analyzing load calculations and material
selection.
3. Estimation & Costing
 Help in calculating material quantities and preparing cost
estimates.
4. Quality Control & Assurance
 Conduct material testing for concrete, steel, and other components.
 Ensure adherence to construction quality standards and regulations.
5. Surveying & Leveling
 Operate surveying instruments like Total Station and Theodolite.
 Assist in land measurement, leveling, and layout marking.
6. Documentation & Reporting
 Maintain daily progress reports and project documentation.
 Assist in preparing technical reports and presentations.
7. Coordination & Communication
 Work closely with architects, engineers, and contractors.
 Participate in meetings and provide updates on project status.
Skills development
 Technical Skills:
 Site Supervision & Execution – Learn construction processes and safety
protocols.
 Estimation & Costing – Calculate materials, labor costs, and budgets.
 Quality Control & Assurance – Understand material testing procedures.
 Surveying & Leveling – Work with Total Station, Theodolite, and GPS.
 Waterproofing & Drainage – Learn modern waterproofing and plumbing
techniques.
 Construction Materials & Techniques – Explore sustainable and
advanced building materials
 Soft Skills:
 Problem-Solving – Tackle real-time construction
challenges.
 Communication & Teamwork – Work with engineers,
architects, and contractors.
 Time Management – Prioritize tasks and meet
deadlines.
 Attention to Detail – Ensure accuracy in drawings
and site work.
 Adaptability – Stay updated with new technologies
and trends.
Action plan for the upcoming internship
period
 The internship follows a structured plan, starting with orientation and familiarization where
interns attend inductions, review company policies, and visit project sites.
 In they assist in site supervision and execution, learning about construction activities, safety
protocols, and foundation work. focus on structural analysis and design involving drafting
and reviewing drawings using AutoCAD, STAAD Pro, and . cover estimation and costing.
 where interns calculate material quantities and assist in budget tracking. emphasize quality
control and surveying, including material testing and land measurements using Total Station
and Theodolite.
 In handle documentation and reporting, preparing technical reports and maintaining
progress records,and focus on coordination and evaluation, with interns participating in
meetings, collaborating with professionals, and receiving mentor feedback to enhance their
learning experience.
Conclusion
 The internship has provided hands-on experience in large-scale
residential construction.
 Enhanced both technical knowledge and project management
skills.
 Future Outlook: Looking forward to applying these skills in future
projects and continuing professional growth.
 Networking and Professional Growth: Built strong connections
with industry professionals, gaining insights into real-world.
 construction practices and project management strategies.

AKASH kumar REV 1.pptx@234#£_-(report)":!!/

  • 1.
    DAYANANDA SAGAR COLLEGEOF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING. UNDER THE GUIDANCE OF : Asst Prof :- Dr. RESHMA E K PRESENTED BY : AKASH KUMAR .S USN:- 1DS22CV401 INTERNSHIP 2025 :-Salarpuria Sattva Sattva Springs
  • 2.
    TABLE OF CONTENT Company Introduction  Internship overview  Project description and roles and responsibilities  skills development  Action plan for the upcoming internship period  Conclusion
  • 3.
    Company Introduction  TheSattva Group, a leading real estate developer and consulting firm, has been shaping India’s urban landscape since 1993. Headquartered in Bengaluru.  it has expanded across seven cities, delivering over 142 projects with 80 million sq. ft. completed and another 80 million sq. ft. in development. Renowned for innovation and sustainability, its iconic Sattva Knowledge City in Hyderabad is among Asia’s top tech parks.  Led by visionary MD Bijay Agarwal, the company has diversified into education, co-living, co-working, warehousing, data centers, and e- commerce, reinforcing its reputation as a market leader.
  • 4.
    Internship overview • Theinternship at Sattva Group offers hands-on experience in real estate development, construction management, and structural design. • It provides exposure to site supervision, quality control and safety management, cost estimation, and sustainable construction techniques. • Interns receive mentorship from experienced engineers, work on real-world projects, and gain expertise in the latest industry technologies. • The internship enhances professional skills, offers networking opportunities, and provides valuable industry experience to kickstart a career in civil engineering.
  • 5.
    Project description Sattva Springs– Luxury 4BHK Villas Off Kanakapura Road, South Bangalore • Overview: Sattva Springs offers ultra-luxury 4BHK row house villas (B+G+2 floors), located just 250 meters off Kanakapura Road in South Bangalore. • Spanning 5 acres and 25 guntas(245,025 sq. ft.), the project comprises 66 lavish villas ranging from 3,607 to 5,287 sq. ft. • Each villa features spacious balconies, a huge private terrace, a store room, and an elevator provision, providing an unparalleled living experience.
  • 6.
     Vendors List: Earthwork: M/s SLV Enterprises  Civil: M/s T&T Engineers & Contractors  Waterproofing: M/s Alliance Waterproofing  Electrical: M/s Fangos Electricals  Plumbing: M/s Santhosh Plumbing & Sanitary.  Project Start Date: 12-Apr-2024  Project End Date: 12-Oct-2025.
  • 7.
     Villa Types& Specifications:  Type 1 – West Facing, 3,720 sq. ft. – 20 Units  Type 2 – East Facing, 3,824 sq. ft. – 17 Units  Type 3 – West Facing, 4,025 sq. ft. – 8 Units  Type 4 – East Facing, 4,156 sq. ft. – 8 Units  Type 5 – North Facing, 5,287 sq. ft. – 18 Units  Type 6 – West Facing, 3,606 sq. ft. – 1 Unit  Blocks Types : • Block 1- Club house • Block 2- 9 Villas • Block 3- 12 Villas • Block 4- 15 Villas • Block 5- 12 Villas • Block 6- 18 Villas
  • 8.
    Roles and responsibilities 1.Site Supervision & Execution  Monitor construction activities and ensure compliance with project plans.  Assist in maintaining safety protocols and quality standards. 2. Structural Analysis & Design  Assist in drafting and reviewing structural drawings using AutoCAD.  Support engineers in analyzing load calculations and material selection. 3. Estimation & Costing  Help in calculating material quantities and preparing cost estimates.
  • 9.
    4. Quality Control& Assurance  Conduct material testing for concrete, steel, and other components.  Ensure adherence to construction quality standards and regulations. 5. Surveying & Leveling  Operate surveying instruments like Total Station and Theodolite.  Assist in land measurement, leveling, and layout marking. 6. Documentation & Reporting  Maintain daily progress reports and project documentation.  Assist in preparing technical reports and presentations. 7. Coordination & Communication  Work closely with architects, engineers, and contractors.  Participate in meetings and provide updates on project status.
  • 10.
    Skills development  TechnicalSkills:  Site Supervision & Execution – Learn construction processes and safety protocols.  Estimation & Costing – Calculate materials, labor costs, and budgets.  Quality Control & Assurance – Understand material testing procedures.  Surveying & Leveling – Work with Total Station, Theodolite, and GPS.  Waterproofing & Drainage – Learn modern waterproofing and plumbing techniques.  Construction Materials & Techniques – Explore sustainable and advanced building materials
  • 11.
     Soft Skills: Problem-Solving – Tackle real-time construction challenges.  Communication & Teamwork – Work with engineers, architects, and contractors.  Time Management – Prioritize tasks and meet deadlines.  Attention to Detail – Ensure accuracy in drawings and site work.  Adaptability – Stay updated with new technologies and trends.
  • 12.
    Action plan forthe upcoming internship period  The internship follows a structured plan, starting with orientation and familiarization where interns attend inductions, review company policies, and visit project sites.  In they assist in site supervision and execution, learning about construction activities, safety protocols, and foundation work. focus on structural analysis and design involving drafting and reviewing drawings using AutoCAD, STAAD Pro, and . cover estimation and costing.  where interns calculate material quantities and assist in budget tracking. emphasize quality control and surveying, including material testing and land measurements using Total Station and Theodolite.  In handle documentation and reporting, preparing technical reports and maintaining progress records,and focus on coordination and evaluation, with interns participating in meetings, collaborating with professionals, and receiving mentor feedback to enhance their learning experience.
  • 13.
    Conclusion  The internshiphas provided hands-on experience in large-scale residential construction.  Enhanced both technical knowledge and project management skills.  Future Outlook: Looking forward to applying these skills in future projects and continuing professional growth.  Networking and Professional Growth: Built strong connections with industry professionals, gaining insights into real-world.  construction practices and project management strategies.